PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 1215)841-4000 September 7, 1979 Mr. Boyce H. Grier, Director Office of Inspection and Enforcement Region I United States Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19h06 RE: Peach Bottom Unit "o. 3 - Preservice Inspection | |||
==REFERENCE:== | ==REFERENCE:== | ||
| Line 23: | Line 23: | ||
==Dear Mr. Grier:== | ==Dear Mr. Grier:== | ||
In accordance with the referenced technical specifications, preservice inspection was completed during the June 2 to June 11, 1979, mini-outage. | In accordance with the referenced technical specifications, preservice inspection was completed during the June 2 to June 11, 1979, mini-outage. | ||
Enclosed are three copies of the Preservice Inspection Report which summarizes the evnmi mtions performed. No reportable indicatiers were observed during this inspection. | Enclosed are three copies of the Preservice Inspection Report which summarizes the evnmi mtions performed. No reportable indicatiers were observed during this inspection. | ||
This report has been reviewed by the Plant Operation Review Committee, the Philadelphia Electric Company Senior Engineer - Inservice Inspection Section, and the Hartford Steam Boiler Authorized Code Inspector. The results of these reviews indicate that the PSI requirements have been =et satisfactorily. In addition to the Preservice Inspection Report, a detailed data package has been assembled which supports this evamination. This package is retained by Philadelphia Electric Company and is available for your review. | This report has been reviewed by the Plant Operation Review Committee, the Philadelphia Electric Company Senior Engineer - Inservice Inspection Section, and the Hartford Steam Boiler Authorized Code Inspector. The results of these reviews indicate that the PSI requirements have been =et satisfactorily. In addition to the Preservice Inspection Report, a detailed data package has been assembled which supports this evamination. This package is retained by Philadelphia Electric Company and is available for your review. | ||
Very truly yours, | Very truly yours, | ||
/ | |||
. Cooney Super.endent-Nuclear Generation Division TCH/cs Enclosures cc: Mr. Jull ax, Acting Chief Inspector l[}} 014 Departmenu of Labor and Indut:y g()' k Mr. Charles E. Berry, Chief Inspector The Hartford Steam Boiler Inspection and Insurance Compary 8 0 01240 ) N i'* | |||
PHILADELPHIA ELECTRIC COMPANY | PHILADELPHIA ELECTRIC COMPANY 2301 Market Street | ||
, c Philacelphia, Pennslyvania 19101 Peach Bottom Station - Unit 3 Date: August 27, 1979 R.D. No. 1 Delta, Pennsylvania 17314 Inspection Date: | |||
June 2, 1979 to Commerical Service Date: December 23, 1974 | June 2, 1979 to Commerical Service Date: December 23, 1974 June 11, 1979 Gross Generating Capability: | ||
1098 MWe Pennsylvania State Identification Number: ST433411 National Board Number Assigned by Reactor Manufacturer: NB 3904 Component Identification: See Attachment 1 - Summary of Examinations Abstract of Inspections Performed, Conditions Observed, Corrective Measures Recommended and Taken See: - Summary of Examinations Name of Inspector: Karl S. Russell, Jr. | |||
Name and Mailing Address of the Inspector's Employer: | Name and Mailing Address of the Inspector's Employer: | ||
The Hartford Steant Boiler Inspection & Insurance Company P.O. Box 504 Wayne, Pennsylvania 19007 Signature of PECO Senior Engineer - ISI Section | The Hartford Steant Boiler Inspection & Insurance Company P.O. Box 504 Wayne, Pennsylvania 19007 Signature of PECO Senior Engineer - ISI Section | ||
/ | |||
4h7 | |||
/f | |||
Signature of PECO Plant Engineer-Maintenance | 'l Date | ||
Q | ~ | ||
the Owner has performed examinations and taken corrective measures described in this Owners' Data Report in accordance with the requirements | Signature of PECO Plant Engineer-Maintenance | ||
of the ASME Code, Section XI. | / | ||
Q Date PORC Review & Approval MY/[ | |||
/ | |||
r.either the Inspector nor his employer shall be liable in any manner for h% ('Q h any personal injury or property damage or loss of any kind arising from | Pi[7c /79 Date CERTIFICATE OF INSERVICE INSPEL'IION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of Pennsylvanfa and employed by Hartford Steam Boiler Inscection & Insurance Company of Hartford, Conn. have inspected the components described in this Owners' Data Report during the period June 9, 1979 and state that to the best or my knowledge and belief, the Owner has performed examinations and taken corrective measures 1795 m*)'' | ||
described in this Owners' Data Report in accordance with the requirements of the ASME Code, Section XI. | |||
Date | M h] | ||
By signing this certificate neither the Inspector nor his employer j | |||
Inspector's Signature U | makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Data Report. Furthermore, d | ||
" h" r.either the Inspector nor his employer shall be liable in any manner for h% ('Q h any personal injury or property damage or loss of any kind arising from h | |||
or connected with this inspection. | |||
j/ | |||
Date | |||
[ | |||
(( | |||
M(( M// | |||
gd owA Commissions Inspector's Signature U National Board, State, Providence and No. | |||
AT'. | |||
==SUMMARY== | ==SUMMARY== | ||
ii, , ; IONS On Junn 9, 1979, a Preservice Inspection was performed at Peach Bottom Atomic Power S':ation, Unit No. 3. Examinations were performed (by qualified personnel of Southwest Research Institute) on (2) circumferential pipe welds following the installation of a new check valve (#CV-62). The following is a summary of the examinations performed: | ii,, ; IONS On Junn 9, 1979, a Preservice Inspection was performed at Peach Bottom Atomic Power S':ation, Unit No. 3. | ||
ASME | Examinations were performed (by qualified personnel of Southwest Research Institute) on (2) circumferential pipe welds following the installation of a new check valve (#CV-62). The following is a summary of the examinations performed: | ||
B 4.1 | ASME ASME Section XI Section XI Examination Area Identification Examination Item No. | ||
Category Method B 4.5 B-J 12-I-2A (4" Dia. Carbon Steel UT Pipe To Elbow Weld) | |||
B 4.1 B-F 12-I-2R (4" Dia. Stainless UT Steel Valve To Carbon Steel PT Pipe Weld) 1795 016}} | |||
Latest revision as of 08:50, 2 January 2025
| ML19291C317 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/17/1979 |
| From: | Cooney M PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 8001240180 | |
| Download: ML19291C317 (1) | |
Text
s g
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 1215)841-4000 September 7, 1979 Mr. Boyce H. Grier, Director Office of Inspection and Enforcement Region I United States Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19h06 RE: Peach Bottom Unit "o. 3 - Preservice Inspection
REFERENCE:
Technical Specification 6.9 3.b, 4.6.G, Table 4.6.1
Dear Mr. Grier:
In accordance with the referenced technical specifications, preservice inspection was completed during the June 2 to June 11, 1979, mini-outage.
Enclosed are three copies of the Preservice Inspection Report which summarizes the evnmi mtions performed. No reportable indicatiers were observed during this inspection.
This report has been reviewed by the Plant Operation Review Committee, the Philadelphia Electric Company Senior Engineer - Inservice Inspection Section, and the Hartford Steam Boiler Authorized Code Inspector. The results of these reviews indicate that the PSI requirements have been =et satisfactorily. In addition to the Preservice Inspection Report, a detailed data package has been assembled which supports this evamination. This package is retained by Philadelphia Electric Company and is available for your review.
Very truly yours,
/
. Cooney Super.endent-Nuclear Generation Division TCH/cs Enclosures cc: Mr. Jull ax, Acting Chief Inspector l[ 014 Departmenu of Labor and Indut:y g()' k Mr. Charles E. Berry, Chief Inspector The Hartford Steam Boiler Inspection and Insurance Compary 8 0 01240 ) N i'*
PHILADELPHIA ELECTRIC COMPANY 2301 Market Street , c Philacelphia, Pennslyvania 19101 Peach Bottom Station - Unit 3 Date: August 27, 1979 R.D. No. 1 Delta, Pennsylvania 17314 Inspection Date: June 2, 1979 to Commerical Service Date: December 23, 1974 June 11, 1979 Gross Generating Capability: 1098 MWe Pennsylvania State Identification Number: ST433411 National Board Number Assigned by Reactor Manufacturer: NB 3904 Component Identification: See Attachment 1 - Summary of Examinations Abstract of Inspections Performed, Conditions Observed, Corrective Measures Recommended and Taken See: - Summary of Examinations Name of Inspector: Karl S. Russell, Jr. Name and Mailing Address of the Inspector's Employer: The Hartford Steant Boiler Inspection & Insurance Company P.O. Box 504 Wayne, Pennsylvania 19007 Signature of PECO Senior Engineer - ISI Section / 4h7 /f 'l Date ~ Signature of PECO Plant Engineer-Maintenance / Q Date PORC Review & Approval MY/[ / Pi[7c /79 Date CERTIFICATE OF INSERVICE INSPEL'IION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of Pennsylvanfa and employed by Hartford Steam Boiler Inscection & Insurance Company of Hartford, Conn. have inspected the components described in this Owners' Data Report during the period June 9, 1979 and state that to the best or my knowledge and belief, the Owner has performed examinations and taken corrective measures 1795 m*) described in this Owners' Data Report in accordance with the requirements of the ASME Code, Section XI. M h] By signing this certificate neither the Inspector nor his employer j makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Data Report. Furthermore, d " h" r.either the Inspector nor his employer shall be liable in any manner for h% ('Q h any personal injury or property damage or loss of any kind arising from h or connected with this inspection. j/ Date [ (( M(( M// gd owA Commissions Inspector's Signature U National Board, State, Providence and No.
AT'.
SUMMARY
ii,, ; IONS On Junn 9, 1979, a Preservice Inspection was performed at Peach Bottom Atomic Power S':ation, Unit No. 3. Examinations were performed (by qualified personnel of Southwest Research Institute) on (2) circumferential pipe welds following the installation of a new check valve (#CV-62). The following is a summary of the examinations performed: ASME ASME Section XI Section XI Examination Area Identification Examination Item No. Category Method B 4.5 B-J 12-I-2A (4" Dia. Carbon Steel UT Pipe To Elbow Weld) B 4.1 B-F 12-I-2R (4" Dia. Stainless UT Steel Valve To Carbon Steel PT Pipe Weld) 1795 016}}