ML14225A138: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML14225A138 | | number = ML14225A138 | ||
| issue date = 08/12/2014 | | issue date = 08/12/2014 | ||
| title = | | title = IR 05000313-14-008 and 05000368-14-008, Arkansas Nuclear One, Units 1 and 2 - Response to Notice of Violation | ||
| author name = Werner G | | author name = Werner G | ||
| author affiliation = NRC/RGN-IV/DRP/RPB-E | | author affiliation = NRC/RGN-IV/DRP/RPB-E | ||
| addressee name = Browning J | | addressee name = Browning J | ||
| Line 9: | Line 9: | ||
| docket = 05000313, 05000368 | | docket = 05000313, 05000368 | ||
| license number = DPR-051, NPF-006 | | license number = DPR-051, NPF-006 | ||
| contact person = Werner G | | contact person = Werner G | ||
| case reference number = IR-14-008 | | case reference number = IR-14-008 | ||
| document type = Letter | | document type = Letter | ||
| page count = 3 | | page count = 3 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000313/2014008]] | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
1600 E LAMAR BLVD | |||
ARLINGTON, TX 76011-4511 | |||
August 12, 2014 | |||
EA-14-008 | |||
Jeremy Browning, Site Vice | |||
President | |||
Entergy Operations, Inc. | |||
Arkansas Nuclear One | |||
1448 SR 333 | |||
Russellville, AR 72802-0967 | |||
SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - RESPONSE TO NOTICE | |||
OF VIOLATION (NRC INSPECTION REPORT 05000313/2014008 | |||
AND 05000368/2014008) | |||
Dear Mr. Browning: | |||
On June 23, 2014, the NRC cited Entergy Operations, Inc.s failure to accomplish a move of the | |||
Unit 1 main turbine generator stator in accordance with documented instructions and | |||
procedures as required by 10 CFR 50, Appendix B, Criterion V, Instructions, Procedures, and | |||
Drawings. The Notice of Violation, enclosed with Inspection Report 05000313/2014008 and | |||
05000368/2014008 (ML14174A832), required you to respond in writing within 30 days. You | |||
responded by letter dated July 18, 2014 (ML14199A412). | |||
We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We | |||
will review your corrective actions during a future inspection. We also noted that your response | |||
included a discussion regarding safety-related equipment not being damaged by the | |||
March 31, 2013, Unit 1 stator drop event. It is acknowledged that no safety-related components | |||
were damaged by the crane collapse and resulting drop of the main turbine generator stator. | |||
The statement contained in our June 23, 2014, letter that safety-related equipment was affected | |||
by the event was based on the damage caused by the event affecting safety-related systems | |||
such as: (1) the loss of the operating decay heat removal pump in Unit 1 resulting in a | |||
temporary loss of shutdown cooling to the reactor; and (2) a loss of one Unit 2 safety-related | |||
electrical bus that had to be re-energized by a standby emergency diesel generator. | |||
ML14225A138 | |||
SUNSI Review ADAMS Publicly Available Non-Sensitive | |||
By: GWerner Yes No Non-Publicly Available Sensitive | |||
OFFICE RIV/DRP RIV/DRP | |||
NAME CYoung/dll GWerner | |||
SIGNATURE /RA/ /RA/ | |||
DATE 8/7/14 8/13/14 | |||
Letter to Jeremy Browning from Gregory E. Werner dated August 12, 2014 | |||
SUBJECT: ANNUAL ASSESSMENT LETTER FOR ARKANSAS NUCLEAR ONE, | |||
UNITS 1 AND 2 (REPORT 05000313/2014006 AND 05000368/2014006) | |||
DISTRIBUTION: | |||
Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | |||
Acting DRP Director (Troy.Pruett@nrc.gov) | |||
Acting DRP Deputy Director (Michael.Hay@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (Brian.Tindell@nrc.gov) | |||
Resident Inspector (Abin.Fairbanks@nrc.gov) | |||
Resident Inspector (Matt.Young@nrc.gov) | |||
Administrative Assistant (Gloria.Hatfield@nrc.gov) | |||
Branch Chief (Greg.Werner@nrc.gov) | |||
Senior Project Engineer (Cale.Young@nrc.gov) | |||
Project Engineer (Jim.Melfi@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Public Affairs Officer (Lara.Uselding@nrc.gov) | |||
RIV State Liaison Officer (Bill.Maier@nrc.gov) | |||
Branch Chief, TSB (Geoffrey.Miller@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) | |||
R4AllegationResource@nrc.gov | |||
ROPreports@nrc.gov | |||
Distribution via Listserv for Arkansas Nuclear One | |||
}} | }} | ||
Latest revision as of 01:30, 4 November 2019
| ML14225A138 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 08/12/2014 |
| From: | Greg Werner NRC/RGN-IV/DRP/RPB-E |
| To: | Jeremy G. Browning Entergy Operations |
| Werner G | |
| References | |
| IR-14-008 | |
| Download: ML14225A138 (3) | |
See also: IR 05000313/2014008
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E LAMAR BLVD
ARLINGTON, TX 76011-4511
August 12, 2014
Jeremy Browning, Site Vice
President
Entergy Operations, Inc.
Arkansas Nuclear One
1448 SR 333
Russellville, AR 72802-0967
SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - RESPONSE TO NOTICE
OF VIOLATION (NRC INSPECTION REPORT 05000313/2014008
AND 05000368/2014008)
Dear Mr. Browning:
On June 23, 2014, the NRC cited Entergy Operations, Inc.s failure to accomplish a move of the
Unit 1 main turbine generator stator in accordance with documented instructions and
procedures as required by 10 CFR 50, Appendix B, Criterion V, Instructions, Procedures, and
Drawings. The Notice of Violation, enclosed with Inspection Report 05000313/2014008 and
05000368/2014008 (ML14174A832), required you to respond in writing within 30 days. You
responded by letter dated July 18, 2014 (ML14199A412).
We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We
will review your corrective actions during a future inspection. We also noted that your response
included a discussion regarding safety-related equipment not being damaged by the
March 31, 2013, Unit 1 stator drop event. It is acknowledged that no safety-related components
were damaged by the crane collapse and resulting drop of the main turbine generator stator.
The statement contained in our June 23, 2014, letter that safety-related equipment was affected
by the event was based on the damage caused by the event affecting safety-related systems
such as: (1) the loss of the operating decay heat removal pump in Unit 1 resulting in a
temporary loss of shutdown cooling to the reactor; and (2) a loss of one Unit 2 safety-related
electrical bus that had to be re-energized by a standby emergency diesel generator.
SUNSI Review ADAMS Publicly Available Non-Sensitive
By: GWerner Yes No Non-Publicly Available Sensitive
OFFICE RIV/DRP RIV/DRP
NAME CYoung/dll GWerner
SIGNATURE /RA/ /RA/
DATE 8/7/14 8/13/14
Letter to Jeremy Browning from Gregory E. Werner dated August 12, 2014
SUBJECT: ANNUAL ASSESSMENT LETTER FOR ARKANSAS NUCLEAR ONE,
UNITS 1 AND 2 (REPORT 05000313/2014006 AND 05000368/2014006)
DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Brian.Tindell@nrc.gov)
Resident Inspector (Abin.Fairbanks@nrc.gov)
Resident Inspector (Matt.Young@nrc.gov)
Administrative Assistant (Gloria.Hatfield@nrc.gov)
Branch Chief (Greg.Werner@nrc.gov)
Senior Project Engineer (Cale.Young@nrc.gov)
Project Engineer (Jim.Melfi@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
RIV State Liaison Officer (Bill.Maier@nrc.gov)
Branch Chief, TSB (Geoffrey.Miller@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
R4AllegationResource@nrc.gov
ROPreports@nrc.gov
Distribution via Listserv for Arkansas Nuclear One