{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION May 8, 2019
{{#Wiki_filter:May 8, 2019


==SUBJECT:==
==SUBJECT:==
Line 41: Line 41:


Sincerely,
Sincerely,
/RA/
/RA/  
Glenn T. Dentel, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64 Enclosure:
Indian Point Nuclear Generating Cyber-Security Inspection Document Request cc w/encl: Distribution via ListServ


ML19130A042 Non-Sensitive  Publicly Available SUNSI Review Sensitive  Non-Publicly Available OFFICE RI/DRS RI/DRS NAME DWerkheiser GDentel DATE 5/8/19 5/8/19
Glenn T. Dentel, Chief Engineering Branch 2 Division of Reactor Safety


INDIAN POINT NUCLEAR GENERATING CYBER-SECURITY INSPECTION DOCUMENT REQUEST Inspection Report: 05000247/2019403 and 05000286/2019403 Inspection Dates: September 16 - 20 and September 30 - October 4, 2019 Inspection Procedure: IP 71130.10P, Cyber-Security, Issue Date May 15, 2017 Reference: Guidance Document for Development of the Request for Information (RFI) and Notification Letter for Full-Implementation of the Cyber Security Inspection, Issue Date October 26, 2017 NRC Inspectors: David Werkheiser, Lead Louis Dumont 610-337-5316 610-337-5183 David.Werkheiser@nrc.gov Louis.Dumont@nrc.gov NRC Contractors: Alan Konkal William (Bill) Johns Alan.Konkal@nrc.gov William.Johns@nrc.gov I. Information Requested for In-Office Preparation The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate components and Cyber Security Program (CSP) elements to develop a site-specific inspection plan.
Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64
 
Enclosure:
Indian Point Nuclear Generating Cyber-Security Inspection Document Request
 
cc w/encl: Distribution via ListServ
 
ML19130A042
 
SUNSI Review
 
Non-Sensitive Sensitive
 
Publicly Available Non-Publicly Available
 
OFFICE RI/DRS RI/DRS
 
NAME DWerkheiser GDentel
 
DATE 5/8/19 5/8/19
 
INDIAN POINT NUCLEAR GENERATING CYBER-SECURITY INSPECTION DOCUMENT REQUEST  
 
Enclosure Inspection Report:
05000247/2019403 and 05000286/2019403  
 
Inspection Dates:
September 16 - 20 and September 30 - October 4, 2019  
 
Inspection Procedure:
IP 71130.10P, Cyber-Security, Issue Date May 15, 2017  
 
Reference:
Guidance Document for Development of the Request for Information (RFI) and Notification Letter for Full-Implementation of the Cyber Security Inspection, Issue Date October 26, 2017  
 
NRC Inspectors:
David Werkheiser, Lead Louis Dumont 610-337-5316 610-337-5183 David.Werkheiser@nrc.gov Louis.Dumont@nrc.gov  
 
NRC Contractors:
Alan Konkal William (Bill) Johns Alan.Konkal@nrc.gov William.Johns@nrc.gov  
 
I.
 
Information Requested for In-Office Preparation The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate components and Cyber Security Program (CSP) elements to develop a site-specific inspection plan.


The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control portions of the CSP to be chosen as the sample set required to be inspected by the cyber security IP.
The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control portions of the CSP to be chosen as the sample set required to be inspected by the cyber security IP.
Line 57: Line 98:
The required Table RFI #1 information shall be provided on compact disc (CD) to the lead inspector by June 20, 2019. Please provide four copies of each CD submitted (i.e., one for each inspector/contractor). The preferred file format for all lists is a searchable Excel spreadsheet file on a CD. These CDs should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
The required Table RFI #1 information shall be provided on compact disc (CD) to the lead inspector by June 20, 2019. Please provide four copies of each CD submitted (i.e., one for each inspector/contractor). The preferred file format for all lists is a searchable Excel spreadsheet file on a CD. These CDs should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.


1  Enclosure
INDIAN POINT NUCLEAR GENERATING CYBER-SECURITY INSPECTION DOCUMENT REQUEST


INDIAN POINT NUCLEAR GENERATING CYBER-SECURITY INSPECTION DOCUMENT REQUEST Table RFI #1 Reference Section 3, Paragraph Number/Title:   Items 1 List All Identified Critical Systems and Critical Digital Assets All List CDA Facility and Site Ethernet - Transmission Control 2 Protocol/Internet Protocol (TCP/IP) Based Local Area Networks All (LANs) and Identify Those LANs That Have Non-CDAs On Them List CDA Facility and Site Non-Ethernet TCP/IP Based LANs Including 3 Those Industrial Networks and Identify LANs That Have Non-CDAs On All Them Network Topology Diagrams (Be Sure To Include all Network Intrusion Detection Systems (NIDS) and Security Information and Event 4      All Management (SIEMs) for Emergency Preparedness (EP) networks and Security Level 3 and 4 Networks)
Table RFI #1 Reference Section 3, Paragraph Number/Title:
List All Network Security Boundary Devices for EP Networks and All 8      All Network Security Boundary Devices for Levels 3 and 4 9 List CDA Wireless Industrial Networks   All NIDS Documentation for Critical Systems That Have CDAs Associated 11.a.1)
Items 1 List All Identified Critical Systems and Critical Digital Assets All  
11 with Them 11.a.2)
 
SIEM Documentation for Critical systems That Have CDAs Associated 12.a.1)
List CDA Facility and Site Ethernet - Transmission Control Protocol/Internet Protocol (TCP/IP) Based Local Area Networks (LANs) and Identify Those LANs That Have Non-CDAs On Them All
12 with Them 12.a.2)
 
List EP and Security Onsite and Offsite Digital Communication 14      All Systems Cyber Security Assessment and Cyber Security Incident Response 25      All Teams In addition to the above information please provide the following:
List CDA Facility and Site Non-Ethernet TCP/IP Based LANs Including Those Industrial Networks and Identify LANs That Have Non-CDAs On Them All  
(1) Electronic copy of your current Cyber Security Plan.
 
Network Topology Diagrams (Be Sure To Include all Network Intrusion Detection Systems (NIDS) and Security Information and Event Management (SIEMs) for Emergency Preparedness (EP) networks and Security Level 3 and 4 Networks)
All 8 List All Network Security Boundary Devices for EP Networks and All Network Security Boundary Devices for Levels 3 and 4 All 9 List CDA Wireless Industrial Networks All  
 
NIDS Documentation for Critical Systems That Have CDAs Associated with Them 11.a.1)
11.a.2)  
 
SIEM Documentation for Critical systems That Have CDAs Associated with Them 12.a.1)
12.a.2)
14 List EP and Security Onsite and Offsite Digital Communication Systems All 25 Cyber Security Assessment and Cyber Security Incident Response Teams All In addition to the above information please provide the following:  
(1) Electronic copy of your current Cyber Security Plan.


(2) Electronic copy of summary of changes (if any), including any 10 CFR 50.54p analysis to support those changes, made to the originally approved Cyber Security Plan.
(2) Electronic copy of summary of changes (if any), including any 10 CFR 50.54p analysis to support those changes, made to the originally approved Cyber Security Plan.
Line 79: Line 130:
(7) In a separate directory, an electronic copy of the documents listed in the matrix from (3) above.
(7) In a separate directory, an electronic copy of the documents listed in the matrix from (3) above.


INDIAN POINT NUCLEAR GENERATING CYBER-SECURITY INSPECTION DOCUMENT REQUEST Based on this information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and will submit a list of specific systems and equipment to your staff by July 19, 2019, for the second RFI (i.e., Table RFI #2).
INDIAN POINT NUCLEAR GENERATING CYBER-SECURITY INSPECTION DOCUMENT REQUEST  


II. Additional Information Requested to be Available Prior to Inspection.
Based on this information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and will submit a list of specific systems and equipment to your staff by July 19, 2019, for the second RFI (i.e., Table RFI #2).
 
II.
 
Additional Information Requested to be Available Prior to Inspection.


As stated above, in Section I. of this enclosure, the inspection team will examine the returned documentation requested from Table RFI #1 and submit the list of specific systems and equipment to your staff by July 19, 2019, for the second RFI (i.e., RFI #2).
As stated above, in Section I. of this enclosure, the inspection team will examine the returned documentation requested from Table RFI #1 and submit the list of specific systems and equipment to your staff by July 19, 2019, for the second RFI (i.e., RFI #2).
Line 89: Line 144:
The Table RFI #2 information shall be provided on CD to the lead inspector by August 21, 2019. Please provide four copies of each CD submitted (i.e., one for each inspector/contractor). The preferred file format for all lists is a searchable Excel spreadsheet file on a CD. These CDs should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
The Table RFI #2 information shall be provided on CD to the lead inspector by August 21, 2019. Please provide four copies of each CD submitted (i.e., one for each inspector/contractor). The preferred file format for all lists is a searchable Excel spreadsheet file on a CD. These CDs should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.


Table RFI #2 Section 3, Paragraph Number/Title:     Items Plant Computer System Block Diagram (If Plant Computer System Is 5      All Selected for Inspection)
Table RFI #2 Section 3, Paragraph Number/Title:
Plant Security System Block Diagram (If Security Computer System Is 6      All Selected for Inspection)
Items 5 Plant Computer System Block Diagram (If Plant Computer System Is Selected for Inspection)
Systems That Are Distributed Block Diagrams (For Systems Selected 7      All For Inspection)
All 6 Plant Security System Block Diagram (If Security Computer System Is Selected for Inspection)
All 7 Systems That Are Distributed Block Diagrams (For Systems Selected For Inspection)
All 10 Host-Based Intrusion Detection System Documentation (For CDAs for Systems Selected for Inspection)
10.a.1)
10.a.1)
Host-Based Intrusion Detection System Documentation (For CDAs for
Systems Selected for Inspection)
10.a.2)
10.a.2)
List all Maintenance and Test Equipment Used On CDAs for Systems 13      All Selected for Inspection 15 Configuration Management   All 16.b.
13 List all Maintenance and Test Equipment Used On CDAs for Systems Selected for Inspection All 15 Configuration Management All 16 Supply Chain Management 16.b.


16.c.1)
16.c.1)
16 Supply Chain Management 16.c.5)
16.c.5)
16.c.6)
16.c.6)
17 Portable Media and Mobile Device Control   All 18 Software Management     All 20 Vendor Access and Monitoring   All 21 Work Control     All 22 Device Access and Key Control   All 23 Password/Authenticator Policy   All
17 Portable Media and Mobile Device Control All 18 Software Management All 20 Vendor Access and Monitoring All 21 Work Control All 22 Device Access and Key Control All 23 Password/Authenticator Policy All  
 
INDIAN POINT NUCLEAR GENERATING CYBER-SECURITY INSPECTION DOCUMENT REQUEST
 
Table RFI #2 Section 3, Paragraph Number/Title:
Items 24 User Account/Credential Policy All 26 Corrective Actions Since Last NRC Inspection All In addition to the above information please provide the following:
(1) The documented CSP assessment and analysis for each CDA in each of the selected systems.


INDIAN POINT NUCLEAR GENERATING CYBER-SECURITY INSPECTION DOCUMENT REQUEST Table RFI #2 Section 3, Paragraph Number/Title:    Items 24 User Account/Credential Policy    All 26 Corrective Actions Since Last NRC Inspection  All In addition to the above information please provide the following:
III.
(1) The documented CSP assessment and analysis for each CDA in each of the selected systems.


III. Information Requested to be Available on First Day of Inspection For the specific systems and equipment identified in this enclosures Section II., provide the following RFI (i.e., Table: 1ST Week Onsite) on a CD by September 16, 2019, the first day of the inspection. All requested information shall follow the Table: 1ST Week Onsite and the guidance document referenced above.
Information Requested to be Available on First Day of Inspection For the specific systems and equipment identified in this enclosures Section II., provide the following RFI (i.e., Table: 1ST Week Onsite) on a CD by September 16, 2019, the first day of the inspection. All requested information shall follow the Table: 1ST Week Onsite and the guidance document referenced above.


The preferred file format for all lists is a searchable Excel spreadsheet file on a CD. The CD should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
The preferred file format for all lists is a searchable Excel spreadsheet file on a CD. The CD should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.


Table: 1ST Week Onsite Section 3, Paragraph Number/Title:   Items 10.a.3)
Table: 1ST Week Onsite Section 3, Paragraph Number/Title:
Host-Based Intrusion Detection System Documentation for CDAs 10      thru for systems selected for inspection 10.a.12)
Items 10 Host-Based Intrusion Detection System Documentation for CDAs for systems selected for inspection 10.a.3)
11.a.3)
thru 10.a.12)
NIDS Documentation for Critical Systems That Have CDAs 11      thru Associated with Them 11.a.15)
11 NIDS Documentation for Critical Systems That Have CDAs Associated with Them 11.a.3)
12.a.3)
thru 11.a.15)
SIEM Documentation for Critical Systems That Have CDAs 12      thru Associated with Them 12.a.14)
12 SIEM Documentation for Critical Systems That Have CDAs Associated with Them 12.a.3)
16.c.2)
thru 12.a.14)
16 Supply Chain Management    16.c.3)
16 Supply Chain Management 16.c.2)
16.c.3)
16.c.4)
16.c.4)
19 Cyber Security Event Notifications   All In addition to the above information please provide the following:
19 Cyber Security Event Notifications All In addition to the above information please provide the following:  
(1) Copies of the following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them:
(1) Copies of the following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them:
a. Original Final Safety Analysis Report Volumes; b. Original Safety Evaluation Report and Supplements;
a. Original Final Safety Analysis Report Volumes;  
 
b. Original Safety Evaluation Report and Supplements;  


INDIAN POINT NUCLEAR GENERATING CYBER-SECURITY INSPECTION DOCUMENT REQUEST c. Final Safety Analysis Report Question and Answers; d. Quality Assurance (QA) Plan; e. Latest Individual Plant Examination for External Events / Probabilistic Risk Assessment Report; and f. Vendor Manuals.
INDIAN POINT NUCLEAR GENERATING CYBER-SECURITY INSPECTION DOCUMENT REQUEST  
 
c. Final Safety Analysis Report Question and Answers;  
 
d. Quality Assurance (QA) Plan;  
 
e. Latest Individual Plant Examination for External Events / Probabilistic Risk Assessment Report; and  
 
f.
 
Vendor Manuals.
 
(2) Assessment and Corrective Actions:


(2) Assessment and Corrective Actions:
a. The most recent Cyber Security QA audit and/or self-assessment; and b. Corrective action documents (e.g., condition reports, including status of corrective actions) generated as a result of the most recent Cyber Security QA audit and/or self-assessment.
a. The most recent Cyber Security QA audit and/or self-assessment; and b. Corrective action documents (e.g., condition reports, including status of corrective actions) generated as a result of the most recent Cyber Security QA audit and/or self-assessment.


IV. Information Requested To Be Provided Throughout the Inspection (1) Copies of any corrective action documents generated as a result of the inspection teams questions or queries during the inspection.
IV.
 
Information Requested To Be Provided Throughout the Inspection (1) Copies of any corrective action documents generated as a result of the inspection teams questions or queries during the inspection.


(2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).
(2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).


If you have any questions regarding the information requested, please contact the inspection team leader.
If you have any questions regarding the information requested, please contact the inspection team leader.
5
}}
}}

Latest revision as of 02:33, 5 January 2025

Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000247/2019403 and 05000286/2019403
ML19130A042
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 05/08/2019
From: Glenn Dentel
Engineering Region 1 Branch 2
To: Vitale A
Entergy Nuclear Operations
Dentel G
References
IR 2019403
Download: ML19130A042 (8)


Text

May 8, 2019

SUBJECT:

INDIAN POINT NUCLEAR GENERATING - INFORMATION REQUEST FOR THE CYBER-SECURITY INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000247/2019403 AND 05000286/2019403

Dear Mr. Vitale:

On September 16, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin a team inspection in accordance with Inspection Procedure 71130.10P, Cyber-Security, issued May 15, 2017, at Indian Point Nuclear Generating (Indian Point), Units 2 and 3. The inspection will be performed to evaluate and verify your ability to meet full implementation requirements of the NRCs Cyber-Security Rule, Title 10 of the Code of Federal Regulations (CFR) Part 73, Section 54, Protection of Digital Computer and Communication Systems and Networks. The onsite portion of the inspection will take place during the weeks of September 16, 2019, and September 30, 2019. Experience has shown that team inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. To minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection with dates agreed by the site. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., sample set) to be inspected by the cyber security inspection procedure. This information should be made available via compact disc and delivered to the regional office no later than June 20, 2019. The inspection team will review this information and, by July 19, 2019, will request the specific items that should be provided for review.

The second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of your plants Cyber Security Program selected for the cyber security inspection.

This information will be requested for review in the regional office prior to the inspection by August 21, 2019.

The third group of requested documents consists of those items that the inspection team will review, or need access to, during the inspection. Please have this information available by the first day of the onsite inspection, September 16, 2019. The fourth group of information is necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is David Werkheiser. We understand that our regulatory contact for this inspection is George Dahl of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at 610-337-5316 or via e-mail at David.Werkheiser@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

This letter and its enclosure will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Glenn T. Dentel, Chief Engineering Branch 2 Division of Reactor Safety

Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64

Enclosure:

Indian Point Nuclear Generating Cyber-Security Inspection Document Request

cc w/encl: Distribution via ListServ

ML19130A042

SUNSI Review

Non-Sensitive Sensitive

Publicly Available Non-Publicly Available

OFFICE RI/DRS RI/DRS

NAME DWerkheiser GDentel

DATE 5/8/19 5/8/19

INDIAN POINT NUCLEAR GENERATING CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Enclosure Inspection Report:

05000247/2019403 and 05000286/2019403

Inspection Dates:

September 16 - 20 and September 30 - October 4, 2019

Inspection Procedure:

IP 71130.10P, Cyber-Security, Issue Date May 15, 2017

Reference:

Guidance Document for Development of the Request for Information (RFI) and Notification Letter for Full-Implementation of the Cyber Security Inspection, Issue Date October 26, 2017

NRC Inspectors:

David Werkheiser, Lead Louis Dumont 610-337-5316 610-337-5183 David.Werkheiser@nrc.gov Louis.Dumont@nrc.gov

NRC Contractors:

Alan Konkal William (Bill) Johns Alan.Konkal@nrc.gov William.Johns@nrc.gov

I.

Information Requested for In-Office Preparation The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate components and Cyber Security Program (CSP) elements to develop a site-specific inspection plan.

The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control portions of the CSP to be chosen as the sample set required to be inspected by the cyber security IP.

The first RFIs requested information is specified below in Table RFI #1. The Table RFI #1 information is requested to be provided to the regional office by June 20, 2019, or sooner, to facilitate the selection of the specific items that will be reviewed during the onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused follow-up request to develop the second RFI. The inspection team will submit the specific systems and equipment list to your staff by July 19, 2019, which will identify the specific systems and equipment that will be utilized to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the cyber security inspection. We request that the additional information provided from the second RFI be made available to the regional office by August 21, 2019. All requests for information responses shall follow the RFI table matrix and the guidance document referenced above.

The required Table RFI #1 information shall be provided on compact disc (CD) to the lead inspector by June 20, 2019. Please provide four copies of each CD submitted (i.e., one for each inspector/contractor). The preferred file format for all lists is a searchable Excel spreadsheet file on a CD. These CDs should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.

INDIAN POINT NUCLEAR GENERATING CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Table RFI #1 Reference Section 3, Paragraph Number/Title:

Items 1 List All Identified Critical Systems and Critical Digital Assets All

List CDA Facility and Site Ethernet - Transmission Control Protocol/Internet Protocol (TCP/IP) Based Local Area Networks (LANs) and Identify Those LANs That Have Non-CDAs On Them All

List CDA Facility and Site Non-Ethernet TCP/IP Based LANs Including Those Industrial Networks and Identify LANs That Have Non-CDAs On Them All

Network Topology Diagrams (Be Sure To Include all Network Intrusion Detection Systems (NIDS) and Security Information and Event Management (SIEMs) for Emergency Preparedness (EP) networks and Security Level 3 and 4 Networks)

All 8 List All Network Security Boundary Devices for EP Networks and All Network Security Boundary Devices for Levels 3 and 4 All 9 List CDA Wireless Industrial Networks All

NIDS Documentation for Critical Systems That Have CDAs Associated with Them 11.a.1)

11.a.2)

SIEM Documentation for Critical systems That Have CDAs Associated with Them 12.a.1)

12.a.2)

14 List EP and Security Onsite and Offsite Digital Communication Systems All 25 Cyber Security Assessment and Cyber Security Incident Response Teams All In addition to the above information please provide the following:

(1) Electronic copy of your current Cyber Security Plan.

(2) Electronic copy of summary of changes (if any), including any 10 CFR 50.54p analysis to support those changes, made to the originally approved Cyber Security Plan.

(3) Electronic copy of a matrix that summarizes what controls are in place to satisfy the controls required by Policies and Procedures.

(4) Electronic copy of the Updated Final Safety Analysis Report and Technical Specifications.

(5) Name(s) and phone numbers for the regulatory and technical contacts.

(6) Current management and engineering organizational charts.

(7) In a separate directory, an electronic copy of the documents listed in the matrix from (3) above.

INDIAN POINT NUCLEAR GENERATING CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Based on this information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and will submit a list of specific systems and equipment to your staff by July 19, 2019, for the second RFI (i.e., Table RFI #2).

II.

Additional Information Requested to be Available Prior to Inspection.

As stated above, in Section I. of this enclosure, the inspection team will examine the returned documentation requested from Table RFI #1 and submit the list of specific systems and equipment to your staff by July 19, 2019, for the second RFI (i.e., RFI #2).

The second RFI will request additional information required to evaluate the CSs/CDAs, defensive architecture, and the areas of your stations CSP selected for the cyber-security inspection. The additional information requested for the specific systems and equipment is identified in Table RFI #2. All requested information shall follow the Table RFI #2 and the guidance document referenced above.

The Table RFI #2 information shall be provided on CD to the lead inspector by August 21, 2019. Please provide four copies of each CD submitted (i.e., one for each inspector/contractor). The preferred file format for all lists is a searchable Excel spreadsheet file on a CD. These CDs should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.

Table RFI #2 Section 3, Paragraph Number/Title:

Items 5 Plant Computer System Block Diagram (If Plant Computer System Is Selected for Inspection)

All 6 Plant Security System Block Diagram (If Security Computer System Is Selected for Inspection)

All 7 Systems That Are Distributed Block Diagrams (For Systems Selected For Inspection)

All 10 Host-Based Intrusion Detection System Documentation (For CDAs for Systems Selected for Inspection)

10.a.1)

10.a.2)

13 List all Maintenance and Test Equipment Used On CDAs for Systems Selected for Inspection All 15 Configuration Management All 16 Supply Chain Management 16.b.

16.c.1)

16.c.5)

16.c.6)

17 Portable Media and Mobile Device Control All 18 Software Management All 20 Vendor Access and Monitoring All 21 Work Control All 22 Device Access and Key Control All 23 Password/Authenticator Policy All

INDIAN POINT NUCLEAR GENERATING CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Table RFI #2 Section 3, Paragraph Number/Title:

Items 24 User Account/Credential Policy All 26 Corrective Actions Since Last NRC Inspection All In addition to the above information please provide the following:

(1) The documented CSP assessment and analysis for each CDA in each of the selected systems.

III.

Information Requested to be Available on First Day of Inspection For the specific systems and equipment identified in this enclosuresSection II., provide the following RFI (i.e., Table: 1ST Week Onsite) on a CD by September 16, 2019, the first day of the inspection. All requested information shall follow the Table: 1ST Week Onsite and the guidance document referenced above.

The preferred file format for all lists is a searchable Excel spreadsheet file on a CD. The CD should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.

Table: 1ST Week Onsite Section 3, Paragraph Number/Title:

Items 10 Host-Based Intrusion Detection System Documentation for CDAs for systems selected for inspection 10.a.3)

thru 10.a.12)

11 NIDS Documentation for Critical Systems That Have CDAs Associated with Them 11.a.3)

thru 11.a.15)

12 SIEM Documentation for Critical Systems That Have CDAs Associated with Them 12.a.3)

thru 12.a.14)

16 Supply Chain Management 16.c.2)

16.c.3)

16.c.4)

19 Cyber Security Event Notifications All In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them:

a. Original Final Safety Analysis Report Volumes;

b. Original Safety Evaluation Report and Supplements;

INDIAN POINT NUCLEAR GENERATING CYBER-SECURITY INSPECTION DOCUMENT REQUEST

c. Final Safety Analysis Report Question and Answers;

d. Quality Assurance (QA) Plan;

e. Latest Individual Plant Examination for External Events / Probabilistic Risk Assessment Report; and

f.

Vendor Manuals.

(2) Assessment and Corrective Actions:

a. The most recent Cyber Security QA audit and/or self-assessment; and b. Corrective action documents (e.g., condition reports, including status of corrective actions) generated as a result of the most recent Cyber Security QA audit and/or self-assessment.

IV.

Information Requested To Be Provided Throughout the Inspection (1) Copies of any corrective action documents generated as a result of the inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection team leader.