{{#Wiki_filter:'hornas Alexion - 1R1 8 Status of Alloy 600 Inspections                                                   Page 1 lI homas Alexion 1Ri 8 Status of Alloy 600 Inspections Page 1 From:             "BENNETT, STEVE A"<SBENNE2@entergy.com>
{{#Wiki_filter:'hornas Alexion - 1 R1 8 Status of Alloy 600 Inspections Page 1 l homas Alexion - 1 Ri 8 Status of Alloy 600 Inspections Page 1 I From:  
To:               Tom Alexion <twa nrc.gov>, "Jeff Clark (ac~nrc.gov)" <jac nrc.gov>, "SWAIN, RONALD VANCE" <RSWAIN1 @entergy.com>, "BICE, DAVID B <DBICE@entergy.com>, "BURFORD, FRANCIS G"<FBURFOR&#xa9;entergy.com>, "CAMPBELL, BILL - NUCLEAR" <WCAMPB3@entergy.com>,
"BENNETT, STEVE A" <SBENNE2@entergy.com>
            "COMPTON, LESLIE" <LCOMPTO~entergy.com>, "DAIBER, BRYAN J <BDAIBER~entergy.com>,
To:
            "DAVANT, GUY H <GDAVANT~entergy.com>, "DEESE, RICHARD W <rdees9O~entergy.com>,
Tom Alexion <twa nrc.gov>, "Jeff Clark (ac~nrc.gov)" <jac nrc.gov>, "SWAIN, RONALD VANCE" <RSWAIN1 @entergy.com>, "BICE, DAVID B <DBICE@entergy.com>, "BURFORD, FRANCIS G" <FBURFOR&#xa9;entergy.com>, "CAMPBELL, BILL - NUCLEAR" <WCAMPB3@entergy.com>,
            "EATON, WILLIAM A" <WEATON~entergy.com>, "EDGELL, DOUGLAS W"
"COMPTON, LESLIE" <LCOMPTO~entergy.com>, "DAIBER, BRYAN J <BDAIBER~entergy.com>,
            <DEDGELL~entergy.com>, "EHREN, TERRY G" <TEHREN~entergy.com>, NEUBANKS, CLIFFORD"
"DAVANT, GUY H <GDAVANT~entergy.com>, "DEESE, RICHARD W <rdees9O~entergy.com>,
            <CEUBANK entergy.com>, "FORBES, JEFFREY" <JFORBE1 &#xa9;entergy.com>, "FORREST, FREDDIE"
"EATON, WILLIAM A" <WEATON~entergy.com>, "EDGELL, DOUGLAS W"
            <FFORRES~entergy.com>, "GOBELL, JAMIE N"<JGOBELL~entergy.com>, 'GORDON, ROBERT A"
<DEDGELL~entergy.com>, "EHREN, TERRY G" <TEHREN~entergy.com>, NEUBANKS, CLIFFORD"
            <RGORDON@entergy.com>, "HOUGHTALING, JOHN B"<JHOUGHT@ entergy.com>, "JAMES, DALE E" <DJAMES@entergy.com>, "JAMES, WILLIAM" <WJAMES1 @entergy.com>, OKOWALEWSKI, JOSEPH A" <JKOWALE@entergy.com>, "LEWIS, RAYMOND S" <RLEWIS1 @entergy.com>, "MEANS, BRACY En <BMEANS~entergy.com>, "MITCHELL, TIMOTHY G" <TMITCH1 &#xa9;entergy.com>,
<CEUBANK entergy.com>, "FORBES, JEFFREY" <JFORBE1 &#xa9;entergy.com>, "FORREST, FREDDIE"
            "PANTHER, KENNETH C"<KPANTHE&#xa9;entergy.com>, "PARKS, GLENN A <GPARKS@entergy.com>,
<FFORRES~entergy.com>, "GOBELL, JAMIE N" <JGOBELL~entergy.com>, 'GORDON, ROBERT A"
            "PAYNE, GARY - WF3" <GPAYNE@entergy.com>, "SIMS, WILLIAM D" WSIMS~entergy.com>,
<RGORDON@entergy.com>, "HOUGHTALING, JOHN B" <JHOUGHT@ entergy.com>, "JAMES, DALE E" <DJAMES@entergy.com>, "JAMES, WILLIAM" <WJAMES1 @ entergy.com>, OKOWALEWSKI, JOSEPH A" <JKOWALE@entergy.com>, "LEWIS, RAYMOND S" <RLEWIS1 @entergy.com>, "MEANS, BRACY En <BMEANS~entergy.com>, "MITCHELL, TIMOTHY G" <TMITCH1 &#xa9;entergy.com>,
            "SMITH, JAMES A" <JSMITH~entergy.com>
"PANTHER, KENNETH C" <KPANTHE&#xa9;entergy.com>, "PARKS, GLENN A <GPARKS@entergy.com>,
Date:             4122104 S:23AM
"PAYNE, GARY - WF3" <GPAYNE@entergy.com>, "SIMS, WILLIAM D" WSIMS~entergy.com>,
"SMITH, JAMES A" <JSMITH~entergy.com>
Date:
4122104 S:23AM


==Subject:==
==Subject:==
1R1 8 Status of Alloy 600 Inspections Attached isthe first daily status of the Alloy 600 Inspections being conducted during 1R18.
1 R1 8 Status of Alloy 600 Inspections Attached is the first daily status of the Alloy 600 Inspections being conducted during 1 R18.
CC:               "PYLE, STEPHENIE L <SPYLE@entergy.com>, *HAWKINS, ADELIA J"
CC:  
            <AHAWKIN@entergy.com>, SCHEIDE, RICHARD H <RSCHEID &#xa9; entergy.com>
"PYLE, STEPHENIE L <SPYLE@entergy.com>, *HAWKINS, ADELIA J"
                                            -    J..A-i OC XT;
<AHAWKIN@entergy.com>,
SCHEIDE, RICHARD H <RSCHEID &#xa9; entergy.com>
J..A-i OC XT;


.:\WINDOWS\TEMP\GW)00001 .TMP                                             Page 1 Mail Envelope Properties     (4087C724.D1O: 3: 64784)
.:\\WINDOWS\\TEMP\\GW)00001.TMP Page 1 Mail Envelope Properties (4087C724.D1O: 3: 64784)


==Subject:==
==Subject:==
1R18 Status of Alloy 600 Inspections Creation Date:         4/22/04 9:18AM From:                 "BENNETT, STEVE A" <SBENNE2@entergy.com>
1R18 Status of Alloy 600 Inspections Creation Date:
Created By:           SBENNE2@entergy.com Recipients nrc.gov owf4_po.OWFNDO TWA (Thomas Alexion) nrc.gov ARL PO.ARLDO JAC (Jeffrey Clark) entergy.com RSCHEID CC (SCHEIDE, RICHARD H)
4/22/04 9:18AM From:  
"BENNETT, STEVE A" <SBENNE2@entergy.com>
Created By:
SBENNE2@entergy.com Recipients nrc.gov owf4_po.OWFNDO TWA (Thomas Alexion) nrc.gov ARL PO.ARLDO JAC (Jeffrey Clark) entergy.com RSCHEID CC (SCHEIDE, RICHARD H)
AHAWKIN CC (HAWKINS, ADELIA J)
AHAWKIN CC (HAWKINS, ADELIA J)
SPYLE CC (PYLE, STEPHENIE L)
SPYLE CC (PYLE, STEPHENIE L)
Line 67: Line 75:
LCOMPTO (COMPTON, LESLIE)
LCOMPTO (COMPTON, LESLIE)


N
N.#:\\W1ND0WS\\TEMP\\GWJ00001.TMP Page 2
.#:\W1ND0WS\TEMP\GWJ00001.TMP                                       Page 2
-:\\ INOSTM\\WOOQ TPPg WCAMPB3 (CAMPBELL, BILL - NUCLEAR)
-:\ INOSTM\WOOQ             TPPg WCAMPB3 (CAMPBELL, BILL - NUCLEAR)
FBURFOR (BURFORD, FRANCIS G)
FBURFOR (BURFORD, FRANCIS G)
DBICE (BICE, DAVID B)
DBICE (BICE, DAVID B)
RSWAINI (SWAIN, RONALD VANCE)
RSWAINI (SWAIN, RONALD VANCE)
Post Office                           Route owf4.po.OWFNDO                       nrc.gov ARL_PO.ARL_DO                         nrc.gov entergy.com Files                         Size       Date & Time MESSAGE                     94         04/22/04 09:18AM Part.001                     438 IR18 RVH Inspection Results 4-22.doc   41472 Mime.822                     60691 Options Expiration Date:             None Priority:                   Standard Reply Requested:             No Return Notification:         None Concealed  
Post Office owf4.po.OWFNDO ARL_PO.ARL_DO Files Size MESSAGE 94 Part.001 438 IR18 RVH Inspection Results 4-22.doc Mime.822 60691 Route nrc.gov nrc.gov entergy.com Date & Time 04/22/04 09:18AM 41472 Options Expiration Date:
Priority:
Reply Requested:
Return Notification:
Concealed  


==Subject:==
==Subject:==
No Security:                   Standard
Security:
None Standard No None No Standard


April 22, 2004 - 8:00 AM 1R18 Alloy 600 Status Inspection   Inspection Method                     Extent of Inspection                                             1R18 Status/ Findings BMV of RV   BMV exam inside Service   100% of the RPV head surface (including 3600           Scheduled to begin Dayshift on 4/22/04 Head       Structure                 around each head penetration). (OP 2311.009)
April 22, 2004 - 8:00 AM 1R18 Alloy 600 Status Inspection Inspection Method Extent of Inspection 1R18 Status/ Findings BMV of RV BMV exam inside Service 100% of the RPV head surface (including 3600 Scheduled to begin Dayshift on 4/22/04 Head Structure around each head penetration). (OP 2311.009)
CRDM!       UT of 60 CRDM nozzles     UT of the RPV nozzle from 2" above the highest         Scheduled to begin UT exams late 4/25/04 RADCAL     (no known defects)       point of the root of the J-weld to the blind zone.
CRDM!
Nozzles UT of six FTI repaired   UT the weld and at least 1-inch above the weld in CRDM nozzles (Nozzles     the nozzle base material.
UT of 60 CRDM nozzles UT of the RPV nozzle from 2" above the highest Scheduled to begin UT exams late 4/25/04 RADCAL (no known defects) point of the root of the J-weld to the blind zone.
Nozzles UT of six FTI repaired UT the weld and at least 1-inch above the weld in CRDM nozzles (Nozzles the nozzle base material.
3,6,15,17, 33,&56)
3,6,15,17, 33,&56)
UTIWS of two W repaired   UT of the RPV nozzle from 2" above the highest CRDM nozzles (Nozzles     point of the root of the J-weld to the blind zone 54 & 68)                 and wetted surface exam of weld overlay.
UTIWS of two W repaired UT of the RPV nozzle from 2" above the highest CRDM nozzles (Nozzles point of the root of the J-weld to the blind zone 54 & 68) and wetted surface exam of weld overlay.
UT of RADCAL Nozzle       UT of the RPV nozzle from 2" above the highest (Nozzle 1)               point of the root of the J-weld to the blind zone.
UT of RADCAL Nozzle UT of the RPV nozzle from 2" above the highest (Nozzle 1) point of the root of the J-weld to the blind zone.
UT of nozzle Annulus     Interrogate interference fit In all 69 nozzle annuli
UT of nozzle Annulus Interrogate interference fit In all 69 nozzle annuli
[Leak Path Assessment]   above J-weld for leakage path ICI Nozzles Visual Inspection of 52   Inspect 100% of the circumference of each               52 of 52 BMls inspected on night shift 4/22/04 BMI nozzles               penetration as it enters the RPV lower head.                   (Complete)
[Leak Path Assessment]
(OP 2311.009)                                                  . No leaking nozzles
above J-weld for leakage path ICI Nozzles Visual Inspection of 52 Inspect 100% of the circumference of each 52 of 52 BMls inspected on night shift 4/22/04 BMI nozzles penetration as it enters the RPV lower head.
                                                                                                    . 1 CR being written on rust/staining
(Complete)
* Video tapes being reproduced Visually Inspect RCS, for Visually inspect above the RPV head for potential      Beginning day shift 4/22/04 RCS leaks                boric acid leaks from pressure-retaining components as well as other A600 RCS locations.
(OP 2311.009)
(OP 2311.009)
L ________________________________                             .1}}
No leaking nozzles 1 CR being written on rust/staining Video tapes being reproduced Visually Inspect RCS RCS leaks
, for Visually inspect above the RPV head for potential boric acid leaks from pressure-retaining components as well as other A600 RCS locations.
(OP 2311.009)
Beginning day shift 4/22/04 L ________________________________  
.1}}

Latest revision as of 02:33, 16 January 2025

1R18 Alloy 600 Inspection
ML041770166
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/22/2004
From: Sharon Bennett
Entergy Operations
To: Alexion T, Clark J
Office of Nuclear Reactor Regulation
Alexion T W, NRR/DLPM, 415-1326
Shared Package
ML042110357 List:
References
Download: ML041770166 (4)


Text

'hornas Alexion - 1 R1 8 Status of Alloy 600 Inspections Page 1 l homas Alexion - 1 Ri 8 Status of Alloy 600 Inspections Page 1 I From:

"BENNETT, STEVE A" <SBENNE2@entergy.com>

To:

Tom Alexion <twa nrc.gov>, "Jeff Clark (ac~nrc.gov)" <jac nrc.gov>, "SWAIN, RONALD VANCE" <RSWAIN1 @entergy.com>, "BICE, DAVID B <DBICE@entergy.com>, "BURFORD, FRANCIS G" <FBURFOR©entergy.com>, "CAMPBELL, BILL - NUCLEAR" <WCAMPB3@entergy.com>,

"COMPTON, LESLIE" <LCOMPTO~entergy.com>, "DAIBER, BRYAN J <BDAIBER~entergy.com>,

"DAVANT, GUY H <GDAVANT~entergy.com>, "DEESE, RICHARD W <rdees9O~entergy.com>,

"EATON, WILLIAM A" <WEATON~entergy.com>, "EDGELL, DOUGLAS W"

<DEDGELL~entergy.com>, "EHREN, TERRY G" <TEHREN~entergy.com>, NEUBANKS, CLIFFORD"

<CEUBANK entergy.com>, "FORBES, JEFFREY" <JFORBE1 ©entergy.com>, "FORREST, FREDDIE"

<FFORRES~entergy.com>, "GOBELL, JAMIE N" <JGOBELL~entergy.com>, 'GORDON, ROBERT A"

<RGORDON@entergy.com>, "HOUGHTALING, JOHN B" <JHOUGHT@ entergy.com>, "JAMES, DALE E" <DJAMES@entergy.com>, "JAMES, WILLIAM" <WJAMES1 @ entergy.com>, OKOWALEWSKI, JOSEPH A" <JKOWALE@entergy.com>, "LEWIS, RAYMOND S" <RLEWIS1 @entergy.com>, "MEANS, BRACY En <BMEANS~entergy.com>, "MITCHELL, TIMOTHY G" <TMITCH1 ©entergy.com>,

"PANTHER, KENNETH C" <KPANTHE©entergy.com>, "PARKS, GLENN A <GPARKS@entergy.com>,

"PAYNE, GARY - WF3" <GPAYNE@entergy.com>, "SIMS, WILLIAM D" WSIMS~entergy.com>,

"SMITH, JAMES A" <JSMITH~entergy.com>

Date:

4122104 S:23AM

Subject:

1 R1 8 Status of Alloy 600 Inspections Attached is the first daily status of the Alloy 600 Inspections being conducted during 1 R18.

CC:

"PYLE, STEPHENIE L <SPYLE@entergy.com>, *HAWKINS, ADELIA J"

<AHAWKIN@entergy.com>,

SCHEIDE, RICHARD H <RSCHEID © entergy.com>

J..A-i OC XT;

.:\\WINDOWS\\TEMP\\GW)00001.TMP Page 1 Mail Envelope Properties (4087C724.D1O: 3: 64784)

Subject:

1R18 Status of Alloy 600 Inspections Creation Date:

4/22/04 9:18AM From:

"BENNETT, STEVE A" <SBENNE2@entergy.com>

Created By:

SBENNE2@entergy.com Recipients nrc.gov owf4_po.OWFNDO TWA (Thomas Alexion) nrc.gov ARL PO.ARLDO JAC (Jeffrey Clark) entergy.com RSCHEID CC (SCHEIDE, RICHARD H)

AHAWKIN CC (HAWKINS, ADELIA J)

SPYLE CC (PYLE, STEPHENIE L)

JSMITH (SMITH, JAMES A)

WSIMS (SIMS, WILLIAM D)

GPAYNE (PAYNE, GARY - WF3)

GPARKS (PARKS, GLENN A)

KPANTHE (PANTHER, KENNETH C)

TMITCH1 (MITCHELL, TIMOTHY G)

BMEANS (MEANS, BRACY E)

RLEWIS I (LEWIS, RAYMOND S)

JKOWALE (KOWALEWSKI, JOSEPH A)

WJAMES1 (JAMES, WILLIAM)

DJAMES (JAMES, DALE E)

JHOUGHT (HOUGHTALJNG, JOHN B)

RGORDON (GORDON, ROBERT A)

JGOBELL (GOBELL, JAMIE N)

FFORRES (FORREST, FREDDIE)

JFORBE1 (FORBES, JEFFREY)

CEUBANK (EUBANKS, CLIFFORD)

TEHREN (EHREN, TERRY G)

DEDGELL (EDGELL, DOUGLAS W)

WEATON (EATON, WILLIAM A) rdees90 (DEESE, RICHARD W)

GDAVANT (DAVANT, GUY H)

BDAIBER (DAIBER, BRYAN J)

LCOMPTO (COMPTON, LESLIE)

N.#:\\W1ND0WS\\TEMP\\GWJ00001.TMP Page 2

-:\\ INOSTM\\WOOQ TPPg WCAMPB3 (CAMPBELL, BILL - NUCLEAR)

FBURFOR (BURFORD, FRANCIS G)

DBICE (BICE, DAVID B)

RSWAINI (SWAIN, RONALD VANCE)

Post Office owf4.po.OWFNDO ARL_PO.ARL_DO Files Size MESSAGE 94 Part.001 438 IR18 RVH Inspection Results 4-22.doc Mime.822 60691 Route nrc.gov nrc.gov entergy.com Date & Time 04/22/04 09:18AM 41472 Options Expiration Date:

Priority:

Reply Requested:

Return Notification:

Concealed

Subject:

Security:

None Standard No None No Standard

April 22, 2004 - 8:00 AM 1R18 Alloy 600 Status Inspection Inspection Method Extent of Inspection 1R18 Status/ Findings BMV of RV BMV exam inside Service 100% of the RPV head surface (including 3600 Scheduled to begin Dayshift on 4/22/04 Head Structure around each head penetration). (OP 2311.009)

CRDM!

UT of 60 CRDM nozzles UT of the RPV nozzle from 2" above the highest Scheduled to begin UT exams late 4/25/04 RADCAL (no known defects) point of the root of the J-weld to the blind zone.

Nozzles UT of six FTI repaired UT the weld and at least 1-inch above the weld in CRDM nozzles (Nozzles the nozzle base material.

3,6,15,17, 33,&56)

UTIWS of two W repaired UT of the RPV nozzle from 2" above the highest CRDM nozzles (Nozzles point of the root of the J-weld to the blind zone 54 & 68) and wetted surface exam of weld overlay.

UT of RADCAL Nozzle UT of the RPV nozzle from 2" above the highest (Nozzle 1) point of the root of the J-weld to the blind zone.

UT of nozzle Annulus Interrogate interference fit In all 69 nozzle annuli

[Leak Path Assessment]

above J-weld for leakage path ICI Nozzles Visual Inspection of 52 Inspect 100% of the circumference of each 52 of 52 BMls inspected on night shift 4/22/04 BMI nozzles penetration as it enters the RPV lower head.

(Complete)

(OP 2311.009)

No leaking nozzles 1 CR being written on rust/staining Video tapes being reproduced Visually Inspect RCS RCS leaks

, for Visually inspect above the RPV head for potential boric acid leaks from pressure-retaining components as well as other A600 RCS locations.

(OP 2311.009)

Beginning day shift 4/22/04 L ________________________________

.1