ML042190122: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Final Submittal
{{#Wiki_filter:Final Submittal  
OCONEE JUNE 2004 EXAM
OCONEE JUNE 2004 EXAM  
    50-26912004-301I
50-26912004-301 I
  50-27012004-301, &
50-27012004-301, &  
    50-28712004-301
50-28712004-301  
          -
JUNE 14 - 18 & 25,2004  
JUNE 14 18 & 25,2004


                                      Admin-100 fnl
Admin-100 fnl  
                                        Page 1 of 7
Page 1 of 7  
                      REGION II
REGION II  
          INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
          JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
                DETERMINE SDM
DETERMINE SDM  
          WITH A DROPPED CONTROL ROD
WITH A DROPPED CONTROL ROD  
CANDIDATE
CANDIDATE  
EXAMINER
EXAM I NER


                                                                                                  Admin-100 fnl
Admin-100 fnl  
                                                                                                    Page 2 of 7
Page 2 of 7  
                                                  REGION II
REGION II  
                                      INITIAL LICENSE EXAWNATION
INITIAL LICENSE EXAWNATION  
                                      JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
Task:
Task:  
DETERMINE SBM WITH A DROPPED CONTROL ROD
DETERMINE SBM WITH A DROPPED CONTROL ROD  
Alternate Path:
Alternate Path:  
Facllitv JPM #:
Facllitv JPM #:  
. .                           . .
. .
KIA Ratindsk
. .
Gsn 2.12 3       3.9/4.0
KIA Ratindsk  
Task Standard:
Gsn 2.1 2 3
PT/l/Ni lOW15, Reactivity Balance Procedure is used to verify > 1% SDM with one inoperable (dropped) CR within
3.9/4.0  
I hour. Determinethat 1% SDM does not exist and boratlon is required within 15 minutes.
Task Standard:  
Preferred Evaluation Location:                                           Preferred Evaluation Method:
PT/l/Ni lOW15, Reactivity Balance Procedure is used to verify > 1% SDM with one inoperable (dropped) CR within  
Simulator X
I hour. Determine that 1% SDM does not exist and boratlon is required within 15 minutes.  
          --.      In-Plant ~                                           Perform       Simulate -
Preferred Evaluation Location:  
References:
Preferred Evaluation Method:  
PT/I/Af1103/15, Reactivity Balance Procedure
Simulator --X-.-  
AP/l/NI 70011 5, Dropped Control Rods
In-Plant  
Technical Specifications:
~  
        3.1.4, Control Rod Group Alignment Limits
Perform  
        3.2.1, Regulating Rod Position Limits
Simulate -  
Validation Time: 10 min.                                               Time Critical: YES
References:  
...................................................................................
PT/I/Af1103/15, Reactivity Balance Procedure  
Candidate:                                                                     Time Start:
AP/l/NI 70011 5, Dropped Control Rods  
                                    NAME                                       Time Finish:
Technical Specifications:  
Performance Ratinq SAT           ~     UNSAT -                                 Performance Time
3.1.4, Control Rod Group Alignment Limits  
Examiner:                                                             -                         /
3.2.1, Regulating Rod Position Limits  
                          NAME                                         SkNATURE                     DATE
Validation Time: 10 min.  
                                                  COMMENTS
Time Critical: YES  
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Candidate:  
Time Start:  
NAME  
Time Finish:  
Performance Ratinq SAT ~  
UNSAT -  
Performance Time  
Examiner:  
-  
/  
NAME  
SkNATURE  
DATE  
COMMENTS  


                                                            Admin-100 fnl
Admin-100 fnl  
                                                              Page 3 of 7
Page 3 of 7  
                          SIMULATOR OPERATOR INSTRUCTIONS:
SIMULATOR OPERATOR INSTRUCTIONS:  
1. Recall Snap 205
1. Recall Snap 205  
2. Import Admin-7 OR Simulator files
2. Import Admin-7 OR Simulator files  


                                                                                          Admin-100 fnl
Admin-100 fnl  
                                                                                            Page 4 of 7
Page 4 of 7  
Teo%s/EcluipmentEProcedures         Needed:
Teo%s/EcluipmentEProcedures  
PT/1/A/1103/8157Reactivity Balance Procedure
Needed:  
OP/0/A/1105/009, Control Rod Drive System
PT/1/A/1103/8157 Reactivity Balance Procedure  
Technical Specifications:
OP/0/A/1105/009, Control Rod Drive System  
3.4.4,Control Rod Group Alignment Limits
Technical Specifications:  
3.2.1,Regulating Rod Position Limits
3.4.4,  
                                        READ TO OPERATOR
Control Rod Group Alignment Limits  
DIRECTION TO TRAINEE:
3.2.1,  
I will explain the initial conditions, and state the task to be performed. All control room
Regulating Rod Position Limits  
steps shall be performed for this JPM, including any required communications. I will
READ TO OPERATOR  
provide initiating cues and reports on other actions when directed by you. Ensure you
DIRECTION TO TRAINEE:  
indicate to me when you understand your assigned task. To indicate that you have
I will explain the initial conditions, and state the task to be performed. All control room  
completed your assigned task return the handout sheet I provided you.
steps shall be performed for this JPM, including any required communications. I will  
INITIAL CONDITIONS:
provide initiating cues and reports on other actions when directed by you. Ensure you  
You are the Unit 1 OAYC and Group 6 Rod 3 has dropped into the core. Reactor power is stable
indicate to me when you understand your assigned task. To indicate that you have  
at = 55%. AP/l/a/l700/15, Dropped Control Rods, has been completed up to step 4.5.
completed your assigned task return the handout sheet I provided you.  
INITIATING CUES:
INITIAL CONDITIONS:  
The SWO in the Control Room directs you to continue with AP/l/a/1700/15, Dropped Control
You are the Unit 1 OAYC and Group 6 Rod 3 has dropped into the core. Reactor power is stable  
Rods.
at = 55%. AP/l/a/l700/15, Dropped Control Rods, has been completed up to step 4.5.  
TIME CRITICAL
INITIATING CUES:  
The SWO in the Control Room directs you to continue with AP/l/a/1700/15, Dropped Control  
Rods.  
TIME CRITICAL  


                                                                                                    Admin-100 fnl
Admin-100 fnl  
                                                                                                      Page 5 of 7
Page 5 of 7  
  START TIME:
START TIME:  
    STEQ:             Within one hour verify > 1% SDM with allowance to the inoperable control
STEQ:  
                        rod. Perform PT/l/A/1103/15. Reactivity Balance Procedure.
STANDARD:
                                                                                                  -SAT
COMMENTS:
    STANDARD:          Obtain copy of PT/l/A/1103/15, Reactivity Balance Procedure.
Within one hour verify > 1% SDM with allowance to the inoperable control  
    COMMENTS:
rod. Perform PT/l/A/1103/15. Reactivity Balance Procedure.  
                                                                                                  -UNSAT
Obtain copy of PT/l/A/1103/15, Reactivity Balance Procedure.  
    STEP:              Determine proper enclosure to use.
STEP:  
    STANDARD:        Enclosure 13.19, Shutdown Margin at Power, Is chosen.
STANDARD:
                                                                                                __ SAT
Determine proper enclosure to use.  
I   COMMENTS:
Enclosure 13.19, Shutdown Margin at Power, Is chosen.  
                                                                                                -UNSAT
I COMMENTS:  
                      Refer to the COLR. Use the "Control Rod Position Setpoints 1 inoperable CRlTICPab STEP
Refer to the COLR. Use the "Control Rod Position Setpoints 1 inoperable  
                      Rod, 4 Pump Flow" curve. Verify SDM is 2 1% AWK by verifying that the
Rod, 4 Pump Flow" curve. Verify SDM is 2 1% AWK by verifying that the  
                      control rod position and power level are within the acceptable region of
control rod position and power level are within the acceptable region of  
                      the curve.                                                                 -SAT
the curve.  
    STANDARD:          SDM is determined to be is s 1% AUK.
SDM is determined to be is s 1% AUK.  
                                                                                                  __ UNSAT
STANDARD:
    COMMENTS:
COMMENTS:  
  :4-                  Appropriate actions are taken per ITS 3.1.4, 3.1.5 and 3.2.1.           CRITICAL STEP
-4:  
    STANDARD:          Refer to IT§ 3.1.4, 3.1.5 and 3.2.1 and determine that initiation of
STANDARD:
                      boration to restore SDM to within limits is required within 15 minutes.   -SAT
Appropriate actions are taken per ITS 3.1.4, 3.1.5 and 3.2.1.  
    C U E !nnfesrPp student that an RQ is commencing boration.
Refer to IT§ 3.1.4, 3.1.5 and 3.2.1 and determine that initiation of  
    COMMENTS:                                                                                   -UNSAT
boration to restore SDM to within limits is required within 15 minutes.  
                                            END OF TASK
CUE !nnfesrPp student that an RQ is commencing boration.  
                                                TIME STOP:
COMMENTS:  
END OF TASK  
-
SAT
-
UNSAT
__ SAT
-
UNSAT
CRlTICPab STEP
-
SAT
__ UNSAT
CRITICAL STEP
-
SAT
-
UNSAT
TIME STOP:  


                                                                                Admin-100 fnl
Admin-100 fnl  
                                                                                  Page 6 of 7
Page 6 of 7  
                      -STEPEs.P.LANATI                     0 NS:
-STEPEs.P.LANATI  
STEP #                                       Explanation
0 NS :  
  3   Step is necessary, the operator must interpret the 4 WCP curve to ensure adequate
STEP #  
      SDM.
Explanation  
  4    Step is necessary; initiation of boration must QCCW within 15 minutes to restore SDM.
3  
Step is necessary, the operator must interpret the 4 WCP curve to ensure adequate  
SDM.  
Step is necessary; initiation of boration must QCCW within 15 minutes to restore SDM.  
4


                                                                                Admin-100 fnl
Admin-100 fnl  
                                                                                  Page 7 of 7
Page 7 of 7  
                              CANDIDATE CUE SHEET
CANDIDATE CUE SHEET  
                  (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
You are the Unit 1 OATC and Group 6 Rod 3 has dropped into the core. Reactor power is stable
You are the Unit 1 OATC and Group 6 Rod 3 has dropped into the core. Reactor power is stable  
at = 55%. AP/t/A/1700/15, Dropped Control Rods, is complete up to step 4.5.
at = 55%. AP/t/A/1700/15, Dropped Control Rods, is complete up to step 4.5.  
INlTlATlNG CUES:
INlTlATlNG CUES:  
The SWO in the Control Room directs you to continue with AP/l/PJl700/f5, Dropped Control
The SWO in the Control Room directs you to continue with AP/l/PJl700/f5, Dropped Control  
Rods.
Rods.  
TIME CRITICAL
TIME CRITICAL  


                                      Acimin-103 fnl
Acimin-103 fnl  
                                      Page 1 of 10
Page 1 of 10  
                    REGION ll
REGION ll  
          INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
          JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
                          -
Ad m i n - I
                    Admin I03
03
PERFORM MANUAL RCS LEAKAGE CALCULATION
PERFORM MANUAL RCS LEAKAGE CALCULATION  
CANDIDATE
CANDIDATE  
EXAMINER
EXAMINER  


                                                                                            Admin-103 fnl
Admin-103 fnl  
                                                                                              Page 2 of 10
Page 2 of 10  
                                                REGION II
REGION II  
                                  INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
                                  JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
Task:
Task:  
PERFORM MANUAL RCS LEAKAGE CALCULATION
PERFORM MANUAL RCS LEAKAGE CALCULATION  
Alternate Path:
Alternate Path:  
No
No  
Facilitv JPM #:
Facilitv JPM #:  
CRO-43
CRO-43  
WA Ratindsl:
WA Ratindsl:  
Gen 2.1.7     3.714.4
Gen 2.1.7  
Task Standard:
3.714.4  
RCS Leakage is correctly calculated within .Q1 gpm of attached key.
Task Standard:  
Preferred Evaluation Location:                                      Preferred Evaluation Method:
RCS Leakage is correctly calculated within .Q1 gpm of attached key.  
Simulator ~     In-Plant                                           Perform X Simulate -
Preferred Evaluation Location:  
References:
Simulator ~  
PT/O/A/060O/OQIA, Loss Of Computer
In-Plant  
PT/IiA/600/10. Reactor Coolant Leakage
References:  
Examiner:                                                                                   /
PT/O/A/060O/OQI A, Loss Of Computer  
                        NAME                                       SIGNATURE                   DATE
PT/IiA/600/10. Reactor Coolant Leakage  
Preferred Evaluation Method:
Perform X
Simulate -
Examiner:  
/  
NAME  
SIGNATURE  
DATE  


                                      Admin-I03 fnl
Admin-I03 fnl  
                                      Page 3 of 10
Page 3 of 10  
    SIMULATOR OPERATOR INSTRUCTIONS:
SIMULATOR OPERATOR INSTRUCTIONS:  
NONE
NONE  


                                                                                          Admin-103 fnl
Poolsl~suipmenffProcedures Needed:  
                                                                                          Page4of 10
Enclosure 43.3 of PTIl/N600/10  
Poolsl~suipmenffProceduresNeeded:
Admin-103 fnl
Enclosure 43.3 of PTIl/N600/10
Page4of 10
                                        READ PO OPERATOR
READ PO OPERATOR  
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:  
I will explain the initial conditions, and state the task to be performed. All control room
I will explain the initial conditions, and state the task to be performed. All control room  
steps shall be performed for this JPM, including any required communications. I will
steps shall be performed for this JPM, including any required communications. I will  
provide initiating cues and reporis on other actions when directed by you. Ensure you
provide initiating cues and reporis on other actions when directed by you. Ensure you  
indicate to me when you understand your assigned task. To indicate that you have
indicate to me when you understand your assigned task. To indicate that you have  
completed your assigned task return the handout sheet I provided you.
completed your assigned task return the handout sheet I provided you.  
lNlTiAL CONDITIONS:
lNlTiAL CONDITIONS:  
Unit 1 computer repairs are expected to be extended through turnover for hardware
Unit 1 computer repairs are expected to be extended through turnover for hardware  
replacement. The boss of Computer procedure PTl/O/A/0600/001A, boss Of Computer, is in
replacement. The boss of Computer procedure PTl/O/A/0600/001A, boss Of Computer, is in  
progress, however an RCS Leakage Calculation has not been performed during this shift.
progress, however an RCS Leakage Calculation has not been performed during this shift.  
INITIATING CUES:
INITIATING CUES:  
The Control ROOM SRO directs you to perform a manual RCS leakage per PT/1/,4/600/10
The Control ROOM SRO directs you to perform a manual RCS leakage per PT/1/,4/600/10  
(Reactor Coolant Leakage). The initial data given was collected one hour previously. Use the
(Reactor Coolant Leakage). The initial data given was collected one hour previously. Use the  
final set of leakage data and manually calculate the RCS leakage rate. Enclosure 13.3 of
final set of leakage data and manually calculate the RCS leakage rate. Enclosure 13.3 of  
PT/I/N600/10 (Reactor Coolant Leakage) is complete up to step 2.2.
PT/I/N600/10 (Reactor Coolant Leakage) is complete up to step 2.2.  


                                                                                            Admin-103 fnl
Admin-103 fnl  
                                                                                              Page 5 of 10
Page 5 of 10  
START TIME:
START TIME:  
Note: Data cues are only applicable if JPM is performed in the control
Note: Data cues are only applicable if JPM is performed in the control  
room.                                                                                     I SAT
room.  
              Step 2.2
STANDARD:
              After 1 hour, Record final set of data in "Table #I"
COMMENTS:
                                                                                            -UNSAT
Step 2.2  
STANDARD:    Student enters final set of data into "Table # I " of Enclosure 13.3 (Manual
After 1 hour, Record final set of data in "Table #I"  
              Leakage Calculation Data Sheet).
Student enters final set of data into "Table #I" of Enclosure 13.3 (Manual  
              CUE: Present student with aifachment of final data readings.
Leakage Calculation Data Sheet).  
                                          OR
CUE: Present student with aifachment of final data readings.  
              Student locates Prr level gauge on UBI and enters value on data sheet.
OR  
              CUE: Pzr Level 269.0 inches
Student locates Prr level gauge on UBI and enters value on data sheet.  
              Student locates Quench Tank level on AB1 and enters value on data
CUE: Pzr Level 269.0 inches  
              sheet.
Student locates Quench Tank level on AB1 and enters value on data  
              CUE: Quench Tank Level 84.9 inches
sheet.  
              Student locates LDST level gauge on UBI and enters value on data
CUE: Quench Tank Level 84.9 inches  
              sheet.
Student locates LDST level gauge on UBI and enters value on data  
              CUE: LDST Leveel 73.4 inches
sheet.  
              Student locates Tave meter on UB1 and enters value on data sheet.
CUE: LDST Leveel 73.4 inches  
              CUE: Tave Indication 579.0"F
Student locates Tave meter on UB1 and enters value on data sheet.  
              Student locates Power meters on UBI and enters value on data sheet
CUE: Tave Indication 579.0"F  
              CUE: Power Range N! indicates 100.1%
Student locates Power meters on UBI and enters value on data sheet  
              Student locates RCS NR Pressure chart on UBI and enters value on
CUE: Power Range N! indicates 100.1%  
              data sheet.
Student locates RCS NR Pressure chart on UBI and enters value on  
              CUE: RCS NR Pressure chart 2450 psig
data sheet.  
              Student locates Group 7 Control Rod Position on the Computer and
CUE: RCS NR Pressure chart 2450 psig  
              enters value on data sheet.
Student locates Group 7 Control Rod Position on the Computer and  
              CUE: Group 7 Control Rod Position is 93.6%
enters value on data sheet.  
COMMENTS:
CUE: Group 7 Control Rod Position is 93.6%  
I
SAT
-
UNSAT


                                                                                      Adrnin-103 fnl
Adrnin-103 fnl  
                                                                                    Page6  .- 0 f 1 0
P a g e 6 0 f 1 0
              Step 2.3
-.
              Calculate and record Change values in "Table # I " of Enclosure 13.3
Step 2.3  
              (Manual Leakage Calculation Data Sheet).
Calculate and record Change values in "Table #I" of Enclosure 13.3  
                                                                                    -SAT
(Manual Leakage Calculation Data Sheet).  
    STANDARD  Student performs calculation and records Change values in "Table #?"
STANDARD
              Enclosure 13.3 (Manual Leakage Calculation Data Sheet).
Student performs calculation and records Change values in "Table #?"  
                                                                                    -UNSAT
Enclosure 13.3 (Manual Leakage Calculation Data Sheet).  
    COMMENTS:
COMMENTS:  
              Step 2.4
Step 2.4  
              Calculated Corrected PZW Level Change:
Calculated Corrected PZW Level Change:  
                                                                                    -SAT
STANDARD:  
    STANDARD: (- 6.831 inchesl" F x         O F) =+ 1.0 inches = 0.3169 inches
(- 6.831 inchesl" F x  
                                                                                      UNSAT
O F) =+ 1.0 inches = 0.3169 inches  
    COMMENTS:
COMMENTS:  
              Step 2.5
Step 2.5  
              Convert Corrected PZR Level Change to gallons:
Convert Corrected PZR Level Change to gallons:  
                                                                                      SAT
STANDARD:  
    STANDARD: 0.3269 inches X 14.364 gAlofls/inch =                 gallons
0.3269 inches X 14.364 gAlofls/inch =  
                                                                                    -UNSAT
gallons  
    COMMENTS:
COMMENTS:  
:5-          Step 2.6
-5:  
              Convert QT Level Change to gallons:
Step 2.6  
                                                                                  ~   SAT
Convert QT Level Change to gallons:  
                                                                                  I   UNSAT
COMMENTS:
  COMMENTS:
-
SAT
-
UNSAT
-
SAT
UNSAT
SAT
-
UNSAT
~  
SAT  
I  
UNSAT  


                                                                                      Admin-103 fnl
Admin-103 fnl  
                                                                                -. -9       of 10
-.  
    STEP:       Step 4.7
-9  
                Convert LDST Level Change to gallons:
of 10  
                                                                                  -SAT
STEP:  
                                                                                  -UNSAT
Step 4.7  
  COMMENTS:
Convert LDST Level Change to gallons:  
- .     ..
COMMENTS:  
:9-            Step 2.8
-.  
              Calculated Total Volume Change:
..  
                                                                                  -SAT
-9:  
  STANDARD:
Step 2.8  
  4.552 gallons + - q0.482 gallons + I- 9.287 qallons) = - 25.247 gallons         -UNSAT
Calculated Total Volume Change:  
  COMMENTS:
STANDARD :  
  STEP:       Step 2.9                                                         CRITICAL TAS
4.552 gallons + - q0.482 gallons + I- 9.287 qallons) = - 25.247 gallons  
              Calculate RCS Leakage Rate:
COMMENTS:  
                                                                                  -SAT
STEP:  
  STANDARD:   - 45.217 gallons '60               -
Step 2.9  
                                        minutes = 0.254 gpm (k .01 gprn)
Calculate RCS Leakage Rate:  
COMMENTS:
STANDARD: - 45.217 gallons '60 minutes = - 0.254 gpm (k .01 gprn)  
                                                                                  -UNSAT
COMMENTS:  
                ~..                 . . TASK
_ . 
                                    END                _.      _.      .. .-
_.
STOP TIME:
~..  
END
.. . TASK  
.. .-  
-
SAT
-
UNSAT
-
SAT
-
UNSAT
CRITICAL TAS
-
SAT
-
UNSAT
STOP TIME:  


                                                                                Admin-103 fnl
CRITICAL STEP EXPLANATIONS:
                                                                                Page 8 of 10
Admin-103 fnl  
                          CRITICAL STEP EXPLANATIONS:
Page 8 of 10  
STEP #                                         Explanation
STEP #  
    8     Necessary data calculation to properly determine manual RCS leakage rate.
Explanation  
Note: If complamenery errors occur while performing calculations is steps 3 - 7 they
8  
will become critical. Credit will not be given for obtaining the correct answer for the
Necessary data calculation to properly determine manual RCS leakage rate.  
wrong reason.
Note: If complamenery errors occur while performing calculations is steps 3 - 7 they  
will become critical. Credit will not be given for obtaining the correct answer for the  
wrong reason.  


                                                    Admin-I03 fnl
Manuai RCS Leakage Final Data  
                                                      Page 9 of 10
7 -
        Manuai RCS Leakage Final Data
Para meter
7 -
~ Time  
              Parameter                    Final
-~  
~ Time                               0115        I
Quehch Tank Level
                                  -~
....  
                                      219.8 inches
__
  Quehch Tank....Level              84.9 inches
Tave Indication  
  Tave Indication       __            Ei79.0"F I-
Power ~ a n b
  Power ~ a n b eNI        __
NI
        NR Pr&sure
__  
            ... . .       ... ...
NR Pr&sure  
!.. ...
...  
  Grouo 7 Control Rod Position
. .
... ...  
!..  
...  
Grouo 7 Control Rod Position  
Final
0115
I
21 9.8 inches
84.9 inches
Ei79.0"F --I
Admin-I03 fnl
Page 9 of 10


                                                                                  Admin-103 fnl
Admin-103 fnl  
                                                                                  Page 10 of 10
Page 10 of 10  
                                CANDIDATE CUE SHEET
CANDIDATE CUE SHEET  
                  (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
Unit 1 computer repairs are expected to be extended through turnover for hardware
Unit 1 computer repairs are expected to be extended through turnover for hardware  
replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss Of Computer, is in
replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss Of Computer, is in  
progress, however an RCS Leakage Calculation has not been performed during this shift.
progress, however an RCS Leakage Calculation has not been performed during this shift.  
INITIATING CUES:
INITIATING CUES:  
The Control Room SRO directs you to perform a manual RCS leakage per PT/I/A/600/10
The Control Room SRO directs you to perform a manual RCS leakage per PT/I/A/600/10  
(Reactor Coolant Leakage). The initial data given was collected one hour previously. Use the
(Reactor Coolant Leakage). The initial data given was collected one hour previously. Use the  
final set of leakage data and manually calculate the RCS leakage rate. Endosure 13.3 of
final set of leakage data and manually calculate the RCS leakage rate. Endosure 13.3 of  
PT/il/A/600/10 (Reactor Coolant Leakage) is complete up to step 2.2.
PT/il/A/600/10 (Reactor Coolant Leakage) is complete up to step 2.2.  


                                          Adrnin-110 fnl
Adrnin-110 fnl  
                                            Page 1 of 9
Page 1 of 9  
                      REGION II
REGION II  
          INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
          JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
                      Admin-I I O
Admin-I I O
          Determine Minimum Shift Staffing
Determine Minimum Shift Staffing  
CANDIDATE
CANDIDATE  
EXAMINER
EXAMINER  


                                                                                              Admin-I I O fnl
Admin-I I O fnl  
                                                                                                Page 2 of 9
Page 2 of 9  
                                            REGION II
REGION II  
                                INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
                                JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
Task:
Task:  
Determine MINIMUM staffing requirements for the shift for NEQ's, RQs and SRQs
Determine MINIMUM staffing requirements for the shift for NEQ's, RQs and SRQs  
Alternate Path:
Alternate Path:  
Facilitv JPM #:
Facilitv JPM #:  
Ad
Ad  
KIA Ratinals):
KIA Ratinals):  
Gen214         2.313.4
Gen214  
Task Standard:
2.313.4  
SLC 16.13.1-1 (Minimum Station Staffing Requirements) is used to correctly determine MINIMUM staffing
Task Standard:  
requirements for the shift.
SLC 16.13.1-1 (Minimum Station Staffing Requirements) is used to correctly determine MINIMUM staffing  
Preferred Evaluation Location:                                        Preferred Evaluation Method:
requirements for the shift.  
Simulator -in-Plant         X                                         Perform ~     Simulate 2
Preferred Evaluation Location:  
Simulator -  
in-Plant  
X  
Preferred Evaluation Method:
Perform  
~  
Simulate 2  


                                Admin-I 10 fnl
SIMULATOR OPERATOR INSTRUCTIONS:
                                  Page 3 of 9
NONE
SIMULATOR OPERATOR INSTRUCTIONS:
Admin-I 10 fnl  
            NONE
Page 3 of 9  


                                                                                              Admin-I 10 fnl
Admin-I 10 fnl  
                                                                                                Page 4 of 9
Page 4 of 9  
    Toolsl~uuipmentlProceduresNeeded:
Toolsl~uuipmentlProcedures Needed:  
    SLC 16.13.1-1
SLC 16.13.1-1  
                                                                READ TO OPERATOR
READ TO OPERATOR  
    DIRECTIONS TO STUDENT:
DIRECTIONS TO STUDENT:  
    I will explain the initiab conditions, and state the task to be performed. All control room
I will explain the initiab conditions, and state the task to be performed. All control room  
    steps shall be performed for this JPM, including any required communications. I will
steps shall be performed for this JPM, including any required communications. I will  
    provide initiating cues and reports on other actions when directed by you. Ensure you
provide initiating cues and reports on other actions when directed by you. Ensure you  
    indicate to me when you understand your assigned task. To indicate that you have
indicate to me when you understand your assigned task. To indicate that you have  
    completed your assigned task return the handout sheet I provided you.
completed your assigned task return the handout sheet I provided you.  
    INITIAL CONDITIONS:
INITIAL CONDITIONS:  
    Plant conditions are as following:
Plant conditions are as following:  
                Unit 1 is in MODE 5 with fuel handling in the SFP in progress
Unit 1 is in MODE 5 with fuel handling in the SFP in progress  
                Unit 2 is in MODE 1 at 73% with 2 8 HPlP OOS for the last 85 hours
Unit 2 is in MODE 1 at 73% with 28 HPlP OOS for the last 85 hours  
                Unit 3 is in MODE 1 at 700% power
Unit 3 is in MODE 1 at 700% power  
                2 on-shift NEO's are qualified as fire brigade leader
2 on-shift NEO's are qualified as fire brigade leader  
                1 RP Tech is fire brigade qualified
1 RP Tech is fire brigade qualified  
    INITIATING CUE:
INITIATING CUE:  
    What are the MlNlMUM staffing requirements for the shift?
What are the MlNlMUM staffing requirements for the shift?  
I                  ......     .
..... .-
                                          ..... .-
I
                                      Minimum Number
.
.~.-~.
    OSM
......  
    STA
Minimum Number  
    SRO
.~.-~.  
t
OSM  
~~~~    ...       I    . _   '
STA  
                              .
SRO  
    RO                  ~~~~ ~   I                               !
t ...  
-.
.
    NLO .. -.
'
                                    !            .......
_
    SPOC                          ~ NIA                           !
.
            ....                    !
I
                                ...~                  -........
                                                                    !
!
    Chemistry Technician            N/A                          i
~~~~  
                              l-r
~  
                                    ~
I  
                                                    .-... d
~~~~
                                                                    I
RO
..  
.......  
NLO
!
-.  
-.  
~ NIA  
!
!  
Chemistry Technician
~ N/A
i
-.  
SPOC
....  
.......  
!  
.-... d  
...~ l-r
I  


                                                                                    Admin-I10 fnl
Admin-I10 fnl  
                                                                                      Page 5 of 9
Page 5 of 9  
START TIME:
START TIME:  
    STEP 1:   Reference SLC 16.13.1
STEP 1 :  
    STANDARD: Reference SLC 16.13.1-1 table                                                   SAT
Reference SLC 16.13.1  
    COMMENTS:
STANDARD:  
                                                                                          __ UNSAT
Reference SLC 16.13.1-1 table  
                                                                ....
COMMENTS:  
                                                            ...~                                -..-.___
...~
    STEP 2:   Reference SLC 16.13.1-1 for plant conditions
....  
                                                                                          -SAT
STEP 2:  
    STANDARD: Determine correct table to be used:
Reference SLC 16.13.1-1 for plant conditions  
              Column for 2 units in MODE 1-4 from two control rooms based on:             -UNSAT
STANDARD:  
                      Unit 1 is in MODE 5 with fuel handling in the SFP in progress
Determine correct table to be used:  
                      Unit 2 is in MODE Iat 73% with 2 8 HPlP 00s for the last 85
Column for 2 units in MODE 1-4 from two control rooms based on:  
                      hours
Unit 1 is in MODE 5 with fuel handling in the SFP in progress  
                      Unit 3 is in MODE 1 at 100% power
Unit 2 is in MODE I
  COMMENTS:
at 73% with 28 HPlP 00s for the last 85  
:3-          Determine correct number from column for 2 units in MODE 1-4 from two
hours  
              control rooms
Unit 3 is in MODE 1 at 100% power  
  STANDARD:  1 QSM. 1 STA. 5 SRO, 5 RO, and 8 NE0                                         -SAT
COMMENTS:  
  COMMENTS:
-3:  
                                                                                          -UNSAT
Determine correct number from column for 2 units in MODE 1-4 from two  
  =:         Determine that available NE0 is fire brigade leader qualified
control rooms  
  STANDARD:  2 on-shifi NEO's are qualified as fire brigade leader
1 QSM. 1 STA. 5 SRO, 5 RO, and 8 NE0  
              1 RP Tech is fire brigade qualified                                       ~    SAT
STANDARD:
  COMMENTS:
COMMENTS:  
                                                                                        __ UNSAT
=:
STANDARD:  
Determine that available NE0 is fire brigade leader qualified  
2 on-shifi NEO's are qualified as fire brigade leader  
1 RP Tech is fire brigade qualified  
COMMENTS:  
SAT
__ UNSAT
-..-.___
-
SAT
-
UNSAT
-
SAT
-
UNSAT
~
SAT
__ UNSAT  


                                                                            Admin-110 fnl
Admin-110 fnl  
                                                                              Page 6 of 9
Page 6 of 9  
:5-          Adjust total staffing numbers per Step 4
-
    STANDARD:  Subtract 1 SRO based on NE0 qualified as fire brigade leader:
SAT
                                                                                  -SAT
UNSAT
              1 OSM, 1 STA, 4 SRO, 5 RO, and 8 NE0
-
    COMMENTS:                                                                         UNSAT
SAT
              Reference TS 3.5.2.B
I_ UNSAT
    STANDARD: Determine that TS 3.5.2.B is applicable:
-5:  
              2 8 HPlP 00s for z 72 hours
STANDARD:
                                                                                  -SAT
Adjust total staffing numbers per Step 4  
    COMMENTS:
Subtract 1 SRO based on NE0 qualified as fire brigade leader:  
                                                                                  I _ UNSAT
1 OSM, 1 STA, 4 SRO, 5 RO, and 8 NE0  
:7-          Adjust total staffing numbers per Step 6
COMMENTS:  
  STANDARD:   Add 1 80 based on TS 3.5.2.8applying
Reference TS 3.5.2.B  
                                                                                  ___ SAT
Determine that TS 3.5.2.B is applicable:  
              1 OSM, 1 STA. 4 SRO, 6 RO. and 8 NE0
28 HPlP 00s for z 72 hours  
  COMMENTS:
STANDARD:
                                                                                  -UNSAT
COMMENTS:  
STEP:       Adjust total staffing numbers per Step 7
-7:
STANDARD:    Add 2 NEOs based on TS 3.5.2.8 applying
Adjust total staffing numbers per Step 6  
              1 OSM, 1 STA, 4 SRO, 6 RO, and I    J NE0
STANDARD:  
                                                                                -SAT
Add 1 80 based on TS 3.5.2.8
COMMENTS:                                                                      ~     UNSAT
applying
1 OSM, 1 STA. 4 SRO, 6 RO. and 8 NE0  
COMMENTS:  
STEP:
STANDARD:  
Adjust total staffing numbers per Step 7  
Add 2 NEOs based on TS 3.5.2.8 applying  
1 OSM, 1 STA, 4 SRO, 6 RO, and IJ
NE0  
COMMENTS:
___ SAT
-  
UNSAT
-
SAT  
~  
UNSAT  


                                                      Admin-I 10 fnl
Admin-I 10 fnl  
                                                        Page 7 of 9
Page 7 of 9  
STEP:         Determine total staffing requirements   CRITICAL STEP
CRITICAL STEP
STANDARD:     1 OSM. ISTA, 4 SRO, 6 RO, and 10 NE8
-
                                                          -SAT
SAT
  Position                  Minimum Number
_I_ UNSAT
                                                          _I_  UNSAT
Position
  OSM                      1
OSM
  STA
STEP:  
                ..
Determine total staffing requirements  
  SRO
STANDARD:  
                        II qo
1 OSM. I
  NLO
STA, 4 SRO, 6 RO, and 10 NE8  
  SPOC                    I NIA
Minimum Number  
  Chemistry Technician I NIA
1  
  RP Technician
STA  
          ._
SRO
                        1
..  
                      .~
NLO
                            NIA
I I qo  
COMMENTS:
SPOC
TIME STOP:
I NIA  
Chemistry Technician  
I NIA  
RP Technician  
1 NIA
._  
.~  
COMMENTS:  
TIME STOP:  


                                                  Admin-110 fni
Admin-110 fni  
                                                    Page 8 of 9
Page 8 of 9  
                    CRlTlCAL STEP EXPLANATIONS:
CRlTlCAL STEP EXPLANATIONS:  
STEP #                                 Explanation
STEP #  
      Determine staffing requirements
Explanation  
Determine staffing requirements  


                                                                              Admin-110 fnl
Admin-110 fnl  
                                                                                Page 9 of 9
Page 9 of 9  
                                    CANDIDATE CUE SHEET
CANDIDATE CUE SHEET  
                      (TO BE RETURNED TO EXAMINER UPQN COMPLETION OF TASK)
(TO BE RETURNED TO EXAMINER UPQN COMPLETION OF TASK)  
  INITIAL CONDITIONS:
INITIAL CONDITIONS:  
  Plant conditions are as following:
Plant conditions are as following:  
          Unit 1 is in MODE 5 with fuel handling in the §FP in progress
Unit 1 is in MODE 5 with fuel handling in the §FP in progress  
          Unit 2 is in MODE Iat. 73% with 2 8 HPlP 00s for the last 85 hours
Unit 2 is in MODE I at. 73% with 28 HPlP 00s for the last 85 hours  
          Unit 3 is in MODE Z at 100% power
Unit 3 is in MODE Z at 100% power  
          2 on-shift NEO's are qualified as fire brigade leader
2 on-shift NEO's are qualified as fire brigade leader  
          1 RP Tech is fire brigade qualified
1 RP Tech is fire brigade qualified  
  INITIATING CUE:
INITIATING CUE:  
  What are the MINIMUM staffing requirements for the shift?
What are the MINIMUM staffing requirements for the shift?  
  SRO                       I                 I
SRO  
  I3
I  
  NLO
I  
    0
t-
                            t-                I
I
I
I30
.. .
NLO
  ::rlstry
I NIA
k--Technician
... ..  
                .....
.....  
            Technician
' ...
                            I NIA
I ::rlstry
                            '
Technician
                            I
, NIA  
                              .
k--Technician
                              ..
I NIA  
                            , NIA
..  
                              NIA
                      ..


                                                Adrnin-202 fnl
Adrnin-202 fnl  
                                                  Page 1 of 7
Page 1 of 7  
                        REGION II
REGION II  
            INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
                  PERFORMANCE MEASURE
PERFORMANCE MEASURE  
                        Ad min-202
Ad m i n -2 02
  Perform surveillance to verify SSF RCMUP Operability
Perform surveillance to verify SSF RCMUP Operability  
CANDIDATE
CANDIDATE  
EXaMINER
EXaMINER  




                                Admin-202 fnl
Admin-202 fnl  
                                  Page 3 of 7
Page 3 of 7  
SIMULATOR OPERATOR INSTRUCTIONS:
SIMULATOR OPERATOR INSTRUCTIONS:  
                NONE
NONE  


                                                                                          Adrnin-202 fnl
Adrnin-202 fnl  
                                                                                            Page 4 of 7
Page 4 of 7  
ToolslEquipmenffPrasehiuresNeeded:
ToolslEquipmenffPrasehiures Needed:  
a   PT/I/N0600/001 (Periodic Instrument Surveillance), Encl. 13.1 (Mode 1 & 2) Page 35 of
a  
    36
PT/I/N0600/001 (Periodic Instrument Surveillance), Encl. 13.1 (Mode 1 & 2) Page 35 of  
Q   Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve of OQ/O/N1108/001
36  
    (Curves And General Information)
Q  
                                        READ TO OPERATOR
Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve of OQ/O/N1108/001  
DIRECTION TO TRAINEE:
(Curves And General Information)  
I will explain the initial conditions, and slate the task to be performed. All control room
READ TO OPERATOR  
steps shall be performed for this JPM, including any required communications. I will
DIRECTION TO TRAINEE:  
provide initiating cues and reports on other actions when directed by you. Ensure you
I will explain the initial conditions, and slate the task to be performed. All control room  
indicate to me when you understand your assigned task. To indicate that you have
steps shall be performed for this JPM, including any required communications. I will  
completed your assigned task return the handout sheet I provided you.
provide initiating cues and reports on other actions when directed by you. Ensure you  
INITIAL CQNDITIONS:
indicate to me when you understand your assigned task. To indicate that you have  
    112EOC20 outage in progress
completed your assigned task return the handout sheet I provided you.  
a   Unit 2 was shutdown (subcritical) on 3120104 at 0100
INITIAL CQNDITIONS:  
*   Unit 2 core is defueled
112EOC20 outage in progress  
*   Spent Fuel Pool Level = +0.1 feet
a  
    Spent Fuel Pool Temperature = 91°F
Unit 2 was shutdown (subcritical) on 3120104 at 0100  
*   Current date and time: 3/26/04 at 1100
* Unit 2 core is defueled  
Q   PT/600/001, Enclosure 13.1 in progress
* Spent Fuel Pool Level = +0.1 feet  
INITIATING CUE§:
Spent Fuel Pool Temperature = 91°F  
The SRO instructs you to continue with PT/600/001, Enclosure 13.1 starting at the top of page
* Current date and time: 3/26/04 at 1100  
35.
Q  
PT/600/001, Enclosure 13.1 in progress  
INITIATING CUE§:  
The SRO instructs you to continue with PT/600/001, Enclosure 13.1 starting at the top of page  
35.  


                                                                                                Admin-202 fnl
Admin-202 fnl  
                                                                                                    Page 5 of 7
Page 5 of 7  
START TIME:
START TIME:  
                Determine if 811 fuel in SFP subcritical > maximum days specified on       CRITICAL STEP
Determine if 811 fuel in SFP subcritical > maximum days specified on  
                  Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve
Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve  
                                                                                              __ SAT
STANDARD:  
STANDARD:       Refer to Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature
Refer to Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature  
                Curve of OP/l108/001. Determine that Unit 2s fuel has been subcritical
Curve of OP/l108/001. Determine that Unit 2s fuel has been subcritical  
                for 6 days and 10 hours. This is < than the maximum days specified on
for 6 days and 10 hours. This is < than the maximum days specified on  
                  Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve.           I    UNSAT
Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve.  
COMMENTS:
COMMENTS:  
                Verify SFP level > specified on appropriate curve of Enclosure Unit 1&2   CRITICAL STEP
Verify SFP level > specified on appropriate curve of Enclosure Unit 1&2  
                Spent Fuel Pool Level Vs Temperature Curve.
Spent Fuel Pool Level Vs Temperature Curve.  
                                                                                            _ I _ SAT
STANDARD:  
STANDARD:       Determine that the correct curve is  Day > 6 & 5 7.
Determine that the correct curve is  Day > 6 & 5 7.  
                                ent Fuel Pool water temperature is 98&deg;F by looking on SFP
ent Fuel Pool water temperature is 98&deg;F by looking on SFP  
                                auge on 2AB3 or on the OAC                                   -UNSAT
auge on 2AB3 or on the OAC  
                                          Pool water level is + 0.10 feet by looking on SFP
Pool water level is + 0.10 feet by looking on SFP  
Cue: When a SFP temperature indication is located indicate to the candidate that
Cue: When a SFP temperature indication is located indicate to the candidate that  
    SFP temperature = 98F
SFP temperature = 98F  
                Determine Spent Fuei Pool water level is + 0.10 feet by looking on SFP
Determine Spent Fuei Pool water level is + 0.10 feet by looking on SFP  
                Level gauge on 2AB3.
Level gauge on 2AB3.  
Cue: When the Unit 1 i% 2 SFP level indication is located indicate to the candidate
Cue: When the Unit 1 i% 2 SFP level indication is located indicate to the candidate  
    that SFP Level = + 0.7 feet.
that SFP Level = + 0.7 feet.  
Determine that SFP level is NOT > than the appropriate curve
Determine that SFP level is NOT > than the appropriate curve  
COMMENTS:
COMMENTS:  
                                                                                                              -
STEP:
STEP:           If limit exceeded, SSF RCMUP is inoperable.                               CRITICAL STEP
STANDARD:
STANDARD:        Declare the SSF RCMUQ inoperable.                                           -SAT
COMMENTS:  
COMMENTS:
If limit exceeded, SSF RCMUP is inoperable.  
                                                                                            _ I_  UNSAT
Declare the SSF RCMUQ inoperable.  
;TOP TIME:
CRITICAL STEP
__ SAT
I
UNSAT
CRITICAL STEP
_I_ SAT
-
UNSAT
-
CRITICAL STEP
-  
SAT  
_I_ UNSAT  
;TOP TIME:  


                                                                              Admin-202 fnl
Admin-202 fnl  
                                                                                Page 6 of 7
Page 6 of 7  
                    CRITICAL STEP EXPLANATIONS:
CRITICAL STEP EXPLANATIONS:  
STEP tc                                     Explanation
STEP tc  
  I     Must determine that some fuel has been subcritical e than the maximum days
Explanation  
        specified on Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve
I  
  2    Required to determine is SFP level is adequate.
Must determine that some fuel has been subcritical e than the maximum days  
  3    SSF RCMUP is declared inoperable.
specified on Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve  
Required to determine is SFP level is adequate.  
SSF RCMUP is declared inoperable.  
2
3


                                                                                  Adrnin-202 fnl
Adrnin-202 fnl  
                                                                                    Page 7 of 7
Page 7 of 7  
                                  CANDIDATE CUE SHEET
CANDIDATE CUE SHEET  
                  (TOBE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
e   U2EOC20 outage in progress
e  
* Unit 2 was shutdown (subcritical) on 3/20/04 at 0100
U2EOC20 outage in progress  
    Unit 2 core is defueled
* Unit 2 was shutdown (subcritical) on 3/20/04 at 0100  
e   Spent Fuel Pool Level = +0.1 feet
Unit 2 core is defueled  
    Spent Fuel Pool Temperature = 91&deg;F
e  
    Current date and time: 3/26/04 at 1100
Spent Fuel Pool Level = +0.1 feet  
    PP/600/001, Enclosure 13.1 in progress
Spent Fuel Pool Temperature = 91&deg;F  
INITIATING CUES:
Current date and time: 3/26/04 at 1100  
The SRO instructs you to continue with PT/600/001, Enclosure 13.1 starting at the top of page
PP/600/001, Enclosure 13.1 in progress  
35.
INITIATING CUES:  
The SRO instructs you to continue with PT/600/001, Enclosure 13.1 starting at the top of page  
35.  


                                              Admin-300 fnl
Admin-300 fnl  
                                                Page 1 of 8
Page 1 of 8  
                        REGION ll
REGION ll  
            INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
            JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
                        Ad mi n-300
Ad m i n -300  
    Calculate the Maximum Permissible Stay Time
Calculate the Maximum Permissible Stay Time  
          Within Emergency Dose Limits (EDL)
Within Emergency Dose Limits (EDL)  
CANDIDATE
CANDIDATE  
EXAMINER
EXAMINER  


                                                                                        Admin-300 fnl
Admin-300 fnl  
                                                                                          Page 2 of 8
Page 2 of 8  
                                            REGION II
REGION II  
                                INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
                                JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
__
Task:  
Task:
Calculate the Maximum Permissible Stay Time Within Emergency Dose Limits  
Calculate the Maximum Permissible Stay Time Within Emergency Dose Limits
Alternate Path:  
Alternate Path:
NIA  
NIA
Facilitv JPM #:  
Facilitv JPM #:
NIA  
NIA
KIA Ratinds):  
KIA Ratinds):
Gen 2.3.4  
Gen 2.3.4       2.5B.1
2.5B.1  
Task Standard:
Task Standard:  
Calculate the Maximum Permissible Stay Time Within Emergency Dose Limits (k 5 minutes).
Calculate the Maximum Permissible Stay Time Within Emergency Dose Limits (k 5 minutes).  
Examiner:                                                                               I
__
                      NAME                                       SIGNATURE               DATE
Examiner:  
I  
NAME  
SIGNATURE  
DATE  


                                      Adrnin-300 fnl
Adrnin-300 fnl  
                                        Page 3 of 8
Page 3 of 8  
    SIMULATOR OPERATOR INSTRUCTIONS:
SIMULATOR OPERATOR INSTRUCTIONS:  
NONE
NONE  


                                                                                                          Admin-300 fnl
ToolsiEsuiiprnenffProcedur~~
                                                                                                            Page 4 of 8
Needed:
ToolsiEsuiiprnenffProcedur~~                Needed:
None
None
Admin-300 fnl  
                                                    READ TO OPERATOR
Page 4 of 8  
DIRECTIONS TO STUDENT:
READ TO OPERATOR  
I will explain the initial conditions, and state the task to be performed. All control room steps shall be
DIRECTIONS TO STUDENT:  
performed for this JPM, including any required communications. I will provide initiating cues and reports
I will explain the initial conditions, and state the task to be performed. All control room steps shall be  
on other actions when directed by you. Ensure you indicate to me when you understand your assigned
performed for this JPM, including any required communications. I will provide initiating cues and reports  
task. To indicate that you have completed your assigned task return the handout sheet I provided you.
on other actions when directed by you. Ensure you indicate to me when you understand your assigned  
INITIAL CONDITIONS:
task. To indicate that you have completed your assigned task return the handout sheet I provided you.  
1. Steam Generator Tube Rupture has occurred OR Unit 3
INITIAL CONDITIONS:  
2. Emergency Dose Limits are in effect
1. Steam Generator Tube Rupture has occurred OR Unit 3  
3. NEQ Ahas received 2.26 R TEBE this year
2. Emergency Dose Limits are in effect  
4. The following tasks are required to be performed:
3. NEQ A has received 2.26 R TEBE this year  
                                    ...... .
4. The following tasks are required to be performed:  
    p1        ..... .. , .TASK          ...
. . . . . . .  
                                                ~.           ... .
~.  
                                                    TIME REQUIRED
. . . .  
                                                                    . .
. .  
                                                                      ... 1.
. . .  
                                                                                    . ..
p
                                                                                  O O S...k.. . ..k
.....  
                                                                                                  ... r A
.. , .TASK
    I   1   I Closing 3 ~ - 5 7 3              I         12 min                   5.31 Whr             I
...  
                Open all Unit 3s ADVs                                             3.65 Whr
TIME REQUIRED
Note: Assume no dose received while travelling between tasks.
...  
INITIATING CUE:
1.  
Refer to the above information. NEQ A has completed tasks 1 and 2 in the time required. How long does he
O O S k . k r A 
have to complete task 3 without exceeding his Emergency Dose Limits?
. . . . . . . . . . .  
I  
1 I Closing 3~-573
I  
12 min  
5.31 Whr  
I  
Open all Unit 3s ADVs  
3.65 Whr  
Note: Assume no dose received while travelling between tasks.  
INITIATING CUE:  
Refer to the above information. NEQ A has completed tasks 1 and 2 in the time required. How long does he  
have to complete task 3 without exceeding his Emergency Dose Limits?  


                                                                                            Admin-300 fnl
Admin-300 fnl  
                                                                                              Page 5 of 0
Page 5 of 0  
START TIME:
START TIME:  
Note: Candidate may perform these steps in a different order however the calculated stay time should be
Note: Candidate may perform these steps in a different order however the calculated stay time should be  
correct.
correct.  
Note:   Candidate should understand the following:
Note: Candidate should understand the following:  
        1. EDL is 5 R per event ( L O W or SGTR).
1. EDL is 5 R per event (LOW or SGTR).  
        2. Current exposure for the year is not counted toward the Emergency Dose Limit (EDb).
2.  
  :1-          Determine dose received while performing task 1.                       CRITICAL STEP
Current exposure for the year is not counted toward the Emergency Dose Limit (EDb).  
    STANDARD:   Determine dose received while performing task 1.                         -SAT
-1:  
                5.31 Whr X 1hr/60 min X 12 min = 1.06 R
Determine dose received while performing task 1.  
                                                                                              UNSAT
STANDARD:  
    COMMENTS:
Determine dose received while performing task 1.  
                Determine dose received while performing task 2.                         CRITICAL STEP
5.31 Whr X 1hr/60 min X 12 min = 1.06 R  
                                                                                          -SAT
COMMENTS:  
    STANDARD:   Determine dose received while performing task 2.
Determine dose received while performing task 2.  
                19.75 Whr X 1hr/60 min X 4 min = 1.32 R
STANDARD:  
                                                                                          -UNSAT
Determine dose received while performing task 2.  
    COMMENTS:
19.75 Whr X 1 hr/60 min X 4 min = 1.32 R  
:3-            Determine dose remaining from EDLs.                                     CRITICAL STEP
COMMENTS:  
                                                                                          -SAT
-3:  
    STANDARD:   Determine dose remaining from EDLs.
Determine dose remaining from EDLs.  
                5R - 1..06R - 1.32R = 2.62 R
STANDARD:  
                                                                                              UNSAT
Determine dose remaining from EDLs.  
    COMMENTS:
5R - 1 ..06R - 1.32R = 2.62 R  
COMMENTS :
CRITICAL STEP
-
SAT
UNSAT  
CRITICAL STEP
-
SAT
-
UNSAT
CRITICAL STEP
-
SAT
UNSAT


                                                                                      Admin-300 fnl
STEP:
                                                                                -. .  Page6 o f 8
STANDARD:
STEP:     Determine time available for the NE0 to complete task 3 without         CRITICAL STEP
Available Dose =
          exceeding EDL.
Dose Rate
                                                                                    -SAT
COMMENTS:  
STANDARD: Stay time is calculated to be:
Determine time available for the NE0 to complete task 3 without  
          Available Dose =              = ,728 hr X         = 43.1 min
exceeding EDL.  
            Dose Rate          3.65 Rlhr                 1hr                        -UNSAT
Stay time is calculated to be:  
                                                                    (i5 minutes)
= ,728 hr X  
COMMENTS:
= 43.1 min  
                              ..END OF TASK         .,,..           ...~
3.65 Rlhr  
1 hr
(i 5 minutes)  
...~
END OF TASK  
.,,..  
..  
Admin-300 fnl
-. . Page6 o f 8 
CRITICAL STEP
SAT
-
-
UNSAT


                                                    Admin-300 fnl
Admin-300 fnl  
                                                      Page 7 of 8
Page 7 of 8  
                      CRITICAL STEP. EXPLANATIONS:
CRITICAL STEP. EXPLANATIONS:  
STE? #                                 Explanation
STE? #  
  4   Required to calculate stay time.
Explanation  
  2    Required to calculate stay time.
4  
  3    Required to calculate stay time.
2
  4    Required to calculate stay time.
3
4
Required to calculate stay time.  
Required to calculate stay time.  
Required to calculate stay time.  
Required to calculate stay time.  


                                                                                                Admin-300 fnl
Admin-300 fnl  
                                                                                                    Page 8 of 8
Page 8 of 8  
                                        CANDIDATE CUE SHEET
CANDIDATE CUE SHEET  
                        (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
1. Steam Generator Tube Rupture has occurred on Unit 3
1. Steam Generator Tube Rupture has occurred on Unit 3  
2. Emergency Dose Limits are in effect
2. Emergency Dose Limits are in effect  
3. N E 0 "A" has received 2.26 R TEDE this year
3. NE0 "A" has received 2.26 R TEDE this year  
4. The following tasks are required to be performed:
4. The following tasks are required to be performed:  
                ...... ~.         .   .......      ..
......  
    r.-
.
    ..... #        ...I...TASK
~.  
                                    ~
~
                                                TIME REQUIRED-. ....
.......  
                                                        ~
..  
                                                                D .~ O S E RATE          .:
r.- #I TIME REQUIRED-. D
            Closing 3C-573                                                 5.31 Rfhr
O
            Open 3FDW-313
S
                                ..
E
Note: Assume no dose received while traveling between tasks.
lNlTlATlNG CUE:
RATE
Refer to the above information. NE0 "A" has completed tasks 1 and 2 in the time required. How long does he
.....  
have to complete task 3 without exceeding his Emergency Dose Limits?
... ...TASK  
~  
.... .~  
.:  
Closing 3C-573  
5.31 Rfhr  
Open 3FDW-313 ..  
Note: Assume no dose received while traveling between tasks.  
lNlTlATlNG CUE:  
Refer to the above information. NE0 "A" has completed tasks 1 and 2 in the time required. How long does he  
have to complete task 3 without exceeding his Emergency Dose Limits?  


                                              Admin-402 fnl
Admin-402 fnl  
                                                Page 1 of 14
Page 1 of 14  
                        REGION II
REGION II  
              INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
              JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
                        Admin-402
Admin-402  
          Perform Actions for Medical Emergency
Perform Actions for Medical Emergency  
CANDIDATE
CANDIDATE  
EXAMINER
EXAM IN ER


                                                                                      Admin-402 fnl
Admin-402 fnl  
                                                                                        Page 2 of 14
Page 2 of 14  
                                            REGION I1
REGION I1  
                                  INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
                                  JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
Task:
Task:  
Perform Actions for Medical Emergency
Perform Actions for Medical Emergency  
Alternate Path:
Alternate Path:  
Facility JPM #
Facility JPM #  
KIA Ratinds):
KIA Ratinds):  
System: GEN
System: GEN  
WA:       2.4.39
WA:  
Rating:
2.4.39  
Task Standard:
Rating:  
Complete RP/lOO01016, Encl. 4.1 (Medical Response) as required
Task Standard:  
Preferred Evaluatlon Location:                                Preferred Evaluation Method:
Complete RP/lOO01016, Encl. 4.1 (Medical Response) as required  
Simulator __ In-Plant                                         Perform -Simulate
Preferred Evaluatlon Location:  
References:
Simulator __ In-Plant  
RPllOOO/O16, Encl. 4.4 (Medical Response)
References:  
RPllOOO/O16, Encl. 4.4 (Medical Response)  
Preferred Evaluation Method:
Perform -
Simulate


                                Admin-402 fnl
Admin-402 fnl  
                                  Page 3 of 14
Page 3 of 14  
SIMULATOR OPERATOR INSTRUCTIONS:
SIMULATOR OPERATOR INSTRUCTIONS:  
                NONE
NONE  


                                                                                          Admin-402 fnl
Admin-402 fnl  
                                                                                          Page 4 of 14
Page 4 of 14  
ToolslEuuipmenffP~oceduresNeeded:
ToolslEuuipmenffP~ocedures Needed:  
RP/1QQQ/OI6,Encl. 4.1 (Medical Emergency Action - Routine Operations)
RP/1QQQ/OI6, Encl. 4.1 (Medical Emergency Action - Routine Operations)  
                                        READ TO OPERATOR
READ TO OPERATOR  
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:  
I will explain the initial conditions, and state the task to be performed. All control room
I will explain the initial conditions, and state the task to be performed. All control room  
steps shall be performed for this JPM, including any required communications. I will
steps shall be performed for this JPM, including any required communications. I will  
provide initiating cues and reports on other actions when directed by you. Ensure you
provide initiating cues and reports on other actions when directed by you. Ensure you  
indicate to me when you understand your assigned task. To indicate that you have
indicate to me when you understand your assigned task. To indicate that you have  
completed your assigned task return the handout sheet I provided you.
completed your assigned task return the handout sheet I provided you.  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
1. You have answered a call on 491 1 (emergency line) repofling a medical emergency.
1. You have answered a call on 491 1 (emergency line) repofling a medical emergency.  
2. The caller is still on the line.
2. The caller is still on the line.  
INITIATING CUES:
INITIATING CUES:  
The SRQ in the control room instructs you perform the required actions for a medical
The SRQ in the control room instructs you perform the required actions for a medical  
emergency.
emergency.  


                                                                                                Admin-402 fnl
START TIME:  
                                                                                                Page 5 of 24
STEP:  
START TIME:
STANDARD:
STEP:           Determine the appropriate procedure to use.                               CRITICAL STEP
Determine the appropriate procedure to use.  
                                                                                            -SAT
RP/OiB/lOQQi016 (Medical Response) is referenced and Enclosure 4. I  
STANDARD:      RP/OiB/lOQQi016(Medical Response) is referenced and Enclosure 4. I
(Medical Emergency Actions - Routine Operations) is determined to be  
                (Medical Emergency Actions - Routine Operations) is determined to be
the appropriate procedure to use. Enclosure 4.1 is obtained from  
                the appropriate procedure to use. Enclosure 4.1 is obtained from
notebook located in the front of the control room desk or from the cart in  
                notebook located in the front of the control room desk or from the cart in
the TSC.  
                the TSC.                                                                   -UNSAT
Cue: When procedure is located give candidate a copy of Enclosure 4. f.  
Cue: When procedure is located give candidate a copy of Enclosure 4. f .
COMMENTS:  
COMMENTS:
Step 1.2  
                Step 1.2                                                                   CRITICAL STEP
Complete the following accident information:  
                Complete the following accident information:
Name of person reporting injury  
                                                                                                SAT
Call back number  
                    Name of person reporting injury
Name of person injured  
                                                                                            ___I
Supervisor of injured person  
                    Call back number
e  
                    Name of person injured
Location injury occurred  
                    Supervisor of injured person                                           I    UNSAT
Brief description of injury  
                e   Location injury occurred
Time  
                    Brief description of injury
Note: The evaluator will play the role of the person reporting the injury. Answer  
                    Time
questions by referring to the Medical Emergency Phone Call Information Sheet.  
Note: The evaluator will play the role of the person reporting the injury. Answer
STANDARD:  
questions by referring to the Medical Emergency Phone Call Information Sheet.
The candidate obtains the above information from the evaluator by  
STANDARD:       The candidate obtains the above information from the evaluator by
asking the appropriate questions and completes step 1.2 correctly.  
                asking the appropriate questions and completes step 1.2 correctly.
Note: Refer to the completed procedure as an answer key.  
Note: Refer to the completed procedure as an answer key.
COMMENTS:  
COMMENTS:
Admin-402 fnl
Page 5 of 24
CRITICAL STEP
-
SAT
-
UNSAT
CRITICAL STEP
___I SAT
I
UNSAT


                                                                                                  Admin-402 fnl
. ..  
                                  . ..                               ..~.
.. ~.  
                                                                        ~..         ....      .
~ . .
                                                                                              ..  Page 6 of 14
....  
    STEQ:           Step 1.3                                                                 CRITICAL STEP
STEQ:  
                    IF There is a Security Event in progress,
Step 1.3  
                    THEN Continue with ...                                                       -SAT
IF There is a Security Event in progress,  
    STANDARD:       Determine a Security vent is not in progress and NIA step 1.3.
THEN Continue with ...  
                                                                                                  UNSAT
STANDARD:  
    Cue: lf asked, inform candidate a Security Event is not in progress.
Cue: lf asked, inform candidate a Security Event is not in progress.  
    COMMENTS:
COMMENTS:  
                                    --               __                 ...~.           ___
Determine a Security vent is not in progress and NIA step 1.3.
    STEP:           Step 1.4.1                                                               CRITICAL STEP
- -  
                    Use Plant Page to request all MERT members to respond to the incident.
__  
                                                                                              -SAT
...~  
    STANDARD:      The phone is used to access the Plant Page and request all MERT
.  
                    members to respond to the incident.
___  
    Cue: inform candidate to simulate onjy.                                                     -UNSAIT
STEP:  
    COMMENTS:
Step 1.4.1  
:5-                Step 1.4.2
Use Plant Page to request all MERT members to respond to the incident.  
                    Use the radio paging system to request MERT members to respond to
The phone is used to access the Plant Page and request all MERT  
                    the incident.                                                             -SAT
members to respond to the incident.  
                        Transmit "Standby for Emergency Message"
STANDARD:
                    o    Press the "instant Call" button labeled "MERT"
Cue: inform candidate to simulate onjy.  
                    o    Wait for the red "Transmit" light on the radio to turn off             ~  UNSAT
COMMENTS:  
                        Transmit message
-5:  
  STANDARD:       The radio paging system is used to request MERT members to respond
Step 1.4.2  
                    to the incident by:
Use the radio paging system to request MERT members to respond to  
                        Transmit "Standby for Emergency Message"
the incident.  
                        Press the "instant Call" button labeled "MERT"
o
                        Wait for the red "Transmit" light on the radio to turn off
o
                        Transmit message "MERT members respond to a medical
Transmit "Standby for Emergency Message"  
                        emergency in the Unit 3 clean side of the change room.'r
Press the "instant Call" button labeled "MERT"  
  Note: The red "Transmit" light is normally green and is located next to the "MERT"
Wait for the red "Transmit" light on the radio to turn off  
  button on the radio.
Transmit message  
    Cue: hnform candidate to simulate only.
STANDARD:  
  COMMENTS:
The radio paging system is used to request MERT members to respond  
to the incident by:  
Transmit "Standby for Emergency Message"  
Press the "instant Call" button labeled "MERT"  
Wait for the red "Transmit" light on the radio to turn off  
Transmit message "MERT members respond to a medical  
emergency in the Unit 3 clean side of the change room.'r  
Note: The red "Transmit" light is normally green and is located next to the "MERT"  
button on the radio.  
Cue: hnform candidate to simulate only.  
COMMENTS:  
Admin-402 fnl
Page 6 of 14
...
CRITICAL STEP
-
SAT
UNSAT
CRITICAL STEP
-
SAT
-
UNSAIT
-
SAT
~
UNSAT


                                                                                          Admin-402 fnl
Admin-402 fnl  
                                                                                            Page 7 of 14
Page 7 of 14  
              Step 1.4.3
Step 1.4.3  
              Repeat steps 1.4.1 and 1.4.2                                             __ SAT
Repeat steps 1.4.1 and 1.4.2  
STANDARD:      The Plant Page and the radio paging system are used a second time to
The Plant Page and the radio paging system are used a second time to  
              request MERT members to respond to the incident.                         -UNSAT
request MERT members to respond to the incident.  
Cue: h f o m candidate to simukaite only.
STANDARD:
COMMENTS:
Cue: h f o m candidate to simukaite only.  
STEP 7:       Step 1.4.4
COMMENTS:  
              Call Securitv at one of the followina extensions and request they have     SAT
STEP 7:  
              security M&T members respondio the emergency
Step 1.4.4  
                  SAS (Secondary Alarm Station) 2205 or 2767
Call Securitv at one of the followina extensions and request they have  
              e  CAS (Central Alarm Station) 2222 or 2958                             -UNSAT
security M&T members respondio the emergency  
STANDARD:     Security is notified at one of the above extensions and are requested to
SAS (Secondary Alarm Station) 2205 or 2767  
              have security MERT members respond to the emergency.
CAS (Central Alarm Station) 2222 or 2958  
Cue: Inform candidate to simulate only.
e
COMMENTS:
STANDARD:  
              Step 1.4.5
Security is notified at one of the above extensions and are requested to  
              IF The incident location is away from the rn ain plant (WOE, Complex,
have security MERT members respond to the emergency.  
              Keowee Hydro, etc.) and incident occurs during normal working hours,
Cue: Inform candidate to simulate only.  
              THEN Notify shuttle Bus...                                               __SAT
COMMENTS:  
STANDARD:     Determine that this step does not apply and N/A step 1.4.5
Step 1.4.5  
                                                                                        _ I UNSAT
IF The incident location is away from the rn ain plant (WOE, Complex,  
COMMENTS:
Keowee Hydro, etc.) and incident occurs during normal working hours,  
              Step 1.5
THEN Notify shuttle Bus ...  
              IF A mass casualty event has occurred or is suspected, and a centralized
STANDARD:  
              treatment area is needed. and plant conditions allow,
Determine that this step does not apply and N/A step 1.4.5  
              THEN Make a PA Announcement ...                                           -SAT
COMMENTS:  
STANDARD:     Determine that this step does not apply and N/A step 1.5
Step 1.5  
                                                                                        -UNSAT
IF A mass casualty event has occurred or is suspected, and a centralized  
COMMENTS:
treatment area is needed. and plant conditions allow,  
THEN Make a PA Announcement ...  
STANDARD:  
Determine that this step does not apply and N/A step 1.5  
COMMENTS:
__ SAT
-  
UNSAT  
SAT
-
UNSAT
__
SAT
_I UNSAT
-
SAT
-
UNSAT


                                                                                              Admin-402 fnl
STEP IO:  
                                                                                                Page 8 of 14
Step 1.6  
  STEP IO:       Step 1.6                                                                   CRITICAL STEP
IF Hospital evacuation is needed as determined by MERT Command or  
                IF Hospital evacuation is needed as determined by MERT Command or
as indicated by Step 1.6.1,  
                as indicated by Step 1.6.1,
THEN Arrange transport of patient to the hospital by one of the following  
                THEN Arrange transport of patient to the hospital by one of the following   _ I SAT
means:  
                means:
EMS (ambulance)  
                      EMS (ambulance)
Dial 9-91 1 from the Operations Shift Manager's phone or Unit 1  
                      Dial 9-911 from the Operations Shift Manager's phone or Unit 1
Control Room SROs phone or dial 91 1 from the bell South line - Unit  
                      Control Room SROs phone or dial 91 1 from the bell South line - Unit   __ UNSAT
1: 2, and 3 Control Rooms. Refer to Step 1.6.2, prior to requesting  
                      1: 2, and 3 Control Rooms. Refer to Step 1.6.2, prior to requesting
EMS.  
                      EMS.
Company vehicle (less serious injury)  
                e    Company vehicle (less serious injury)
Personal vehicle (less serious injury)  
                      Personal vehicle (less serious injury)
e
  STANDARD:     Ambulance is requested by calling 9-911. Ambulance is requested to
STANDARD:  
                come to Oconee Nuclear Station.
Ambulance is requested by calling 9-91 1. Ambulance is requested to  
  COMMENTS:
come to Oconee Nuclear Station.  
I
COMMENTS:  
  STEP 11:       Step 1.6.1
I  
                IF Any of the following illnesses or injuries are reported on the emergency
STEP 11:  
                line (491I)
Step 1.6.1  
                THEN Immediately request EMS (ambulance) to respond to the site:           -SAT
IF Any of the following illnesses or injuries are reported on the emergency  
                      Unconsciousness
line (491 I)  
                                                                                            -UNSAT
THEN Immediately request EMS (ambulance) to respond to the site:  
  COMMENTS:
Unconsciousness  
  STEP 12:       step 1.6.2
COMMENTS:  
                IF The patient is known or suspected to be radiologically contaminated,
STEP 12:  
                THEN Have the EMS dispatcher inform the EMS personnel to expect a           __ SAT
step 1.6.2  
                          contaminated person.
IF The patient is known or suspected to be radiologically contaminated,  
  STANDARD:     Determine that this step does not apply and NIA step 1.6.2
THEN Have the EMS dispatcher inform the EMS personnel to expect a  
                                                                                                UNSAT
contaminated person.  
  Cue: !tasked, inform candidate that the patient is NOT wntaminabed.
STANDARD:  
  COMMENTS:
Determine that this step does not apply and NIA step 1.6.2  
I
Cue: !tasked, inform candidate that the patient is NOT wntaminabed.  
COMMENTS:  
I  
Admin-402 fnl
Page 8 of 14
CRITICAL STEP
_I SAT
__ UNSAT
-
SAT
-
UNSAT
__ SAT
UNSAT


                                                                                              Admin-402 fnl
Admin-402 fnl  
                                                                                                Page 9 of 24
Page 9 of 24  
STEP 13:       Step 1.6.3
STEP 13:  
                Notify Security at 2222 that the ambulance is enroute
Step 1.6.3  
STANDARD:      Security is notified that the ambulance is enroute                         -SAT
Notify Security at 2222 that the ambulance is enroute  
COMMENTS:
Security is notified that the ambulance is enroute  
                                                                                          -UNSAT
STANDARD:
                                                                                                  ~
COMMENTS:  
STEP 14:       Step 1.6.4                                                               CRITICAL STEP
STEP 14:  
                Notify M E N Command that the ambulance is enroute.
Step 1.6.4  
STANDARD:       MERT Command is notified via radio that the ambulance is enroute.         -SAT
Notify M E N Command that the ambulance is enroute.  
Cue: lnforrn candidate to sirnulate only.
STANDARD:  
COMMENTS:                                                                                -UNSAT
Cue: lnforrn candidate to sirnulate only.
STEP 15:       Step 1.6.5
COMMENTS:
                Nstify World of Energy Duty Person (Ext. 4602 or Pager #777-9414).
MERT Command is notified via radio that the ambulance is enroute.  
STANDARD:     World of Energy Duty Person is notified by phone.                          I    SAT
STEP 15:  
Cue: lnforrn candidate to simulate only.
Step 1.6.5  
COMMENTS:                                                                                 _ I_  UNSAT
Nstify World of Energy Duty Person (Ext. 4602 or Pager #777-9414).  
STEP 16:       Step 1.7
STANDARD:  
              Notify the Occupational Health Unit at ONS during normal working hours
Cue: lnforrn candidate to simulate only.  
              (4652).
COMMENTS:  
                                                                                          _  ISAT
World of Energy Duty Person is notified by phone.
STANDARD;      Occupational Health Unit at ONS is notified by phone.
STEP 16:  
Cue: lnforrn candidate to simulate only.
Step 1.7  
                                                                                              UNSAT
Notify the Occupational Health Unit at ONS during normal working hours  
COMMENTS:
(4652).  
STEP 17:       Step 1.8
Occupational Health Unit at ONS is notified by phone.  
              IF Radiological contamination is involved and the person is being sent to
STANDARD;
              a hospital.
Cue: lnforrn candidate to simulate only.  
              THEN Complete...                                                           -SAT
COMMENTS:  
STANDARD:      Determine that this step does not apply and N/A step 1.8.
STEP 17:  
                                                                                          -UNSAT
Step 1.8  
COMMENTS:
IF Radiological contamination is involved and the person is being sent to  
a hospital.  
THEN Complete ...  
Determine that this step does not apply and N/A step 1.8.  
STANDARD:
COMMENTS:
-
SAT
-
UNSAT
~
CRITICAL STEP
-
SAT
-  
UNSAT
I
SAT
_I_ UNSAT
_I SAT
UNSAT  
-
SAT
-
UNSAT


                                                                                                Admin-402 fnl
Admin-402 fnl  
                                                                                                Page 10 of 14
Page 10 of 14  
STEP 18:   Step 1.9
STEP 18:  
          Remind MERT Command that a Patient Treatment Form needs to be
Step 1.9  
          completed for all patients and that the completed form is to be sent to the
Remind MERT Command that a Patient Treatment Form needs to be  
          Medical Unit for inclusion in the patients medical file.                         -SAT
completed for all patients and that the completed form is to be sent to the  
STANDARD:  MERT Command is informed that a Patient Treatment Form needs to be
Medical Unit for inclusion in the patients medical file.  
          completed and sent to the Medical Unit.
MERT Command is informed that a Patient Treatment Form needs to be  
                                                                                            __ UNSAT
completed and sent to the Medical Unit.  
COMMENTS:
STANDARD:
STEP 19: Step 1.10
COMMENTS:  
          After normal working hours the Operations Shift Manager or designee
STEP 19:  
          shall report the following incidents to ONS Safety 5uty Person who will
Step 1.10  
          determine if additional people need to be notified.                               -SAT
After normal working hours the Operations Shift Manager or designee  
STANDARD: Determine that this step does not apply and NIA step 1. I O
shall report the following incidents to ONS Safety 5uty Person who will  
                                                                                            -UNSAT
determine if additional people need to be notified.  
COMMENTS:
Determine that this step does not apply and NIA step 1 . I O
STEP 20: Step 1.11
STANDARD:
          Verif), the following notification in the event of a fatality or injuries to 3 or
COMMENTS:  
          more people:
STEP 20:  
                                                                                            __ SAT
Step 1.11  
STANDARD: Determine that this step does not apply and N/A step I.I1
Verif), the following notification in the event of a fatality or injuries to 3 or  
COMMENTS:                                                                                   -UNSAT
more people:  
STEP 21: Step 1.12
Determine that this step does not apply and N/A step I .I
          Notify STA to make appropriate notifications of the transport of an
1
          employee to an off site medical facility.
STANDARD:
                                                                                            __ SAT
COMMENTS:  
STANDARD: Notify the STA by phone or in person to make appropriate notifications of
STEP 21:  
          the transport of an employee to an off site medical facility.
Step 1.12  
                                                                                            __II UNSAT
Notify STA to make appropriate notifications of the transport of an  
COMMENTS:
employee to an off site medical facility.  
Notify the STA by phone or in person to make appropriate notifications of  
the transport of an employee to an off site medical facility.  
STANDARD:
COMMENTS:  
-
SAT
__ UNSAT
-
SAT
-
UNSAT
__ SAT
-
UNSAT
__ SAT
__II UNSAT


                                                                                    Admin-402 fnl
Admin-402 fnl  
                                                                                    Page 11 of 14
Page 11 of 14  
STEP 22:   Step 1.13
STEP 22:  
          IF A death, near death, or major traumatic injury...
Step 1.13  
STANBARD:  Determine step does not apply and NIA Step 1.I3                         I  SAT
IF A death, near death, or major traumatic inju ry...  
COMMENTS:
Determine step does not apply and NIA Step 1 .I3  
                                                                                  -UNSAT
STANBARD:
STEP 23:   Step 1.14
COMMENTS:  
          The Operations Shifl Manager (OSM) or designee shall ensure
STEP 23:  
          notification of next of kin, if applicable.
Step 1.14  
                Fatality - Appropriate Division Manager performs notifications     __ SAT
The Operations Shifl Manager (OSM) or designee shall ensure  
          e    Injury requiring hospitalization- Employee's Supervisor or Manager
notification of next of kin, if applicable.  
              perform notification
e
STANBARD: Inform the OSM to perform this step as required.                       __UNSAT
Fatality - Appropriate Division Manager performs notifications  
COMMENTS:
Injury requiring hospitalization - Employee's Supervisor or Manager  
STEP 24:   Step 2.15
perform notification  
          Submit completed Enclosure 4.1, (Medical Emergency Action -Routine
STANBARD:  
          Operations).to the Emergency Planning Section
Inform the OSM to perform this step as required.  
                                                                                  -SAT
COMMENTS:  
STANDARD:  Indicate that form would be submitted to the Emergency Planning
STEP 24:  
          Section.
Step 2.15  
                                                                                  -UNSAT
Submit completed Enclosure 4.1, (Medical Emergency Action -Routine  
COMMENTS:
Operations).to the Emergency Planning Section  
STOP TIME:
Indicate that form would be submitted to the Emergency Planning  
Section.  
STANDARD:
COMMENTS:  
STOP TIME:  
I
SAT
-
UNSAT
__ SAT
__
UNSAT
-
SAT
-
UNSAT


                                                                              AdMin-402 fnl
AdMin-402 fnl  
                                                                              Page 12 of 14
Page 12 of 14  
            Medical Emergency Phone Call Information Sheet
Medical Emergency Phone Call Information Sheet  
1. Name person calling
1. Name person calling  
  John Adams
John Adams  
2. Call back number
2. Call back number  
  2322
2322  
3. Name of injured person
3. Name of injured person  
  David Smith
David Smith  
4. Supervisor of injured person
4. Supervisor of injured person  
  Allan Jones
Allan Jones  
5. Location injury occurred
5. Location injury occurred  
  Unit 3 HPI Pump Room
Unit 3 HPI Pump Room  
  The injured is currently located in the clean side of Unit 3schange room (srd
The injured is currently located in the clean side of Unit 3s change room (srd  
  floor Aux Building).
floor Aux Building).  
  Injured is NOT contaminated
Injured is NOT contaminated  
6. Description of injury
The injured stood up to put on his hard hat and hit his head on a cable tray  
  The injured stood up to put on his hard hat and hit his head on a cable tray
resulting in a laceration to tog of head. The wound is continuing to bleed. The  
  resulting in a laceration to tog of head. The wound is continuing to bleed. The
injured is unconscious.  
  injured is unconscious.
6. Description of injury
7. Time
7. Time  
  Current time
Current time  


                                                                              Admin-402 fnl
CRITICAL STEP EXPLANATIONS:
                                                                              Page 13 of 14
Admin-402 fnl  
                    CRITICAL STEP EXPLANATIONS:
Page 13 of 14  
STEP #                                    Explanation
STEP #
  1  Need to select the correct procedure.
Explanation  
  2    Need the correct information to ensure proper actions are taken.
Need to select the correct procedure.  
  3   Need to determine a security event is not in progress so that MERT can be called.
Need the correct information to ensure proper actions are taken.  
  4    Need to activate MERT.
1
  10  Ambulance has to be requested.
2
  14   MERT command should be notified so that the injured can be taken to the pickup
3  
      point.
4
Need to activate MERT.
Need to determine a security event is not in progress so that MERT can be called.  
10
Ambulance has to be requested.  
14  
MERT command should be notified so that the injured can be taken to the pickup  
point.  


                                                                                  Admin-402 fnl
Admin-402 fnl  
                                                                                  Page 14 of 14
Page 14 of 14  
                                    CANDIDATE CUE SHEET
CANDIDATE CUE SHEET  
                  (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
1. You have answered a call on 491 1 (emergency line) reporting a medical emergency.
1. You have answered a call on 491 1 (emergency line) reporting a medical emergency.  
2. The caller is still on the line.
2. The caller is still on the line.  
INITIATING CUES:
INITIATING CUES:  
The SRO in the control room instructs you perform the required actions for a. medical
The SRO in the control room instructs you perform the required actions for a. medical  
emergency.
emergency.  


                                            Admin-403 fnl
Admin-403 fnl  
                                              Page 1 of 8
Page 1 of 8  
                    REGION II
REGION II  
          INITIAL LIC ENSE EXAMINATION
I N IT I AL L I C ENS E EXAM I NATION
          JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
                    Ad rnin-403
Ad rn i n -40 3
Determine Emergency C lassification and Protective
Dete rm i ne E merge n cy C lass if i cat ion and Protective  
            Action Recommendations
Action Recommendations  
CANDIDATE
CANDIDATE  
EXAMINER
EXAMINER  


                                                                                                  Admin-403 fnl
Admin-403 fnl  
                                                                                                    Page 2 of 8
Page 2 of 8  
                                                REGION I1
REGION I1  
                                    INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
                                    JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
Task:
Task:  
Determine Emergency Classification and Protective Action Recommendations
Determine Emergency Classification and Protective Action Recommendations  
Alternate Path:
Alternate Path:  
FacilitvJPM #:
FacilitvJPM #:  
s
s  
KIA Ratinnk):
KIA Ratinnk):  
Gen 2.4.38     2.2/4.0
Gen 2.4.38  
Task Standard:
2.2/4.0  
Appropriate classification is determined and associated Protective Action Recommendations are made
Task Standard:  
Preferred Evaluation Location:                                            Preferred Evaluation Method:
Appropriate classification is determined and associated Protective Action Recommendations are made  
Simulator         In-Plant     X                                         Perform -Simulate 2
Preferred Evaluation Location:  
References:
Simulator  
RP/O/B/1000/01
In-Plant  
RP/OlB/l000/02
X  
BASIS Document (Volume A. Section D of the Emergency Plan)
References:  
Examiner:                                                                                         I
RP/O/B/1000/01  
                        NAME                                             SIGNATURE                 DATE
RP/OlB/l000/02  
BASIS Document (Volume A. Section D of the Emergency Plan)  
Preferred Evaluation Method:
Perform -
Simulate 2
Examiner:  
I  
NAME  
SIGNATURE  
DATE  


                                Admin-403 fnl
Admin-403 fnl  
                                  Page 3 of 8
Page 3 of 8  
SIMULATOR OPERATOR INSTRUCTIONS:
SIMULATOR OPERATOR INSTRUCTIONS:  
            NONE
NONE  


                                                                                          Admin-403 fnl
Admin-403 fnl  
                                                                                            Page 4 of 8
Page 4 of 8  
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:  
RPlOlB/lO00101
RPlOlB/lO00101  
RPIQIBIZ QOOlO2
RPIQIBIZ QOOlO2  
BASIS Document (Volume A , Section D of the Emergency Plan)
BASIS Document (Volume A, Section D of the Emergency Plan)  
                                        READ TO OPERATOR
READ TO OPERATOR  
DIRECTIONS TO STUDENT:
DIRECTIONS TO STUDENT:  
I will explain the initial conditions, and state the task to be performed. All control room
I will explain the initial conditions, and state the task to be performed. All control room  
steps shall be performed for this JPM, including any required communications. S will
steps shall be performed for this JPM, including any required communications. S will  
provide initiating cues and reports on other actions when directed by you. Ensure you
provide initiating cues and reports on other actions when directed by you. Ensure you  
indicate to me when you understand your assigned task. To indicate that you have
indicate to me when you understand your assigned task. To indicate that you have  
completed your assigned task return the handout sheet I provided you.
completed your assigned task return the handout sheet I provided you.  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
8800: Civil demonstration occurring at the World of Energy by anti-nuke activists.
8800: Civil demonstration occurring at the World of Energy by anti-nuke activists.  
0900: Security reports to the OSM that, one or more persons has been observed cutting their
0900: Security reports to the OSM that, one or more persons has been observed cutting their  
        way through the double security fences. RP/Q/B/1000l007(Security Event) is being
way through the double security fences. RP/Q/B/1000l007 (Security Event) is being  
        used in conjunction with the Emergency Plan.
used in conjunction with the Emergency Plan.  
0905: intruders have been seen entering the SSF. Security has isolated the area around the
0905: intruders have been seen entering the SSF. Security has isolated the area around the  
        SSF.
SSF.  
0910: Security reports that an explosion has occurred on the Keowee Barn and that water is
0910: Security reports that an explosion has occurred on the Keowee Barn and that water is  
        beginning to leak through the dam in several places.
beginning to leak through the dam in several places.  
0930: Security reports that no additional bombs were found and that no additional intruders
0930: Security reports that no additional bombs were found and that no additional intruders  
        have been located.
have been located.  
NOTE: All three Oconee Units remain in MODE 1 at 100% power during this event.
NOTE: All three Oconee Units remain in MODE 1 at 100% power during this event.  
INITIATING CUE:
INITIATING CUE:  
You are to perform the required actions of the Emergency Coordinator by referring lo
You are to perform the required actions of the Emergency Coordinator by referring lo  
RP/Q/BI1QOO/OI,Emergency Classification and determining the emergency classification and
RP/Q/BI1 QOO/OI, Emergency Classification and determining the emergency classification and  
any Protective Action Recommendations.
any Protective Action Recommendations.  


                                                                                    Admin-403 fnl
Admin-403 fnl  
                                                                                        Page 5 of 8
Page 5 of 8  
START TIME:
START TIME:  
            Classify the Event                                                   CRITICAL s'
Classify the Event  
STANDARD:  Refer to RP/O/B/lOOO/Ol (Emergency Classification) Enclosure 4.6
Refer to RP/O/B/lOOO/Ol (Emergency Classification) Enclosure 4.6  
            (FireslExplosions and Security Actions.                               __ SAT
(FireslExplosions and Security Actions.  
            Classify the event as a "Site Area Emergency" due to following:
Classify the event as a "Site Area Emergency" due to following:  
            Bomb detonated in Keowee Dam                                           __ UNSAl
Bomb detonated in Keowee Dam  
COMMENTS:
STANDARD:
            Determine Protective Action Recommendations
COMMENTS:  
STANDARD:  Refer to RP/O/B/1OOO/OO2 (Control Room Emergency Coordinator               SAT
Determine Protective Action Recommendations  
            Procedure) and GO TO Enclosure 4.2 (Site Emergency)
Refer to RP/O/B/1OOO/OO2 (Control Room Emergency Coordinator  
COMMENTS:                                                                         -UNSA'
Procedure) and GO TO Enclosure 4.2 (Site Emergency)  
            IF It has been determined that an Emergency Action bevel for an
STANDARD:
            Initiating Conditions has been met,
COMMENTS:  
            THEN Declare a Site Area Emergency
STANDARD:
            Time of Declaration: -                                                 -SAT
COMMENTS
STANDARD:  Determine Initiating Conditions have been met and Declare a Site Area
IF It has been determined that an Emergency Action bevel for an  
            Emergency due to:
Initiating Conditions has been met,  
            e   Bomb detonated in Keowee Dam                                     -UNSA-
THEN Declare a Site Area Emergency  
                OR
Time of Declaration: -  
                  Imminent /actual failure of the Keowee Hydro dam
Determine Initiating Conditions have been met and Declare a Site Area  
            Determine Time of Declaration is pressnt time.
Emergency due to:  
COMMENTS
e  
Determine Time of Declaration is pressnt time.
Bomb detonated in Keowee Dam  
OR  
Imminent /actual failure of the Keowee Hydro dam  
CRITICAL s'
__ SAT
__ UNSAl
SAT
-
UNSA'
-
SAT
-
UNSA-


                                                                                            Admin-403 hi
Admin-403 hi  
                                                                                                Page 6 of 8
Page 6 of 8  
                Appoint a person to maintzin the Emergency Coordinator Log OR
Appoint a person to maintzin the Emergency Coordinator Log OR  
                maintain the log yourself.
maintain the log yourself.  
STANDARD:        A person is appointed to maintain the Emergency Coordinator Log or       -SAT
A person is appointed to maintain the Emergency Coordinator Log or  
                indicate that you will maintain the log.
indicate that you will maintain the log.  
Cue: Masked, indicate someone is maintaining the Emergency Coordinator Log.
STANDARD:
                                                                                          __ UNSAT
Cue: Masked, indicate someone is maintaining the Emergency Coordinator Log.  
COMMENTS:
COMMENTS:  
                Appoint Control Room Offsite Communicator(s).
Appoint Control Room Offsite Communicator(s).  
STANDARD:        A Control Room Offsite Communicator is appointed.
A Control Room Offsite Communicator is appointed.  
                                                                                          -SAT
STANDARD:
Cue: If asked, indicate a Control Room Offsite Communicator has been appointed.
Cue: If asked, indicate a Control Room Offsite Communicator has been appointed.  
COMMENTS:
COMMENTS:  
                                                                                              UNSAT
STEP:
STEP:           Provide the Protective Action Recommendations from Enclosure 4.7.       CRITICAL STEP
STANDARD :  
                (Condition A I Condition B Response Action). Step 1.O,for use by the
Provide the Protective Action Recommendations from Enclosure 4.7.  
                Offsite Communicator if a Condition A, Imminent or Actual Dam Failure,
(Condition A I Condition B Response Action). Step 1 .O, for use by the  
                exists.                                                                   -SAT
Offsite Communicator if a Condition A, Imminent or Actual Dam Failure,  
STANDARD:      Enclosure 4.7, (Condition A I Condition B Response Action) is used to
exists.  
                determine that the following protective action recommendations are given
Enclosure 4.7, (Condition A I Condition B Response Action) is used to  
                to Oconee and Pickens County:                                             -UNSAT
determine that the following protective action recommendations are given  
                      1, Provide the following recommendationfor Emergency Notification
to Oconee and Pickens County:  
                          Form Section 15 (B)Evacuate:
1, Provide the following recommendation for Emergency Notification  
                              Move residents living downstream of the Keowee Hydro
Form Section 15 (B)  
                              Project dams to higher ground.
Evacuate:  
                    2. Provide the following recornmendation for Emergency Notification
Move residents living downstream of the Keowee Hydro  
                          Form Section 15 (El) Other:
Project dams to higher ground.  
                              Prohibit traffic flow across bridges identified on your
2. Provide the following recornmendation for Emergency Notification  
                              inundation maps until the danger has passed.
Form Section 15 (El) Other:  
Cue: If asked, inform the candidate that Keowee Dam failure is imminent
Prohibit traffic flow across bridges identified on your  
COMMENTS:
inundation maps until the danger has passed.  
                                        END OF TASK
Cue: If asked, inform the candidate that Keowee Dam failure is imminent  
'IME STOP:
COMMENTS:  
END OF TASK  
'IME STOP:  
-
SAT
__ UNSAT
-
SAT
UNSAT
CRITICAL STEP
-
SAT
-
UNSAT


                                                                                Admin-403 fnl
Admin-403 fnl  
                                                                                  Page 7 of a
Page 7 of a  
                      CRITICAL STEP EXPLANATIONS:
CRITICAL STEP EXPLANATIONS:  
STEP #                                     Explanation
STEP #  
  I    The candidate needs to be able to utilize the procedure and determine that a Site
Explanation  
      Area Emergency needs to be declared.
The candidate needs to be able to utilize the procedure and determine that a Site  
  6    The candidate must be abk?to make recommendations to the local agencies as to
Area Emergency needs to be declared.  
      what actions are necessary to protect the health and safety of the public.
The candidate must be abk? to make recommendations to the local agencies as to  
what actions are necessary to protect the health and safety of the public.  
I
6


                                                                                  Admin-403 fnl
Admin-403 fnl  
                                                                                    Page 8 of 8
Page 8 of 8  
                                  CANDIDATE CUE SHEET
CANDIDATE CUE SHEET  
                  (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)  
I INITIAL CONDITIONS:
I INITIAL CONDITIONS:  
0800: Civil demonstration occurring at the World of Energy by anti-nuke activists.
0800: Civil demonstration occurring at the World of Energy by anti-nuke activists.  
0900: Security reports to the QSM that, one or more persons has been observed cutting their
0900: Security reports to the QSM that, one or more persons has been observed cutting their  
      way through the double security fences. RP/O/B/1000/087 (Security Event) is being
way through the double security fences. RP/O/B/1000/087 (Security Event) is being  
      used in conjunction with the Emergency Plan.
used in conjunction with the Emergency Plan.  
0905: Intruders have been seen entering the SSF. Security has isolated the area around the
0905: Intruders have been seen entering the SSF. Security has isolated the area around the  
      SSF.
SSF.  
0910: Security reports that an explosion has occurred on the K ~ O W WDam and that water is
091 0: Security reports that an explosion has occurred on the K ~ O W
      beginning to leak through the dam in several places.
Dam and that water is  
0930: Security reports that no additional bombs were found and that no additional intruders
beginning to leak through the dam in several places.  
      have been located.
0930: Security reports that no additional bombs were found and that no additional intruders  
NOTE: All three Oconee Units remain in MODE 1 at 100% power during this event.
have been located.  
INITIATING CUE:
NOTE: All three Oconee Units remain in MODE 1 at 100% power during this event.  
YOU are to perform the required actions of the Emergency Coordinator by referring to
INITIATING CUE:  
RP/O/B/'l OOOlOI , Emergency Classification and detWmiRing the emergency classification and
YOU are to perform the required actions of the Emergency Coordinator by referring to  
any Protective Action Recommendations.
RP/O/B/'l OOOlOI , Emergency Classification and detWmiRing the emergency classification and  
any Protective Action Recommendations.  


                                        CRO-12A fnl
CRO-12A fnl  
                                        Page 1 of 11
Page 1 of 11  
                        REGION II
REGION II  
            INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
            JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
                        CRO-Ol2A
CRO-Ol2A  
          RECOVER A DROPPED CONTROL ROD
RECOVER A DROPPED CONTROL ROD  
CANDIDATE
CANDIDATE  
EXAMINER
EXAM IN ER


                                                                                        CRO-12A fnl
CRO-12A fnl  
                                                                                        Page2of11
Page2of11  
                                                REGION II
REGION II  
                                    INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
                                    JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
Task:
Task:  
RECOVER A DROPPED CONTROL ROD
RECOVER A DROPPED CONTROL ROD  
Alternate Path:
Alternate Path:  
Facilitv JPM #
Facilitv JPM #  
WA Ratinats):
WA Ratinats):  
System: APE 005
System: APE 005  
KIA:       AA2.03
KIA:  
Rating: 3.5/4.4
AA2.03  
Task Standard:
Rating: 3.5/4.4  
Unit is tripped manually upon receipt of second dropped rod
Task Standard:  
Preferred Evaluation Location:                                  Preferred Evaluation Method:
Unit is tripped manually upon receipt of second dropped rod  
Simulator         InPlant __                                   Perform X      Simulate -
Preferred Evaluation Location:  
References:
Simulator  
APIIIAII 700/15 (10110102)
InPlant __  
OQIQINI105/09 (1 1/21/02)
References:  
T.S. 3.1 4
APIIIAII 700/15 (1 0110102)  
OMP 1-18
OQIQINI 105/09 (1 1/21/02)  
Candidate:                                                             Time Start:
T.S. 3.1 4  
                                NAME                                 Time Finish:
OMP 1-18  
Performance Rating: SAT-             UNSAT   -                         Performance Time _I_
Preferred Evaluation Method:
Perform X Simulate -
Candidate:  
Time Start:  
NAME  
Time Finish:  
Performance Rating: SAT-  
UNSAT -  
Performance Time _I_  


                                                      CRO-12A fnl
CRO-12A fnl  
                                                      Page 3 of 1I
Page 3 of 1 I
                      SIMULATOR OPERATOR INSTRUCTIONS:
SIMULATOR OPERATOR INSTRUCTIONS:  
I.Recall Snap 206
I.  
2. Import files for CRQ-128
Recall Snap 206  
3. GotoRUN
2. Import files for CRQ-128  
3. GotoRUN  


                                                                                          CRO-12A fnl
CRO-12A fnl  
                                                                                          Page 4 of 11
Page 4 of 11  
Too~s/~quipmentl8rocedures           Needed:
Too~s/~quipmentl8rocedures  
Enclosure 5.3 of APlOlI (Recovery From Loss of Power)
Needed:  
                                          READ TO OPERATOR
Enclosure 5.3 of APlOlI (Recovery From Loss of Power)  
DIRECTION TO TRAINEE:
READ TO OPERATOR  
I will explain the initial conditions, and state the task to be performed. All control room
DIRECTION TO TRAINEE:  
steps shali be performed for this JPM, including any required communications. I will
I will explain the initial conditions, and state the task to be performed. All control room  
provide initiating cues and reports on other actions when directed by you. Ensure you
steps shali be performed for this JPM, including any required communications. I will  
indicate to me when you understand your assigned task. To indicate that you have
provide initiating cues and reports on other actions when directed by you. Ensure you  
completed your assigned task return the handout sheet I provided you.
indicate to me when you understand your assigned task. To indicate that you have  
INITIAL CONDITIONS:
completed your assigned task return the handout sheet I provided you.  
Unit #I   dropped a control rod in Group 6 approximately one hour ago and the unit is stable at
INITIAL CONDITIONS:  
55%.
Unit #I  
The Subsequent Actions of AP/15, DROPPED CONTROL RODS, have been completed
dropped a control rod in Group 6 approximately one hour ago and the unit is stable at  
through step 4.9.
55%.  
Shutdown Margin calculation has been run to verify that an adequate SBM exists.
The Subsequent Actions of AP/15, DROPPED CONTROL RODS, have been completed  
Systems Duty Engineer has been notified and no special maneuvering instructions are
through step 4.9.  
required,
Shutdown Margin calculation has been run to verify that an adequate SBM exists.  
Enclosure 4.10 of OP/O/A/I 105/09 has been completed up tu step 2.0.
Systems Duty Engineer has been notified and no special maneuvering instructions are  
INITIATING CUE::
required,  
The Control Room SRO informs you that the problem has been corrected and that recovery of
Enclosure 4.10 of OP/O/A/I 105/09 has been completed up tu step 2.0.  
the dropped rod can now begin.
INITIATING CUE::  
The Control Room SRO informs you that the problem has been corrected and that recovery of  
the dropped rod can now begin.  


                                                                                        CR0-12A fnl
CR0-12A fnl  
                                                                                        Page 5 of 11
Page 5 of 11  
START TIME:
START TIME:  
                                                                                  CRITICAL !
STANDARD:
            Step 2.1
COMMENTS:
            Take manual control of rods at the Diamond Control Station:
Step 2.1  
            Ensure the SG Master in HAND                                           _  ISAT
Take manual control of rods at the Diamond Control Station:  
            Ensure the Diamond Station in MANUAL
Ensure the SG Master in HAND  
                                                                                    -UNSI
Ensure the Diamond Station in MANUAL  
STANDARD:  The manual pushbutton for the SG Master handlauto station is
The manual pushbutton for the SG Master handlauto station is  
            depressed. The White Hand light comes ON and the Red Auto light -Jes
depressed. The White Hand light comes ON and the Red Auto light -Jes  
            OFF.
OFF.  
            The AUTOlMANUAL pushbutton on the Diamond Control Panel is
The AUTOlMANUAL pushbutton on the Diamond Control Panel is  
            depressed; the MANUAL half of the Push Button is back lighted.
depressed; the MANUAL half of the Push Button is back lighted.  
            Location 1UB1
Location 1 UB1
COMMENTS:
STEP:  
STEP:      Step 2.2                                                               CRITICAL I
Step 2.2  
            Ensure group with drcppedlrnisaligned rod selected on the Group Select
Ensure group with drcppedlrnisaligned rod selected on the Group Select  
            Switch.                                                                 -SAT
Switch.  
STANDARD: GKOUP SELECT SWITCH on 1UB1 is located by the student and               __ UNSP
STANDARD:  
            rotated to Group 6.
GKOUP SELECT SWITCH on 1UB1 is located by the student and  
COMMENTS:
rotated to Group 6.  
m:         Step 2.3                                                               CRITICAL E
COMMENTS:  
            Ensure in SEQ OVERRIDE.
m:  
                                                                                    __I SAT
Step 2.3  
STANDARD: The SEQlSEQ OR pushbutton is located on the Diamond Control panel
Ensure in SEQ OVERRIDE.  
            on 1UB1 and depressed. "SEB 08"is backlighted.                         __ UNSP
STANDARD:  
COMMENTS:
The SEQlSEQ OR pushbutton is located on the Diamond Control panel  
on 1UB1 and depressed. "SEB 08" is backlighted.  
COMMENTS:
CRITICAL !
_I SAT
-
UNSI
CRITICAL I
-
SAT
__ UNSP  
CRITICAL E
__I SAT
__ UNSP


                                                                                      CRO-12
Step 2.4  
                                                                                      Page 6 (
Ensure JOG selected on Speed Selector.  
          Step 2.4                                                               CRlTlCAb STI
STANDARD:  
          Ensure JOG selected on Speed Selector.
The SPEED Selector is located by the student on the Diamond Control  
STANDARD: The SPEED Selector is located by the student on the Diamond Control
panel on 1 UBI and rotated to the JOG position.  
          panel on 1UBI and rotated to the JOG position.                         ~  UNSAT
COMMENTS:  
COMMENTS:
COMMENTS:
          Step 2.5                                                               CRITICAL STI
Step 2.5  
          If Group is at the OUT LIMIT:
If Group is at the OUT LIMIT:  
                Depress and hold LATCH switch.                                     -SAT
Release LATCH switch.
                Insert group for approximately 15 seconds or until the group OUT
Depress and hold LATCH switch.  
              LIMIT lamp on the Diamond Panel goes off.
Insert group for approximately 15 seconds or until the group OUT  
                Release LATCH switch.                                              -UNSAT
LIMIT lamp on the Diamond Panel goes off.  
          The IN LIMIT (LATCH) BYPASS pushbutton is located by the student and
The IN LIMIT (LATCH) BYPASS pushbutton is located by the student and  
          depressed and held while the INSERT/WITHDRAW joystick is used to
depressed and held while the INSERT/WITHDRAW joystick is used to  
          insert Group 6 until the Group 6 But limit lamp, located on the Diamond
insert Group 6 until the Group 6 But limit lamp, located on the Diamond  
          Control Panel on 1UBI, extinguishes.
Control Panel on 1 UBI, extinguishes.  
          The LATCH pushbutton is then released and the INSERTMITHDRAW
The LATCH pushbutton is then released and the INSERTMITHDRAW  
          joystick returned to neutral.
joystick returned to neutral.  
COMMENTS:
CRO-12
Page 6 (
CRlTlCAb STI
~
UNSAT
CRITICAL STI
-
SAT
-
UNSAT


                                                                                      CRQ-12A fnl
-6:
                                                                                      Page 7 of 11
Step 2.6  
                                                                                CRITICAL STEP
TRANSFER the droppedlmisaligned rod to the Auxiliary Power Supply:  
:6-        Step 2.6
Ensure desired group selected on Group Select Switch.  
            TRANSFER the droppedlmisaligned rod to the Auxiliary Power Supply:
Ensure droppedimisaligned rod selected on Single Select Switch  
                Ensure desired group selected on Group Select Switch.             I  SAT
Ensure in SEQ OVERRIDE.  
                Ensure droppedimisaligned rod selected on Single Select Switch
Ensure in AUXILIARY.  
                                                                                      UNSAT
Verify Manual Transfer Sync light is lit before pressing clamp.  
                Ensure in SEQ OVERRIDE.
Depress CLAMP.  
                Ensure in AUXILIARY.
Depress selector for MANUAL TRANSFER switch until TRANSFER  
                Verify Manual Transfer Sync light is lit before pressing clamp.
CONFIRM lamp and the CONTROL ON lamp on the PI panel light.  
                Depress CLAMP.
Depress CLAMP RELEASE  
                Depress selector for MANUAL TRANSFER switch until TRANSFER
STANDARD:  
                CONFIRM lamp and the CONTROL ON lamp on the PI panel light.
On the CRD Panel on 1 UB1:  
                Depress CLAMP RELEASE
Verify Group Select Switch positioned to Group 6.  
  STANDARD: On the CRD Panel on 1UB1:
SELECT droppedlmisaligned rod on the SINGLE SELECT SWITCH.  
            Verify Group Select Switch positioned to Group 6.
VERIFY SEQ OR is backlit (Not Critical).  
            SELECT droppedlmisaligned rod on the SINGLE SELECT SWITCH.
Depresses GRQUWAUXIL pushbutton to make transfer to AUXIL.  
            VERIFY SEQ OR is backlit (Not Critical).
Verifies SYNC is backlit on MAN TRANSISYITU CF pushbutton (Not  
            Depresses GRQUWAUXIL pushbutton to make transfer to AUXIL.
Critical)  
            Verifies SYNC is backlit on MAN TRANSISYITU CF pushbutton (Not
Depresses CLAMPCLAMP REL pushbutton to make transfer to CLAMP.  
            Critical)
CLAMP will be backlit.  
            Depresses CLAMPCLAMP REL pushbutton to make transfer to CLAMP.
Depresses MAN TRANSISYITR CF pushbutton. TR CF will become  
            CLAMP will be backlit.
backlit. White CONTROL ON lights will illuminate for the Dropped Rod  
            Depresses MAN TRANSISYITR CF pushbutton. TR CF will become
on the Position Indication panel.  
            backlit. White CONTROL ON lights will illuminate for the Dropped Rod
Depresses CLAMPCLAMP REL pushbutton and verifies CLAMP REL is  
            on the Position Indication panel.
backlit.  
            Depresses CLAMPCLAMP REL pushbutton and verifies CLAMP REL is
COMMENTS:  
            backlit.
CRQ-12A fnl
  COMMENTS:
Page 7 of 11
CRITICAL STEP
I
SAT
UNSAT


                                                                                      CRO-12A fnl
Step 2.7  
                                                                                      Page8of11
Perform PI alignment on the droppedlmisaligned rod as follows:  
          Step 2.7
Release LATCH switch  
          Perform PI alignment on the droppedlmisaligned rod as follows:           -SAT
Depress and hold LATCH switch and use the INSEWTFAITHDRAW  
              Depress and hold LATCH switch.
joystick to insert rod for 15 seconds. Release the LATCH switch.  
                Insert rod for 15 seconds.                                        -UNSAT
Depress and hold LATCH switch.
                Release LATCH switch
Insert rod for 15 seconds.
STANDARD:  Depress and hold LATCH switch and use the INSEWTFAITHDRAW
STANDARD:
          joystick to insert rod for 15 seconds. Release the LATCH switch.
COMMENTS:  
COMMENTS:
STANDARD:
          Step 2.8
COMMENTS
          Perform PI alignment on droppedhnisaligned rod as follows:
Step 2.8  
                                                                                  __ SAT
Perform PI alignment on droppedhnisaligned rod as follows:  
              Compare absolute and relative readings on the PI panel
Compare absolute and relative readings on the PI panel  
                Use PI reset raisellower switch to match absolute and relative
Use PI reset raisellower switch to match absolute and relative  
                                                                                  -UNSAT
readings.  
                readings.
Absolute and relative indications on the PI panel, on 1 UBI, are compared  
STANDARD: Absolute and relative indications on the PI panel, on 1UBI, are compared
using toggle switch to make comparison.  
          using toggle switch to make comparison.
RPI is selected with the select toggle switch. The POSITION RESET  
          RPI is selected with the select toggle switch. The POSITION RESET
WISEILOWER toggle switch is then placed in the lower position and RPI  
          WISEILOWER toggle switch is then placed in the lower position and RPI
indication is matched to API position.  
          indication is matched to API position.
When matched the aAlSElLOWER toggle is released to neutral.  
          When matched the aAlSElLOWER toggle is released to neutral.
The select toggle switch is returned to the API position.  
          The select toggle switch is returned to the API position.
CRO-12A fnl
COMMENTS
Page8of11
-
SAT
-
UNSAT
__ SAT
-
UNSAT


                                                                                            CRO-12A fnl
CRO-12A fnl  
                                                                                            Page 9 of 11
Page 9 of 11  
STEQ:       Step 2.9
STEQ:  
              Ensure RUN selected on Speed Selector                                     _  I SAT
Step 2.9  
STANDARD:   SPEED SELECTOR is located by the student on 1UB1 and rotated to the       -UNSAT
Ensure RUN selected on Speed Selector  
              run position.
STANDARD:  
NOTE: Instructor in Booth: at this time fire timer to drop second control rod.
SPEED SELECTOR is located by the student on 1UB1 and rotated to the  
COMMENTS:
run position.  
              Manually trip the reactor                                                CRlTlCAL STEP
NOTE: Instructor in Booth: at this time fire timer to drop second control rod.  
STEQ I O :
COMMENTS:  
                                                                                        -SAT
STEQ I O :
STANDARB:   The student recognizes the second control rod inserting and manually
STANDARB:  
              trips the reactor by depressing the Reactor Trip pushbutton and verifies
Manually trip the reactor
              that the reactor is shutdovdn.
The student recognizes the second control rod inserting and manually  
                                                                                        __ UNS T
trips the reactor by depressing the Reactor Trip pushbutton and verifies  
COMMENTS:
that the reactor is shutdovdn.  
                                      END TASK
COMMENTS:  
STOP TIME:
END TASK  
_I SAT
-
UNSAT
CRlTlCAL STEP
-
SAT
__ UNS T
STOP TIME:  


                                                                                    CRQ-12A fnl
CRITICAL STEP EXPLANATIONS:
                                                                                    Page 10of 11
CRQ-12A fnl  
                        CRITICAL STEP EXPLANATIONS:
Page 10of 11  
STEP #                                        Explanation
STEP #
  1   Step is necessary for the operator to select the single rod and not move the plant
Explanation  
      around due to power excursions.
1  
  2    Step is necessary to instruct the rod logic as to which group the rod is in that the
2
      operator wants to recover.
3
  3    Step is necessary to allow the operator to withdraw the dropped rod.
4
  4    Jog is necessary because the roods will not latch with the selector switch in RUN
5
  5    The latching of the group to clear the out limit is necessary so that the individual rod
6
      can be withdrawn.
10
  6    Necessary to place the dropped rod on the auxiliary power supply for withdrawal while
Step is necessary for the operator to select the single rod and not move the plant  
      leaving the group on the group power supply.
around due to power excursions.  
  10  Necessary because the second dropped FOCI       places the unit in an unanalyzed
Step is necessary to instruct the rod logic as to which group the rod is in that the  
      condition and this is a direction, which is given by OMP 1-58.
operator wants to recover.  
Step is necessary to allow the operator to withdraw the dropped rod.  
Jog is necessary because the roods will not latch with the selector switch in RUN  
The latching of the group to clear the out limit is necessary so that the individual rod  
can be withdrawn.  
Necessary to place the dropped rod on the auxiliary power supply for withdrawal while  
leaving the group on the group power supply.  
Necessary because the second dropped FOCI  
places the unit in an unanalyzed  
condition and this is a direction, which is given by OMP 1-58.  


                                                                                  CRO-12A fnl
CRO-12A fnl  
                                                                                  Page 11 of 11
Page 11 of 11  
                              CANDIDATE CUE SHET
CANDIDATE CUE SHET  
            (TO BE RETURNED TO EXAMINER UPON CQMPLETIOM OF TASK)
(TO BE RETURNED TO EXAMINER UPON CQMPLETIOM OF TASK)  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
Unit #I dropped a control rod in Group 6 approximately one hour ago and the unit is stable at
Unit #I  
55%.
dropped a control rod in Group 6 approximately one hour ago and the unit is stable at  
The Subsequent Actions of AP/I/A/I 700115, DROPPED CONTROL RODS, have been
55%.  
completed through step 4.9.
The Subsequent Actions of AP/I/A/I 70011 5, DROPPED CONTROL RODS, have been  
Shutdown Margin calculation has been run to verify that an adequate SDM exists.
completed through step 4.9.  
Systems Duty Engineer has been notified and no special maneuvering instructions are
Shutdown Margin calculation has been run to verify that an adequate SDM exists.  
required.
Systems Duty Engineer has been notified and no special maneuvering instructions are  
Enclosure 4.10 of OP/O/A/1105/09 has been completed up to step 2.0.
required.  
INITIATING CUE:
Enclosure 4.10 of OP/O/A/1105/09 has been completed up to step 2.0.  
The Control Room SRO informs you that the problem has been corrected and that rec~vsryof
INITIATING CUE:  
the dropped rod can now begin.
The Control Room SRO informs you that the problem has been corrected and that rec~vsry of
the dropped rod can now begin.  


                                      CRO-015 fnl
CRO-015 fnl  
                                      Page 1 of 16
Page 1 of 16  
                    REGION II
REGION II  
          INlTlAL LICENSE EXAMINATION
IN lTlAL LICENSE EXAM I NATION
          JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
                    CRO-015
CRO-015  
    ESTABLISH EFDW FLOW THROUGH STARTUP
ESTABLISH EFDW FLOW THROUGH STARTUP  
                    VALVES
VALVES  
CANDIDATE
CANDIDATE  
EXAMINER
EXAMINER  


                                                                                                  CRO-015 fni
CRO-015 fni  
                                                                                                  Page 2 of 16
Page 2 of 16  
                                              REGION II
REGION II  
                                  INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
                                  JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
Task:
Task:  
ESTABLISH EFDW FLOW THROUGH STARTUP VALVES.
ESTABLISH EFDW FLOW THROUGH STARTUP VALVES.  
Alternate Path:
Alternate Path:  
N
N  
Facilitv JPM #:
Facilitv JPM #:  
KIA Ratinds):
KIA Ratinds):  
System: APE-054
System: APE-054  
KIA:     AA204
KIA:  
Rating: 4.2/4.3
AA204  
Task Standard:
Rating: 4.2/4.3  
EFDW flow IS established to the affected header through the startup valve
Task Standard:  
Preferred Evaluation Location:                                          Preferred Evaluation Method:
EFDW flow IS established to the affected header through the startup valve  
Simulator       in-Piant -                                              Perform X Simulate      -
Preferred Evaluation Location:  
References:
Simulator  
EOP Rule 3,(boss of Main or Emergency FDW)
in-Piant -  
EOP Rule 7 , (SG Feed Control)
References:  
EOP Enclosure 5.27, (Alternate Methods for Controlling EFDW Flow)
EOP Rule 3, (boss of Main or Emergency FDW)  
Candidate:                                                                     Time Start:
EOP Rule 7, (SG Feed Control)  
                                NAME                                           Time Finish:
EOP Enclosure 5.27, (Alternate Methods for Controlling EFDW Flow)  
Performance Rating: SAT -UNSAT -                                                Performance Time -
Preferred Evaluation Method:
Examiner:                                                                                       I
Perform X
                      NAME                                             SIGNATURE                   DATE
Simulate -
Candidate:  
Time Start:  
NAME  
Time Finish:  
Performance Time -
Performance Rating: SAT -  
UNSAT -  
Examiner:  
I  
NAME  
SIGNATURE  
DATE  


                                                      CRO-015 fnl
CRO-015 fnl  
                                                      Page 3 of 16
Page 3 of 16  
                      SIMULATOR OPERATOR INSTRUCTIONS:
SIMULATOR OPERATOR INSTRUCTIONS:  
1. Recall Snap 209
1. Recall Snap 209  
2. Import files for CRO-015
2. Import files for CRO-015  
3. GotoRUN
3. GotoRUN  


                                                                                          CRO-015 fnl
CRO-015 fnl  
                                                                                          Page 4 of 16
Page 4 of 16  
TooIslEquipmenff Procedures Needed:
TooIslEquipmenff Procedures Needed:  
                                        READ TO OPERATOR
READ TO OPERATOR  
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:  
I will explain the initial conditions, and state the task to be performed. All control room
I will explain the initial conditions, and state the task to be performed. All control room  
steps shall be performed for this JPM, including any required communications. I will
steps shall be performed for this JPM, including any required communications. I will  
provide initiating cues and reports on other actions when directed by you. Ensure you
provide initiating cues and reports on other actions when directed by you. Ensure you  
indicate to me when YOU understand your assigned task. To indicate that you have
indicate to me when YOU understand your assigned task. To indicate that you have  
completed your assigned task return the handout sheet I provided you.
completed your assigned task return the handout sheet I provided you.  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
The reactor has tripped
The reactor has tripped  
Main feedwater is lost
Main feedwater is lost  
NQ increase in Reactor Building pressure is occurring and all KCPs are running
NQ increase in Reactor Building pressure is occurring and all KCPs are running  
Subsequent Actions are complete
Subsequent Actions are complete  
Kule 3 is complete up to Step 29.
Kule 3 is complete up to Step 29.  
1FDW-32 5 is determined to be failed closed.
1 FDW-32 5 is determined to be failed closed.  
INITIATING CUES:
INITIATING CUES:  
The SRO directs you to initiate Enclosure 5.27, Alternate Methods for Controlling EFDW Flow
The SRO directs you to initiate Enclosure 5.27, Alternate Methods for Controlling EFDW Flow  
and establish 200 gpm EFBW flow to the 1A SG.
and establish 200 gpm EFBW flow to the 1A SG.  


                                                                                        CRO-015 fnl
CRO-015 fnl  
                                                                                        Page 5 of 16
Page 5 of 16  
START TIME:
START TIME:  
            Step 1
Step 1  
            Verify EFDW is being supplied by an alternate unit.                   -SAT
Verify EFDW is being supplied by an alternate unit.  
            RNO
RNO  
            GO TO Step 7
GO TO Step 7  
STANDARD:  Determine EFDW is not being supplied from another unit.               _  I UNSAT
Determine EFDW is not being supplied from another unit.  
            Perform RMO step and GO TO Step 7
Perform RMO step and GO TO Step 7  
CUE: EFDWis NOT being supplied by an alternate unit
STANDARD:
COMMENTS:
CUE: EFDWis NOT being supplied by an alternate unit  
            Step 7                                                               CRITICAL STEP
COMMENTS:  
            Stop MD EFWP in     a headers with malfunctioning EFDW control valve. _ I SAT
Step 7  
STANDARD:  Observes 1A steam generator level decreasing below setpoint on the SG
Stop MD EFWP in a  
            EXTENDED SU RANGE LEVEL meters (1UB1) or OAC screens.
headers with malfunctioning EFDW control valve.  
                    andlor
Observes 1A steam generator level decreasing below setpoint on the SG  
                                                                                    -UNSAT
EXTENDED SU RANGE LEVEL meters (1 UB1) or OAC screens.  
            Observes zero flow indicated to the 1A steam generator on the TOTAL
STANDARD:
            EFDW FLOW meters: on 1UBI.
andlor  
            Based on these indications. candidate determines that 18 steam
Observes zero flow indicated to the 1A steam generator on the TOTAL  
            generator EFDW header is the affected header.
EFDW FLOW meters: on 1 UBI.  
            Control switch for the l A MD EFWP is rotated to the OFF position.
Based on these indications. candidate determines that 18 steam  
            Continue to Step 8
generator EFDW header is the affected header.  
COMMENTS:
Control switch for the l A MD EFWP is rotated to the OFF position.  
            Step 8                                                               CRITICAL STEP
Continue to Step 8  
            Place TD EFDWP in PULL TO LOCK.
COMMENTS:  
                                                                                    __ SAP
Step 8  
STANBARB:  The TI3 EFDWP switch is placed in the LOCKOUT position.
Place TD EFDWP in PULL TO LOCK.  
            Continue to Step 9
The TI3 EFDWP switch is placed in the LOCKOUT position.  
                                                                                    -UNSAT
Continue to Step 9  
COMMENTS:
STANBARB:
COMMENTS:
-
SAT
_I UNSAT
CRITICAL STEP
_I SAT
-  
UNSAT  
CRITICAL STEP
__ SAP
-
UNSAT


                                                                                            CRO-015 fnl
CRO-015 fnl  
                                                                                            Page 6 of 16
Page 6 of 16  
              Step 9                                                                   CRlTlCAL STEP
Step 9  
              Place controllers for the following in HAND and set demand to 0% in
Place controllers for the following in HAND and set demand to 0% in  
              affected headers:                                                         -SAT
affected headers:  
                  IFDW-35 ( I A STARTUP FDW Control)
Candidate locates 1 FDW-35 on 1 UBI and the Bailey control station is  
STANDARD:    Candidate locates 1FDW-35 on 1UBI and the Bailey control station is
piaced in Hand by depressing the white HAND pushbutton, and observing  
              piaced in Hand by depressing the white HAND pushbutton, and observing     -UNSAT
the white HAND light ON. Valve position demand is reduced to 0 using  
              the white HAND light ON. Valve position demand is reduced to 0 using
the toggle switch to close the valve.  
              the toggle switch to close the valve.
Continue to Step 10  
              Continue to Step 10
IFDW-35 (IA STARTUP FDW Control)
NOTE: Candidate should perform all actions for 1A header because it is the header
STANDARD:
      with the failed valve.
NOTE: Candidate should perform all actions for 1A header because it is the header  
COMMENTS:
with the failed valve.  
              Step 10                                                                 CRITICAL STEP
COMMENTS:  
              Place control switch for the following in CLOSE in all affected headers:
STANDARD:
                  IFDW-33 ( I A S U FDW Block)                                         _ II SAT
COMMENTS:
                  IFDW-372 (la MDEFWP DISCH BLOCK)
Step 10  
STANDARD:    Candidate Locates IFDW-33 control switch on 1UB1 and rotates to the       -UNSAT
Place control switch for the following in CLOSE in all affected headers:  
            CLOSE position, observing the green CLOSE light ON and red OPEN
IFDW-33 (IASU FDW Block)  
            light OFF. (NOT CRITICAL IF IFDW-35 IS CLOSED)
IFDW-372 (la MDEFWP DISCH BLOCK)  
              Locates IFDW-372 Control Switch on 1UB1 and rotates to the CLOSE
Candidate Locates IFDW-33 control switch on 1UB1 and rotates to the  
            position, observing the green CLOSE light ON and the red OPEN light
CLOSE position, observing the green CLOSE light ON and red OPEN  
            OFF.
light OFF. (NOT CRITICAL IF IFDW-35 IS CLOSED)  
            Continue to Step 11
Locates IFDW-372 Control Switch on 1UB1 and rotates to the CLOSE  
COMMENTS:
position, observing the green CLOSE light ON and the red OPEN light  
OFF.  
Continue to Step 11  
CRlTlCAL STEP
-
SAT
-
UNSAT
CRITICAL STEP
_II SAT
-
UNSAT


                                                                                        CRO-015 fnl
CRO-015 fnl  
                                                                                        Page 7 of 16
Page 7 of 16  
          Step 11                                                                 CRITICAL STEP
Step 11  
          Place control switch for the following in OPEN in all affected headers:
Place control switch for the following in OPEN in all affected headers:  
          * IFDW-374 (MD EFDWP I A DISCH TO SG A)                                 -SAT
*  
STANDARD: Candidate locates IFDW-374 on l U B l and the red OPEN pushbutton is
IFDW-374 (MD EFDWP I A DISCH TO SG A)  
          depressed, the red OPEN indication is observed to be ON.                 -UNSAT
STANDARD:  
          Continue to Step 12
Candidate locates IFDW-374 on lUBl and the red OPEN pushbutton is  
COMMENTS:
depressed, the red OPEN indication is observed to be ON.  
          Step 12
Continue to Step 12  
          Place control switch for the following in CLOSE in all affected headers:
COMMENTS:  
          m   IFDW-36 ( I A S G NORM SU FDW HDR)                                   -SAT
Step 12  
STANDARD: Candidate locates 1FDW-36 on 1VB3 places control switch in the
Place control switch for the following in CLOSE in all affected headers:  
          CLOSE position and the green CLOSE indication is observed to be           I  UNSAT
m  
          illuminated; and the red OPEN indication is observed to be extinguished.
IFDW-36 (IASG NORM SU FDW HDR)  
          Continue to Step 13
STANDARD:  
COMMENTS:
Candidate locates 1FDW-36 on 1VB3 places control switch in the  
m:       Step 13
CLOSE position and the green CLOSE indication is observed to be  
          Place control switch for the following in OPEN in all affected headers:
illuminated; and the red OPEN indication is observed to be extinguished.  
          * IFDW-38 ( I A SG EFDW Header)                                           -SAT
Continue to Step 13  
STANDARD: Candidate locates IFDW-38 on IVB3 places control switch in the OPEN
COMMENTS:  
          position and the red OPEN indication is observed to be illuminated and   -UNSAT
m:  
          the green CLOSE indication is observed to be extinguished.
Step 13  
          Continue to Step 14
Place control switch for the following in OPEN in all affected headers:  
COMMENTS:
*  
IFDW-38 (IA SG EFDW Header)  
STANDARD:  
Candidate locates IFDW-38 on IVB3 places control switch in the OPEN  
position and the red OPEN indication is observed to be illuminated and  
the green CLOSE indication is observed to be extinguished.  
Continue to Step 14  
COMMENTS:  
CRITICAL STEP
-
SAT
-
UNSAT
-
SAT
I
UNSAT
-
SAT
-
UNSAT


                                                                                  CRO-015 fnl
CRO-015 fnl  
                                                                                  Page 8 of 16
Page 8 of 16  
            Step 14
Step 14  
          Verify 1FBW-315 failed
Verify 1FBW-315 failed  
                                                                                  -SAT
STANDARD:  
STANDARD: h4anual Loader Knob is turned counter-clockwise to OPEN valve, on
h4anual Loader Knob is turned counter-clockwise to OPEN valve, on  
            1UB1.
1UB1.  
            Candidate recognizes that 1FDW-315 is NOT responding to manual
Candidate recognizes that 1 FDW-315 is NOT responding to manual  
                                                                                  -UNSAT
control.  
          control.
Continue to Step 15  
          Continue to Step 15
COMMENTS:  
COMMENTS:
STEP IO:
STEP I O : Step 15
STANDARD:
          Verify I the following:
COMMENTS:  
          e   1FDW-38 open                                                     -SAT
Step 15  
                1FDW-36 closed
Verify I  
                IFDW-35 closed
the following:  
                IFDW-33 closed
e  
                                                                                  -UNSAT
1 FDW-38 open  
STANDARD:  Candidate locates 1FDW-38 on 1V53 and the red OPEN indication is
1FDW-36 closed  
          observed to be illuminated and the green CLOSE indication is observed
IFDW-35 closed  
          to be extinguished.
IFDW-33 closed  
          Candidate locates IFDW-36 on 1VB3 and the green CLOSE indication is
Candidate locates 1FDW-38 on 1V53 and the red OPEN indication is  
          observed to be illuminated; and the red OPEN indication is observed to
observed to be illuminated and the green CLOSE indication is observed  
          be extinguished.
to be extinguished.  
          Candidate locates 1FDW-35 on 1UBI and observes the Bailey control
Candidate locates IFDW-36 on 1VB3 and the green CLOSE indication is  
          station position demand is zero.
observed to be illuminated; and the red OPEN indication is observed to  
          Candidate locates 1FDW-33 control switch on 1UBI and observes the
be extinguished.  
          green CLOSE light ON and red OPEN light OFF.
Candidate locates 1 FDW-35 on 1 UBI and observes the Bailey control  
          Continue to Step 16
station position demand is zero.  
COMMENTS:
Candidate locates 1 FDW-33 control switch on 1 UBI and observes the  
green CLOSE light ON and red OPEN light OFF.  
Continue to Step 16  
-
SAT
-
UNSAT
-
SAT
-
UNSAT


                                                                                  CRO-015 fnl
CRO-015 fnl  
                                                                                  Page 9 of 16
Page 9 of 16  
STEP 11: Step 16
STEP 11:  
          Verify 1FDW-372 closed
Step 16  
                                                                                -SAT
Verify 1 FDW-372 closed  
STANDARD: Candidate locates IFDW-372 Control Switch on l U B i and observes the
STANDARD:  
          green CLOSE light ON arid the red OPEN light OFF.
Candidate locates IFDW-372 Control Switch on l U B i and observes the  
                                                                                I  UNSAT
green CLOSE light ON arid the red OPEN light OFF.  
          Continue to Step 17
Continue to Step 17  
COMMENTS:
COMMENTS:  
STEP 12: Step 17
STEP 12:  
          Verify both of the following:
Step 17  
              Verify 1FDW-374 is open.
Verify both of the following:  
          0   Verify 1A MDEFDWP available.                                     __ SAT
Verify 1 FDW-374 is open.  
STANDARD: Candidate locates IFDW-374 on 1UB1 and the red OPEN indication is
0  
                                                                                -UNSAT
Verify 1A MDEFDWP available.  
          observed to be ON.
STANDARD:  
          1A MD EFDWP control switch green OFF light is verified illuminated.
Candidate locates IFDW-374 on 1UB1 and the red OPEN indication is  
          This pump was secured by the candidate in a previous step.
observed to be ON.  
          Continue to Step 18
1A MD EFDWP control switch green OFF light is verified illuminated.  
CQMMENTS:
This pump was secured by the candidate in a previous step.  
STEP 13: Step 18
Continue to Step 18  
          GO TO Step 22
CQMMENTS:  
                                                                                -SAT
STEP 13:  
STANDARD: Candidate goes to Step 22.
Step 18  
COMMENTS:
GO TO Step 22  
                                                                                  UNSAP
Candidate goes to Step 22.  
STANDARD:
COMMENTS:  
-
SAT
I
UNSAT
__ SAT
-
UNSAT
-
SAT
UNSAP  


                                                                                      CRO-015 fnl
CRO-015 fnl  
                                                                                    Page 10 of 16
Page 10 of 16  
STEP 14: Step 22                                                               CRITICAL STEP
STEP 14:  
          Verify IFDW-316 failed
Step 22  
          RNO
Verify IFDW-316 failed  
          GO TO Step 30.                                                         -SAT
RNO  
STANDARD: Candidate verifies IFDW-316 is controlling SG level @ --j 30%.
GO TO Step 30.  
                                                                                  -UNSAT
STANDARD:  
                                    or
Candidate verifies IFDW-316 is controlling SG level @ --j 30%.  
          Manual Loader Knob is turned counter-clockwise to OPEN valve, on
Manual Loader Knob is turned counter-clockwise to OPEN valve, on  
          1UB1. Recognizes that IFBW-316 & responding to manual control.
1UB1. Recognizes that IFBW-316 & responding to manual control.  
          Perform RNO and GO TO Step 30.
Perform RNO and GO TO Step 30.  
COMMENTS:
or
STEP 15: Step 30
COMMENTS:  
          Verify AFlS actuation has occurred (either Statalarm on):
STEP 15:  
              AFlS HEADER A INITIATED (1SA-2/C-8)
STANDARD:
              AFIS HEADER E3 INITIATED (ISA-2/B-8)                               -SAT
COMMENTS:
          RNO
Step 30  
          GO TO Step 34.
Verify AFlS actuation has occurred (either Statalarm on):  
                                                                                      UNSAT
RNO
STANDARD: Candidate observes indicated Statalarms and verifies that they are NOT
GO TO Step 34.
                                                                                  i__
Candidate observes indicated Statalarms and verifies that they are NOT
          illuminated. Perform RNO and GO TO Step 34.
illuminated. Perform RNO and GO TO Step 34.
COMMENTS:
AFlS HEADER A INITIATED (1SA-2/C-8)  
AFIS HEADER E3 INITIATED (ISA-2/B-8)  
CRITICAL STEP
-  
SAT  
-
UNSAT
-
SAT
i__ UNSAT


                                                                                  CRO-015 fnl
CRO-015 fnl  
                                                                                  Page 11 of 16
Page 11 of 16  
STEP 16:     Step 34
STEP 16:  
            Verify an operator has been sent to locally position any FDW valvi
Step 34  
                    IFDW-94
Verify an operator has been sent to locally position any FDW valvi  
                    IFDW-315                                                   _ I SAT
IFDW-94  
            RNO
IFDW-315  
            GO TO Step 36.
RNO  
                                                                                -UNSAT
GO TO Step 36.  
STANDARD:   Determine that an operator has NOT been sent to locally position
STANDARD:  
            FDW valve.
Determine that an operator has NOT been sent to locally position  
            Perform RNO and GO TO Step 36.
FDW valve.  
CUE: No operators have been dispatched to locally operate any valves.
Perform RNO and GO TO Step 36.  
COMMENTS:
CUE: No operators have been dispatched to locally operate any valves.  
STEP 17:     Step 36
COMMENTS:  
            Verify 1FDW-315 failed open.
STEP 17:  
            RNO
Step 36  
              If lineup to feed through 1A SIU Control Valve was successful.   -SAT
Verify 1 FDW-315 failed open.  
            THEN GO TO Step 37.
RNO  
STANDARD:    Candidate should determine that the Manual Loader on 1UBI indi
If lineup to feed through 1A SIU Control Valve was successful.  
            0% and 1FDW-315 has failed dosed.                                 I_  UNSAT
THEN GO TO Step 37.  
                      Of
Candidate should determine that the Manual Loader on 1 UBI indi  
            Green CLOSED light is ON.
0% and 1 FDW-315 has failed dosed.  
              Perform RNO step 2., 1A SIU control valve linsup has been SUCCE
Green CLOSED light is ON.  
            THEN GO TO Step 37
Perform RNO step 2., 1A SIU control valve linsup has been SUCCE  
CQMMENTS:
THEN GO TO Step 37  
STEP 18:     Step 37
STANDARD:
            Verifv an operator has been sent to locally open IFDW-94.
Of
                                                                                -SAT
CQMMENTS:  
STANDARD:     Determine an operator has NOT been sent to locally open 1FDW.
STEP 18:  
              Perform RNO and GO TO Step 40
Step 37  
                                                                                __ UNSAT
Verifv an operator has been sent to locally open IFDW-94.  
CUE: No operators have been dispatched to locally operate any valves.
STANDARD:  
COMMENTS:
Determine an operator has NOT been sent to locally open 1 FDW.  
Perform RNO and GO TO Step 40  
CUE: No operators have been dispatched to locally operate any valves.  
COMMENTS:  
_I SAT
-
UNSAT
-
SAT
I_ UNSAT
-
SAT
__ UNSAT


                                                                                CRO-015 fnl
CRO-015 fnl  
                                                                                Page 12 of 16
Page 12 of 16  
STEP 39:       Step 40
STEP 39:  
              Start 1A MB EFDWP.
Step 40  
                                                                              -SAT
Start 1A MB EFDWP.  
STANDARD:    The 1A MD EFDWP control switch is rotated clockwise to the RUN
The 1A MD EFDWP control switch is rotated clockwise to the RUN  
              position and the red RUN light is verified ON.
position and the red RUN light is verified ON.  
              Contjnue to Step 41                                             -UNSAT
Contjnue to Step 41  
COMMENTS:
STANDARD:
STEP 20:     Step 41
COMMENTS:  
              Verify IFDW-316 failed open
STEP 20:  
                                                                              -SAT
STANDARD:
STANDARD:    Verifies IFDW-316 is controlling SG level @ r% 30%.
COMMENTS:
                      OI
Step 41  
              Manual Loader Knob is turned counter-clockwise to OPEN valve, on   UNSAT
Verify IFDW-316 failed open  
              1 UBI.
Verifies IFDW-316 is controlling SG level @ r% 30%.  
              Student recognizes that 1FDW-316 &responding to manual control.
O I 
              Perform RNO and GO TO Step 46.
Manual Loader Knob is turned counter-clockwise to OPEN valve, on  
COMMENTS:
1 UBI.  
STEP 21:     Step 46
Student recognizes that 1 FDW-316 &responding to manual control.  
              Verify HPI forced cooling is in progress.
Perform RNO and GO TO Step 46.  
                                                                              -SAT
STEP 21:  
STANDARD:     Determine that HPI Forced Cooling is NOT in progress
Step 46  
              Perform RNO and GO TO Step 48.
Verify HPI forced cooling is in progress.  
                                                                              -UNSAT
STANDARD:  
CUE: HPI forced cooling is NOT in progress.
Determine that HPI Forced Cooling is NOT in progress  
COMMENTS:
Perform RNO and GO TO Step 48.  
CUE: HPI forced cooling is NOT in progress.  
COMMENTS:  
-
SAT
-
UNSAT
-
SAT
UNSAT
-
SAT
-
UNSAT


                                                                                CRO-015 fnl
CRO-015 fnl  
                                                                                Page 13 of 16
Page 13 of 16  
STEP 22:     Step 48
STEP 22:  
              Verify LOHT tab is NOT in progress
Step 48  
                                                                                SAT
Verify LOHT tab is NOT in progress  
STANDARD:    Determine LQHT is NOT in progress.
Determine LQHT is NOT in progress.  
              Perform RMO and GO TO Step 51.
Perform RMO and GO TO Step 51.  
CUE: LOHT tab is NOT in progress.                                             -UNSAT
STANDARD:
COMMENTS:
CUE: LOHT tab is NOT in progress.  
              Verify 1FDW-315 failed.
COMMENTS:  
                                                                              I  SAT
Verify 1 FDW-315 failed.  
STANDARD:    Manual Loader on 1UBI indicates 0% 1FDW-315 has failed closed.
Manual Loader on 1 UBI indicates 0% 1 FDW-315 has failed closed.  
                      or
Green CLOSED light is ON.  
              Green CLOSED light is ON.                                       -UNSAT
Continue to Step 52  
              Continue to Step 52
STANDARD:
COMMENTS:
or
              Verify one of the following:
COMMENTS:  
                  Lineup to feed through l A SIU Control Valve was successful
Verify one of the following:  
                  Operator sent to locally throttle 1FDW-315                 -SAT
Lineup to feed through l A SIU Control Valve was successful  
STANDARD:     Determine that Lineup to feed through 1A SIU Control Valve was
Operator sent to locally throttle 1FDW-315  
              successful.                                                     __ UNSAT
STANDARD:  
              Continue to Step 53
Determine that Lineup to feed through 1A SIU Control Valve was  
CUE: 1A s/u control valve lineup has been successfurrl.
successful.  
COMMENTS:
Continue to Step 53  
CUE: 1A s/u control valve lineup has been successfurrl.  
COMMENTS:  
SAT
-
UNSAT
I
SAT
-
UNSAT
-
SAT
__ UNSAT


                                                                                              CRO-015 fnl
STEP 25:  
                                                                                            Page 14of 16
Step 53  
STEP 25:       Step 53
Verify an operator has been sent to locally control 1 FBW-315.  
                Verify an operator has been sent to locally control 1FBW-315.
STANDARD:  
STANDARD:       Determine that an operator has NOT been sent to locally control IFDW-
Determine that an operator has NOT been sent to locally control IFDW-  
                315.
315.  
                Perform RNO and GO TO Step 56                                             I UNSAT
Perform RNO and GO TO Step 56  
CUE: NO operators have been dispatched to localjy operate any valves.
CUE: NO operators have been dispatched to localjy operate any valves.  
COMMENTS:
COMMENTS:  
                ..                                 .--               .
..  
                                          NOTE                                           CRITICAL STEP
.--  
    FIQWfrom the TDEFDWP through a SIU control valve should be reads on the FDW
.  
    SU FLOW gauge.
NOTE  
                                                                                              SAT
FIQW from the TDEFDWP through a SIU control valve should be reads on the FDW  
*
SU FLOW gauge.  
                                                                                          I
Flow from the MDEFDWP through a SIU control valve should be read on the  
    Flow from the MDEFDWP through a SIU control valve should be read on the
MDEFDWP DlSCH FLOW gauge.  
    MDEFDWP DlSCH FLOW gauge.....                         ... ..             .._..
*
STEP 26:       Step 56                                                                   ~  UNSAT
....  
                Throttle 1FDW-35 S/U to obtain desired flow rate and/or SG level per
... ..  
                Rule 7 (SG Feed Control).
.._..  
STANDARD:      Manually throttle 4 FBW-35 on 1UBI. The raise/lower toggle switch is
STEP 26:  
                pushed up to increase the valve position demand signal to throttle open
Step 56  
                the valve. Flow is maintained within allowable limits. If flow exceeds
Throttle 1 FDW-35 S/U to obtain desired flow rate and/or SG level per  
                pump runout limits, action must be taken to reduce flow to within limits
Rule 7 (SG Feed Control).  
                prior to completing the task.
Manually throttle 4 FBW-35 on 1 UBI. The raise/lower toggle switch is  
                When feeding through the S/U Control Valves with the MDEFW Pumps,
pushed up to increase the valve position demand signal to throttle open  
                the MBEFOWP RISCH FLOW gauge should be used to verify flow within
the valve. Flow is maintained within allowable limits. If flow exceeds  
                limits.
pump runout limits, action must be taken to reduce flow to within limits  
NOTE: When flow has been established and level is increasing in the ? ASG, the
prior to completing the task.  
JPM is complete.
When feeding through the S/U Control Valves with the MDEFW Pumps,  
CQMMENTS:
the MBEFOWP RISCH FLOW gauge should be used to verify flow within  
STOP TIME:
limits.  
STANDARD:
NOTE: When flow has been established and level is increasing in the ?A SG, the  
JPM is complete.  
CQMMENTS:  
CRO-015 fnl
Page 14of 16
I
UNSAT
CRITICAL STEP
I
SAT
~
UNSAT
STOP TIME:  


                                                                                CRO-015 fnl
CRO-015 fnl  
                                                                              Page 15 of 16
Page 15 of 16  
                        CRITICAL STEP EXPLANATIONS:
CRITICAL STEP EXPLANATIONS:  
STEP #                                       Explanation
STEP #  
2&3   Necessary because the MD EFWP in the affected header needs to be sewred so
Explanation  
      that the header can be isolated and valves repositioned. Step is necessary because
2 & 3  
      the TD EFWP needs to be secured so that the header can be isolated and valves
Necessary because the MD EFWP in the affected header needs to be sewred so  
      repositioned.
that the header can be isolated and valves repositioned. Step is necessary because  
4& 5 Necessary to prevent the EFDW flow, which is meant for 1A SG from getting to other
the TD EFWP needs to be secured so that the header can be isolated and valves  
      portions of the system.
repositioned.  
  6   Aligns the emergency feed water to the 1A SG through the startup valves.
4 & 5  
  19   Restarts the MD EFDWP, which was stopped to reduce the DIP for the closure of
Necessary to prevent the EFDW flow, which is meant for 1A SG from getting to other  
      valves to isolate the affected header.
portions of the system.  
  26   Actually establishes flow to the 1A SG to establish required S6 levels.
6  
Aligns the emergency feed water to the 1A SG through the startup valves.  
19  
Restarts the MD EFDWP, which was stopped to reduce the DIP for the closure of  
valves to isolate the affected header.  
26  
Actually establishes flow to the 1A SG to establish required S6 levels.  


                                                                                    CRO-015 fnl
CRO-015 fnl  
                                                                                  Page 16 of 16
Page 16 of 16  
                              CANDIDATE CUE SHEET
CANDIDATE CUE SHEET  
            (TO B RETURNED TO EXAMINER UPON COMPLETION OF TASK)
(TO B RETURNED TO EXAMINER UPON COMPLETION OF TASK)  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
The reactor has tripped
The reactor has tripped  
Main feedwater is lost
Main feedwater is lost  
No increase in Reactor Building pressure is occurring and all RCPs are running
No increase in Reactor Building pressure is occurring and all RCPs are running  
Subsequent Actions are complete
Subsequent Actions are complete  
Rule 3 is complete up to Step 29.
Rule 3 is complete up to Step 29.  
IFDW-325 is determined to be failed closed.
IFDW-325 is determined to be failed closed.  
INITIATING CUES:
INITIATING CUES:  
The SR6 directs you to initiate Enclosure 5.27, Alternate Methods for Controlling EFDW Flow
The SR6 directs you to initiate Enclosure 5.27, Alternate Methods for Controlling EFDW Flow  
and establish 200 gpm EFDW flow to the 1A SG.
and establish 200 gpm EFDW flow to the 1A SG.  


                                      CRO-053 fnl
CRO-053 fnl  
                                        Page 1 of 8
Page 1 of 8  
                    REGION II
REGION II  
          INITlAL LICENSE EXAMINAT ION
IN ITlAL LICENSE EXAM IN AT ION  
          JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
                    CRO-053
CRO-053  
BYPASS COOLANT PUMP STARTING INTERLOCKS
BYPASS COOLANT PUMP STARTING INTERLOCKS  
CANDIDATE
CANDIDATE  
EXAMINER
EXAMINER  


                                                                                          CRO-053 fnl
CRO-053 fnl  
                                                                                          Page 2 of 8
Page 2 of 8  
                                              REGION II
REGION II  
                                  lNlTlAL LICENSE EXAMINATION
lNlTlAL LICENSE EXAMINATION  
                                  JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
Tirsk:
Tirsk:  
BYPASS COOLANT BUMP STARTING INTERLOCKS
BYPASS COOLANT BUMP STARTING INTERLOCKS  
Alternate Path:
Alternate Path:  
Facilitv JPM #:
Facilitv JPM #:  
KIA Ratinds):
KIA Ratinds):  
System: EPE-074
System: EPE-074  
WA:       A3.04
WA:  
Rating:
A3.04  
Task Standard:
Rating:  
Reactor Coolant Pump starting interlocks are correctly bypassed
Task Standard:  
Preferred Evaluation Location:                                  Preferred Evaluation Method:
Reactor Coolant Pump starting interlocks are correctly bypassed  
Simulator _s   In-Plant X                                     Perform -Simulate _X___
Preferred Evaluation Location:  
References:
Simulator _s In-Plant  
Examiner:                                                                              I
X  
                        NAME                                   SIGNATURE                   DATE
References:
Preferred Evaluation Method:
Perform -  
Simulate _X___  
Examiner:  
I  
NAME  
SIGNATURE  
DATE  


                                CRO-053 fnl
CRO-053 fnl  
                                  Page 3 of 8
Page 3 of 8  
SIMULATOR OPEFUTBR INSTRUCTIONS:
SIMULATOR OPEFUTBR INSTRUCTIONS:  
              NONE
NONE  


                                                                                          CRO-853 fnl
CRO-853 fnl  
                                                                                          Page 4 of 8
Page 4 of 8  
TooIslE~uipmen~Procedures           Needed:
TooIslE~uipmen~Procedures  
                                        READ TO OPERATOR
Needed:  
DIRECTION TO TRAINEE:
READ TO OPERATOR  
I will explain the initial conditions, and state the task to be performed. All control room
DIRECTION TO TRAINEE:  
steps shall be performed for this JPM, including any required communications. I will
I will explain the initial conditions, and state the task to be performed. All control room  
provide initiating cues and reports on other actions when directed by you. Ensure you
steps shall be performed for this JPM, including any required communications. I will  
indicate to me when you understand your assigned task. To indicate that you have
provide initiating cues and reports on other actions when directed by you. Ensure you  
completed your assigned task return the handout sheet I provided you.
indicate to me when you understand your assigned task. To indicate that you have  
INITIAL CONDITIONS:
completed your assigned task return the handout sheet I provided you.  
An accident has occurred on Unit 3 in which the EQP is being used.
INITIAL CONDITIONS:  
All RCPs are off and full HPI has been initiated.
An accident has occurred on Unit 3 in which the EQP is being used.  
Inadequate core cooling exists with Core Exit Thermocouples > 780&deg;F but           1200&deg;F and not
All RCPs are off and full HPI has been initiated.  
decreasing.
Inadequate core cooling exists with Core Exit Thermocouples > 780&deg;F but  
INITIATING CUE:
decreasing.  
The Procedure Director directs you to bypass Reactor Coolant Pump starting interlocks per
INITIATING CUE:  
Enclosure 5.14, "Jumpe~Contacts for RCP Starting interlocks" of the EO$.
The Procedure Director directs you to bypass Reactor Coolant Pump starting interlocks per  
Enclosure 5.14, "Jumpe~ Contacts for RCP Starting interlocks" of the EO$.  
1200&deg;F and not


                                                                                              CRO-053 fnl
CRO-053 fnl  
                                                                                              Page 5 of 8
Page 5 of 8  
  START TIME:
START TIME:  
                  Obtain Reactor Coolant Pump Motor starting interlock jumper cables for CRITICAL STEP
Obtain Reactor Coolant Pump Motor starting interlock jumper cables for  
                  affected unit(&sect;), per Endosure 5.14 of EP/1,2,or 3/A11800/01 Emergency
affected unit(&sect;), per Endosure 5.14 of EP/1,2,or 3/A11800/01 Emergency  
                  Operating Procedure.                                                       SAT
Operating Procedure.  
~
Jumper cables are obtained from the key locker located in the Work  
                                                                                          I _
Control Center.  
'
~
~
~
  STANDARD:      Jumper cables are obtained from the key locker located in the Work
' STANDARD:
                  Control Center.
NOTE: Jumper cables for unit #1  
                                                                                          -UNSAT
locker. Ensure correct set of jumper cables are identified and obtained.  
  NOTE: Jumper cables for unit #1         unit #2 RCPs are located in the same key
CUE: After correct jumpers have been located, inform student that he may leave  
  locker. Ensure correct set of jumper cables are identified and obtained.
jumpers in the key locker.  
  CUE: After correct jumpers have been located, inform student that he may leave
unit #2 RCPs are located in the same key
  jumpers in the key locker.
COMMENTS:  
  COMMENTS:
STEP:  
  STEP:           LOCATE Termin81 Cabinet MTC3 for the affected unit(s)                 CRITICAL STEP
LOCATE Termin81 Cabinet MTC3 for the affected unit(s)  
                                                                                              SAT
STANDARD:  
  STANDARD:     Terminal Cabinet MTC3 is correctly located:
Terminal Cabinet MTC3 is correctly located:  
                  3MTC3 is located in Unit #3 Cable Room near south Cable Room door.
3MTC3 is located in Unit #3 Cable Room near south Cable Room door.  
                                                                                          -UNSAT
COMMENTS:
  COMMENTS:
CRITICAL STEP
I_ SAT
-  
UNSAT  
CRITICAL STEP
SAT
-
UNSAT


                                                                                          CRO-053 fnl
a:
                                                                                          Page 6 of 8
STANDARD:
a:BYPASS the Reactor Coolant Pump Motor starting interlocks on the                   CRITICAL STEP
BYPASS the Reactor Coolant Pump Motor starting interlocks on the  
              affected unit(s), as listed on Enclosure 5.14 of EW 4/Nl800/01,
affected unit(s), as listed on Enclosure 5.14 of EW 4/Nl800/01,  
              Emergency Operating Procedure.                                             SAT
Emergency Operating Procedure.  
            Bcp       Contacts
Bcp Contacts  
                                                                                          UNSAT
A I 
            AI      A3PA to A305
A3PA to A305  
            82     B8PBto8805
82  
              BI    A4PA to A405
B8PBto8805  
              E2     BSPB to B905
B I 
STANDARD:    MTC3 cabinet door is opened and the following steps are performed for
A4PA to A405  
            EACH Reactor Coolant Pump Motor:
E2  
            The first contact is located and identified on the terminal board
BSPB to B905  
            One end of the jumper cable is simulated to be clipped to this contact.
MTC3 cabinet door is opened and the following steps are performed for  
            The second specified contact is located and identified on the terminal
EACH Reactor Coolant Pump Motor:  
            board.
The first contact is located and identified on the terminal board  
            The other end of the jumper cable is simulated to be clipped to the
One end of the jumper cable is simulated to be clipped to this contact.  
            second contact.
The second specified contact is located and identified on the terminal  
NOTE: End task when you have determined that student is proficient at identifying
board.  
RCB jumper contacts.
The other end of the jumper cable is simulated to be clipped to the  
COMMENTS:
second contact.  
NOTE: End task when you have determined that student is proficient at identifying  
RCB jumper contacts.  
COMMENTS:  
CRO-053 fnl
Page 6 of 8
CRITICAL STEP
SAT
UNSAT


                                                                                CRQ-053 fnl
CRQ-053 fnl  
                                                                                Page 7 of 8
Page 7 of 8  
                      CRITICAL STEP EXPLANATIONS:
CRITICAL STEP EXPLANATIONS:  
STEP #                                     Explanation
STEP #  
  1   Necessary because the cables must be obtained to jumper the interlocks.
Explanation  
  2   Necessary because the operator must locate the correct cabinet for the correct unit
1  
  3   Necessary because the operator must be able to identify the correct contacts for each
Necessary because the cables must be obtained to jumper the interlocks.  
      WCP or the interlocks will not be bypassed as required.
2  
Necessary because the operator must locate the correct cabinet for the correct unit  
3  
Necessary because the operator must be able to identify the correct contacts for each  
WCP or the interlocks will not be bypassed as required.  


                                                                                  CRO-053 fnl
CRO-053 fnl  
                                                                                    Page 8 of 8
Page 8 of 8  
                              CANDIDATE CUE SHEEP
CANDIDATE CUE SHEEP  
            (TO BE RETURNED TO EXMIINER UPON COMPLETION OF TASK)
(TO BE RETURNED TO EXMIINER UPON COMPLETION OF TASK)  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
An accident has occurred on Unit 3 in which the EQP is being used.
An accident has occurred on Unit 3 in which the EQP is being used.  
All WCPs are off and full HPI has been initiated.
All WCPs are off and full HPI has been initiated.  
Inadequate core cooling exists with Core Exit Thermocouples   700&deg;F but c 1200&deg;F and not
Inadequate core cooling exists with Core Exit Thermocouples  
decreasing.
decreasing.
INITIATING CUE:
INITIATING CUE:
The Procedure Director directs you to bypass Reactor Coolant Pump starting interlocks per
700&deg;F but c 1200&deg;F and not  
Enclosure 5.14?"Jumper Contacts for WCP Starting interlocks" of the EOQ.
The Procedure Director directs you to bypass Reactor Coolant Pump starting interlocks per  
Enclosure 5.14? "Jumper Contacts for WCP Starting interlocks" of the EOQ.  


                                      CRO-060 fnl
CRO-060 fnl  
                                      Page Iof 11
Page I of 11  
                    REGION II
REGION II  
          INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
          JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
                    CRO-060
CRO-060  
  PERFORM REQUIRED ACTIONS FOR A TURBINE
PERFORM REQUIRED ACTIONS FOR A TURBINE  
                BUILDING FLOOD
BUILDING FLOOD  
CANDIDATE
CANDIDATE  
EXAMINER
EXAMINER  


                                                                                        CRO-060 fnl
CRO-060 fnl  
                                                                                        Page 2 of 11
Page 2 of 11  
                                              REGION II
REGION II  
                                  INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
                                  JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
Task:
Task:  
PERFORM REQUIRED ACTIONS FOR A TURBINE BUILDING FLOOD
PERFORM REQUIRED ACTIONS FOR A TURBINE BUILDING FLOOD  
Alternate Path:
Alternate Path:  
Facilitv JPM #:
Facilitv JPM #:  
KIA Ratinds):
KIA Ratinds):  
System: APE BW/A07
System: APE BW/A07  
K/A:     AA1.3
K/A:  
Rating:
AA1.3  
Task Standard:
Rating:  
Preferred Evaluation Location:                                Preferred Evaluation Method:
Task Standard:  
Simulator       In-Plant __                                   Perform        Simulate -
Preferred Evaluation Location:  
References:
Simulator  
APllO, Uncontrollable Flooding of Turbine Building
In-Plant __  
Candidate:                                                           Time Start:
References:  
                                NAME                                 Time Finish:
APllO, Uncontrollable Flooding of Turbine Building  
PerformanCeg           SAT-UNSAT -                                     Performance Time -
Preferred Evaluation Method:
Perform
Simulate -
Candidate:  
Time Start:  
NAME  
Time Finish:  
PerformanCeg SAT-  
UNSAT -  
Performance Time -  


                                                      CRO-060 fnl
CRO-060 fnl  
                                                      Page 3 of 11
Page 3 of 11  
                      SIMULATOR OPERATOR INSTRUCTIONS:
SIMULATOR OPERATOR INSTRUCTIONS:  
1. Recall Snap 212
1. Recall Snap 212  
2. Import files for CRO-060
2. Import files for CRO-060  
3. GotoWUN
3. GotoWUN  


                                                                                          CRO-060 fnl
CRO-060 fnl  
                                                                                          Page 4 of 11
Page 4 of 11  
TQosslEquipmentlPrQcedures Needed:
TQosslEquipmentlPrQcedures Needed:  
                                        READ TO OPERATOR
READ TO OPERATOR  
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:  
I wiil explain the initial conditions, and state the task to be performed. All control room
I wiil explain the initial conditions, and state the task to be performed. All control room  
steps shall be performed for this JPM, including any required communications. I will
steps shall be performed for this JPM, including any required communications. I will  
provide initiating cues and reports on other actions when directed by you. Ensure you
provide initiating cues and reports on other actions when directed by you. Ensure you  
indicate to me when you understand your assigned task. To indicate that you have
indicate to me when you understand your assigned task. To indicate that you have  
completed your assigned task return the handout sheet I provided you.
completed your assigned task return the handout sheet I provided you.  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
Unit 1 was operating at 108% power with no known problems.
Unit 1 was operating at 108% power with no known problems.  
Unit 2 is in cold shutdown.
Unit 2 is in cold shutdown.  
The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water
The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water  
level is rising.
level is rising.  
Unit 1 has been tripped and the EOP is being completed by other team members.
Unit 1 has been tripped and the EOP is being completed by other team members.  
INITIATING CUES:
INITIATING CUES:  
The Control Room &sect;a0 directs you to refer to APIIO, Uncontrollable Flooding of Turbine
The Control Room &sect;a0 directs you to refer to APIIO, Uncontrollable Flooding of Turbine  
Building, and peldorm required actions.
Building, and peldorm required actions.  


                                                                                            CRO-060 fnl
CRO-060 fnl  
                                                                                            Page 5 of 11
Page 5 of 11  
START TIME:
START TIME:  
STEP:           Step 4
STEP:  
                Ensure Rx is tripped
Step 4  
                                                                                        -SAT
Ensure Rx is tripped  
STANDAKD:      Determine RX has tripped by observing all control rods inserted and
Determine RX has tripped by observing all control rods inserted and  
                power is < 1%.
power is < 1 %.  
                                                                                        -UNSAT
Continue to Step 2.  
                Continue to Step 2.
STANDAKD:
COMMENTS:
COMMENTS:  
                                        ..                           .......
....
                                            NOTE                                       CRITICAL STEP
.......  
Tripping the CCW pumps will cause loss of condenser vacuum which will result in TBVs
NOTE  
                      of the MFDWPs.
Tripping the CCW pumps will cause loss of condenser vacuum which will result in TBVs  
                    -..                              ...... -.                   _.__
.  
                                                                                            SAT
...... -.  
STEP:         Step 2
_.__  
                Ensure all CCW pumps are shutdown                                       ___ UNSAT
of the MFDWPs.
STANDARD:      The I A , 1B. and I C CCW pump switches are rotated to the TRIP
-.
                position. (located on 1AB3)
STEP:  
                Continue to Step 3.
Step 2  
COMMENTS:
Ensure all CCW pumps are shutdown  
STEP:         Step 3                                                                 CRITICAL STEP
The IA, 1B. and I C CCW pump switches are rotated to the TRIP  
                Press both of the following on the TURB BLDG FLOOD MER CLOSING
position. (located on 1AB3)  
                ALL CCWP DISCH VALVES control switch:                                   __ SAT
Continue to Step 3.  
                    CLOSE1
STANDARD:
                    CLOSE2
COMMENTS:  
                                                                                        -UNSAT
STEP:  
STANDARD:      "CLOSE 1" and "CLOSE 2" on the TURB BLDG FLOOD MER
Step 3  
                CLOSING ALL CCWP BlSCH VALVES control switch are both
Press both of the following on the TURB BLDG FLOOD MER CLOSING  
                depressed. (located on IAB3)
ALL CCWP DISCH VALVES control switch:  
                Continue to Step 4
CLOSE1  
COMMENTS:
CLOSE2  
L.......                           .....                       ......
"CLOSE 1" and "CLOSE 2" on the TURB BLDG FLOOD MER  
CLOSING ALL CCWP BlSCH VALVES control switch are both  
depressed. (located on IAB3)  
Continue to Step 4  
STANDARD:
COMMENTS:  
.......  
.....  
L
......  
-
SAT
-
UNSAT
CRITICAL STEP
SAT
___ UNSAT
CRITICAL STEP
__ SAT
-
UNSAT


                                                                                                  CRO-060 fnl
CRO-060 fnl  
                                                                                                  Page 6 of 11
Page 6 of 11  
    STEP:             Step 4
STEP:  
                    Verify all CCW pump discharge valves are closed
Step 4  
                                                                                              -SAT
Verify all CCW pump discharge valves are closed  
    STANDARD:       The green CLOSED lights for ICCW-IO, 11, 12 & 23 are verified
STANDARD:  
                      illuminated and the red OPEN lights for the same valves are verified
The green CLOSED lights for ICCW-IO, 11, 12 & 23 are verified  
                    extinguished. (located on 1AE3)                                           -UNSP
illuminated and the red OPEN lights for the same valves are verified  
                    Continue to Step 5.
extinguished. (located on 1AE3)  
    COMMENTS:
Continue to Step 5.  
I                                              NOTE
COMMENTS:  
    Field tasks.that may affect multiple units should be coordinated
NOTE  
                                                                  . with Unit 2 and Unit 3.
I Field tasks.that may affect multiple units should be coordinated  
                                                                                              CRITICAL S
. with Unit 2 and Unit 3.  
                                                                                              ___ SAT
STEP:  
  STEP:             Step 5
Step 5  
                    Dispatch operators to ensure all three flood doors are closed and in the
Dispatch operators to ensure all three flood doors are closed and in the  
                    SECURED position from the AB side (A-I, at Unit 1, 2, and 3 stairwell         UNSP
SECURED position from the AB side (A-I, at Unit 1, 2, and 3 stairwell  
                    entrances to TB): (2)
entrances to TB): (2)  
                          Unit 1 Flood Door
Unit 1 Flood Door  
                          Unit 2 Flood Door
Unit 2 Flood Door  
                          Unit 3 Flood Door
Unit 3 Flood Door  
    STANDARD:       Candidate should dispatch and NE0 to ensure all three flood doors are
STANDARD:  
                    closed and in the SECURED position from the AB side.
Candidate should dispatch and NE0 to ensure all three flood doors are  
                    Continue to Step 6
closed and in the SECURED position from the AB side.  
    Cue: An operator has been dispatched.
Continue to Step 6  
    COMMENTS:
Cue: An operator has been dispatched.  
:6-                Step 6
COMMENTS:  
                    Verify LPI decay heat removal is NOT in progress
-6:  
                                                                                              -SAT
Step 6  
  STANDARD:        Determine LPI pumps are not operating by observing pumps switch
Verify LPI decay heat removal is NOT in progress  
                    indicaticns on 1UB2.
Determine LPI pumps are not operating by observing pumps switch  
                                                                                                  UNSP
indicaticns on 1 UB2.  
                    Continue to Step 7.
Continue to Step 7.  
  COMMENTS:
STANDARD:
COMMENTS:  
-
SAT
-
UNSP
CRITICAL S
___ SAT
UNSP
-
SAT
UNSP


                                                                                          CRO-OB0 fnl
CRO-OB0 fnl  
                                                                                          Page 7 of I 1
Page 7 of I 1
              Step 7
Step 7  
              Dispatch an operator to place the following waterbox discharge valve
Dispatch an operator to place the following waterbox discharge valve  
              switches to HAND and CLOSE (T-3, East of condenser catwalk):             -SAT
switches to HAND and CLOSE (T-3, East of condenser catwalk):  
                  1CCW-20 ( I A I )
1CCW-20 (IAI)  
                  ICCW-21 (1A2)
ICCW-21 (1A2)  
              0   ICCW-22 ( I B I )
0  
                                                                                      __ UNSAT
ICCW-22 (IBI)  
              .   1CCW-23 (182)
. 16CW-24(1C1)  
                  16CW-24(1C1)
1 CCW-23 (1 82)  
                  ICCW-25 (IC2)
ICCW-25 (IC2)  
    Nc -
Nc -  
      RD:   Candidate should disp       an opei tor to plac  tt  3b    valves to
RD:  
              HAND and CLOSE.
Candidate should disp  
              Continue to Step 8
HAND and CLOSE.  
Cue: QperatQr has been dispatched.
Continue to Step 8  
COMMENTS:
Cue: QperatQr has been dispatched.  
              Step 8
COMMENTS:  
              Make a PA announcement of the event including restrictions on entry into
an opei tor to plac tt
              TB basement due to electrical hazard.                                   -SAT
3b
STANDARD:     FA announcement is made using the Control Room phone
valves to
                                                                                      -UNSAT
Step 8  
              Continue tu Step 9.
Make a PA announcement of the event including restrictions on entry into  
COMMENTS:
TB basement due to electrical hazard.  
              Step 9
STANDARD:  
              Attempt to locate and isolate the suurce of the flooding
FA announcement is made using the Control Room phone  
                                                                                      -SAT
Continue tu Step 9.  
STANDARD:     Dispatch operators to locate and isolate the source of the flooding
COMMENTS:  
              Continue to Step I O .                                                   -UNSAT
Step 9  
Cue: Operators have been dispatched.
Attempt to locate and isolate the suurce of the flooding  
COMMENTS:
STANDARD:  
Dispatch operators to locate and isolate the source of the flooding  
Continue to Step I O .
Cue: Operators have been dispatched.  
COMMENTS:  
-
SAT
__ UNSAT
-
SAT
-
UNSAT
-
SAT
-
UNSAT


                                                                                          CRO-060 fnl
CRO-060 fnl  
                                                                                          Page 8 of 11
Page 8 of 11  
STEP IO:     Step 10
STEP IO:  
              Ensure all Unit 1 ESV pumps are shutdown:
Step 10  
              e   IAESVPump                                                           __ SAT
Ensure all Unit 1 ESV pumps are shutdown:  
                  1CESVPump
e  
                  1BESVPump
IAESVPump  
                                                                                      -UNSAT
1CESVPump  
STANDARD:     Stop ALL Unit 1 ESV pumps by rotating their pumps switches to OFF.
1BESVPump  
              (located on 1AB3)
STANDARD:  
              Continue to Step 11
Stop ALL Unit 1 ESV pumps by rotating their pumps switches to OFF.  
COMMENTS:
(located on 1AB3)  
STEP 11:       Step 11
Continue to Step 11  
              Verify all CCW pump discharge valves were suecessfully closed in earlier
COMMENTS:  
              steps.                                                                 -SAT
STEP 11:  
STANDARD:
Step 11  
              Continue to SteD 12                                                     -UNSAT
Verify all CCW pump discharge valves were suecessfully closed in earlier  
COMMENTS:
steps.  
STEP 12:       Step 12
STANDARD:  
              Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW
Continue to SteD 12  
              Pumps).
COMMENTS:  
                                                                                      -SAT
STEP 12:  
STANDARD:     Candidate should dispatch an operator to perform Encl 5.1 (Isolation of
Step 12  
              SSW to CCW Pumps).
Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW  
                                                                                      -UNSAT
Pumps).  
              Continue to Step 13
STANDARD:  
Cue: Operator is dispatched.
Candidate should dispatch an operator to perform Encl 5.1 (Isolation of  
COMMENTS:
SSW to CCW Pumps).  
Continue to Step 13  
Cue: Operator is dispatched.  
COMMENTS:  
__ SAT
-
UNSAT
-
SAT
-
UNSAT
-
SAT
-
UNSAT


                                                                                      CRO-060 fnl
CRO-060 fnl  
                                                                                      Page 9 of Z 1
Page 9 of Z 1  
STEP 53:       Step 13
STEP 53:  
                IAAT HPSW is NOT available,
STANDARD:
                THEN ensure End 5.31 (Temporarily Charging the HPSW System) of
COMMENTS:
                EP/l has been initiated.                                           -SAT
Step 13  
STANDARD:      Determine that HPSW is available by observing the HPSW Jockey pump
IAAT HPSW is NOT available,  
                operating and level in the EWST. (located on 1AB3)                     UNSAT
THEN ensure End 5.31 (Temporarily Charging the HPSW System) of  
                Continue to Steo <4
EP/l has been initiated.  
COMMENTS:
Determine that HPSW is available by observing the HPSW Jockey pump  
STEP 14:       Step 14
operating and level in the EWST. (located on 1AB3)  
                Notify a SRO to evaluate de-energizing electrical components in the
Continue to Steo <4  
                flooded areas.
STEP 14:  
                                                                                    -SAT
Step 14  
:-              Candidate should inform a SRO to evaluate de-energizing electrical
Notify a SRO to evaluate de-energizing electrical components in the  
                components in the flooded areas.
flooded areas.  
                                                                                    __ UNSAT
-:
Cue: SRO will evaluate which electrical equipment to de-energize.
Candidate should inform a SRO to evaluate de-energizing electrical  
COMMENTS:
components in the flooded areas.  
                    --                 END TASK
Cue: SRO will evaluate which electrical equipment to de-energize.  
STOP TIME:
COMMENTS:  
--  
END TASK  
STOP TIME:  
-
SAT
UNSAT
-
SAT
__ UNSAT


                                                                                CWQ-060 fnl
CWQ-060 fnl  
                                                                                Page 10 of 11
Page 10 of 11  
                      CRITICAL STEP EXPLANATIONS:
CRITICAL STEP EXPLANATIONS:  
STEP #                                     Explanation
STEP #  
  2   Necessary to attempt to terminate the flooding and not contribute to the water level in
Explanation  
      the TB basement.
2  
  3   Necessary to attempt to terminate the flooding and not contribute to the water level in
Necessary to attempt to terminate the flooding and not contribute to the water level in  
      the TB basement.
the TB basement.  
  5    Necessary to prevent the waters from the flooding from entering the Aux. Bldg.,
3  
      causing more problems and the spread of contamination,
Necessary to attempt to terminate the flooding and not contribute to the water level in  
the TB basement.  
Necessary to prevent the waters from the flooding from entering the Aux. Bldg.,  
causing more problems and the spread of contamination,  
5


                                                                                CRO-060 fnl
CRO-060 fnl  
                                                                                Page 12 of 11
Page 12 of 11  
                              CANDIDATE CUE SHEET
CANDIDATE CUE SHEET  
              (TOBE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
Unit 1 was operating at 100% power with no known problems.
Unit 1 was operating at 100% power with no known problems.  
Unit 2 is in cold shutdown.
Unit 2 is in cold shutdown.  
The 2/41 condenser inlet expansion joint has ruptured and Turbine Building Basement water
The 2/41 condenser inlet expansion joint has ruptured and Turbine Building Basement water  
level is rising.
level is rising.  
Unit 1 has been tripped and the EOP is being completed by other team members.
Unit 1 has been tripped and the EOP is being completed by other team members.  
INITIATING CUES:
INITIATING CUES:  
The Control Room SRO directs you to refer to AW10, Uncontrollable Flooding of Turbine
The Control Room SRO directs you to refer to AW10, Uncontrollable Flooding of Turbine  
Building, and perform required actions.
Building, and perform required actions.  


                                              CRO-067 fnl
CRO-067 fnl  
                                            Page Iof 13
Page I of 13  
                    REGION II
REGION II  
          INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
          JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
                    CRO-067
CRO-067  
Perform Required Actions far ES Actuation (> 3psig)
Perform Required Actions far ES Actuation (> 3psig)  
CANDIDATE
CANDIDATE  
EXAMINER
EXAM IN ER


                                                                                                    CRO-067 fnl
CRO-067 fnl  
                                                                                                    Page 2 of 23
Page 2 of 23  
                                                REGION II
REGION II  
                                    INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
                                    JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
Task:
Task:  
Perform Required Actions for ES Actuation (> 3psig)
Perform Required Actions for ES Actuation (> 3psig)  
Alternate Path:
Alternate Path:  
Facilitv JPM #:
Facilitv JPM #:  
c
c  
KIA Ratin&):
KIA Ratin&):  
System: EPE-009
UfA:  
UfA:      E.41.13
E.41.13  
Rating.
Rating.  
Task Standard:
Task Standard:  
Proper E$ conditions are verified using the appropriate procedures and re-start the 1A and 1B LPI pump
Proper E$ conditions are verified using the appropriate procedures and re-start the 1A and 1B LPI pump  
when required.
when required.  
Preferred Evaluation Location:                                           Preferred Evaluation Method:
System: EPE-009
Simulator 2In-Piant __                                                  Perform X       Simulate _.
Preferred Evaluation Location:  
References:
Simulator 2
EOP Enclosure 5.1, E&sect; ACTUATION
In-Piant __
Candidate:                                                                       Time Start:
References:
                                NAME                                             Time Finish:
Preferred Evaluation Method:  
Performance Rating: SAT -UNSAT               ~                                   Performance Time _ I_
Perform X Simulate _.  
EOP Enclosure 5.1, E&sect; ACTUATION  
Candidate:  
Time Start:  
NAME  
Time Finish:  
Performance Rating: SAT -  
UNSAT  
~  
Performance Time _I_


                                                      CRQ-067 fnl
CRQ-067 fnl  
                                                      Page 3 of I 3
Page 3 of I 3
                      SIMULATOR OPERATOR INSTRUCTIONS:
SIMULATOR OPERATOR INSTRUCTIONS:  
1. Recall Snap 207
1. Recall Snap 207  
2. Import files for CRQ-(367
2. Import files for CRQ-(367  
3. GotoRUN
3. GotoRUN  


                                                                                          CRO-069 fnl
CRO-069 fnl  
                                                                                          Page 4 of 43
Page 4 of 43  
ToolslEquipment/Praceduses Needed:
ToolslEquipment/Praceduses Needed:  
                                        READ TO OPERATOR
READ TO OPERATOR  
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:  
I will explain the initial conditions, and state the task to be performed. All control room
I will explain the initial conditions, and state the task to be performed. All control room  
steps shall be performed for this JPM, including any required communications. I will
steps shall be performed for this JPM, including any required communications. I will  
provide initiating cues and reports on other actions when directed by you. Ensure you
provide initiating cues and reports on other actions when directed by you. Ensure you  
indicate to me when you understand your assigned task. To indicate that you have
indicate to me when you understand your assigned task. To indicate that you have  
completed your assigned task return the handout sheet I provided you.
completed your assigned task return the handout sheet I provided you.  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
Small Break LOCA is in progress.
Small Break LOCA is in progress.  
Rule 2 in progress
Rule 2 in progress  
RCS is saturated and KCPs are off.
RCS is saturated and KCPs are off.  
ES Channels I 6 have actuated.
ES Channels I  
                  ~
~ 6 have actuated.  
INITIATING CUES:
INITIATING CUES:  
The Control Room SRO instructs you to perform EOP Enclosure 5.1, ES Actuation.
The Control Room SRO instructs you to perform EOP Enclosure 5.1, ES Actuation.  


                                                                                        CRO-067 fnl
CRO-067 fnl  
                                                                                        Page 5 of 13
Page 5 of 13  
START TIME:
START TIME:  
              Step 1
Step 1  
              Determine all ES channels that should have actuated based on
Determine all ES channels that should have actuated based on  
              pressure and RB Dressure:                                                 -SAT
pressure and RB Dressure:  
                    Actuation
STANDARD:
                                                                                        -UNSAT
COMMENTS:
              10                ...
Actuation  
    STANDARD: Candidate should monitor the existing RCS Pressure, using valid
...  
              pressure indication, ICCM Train A or B, OAC,RCS Pressure (NR), RCS
10
              Pressure (WR) on 1UB1 and 1UB2 to verify RB pressure is > 3 psig.
Candidate should monitor the existing RCS Pressure, using valid  
              Determines that ES Channels 1-6 should be actuated
pressure indication, ICCM Train A or B, OAC, RCS Pressure (NR), RCS  
              Continue to Step 2
Pressure (WR) on 1UB1 and 1UB2 to verify RB pressure is > 3 psig.  
  COMMENTS:
Determines that ES Channels 1-6 should be actuated  
:2-          Step 2
Continue to Step 2  
              Verify   ES channels associated with actuation setpoint have actuated:   -&sect;AT
-2:  
  STANDARD:   Ensure ES digital channels 1-6 are actuated by observing "Tripped" lights
Step 2  
              on 1UB1.
Verify  
              Continue to Step 3                                                       -UNSAT
ES channels associated with actuation setpoint have actuated:  
  COMMENTS:
STANDARD:  
Ensure ES digital channels 1-6 are actuated by observing "Tripped" lights  
on 1UB1.  
Continue to Step 3  
COMMENTS:
-
SAT
-  
UNSAT  
-
&sect;AT
-
UNSAT


                                                                                            CRO-067 fni
CRO-067 fni  
                                                                                            Page 6 of 13
Page 6 of 13  
              Step 3
Step 3  
              IAAT additional ES actuation setpoints are exceeded.
IAAT additional ES actuation setpoints are exceeded.  
                                                                                            SAT
THEN perform Steps 1 - 2.  
              THEN perform Steps 1 - 2.
Continue to Step 4  
                                                                                      _  I
IAAT additional ES actuation setpoints are exceeded candidate perform  
              Continue to Step 4
STANDARD:
                                                                                            UNSAT
Note: During the performance of thi5 JPM ES Channels 7 and 8 will actuate.  
STANDARD:
COMMENTS:  
                                                                                      _I_
Steps 1 - 2.
              IAAT additional ES actuation setpoints are exceeded candidate perform
Step 4  
              Steps 1 - 2.
Place HPI in manual control  
Note: During the performance of thi5 JPM ES Channels 7 and 8 will actuate.
STANDARD:  
COMMENTS:
Go to RZ modules on 1VB2 and select manual for the #PI components.  
              Step 4
Continue to Step 5  
              Place HPI in manual control
COMMENTS:  
                                                                                      _  ISAT
Step 5  
STANDARD:     Go to RZ modules on 1VB2 and select manual for the #PI components.
Verify Rule 2 in progress or complete.  
              Continue to Step 5
Determine Rule 2 in progress by referring to the Initial Conditions.  
                                                                                      -UNSAT
Continue to Step 6  
COMMENTS:
STANDARD:
              Step 5
COMMENTS:
              Verify Rule 2 in progress or complete.
_I SAT
                                                                                    ~    SAT
_I_ UNSAT
STANDARD:      Determine Rule 2 in progress by referring to the Initial Conditions.
_I SAT
              Continue to Step 6
-  
                                                                                    -UNSAT
UNSAT  
COMMENTS:
~
SAT
-
UNSAT


                                                                              CRO-067 fnl
CRO-067 fnl  
                                                                              Page 7 of 13
Page 7 of 13  
m:         Step 6
m:  
          Open the following:
Step 6  
          0   IBS-4                                                       __ SAT
Open the following:  
              IBS-2
0  
STANDARD: At the ES RZ modules an 1AB2, OPEN 1BS-1 and 1BS-2 by depressing -UNSAT
IBS-4  
          the open pushbutton.
IBS-2  
          Continue to Step 7
At the ES RZ modules an 1 AB2, OPEN 1 BS-1 and 1 BS-2 by depressing  
COMMENTS:
the open pushbutton.  
          Verify any RCP operating
Continue to Step 7  
                                                                          -SAT
STANDARD:
STANDARD: Determine NO RCP is operating.
COMMENTS:  
          Perform RNO step and GO TO Step 9.
Verify any RCP operating  
                                                                          -UNSAT
Determine NO RCP is operating.  
COMMENTS:
Perform RNO step and GO TO Step 9.  
STEP:     Step 9
STANDARD:
          IAAT any RCP is operating
COMMENTS:  
          AND ES Channels 5 and 6 actuate                                 -SAT
STEP:  
          THEN perform Steps 40 and 11
Step 9  
                                                                          I  UNSAT
IAAT any RCP is operating  
STANDARD: Determine NO RCP is operating.
AND ES Channels 5 and 6 actuate  
          Perform RNO step and GO TO Step 12.
THEN perform Steps 40 and 11  
COMMENTS:
STANDARD:  
Determine NO RCP is operating.  
Perform RNO step and GO TO Step 12.  
COMMENTS:  
__ SAT
-
UNSAT
-
SAT
-
UNSAT
-
SAT
I
UNSAT


                                                                            CRO-067 fnl
CRO-067 fnl  
                                                                            Page 8 of 13
Page 8 of 13  
          Step 12
Step 12  
          I M T ES Channels 3 & 4 are actuated,
I M T ES Channels 3 & 4 are actuated,  
                                                                            -&sect;AT
THEN GO TO Step 13  
          THEN GO TO Step 13
STANDARD:  
STANDARD: Determine E&sect; Channels 3 & 4 are actuated by one of the following: -UNSAT
Determine E&sect; Channels 3 & 4 are actuated by one of the following:  
              Statalarms: ISA-IC-10 (ES Channel 3 Trip) and 1SA-IID-IO (ES
Statalarms: ISA-IC-10 (ES Channel 3 Trip) and 1SA-IID-IO (ES  
              Channel 4 Trip)
Channel 4 Trip)  
              E&sect; Channel 3 and Channel 4 Tripped lights lit on 1UBI.
E&sect; Channel 3 and Channel 4 Tripped lights lit on 1 UBI.  
          GO TO step 13
GO TO step 13  
COMMENTS:
COMMENTS:  
STEP 10: Step 13
STEP 10:  
          Place the following in manual control:
Step 13  
              IAbPIPump                                                     ISAT
Place the following in manual control:  
              1B LPI Pump
IAbPIPump  
          .
1B LPI Pump  
          * ILP-17
*
              IbP-18                                                       -UNSAT
ILP-17  
STANDARD: Go to the ES RZ modules on 1VB2 and place the above components in
. IbP-18  
          manual by depressing each components manual pushbutton.
STANDARD:  
          Continue to Step 14
Go to the ES RZ modules on 1VB2 and place the above components in  
COMMENTS:
manual by depressing each components manual pushbutton.  
Continue to Step 14  
COMMENTS:  
-
&sect;AT
-
UNSAT
I
SAT
-
UNSAT


                                                                                                CRO-069 fnl
.~.~.-  
                                                                                                Page 9 of 13
.. . . . . .  
              .~.~.-                     ......
-.  
                                          .                  -.     .
.  
                                        CAUTION
CAUTION  
LPI pump damage
LPI pump damage may occur if operated in excess of 30 minutes  
              ......may occur if operated in excess of 30 minutes
... against  
                                                                ... against
~ ..  
                                                                    ~ ..   a shutoff head.
a shutoff head.  
                                                                                            -SAT
......
              Step 14
Step 14  
              IAAT any LPI pump is operating against a shutoff head,
IAAT any LPI pump is operating against a shutoff head,  
              THEN at the CR SROs discretion stop affected LPI pumps.                       __ UNSAT
THEN at the CR SROs discretion stop affected LPI pumps.  
STANDARD:    Determine RCS pressure is above LPI pump discharge head and then
Determine RCS pressure is above LPI pump discharge head and then  
              ask for SRO direction. When directed by the SRO secure both the  A
ask for SRO direction. When directed by the SRO secure both the  A
              and WLPI pump.
and W LPI pump.  
              Continue to Step 15
Continue to Step 15  
Cue: When asked inform candidate that the SRO desires to stop BOTH LPI pumps.
STANDARD:
COMMENTS:
Cue: When asked inform candidate that the SRO desires to stop BOTH LPI pumps.  
              Step 15
COMMENTS:  
              IAAT RCS pressure is .z LPI pump shutoff head.
Step 15  
            THEN perform Steps 46 - 17.                                                     -SAT
IAAT RCS pressure is .z LPI pump shutoff head.  
STANDARD:    Determine RCS pressure is NOT .z LPI pump shutoff head (=ZOO psig)
THEN perform Steps 46 - 17.  
              Perform RNO step and GO TO Step 18.                                           __ UNSAT
Determine RCS pressure is NOT .z LPI pump shutoff head (=ZOO psig)  
COMMENTS:
Perform RNO step and GO TO Step 18.  
STANDARD:
COMMENTS:
CRO-069 fnl
Page 9 of 13
-
SAT
__ UNSAT  
-
SAT
__ UNSAT


                                                                                            CRO-067 fnl
CRO-067 fnl  
                                                                                          Page l o o f 13
Page l o o f 13  
STEP I O :     Step 18
STEP IO:  
              IAAT 1A and 1B LPI pumps are off I tripped,
Step 18  
              AND ail the following conditions exist:                                 -&sect;AT
IAAT 1A and 1 B LPI pumps are off I tripped,  
              RCS pressure z LPI pump shutoff head
AND ail the following conditions exist:  
              ILP-19 closed
RCS pressure z LPI pump shutoff head  
              1LP-20 closed                                                           -UNSAT
ILP-19 closed  
              IBS-1 open OR throttled open
1 LP-20 closed  
              IBS-2 open OR throttled open
IBS-1 open OR throttled open  
              THEN perform Steps 19 - 21
IBS-2 open OR throttled open  
STANDARD:     Determine conditions of step NOT met because RCS pressure is not
THEN perform Steps 19 - 21  
              < LPI pump shutoff head ( ~ 2 0 0psig).
STANDARD:  
              Perform RNO Step and GO TO Step 22
Determine conditions of step NOT met because RCS pressure is not  
COMMENTS:
< LPI pump shutoff head ( ~ 2 0
Note: After Step 18 is completed RCS pressure will decrease to LPI pump SkLItQff
psig).  
head. The candidate should datermime that IAAT step 15 is mat and transfer to step
Perform RNO Step and GO TO Step 22  
15.                                                                                   -SAT
COMMENTS:  
STEP 11:       Step I 5
Note: After Step 18 is completed RCS pressure will decrease to  
              IAAT RCS pressure is < LPI pump shutoff head,
LPI pump SkLItQff  
              THEN perform Steps 16 - 17.                                             -UNSAT
head. The candidate should datermime that IAAT step 15 is mat and transfer to step  
STANDARD:                                                                    psig)
15.  
              Determine that RCS pressure is z LPI pump shutoff head ( ~ 2 0 0
STEP 11:  
              Continue to Step 16
Step I 5
COMMENTS:
IAAT RCS pressure is < LPI pump shutoff head,  
STEP 12:       Step 16                                                               CRITICAL STEP
THEN perform Steps 16 - 17.  
              Perform the following:
Determine that RCS pressure is z LPI pump shutoff head ( ~ 2 0 0
                  Open ILP-17 (already open)
psig)
                  Start I A LPI pump                                                 -SAT
Continue to Step 16  
STANDARD:     Verify 1LP-17 is open by observing the open light on the ES RZ module.
STANDARD:
              Start the 1A LPI pump by using the pump switch on 1UB2.
COMMENTS:  
              Continue to Step 17                                                     -UNSAT
STEP 12:  
COMMENTS:
Step 16  
Perform the following:  
Open ILP-17 (already open)  
Start I A LPI pump  
STANDARD:  
Verify 1 LP-17 is open by observing the open light on the ES RZ module.  
Start the 1A LPI pump by using the pump switch on 1 UB2.  
Continue to Step 17  
COMMENTS:
-
&sect;AT
-
UNSAT
-  
SAT
-
UNSAT  
CRITICAL STEP
-
SAT
-
UNSAT


                                                                                      CRQ-069 fnl
CRQ-069 fnl  
                                                                                      Page 11 of 13
Page 11 of 13  
STEP 13: Step 17                                                               CRITICAL STEP
STEP 13:  
          Perform the following:
Step 17  
          * Open 1LP-18 (already open)
Perform the following:  
              Start 18 LPI pump                                                   -SAT
*  
STANDARD: Verify 1 LP-18 is open by observing the open light on the ES E module.
Start 18 LPI pump  
          Start the 1B LPI pump by using !he pump switch on 1UB4.
Verify 1 LP-18 is open by observing the open light on the ES E module.  
                                                                                  -UNSAT
Start the 1 B LPI pump by using !he pump switch on 1 UB4.  
COMMENTS:
Open 1 LP-18 (already open)
                                  END TASK
STANDARD:
STOP TIME:
COMMENTS:  
CRITICAL STEP
-
SAT
-
UNSAT
END TASK  
STOP TIME:  


                                                                                  CRO-067 fnl
CRO-067 fnl  
                                                                                Page 12 of 13
Page 12 of 13  
                          CRITICAL STEP EXPLANATIONS:
CRITICAL STEP EXPLANATIONS:  
STEP #                                     Explanation
STEP #  
  12   The " A bPl pump must be started when RCS pressure is less than LPI pump head to
Explanation  
      ensure LPI flow into the core.
12  
  13  The " B LPI pump must be started when RC&sect; pressure is less than LPI pump head to ensure
The "A bPl pump must be started when RCS pressure is less than LPI pump head to  
      LPI flew into the core.
ensure LPI flow into the core.  
The " B LPI pump must be started when RC&sect; pressure is less than LPI pump head to ensure  
LPI flew into the core.  
13


                                                                                CRO-067 fnl
CRO-067 fnl  
                                                                              Page 13 of 13
Page 13 of 13  
                              CANDIDATE CUE SHEET
CANDIDATE CUE SHEET  
            (TO B RETURNED TO EXAMINER UPON COMPLETION OF TASK)
(TO B RETURNED TO EXAMINER UPON COMPLETION OF TASK)  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
Small Break LBCA is in progress.
Small Break LBCA is in progress.  
Rule 2 in progress
Rule 2 in progress  
RCS is saturated and RCPs are off.
RCS is saturated and RCPs are off.  
E&sect; Channels 1 - 6 have actuated.
E&sect; Channels 1 - 6 have actuated.  
INITIATING CUES:
INITIATING CUES:  
The Control Room SRO instructs you to perform EOP Enclosure 5.1, ES Actuation.
The Control Room SRO instructs you to perform EOP Enclosure 5.1, ES Actuation.  


                                            CR6-097 fnl
CR6-097 fnl  
                                            Page IOf 13
Page I
                      REGION II
Of 13  
          INITIAL LICENSE EXAMINATION
REGION II  
          JOB PERFORMANCE MEASURE
INITIAL LICENSE EXAMINATION  
                      CRQ-097
JOB PERFORMANCE MEASURE  
  Transfer ECCS Suction to the Emergency Sump
CRQ-097  
                (1LP-15 Failed Closed)
Transfer ECCS Suction to the Emergency Sump  
CANDIDATE
(1 LP-15 Failed Closed)  
EXAMINER
CANDIDATE  
EXAMINER  


                                                                                                  CRO-097 fnl
CRO-097 fnl  
                                                                                                  Page 2 of 13
Page 2 of 13  
                                              REGION II
REGION II  
                                  INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
                                  JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
*
*  
Transfer ECCS Suction to the Emergency Sump (1LP-I 5 Failed Closed)
Transfer ECCS Suction to the Emergency Sump (1 LP-I 5 Failed Closed)  
Alternate Path:
Alternate Path:  
Facilitv JPM #:
Facilitv JPM #:  
KIA Ratinds):
KIA Ratinds):  
System: BWIEOB
System: BWIEOB  
WA:       EA1.1
WA:  
Rating. 4013.7
EA1.1  
Task Standard:
Rating. 4013.7  
Steps of EOP are properly completed by the student to align HPllbPl piggyback mode
Task Standard:  
Preferred Evaluation Location:                                          Preferred Evaluation Method:
Steps of EOP are properly completed by the student to align HPllbPl piggyback mode  
Simulator 2In-Plant -                                                   Perform X      Simulate __
Preferred Evaluation Location:  
References:
Simulator 2
EOP Enclosure 5.12, (ECCS Suction Swap to R E S )
In-Plant -  
Candidate:                                                                     Time Start:
References:  
                              NAME                                             Time Finish:
EOP Enclosure 5.12, (ECCS Suction Swap to R E S )
Performance Rating: SAT-           wsa-r -                                     Performance Time -
Preferred Evaluation Method:
Examiner:                                                                                       I
Perform X Simulate __
                      NAME                                             SIGNATURE                   DATE
Candidate:  
Time Start:  
NAME  
Time Finish:  
Performance Rating: SAT-  
wsa-r -  
Performance Time -  
Examiner:  
I  
NAME  
SIGNATURE  
DATE  


                                                      CRO-097 fnl
CRO-097 fnl  
                                                      Page 3 of 13
Page 3 of 13  
                      SIMULATOR OPERATOR INSTRUCTIONS:
SIMULATOR OPERATOR INSTRUCTIONS:  
1. Recall Snap 208
1. Recall Snap 208  
2. Import files for CRO-097
2. Import files for CRO-097  
3. GotoRUN
3. GotoRUN  


                                                                                          CRO-097 fnl
CRO-097 fnl  
                                                                                          Page 4 of 13
Page 4 of 13  
ToolslEquipmenffProcedures Needed:
ToolslEquipmenffProcedures Needed:  
                                        READ TO OPERATOR
READ TO OPERATOR  
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:  
I will explain the initial conditions, and state the task to be performed. All control room
I will explain the initial conditions, and state the task to be performed. All control room  
steps shall be performed for this JPM, including any required communications. I will
steps shall be performed for this JPM, including any required communications. I will  
provide initiating cues and reports on other actions when directed by you. Ensure you
provide initiating cues and reports on other actions when directed by you. Ensure you  
indicate to me when you understand your assigned task. To indicate that you have
indicate to me when you understand your assigned task. To indicate that you have  
completed your assigned task return the handout sheet I provided you.
completed your assigned task return the handout sheet I provided you.  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
A small break LOCA has occurred which is depleting the 5WST.
A small break LOCA has occurred which is depleting the 5WST.  
Core SCM = 0&deg;F.
Core SCM = 0&deg;F.  
The BWST level is 19 feet and RB level is increasing.
The BWST level is 19 feet and RB level is increasing.  
LOCA CD tab has been completed up to step 7.
LOCA CD tab has been completed up to step 7.  
" 1 A LPI header indicates no flow
" 1 A LPI header indicates no flow  
"15" LPI header indicates no flow
"1 5" LPI header indicates no flow  
INITIATING CUES:
INITIATING CUES:  
The Procedure Director directs you to perform IAAT Step I;Initiate Enclosure 5.12, (ECCS
The Procedure Director directs you to perform IAAT Step I;  
Suction Swap to RBES).
Initiate Enclosure 5.12, (ECCS  
Suction Swap to RBES).  


                                                                                          CRO-097 fnl
START TIME:  
                                                                                          Page 5 of 13
STEP:  
START TIME:
Step I  
  STEP:       Step I                                                                 CRITICAL STEP
Start both of the following:  
              Start both of the following:                                           -SAT
IALPIPump  
                  IALPIPump
1B LPI Pump  
                  1B LPI Pump
STANDARD:  
                                                                                      -UNSAT
The candidate rotates the control switches on 1 UB2 for "1A" and "I
  STANDARD: The candidate rotates the control switches on 1UB2 for "1A"and "IB LPI
B LPI  
              Pumps clockwise to the CLOSE position and verifies that the Red TRIP
Pumps clockwise to the CLOSE position and verifies that the Red TRIP  
              COIL lights illuminate and the White CLOSE COIL light is OFF and the
COIL lights illuminate and the White CLOSE COIL light is OFF and the  
              ammeter responds.
ammeter responds.  
              Continue to Step 2
Continue to Step 2  
  COMMENTS:
COMMENTS:  
:2-          Step 2
-2:  
              Verify either of the foliowing exist:
Step 2  
                  LPI FLOW TRAIN A plus LPI FLOW TRAIN B 2 3300 gpm
Verify either of the foliowing exist:  
                                                                                      -SAT
LPI FLOW TRAIN A plus LPI FLOW TRAIN B 2 3300 gpm  
                  Only one LPI header is operating AND flow in that header is 2 2850
Only one LPI header is operating AND flow in that header is 2 2850  
                  gpm
gpm  
                                                                                      -UNSAT
STANDARD:  
  STANDARD: The candidate locates the flow instrumentation (on IUB1) for the LPI
The candidate locates the flow instrumentation (on IUB1) for the LPI  
              headers and determines that no flow is indicated in either header.
headers and determines that no flow is indicated in either header.  
              Perform RNO Step and GO PO Step 4
Perform RNO Step and GO PO Step 4  
    COMMENTS:
COMMENTS:  
CRO-097 fnl
Page 5 of 13
CRITICAL STEP
-
SAT
-
UNSAT
-
SAT
-
UNSAT


                                                                                          CRO-097 fnl
CRO-097 fnl  
                                                                                          Page 6 of 13
Page 6 of 13  
              Step 4
Step 4  
              Verify 6 three HPI pumps operating
Verify 6 three HPI pumps operating  
                                                                                        -SAT
RNO  
              RNO
STOP 1 B HPI pump  
              STOP 1 B HPI pump
STANDARD:  
STANDARD:     Candidate observes the indications for the HPI Pump controls on ?UBI     -UNSAT
Candidate observes the indications for the HPI Pump controls on ?UBI  
              and determines that all 3 #PI Pumps are operating.
and determines that all 3 #PI Pumps are operating.  
              The candidate locates the control switch for the 1B HPI Pump and rotates
The candidate locates the control switch for the 1B HPI Pump and rotates  
              it to OFF position and verifies that the white OFF light comes on and the
it to OFF position and verifies that the white OFF light comes on and the  
              red RUN lights go off.
red RUN lights go off.  
              Continue to Step 5
Continue to Step 5  
COMMENTS:
COMMENTS:  
              Step 5
Step 5  
              Dispatch an operator to perform Enel. 5.37 (Isolation of HPI Pump
Dispatch an operator to perform Enel. 5.37 (Isolation of HPI Pump  
              Reeirc) without dressing out. (PSI                                       -SAT
Reeirc) without dressing out. (PSI  
STANDARD:    Candidate should dispatch NEO(s) to perform End. 5.37.
Candidate should dispatch NEO(s) to perform End. 5.37.  
              Continue to Step 6                                                         -UNSAT
Continue to Step 6  
CUE: inform candidate operatcir(s) dispatched as requested.
STANDARD:
COMMENTS:
CUE: inform candidate operatcir(s) dispatched as requested.  
              Step 6
COMMENTS:  
              Notify Control Room personnel that the 170 gpfnlpump minimum HPI
Step 6  
              flow requirement is in effect.                                             -SAT
Notify Control Room personnel that the 170 gpfnlpump minimum HPI  
STANDARD:     Candidate informs control room personnel of HPI minimum flow
flow requirement is in effect.  
              requirements for HPI.                                                     -VNSAT
STANDARD:  
              Continue to Step 7
Candidate informs control room personnel of HPI minimum flow  
CUE: lnform student the control mom has been notified.
requirements for HPI.  
COMMENTS:
Continue to Step 7  
CUE: lnform student the control mom has been notified.  
COMMENTS:  
-
SAT
-
UNSAT
-
SAT
-
UNSAT
-
SAT
-
VNSAT


                                                                                                  CRO-097 fnl
CRO-097 fnl  
                                                                                                  Page 7 of 13
Page 7 of 13  
                        .....                                 ~                  ...   ..... .-
~
                                                CAUTION
...  
    ECCS pump damage may occur if LPI pumps are operated below the following minimum
..... .-
  flows:
.....  
                                                                                                  -SAT
CAUTION  
      Any LPI pump operated at e 100 gprn for > 30 minutes
ECCS pump damage may occur if LPI pumps are operated below the following minimum  
      Two LPI pumps operating in piggyback with NO LPI flow and total HPI flow e 500
flows:  
                                                                                                  -UNSAT
Any LPI pump operated at e 100 gprn for > 30 minutes  
              ......                     -......._-                      .......         ...
Two LPI pumps operating in piggyback with NO LPI flow and total HPI flow e 500  
:6-                  Step 7
.......  
                      Verify two LPI pumps operating.
. . .
  STANDARD:          The candidate locates the controls for "1K and "1 B" LPI pumps on 1UB2
......  
                      and determines that both LPI pumps are running.
- ....... _-
                      Continue to Step 8
-6:  
  COMMENTS:
Step 7  
  STEP:               Step 8
Verify two LPI pumps operating.  
                      Verify total HPI flow including seal injection is > 500 gpm.
The candidate locates the controls for "1K and "1 B" LPI pumps on 1 UB2
                                                                                                  ISAT
and determines that both LPI pumps are running.  
    STANDARD:        Observe HPI headers flows on 1UBI and determine total #PI flow
Continue to Step 8  
                      including seal injection is > 500 gpm.
STANDARD:
                      Continue to Step 9                                                         -UNSAT
COMMENTS:  
    COMMENTS:
STEP:  
                                  .....                         ........
Step 8  
Verify total HPI flow including seal injection is > 500 gpm.  
Observe HPI headers flows on 1 UBI and determine total #PI flow  
including seal injection is > 500 gpm.  
Continue to Step 9  
STANDARD:
COMMENTS:  
.....  
........  
-
SAT
-
UNSAT
I
SAT
-
UNSAT


                                                                                                  CRO-097 fnl
-8:
                                                                                                  Page 8 of 13
STAN BARD:  
:8-              Step 9                                                                     CRITICAL STEP
Step 9  
                  Simultaneously open the following:
Simultaneously open the following:  
                                                                                                  SAT
1bP-15  
                  .
. 1bP-16  
                                                                                              _I_
RNO  
                        1bP-15
Limit total HPI flow to < 750 gpm including seal injection  
                        1bP-16
Candidate locates the control switches and light indication for ILP-15 and  
                  RNO
ILP-16 on 1 UB2 and determines that the valves are closed.  
                                                                                              -UNSAT
1LP-15 and 1 LP-16 switches are rotated to the OPEN direction and the  
                  Limit total HPI flow to < 750 gpm including seal injection
student verifies that the green CLOSED light goes out and the red OPEN  
    STANBARD:    Candidate locates the control switches and light indication for ILP-15 and
light comes on.  
                  ILP-16 on 1UB2 and determines that the valves are closed.
The candidate identifies that 1 LP-15 did not open when its control switch  
                  1LP-15 and 1LP-16 switches are rotated to the OPEN direction and the
was placed in the OPEN position and performs RNO.  
                  student verifies that the green CLOSED light goes out and the red OPEN
Throttle 1 HP-26 and 1 HP-27 to limit total HPI flow to  
                  light comes on.
seal injection.  
                  The candidate identifies that 1LP-15 did not open when its control switch
Continue to Step 10  
                  was placed in the OPEN position and performs RNO.
750 gpm including
                  Throttle 1HP-26 and 1HP-27 to limit total HPI flow to   750 gpm including
NOPE: aLP-15 ('IA LPI TO HPI AND RBS) will NOT respond, and will not be  
                  seal injection.
operable during this JPM.  
                  Continue to Step 10
COMMENTS:  
    NOPE: aLP-15 ( ' I A LPI TO HPI AND RBS) will NOT respond, and will not be
Step 10  
    operable during this JPM.
GO TO Step 14  
    COMMENTS:
Candidate goes to step 14  
                  Step 10
STANDARD:
                  GO TO Step 14
COMMENTS:  
                                                                                              -SAT
CRO-097 fnl
    STANDARD:    Candidate goes to step 14
Page 8 of 13
    COMMENTS:                                                                                 __ UNSAT
CRITICAL STEP
_I_ SAT
-
UNSAT
-
SAT
__ UNSAT  


                                                                                      CRO-097 fnl
CRO-097 fnl  
                                                                                      Page 9 of 13
Page 9 of 13  
STEP I O : Step 14
STEP I O :
          Place the "LDST LEVEL INTERLOCK switch in the "DISABLE" position.         SAT
Step 14  
STANDARD: The candidate locates the "LDST LEVEL INTERLOCK" switch and places
Place the "LDST LEVEL INTERLOCK switch in the "DISABLE" position.  
          it in the "DISABLE" position.                                         -UNSAl
STANDARD:  
          Continue to Step 15
The candidate locates the "LDST LEVEL INTERLOCK" switch and places  
COMMENTS:
it in the "DISABLE" position.  
STEP 11:   Step 15
Continue to Step 15  
          Position the following valves switches to close until valve travel is
COMMENTS:  
          initiated:                                                                 SAT
STEP 11 :  
          e     1HP-23
Step 15  
                IHP-24
Position the following valves switches to close until valve travel is  
                                                                                ~    UNSA-
initiated:  
                IHP-25
e  
STANDARD: The controls for 1HP-23, 24 and 25 are located by the candidate on
1HP-23  
          IUBI. The switches are rotated to the CLOSE position and the grec
IHP-24  
          CLOSED lights are observed to come on and the red OPEN lights are
IHP-25  
          observed to go off.
STANDARD:  
          Continue to Step 16
The controls for 1HP-23, 24 and 25 are located by the candidate on  
COMMENTS:
I
STEP 12:   Step 16
UBI. The switches are rotated to the CLOSE position and the grec  
          Verify any of the following are open:
CLOSED lights are observed to come on and the red OPEN lights are  
                                                                                -SAT
observed to go off.  
          0      ILPSW-4
Continue to Step 16  
                  ILPSW-5
COMMENTS:  
          Continue to Step 17                                                   __I UNSA'
STEP 12:  
STANDARD:  Verify any of the above valves are open by observing their open
Step 16  
          indications on 1VB2.
Verify any of the following are open:  
COMMENTS:
0
ILPSW-4  
ILPSW-5  
Continue to Step 17  
Verify any of the above valves are open by observing their open  
indications on 1VB2.  
STANDARD:
COMMENTS:  
SAT
-
UNSAl
SAT
~
UNSA-
-
SAT
__I UNSA'


                                                                                    CRB-097 fnl
CRB-097 fnl  
                                                                                  Page 10 of 13
Page 10 of 13  
STEP 13: Step 17
STEP 13:  
          GO TO Step 22
Step 17  
                                                                                -SAT
GO TO Step 22  
STANDARD: Candidate goes to Step 22.
Candidate goes to Step 22.  
COMMENTS:                                                                       ___UNSAT
STANDARD:
STEP 14: Step 22
COMMENTS:  
          Verify both LPI coolers available for LPI and LPSW.
STEP 14:  
                                                                                __ SAT
Step 22  
STANDARD: Determine both LPI coolers available for LPI and LPSW
Verify both LPI coolers available for LPI and LPSW.  
          Continue to Step 23
Determine both LPI coolers available for LPI and LPSW  
                                                                                -UNSAT
Continue to Step 23  
COMMENTS:
STANDARD:
STEP 15: Step 23
COMMENTS:  
          Verify any LPI pump has been secured in this enclosure due to low flow
STEP 15:  
          conditions.                                                           -SAT
Step 23  
STANDARD: Determine BOTH LPI pumps are operating and perform RNO and GO
Verify any LPI pump has been secured in this enclosure due to low flow  
          TO Step 25.                                                           _ I UNSAT
conditions.  
          Continue to Step 25
STANDARD:  
COMMENTS:
Determine BOTH LPI pumps are operating and perform RNO and GO  
TO Step 25.  
Continue to Step 25  
COMMENTS:  
-
SAT
___ UNSAT
__ SAT
-
UNSAT
-
SAT
_I UNSAT


                                                                                            CRO-897 fnl
~.  
                                                                                          Page 11 of 13
.  
~.     .           .. ..~..                                 ~ . ~.~
.. ..~..  
                                                                  ..              ..-
~.~..
                                                NOTE'-
.~  
                RB
. .-  
                  . level
NOTE'-  
                      ~ ~          is~expected
RB level of 2 2' is expected when BWST level reaches 9'.  
                            of 2~2' ~....  .    when BWST level reaches 9'.
.
                                                                                        -SAT
~
  STEP 16:       Step 25
~
                WHEN BWST level is 2 9'.
~
                AND RB level is rising,
~
                                                                                        -UNSAT
.
                THEN continue in this enclosure.
   
STANDARD:       Monitor EWST level and RB level and determine that this step is sat
~....
                and continue to Step 26.
STEP 16:  
Cue: If required, inform cand!dafe time compression will be used and the BWS
Step 25  
    level will be lowered.
WHEN BWST level is 2 9'.  
COMMENTS:
AND RB level is rising,  
STEP 17:         Step 26                                                               CRlPlCAL STEP
THEN continue in this enclosure.  
                Simultaneously open the following:
STANDARD:  
                        ILP-19                                                         -SAT
Monitor EWST level and RB level and determine that this step is sat  
                        ILP-20
and continue to Step 26.  
                                                                                        -UNSAT
Cue: If required, inform cand!dafe time compression will be used and the BWS  
STANDARD:       The candidate locates the controls for 1LP-19 ( I A RX BLBG SUCTll
level will be lowered.  
                AN5 ILP-20 (1E RX BLDG SUCTION) on UB2.
COMMENTS:  
                The switches are placed in the OPEN position and the valves are ve
STEP 17:  
                to open.
Step 26  
COMMENTS:
Simultaneously open the following:  
__._                 ...~..             ...   END TASK
ILP-19  
                                                    I               ...
ILP-20  
;TOP TIME:
STANDARD:  
The candidate locates the controls for 1LP-19 (IA RX BLBG SUCTll  
AN5 I
LP-20 (1 E RX BLDG SUCTION) on UB2.  
The switches are placed in the OPEN position and the valves are ve  
to open.  
COMMENTS:  
__._  
...~..  
... END TASK  
I  
...  
;TOP TIME:  
CRO-897 fnl
Page 11 of 13
-
SAT
-
UNSAT
CRlPlCAL STEP
-
SAT
-
UNSAT


                                                                              CRO-097 fnl
CRO-097 fnl  
                                                                              Page 12 of 13
Page 12 of 13  
                      CRITICAL STEP EXPLANATIONS:
CRITICAL STEP EXPLANATIONS:  
STEP #                                     Explanation
STEP #  
  .l  Required to provide HPI pump suction
Explanation  
  8   Necessary to allow the flow from the LPI headers to the HPI pump suctions.
Required to provide HPI pump suction  
      Candidate must determine that ILP-15 did not open and then throttle HPI flow to
.l
      protect the HPI pumps.
8  
  16   Necessary to allow the suction source for the LPI system to be the WBES and not the
Necessary to allow the flow from the LPI headers to the HPI pump suctions.  
      BWSP, which is almost depleted.
Candidate must determine that ILP-15 did not open and then throttle HPI flow to  
protect the HPI pumps.  
16  
Necessary to allow the suction source for the LPI system to be the WBES and not the  
BWSP, which is almost depleted.  


                                                                                    CRQ-097 fnl
CRQ-097 fnl  
                                                                                  Page 13 of 13
Page 13 of 13  
                                CANDIDATE CUE SHEET
CANDIDATE CUE SHEET  
          (TO B RETURNED TO EXAMINER UPON COMPLTIQN OF TASK)
(TO B RETURNED TO EXAMINER UPON COMPLTIQN OF TASK)  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
A small break LOCA has occurred which is depleting the BWST
A small break LOCA has occurred which is depleting the BWST  
Core SCM = 0&deg;F
Core SCM = 0&deg;F  
The BWST level is 19 feet and RB level is increasing.
The BWST level is 19 feet and RB level is increasing.  
LOCA CD tab has been completed up to step 7.
LOCA CD tab has been completed up to step 7.  
INLPI header indicates no flow
IN LPI header indicates no flow  
IB LPI header indicates no flow
IB LPI header indicates no flow  
INITIATING CUES:
INITIATING CUES:  
The Procedure Director directs you to perform lAaT Step 1; Initiate Enclosure 5.12, (ECCS
The Procedure Director directs you to perform lAaT Step 1; Initiate Enclosure 5.12, (ECCS  
Suction Swap to R E S ) .
Suction Swap to R E S ) .


                                      CRO-600 fnl
CRO-600 fnl  
                                      Page 1 of 12
Page 1 of 12  
                      REGION It
REGION It  
          INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
          JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
                      CRO-600
CRO-600  
      RECOVER FROM SWITCHYARD ISOLATION
RECOVER FROM SWITCHYARD ISOLATION  
CANDIDATE
CANDIDATE  
EXAMINER
EXAM IN ER


                                                                                                    CRO-GOO fnl
CRO-GOO fnl  
                                                                                                    Page 2 of 12
Page 2 of 12  
                                              REGION II
REGION II  
                                  INITIAL LICENSE EXANllNATlON
INITIAL LICENSE EXANllNATlON  
                                  JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
Task:
Task:  
Recover from Switchyard Isolation
Recover from Switchyard Isolation  
Alternate Path:
Alternate Path:  
Facility JPM #:
Facility JPM #:  
IVA Ratinq(s):
IVA Ratinq(s):  
System: BW/AQS
System: BW/AQS  
WA:       AA1.l
WA:  
Rating: 4.3/4.2
AA1.l  
Task Standard:
Rating: 4.3/4.2  
Recovery from Switchyard Isolation is performed correctly including manually synchronizing the overhead Keowee
Task Standard:  
Unit onto the 230 KV Red Bus.
Recovery from Switchyard Isolation is performed correctly including manually synchronizing the overhead Keowee  
Preferred Evaluation Leeation:                                         Preferred Evaluation Method:
Unit onto the 230 KV Red Bus.  
Simulator       In-Plant -                                             Perform X Simulate         _ .
Preferred Evaluation Leeation:  
References:
Preferred Evaluation Method:  
Enclosure 5.3 of APlOl Z (Recovery From Loss of Power)
Simulator  
Validation Time: 15 minutes                                             Time Critical: NO
In-Plant -  
......................................................................................
Perform X  
Candidate:                                                                       Time Start:
Simulate _.  
                                NAME                                             Time Finish:
References:  
Performance Ratinq: SAT -UNSAT -                                                 Performance Time I               _
Enclosure 5.3 of APlOl Z (Recovery From Loss of Power)  
Examiner:                                                                                         I
Validation Time: 15 minutes  
                        NAME                                           SIGNATURE                     BATE
Time Critical: NO  
......................................................................................
......................................................................................  
Candidate:  
Time Start:  
NAME  
Time Finish:  
Performance Ratinq: SAT -  
UNSAT -  
Performance Time I
_
Examiner:  
I  
NAME  
SIGNATURE  
BATE  


                                                                                CRO-600 fnl
CRO-600 fnl  
                                                                                Page 3 of 12
Page 3 of 12  
                      SIMULATOR OPERATOR INSTRUCTIONS:
SIMULATOR OPERATOR INSTRUCTIONS:  
1. Recall Snap 210
1. Recall Snap 210  
2. Import files for CRO-600
2. Import files for CRO-600  
3. GotoRUN
3. GotoRUN  
4. Use the Speed Change Motor on Keowee Unit 1 to ensure the unit is out of sync.
4. Use the Speed Change Motor on Keowee Unit 1 to ensure the unit is out of sync.  
5. Timer 2 will reset the SWYD Isolation
5. Timer 2 will reset the SWYD Isolation  
6. Timer 3 will give remote control of Keowee
6. Timer 3 will give remote control of Keowee  


                                                                                          CRO-600 fnl
CRO-600 fnl  
                                                                                          Page 4 of 12
Page 4 of 12  
ToolslEquipmenffP~oceduresNeeded:
ToolslEquipmenffP~ocedures Needed:  
Enclosure 5.3 of AW01-i (Recovery From Loss of Power)
Enclosure 5.3 of AW01-i (Recovery From Loss of Power)  
                                        READ TO OPERATOR
READ TO OPERATOR  
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:  
I will explain the initial conditions, and state the task to be performed. All control room
I will explain the initial conditions, and state the task to be performed. All control room  
steps shall be petformed for this JPM, including any required communications. I will
steps shall be petformed for this JPM, including any required communications. I will  
provide initiating cues and reports on other actions when directed by you. Ensure you
provide initiating cues and reports on other actions when directed by you. Ensure you  
indicate to me when you understand your assigned task. To indicate that you have
indicate to me when you understand your assigned task. To indicate that you have  
completed your assigned task return the handout sheet I provided you.
completed your assigned task return the handout sheet I provided you.  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
1. A switchyard Isolation has occurred
1. A switchyard Isolation has occurred  
2. Unit 1 and Unit 2 reactors have tripped
2. Unit 1 and Unit 2 reactors have tripped  
3. Unit 3 remains online at 100% power
3. Unit 3 remains online at 100% power  
4. Power has been restored to Unit 1 and Unit 2's Main Feeder Buses from Keowee Unit 1 via
4. Power has been restored to Unit 1 and Unit 2's Main Feeder Buses from Keowee Unit 1 via  
    the overhead power path
the overhead power path  
5. The TCC has notified Oconee that the 230 KV transmission system voltage and frequency
5. The TCC has notified Oconee that the 230 KV transmission system voltage and frequency  
    has returned to normal and recovery from switchyard isolation may be initiated.
has returned to normal and recovery from switchyard isolation may be initiated.  
INITIATING CUES:
INITIATING CUES:  
1. The SRO in the control room instructs you utilize Enclosure 5.3 of APlOl1 (Recovery From
1. The SRO in the control room instructs you utilize Enclosure 5.3 of APlOl1 (Recovery From  
    Loss of Power) to recover from the Switchyard Isolation.
Loss of Power) to recover from the Switchyard Isolation.  
2. Procedure steps 1 and 2 have been completed. Begin on step 3.
2. Procedure steps 1 and 2 have been completed. Begin on step 3.  


                                                                                            CRO-600 fnl
CRO-600 fnl  
                                                                                            Page 5 of 12
Page 5 of 12  
START TIME:
START TIME:  
:1-                Step 3
-1:
                  Verify NO ES 1 or 2 actuation on   Oconee unit:
STANDARD:  
                      Unit 1
Step 3  
                                                                                            -SAT
Verify NO ES 1 or 2 actuation on  
                      Unit 2
Unit 1  
                      Unit 3
Unit 2  
                                                                                            -UNSAT
Unit 3  
  STANDARD:      Verify ES 1 or 2 has NOT actuated on Unit 1 by observing the RZ
Oconee unit:
                  modules and/or statalarrns. Contact Unit 2 and 3 to determine if ES 1 or
Verify ES 1 or 2 has NOT actuated on Unit 1 by observing the RZ  
                  2 has actuated.
modules and/or statalarrns. Contact Unit 2 and 3 to determine if ES 1 or  
                  Continue to Step 4.
2 has actuated.  
    Cue: Unit 2 and 3 have not had an ES actuation.
Continue to Step 4.  
  COMMENTS:
Cue: Unit 2 and 3 have not had an ES actuation.  
  STEQ:           Step 4
COMMENTS:  
                  Ensure     of the following AUTOlMAN transfer switches in MAN:
STEQ:  
                                                                                            -SAT
Step 4  
                                                                                            -UNSAT
Ensure  
  STANDARD: Place the Unit ITA and TB AUTOIMAN transfer switches in MAN
of the following AUTOlMAN transfer switches in MAN:  
                  Contact Unit 2 and 3 by phone and have them ensure TA and TB
STANDARD: Place the Unit I
                  AUTOlMAN transfer switches in MAN.
TA and TB AUTOIMAN transfer switches in MAN  
                  Continue to Step 5.
Contact Unit 2 and 3 by phone and have them ensure TA and TB  
  Cue: Unit 2 and 3 TA and TB AUTO/MAN transfer switches are in MANUAL.
AUTOlMAN transfer switches in MAN.  
  COMMENTS:
Continue to Step 5.  
Cue: Unit 2 and 3 TA and TB AUTO/MAN transfer switches are in MANUAL.  
COMMENTS:  
-
SAT
-
UNSAT
-
SAT
-
UNSAT


                                                                                          CRO-600 fni
CRO-600 fni  
                                                                                          Page 6 of 12
Page 6 of 12  
                                                                                    _.
_.  
  STEP 3:         Step 5
STEP 3:  
                  Depress all of !he following RESET pushbuttons:                     CRITICAL STEP
Step 5  
                      GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL I RESET
Depress all of !he following RESET pushbuttons:  
                      GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 2 RESET             -SAT
The following RESET pushbuttons are depressed:
                      'GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 1 RESET
Continue to Step 6.
                      *GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 2 RESET
Note: Buttons are located electrical mimic board.
                                                                                          UNSAT
* Not critical
  STANDARD:      The following RESET pushbuttons are depressed:
COMMENTS:
                      GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 1 RESET
GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL I RESET  
                      GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 2 RESET
GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 2 RESET  
                      GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 1 RESET
'GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 1 RESET  
                      GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 2 RESET
*GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 2 RESET  
                  Continue to Step 6.
STANDARD:  
  Note: Buttons are located electrical mimic board.
GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 1 RESET  
  * Not critical
GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 2 RESET  
  COMMENTS:
GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 1 RESET  
:4-              Step 6
GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 2 RESET  
                  Verify the following statalarms are off:
-4:  
                      SA-15/A-2 (CHANNEL #I         UNBERFREBUENCY)
Step 6  
                      SA-138-4 (CHANNEL #2 UNDERFREQUENCY)                           il_ SAT
Verify the following statalarms are off:  
                  * SA-15/C-1 (CHANNEL #I           UNDERVOLTAGE)
SA-15/A-2 (CHANNEL #I  
                      SA-15/C-3 (CHANNEL #2 UNDERVOLTAGE)
UNBERFREBUENCY)  
                                                                                      -UNSAT
SA-138-4 (CHANNEL #2 UNDERFREQUENCY)  
  STANDARD: The above Statalarms are verified to be off. Statalarms are loci     in
*  
                SA-I 5.
SA-15/C-1 (CHANNEL #I  
                Continue to Step 7
UNDERVOLTAGE)  
  COMMENTS:
SA-15/C-3 (CHANNEL #2 UNDERVOLTAGE)  
  STEP:         Step 7                                                             CRITICAL STEP
STANDARD: The above Statalarms are verified to be off. Statalarms are loci  
                Notify Keowee Qperator to transfer control of & t
SA-I 5.  
                                                                JKeowee units to
Continue to Step 7  
                Oconee.                                                               -SAT
COMMENTS:  
  STANDARD: Contact Keowee Operator, by phone, to transfer control of         Keowee
in
                units to Oconee.                                                     -UNSAT
STEP:  
                Continue to Step 8.
Step 7  
  NOTE: Simulator instructor will transfer control of @       Keowee
Notify Keowee Qperator to transfer control of &tJ
                                                              J units to Oconee.
Keowee units to  
                                                              t
Oconee.  
  COMMENTS:
STANDARD: Contact Keowee Operator, by phone, to transfer control of  
units to Oconee.  
Continue to Step 8.  
Keowee
NOTE: Simulator instructor will transfer control of @tJ
Keowee units to Oconee.  
COMMENTS:  
CRITICAL STEP
-
SAT
UNSAT
il_ SAT
-
UNSAT
CRITICAL STEP
-
SAT
-
UNSAT


                                                                                              CRO-600 fnl
STEP 6:  
                                                                                              Page 7 of 12
Step 8  
STEP 6:       Step 8
Verify both channels of all Oconee units Main Feeder Bus Monitor Relay  
              Verify both channels of all Oconee units Main Feeder Bus Monitor Relay
Panels reset as indicated by the following statalarms off:  
              Panels reset as indicated by the following statalarms off:
-. .....  
                                    -. .....                                             -SAT
S'H~I'CHNL A L ~ G I C
                                      S'H~I'CHNL A L ~ G I C                                   UNSAT
4 (2)(3)SA74/Q-4 (LOAD  
                                      INITIATE)
SHED CHNL B LOGIC  
                                      4 (2)(3)SA74/Q-4 (LOAD
INITIATE)
                                      SHED CHNL B LOGIC
~b'S6  
                                    ~b'S6       CHNL A LOGIC     I
CHNL A LOGIC  
                                      INITIATE
I  
                                      1(2)(3w-I4/D-6
INITIATE  
                                        %   ,\ ,
1 (2)(3w-I4/D-6  
                                    TO SB CHNL B LQGlC
%  
                                      INITIATE)         ... -
,\\ ,  
STANDARD: Both channels of Oconee unit 1 Main Feeder Bus Monitor Relay Panel is
TO SB CHNL B LQGlC  
              verified reset as indicated by observing the above statalarms off. Contact
INITIATE)  
              Unit 2 and 3 and have them verify their Main Feeder Buses are reset.
... -  
              Continue to Step 9.
STANDARD: Both channels of Oconee unit 1 Main Feeder Bus Monitor Relay Panel is  
Cue: Unit 2 and 3 Main Feeder Bus Monitor Panels are reset as indicated by the
verified reset as indicated by observing the above statalarms off. Contact  
above alarms ar@off.
Unit 2 and 3 and have them verify their Main Feeder Buses are reset.  
Note: Unit 1's Main Feeder Bus Monitor Panel has not actuated.
Continue to Step 9.  
COMMENTS:
Cue: Unit 2 and 3 Main Feeder Bus Monitor Panels are reset as indicated by the  
STEP 7:         Step 9                                                                   CRITICAL STEP
above alarms ar@ off.  
                Verify overhead Keovfee unit energizing     a Oconee unit MFB
Note: Unit 1's Main Feeder Bus Monitor Panel has not actuated.  
                                                                                          -SAT
COMMENTS:  
STANDARD:       Determine that Kecwee Unit 1 is energizing Oconee Unit 1 MFBs via the
STEP 7:  
                overhead path, by observing Keowee Unit 1 has emergency started and
Step 9  
                ACB-1 is closed energizing unit 1's MFBs.
Verify overhead Keovfee unit energizing a  
                Continue to Step 10.
Oconee unit MFB  
                                                                                          -UNSAT
STANDARD:  
COMMENTS:
Determine that Kecwee Unit 1 is energizing Oconee Unit 1 MFBs via the  
overhead path, by observing Keowee Unit 1 has emergency started and  
ACB-1 is closed energizing unit 1's MFBs.  
Continue to Step 10.  
COMMENTS:
CRO-600 fnl
Page 7 of 12
-  
SAT
UNSAT  
CRITICAL STEP
-
SAT
-
UNSAT


                                                                                      CRQ-600 fnl
CRQ-600 fnl  
                                                                                      Page 8 of 12
Page 8 of 12  
STEP:       Step 10
STEP:  
              GO TO Step 23
Step 10  
STANDARD:    Candidate goes to Step 23                                             -SAT
GO TO Step 23  
COMMENTS:
Candidate goes to Step 23  
                                                                                    -UNSAT
STANDARD:
STEP:       Step 23
COMMENTS:  
            Verify Keowee overhead unit is energizing a Oconee unit MFB.
STEP:  
                                                                                    -SAT
Step 23  
STANBARD:   Determine that Keovvee Unit 1 is energizing Oconee Unit 1 MFBs via the
Verify Keowee overhead unit is energizing a Oconee unit MFB.  
            overhead path, by observing Keowee Unit 1 has emergency started and
STANBARD:  
            ACB-1 is closed energizing Unit ts MFBs.
Determine that Keovvee Unit 1 is energizing Oconee Unit 1 MFBs via the  
                                                                                    -UNSAT
overhead path, by observing Keowee Unit 1 has emergency started and  
            Continue to Step 24.
ACB-1 is closed energizing Unit ts MFBs.  
COMMENTS:
Continue to Step 24.  
STEP IO:     Step 24
COMMENTS:  
            Notify Emergency Coordinator to determine which of the following is
STEP IO:  
            desired:
Step 24  
                  Manually synchronize overhead Keowee unit onto the 230 KV Red     -SAT
Notify Emergency Coordinator to determine which of the following is  
                  Bus
desired:  
                  Disconnect overhead Keowee unit from the 230 KV Yellow Bus and
Manually synchronize overhead Keowee unit onto the 230 KV Red  
                  reconnect (dead bus transfer) 230 KV Yellow Bus to the System Grid
Bus  
                                                                                    -UNSAT
Disconnect overhead Keowee unit from the 230 KV Yellow Bus and  
STANDARD:   Call Emergency Coordinator and ask which of the above methods is
reconnect (dead bus transfer) 230 KV Yellow Bus to the System Grid  
            desired.
STANDARD:  
            Continue to Step 25
Call Emergency Coordinator and ask which of the above methods is  
Cue: The Emergency Coordinator determines that manually synchronizing the
desired.  
overhead Keowee unit onto the 230 KV Red Bus is desired.
Continue to Step 25  
COMMENTS:
Cue: The Emergency Coordinator determines that manually synchronizing the  
overhead Keowee unit onto the 230 KV Red Bus is desired.  
COMMENTS:  
-
SAT
-
UNSAT
-
SAT
-
UNSAT
-
SAT
-
UNSAT


                                                                                        CRO-GOO fnl
CRO-GOO fnl  
                                                                                        Page 9 of 12
Page 9 of 12  
STEP ? I:     Step 25
STEP ? I  
              Verify manual Synchronization of the overhead Keowee Unit onto the
:  
              System Grid via the 230 KV Red Bus is desired.
Step 25  
                                                                                      __ SAT
Verify manual Synchronization of the overhead Keowee Unit onto the  
STANDARD:      Determine from previous discussion with the Emergency Coordinator that
System Grid via the 230 KV Red Bus is desired.  
              manual synchronization of the overhead Keowee Unit onto the System
Determine from previous discussion with the Emergency Coordinator that  
              Grid via the 230 KV Red Bus is desired.
manual synchronization of the overhead Keowee Unit onto the System  
                                                                                        UNSAT
Grid via the 230 KV Red Bus is desired.  
              Continue to Step 26.
Continue to Step 26.  
COMMENTS:
STANDARD:
STEP 12:       Step 26
COMMENTS:  
              Obtain permission from TCC to connect overhead Keowee unit (230 KV
STEP 12:  
              Yellow Bus Supply) to the System Grid.                                 -SAT
Step 26  
Cue: The TCC gives permission to connect overhead Keowee unit (230 KV Yeellow
Obtain permission from TCC to connect overhead Keowee unit (230 KV  
Bus Supply) io ihe System Grid.
Yellow Bus Supply) to the System Grid.  
                                                                                      __ UNSAT
Cue: The TCC gives permission to connect overhead Keowee unit (230 KV Yeellow  
STANDARD:     Call the permission from TCC to connect overhead Keowee unit (230 KV
Bus Supply) io ihe System Grid.  
              Yellow Bus Supply) to the System Grid.
STANDARD:  
              Continue to Step 27.
Call the permission from TCC to connect overhead Keowee unit (230 KV  
COMMENTS:
Yellow Bus Supply) to the System Grid.  
Continue to Step 27.  
COMMENTS:  
__ SAT
UNSAT
-
SAT
__ UNSAT


                                                                                            CRO-600 fnl
CRO-600 fnl  
                                                                                          Page 10 of 12
Page 10 of 12  
STEP 13:       Step 27                                                               CRITICAL STEP
STEP 13:  
              Perform the followina to svnc and tie overhead Keowee unit (Yellow Bus
Step 27  
              Supply) to 230 KV RLd Bds:
Perform the followina to svnc and tie overhead Keowee unit (Yellow Bus  
                                                                                      -SAT
Supply) to 230 KV RLd Bds:  
                  Establish communications with Keowee Operations
Establish communications with Keowee Operations  
                  Depress and hold PCB-8 SYNC push button
Depress and hold PCB-8 SYNC push button  
                  Adjust overhead Keowee unit SPEED CHANGER MOTOR to                 -UNSAT
Adjust overhead Keowee unit SPEED CHANGER MOTOR to  
                  Synchronize overhead Keowee unit to 230 KV Red Bus.
Synchronize overhead Keowee unit to 230 KV Red Bus.  
              e  WHEN synchronization is achieved,
THEN perform the following:  
                  THEN perform the following:
2. Close PCB-8.  
                  2. Close PCB-8.
2.  
                  2. Release PCB-8 SYNC push button
e
STANDARD:     The overhead Keowee unit (Yellow Bus Supply) is synced and tied to the
WHEN synchronization is achieved,
              230 KV Red Bus by:
Release PCB-8 SYNC push button  
              e   Establishing communications with Keowee Operations.
STANDARD:  
                  Depressing and holding the PCB-8 SYNC push button.
The overhead Keowee unit (Yellow Bus Supply) is synced and tied to the  
Cue: The simulator operator will act as a second operator and operate the PCB-8
230 KV Red Bus by:  
SYNC butfon. After synchronization is achieved (slow in the fast direction), inform
e  
the candidate to close the PCB.
Establishing communications with Keowee Operations.  
              e   Adjusting the overhead Keowee unit SPEED CHANGER MOTOR to
Depressing and holding the PCB-8 SYNC push button.  
                  synchronize overhead Keowee unit to 230 KV Red Bus.
Cue: The simulator operator will act as a second operator and operate the PCB-8  
                  WHEN synchronization is achieved,
SYNC butfon. After synchronization is achieved (slow in the fast direction), inform  
                  THEN perform the following:
the candidate to close the PCB.  
                  > Close PCH-8 (Red closed light illuminated)
e  
                  2 Release PCB-8 SYNC push button.
Adjusting the overhead Keowee unit SPEED CHANGER MOTOR to  
Note: The SYNC CHECK provides only indication, NOT protection against out of
synchronize overhead Keowee unit to 230 KV Red Bus.  
phase closure.
THEN perform the following:  
Cue: lnform candidate that this task is complete.
> Close PCH-8 (Red closed light illuminated)  
COMMENTS:
2 Release PCB-8 SYNC push button.  
                                      END TASK
WHEN synchronization is achieved,
:TOP TIME:
Note: The SYNC CHECK provides only indication, NOT protection against out of  
phase closure.  
Cue: lnform candidate that this task is complete.  
COMMENTS:  
END TASK  
:TOP TIME:  
CRITICAL STEP
-
SAT
-
UNSAT


                                                                                  CRB-SOOfnl
CRB-SOOfnl  
                                                                                Page 11 of 12
Page 11 of 12  
                        CRITICAL STEP EXPLANATIONS:
CRITICAL STEP EXPLANATIONS:  
STEP #                                     Explanation
STEP #  
  3   Reset buttons must be pushed to reset the Switchyard Isolation circuit to allow PCBs
Explanation  
      to be repositioned.
3  
  5    Oconee must have Keowee control to operate any Keowee Unit.
Reset buttons must be pushed to reset the Switchyard Isolation circuit to allow PCBs  
  7    Must recognize power is coming from a Keowee Unit via the overhead path in order
to be repositioned.  
      to transfer power back to the switchyard.
Oconee must have Keowee control to operate any Keowee Unit.  
  I3  Manually syncing of the Keowee Unit is required to put the Oconee axillaries on the
Must recognize power is coming from a Keowee Unit via the overhead path in order  
      switchyard.
to transfer power back to the switchyard.  
Manually syncing of the Keowee Unit is required to put the Oconee axillaries on the  
switchyard.  
5
7
I 3 


                                                                                    CRO-GOB fnl
CRO-GOB fnl  
                                                                                  Page 12 of 12
Page 12 of 12  
                              CANDIDATE CUE SHEET
CANDIDATE CUE SHEET  
            (TO BE RETURNED TO EXAMINER UPON COMPLETION QF TASK)
(TO BE RETURNED TO EXAMINER UPON COMPLETION QF TASK)  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
1. A switchyard isofation has occurred
1. A switchyard isofation has occurred  
2. Unit 1 and Unit 2 reactors have tripped
2. Unit 1 and Unit 2 reactors have tripped  
3. Unit 3 remains online at 100% power
3. Unit 3 remains online at 100% power  
4. Power has been restored to Unit 1 and Unit 2's Main Feeder Buses from Keowee Unit 1 via
4. Power has been restored to Unit 1 and Unit 2's Main Feeder Buses from Keowee Unit 1 via  
  the overhead power path
the overhead power path  
5. The TCC has notified Oconee that the 230 KV transmission system voltage and frequency
5. The TCC has notified Oconee that the 230 KV transmission system voltage and frequency  
  has returned to normal and recovery from switchyard isolation may be initiated.
has returned to normal and recovery from switchyard isolation may be initiated.  
INITIATING CUES:
INITIATING CUES:  
1. The SRO in the control room instructs you utilize Enclosure 5.3 of AP/511 (Recovery From
1. The SRO in the control room instructs you utilize Enclosure 5.3 of AP/511 (Recovery From  
  boss of Power) to recover from the Switchyard Isolation.
boss of Power) to recover from the Switchyard Isolation.  
2. Procedure steps Z and 2 have been completed. Begin on step 3.
2. Procedure steps Z and 2 have been completed. Begin on step 3.  


                                              CRO-700 fnl
CRO-700 fnl  
                                              Page Z of 18
Page Z of 18  
                      REGION II
REGION II  
            INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
          JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
                      CRO-700
CRO-700  
  Place IC&sect; In Auto following Loss Of Auto Power
Place IC&sect; In Auto following Loss Of Auto Power  
CANDIDATE
CANDIDATE  
EXAMINER
EXAMINER  


                                                                                                  CRO-700 fnl
CRO-700 fnl  
                                                                                                  Page 2 of 18
Page 2 of 18  
                                              REGION II
REGION II  
                                    INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
                                  JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
Task:
Task:  
Place ICS In Auto following Loss Of Auto Power
Place ICS In Auto following Loss Of Auto Power  
Alternate Path:
Alternate Path:  
Facility JPM #:
Facility JPM #:  
KIA Ratinqfs):
KIA Ratinqfs):  
System' BWIA02
System' BWIA02  
WA.       MI.1
WA.  
Rating: 4.013.8
M I . 1
Task Standard:
Rating: 4.013.8  
Use AP/23 (boss Of ICs Power) Enclosure 5 5 (Placing ICs In Auto) to place the 16s in AUTO following a
Task Standard:  
Loss Of Auto Power.
Use AP/23 (boss Of ICs Power) Enclosure 5 5 (Placing ICs In Auto) to place the 16s in AUTO following a  
Preferred Evaluation Location:                                        Preferred Evaluation Method:
Loss Of Auto Power.  
Simulator       In-Plant __                                          Perform 2Simulate __
Preferred Evaluation Location:  
References:
Simulator  
In-Plant __  
References:  
Preferred Evaluation Method:
Perform 2
Simulate __


                                                      CRO-700 fnl
CRO-700 fnl  
                                                      Page 3 of 18
Page 3 of 18  
                      SIMULATOR OPERATOR INSTRUCTIONS:
SIMULATOR OPERATOR INSTRUCTIONS:  
I.Recall Snap 22 1
I.  
2. Import files for CRO-708
Recall Snap 22 1  
3. GotoRUN
2. Import files for CRO-708  
3. GotoRUN  


                                                                                          CRO-700 fnl
CRO-700 fnl  
                                                                                          Page 4 of 18
Page 4 of 18  
TooIslEquipmenffProcedures Needed:
TooIslEquipmenffProcedures Needed:  
AW23 (boss Of ICs Power) Enclosure 5.5 (Placing ICs In Auto)
AW23 (boss Of ICs Power) Enclosure 5.5 (Placing ICs In Auto)  
                                        READ TO OPERATOR
READ TO OPERATOR  
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:  
I will explain the initial conditions, and state the task to be performed. All control room
I will explain the initial conditions, and state the task to be performed. All control room  
steps shall be performed for this JPM, including any required communications. I will
steps shall be performed for this JPM, including any required communications. I will  
provide initiating cues and reports on other actions when directed by you. Ensure you
provide initiating cues and reports on other actions when directed by you. Ensure you  
indicate l o me when you understand your assigned task. To indicate that you have
indicate lo me when you understand your assigned task. To indicate that you have  
completed your assigned task return the handout sheet I provided you.
completed your assigned task return the handout sheet I provided you.  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
1. ICs AUTO power lost
1. ICs AUTO power lost  
2. AP/23 (Loss of ICs Power) in progress
2. AP/23 (Loss of ICs Power) in progress  
3. 16s AUTO power has been restored
3. 16s AUTO power has been restored  
INITEATING CUES:
INITEATING CUES:  
The SRO directs you to perform Enclosure 5.5 (Placing 16s in AUTO) to place ALL ICs H/A
The SRO directs you to perform Enclosure 5.5 (Placing 16s in AUTO) to place ALL ICs H/A  
stations in AUTO.
stations in AUTO.  


                                                                                              CRO-700 fnl
CRO-700 fnl  
                                                                                              Page 5 of 18
Page 5 of 18  
START TIME:
START TIME:  
Note: All operations will be performed on the ICs stations located on I U B I .
Note: All operations will be performed on the ICs stations located on IUBI.  
                Step I
Step I  
                Perform a pre-job briefing for AP/l/Ai1700/023 from the pra-job briefing
Perform a pre-job briefing for AP/l/Ai1700/023 from the pra-job briefing  
                database.                                                               _I_ SAT
database.  
STANDARD:      State that 8 pre-job briefing should be performed.
State that 8 pre-job briefing should be performed.  
                                                                                              UNSAT
Continue to Step 2.  
                Continue to Step 2.
STANDARD:
                                                                                          I _
Cue: Inform candidate that the pre-job briefing has been performed.  
Cue: Inform candidate that the pre-job briefing has been performed.
Note: Candidate will obtain setpoint information from the OAC during this JPM.  
Note: Candidate will obtain setpoint information from the OAC during this JPM.
COMMENTS:  
COMMENTS:
Step 2  
                Step 2
Ensure RATE SET to 0.0  
                Ensure RATE SET to 0.0
Ensure RATE SET thumbwheel located is set to 0.0  
                                                                                          -SAT
Continue to SteD 3.  
STANDARD:      Ensure RATE SET thumbwheel located is set to 0.0
STANDARD:
                Continue to SteD 3.                                                     __ UNSAT
COMMENTS:  
COMMENTS:
_I_ SAT
I_ UNSAT
-
SAT
__ UNSAT


                                                                                    CRO-700 fnl
CRO-700 fnl  
                                                                                    Page 6 of 18
Page 6 of 18  
STEQ:     Step 3                                                               CRITICAL STEP
STEQ:  
          Verify TflP setpoint at THP by comparing the following,
STANDARD
                0 1 E2089 (TURB HBR PRESS SETPOINT)
COMMENTS:
                0 1 E2088 (IC5 SELECTED TURB HDR PRESS)                         -SAT
Step 3  
          RNQ
Verify TflP setpoint at THP by comparing the following,  
          Ensure the following in HAND:
RNQ
                TURBINE MASTER
Ensure the following in HAND:
          * 1A TURBINE BYPASS VALVES                                            -UNSAT
*
          e    1B TURBINE BYPASS VALVES
1A TURBINE BYPASS VALVES
              Adjust THP setpoint to = THP at the TURBINE MASTER.
e
STANDARD  Call up the appropriate OAC display (enter GB AP28) anti determine
1B TURBINE BYPASS VALVES
          THP setpoint NOT at THP and perform RNO.
0 1 E2089 (TURB HBR PRESS SETPOINT)  
                                J
0 1 E2088 (IC5 SELECTED TURB HDR PRESS)  
          Verify the above stations are in HAND.
TURBINE MASTER  
          Use the Setpoint knob on the TURBINE MASTER to match THP setpoint
Adjust THP setpoint to = THP at the TURBINE MASTER.  
          to i- THP while monitoring on the OAC.
Call up the appropriate OAC display (enter GB AP28) anti determine  
          Continue to Step 4.
THP setpoint NOT at J THP and perform RNO.  
COMMENTS:
Verify the above stations are in HAND.  
=:        Step 4                                                               CRITICAL STEP
Use the Setpoint knob on the TURBINE MASTER to match THP setpoint  
          Place TURBINE MASTER in AUTO
to i- THP while monitoring on the OAC.  
STANDARD: TURBINE MASTER is placed in AUTO by depressing the Auto               -SAT
Continue to Step 4.  
          pushbutton on the TURBINE MASTER Bailey station.
=:  
          Continue to Step 5
Step 4  
                                                                                    UNSAT
Place TURBINE MASTER in AUTO  
COMMENTS:
STANDARD:  
STEP:     Step 5
TURBINE MASTER is placed in AUTO by depressing the Auto  
          Verify Main Turbine controlling THP.
pushbutton on the TURBINE MASTER Bailey station.  
                                                                                -SAT
Continue to Step 5  
STANDARD: Verify Main Turbine controlling THP by observing THP being maintained
COMMENTS:  
          at setpoint.
STEP:  
          Continue to Step 6                                                     I _ UNSAT
Step 5  
COMMENTS:
Verify Main Turbine controlling THP.  
Verify Main Turbine controlling THP by observing THP being maintained  
at setpoint.  
Continue to Step 6  
STANDARD:
COMMENTS:  
CRITICAL STEP
-
SAT
-
UNSAT
CRITICAL STEP
-
SAT
UNSAT
-
SAT
I_
UNSAT


                                                                                    CRO-700 fnl
CRO-700 fnl  
                                                                                    Page 7 of 18
Page 7 of 18  
          Step 6
Step 6  
          Verify all TBVs are closed.
Verify all TBVs are closed.  
                                                                                -SAT
Verify all TBVs closed by observing the Green closed indication  
STANDARD: Verify all TBVs closed by observing the Green closed indication
Continue to Step 7.  
          Continue to Step 7.
STANDARD:
                                                                                -UNSAT
COMMENTS:  
COMMENTS:
Step 7  
          Step 7                                                               CRITICAL STEP
Ensure all TBVs in AUTO:  
          Ensure all TBVs in AUTO:
1A TURBINE BYPASS VALVES  
              1A TURBINE BYPASS VALVES
1B TURBINE BYPASS VALVES  
              1B TURBINE BYPASS VALVES                                         I _ SAT
Place TBVs in AUTO by depressing the red AUTO pushbutton and verify  
STANDARD: Place TBVs in AUTO by depressing the red AUTO pushbutton and verify
the red AUTO light illuminates and the white HAND light extinguishes.  
          the red AUTO light illuminates and the white HAND light extinguishes. __ UNSAT
Continue to Step 8.  
          Continue to Step 8 .
STANDARD:
COMMENTS:
COMMENTS:  
          Step 8                                                               CRITICAL STEP
Step 8  
          Verify Tave setpoint at = Tave by comparing the following:
Verify Tave setpoint at = Tave by comparing the following:  
              OlE2087 (ICs TAVE SETPOINT)
OlE2087 (ICs TAVE SETPOINT)  
          e   OlE2086 (ICs SELECTED TAVE)                                       -SAT
e  
          RNO
OlE2086 (ICs SELECTED TAVE)  
          Ensure the following:
RNO  
              DIAMOND in HAND                                                   -UNSAT
Ensure the following:  
              I A FDW MASTER in HAND
DIAMOND in HAND  
          e    1B FBW MASTER in HAND
e
STANDA.   Call up the appropriate OAC display (enter G- AP28) and determine
I A FDW MASTER in HAND  
          Tave setpoint NOT at = Tave and perform RNO.
1B FBW MASTER in HAND  
          Verify the above stations are in HAND.
STANDA.  
          Adjust Tave setpoint to = Tave at the REACTOR MASTER while
COMMENTS:
          mcnitoring on the OAC.
Call up the appropriate OAC display (enter G- AP28) and determine  
          Continue to Step 9
Tave setpoint NOT at = Tave and perform RNO.  
COMMENTS:
Verify the above stations are in HAND.  
Adjust Tave setpoint to = Tave at the REACTOR MASTER while  
mcnitoring on the OAC.  
Continue to Step 9  
-
SAT
-
UNSAT
CRITICAL STEP
I_ SAT
__ UNSAT
CRITICAL STEP
-
SAT
-
UNSAT


                                                                                      CRO-900 fnl
CRO-900 fnl  
                                                                                      Page 8 of 18
Page 8 of 18  
            Step 9
Step 9  
            Ensure DIAMOND in MANUAL.
Ensure DIAMOND in MANUAL.  
                                                                                  -SAT
Verify DIAMOND in MANUAL by observing MANUAL light illuminated on  
STANDARD:    Verify DIAMOND in MANUAL by observing MANUAL light illuminated on
DIAMOND panel.  
            DIAMOND panel.
Continue to Step I O .
                                                                                  -UNSAT
STANDARD:
            Continue to Step I O .
COMMENTS:  
COMMENTS:
STEP I O :
STEP I O :   Step 10                                                             CRITICAL STEP
Step 10  
            Place REACTOR MASTER in AUTO.
Place REACTOR MASTER in AUTO.  
STANDARD:    REACTOR MASTER is placed in AUTO by depressing the Auto               __ SAT
REACTOR MASTER is placed in AUTO by depressing the Auto  
            pushbutton on the REACTOR MASTER Bailey station and verify the red
pushbutton on the REACTOR MASTER Bailey station and verify the red  
            AUTO light illuminates and the white HAND light extinguishes.
AUTO light illuminates and the white HAND light extinguishes.  
            Continue to Step 11                                                   _ I UNSAT
Continue to Step 11  
COMMENTS:
STANDARD:
STEP 11:   Step 11
COMMENTS:  
            Verify Neutron Error is 0 f I0h.
STEP 11 :  
                                                                                  -SAT
Step 11  
STANDARD:  Verify Neutron Error is 0 f 1% by observing Neutron Error meter on
Verify Neutron Error is 0 f I0h.  
            IUBI.
Verify Neutron Error is 0 f 1% by observing Neutron Error meter on  
            Continue to Step 52                                                   -UNSAT
IUBI.  
COMMENTS:
Continue to Step 52  
          .. .               ...               ...                           ..
STANDARD:
COMMENTS:  
. . .  
.. .  
. ..  
..  
-
SAT
-
UNSAT
CRITICAL STEP
__ SAT
_I UNSAT
-
SAT
-
UNSAT


                                                                                        CRO-700 fnl
CRO-700 fnl  
                                                                                        Page 9 of 18
Page 9 of 18  
STEP 12: Step 12                                                                 CRITICAL STEP
STEP 12:  
          Place DIAMOND in AUTO
Step 12  
                                                                                    -SAT
Place DIAMOND in AUTO  
STANDARD: Place DIAMOND in AUTO by depressing the AUTO pushbutton on the
STANDARD:  
          DIAMOND panel pushbutton and verify the AUTO light illuminates and
Place DIAMOND in AUTO by depressing the AUTO pushbutton on the  
          the HAND light extinguishes. Verify plant parameters do not change.
DIAMOND panel pushbutton and verify the AUTO light illuminates and  
          Continue to Step 13                                                       -UNSAT
the HAND light extinguishes. Verify plant parameters do not change.  
COMMENTS:
Continue to Step 13  
STEP 13: Step 13
COMMENTS:  
          Verify STM GENERATOR MASTER Measured Variable is on the caret.
STEP 13:  
                                                                                    I__ SAT
Step 13  
STANDARD; Place selector switch to Measured Variable and verify the pointer on the
Verify STM GENERATOR MASTER Measured Variable is on the caret.  
          STM GENERATOR MASTER is on the caret.
Place selector switch to Measured Variable and verify the pointer on the  
          Continue to Step 14.                                                     -UNSAT
STM GENERATOR MASTER is on the caret.  
COMMENTS:
Continue to Step 14.  
STEP 14: Step 14                                                                 CRITICAL STEP
STANDARD;
          Place STM GENERATOR MASTER in AUTO.
COMMENTS:  
STANDARD: STM GENERATOR MASTER is placed in AUTO by depressing the Auto             I  SAT
STEP 14:  
          pushbutton on the STM GENERATOR MASTER Bailey station and verify
Step 14  
          the red AUTO light illuminates and the white HAND light extinguishes.
Place STM GENERATOR MASTER in AUTO.  
                                                                                    -UNSAT
STM GENERATOR MASTER is placed in AUTO by depressing the Auto  
          Continue to Step 15
pushbutton on the STM GENERATOR MASTER Bailey station and verify  
COMMENTS:
the red AUTO light illuminates and the white HAND light extinguishes.  
Continue to Step 15  
STANDARD:
COMMENTS:  
CRITICAL STEP
-
SAT
-
UNSAT
I__ SAT
-
UNSAT
CRITICAL STEP
I
SAT
-
UNSAT


                                                                                        CRO-700 fnl
CRO-700 fnl  
                                                                                      Page 10 of 18
Page 10 of 18  
          Verify Delta Tc setpoint at = Delta Tc by comparing the following:
Verify Delta Tc setpoint at = Delta Tc by comparing the following:  
          0   O1E2091 (ICs DELTA TC SETPOINT)                                     I _ SAT
0  
          0    OlP1608 (RCS NARROW WNGE BELTATC)
0
STANDARD: Verify Delta Tc setpoint at = Delta Tc by comparing the above points on       UNSAT
O1E2091 (ICs DELTA TC SETPOINT)  
          the OAC.
OlP1608 (RCS NARROW WNGE BELTATC)  
                                                                                    I _
STANDARD:  
          Continue to Step 16
Verify Delta Tc setpoint at = Delta Tc by comparing the above points on  
COMMENTS:
the OAC.  
                                                                                  -
Continue to Step 16  
STEP 16: Step 16                                                                 CRITICAL STEP
COMMENTS:  
          Place DELTA Tc station in AUTO.
STEP 16:  
STANDARD:                                                                          -SAT
Step 16  
          The DELTA Tc station is placed in AUTO by depressing the Auto
Place DELTA Tc station in AUTO.  
          pushbutton on the DELTA Tc Bailey station and verifying the red AUTO
The DELTA Tc station is placed in AUTO by depressing the Auto  
          light illuminates and the white HAND light extinguishes.
pushbutton on the DELTA Tc Bailey station and verifying the red AUTO  
          Continue to Step 17.                                                     -UNSAT
light illuminates and the white HAND light extinguishes.  
COMMENTS:
Continue to Step 17.  
STEP 17: Step 17
STANDARD:
          Verify 1A FDW MASTER Measured Variable is on the caret.
COMMENTS:  
                                                                                    I  SAT
STEP 17:  
STANDARD: Place selector switch to Measured Variable and verify the pointer on the
Step 17  
          1A FCIW MASTER is on the caret.
Verify 1A FDW MASTER Measured Variable is on the caret.  
          Continue to Step 18.                                                     -UNSAT
Place selector switch to Measured Variable and verify the pointer on the  
COMMENTS:
1A FCIW MASTER is on the caret.  
Continue to Step 18.  
STANDARD:
COMMENTS:
I_
SAT
I_ UNSAT
-  
CRITICAL STEP
-
SAT
-
UNSAT  
I
SAT
-
UNSAT


                                                                                                CRO-780 fnl
CRO-780 fnl  
                                                                                                Page 11 of 18
Page 11 of 18  
STEP 18:       Step 18
STEP 18:  
              Verify 1B FBW MASTER Measured Variable is on the caret.
Step 18  
                                                                                            -SAT
Verify 1 B FBW MASTER Measured Variable is on the caret.  
STANBARD:      Place selector switch to Measured Variable and verify the pointer on the
Place selector switch to Measured Variable and verify the pointer on the  
              1B FDW MASTER is on the caret.
1 B FDW MASTER is on the caret.  
              Continue to Step 19.                                                         -UNSAT
Continue to Step 19.  
COMMENTS:
STANBARD:
                                        NOTE                                               CRITICAL STEP
COMMENTS:  
      1A FDW MASTER and 18 FDW MASTER should both be placed in AUTO
NOTE  
  -          .~...                 simultaneously.                       ....         ...
1A FDW MASTER and 18 FDW MASTER should both be placed in AUTO  
                                                                                            __ SAT
....  
STEP 19:       Step 19
...  
              Place the following in AUTO:
-
                  I A FDW MASTER                                                           -UNSAT
.~...  
              * I B FDW MASTER
simultaneously.  
STANDARD:      The 1A FBW MASTER and 1B FBW MASTER is placed in AUTO
STEP 19:  
              simultaneously by depressing the Auto pushbuttons on both the 1A FDW
Step 19  
              MASTER and IB FDW MASTER Bailey stations and verifying the red
Place the following in AUTO:  
              AUTO lights illuminate and the white HAND lights extinguish.
I A FDW MASTER  
              Continue to Step 20.
*  
Note: Simultaneous operation is not critical.
I B FDW MASTER  
COMMENTS:
The 1A FBW MASTER and 1 B FBW MASTER is placed in AUTO  
simultaneously by depressing the Auto pushbuttons on both the 1A FDW  
MASTER and I
B FDW MASTER Bailey stations and verifying the red  
AUTO lights illuminate and the white HAND lights extinguish.  
Continue to Step 20.  
STANDARD:
Note: Simultaneous operation is not critical.  
COMMENTS:  
-
SAT
-
UNSAT
CRITICAL STEP
__ SAT
-
UNSAT


'
CRO-700 fnl
STEP 20:
Page 12 of 18
STANDARD:
CAUTION  
                Step 20
Changing Total FDW flow will result in Rx power change. Total FDW flow should be  
                                          CAUTION
maintained as near constant as possible by adjusting FDW pump speed and FDW control  
Changing Total FDW flow will result in Rx power change. Total FDW flow should be
valve positions.  
maintained as near constant as possible by adjusting FDW pump speed and FDW control
STEP 20:
valve positions.       ._..           .......
Step 20
                Verify lowest FDW VALVE AP = 35 psid
._..  
                                                        .. .~
.. . . .. .  
                Verify lowest FDW VALVE AP = 35 psid by observing the FBW VALVE
. . .~
                AP gauge.
Verify lowest FDW VALVE AP = 35 psid  
                                                                                          -SAT
'
                                                                                              CRO-700 fnl
STANDARD:
                                                                                              Page 12 of 18
Verify lowest FDW VALVE AP = 35 psid by observing the FBW VALVE  
                                                                                          ___ UNSAT
AP gauge.  
                Continue to Step 21
Continue to Step 21  
COMMENTS:
COMMENTS:  
STEP 21 :       Step 21
STEP 21 :  
                Verify 18 MAIN FDW PUMP Measured Variable is on the caret.
Step 21  
                                                                                          __ SAT
Verify 18 MAIN FDW PUMP Measured Variable is on the caret.  
STANDARD:        Place selector switch to Measured Variable and verify the pointer on the
Place selector switch to Measured Variable and verify the pointer on the  
                I A MAIN FDW PUMP is on the caret.
I A MAIN FDW PUMP is on the caret.  
                Continue to Step 22.
Continue to Step 22.  
                                                                                          -UNSAT
STANDARD:
COMMENTS:
COMMENTS:  
STEP 22:         Step 22                                                                 CRITICAL STEP
STEP 22:  
                IAAT 1A MAIN FDW PUMP Measured Variable is on the caret,
Step 22  
                AND desired in AUTO,
IAAT 1A MAIN FDW PUMP Measured Variable is on the caret,  
                THEN place 1A MAIN FDW PUMP in AUTO.                                     ___ SAT
AND desired in AUTO,  
STANDARD:        Place I A MAIN FDW PUMP in AUTO by depressing the AUTO
THEN place 1A MAIN FDW PUMP in AUTO.  
                pushbutton and verify the red AUTO light illuminates and the white HAND   -UNSA?
Place I A MAIN FDW PUMP in AUTO by depressing the AUTO  
                light extinguishes.
pushbutton and verify the red AUTO light illuminates and the white HAND  
                Continue to Step 23.
light extinguishes.  
COMMENTS:
Continue to Step 23.  
STANDARD:
COMMENTS:  
-
SAT
___ UNSAT
__ SAT
-
UNSAT
CRITICAL STEP
___ SAT
-
UNSA?


                                                                                                CRO-700 fnl
CRO-700 fnl  
                                                                                                Page 13of 18
Page 13of 18  
STEP 23:           Step 23
STEP 23:  
                  Verify 18 MAIN FDW PUMP Measured Variable is on the caret.
Step 23  
                                                                                            -SAT
Verify 18 MAIN FDW PUMP Measured Variable is on the caret.  
STANDARD:          Place selector switch to Measured Variable and verify the pointer on the
Place selector switch to Measured Variable and verify the pointer on the  
                    I B MAIN FDW PUMP is on the caret.
I B MAIN FDW PUMP is on the caret.  
                                                                                            -UNSAT
Continue to Step 24.  
                  Continue to Step 24.
STANDARD:
COMMENTS:
COMMENTS:  
STEP 24:           Step 24                                                                 CRITICAL STEP
STEP 24:  
                  IAAT 16 MAIN FDW PUMP Measured Variable is on the caret,
STANDARD:
                  AND desired in AUTO.
COMMENTS:
                  THEN perform the following:                                               -SAT
Step 24  
                  0   Adjust I B MAIN FDW 6UMP bias as required using 0 1 E2092 (FWT
IAAT 16 MAIN FDW PUMP Measured Variable is on the caret,  
                  .    1B BIAS).
AND desired in AUTO.  
                        Place r E MAIN FDW PUMP in AUTO.
THEN perform the following:  
                                                                                            __ UNSAT
0  
STANDARD:          Place 1B MAIN FDW PUMP in AUTO by depressing the AUTO
Adjust I B MAIN FDW 6UMP bias as required using 0 1 E2092 (FWT  
                  pushbutton and verify the red AUTO light illuminates and the white HAND
1 B BIAS).  
                  light extinguishes.
.  
                  Continue toStep 25
Place 1 B MAIN FDW PUMP in AUTO by depressing the AUTO  
COMMENTS:
pushbutton and verify the red AUTO light illuminates and the white HAND  
STEP 25:         Step 25
light extinguishes.  
                  Verify 1FDW-32 Measured Variable is on the caret
Continue toStep 25  
                                                                                            -SAT
Place r E  MAIN FDW PUMP in AUTO.
STANDARD:        Place selector switch to Measured Variable and verify the pointer on the
STEP 25:  
                  1FDW-32 controller is on the caret.
Step 25  
                                                                                            -UNSAT
Verify 1 FDW-32 Measured Variable is on the caret  
                  Continue to Step 26
Place selector switch to Measured Variable and verify the pointer on the  
COMMENTS:
1 FDW-32 controller is on the caret.  
        .. ... ..                 -.                       .......
Continue to Step 26  
STANDARD:
COMMENTS:  
. .. .
. . . .  
-.  
.. .. ...  
-SAT
-
UNSAT
CRITICAL STEP
-
SAT
__ UNSAT
-
SAT
-
UNSAT


                                                                                                  CRO-700 fnl
CRO-700 fnl  
                                                                                                Page 14of 18
Page 14of 18  
  STEP 26:     Step 26
STEP 26:  
              Verify ?FDW-35 Mmsured Variable is on the caret.
Step 26  
                                                                                              -SAT
Verify ?FDW-35 Mmsured Variable is on the caret.  
  STANDARD:    Place selector switch to Measured Variable and verify the pointer on the
Place selector switch to Measured Variable and verify the pointer on the  
                1FBW-35 controller is on the caret.
1 FBW-35 controller is on the caret.  
                                                                                                  UNSAT
Continue to Step 27.  
              Continue to Step 27.
STANDARD:
  COMMENTS:
COMMENTS:  
            .~~..           _.                                   .. .
. ~ ~ . .
                                          NOTE"                                           CRlTlCAL STEP
_.  
~      .. 1FDW-32 and   1FDW-35
.. .  
                    ...._.      should.
NOTE"  
                                      .  both
1 FDW-32 and 1 FDW-35 should .. .-.  
                                        .-.  be placed in......
both be placed in ......  
                                                              AUTO simultaneously.
AUTO simultaneously.  
                                                                          ~ ~ ~
~  
  STEP 27:     Step 27
~
                                                                                              -SAT
~  
              Place the following in AUTO:
~  
                  IFDW-32
..
                  IFDW-35                                                                     __ UNSAT
...._.
STANDARD:    The IFDW-32 and IFDW-35 is placed in AUTO simultaneously by
STEP 27:  
              depressing the Auto pushbuttons on both the IFDW-32 and 1FDW-35
Step 27  
              Bailey stations and verifying the red AUTO lights illuminate and the M i t e
Place the following in AUTO:  
              HAND lights extinguish.
IFDW-32  
              Continue to Step 28
IFDW-35  
COMMENTS:
The IFDW-32 and IFDW-35 is placed in AUTO simultaneously by  
STEP 28:       Step 28
depressing the Auto pushbuttons on both the IFDW-32 and 1FDW-35  
              Verify IFDW-41 Measured Variable is on the caret
Bailey stations and verifying the red AUTO lights illuminate and the M i t e
                                                                                            ~    SAT
HAND lights extinguish.  
STANDARD:     Place selector switch to Measured Variable and verify the pointer on the
Continue to Step 28  
              1FDW-41 controller is on the caret.
STANDARD:
                                                                                              -UNSAT
COMMENTS:  
              Continue to Step 29.
STEP 28:  
COMMENTS:
Step 28  
Verify IFDW-41 Measured Variable is on the caret  
STANDARD:  
Place selector switch to Measured Variable and verify the pointer on the  
1 FDW-41 controller is on the caret.  
Continue to Step 29.  
COMMENTS:  
-
SAT
UNSAT
CRlTlCAL STEP
-
SAT
__ UNSAT
~
SAT
-
UNSAT


                                                                                                  CRO-900 fnl
CRO-900 fnl  
                                                                                                Page 15of 18
Page 15of 18  
  STEP 29:       Step 29
STEP 29:  
                  Verify 1FDW-44 Measured Variable is on the caret.
Step 29  
                                                                                              I  SAT
Verify 1 FDW-44 Measured Variable is on the caret.  
  STANDARD:      Place selector switch to Measured Variable and verify the pointer Qnthe
Place selector switch to Measured Variable and verify the pointer Qn the
                  1FDW-44 controller is on the caret.
1 FDW-44 controller is on the caret.  
                                                                                                  UNSAT
Continue to Step 30.  
                  Continue to Step 30.
STANDARD:
                                                                                              _  I
COMMENTS:  
  COMMENTS:
NOTE  
                                            NOTE                                           CRITICAL STEP
1 FDW-41 and 1 FDW-44 should both be placed in AUTO simultaneously.
~    -. 1..
.
          FDW-41
~  
            .. ,.    and 1FDW-44 should both be placed
-. .. . . ,.  
                                                    ~ ....                     .
~ ....  
                                                            in AUTO simultaneously.
STEP 30:  
                                                                                              -SAT
Step 30  
  STEP 30:       Step 30
Place the following in AUTO:  
                  Place the following in AUTO:
IFDW-41  
                      IFDW-41
IFDW-44  
                      IFDW-44                                                                 -UNSAT
STANDARD:  
  STANDARD:       The 1FDW-41 and 1FDW-44 is placed in AUTO simultaneously by
COMMENTS:
                  depressing the Auto pushbuttons on both the 1FDW-41 and 1FDW.
The 1 FDW-41 and 1 FDW-44 is placed in AUTO simultaneously by  
                  Bailey stations and verifying the red AUTO lights illuminate and the white
depressing the Auto pushbuttons on both the 1 FDW-41 and 1 FDW.  
                  HAND lights extinguish.
Bailey stations and verifying the red AUTO lights illuminate and the white  
                  Continue to Step 31.
HAND lights extinguish.  
  COMMENTS:
Continue to Step 31.  
  STEP 31:       Step 31
STEP 31:  
                  Slowly adjust the following as required by unit operation:
Step 31  
                      Tave                                                                   I  SAT_      .
Slowly adjust the following as required by unit operation:  
                      THP
Tave  
                      Delta Tc
THP  
                                                                                                  UNSAT
Delta Tc  
  STANDARD:      Adjust the above on 1UBI as required by unit operation.
Adjust the above on 1 UBI as required by unit operation.  
                  Continue to Step 32.
Continue to Step 32.  
  COMMENTS:
STANDARD:
COMMENTS:  
I
SAT
_I UNSAT
CRITICAL STEP
-
SAT
-
UNSAT
I
_
.
SAT
UNSAT


                                                            CRO-700 fill
CRO-700 fill  
                                                          Page 16 of 18
Page 16 of 18  
STEP 32: Step 32
STEP 32:  
          Ensure CTPD SET at desired value
STANDARD
                                                        I_  SAT
COMMENTS:
STANDARD  Ensure CTPD SET at desired value on 1UBI.
Step 32  
                                                        ___ UNSAT
Ensure CTPD SET at desired value  
COMMENTS:
Ensure CTPD SET at desired value on 1 UBI.  
...           ...~..         END.. TASK           ... .
I_ SAT
STOP TIME:
___ UNSAT  
...  
...~..  
END  
.. TASK  
... .  
STOP TIME:  


                                                                                      CRO-700 fRl
CRO-700 fRl  
                                                                                    Page 17 of 18
Page 17 of 18  
                        CRITICAL STEP EXPLANATIONS:
CRITICAL STEP EXPLANATIONS:  
STEP tC                                       Explanation
STEP tC  
  3     The setpoint and the parameter have to be matched to prevent a plant transient as
Explanation  
        the ICs is place in AUTO.
3  
  4    Required to place the ICs in AUTO.
4
  7    Required to place the   16s in AUTO.
7
  8    The setpoint and the parameter have to be matched to prevent a plant transient as the ICs is
8
        place in AUTO.
I 0 
  I0    Required to place the ICs in AUTO.
12
  12    Required to place the ICs in AUTO.
14
  14    Required to place the ICs in AUTO.
16
  16    Required to place the ICs in AUTO.
19
  19    Required to place the ICs in AUTO.
22
  22    Required to place the ICs in AUTO.
24
  24    Required to place the IC&sect; in AUTO.
27
  27    Required to place the IC&sect; in AUTO.
30
  30    Required to place the ICs in AUTO.
The setpoint and the parameter have to be matched to prevent a plant transient as  
the ICs is place in AUTO.  
Required to place the ICs in AUTO.  
Required to place the 16s in AUTO.  
The setpoint and the parameter have to be matched to prevent a plant transient as the ICs is  
place in AUTO.  
Required to place the ICs in AUTO.  
Required to place the ICs in AUTO.  
Required to place the ICs in AUTO.  
Required to place the ICs in AUTO.  
Required to place the ICs in AUTO.  
Required to place the ICs in AUTO.  
Required to place the IC&sect; in AUTO.  
Required to place the IC&sect; in AUTO.  
Required to place the ICs in AUTO.  


                                                                                CRO-700 ftll
CRO-700 ftll  
                                                                              Page 18 of 18
Page 18 of 18  
                            CANDIDATE CUE SHEET
CANDIDATE CUE SHEET  
            (TOBE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
I ICs AUTO power lost
I  
  ~
~ ICs AUTO power lost  
2. AP/23 (Loss of ICs Power) in progress
2. AP/23 (Loss of ICs Power) in progress  
3. ICS AUTO power has been restored
3. ICS AUTO power has been restored  
INITIATING CUES:
INITIATING CUES:  
The SRO directs you to perform Enclosure 5.5 (Placing ICs in AUTO) to place ALL ICs H/A
The SRO directs you to perform Enclosure 5.5 (Placing ICs in AUTO) to place ALL ICs H/A  
stations in AUTO.
stations in AUTO.  


                                      CRO-900 fnl
CRO-900 fnl  
                                      Page 1 of 13
Page 1 of 13  
                    REGION II
REGION II  
          INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
          JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
                    CRO-900
CRO-900  
                Release GWD Tank
Release GWD Tank  
CANDIDATE
CANDIDATE  
EXAMINER
EXAMINER  


                                                                                        CRO-900 fnl
CRO-900 fnl  
                                                                                        Page 2 of 13
Page 2 of 13  
                                            REGION II
REGION II  
                                INITIAL LICENSE WAMINATION
INITIAL LICENSE WAMINATION  
                                JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
Task:
Task:  
Release GWD Tank
Release GWD Tank  
Alternate Path:
Alternate Path:  
N
N  
FacilitvJPM #:
FacilitvJPM #:  
WA Rating(&
WA Rating(&  
System: 071
System: 071  
WA:     A426
WA:  
Rating: 3.1/3.9
A426  
Task Standard:
Rating: 3.1/3.9  
Release a GWD tank correctly using OP1I&2iAl104~018
Task Standard:  
                                                  End 4 9 (GWDTankRelease)
Release a GWD tank correctly using OP1I&2iAl104~018  
Preferred Evaluation Location:                                 Preferred Evaluation Method:
End 4 9 (GWD
Simulator 2In-Piant __                                          Perform       Simulate -
TankRelease)  
Preferred Evaluation Location:  
Simulator 2
In-Piant __
Preferred Evaluation Method:  
Perform  
Simulate -  


                                                  CRO-900 fnl
CRO-900 fnl  
                                                  Page 3 of 13
Page 3 of 13  
                SIMULATOR OPERATOR INSTRUCTIONS:
SIMULATOR OPERATOR INSTRUCTIONS:  
Z . Recall IC-30
Z . Recall IC-30  
2. GotoRUN
2. GotoRUN  


                                                                                          CRO-900 ffll
CRO-900 ffll  
                                                                                          Page 4 of 13
Page 4 of 13  
TooIslEauipment/Procedu~esNeeded:
TooIslEauipment/Procedu~es Needed:  
                                        READ TO OPERATOR
READ TO OPERATOR  
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:  
I will explain the initial conditions, and state the task to be periormed. All control room
I will explain the initial conditions, and state the task to be periormed. All control room  
steps shall be performed for this JPM, including any required communications. I will
steps shall be performed for this JPM, including any required communications. I will  
provide initiating cues and reports on other actions when directed by you. Ensure you
provide initiating cues and reports on other actions when directed by you. Ensure you  
indicate to me when you understand your assigned task. To indicate that you have
indicate to me when you understand your assigned task. To indicate that you have  
completed your assigned task return the handout sheet i provided you.
completed your assigned task return the handout sheet i provided you.  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
Release of "B"GWB tank is desired
Release of "B" GWB tank is desired  
QP/1&2/N1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to
QP/1&2/N1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to  
step 2.3.
step 2.3.  
INITIATING CUES:
INITIATING CUES:  
SRO directs you to complete the release of the "B"G W D tank at step 2.3 of Enclosure 4.9.
SRO directs you to complete the release of the "B" GWD tank at step 2.3 of Enclosure 4.9.  


                                                                                              CRO-900 fnl
CRO-900 fnl  
                                                                                              Page 5 of 13
Page 5 of 13  
START TIME:
START TIME:  
                Step 2.3
Step 2.3  
                Determine any other GWR(s) are in progress at station.
Determine any other GWR(s) are in progress at station.  
                                                                                          -SAT
Determine that no other GWR(s) are in progress at ONS  
STANDARD:      Determine that no other GWR(s) are in progress at ONS
Continue to Step 2.4  
                Continue to Step 2.4
STANDARD:
                                                                                          -UNSAT
Cue: No other GWRs are in progress.  
Cue: No other GWRs are in progress.
COMMENTS:  
COMMENTS:
Step 2.4  
                Step 2.4                                                                 CRITICAL STE
EF release will be made at 1/3 station release limit, verify IRIA-45 High  
                EF release will be made at 1/3 station release limit, verify IRIA-45 High
and Alert Alarm setpoints set per PT/0/A/0230/001 (Radiation MonitQr  
                and Alert Alarm setpoints set per PT/0/A/0230/001 (Radiation MonitQr       _ I SAT
Check).  
                Check).
STANDARD:  
STANDARD:     Refer to PT/OIA/0230/001 (Radiation Monitor Check) and verify 1RIA-45     -UNSAT
Refer to PT/OIA/0230/001 (Radiation Monitor Check) and verify 1 RIA-45  
                High and Aiert Alarm setpoints using the RIA View Node.
High and Aiert Alarm setpoints using the RIA View Node.  
                Continue to Step 2.5
Continue to Step 2.5  
Note: The setpoints will not be correct and will require the candidate to reset them
Note: The setpoints will not be correct and will require the candidate to reset them  
      per PT~02301001.
per PT~02301001.  
COMMENTS:
COMMENTS:  
m:             Step 2.5
m:  
                IF release will be made at 2/3 station release limit:
Step 2.5  
                                                                                              SAT
IF release will be made at 2/3 station release limit:  
STANDARD        Determine that this release will be made a 1/3 station limit
STANDARD
                N/A steps 2.5.1 - 2.5.5.                                                 -UNSAT
Determine that this release will be made a 1/3 station limit  
                Continue to Step 3.1
N/A steps 2.5.1 - 2.5.5.  
Cue: If asked inform the candidate as the SRO that this release will be at 5/3 station
Continue to Step 3.1  
    limit
Cue: If asked inform the candidate as the SRO that this release will be at 5/3 station  
COMMENTS:
limit  
COMMENTS:  
-
SAT
-
UNSAT
CRITICAL STE
_I SAT
-
UNSAT
SAT
-
UNSAT


                                                                                            CRO-900 fnl
CRO-900 fnl  
                                                                                            Page 6 of 13
Page 6 of 13  
  STEP:             Step 3.1
STEP:  
                    Record background readings for 1RIA-37 & 1RIA-38 on Enclosure 4.10
Step 3.1  
                    GWD Tank Sample Request.                                           __ SAT
Record background readings for 1 RIA-37 & 1 RIA-38 on Enclosure 4.10  
  STANDARD:         Determine background readings for 1RIA-37 & 1RIA-38 by observing the
GWD Tank Sample Request.  
                    RIA readings on the RIA View Node and record on Enclosure 4.10.     -UNSAT
STANDARD:  
  Note: The background readings should be as follows:
Determine background readings for 1 RIA-37 & 1  RIA-38 by observing the  
                    ZRIA-37 Background reading is: 45 cps
RIA readings on the RIA View Node and record on Enclosure 4.10.  
                    IRIA-38 Background reading is: 6.6 cps
Note: The background readings should be as follows:  
                    Continue to Step 3.2
ZRIA-37 Background reading is: 45 cps  
  COMMENTS:
IRIA-38 Background reading is: 6.6 cps  
                                                                                ....
Continue to Step 3.2  
[%OTE: The RIArequired to terminate release (ILIA within range) must be
COMMENTS:  
1 operable or .....
....  
              two independent samples must be taken   ._.. (SLG 16.1 1.3).
[%OTE: The RIArequired to terminate release (ILIA within range) must be  
                                                                        ......         I  SAT
1 operable or .....  
  m:               Step 3.2
two independent samples must be taken  
                    Recommended 1RIA-37 and 38 High and Alert setpcints:
._.. (SLG 16.1 1.3).  
                    e   1RIA-37           cpm above background
......  
                                                                                        -UNSAT
m:  
                        1RIA-38          cpm above background
Step 3.2  
  STANDARD:        Obtain this information from the sample request and record on form.
Recommended 1 RIA-37 and 38 High and Alert setpcints:  
                    Continue to Step 3.3
e  
  COMMENTS:
1 RIA-37  
cpm above background  
1 RIA-38
cpm above background  
Obtain this information from the sample request and record on form.  
Continue to Step 3.3  
STANDARD:
COMMENTS:  
__ SAT
-
UNSAT
I
SAT
-
UNSAT


                                                                                  CRO-900 fnl
CRO-900 fnl  
                                                                                  Page 7 of 13
Page 7 of 13  
          Step 3.3                                                           CRITICAL STE
STANDARD:
          Adjust 1RIA-37 setpoints for release per on6 of the foliowing:
COMMENTS:
          3.3.1 IF above instrument range over-ride 1RIA-37 setpoints:       __ SAT
STANDARD:
              o   Set 1RIA-37 alert setpoint at zero
COMMENTS
                  Set 1RIA-37 High setpoint at zero
Step 3.3  
          Or
Adjust 1 RIA-37 setpoints for release per on6 of the foliowing:  
                                                                              __ UNSAT
3.3.1 IF above instrument range over-ride 1 RIA-37 setpoints:  
          3.3.2 IF required to set alarms:
o  
              a   Set 1RIA-37 Alert setpoint at 4795 cpm
Set 1 RIA-37 alert setpoint at zero  
                  Set 1RIA-37 High setpoint at 4795 cpm
Set 1 RIA-37 High setpoint at zero  
STANDARD: Determine setpoints for release are NOT above instrument range and
Or  
          NIA step 3.3.1.
3.3.2 IF required to set alarms:  
          Determine required setpoints by adding background to data from the
a  
          sample request and enter it on this form.
Set 1 RIA-37 Alert setpoint at 4795 cpm  
          Continue to Step 3.4
Set 1 RIA-37 High setpoint at 4795 cpm  
COMMENTS:
Determine setpoints for release are NOT above instrument range and  
          Step 3.4                                                           CRITICAL STE
NIA step 3.3.1.  
          Adjust 1RIA-38 setpoints for release per one of the following:
Determine required setpoints by adding background to data from the  
          3.4.1 IF above instrument range over-ride 1RIA-38 setpoints:       __ SAT
sample request and enter it on this form.  
                  Set 1RIA-38 Alert setpoint at zero
Continue to Step 3.4  
              e    Set 1RIA-38 High setpoint at zero
Step 3.4  
          Or
Adjust 1 RIA-38 setpoints for release per one of the following:  
          3.4.2 IF required to set alarms:
3.4.1 IF above instrument range over-ride 1 RIA-38 setpoints:  
                                                                              -UNSAT
e
                  Set 1RIA-38 Alert setpoint at 31E).6 cpm
Set 1 RIA-38 Alert setpoint at zero  
                  Set 1RIA-38 High setpoint at 319.6 cpm
Set 1 RIA-38 High setpoint at zero  
STANDARD: Determine setpoints for release are NOT above instrument range and
Or  
          NIA step 3.3.1.
3.4.2 IF required to set alarms:  
          Determine required setpoints by adding background to data from the
Set 1 RIA-38 Alert setpoint at 31E).6 cpm  
          sample request and enter it on this form.
Set 1 RIA-38 High setpoint at 319.6 cpm  
          Continue to Step 3.5
Determine setpoints for release are NOT above instrument range and  
COMMENTS
NIA step 3.3.1.  
Determine required setpoints by adding background to data from the  
sample request and enter it on this form.  
Continue to Step 3.5  
CRITICAL STE
__ SAT
__ UNSAT
CRITICAL STE
__ SAT
-
UNSAT


                                                                                    CRO-900 fnl
CRO-900 fnl  
                                                                                    Page 8 of 13
Page 8 of 13  
              Step 3.5
STAN DARD :
              Reset WASTE GASTANK DISCH integrator to zero.
COMMENTS:
                                                                                I  SAT
STANDARD:
STANDARD:      Reset WASTE GASTANK DISC# integrator located on 1AB3 to zero by
COMMENTS:
              deprsssing the reset button.
Step 3.5  
                                                                                __ UNSAT
Reset WASTE GASTANK DISCH integrator to zero.  
              Continue to Step 3.6
Reset WASTE GASTANK DISC# integrator located on 1AB3 to zero by  
COMMENTS:
deprsssing the reset button.  
              Step 3.6
Continue to Step 3.6  
              Ensure GWW DISCHARGE FLOW CONTROL in '"HAND".
Step 3.6  
                  Verify GWR DISCHARGE FLOW CONTROL "CLOSED"                    -SAT
Ensure GWW DISCHARGE FLOW CONTROL in '"HAND".  
STANDARD:    Ensure GWR DISCHARGE FLOW CONTROL in "HAND" and CLOSED
Ensure GWR DISCHARGE FLOW CONTROL in "HAND" and CLOSED  
              located on 1AB3.
located on 1AB3.  
                                                                                    UNSAT
Verify GWR DISCHARGE FLOW CONTROL "CLOSED"
              Continue to Step 3.7
Continue to Step 3.7  
COMMENTS:
STEP 10:  
STEP 10:     Step 3.7                                                         CRITICAL STEl
Step 3.7  
              Open GWD-100 (Decay Tanks Bischarge Header Block). (A-2-2091E 13'
Open GWD-100 (Decay Tanks Bischarge Header Block). (A-2-2091E 13'  
              N of Door)                                                         -SAT
N of Door)  
STANDARD:     Dispatch N E 0 to Open GWD-100 (Decay Tanks Discharge Header
STANDARD:  
              Block).                                                           -UNSAT
Dispatch NE0 to Open GWD-100 (Decay Tanks Discharge Header  
              Continue to Step 3.8
Block).  
Cue: inform candidate that GWD-IO0 is open.
Continue to Step 3.8  
COMMENTS:
Cue: inform candidate that GWD-IO0 is open.  
COMMENTS:  
I
SAT
__ UNSAT
-
SAT
UNSAT
CRITICAL STEl
-
SAT
-
UNSAT


                                                                                        CRO-900 fnl
CRO-900 fnl  
                                                                                        Page 9 of 13
Page 9 of 13  
STEP 11:         Step 3.8                                                         CRITICAL STEP
STEP 11 :  
                IF releasing GWD Tank B perform the following:
Step 3.8  
                      Open GWD-99 (Decay Tank 1B Discharge Block)                   -SAT
IF releasing GWD Tank B perform the following:  
                e    Place GWD-5 (5 GWB TANK DISCHARGE) switch to "AUTO
e
STANDARD:       Dispatch N E 0 to open GWD-99 (Decsy Tank 15 Discharge Block).    -UNSAT
Open GWD-99 (Decay Tank 1B Discharge Block)  
Cue: Inform candidate that GWB-99 is open.
Place GWD-5 (5 GWB TANK DISCHARGE) switch to "AUTO  
                Located GWD-5 (B GWD TANK DISCHARGE) on 1863 and place
STANDARD:  
                switch to "AUTO"
Cue: Inform candidate that GWB-99 is open.
                Continue to Step 3.9
Dispatch NE0 to open GWD-99 (Decsy Tank 15 Discharge Block).  
COMMENTS:
Located GWD-5 (B GWD TANK DISCHARGE) on 1863 and place  
STEP 12:         Steps 3.9 - 3.1 1
switch to "AUTO"  
                IF releasing GWD Tank B perform the following...
Continue to Step 3.9  
                                                                                        SAT
COMMENTS:  
STANDARD:        Determine NOT releasing GWD Tank A, C, D and NIA steps 3.8. 3.10,
STEP 12:  
                and 3.1 1.
Steps 3.9 - 3.1 1  
                Continue to Step 3.12
IF releasing GWD Tank B perform the following ...  
                                                                                    __ UNSAT
Determine NOT releasing GWD Tank A, C, D and NIA steps 3.8. 3.10,  
COMMENTS:
and 3.1 1.  
      -          ~
Continue to Step 3.12  
NOTE: Station Limit release rates, per SLC 16.11, will NOT be exceeded if
STANDARD:
                                                                            ....
COMMENTS:  
        recommended release rates per Enclosure 4.10 "GWD Tank Sample Request"
....
        are followed.
~  
        * Limit and Precautions have~required
NOTE: - Station Limit release rates, per SLC 16.11, will NOT be exceeded if  
                                        . . ~ approval levels for release.         -SAT
recommended release rates per Enclosure 4.10 "GWD Tank Sample Request"  
STEP 13:         Step 3.12
are followed.  
                Approval granted for release.
* Limit and Precautions have ~..~  
                                                                                    -UNSAT
required approval levels for release.  
STANDARD:       Obtain approval for release.
STEP 13:  
                Continue to Step 3.13
Step 3.12  
Cue: Approval is granted for release by Trac: Lemons at current Daterrime.
Approval granted for release.  
COMMENTS:
STANDARD:  
Obtain approval for release.  
Continue to Step 3.13  
Cue: Approval is granted for release by Trac:  
COMMENTS:
Lemons at current Daterrime.  
CRITICAL STEP
-
SAT
-
UNSAT
SAT
__ UNSAT
-
SAT
-
UNSAT


                                                                                            CRO-900 fnl
CRO-900 fnl  
                                                                                            Page 10 of 13
Page 10 of 13  
  STEP 14:       Step 3.43
STEP 14:  
                  IF releasing at 2/3 Station Limit:
Step 3.43  
                                                                                        -SAT
IF releasing at 2/3 Station Limit:  
  STANDARD:      Determine NOT releasing at 2/3 Station Limit by previous cue.
Determine NOT releasing at 2/3 Station Limit by previous cue.  
                Continue to Step 3.14
Continue to Step 3.14  
                                                                                        II_ UNSAT
STANDARD:
  COMMENTS:
COMMENTS:  
  STEP 15:       Step 3.14
STEP 15:  
                Recommended Release Rate from Enclosure 4.10 "GWD Tank Sample
Step 3.14  
                Request":           cfm.                                               I  SAT
Recommended Release Rate from Enclosure 4.10 "GWD Tank Sample  
  STANDARD:      Record Recommended Release Rate from Enclosure 4.10 "GWD Tank
Request":  
                Sample Request".                                                       -UNSAT
cfm.  
                Continue to Step 3.15
Record Recommended Release Rate from Enclosure 4.10 "GWD Tank  
  CQMMENPS:
Sample Request".  
  NOTE:
Continue to Step 3.15  
    If U1 Penetration Room Ventilation (PRV) system is shutdown, RIA-32 U1 Penetration
STANDARD:
    Room sample point does NOT sample general area air properly.
CQMMENPS:  
                                                                                            SAT
NOTE:  
    With U1 PRV system shutdown. RIA-32 sample point for U1 Penetration Room is
e
                                                                                        _ I
e
  e
If U1 Penetration Room Ventilation (PRV) system is shutdown, RIA-32 U1 Penetration  
    sampling air in piping between U1 Unit Vent and PRV discharge.
Room sample point does NOT sample general area air properly.  
  e  RIA-32 counts may increase when selected to U1 Penetration Room while making a
With U1 PRV system shutdown. RIA-32 sample point for U1 Penetration Room is  
    GWD Release.                                                                       -UNSAT
sampling air in piping between U1 Unit Vent and PRV discharge.  
  STEP 16:       Step 3.15
RIA-32 counts may increase when selected to U1 Penetration Room while making a  
                Place a note on Turnover sheet that RIA-32 Penetration Room sample
GWD Release.  
                point may alarm when selected to U'i Penetration Room during GWD
STEP 16:  
                release.
Step 3.15  
  STANDARD:      Candidate should indicate a note should be placed on the Turnover sheet
Place a note on Turnover sheet that RIA-32 Penetration Room sample  
                indicating that RIA-32 Penetration Room sample point may alarm when
point may alarm when selected to U'i Penetration Room during GWD  
                selected to U1 Penetration Room during GWD release.
release.  
                Continue to Step 3.16
Candidate should indicate a note should be placed on the Turnover sheet  
  COMMENTS:
indicating that RIA-32 Penetration Room sample point may alarm when  
I
selected to U1 Penetration Room during GWD release.  
Continue to Step 3.16  
STANDARD:
COMMENTS:  
I  
-
SAT
II_ UNSAT
I
SAT
-
UNSAT
_I SAT
-
UNSAT


                                                                                                CRO-900 fnl
CRO-900 fnl  
                                                                                                Page I 1 of 13
Page I 1 of 13  
STEP 17:     Step3.16                                                                     CRITICAL STEP
STEP 17:  
              Adjust GWR DISCHARGE FLOW CONTROL to obtain desired release
Step3.16  
              rate.
Adjust GWR DISCHARGE FLOW CONTROL to obtain desired release  
                                                                                            -SAT
rate.  
STANDARD:     Slowly adjust the manual loading knob to obtain the desired release rate.
STANDARD:  
              Continue to Step 3.17
Slowly adjust the manual loading knob to obtain the desired release rate.  
                                                                                            -UNSAT
Continue to Step 3.17  
Note: Although the maximum rate is high the actual release rate will be low.
Note: Although the maximum rate is high the actual release rate will be low.  
COMMENTS:
COMMENTS:  
STEP 18:       Step 3.17
STEP 18:  
                Record "Begin GWR #               " in Unit Log
Step 3.17  
                                                                                            I  SAT
Record "Begin GWR #  
STANDARD:     Candidate should indicate a Unit log entry would be made.
" in Unit Log  
                                                                                            -UNSAT
STANDARD:  
COMMENTS:
Candidate should indicate a Unit log entry would be made.  
                                    END
COMMENTS:  
                                      .~  TASK
END  
                                            -                          ..             .....
. ~ -  
STOP TIME:
TASK  
..  
.....  
CRITICAL STEP
-
SAT
-
UNSAT
I
SAT
-
UNSAT
STOP TIME:  


                                                                    CRO-900 fnl
CRO-900 fnl  
                                                                    Page 1 2 0 f 13
Page 120f 13  
                      CRITICAL STEP EXPLANATIONS:
CRITICAL STEP EXPLANATIONS:  
STEP #                                     Explanation
STEP #  
  2   Required to set RIA to prevent station release above limits.
Explanation  
  6    Required to set RIA to prevent station release above limits.
2  
  7    Required to set RIA to prevent station release above limits.
6
  10  Required to align release flow path.
7
  21  Required to align release flow path.
10
  17  Required to align release flow path.
2 1
17
Required to set RIA to prevent station release above limits.  
Required to set RIA to prevent station release above limits.  
Required to set RIA to prevent station release above limits.  
Required to align release flow path.  
Required to align release flow path.  
Required to align release flow path.  


                                                                                    CRO-900 fnl
CRO-900 fnl  
                                                                                  Page 13 of 13
Page 13 of 13  
                              CANDIDATE CUE SHEET
CANDIDATE CUE SHEET  
          (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
Release of "5" GWD tank is desired
Release of "5" GWD tank is desired  
OQ/l&2/A/1104/818, Endosure 4.9 (GWD Tank Release) is in progress and completed up to
OQ/l&2/A/1104/818, Endosure 4.9 (GWD Tank Release) is in progress and completed up to  
step 2.3.
step 2.3.  
INITIATING CUES:
INITIATING CUES:  
SRQ directs you to complete the release of the "B" GWD tank at step 2.3 of Enclosure 4.9.
SRQ directs you to complete the release of the "B" GWD tank at step 2.3 of Enclosure 4.9.  


                                        NLO-036 fnl
NLO-036 fnl  
                                        Page 1 of 10
Page 1 of 10  
                        REGION II
REGION II  
            INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
            JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
                        NLO-036
NLO-036  
          STARTUP A VITAL BUS INVERTER
STARTUP A VITAL BUS INVERTER  
CANDIDATE
CANDIDATE  
EXAMINER
EXAMINER  


                                                                                                    NLO-036 fnl
NLO-036 fnl  
                                                                                                    Page 2 of 10
Page 2 of 10  
                                                REGION II
REGION II  
                                      INlTiAL LICENSE EXAMINATION
INlTiAL LICENSE EXAMINATION  
                                    JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
Task:
Task:  
STARTUP A VITAL BUS INVERTER
STARTUP A VITAL BUS INVERTER  
Alternate Path:
Alternate Path:  
N
N  
Facilitv JPM #
Facilitv JPM #  
N
N  
WA Ratinds):
WA Ratinds):  
System: 062
System: 062  
WA:       A3.04
WA:  
Rating: 2.9/2.9
A3.04  
Task Standard:
Rating: 2.9/2.9  
Vital Bus Inverter placed in service correctly
Task Standard:  
Preferred Evaluation Location:                                          Preferred Evaluation Method:
Vital Bus Inverter placed in service correctly  
Simulator -In-Plant       X                                           Perform -Simulate
Preferred Evaluation Location:  
References:
Simulator -  
OP/l,2,3/A/t 107/04. Enclosure 4 2 (Startup Of The Vital Bus Inverters)
In-Plant  
Validation Time: 3 minutes                                               Time Critical: NO
X  
Perform -  
Simulate  
References:  
OP/l,2,3/A/t 107/04. Enclosure 4 2 (Startup Of The Vital Bus Inverters)  
Validation Time: 3 minutes  
Time Critical: NO  
Preferred Evaluation Method:
----____-_____________---ssssss_______ss------------------------------------------
----____-_____________---ssssss_______ss------------------------------------------
_ ~ ~ ~ ~ _ _ _ _ _ ~ _ _ ~ ~ ~ ~ ~ _ _ ~ - - - s s s s s s _ _ _ _ _ _ _ _ ~ ~ ~ ~ ~ ~ ~ ~ ~ - - - - - ~
_ ~ ~ ~ ~ _ _ _ _ _ ~ _ _ ~ ~ ~ ~ ~ _ _ ~ - - - s s s s s s _ _ _ _ _ _ _ _ ~ ~ ~ ~ ~ ~ ~ ~ ~ - - - - - ~
Candidate:                                                                     Time Start,
Candidate:  
                                  NAME                                         Time Finish.
Time Start,  
Performance R a t i n s SAT   ~       UNSAT -                                 Performance Time -
NAME  
Examiner:                                                                                       -I
Time Finish.  
                        NAME                                           SIGNATURE                   DATE
Performance Ratins SAT  
~  
UNSAT -  
Performance Time -  
Examiner:  
I--  
NAME  
SIGNATURE  
DATE  


                                NLO-036 fnl
NLO-036 fnl  
                                Page 3 of 10
Page 3 of 10  
SIMULATOR OPERATOR INSTRUCTIONS:
SIMULATOR OPERATOR INSTRUCTIONS:  
              NONE
NONE  


                                                                                          NLO-036 fnl
ToolslEquipmentIProcedures Needed:
                                                                                          Page4of10
NLO-036 fnl  
ToolslEquipmentIProcedures Needed:
Page4of10  
                                        READ TO OPERATOR
READ TO OPERATOR  
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:  
I will explain the initial conditions, and state the task to be performed. All control room
I will explain the initial conditions, and state the task to be performed. All control room  
steps shall be performed for this JPM, including any required communications. I will
steps shall be performed for this JPM, including any required communications. I will  
provide initiating cues and reports on other actions when directed by you. Ensure you
provide initiating cues and reports on other actions when directed by you. Ensure you  
indicate to me when you understand your assigned task. To indicate that you have
indicate to me when you understand your assigned task. To indicate that you have  
completed your assigned task return the handout sheet I provided you.
completed your assigned task return the handout sheet I provided you.  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
Earkies today the 1DIB Vital Bus Inverter was shutdown for maintenance. I & E personnel
Earkies today the 1DIB Vital Bus Inverter was shutdown for maintenance. I & E personnel  
have just notified the Control Room SRO that they have completed their work on the inverter.
have just notified the Control Room SRO that they have completed their work on the inverter.  
The affected I2OVAC Vital Instrumentation Power Panelboard is being supplied by Regulated
The affected I2OVAC Vital Instrumentation Power Panelboard is being supplied by Regulated  
AC Panelboard KRA.
AC Panelboard KRA.  
INITIATING C U E
INITIATING CUE
The Control Room SRQ directs you to startup IDIB Vital Bus Inverter per OPlllNZ 107/04
The Control Room SRQ directs you to startup IDIB Vital Bus Inverter per OPlllNZ 107/04  
(Enctosure 4.2). DC Power to the inverter has           been isolated.
(Enctosure 4.2). DC Power to the inverter has  
Begin at Step 2.1.
Begin at Step 2.1.
been isolated.  


                                                                                            NbQ-036 fnl
START TIME:  
                                                                                            Page 5 of 10
Step 2.1  
START TIME:
IF DC power to the inverter has been isolated, close breaker #33 on the  
                Step 2.1
associated DC paneiboard.  
                IF DC power to the inverter has been isolated, close breaker #33 on the
Determine that DC power to the inverter has not been isolated by  
                associated DC paneiboard.                                               -SAT
referring to the initial conditions.  
STANDARD:      Determine that DC power to the inverter has not been isolated by
Continue to Step 2.2.  
                referring to the initial conditions.                                     -UNSAT
STANDARD:
                Continue to Step 2.2.
CUE: Indicate to candidate that breaker #33 is closed.  
CUE: Indicate to candidate that breaker #33 is closed.
COMMENTS:  
COMMENTS:
Step 2.2  
                Step 2.2                                                               CRITICAL TASK
Press the PRECHARGE SWITCH pushbutton until the PRECHARGE  
                Press the PRECHARGE SWITCH pushbutton until the PRECHARGE
light comes on.  
                light comes on.                                                         -SAT
STANDARD:  
STANDARD:     The candidate depresses the PRECHARGE SWITCH pushbutton untii
The candidate depresses the PRECHARGE SWITCH pushbutton untii  
                the PRECHARGE light comes on.                                           -UNSAT
the PRECHARGE light comes on.  
CUE: Indicate to the student that the PRECHARGE light is ON.
CUE: Indicate to the student that the PRECHARGE light is ON.  
                Continue to Step 2.3.
Continue to Step 2.3.  
COMMENTS:
COMMENTS:  
NbQ-036 fnl
Page 5 of 10
-
SAT
-
UNSAT
CRITICAL TASK
-
SAT
-
UNSAT


                                                                                      NLO-036 fnl
Step 2.3  
                                                                                      Page 6 of 10
CLOSE the DC INPUT circuit breaker and verify Vital Bus INVERTER  
              Step 2.3                                                         CRITICAL TASK
OUTPUT voltage increases to approximately 120 volts AC.  
              CLOSE the DC INPUT circuit breaker and verify Vital Bus INVERTER   I  SAT
STANDARD:  
              OUTPUT voltage increases to approximately 120 volts AC.
Cue: indicate to the student that the DC INPUT breaker is ifl the ON position.  
STANDARD:     The DC INPUT circuit breaker is CLOSED
The DC INPUT circuit breaker is CLOSED
                                                                                  -UNSAT
INVERTER OUTPUT voltmeter, AC volts, is observed and verified to  
Cue: indicate to the student that the DC INPUT breaker is ifl the ON position.
indicate approximately 120 volts AC.  
                INVERTER OUTPUT voltmeter, AC volts, is observed and verified to
Cue: indicate to student that inverter voltage iNCREASES from 0 to 120 volts AC,  
                indicate approximately 120 volts AC.
as indicated on the INVRTER OUTPUT voltmeter.  
Cue: indicate to student that inverter voltage iNCREASES from 0 to 120 volts AC,
Continue to Step 2.4.  
as indicated on the INVRTER OUTPUT voltmeter.
COMMENTS:  
              Continue to Step 2.4.
Step 2.4  
COMMENTS:
CLOSE the INVERTER OUTPUT circuit breaker.  
              Step 2.4                                                         CRITICAL TASK
STANDARD:  
              CLOSE the INVERTER OUTPUT circuit breaker.
CUE: indicate to the student that the INVERTER OUTPUT breaker is in the ON  
                                                                                  -SAT
position.  
STANDARD:     The INVERTER OUTPUT circuit breaker is CLOSED
The INVERTER OUTPUT circuit breaker is CLOSED
CUE: indicate to the student that the INVERTER OUTPUT breaker is in the ON           UNSAT
Continue to Step 2.5.  
position.
COMMENTS:  
              Continue to Step 2.5.
NLO-036 fnl
COMMENTS:
Page 6 of 10
CRITICAL TASK
I
SAT
-
UNSAT
CRITICAL TASK
-
SAT
UNSAT


                                                                                  NLO-036 fnl
Step 2.5  
                                                                                  Page 7 of 10
VERIFY the IN SYNC light is on.  
                Step 2.5
Green IN SYNC light is verified ON.  
                VERIFY the IN SYNC light is on.
STANDARD:
                                                                              -SAT
CUE: indicate to student that IN SYNC light is ON.  
STANDARD:      Green IN SYNC light is verified ON.
Continue to Step 2.6.  
CUE: indicate to student that IN SYNC light is ON.                           I  UNSAT
COMMENTS:  
                Continue to Step 2.6.
Step 2.6  
COMMENTS:
POSITION the MANUAL BYPASS SWITCH to the NORMAL SOURCE  
                Step 2.6                                                     CRITICAL TASK
position.  
                POSITION the MANUAL BYPASS SWITCH to the NORMAL SOURCE
Student rotates the Manual Bypass Switch from the ALTERNATE  
                position.                                                     _I_ SAT
SOURCE position to the NORMAL SOURCE position.  
STANDARD:      Student rotates the Manual Bypass Switch from the ALTERNATE
STANDARD:
                SOURCE position to the NORMAL SOURCE position.
Cue: lndicate to the sfudenf that the Maflual Bypass Switch is in the NORMAL  
                                                                              -UNSAT
SOURCE position.  
Cue: lndicate to the sfudenf that the Maflual Bypass Switch is in the NORMAL
Continue to Step 2.7.  
SOURCE position.
COMMENTS:  
              Continue to Step 2.7.
NLO-036 fnl
COMMENTS:
Page 7 of 10
-
SAT
I
UNSAT
CRITICAL TASK
_I_ SAT
-
UNSAT


                                                                                NLO-036 fnl
Step 2.7  
                                                                                Page 8 of 10
VERIFY the following indications:  
                Step 2.7
INVERTER OUTPUT volt meter = 120 volts  
              VERIFY the following indications:                               -SAT
Inverter Output frequency meters 60 Hz  
                    INVERTER OUTPUT volt meter = 120 volts
INVERTER OUTPUT amp meter increases and stabilizes to match  
                e  Inverter Output frequency meters 60 Hz
SYSTEM OUTPUT amp meter.  
                    INVERTER OUTPUT amp meter increases and stabilizes to match -UNSAT
e
                    SYSTEM OUTPUT amp meter.
The following indications are verified:  
                                            -
INVERTER OUTPUT volts - 120  
STANDARD:      The following indications are verified:
STANDARD:
                INVERTER OUTPUT volts         120
INVERTER OUTPUT frequency = 60 tiz.  
                INVERTER OUTPUT frequency = 60 tiz.
INVERTER OUTPUT amp meter increases and stabilizes to match  
                INVERTER OUTPUT amp meter increases and stabilizes to match
SYSTEM OUTPUT amp meter.  
                SYSTEM OUTPUT amp meter.
Cue: Provide the following indications to the student:  
Cue: Provide the following indications to the student:
INV. OUTPUT volts f20.  
        INV. OUTPUT volts f20.
INV. OUTPUT freq. 60.  
        INV. OUTPUT freq. 60.
INV. OUTPUT amps 20 - 40.  
        INV. OUTPUT amps 20 40. -
SYS. OUTPUT amps 20 - 40.  
        SYS. OUTPUT amps 20 40.   -
COMMENTS:  
COMMENTS:
.....  
                          .....         END TASK           ......         ...
END TASK  
STOP TIME:
......  
. ..  
NLO-036 fnl
Page 8 of 10
-
SAT
-
UNSAT
STOP TIME:  


                                                                                    NLO-036 fnl
CRITICAL STEP EX-PLANATIONS:
                                                                                    Page 9 of 10
NLO-036 fnl  
                        CRITICAL STEP EX-PLANATIONS:
Page 9 of 10  
STEP #                                        Explanation
STEP #
  2   Recharge input filter capacitor prevents a large increase in current when the inverter
Explanation  
      is placed on line.
2  
  3   Closing the DC input breaker supplies DC input to the inverter.
Recharge input filter capacitor prevents a large increase in current when the inverter  
  4   Closing this breaker connects the inverter output to the input of the autotransformer.
is placed on line.  
  6   Selecting NORMAL Source with the Manual Bypass Switch causes a make before
3  
      break transfer to the inverter output placing the inverter in service.
Closing the DC input breaker supplies DC input to the inverter.  
4  
Closing this breaker connects the inverter output to the input of the autotransformer.  
6  
Selecting NORMAL Source with the Manual Bypass Switch causes a make before  
break transfer to the inverter output placing the inverter in service.  


                                                                                  NLO-036 fnl
NLO-036 fnl  
                                                                                Page 10 of 10
Page 10 of 10  
                                CANDIDATE CUE SHEET
CANDIDATE CUE SHEET  
            (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
Earlier today the 1DIB Vital Bus Inverter was shutdown for maintenance. I & E personnel
Earlier today the 1DIB Vital Bus Inverter was shutdown for maintenance. I & E personnel  
have just notified the Control Room SRO that they have completed their work on the inverter.
have just notified the Control Room SRO that they have completed their work on the inverter.  
The affected I20VAC Vital Instrumentation Power Panelboard is being supplied by Regulated
The affected I20VAC Vital Instrumentation Power Panelboard is being supplied by Regulated  
AC Panelboard KKA.
AC Panelboard KKA.  
lNlTIATlNG CUE:
lNlTIATlNG CUE:  
The Control Room SRQ directs you to startup IDIB Vital Bus Inverter per OP/l/Ail107/04
The Control Room SRQ directs you to startup IDIB Vital Bus Inverter per OP/l/Ail107/04  
(Enclosure 4.2). DC Power to the inverter has ROf been isolated.
(Enclosure 4.2). DC Power to the inverter has ROf been isolated.  
Begin at Step 2.1
Begin at Step 2.1  


                                        NLO-039 fnl
NLO-039 fnl  
                                        Page 1 of 10
Page 1 of 10  
                      REGION II
REGION II  
          INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
          JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
                      NLO-039
N LO-039  
    PRIME THE SPENT FUEL POOL FILL LINE
PRIME THE SPENT FUEL POOL FILL LINE  
CANDIDATE
CANDIDATE  
EXAMBUER
EXAMBUER  


                                                                                        NbO-039 fnl
NbO-039 fnl  
                                                                                        Pags 2 of 10
Pags 2 of 10  
                                            REGION II
REGION II  
                                  INITIAL LICENSE EXAMINATION
INITIAL LICENSE EXAMINATION  
                                JOB PERFORMANCE MEASURE
JOB PERFORMANCE MEASURE  
Task:
Task:  
PRIME THE SPENT FUEL POOL FILL LINE
PRIME THE SPENT FUEL POOL FILL LINE  
Alternate Path:
Alternate Path:  
Facilihr JPM #:
Facilihr JPM #:  
KIA Ratinnb):
KIA Ratinnb):  
System: APE022
System: APE022  
KIA:     AK3.02
KIA:  
Rating. 3.5/3.8
AK3.02  
Task Standard:
Rating. 3.5/3.8  
SFP Priming Pump is aligned and started
Task Standard:  
Preferred Evaluation Location:                               Preferred Evaluation Method:
SFP Priming Pump is aligned and started  
Simulator -In-Plant       X                                   Perform -Simulate X
Preferred Evaluation Location:  
References:
Preferred Evaluation Method:  
EOP Enclosure "HPI Pump Operations from ASW Pump Switchgear"
Simulator -  
Candidate:                                         I-               Time Start:
In-Plant  
                              NAME                                   Time Finish:
X  
Performance RatinR: SAT-UNSAT -                                       Performance Time ~
Perform -  
Examiner:                                                                             I
Simulate X  
                      NAME                                   SIGNATURE                   DATE
References:  
EOP Enclosure "HPI Pump Operations from ASW Pump Switchgear"  
Candidate:  
I
-
Time Start:  
NAME  
Time Finish:  
Performance Time
~
Performance RatinR: SAT-  
UNSAT -  
Examiner:  
I  
NAME  
SIGNATURE  
DATE  


                                Nb0-039 fnl
SIMULATOR OPERATOR INSTRUCTIONS:
                                Page 3 of 10
NONE
SIMULATOR OPERATOR INSTRUCTIONS:
Nb0-039 fnl  
              NONE
Page 3 of 10  


                                                                                          NLO-039 fnl
__
                                                                                          Pageeof 10
Tools/auipmenffProcedu~~s  
Tools/auipmenffProcedu~~s           Needed:
Needed:  
                                        READ TO OPERATOR
NLO-039 fnl
DlRECTlON TO TRAINEE:
Pageeof 10
I will explain the initial conditions, and state the task to be performed. All control room
READ TO OPERATOR  
steps shall be performed for this JPM, including any required communications. I wil[
DlRECTlON TO TRAINEE:  
provide initiating cues and reports on other actions when directed by you. Ensure you
I will explain the initial conditions, and state the task to be performed. All control room  
indicate to me when you understand your assigned task. To indicate that you have
steps shall be performed for this JPM, including any required communications. I wil[  
completed your assigned task return the handout sheet I provided you.
provide initiating cues and reports on other actions when directed by you. Ensure you  
INITIAL CONDITIONS:
indicate to me when you understand your assigned task. To indicate that you have  
A tornado has struck Unit 2 Turbine Building and destroyed the 4160 volt switchgear TC, TD,
completed your assigned task return the handout sheet I provided you.  
and TE.
INITIAL CONDITIONS:  
it also struck the Unit 2 BWST, rupturing and draining it.
A tornado has struck Unit 2 Turbine Building and destroyed the 4160 volt switchgear TC, TD,  
The SSF Reactor Coolant Makeup Pump failed to start.
and TE.  
2A HPIP has been powered from the ASW switchgear.
it also struck the Unit 2 BWST, rupturing and draining it.  
The Spent Fuel Pool level is currently +I     .Q feet.
The SSF Reactor Coolant Makeup Pump failed to start.  
INITIATING CUES:
2A HPIP has been powered from the ASW switchgear.  
The EOP directs the operator to perform "HPI Pump Operation From ASW Pump Switchgear"
The Spent Fuel Pool level is currently +I  
Enclosure to align HPlPs to the SFP.
.Q feet.  
Another operator is aligning the HPI Suction from the SFP.
INITIATING CUES:  
The Control Room SRO directs you to prime the Spent Fuel Pool fill line on Unit 2 per this
The EOP directs the operator to perform "HPI Pump Operation From ASW Pump Switchgear"  
Enclosure, beginning at Step 20.
Enclosure to align HPlPs to the SFP.  
Another operator is aligning the HPI Suction from the SFP.  
The Control Room SRO directs you to prime the Spent Fuel Pool fill line on Unit 2 per this  
Enclosure, beginning at Step 20.  


                                                                                                NLO-039 fnl
NLO-039 fnl  
                                                                                              Page 5 of 10
Page 5 of 10  
START TIME:
START TIME:  
                  Step 20
Step 20  
                  Obtain bucket and rope from EOP equipment locker U2AB5. (A-5.U2
Obtain bucket and rope from EOP equipment locker U2AB5. (A-5.  
                  elevator lobby)                                                         -SAT
U2  
    STANDARD:      Locate EOQ equipment locker U2AB5 located at A-5, U2 elevator lobby
elevator lobby)  
                  and idcaite that you would obtain a bucket and rope from the locker.
Locate EOQ equipment locker U2AB5 located at A-5, U2 elevator lobby  
                                                                                            _ I UNSAT
and idcaite that you would obtain a bucket and rope from the locker.  
                  Continue to Step 21.
Continue to Step 21.  
    Cue: Inform candidate that opening the docker is not rqUiFed.
STANDARD:
  COMMENTS:
Cue: Inform candidate that opening the docker is not rqUiFed.  
:2-              Step 21A
COMMENTS:  
                  Connect SF priming pump suction hose to quick disconnect fitting at SF-
-2:  
                  86 (SF PRIMING PUMP SEAL WATEK INLET)                                   -SAT
Step 21A  
  STANDARD:       Candidate connects suction hose to quick disconnect fitting at SF-86, 01
Connect SF priming pump suction hose to quick disconnect fitting at SF-  
                  verifies it is connected                                                 I_  UNSAT
86 (SF PRIMING PUMP SEAL WATEK INLET)  
                  Continue to Step 21B.
STANDARD:  
  COMMENTS:
Candidate connects suction hose to quick disconnect fitting at SF-86, 01  
  STEP:           Step 21B
verifies it is connected  
                  Connect ths Spent Fuel Priming Pump suction hose to the Spent Fuel
Continue to Step 21 B.  
                  Pool Fill line connection tap on SF-85 (SF PRIMING PUMP                 I  SAT
COMMENTS:  
                  UNDERWATER SUPPLY BLOCK).
STEP:  
  STANDARD:      Verify the Spent Fuel Priming Pump suction hose to the Spent Fuel Pool
Step 21 B
                  Fill line connection tap on SF-85 (SFPRIMING PUMP UNDERWATER
Connect ths Spent Fuel Priming Pump suction hose to the Spent Fuel  
                                                                                            -UNSAT
Pool Fill line connection tap on SF-85 (SF PRIMING PUMP  
                  SUPPLY BLOCK) is connected.
UNDERWATER SUPPLY BLOCK).  
                  Continue to Step 21C
Verify the Spent Fuel Priming Pump suction hose to the Spent Fuel Pool  
  COMMENTS:
Fill line connection tap on SF-85 (SF PRIMING PUMP UNDERWATER  
SUPPLY BLOCK) is connected.  
STANDARD:
Continue to Step 21C  
COMMENTS:  
-
SAT
_I UNSAT
-
SAT
I_ UNSAT
I
SAT
-
UNSAT


                                                                                                        NLO-039 fnl
NLO-039 fnl  
                                                                                                        Page 6 of 10
Page 6 of 10  
  :4-                Step 21C                                                                     CRITICAL
-4:  
                      Open SF-85 (SF PRIMING PUMP UNDRWATER SUPPLY BLOCK)
Step 21C  
      STANDARD:      The student locates and opens SF-85 (Pool Underwater Supply Block to           __ SAT
Open SF-85 (SF PRIMING PUMP UNDRWATER SUPPLY BLOCK)  
                      Priming Pump) by rotating valve operator until handle is parallel with pipe.
The student locates and opens SF-85 (Pool Underwater Supply Block to  
                      Continue to Step 210.
Priming Pump) by rotating valve operator until handle is parallel with pipe.  
                                                                                                    -UNSI
Continue to Step 210.  
      Note: There is a special tool for operating SF-85 and SF-84 hanging at the South
STANDARD:
            end of the Spent Fuel Pool.
Note: There is a special tool for operating SF-85 and SF-84 hanging at the South  
      COMMENTS:
end of the Spent Fuel Pool.  
:5-                  Step 21D
COMMENTS:  
                    Place the flex hose on the discharge of the SF Priming Pump into the
-5:  
                    SFP.                                                                         ~    SAT
Step 21 D
    STANDARD:       The student (simulates) placing the free end of discharge hose into the
Place the flex hose on the discharge of the SF Priming Pump into the  
                    Spent Fuel Peel.                                                             -UNSC
SFP.  
                    Continue to Step 21E.
STANDARD:  
    COMMENTS:
The student (simulates) placing the free end of discharge hose into the  
  a:Step 21E
Spent Fuel Peel.  
                    CLOSE SF-84 (SF POOL UNDERWATER SUPPLY VENT)
Continue to Step 21E.  
                                                                                                  -SAT
COMMENTS:  
  STANDARD:        SF-84 (SF Pool Underwater Supply Vent) is CLOSED by rotating valve
a:  
                    operator until handle is perpendicular to pipe.
Step 21 E
                                                                                                        UNSF
CLOSE SF-84 (SF POOL UNDERWATER SUPPLY VENT)  
                    Continue to Step 21F.
SF-84 (SF Pool Underwater Supply Vent) is CLOSED by rotating valve  
                                                                                                  _  I
operator until handle is perpendicular to pipe.  
  Note: There is a special tool for operating SF-85 and SF-84 hanging at the South
Continue to Step 21 F.  
          end of the Spent Fuel Pool.
STANDARD:
  COMMENTS:
Note: There is a special tool for operating SF-85 and SF-84 hanging at the South  
end of the Spent Fuel Pool.  
COMMENTS:  
CRITICAL
__ SAT
-
UNSI
~
SAT
-
UNSC
SAT
-
_I UNSF


                                                                                                Nb0-039 fnl
STEQ:  
                                                                                                Page 7 of 10
Step 21 F
STEQ:           Step 21F                                                                  CRITICAL TASK
Fill the SF Priming Pump Seal Tank to at least half-full with DW or water  
                Fill the SF Priming Pump Seal Tank to at least half-full with DW or water
from SFP using bucket.  
                                                                                            -SAT
The candidate fills the SF Priming Pump Seal Tank at least half-full using  
                from SFP using bucket.
DW from the North-West end of the SFP or by using the rope and bucket  
STANDARD:        The candidate fills the SF Priming Pump Seal Tank at least half-full using
to dip out of the SFP.  
                DW from the North-West end of the SFP or by using the rope and bucket
STANDARD:
                to dip out of the SFP.                                                     -UNSAT
Note: It will take several buckets of water to fill the SF Priming Pump Seal Tank  
Note: It will take several buckets of water to fill the SF Priming Pump Seal Tank
half-full.  
    half-full.
Continue to Step 22  
                Continue to Step 22
CUE: Communications have been established with operators at the ASWPump  
CUE: Communications have been established with operators at the ASWPump
Room and East Penetration Room.  
Room and East Penetration Room.
COMMENTS:  
COMMENTS:
Step 22  
                Step 22                                                                   CRITICAL TASK
WHEN communication is established with operators in the following  
                WHEN communication is established with operators in the following
locations:  
                locations:
ASW Pump Room  
                                                                                            -SAT
East Pen Room  
                      ASW Pump Room
THEN open SF-86 (SF PRIMING PUMP SEAL WATER INLET)  
                      East Pen Room
STANDARD:  
                THEN open SF-86 (SF PRIMING PUMP SEAL WATER INLET)
Determine communications have been established with the above  
                                                                                            -UNSAT
locations and then open SF-86 (SF PRIMING PUMP SEAL WATER  
STANDARD:       Determine communications have been established with the above
INLET).  
                locations and then open SF-86 (SF PRIMING PUMP SEAL WATER
Continue to Step 23.  
                  INLET).
Cue: Communications have been established.  
                Continue to Step 23.
COMMENTS:  
Cue: Communications have been established.
Nb0-039 fnl
COMMENTS:
Page 7 of 10
CRITICAL TASK
-
SAT
-
UNSAT
CRITICAL TASK
-
SAT
-
UNSAT


                                                                                                  NbO-039 fnl
NbO-039 fnl  
                                                                                                Page 8 of I O
Page 8 of I O
:9-              Step 23                                                                   CRITICAL TASK
-9:  
                  Notify operator in ASW pump Rm to start U1/2 SF PRIMING PUMP
Step 23  
                  (remote starter on S wall)
Notify operator in ASW pump Rm to start U1/2 SF PRIMING PUMP  
                                                                                              -SAT
(remote starter on S wall)  
  STANDAKD:     Notify operator in ASW pump Rm to start U112 SF PRIMING PUMP
STANDAKD:  
                  Continue to Step 24.
Notify operator in ASW pump Rm to start U112 SF PRIMING PUMP  
                                                                                              __ UNSAT
Continue to Step 24.  
  Cue: The UV2 SF P R M N G PUMP is operafing.
Cue: The UV2 SF PRMNG PUMP is operafing.  
  COMMENTS:
COMMENTS:  
  STEP IO:       Step 24
STEP IO:  
                  IAAT seal tank level begins to rise,
Step 24  
                                                                                                SAT
IAAT seal tank level begins to rise,  
                  THEN close SF-86 (SF PRIMING PUMP SEAL WATER INLET)
THEN close SF-86 (SF PRIMING PUMP SEAL WATER INLET)  
                                                                                            _ I
STANDARD:  
  STANDARD:       Monitor seal tank level and determine it is NOT rising
Monitor seal tank level and determine it is NOT rising  
                  Continue to Step 25.
Continue to Step 25.  
                                                                                            -UNSAT
Cue: Seal tank level is NOT rising.  
  Cue: Seal tank level is NOT rising.
COMMENTS:  
  COMMENTS:
STEP 11 :  
  STEP 11:       Step 25
Step 25  
                  WHEN SFP fill line is primed (as indicated by a steady discharge stream   -SAT
WHEN SFP fill line is primed (as indicated by a steady discharge stream  
                  from the SF priming pump),
from the SF priming pump),  
                  THEN notify Control Room of the following:
THEN notify Control Room of the following:  
                      HPI suction aligned to SFP fill line                                   __ UNSAT
HPI suction aligned to SFP fill line  
                      HPI pump cooling water status
HPI pump cooling water status  
                      An operator is available in the E Pen Rm to throttle 1HP-26
An operator is available in the E Pen Rm to throttle 1 HP-26  
  STANDARD:      Monitor the hose attached to the SF priming pump discharge and
Monitor the hose attached to the SF priming pump discharge and  
                  determine the SFP line is primed.
determine the SFP line is primed.  
                  THEN
THEN  
                  Notify the Control Room the HPI suction is aligned to SFP fill line.
Notify the Control Room the HPI suction is aligned to SFP fill line.  
  Cue: The SFpriming pump has steady discharge stream.
STANDARD:
  Cue: Notifying the Control of the last two bulieted items is not required for this
Cue: The SFpriming pump has steady discharge stream.  
        JPM.
Cue: Notifying the Control of the last two bulieted items is not required for this  
  COMMENTS:
JPM.  
L...                                 ..~END
COMMENTS:  
                                          ~ . TASK      .-.                           __.__
L...  
STOP TIME:
..~~.  
.-.  
__.__  
END TASK
STOP TIME:  
CRITICAL TASK
-
SAT
__ UNSAT
_I SAT
-
UNSAT
-
SAT
__ UNSAT


                                                                NLO-039 fnl
NLO-039 fnl  
                                                                Page 9 of 10
Page 9 of 10  
                      CRITICAL STEP EXPLANATIONS:
CRITICAL STEP EXPLANATIONS:  
STEP #                                         Explanation
STEP #  
  4    Necessary to provide suction to the priming pump.
Explanation  
  7    Tank must be %full to provide adequate water for priming
Necessary to provide suction to the priming pump.  
  8    Required to provide flow path.
Tank must be %full to provide adequate water for priming  
  9    Priming pump must operate to fill the line.
Required to provide flow path.  
Priming pump must operate to fill the line.  
4
7
8
9


                                                                                    NLO-039 fnl
NLO-039 fnl  
                                                                                  Page 20 of 10
Page 20 of 10  
                                CANDIDATE CUE SHEET
CANDIDATE CUE SHEET  
            (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)  
INITIAL CONDITIONS:
INITIAL CONDITIONS:  
A tornado has struck Unit 2 Turbine Building and destroyed the 4160 volt switchgear TC, TB,
A tornado has struck Unit 2 Turbine Building and destroyed the 4160 volt switchgear TC, TB,  
and TE.
and TE.  
it also struck the Unit 2 BWST, rupturing and draining it.
it also struck the Unit 2 BWST, rupturing and draining it.  
The SSF Reactor Coolant Makeup Pump failed to start.
The SSF Reactor Coolant Makeup Pump failed to start.  
2A HPlP has been powered from the ASW switchgear.
2A HPlP has been powered from the ASW switchgear.  
The Spent Fuel Po01 level is currently +I .Qfeet.
The Spent Fuel Po01 level is currently +I .Q feet.  
INITIATING CUES:
INITIATING CUES:  
The EOP directs the operator to petform HPI Pump Operation From ASW Pump Switchgear
The EOP directs the operator to petform HPI Pump Operation From ASW Pump Switchgear  
Enclosure to align HPlPs to the SFP.
Enclosure to align HPlPs to the SFP.  
Another operator js aiigning the HPI Suction from the SFP.
Another operator js aiigning the HPI Suction from the SFP.  
The Control Room SRO directs you to prime the Spent Fuel Pool fill line on Unit 2 per this
The Control Room SRO directs you to prime the Spent Fuel Pool fill line on Unit 2 per this  
Enclosure, beginning at Step 20.
Enclosure, beginning at Step 20.
}}
}}

Latest revision as of 01:55, 16 January 2025

June 2004 Exam 50-269/2004-301 Final JPMs
ML042190122
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/17/2004
From: Ernstes M
Operator Licensing and Human Performance Branch
To: Bradley Jones
Duke Energy Corp
References
50-269/04-301, 50-270/04-301, 50-287/04-301
Download: ML042190122 (199)


See also: IR 05000269/2004301

Text

Final Submittal

OCONEE JUNE 2004 EXAM

50-26912004-301 I

50-27012004-301, &

50-28712004-301

JUNE 14 - 18 & 25,2004

Admin-100 fnl

Page 1 of 7

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

DETERMINE SDM

WITH A DROPPED CONTROL ROD

CANDIDATE

EXAM I NER

Admin-100 fnl

Page 2 of 7

REGION II

INITIAL LICENSE EXAWNATION

JOB PERFORMANCE MEASURE

Task:

DETERMINE SBM WITH A DROPPED CONTROL ROD

Alternate Path:

Facllitv JPM #:

. .

. .

KIA Ratindsk

Gsn 2.1 2 3

3.9/4.0

Task Standard:

PT/l/Ni lOW15, Reactivity Balance Procedure is used to verify > 1% SDM with one inoperable (dropped) CR within

I hour. Determine that 1% SDM does not exist and boratlon is required within 15 minutes.

Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator --X-.-

In-Plant

~

Perform

Simulate -

References:

PT/I/Af1103/15, Reactivity Balance Procedure

AP/l/NI 70011 5, Dropped Control Rods

Technical Specifications:

3.1.4, Control Rod Group Alignment Limits

3.2.1, Regulating Rod Position Limits

Validation Time: 10 min.

Time Critical: YES

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Candidate:

Time Start:

NAME

Time Finish:

Performance Ratinq SAT ~

UNSAT -

Performance Time

Examiner:

-

/

NAME

SkNATURE

DATE

COMMENTS

Admin-100 fnl

Page 3 of 7

SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 205

2. Import Admin-7 OR Simulator files

Admin-100 fnl

Page 4 of 7

Teo%s/EcluipmentEProcedures

Needed:

PT/1/A/1103/8157 Reactivity Balance Procedure

OP/0/A/1105/009, Control Rod Drive System

Technical Specifications:

3.4.4,

Control Rod Group Alignment Limits

3.2.1,

Regulating Rod Position Limits

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

You are the Unit 1 OAYC and Group 6 Rod 3 has dropped into the core. Reactor power is stable

at = 55%. AP/l/a/l700/15, Dropped Control Rods, has been completed up to step 4.5.

INITIATING CUES:

The SWO in the Control Room directs you to continue with AP/l/a/1700/15, Dropped Control

Rods.

TIME CRITICAL

Admin-100 fnl

Page 5 of 7

START TIME:

STEQ:

STANDARD:

COMMENTS:

Within one hour verify > 1% SDM with allowance to the inoperable control

rod. Perform PT/l/A/1103/15. Reactivity Balance Procedure.

Obtain copy of PT/l/A/1103/15, Reactivity Balance Procedure.

STEP:

STANDARD:

Determine proper enclosure to use.

Enclosure 13.19, Shutdown Margin at Power, Is chosen.

I COMMENTS:

Refer to the COLR. Use the "Control Rod Position Setpoints 1 inoperable

Rod, 4 Pump Flow" curve. Verify SDM is 2 1% AWK by verifying that the

control rod position and power level are within the acceptable region of

the curve.

SDM is determined to be is s 1% AUK.

STANDARD:

COMMENTS:

-4:

STANDARD:

Appropriate actions are taken per ITS 3.1.4, 3.1.5 and 3.2.1.

Refer to IT§ 3.1.4, 3.1.5 and 3.2.1 and determine that initiation of

boration to restore SDM to within limits is required within 15 minutes.

CUE !nnfesrPp student that an RQ is commencing boration.

COMMENTS:

END OF TASK

-

SAT

-

UNSAT

__ SAT

-

UNSAT

CRlTICPab STEP

-

SAT

__ UNSAT

CRITICAL STEP

-

SAT

-

UNSAT

TIME STOP:

Admin-100 fnl

Page 6 of 7

-STEPEs.P.LANATI

0 NS :

STEP #

Explanation

3

Step is necessary, the operator must interpret the 4 WCP curve to ensure adequate

SDM.

Step is necessary; initiation of boration must QCCW within 15 minutes to restore SDM.

4

Admin-100 fnl

Page 7 of 7

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

You are the Unit 1 OATC and Group 6 Rod 3 has dropped into the core. Reactor power is stable

at = 55%. AP/t/A/1700/15, Dropped Control Rods, is complete up to step 4.5.

INlTlATlNG CUES:

The SWO in the Control Room directs you to continue with AP/l/PJl700/f5, Dropped Control

Rods.

TIME CRITICAL

Acimin-103 fnl

Page 1 of 10

REGION ll

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Ad m i n - I

03

PERFORM MANUAL RCS LEAKAGE CALCULATION

CANDIDATE

EXAMINER

Admin-103 fnl

Page 2 of 10

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

PERFORM MANUAL RCS LEAKAGE CALCULATION

Alternate Path:

No

Facilitv JPM #:

CRO-43

WA Ratindsl:

Gen 2.1.7

3.714.4

Task Standard:

RCS Leakage is correctly calculated within .Q1 gpm of attached key.

Preferred Evaluation Location:

Simulator ~

In-Plant

References:

PT/O/A/060O/OQI A, Loss Of Computer

PT/IiA/600/10. Reactor Coolant Leakage

Preferred Evaluation Method:

Perform X

Simulate -

Examiner:

/

NAME

SIGNATURE

DATE

Admin-I03 fnl

Page 3 of 10

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

Poolsl~suipmenffProcedures Needed:

Enclosure 43.3 of PTIl/N600/10

Admin-103 fnl

Page4of 10

READ PO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reporis on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

lNlTiAL CONDITIONS:

Unit 1 computer repairs are expected to be extended through turnover for hardware

replacement. The boss of Computer procedure PTl/O/A/0600/001A, boss Of Computer, is in

progress, however an RCS Leakage Calculation has not been performed during this shift.

INITIATING CUES:

The Control ROOM SRO directs you to perform a manual RCS leakage per PT/1/,4/600/10

(Reactor Coolant Leakage). The initial data given was collected one hour previously. Use the

final set of leakage data and manually calculate the RCS leakage rate. Enclosure 13.3 of

PT/I/N600/10 (Reactor Coolant Leakage) is complete up to step 2.2.

Admin-103 fnl

Page 5 of 10

START TIME:

Note: Data cues are only applicable if JPM is performed in the control

room.

STANDARD:

COMMENTS:

Step 2.2

After 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, Record final set of data in "Table #I"

Student enters final set of data into "Table #I" of Enclosure 13.3 (Manual

Leakage Calculation Data Sheet).

CUE: Present student with aifachment of final data readings.

OR

Student locates Prr level gauge on UBI and enters value on data sheet.

CUE: Pzr Level 269.0 inches

Student locates Quench Tank level on AB1 and enters value on data

sheet.

CUE: Quench Tank Level 84.9 inches

Student locates LDST level gauge on UBI and enters value on data

sheet.

CUE: LDST Leveel 73.4 inches

Student locates Tave meter on UB1 and enters value on data sheet.

CUE: Tave Indication 579.0"F

Student locates Power meters on UBI and enters value on data sheet

CUE: Power Range N! indicates 100.1%

Student locates RCS NR Pressure chart on UBI and enters value on

data sheet.

CUE: RCS NR Pressure chart 2450 psig

Student locates Group 7 Control Rod Position on the Computer and

enters value on data sheet.

CUE: Group 7 Control Rod Position is 93.6%

I

SAT

-

UNSAT

Adrnin-103 fnl

P a g e 6 0 f 1 0

-.

Step 2.3

Calculate and record Change values in "Table #I" of Enclosure 13.3

(Manual Leakage Calculation Data Sheet).

STANDARD

Student performs calculation and records Change values in "Table #?"

Enclosure 13.3 (Manual Leakage Calculation Data Sheet).

COMMENTS:

Step 2.4

Calculated Corrected PZW Level Change:

STANDARD:

(- 6.831 inchesl" F x

O F) =+ 1.0 inches = 0.3169 inches

COMMENTS:

Step 2.5

Convert Corrected PZR Level Change to gallons:

STANDARD:

0.3269 inches X 14.364 gAlofls/inch =

gallons

COMMENTS:

-5:

Step 2.6

Convert QT Level Change to gallons:

COMMENTS:

-

SAT

-

UNSAT

-

SAT

UNSAT

SAT

-

UNSAT

~

SAT

I

UNSAT

Admin-103 fnl

-.

-9

of 10

STEP:

Step 4.7

Convert LDST Level Change to gallons:

COMMENTS:

-.

..

-9:

Step 2.8

Calculated Total Volume Change:

STANDARD :

4.552 gallons + - q0.482 gallons + I- 9.287 qallons) = - 25.247 gallons

COMMENTS:

STEP:

Step 2.9

Calculate RCS Leakage Rate:

STANDARD: - 45.217 gallons '60 minutes = - 0.254 gpm (k .01 gprn)

COMMENTS:

_ .

_.

~..

END

.. . TASK

.. .-

-

SAT

-

UNSAT

-

SAT

-

UNSAT

CRITICAL TAS

-

SAT

-

UNSAT

STOP TIME:

CRITICAL STEP EXPLANATIONS:

Admin-103 fnl

Page 8 of 10

STEP #

Explanation

8

Necessary data calculation to properly determine manual RCS leakage rate.

Note: If complamenery errors occur while performing calculations is steps 3 - 7 they

will become critical. Credit will not be given for obtaining the correct answer for the

wrong reason.

Manuai RCS Leakage Final Data

7 -

Para meter

~ Time

-~

Quehch Tank Level

....

__

Tave Indication

Power ~ a n b e

NI

__

NR Pr&sure

...

. .

... ...

!..

...

Grouo 7 Control Rod Position

Final

0115

I

21 9.8 inches

84.9 inches

Ei79.0"F --I

Admin-I03 fnl

Page 9 of 10

Admin-103 fnl

Page 10 of 10

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 computer repairs are expected to be extended through turnover for hardware

replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss Of Computer, is in

progress, however an RCS Leakage Calculation has not been performed during this shift.

INITIATING CUES:

The Control Room SRO directs you to perform a manual RCS leakage per PT/I/A/600/10

(Reactor Coolant Leakage). The initial data given was collected one hour previously. Use the

final set of leakage data and manually calculate the RCS leakage rate. Endosure 13.3 of

PT/il/A/600/10 (Reactor Coolant Leakage) is complete up to step 2.2.

Adrnin-110 fnl

Page 1 of 9

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Admin-I I O

Determine Minimum Shift Staffing

CANDIDATE

EXAMINER

Admin-I I O fnl

Page 2 of 9

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

Determine MINIMUM staffing requirements for the shift for NEQ's, RQs and SRQs

Alternate Path:

Facilitv JPM #:

Ad

KIA Ratinals):

Gen214

2.313.4

Task Standard:

SLC 16.13.1-1 (Minimum Station Staffing Requirements) is used to correctly determine MINIMUM staffing

requirements for the shift.

Preferred Evaluation Location:

Simulator -

in-Plant

X

Preferred Evaluation Method:

Perform

~

Simulate 2

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

Admin-I 10 fnl

Page 3 of 9

Admin-I 10 fnl

Page 4 of 9

Toolsl~uuipmentlProcedures Needed:

SLC 16.13.1-1

READ TO OPERATOR

DIRECTIONS TO STUDENT:

I will explain the initiab conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Plant conditions are as following:

Unit 1 is in MODE 5 with fuel handling in the SFP in progress

Unit 2 is in MODE 1 at 73% with 28 HPlP OOS for the last 85 hours9.837963e-4 days <br />0.0236 hours <br />1.405423e-4 weeks <br />3.23425e-5 months <br />

Unit 3 is in MODE 1 at 700% power

2 on-shift NEO's are qualified as fire brigade leader

1 RP Tech is fire brigade qualified

INITIATING CUE:

What are the MlNlMUM staffing requirements for the shift?

..... .-

I

.

......

Minimum Number

.~.-~.

OSM

STA

SRO

t ...

.

'

_

.

I

!

~~~~

~

I

~~~~

RO

..

.......

NLO

!

-.

-.

~ NIA

!

!

Chemistry Technician

~ N/A

i

-.

SPOC

....

.......

!

.-... d

...~ l-r

I

Admin-I10 fnl

Page 5 of 9

START TIME:

STEP 1 :

Reference SLC 16.13.1

STANDARD:

Reference SLC 16.13.1-1 table

COMMENTS:

...~

....

STEP 2:

Reference SLC 16.13.1-1 for plant conditions

STANDARD:

Determine correct table to be used:

Column for 2 units in MODE 1-4 from two control rooms based on:

Unit 1 is in MODE 5 with fuel handling in the SFP in progress

Unit 2 is in MODE I

at 73% with 28 HPlP 00s for the last 85

hours

Unit 3 is in MODE 1 at 100% power

COMMENTS:

-3:

Determine correct number from column for 2 units in MODE 1-4 from two

control rooms

1 QSM. 1 STA. 5 SRO, 5 RO, and 8 NE0

STANDARD:

COMMENTS:

=:

STANDARD:

Determine that available NE0 is fire brigade leader qualified

2 on-shifi NEO's are qualified as fire brigade leader

1 RP Tech is fire brigade qualified

COMMENTS:

SAT

__ UNSAT

-..-.___

-

SAT

-

UNSAT

-

SAT

-

UNSAT

~

SAT

__ UNSAT

Admin-110 fnl

Page 6 of 9

-

SAT

UNSAT

-

SAT

I_ UNSAT

-5:

STANDARD:

Adjust total staffing numbers per Step 4

Subtract 1 SRO based on NE0 qualified as fire brigade leader:

1 OSM, 1 STA, 4 SRO, 5 RO, and 8 NE0

COMMENTS:

Reference TS 3.5.2.B

Determine that TS 3.5.2.B is applicable:

28 HPlP 00s for z 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

STANDARD:

COMMENTS:

-7:

Adjust total staffing numbers per Step 6

STANDARD:

Add 1 80 based on TS 3.5.2.8

applying

1 OSM, 1 STA. 4 SRO, 6 RO. and 8 NE0

COMMENTS:

STEP:

STANDARD:

Adjust total staffing numbers per Step 7

Add 2 NEOs based on TS 3.5.2.8 applying

1 OSM, 1 STA, 4 SRO, 6 RO, and IJ

NE0

COMMENTS:

___ SAT

-

UNSAT

-

SAT

~

UNSAT

Admin-I 10 fnl

Page 7 of 9

CRITICAL STEP

-

SAT

_I_ UNSAT

Position

OSM

STEP:

Determine total staffing requirements

STANDARD:

1 OSM. I

STA, 4 SRO, 6 RO, and 10 NE8

Minimum Number

1

STA

SRO

..

NLO

I I qo

SPOC

I NIA

Chemistry Technician

I NIA

RP Technician

1 NIA

._

.~

COMMENTS:

TIME STOP:

Admin-110 fni

Page 8 of 9

CRlTlCAL STEP EXPLANATIONS:

STEP #

Explanation

Determine staffing requirements

Admin-110 fnl

Page 9 of 9

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPQN COMPLETION OF TASK)

INITIAL CONDITIONS:

Plant conditions are as following:

Unit 1 is in MODE 5 with fuel handling in the §FP in progress

Unit 2 is in MODE I at. 73% with 28 HPlP 00s for the last 85 hours9.837963e-4 days <br />0.0236 hours <br />1.405423e-4 weeks <br />3.23425e-5 months <br />

Unit 3 is in MODE Z at 100% power

2 on-shift NEO's are qualified as fire brigade leader

1 RP Tech is fire brigade qualified

INITIATING CUE:

What are the MINIMUM staffing requirements for the shift?

SRO

I

I

t-

I

I30

NLO

I NIA

... ..

.....

' ...

I ::rlstry

Technician

, NIA

k--Technician

I NIA

..

Adrnin-202 fnl

Page 1 of 7

REGION II

INITIAL LICENSE EXAMINATION

PERFORMANCE MEASURE

Ad m i n -2 02

Perform surveillance to verify SSF RCMUP Operability

CANDIDATE

EXaMINER

Admin-202 fnl

Page 3 of 7

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

Adrnin-202 fnl

Page 4 of 7

ToolslEquipmenffPrasehiures Needed:

a

PT/I/N0600/001 (Periodic Instrument Surveillance), Encl. 13.1 (Mode 1 & 2) Page 35 of

36

Q

Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve of OQ/O/N1108/001

(Curves And General Information)

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and slate the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CQNDITIONS:

112EOC20 outage in progress

a

Unit 2 was shutdown (subcritical) on 3120104 at 0100

  • Unit 2 core is defueled
  • Spent Fuel Pool Level = +0.1 feet

Spent Fuel Pool Temperature = 91°F

  • Current date and time: 3/26/04 at 1100

Q

PT/600/001, Enclosure 13.1 in progress

INITIATING CUE§:

The SRO instructs you to continue with PT/600/001, Enclosure 13.1 starting at the top of page

35.

Admin-202 fnl

Page 5 of 7

START TIME:

Determine if 811 fuel in SFP subcritical > maximum days specified on

Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve

STANDARD:

Refer to Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature

Curve of OP/l108/001. Determine that Unit 2s fuel has been subcritical

for 6 days and 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />. This is < than the maximum days specified on

Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve.

COMMENTS:

Verify SFP level > specified on appropriate curve of Enclosure Unit 1&2

Spent Fuel Pool Level Vs Temperature Curve.

STANDARD:

Determine that the correct curve is Day > 6 & 5 7.

ent Fuel Pool water temperature is 98°F by looking on SFP

auge on 2AB3 or on the OAC

Pool water level is + 0.10 feet by looking on SFP

Cue: When a SFP temperature indication is located indicate to the candidate that

SFP temperature = 98F

Determine Spent Fuei Pool water level is + 0.10 feet by looking on SFP

Level gauge on 2AB3.

Cue: When the Unit 1 i% 2 SFP level indication is located indicate to the candidate

that SFP Level = + 0.7 feet.

Determine that SFP level is NOT > than the appropriate curve

COMMENTS:

STEP:

STANDARD:

COMMENTS:

If limit exceeded, SSF RCMUP is inoperable.

Declare the SSF RCMUQ inoperable.

CRITICAL STEP

__ SAT

I

UNSAT

CRITICAL STEP

_I_ SAT

-

UNSAT

-

CRITICAL STEP

-

SAT

_I_ UNSAT

TOP TIME

Admin-202 fnl

Page 6 of 7

CRITICAL STEP EXPLANATIONS:

STEP tc

Explanation

I

Must determine that some fuel has been subcritical e than the maximum days

specified on Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve

Required to determine is SFP level is adequate.

SSF RCMUP is declared inoperable.

2

3

Adrnin-202 fnl

Page 7 of 7

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

e

U2EOC20 outage in progress

  • Unit 2 was shutdown (subcritical) on 3/20/04 at 0100

Unit 2 core is defueled

e

Spent Fuel Pool Level = +0.1 feet

Spent Fuel Pool Temperature = 91°F

Current date and time: 3/26/04 at 1100

PP/600/001, Enclosure 13.1 in progress

INITIATING CUES:

The SRO instructs you to continue with PT/600/001, Enclosure 13.1 starting at the top of page

35.

Admin-300 fnl

Page 1 of 8

REGION ll

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Ad m i n -300

Calculate the Maximum Permissible Stay Time

Within Emergency Dose Limits (EDL)

CANDIDATE

EXAMINER

Admin-300 fnl

Page 2 of 8

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

Calculate the Maximum Permissible Stay Time Within Emergency Dose Limits

Alternate Path:

NIA

Facilitv JPM #:

NIA

KIA Ratinds):

Gen 2.3.4

2.5B.1

Task Standard:

Calculate the Maximum Permissible Stay Time Within Emergency Dose Limits (k 5 minutes).

__

Examiner:

I

NAME

SIGNATURE

DATE

Adrnin-300 fnl

Page 3 of 8

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

ToolsiEsuiiprnenffProcedur~~

Needed:

None

Admin-300 fnl

Page 4 of 8

READ TO OPERATOR

DIRECTIONS TO STUDENT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be

performed for this JPM, including any required communications. I will provide initiating cues and reports

on other actions when directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Steam Generator Tube Rupture has occurred OR Unit 3

2. Emergency Dose Limits are in effect

3. NEQ A has received 2.26 R TEBE this year

4. The following tasks are required to be performed:

. . . . . . .

~.

. . . .

. .

. . .

p

1 .....

.. , .TASK

...

TIME REQUIRED

...

1.

O O S k . k r A

. . . . . . . . . . .

I

1 I Closing 3~-573

I

12 min

5.31 Whr

I

Open all Unit 3s ADVs

3.65 Whr

Note: Assume no dose received while travelling between tasks.

INITIATING CUE:

Refer to the above information. NEQ A has completed tasks 1 and 2 in the time required. How long does he

have to complete task 3 without exceeding his Emergency Dose Limits?

Admin-300 fnl

Page 5 of 0

START TIME:

Note: Candidate may perform these steps in a different order however the calculated stay time should be

correct.

Note: Candidate should understand the following:

1. EDL is 5 R per event (LOW or SGTR).

2.

Current exposure for the year is not counted toward the Emergency Dose Limit (EDb).

-1:

Determine dose received while performing task 1.

STANDARD:

Determine dose received while performing task 1.

5.31 Whr X 1hr/60 min X 12 min = 1.06 R

COMMENTS:

Determine dose received while performing task 2.

STANDARD:

Determine dose received while performing task 2.

19.75 Whr X 1 hr/60 min X 4 min = 1.32 R

COMMENTS:

-3:

Determine dose remaining from EDLs.

STANDARD:

Determine dose remaining from EDLs.

5R - 1 ..06R - 1.32R = 2.62 R

COMMENTS :

CRITICAL STEP

-

SAT

UNSAT

CRITICAL STEP

-

SAT

-

UNSAT

CRITICAL STEP

-

SAT

UNSAT

STEP:

STANDARD:

Available Dose =

Dose Rate

COMMENTS:

Determine time available for the NE0 to complete task 3 without

exceeding EDL.

Stay time is calculated to be:

= ,728 hr X

= 43.1 min

3.65 Rlhr

1 hr

(i 5 minutes)

...~

END OF TASK

.,,..

..

Admin-300 fnl

-. . Page6 o f 8

CRITICAL STEP

SAT

-

-

UNSAT

Admin-300 fnl

Page 7 of 8

CRITICAL STEP. EXPLANATIONS:

STE? #

Explanation

4

2

3

4

Required to calculate stay time.

Required to calculate stay time.

Required to calculate stay time.

Required to calculate stay time.

Admin-300 fnl

Page 8 of 8

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

1. Steam Generator Tube Rupture has occurred on Unit 3

2. Emergency Dose Limits are in effect

3. NE0 "A" has received 2.26 R TEDE this year

4. The following tasks are required to be performed:

......

.

~.

~

.......

..

r.- #I TIME REQUIRED-. D

O

S

E

RATE

.....

... ...TASK

~

.... .~

.:

Closing 3C-573

5.31 Rfhr

Open 3FDW-313 ..

Note: Assume no dose received while traveling between tasks.

lNlTlATlNG CUE:

Refer to the above information. NE0 "A" has completed tasks 1 and 2 in the time required. How long does he

have to complete task 3 without exceeding his Emergency Dose Limits?

Admin-402 fnl

Page 1 of 14

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Admin-402

Perform Actions for Medical Emergency

CANDIDATE

EXAM IN ER

Admin-402 fnl

Page 2 of 14

REGION I1

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

Perform Actions for Medical Emergency

Alternate Path:

Facility JPM #

KIA Ratinds):

System: GEN

WA:

2.4.39

Rating:

Task Standard:

Complete RP/lOO01016, Encl. 4.1 (Medical Response) as required

Preferred Evaluatlon Location:

Simulator __ In-Plant

References:

RPllOOO/O16, Encl. 4.4 (Medical Response)

Preferred Evaluation Method:

Perform -

Simulate

Admin-402 fnl

Page 3 of 14

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

Admin-402 fnl

Page 4 of 14

ToolslEuuipmenffP~ocedures Needed:

RP/1QQQ/OI6, Encl. 4.1 (Medical Emergency Action - Routine Operations)

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. You have answered a call on 491 1 (emergency line) repofling a medical emergency.

2. The caller is still on the line.

INITIATING CUES:

The SRQ in the control room instructs you perform the required actions for a medical

emergency.

START TIME:

STEP:

STANDARD:

Determine the appropriate procedure to use.

RP/OiB/lOQQi016 (Medical Response) is referenced and Enclosure 4. I

(Medical Emergency Actions - Routine Operations) is determined to be

the appropriate procedure to use. Enclosure 4.1 is obtained from

notebook located in the front of the control room desk or from the cart in

the TSC.

Cue: When procedure is located give candidate a copy of Enclosure 4. f.

COMMENTS:

Step 1.2

Complete the following accident information:

Name of person reporting injury

Call back number

Name of person injured

Supervisor of injured person

e

Location injury occurred

Brief description of injury

Time

Note: The evaluator will play the role of the person reporting the injury. Answer

questions by referring to the Medical Emergency Phone Call Information Sheet.

STANDARD:

The candidate obtains the above information from the evaluator by

asking the appropriate questions and completes step 1.2 correctly.

Note: Refer to the completed procedure as an answer key.

COMMENTS:

Admin-402 fnl

Page 5 of 24

CRITICAL STEP

-

SAT

-

UNSAT

CRITICAL STEP

___I SAT

I

UNSAT

. ..

.. ~.

~ . .

....

STEQ:

Step 1.3

IF There is a Security Event in progress,

THEN Continue with ...

STANDARD:

Cue: lf asked, inform candidate a Security Event is not in progress.

COMMENTS:

Determine a Security vent is not in progress and NIA step 1.3.

- -

__

...~

.

___

STEP:

Step 1.4.1

Use Plant Page to request all MERT members to respond to the incident.

The phone is used to access the Plant Page and request all MERT

members to respond to the incident.

STANDARD:

Cue: inform candidate to simulate onjy.

COMMENTS:

-5:

Step 1.4.2

Use the radio paging system to request MERT members to respond to

the incident.

o

o

Transmit "Standby for Emergency Message"

Press the "instant Call" button labeled "MERT"

Wait for the red "Transmit" light on the radio to turn off

Transmit message

STANDARD:

The radio paging system is used to request MERT members to respond

to the incident by:

Transmit "Standby for Emergency Message"

Press the "instant Call" button labeled "MERT"

Wait for the red "Transmit" light on the radio to turn off

Transmit message "MERT members respond to a medical

emergency in the Unit 3 clean side of the change room.'r

Note: The red "Transmit" light is normally green and is located next to the "MERT"

button on the radio.

Cue: hnform candidate to simulate only.

COMMENTS:

Admin-402 fnl

Page 6 of 14

...

CRITICAL STEP

-

SAT

UNSAT

CRITICAL STEP

-

SAT

-

UNSAIT

-

SAT

~

UNSAT

Admin-402 fnl

Page 7 of 14

Step 1.4.3

Repeat steps 1.4.1 and 1.4.2

The Plant Page and the radio paging system are used a second time to

request MERT members to respond to the incident.

STANDARD:

Cue: h f o m candidate to simukaite only.

COMMENTS:

STEP 7:

Step 1.4.4

Call Securitv at one of the followina extensions and request they have

security M&T members respondio the emergency

SAS (Secondary Alarm Station) 2205 or 2767

CAS (Central Alarm Station) 2222 or 2958

e

STANDARD:

Security is notified at one of the above extensions and are requested to

have security MERT members respond to the emergency.

Cue: Inform candidate to simulate only.

COMMENTS:

Step 1.4.5

IF The incident location is away from the rn ain plant (WOE, Complex,

Keowee Hydro, etc.) and incident occurs during normal working hours,

THEN Notify shuttle Bus ...

STANDARD:

Determine that this step does not apply and N/A step 1.4.5

COMMENTS:

Step 1.5

IF A mass casualty event has occurred or is suspected, and a centralized

treatment area is needed. and plant conditions allow,

THEN Make a PA Announcement ...

STANDARD:

Determine that this step does not apply and N/A step 1.5

COMMENTS:

__ SAT

-

UNSAT

SAT

-

UNSAT

__

SAT

_I UNSAT

-

SAT

-

UNSAT

STEP IO:

Step 1.6

IF Hospital evacuation is needed as determined by MERT Command or

as indicated by Step 1.6.1,

THEN Arrange transport of patient to the hospital by one of the following

means:

EMS (ambulance)

Dial 9-91 1 from the Operations Shift Manager's phone or Unit 1

Control Room SROs phone or dial 91 1 from the bell South line - Unit

1: 2, and 3 Control Rooms. Refer to Step 1.6.2, prior to requesting

EMS.

Company vehicle (less serious injury)

Personal vehicle (less serious injury)

e

STANDARD:

Ambulance is requested by calling 9-91 1. Ambulance is requested to

come to Oconee Nuclear Station.

COMMENTS:

I

STEP 11:

Step 1.6.1

IF Any of the following illnesses or injuries are reported on the emergency

line (491 I)

THEN Immediately request EMS (ambulance) to respond to the site:

Unconsciousness

COMMENTS:

STEP 12:

step 1.6.2

IF The patient is known or suspected to be radiologically contaminated,

THEN Have the EMS dispatcher inform the EMS personnel to expect a

contaminated person.

STANDARD:

Determine that this step does not apply and NIA step 1.6.2

Cue: !tasked, inform candidate that the patient is NOT wntaminabed.

COMMENTS:

I

Admin-402 fnl

Page 8 of 14

CRITICAL STEP

_I SAT

__ UNSAT

-

SAT

-

UNSAT

__ SAT

UNSAT

Admin-402 fnl

Page 9 of 24

STEP 13:

Step 1.6.3

Notify Security at 2222 that the ambulance is enroute

Security is notified that the ambulance is enroute

STANDARD:

COMMENTS:

STEP 14:

Step 1.6.4

Notify M E N Command that the ambulance is enroute.

STANDARD:

Cue: lnforrn candidate to sirnulate only.

COMMENTS:

MERT Command is notified via radio that the ambulance is enroute.

STEP 15:

Step 1.6.5

Nstify World of Energy Duty Person (Ext. 4602 or Pager #777-9414).

STANDARD:

Cue: lnforrn candidate to simulate only.

COMMENTS:

World of Energy Duty Person is notified by phone.

STEP 16:

Step 1.7

Notify the Occupational Health Unit at ONS during normal working hours

(4652).

Occupational Health Unit at ONS is notified by phone.

STANDARD;

Cue: lnforrn candidate to simulate only.

COMMENTS:

STEP 17:

Step 1.8

IF Radiological contamination is involved and the person is being sent to

a hospital.

THEN Complete ...

Determine that this step does not apply and N/A step 1.8.

STANDARD:

COMMENTS:

-

SAT

-

UNSAT

~

CRITICAL STEP

-

SAT

-

UNSAT

I

SAT

_I_ UNSAT

_I SAT

UNSAT

-

SAT

-

UNSAT

Admin-402 fnl

Page 10 of 14

STEP 18:

Step 1.9

Remind MERT Command that a Patient Treatment Form needs to be

completed for all patients and that the completed form is to be sent to the

Medical Unit for inclusion in the patients medical file.

MERT Command is informed that a Patient Treatment Form needs to be

completed and sent to the Medical Unit.

STANDARD:

COMMENTS:

STEP 19:

Step 1.10

After normal working hours the Operations Shift Manager or designee

shall report the following incidents to ONS Safety 5uty Person who will

determine if additional people need to be notified.

Determine that this step does not apply and NIA step 1 . I O

STANDARD:

COMMENTS:

STEP 20:

Step 1.11

Verif), the following notification in the event of a fatality or injuries to 3 or

more people:

Determine that this step does not apply and N/A step I .I

1

STANDARD:

COMMENTS:

STEP 21:

Step 1.12

Notify STA to make appropriate notifications of the transport of an

employee to an off site medical facility.

Notify the STA by phone or in person to make appropriate notifications of

the transport of an employee to an off site medical facility.

STANDARD:

COMMENTS:

-

SAT

__ UNSAT

-

SAT

-

UNSAT

__ SAT

-

UNSAT

__ SAT

__II UNSAT

Admin-402 fnl

Page 11 of 14

STEP 22:

Step 1.13

IF A death, near death, or major traumatic inju ry...

Determine step does not apply and NIA Step 1 .I3

STANBARD:

COMMENTS:

STEP 23:

Step 1.14

The Operations Shifl Manager (OSM) or designee shall ensure

notification of next of kin, if applicable.

e

Fatality - Appropriate Division Manager performs notifications

Injury requiring hospitalization - Employee's Supervisor or Manager

perform notification

STANBARD:

Inform the OSM to perform this step as required.

COMMENTS:

STEP 24:

Step 2.15

Submit completed Enclosure 4.1, (Medical Emergency Action -Routine

Operations).to the Emergency Planning Section

Indicate that form would be submitted to the Emergency Planning

Section.

STANDARD:

COMMENTS:

STOP TIME:

I

SAT

-

UNSAT

__ SAT

__

UNSAT

-

SAT

-

UNSAT

AdMin-402 fnl

Page 12 of 14

Medical Emergency Phone Call Information Sheet

1. Name person calling

John Adams

2. Call back number

2322

3. Name of injured person

David Smith

4. Supervisor of injured person

Allan Jones

5. Location injury occurred

Unit 3 HPI Pump Room

The injured is currently located in the clean side of Unit 3s change room (srd

floor Aux Building).

Injured is NOT contaminated

The injured stood up to put on his hard hat and hit his head on a cable tray

resulting in a laceration to tog of head. The wound is continuing to bleed. The

injured is unconscious.

6. Description of injury

7. Time

Current time

CRITICAL STEP EXPLANATIONS:

Admin-402 fnl

Page 13 of 14

STEP #

Explanation

Need to select the correct procedure.

Need the correct information to ensure proper actions are taken.

1

2

3

4

Need to activate MERT.

Need to determine a security event is not in progress so that MERT can be called.

10

Ambulance has to be requested.

14

MERT command should be notified so that the injured can be taken to the pickup

point.

Admin-402 fnl

Page 14 of 14

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

1. You have answered a call on 491 1 (emergency line) reporting a medical emergency.

2. The caller is still on the line.

INITIATING CUES:

The SRO in the control room instructs you perform the required actions for a. medical

emergency.

Admin-403 fnl

Page 1 of 8

REGION II

I N IT I AL L I C ENS E EXAM I NATION

JOB PERFORMANCE MEASURE

Ad rn i n -40 3

Dete rm i ne E merge n cy C lass if i cat ion and Protective

Action Recommendations

CANDIDATE

EXAMINER

Admin-403 fnl

Page 2 of 8

REGION I1

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

Determine Emergency Classification and Protective Action Recommendations

Alternate Path:

FacilitvJPM #:

s

KIA Ratinnk):

Gen 2.4.38

2.2/4.0

Task Standard:

Appropriate classification is determined and associated Protective Action Recommendations are made

Preferred Evaluation Location:

Simulator

In-Plant

X

References:

RP/O/B/1000/01

RP/OlB/l000/02

BASIS Document (Volume A. Section D of the Emergency Plan)

Preferred Evaluation Method:

Perform -

Simulate 2

Examiner:

I

NAME

SIGNATURE

DATE

Admin-403 fnl

Page 3 of 8

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

Admin-403 fnl

Page 4 of 8

Tools/Equipment/Procedures Needed:

RPlOlB/lO00101

RPIQIBIZ QOOlO2

BASIS Document (Volume A, Section D of the Emergency Plan)

READ TO OPERATOR

DIRECTIONS TO STUDENT:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. S will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

8800: Civil demonstration occurring at the World of Energy by anti-nuke activists.

0900: Security reports to the OSM that, one or more persons has been observed cutting their

way through the double security fences. RP/Q/B/1000l007 (Security Event) is being

used in conjunction with the Emergency Plan.

0905: intruders have been seen entering the SSF. Security has isolated the area around the

SSF.

0910: Security reports that an explosion has occurred on the Keowee Barn and that water is

beginning to leak through the dam in several places.

0930: Security reports that no additional bombs were found and that no additional intruders

have been located.

NOTE: All three Oconee Units remain in MODE 1 at 100% power during this event.

INITIATING CUE:

You are to perform the required actions of the Emergency Coordinator by referring lo

RP/Q/BI1 QOO/OI, Emergency Classification and determining the emergency classification and

any Protective Action Recommendations.

Admin-403 fnl

Page 5 of 8

START TIME:

Classify the Event

Refer to RP/O/B/lOOO/Ol (Emergency Classification) Enclosure 4.6

(FireslExplosions and Security Actions.

Classify the event as a "Site Area Emergency" due to following:

Bomb detonated in Keowee Dam

STANDARD:

COMMENTS:

Determine Protective Action Recommendations

Refer to RP/O/B/1OOO/OO2 (Control Room Emergency Coordinator

Procedure) and GO TO Enclosure 4.2 (Site Emergency)

STANDARD:

COMMENTS:

STANDARD:

COMMENTS

IF It has been determined that an Emergency Action bevel for an

Initiating Conditions has been met,

THEN Declare a Site Area Emergency

Time of Declaration: -

Determine Initiating Conditions have been met and Declare a Site Area

Emergency due to:

e

Determine Time of Declaration is pressnt time.

Bomb detonated in Keowee Dam

OR

Imminent /actual failure of the Keowee Hydro dam

CRITICAL s'

__ SAT

__ UNSAl

SAT

-

UNSA'

-

SAT

-

UNSA-

Admin-403 hi

Page 6 of 8

Appoint a person to maintzin the Emergency Coordinator Log OR

maintain the log yourself.

A person is appointed to maintain the Emergency Coordinator Log or

indicate that you will maintain the log.

STANDARD:

Cue: Masked, indicate someone is maintaining the Emergency Coordinator Log.

COMMENTS:

Appoint Control Room Offsite Communicator(s).

A Control Room Offsite Communicator is appointed.

STANDARD:

Cue: If asked, indicate a Control Room Offsite Communicator has been appointed.

COMMENTS:

STEP:

STANDARD :

Provide the Protective Action Recommendations from Enclosure 4.7.

(Condition A I Condition B Response Action). Step 1 .O, for use by the

Offsite Communicator if a Condition A, Imminent or Actual Dam Failure,

exists.

Enclosure 4.7, (Condition A I Condition B Response Action) is used to

determine that the following protective action recommendations are given

to Oconee and Pickens County:

1, Provide the following recommendation for Emergency Notification

Form Section 15 (B)

Evacuate:

Move residents living downstream of the Keowee Hydro

Project dams to higher ground.

2. Provide the following recornmendation for Emergency Notification

Form Section 15 (El) Other:

Prohibit traffic flow across bridges identified on your

inundation maps until the danger has passed.

Cue: If asked, inform the candidate that Keowee Dam failure is imminent

COMMENTS:

END OF TASK

'IME STOP:

-

SAT

__ UNSAT

-

SAT

UNSAT

CRITICAL STEP

-

SAT

-

UNSAT

Admin-403 fnl

Page 7 of a

CRITICAL STEP EXPLANATIONS:

STEP #

Explanation

The candidate needs to be able to utilize the procedure and determine that a Site

Area Emergency needs to be declared.

The candidate must be abk? to make recommendations to the local agencies as to

what actions are necessary to protect the health and safety of the public.

I

6

Admin-403 fnl

Page 8 of 8

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

I INITIAL CONDITIONS:

0800: Civil demonstration occurring at the World of Energy by anti-nuke activists.

0900: Security reports to the QSM that, one or more persons has been observed cutting their

way through the double security fences. RP/O/B/1000/087 (Security Event) is being

used in conjunction with the Emergency Plan.

0905: Intruders have been seen entering the SSF. Security has isolated the area around the

SSF.

091 0: Security reports that an explosion has occurred on the K ~ O W W

Dam and that water is

beginning to leak through the dam in several places.

0930: Security reports that no additional bombs were found and that no additional intruders

have been located.

NOTE: All three Oconee Units remain in MODE 1 at 100% power during this event.

INITIATING CUE:

YOU are to perform the required actions of the Emergency Coordinator by referring to

RP/O/B/'l OOOlOI , Emergency Classification and detWmiRing the emergency classification and

any Protective Action Recommendations.

CRO-12A fnl

Page 1 of 11

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

CRO-Ol2A

RECOVER A DROPPED CONTROL ROD

CANDIDATE

EXAM IN ER

CRO-12A fnl

Page2of11

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

RECOVER A DROPPED CONTROL ROD

Alternate Path:

Facilitv JPM #

WA Ratinats):

System: APE 005

KIA:

AA2.03

Rating: 3.5/4.4

Task Standard:

Unit is tripped manually upon receipt of second dropped rod

Preferred Evaluation Location:

Simulator

InPlant __

References:

APIIIAII 700/15 (1 0110102)

OQIQINI 105/09 (1 1/21/02)

T.S. 3.1 4

OMP 1-18

Preferred Evaluation Method:

Perform X Simulate -

Candidate:

Time Start:

NAME

Time Finish:

Performance Rating: SAT-

UNSAT -

Performance Time _I_

CRO-12A fnl

Page 3 of 1 I

SIMULATOR OPERATOR INSTRUCTIONS:

I.

Recall Snap 206

2. Import files for CRQ-128

3. GotoRUN

CRO-12A fnl

Page 4 of 11

Too~s/~quipmentl8rocedures

Needed:

Enclosure 5.3 of APlOlI (Recovery From Loss of Power)

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shali be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit #I

dropped a control rod in Group 6 approximately one hour ago and the unit is stable at

55%.

The Subsequent Actions of AP/15, DROPPED CONTROL RODS, have been completed

through step 4.9.

Shutdown Margin calculation has been run to verify that an adequate SBM exists.

Systems Duty Engineer has been notified and no special maneuvering instructions are

required,

Enclosure 4.10 of OP/O/A/I 105/09 has been completed up tu step 2.0.

INITIATING CUE::

The Control Room SRO informs you that the problem has been corrected and that recovery of

the dropped rod can now begin.

CR0-12A fnl

Page 5 of 11

START TIME:

STANDARD:

COMMENTS:

Step 2.1

Take manual control of rods at the Diamond Control Station:

Ensure the SG Master in HAND

Ensure the Diamond Station in MANUAL

The manual pushbutton for the SG Master handlauto station is

depressed. The White Hand light comes ON and the Red Auto light -Jes

OFF.

The AUTOlMANUAL pushbutton on the Diamond Control Panel is

depressed; the MANUAL half of the Push Button is back lighted.

Location 1 UB1

STEP:

Step 2.2

Ensure group with drcppedlrnisaligned rod selected on the Group Select

Switch.

STANDARD:

GKOUP SELECT SWITCH on 1UB1 is located by the student and

rotated to Group 6.

COMMENTS:

m:

Step 2.3

Ensure in SEQ OVERRIDE.

STANDARD:

The SEQlSEQ OR pushbutton is located on the Diamond Control panel

on 1UB1 and depressed. "SEB 08" is backlighted.

COMMENTS:

CRITICAL !

_I SAT

-

UNSI

CRITICAL I

-

SAT

__ UNSP

CRITICAL E

__I SAT

__ UNSP

Step 2.4

Ensure JOG selected on Speed Selector.

STANDARD:

The SPEED Selector is located by the student on the Diamond Control

panel on 1 UBI and rotated to the JOG position.

COMMENTS:

COMMENTS:

Step 2.5

If Group is at the OUT LIMIT:

Release LATCH switch.

Depress and hold LATCH switch.

Insert group for approximately 15 seconds or until the group OUT

LIMIT lamp on the Diamond Panel goes off.

The IN LIMIT (LATCH) BYPASS pushbutton is located by the student and

depressed and held while the INSERT/WITHDRAW joystick is used to

insert Group 6 until the Group 6 But limit lamp, located on the Diamond

Control Panel on 1 UBI, extinguishes.

The LATCH pushbutton is then released and the INSERTMITHDRAW

joystick returned to neutral.

CRO-12

Page 6 (

CRlTlCAb STI

~

UNSAT

CRITICAL STI

-

SAT

-

UNSAT

-6:

Step 2.6

TRANSFER the droppedlmisaligned rod to the Auxiliary Power Supply:

Ensure desired group selected on Group Select Switch.

Ensure droppedimisaligned rod selected on Single Select Switch

Ensure in SEQ OVERRIDE.

Ensure in AUXILIARY.

Verify Manual Transfer Sync light is lit before pressing clamp.

Depress CLAMP.

Depress selector for MANUAL TRANSFER switch until TRANSFER

CONFIRM lamp and the CONTROL ON lamp on the PI panel light.

Depress CLAMP RELEASE

STANDARD:

On the CRD Panel on 1 UB1:

Verify Group Select Switch positioned to Group 6.

SELECT droppedlmisaligned rod on the SINGLE SELECT SWITCH.

VERIFY SEQ OR is backlit (Not Critical).

Depresses GRQUWAUXIL pushbutton to make transfer to AUXIL.

Verifies SYNC is backlit on MAN TRANSISYITU CF pushbutton (Not

Critical)

Depresses CLAMPCLAMP REL pushbutton to make transfer to CLAMP.

CLAMP will be backlit.

Depresses MAN TRANSISYITR CF pushbutton. TR CF will become

backlit. White CONTROL ON lights will illuminate for the Dropped Rod

on the Position Indication panel.

Depresses CLAMPCLAMP REL pushbutton and verifies CLAMP REL is

backlit.

COMMENTS:

CRQ-12A fnl

Page 7 of 11

CRITICAL STEP

I

SAT

UNSAT

Step 2.7

Perform PI alignment on the droppedlmisaligned rod as follows:

Release LATCH switch

Depress and hold LATCH switch and use the INSEWTFAITHDRAW

joystick to insert rod for 15 seconds. Release the LATCH switch.

Depress and hold LATCH switch.

Insert rod for 15 seconds.

STANDARD:

COMMENTS:

STANDARD:

COMMENTS

Step 2.8

Perform PI alignment on droppedhnisaligned rod as follows:

Compare absolute and relative readings on the PI panel

Use PI reset raisellower switch to match absolute and relative

readings.

Absolute and relative indications on the PI panel, on 1 UBI, are compared

using toggle switch to make comparison.

RPI is selected with the select toggle switch. The POSITION RESET

WISEILOWER toggle switch is then placed in the lower position and RPI

indication is matched to API position.

When matched the aAlSElLOWER toggle is released to neutral.

The select toggle switch is returned to the API position.

CRO-12A fnl

Page8of11

-

SAT

-

UNSAT

__ SAT

-

UNSAT

CRO-12A fnl

Page 9 of 11

STEQ:

Step 2.9

Ensure RUN selected on Speed Selector

STANDARD:

SPEED SELECTOR is located by the student on 1UB1 and rotated to the

run position.

NOTE: Instructor in Booth: at this time fire timer to drop second control rod.

COMMENTS:

STEQ I O :

STANDARB:

Manually trip the reactor

The student recognizes the second control rod inserting and manually

trips the reactor by depressing the Reactor Trip pushbutton and verifies

that the reactor is shutdovdn.

COMMENTS:

END TASK

_I SAT

-

UNSAT

CRlTlCAL STEP

-

SAT

__ UNS T

STOP TIME:

CRITICAL STEP EXPLANATIONS:

CRQ-12A fnl

Page 10of 11

STEP #

Explanation

1

2

3

4

5

6

10

Step is necessary for the operator to select the single rod and not move the plant

around due to power excursions.

Step is necessary to instruct the rod logic as to which group the rod is in that the

operator wants to recover.

Step is necessary to allow the operator to withdraw the dropped rod.

Jog is necessary because the roods will not latch with the selector switch in RUN

The latching of the group to clear the out limit is necessary so that the individual rod

can be withdrawn.

Necessary to place the dropped rod on the auxiliary power supply for withdrawal while

leaving the group on the group power supply.

Necessary because the second dropped FOCI

places the unit in an unanalyzed

condition and this is a direction, which is given by OMP 1-58.

CRO-12A fnl

Page 11 of 11

CANDIDATE CUE SHET

(TO BE RETURNED TO EXAMINER UPON CQMPLETIOM OF TASK)

INITIAL CONDITIONS:

Unit #I

dropped a control rod in Group 6 approximately one hour ago and the unit is stable at

55%.

The Subsequent Actions of AP/I/A/I 70011 5, DROPPED CONTROL RODS, have been

completed through step 4.9.

Shutdown Margin calculation has been run to verify that an adequate SDM exists.

Systems Duty Engineer has been notified and no special maneuvering instructions are

required.

Enclosure 4.10 of OP/O/A/1105/09 has been completed up to step 2.0.

INITIATING CUE:

The Control Room SRO informs you that the problem has been corrected and that rec~vsry of

the dropped rod can now begin.

CRO-015 fnl

Page 1 of 16

REGION II

IN lTlAL LICENSE EXAM I NATION

JOB PERFORMANCE MEASURE

CRO-015

ESTABLISH EFDW FLOW THROUGH STARTUP

VALVES

CANDIDATE

EXAMINER

CRO-015 fni

Page 2 of 16

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

ESTABLISH EFDW FLOW THROUGH STARTUP VALVES.

Alternate Path:

N

Facilitv JPM #:

KIA Ratinds):

System: APE-054

KIA:

AA204

Rating: 4.2/4.3

Task Standard:

EFDW flow IS established to the affected header through the startup valve

Preferred Evaluation Location:

Simulator

in-Piant -

References:

EOP Rule 3, (boss of Main or Emergency FDW)

EOP Rule 7, (SG Feed Control)

EOP Enclosure 5.27, (Alternate Methods for Controlling EFDW Flow)

Preferred Evaluation Method:

Perform X

Simulate -

Candidate:

Time Start:

NAME

Time Finish:

Performance Time -

Performance Rating: SAT -

UNSAT -

Examiner:

I

NAME

SIGNATURE

DATE

CRO-015 fnl

Page 3 of 16

SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 209

2. Import files for CRO-015

3. GotoRUN

CRO-015 fnl

Page 4 of 16

TooIslEquipmenff Procedures Needed:

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when YOU understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The reactor has tripped

Main feedwater is lost

NQ increase in Reactor Building pressure is occurring and all KCPs are running

Subsequent Actions are complete

Kule 3 is complete up to Step 29.

1 FDW-32 5 is determined to be failed closed.

INITIATING CUES:

The SRO directs you to initiate Enclosure 5.27, Alternate Methods for Controlling EFDW Flow

and establish 200 gpm EFBW flow to the 1A SG.

CRO-015 fnl

Page 5 of 16

START TIME:

Step 1

Verify EFDW is being supplied by an alternate unit.

RNO

GO TO Step 7

Determine EFDW is not being supplied from another unit.

Perform RMO step and GO TO Step 7

STANDARD:

CUE: EFDWis NOT being supplied by an alternate unit

COMMENTS:

Step 7

Stop MD EFWP in a

headers with malfunctioning EFDW control valve.

Observes 1A steam generator level decreasing below setpoint on the SG

EXTENDED SU RANGE LEVEL meters (1 UB1) or OAC screens.

STANDARD:

andlor

Observes zero flow indicated to the 1A steam generator on the TOTAL

EFDW FLOW meters: on 1 UBI.

Based on these indications. candidate determines that 18 steam

generator EFDW header is the affected header.

Control switch for the l A MD EFWP is rotated to the OFF position.

Continue to Step 8

COMMENTS:

Step 8

Place TD EFDWP in PULL TO LOCK.

The TI3 EFDWP switch is placed in the LOCKOUT position.

Continue to Step 9

STANBARB:

COMMENTS:

-

SAT

_I UNSAT

CRITICAL STEP

_I SAT

-

UNSAT

CRITICAL STEP

__ SAP

-

UNSAT

CRO-015 fnl

Page 6 of 16

Step 9

Place controllers for the following in HAND and set demand to 0% in

affected headers:

Candidate locates 1 FDW-35 on 1 UBI and the Bailey control station is

piaced in Hand by depressing the white HAND pushbutton, and observing

the white HAND light ON. Valve position demand is reduced to 0 using

the toggle switch to close the valve.

Continue to Step 10

IFDW-35 (IA STARTUP FDW Control)

STANDARD:

NOTE: Candidate should perform all actions for 1A header because it is the header

with the failed valve.

COMMENTS:

STANDARD:

COMMENTS:

Step 10

Place control switch for the following in CLOSE in all affected headers:

IFDW-33 (IASU FDW Block)

IFDW-372 (la MDEFWP DISCH BLOCK)

Candidate Locates IFDW-33 control switch on 1UB1 and rotates to the

CLOSE position, observing the green CLOSE light ON and red OPEN

light OFF. (NOT CRITICAL IF IFDW-35 IS CLOSED)

Locates IFDW-372 Control Switch on 1UB1 and rotates to the CLOSE

position, observing the green CLOSE light ON and the red OPEN light

OFF.

Continue to Step 11

CRlTlCAL STEP

-

SAT

-

UNSAT

CRITICAL STEP

_II SAT

-

UNSAT

CRO-015 fnl

Page 7 of 16

Step 11

Place control switch for the following in OPEN in all affected headers:

IFDW-374 (MD EFDWP I A DISCH TO SG A)

STANDARD:

Candidate locates IFDW-374 on lUBl and the red OPEN pushbutton is

depressed, the red OPEN indication is observed to be ON.

Continue to Step 12

COMMENTS:

Step 12

Place control switch for the following in CLOSE in all affected headers:

m

IFDW-36 (IASG NORM SU FDW HDR)

STANDARD:

Candidate locates 1FDW-36 on 1VB3 places control switch in the

CLOSE position and the green CLOSE indication is observed to be

illuminated; and the red OPEN indication is observed to be extinguished.

Continue to Step 13

COMMENTS:

m:

Step 13

Place control switch for the following in OPEN in all affected headers:

IFDW-38 (IA SG EFDW Header)

STANDARD:

Candidate locates IFDW-38 on IVB3 places control switch in the OPEN

position and the red OPEN indication is observed to be illuminated and

the green CLOSE indication is observed to be extinguished.

Continue to Step 14

COMMENTS:

CRITICAL STEP

-

SAT

-

UNSAT

-

SAT

I

UNSAT

-

SAT

-

UNSAT

CRO-015 fnl

Page 8 of 16

Step 14

Verify 1FBW-315 failed

STANDARD:

h4anual Loader Knob is turned counter-clockwise to OPEN valve, on

1UB1.

Candidate recognizes that 1 FDW-315 is NOT responding to manual

control.

Continue to Step 15

COMMENTS:

STEP IO:

STANDARD:

COMMENTS:

Step 15

Verify I

the following:

e

1 FDW-38 open

1FDW-36 closed

IFDW-35 closed

IFDW-33 closed

Candidate locates 1FDW-38 on 1V53 and the red OPEN indication is

observed to be illuminated and the green CLOSE indication is observed

to be extinguished.

Candidate locates IFDW-36 on 1VB3 and the green CLOSE indication is

observed to be illuminated; and the red OPEN indication is observed to

be extinguished.

Candidate locates 1 FDW-35 on 1 UBI and observes the Bailey control

station position demand is zero.

Candidate locates 1 FDW-33 control switch on 1 UBI and observes the

green CLOSE light ON and red OPEN light OFF.

Continue to Step 16

-

SAT

-

UNSAT

-

SAT

-

UNSAT

CRO-015 fnl

Page 9 of 16

STEP 11:

Step 16

Verify 1 FDW-372 closed

STANDARD:

Candidate locates IFDW-372 Control Switch on l U B i and observes the

green CLOSE light ON arid the red OPEN light OFF.

Continue to Step 17

COMMENTS:

STEP 12:

Step 17

Verify both of the following:

Verify 1 FDW-374 is open.

0

Verify 1A MDEFDWP available.

STANDARD:

Candidate locates IFDW-374 on 1UB1 and the red OPEN indication is

observed to be ON.

1A MD EFDWP control switch green OFF light is verified illuminated.

This pump was secured by the candidate in a previous step.

Continue to Step 18

CQMMENTS:

STEP 13:

Step 18

GO TO Step 22

Candidate goes to Step 22.

STANDARD:

COMMENTS:

-

SAT

I

UNSAT

__ SAT

-

UNSAT

-

SAT

UNSAP

CRO-015 fnl

Page 10 of 16

STEP 14:

Step 22

Verify IFDW-316 failed

RNO

GO TO Step 30.

STANDARD:

Candidate verifies IFDW-316 is controlling SG level @ --j 30%.

Manual Loader Knob is turned counter-clockwise to OPEN valve, on

1UB1. Recognizes that IFBW-316 & responding to manual control.

Perform RNO and GO TO Step 30.

or

COMMENTS:

STEP 15:

STANDARD:

COMMENTS:

Step 30

Verify AFlS actuation has occurred (either Statalarm on):

RNO

GO TO Step 34.

Candidate observes indicated Statalarms and verifies that they are NOT

illuminated. Perform RNO and GO TO Step 34.

AFlS HEADER A INITIATED (1SA-2/C-8)

AFIS HEADER E3 INITIATED (ISA-2/B-8)

CRITICAL STEP

-

SAT

-

UNSAT

-

SAT

i__ UNSAT

CRO-015 fnl

Page 11 of 16

STEP 16:

Step 34

Verify an operator has been sent to locally position any FDW valvi

IFDW-94

IFDW-315

RNO

GO TO Step 36.

STANDARD:

Determine that an operator has NOT been sent to locally position

FDW valve.

Perform RNO and GO TO Step 36.

CUE: No operators have been dispatched to locally operate any valves.

COMMENTS:

STEP 17:

Step 36

Verify 1 FDW-315 failed open.

RNO

If lineup to feed through 1A SIU Control Valve was successful.

THEN GO TO Step 37.

Candidate should determine that the Manual Loader on 1 UBI indi

0% and 1 FDW-315 has failed dosed.

Green CLOSED light is ON.

Perform RNO step 2., 1A SIU control valve linsup has been SUCCE

THEN GO TO Step 37

STANDARD:

Of

CQMMENTS:

STEP 18:

Step 37

Verifv an operator has been sent to locally open IFDW-94.

STANDARD:

Determine an operator has NOT been sent to locally open 1 FDW.

Perform RNO and GO TO Step 40

CUE: No operators have been dispatched to locally operate any valves.

COMMENTS:

_I SAT

-

UNSAT

-

SAT

I_ UNSAT

-

SAT

__ UNSAT

CRO-015 fnl

Page 12 of 16

STEP 39:

Step 40

Start 1A MB EFDWP.

The 1A MD EFDWP control switch is rotated clockwise to the RUN

position and the red RUN light is verified ON.

Contjnue to Step 41

STANDARD:

COMMENTS:

STEP 20:

STANDARD:

COMMENTS:

Step 41

Verify IFDW-316 failed open

Verifies IFDW-316 is controlling SG level @ r% 30%.

O I

Manual Loader Knob is turned counter-clockwise to OPEN valve, on

1 UBI.

Student recognizes that 1 FDW-316 &responding to manual control.

Perform RNO and GO TO Step 46.

STEP 21:

Step 46

Verify HPI forced cooling is in progress.

STANDARD:

Determine that HPI Forced Cooling is NOT in progress

Perform RNO and GO TO Step 48.

CUE: HPI forced cooling is NOT in progress.

COMMENTS:

-

SAT

-

UNSAT

-

SAT

UNSAT

-

SAT

-

UNSAT

CRO-015 fnl

Page 13 of 16

STEP 22:

Step 48

Verify LOHT tab is NOT in progress

Determine LQHT is NOT in progress.

Perform RMO and GO TO Step 51.

STANDARD:

CUE: LOHT tab is NOT in progress.

COMMENTS:

Verify 1 FDW-315 failed.

Manual Loader on 1 UBI indicates 0% 1 FDW-315 has failed closed.

Green CLOSED light is ON.

Continue to Step 52

STANDARD:

or

COMMENTS:

Verify one of the following:

Lineup to feed through l A SIU Control Valve was successful

Operator sent to locally throttle 1FDW-315

STANDARD:

Determine that Lineup to feed through 1A SIU Control Valve was

successful.

Continue to Step 53

CUE: 1A s/u control valve lineup has been successfurrl.

COMMENTS:

SAT

-

UNSAT

I

SAT

-

UNSAT

-

SAT

__ UNSAT

STEP 25:

Step 53

Verify an operator has been sent to locally control 1 FBW-315.

STANDARD:

Determine that an operator has NOT been sent to locally control IFDW-

315.

Perform RNO and GO TO Step 56

CUE: NO operators have been dispatched to localjy operate any valves.

COMMENTS:

..

.--

.

NOTE

FIQW from the TDEFDWP through a SIU control valve should be reads on the FDW

SU FLOW gauge.

Flow from the MDEFDWP through a SIU control valve should be read on the

MDEFDWP DlSCH FLOW gauge.

....

... ..

.._..

STEP 26:

Step 56

Throttle 1 FDW-35 S/U to obtain desired flow rate and/or SG level per

Rule 7 (SG Feed Control).

Manually throttle 4 FBW-35 on 1 UBI. The raise/lower toggle switch is

pushed up to increase the valve position demand signal to throttle open

the valve. Flow is maintained within allowable limits. If flow exceeds

pump runout limits, action must be taken to reduce flow to within limits

prior to completing the task.

When feeding through the S/U Control Valves with the MDEFW Pumps,

the MBEFOWP RISCH FLOW gauge should be used to verify flow within

limits.

STANDARD:

NOTE: When flow has been established and level is increasing in the ?A SG, the

JPM is complete.

CQMMENTS:

CRO-015 fnl

Page 14of 16

I

UNSAT

CRITICAL STEP

I

SAT

~

UNSAT

STOP TIME:

CRO-015 fnl

Page 15 of 16

CRITICAL STEP EXPLANATIONS:

STEP #

Explanation

2 & 3

Necessary because the MD EFWP in the affected header needs to be sewred so

that the header can be isolated and valves repositioned. Step is necessary because

the TD EFWP needs to be secured so that the header can be isolated and valves

repositioned.

4 & 5

Necessary to prevent the EFDW flow, which is meant for 1A SG from getting to other

portions of the system.

6

Aligns the emergency feed water to the 1A SG through the startup valves.

19

Restarts the MD EFDWP, which was stopped to reduce the DIP for the closure of

valves to isolate the affected header.

26

Actually establishes flow to the 1A SG to establish required S6 levels.

CRO-015 fnl

Page 16 of 16

CANDIDATE CUE SHEET

(TO B RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

The reactor has tripped

Main feedwater is lost

No increase in Reactor Building pressure is occurring and all RCPs are running

Subsequent Actions are complete

Rule 3 is complete up to Step 29.

IFDW-325 is determined to be failed closed.

INITIATING CUES:

The SR6 directs you to initiate Enclosure 5.27, Alternate Methods for Controlling EFDW Flow

and establish 200 gpm EFDW flow to the 1A SG.

CRO-053 fnl

Page 1 of 8

REGION II

IN ITlAL LICENSE EXAM IN AT ION

JOB PERFORMANCE MEASURE

CRO-053

BYPASS COOLANT PUMP STARTING INTERLOCKS

CANDIDATE

EXAMINER

CRO-053 fnl

Page 2 of 8

REGION II

lNlTlAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Tirsk:

BYPASS COOLANT BUMP STARTING INTERLOCKS

Alternate Path:

Facilitv JPM #:

KIA Ratinds):

System: EPE-074

WA:

A3.04

Rating:

Task Standard:

Reactor Coolant Pump starting interlocks are correctly bypassed

Preferred Evaluation Location:

Simulator _s In-Plant

X

References:

Preferred Evaluation Method:

Perform -

Simulate _X___

Examiner:

I

NAME

SIGNATURE

DATE

CRO-053 fnl

Page 3 of 8

SIMULATOR OPEFUTBR INSTRUCTIONS:

NONE

CRO-853 fnl

Page 4 of 8

TooIslE~uipmen~Procedures

Needed:

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

An accident has occurred on Unit 3 in which the EQP is being used.

All RCPs are off and full HPI has been initiated.

Inadequate core cooling exists with Core Exit Thermocouples > 780°F but

decreasing.

INITIATING CUE:

The Procedure Director directs you to bypass Reactor Coolant Pump starting interlocks per

Enclosure 5.14, "Jumpe~ Contacts for RCP Starting interlocks" of the EO$.

1200°F and not

CRO-053 fnl

Page 5 of 8

START TIME:

Obtain Reactor Coolant Pump Motor starting interlock jumper cables for

affected unit(§), per Endosure 5.14 of EP/1,2,or 3/A11800/01 Emergency

Operating Procedure.

Jumper cables are obtained from the key locker located in the Work

Control Center.

~

~

' STANDARD:

NOTE: Jumper cables for unit #1

locker. Ensure correct set of jumper cables are identified and obtained.

CUE: After correct jumpers have been located, inform student that he may leave

jumpers in the key locker.

unit #2 RCPs are located in the same key

COMMENTS:

STEP:

LOCATE Termin81 Cabinet MTC3 for the affected unit(s)

STANDARD:

Terminal Cabinet MTC3 is correctly located:

3MTC3 is located in Unit #3 Cable Room near south Cable Room door.

COMMENTS:

CRITICAL STEP

I_ SAT

-

UNSAT

CRITICAL STEP

SAT

-

UNSAT

a:

STANDARD:

BYPASS the Reactor Coolant Pump Motor starting interlocks on the

affected unit(s), as listed on Enclosure 5.14 of EW 4/Nl800/01,

Emergency Operating Procedure.

Bcp Contacts

A I

A3PA to A305

82

B8PBto8805

B I

A4PA to A405

E2

BSPB to B905

MTC3 cabinet door is opened and the following steps are performed for

EACH Reactor Coolant Pump Motor:

The first contact is located and identified on the terminal board

One end of the jumper cable is simulated to be clipped to this contact.

The second specified contact is located and identified on the terminal

board.

The other end of the jumper cable is simulated to be clipped to the

second contact.

NOTE: End task when you have determined that student is proficient at identifying

RCB jumper contacts.

COMMENTS:

CRO-053 fnl

Page 6 of 8

CRITICAL STEP

SAT

UNSAT

CRQ-053 fnl

Page 7 of 8

CRITICAL STEP EXPLANATIONS:

STEP #

Explanation

1

Necessary because the cables must be obtained to jumper the interlocks.

2

Necessary because the operator must locate the correct cabinet for the correct unit

3

Necessary because the operator must be able to identify the correct contacts for each

WCP or the interlocks will not be bypassed as required.

CRO-053 fnl

Page 8 of 8

CANDIDATE CUE SHEEP

(TO BE RETURNED TO EXMIINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

An accident has occurred on Unit 3 in which the EQP is being used.

All WCPs are off and full HPI has been initiated.

Inadequate core cooling exists with Core Exit Thermocouples

decreasing.

INITIATING CUE:

700°F but c 1200°F and not

The Procedure Director directs you to bypass Reactor Coolant Pump starting interlocks per

Enclosure 5.14? "Jumper Contacts for WCP Starting interlocks" of the EOQ.

CRO-060 fnl

Page I of 11

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

CRO-060

PERFORM REQUIRED ACTIONS FOR A TURBINE

BUILDING FLOOD

CANDIDATE

EXAMINER

CRO-060 fnl

Page 2 of 11

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

PERFORM REQUIRED ACTIONS FOR A TURBINE BUILDING FLOOD

Alternate Path:

Facilitv JPM #:

KIA Ratinds):

System: APE BW/A07

K/A:

AA1.3

Rating:

Task Standard:

Preferred Evaluation Location:

Simulator

In-Plant __

References:

APllO, Uncontrollable Flooding of Turbine Building

Preferred Evaluation Method:

Perform

Simulate -

Candidate:

Time Start:

NAME

Time Finish:

PerformanCeg SAT-

UNSAT -

Performance Time -

CRO-060 fnl

Page 3 of 11

SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 212

2. Import files for CRO-060

3. GotoWUN

CRO-060 fnl

Page 4 of 11

TQosslEquipmentlPrQcedures Needed:

READ TO OPERATOR

DIRECTION TO TRAINEE:

I wiil explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 was operating at 108% power with no known problems.

Unit 2 is in cold shutdown.

The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water

level is rising.

Unit 1 has been tripped and the EOP is being completed by other team members.

INITIATING CUES:

The Control Room §a0 directs you to refer to APIIO, Uncontrollable Flooding of Turbine

Building, and peldorm required actions.

CRO-060 fnl

Page 5 of 11

START TIME:

STEP:

Step 4

Ensure Rx is tripped

Determine RX has tripped by observing all control rods inserted and

power is < 1 %.

Continue to Step 2.

STANDAKD:

COMMENTS:

....

.......

NOTE

Tripping the CCW pumps will cause loss of condenser vacuum which will result in TBVs

.

...... -.

_.__

of the MFDWPs.

-.

STEP:

Step 2

Ensure all CCW pumps are shutdown

The IA, 1B. and I C CCW pump switches are rotated to the TRIP

position. (located on 1AB3)

Continue to Step 3.

STANDARD:

COMMENTS:

STEP:

Step 3

Press both of the following on the TURB BLDG FLOOD MER CLOSING

ALL CCWP DISCH VALVES control switch:

CLOSE1

CLOSE2

"CLOSE 1" and "CLOSE 2" on the TURB BLDG FLOOD MER

CLOSING ALL CCWP BlSCH VALVES control switch are both

depressed. (located on IAB3)

Continue to Step 4

STANDARD:

COMMENTS:

.......

.....

L

......

-

SAT

-

UNSAT

CRITICAL STEP

SAT

___ UNSAT

CRITICAL STEP

__ SAT

-

UNSAT

CRO-060 fnl

Page 6 of 11

STEP:

Step 4

Verify all CCW pump discharge valves are closed

STANDARD:

The green CLOSED lights for ICCW-IO, 11, 12 & 23 are verified

illuminated and the red OPEN lights for the same valves are verified

extinguished. (located on 1AE3)

Continue to Step 5.

COMMENTS:

NOTE

I Field tasks.that may affect multiple units should be coordinated

. with Unit 2 and Unit 3.

STEP:

Step 5

Dispatch operators to ensure all three flood doors are closed and in the

SECURED position from the AB side (A-I, at Unit 1, 2, and 3 stairwell

entrances to TB): (2)

Unit 1 Flood Door

Unit 2 Flood Door

Unit 3 Flood Door

STANDARD:

Candidate should dispatch and NE0 to ensure all three flood doors are

closed and in the SECURED position from the AB side.

Continue to Step 6

Cue: An operator has been dispatched.

COMMENTS:

-6:

Step 6

Verify LPI decay heat removal is NOT in progress

Determine LPI pumps are not operating by observing pumps switch

indicaticns on 1 UB2.

Continue to Step 7.

STANDARD:

COMMENTS:

-

SAT

-

UNSP

CRITICAL S

___ SAT

UNSP

-

SAT

UNSP

CRO-OB0 fnl

Page 7 of I 1

Step 7

Dispatch an operator to place the following waterbox discharge valve

switches to HAND and CLOSE (T-3, East of condenser catwalk):

1CCW-20 (IAI)

ICCW-21 (1A2)

0

ICCW-22 (IBI)

. 16CW-24(1C1)

1 CCW-23 (1 82)

ICCW-25 (IC2)

Nc -

RD:

Candidate should disp

HAND and CLOSE.

Continue to Step 8

Cue: QperatQr has been dispatched.

COMMENTS:

an opei tor to plac tt

3b

valves to

Step 8

Make a PA announcement of the event including restrictions on entry into

TB basement due to electrical hazard.

STANDARD:

FA announcement is made using the Control Room phone

Continue tu Step 9.

COMMENTS:

Step 9

Attempt to locate and isolate the suurce of the flooding

STANDARD:

Dispatch operators to locate and isolate the source of the flooding

Continue to Step I O .

Cue: Operators have been dispatched.

COMMENTS:

-

SAT

__ UNSAT

-

SAT

-

UNSAT

-

SAT

-

UNSAT

CRO-060 fnl

Page 8 of 11

STEP IO:

Step 10

Ensure all Unit 1 ESV pumps are shutdown:

e

IAESVPump

1CESVPump

1BESVPump

STANDARD:

Stop ALL Unit 1 ESV pumps by rotating their pumps switches to OFF.

(located on 1AB3)

Continue to Step 11

COMMENTS:

STEP 11:

Step 11

Verify all CCW pump discharge valves were suecessfully closed in earlier

steps.

STANDARD:

Continue to SteD 12

COMMENTS:

STEP 12:

Step 12

Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW

Pumps).

STANDARD:

Candidate should dispatch an operator to perform Encl 5.1 (Isolation of

SSW to CCW Pumps).

Continue to Step 13

Cue: Operator is dispatched.

COMMENTS:

__ SAT

-

UNSAT

-

SAT

-

UNSAT

-

SAT

-

UNSAT

CRO-060 fnl

Page 9 of Z 1

STEP 53:

STANDARD:

COMMENTS:

Step 13

IAAT HPSW is NOT available,

THEN ensure End 5.31 (Temporarily Charging the HPSW System) of

EP/l has been initiated.

Determine that HPSW is available by observing the HPSW Jockey pump

operating and level in the EWST. (located on 1AB3)

Continue to Steo <4

STEP 14:

Step 14

Notify a SRO to evaluate de-energizing electrical components in the

flooded areas.

-:

Candidate should inform a SRO to evaluate de-energizing electrical

components in the flooded areas.

Cue: SRO will evaluate which electrical equipment to de-energize.

COMMENTS:

--

END TASK

STOP TIME:

-

SAT

UNSAT

-

SAT

__ UNSAT

CWQ-060 fnl

Page 10 of 11

CRITICAL STEP EXPLANATIONS:

STEP #

Explanation

2

Necessary to attempt to terminate the flooding and not contribute to the water level in

the TB basement.

3

Necessary to attempt to terminate the flooding and not contribute to the water level in

the TB basement.

Necessary to prevent the waters from the flooding from entering the Aux. Bldg.,

causing more problems and the spread of contamination,

5

CRO-060 fnl

Page 12 of 11

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 was operating at 100% power with no known problems.

Unit 2 is in cold shutdown.

The 2/41 condenser inlet expansion joint has ruptured and Turbine Building Basement water

level is rising.

Unit 1 has been tripped and the EOP is being completed by other team members.

INITIATING CUES:

The Control Room SRO directs you to refer to AW10, Uncontrollable Flooding of Turbine

Building, and perform required actions.

CRO-067 fnl

Page I of 13

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

CRO-067

Perform Required Actions far ES Actuation (> 3psig)

CANDIDATE

EXAM IN ER

CRO-067 fnl

Page 2 of 23

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

Perform Required Actions for ES Actuation (> 3psig)

Alternate Path:

Facilitv JPM #:

c

KIA Ratin&):

UfA:

E.41.13

Rating.

Task Standard:

Proper E$ conditions are verified using the appropriate procedures and re-start the 1A and 1B LPI pump

when required.

System: EPE-009

Preferred Evaluation Location:

Simulator 2

In-Piant __

References:

Preferred Evaluation Method:

Perform X Simulate _.

EOP Enclosure 5.1, E§ ACTUATION

Candidate:

Time Start:

NAME

Time Finish:

Performance Rating: SAT -

UNSAT

~

Performance Time _I_

CRQ-067 fnl

Page 3 of I 3

SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 207

2. Import files for CRQ-(367

3. GotoRUN

CRO-069 fnl

Page 4 of 43

ToolslEquipment/Praceduses Needed:

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Small Break LOCA is in progress.

Rule 2 in progress

RCS is saturated and KCPs are off.

ES Channels I

~ 6 have actuated.

INITIATING CUES:

The Control Room SRO instructs you to perform EOP Enclosure 5.1, ES Actuation.

CRO-067 fnl

Page 5 of 13

START TIME:

Step 1

Determine all ES channels that should have actuated based on

pressure and RB Dressure:

STANDARD:

COMMENTS:

Actuation

...

10

Candidate should monitor the existing RCS Pressure, using valid

pressure indication, ICCM Train A or B, OAC, RCS Pressure (NR), RCS

Pressure (WR) on 1UB1 and 1UB2 to verify RB pressure is > 3 psig.

Determines that ES Channels 1-6 should be actuated

Continue to Step 2

-2:

Step 2

Verify

ES channels associated with actuation setpoint have actuated:

STANDARD:

Ensure ES digital channels 1-6 are actuated by observing "Tripped" lights

on 1UB1.

Continue to Step 3

COMMENTS:

-

SAT

-

UNSAT

-

§AT

-

UNSAT

CRO-067 fni

Page 6 of 13

Step 3

IAAT additional ES actuation setpoints are exceeded.

THEN perform Steps 1 - 2.

Continue to Step 4

IAAT additional ES actuation setpoints are exceeded candidate perform

STANDARD:

Note: During the performance of thi5 JPM ES Channels 7 and 8 will actuate.

COMMENTS:

Steps 1 - 2.

Step 4

Place HPI in manual control

STANDARD:

Go to RZ modules on 1VB2 and select manual for the #PI components.

Continue to Step 5

COMMENTS:

Step 5

Verify Rule 2 in progress or complete.

Determine Rule 2 in progress by referring to the Initial Conditions.

Continue to Step 6

STANDARD:

COMMENTS:

_I SAT

_I_ UNSAT

_I SAT

-

UNSAT

~

SAT

-

UNSAT

CRO-067 fnl

Page 7 of 13

m:

Step 6

Open the following:

0

IBS-4

IBS-2

At the ES RZ modules an 1 AB2, OPEN 1 BS-1 and 1 BS-2 by depressing

the open pushbutton.

Continue to Step 7

STANDARD:

COMMENTS:

Verify any RCP operating

Determine NO RCP is operating.

Perform RNO step and GO TO Step 9.

STANDARD:

COMMENTS:

STEP:

Step 9

IAAT any RCP is operating

AND ES Channels 5 and 6 actuate

THEN perform Steps 40 and 11

STANDARD:

Determine NO RCP is operating.

Perform RNO step and GO TO Step 12.

COMMENTS:

__ SAT

-

UNSAT

-

SAT

-

UNSAT

-

SAT

I

UNSAT

CRO-067 fnl

Page 8 of 13

Step 12

I M T ES Channels 3 & 4 are actuated,

THEN GO TO Step 13

STANDARD:

Determine E§ Channels 3 & 4 are actuated by one of the following:

Statalarms: ISA-IC-10 (ES Channel 3 Trip) and 1SA-IID-IO (ES

Channel 4 Trip)

E§ Channel 3 and Channel 4 Tripped lights lit on 1 UBI.

GO TO step 13

COMMENTS:

STEP 10:

Step 13

Place the following in manual control:

IAbPIPump

1B LPI Pump

ILP-17

. IbP-18

STANDARD:

Go to the ES RZ modules on 1VB2 and place the above components in

manual by depressing each components manual pushbutton.

Continue to Step 14

COMMENTS:

-

§AT

-

UNSAT

I

SAT

-

UNSAT

.~.~.-

.. . . . . .

-.

.

CAUTION

LPI pump damage may occur if operated in excess of 30 minutes

... against

~ ..

a shutoff head.

......

Step 14

IAAT any LPI pump is operating against a shutoff head,

THEN at the CR SROs discretion stop affected LPI pumps.

Determine RCS pressure is above LPI pump discharge head and then

ask for SRO direction. When directed by the SRO secure both the A

and W LPI pump.

Continue to Step 15

STANDARD:

Cue: When asked inform candidate that the SRO desires to stop BOTH LPI pumps.

COMMENTS:

Step 15

IAAT RCS pressure is .z LPI pump shutoff head.

THEN perform Steps 46 - 17.

Determine RCS pressure is NOT .z LPI pump shutoff head (=ZOO psig)

Perform RNO step and GO TO Step 18.

STANDARD:

COMMENTS:

CRO-069 fnl

Page 9 of 13

-

SAT

__ UNSAT

-

SAT

__ UNSAT

CRO-067 fnl

Page l o o f 13

STEP IO:

Step 18

IAAT 1A and 1 B LPI pumps are off I tripped,

AND ail the following conditions exist:

RCS pressure z LPI pump shutoff head

ILP-19 closed

1 LP-20 closed

IBS-1 open OR throttled open

IBS-2 open OR throttled open

THEN perform Steps 19 - 21

STANDARD:

Determine conditions of step NOT met because RCS pressure is not

< LPI pump shutoff head ( ~ 2 0 0

psig).

Perform RNO Step and GO TO Step 22

COMMENTS:

Note: After Step 18 is completed RCS pressure will decrease to

LPI pump SkLItQff

head. The candidate should datermime that IAAT step 15 is mat and transfer to step

15.

STEP 11:

Step I 5

IAAT RCS pressure is < LPI pump shutoff head,

THEN perform Steps 16 - 17.

Determine that RCS pressure is z LPI pump shutoff head ( ~ 2 0 0

psig)

Continue to Step 16

STANDARD:

COMMENTS:

STEP 12:

Step 16

Perform the following:

Open ILP-17 (already open)

Start I A LPI pump

STANDARD:

Verify 1 LP-17 is open by observing the open light on the ES RZ module.

Start the 1A LPI pump by using the pump switch on 1 UB2.

Continue to Step 17

COMMENTS:

-

§AT

-

UNSAT

-

SAT

-

UNSAT

CRITICAL STEP

-

SAT

-

UNSAT

CRQ-069 fnl

Page 11 of 13

STEP 13:

Step 17

Perform the following:

Start 18 LPI pump

Verify 1 LP-18 is open by observing the open light on the ES E module.

Start the 1 B LPI pump by using !he pump switch on 1 UB4.

Open 1 LP-18 (already open)

STANDARD:

COMMENTS:

CRITICAL STEP

-

SAT

-

UNSAT

END TASK

STOP TIME:

CRO-067 fnl

Page 12 of 13

CRITICAL STEP EXPLANATIONS:

STEP #

Explanation

12

The "A bPl pump must be started when RCS pressure is less than LPI pump head to

ensure LPI flow into the core.

The " B LPI pump must be started when RC§ pressure is less than LPI pump head to ensure

LPI flew into the core.

13

CRO-067 fnl

Page 13 of 13

CANDIDATE CUE SHEET

(TO B RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Small Break LBCA is in progress.

Rule 2 in progress

RCS is saturated and RCPs are off.

E§ Channels 1 - 6 have actuated.

INITIATING CUES:

The Control Room SRO instructs you to perform EOP Enclosure 5.1, ES Actuation.

CR6-097 fnl

Page I

Of 13

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

CRQ-097

Transfer ECCS Suction to the Emergency Sump

(1 LP-15 Failed Closed)

CANDIDATE

EXAMINER

CRO-097 fnl

Page 2 of 13

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Transfer ECCS Suction to the Emergency Sump (1 LP-I 5 Failed Closed)

Alternate Path:

Facilitv JPM #:

KIA Ratinds):

System: BWIEOB

WA:

EA1.1

Rating. 4013.7

Task Standard:

Steps of EOP are properly completed by the student to align HPllbPl piggyback mode

Preferred Evaluation Location:

Simulator 2

In-Plant -

References:

EOP Enclosure 5.12, (ECCS Suction Swap to R E S )

Preferred Evaluation Method:

Perform X Simulate __

Candidate:

Time Start:

NAME

Time Finish:

Performance Rating: SAT-

wsa-r -

Performance Time -

Examiner:

I

NAME

SIGNATURE

DATE

CRO-097 fnl

Page 3 of 13

SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 208

2. Import files for CRO-097

3. GotoRUN

CRO-097 fnl

Page 4 of 13

ToolslEquipmenffProcedures Needed:

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A small break LOCA has occurred which is depleting the 5WST.

Core SCM = 0°F.

The BWST level is 19 feet and RB level is increasing.

LOCA CD tab has been completed up to step 7.

" 1 A LPI header indicates no flow

"1 5" LPI header indicates no flow

INITIATING CUES:

The Procedure Director directs you to perform IAAT Step I;

Initiate Enclosure 5.12, (ECCS

Suction Swap to RBES).

START TIME:

STEP:

Step I

Start both of the following:

IALPIPump

1B LPI Pump

STANDARD:

The candidate rotates the control switches on 1 UB2 for "1A" and "I

B LPI

Pumps clockwise to the CLOSE position and verifies that the Red TRIP

COIL lights illuminate and the White CLOSE COIL light is OFF and the

ammeter responds.

Continue to Step 2

COMMENTS:

-2:

Step 2

Verify either of the foliowing exist:

LPI FLOW TRAIN A plus LPI FLOW TRAIN B 2 3300 gpm

Only one LPI header is operating AND flow in that header is 2 2850

gpm

STANDARD:

The candidate locates the flow instrumentation (on IUB1) for the LPI

headers and determines that no flow is indicated in either header.

Perform RNO Step and GO PO Step 4

COMMENTS:

CRO-097 fnl

Page 5 of 13

CRITICAL STEP

-

SAT

-

UNSAT

-

SAT

-

UNSAT

CRO-097 fnl

Page 6 of 13

Step 4

Verify 6 three HPI pumps operating

RNO

STOP 1 B HPI pump

STANDARD:

Candidate observes the indications for the HPI Pump controls on ?UBI

and determines that all 3 #PI Pumps are operating.

The candidate locates the control switch for the 1B HPI Pump and rotates

it to OFF position and verifies that the white OFF light comes on and the

red RUN lights go off.

Continue to Step 5

COMMENTS:

Step 5

Dispatch an operator to perform Enel. 5.37 (Isolation of HPI Pump

Reeirc) without dressing out. (PSI

Candidate should dispatch NEO(s) to perform End. 5.37.

Continue to Step 6

STANDARD:

CUE: inform candidate operatcir(s) dispatched as requested.

COMMENTS:

Step 6

Notify Control Room personnel that the 170 gpfnlpump minimum HPI

flow requirement is in effect.

STANDARD:

Candidate informs control room personnel of HPI minimum flow

requirements for HPI.

Continue to Step 7

CUE: lnform student the control mom has been notified.

COMMENTS:

-

SAT

-

UNSAT

-

SAT

-

UNSAT

-

SAT

-

VNSAT

CRO-097 fnl

Page 7 of 13

~

...

..... .-

.....

CAUTION

ECCS pump damage may occur if LPI pumps are operated below the following minimum

flows:

Any LPI pump operated at e 100 gprn for > 30 minutes

Two LPI pumps operating in piggyback with NO LPI flow and total HPI flow e 500

.......

. . .

......

- ....... _-

-6:

Step 7

Verify two LPI pumps operating.

The candidate locates the controls for "1K and "1 B" LPI pumps on 1 UB2

and determines that both LPI pumps are running.

Continue to Step 8

STANDARD:

COMMENTS:

STEP:

Step 8

Verify total HPI flow including seal injection is > 500 gpm.

Observe HPI headers flows on 1 UBI and determine total #PI flow

including seal injection is > 500 gpm.

Continue to Step 9

STANDARD:

COMMENTS:

.....

........

-

SAT

-

UNSAT

I

SAT

-

UNSAT

-8:

STAN BARD:

Step 9

Simultaneously open the following:

1bP-15

. 1bP-16

RNO

Limit total HPI flow to < 750 gpm including seal injection

Candidate locates the control switches and light indication for ILP-15 and

ILP-16 on 1 UB2 and determines that the valves are closed.

1LP-15 and 1 LP-16 switches are rotated to the OPEN direction and the

student verifies that the green CLOSED light goes out and the red OPEN

light comes on.

The candidate identifies that 1 LP-15 did not open when its control switch

was placed in the OPEN position and performs RNO.

Throttle 1 HP-26 and 1 HP-27 to limit total HPI flow to

seal injection.

Continue to Step 10

750 gpm including

NOPE: aLP-15 ('IA LPI TO HPI AND RBS) will NOT respond, and will not be

operable during this JPM.

COMMENTS:

Step 10

GO TO Step 14

Candidate goes to step 14

STANDARD:

COMMENTS:

CRO-097 fnl

Page 8 of 13

CRITICAL STEP

_I_ SAT

-

UNSAT

-

SAT

__ UNSAT

CRO-097 fnl

Page 9 of 13

STEP I O :

Step 14

Place the "LDST LEVEL INTERLOCK switch in the "DISABLE" position.

STANDARD:

The candidate locates the "LDST LEVEL INTERLOCK" switch and places

it in the "DISABLE" position.

Continue to Step 15

COMMENTS:

STEP 11 :

Step 15

Position the following valves switches to close until valve travel is

initiated:

e

1HP-23

IHP-24

IHP-25

STANDARD:

The controls for 1HP-23, 24 and 25 are located by the candidate on

I

UBI. The switches are rotated to the CLOSE position and the grec

CLOSED lights are observed to come on and the red OPEN lights are

observed to go off.

Continue to Step 16

COMMENTS:

STEP 12:

Step 16

Verify any of the following are open:

0

ILPSW-4

ILPSW-5

Continue to Step 17

Verify any of the above valves are open by observing their open

indications on 1VB2.

STANDARD:

COMMENTS:

SAT

-

UNSAl

SAT

~

UNSA-

-

SAT

__I UNSA'

CRB-097 fnl

Page 10 of 13

STEP 13:

Step 17

GO TO Step 22

Candidate goes to Step 22.

STANDARD:

COMMENTS:

STEP 14:

Step 22

Verify both LPI coolers available for LPI and LPSW.

Determine both LPI coolers available for LPI and LPSW

Continue to Step 23

STANDARD:

COMMENTS:

STEP 15:

Step 23

Verify any LPI pump has been secured in this enclosure due to low flow

conditions.

STANDARD:

Determine BOTH LPI pumps are operating and perform RNO and GO

TO Step 25.

Continue to Step 25

COMMENTS:

-

SAT

___ UNSAT

__ SAT

-

UNSAT

-

SAT

_I UNSAT

~.

.

.. ..~..

~.~..

.~

. .-

NOTE'-

RB level of 2 2' is expected when BWST level reaches 9'.

.

~

~

~

~

.

~....

STEP 16:

Step 25

WHEN BWST level is 2 9'.

AND RB level is rising,

THEN continue in this enclosure.

STANDARD:

Monitor EWST level and RB level and determine that this step is sat

and continue to Step 26.

Cue: If required, inform cand!dafe time compression will be used and the BWS

level will be lowered.

COMMENTS:

STEP 17:

Step 26

Simultaneously open the following:

ILP-19

ILP-20

STANDARD:

The candidate locates the controls for 1LP-19 (IA RX BLBG SUCTll

AN5 I

LP-20 (1 E RX BLDG SUCTION) on UB2.

The switches are placed in the OPEN position and the valves are ve

to open.

COMMENTS:

__._

...~..

... END TASK

I

...

TOP TIME

CRO-897 fnl

Page 11 of 13

-

SAT

-

UNSAT

CRlPlCAL STEP

-

SAT

-

UNSAT

CRO-097 fnl

Page 12 of 13

CRITICAL STEP EXPLANATIONS:

STEP #

Explanation

Required to provide HPI pump suction

.l

8

Necessary to allow the flow from the LPI headers to the HPI pump suctions.

Candidate must determine that ILP-15 did not open and then throttle HPI flow to

protect the HPI pumps.

16

Necessary to allow the suction source for the LPI system to be the WBES and not the

BWSP, which is almost depleted.

CRQ-097 fnl

Page 13 of 13

CANDIDATE CUE SHEET

(TO B RETURNED TO EXAMINER UPON COMPLTIQN OF TASK)

INITIAL CONDITIONS:

A small break LOCA has occurred which is depleting the BWST

Core SCM = 0°F

The BWST level is 19 feet and RB level is increasing.

LOCA CD tab has been completed up to step 7.

IN LPI header indicates no flow

IB LPI header indicates no flow

INITIATING CUES:

The Procedure Director directs you to perform lAaT Step 1; Initiate Enclosure 5.12, (ECCS

Suction Swap to R E S ) .

CRO-600 fnl

Page 1 of 12

REGION It

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

CRO-600

RECOVER FROM SWITCHYARD ISOLATION

CANDIDATE

EXAM IN ER

CRO-GOO fnl

Page 2 of 12

REGION II

INITIAL LICENSE EXANllNATlON

JOB PERFORMANCE MEASURE

Task:

Recover from Switchyard Isolation

Alternate Path:

Facility JPM #:

IVA Ratinq(s):

System: BW/AQS

WA:

AA1.l

Rating: 4.3/4.2

Task Standard:

Recovery from Switchyard Isolation is performed correctly including manually synchronizing the overhead Keowee

Unit onto the 230 KV Red Bus.

Preferred Evaluation Leeation:

Preferred Evaluation Method:

Simulator

In-Plant -

Perform X

Simulate _.

References:

Enclosure 5.3 of APlOl Z (Recovery From Loss of Power)

Validation Time: 15 minutes

Time Critical: NO

......................................................................................

......................................................................................

Candidate:

Time Start:

NAME

Time Finish:

Performance Ratinq: SAT -

UNSAT -

Performance Time I

_

Examiner:

I

NAME

SIGNATURE

BATE

CRO-600 fnl

Page 3 of 12

SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 210

2. Import files for CRO-600

3. GotoRUN

4. Use the Speed Change Motor on Keowee Unit 1 to ensure the unit is out of sync.

5. Timer 2 will reset the SWYD Isolation

6. Timer 3 will give remote control of Keowee

CRO-600 fnl

Page 4 of 12

ToolslEquipmenffP~ocedures Needed:

Enclosure 5.3 of AW01-i (Recovery From Loss of Power)

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be petformed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. A switchyard Isolation has occurred

2. Unit 1 and Unit 2 reactors have tripped

3. Unit 3 remains online at 100% power

4. Power has been restored to Unit 1 and Unit 2's Main Feeder Buses from Keowee Unit 1 via

the overhead power path

5. The TCC has notified Oconee that the 230 KV transmission system voltage and frequency

has returned to normal and recovery from switchyard isolation may be initiated.

INITIATING CUES:

1. The SRO in the control room instructs you utilize Enclosure 5.3 of APlOl1 (Recovery From

Loss of Power) to recover from the Switchyard Isolation.

2. Procedure steps 1 and 2 have been completed. Begin on step 3.

CRO-600 fnl

Page 5 of 12

START TIME:

-1:

STANDARD:

Step 3

Verify NO ES 1 or 2 actuation on

Unit 1

Unit 2

Unit 3

Oconee unit:

Verify ES 1 or 2 has NOT actuated on Unit 1 by observing the RZ

modules and/or statalarrns. Contact Unit 2 and 3 to determine if ES 1 or

2 has actuated.

Continue to Step 4.

Cue: Unit 2 and 3 have not had an ES actuation.

COMMENTS:

STEQ:

Step 4

Ensure

of the following AUTOlMAN transfer switches in MAN:

STANDARD: Place the Unit I

TA and TB AUTOIMAN transfer switches in MAN

Contact Unit 2 and 3 by phone and have them ensure TA and TB

AUTOlMAN transfer switches in MAN.

Continue to Step 5.

Cue: Unit 2 and 3 TA and TB AUTO/MAN transfer switches are in MANUAL.

COMMENTS:

-

SAT

-

UNSAT

-

SAT

-

UNSAT

CRO-600 fni

Page 6 of 12

_.

STEP 3:

Step 5

Depress all of !he following RESET pushbuttons:

The following RESET pushbuttons are depressed:

Continue to Step 6.

Note: Buttons are located electrical mimic board.

  • Not critical

COMMENTS:

GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL I RESET

GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 2 RESET

'GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 1 RESET

  • GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 2 RESET

STANDARD:

GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 1 RESET

GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 2 RESET

GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 1 RESET

GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 2 RESET

-4:

Step 6

Verify the following statalarms are off:

SA-15/A-2 (CHANNEL #I

UNBERFREBUENCY)

SA-138-4 (CHANNEL #2 UNDERFREQUENCY)

SA-15/C-1 (CHANNEL #I

UNDERVOLTAGE)

SA-15/C-3 (CHANNEL #2 UNDERVOLTAGE)

STANDARD: The above Statalarms are verified to be off. Statalarms are loci

SA-I 5.

Continue to Step 7

COMMENTS:

in

STEP:

Step 7

Notify Keowee Qperator to transfer control of &tJ

Keowee units to

Oconee.

STANDARD: Contact Keowee Operator, by phone, to transfer control of

units to Oconee.

Continue to Step 8.

Keowee

NOTE: Simulator instructor will transfer control of @tJ

Keowee units to Oconee.

COMMENTS:

CRITICAL STEP

-

SAT

UNSAT

il_ SAT

-

UNSAT

CRITICAL STEP

-

SAT

-

UNSAT

STEP 6:

Step 8

Verify both channels of all Oconee units Main Feeder Bus Monitor Relay

Panels reset as indicated by the following statalarms off:

-. .....

S'H~I'CHNL A L ~ G I C

4 (2)(3)SA74/Q-4 (LOAD

SHED CHNL B LOGIC

INITIATE)

~b'S6

CHNL A LOGIC

I

INITIATE

1 (2)(3w-I4/D-6

%

,\\ ,

TO SB CHNL B LQGlC

INITIATE)

... -

STANDARD: Both channels of Oconee unit 1 Main Feeder Bus Monitor Relay Panel is

verified reset as indicated by observing the above statalarms off. Contact

Unit 2 and 3 and have them verify their Main Feeder Buses are reset.

Continue to Step 9.

Cue: Unit 2 and 3 Main Feeder Bus Monitor Panels are reset as indicated by the

above alarms ar@ off.

Note: Unit 1's Main Feeder Bus Monitor Panel has not actuated.

COMMENTS:

STEP 7:

Step 9

Verify overhead Keovfee unit energizing a

Oconee unit MFB

STANDARD:

Determine that Kecwee Unit 1 is energizing Oconee Unit 1 MFBs via the

overhead path, by observing Keowee Unit 1 has emergency started and

ACB-1 is closed energizing unit 1's MFBs.

Continue to Step 10.

COMMENTS:

CRO-600 fnl

Page 7 of 12

-

SAT

UNSAT

CRITICAL STEP

-

SAT

-

UNSAT

CRQ-600 fnl

Page 8 of 12

STEP:

Step 10

GO TO Step 23

Candidate goes to Step 23

STANDARD:

COMMENTS:

STEP:

Step 23

Verify Keowee overhead unit is energizing a Oconee unit MFB.

STANBARD:

Determine that Keovvee Unit 1 is energizing Oconee Unit 1 MFBs via the

overhead path, by observing Keowee Unit 1 has emergency started and

ACB-1 is closed energizing Unit ts MFBs.

Continue to Step 24.

COMMENTS:

STEP IO:

Step 24

Notify Emergency Coordinator to determine which of the following is

desired:

Manually synchronize overhead Keowee unit onto the 230 KV Red

Bus

Disconnect overhead Keowee unit from the 230 KV Yellow Bus and

reconnect (dead bus transfer) 230 KV Yellow Bus to the System Grid

STANDARD:

Call Emergency Coordinator and ask which of the above methods is

desired.

Continue to Step 25

Cue: The Emergency Coordinator determines that manually synchronizing the

overhead Keowee unit onto the 230 KV Red Bus is desired.

COMMENTS:

-

SAT

-

UNSAT

-

SAT

-

UNSAT

-

SAT

-

UNSAT

CRO-GOO fnl

Page 9 of 12

STEP ? I

Step 25

Verify manual Synchronization of the overhead Keowee Unit onto the

System Grid via the 230 KV Red Bus is desired.

Determine from previous discussion with the Emergency Coordinator that

manual synchronization of the overhead Keowee Unit onto the System

Grid via the 230 KV Red Bus is desired.

Continue to Step 26.

STANDARD:

COMMENTS:

STEP 12:

Step 26

Obtain permission from TCC to connect overhead Keowee unit (230 KV

Yellow Bus Supply) to the System Grid.

Cue: The TCC gives permission to connect overhead Keowee unit (230 KV Yeellow

Bus Supply) io ihe System Grid.

STANDARD:

Call the permission from TCC to connect overhead Keowee unit (230 KV

Yellow Bus Supply) to the System Grid.

Continue to Step 27.

COMMENTS:

__ SAT

UNSAT

-

SAT

__ UNSAT

CRO-600 fnl

Page 10 of 12

STEP 13:

Step 27

Perform the followina to svnc and tie overhead Keowee unit (Yellow Bus

Supply) to 230 KV RLd Bds:

Establish communications with Keowee Operations

Depress and hold PCB-8 SYNC push button

Adjust overhead Keowee unit SPEED CHANGER MOTOR to

Synchronize overhead Keowee unit to 230 KV Red Bus.

THEN perform the following:

2. Close PCB-8.

2.

e

WHEN synchronization is achieved,

Release PCB-8 SYNC push button

STANDARD:

The overhead Keowee unit (Yellow Bus Supply) is synced and tied to the

230 KV Red Bus by:

e

Establishing communications with Keowee Operations.

Depressing and holding the PCB-8 SYNC push button.

Cue: The simulator operator will act as a second operator and operate the PCB-8

SYNC butfon. After synchronization is achieved (slow in the fast direction), inform

the candidate to close the PCB.

e

Adjusting the overhead Keowee unit SPEED CHANGER MOTOR to

synchronize overhead Keowee unit to 230 KV Red Bus.

THEN perform the following:

> Close PCH-8 (Red closed light illuminated)

2 Release PCB-8 SYNC push button.

WHEN synchronization is achieved,

Note: The SYNC CHECK provides only indication, NOT protection against out of

phase closure.

Cue: lnform candidate that this task is complete.

COMMENTS:

END TASK

TOP TIME:

CRITICAL STEP

-

SAT

-

UNSAT

CRB-SOOfnl

Page 11 of 12

CRITICAL STEP EXPLANATIONS:

STEP #

Explanation

3

Reset buttons must be pushed to reset the Switchyard Isolation circuit to allow PCBs

to be repositioned.

Oconee must have Keowee control to operate any Keowee Unit.

Must recognize power is coming from a Keowee Unit via the overhead path in order

to transfer power back to the switchyard.

Manually syncing of the Keowee Unit is required to put the Oconee axillaries on the

switchyard.

5

7

I 3

CRO-GOB fnl

Page 12 of 12

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION QF TASK)

INITIAL CONDITIONS:

1. A switchyard isofation has occurred

2. Unit 1 and Unit 2 reactors have tripped

3. Unit 3 remains online at 100% power

4. Power has been restored to Unit 1 and Unit 2's Main Feeder Buses from Keowee Unit 1 via

the overhead power path

5. The TCC has notified Oconee that the 230 KV transmission system voltage and frequency

has returned to normal and recovery from switchyard isolation may be initiated.

INITIATING CUES:

1. The SRO in the control room instructs you utilize Enclosure 5.3 of AP/511 (Recovery From

boss of Power) to recover from the Switchyard Isolation.

2. Procedure steps Z and 2 have been completed. Begin on step 3.

CRO-700 fnl

Page Z of 18

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

CRO-700

Place IC§ In Auto following Loss Of Auto Power

CANDIDATE

EXAMINER

CRO-700 fnl

Page 2 of 18

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

Place ICS In Auto following Loss Of Auto Power

Alternate Path:

Facility JPM #:

KIA Ratinqfs):

System' BWIA02

WA.

M I . 1

Rating: 4.013.8

Task Standard:

Use AP/23 (boss Of ICs Power) Enclosure 5 5 (Placing ICs In Auto) to place the 16s in AUTO following a

Loss Of Auto Power.

Preferred Evaluation Location:

Simulator

In-Plant __

References:

Preferred Evaluation Method:

Perform 2

Simulate __

CRO-700 fnl

Page 3 of 18

SIMULATOR OPERATOR INSTRUCTIONS:

I.

Recall Snap 22 1

2. Import files for CRO-708

3. GotoRUN

CRO-700 fnl

Page 4 of 18

TooIslEquipmenffProcedures Needed:

AW23 (boss Of ICs Power) Enclosure 5.5 (Placing ICs In Auto)

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate lo me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. ICs AUTO power lost

2. AP/23 (Loss of ICs Power) in progress

3. 16s AUTO power has been restored

INITEATING CUES:

The SRO directs you to perform Enclosure 5.5 (Placing 16s in AUTO) to place ALL ICs H/A

stations in AUTO.

CRO-700 fnl

Page 5 of 18

START TIME:

Note: All operations will be performed on the ICs stations located on IUBI.

Step I

Perform a pre-job briefing for AP/l/Ai1700/023 from the pra-job briefing

database.

State that 8 pre-job briefing should be performed.

Continue to Step 2.

STANDARD:

Cue: Inform candidate that the pre-job briefing has been performed.

Note: Candidate will obtain setpoint information from the OAC during this JPM.

COMMENTS:

Step 2

Ensure RATE SET to 0.0

Ensure RATE SET thumbwheel located is set to 0.0

Continue to SteD 3.

STANDARD:

COMMENTS:

_I_ SAT

I_ UNSAT

-

SAT

__ UNSAT

CRO-700 fnl

Page 6 of 18

STEQ:

STANDARD

COMMENTS:

Step 3

Verify TflP setpoint at THP by comparing the following,

RNQ

Ensure the following in HAND:

1A TURBINE BYPASS VALVES

e

1B TURBINE BYPASS VALVES

0 1 E2089 (TURB HBR PRESS SETPOINT)

0 1 E2088 (IC5 SELECTED TURB HDR PRESS)

TURBINE MASTER

Adjust THP setpoint to = THP at the TURBINE MASTER.

Call up the appropriate OAC display (enter GB AP28) anti determine

THP setpoint NOT at J THP and perform RNO.

Verify the above stations are in HAND.

Use the Setpoint knob on the TURBINE MASTER to match THP setpoint

to i- THP while monitoring on the OAC.

Continue to Step 4.

=:

Step 4

Place TURBINE MASTER in AUTO

STANDARD:

TURBINE MASTER is placed in AUTO by depressing the Auto

pushbutton on the TURBINE MASTER Bailey station.

Continue to Step 5

COMMENTS:

STEP:

Step 5

Verify Main Turbine controlling THP.

Verify Main Turbine controlling THP by observing THP being maintained

at setpoint.

Continue to Step 6

STANDARD:

COMMENTS:

CRITICAL STEP

-

SAT

-

UNSAT

CRITICAL STEP

-

SAT

UNSAT

-

SAT

I_

UNSAT

CRO-700 fnl

Page 7 of 18

Step 6

Verify all TBVs are closed.

Verify all TBVs closed by observing the Green closed indication

Continue to Step 7.

STANDARD:

COMMENTS:

Step 7

Ensure all TBVs in AUTO:

1A TURBINE BYPASS VALVES

1B TURBINE BYPASS VALVES

Place TBVs in AUTO by depressing the red AUTO pushbutton and verify

the red AUTO light illuminates and the white HAND light extinguishes.

Continue to Step 8.

STANDARD:

COMMENTS:

Step 8

Verify Tave setpoint at = Tave by comparing the following:

OlE2087 (ICs TAVE SETPOINT)

e

OlE2086 (ICs SELECTED TAVE)

RNO

Ensure the following:

DIAMOND in HAND

e

I A FDW MASTER in HAND

1B FBW MASTER in HAND

STANDA.

COMMENTS:

Call up the appropriate OAC display (enter G- AP28) and determine

Tave setpoint NOT at = Tave and perform RNO.

Verify the above stations are in HAND.

Adjust Tave setpoint to = Tave at the REACTOR MASTER while

mcnitoring on the OAC.

Continue to Step 9

-

SAT

-

UNSAT

CRITICAL STEP

I_ SAT

__ UNSAT

CRITICAL STEP

-

SAT

-

UNSAT

CRO-900 fnl

Page 8 of 18

Step 9

Ensure DIAMOND in MANUAL.

Verify DIAMOND in MANUAL by observing MANUAL light illuminated on

DIAMOND panel.

Continue to Step I O .

STANDARD:

COMMENTS:

STEP I O :

Step 10

Place REACTOR MASTER in AUTO.

REACTOR MASTER is placed in AUTO by depressing the Auto

pushbutton on the REACTOR MASTER Bailey station and verify the red

AUTO light illuminates and the white HAND light extinguishes.

Continue to Step 11

STANDARD:

COMMENTS:

STEP 11 :

Step 11

Verify Neutron Error is 0 f I0h.

Verify Neutron Error is 0 f 1% by observing Neutron Error meter on

IUBI.

Continue to Step 52

STANDARD:

COMMENTS:

. . .

.. .

. ..

..

-

SAT

-

UNSAT

CRITICAL STEP

__ SAT

_I UNSAT

-

SAT

-

UNSAT

CRO-700 fnl

Page 9 of 18

STEP 12:

Step 12

Place DIAMOND in AUTO

STANDARD:

Place DIAMOND in AUTO by depressing the AUTO pushbutton on the

DIAMOND panel pushbutton and verify the AUTO light illuminates and

the HAND light extinguishes. Verify plant parameters do not change.

Continue to Step 13

COMMENTS:

STEP 13:

Step 13

Verify STM GENERATOR MASTER Measured Variable is on the caret.

Place selector switch to Measured Variable and verify the pointer on the

STM GENERATOR MASTER is on the caret.

Continue to Step 14.

STANDARD;

COMMENTS:

STEP 14:

Step 14

Place STM GENERATOR MASTER in AUTO.

STM GENERATOR MASTER is placed in AUTO by depressing the Auto

pushbutton on the STM GENERATOR MASTER Bailey station and verify

the red AUTO light illuminates and the white HAND light extinguishes.

Continue to Step 15

STANDARD:

COMMENTS:

CRITICAL STEP

-

SAT

-

UNSAT

I__ SAT

-

UNSAT

CRITICAL STEP

I

SAT

-

UNSAT

CRO-700 fnl

Page 10 of 18

Verify Delta Tc setpoint at = Delta Tc by comparing the following:

0

0

O1E2091 (ICs DELTA TC SETPOINT)

OlP1608 (RCS NARROW WNGE BELTATC)

STANDARD:

Verify Delta Tc setpoint at = Delta Tc by comparing the above points on

the OAC.

Continue to Step 16

COMMENTS:

STEP 16:

Step 16

Place DELTA Tc station in AUTO.

The DELTA Tc station is placed in AUTO by depressing the Auto

pushbutton on the DELTA Tc Bailey station and verifying the red AUTO

light illuminates and the white HAND light extinguishes.

Continue to Step 17.

STANDARD:

COMMENTS:

STEP 17:

Step 17

Verify 1A FDW MASTER Measured Variable is on the caret.

Place selector switch to Measured Variable and verify the pointer on the

1A FCIW MASTER is on the caret.

Continue to Step 18.

STANDARD:

COMMENTS:

I_

SAT

I_ UNSAT

-

CRITICAL STEP

-

SAT

-

UNSAT

I

SAT

-

UNSAT

CRO-780 fnl

Page 11 of 18

STEP 18:

Step 18

Verify 1 B FBW MASTER Measured Variable is on the caret.

Place selector switch to Measured Variable and verify the pointer on the

1 B FDW MASTER is on the caret.

Continue to Step 19.

STANBARD:

COMMENTS:

NOTE

1A FDW MASTER and 18 FDW MASTER should both be placed in AUTO

....

...

-

.~...

simultaneously.

STEP 19:

Step 19

Place the following in AUTO:

I A FDW MASTER

I B FDW MASTER

The 1A FBW MASTER and 1 B FBW MASTER is placed in AUTO

simultaneously by depressing the Auto pushbuttons on both the 1A FDW

MASTER and I

B FDW MASTER Bailey stations and verifying the red

AUTO lights illuminate and the white HAND lights extinguish.

Continue to Step 20.

STANDARD:

Note: Simultaneous operation is not critical.

COMMENTS:

-

SAT

-

UNSAT

CRITICAL STEP

__ SAT

-

UNSAT

CRO-700 fnl

Page 12 of 18

CAUTION

Changing Total FDW flow will result in Rx power change. Total FDW flow should be

maintained as near constant as possible by adjusting FDW pump speed and FDW control

valve positions.

STEP 20:

Step 20

._..

.. . . .. .

. . .~

Verify lowest FDW VALVE AP = 35 psid

'

STANDARD:

Verify lowest FDW VALVE AP = 35 psid by observing the FBW VALVE

AP gauge.

Continue to Step 21

COMMENTS:

STEP 21 :

Step 21

Verify 18 MAIN FDW PUMP Measured Variable is on the caret.

Place selector switch to Measured Variable and verify the pointer on the

I A MAIN FDW PUMP is on the caret.

Continue to Step 22.

STANDARD:

COMMENTS:

STEP 22:

Step 22

IAAT 1A MAIN FDW PUMP Measured Variable is on the caret,

AND desired in AUTO,

THEN place 1A MAIN FDW PUMP in AUTO.

Place I A MAIN FDW PUMP in AUTO by depressing the AUTO

pushbutton and verify the red AUTO light illuminates and the white HAND

light extinguishes.

Continue to Step 23.

STANDARD:

COMMENTS:

-

SAT

___ UNSAT

__ SAT

-

UNSAT

CRITICAL STEP

___ SAT

-

UNSA?

CRO-700 fnl

Page 13of 18

STEP 23:

Step 23

Verify 18 MAIN FDW PUMP Measured Variable is on the caret.

Place selector switch to Measured Variable and verify the pointer on the

I B MAIN FDW PUMP is on the caret.

Continue to Step 24.

STANDARD:

COMMENTS:

STEP 24:

STANDARD:

COMMENTS:

Step 24

IAAT 16 MAIN FDW PUMP Measured Variable is on the caret,

AND desired in AUTO.

THEN perform the following:

0

Adjust I B MAIN FDW 6UMP bias as required using 0 1 E2092 (FWT

1 B BIAS).

.

Place 1 B MAIN FDW PUMP in AUTO by depressing the AUTO

pushbutton and verify the red AUTO light illuminates and the white HAND

light extinguishes.

Continue toStep 25

Place r E MAIN FDW PUMP in AUTO.

STEP 25:

Step 25

Verify 1 FDW-32 Measured Variable is on the caret

Place selector switch to Measured Variable and verify the pointer on the

1 FDW-32 controller is on the caret.

Continue to Step 26

STANDARD:

COMMENTS:

. .. .

. . . .

-.

.. .. ...

-SAT

-

UNSAT

CRITICAL STEP

-

SAT

__ UNSAT

-

SAT

-

UNSAT

CRO-700 fnl

Page 14of 18

STEP 26:

Step 26

Verify ?FDW-35 Mmsured Variable is on the caret.

Place selector switch to Measured Variable and verify the pointer on the

1 FBW-35 controller is on the caret.

Continue to Step 27.

STANDARD:

COMMENTS:

. ~ ~ . .

_.

.. .

NOTE"

1 FDW-32 and 1 FDW-35 should .. .-.

both be placed in ......

AUTO simultaneously.

~

~

~

~

..

...._.

STEP 27:

Step 27

Place the following in AUTO:

IFDW-32

IFDW-35

The IFDW-32 and IFDW-35 is placed in AUTO simultaneously by

depressing the Auto pushbuttons on both the IFDW-32 and 1FDW-35

Bailey stations and verifying the red AUTO lights illuminate and the M i t e

HAND lights extinguish.

Continue to Step 28

STANDARD:

COMMENTS:

STEP 28:

Step 28

Verify IFDW-41 Measured Variable is on the caret

STANDARD:

Place selector switch to Measured Variable and verify the pointer on the

1 FDW-41 controller is on the caret.

Continue to Step 29.

COMMENTS:

-

SAT

UNSAT

CRlTlCAL STEP

-

SAT

__ UNSAT

~

SAT

-

UNSAT

CRO-900 fnl

Page 15of 18

STEP 29:

Step 29

Verify 1 FDW-44 Measured Variable is on the caret.

Place selector switch to Measured Variable and verify the pointer Qn the

1 FDW-44 controller is on the caret.

Continue to Step 30.

STANDARD:

COMMENTS:

NOTE

1 FDW-41 and 1 FDW-44 should both be placed in AUTO simultaneously.

.

~

-. .. . . ,.

~ ....

STEP 30:

Step 30

Place the following in AUTO:

IFDW-41

IFDW-44

STANDARD:

COMMENTS:

The 1 FDW-41 and 1 FDW-44 is placed in AUTO simultaneously by

depressing the Auto pushbuttons on both the 1 FDW-41 and 1 FDW.

Bailey stations and verifying the red AUTO lights illuminate and the white

HAND lights extinguish.

Continue to Step 31.

STEP 31:

Step 31

Slowly adjust the following as required by unit operation:

Tave

THP

Delta Tc

Adjust the above on 1 UBI as required by unit operation.

Continue to Step 32.

STANDARD:

COMMENTS:

I

SAT

_I UNSAT

CRITICAL STEP

-

SAT

-

UNSAT

I

_

.

SAT

UNSAT

CRO-700 fill

Page 16 of 18

STEP 32:

STANDARD

COMMENTS:

Step 32

Ensure CTPD SET at desired value

Ensure CTPD SET at desired value on 1 UBI.

I_ SAT

___ UNSAT

...

...~..

END

.. TASK

... .

STOP TIME:

CRO-700 fRl

Page 17 of 18

CRITICAL STEP EXPLANATIONS:

STEP tC

Explanation

3

4

7

8

I 0

12

14

16

19

22

24

27

30

The setpoint and the parameter have to be matched to prevent a plant transient as

the ICs is place in AUTO.

Required to place the ICs in AUTO.

Required to place the 16s in AUTO.

The setpoint and the parameter have to be matched to prevent a plant transient as the ICs is

place in AUTO.

Required to place the ICs in AUTO.

Required to place the ICs in AUTO.

Required to place the ICs in AUTO.

Required to place the ICs in AUTO.

Required to place the ICs in AUTO.

Required to place the ICs in AUTO.

Required to place the IC§ in AUTO.

Required to place the IC§ in AUTO.

Required to place the ICs in AUTO.

CRO-700 ftll

Page 18 of 18

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

I

~ ICs AUTO power lost

2. AP/23 (Loss of ICs Power) in progress

3. ICS AUTO power has been restored

INITIATING CUES:

The SRO directs you to perform Enclosure 5.5 (Placing ICs in AUTO) to place ALL ICs H/A

stations in AUTO.

CRO-900 fnl

Page 1 of 13

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

CRO-900

Release GWD Tank

CANDIDATE

EXAMINER

CRO-900 fnl

Page 2 of 13

REGION II

INITIAL LICENSE WAMINATION

JOB PERFORMANCE MEASURE

Task:

Release GWD Tank

Alternate Path:

N

FacilitvJPM #:

WA Rating(&

System: 071

WA:

A426

Rating: 3.1/3.9

Task Standard:

Release a GWD tank correctly using OP1I&2iAl104~018

End 4 9 (GWD

TankRelease)

Preferred Evaluation Location:

Simulator 2

In-Piant __

Preferred Evaluation Method:

Perform

Simulate -

CRO-900 fnl

Page 3 of 13

SIMULATOR OPERATOR INSTRUCTIONS:

Z . Recall IC-30

2. GotoRUN

CRO-900 ffll

Page 4 of 13

TooIslEauipment/Procedu~es Needed:

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be periormed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet i provided you.

INITIAL CONDITIONS:

Release of "B" GWB tank is desired

QP/1&2/N1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to

step 2.3.

INITIATING CUES:

SRO directs you to complete the release of the "B" GWD tank at step 2.3 of Enclosure 4.9.

CRO-900 fnl

Page 5 of 13

START TIME:

Step 2.3

Determine any other GWR(s) are in progress at station.

Determine that no other GWR(s) are in progress at ONS

Continue to Step 2.4

STANDARD:

Cue: No other GWRs are in progress.

COMMENTS:

Step 2.4

EF release will be made at 1/3 station release limit, verify IRIA-45 High

and Alert Alarm setpoints set per PT/0/A/0230/001 (Radiation MonitQr

Check).

STANDARD:

Refer to PT/OIA/0230/001 (Radiation Monitor Check) and verify 1 RIA-45

High and Aiert Alarm setpoints using the RIA View Node.

Continue to Step 2.5

Note: The setpoints will not be correct and will require the candidate to reset them

per PT~02301001.

COMMENTS:

m:

Step 2.5

IF release will be made at 2/3 station release limit:

STANDARD

Determine that this release will be made a 1/3 station limit

N/A steps 2.5.1 - 2.5.5.

Continue to Step 3.1

Cue: If asked inform the candidate as the SRO that this release will be at 5/3 station

limit

COMMENTS:

-

SAT

-

UNSAT

CRITICAL STE

_I SAT

-

UNSAT

SAT

-

UNSAT

CRO-900 fnl

Page 6 of 13

STEP:

Step 3.1

Record background readings for 1 RIA-37 & 1 RIA-38 on Enclosure 4.10

GWD Tank Sample Request.

STANDARD:

Determine background readings for 1 RIA-37 & 1 RIA-38 by observing the

RIA readings on the RIA View Node and record on Enclosure 4.10.

Note: The background readings should be as follows:

ZRIA-37 Background reading is: 45 cps

IRIA-38 Background reading is: 6.6 cps

Continue to Step 3.2

COMMENTS:

....

[%OTE: The RIArequired to terminate release (ILIA within range) must be

1 operable or .....

two independent samples must be taken

._.. (SLG 16.1 1.3).

......

m:

Step 3.2

Recommended 1 RIA-37 and 38 High and Alert setpcints:

e

1 RIA-37

cpm above background

1 RIA-38

cpm above background

Obtain this information from the sample request and record on form.

Continue to Step 3.3

STANDARD:

COMMENTS:

__ SAT

-

UNSAT

I

SAT

-

UNSAT

CRO-900 fnl

Page 7 of 13

STANDARD:

COMMENTS:

STANDARD:

COMMENTS

Step 3.3

Adjust 1 RIA-37 setpoints for release per on6 of the foliowing:

3.3.1 IF above instrument range over-ride 1 RIA-37 setpoints:

o

Set 1 RIA-37 alert setpoint at zero

Set 1 RIA-37 High setpoint at zero

Or

3.3.2 IF required to set alarms:

a

Set 1 RIA-37 Alert setpoint at 4795 cpm

Set 1 RIA-37 High setpoint at 4795 cpm

Determine setpoints for release are NOT above instrument range and

NIA step 3.3.1.

Determine required setpoints by adding background to data from the

sample request and enter it on this form.

Continue to Step 3.4

Step 3.4

Adjust 1 RIA-38 setpoints for release per one of the following:

3.4.1 IF above instrument range over-ride 1 RIA-38 setpoints:

e

Set 1 RIA-38 Alert setpoint at zero

Set 1 RIA-38 High setpoint at zero

Or

3.4.2 IF required to set alarms:

Set 1 RIA-38 Alert setpoint at 31E).6 cpm

Set 1 RIA-38 High setpoint at 319.6 cpm

Determine setpoints for release are NOT above instrument range and

NIA step 3.3.1.

Determine required setpoints by adding background to data from the

sample request and enter it on this form.

Continue to Step 3.5

CRITICAL STE

__ SAT

__ UNSAT

CRITICAL STE

__ SAT

-

UNSAT

CRO-900 fnl

Page 8 of 13

STAN DARD :

COMMENTS:

STANDARD:

COMMENTS:

Step 3.5

Reset WASTE GASTANK DISCH integrator to zero.

Reset WASTE GASTANK DISC# integrator located on 1AB3 to zero by

deprsssing the reset button.

Continue to Step 3.6

Step 3.6

Ensure GWW DISCHARGE FLOW CONTROL in '"HAND".

Ensure GWR DISCHARGE FLOW CONTROL in "HAND" and CLOSED

located on 1AB3.

Verify GWR DISCHARGE FLOW CONTROL "CLOSED"

Continue to Step 3.7

STEP 10:

Step 3.7

Open GWD-100 (Decay Tanks Bischarge Header Block). (A-2-2091E 13'

N of Door)

STANDARD:

Dispatch NE0 to Open GWD-100 (Decay Tanks Discharge Header

Block).

Continue to Step 3.8

Cue: inform candidate that GWD-IO0 is open.

COMMENTS:

I

SAT

__ UNSAT

-

SAT

UNSAT

CRITICAL STEl

-

SAT

-

UNSAT

CRO-900 fnl

Page 9 of 13

STEP 11 :

Step 3.8

IF releasing GWD Tank B perform the following:

e

Open GWD-99 (Decay Tank 1B Discharge Block)

Place GWD-5 (5 GWB TANK DISCHARGE) switch to "AUTO

STANDARD:

Cue: Inform candidate that GWB-99 is open.

Dispatch NE0 to open GWD-99 (Decsy Tank 15 Discharge Block).

Located GWD-5 (B GWD TANK DISCHARGE) on 1863 and place

switch to "AUTO"

Continue to Step 3.9

COMMENTS:

STEP 12:

Steps 3.9 - 3.1 1

IF releasing GWD Tank B perform the following ...

Determine NOT releasing GWD Tank A, C, D and NIA steps 3.8. 3.10,

and 3.1 1.

Continue to Step 3.12

STANDARD:

COMMENTS:

....

~

NOTE: - Station Limit release rates, per SLC 16.11, will NOT be exceeded if

recommended release rates per Enclosure 4.10 "GWD Tank Sample Request"

are followed.

  • Limit and Precautions have ~..~

required approval levels for release.

STEP 13:

Step 3.12

Approval granted for release.

STANDARD:

Obtain approval for release.

Continue to Step 3.13

Cue: Approval is granted for release by Trac:

COMMENTS:

Lemons at current Daterrime.

CRITICAL STEP

-

SAT

-

UNSAT

SAT

__ UNSAT

-

SAT

-

UNSAT

CRO-900 fnl

Page 10 of 13

STEP 14:

Step 3.43

IF releasing at 2/3 Station Limit:

Determine NOT releasing at 2/3 Station Limit by previous cue.

Continue to Step 3.14

STANDARD:

COMMENTS:

STEP 15:

Step 3.14

Recommended Release Rate from Enclosure 4.10 "GWD Tank Sample

Request":

cfm.

Record Recommended Release Rate from Enclosure 4.10 "GWD Tank

Sample Request".

Continue to Step 3.15

STANDARD:

CQMMENPS:

NOTE:

e

e

If U1 Penetration Room Ventilation (PRV) system is shutdown, RIA-32 U1 Penetration

Room sample point does NOT sample general area air properly.

With U1 PRV system shutdown. RIA-32 sample point for U1 Penetration Room is

sampling air in piping between U1 Unit Vent and PRV discharge.

RIA-32 counts may increase when selected to U1 Penetration Room while making a

GWD Release.

STEP 16:

Step 3.15

Place a note on Turnover sheet that RIA-32 Penetration Room sample

point may alarm when selected to U'i Penetration Room during GWD

release.

Candidate should indicate a note should be placed on the Turnover sheet

indicating that RIA-32 Penetration Room sample point may alarm when

selected to U1 Penetration Room during GWD release.

Continue to Step 3.16

STANDARD:

COMMENTS:

I

-

SAT

II_ UNSAT

I

SAT

-

UNSAT

_I SAT

-

UNSAT

CRO-900 fnl

Page I 1 of 13

STEP 17:

Step3.16

Adjust GWR DISCHARGE FLOW CONTROL to obtain desired release

rate.

STANDARD:

Slowly adjust the manual loading knob to obtain the desired release rate.

Continue to Step 3.17

Note: Although the maximum rate is high the actual release rate will be low.

COMMENTS:

STEP 18:

Step 3.17

Record "Begin GWR #

" in Unit Log

STANDARD:

Candidate should indicate a Unit log entry would be made.

COMMENTS:

END

. ~ -

TASK

..

.....

CRITICAL STEP

-

SAT

-

UNSAT

I

SAT

-

UNSAT

STOP TIME:

CRO-900 fnl

Page 120f 13

CRITICAL STEP EXPLANATIONS:

STEP #

Explanation

2

6

7

10

2 1

17

Required to set RIA to prevent station release above limits.

Required to set RIA to prevent station release above limits.

Required to set RIA to prevent station release above limits.

Required to align release flow path.

Required to align release flow path.

Required to align release flow path.

CRO-900 fnl

Page 13 of 13

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Release of "5" GWD tank is desired

OQ/l&2/A/1104/818, Endosure 4.9 (GWD Tank Release) is in progress and completed up to

step 2.3.

INITIATING CUES:

SRQ directs you to complete the release of the "B" GWD tank at step 2.3 of Enclosure 4.9.

NLO-036 fnl

Page 1 of 10

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

NLO-036

STARTUP A VITAL BUS INVERTER

CANDIDATE

EXAMINER

NLO-036 fnl

Page 2 of 10

REGION II

INlTiAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

STARTUP A VITAL BUS INVERTER

Alternate Path:

N

Facilitv JPM #

N

WA Ratinds):

System: 062

WA:

A3.04

Rating: 2.9/2.9

Task Standard:

Vital Bus Inverter placed in service correctly

Preferred Evaluation Location:

Simulator -

In-Plant

X

Perform -

Simulate

References:

OP/l,2,3/A/t 107/04. Enclosure 4 2 (Startup Of The Vital Bus Inverters)

Validation Time: 3 minutes

Time Critical: NO

Preferred Evaluation Method:


____-_____________---ssssss_______ss------------------------------------------

_ ~ ~ ~ ~ _ _ _ _ _ ~ _ _ ~ ~ ~ ~ ~ _ _ ~ - - - s s s s s s _ _ _ _ _ _ _ _ ~ ~ ~ ~ ~ ~ ~ ~ ~ - - - - - ~

Candidate:

Time Start,

NAME

Time Finish.

Performance Ratins SAT

~

UNSAT -

Performance Time -

Examiner:

I--

NAME

SIGNATURE

DATE

NLO-036 fnl

Page 3 of 10

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

ToolslEquipmentIProcedures Needed:

NLO-036 fnl

Page4of10

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Earkies today the 1DIB Vital Bus Inverter was shutdown for maintenance. I & E personnel

have just notified the Control Room SRO that they have completed their work on the inverter.

The affected I2OVAC Vital Instrumentation Power Panelboard is being supplied by Regulated

AC Panelboard KRA.

INITIATING CUE

The Control Room SRQ directs you to startup IDIB Vital Bus Inverter per OPlllNZ 107/04

(Enctosure 4.2). DC Power to the inverter has

Begin at Step 2.1.

been isolated.

START TIME:

Step 2.1

IF DC power to the inverter has been isolated, close breaker #33 on the

associated DC paneiboard.

Determine that DC power to the inverter has not been isolated by

referring to the initial conditions.

Continue to Step 2.2.

STANDARD:

CUE: Indicate to candidate that breaker #33 is closed.

COMMENTS:

Step 2.2

Press the PRECHARGE SWITCH pushbutton until the PRECHARGE

light comes on.

STANDARD:

The candidate depresses the PRECHARGE SWITCH pushbutton untii

the PRECHARGE light comes on.

CUE: Indicate to the student that the PRECHARGE light is ON.

Continue to Step 2.3.

COMMENTS:

NbQ-036 fnl

Page 5 of 10

-

SAT

-

UNSAT

CRITICAL TASK

-

SAT

-

UNSAT

Step 2.3

CLOSE the DC INPUT circuit breaker and verify Vital Bus INVERTER

OUTPUT voltage increases to approximately 120 volts AC.

STANDARD:

Cue: indicate to the student that the DC INPUT breaker is ifl the ON position.

The DC INPUT circuit breaker is CLOSED

INVERTER OUTPUT voltmeter, AC volts, is observed and verified to

indicate approximately 120 volts AC.

Cue: indicate to student that inverter voltage iNCREASES from 0 to 120 volts AC,

as indicated on the INVRTER OUTPUT voltmeter.

Continue to Step 2.4.

COMMENTS:

Step 2.4

CLOSE the INVERTER OUTPUT circuit breaker.

STANDARD:

CUE: indicate to the student that the INVERTER OUTPUT breaker is in the ON

position.

The INVERTER OUTPUT circuit breaker is CLOSED

Continue to Step 2.5.

COMMENTS:

NLO-036 fnl

Page 6 of 10

CRITICAL TASK

I

SAT

-

UNSAT

CRITICAL TASK

-

SAT

UNSAT

Step 2.5

VERIFY the IN SYNC light is on.

Green IN SYNC light is verified ON.

STANDARD:

CUE: indicate to student that IN SYNC light is ON.

Continue to Step 2.6.

COMMENTS:

Step 2.6

POSITION the MANUAL BYPASS SWITCH to the NORMAL SOURCE

position.

Student rotates the Manual Bypass Switch from the ALTERNATE

SOURCE position to the NORMAL SOURCE position.

STANDARD:

Cue: lndicate to the sfudenf that the Maflual Bypass Switch is in the NORMAL

SOURCE position.

Continue to Step 2.7.

COMMENTS:

NLO-036 fnl

Page 7 of 10

-

SAT

I

UNSAT

CRITICAL TASK

_I_ SAT

-

UNSAT

Step 2.7

VERIFY the following indications:

INVERTER OUTPUT volt meter = 120 volts

Inverter Output frequency meters 60 Hz

INVERTER OUTPUT amp meter increases and stabilizes to match

SYSTEM OUTPUT amp meter.

e

The following indications are verified:

INVERTER OUTPUT volts - 120

STANDARD:

INVERTER OUTPUT frequency = 60 tiz.

INVERTER OUTPUT amp meter increases and stabilizes to match

SYSTEM OUTPUT amp meter.

Cue: Provide the following indications to the student:

INV. OUTPUT volts f20.

INV. OUTPUT freq. 60.

INV. OUTPUT amps 20 - 40.

SYS. OUTPUT amps 20 - 40.

COMMENTS:

.....

END TASK

......

. ..

NLO-036 fnl

Page 8 of 10

-

SAT

-

UNSAT

STOP TIME:

CRITICAL STEP EX-PLANATIONS:

NLO-036 fnl

Page 9 of 10

STEP #

Explanation

2

Recharge input filter capacitor prevents a large increase in current when the inverter

is placed on line.

3

Closing the DC input breaker supplies DC input to the inverter.

4

Closing this breaker connects the inverter output to the input of the autotransformer.

6

Selecting NORMAL Source with the Manual Bypass Switch causes a make before

break transfer to the inverter output placing the inverter in service.

NLO-036 fnl

Page 10 of 10

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Earlier today the 1DIB Vital Bus Inverter was shutdown for maintenance. I & E personnel

have just notified the Control Room SRO that they have completed their work on the inverter.

The affected I20VAC Vital Instrumentation Power Panelboard is being supplied by Regulated

AC Panelboard KKA.

lNlTIATlNG CUE:

The Control Room SRQ directs you to startup IDIB Vital Bus Inverter per OP/l/Ail107/04

(Enclosure 4.2). DC Power to the inverter has ROf been isolated.

Begin at Step 2.1

NLO-039 fnl

Page 1 of 10

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

N LO-039

PRIME THE SPENT FUEL POOL FILL LINE

CANDIDATE

EXAMBUER

NbO-039 fnl

Pags 2 of 10

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

PRIME THE SPENT FUEL POOL FILL LINE

Alternate Path:

Facilihr JPM #:

KIA Ratinnb):

System: APE022

KIA:

AK3.02

Rating. 3.5/3.8

Task Standard:

SFP Priming Pump is aligned and started

Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator -

In-Plant

X

Perform -

Simulate X

References:

EOP Enclosure "HPI Pump Operations from ASW Pump Switchgear"

Candidate:

I

-

Time Start:

NAME

Time Finish:

Performance Time

~

Performance RatinR: SAT-

UNSAT -

Examiner:

I

NAME

SIGNATURE

DATE

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

Nb0-039 fnl

Page 3 of 10

__

Tools/auipmenffProcedu~~s

Needed:

NLO-039 fnl

Pageeof 10

READ TO OPERATOR

DlRECTlON TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I wil[

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A tornado has struck Unit 2 Turbine Building and destroyed the 4160 volt switchgear TC, TD,

and TE.

it also struck the Unit 2 BWST, rupturing and draining it.

The SSF Reactor Coolant Makeup Pump failed to start.

2A HPIP has been powered from the ASW switchgear.

The Spent Fuel Pool level is currently +I

.Q feet.

INITIATING CUES:

The EOP directs the operator to perform "HPI Pump Operation From ASW Pump Switchgear"

Enclosure to align HPlPs to the SFP.

Another operator is aligning the HPI Suction from the SFP.

The Control Room SRO directs you to prime the Spent Fuel Pool fill line on Unit 2 per this

Enclosure, beginning at Step 20.

NLO-039 fnl

Page 5 of 10

START TIME:

Step 20

Obtain bucket and rope from EOP equipment locker U2AB5. (A-5.

U2

elevator lobby)

Locate EOQ equipment locker U2AB5 located at A-5, U2 elevator lobby

and idcaite that you would obtain a bucket and rope from the locker.

Continue to Step 21.

STANDARD:

Cue: Inform candidate that opening the docker is not rqUiFed.

COMMENTS:

-2:

Step 21A

Connect SF priming pump suction hose to quick disconnect fitting at SF-

86 (SF PRIMING PUMP SEAL WATEK INLET)

STANDARD:

Candidate connects suction hose to quick disconnect fitting at SF-86, 01

verifies it is connected

Continue to Step 21 B.

COMMENTS:

STEP:

Step 21 B

Connect ths Spent Fuel Priming Pump suction hose to the Spent Fuel

Pool Fill line connection tap on SF-85 (SF PRIMING PUMP

UNDERWATER SUPPLY BLOCK).

Verify the Spent Fuel Priming Pump suction hose to the Spent Fuel Pool

Fill line connection tap on SF-85 (SF PRIMING PUMP UNDERWATER

SUPPLY BLOCK) is connected.

STANDARD:

Continue to Step 21C

COMMENTS:

-

SAT

_I UNSAT

-

SAT

I_ UNSAT

I

SAT

-

UNSAT

NLO-039 fnl

Page 6 of 10

-4:

Step 21C

Open SF-85 (SF PRIMING PUMP UNDRWATER SUPPLY BLOCK)

The student locates and opens SF-85 (Pool Underwater Supply Block to

Priming Pump) by rotating valve operator until handle is parallel with pipe.

Continue to Step 210.

STANDARD:

Note: There is a special tool for operating SF-85 and SF-84 hanging at the South

end of the Spent Fuel Pool.

COMMENTS:

-5:

Step 21 D

Place the flex hose on the discharge of the SF Priming Pump into the

SFP.

STANDARD:

The student (simulates) placing the free end of discharge hose into the

Spent Fuel Peel.

Continue to Step 21E.

COMMENTS:

a:

Step 21 E

CLOSE SF-84 (SF POOL UNDERWATER SUPPLY VENT)

SF-84 (SF Pool Underwater Supply Vent) is CLOSED by rotating valve

operator until handle is perpendicular to pipe.

Continue to Step 21 F.

STANDARD:

Note: There is a special tool for operating SF-85 and SF-84 hanging at the South

end of the Spent Fuel Pool.

COMMENTS:

CRITICAL

__ SAT

-

UNSI

~

SAT

-

UNSC

SAT

-

_I UNSF

STEQ:

Step 21 F

Fill the SF Priming Pump Seal Tank to at least half-full with DW or water

from SFP using bucket.

The candidate fills the SF Priming Pump Seal Tank at least half-full using

DW from the North-West end of the SFP or by using the rope and bucket

to dip out of the SFP.

STANDARD:

Note: It will take several buckets of water to fill the SF Priming Pump Seal Tank

half-full.

Continue to Step 22

CUE: Communications have been established with operators at the ASWPump

Room and East Penetration Room.

COMMENTS:

Step 22

WHEN communication is established with operators in the following

locations:

ASW Pump Room

East Pen Room

THEN open SF-86 (SF PRIMING PUMP SEAL WATER INLET)

STANDARD:

Determine communications have been established with the above

locations and then open SF-86 (SF PRIMING PUMP SEAL WATER

INLET).

Continue to Step 23.

Cue: Communications have been established.

COMMENTS:

Nb0-039 fnl

Page 7 of 10

CRITICAL TASK

-

SAT

-

UNSAT

CRITICAL TASK

-

SAT

-

UNSAT

NbO-039 fnl

Page 8 of I O

-9:

Step 23

Notify operator in ASW pump Rm to start U1/2 SF PRIMING PUMP

(remote starter on S wall)

STANDAKD:

Notify operator in ASW pump Rm to start U112 SF PRIMING PUMP

Continue to Step 24.

Cue: The UV2 SF PRMNG PUMP is operafing.

COMMENTS:

STEP IO:

Step 24

IAAT seal tank level begins to rise,

THEN close SF-86 (SF PRIMING PUMP SEAL WATER INLET)

STANDARD:

Monitor seal tank level and determine it is NOT rising

Continue to Step 25.

Cue: Seal tank level is NOT rising.

COMMENTS:

STEP 11 :

Step 25

WHEN SFP fill line is primed (as indicated by a steady discharge stream

from the SF priming pump),

THEN notify Control Room of the following:

HPI suction aligned to SFP fill line

HPI pump cooling water status

An operator is available in the E Pen Rm to throttle 1 HP-26

Monitor the hose attached to the SF priming pump discharge and

determine the SFP line is primed.

THEN

Notify the Control Room the HPI suction is aligned to SFP fill line.

STANDARD:

Cue: The SFpriming pump has steady discharge stream.

Cue: Notifying the Control of the last two bulieted items is not required for this

JPM.

COMMENTS:

L...

..~~.

.-.

__.__

END TASK

STOP TIME:

CRITICAL TASK

-

SAT

__ UNSAT

_I SAT

-

UNSAT

-

SAT

__ UNSAT

NLO-039 fnl

Page 9 of 10

CRITICAL STEP EXPLANATIONS:

STEP #

Explanation

Necessary to provide suction to the priming pump.

Tank must be %full to provide adequate water for priming

Required to provide flow path.

Priming pump must operate to fill the line.

4

7

8

9

NLO-039 fnl

Page 20 of 10

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

A tornado has struck Unit 2 Turbine Building and destroyed the 4160 volt switchgear TC, TB,

and TE.

it also struck the Unit 2 BWST, rupturing and draining it.

The SSF Reactor Coolant Makeup Pump failed to start.

2A HPlP has been powered from the ASW switchgear.

The Spent Fuel Po01 level is currently +I .Q feet.

INITIATING CUES:

The EOP directs the operator to petform HPI Pump Operation From ASW Pump Switchgear

Enclosure to align HPlPs to the SFP.

Another operator js aiigning the HPI Suction from the SFP.

The Control Room SRO directs you to prime the Spent Fuel Pool fill line on Unit 2 per this

Enclosure, beginning at Step 20.