L.S.Q.P. Ns. 3-1 Rev. 0
L.S.Q.P. Ns. 3-1 s
  ' ''J '
I Rev. 0
I Datas h/11/79 TITLE: Section XI Repairs and Revisions For LaSalle Cor sty Station Performed m$                   by Morrison Const. Co. at the Direction of Com=onwealth Edison Co.
' ''J '
Station Construction Department 1.0 PURPOSE                                         .
Datas h/11/79 TITLE: Section XI Repairs and Revisions For LaSalle Cor sty Station Performed m$
This procedure details requirements for Morrison Const. Co. to perform ASME Section XI repairs and revisions at the LaSalle site as directed by Comaonwealth Edison Co.
by Morrison Const. Co. at the Direction of Com=onwealth Edison Co.
Station Construction Department 1.0 PURPOSE This procedure details requirements for Morrison Const. Co. to perform ASME Section XI repairs and revisions at the LaSalle site as directed by Comaonwealth Edison Co.
2.0 SCOPE The repairs or revisions covered by this Procedure are necessitated by damage to or indications found in piping systems and components or design revisions and interference proble=s identified after completion of Section III Construction requirements.
2.0 SCOPE The repairs or revisions covered by this Procedure are necessitated by damage to or indications found in piping systems and components or design revisions and interference proble=s identified after completion of Section III Construction requirements.
            ' ,3 0 DEFINITIONS The ter= " revision", as used in this procedure, refers to any operation allowed by paragraph IWA-h2h0. See specification J-2530, Piping Erection, and ASME Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, for other appli_ cable definitions.
',3 0 DEFINITIONS The ter= " revision", as used in this procedure, refers to any operation allowed by paragraph IWA-h2h0. See specification J-2530, Piping Erection, and ASME Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, for other appli_ cable definitions.
h.0 RESFO:ISIBILITIES h.1 Station Euclear Engineering Depart =ent h.1.1 Datarnino Section XI Ccde Addenda, if different than listed in precedure.
h.0 RESFO:ISIBILITIES h.1 Station Euclear Engineering Depart =ent h.1.1 Datarnino Section XI Ccde Addenda, if different than listed in precedure.
h.1.2 Initiate repairs and revisions by:
h.1.2 Initiate repairs and revisions by:
h.1.2.1       Letter from SUED.
h.1.2.1 Letter from SUED.
h.1.2.2 Approval of Sargent & Lundy directives to take revisions.
h.1.2.2 Approval of Sargent & Lundy directives to take revisions.
h.1 3 Inform the applicable enforcement or jurisdictional authorities.
h.1 3 Inform the applicable enforcement or jurisdictional authorities.
h.1.h Perform a safety evaluation, as applicable.
h.1.h Perform a safety evaluation, as applicable.
h.1.5   Insure that the stresa analysis is revised, as needed.
h.1.5 Insure that the stresa analysis is revised, as needed.
h.2 Station Construction Field Engineer h.2.1   Direct i=ple=entation of this LSQP.
h.2 Station Construction Field Engineer h.2.1 Direct i=ple=entation of this LSQP.
h.2.2 Initiate repairs and revisiens by:
h.2.2 Initiate repairs and revisiens by:
h.2.2.1       Initiatin; an !OR.
h.2.2.1 Initiatin; an !OR.
h.2.2.2       Initiating an FCR.
h.2.2.2 Initiating an FCR.
h.2 3 Fill out a repair /revicien report.
h.2 3 Fill out a repair /revicien report.
8004150      [:I '
[:I '
8004150


o 4.2.4 N*,tify site q,A. that repair er revicita wort ic
o 4.2.4 N*,tify site q,A. that repair er revicita wort ic to be perfcrmed.
        .                      to be perfcrmed.
h.2 5 Provide repair or revision detail information to A.N.I.I.
h.2 5 Provide repair or revision detail information to A.N.I.I.
h.2.6 CoorrHmte re-examination by NDE, reflushing, and I.S.I. reinspection.
h.2.6 CoorrHmte re-examination by NDE, reflushing, and I.S.I. reinspection.
Line 47: Line 48:
h.3 Morrison Construction Co.
h.3 Morrison Construction Co.
Perform repairs and revisions as directed by Commonwealth Edison S.C.D. personnel in accor-dance with procedures and quality assurance program approved by C.E.Co. and properly quali-fled personnel.
Perform repairs and revisions as directed by Commonwealth Edison S.C.D. personnel in accor-dance with procedures and quality assurance program approved by C.E.Co. and properly quali-fled personnel.
h.h Authorized Inspection                                         '
h.h Authorized Inspection Authorized Nuclear Inservice Inspection services per IWA-2120 will be furnished by Hartford Steam Boiler Inspection and Insurance Co. ~under an agreement with Coc=onwealth Edison.
Authorized Nuclear Inservice Inspection services per IWA-2120 will be furnished by Hartford Steam Boiler Inspection and Insurance Co. ~under an agreement with Coc=onwealth Edison.
k.5 Commonwealth Edison Quality Assurance Dept.
k.5 Commonwealth Edison Quality Assurance Dept.
h.5 1 Review S.C.D. Eenerated ER's and NCR's.
h.5 1 Review S.C.D. Eenerated ER's and NCR's.
h.5 2 Maintain final docueentation package.
h.5 2 Maintain final docueentation package.
h.5.3 Assure the implementation of this procedure and the requirements of Section XI.
h.5.3 Assure the implementation of this procedure and the requirements of Section XI.
5.0 PRCCEDURE 5.1 Codes and Specifications 5.1.1 ASME Boiler and Pressure Vessel Code Section XI, 197h Edition including Su==er 1975 Addenda and for reference IWB-700r., Su==er 1976 Addenda.
5.0 PRCCEDURE 5.1 Codes and Specifications 5.1.1 ASME Boiler and Pressure Vessel Code Section XI, 197h Edition including Su==er 1975 Addenda and for reference IWB-700r., Su==er 1976 Addenda.
5 1.2 ASME Boiler and Pressure Vessel Code Section III, 197h Edition with no Addenda or other Addenda used for ini-tial construction, as approved by an ECN or E R.
5 1.2 ASME Boiler and Pressure Vessel Code Section III, 197h Edition with no Addenda or other Addenda used for ini-tial construction, as approved by an ECN or E R.
5.1 3 Sargent & Lundy Specification J-2530, Piping Erection.
5.1 3 Sargent & Lundy Specification J-2530, Piping Erection.
5 1.4 Morrison Construction Co. Quality Assurance Program as approved for use at LaSalle County Station 5.2 Code nequirements 5.2.1 ASME Section XI Article IWB-hC00 Repair Procedure 1 thru 5 will be utill:cd should they apply to a par-ticular repair. Repairs and revisions not covered in Article IWB-hC00 will be perfonned in accordance with e
5 1.4 Morrison Construction Co. Quality Assurance Program as approved for use at LaSalle County Station 5.2 Code nequirements 5.2.1 ASME Section XI Article IWB-hC00 Repair Procedure 1 thru 5 will be utill:cd should they apply to a par-ticular repair. Repairs and revisions not covered in Article IWB-hC00 will be perfonned in accordance with e


5 2.1
5 2.1 C:ntinutd the requir;menta of th2 Coda gpplicable to tha initial Crnstruction to c11 owed by paragraph IVA-h100 C.
      .'                    C:ntinutd the requir;menta of th2 Coda gpplicable to tha initial Crnstruction to c11 owed by paragraph IVA-h100 C. The repair procedure number used or reference to the initial construction Code will be recorded on the Repair / Revision h   ,
The repair procedure number used or reference to the initial construction Code will be recorded on the Repair / Revision h
Report (See paragraph 5 5) 5 2.2 The' Code Addenda for Section XI will be established by SNED.
Report (See paragraph 5 5) 5 2.2 The' Code Addenda for Section XI will be established by SNED.
53 Initiation and Approval of Repairs or Modification 5.3 1 Repairs or revisions will be initiated by Station Nuclear Engineering Dept. or Station Construction Dept. by one of the following methods:
53 Initiation and Approval of Repairs or Modification 5.3 1 Repairs or revisions will be initiated by Station Nuclear Engineering Dept. or Station Construction Dept. by one of the following methods:
5.3 1.1 .SNED Initiated Repairs or Revisions A letter from Station Nuclear Engineering Department or a drawing revision and letter from Sargent & Lundy as approved by SNED, will be authorization to perform a repair           ,
5.3 1.1.SNED Initiated Repairs or Revisions A letter from Station Nuclear Engineering Department or a drawing revision and letter from Sargent & Lundy as approved by SNED, will be authorization to perform a repair or revision.
or revision.                           -
cc 531.2 SCD Initiated Repairs or Revisions Station Construction Dept. requests for re-pairs or revisions will be processed by means of an ICR or NCR, as applicable.
cc                 -
C.:
531.2 SCD Initiated Repairs or Revisions Station Construction Dept. requests for re-pairs or revisions will be processed by means of an ICR or NCR, as applicable.
5.3 2 All repairs or revisions are therefore approved by Station Nuclear Engineering Dept. SNED is also responsible for in-forming the applicable enforcement or jurisdictional author-ities as required by IWA-h230, performing a safety evaluation, as applicable, and insuring that the stress analysis is revised, as needed.
5.3 2 All repairs or revisions are therefore approved by Station C.:                  Nuclear Engineering Dept. SNED is also responsible for in-forming the applicable enforcement or jurisdictional author-ities as required by IWA-h230, performing a safety evaluation, as applicable, and insuring that the stress analysis is revised, as needed.
5.h Quality Assurance Program The work will be performed in accordance with the Morrison Construction Co. Quality Assurance Program as approved for use at LaSalle County Station by Commonwealth Edison.
5.h Quality Assurance Program The work will be performed in accordance with the Morrison Construction Co. Quality Assurance Program as approved for use at LaSalle County Station by Commonwealth Edison.
5 5 Repair / Revision Report A Repair /devision Report (see attached) will be filled out to record SNED approvals, code requirements, NDE re-quirements, etc. for each repair or revision. If the Station maintenance dept. is required to perform work as part of a repair or revision, the work request number will be recorded (see item 8 of the report) and a copy of the request attached.
5 5 Repair / Revision Report A Repair /devision Report (see attached) will be filled out to record SNED approvals, code requirements, NDE re-quirements, etc. for each repair or revision. If the Station maintenance dept. is required to perform work as part of a repair or revision, the work request number will be recorded (see item 8 of the report) and a copy of the request attached.
5.6 Nondestructive and Hydrostatic Testing               ,
5.6 Nondestructive and Hydrostatic Testing 5.6.1 Nondestructive testing will be performed in accordance with the requirements of Section XI or Section III, as applicable.
5.6.1 Nondestructive testing will be performed in accordance with the requirements of Section XI or Section III, as applicable.
5.6.2 A hydrostatic or system pressure test as required by paragraph IWA-h210 will be perfomed following completion of weldol re-pairs or revisions.
5.6.2 A hydrostatic or system pressure test as required by paragraph IWA-h210 will be perfomed following completion of weldol re-pairs or revisions.


      ,          .                                                                                      i
i 57 Documentation 5.7 1 Docu=entation as required in paragraph 112 of specification J-2530 and ASME Fection XI will be submitted for each repair or revision.
    ;.        .        57 Documentation 5.7 1 Docu=entation as required in paragraph 112 of specification J-2530 and ASME Fection XI will be submitted for each repair or revision.                                           -            -
572 The completed documentation package will be forwarded to the
572 The completed documentation package will be forwarded to the
                                        ~
~
site Q.A. Department.
site Q.A. Department.
5.8 Code Data Report                                           ,
5.8 Code Data Report 5 8.1 Data Report for Inservice Inspection will be completed for repairs and revisions and submitted for approval by the appropriate Con =1onwealth Edison and Hartford Steam Boiler Inspection and Insurance Co. personnel.
5 8.1 Data Report for Inservice Inspection will be completed for repairs and revisions and submitted for approval by the appropriate Con =1onwealth Edison and Hartford Steam Boiler Inspection and Insurance Co. personnel.
~l Approved Approved
                                                                                                              ~l Approved                   ,
-3
Approved
.,/'
                          -        -3
'/
                    .,/'         '/                                                       r.           -
r.
                  /N           h llVYl,L-         S                   ,.      ,,      . /   y ,
f :
f!: ,bj L. J. Burke                                               T. E. Quaka ^             '
,bj
Site Project Superintendent                     ..        Q.A. Supervisor
/N h llVYl,L-S
          ,,    Approved
. /
                  - 7 [. ed'bNb~ 4[/// /9                                                               ,
y L. J. Burke T. E. Quaka ^
T. E. Watts                     TM SNED Project Engineer b
Site Project Superintendent Q.A. Supervisor Approved
- 7 [.
ed'bNb~ 4[/// /9 T. E. Watts TM SNED Project Engineer b


  ---..~.--                                                     .    - - . .      .
---..~.--
_                                                                                F;rm LSQP 3-1.1   '
F;rm LSQP 3-1.1 LaSallo C unty Stati n Revision 0 Date h.11.79 REPAIR / REVISION REPORT g,.
                ..      , ,                                                                                      LaSallo C unty Stati n Revision 0 Date     h.11.79 g,.                                                      REPAIR / REVISION REPORT                                           -
h LaSalle County Station Report #
h                 LaSalle County Station                                                       Report #
Specification J-2530 Piping Erection Date:
Specification J-2530                   Piping Erection                       Date:
: 1) Reference Drawings / Documents:
: 1) Reference Drawings / Documents:
: 2) Equipment / Piping Line No.:
: 2) Equipment / Piping Line No.:
Line 101: Line 99:
N-5 Form Completion Date:
N-5 Form Completion Date:
: 1) DescriptionofRepair/ Modification 4
: 1) DescriptionofRepair/ Modification 4
: 5) Initiated By:               SIED                     Letter Dated S&L               -
: 5) Initiated By:
Letter Dated S&L                     Drawing Revision SCD                     KR#
SIED Letter Dated S&L Letter Dated S&L Drawing Revision SCD KR#
NCR #
NCR #
: 6) Vork to be perfor=ed to:
: 6) Vork to be perfor=ed to:
Section XI Procedure #
Section XI Procedure #
C,.                                       Initial Construction Requirements of Section III Code Addenda Code Cases Used
C,.
                                                                          ~                                                          ~
Initial Construction Requirements of Section III Code Addenda Code Cases Used
                            ~7) NDE Requirements Section XI Requirements Initial Installation Requirements of Section III
~7) NDE Requirements
                                              .        Additional NDE Requirements
~
~
Section XI Requirements Initial Installation Requirements of Section III Additional NDE Requirements
: 8) Station Work Request #
: 8) Station Work Request #
: 9) Reflushing Required:               Yes No If yes, reflushing is accepteable:                                   Date
: 9) Reflushing Required:
: 10)   I.S.I. Reinspection Required                   Yes No Reinspection acceptable:                                             Date
Yes No If yes, reflushing is accepteable:
: 11) Final Disposition Repair / Revision Complete:                                         Date Station Construction Approved:                                                           Date
Date 10)
                    -.                          Site Project Superintendent or Desi6nce Cecpletion Verified:                                                 Date Site Q.A. Supr. or Designee I
I.S.I. Reinspection Required Yes No Reinspection acceptable:
Date
: 11) Final Disposition Repair / Revision Complete:
Date Station Construction Approved:
Date Site Project Superintendent or Desi6nce Cecpletion Verified:
Date Site Q.A. Supr. or Designee I


suua wa y- e . n LaSallo County Ststion
suua wa y-e. n LaSallo County Ststion Revision 0 Date 'h.11.79 RSPAIR/ REVISION RSPORT LaSalle County Station Report #
  . ''..-                                                                                Revision 0 Date 'h.11.79 RSPAIR/ REVISION RSPORT LaSalle County Station                                                     Report #     I Specification J-2$30                     Piping Erection                   Date:   15//o/71             l
I Specification J-2$30 Piping Erection Date:
: 1) Reference Drawings / Documents:                                                                       [
15//o/71 l
H - 13   S H. I +A                                                               ,
: 1) Reference Drawings / Documents:
i
[
H - 13 S H. I +A i
: 2) Equipment / Piping Line No. :
: 2) Equipment / Piping Line No. :
BLIMb Fi A9 Cr2       09       L.I M5 S     lWOH A + b ~ $a
lWOH A + b ~ $a BLIMb Fi A9 Cr2 09 L.I M5 S
: 3) Initial Construction ASMS Component / Pipe Class:                 O N-$ Form Completien Date:         /o/ 4 /79                                                         I h) Description of Repair / Modification REhoVE B LIU D FL A9 6-2 FOR                   F l U Sl+1 N lr. kHD     fleypsT71LL.
: 3) Initial Construction ASMS Component / Pipe Class:
AFTele       CO P Pi erioAJ       or Ft.uspi96-
O N-$ Form Completien Date:
: 5) Initiated By:               SusD               Letter Dated
/o/ 4 /79 I
                                                                                ^
h) Description of Repair / Modification REhoVE B LIU D FL A9 6-2 FOR F l U Sl+1 N lr.
S&L               Letter Dated       -
kHD fleypsT71LL.
S&L               Drawing Revision     -
AFTele CO P Pi erioAJ or Ft.uspi96-
SCD               FUR # 888-NCR #                                             .    .
: 5) Initiated By:
SusD Letter Dated
^
S&L Letter Dated S&L Drawing Revision SCD FUR # 888-NCR #
: 6) Work to be performed to:
: 6) Work to be performed to:
~
~
Section XI Procedure #
Section XI Procedure #
(                                 Initial Construction Requirecents of Section III Code Addenda 1774 CD4Dod - po A-DA sv D A X
(
Code Cases Used       M/A
Initial Construction Requirecents of Section III X
: 7) UDS Requirements Section XI Requirements           -
Code Addenda 1774 CD4Dod po A-DA sv D A Code Cases Used M/A
Initial Installation Require =ents of Section III             k
: 7) UDS Requirements Section XI Requirements Initial Installation Require =ents of Section III k
                          .        Additional NDS Requirements                                                     i
Additional NDS Requirements i
: 8) Station Work Request #       -
: 8) Station Work Request #
: 9) Reflushing Required:             Yes X No If yes, reflushing is accepteable:                               Date
: 9) Reflushing Required:
: 10)   I.S.I. Reinspection Required             Yes
Yes X No If yes, reflushing is accepteable:
              #                                      X  No Reinspection acceptable:       _ _                                Date PREPh5Ebj $ W Y.
Date 10)
: 11) Final Disposition                                11-flo/77
I.S.I. Reinspection Required Yes X
* Repair /RevisionComplete:                                         Date                               i Station Construction Approved:                                                         Date Site Project Superintendent or Designee                                               !
No Reinspection acceptable:
Completion Verified:                                               Date Site Q.A. Supr. or Designee
Date PREPh5Ebj $ W Y.
11-flo/77
: 11) Final Disposition Repair /RevisionComplete:
Date i
Station Construction Approved:
Date Site Project Superintendent or Designee Completion Verified:
Date Site Q.A. Supr. or Designee


                                                                                                      .--- --,, s ...
.--- --,, s...
                    -                                                                                LaSallo County Station Revision 0 Data 'h.11-79 REPAIR /REVISIO!! REPORT LaSalle County Station                                                       Report #         b Specification J-2530                     Piping Erection                     Date:   // //o/79
LaSallo County Station Revision 0 Data 'h.11-79 REPAIR /REVISIO!! REPORT LaSalle County Station Report #
b Specification J-2530 Piping Erection Date:
// //o/79
: 1) Reference Drawings /Docu=ents:
: 1) Reference Drawings /Docu=ents:
h-799           kHD ttA+)G-En       D einit--       D A Aw arx-S -
h-799 kHD ttA+)G-En D einit--
: 2) Equipment / Piping Line No. :         S Er-77o d     111     PoA7709 OF           F: u)
D A Aw arx-S -
S 't'S TE7% .                                                                                           I
: 2) Equipment / Piping Line No. :
: 3) Initial Construction ASIE: Component / Pipe Class:               AO U-5 Form Completion Date: fo/ A:t / it                                                                   '
S Er-77o d 111 PoA7709 OF F: u)
h) Description of Repair / Modification AD D P,PE               sop /o A7 A rrth!. tti9 ews
S 't'S TE7%.
                'T'o       P lJ   G @ Tl"2' t   A-S   D e o ne t.Eb   oM     c.o A p 5,J,-   /FMb     P uTuan (EEus StoM S 'I'o       ht-799 AHD IMHCrE7?- D ET7+tt. D Atw>si'crs. tthocrees                       to BC
I
: 5) Initiated By:                                                                       *          #
: 3) Initial Construction ASIE: Component / Pipe Class:
SNED             Letter Dated -                              3, p   p_ p/s, S&L               Letter Lated S&L               Drawing Revision     -
AO U-5 Form Completion Date: fo/ A:t / it h) Description of Repair / Modification AD D P,PE sop /o A7 A rrth!. tti9 ews
SCD               KR# Pf3 UCR # -        -
'T'o P lJ G @ Tl"2' t A-S D e o ne t.Eb oM c.o A p 5,J,-
/FMb P uTuan (EEus StoM S
'I'o ht-799 AHD IMHCrE7?- D ET7+tt. D Atw>si'crs. tthocrees to BC
: 5) Initiated By:
SNED Letter Dated 3, p p_ p/s, S&L Letter Lated S&L Drawing Revision SCD KR# Pf3 UCR # -
: 6) Work to be performed to:
: 6) Work to be performed to:
                                                                                  ~
Section XI Procedure #
Section XI Procedure #
    .(                                       Initial Construction Requirece3t s of Section III               N Code Addenda W74- e-DITicM -lWo /VbDEMDA                                           ,
~
Code Cases Used           -
. (
: 7) NDE Require =ents Section XI Requirements                                                           ;
Initial Construction Requirece3 s of Section III N
Initial Installation Requirements of Section III                 h                 i
t Code Addenda W74-e-DITicM -lWo /VbDEMDA Code Cases Used
                                      .        Additional NDS Requirements       -------
: 7) NDE Require =ents Section XI Requirements Initial Installation Requirements of Section III h
i Additional NDS Requirements
: 8) Station Work Request #
: 8) Station Work Request #
: 9) Reflushing Required:                 Yes X No                                 .
: 9) Reflushing Required:
If yes, reflushing is accepteable:                                 Date
Yes X
: 10)     I.S.I. Reinspection Required               Yes cou sreva riou A.e-cc4 D S Lu /t,t             8E o                                   X No     V3Eb       PoA PAE" 3 ef t/se--E (Ps PEc rtok3. :
No If yes, reflushing is accepteable:
Reinspection acceptable:                                           Date P2 epi +4 e-b: 74 M t. % = = = iwfiop7
Date 10)
: 11) Final Disposition                                                                                             '
I.S.I. Reinspection Required Yes cou sreva riou A.e-cc4 D S Lu /t,t 8E o
Repair /RevisionComplete:                                         Date                                   l Station Construction Approved:                                                         Date Site Project Superintendent or Designee Completion Verified:                                               Date Site Q.A. Supr. or Designee bN     p G
X No V3Eb PoA PAE" 3 ef t/se--E (Ps PEc rtok3. :
h_
Reinspection acceptable:
Date P2 epi +4 e-b: 74 M t. % = = = iwfiop7
: 11) Final Disposition Repair /RevisionComplete:
Date l
Station Construction Approved:
Date Site Project Superintendent or Designee Completion Verified:
Date Site Q.A. Supr. or Designee bN p
G h_


maJaile Guaty v.at.ici
maJaile Guaty v.at.ici D"@
                                      > -                        D"@                 *D m$~,'0                         >
*D m$~,'0 3**i i " U Dato h 11-79 Mh sf
3**i i " .-U Dato                       h 11-79 1
"! O -
Mh                   sf           "!
1
O-
!.hi n.MJIO!! IiEPoliT P
                                                                                                        ! .hi n.MJIO!! IiEPoliT                                                                                                                   P LaSalle County Station                                                                                                                     Report #                                   7 Specificaticn J-2330                                                         Piping Erection Date:                               l'4//o/79
LaSalle County Station Report #
    ',                          1) ReferenceDrawings/ Documents.                                                                                                                                       ,
7 Specificaticn J-2330 Piping Erection Date:
JA 749 RND                             tt/V>cet R-                     D e Tall-             f)/E A U' !N 0-5 .                 ;          ' . \ ...:'.i.,                    ,
l'4//o/79
    .f.:
: 1) ReferenceDrawings/ Documents.
.f.:
JA 749 RND tt/V>cet R-D e Tall-f)/E A U' !N 0-5.
'. \\. :'.i.,
#'# b# #
5[ Equipment /PipingLineNo.: S EC T70 '> E
5[ Equipment /PipingLineNo.: S EC T70 '> E
                                                                                                                                                    #'# b# # ##                                                "                  ##
.g u G.t U D ED 19 R ERC YD A VESSEL.
                                      .g u G.t U D ED                     19             R ERC YD A                         VESSEL.           Pseessone B cuHDAe Y.
Pseessone B cuHDAe Y.
                            ~3) Initial Construction ASIE Component / Pipe Class:                                                                         O             '                      '                  '~
~3) Initial Construction ASIE Component / Pipe Class:
O
'~
N-5 Form Completion Date: /MM74
N-5 Form Completion Date: /MM74
                                                                                                                                                                    ~
~
14 ) Description of Repair / Modification /100 P.Ps 50r/047 A-rrA c // A W7-5 To             t+ P S Ys Thy A-s De ratted op s uk&Eu r npD rv rvste* BEvtStoso s To h-799 s;r                .
14 ) Description of Repair / Modification /100 P.Ps 50r/047 A-rrA c // A W7-5 To t+ P S Ys Thy A-s De ratted op s uk&Eu r npD rv rvste* BEvtStoso s To h-799
                                  ~ .
~ pod, tt&pm p g rnst. l)RAu noc-c, Itt1M&e~ns ro Be t.tsnce op jaonisea h nb's.
pod , tt&pm p g rnst . l)RAu noc-c, Itt1M&e~ns ro Be t.tsnce op jaonisea h nb's.
s;r 74;, ;
                                                                                                                                                                                ~
* $);,InitiatedBy:
                          * $);,InitiatedBy:                                                                                         Letter Dated 74;, ;                                                                              , ,SNED                               ,.
,,SNED Letter Dated
S&L                                 Letter Dated                           .
~
9 j y . i t. /.; :., h * ., ;                      ..
S&L Letter Dated 9
j                     S&L s                         ' Drawing Revision -
j S&L s
                                                                                                                                                                                          - V ' .;l/.        .
' Drawing Revision -
s        .
- V '.;l/.
                                                    .                                                                                                                         r                            .;_
j y. i t. /.;, h *., ;
                                                      .                                        SCD                                   ER# 8'8 b
r s
                                                ..                                                                                    nCR H
SCD ER# 8'8 b nCR H
    "._ { .;, ; 5 . < ; ..!n                                   .
" {.;, ; 5.
                                                                                                                    ~
< ;..!n
    , -j. ,. ] , 6 ) Vork 'to be perfomed to:
, -j.,. ], 6 ) Vork 'to be perfomed to:
        ; '3
~
                                ;. . j 2     '
'3 Section XI Procedure #
Section XI Procedure #                                                                                  '' -                            --
Q
X Q  . . .g > . . . ' .; -
;.. j 2 Code Addenda I47+ etanoa, ya ADoeyDA Initial Construction Requirements of Section III X
Initial Construction Requirements of Section III Code Addenda I47+ etanoa , ya ADoeyDA                                                                        '        ," ,
...g >... '.; -
                  "1 '                 ,                                              Code Cases Used                                                                                                 -'-
"1 '
    ..h ,.                   7) NDS Requirements Section XI Requirements                                                                                 1 Liitial Installation Requirements of Section III
Code Cases Used
                                                                                                                                                                                                              ~
..h,.
k                                  ,
: 7) NDS Requirements Section XI Requirements 1
                                                                    .                Additional NDS Requirements                                                                     .
Liitial Installation Requirements of Section III k
                                                              .            .      'i   .,
~
: 8) Station Work Request #                                           ^                                                                                   -
Additional NDS Requirements
    ..                        9) Reflushing Required:                                                   Yes                                                                         '.'
'i
6                                                                              X         No
: 8) Station Work Request #
                  .                        If yes, reflushing is accepteable:                                                                                   Date                                                   -
^
: 10)             I.S.I. Reinspection Required
: 9) Reflushing Required:
Yes 6
X No If yes, reflushing is accepteable:
Date 10)
I.S.I. Reinspection Required
* Yes cop 57tv o.rto u Reco#0s cuts c 8e
* Yes cop 57tv o.rto u Reco#0s cuts c 8e
                                            *                                                                        .X     No U S ED           PC/h       PAeS&^2VtCG IHS PEETTOM *
.X No U S ED PC/h PAeS&^2VtCG IHS PEETTOM
              .                            Reinspection acceptable:                                       .
* Reinspection acceptable:
Date                                                               -
Date
                                    ' PP EP A rd e O l P Q E. W stllo f rq ,
' PP EP A rd e O l P Q E. W stllo f rq,
: 11) Final Disposition                                                                                                                                                                                                             ,
: 11) Final Disposition Repair /RevisionComplete:
Repair /RevisionComplete:                                                                                             Date Station Construction Approved:                                                                                                             Date Site Project Superintendent or Designee
Date Station Construction Approved:
.                                        Completion Verified:                                                                                                 Date Site Q.A. Supr. or Designee i:             '
Date Site Project Superintendent or Designee Completion Verified:
l . . ... " .4.=M"; ;.G aa. & ~ - ^ 6 .- - '' - ~ -~~~ ~ '
Date Site Q.A. Supr. or Designee i:
l..... ".4.=M"; ;.G aa. & ~ - ^ 6.- - '' - ~ -~~~ ~ '


  .e'.
.e'.. i,
                                    . e n r* .. .
''. Q'.,.,
                                                                                          .r        -
. '..,Qr. 'r h. p:
Rev s n0
. e n r*..
                        . i,
.r Rev s n0
  . ' . .,Qr. 'r ''.h.Q'.p:, .,                                            :.. ,        . .[,
..[,
                                                                                                              .. _p _-::,,; , ,
.. _p _-::,,;,,
pagg *b,33 79                                       %
pagg *b,33 79 P2 PAIR /F2VIGION REFC'IT
P2 PAIR /F2VIGION REFC'IT                   .            .                  .
(-
(-               LaSalle County Station                                                                                   Report #                         8 (N                                                                                                               '
LaSalle County Station Report #
5 Specification J-2330                                     Piping Erection                                 Date:                     ~#h/o[79 j~
8 (N
: 1) Reference Drawings / Documents:                                                                                                                             -
~#h/o[79 5
Mo &E12           D e 'rntL D/2Awt"0 5 3. ,                                            -
Specification J-2330 Piping Erection Date:
: l.                         .
-j~
                                  .h-779 kob                                                                                                , .          ..                        ,            ,
: 1) Reference Drawings / Documents:
  .. k
l.
    .                      2) Equipment / Piping Line No.: . EC-77                               N ,.             4.Tiob             .              Y-                               NE#
.h-779 kob Mo &E12 D e 'rntL D/2Awt"0 5
Ipctab x p3 rVG & E7%G TcA. Vess ex- P2ess02 C. B ou a Div'-Y.
: 3.,
3)
.. k
InitialForm Construction         ASIE     Comkonent/         Pipe Class:
: 2) Equipment / Piping Line No.:. EC-77 N,.
O                                    4-                    --
4.Tiob Y-NE#
                                                                                                                                                                                                          ,1 N-5               Completion         Date:   IA /M                                                             v-@                           '
Ipctab x p3 rVG & E7%G TcA. Vess ex-P2ess02 C. B ou a Div'-Y.
: 2.             7 h) Description of Repair / Modification ADD P:Pe Suppo47 Ar77tcH HEMTS Q -[Jfg Li             .3YSTEnt hs De' TAIL-yD cp eugggur wb puimaE RGutsscas To W194 A+)D HMc-E12- DeTnte D/2/Ruovc-S. Hnp6-EAS Tv BE LISTED o9 t<cpassoa MRD'S-                 "
O 4-
    ~''.         '
,1 3)
                          .$) Initiated By:                               SNED        -
Initial Construction ASIE Comkonent/ Pipe Class:
N-5 Form Completion Date: IA /M v-@
2.
7 h) Description of Repair / Modification ADD P:Pe Suppo47 Ar77tcH HEMTS Q -[Jfg Li
.3YSTEnt hs De' TAIL-yD cp eugggur wb puimaE RGutsscas To W194 A+)D HMc-E12-DeTnte D/2/Ruovc-S. Hnp6-EAS Tv BE LISTED o9 t<cpassoa MRD'S-
.$) Initiated By:
SNED Letter Dated
~ ' '.
*;QL.:y...,. *~.- u.f,y '
Q~.',;.%.*l5bbh '
''A.'z ihy ;*'j?,' :. ' *'.NS & b
'3
^
Letter Dated
Letter Dated
                                        ''A.'z ihy ;*'j? ,' : . ' *'.NS & b '3~ . . . -
~
                                                                                            ^
S&L
Letter Dated                            ~
~... -
                                                                                                                                                      *;QL.:y.. . ,. *~.- u .f,y '
Drawing Revision -
Q~.',;.%.*l5bbh                            '                          S&L              ^
'~*#".*_".
                                                                                                                                                          '~*#".*_". 'd -
'd -
Drawing Revision -                                                            .
^
SCD                   ECR'# N S~                                                                       ~'*
SCD ECR'# N S~
NCR #-                                                                                               .
~ '
* NCR #-
: 6) Work to be perfor=ed to:
: 6) Work to be perfor=ed to:
_. N                   [
N
[
Section XI Procedure #
Section XI Procedure #
        =
=
                .-                                                Initial Construction Requirements of Section III                                                   k                               '
Initial Construction Requirements of Section III k
                    )                                             Code Addenda 1974 EDIT 1c4 - Po /lDBsJDA                                                       ,              ,.
)
Code Cases Used
Code Addenda 1974 EDIT 1c4 - Po /lDBsJDA Code Cases Used
: 7) NDS Require =ents                                                                       '
: 7) NDS Require =ents Section XI Requirements Initial Installation Requirements of Se dion III M
Section XI Requirements c                                      .                        Initial Installation Requirements of Se dion III                                                       M i.-                                     -          .          Additional NDE Requirements s              8) Station Work Request #                                                                                                                         _
c i.-
mA                     '9               '~D D
Additional NDE Requirements
: 8) Station Work Request #
s mA
'9
'~D D
: 9) Reflushing Required:
: 9) Reflushing Required:
                                                                          ,X No Yes                                                g                                  J_                        _2 If yes, reflushing is .-'.ccepteable:                                                       Date
Yes J_
                                                                                                                                                                                                      ~
_2 g
: 10)      I.S.I. Reinspection Required                            Y'e s cop 572uenc9 lacco40 s cute.t, B 6' v5FO o                                                   X No FoA PAG ~s r$ Vice spSPFc.T-tod .
,X No If yes, reflushing is.-'.ccepteable:
Reinscection acceptab e:                                                                   Date                                                                       .    '
Date Y' s cop 572uenc9 lacco40 s cute.t, B 6' v5FO
Pt e PA g gD ,' p                                                   g 2,jpo(77                                 _
~
: 11) Final Disposition Repair /RevisionComplete:                                                                   Date Station Construction Approved:                                                                                   Date
10)
                ~. -                                       Site Project Superintendent or Designee Coapletion Verified:                                                                         Data Site Q.A. Supr. or Designee                                                                                           -''
I.S.I. Reinspection Required e
        .                                                                                                  ,                          0               ,
o X No FoA PAG ~s r$ Vice spSPFc.T-tod.
                                                                                                              ~
Reinscection acceptab e:
:f, .., ' * -             ,
Date Pt e PA g gD,' p g 2,jpo(77
.i-;.Gi.i.                 C, ' '. . . .. ;                            -
: 11) Final Disposition Repair /RevisionComplete:
                                                                                            . . .  ... r;     .,              - -: ; l '^.~ : .
Date Station Construction Approved:
... e - Q .f.7,q5 /.:.y &;                           -
Date
1Jg <. .       - -r,.C.3gh;A;(- L - _ _ ;,, . A.;.. O
~. -
Site Project Superintendent or Designee Coapletion Verified:
Data Site Q.A. Supr. or Designee 0
:f,.., ' * -
~
.i-;.Gi.i.
C, ' '.
... r;
- -: ; l '^.~ :.
... e - Q.f.7,q5 /.:.y &;
1Jg <..
- -r,.C.3gh;A;(- L - _ _ ;,,. A.;.. O


                                                                                                              . u ra . + y ; .1 LaSallo County Station
. u ra
    -                                                                                                        Revision O Date       h.11.79 Y.? AIR / REVISION REPORT IaR211e County Station                                                                   Report #           23 Specification J-2330                             Piping Erection                       Date:             3-/8-80
. + y ;.1 LaSallo County Station Revision O Date h.11.79 Y.? AIR / REVISION REPORT IaR211e County Station Report #
23 Specification J-2330 Piping Erection Date:
3-/8-80
: 1) Reference Drawings /Docu=ents: gjg, fj Q jijgg ng g__/3
: 1) Reference Drawings /Docu=ents: gjg, fj Q jijgg ng g__/3
: 2) Equipment / Piping Line No.: /pjg 2$q _ 3/y #/
: 2) Equipment / Piping Line No.: /pjg 2$q _ 3/y #/
: 3) Initial Construction ASIE Component / Pipe Class:                             3 N-$ Form Completion Date: 2_- /5- 80                                                                                   -
: 3) Initial Construction ASIE Component / Pipe Class:
: 1) Description f Repair / Modification h,k h, 4                                                                                p_   he, $ her' effAm
3 N-$ Form Completion Date:
          $) Initiated By:
2_- /5-80
NCA$$              t 6k              {lec.('{c k         w hu's f.
: 1) Description f Repair / Modification h,k h,
SIED                           Letter Dated -
p_ he, $ her' effAm 4
S&L                             Letter Dated S&L                           Drawing Revision SCD                             ICR # /28Y NCR #
6k
{lec.('{c k w hu's f.
NCA$$
t
$) Initiated By:
SIED Letter Dated -
S&L Letter Dated S&L Drawing Revision SCD ICR # /28Y NCR #
: 6) Work to ']e, performed to:
: 6) Work to ']e, performed to:
3                                   Section XI Procedure #                                   -
3 Section XI Procedure #
  )                                   Initial Construction Recuirpments of Section III                                   N Code Addenda JQ7Y Ah AdM1 Code Cases Used -
)
Initial Construction Recuirpments of Section III N
Code Addenda JQ7Y Ah AdM1 Code Cases Used -
: 7) NDE Require =ents Section XI Requirements -
: 7) NDE Require =ents Section XI Requirements -
Initial L1stallation Require =ents of Section III
Initial L1stallation Require =ents of Section III Additional NDE Requirecents -
                            ,        Additional NDE Requirecents -
: 8) Station Work Request # -
: 8) Station Work Request # -                          -
: 9) Reflushing Required:
: 9) Reflushing Required:             Y Yes No If yes, reflushing is accepteable:                                               Date
Y Yes No If yes, reflushing is accepteable:
: 10)   I.S.I. Reinspection Required                           Yes
Date 10)
                                                                % No
I.S.I. Reinspection Required Yes
                " inspecti n acceptable:                 .                                      Date Ve-pV
% No
: 11) Final Disposit1&1S%.WP.%   6                u Dae.1-ts -80 Repair /RevisionCo=plete:                                                       Date Station Construction Approved:                                                                       Date
" inspecti n acceptable:
,.]                           Site Project Superintendent or Designee Completion Verified:                                                             Date Site Q.A. Supr. or Designee
Date Ve-pV S%.WP.%
Dae.1-ts -80
: 11) Final Disposit1&1 6
u Repair /RevisionCo=plete:
Date Station Construction Approved:
Date
,,.]
Site Project Superintendent or Designee Completion Verified:
Date Site Q.A. Supr. or Designee


v..   - - - , ,      .i
v..
    .s                     ;          ..-                                                                                      LaSalle County Station
.i LaSalle County Station
                          ^'.
.s
                                                    , 4 S,.                    -'
&Ju. 2_ }1Fu o.
: s.                                       ,-
Revision 0 g
g .,       g          g             .
S,.
Revision 0            -
^ '.
                                                                                %,U f6 &Ju.            2_ }1Fu      o.            Date       h.19.79 p-         ~ EPAIII/EVISIGII EPORT
, 4 s.
                            -: .            _,/-                                                                      -
g.,
I.'               IISalleCoud~ttyStation                                                                               Report #         2Y Specificaticn J-2$30                                       Piping Erection                           Date:       3-/ 8- 8D
g Date h.19.79 U
: 1) Reference Drawings /Docu=ents:                             M 1301- 20 A~A MC00 ISO /J3-/23
%, f6 p-
: 2) Equipment / Piping Line No.:                           / 6 0 M A- 3//                                                       ,
~ EPAIII/EVISIGII EPORT
: 3) Initial Construction ASME Component / Pipe Class:                                         b                                                       ,
_,/-
N-5 Fora Comple+ ion Date:                         2 -/S- 30
I.'
: 1) DescriptionofRepair/ Modification 4
IISalleCoud~ttyStation Report #
fTC              E                o    b Yo5                    Of 9.esidd                       wk.         Ed             Ok st{eghs, i                       C-
2Y Specificaticn J-2$30 Piping Erection Date:
3-/ 8-8D
: 1) Reference Drawings /Docu=ents: M 1301-20 A~A MC00 ISO /J3-/23
: 2) Equipment / Piping Line No.:
/ 6 0 M A-3//
: 3) Initial Construction ASME Component / Pipe Class:
b N-5 Fora Comple+ ion Date:
2 -/S-30
: 1) DescriptionofRepair/ Modification 9.esidd wk. Ed Ok st{eghs, i C-b Yo5 O
4 fTC E
o f
: 5) Initiated sy:
: 5) Initiated sy:
SusD                   Letter Dated S&L                   Letter Dated S&L                   Drawing Revision SCD                   FCR# /288                                       ,
SusD Letter Dated S&L Letter Dated S&L Drawing Revision SCD FCR# /288
                                                                                                                                                        ~                ~
~
NCR # -               -
NCR # -
~
: 6) Work to 'oe performed to:
: 6) Work to 'oe performed to:
3                                                     Section XI Procedure #                                                           v c)                                                     Initial Construction Re uirements of Section III Code Addenda 19% No 4                       Mg A
3 Section XI Procedure #
Code Cases Used ---                      --
v c)
Initial Construction Re uirements of Section III A
Code Addenda 19% No 4 Mg Code Cases Used ---
e
e
: 7) NDE Requirements Section XI Requirements -
: 7) NDE Requirements Section XI Requirements -
                    ~
~
Initial Installation Requirements of Section III                                 N             '
Initial Installation Requirements of Section III N
                                                  .            Additional NDE Requirements -
Additional NDE Requirements -
: 8) Station Work Request #
: 8) Station Work Request #
: 9) Reflushing Required:                           % Yes No Date If yes, reflushing is accepteable:
: 9) Reflushing Required:
: 10)       I.S.I. Reinspection Required                               Yes Y. No Reinspection acceptable:                           _i     .                            Date ht e- 93A'e             b                         UssttA.                       k {c. 3-l8-1 0
% Yes No If yes, reflushing is accepteable:
: 11) Final Disposition                                 i         G
Date 10)
                                                                                            ~
I.S.I. Reinspection Required Yes Y.
                                                                                                    ~
No Reinspection acceptable:
Repair /RevisionCcoplete:                                                               Date Station Construction Approved:                                                                               Date Site Project Superintendent or Designee                                                                       ,
_i Date ht e-93A'e b
Completion Yerified:                                                                   Date Site Q.A. Supr. or Desi 6nce
UssttA.
                                                                                                              ~
k {c. 3-l8-1 0
          ; ,              .         .             . , ,z
: 11) Final Disposition i
                                                                                              .                             .r      -
G
                                                                                                                                            ,-      .r.'
~
                                                                                                ..- . .&L =...~.: . . . : n ' . *                   . , :(
~
                                                          ..}:.. ; w . w _ n .>
Repair /RevisionCcoplete:
Date Station Construction Approved:
Date Site Project Superintendent or Designee Completion Yerified:
Date Site Q.A. Supr. or Desi nce 6
~
.r
.r.'
.,,z
..}:.. ; w. w _ n.>
..-..&L =...~.:... : n '. *
., :(


                                                                                                                                                            . ..a a.J j-i.i                           .
..a a.J j-i.i
V
[
[     '
. D
                        ''M
' D fD 3"k}
                                            ~
LaSalle County Station V
D            '
''M
D                                                 #
~
LaSalle County Station fD y]    3"k} [
~ '
                                                        ~ '                                           ~
l 3 JJ;
l   3 JJ;           j               '
~
Revision 0             -
j y]
  -4 Date         h.11.79 REPAIR /REVISIGN REFCRT                                                                                   ..,  .
[
: q. -                    .
Revision 0
LaSalle Coun$y                             /-
-4 Date h.11.79 REPAIR /REVISIGN REFCRT f.
Station                                                                             Report #                   kd
LaSalle Coun$y / -
                                                                                                                                                                                          '~
: q. -
f.
Station Report #
Specificatien J-2$30                                                 Piping Erection                                     Date:                 3-I8- 80
kd
: 1) Reference Drawings / Documents: MI302.-Zl A                                                                     MC.C.O . ISO NB-6
'~
  *                                                                                                                      ~
Specificatien J-2$30 Piping Erection Date:
3-I8-80
: 1) Reference Drawings / Documents: MI302.-Zl A MC.C.O. ISO NB-6
~
,}.
: 2) Equipment / Piping Line No. :
: 2) Equipment / Piping Line No. :
,}.
lNB03 AA-3 n fy
lNB03 AA- 3fyn                                                                      ,
: 3) Initial Construction AS?S Component / Pipe Class:
: 3) Initial Construction AS?S Component / Pipe Class:                                                               b N-$ Form Ccapletion Date:                               2 20
b N-$ Form Ccapletion Date:
: 1) Description of Repair 4
2 20
kg, eu,hg f,, kg                               [o h gro'( C swkd.                                         me./ModificationL Ad LElec.tebL                                             W b ec.e;s,
: 1) Description of Repair kg, eu,hg f,, kg
: 5) Initiated By:                                             S:sD                         Letter Dated -                          -
[o h gro'( C swkd.
S&L                         Letter Dated S&L                         Drawing Revision -
me./ModificationL Ad Elec.tebL L W b ec.e;s, 4
                    .^      .*
: 5) Initiated By:
SCD                         ICR # /2.8b                         .
S:sD Letter Dated -
DCR #                                                             '
S&L Letter Dated S&L Drawing Revision -
SCD ICR # /2.8b
. ^
DCR #
: 6) Work to be perforned to:
: 6) Work to be perforned to:
Section XI Precedure # -
Section XI Precedure # -
Initial Construction Req 4 ccepts of Section III                                                   X Coile Addenda 19"?8/ ll[o A                         e d1h Code Cases Used-
Initial Construction Req 4 ccepts of Section III X
Coile Addenda 19"?8/ ll[o A e d1h Code Cases Used-
: 7) NDE Require =ents
: 7) NDE Require =ents
          ~
~
              ~                                  ..                    Section XI Requirements Initial Installation Require =ents of Section III                                                 --X Additional HDE Requirements -                                         ,
Section XI Requirements
--X
~
Initial Installation Require =ents of Section III Additional HDE Requirements -
: 8) Station Work Request # -
: 8) Station Work Request # -
: 9) Reflushing Required:                                     X Yes Uo If yes, reflushing is accepteable:                                                                         Date
: 9) Reflushing Required:
: 10)         I.S.I. Reinspection Required                                           Yes' V     50 inspection accept b e:.                             .A       a                                     Date f8.P V 8 34                                       WF M                                     Me 3-18-80
X Yes Uo If yes, reflushing is accepteable:
: 11) Final Dispositica                                         I                 '
Date 10)
                                                                                                                ~
I.S.I. Reinspection Required Yes' V
Repair / Revision Co=plete:                                                                                 Date Station Construction Approved:                                                                                                   Date Site Project Superintendent, or Designee                                                                                     .
50 inspection accept b e:.
Completion Yerified:                                                                                       Date Site Q.A. Supr. or Designee
.A a
                                                    .. . . . . .      . ...;                          .a       . . ..      . .              . - , -        . .
Date f8.P V 8 34 WF M
h *.' -..* :.    ..w v;                 .G.'.,-                   u
: 11) Final Dispositica I
                                                                                                .. .                              * . h. -    -        +       . e '} ~                             /=
~
?               '.' A.;u             ..,.v;:..F*.
Me 3-18-80 Repair / Revision Co=plete:
                                                                        ' ~
Date Station Construction Approved:
                                                                  . G : '~ . .         c :.:.. +. -'- M . ' *. u'a: x                       :'..N. - '
Date Site Project Superintendent, or Designee Completion Yerified:
Date Site Q.A. Supr. or Designee
.a h *.' -..
..w v;
.G.'.,-
u h.
+
' ~
. e '} ~
/=
?
'.' A.;u
..,.v;:..F*.
. G : '~..
c :.:.. +. -'- M. ' *. u'a: x :'..N. - '
.-~': ^*-
(~ -
(~ -
                                                                                                                                                                                  .-~':_^*-_


o          oy.        rr ooD
rr s.
      '=
D ooD o.
s .       -
[e ' % l o
D                                                           1:evision o
y
[e ' % l               '
'=
                                                                      .c w;.    -d                .11       L:JJ .;...:       Data     h 11 79             -
1:evision o
      .-,T .
.11 L:JJ.;...: Data h 11 79
            ..., .      .          , ...              .~.-   .
.~.-
                        .~..                  /*
.c w
                                                      ~ W '' REPAIR / REVISION REPORT                                                                     * ,
-d
      .'              L2?hlla Cc ItyStation                                                                             20 port !         929 Specificatica J-2$30                                   Piping Erection                             Date:       .3 - I S- 8 0
.-,T.
~ W '' REPAIR / REVISION REPORT
. ~..
/*
L2?hlla Cc ItyStation 20 port !
929 Specificatica J-2$30 Piping Erection Date:
.3 - I S-8 0
: 1) Reference Drawings /Deu=ents: M i302-5 A d /MO.CO UO's A)B-YOr/gR
: 1) Reference Drawings /Deu=ents: M i302-5 A d /MO.CO UO's A)B-YOr/gR
: 2) Equipment / Piping Line No.: 1NB20 8-@"                                                                               ,
: 2) Equipment / Piping Line No.: 1NB20 8-@"
: 3) Initial Construction ASME Component Pire Class:                                           B U-5 Form Completion Date:                     2-/ -20 1;) DescriptionofRepair/ Modification kgK                                               Q                 .
: 3) Initial Construction ASME Component Pire Class:
                                                                                                                                          $Q             g S M A- M 3.
B U-5 Form Completion Date:
                      $) Initiated By:                               S ED                 Letter Dated S&L                 Letter Dated S&L                 Drawing Revision SCD                 K R f 12.3 7                                                             .
2-/
UcR # -                                                                      -
-20 1;) DescriptionofRepair/ Modification kgK Q
$Q g
S M A-M 3.
$) Initiated By:
S ED Letter Dated S&L Letter Dated S&L Drawing Revision SCD K R f 12.3 7 UcR # -
: 6) Work to 'oe perfor=ed to:
: 6) Work to 'oe perfor=ed to:
3                                               Section XI Procedure #                                                                                   -',
3 Section XI Procedure #
      -)
-)
Initial Construction Rea rec nts of Section III Code Addenda IQ'll{ f{o Acl                     h X
Initial Construction Rea rec nts of Section III X
Code Cases Used -                                                                                       -'
Code Addenda IQ'll{ f{o Acl h
Code Cases Used -
: 7) NDE Requirements
: 7) NDE Requirements
                                                ~
~
Section XI Requirements ~                   -
Section XI Requirements ~
Initial Installation Require =ents of Section III
Initial Installation Require =ents of Section III Additional NDE Requirements
                                              ,            Additional NDE Requirements
: 8) Station Work Request 8 -
: 8) Station Work Request 8 -
: 9) Reflushing Required:                       'N Yes No If yes, reflushing is accepteable:                                                     Date
: 9) Reflushing Required:
: 10)     I.S.I. Reinspection Required                         Yes
'N Yes No If yes, reflushing is accepteable:
                                                                                %  No Reinspection acceptabl :                                                               Date Prepwed Bs dP MA
Date 10)
: 11) FinaJ Dispositidh                       L
I.S.I. Reinspection Required Yes No Reinspection acceptabl :
                                                                          .m L
.m Date Prepwed Bs dP MA We 3 8o
We 3 8o          ~
: 11) FinaJ Dispositidh L
Repair /.% vision Cc=plete:                                                           Date Station Construction l
L
Approved:                                                                             Date Site Project Superintendent or Designee                                                                   ,
~
Completion Verified:                                                                   Date Site Q.A. Supr. or Designee
Repair /.% vision Cc=plete:
                                                                                      ~
Date Station Construction l
    ''.i..i.* h 4.4.; ;                   :. % .u _ '.. .                 '
Approved:
                                                                                              '        '    ~
Date Site Project Superintendent or Designee Completion Verified:
                                                                                                                'U * % -'                                          '
Date Site Q.A. Supr. or Designee
i-               .c       . -    3,. .                   _.      -- xgy;1_., ggy .q;~gy--~~y~ &mMMg(_sgr,
~
''.i..i.* h 4.4.; ;
:. %.u _ '...
~
'U * % -'
i-
.c 3,..
-- xgy;1_., ggy.q;~gy--~~y~ &mMMg(_sgr,


r,            . ,
W -- @ J-1.1 r,
W -- @ J-1.1 3.- ,.. .        . . . ~,,-: . J -                                        V'         .'*.        3,       ~
V' 3,
                                                                                                                                                          ;, ? . . < .'       LaSalle County Statiora e" ....r . -. .
~
9                                           .
;, ?.. <.'
                                                                                                                                                                                                                                "~
LaSalle County Statiora e r... 3.,..
* Revision 0 -'
... ~, :. J -
: o.       *                                  #
9
L.q -
* Revision 0
Date           h.11.79 REPAIR /REVISICH REFCET                                                                                                     ~l
"~
                                , .              . ,        y-                                                                                                                                               ,
o.
2-    - -
Date h.11.79 L.q -
E.                 IaSalle County Station                                                                       '
REPAIR /REVISICH REFCET
Report #             k7 Specificatien J-2$30                                                             Piping Erection                                               Date:           3- I H- 80
~l y-2-
: 1) Reference Drawings /Docu=ents: M 1302.-17 And MGc.0 ISO MB. ,33
E.
: 2) Equip =ent/Fiping Line No.:                                                 1NB02B                 3[ /                                                                     .-
IaSalle County Station Report #
k7 Specificatien J-2$30 Piping Erection Date:
3-I H-80
: 1) Reference Drawings /Docu=ents: M 1302.-17 And MGc.0 ISO MB.,33
: 2) Equip =ent/Fiping Line No.:
1NB02B 3[
/
: 3) Initial Construction ASIE Component Pipe Class:
: 3) Initial Construction ASIE Component Pipe Class:
N-$ Form Completion Date:                                             '2. - / - 8 0 s
N-$ Form Completion Date:
: 1) Description of Repair / Modification kyMg 4
'2. - / - 8 0 s
[Q % {                               gd Nbme     $) Initiated By:
: 1) Description of Repair / Modification kyMg [Q
uhtk                 Cab                   Al     A       sm%er, S'ED                           Letter Dated -                                                                     .
% {
                                                                                                                                                                                                                ,    ,      *g:
gd 4
f S&L                             Letter Dated                                         -
Nbme uhtk Cab Al A sm%er,
S&L                             Drawing Revision -                                       _
$) Initiated By:
y:                                .: - ,- .
S'ED Letter Dated -
SCD                             ECR l l2.8$                                                                   a-                     - y...
*g:
                            ~. - ,
f S&L Letter Dated S&L Drawing Revision -
ygg y                           _
SCD ECR l l2.8$
g-             .''
a-
- y...
ygg y g-y:
~. -,
: 6) Work to 'oe perfor ed to:
: 6) Work to 'oe perfor ed to:
Section XI Procedure # -                                                                                                                     .'
Section XI Procedure # -
9                                                                       Initial Construction Require =ents of Section III                                                                 N Code Addenda l d No Ad1                                                 g                                                                           ,
9 Initial Construction Require =ents of Section III N
JQ.s .                                 .                                    Code Cases Used -                                                     ,
Code Addenda l d No Ad1 g
: 7) NDE Require:ents                                                                                                                                       .
JQ.s.
Section XI Requirements                             - - -
Code Cases Used -
Initial Installation Requirements of Section III                                                                     N
: 7) NDE Require:ents Section XI Requirements Initial Installation Requirements of Section III N
                                                                  ,            Additional NDE Requirementa                                                       -
Additional NDE Requirementa
: 8) Station Work Request #
: 8) Station Work Request #
: 9) Reflushing Required:                                           % Yes                                                                                                                                     '
: 9) Reflushing Required:
No If yes, reflushing is accepteable:                                                                                           Date
% Yes No If yes, reflushing is accepteable:
: 10)         I.S.I. Reinspection Required                                                     Yes V   No inspectio acceptable:                             .                .                                                    Date                                                               .
Date 10)
c e.
I.S.I. Reinspection Required Yes V
Final gDispos                     B tioy h 6 P.9 h                              -                                 a ge. s-a-ro                           .
No inspectio acceptable:
: 11)                                                               n                   e Repair /FavisionCc=plete:                                                                                                     Date Station Construction Approved:                                                                                                                     Date
Date c e.
: a.                                                        Site Project Superintendent or Designee                                                                                                             ,
B Final gDispos tioy h 6 P.9h -
y Completion' Yerified:                                                                                                         Date                                                         .
a ge. s-a-ro 11) n e
Site Q.A. Supr. or Desi 6nee                                                                                                      .
Repair /FavisionCc=plete:
Date Station Construction Approved:
Date Site Project Superintendent or Designee a.
y Completion' Yerified:
Date Site Q.A. Supr. or Desi nee 6
l
l
                                                                                                  ~                                                                                                   '
* P..h ;? -Q,;".c h., ' <...i I * -' ~.
* i- '' V W .'.4."N'*\. ~ ~ ' ; . ' * ' ~ ^: - ' ' ' M . '. ' .K ~~'
* i- '' V W.'.4."N'*\\. ~ ~ ' ;. ' * ' ~ ^: - ' ' ' M. '. '.K ~~'
i
i
    *.P.  . m,.h ;? -Q,;".c h. , ' <.. .i I * -' ~ .
~
e              ao d   o n. % %'* .m   .e. f     6% "' ~       .w '
.. m, e
9 * * * *            -        * * * *
ao d
* b                   *                                  '
o n.
% %'*.m
.e.
f 6% "' ~
.w 9 * * *
* b


a..a L           y i.1
a..a L y i.1
  -e [:l1, ). ,
-e [:l1,
                                ..r., . 6 ,         ..',.2 0**                   *~
).,
O lldg' '',: -     .
..r.,. 6,
LaS ll County Statior; Revision O                   ,, ..
..',.2 0**
                              ,                                              oO'.   #
lld
Data       h.11.79 I
*~
REPAIR /REVIS!ON REpCRT y                   .;                    ,
g' '',: -
[,             LadalleCouI$tyStation                                                                                   Report #         9. 8 Specificitica J-2$30                                         Piping Ereetion                             Date:       3 80                   '
LaS ll County Statior; Revision O oO'.
: 1) Reference Drawings /Docu=er.its: h] l3QQ. g g g                                                   % QQQ {$Q,g yg.fD                                       ,
O Data h.11.79 I
n~k NS-13.                                                                                                                               #
REPAIR /REVIS!ON REpCRT y
[,
LadalleCouI$tyStation Report #
: 9. 8 Specificitica J-2$30 Piping Ereetion Date:
3 80
: 1) Reference Drawings /Docu=er.its: h] l3QQ. g g g
% QQQ {$Q,g yg.fD n~k NS-13.
: 2) Equip:ent/ Piping Line No. :
: 2) Equip:ent/ Piping Line No. :
l N 3 Q Q M O s// A&                         LMB OQ A- Ye/
l N 3 Q Q M O s// A&
: 3) Initial Constimetion ASIE Comuonent/ Pipe Class:                                               n N-5 Pora Cc=pletion Date:                             1- t 5- 80 14 ) Description of Repair / Modification kg p p3 g.                                         {3 pg,ge,g_f h es uhk                       L0ue C.cossed Dx I,dsa                                                       rdu.h ~
LMB OQ A-Ye/
: 5) Initiated Dy:                              SisD                          Letter Dated S&L
: 3) Initial Constimetion ASIE Comuonent/ Pipe Class:
n N-5 Pora Cc=pletion Date:
1-t 5-80 14 ) Description of Repair / Modification kg p p3 g. {3 pg,ge,g_f h es uhk L0ue C.cossed Dx I,dsa rdu.h ~
* f) :
* f) :
Letter Dated                                                                     i S&L                           Drawing Revision                     __
: 5) Initiated Dy:
SCD                           R:R# /289                       ,                                        ,.,,.
SisD Letter Dated S&L Letter Dated i
NCR # -             _
S&L Drawing Revision SCD R:R# /289 NCR # -
                                                                                                                                                                        ' 'm '
' 'm '
l
l
: 6) Work to 'ce perfor=ed to:
: 6) Work to 'ce perfor=ed to:
Section XI Procedure #
3 Section XI Procedure #
3                                                                                                            ~
~
      ')                                                     Initial Construction Requirece.to of Section III                                       N Code Addenda 19'74 Nn 4dd                           g                                         ,
')
Code Cases Used e                             -
Initial Construction Requirece.to of Section III N
                                                                                                                                                                              ~
Code Addenda 19'74 Nn 4dd g
                                                                                                                                                                                ,t
Code Cases Used e
: 7) NDE Require =ents Section XI Requirements                     ~
~
Initial Installation Requirements of Section III                                       k Additional NDE Requirements -                               ,
,t
: 8) Station Work Request #                                                                                                                                     f
: 7) NDE Require =ents Section XI Requirements
: 9) Reflushing Required:                       %. Yes                                                                                                   ~
~
Initial Installation Requirements of Section III k
Additional NDE Requirements -
: 8) Station Work Request #
f
: 9) Reflushing Required:
%. Yes
~
No If yes, reflushing is accepteable:
No If yes, reflushing is accepteable:
* Date
Date 10)
: 10)     I.S.I. Reinspection Required                                     Yes
I.S.I. Reinspection Required Yes
                                                                                      % No Reinspectio acceptab e:                     .              _m     _                        Date Fhinayispostion3- e
% No Reinspectio acceptab e:
* P%                         '3de 3-/R-RO .
Fhinayispostion3-
: 11)                                               1                       J                                                                           -
_m Date e
Repair /FavisionComplete:                                                                     Date Station Construction l                         Approved:                                                                                       Date
P%
      ,                                            Site Project Superintendent or Designee                                                                           ,
'3de 3-/R-RO.
Completion Yerified:                                                                           Date Site Q.A. Supr. or Designee
11) 1 J
  , J *G-                                                                                  *  * * *                        *"
Repair /FavisionComplete:
                        ?. . '.. .   %''
Date Station Construction l
hl **5:~ -              -
Approved:
Y Y ..                      -       .l ,        ..
Date Site Project Superintendent or Designee Completion Yerified:
x b..           -    N; ,. . .    ..
Date Site Q.A. Supr. or Designee Y Y..
                                                                            .: . .... -      d %. . x0 i. . * -         ~u': .. - '             '
.l,
                                                                                                                                                      *O.- G :- : M
x b..
N;,...
hl **5:~ -
, J *G-
?.. '...
d %..
x0 i.. * -
~u':.. - '
' *O.- G :- : M


                                                                                                                  'O "3N             A                   <
'O "3N A
                                                                                                                                                                  # I" L' # J-I'1 O '3 e '              l
# I" L' # J-I'1 l
:.6b.
6b 1.... /.'..-
r ,,1.. .. /.'..-
.i. ;. ~
                                            .i. ;. ~             ': "-            ~
~ O '3 e '
                                                                                        $, { Ju          i 3 $ k e                  N'. #'
3 $ k N'. #'
                                                                                                                                                      - ' . LaSallo County Station Revision 0                                      .'
. LaSallo County Station
                                                                                          ..~,,                                                                   Dato     h.11.79
$, { Ju i
: q. f . -  .
:. r,,
                                    .          n.                          .
e Revision 0 Dato h.11.79 n.
i(            -
.. ~,,
                                                                      . 3 ~ ' FI? AIR /FIVISIOI FIFCF.T
: q. f. -
      ;.        , . m . -:g                     .
. 3 ~ ' FI? AIR /FIVISIOI FIFCF.T i(
                                                    ,f .                                                                               ~
,. m. -:g
kh               'LaSalle C5unty Station'                                                       ,                                                  Report #               M~
,f.
Specificatien J-2530                                               Piping Erection                                             Date:           .3 - / 8- 8 0
~
          ,            1) Reference Drawings / Documents: %l3Q2-2] fMD /V1cco ISO                                                                                                     R R %.
kh
u                                                                                                                                                                                         ..      ,
'LaSalle C5unty Station' Report #
: 2) Equip =ent/ Piping Line No.: 1R.R.08 FA 3/y                                                                   -
M~
e.
Specificatien J-2530 Piping Erection Date:
: x. . . ..
.3 - / 8-8 0
: 3) Initial Construction ASME Connonent/Pi                                                       Cl ass:            3 II-$ Form Cc=pletion Date:                               3- 2 0- 7h 14 ) DescriptionofRepair/ Modification (g, p.oghe                                                                   1w.si. bin.e b Poh O
: 1) Reference Drawings / Documents: %l3Q2-2] fMD /V1cco ISO R R %.
                      $)pq       Initiaten By:
u
k bye.LL Floor. -
: 2) Equip =ent/ Piping Line No.: 1R.R.08 FA 3/y e.
SIED           -
: x.....
                                                                                                                  -Letter Dated                                         "'":'' .
Cl 3
                                                                                                                                                                                                                      .i.
: 3) Initial Construction ASME Connonent/Pi II-$ Form Cc=pletion Date:
S&L                             Letter Dated                                               -
3-2 0- 7h ass:
S&L                             Drawing Revision                               -
14 ) DescriptionofRepair/ Modification (g, p.oghe 1w.si. bin.e b Poh O$)pq k bye.LL Floor.
SCD                             KR#         /2.90
Initiaten By:
                    - - * .;                                                                                                                                               p ,. ,
SIED
1;ca y                      _.                                    ,        2. ,
-Letter Dated
.i.
S&L Letter Dated S&L Drawing Revision SCD KR#
/2.90 1;ca y p,.,
: 2.,
: 6) Work to be perfor=ed to:
: 6) Work to be perfor=ed to:
Section XI Procedure #                                                    -
'E Initial Construction Re
    'E                                                                   Initial Construction Re                         're: nts of Section III                             N Code Addenda RM No A                                       g                         ,
're: nts of Section III N
Code Cases Used                                   -
Section XI Procedure #
Code Addenda RM No A g
Code Cases Used
: 7) IIDE Requirements
: 7) IIDE Requirements
                                                              ~
~
Section XI Requirements '
Section XI Requirements '
Initial Installation Require =ents of Section III
Initial Installation Require =ents of Section III Additional NDE Require =ents N
                                                            ,              Additional NDE Require =ents N                                                                                                     .
: 8) Station Work Request # '
: 8) Station Work Request # '                                                   -
# 's.
                                                                                                                                                                                                                    ~*
* 9) Reflushing Required:
* 9) Reflushing Required:                                         X     Yes ~                                                                           #      # 's . '
X Yes ~
No If yas, reflushing is accepteable:                                                                               Date
~*
: 10)         I.S.I. Reinspection Required                                               Yes
No If yas, reflushing is accepteable:
                                                                                                % No P inspectio acceptable:                                                 . .                                    Date fee.ow tion-
Date 10)
: 11) FinaltDispos                                           'AW. he i
I.S.I. Reinspection Required Yes
                                                                                                                                              .wh. :3-is                                 Repair / Revision C plete: _                                                                                       Date Station Construction                                                                                 -
% No P inspectio acceptable:
                            .                                                                                                                                                                          ..^         .
Date fee.ow
Approved:                                                                                                         Date Site Project Superintendent or Designee                                                                                                     .
: 11) FinaltDispos tion- 'AW. h
Completion Terified:                                                                                               Date
.wh. :3-is e i
                                                      ,.,                            Site Q.A. Supr. or Desi6 nee                                                                                                       *
Repair / Revision C plete: _
  .a..                   ...
Date Station Construction
                                                      .       .           .   * :p.? . :~,              -.;. .;c...q.W.~: :~. ---.-                    -
..^
i          -*                    *
Approved:
                        .w:-
Date Site Project Superintendent or Designee Completion Terified:
  . . :.~                                    :. n .. . .                                      -
Date Site Q.A. Supr. or Desi6 nee
  $-5*.A.Q' m"' '$: o                   .>      5..      .
* :p.?. :~,
i    *                        *$
i
                                                                                                        *            $N*    '      '
.. :.~.w:-
                                                      =__
:. n....
.;c...q.W.~: :~. ---.-
.a..
=
i
$N*
$-5*.A.Q' "' '$: o 5..
m


                                                                                                                                                                        . ...                .; , r.1
.;, r.1
              . . ' A.S. 2- r:3. ; - d'.d.- . . .:                                  'W      "
3'        'h
                                                                                                                                    '                                          alle County Statior '
.f.[.
.f.[.
r5 D@W                                     #
.. ' A.S. 2-r:3. ; - d'.d....:
                                                                                                                                                                  . Revision 0                                                           '.
D@W
6        c                                                                                                   h.11.79
'h alle County Statior '
                                . -                                    6                    -. .J                                                   -
'W 3'
Ihte
. Revision 0 r5 6 6.-
* REPAIR /REVISIC:1REPCRT                                         _
c
                  -La alle-C5 by Station                                           .
-..J Ihte h.11.79
Report #                                             M                                                 ~
* REPAIR /REVISIC:1REPCRT
2:.
-La alle-C5 by Station Report #
                ' Specification J-2$30                                         Piping Erection                                         Date:                                     3-/S40
M
: 1) ReferenceDrawings/ Documents: h QQQ f @                                   -
~
yg                       30 g{Q
' Specification J-2$30 Piping Erection Date:
: 2) Equipment / Piping Line No. :                         l QQg g                 3     /I   ,;                                                                                ,
3-/S40 2:.
: 3) Initial Construction AS :S Comp)nent/ Pipe Class:                                           b N-$ Form Completion Date:                     3 - 2 0 "79                                                                                                                                                 -,
: 1) ReferenceDrawings/ Documents: h QQQ f @
: 1) DescriptionofRepair/Modificationkeghke, 4                                                                                          [ g (ke                                                                               g
yg 30 g{Q
              .O                                 ix ' L y~ SNEDe.LL. Floor.                                     .=                                                                                     ca                            - -
: 2) Equipment / Piping Line No. :
.['       R        $          %nitia I             d By:~                                  -
l QQg g 3
                                                                                          - Letter Dated                                           -
/I
                                                                                                                                                                                                                                            'I S&L                   Letter Dated             -                                                                      --
: 3) Initial Construction AS :S Comp)nent/ Pipe Class:
S&L                   Drawing Revision                       ---
b N-$ Form Completion Date:
    ;c:
3 - 2 0 "79
                      *;. 3      ,                              '
: 1) DescriptionofRepair/Modificationkeghke,
SCD                   KR # /29 [                       '
[ g (ke g
                                                                                                                                        '' ,                                      .v.    ~
4
                                                                                                                                                                                                ,c-                -
. O %nitia ~ ' L y~ SNEDe.LL. Floor.
ix ca
.=
.['
I d By:
- Letter Dated
'I R
S&L Letter Dated S&L Drawing Revision SCD KR # /29 [
NCR !
NCR !
s
~,c-
: 6) Work to be performed to:                                                                                                                             .
.v.
;c:
*;. 3 s
: 6) Work to be performed to:
Section XI Procedure #
Section XI Procedure #
(                                                           Initial Construction Re i                 e=er ts of Section III                                                           N Code Addenda R'N No A                   enc ,g                                                       ,                                  .
(
        .                                                      Code Caces Used
Initial Construction Re i e=er ts of Section III N
Code Addenda R'N No A enc,g Code Caces Used
: 7) NDE Requirements
: 7) NDE Requirements
                                                                                                      -~
'~
                    .N.                                         Section XI Requirecents
.N.
    '~                                                ~
-~
Initial Installation Require =ents of Section III                                                                           X
~
                                                  ,            Additional NDE Requirements '                                     -
Section XI Requirecents X
: 8) Station Work Request 8-S
Initial Installation Require =ents of Section III Additional NDE Requirements '
: 9) Reflushing Required:                                 Yes No If yes, reflushir.g is accepteable: ,                                                         Date                                                     __
: 8) Station Work Request 8-
: 10)           I.S.I. Reinspection Required                             Yes V     No                             .,
: 9) Reflushing Required:
inspection acceptabl :                                                                     Date PE 11).FinafDie,osition                             -
S Yes No If yes, reflushir.g is accepteable:,
i
Date 10)
                                                                              >                W                          'Dde 3 8 0 y
I.S.I. Reinspection Required Yes V
Repair /Re ision Co=plete:                                                                       Date Station Conatruction Approved:                                                                                       Date
No inspection acceptabl :
    ,[                                                   Site Project Superintendent or Designee                                                                                                                                         .
Date PE W
9                                                                                                               -
'Dde 3 8 0 11).FinafDie,osition i
Completion Yerified:                                                                           Date                                                                                                                   ,
y Repair /Re ision Co=plete:
Site Q.A. Supr. or Designee
Date Station Conatruction Approved:
          *: T**. Y b3             lf h ' $
Date
:h.Q         l       .h '-         *;j, .*     'L'
,[
                                                                                                              .Y T ** 7 '.. a.. e i.N' .
Site Project Superintendent or Designee 9
Completion Yerified:
Date Site Q.A. Supr. or Designee
*: T**. Y b3 lf h '
:h.Q l
.h '-
*;j,.*
'L'
.Y T ** 7 '.. a.. e i.N'.
N
N
                                                                                                                                                                                                  $.** !. IV 4 * . . L' -
$.** !. IV 4 *.. L' -
                                                                                                                                                                                                      .}}
.}}

Latest revision as of 05:31, 2 January 2025

Procedure for ASME Section XI Repairs & Revisions.Repair/ Revision Repts 5-8 & 23-30 Encl
ML19305D696
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 04/11/1979
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML19305D694 List:
References
L.S.Q.P.3.1, NUDOCS 8004150419
Download: ML19305D696 (17)


Text

.

,,.,I ', ~

L.S.Q.P. Ns. 3-1 s

I Rev. 0

' J '

Datas h/11/79 TITLE: Section XI Repairs and Revisions For LaSalle Cor sty Station Performed m$

by Morrison Const. Co. at the Direction of Com=onwealth Edison Co.

Station Construction Department 1.0 PURPOSE This procedure details requirements for Morrison Const. Co. to perform ASME Section XI repairs and revisions at the LaSalle site as directed by Comaonwealth Edison Co.

2.0 SCOPE The repairs or revisions covered by this Procedure are necessitated by damage to or indications found in piping systems and components or design revisions and interference proble=s identified after completion of Section III Construction requirements.

',3 0 DEFINITIONS The ter= " revision", as used in this procedure, refers to any operation allowed by paragraph IWA-h2h0. See specification J-2530, Piping Erection, and ASME Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, for other appli_ cable definitions.

h.0 RESFO:ISIBILITIES h.1 Station Euclear Engineering Depart =ent h.1.1 Datarnino Section XI Ccde Addenda, if different than listed in precedure.

h.1.2 Initiate repairs and revisions by:

h.1.2.1 Letter from SUED.

h.1.2.2 Approval of Sargent & Lundy directives to take revisions.

h.1 3 Inform the applicable enforcement or jurisdictional authorities.

h.1.h Perform a safety evaluation, as applicable.

h.1.5 Insure that the stresa analysis is revised, as needed.

h.2 Station Construction Field Engineer h.2.1 Direct i=ple=entation of this LSQP.

h.2.2 Initiate repairs and revisiens by:

h.2.2.1 Initiatin; an !OR.

h.2.2.2 Initiating an FCR.

h.2 3 Fill out a repair /revicien report.

[:I '

8004150

o 4.2.4 N*,tify site q,A. that repair er revicita wort ic to be perfcrmed.

h.2 5 Provide repair or revision detail information to A.N.I.I.

h.2.6 CoorrHmte re-examination by NDE, reflushing, and I.S.I. reinspection.

h.2.7 Close out ICR's, NCR's repair / revision, and pro-vide as-built information required to revise design drawings.

h.3 Morrison Construction Co.

Perform repairs and revisions as directed by Commonwealth Edison S.C.D. personnel in accor-dance with procedures and quality assurance program approved by C.E.Co. and properly quali-fled personnel.

h.h Authorized Inspection Authorized Nuclear Inservice Inspection services per IWA-2120 will be furnished by Hartford Steam Boiler Inspection and Insurance Co. ~under an agreement with Coc=onwealth Edison.

k.5 Commonwealth Edison Quality Assurance Dept.

h.5 1 Review S.C.D. Eenerated ER's and NCR's.

h.5 2 Maintain final docueentation package.

h.5.3 Assure the implementation of this procedure and the requirements of Section XI.

5.0 PRCCEDURE 5.1 Codes and Specifications 5.1.1 ASME Boiler and Pressure Vessel Code Section XI, 197h Edition including Su==er 1975 Addenda and for reference IWB-700r., Su==er 1976 Addenda.

5 1.2 ASME Boiler and Pressure Vessel Code Section III, 197h Edition with no Addenda or other Addenda used for ini-tial construction, as approved by an ECN or E R.

5.1 3 Sargent & Lundy Specification J-2530, Piping Erection.

5 1.4 Morrison Construction Co. Quality Assurance Program as approved for use at LaSalle County Station 5.2 Code nequirements 5.2.1 ASME Section XI Article IWB-hC00 Repair Procedure 1 thru 5 will be utill:cd should they apply to a par-ticular repair. Repairs and revisions not covered in Article IWB-hC00 will be perfonned in accordance with e

5 2.1 C:ntinutd the requir;menta of th2 Coda gpplicable to tha initial Crnstruction to c11 owed by paragraph IVA-h100 C.

The repair procedure number used or reference to the initial construction Code will be recorded on the Repair / Revision h

Report (See paragraph 5 5) 5 2.2 The' Code Addenda for Section XI will be established by SNED.

53 Initiation and Approval of Repairs or Modification 5.3 1 Repairs or revisions will be initiated by Station Nuclear Engineering Dept. or Station Construction Dept. by one of the following methods:

5.3 1.1.SNED Initiated Repairs or Revisions A letter from Station Nuclear Engineering Department or a drawing revision and letter from Sargent & Lundy as approved by SNED, will be authorization to perform a repair or revision.

cc 531.2 SCD Initiated Repairs or Revisions Station Construction Dept. requests for re-pairs or revisions will be processed by means of an ICR or NCR, as applicable.

C.:

5.3 2 All repairs or revisions are therefore approved by Station Nuclear Engineering Dept. SNED is also responsible for in-forming the applicable enforcement or jurisdictional author-ities as required by IWA-h230, performing a safety evaluation, as applicable, and insuring that the stress analysis is revised, as needed.

5.h Quality Assurance Program The work will be performed in accordance with the Morrison Construction Co. Quality Assurance Program as approved for use at LaSalle County Station by Commonwealth Edison.

5 5 Repair / Revision Report A Repair /devision Report (see attached) will be filled out to record SNED approvals, code requirements, NDE re-quirements, etc. for each repair or revision. If the Station maintenance dept. is required to perform work as part of a repair or revision, the work request number will be recorded (see item 8 of the report) and a copy of the request attached.

5.6 Nondestructive and Hydrostatic Testing 5.6.1 Nondestructive testing will be performed in accordance with the requirements of Section XI or Section III, as applicable.

5.6.2 A hydrostatic or system pressure test as required by paragraph IWA-h210 will be perfomed following completion of weldol re-pairs or revisions.

i 57 Documentation 5.7 1 Docu=entation as required in paragraph 112 of specification J-2530 and ASME Fection XI will be submitted for each repair or revision.

572 The completed documentation package will be forwarded to the

~

site Q.A. Department.

5.8 Code Data Report 5 8.1 Data Report for Inservice Inspection will be completed for repairs and revisions and submitted for approval by the appropriate Con =1onwealth Edison and Hartford Steam Boiler Inspection and Insurance Co. personnel.

~l Approved Approved

-3

.,/'

'/

r.

f :

,bj

/N h llVYl,L-S

. /

y L. J. Burke T. E. Quaka ^

Site Project Superintendent Q.A. Supervisor Approved

- 7 [.

ed'bNb~ 4[/// /9 T. E. Watts TM SNED Project Engineer b

---..~.--

F;rm LSQP 3-1.1 LaSallo C unty Stati n Revision 0 Date h.11.79 REPAIR / REVISION REPORT g,.

h LaSalle County Station Report #

Specification J-2530 Piping Erection Date:

1) Reference Drawings / Documents:
2) Equipment / Piping Line No.:
3) Initial Construction ASFE Component / Pipe Class:

N-5 Form Completion Date:

1) DescriptionofRepair/ Modification 4
5) Initiated By:

SIED Letter Dated S&L Letter Dated S&L Drawing Revision SCD KR#

NCR #

6) Vork to be perfor=ed to:

Section XI Procedure #

C,.

Initial Construction Requirements of Section III Code Addenda Code Cases Used

~7) NDE Requirements

~

~

Section XI Requirements Initial Installation Requirements of Section III Additional NDE Requirements

8) Station Work Request #
9) Reflushing Required:

Yes No If yes, reflushing is accepteable:

Date 10)

I.S.I. Reinspection Required Yes No Reinspection acceptable:

Date

11) Final Disposition Repair / Revision Complete:

Date Station Construction Approved:

Date Site Project Superintendent or Desi6nce Cecpletion Verified:

Date Site Q.A. Supr. or Designee I

suua wa y-e. n LaSallo County Ststion Revision 0 Date 'h.11.79 RSPAIR/ REVISION RSPORT LaSalle County Station Report #

I Specification J-2$30 Piping Erection Date:

15//o/71 l

1) Reference Drawings / Documents:

[

H - 13 S H. I +A i

2) Equipment / Piping Line No. :

lWOH A + b ~ $a BLIMb Fi A9 Cr2 09 L.I M5 S

3) Initial Construction ASMS Component / Pipe Class:

O N-$ Form Completien Date:

/o/ 4 /79 I

h) Description of Repair / Modification REhoVE B LIU D FL A9 6-2 FOR F l U Sl+1 N lr.

kHD fleypsT71LL.

AFTele CO P Pi erioAJ or Ft.uspi96-

5) Initiated By:

SusD Letter Dated

^

S&L Letter Dated S&L Drawing Revision SCD FUR # 888-NCR #

6) Work to be performed to:

~

Section XI Procedure #

(

Initial Construction Requirecents of Section III X

Code Addenda 1774 CD4Dod po A-DA sv D A Code Cases Used M/A

7) UDS RequirementsSection XI Requirements Initial Installation Require =ents of Section III k

Additional NDS Requirements i

8) Station Work Request #
9) Reflushing Required:

Yes X No If yes, reflushing is accepteable:

Date 10)

I.S.I. Reinspection Required Yes X

No Reinspection acceptable:

Date PREPh5Ebj $ W Y.

11-flo/77

11) Final Disposition Repair /RevisionComplete:

Date i

Station Construction Approved:

Date Site Project Superintendent or Designee Completion Verified:

Date Site Q.A. Supr. or Designee

.--- --,, s...

LaSallo County Station Revision 0 Data 'h.11-79 REPAIR /REVISIO!! REPORT LaSalle County Station Report #

b Specification J-2530 Piping Erection Date:

// //o/79

1) Reference Drawings /Docu=ents:

h-799 kHD ttA+)G-En D einit--

D A Aw arx-S -

2) Equipment / Piping Line No. :

S Er-77o d 111 PoA7709 OF F: u)

S 't'S TE7%.

I

3) Initial Construction ASIE: Component / Pipe Class:

AO U-5 Form Completion Date: fo/ A:t / it h) Description of Repair / Modification AD D P,PE sop /o A7 A rrth!. tti9 ews

'T'o P lJ G @ Tl"2' t A-S D e o ne t.Eb oM c.o A p 5,J,-

/FMb P uTuan (EEus StoM S

'I'o ht-799 AHD IMHCrE7?- D ET7+tt. D Atw>si'crs. tthocrees to BC

5) Initiated By:

SNED Letter Dated 3, p p_ p/s, S&L Letter Lated S&L Drawing Revision SCD KR# Pf3 UCR # -

6) Work to be performed to:

Section XI Procedure #

~

. (

Initial Construction Requirece3 s of Section III N

t Code Addenda W74-e-DITicM -lWo /VbDEMDA Code Cases Used

7) NDE Require =entsSection XI Requirements Initial Installation Requirements of Section III h

i Additional NDS Requirements

8) Station Work Request #
9) Reflushing Required:

Yes X

No If yes, reflushing is accepteable:

Date 10)

I.S.I. Reinspection Required Yes cou sreva riou A.e-cc4 D S Lu /t,t 8E o

X No V3Eb PoA PAE" 3 ef t/se--E (Ps PEc rtok3. :

Reinspection acceptable:

Date P2 epi +4 e-b: 74 M t. % = = = iwfiop7

11) Final Disposition Repair /RevisionComplete:

Date l

Station Construction Approved:

Date Site Project Superintendent or Designee Completion Verified:

Date Site Q.A. Supr. or Designee bN p

G h_

maJaile Guaty v.at.ici D"@

  • D m$~,'0 3**i i " U Dato h 11-79 Mh sf

"! O -

1

!.hi n.MJIO!! IiEPoliT P

LaSalle County Station Report #

7 Specificaticn J-2330 Piping Erection Date:

l'4//o/79

1) ReferenceDrawings/ Documents.

.f.:

JA 749 RND tt/V>cet R-D e Tall-f)/E A U' !N 0-5.

'. \\. :'.i.,

  1. '# b# #

5[ Equipment /PipingLineNo.: S EC T70 '> E

.g u G.t U D ED 19 R ERC YD A VESSEL.

Pseessone B cuHDAe Y.

~3) Initial Construction ASIE Component / Pipe Class:

O

'~

N-5 Form Completion Date: /MM74

~

14 ) Description of Repair / Modification /100 P.Ps 50r/047 A-rrA c // A W7-5 To t+ P S Ys Thy A-s De ratted op s uk&Eu r npD rv rvste* BEvtStoso s To h-799

~ pod, tt&pm p g rnst. l)RAu noc-c, Itt1M&e~ns ro Be t.tsnce op jaonisea h nb's.

s;r 74;, ;

  • $);,InitiatedBy:

,,SNED Letter Dated

~

S&L Letter Dated 9

j S&L s

' Drawing Revision -

- V '.;l/.

j y. i t. /.;, h *., ;

r s

SCD ER# 8'8 b nCR H

" {.;, ; 5.

< ;..!n

, -j.,. ], 6 ) Vork 'to be perfomed to:

~

'3 Section XI Procedure #

Q

.. j 2 Code Addenda I47+ etanoa, ya ADoeyDA Initial Construction Requirements of Section III X

...g >... '.; -

"1 '

Code Cases Used

..h,.

7) NDS RequirementsSection XI Requirements 1

Liitial Installation Requirements of Section III k

~

Additional NDS Requirements

'i

8) Station Work Request #

^

9) Reflushing Required:

Yes 6

X No If yes, reflushing is accepteable:

Date 10)

I.S.I. Reinspection Required

  • Yes cop 57tv o.rto u Reco#0s cuts c 8e

.X No U S ED PC/h PAeS&^2VtCG IHS PEETTOM

  • Reinspection acceptable:

Date

' PP EP A rd e O l P Q E. W stllo f rq,

11) Final Disposition Repair /RevisionComplete:

Date Station Construction Approved:

Date Site Project Superintendent or Designee Completion Verified:

Date Site Q.A. Supr. or Designee i:

l..... ".4.=M"; ;.G aa. & ~ - ^ 6.- - - ~ -~~~ ~ '

.e'.. i,

. Q'.,.,

. '..,Qr. 'r h. p:

. e n r*..

.r Rev s n0

..[,

.. _p _-::,,;,,

pagg *b,33 79 P2 PAIR /F2VIGION REFC'IT

(-

LaSalle County Station Report #

8 (N

~#h/o[79 5

Specification J-2330 Piping Erection Date:

-j~

1) Reference Drawings / Documents:

l.

.h-779 kob Mo &E12 D e 'rntL D/2Awt"0 5

3.,

.. k

2) Equipment / Piping Line No.:. EC-77 N,.

4.Tiob Y-NE#

Ipctab x p3 rVG & E7%G TcA. Vess ex-P2ess02 C. B ou a Div'-Y.

O 4-

,1 3)

Initial Construction ASIE Comkonent/ Pipe Class:

N-5 Form Completion Date: IA /M v-@

2.

7 h) Description of Repair / Modification ADD P:Pe Suppo47 Ar77tcH HEMTS Q -[Jfg Li

.3YSTEnt hs De' TAIL-yD cp eugggur wb puimaE RGutsscas To W194 A+)D HMc-E12-DeTnte D/2/Ruovc-S. Hnp6-EAS Tv BE LISTED o9 t<cpassoa MRD'S-

.$) Initiated By:

SNED Letter Dated

~ ' '.

  • QL.
    y...,. *~.- u.f,y '

Q~.',;.%.*l5bbh '

A.'z ihy ;*'j?,' :. ' *'.NS & b

'3

^

Letter Dated

~

S&L

~... -

Drawing Revision -

'~*#".*_".

'd -

^

SCD ECR'# N S~

~ '

6) Work to be perfor=ed to:

N

[

Section XI Procedure #

=

Initial Construction Requirements of Section III k

)

Code Addenda 1974 EDIT 1c4 - Po /lDBsJDA Code Cases Used

7) NDS Require =entsSection XI Requirements Initial Installation Requirements of Se dion III M

c i.-

Additional NDE Requirements

8) Station Work Request #

s mA

'9

'~D D

9) Reflushing Required:

Yes J_

_2 g

,X No If yes, reflushing is.-'.ccepteable:

Date Y' s cop 572uenc9 lacco40 s cute.t, B 6' v5FO

~

10)

I.S.I. Reinspection Required e

o X No FoA PAG ~s r$ Vice spSPFc.T-tod.

Reinscection acceptab e:

Date Pt e PA g gD,' p g 2,jpo(77

11) Final Disposition Repair /RevisionComplete:

Date Station Construction Approved:

Date

~. -

Site Project Superintendent or Designee Coapletion Verified:

Data Site Q.A. Supr. or Designee 0

f,.., ' * -

~

.i-;.Gi.i.

C, ' '.

... r;

- -: ; l '^.~ :.

... e - Q.f.7,q5 /.:.y &;

1Jg <..

- -r,.C.3gh;A;(- L - _ _ ;,,. A.;.. O

. u ra

. + y ;.1 LaSallo County Station Revision O Date h.11.79 Y.? AIR / REVISION REPORT IaR211e County Station Report #

23 Specification J-2330 Piping Erection Date:

3-/8-80

1) Reference Drawings /Docu=ents: gjg, fj Q jijgg ng g__/3
2) Equipment / Piping Line No.: /pjg 2$q _ 3/y #/
3) Initial Construction ASIE Component / Pipe Class:

3 N-$ Form Completion Date:

2_- /5-80

1) Description f Repair / Modification h,k h,

p_ he, $ her' effAm 4

6k

{lec.('{c k w hu's f.

NCA$$

t

$) Initiated By:

SIED Letter Dated -

S&L Letter Dated S&L Drawing Revision SCD ICR # /28Y NCR #

6) Work to ']e, performed to:

3 Section XI Procedure #

)

Initial Construction Recuirpments of Section III N

Code Addenda JQ7Y Ah AdM1 Code Cases Used -

7) NDE Require =entsSection XI Requirements -

Initial L1stallation Require =ents of Section III Additional NDE Requirecents -

8) Station Work Request # -
9) Reflushing Required:

Y Yes No If yes, reflushing is accepteable:

Date 10)

I.S.I. Reinspection Required Yes

% No

" inspecti n acceptable:

Date Ve-pV S%.WP.%

Dae.1-ts -80

11) Final Disposit1&1 6

u Repair /RevisionCo=plete:

Date Station Construction Approved:

Date

,,.]

Site Project Superintendent or Designee Completion Verified:

Date Site Q.A. Supr. or Designee

v..

.i LaSalle County Station

.s

&Ju. 2_ }1Fu o.

Revision 0 g

S,.

^ '.

, 4 s.

g.,

g Date h.19.79 U

%, f6 p-

~ EPAIII/EVISIGII EPORT

_,/-

I.'

IISalleCoud~ttyStation Report #

2Y Specificaticn J-2$30 Piping Erection Date:

3-/ 8-8D

1) Reference Drawings /Docu=ents: M 1301-20 A~A MC00 ISO /J3-/23
2) Equipment / Piping Line No.:

/ 6 0 M A-3//

3) Initial Construction ASME Component / Pipe Class:

b N-5 Fora Comple+ ion Date:

2 -/S-30

1) DescriptionofRepair/ Modification 9.esidd wk. Ed Ok st{eghs, i C-b Yo5 O

4 fTC E

o f

5) Initiated sy:

SusD Letter Dated S&L Letter Dated S&L Drawing Revision SCD FCR# /288

~

NCR # -

~

6) Work to 'oe performed to:

3 Section XI Procedure #

v c)

Initial Construction Re uirements of Section III A

Code Addenda 19% No 4 Mg Code Cases Used ---

e

7) NDE RequirementsSection XI Requirements -

~

Initial Installation Requirements of Section III N

Additional NDE Requirements -

8) Station Work Request #
9) Reflushing Required:

% Yes No If yes, reflushing is accepteable:

Date 10)

I.S.I. Reinspection Required Yes Y.

No Reinspection acceptable:

_i Date ht e-93A'e b

UssttA.

k {c. 3-l8-1 0

11) Final Disposition i

G

~

~

Repair /RevisionCcoplete:

Date Station Construction Approved:

Date Site Project Superintendent or Designee Completion Yerified:

Date Site Q.A. Supr. or Desi nce 6

~

.r

.r.'

.,,z

..}:.. ; w. w _ n.>

..-..&L =...~.:... : n '. *

., :(

..a a.J j-i.i

[

. D

' D fD 3"k}

LaSalle County Station V

M

~

~ '

l 3 JJ;

~

j y]

[

Revision 0

-4 Date h.11.79 REPAIR /REVISIGN REFCRT f.

LaSalle Coun$y / -

q. -

Station Report #

kd

'~

Specificatien J-2$30 Piping Erection Date:

3-I8-80

1) Reference Drawings / Documents: MI302.-Zl A MC.C.O. ISO NB-6

~

,}.

2) Equipment / Piping Line No. :

lNB03 AA-3 n fy

3) Initial Construction AS?S Component / Pipe Class:

b N-$ Form Ccapletion Date:

2 20

1) Description of Repair kg, eu,hg f,, kg

[o h gro'( C swkd.

me./ModificationL Ad Elec.tebL L W b ec.e;s, 4

5) Initiated By:

S:sD Letter Dated -

S&L Letter Dated S&L Drawing Revision -

SCD ICR # /2.8b

. ^

DCR #

6) Work to be perforned to:

Section XI Precedure # -

Initial Construction Req 4 ccepts of Section III X

Coile Addenda 19"?8/ ll[o A e d1h Code Cases Used-

7) NDE Require =ents

~

Section XI Requirements

--X

~

Initial Installation Require =ents of Section III Additional HDE Requirements -

8) Station Work Request # -
9) Reflushing Required:

X Yes Uo If yes, reflushing is accepteable:

Date 10)

I.S.I. Reinspection Required Yes' V

50 inspection accept b e:.

.A a

Date f8.P V 8 34 WF M

11) Final Dispositica I

~

Me 3-18-80 Repair / Revision Co=plete:

Date Station Construction Approved:

Date Site Project Superintendent, or Designee Completion Yerified:

Date Site Q.A. Supr. or Designee

.a h *.' -..

..w v;

.G.'.,-

u h.

+

' ~

. e '} ~

/=

?

'.' A.;u

..,.v;:..F*.

. G : '~..

c :.:.. +. -'- M. ' *. u'a: x :'..N. - '

.-~': ^*-

(~ -

rr s.

D ooD o.

[e ' % l o

y

'=

1:evision o

.11 L:JJ.;...: Data h 11 79

.~.-

.c w

-d

.-,T.

~ W REPAIR / REVISION REPORT

. ~..

/*

L2?hlla Cc ItyStation 20 port !

929 Specificatica J-2$30 Piping Erection Date:

.3 - I S-8 0

1) Reference Drawings /Deu=ents: M i302-5 A d /MO.CO UO's A)B-YOr/gR
2) Equipment / Piping Line No.: 1NB20 8-@"
3) Initial Construction ASME Component Pire Class:

B U-5 Form Completion Date:

2-/

-20 1;) DescriptionofRepair/ Modification kgK Q

$Q g

S M A-M 3.

$) Initiated By:

S ED Letter Dated S&L Letter Dated S&L Drawing Revision SCD K R f 12.3 7 UcR # -

6) Work to 'oe perfor=ed to:

3 Section XI Procedure #

-)

Initial Construction Rea rec nts of Section III X

Code Addenda IQ'll{ f{o Acl h

Code Cases Used -

7) NDE Requirements

~

Section XI Requirements ~

Initial Installation Require =ents of Section III Additional NDE Requirements

8) Station Work Request 8 -
9) Reflushing Required:

'N Yes No If yes, reflushing is accepteable:

Date 10)

I.S.I. Reinspection Required Yes No Reinspection acceptabl :

.m Date Prepwed Bs dP MA We 3 8o

11) FinaJ Dispositidh L

L

~

Repair /.% vision Cc=plete:

Date Station Construction l

Approved:

Date Site Project Superintendent or Designee Completion Verified:

Date Site Q.A. Supr. or Designee

~

.i..i.* h 4.4.; ;

. %.u _ '...

~

'U * % -'

i-

.c 3,..

-- xgy;1_., ggy.q;~gy--~~y~ &mMMg(_sgr,

W -- @ J-1.1 r,

V' 3,

~

, ?.. <.'

LaSalle County Statiora e r... 3.,..

... ~, :. J -

9

  • Revision 0

"~

o.

Date h.11.79 L.q -

REPAIR /REVISICH REFCET

~l y-2-

E.

IaSalle County Station Report #

k7 Specificatien J-2$30 Piping Erection Date:

3-I H-80

1) Reference Drawings /Docu=ents: M 1302.-17 And MGc.0 ISO MB.,33
2) Equip =ent/Fiping Line No.:

1NB02B 3[

/

3) Initial Construction ASIE Component Pipe Class:

N-$ Form Completion Date:

'2. - / - 8 0 s

1) Description of Repair / Modification kyMg [Q

% {

gd 4

Nbme uhtk Cab Al A sm%er,

$) Initiated By:

S'ED Letter Dated -

  • g:

f S&L Letter Dated S&L Drawing Revision -

SCD ECR l l2.8$

a-

- y...

ygg y g-y:

~. -,

6) Work to 'oe perfor ed to:

Section XI Procedure # -

9 Initial Construction Require =ents of Section III N

Code Addenda l d No Ad1 g

JQ.s.

Code Cases Used -

7) NDE Require:entsSection XI Requirements Initial Installation Requirements of Section III N

Additional NDE Requirementa

8) Station Work Request #
9) Reflushing Required:

% Yes No If yes, reflushing is accepteable:

Date 10)

I.S.I. Reinspection Required Yes V

No inspectio acceptable:

Date c e.

B Final gDispos tioy h 6 P.9h -

a ge. s-a-ro 11) n e

Repair /FavisionCc=plete:

Date Station Construction Approved:

Date Site Project Superintendent or Designee a.

y Completion' Yerified:

Date Site Q.A. Supr. or Desi nee 6

l

  • P..h ;? -Q,;".c h., ' <...i I * -' ~.
  • i- V W.'.4."N'*\\. ~ ~ ' ;. ' * ' ~ ^: - ' ' ' M. '. '.K ~~'

i

~

.. m, e

ao d

o n.

% %'*.m

.e.

f 6% "' ~

.w 9 * * *

  • b

a..a L y i.1

-e [:l1,

).,

..r.,. 6,

..',.2 0**

lld

  • ~

g' ,: -

LaS ll County Statior; Revision O oO'.

O Data h.11.79 I

REPAIR /REVIS!ON REpCRT y

[,

LadalleCouI$tyStation Report #

9. 8 Specificitica J-2$30 Piping Ereetion Date:

3 80

1) Reference Drawings /Docu=er.its: h] l3QQ. g g g

% QQQ {$Q,g yg.fD n~k NS-13.

2) Equip:ent/ Piping Line No. :

l N 3 Q Q M O s// A&

LMB OQ A-Ye/

3) Initial Constimetion ASIE Comuonent/ Pipe Class:

n N-5 Pora Cc=pletion Date:

1-t 5-80 14 ) Description of Repair / Modification kg p p3 g. {3 pg,ge,g_f h es uhk L0ue C.cossed Dx I,dsa rdu.h ~

  • f) :
5) Initiated Dy:

SisD Letter Dated S&L Letter Dated i

S&L Drawing Revision SCD R:R# /289 NCR # -

' 'm '

l

6) Work to 'ce perfor=ed to:

3 Section XI Procedure #

~

')

Initial Construction Requirece.to of Section III N

Code Addenda 19'74 Nn 4dd g

Code Cases Used e

~

,t

7) NDE Require =entsSection XI Requirements

~

Initial Installation Requirements of Section III k

Additional NDE Requirements -

8) Station Work Request #

f

9) Reflushing Required:

%. Yes

~

No If yes, reflushing is accepteable:

Date 10)

I.S.I. Reinspection Required Yes

% No Reinspectio acceptab e:

Fhinayispostion3-

_m Date e

P%

'3de 3-/R-RO.

11) 1 J

Repair /FavisionComplete:

Date Station Construction l

Approved:

Date Site Project Superintendent or Designee Completion Yerified:

Date Site Q.A. Supr. or Designee Y Y..

.l,

x b..

N;,...

hl **5:~ -

, J *G-

?.. '...

d %..

x0 i.. * -

~u':.. - '

' *O.- G :- : M

'O "3N A

  1. I" L' # J-I'1 l

6b 1.... /.'..-

.i. ;. ~

~ O '3 e '

3 $ k N'. #'

. LaSallo County Station

$, { Ju i

. r,,

e Revision 0 Dato h.11.79 n.

.. ~,,

q. f. -

. 3 ~ ' FI? AIR /FIVISIOI FIFCF.T i(

,. m. -:g

,f.

~

kh

'LaSalle C5unty Station' Report #

M~

Specificatien J-2530 Piping Erection Date:

.3 - / 8-8 0

1) Reference Drawings / Documents: %l3Q2-2] fMD /V1cco ISO R R %.

u

2) Equip =ent/ Piping Line No.: 1R.R.08 FA 3/y e.
x.....

Cl 3

3) Initial Construction ASME Connonent/Pi II-$ Form Cc=pletion Date:

3-2 0- 7h ass:

14 ) DescriptionofRepair/ Modification (g, p.oghe 1w.si. bin.e b Poh O$)pq k bye.LL Floor.

Initiaten By:

SIED

-Letter Dated

.i.

S&L Letter Dated S&L Drawing Revision SCD KR#

/2.90 1;ca y p,.,

2.,
6) Work to be perfor=ed to:

'E Initial Construction Re

're: nts of Section III N

Section XI Procedure #

Code Addenda RM No A g

Code Cases Used

7) IIDE Requirements

~

Section XI Requirements '

Initial Installation Require =ents of Section III Additional NDE Require =ents N

8) Station Work Request # '
  1. 's.
  • 9) Reflushing Required:

X Yes ~

~*

No If yas, reflushing is accepteable:

Date 10)

I.S.I. Reinspection Required Yes

% No P inspectio acceptable:

Date fee.ow

11) FinaltDispos tion- 'AW. h

.wh. :3-is e i

Repair / Revision C plete: _

Date Station Construction

..^

Approved:

Date Site Project Superintendent or Designee Completion Terified:

Date Site Q.A. Supr. or Desi6 nee

  • :p.?. :~,

i

.. :.~.w:-

. n....

.;c...q.W.~: :~. ---.-

.a..

=

i

$N*

$-5*.A.Q' "' '$: o 5..

m

.;, r.1

.f.[.

.. ' A.S. 2-r:3. ; - d'.d....:

D@W

'h alle County Statior '

'W 3'

. Revision 0 r5 6 6.-

c

-..J Ihte h.11.79

  • REPAIR /REVISIC:1REPCRT

-La alle-C5 by Station Report #

M

~

' Specification J-2$30 Piping Erection Date:

3-/S40 2:.

1) ReferenceDrawings/ Documents: h QQQ f @

yg 30 g{Q

2) Equipment / Piping Line No. :

l QQg g 3

/I

3) Initial Construction AS :S Comp)nent/ Pipe Class:

b N-$ Form Completion Date:

3 - 2 0 "79

1) DescriptionofRepair/Modificationkeghke,

[ g (ke g

4

. O %nitia ~ ' L y~ SNEDe.LL. Floor.

ix ca

.=

.['

I d By:

- Letter Dated

'I R

S&L Letter Dated S&L Drawing Revision SCD KR # /29 [

NCR !

~,c-

.v.

c
  • . 3 s
6) Work to be performed to:

Section XI Procedure #

(

Initial Construction Re i e=er ts of Section III N

Code Addenda R'N No A enc,g Code Caces Used

7) NDE Requirements

'~

.N.

-~

~

Section XI Requirecents X

Initial Installation Require =ents of Section III Additional NDE Requirements '

8) Station Work Request 8-
9) Reflushing Required:

S Yes No If yes, reflushir.g is accepteable:,

Date 10)

I.S.I. Reinspection Required Yes V

No inspection acceptabl :

Date PE W

'Dde 3 8 0 11).FinafDie,osition i

y Repair /Re ision Co=plete:

Date Station Conatruction Approved:

Date

,[

Site Project Superintendent or Designee 9

Completion Yerified:

Date Site Q.A. Supr. or Designee