{{#Wiki_filter:June 11, 2019
{{#Wiki_filter:June 11, 2019  
Mr. Eric Larson, Site Vice President
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Mr. Eric Larson, Site Vice President  
Port Gibson, MS 39150
Entergy Operations, Inc.  
SUBJECT:         GRAND GULF NUCLEAR STATION - NOTIFICATION OF INSPECTION (NRC
Grand Gulf Nuclear Station  
                INSPECTION REPORT 05000416/2019003) AND REQUEST FOR
P.O. Box 756  
                INFORMATION
Port Gibson, MS 39150  
Dear Mr. Larson:
During the week of August 12, 2019, two inspectors from the Nuclear Regulatory
SUBJECT:  
Commissions (NRC) Region IV office will perform the baseline biennial requalification
GRAND GULF NUCLEAR STATION - NOTIFICATION OF INSPECTION (NRC  
inspection at Grand Gulf Nuclear Station, using NRC Inspection Procedure 71111.11B,
INSPECTION REPORT 05000416/2019003) AND REQUEST FOR  
Licensed Operator Requalification Program.
INFORMATION  
Experience has shown that this inspection is a resource intensive inspection both for the NRC
inspectors and your staff. In order to minimize the impact to your onsite resources and to
Dear Mr. Larson:  
ensure a productive inspection, we have enclosed a request for documents needed for this
inspection. These documents have been divided into three groups:
During the week of August 12, 2019, two inspectors from the Nuclear Regulatory  
    *   The first group (Section A of the enclosure) identifies information to be provided prior to
Commissions (NRC) Region IV office will perform the baseline biennial requalification  
        the inspection to ensure that the inspectors are adequately prepared.
inspection at Grand Gulf Nuclear Station, using NRC Inspection Procedure 71111.11B,  
    *   The second group (Section B of the enclosure) identifies the information the inspectors
Licensed Operator Requalification Program.  
        will need upon arrival at the site.
    *   The third group (Section C of this enclosure) identifies the items which are necessary to
Experience has shown that this inspection is a resource intensive inspection both for the NRC  
        close out the inspection and are usually sent a few weeks after the team has left the site.
inspectors and your staff. In order to minimize the impact to your onsite resources and to  
It is important that all of these documents are up-to-date and complete in order to minimize the
ensure a productive inspection, we have enclosed a request for documents needed for this  
number of additional documents requested during the preparation and/or the onsite portions of
inspection. These documents have been divided into three groups:  
the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
*  
that our regulatory contact for this inspection will be Mr. Mark Pait of your training organization.
The first group (Section A of the enclosure) identifies information to be provided prior to  
Our inspection dates are subject to change based on your updated schedule of examination
the inspection to ensure that the inspectors are adequately prepared.  
activities. If there are any questions about this inspection or the material requested, please
contact the lead inspector Thomas J. Farina, at (817) 200-1117 (thomas.farina@nrc.gov).
*  
The second group (Section B of the enclosure) identifies the information the inspectors  
will need upon arrival at the site.  
*  
The third group (Section C of this enclosure) identifies the items which are necessary to  
close out the inspection and are usually sent a few weeks after the team has left the site.  
It is important that all of these documents are up-to-date and complete in order to minimize the  
number of additional documents requested during the preparation and/or the onsite portions of  
the inspection.  
We have discussed the schedule for these inspection activities with your staff and understand  
that our regulatory contact for this inspection will be Mr. Mark Pait of your training organization.
Our inspection dates are subject to change based on your updated schedule of examination  
activities. If there are any questions about this inspection or the material requested, please  
contact the lead inspector Thomas J. Farina, at (817) 200-1117 (thomas.farina@nrc.gov).  


E. Larson                                   2
This letter does not contain new or amended information collection requirements subject
E. Larson  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
2  
collection requirements were approved by the Office of Management and Budget, control
number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to
This letter does not contain new or amended information collection requirements subject
respond to, a request for information or an information collection requirement unless the
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
requesting document displays a currently valid Office of Management and Budget control
collection requirements were approved by the Office of Management and Budget, control  
number.
number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to  
This letter, its enclosure, and your response (if any) will be made available for public inspection
respond to, a request for information or an information collection requirement unless the  
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
requesting document displays a currently valid Office of Management and Budget control  
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
number.
Withholding.
                                                  Sincerely,
This letter, its enclosure, and your response (if any) will be made available for public inspection  
                                                  /RA/
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document  
                                                  Gregory E. Werner, Chief
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for  
                                                  Operations Branch
Withholding.  
                                                  Division of Reactor Safety
Docket No. 50-416
License No. NPF-29
Sincerely,  
Enclosure:
Biennial Requalification Inspection
   Request for Information
/RA/  
Gregory E. Werner, Chief  
Operations Branch
Division of Reactor Safety  
Docket No. 50-416  
License No. NPF-29  
Enclosure:  
Biennial Requalification Inspection  
   Request for Information  


                                    Initial Request for Information
                                  Biennial Requalification Inspection
                                      Grand Gulf Nuclear Station
Inspection Report:                         05000416/2019003
Enclosure
Inspection Dates:                         August 12 - 16, 2019
Inspection Procedure:                     IP 71111.11B, Licensed Operator Requalification
Initial Request for Information  
                                          Program
Biennial Requalification Inspection  
Lead Inspector:                           Thomas J. Farina, Operations Engineer
Grand Gulf Nuclear Station  
A. The following information is requested in order to support inspection preparation
 
    activities. These items are listed by section as they appear in the inspection module
Inspection Report:
    (i.e. 03.04a, 03.04b, etc.). Requested materials should be sent in an electronic format
05000416/2019003  
    on CD/DVD in order to arrive at the Region IV office no later than August 1, 2019.
 
        *   CD/DVD to: US Nuclear Regulatory Commission, Region IV
Inspection Dates:  
                            ATTN: Thomas Farina
August 12 - 16, 2019  
                            1600 E. Lamar Blvd
                            Arlington, TX 76011
Inspection Procedure:  
    General Requests:
IP 71111.11B, Licensed Operator Requalification  
        *   List of all licensed operators (SRO & RO) by crew (operating & staff)
Program  
        *   Training and Operations Department organization charts (with qualified LOR
            evaluators identified)
Lead Inspector:  
        *   Procedures that identify process for revising and maintaining LO continuing training
            program up-to-date
        *   List of outstanding LOR program changes
Thomas J. Farina, Operations Engineer  
        *   List of plant events and industry operating experience incorporated into LOR
            program since last BRQ (August 4, 2017)
        *   Audits and/or self-assessment reports addressing the licensed operator
A. The following information is requested in order to support inspection preparation  
            requalification training program
activities. These items are listed by section as they appear in the inspection module  
        *   Last two years of Simulator Review Committee (or equivalent) meeting minutes
(i.e. 03.04a, 03.04b, etc.). Requested materials should be sent in an electronic format  
        *   Last two years of Curriculum Review Committee (or equivalent) meeting minutes
on CD/DVD in order to arrive at the Region IV office no later than August 1, 2019.  
        *   A summary report of all condition reports related to operator actions/errors in the
            control room
*  
                                                                                      Enclosure
CD/DVD to: US Nuclear Regulatory Commission, Region IV  
ATTN: Thomas Farina  
1600 E. Lamar Blvd  
Arlington, TX 76011  
General Requests:  
*  
List of all licensed operators (SRO & RO) by crew (operating & staff)  
*  
Training and Operations Department organization charts (with qualified LOR  
evaluators identified)  
*  
Procedures that identify process for revising and maintaining LO continuing training  
program up-to-date  
*  
List of outstanding LOR program changes  
*  
List of plant events and industry operating experience incorporated into LOR  
program since last BRQ (August 4, 2017)  
*  
Audits and/or self-assessment reports addressing the licensed operator  
requalification training program  
*  
Last two years of Simulator Review Committee (or equivalent) meeting minutes  
*  
Last two years of Curriculum Review Committee (or equivalent) meeting minutes  
*  
A summary report of all condition reports related to operator actions/errors in the  
control room  


  *   Any revised requalification training that was based on licensed operator performance
      issues
2
03.04a: Biennial Requalification Written Examinations
  *   The current and approved biennial written examination schedule
*  
  *   The current requalification cycle written examination results for both SRO & RO that
Any revised requalification training that was based on licensed operator performance  
      have already been administered up to the week prior to the inspection team arrival
issues  
      onsite
  *   All written examinations that have been approved for administration up to and
03.04a: Biennial Requalification Written Examinations  
      including the week before the inspection team is onsite. This will need to have
      adequate password protection or double envelope protection if mailed via regular
*  
      mail per NUREG-1021
The current and approved biennial written examination schedule
  *   The current requalification cycle examination methodology (sample plan)
03.04b: Annual Requalification Operating Tests
*  
  *   The schedule for the operating tests (JPMs & scenarios) to be given the week of
The current requalification cycle written examination results for both SRO & RO that  
      August 12, 2019 (week team is onsite)
have already been administered up to the week prior to the inspection team arrival  
  *   The operating tests (JPMs & scenarios) (password protected and provide separately
onsite  
      via telephone at later date) to be given the week of August 12, 2019
  *   Current requalification cycle operating tests (SRO & RO) and results up to the week
*  
      prior to the inspection team arrival onsite
All written examinations that have been approved for administration up to and  
  *   All 2018 NRC required annual operating tests
including the week before the inspection team is onsite. This will need to have  
  *   Current requalification cycle operating test methodology (sample plan)
adequate password protection or double envelope protection if mailed via regular  
03.04c: Administration of an Annual Requalification Operating Test
mail per NUREG-1021  
  *   All procedures used to administer the annual operating test
  *   All procedures used to assess operator performance
*  
  *   All procedures that describe conduct of simulator training
The current requalification cycle examination methodology (sample plan)  
  *   All procedures used to test, operate, and maintain the simulator
03.04d: Requalification Examination Security
03.04b: Annual Requalification Operating Tests  
  *   Submit any tracking tools that you use as a means to prevent excessive overlap on
      the written examinations and also meet the intent of sampling all required topics on a
*  
      periodic basis.
The schedule for the operating tests (JPMs & scenarios) to be given the week of  
  *   Submit any tracking tools that you use as a means to prevent excessive overlap on
August 12, 2019 (week team is onsite)  
      the operating tests and also meet the intent of sampling all required malfunctions
      (including major events, instrument/component malfunctions, TS calls, etc.) on a
*  
      periodic basis.
The operating tests (JPMs & scenarios) (password protected and provide separately  
                                              2
via telephone at later date) to be given the week of August 12, 2019  
*  
Current requalification cycle operating tests (SRO & RO) and results up to the week  
prior to the inspection team arrival onsite  
*  
All 2018 NRC required annual operating tests  
*  
Current requalification cycle operating test methodology (sample plan)  
03.04c: Administration of an Annual Requalification Operating Test  
*  
All procedures used to administer the annual operating test  
*  
All procedures used to assess operator performance  
*  
All procedures that describe conduct of simulator training  
*  
All procedures used to test, operate, and maintain the simulator  
03.04d: Requalification Examination Security  
*  
Submit any tracking tools that you use as a means to prevent excessive overlap on  
the written examinations and also meet the intent of sampling all required topics on a  
periodic basis.
*  
Submit any tracking tools that you use as a means to prevent excessive overlap on  
the operating tests and also meet the intent of sampling all required malfunctions  
(including major events, instrument/component malfunctions, TS calls, etc.) on a  
periodic basis.  


  *   All procedures that describe examination security, including procedures used to
      develop the examinations that include guidelines on overlap between examinations
3
      in current exam cycle tests and prior year examinations
  *   List of all condition reports since the last biennial requalification inspection related to
*  
      examination security and overlap
All procedures that describe examination security, including procedures used to  
03.04e: Remedial Training and Re-Examinations
develop the examinations that include guidelines on overlap between examinations  
  *   List of remedial training conducted or planned since last requalification exam
in current exam cycle tests and prior year examinations  
      (includes training provided to operators to enable passing requalification exam and
      training provided to correct generic or individual weaknesses observed during
*  
      previous requalification exam cycle)
List of all condition reports since the last biennial requalification inspection related to  
  *   Remediation plans (lesson plans, reference materials, and attendance
examination security and overlap  
      documentation)
03.04f: Operator License Conditions
03.04e: Remedial Training and Re-Examinations  
  *   All procedures and program documentation for maintaining active operator licenses,
      tracking training attendance, and ensuring medical fitness of licensed operators
*  
  *   All procedures and associated documentation that supports reactivation of any
List of remedial training conducted or planned since last requalification exam  
      SRO/RO license (operating or staff crew) since the last biennial inspection
(includes training provided to operators to enable passing requalification exam and  
03.04g: Control Room Simulator
training provided to correct generic or individual weaknesses observed during  
  *   All simulator management and configuration procedures if not already provided
previous requalification exam cycle)  
  *   Simulator discrepancy report summary list for all open discrepancy reports and
      summary list for those items closed since August 4, 2017
*  
  *   Primary parameters tested in order to verify core physics parameters (such as
Remediation plans (lesson plans, reference materials, and attendance  
      moderator temperature coefficient, integral rod worth). The applicable reference
documentation)  
      graphs from the plant physics data book (electronic or other means as available)
      should also be included as well as the test procedures used and the acceptance
03.04f: Operator License Conditions  
      criteria with results.
  *   All simulator modification packages that are on hold, delayed, or not completed in the
*  
      last two years
All procedures and program documentation for maintaining active operator licenses,  
  *   A list of simulator modification packages completed in the last two-year window
tracking training attendance, and ensuring medical fitness of licensed operators  
  *   An index of the most recent operability test packages required by ANSI 3.5 2009
      Appendix B, including performance and approval dates, and results
*  
  *   An index of simulator baseline data sources (ANSI 3.5 2009 5.1.1) for the transient
All procedures and associated documentation that supports reactivation of any  
      performance tests required by ANSI 3.5 2009 Appendix B.2.2.1
SRO/RO license (operating or staff crew) since the last biennial inspection  
  *   An index of Post-Event Simulator Tests conducted since August 4, 2017
                                              3
03.04g: Control Room Simulator  
*  
All simulator management and configuration procedures if not already provided
*  
Simulator discrepancy report summary list for all open discrepancy reports and  
summary list for those items closed since August 4, 2017  
*  
Primary parameters tested in order to verify core physics parameters (such as  
moderator temperature coefficient, integral rod worth). The applicable reference  
graphs from the plant physics data book (electronic or other means as available)  
should also be included as well as the test procedures used and the acceptance  
criteria with results.  
*  
All simulator modification packages that are on hold, delayed, or not completed in the  
last two years  
*  
A list of simulator modification packages completed in the last two-year window  
*  
An index of the most recent operability test packages required by ANSI 3.5 2009  
Appendix B, including performance and approval dates, and results  
*  
An index of simulator baseline data sources (ANSI 3.5 2009 5.1.1) for the transient  
performance tests required by ANSI 3.5 2009 Appendix B.2.2.1  
*  
An index of Post-Event Simulator Tests conducted since August 4, 2017  


B. The following information is requested in order to support the onsite inspection
  activities. Requested materials should be available to the inspection team, either
4
  electronically or hardcopy, upon site arrival on August 12, 2019.
  03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written
B. The following information is requested in order to support the onsite inspection  
          Exam and Annual Requalification Operating Tests Quality
activities. Requested materials should be available to the inspection team, either  
      *   All operating tests (JPMs & scenarios) to be given in all subsequent weeks after
electronically or hardcopy, upon site arrival on August 12, 2019.  
          onsite week, if available
      *   All results up to the day the team leaves the site
03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written  
  03.04f: Conformance with Operator License Conditions
Exam and Annual Requalification Operating Tests Quality  
      *   Access to licensed operators records (operating and staff crews)
      *   Access to licensed operators training attendance records
*  
      *   Access to licensed operators medical records
All operating tests (JPMs & scenarios) to be given in all subsequent weeks after  
  03.04g: Control Room Simulator Performance
onsite week, if available  
      *   Simulator discrepancies since August 4, 2017. This should include all open and
          closed simulator discrepancy reports, including the documentation/justification for
*  
          closure.
All results up to the day the team leaves the site  
      *   Acceptance test documentation, including hardware and software model revisions at
          the time of acceptance (as available)
03.04f: Conformance with Operator License Conditions  
      *   Documentation that validates current models, including the thermal-hydraulics and
          neutronics models, to the actual plant
*  
      *   All current model deficiencies, including final safety analysis report vs design
Access to licensed operators records (operating and staff crews)  
          differences in the simulator (any documentation on this)
*  
      *   Summary list of modifications since August 4, 2017
Access to licensed operators training attendance records  
      *   Plant modifications (both hardware and software) completed on the simulator by due
*  
          date since August 4, 2017
Access to licensed operators medical records  
      *   Simulator differences lesson plan used in training (current as of August 12, 2019)
      *   The complete book of all simulator annual performance test packages (usually in a
03.04g: Control Room Simulator Performance  
          single book but may be electronic or in single test packages), complete with all
          transient tests, steady state tests, and malfunction tests. This should also include
*  
          the test procedures for each test, the acceptance criteria, and results. For each
Simulator discrepancies since August 4, 2017. This should include all open and  
          transient test, the reference chart should be included or an equivalent subject matter
closed simulator discrepancy reports, including the documentation/justification for  
          expert review versus the simulator results with a write-up for any differences beyond
closure.  
          the ANSI standard requirements.
      *   All test packages used to verify core physics parameters (such as moderator
*  
          temperature coefficient and integral rod worth). The applicable reference graphs
Acceptance test documentation, including hardware and software model revisions at  
                                                  4
the time of acceptance (as available)  
*  
Documentation that validates current models, including the thermal-hydraulics and  
neutronics models, to the actual plant
*  
All current model deficiencies, including final safety analysis report vs design  
differences in the simulator (any documentation on this)  
*  
Summary list of modifications since August 4, 2017  
*  
Plant modifications (both hardware and software) completed on the simulator by due  
date since August 4, 2017  
*  
Simulator differences lesson plan used in training (current as of August 12, 2019)  
*  
The complete book of all simulator annual performance test packages (usually in a  
single book but may be electronic or in single test packages), complete with all  
transient tests, steady state tests, and malfunction tests. This should also include  
the test procedures for each test, the acceptance criteria, and results. For each  
transient test, the reference chart should be included or an equivalent subject matter  
expert review versus the simulator results with a write-up for any differences beyond  
the ANSI standard requirements.  
*  
All test packages used to verify core physics parameters (such as moderator  
temperature coefficient and integral rod worth). The applicable reference graphs  


          from the plant physics data book (electronic or other means as available) should also
          be included as well as the test procedures used and the acceptance criteria with
5
          results.
      *   All simulator tests, configuration management, and related documents available in
from the plant physics data book (electronic or other means as available) should also  
          the room for inspectors to review. This includes training needs analysis packages,
be included as well as the test procedures used and the acceptance criteria with  
          Simulator Review Committee meeting minutes, etc.
results.  
      *   Current copy of ANSI 3.5 standard you are committed to for simulator testing
C. Grand Gulf Nuclear Station is required to send the final results summary (see Table 1
*  
  below) and any remaining exams and operating tests that have not been reviewed to
All simulator tests, configuration management, and related documents available in  
  the regional office lead inspector for this inspection for final review and comparison
the room for inspectors to review. This includes training needs analysis packages,  
  against the Significance Determination Tools in order to communicate the exit results
Simulator Review Committee meeting minutes, etc.  
  for the inspection.
      TABLE 1: EXAMINATION RESULTS
*  
        1. Total number of licensed operators.
Current copy of ANSI 3.5 standard you are committed to for simulator testing  
        2. Number of licensed operators administered a requalification
            examination required by 10 CFR 55.59(a).
C. Grand Gulf Nuclear Station is required to send the final results summary (see Table 1  
        3. Number of individual licensed operators who failed any portion of a
below) and any remaining exams and operating tests that have not been reviewed to  
            requalification examination (written, JPM, or individual simulator
the regional office lead inspector for this inspection for final review and comparison  
            scenario failures).
against the Significance Determination Tools in order to communicate the exit results  
        4. Divide line 3 by line 2 to obtain the individual requalification
for the inspection.  
            examination failure rate. Line 3/Line 2.                                       %
        5. Number of crews administered simulator scenarios as part of a
TABLE 1: EXAMINATION RESULTS  
            requalification examination required by 10 CFR 55.59(a).
        6. Number of crews who performed unsatisfactorily on the
1. Total number of licensed operators.  
            simulator scenarios.
        7. Divide line 6 by line 5 to obtain the crew simulator scenario
2. Number of licensed operators administered a requalification  
            failure rate. Line 6/Line 5.                                                   %
                                                  5
examination required by 10 CFR 55.59(a).  
3. Number of individual licensed operators who failed any portion of a  
requalification examination (written, JPM, or individual simulator  
scenario failures).  
4. Divide line 3 by line 2 to obtain the individual requalification  
examination failure rate. Line 3/Line 2.  
%  
5. Number of crews administered simulator scenarios as part of a  
requalification examination required by 10 CFR 55.59(a).  
6. Number of crews who performed unsatisfactorily on the  
simulator scenarios.  
7. Divide line 6 by line 5 to obtain the crew simulator scenario  
failure rate. Line 6/Line 5.  
%  




ML19162A062
  ML19162A062  
  SUNSI Review         ADAMS:           Non-Publicly Available  Non-Sensitive Keyword:
  SUNSI Review  
  By: TJF             Yes  No        Publicly Available     Sensitive     NRC-002
ADAMS:  
OFFICE       OE:OB       BC:OB
Non-Publicly Available  
  NAME         TFarina     GWerner
  Non-Sensitive  
  SIGNATURE         /RA/         /RA/
Keyword:
  DATE           06/04/2019   06/11/2019
By: TJF  
Yes     No
  Publicly Available  
Sensitive
  NRC-002  
OFFICE  
OE:OB  
BC:OB  
   
NAME  
TFarina  
GWerner  
   
SIGNATURE  
/RA/  
/RA/  
   
DATE  
06/04/2019  
06/11/2019
}}
}}

Latest revision as of 02:00, 5 January 2025

Notification of Inspection (NRC Inspection Report 05000416/2019003) and Request for Information
ML19162A062
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/11/2019
From: Greg Werner
Operations Branch IV
To: Emily Larson
Entergy Operations
Werner G
References
IR 2019003
Download: ML19162A062 (8)


See also: IR 05000416/2019003

Text

June 11, 2019

Mr. Eric Larson, Site Vice President

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT:

GRAND GULF NUCLEAR STATION - NOTIFICATION OF INSPECTION (NRC

INSPECTION REPORT 05000416/2019003) AND REQUEST FOR

INFORMATION

Dear Mr. Larson:

During the week of August 12, 2019, two inspectors from the Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline biennial requalification

inspection at Grand Gulf Nuclear Station, using NRC Inspection Procedure 71111.11B,

Licensed Operator Requalification Program.

Experience has shown that this inspection is a resource intensive inspection both for the NRC

inspectors and your staff. In order to minimize the impact to your onsite resources and to

ensure a productive inspection, we have enclosed a request for documents needed for this

inspection. These documents have been divided into three groups:

The first group (Section A of the enclosure) identifies information to be provided prior to

the inspection to ensure that the inspectors are adequately prepared.

The second group (Section B of the enclosure) identifies the information the inspectors

will need upon arrival at the site.

The third group (Section C of this enclosure) identifies the items which are necessary to

close out the inspection and are usually sent a few weeks after the team has left the site.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Mark Pait of your training organization.

Our inspection dates are subject to change based on your updated schedule of examination

activities. If there are any questions about this inspection or the material requested, please

contact the lead inspector Thomas J. Farina, at (817) 200-1117 (thomas.farina@nrc.gov).

E. Larson

2

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Sincerely,

/RA/

Gregory E. Werner, Chief

Operations Branch

Division of Reactor Safety

Docket No. 50-416

License No. NPF-29

Enclosure:

Biennial Requalification Inspection

Request for Information

Enclosure

Initial Request for Information

Biennial Requalification Inspection

Grand Gulf Nuclear Station

Inspection Report: 05000416/2019003

Inspection Dates:

August 12 - 16, 2019

Inspection Procedure:

IP 71111.11B, Licensed Operator Requalification

Program

Lead Inspector:

Thomas J. Farina, Operations Engineer

A. The following information is requested in order to support inspection preparation

activities. These items are listed by section as they appear in the inspection module

(i.e. 03.04a, 03.04b, etc.). Requested materials should be sent in an electronic format

on CD/DVD in order to arrive at the Region IV office no later than August 1, 2019.

CD/DVD to: US Nuclear Regulatory Commission, Region IV

ATTN: Thomas Farina

1600 E. Lamar Blvd

Arlington, TX 76011

General Requests:

List of all licensed operators (SRO & RO) by crew (operating & staff)

Training and Operations Department organization charts (with qualified LOR

evaluators identified)

Procedures that identify process for revising and maintaining LO continuing training

program up-to-date

List of outstanding LOR program changes

List of plant events and industry operating experience incorporated into LOR

program since last BRQ (August 4, 2017)

Audits and/or self-assessment reports addressing the licensed operator

requalification training program

Last two years of Simulator Review Committee (or equivalent) meeting minutes

Last two years of Curriculum Review Committee (or equivalent) meeting minutes

A summary report of all condition reports related to operator actions/errors in the

control room

2

Any revised requalification training that was based on licensed operator performance

issues

03.04a: Biennial Requalification Written Examinations

The current and approved biennial written examination schedule

The current requalification cycle written examination results for both SRO & RO that

have already been administered up to the week prior to the inspection team arrival

onsite

All written examinations that have been approved for administration up to and

including the week before the inspection team is onsite. This will need to have

adequate password protection or double envelope protection if mailed via regular

mail per NUREG-1021

The current requalification cycle examination methodology (sample plan)

03.04b: Annual Requalification Operating Tests

The schedule for the operating tests (JPMs & scenarios) to be given the week of

August 12, 2019 (week team is onsite)

The operating tests (JPMs & scenarios) (password protected and provide separately

via telephone at later date) to be given the week of August 12, 2019

Current requalification cycle operating tests (SRO & RO) and results up to the week

prior to the inspection team arrival onsite

All 2018 NRC required annual operating tests

Current requalification cycle operating test methodology (sample plan)

03.04c: Administration of an Annual Requalification Operating Test

All procedures used to administer the annual operating test

All procedures used to assess operator performance

All procedures that describe conduct of simulator training

All procedures used to test, operate, and maintain the simulator

03.04d: Requalification Examination Security

Submit any tracking tools that you use as a means to prevent excessive overlap on

the written examinations and also meet the intent of sampling all required topics on a

periodic basis.

Submit any tracking tools that you use as a means to prevent excessive overlap on

the operating tests and also meet the intent of sampling all required malfunctions

(including major events, instrument/component malfunctions, TS calls, etc.) on a

periodic basis.

3

All procedures that describe examination security, including procedures used to

develop the examinations that include guidelines on overlap between examinations

in current exam cycle tests and prior year examinations

List of all condition reports since the last biennial requalification inspection related to

examination security and overlap

03.04e: Remedial Training and Re-Examinations

List of remedial training conducted or planned since last requalification exam

(includes training provided to operators to enable passing requalification exam and

training provided to correct generic or individual weaknesses observed during

previous requalification exam cycle)

Remediation plans (lesson plans, reference materials, and attendance

documentation)

03.04f: Operator License Conditions

All procedures and program documentation for maintaining active operator licenses,

tracking training attendance, and ensuring medical fitness of licensed operators

All procedures and associated documentation that supports reactivation of any

SRO/RO license (operating or staff crew) since the last biennial inspection

03.04g: Control Room Simulator

All simulator management and configuration procedures if not already provided

Simulator discrepancy report summary list for all open discrepancy reports and

summary list for those items closed since August 4, 2017

Primary parameters tested in order to verify core physics parameters (such as

moderator temperature coefficient, integral rod worth). The applicable reference

graphs from the plant physics data book (electronic or other means as available)

should also be included as well as the test procedures used and the acceptance

criteria with results.

All simulator modification packages that are on hold, delayed, or not completed in the

last two years

A list of simulator modification packages completed in the last two-year window

An index of the most recent operability test packages required by ANSI 3.5 2009

Appendix B, including performance and approval dates, and results

An index of simulator baseline data sources (ANSI 3.5 2009 5.1.1) for the transient

performance tests required by ANSI 3.5 2009 Appendix B.2.2.1

An index of Post-Event Simulator Tests conducted since August 4, 2017

4

B. The following information is requested in order to support the onsite inspection

activities. Requested materials should be available to the inspection team, either

electronically or hardcopy, upon site arrival on August 12, 2019.

03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written

Exam and Annual Requalification Operating Tests Quality

All operating tests (JPMs & scenarios) to be given in all subsequent weeks after

onsite week, if available

All results up to the day the team leaves the site

03.04f: Conformance with Operator License Conditions

Access to licensed operators records (operating and staff crews)

Access to licensed operators training attendance records

Access to licensed operators medical records

03.04g: Control Room Simulator Performance

Simulator discrepancies since August 4, 2017. This should include all open and

closed simulator discrepancy reports, including the documentation/justification for

closure.

Acceptance test documentation, including hardware and software model revisions at

the time of acceptance (as available)

Documentation that validates current models, including the thermal-hydraulics and

neutronics models, to the actual plant

All current model deficiencies, including final safety analysis report vs design

differences in the simulator (any documentation on this)

Summary list of modifications since August 4, 2017

Plant modifications (both hardware and software) completed on the simulator by due

date since August 4, 2017

Simulator differences lesson plan used in training (current as of August 12, 2019)

The complete book of all simulator annual performance test packages (usually in a

single book but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests. This should also include

the test procedures for each test, the acceptance criteria, and results. For each

transient test, the reference chart should be included or an equivalent subject matter

expert review versus the simulator results with a write-up for any differences beyond

the ANSI standard requirements.

All test packages used to verify core physics parameters (such as moderator

temperature coefficient and integral rod worth). The applicable reference graphs

5

from the plant physics data book (electronic or other means as available) should also

be included as well as the test procedures used and the acceptance criteria with

results.

All simulator tests, configuration management, and related documents available in

the room for inspectors to review. This includes training needs analysis packages,

Simulator Review Committee meeting minutes, etc.

Current copy of ANSI 3.5 standard you are committed to for simulator testing

C. Grand Gulf Nuclear Station is required to send the final results summary (see Table 1

below) and any remaining exams and operating tests that have not been reviewed to

the regional office lead inspector for this inspection for final review and comparison

against the Significance Determination Tools in order to communicate the exit results

for the inspection.

TABLE 1: EXAMINATION RESULTS

1. Total number of licensed operators.

2. Number of licensed operators administered a requalification

examination required by 10 CFR 55.59(a).

3. Number of individual licensed operators who failed any portion of a

requalification examination (written, JPM, or individual simulator

scenario failures).

4. Divide line 3 by line 2 to obtain the individual requalification

examination failure rate. Line 3/Line 2.

%

5. Number of crews administered simulator scenarios as part of a

requalification examination required by 10 CFR 55.59(a).

6. Number of crews who performed unsatisfactorily on the

simulator scenarios.

7. Divide line 6 by line 5 to obtain the crew simulator scenario

failure rate. Line 6/Line 5.

%

ML19162A062

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: TJF

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

OE:OB

BC:OB

NAME

TFarina

GWerner

SIGNATURE

/RA/

/RA/

DATE

06/04/2019