ML20057G005: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:, | {{#Wiki_filter:, | ||
f OPERATING DATA REPORT DOCKET NO | f OPERATING DATA REPORT DOCKET NO | ||
$0-0346 | |||
'' AT E 30-01-93 COMPLETEL BY WALTER FLIPPIN TELEPHONE 419-321-8300 OPEP> STING STATUS 1. | |||
Unit Name: Davis-Eesse Unit 1 l Notes l | |||
2. | |||
Reporting Period. | |||
. SEPTEMBER 1993 l l | |||
3. | |||
Licensed Thermal Power (MWt). | |||
.2772 l | |||
l 4 | |||
Nameplate Rating (Gross MWe). | |||
.925 l | |||
l 5. | |||
Design Electrical Rating (Net MWe). | |||
.906 l | |||
l 6. | |||
Maximum Dependable Capacity (Gross MWe)..913 l | |||
l 7. | |||
Maximum Dependable Capacity (Net MWe). | |||
.868 l | |||
l 8. | |||
If Changes occur in Capacity Ratings | |||
[ | |||
l (Items number 3 through 7) since last report, give reasons: | |||
9. | |||
Power Level To Which Restricted, If Any (Net MWe): | |||
: 10. Reasons For Restrictions, If Any (Net MWe): | : 10. Reasons For Restrictions, If Any (Net MWe): | ||
This Month | This Month Yr-to-Date Cumulative | ||
: 11. Hours In Reporting Period. | : 11. Hours In Reporting Period. | ||
: 12. Number of Hours Reactor Was Critical. | 720.00 6,551.00 132,984.00 | ||
: 13. Reactor Reserve Shutdown Hours. | : 12. Number of Hours Reactor Was Critical. | ||
: 14. Hours Generator On-Line | 720.00 5,120.20 80,055.20 | ||
: 15. Unit Reserve Shutdown Hours. | : 13. Reactor Reserve Shutdown Hours. | ||
: 16. Gross Thermal Energy Generated (Lli) . | 0.00 0.00 5,532.00 | ||
: 17. Gross Electrical Energy Generated ( Lli) | : 14. Hours Generator On-Line 720.00 5,071.90 77,847.30 | ||
: 18. Net Electrical Energy Generated ( L'H ) . | : 15. Unit Reserve Shutdown Hours. | ||
: 19. Unit S e rvi c e Factor. | 0.00 0.00 1,732.50 | ||
: 20. Unit Availability Factor. | : 16. Gross Thermal Energy Generated (Lli). | ||
: 21. Unit Capacity Factor (Using MDC Net). | 1,994,509 13,385,433 194,064,556 | ||
: 22. Unit Capacity Factor (Using DER Net). | : 17. Gross Electrical Energy Generated ( Lli) 661,254 4,450,522 64,382,835 | ||
: 23. Unit Forced Outage Rate. | : 18. Net Electrical Energy Generated ( L'H ). | ||
: 24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each): | 628,977 4,224,389 60,667,362 | ||
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup: | : 19. Unit S e rvi c e Factor. | ||
: 26. Units In Test Status (Prior to Commercial Operation): | 100.00 77.42 58.54 | ||
: 20. Unit Availability Factor. | |||
9310200075 PDR | 100.00 77.42 59.84 | ||
: 21. Unit Capacity Factor (Using MDC Net). | |||
100,64 74.29 52.56 | |||
: 22. Unit Capacity Factor (Using DER Net). | |||
96.42 71.18 50.35 | |||
: 23. Unit Forced Outage Rate. | |||
0.00 0.50 21.77 | |||
: 24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each): | |||
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup: | |||
: 26. Units In Test Status (Prior to Commercial Operation): | |||
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9310200075 931014 PDR ADOCK 05000346 R | |||
ppy | |||
t | t Operational Summary September 1993 Reactor power was maintained at approximately 100 percent full power until 2325 on September 11, 1993, when a manual power reduction to approximately 91 percent was initiated to perform main turbine valve testing and Control Rod Drive (CRD) exercising. | ||
Operational Summary September 1993 Reactor power was maintained at approximately 100 percent full power until 2325 on September 11, 1993, when a manual power reduction to approximately 91 percent was initiated to perform main turbine valve testing and Control Rod Drive (CRD) exercising. | |||
After completion of main turbine control valve testing and CRD exercising, reac-tor power was slowly increased to approximately 100 percent full power which was achieved at 0238 on September 12, 1993. | After completion of main turbine control valve testing and CRD exercising, reac-tor power was slowly increased to approximately 100 percent full power which was achieved at 0238 on September 12, 1993. | ||
Reactor power was maintained at this power level for the rest of the month. | Reactor power was maintained at this power level for the rest of the month. | ||
r i | r i | ||
.}} | |||
Latest revision as of 11:16, 17 December 2024
| ML20057G005 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/30/1993 |
| From: | TOLEDO EDISON CO. |
| To: | |
| Shared Package | |
| ML20057F998 | List: |
| References | |
| NUDOCS 9310200075 | |
| Download: ML20057G005 (4) | |
Text
,
f OPERATING DATA REPORT DOCKET NO
$0-0346
AT E 30-01-93 COMPLETEL BY WALTER FLIPPIN TELEPHONE 419-321-8300 OPEP> STING STATUS 1.
Unit Name: Davis-Eesse Unit 1 l Notes l
2.
Reporting Period.
. SEPTEMBER 1993 l l
3.
Licensed Thermal Power (MWt).
.2772 l
l 4
Nameplate Rating (Gross MWe).
.925 l
l 5.
Design Electrical Rating (Net MWe).
.906 l
l 6.
Maximum Dependable Capacity (Gross MWe)..913 l
l 7.
Maximum Dependable Capacity (Net MWe).
.868 l
l 8.
If Changes occur in Capacity Ratings
[
l (Items number 3 through 7) since last report, give reasons:
9.
Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any (Net MWe):
This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period.
720.00 6,551.00 132,984.00
- 12. Number of Hours Reactor Was Critical.
720.00 5,120.20 80,055.20
- 13. Reactor Reserve Shutdown Hours.
0.00 0.00 5,532.00
- 14. Hours Generator On-Line 720.00 5,071.90 77,847.30
- 15. Unit Reserve Shutdown Hours.
0.00 0.00 1,732.50
- 16. Gross Thermal Energy Generated (Lli).
1,994,509 13,385,433 194,064,556
- 17. Gross Electrical Energy Generated ( Lli) 661,254 4,450,522 64,382,835
- 18. Net Electrical Energy Generated ( L'H ).
628,977 4,224,389 60,667,362
- 19. Unit S e rvi c e Factor.
100.00 77.42 58.54
- 20. Unit Availability Factor.
100.00 77.42 59.84
- 21. Unit Capacity Factor (Using MDC Net).
100,64 74.29 52.56
- 22. Unit Capacity Factor (Using DER Net).
96.42 71.18 50.35
- 23. Unit Forced Outage Rate.
0.00 0.50 21.77
- 24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9310200075 931014 PDR ADOCK 05000346 R
ppy
t Operational Summary September 1993 Reactor power was maintained at approximately 100 percent full power until 2325 on September 11, 1993, when a manual power reduction to approximately 91 percent was initiated to perform main turbine valve testing and Control Rod Drive (CRD) exercising.
After completion of main turbine control valve testing and CRD exercising, reac-tor power was slowly increased to approximately 100 percent full power which was achieved at 0238 on September 12, 1993.
Reactor power was maintained at this power level for the rest of the month.