| number = ML14225A138
| number = ML14225A138
| issue date = 08/12/2014
| issue date = 08/12/2014
| title = Ir 05000313-14-008 and 05000368-14-008, Arkansas Nuclear One, Units 1 and 2 - Response to Notice of Violation
| title = IR 05000313-14-008 and 05000368-14-008, Arkansas Nuclear One, Units 1 and 2 - Response to Notice of Violation
| author name = Werner G E
| author name = Werner G
| author affiliation = NRC/RGN-IV/DRP/RPB-E
| author affiliation = NRC/RGN-IV/DRP/RPB-E
| addressee name = Browning J
| addressee name = Browning J
Line 9: Line 9:
| docket = 05000313, 05000368
| docket = 05000313, 05000368
| license number = DPR-051, NPF-006
| license number = DPR-051, NPF-006
| contact person = Werner G E
| contact person = Werner G
| case reference number = IR-14-008
| case reference number = IR-14-008
| document type = Letter
| document type = Letter
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000313/2014008]]
See also: [[see also::IR 05000313/2014008]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES
[[Issue date::August 12, 2014]]
                            NUCLEAR REGULATORY COMMISSION
                                              REGION IV
                                          1600 E LAMAR BLVD
                                      ARLINGTON, TX 76011-4511
                                          August 12, 2014
EA-14-008
Jeremy Browning, Site Vice
  President
Entergy Operations, Inc.
Arkansas Nuclear One
1448 SR 333
Russellville, AR 72802-0967
SUBJECT:       ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - RESPONSE TO NOTICE
                OF VIOLATION (NRC INSPECTION REPORT 05000313/2014008
                AND 05000368/2014008)
Dear Mr. Browning:
On June 23, 2014, the NRC cited Entergy Operations, Inc.s failure to accomplish a move of the
Unit 1 main turbine generator stator in accordance with documented instructions and
procedures as required by 10 CFR 50, Appendix B, Criterion V, Instructions, Procedures, and
Drawings. The Notice of Violation, enclosed with Inspection Report 05000313/2014008 and
05000368/2014008 (ML14174A832), required you to respond in writing within 30 days. You
responded by letter dated July 18, 2014 (ML14199A412).
We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We
will review your corrective actions during a future inspection. We also noted that your response
included a discussion regarding safety-related equipment not being damaged by the
March 31, 2013, Unit 1 stator drop event. It is acknowledged that no safety-related components
were damaged by the crane collapse and resulting drop of the main turbine generator stator.
The statement contained in our June 23, 2014, letter that safety-related equipment was affected
by the event was based on the damage caused by the event affecting safety-related systems
such as: (1) the loss of the operating decay heat removal pump in Unit 1 resulting in a
temporary loss of shutdown cooling to the reactor; and (2) a loss of one Unit 2 safety-related
electrical bus that had to be re-energized by a standby emergency diesel generator.


EA-14-008 Jeremy Browning, Site Vice President Entergy Operations, Inc. Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802-0967


SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 RESPONSE TO NOTICE OF VIOLATION (NRC INSPECTION REPORT 05000313/2014008 AND 05000368/2014008)
        ML14225A138
 
  SUNSI Review          ADAMS             Publicly Available      Non-Sensitive
==Dear Mr. Browning:==
  By: GWerner               Yes No         Non-Publicly Available Sensitive
On June 23, 2014, the NRC cited failure to accomplish a move of the Unit 1 main turbine generator stator in accordance with documented instructions and procedures as required by 10 CFR 50, Appendix B, Criterion VInstructions, Procedures, and Drawings. The Notice of Violation, enclosed with Inspection Report 05000313/2014008 and 05000368/2014008 (ML14174A832), required you to respond in writing within 30 days. You responded by letter dated July 18, 2014 (ML14199A412). We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We will review your corrective actions during a future inspection. We also noted that your response included a discussion regarding safety-related equipment not being damaged by the March 31, 2013, Unit 1 stator drop event. It is acknowledged that no safety-related components were damaged by the crane collapse and resulting drop of the main turbine generator stator. The statement contained in our June 23, 2014, letter that safety-related equipment was affected by the event was based on the damage caused by the event affecting safety-related systems such as: (1) the loss of the operating decay heat removal pump in Unit 1 resulting in a temporary loss of shutdown cooling to the reactor; and (2) a loss of one Unit 2 safety-related electrical bus that had to be re-energized by a standby emergency diesel generator. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs Agencywide Documents Access Management System (ADAMS), which is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
OFFICE       RIV/DRP     RIV/DRP
 
NAME         CYoung/dll GWerner
Sincerely,/RA/ Gregory E. Werner, Chief Project Branch E Division of Reactor Projects Docket No. 50-313 and 50-368 License No. DPR-51 and NPF-6 DISTRIBUTION: See next page ADAMS ACCESSION NUMBER: SUNSI Review By: GWerner ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive OFFICE RIV/DRP RIV/DRP NAME CYoung/dll GWerner SIGNATURE /RA/ /RA/ DATE 8/7/14 8/13/14 OFFICIAL RECORD COPY Letter to Jeremy Browning from Gregory E. Werner dated August 12, 2014 SUBJECT: ANNUAL ASSESSMENT LETTER FOR ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 (REPORT 05000313/2014006 AND 05000368/2014006) DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Brian.Tindell@nrc.gov) Resident Inspector (Abin.Fairbanks@nrc.gov) Resident Inspector (Matt.Young@nrc.gov) Administrative Assistant (Gloria.Hatfield@nrc.gov) Branch Chief (Greg.Werner@nrc.gov) Senior Project Engineer (Cale.Young@nrc.gov) Project Engineer (Jim.Melfi@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) RIV State Liaison Officer (Bill.Maier@nrc.gov) Branch Chief, TSB (Geoffrey.Miller@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) R4AllegationResource@nrc.gov ROPreports@nrc.gov Distribution via Listserv for Arkansas Nuclear One
SIGNATURE /RA/           /RA/
DATE         8/7/14     8/13/14
                                   
Letter to Jeremy Browning from Gregory E. Werner dated August 12, 2014
SUBJECT:       ANNUAL ASSESSMENT LETTER FOR ARKANSAS NUCLEAR ONE,
                UNITS 1 AND 2 (REPORT 05000313/2014006 AND 05000368/2014006)
DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Brian.Tindell@nrc.gov)
Resident Inspector (Abin.Fairbanks@nrc.gov)
Resident Inspector (Matt.Young@nrc.gov)
Administrative Assistant (Gloria.Hatfield@nrc.gov)
Branch Chief (Greg.Werner@nrc.gov)
Senior Project Engineer (Cale.Young@nrc.gov)
Project Engineer (Jim.Melfi@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
RIV State Liaison Officer (Bill.Maier@nrc.gov)
Branch Chief, TSB (Geoffrey.Miller@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
R4AllegationResource@nrc.gov
ROPreports@nrc.gov
Distribution via Listserv for Arkansas Nuclear One
}}
}}

Latest revision as of 01:30, 4 November 2019

IR 05000313-14-008 and 05000368-14-008, Arkansas Nuclear One, Units 1 and 2 - Response to Notice of Violation
ML14225A138
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/12/2014
From: Greg Werner
NRC/RGN-IV/DRP/RPB-E
To: Jeremy G. Browning
Entergy Operations
Werner G
References
IR-14-008
Download: ML14225A138 (3)


See also: IR 05000313/2014008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

August 12, 2014

EA-14-008

Jeremy Browning, Site Vice

President

Entergy Operations, Inc.

Arkansas Nuclear One

1448 SR 333

Russellville, AR 72802-0967

SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - RESPONSE TO NOTICE

OF VIOLATION (NRC INSPECTION REPORT 05000313/2014008

AND 05000368/2014008)

Dear Mr. Browning:

On June 23, 2014, the NRC cited Entergy Operations, Inc.s failure to accomplish a move of the

Unit 1 main turbine generator stator in accordance with documented instructions and

procedures as required by 10 CFR 50, Appendix B, Criterion V, Instructions, Procedures, and

Drawings. The Notice of Violation, enclosed with Inspection Report 05000313/2014008 and

05000368/2014008 (ML14174A832), required you to respond in writing within 30 days. You

responded by letter dated July 18, 2014 (ML14199A412).

We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We

will review your corrective actions during a future inspection. We also noted that your response

included a discussion regarding safety-related equipment not being damaged by the

March 31, 2013, Unit 1 stator drop event. It is acknowledged that no safety-related components

were damaged by the crane collapse and resulting drop of the main turbine generator stator.

The statement contained in our June 23, 2014, letter that safety-related equipment was affected

by the event was based on the damage caused by the event affecting safety-related systems

such as: (1) the loss of the operating decay heat removal pump in Unit 1 resulting in a

temporary loss of shutdown cooling to the reactor; and (2) a loss of one Unit 2 safety-related

electrical bus that had to be re-energized by a standby emergency diesel generator.

ML14225A138

SUNSI Review ADAMS Publicly Available Non-Sensitive

By: GWerner Yes No Non-Publicly Available Sensitive

OFFICE RIV/DRP RIV/DRP

NAME CYoung/dll GWerner

SIGNATURE /RA/ /RA/

DATE 8/7/14 8/13/14

Letter to Jeremy Browning from Gregory E. Werner dated August 12, 2014

SUBJECT: ANNUAL ASSESSMENT LETTER FOR ARKANSAS NUCLEAR ONE,

UNITS 1 AND 2 (REPORT 05000313/2014006 AND 05000368/2014006)

DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Michael.Hay@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Brian.Tindell@nrc.gov)

Resident Inspector (Abin.Fairbanks@nrc.gov)

Resident Inspector (Matt.Young@nrc.gov)

Administrative Assistant (Gloria.Hatfield@nrc.gov)

Branch Chief (Greg.Werner@nrc.gov)

Senior Project Engineer (Cale.Young@nrc.gov)

Project Engineer (Jim.Melfi@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

RIV State Liaison Officer (Bill.Maier@nrc.gov)

Branch Chief, TSB (Geoffrey.Miller@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)

R4AllegationResource@nrc.gov

ROPreports@nrc.gov

Distribution via Listserv for Arkansas Nuclear One