{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 1
{{#Wiki_filter:1 December 16, 2008 South Carolina Electric & Gas Company Mr. Jeffrey B. Archie Vice President, Nuclear Operations Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065  
SAM NUNN ATLANTA    FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 December 16, 2008 South Carolina Electric & Gas Company Mr. Jeffrey B. Archie Vice President, Nuclear Operations Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065


==SUBJECT:==
==SUBJECT:==
Line 22: Line 21:


==SUMMARY==
==SUMMARY==
, VIRGIL C. SUMMER NUCLEAR STATION, DOCKET NO. 05-395
, VIRGIL C. SUMMER NUCLEAR STATION, DOCKET NO. 05-395  


==Dear Mr. Archie:==
==Dear Mr. Archie:==
This refers to the Category 1 public meeting conducted at your request in the Region II Office on December 11, 2008, at 10:00 a.m. The meetings purpose was to discuss and review accomplishments achieved during the spring 2008 refueling outage and work force for the planned units at Virgil C. Summer Nuclear Station. Enclosed is a list of attendees (Enclosure 1) and the presentation handouts (Enclosure 2).
This refers to the Category 1 public meeting conducted at your request in the Region II Office on December 11, 2008, at 10:00 a.m. The meetings purpose was to discuss and review accomplishments achieved during the spring 2008 refueling outage and work force for the planned units at Virgil C. Summer Nuclear Station. Enclosed is a list of attendees (Enclosure 1) and the presentation handouts (Enclosure 2).
This meeting was mutually beneficial and provided the NRC staff with an understanding of your focus goals and direction for the operating unit and planned units.
This meeting was mutually beneficial and provided the NRC staff with an understanding of your focus goals and direction for the operating unit and planned units.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this letter, please contact me at (404) 562-4655.
Should you have any questions concerning this letter, please contact me at (404) 562-4655.
Sincerely,
Sincerely,  
                                              /RA/
/RA/
James S. Dodson, Acting Chief Reactor Projects Branch 5 Division of Reactor Projects
James S. Dodson, Acting Chief Reactor Projects Branch 5 Division of Reactor Projects  


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
: 1. List of Attendees
: 2. Licensee Presentation Handouts Docket No.: 50-395 License No.: NPF-12 cc w/encls: (See page 2)
: 2. Licensee Presentation Handouts Docket No.: 50-395 License No.: NPF-12 cc w/encls: (See page 2)
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931


_________________________                      G SUNSI REVIEW COMPLETE OFFICE               RII:DRP SIGNATURE             /RA/
G SUNSI REVIEW COMPLETE OFFICE RII:DRP SIGNATURE  
NAME                 JDodson DATE                     12/   /2008     12/ /2008       12/   /2008     12/ /2008     12/   /2008     12/   /2008 E-MAIL COPY?           YES         NO YES       NO   YES         NO YES         NO YES         NO YES           NO
/RA/
NAME JDodson DATE 12/ /2008 12/ /2008 12/ /2008 12/ /2008 12/ /2008 12/ /2008 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO  


SCE&G                                       2 cc w/encl:
SCE&G 2
R. J. White                                   David A. Lavigne Nuclear Coordinator                           General Manager S.C. Public Service Authority Mail Code 802   Organization Development Electronic Mail Distribution                  South Carolina Electric & Gas Company Electronic Mail Distribution Kathryn M. Sutton, Esq.
cc w/encl:
Morgan, Lewis & Bockius LLP                   Senior Resident Inspector Electronic Mail Distribution                 South Carolina Electric and Gas Company Virgil C. Summer Nuclear Station Susan E. Jenkins                             U.S. NRC Director, Division of Waste Management       576 Stairway Road Bureau of Land and Waste Management           Jenkinsville, SC 29065 S.C. Department of Health and                 Electronic Mail Distribution Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.
R. J. White Nuclear Coordinator S.C. Public Service Authority Mail Code 802 Electronic Mail Distribution Kathryn M. Sutton, Esq.
Morgan, Lewis & Bockius LLP Electronic Mail Distribution Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.
S.C. Department of Health and Environmental Control Electronic Mail Distribution Bruce L. Thompson, Manager Nuclear Licensing (Mail Code 830)
S.C. Department of Health and Environmental Control Electronic Mail Distribution Bruce L. Thompson, Manager Nuclear Licensing (Mail Code 830)
South Carolina Electric & Gas Company Robert M. Fowlkes General Manager Engineering Services South Carolina Electric & Gas Company Electronic Mail Distribution Thomas D. Gatlin General Manager Nuclear Plant Operations (Mail Code 303)
South Carolina Electric & Gas Company Robert M. Fowlkes General Manager Engineering Services South Carolina Electric & Gas Company Electronic Mail Distribution Thomas D. Gatlin General Manager Nuclear Plant Operations (Mail Code 303)
South Carolina Electric & Gas Company Electronic Mail Distribution
South Carolina Electric & Gas Company Electronic Mail Distribution David A. Lavigne General Manager Organization Development South Carolina Electric & Gas Company Electronic Mail Distribution Senior Resident Inspector South Carolina Electric and Gas Company Virgil C. Summer Nuclear Station U.S. NRC 576 Stairway Road Jenkinsville, SC 29065 Electronic Mail Distribution  


LIST OF ATTENDEES Licensee J. Archie, Site Vice President D. Gatlin, Plant Manager R. Ray, Operations Training Supervisor D. Shue, Planning & Outage Management Manager Region II L. Reyes, Regional Administrator V. McCree, Deputy Regional Administrator L. Wert, Director, Division of Reactor Projects R. Croteau, Deputy Director, Division of Reactor Safety M. Widmann, Chief, Operator Licensing Branch J. Dodson, Acting Chief, Reactor Projects Branch 5 Enclosure 1
LIST OF ATTENDEES Licensee J. Archie, Site Vice President D. Gatlin, Plant Manager R. Ray, Operations Training Supervisor D. Shue, Planning & Outage Management Manager Region II L. Reyes, Regional Administrator V. McCree, Deputy Regional Administrator L. Wert, Director, Division of Reactor Projects R. Croteau, Deputy Director, Division of Reactor Safety M. Widmann, Chief, Operator Licensing Branch J. Dodson, Acting Chief, Reactor Projects Branch 5  


Outage Overview:
Refuel 17 Post Outage Review Don Shue Manager, Planning & Outage Management 3/4Duration: April 25 to June 14, 2008 3/4Focus Of Goals:
3/4Duration: April 25 to June 14, 2008 Refuel 17 Post Outage Review        3/4Focus Of Goals:
Nuclear Safety Radiological Safety Industrial Safety 3/4Outage Milestones:
Nuclear Safety Radiological Safety Industrial Safety Don Shue          3/4Outage Milestones:
53 of 54 Met (98%)
Manager, Planning & Outage Management 53 of 54 Met (98%)
OutageOverview:
Preoutage Focus Areas:                        Preoutage Focus Areas:                RF17 Major Projects:
3/4 Supplemental Workers:
3/4 Supplemental Workers:                       3/4 Computerized Maintenance
3/4 500 General Workers (Various Disciplines) 3/4 200 Specialty Contractors 3/4 Able To Fill All Required Positions PreoutageFocusAreas:
* Items To Be 3/4 500 General Workers (Various Disciplines)   Management System (CMMS)            Reviewed:
3/4 Computerized Maintenance Management System (CMMS) 3/4 Danger Tagging 3/4 Work Control 3/4 Materials Management 3/4 Condition Reports 3/4 On Site Information Services Technology (IST)
3/4 200 Specialty Contractors                   3/4 Danger Tagging                    3/4Major Modifications 3/4 Able To Fill All Required Positions         3/4 Work Control 3/4 Items Having 3/4 Materials Management Significant Schedule 3/4 Condition Reports Impact 3/4 On Site Information Services Technology (IST)         3/4Items Previously Support                              Discussed At Pre-Outage Meeting
Support PreoutageFocusAreas:
* Items To Be Reviewed:
3/4Major Modifications 3/4 Items Having Significant Schedule Impact 3/4Items Previously Discussed At Pre-Outage Meeting RF17MajorProjects:


Pressurizer Weld Overlay (Plan):          Pressurizer Weld Overlay (Results):                  C RCP Gasket Replacement (Plan):
3/4Required By Material Reliability Program Number 139 (MRP-139).
3/4Required By Material Reliability Program 3/4Overlay Went Very Well                              3/4 Slow Weep on Startup Number 139 (MRP-139).                   3/4Second Lowest Dose In Nation (10.17R)                  Under Cold Conditions 3/4VC Summer Allowed Deviation to 2008     3/4Completed Ahead of Schedule                          3/4 Does Not Weep Under 3/4Overlay Six Nozzles                     3/4Attributable To:
3/4VC Summer Allowed Deviation to 2008 3/4Overlay Six Nozzles 3/4 Surge Line (1) 3/4 Safety Valves (3) 3/4 Spray Line (1) 3/4 Power Operated Relief (1) 3/4Repair Vendor: WSI PressurizerWeldOverlay(Plan):
Hot Conditions 3/4 Surge Line (1)                         3/4Preoutage Planning 3/4 Safety Valves (3) 3/4Highly Qualified Vendor 3/4 Spray Line (1)                                                                                                     3/4 Upgrade Flange 3/4VC Summer Employee                                                            Using Hydranuts 3/4 Power Operated Relief (1)
3/4Overlay Went Very Well 3/4Second Lowest Dose In Nation (10.17R) 3/4Completed Ahead of Schedule 3/4Attributable To:
Ownership Of Project                                                     3/4 Repair Vendor:
3/4Preoutage Planning 3/4Highly Qualified Vendor 3/4VC Summer Employee Ownership Of Project PressurizerWeldOverlay(Results):
3/4Repair Vendor: WSI AREVA C RCP Gasket Replacement:              B.5.B Large Area Fire Enhancements                    Refueling Focus Items:
C RCPGasketReplacement(Plan):
3/4 No External Leakage
3/4 Slow Weep on Startup Under Cold Conditions 3/4 Does Not Weep Under Hot Conditions 3/4 Upgrade Flange Using Hydranuts 3/4 Repair Vendor:
* Completed Online Plant
AREVA C RCPGasketReplacement:
* Visual Inspection Of Changes in 2007                                         Lead Test Assembly 3/4 Completed In Scheduled Duration
3/4 No External Leakage 3/4 Completed In Scheduled Duration 3/4 VC Summer Stepped In To Support 3/4 Hydranuts Were Successful 3/4 Shaft Scratch Issue B.5.BLargeAreaFireEnhancements
* Completed Online Plant Changes in 2007
* RF System Modifications:
* RF System Modifications:
* Installation Of New 3/4 Main Feedwater Control Rods 3/4 VC Summer Stepped In To Support                              3/4 Condensate 3/4 Hydranuts Were                            3/4 Reactor Building Spray
3/4 Main Feedwater 3/4 Condensate 3/4 Reactor Building Spray
* No Fuel Leaks Successful
* Modifications Completed
* Modifications Completed
* Core Reloaded Per 3/4 Shaft Scratch Issue
* B.5.B NRC Inspection Completed In June 2008 RefuelingFocusItems:
* B.5.B NRC Inspection                               Design Completed In June 2008
* Visual Inspection Of Lead Test Assembly
* Installation Of New Control Rods
* No Fuel Leaks
* Core Reloaded Per Design
* Will Perform Upflow Conversion In RF-18
* Will Perform Upflow Conversion In RF-18


Secondary Inspections:
Turbine&GeneratorInspection:
Turbine & Generator Inspection:                  Turbine & Generator Inspection:
Flow Accelerated Corrosion (FAC)
* Turbine Inspection:
* Turbine Inspection:
3/4Cleaning 3/4Inspection 3/4NDE
* Generator Inspection:
3/4Robotic 3/4Wedge Tapping Turbine&GeneratorInspection:
* Alterex Refurbishment:
* Alterex Refurbishment:
3/4Refurbished Offsite
3/4Refurbished Offsite 3/4Stiffened 3/4Realigned
* Inspected 302 Grid 3/4Cleaning Locations:
3/4Inspection                                      3/4Stiffened
* No FAC Replacements 3/4NDE                                            3/4Realigned Were Required
* Generator Inspection:
* Results:
* Results:
3/4Robotic                                          3/4Very Low Vibration 3/4Wedge Tapping                                    3/4No. 9 Bearing is Less Than 0.5 mils Feedwater Booster Pump Repairs:                 Circulating Water Pump Motors:                   Positives:
3/4Very Low Vibration 3/4No. 9 Bearing is Less Than 0.5 mils SecondaryInspections:
* A Pump Has New
FlowAcceleratedCorrosion(FAC)
* Began Purchase of
* Inspected 302 Grid Locations:
* Outage Communication Was Very Good Design Seals                                    New Motors Over 2
* No FAC Replacements Were Required FeedwaterBoosterPumpRepairs:
* B Pump Was                                     Years Ago
* A Pump Has New Design Seals
* B Pump Was Refurbished Including New Design Seals
* New Style Seals Are Performing Well
* C & D Pumps Previously Refurbished CirculatingWaterPumpMotors:
* Began Purchase of New Motors Over 2 Years Ago
* Installed New Motor Onto A CW Pump
* The Old CW Motor Will Now Be A Spare
* New Motors Are More Reliable Positives:
* Outage Communication Was Very Good
* Shutdown to Mode 5 Increasing Went Well:
* Shutdown to Mode 5 Increasing Went Well:
Refurbished Including
3/4 Record Short Duration For VC Summer 3/4 Total Duration of 569 Hours 3/4 VC Summer Previous Best 595 Hours
* Installed New Motor                                3/4 Record Short Duration For VC Summer New Design Seals                                Onto A CW Pump                                  3/4 Total Duration of 569 Hours 3/4 VC Summer Previous Best 595 Hours
* Resolved Preoutage 2 MW Loss 3/4 Turbine Gland Seal Loss via HP Shell To Packing Gland 3/4 Replace Divider Gaskets In HP Heaters 1A & 1B 3/4 Repair Tube Issues In LP Heaters Including 6A
* New Style Seals Are
* The Old CW Motor Performing Well                                    Will Now Be A Spare
* Resolved Preoutage 2 MW Loss 3/4 Turbine Gland Seal Loss via HP Shell To Packing Gland
* C & D Pumps
* New Motors Are 3/4 Replace Divider Gaskets In HP Heaters 1A & 1B Previously Refurbished                            More Reliable 3/4 Repair Tube Issues In LP Heaters Including 6A


Positives:                                      Positives:                              Significant Challenges:
Positives:
* Installed New Control Rod Drive Cooling Tower:
* Installed New Control Rod Drive Cooling Tower:
3/4 Inspected Existing Tower Early In Outage 3/4 Had Contingency In Place For New Tower Positives:
* Upgraded FW Control Valve Air System:
* Upgraded FW Control Valve Air System:
* Four Major Contributors 3/4 Inspected Existing Tower Early In Outage      3/4 New Air Filters                        3/4 DG Governor Replacement 3/4 Had Contingency In Place For New Tower        3/4 Air Gag System                        3/4 Addition Of SW Valves On RB Return To Pond 3/4 Stainless Steel Tubing                3/4 B Train RHR Discharge To RCS Valve Leakage 3/4 New Solenoids                          3/4 Digital Rod Position Indication
3/4 New Air Filters 3/4 Air Gag System 3/4 Stainless Steel Tubing 3/4 New Solenoids SignificantChallenges:
* Four Major Contributors 3/4 DG Governor Replacement 3/4 Addition Of SW Valves On RB Return To Pond 3/4 B Train RHR Discharge To RCS Valve Leakage 3/4 Digital Rod Position Indication
* All Were From Mode 5 To Plant On Line
* All Were From Mode 5 To Plant On Line
* Performing Causal Evaluation (CR-08-02965)
* Performing Causal Evaluation (CR-08-02965)
* Outage Critique Information 3/4 Approximately 400 Items Reviewed 3/4 Resolution At Management Level Challenges:                                      Challenges:                            Challenges:
* Outage Critique Information 3/4 Approximately 400 Items Reviewed 3/4 Resolution At Management Level Challenges:
* DG Governor Replacement (ECR-50466):
* DG Governor Replacement (ECR-50466):
* Service Water to RB
3/4Improve Reliability 3/4Old Governor No Longer Vendor Supported 3/4Replacement Requires Precise Tuning 3/4Quick Speed Response on Start 3/4Long Term Stability 3/4Proved Very Difficult 3/473 Hour Delay Challenges:
* Service Water to RB Upgrades 3/4Improve Reliability                            Upgrades (GL 96-06)                     3/4VCS Redesign Required 3/4Old Governor No Longer Vendor Supported        3/4New Butterfly Valves                   3/478 Hour Delay 3/4 XVB-3107 A&B 3/4Replacement Requires Precise Tuning 3/4 Quick Speed Response on Start              3/4Prevent Water Hammer 3/4 Long Term Stability                        3/4Specifications:
* Service Water to RB Upgrades (GL 96-06) 3/4New Butterfly Valves 3/4XVB-3107 A&B 3/4Prevent Water Hammer 3/4Specifications:
3/4 Proved Very Difficult                        3/4 VCS Supplied Critical 3/473 Hour Delay                                        Specifications 3/4 Valves Certified By Vendor 3/4 Did Not Meet Dynamic Specifications
3/4VCS Supplied Critical Specifications 3/4Valves Certified By Vendor 3/4Did Not Meet Dynamic Specifications Challenges:
* Service Water to RB Upgrades 3/4VCS Redesign Required 3/478 Hour Delay


Challenges:                                Challenges:              Challenges:
Challenges:
* RHR Discharge Valve
* RHR Discharge Valve XVG-8887B 3/4Found Packing Leak 3/4In ECCS Post Accident Flowpath 3/4Led to Discovery Of Scratched Stem 3/4Required Complete Valve Disassembly 3/465 Hour Delay Challenges:
* Digital Rod Position  3/4 Misaligned Cards led XVG-8887B                                 Indication (DRPI)        to Overload 3/4Found Packing Leak                         3/4Control Room Rod    3/4 Overload Damaged 3/4In ECCS Post                                 Position Indication  Wires Accident Flowpath                         3/4Computer Card        3/4 Solder Dislodged Based System 3/4Led to Discovery Of Scratched Stem       3/4Inconsistencies In Rod Indication 3/4Required Complete Valve Disassembly    3/4Removed Panel From MCB                                   3/4 Allowed Pin Shorts 3/465 Hour Delay                                                      3/4 76 Hour Delay 3/4Tested Cards Questions?
* Digital Rod Position Indication (DRPI) 3/4Control Room Rod Position Indication 3/4Computer Card Based System 3/4Inconsistencies In Rod Indication 3/4Removed Panel From MCB 3/4Tested Cards Challenges:
3/4 Misaligned Cards led to Overload 3/4 Overload Damaged Wires 3/4 Solder Dislodged 3/4 Allowed Pin Shorts 3/4 76 Hour Delay Questions?
Questions?


3/4 Replace     23 Licensed Operators lost through attrition:
` Unit 1 Attrition
This includes anticipated losses of 2 licensed operators per year and adjusts for current shortfall due to recent losses
` Units 2 and 3 Initial Staffing 3/4 3/4 Replace 23 Licensed Operators lost through Replace 23 Licensed Operators lost through attrition:
` Unit  1 Attrition                              3/4 Provide   32 Experienced Licensed Operators to Units 2 and 3:
attrition:
` Units   2 and 3 Initial Staffing                  - 21 Senior Reactor Operators
This includes anticipated losses of 2 licensed operators per This includes anticipated losses of 2 licensed operators per year and adjusts for current shortfall due to recent losses year and adjusts for current shortfall due to recent losses 3/4 3/4 Provide 32 Experienced Licensed Operators to Provide 32 Experienced Licensed Operators to Units 2 and 3:
                                                      - 11 Reactor Operators 3/4 An   estimated 55 new licenses will be required on Unit 1 3/4 Current staffing plans for Units 2 and 3 are   3/4 Totals:
Units 2 and 3:
built around providing a solid core of Unit 1
-- 21 Senior Reactor Operators 21 Senior Reactor Operators
* Licensed Operators - 73 staff to ensure preservation of our safety
-- 11 Reactor Operators 11 Reactor Operators 3/4 3/4 An estimated 55 new licenses will be required An estimated 55 new licenses will be required on Unit 1 on Unit 1 3/4 Current staffing plans for Units 2 and 3 are built around providing a solid core of Unit 1 staff to ensure preservation of our safety culture.
* Non-Licensed Operators - 54 culture.                                        3/4 Through 2011, majority of new hires for Units 2 and 3 will be trained and qualified on Unit 1 3/4 40% of Licensed Operators will be Unit 1 3/4 Licensed Operator training for Units 2 and 3:
3/4 40% of Licensed Operators will be Unit 1 transfers, including 21 Senior Reactor Operators 3/4 The Operations Training staff for Units 2 and 3 will come from Unit 1.
transfers, including 21 Senior Reactor
3/4 Totals:
* starts in 2012 Operators
* Licensed Operators - 73
* combines qualified Unit 1 candidates with new hires 3/4 The Operations Training staff for Units 2 and 3/4 Starting in 2012, new hires for Units 2 and 3 will 3 will come from Unit 1.                          go directly into Unit 2 organization.
* Non-Licensed Operators - 54 3/4 Through 2011, majority of new hires for Units 2 and 3 will be trained and qualified on Unit 1 3/4 Licensed Operator training for Units 2 and 3:
* starts in 2012
* combines qualified Unit 1 candidates with new hires 3/4 Starting in 2012, new hires for Units 2 and 3 will go directly into Unit 2 organization.


Unit 1 Training staff increased in 2008 Licensing exam schedule needed to support Hiring one third of Unit 2 and 3 Instructor staff annually from 2008 through 2010 staffing projections:
Unit 1 Training staff increased in 2008 Hiring one third of Unit 2 and 3 Instructor staff annually from 2008 through 2010 Future Unit 2 and 3 instructors will be trained on Unit 1 to:
* Future Unit 2 and 3 instructors will be trained on Unit 1 to:                                             3/4 Unit 1 - 2009 through 2015
- Imbed the VCS culture
      - Imbed the VCS culture
- Assist with increased training classes to support Unit 2 and 3 pipeline
      - Assist with increased training classes to support 3/4  8 initial license exams, up to 12 candidates Unit 2 and 3 pipeline per exam
* One third of Unit 2 and 3 Instructor staff will transfer from Unit 1 annually, starting in 2010 Licensing exam schedule needed to support staffing projections:
* One third of Unit 2 and 3 Instructor staff will transfer from Unit 1 annually, starting in 2010 Unit 2 - 2014 through 2015
3/4 Unit 1 - 2009 through 2015 3/4 8 initial license exams, up to 12 candidates per exam Unit 2 - 2014 through 2015
* Four initial exams
* Four initial exams
* Up to 16 candidates per exam
* Up to 16 candidates per exam

Latest revision as of 13:57, 14 January 2025

Public Meeting Summary, Virgil C. Summer Nuclear Station, Docket No.05-395
ML083520416
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/16/2008
From: Jim Dodson
NRC/RGN-II
To: Archie J
South Carolina Electric & Gas Co
References
Download: ML083520416 (11)


Text

1 December 16, 2008 South Carolina Electric & Gas Company Mr. Jeffrey B. Archie Vice President, Nuclear Operations Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065

SUBJECT:

PUBLIC MEETING

SUMMARY

, VIRGIL C. SUMMER NUCLEAR STATION, DOCKET NO.05-395

Dear Mr. Archie:

This refers to the Category 1 public meeting conducted at your request in the Region II Office on December 11, 2008, at 10:00 a.m. The meetings purpose was to discuss and review accomplishments achieved during the spring 2008 refueling outage and work force for the planned units at Virgil C. Summer Nuclear Station. Enclosed is a list of attendees (Enclosure 1) and the presentation handouts (Enclosure 2).

This meeting was mutually beneficial and provided the NRC staff with an understanding of your focus goals and direction for the operating unit and planned units.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this letter, please contact me at (404) 562-4655.

Sincerely,

/RA/

James S. Dodson, Acting Chief Reactor Projects Branch 5 Division of Reactor Projects

Enclosures:

1. List of Attendees
2. Licensee Presentation Handouts Docket No.: 50-395 License No.: NPF-12 cc w/encls: (See page 2)

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931

G SUNSI REVIEW COMPLETE OFFICE RII:DRP SIGNATURE

/RA/

NAME JDodson DATE 12/ /2008 12/ /2008 12/ /2008 12/ /2008 12/ /2008 12/ /2008 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO

SCE&G 2

cc w/encl:

R. J. White Nuclear Coordinator S.C. Public Service Authority Mail Code 802 Electronic Mail Distribution Kathryn M. Sutton, Esq.

Morgan, Lewis & Bockius LLP Electronic Mail Distribution Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.

S.C. Department of Health and Environmental Control Electronic Mail Distribution Bruce L. Thompson, Manager Nuclear Licensing (Mail Code 830)

South Carolina Electric & Gas Company Robert M. Fowlkes General Manager Engineering Services South Carolina Electric & Gas Company Electronic Mail Distribution Thomas D. Gatlin General Manager Nuclear Plant Operations (Mail Code 303)

South Carolina Electric & Gas Company Electronic Mail Distribution David A. Lavigne General Manager Organization Development South Carolina Electric & Gas Company Electronic Mail Distribution Senior Resident Inspector South Carolina Electric and Gas Company Virgil C. Summer Nuclear Station U.S. NRC 576 Stairway Road Jenkinsville, SC 29065 Electronic Mail Distribution

LIST OF ATTENDEES Licensee J. Archie, Site Vice President D. Gatlin, Plant Manager R. Ray, Operations Training Supervisor D. Shue, Planning & Outage Management Manager Region II L. Reyes, Regional Administrator V. McCree, Deputy Regional Administrator L. Wert, Director, Division of Reactor Projects R. Croteau, Deputy Director, Division of Reactor Safety M. Widmann, Chief, Operator Licensing Branch J. Dodson, Acting Chief, Reactor Projects Branch 5

Refuel 17 Post Outage Review Don Shue Manager, Planning & Outage Management 3/4Duration: April 25 to June 14, 2008 3/4Focus Of Goals:

Nuclear Safety Radiological Safety Industrial Safety 3/4Outage Milestones:

53 of 54 Met (98%)

OutageOverview:

3/4 Supplemental Workers:

3/4 500 General Workers (Various Disciplines) 3/4 200 Specialty Contractors 3/4 Able To Fill All Required Positions PreoutageFocusAreas:

3/4 Computerized Maintenance Management System (CMMS) 3/4 Danger Tagging 3/4 Work Control 3/4 Materials Management 3/4 Condition Reports 3/4 On Site Information Services Technology (IST)

Support PreoutageFocusAreas:

  • Items To Be Reviewed:

3/4Major Modifications 3/4 Items Having Significant Schedule Impact 3/4Items Previously Discussed At Pre-Outage Meeting RF17MajorProjects:

3/4Required By Material Reliability Program Number 139 (MRP-139).

3/4VC Summer Allowed Deviation to 2008 3/4Overlay Six Nozzles 3/4 Surge Line (1) 3/4 Safety Valves (3) 3/4 Spray Line (1) 3/4 Power Operated Relief (1) 3/4Repair Vendor: WSI PressurizerWeldOverlay(Plan):

3/4Overlay Went Very Well 3/4Second Lowest Dose In Nation (10.17R) 3/4Completed Ahead of Schedule 3/4Attributable To:

3/4Preoutage Planning 3/4Highly Qualified Vendor 3/4VC Summer Employee Ownership Of Project PressurizerWeldOverlay(Results):

C RCPGasketReplacement(Plan):

3/4 Slow Weep on Startup Under Cold Conditions 3/4 Does Not Weep Under Hot Conditions 3/4 Upgrade Flange Using Hydranuts 3/4 Repair Vendor:

AREVA C RCPGasketReplacement:

3/4 No External Leakage 3/4 Completed In Scheduled Duration 3/4 VC Summer Stepped In To Support 3/4 Hydranuts Were Successful 3/4 Shaft Scratch Issue B.5.BLargeAreaFireEnhancements

  • Completed Online Plant Changes in 2007
  • RF System Modifications:

3/4 Main Feedwater 3/4 Condensate 3/4 Reactor Building Spray

  • Modifications Completed
  • B.5.B NRC Inspection Completed In June 2008 RefuelingFocusItems:
  • Visual Inspection Of Lead Test Assembly
  • No Fuel Leaks
  • Core Reloaded Per Design
  • Will Perform Upflow Conversion In RF-18

Turbine&GeneratorInspection:

  • Turbine Inspection:

3/4Cleaning 3/4Inspection 3/4NDE

  • Generator Inspection:

3/4Robotic 3/4Wedge Tapping Turbine&GeneratorInspection:

  • Alterex Refurbishment:

3/4Refurbished Offsite 3/4Stiffened 3/4Realigned

  • Results:

3/4Very Low Vibration 3/4No. 9 Bearing is Less Than 0.5 mils SecondaryInspections:

FlowAcceleratedCorrosion(FAC)

  • Inspected 302 Grid Locations:
  • No FAC Replacements Were Required FeedwaterBoosterPumpRepairs:
  • A Pump Has New Design Seals
  • B Pump Was Refurbished Including New Design Seals
  • New Style Seals Are Performing Well
  • C & D Pumps Previously Refurbished CirculatingWaterPumpMotors:
  • Began Purchase of New Motors Over 2 Years Ago
  • Installed New Motor Onto A CW Pump
  • The Old CW Motor Will Now Be A Spare
  • New Motors Are More Reliable Positives:
  • Outage Communication Was Very Good
  • Shutdown to Mode 5 Increasing Went Well:

3/4 Record Short Duration For VC Summer 3/4 Total Duration of 569 Hours 3/4 VC Summer Previous Best 595 Hours

  • Resolved Preoutage 2 MW Loss 3/4 Turbine Gland Seal Loss via HP Shell To Packing Gland 3/4 Replace Divider Gaskets In HP Heaters 1A & 1B 3/4 Repair Tube Issues In LP Heaters Including 6A

Positives:

3/4 Inspected Existing Tower Early In Outage 3/4 Had Contingency In Place For New Tower Positives:

  • Upgraded FW Control Valve Air System:

3/4 New Air Filters 3/4 Air Gag System 3/4 Stainless Steel Tubing 3/4 New Solenoids SignificantChallenges:

  • Four Major Contributors 3/4 DG Governor Replacement 3/4 Addition Of SW Valves On RB Return To Pond 3/4 B Train RHR Discharge To RCS Valve Leakage 3/4 Digital Rod Position Indication
  • All Were From Mode 5 To Plant On Line
  • Performing Causal Evaluation (CR-08-02965)
  • Outage Critique Information 3/4 Approximately 400 Items Reviewed 3/4 Resolution At Management Level Challenges:
  • DG Governor Replacement (ECR-50466):

3/4Improve Reliability 3/4Old Governor No Longer Vendor Supported 3/4Replacement Requires Precise Tuning 3/4Quick Speed Response on Start 3/4Long Term Stability 3/4Proved Very Difficult 3/473 Hour Delay Challenges:

3/4VCS Supplied Critical Specifications 3/4Valves Certified By Vendor 3/4Did Not Meet Dynamic Specifications Challenges:

Challenges:

  • RHR Discharge Valve XVG-8887B 3/4Found Packing Leak 3/4In ECCS Post Accident Flowpath 3/4Led to Discovery Of Scratched Stem 3/4Required Complete Valve Disassembly 3/465 Hour Delay Challenges:
  • Digital Rod Position Indication (DRPI) 3/4Control Room Rod Position Indication 3/4Computer Card Based System 3/4Inconsistencies In Rod Indication 3/4Removed Panel From MCB 3/4Tested Cards Challenges:

3/4 Misaligned Cards led to Overload 3/4 Overload Damaged Wires 3/4 Solder Dislodged 3/4 Allowed Pin Shorts 3/4 76 Hour Delay Questions?

Questions?

` Unit 1 Attrition

` Units 2 and 3 Initial Staffing 3/4 3/4 Replace 23 Licensed Operators lost through Replace 23 Licensed Operators lost through attrition:

attrition:

This includes anticipated losses of 2 licensed operators per This includes anticipated losses of 2 licensed operators per year and adjusts for current shortfall due to recent losses year and adjusts for current shortfall due to recent losses 3/4 3/4 Provide 32 Experienced Licensed Operators to Provide 32 Experienced Licensed Operators to Units 2 and 3:

Units 2 and 3:

-- 21 Senior Reactor Operators 21 Senior Reactor Operators

-- 11 Reactor Operators 11 Reactor Operators 3/4 3/4 An estimated 55 new licenses will be required An estimated 55 new licenses will be required on Unit 1 on Unit 1 3/4 Current staffing plans for Units 2 and 3 are built around providing a solid core of Unit 1 staff to ensure preservation of our safety culture.

3/4 40% of Licensed Operators will be Unit 1 transfers, including 21 Senior Reactor Operators 3/4 The Operations Training staff for Units 2 and 3 will come from Unit 1.

3/4 Totals:

  • Licensed Operators - 73
  • Non-Licensed Operators - 54 3/4 Through 2011, majority of new hires for Units 2 and 3 will be trained and qualified on Unit 1 3/4 Licensed Operator training for Units 2 and 3:
  • starts in 2012
  • combines qualified Unit 1 candidates with new hires 3/4 Starting in 2012, new hires for Units 2 and 3 will go directly into Unit 2 organization.

Unit 1 Training staff increased in 2008 Hiring one third of Unit 2 and 3 Instructor staff annually from 2008 through 2010 Future Unit 2 and 3 instructors will be trained on Unit 1 to:

- Imbed the VCS culture

- Assist with increased training classes to support Unit 2 and 3 pipeline

  • One third of Unit 2 and 3 Instructor staff will transfer from Unit 1 annually, starting in 2010 Licensing exam schedule needed to support staffing projections:

3/4 Unit 1 - 2009 through 2015 3/4 8 initial license exams, up to 12 candidates per exam Unit 2 - 2014 through 2015

  • Four initial exams
  • Up to 16 candidates per exam
  • First exam anticipated Spring 2014
  • Second exam Fall 2014
  • Two classes (32 candidates) examine spring 2015.
  • Up to 2 additional exams to support Unit 3 -

dates TBD