{{#Wiki_filter:October 20, 2005 LICENSEE:     DUKE ENERGY CORPORATION FACILITY:     OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3
{{#Wiki_filter:October 20, 2005 LICENSEE:
DUKE ENERGY CORPORATION FACILITY:
OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF SEPTEMBER 27, 2005, MEETING WITH DUKE ENERGY ON THE TORNADO MITIGATION METHOD SUBMITTAL (TAC NOS. MC4608, MC4609, AND MC4610)
OF SEPTEMBER 27, 2005, MEETING WITH DUKE ENERGY ON THE TORNADO MITIGATION METHOD SUBMITTAL (TAC NOS. MC4608, MC4609, AND MC4610)
Line 29: Line 30:
After NRC approval of the methodology and licensing basis, the licensee will update the Oconee Updated Final Safety Analysis Report. The second phase is the evaluation of station hardware upgrades for possible implementation in 2006 or 2007. The station hardware upgrades that are being evaluated include a new high-head station auxiliary service water system, installation of physical barriers, and upgraded power supplies.
After NRC approval of the methodology and licensing basis, the licensee will update the Oconee Updated Final Safety Analysis Report. The second phase is the evaluation of station hardware upgrades for possible implementation in 2006 or 2007. The station hardware upgrades that are being evaluated include a new high-head station auxiliary service water system, installation of physical barriers, and upgraded power supplies.
The proposed methodology would not consider tornado wind speeds greater than 200 miles per hour based on probability considerations. Other events, such as tornado-induced main steam line breaks and loss-of-coolant, accidents, and tornadoes that affect both the Oconee Station and the Keowee Hydro units, would also not be considered in the proposed methodology. The NRC staff expressed concern with this approach for eliminating consideration of certain wind speeds and events, and stated that it would further evaluate this approach and discuss it with NRC management.
The proposed methodology would not consider tornado wind speeds greater than 200 miles per hour based on probability considerations. Other events, such as tornado-induced main steam line breaks and loss-of-coolant, accidents, and tornadoes that affect both the Oconee Station and the Keowee Hydro units, would also not be considered in the proposed methodology. The NRC staff expressed concern with this approach for eliminating consideration of certain wind speeds and events, and stated that it would further evaluate this approach and discuss it with NRC management.
CONTACT:               Leonard N. Olshan, NRR 301-415-1419 lno@nrc.gov
CONTACT:
 
Leonard N. Olshan, NRR 301-415-1419 lno@nrc.gov The licensee and the NRC staff agreed to have another meeting prior to the submittal of the methodology and tentatively scheduled it for the week of October 31, 2005.
The licensee and the NRC staff agreed to have another meeting prior to the submittal of the methodology and tentatively scheduled it for the week of October 31, 2005.
Please direct any inquiries to Leonard N. Olshan, at 301-415-1419, or lno@nrc.gov.
Please direct any inquiries to Leonard N. Olshan, at 301-415-1419, or lno@nrc.gov.
                                    /RA/
/RA/
Leonard N. Olshan, Senior Project Manager, Section1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Leonard N. Olshan, Senior Project Manager, Section1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287


Line 40: Line 40:
: 2. Slide Presentation cc w/encls: See next page
: 2. Slide Presentation cc w/encls: See next page


ML052770147                      
ML052770147


==Enclosure:==
==Enclosure:==
ML052770320         NRC-001 OFFICE             PDII-1/PM                 PDII-1/LA               PDII-1/SC NAME               LOlshan                   CHawes                   EMarinos DATE                       10/ 19 /05               10/ 19 /05             10/ 20 /05 LIST OF ATTENDEES MEETING TO DISCUSS THE OCONEE TORNADO MITIGATION METHOD SUBMITTAL SEPTEMBER 27, 2005 NRC                               DUKE E. Hackett                         J. Robertson J. Tatum                           S. Newman C. Doutt                           L. Kanipe M. Stutzke                         G. Davenport L. Olshan                           G. McAninch M. Ernstes (by phone)
ML052770320 NRC-001 OFFICE PDII-1/PM PDII-1/LA PDII-1/SC NAME LOlshan CHawes EMarinos DATE 10/ 19 /05 10/ 19 /05 10/ 20 /05
ENCLOSURE 1
 
ENCLOSURE 1 LIST OF ATTENDEES MEETING TO DISCUSS THE OCONEE TORNADO MITIGATION METHOD SUBMITTAL SEPTEMBER 27, 2005 NRC DUKE E. Hackett J. Robertson J. Tatum S. Newman C. Doutt L. Kanipe M. Stutzke G. Davenport L. Olshan G. McAninch M. Ernstes (by phone)


Oconee Nuclear Station, Units 1, 2, and 3 cc:
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Ms. Lisa F. Vaughn                       Mr. R. L. Gill, Jr.
Ms. Lisa F. Vaughn Duke Energy Corporation 526 South Church Street P. O. Box 1006 Mail Code = EC07H Charlotte, North Carolina 28201-1006 Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.
Duke Energy Corporation                   Manager - Nuclear Regulatory 526 South Church Street                     Issues and Industry Affairs P. O. Box 1006                           Duke Energy Corporation Mail Code = EC07H                         526 S. Church St.
Columbia, SC 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.
Charlotte, North Carolina 28201-1006     Mail Stop EC05P Charlotte, NC 28202 Manager, LIS NUS Corporation                           Division of Radiation Protection 2650 McCormick Dr., 3rd Floor             NC Dept of Environment, Health, & Natural Clearwater, FL 34619-1035                 Resources 3825 Barrett Dr.
Suite 705 Rosslyn, VA 22209 Ms. Karen E. Long Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Mr. R. L. Gill, Jr.
Senior Resident Inspector                 Raleigh, NC 27609-7721 U.S. Nuclear Regulatory Commission 7812B Rochester Highway                   Mr. Peter R. Harden, IV Seneca, SC 29672                         VP-Customer Relations and Sales Westinghouse Electric Company Mr. Henry Porter, Director               6000 Fairview Road Division of Radioactive Waste Management 12th Floor Bureau of Land and Waste Management       Charlotte, NC 28210 Dept. of Health and Env. Control 2600 Bull St.                             Mr. Henry Barron Columbia, SC 29201-1708                   Group Vice President, Nuclear Generation and Chief Nuclear Officer Mr. Michael A. Schoppman                  P.O. Box 1006-EC07H Framatome ANP                            Charlotte, NC 28201-1006 1911 North Ft. Myer Dr.
Manager - Nuclear Regulatory Issues and Industry Affairs Duke Energy Corporation 526 S. Church St.
Suite 705                                Mr. B. G. Davenport Rosslyn, VA 22209                        Regulatory Compliance Manager Oconee Nuclear Site Ms. Karen E. Long                        Duke Energy Corporation Assistant Attorney General                ON03RC NC Department of Justice                  7800 Rochester Highway P.O. Box 629                              Seneca, SC 29672 Raleigh, NC 27602}}
Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr.
Raleigh, NC 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672}}

Latest revision as of 14:58, 15 January 2025

9/27/05 Meeting Summary with Duke Energy Corp. on Oconee Units 1, 2 and 3, Re Tornado Mitigation Method
ML052770147
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/20/2005
From: Olshan L
NRC/NRR/DLPM/LPD2
To:
Duke Energy Corp
Olshan L N, NRR/DLPM, 415-1419
Shared Package
ML052770118 List:
References
TAC MC4608, TAC MC4609, TAC MC4610
Download: ML052770147 (5)


Text

October 20, 2005 LICENSEE:

DUKE ENERGY CORPORATION FACILITY:

OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3

SUBJECT:

SUMMARY

OF SEPTEMBER 27, 2005, MEETING WITH DUKE ENERGY ON THE TORNADO MITIGATION METHOD SUBMITTAL (TAC NOS. MC4608, MC4609, AND MC4610)

On September 27, 2005, the Nuclear Regulatory Commission (NRC) met with Duke Energy Corporation (the licensee) to discuss the Oconee tornado mitigation method submittal that is being prepared by the licensee. Enclosure 1 is a list of attendees. Enclosure 2 is the handouts provided by the licensee during the meeting.

The licensee stated that it is using a two-phase approach. The first phase involves the submittal of the proposed methodology and licensing basis by the end of December 2005.

After NRC approval of the methodology and licensing basis, the licensee will update the Oconee Updated Final Safety Analysis Report. The second phase is the evaluation of station hardware upgrades for possible implementation in 2006 or 2007. The station hardware upgrades that are being evaluated include a new high-head station auxiliary service water system, installation of physical barriers, and upgraded power supplies.

The proposed methodology would not consider tornado wind speeds greater than 200 miles per hour based on probability considerations. Other events, such as tornado-induced main steam line breaks and loss-of-coolant, accidents, and tornadoes that affect both the Oconee Station and the Keowee Hydro units, would also not be considered in the proposed methodology. The NRC staff expressed concern with this approach for eliminating consideration of certain wind speeds and events, and stated that it would further evaluate this approach and discuss it with NRC management.

CONTACT:

Leonard N. Olshan, NRR 301-415-1419 lno@nrc.gov The licensee and the NRC staff agreed to have another meeting prior to the submittal of the methodology and tentatively scheduled it for the week of October 31, 2005.

Please direct any inquiries to Leonard N. Olshan, at 301-415-1419, or lno@nrc.gov.

/RA/

Leonard N. Olshan, Senior Project Manager, Section1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287

Enclosures:

1. List of Attendees
2. Slide Presentation cc w/encls: See next page

ML052770147

Enclosure:

ML052770320 NRC-001 OFFICE PDII-1/PM PDII-1/LA PDII-1/SC NAME LOlshan CHawes EMarinos DATE 10/ 19 /05 10/ 19 /05 10/ 20 /05

ENCLOSURE 1 LIST OF ATTENDEES MEETING TO DISCUSS THE OCONEE TORNADO MITIGATION METHOD SUBMITTAL SEPTEMBER 27, 2005 NRC DUKE E. Hackett J. Robertson J. Tatum S. Newman C. Doutt L. Kanipe M. Stutzke G. Davenport L. Olshan G. McAninch M. Ernstes (by phone)

Oconee Nuclear Station, Units 1, 2, and 3 cc:

Ms. Lisa F. Vaughn Duke Energy Corporation 526 South Church Street P. O. Box 1006 Mail Code = EC07H Charlotte, North Carolina 28201-1006 Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.

Columbia, SC 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.

Suite 705 Rosslyn, VA 22209 Ms. Karen E. Long Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Mr. R. L. Gill, Jr.

Manager - Nuclear Regulatory Issues and Industry Affairs Duke Energy Corporation 526 S. Church St.

Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr.

Raleigh, NC 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672