ML051250343: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE | {{#Wiki_filter:PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.3.1.1 | ||
--------------- NOTE--------------------- | |||
Applicable for each Function in Table 3.3.3.1-1. | Applicable for each Function in Table 3.3.3.1-1. | ||
Perform CHANNEL CHECK. | Perform CHANNEL CHECK. | ||
31 days SR 3.3.3.1.2 Deleted SR 3.3.3.1.3 | |||
---------------NOTE--------------------- | |||
Applicable for each Function in Table 3.3.3.1-1. | Applicable for each Function in Table 3.3.3.1-1. | ||
Perfo____CANELCALIBRAT__O_._____onhs | Perfo____CANELCALIBRAT__O_._____onhs Perform CHANNEL CALIBRATION. | ||
1B months I | |||
CLINTON 3.3-21 Amendment No. 164 | |||
PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page 1 of 1) | PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page 1 of 1) | ||
Post Accident Monitoring Instrumentation CONDITIONS REFERENCED FROM REOUIRED | Post Accident Monitoring Instrumentation CONDITIONS REFERENCED FROM REOUIRED REQUIRED FUNCTION CITUELS ACTION D.1 | ||
: 1. Reactor Steam Dome Pressure | : 1. Reactor Steam Dome Pressure 2 | ||
: 2. Reactor Vessel Water Level | E | ||
: 2. Reactor Vessel Water Level 2 | |||
E | |||
: 3. Suppression Pool Water Level | : 3. Suppression Pool Water Level | ||
: a. High Range | : a. High Range 2 | ||
: b. Low Range | E | ||
: 4. Drywell Pressure | : b. Low Range 2 | ||
: 5. Primary Containment Area Radiation | E | ||
: 6. Drywell Area Radiation | : 4. | ||
: 7. Penetration Plow Path, Automatic PCIV Position | Drywell Pressure 2 | ||
E | |||
: 5. Primary Containment Area Radiation 2 | |||
F | |||
: 6. Drywell Area Radiation 2 | |||
F | |||
: 7. Penetration Plow Path, Automatic PCIV Position 2 per penetration E | |||
flow, path " | |||
S. Deleted | S. Deleted | ||
: 9. Primary Containment Pressure | : 9. Primary Containment Pressure | ||
: a. High Range | : a. High Range 2 | ||
: b. Low Range | E | ||
: 10. Suppression Pool Water Bulk Average Temperature | : b. Low Range 2 | ||
(b) Only one position indication channel is | E | ||
: 10. Suppression Pool Water Bulk Average Temperature 21cE I | |||
(a) Not required for isolation valves whose associated penetration flow path is isolated. | |||
(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel. | |||
(c) Monitoring each quadrant. | (c) Monitoring each quadrant. | ||
CLINTON | CLINTON 3.3 -22 Amendment No. 164 | ||
3.6.3.1 3.6 | 3.6.3.1 3.6 CONTAINMENT SYSTEMS 3.6.3.1 Deleted CLINTON 3.6-36 Amendment No164 | ||
3.6.3.1 This page intentionally blank CLINTON | 3.6.3.1 This page intentionally blank CLINTON 3.6-37 Amendment No.164}} | ||
Latest revision as of 19:48, 15 January 2025
| ML051250343 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 04/28/2005 |
| From: | Jabbour K NRC/NRR/DLPM/LPD3 |
| To: | |
| Jabbour K, NRR/DLPM, 415-1496 | |
| Shared Package | |
| ML051300162 | List: |
| References | |
| TAC MC4493 | |
| Download: ML051250343 (4) | |
Text
PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.3.1.1
NOTE---------------------
Applicable for each Function in Table 3.3.3.1-1.
Perform CHANNEL CHECK.
31 days SR 3.3.3.1.2 Deleted SR 3.3.3.1.3
NOTE---------------------
Applicable for each Function in Table 3.3.3.1-1.
Perfo____CANELCALIBRAT__O_._____onhs Perform CHANNEL CALIBRATION.
1B months I
CLINTON 3.3-21 Amendment No. 164
PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page 1 of 1)
Post Accident Monitoring Instrumentation CONDITIONS REFERENCED FROM REOUIRED REQUIRED FUNCTION CITUELS ACTION D.1
- 1. Reactor Steam Dome Pressure 2
E
E
- 3. Suppression Pool Water Level
- a. High Range 2
E
- b. Low Range 2
E
- 4.
Drywell Pressure 2
E
- 5. Primary Containment Area Radiation 2
F
- 6. Drywell Area Radiation 2
F
- 7. Penetration Plow Path, Automatic PCIV Position 2 per penetration E
flow, path "
S. Deleted
- 9. Primary Containment Pressure
- a. High Range 2
E
- b. Low Range 2
E
- 10. Suppression Pool Water Bulk Average Temperature 21cE I
(a) Not required for isolation valves whose associated penetration flow path is isolated.
(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.
(c) Monitoring each quadrant.
CLINTON 3.3 -22 Amendment No. 164
3.6.3.1 3.6 CONTAINMENT SYSTEMS 3.6.3.1 Deleted CLINTON 3.6-36 Amendment No164
3.6.3.1 This page intentionally blank CLINTON 3.6-37 Amendment No.164