ML111330455: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000333/2011008]]
| number = ML111330455
| issue date = 05/13/2011
| title = IR 05000333/2011008; 04/18/2011 - 04/29/2011; James A. FitzPatrick Nuclear Power Plant; Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event
| author name = Doerflein L T
| author affiliation = NRC/RGN-I/DRS/EB2
| addressee name = Bronson K
| addressee affiliation = Entergy Nuclear Northeast
| docket = 05000333
| license number = DPR-059
| contact person =
| document report number = IR-11-008
| package number = ML111300168
| document type = Inspection Report, Letter
| page count = 25
}}
See also: [[followed by::IR 05000333/2011008]]
 
=Text=
{{#Wiki_filter: May 13, 20LLMr. Kevin BronsonSite Vice PresidentEntergy Nuclear NortheastJames A. FitzPatrick Nuclear Power PlantP. O. Box 110Lycoming, NY 13093
 
SUBJECT: JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NRC TEMPOMRYINSTRUCTTON 251 5/1 83 TNSPECTION REPORT 05000333/201 1008
 
==Dear Mr. Bronson:==
On April 29,2011, the U.S. Nuclear Regulatory Comlnission (NRC) completed an inspection atyour James A. Fitzpatrick Nuclear Power Plant (FitzPatrick), using T_emporary_lnstruction2SlSlgg,"Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event." Theenclosed inspection report documents the inspection results which were discussed on April 29,2011, with Mr. B. Sullivan and other members of your staff'The objective of this inspection was to promptly assess the capabilities of FitzPatrick to respondto extriordinary consequences similar io those that have recently occurred at the JapaneseFukushima Daiichi Nuclear Station. The results from this inspection, along with the results fromthis inspection performed at other operating commercial nuclear plants in the United States willbe used to evaluate the United States nuclear industry's readiness to safely respond to similarevents. These results will also help the NRC to determine if additional regulatory actions arewarranted.All of the potential issues and observations identified by this inspection are contained in thisreport. The NRC's Reactor Oversight Process will further evaluate any issues to determine ifthey are regulatory findings or violations. Any resulting findings or violations will be documentedny ine nnj in a sLparate report. You are not required to respond to this letter. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letterand its enclosure will be made available electronically for public inspection in the NRCPublic Document Room or from the Publicly Available Records (PARS) component ofNRC's document system (ADAMS), accessible from the NRC Web site athttp:l/www.nrc.oovlreadinq-rmladams.html (the Public Electronic Reading Room).
 
Sincerely,\-0 1C\Slor"r.l---^" l ' tLawrence T. Doerflein, ChiefEngineering Branch 2Division of Reactor SafetyDocket No.: 50-333License No.: DPR-59
 
===Enclosure:===
lnspection Report 05000333/2011008cc w/encl: Distribution via ListServ
}}

Latest revision as of 06:16, 13 January 2025