| title = IR 07200041-13-401,on 07/25/13, San Jose Nuclear Generating Station, and Independent Spent Fuel Storage Installation, Security Inspection | | title = IR 07200041-13-401,on 07/25/13, San Jose Nuclear Generating Station, and Independent Spent Fuel Storage Installation, Security Inspection | ||
| author name = Haire M | | author name = Haire M | ||
| author affiliation = NRC/RGN-IV/DRS/PSB-1 | | author affiliation = NRC/RGN-IV/DRS/PSB-1 | ||
| addressee name = Dietrich P | | addressee name = Dietrich P | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:August 2, 2013 | ||
==SUBJECT:== | |||
SAN ONOFRE NUCLEAR GENERATING STATION, INDEPENDENT SPENT FUEL STORAGE FACILITY - NRC SECURITY INSPECTION REPORT 07200041/2013401 | |||
==Dear Mr. Dietrich:== | |||
On July 25, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an Independent Spent Fuel Storage Installation Security Inspection at your San Onofre Nuclear Generating Station facility. The enclosed inspection report documents the inspection results, which were discussed on July 25, 2013, with Mr. D. Bauder, VP and Station Manager, and other members of your staff. | |||
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. | |||
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. | The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. | ||
| Line 31: | Line 32: | ||
No findings were identified during this inspection. | No findings were identified during this inspection. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
UNITED STATES NUCLEAR REGULATORY COMMISSION RE G IO N I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
Sincerely, | |||
/RA/ David A. Holman for | |||
Mark S. Haire, Chief | |||
Plant Support Branch-1 | |||
Division of Reactor Safety | |||
Dockets.: 50-361, 50-362, 72-41 Licenses.: NPF-10, NPF-15 | |||
Nonpublic Enclosure: | |||
NRC Inspection Report 072-41/2013401 w/Attachment: Supplemental Information | |||
ML13217A150 | |||
Cover Letter Only Non Sensitive Publicly Available: DAH SUNSI Review Complete: DAH Sensitive Non-Publicly Available | |||
Cover Letter w/enclosure Non Sensitive Publicly Available MD 3.4 Non-Public A.3 Sensitive Periodic Review Required Non-Publicly Available: DAH SPSI:PSB1 C:PSB-1 C:FCDB C:PSB-1 DHolman MHaire DBSpitzberg MHaire | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
/RA/ D.A. Holman for 7/31/13 8/1/13 8/2/13 8/2/13 | |||
}} | }} | ||
Latest revision as of 06:19, 11 January 2025
| ML13217A150 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 08/02/2013 |
| From: | Mark Haire Plant Support Branch-1 |
| To: | Peter Dietrich Southern California Edison Co |
| References | |
| IR-13-401 | |
| Download: ML13217A150 (3) | |
Text
August 2, 2013
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION, INDEPENDENT SPENT FUEL STORAGE FACILITY - NRC SECURITY INSPECTION REPORT 07200041/2013401
Dear Mr. Dietrich:
On July 25, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an Independent Spent Fuel Storage Installation Security Inspection at your San Onofre Nuclear Generating Station facility. The enclosed inspection report documents the inspection results, which were discussed on July 25, 2013, with Mr. D. Bauder, VP and Station Manager, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
UNITED STATES NUCLEAR REGULATORY COMMISSION RE G IO N I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/ David A. Holman for
Mark S. Haire, Chief
Plant Support Branch-1
Division of Reactor Safety
Dockets.: 50-361, 50-362, 72-41 Licenses.: NPF-10, NPF-15
Nonpublic Enclosure:
NRC Inspection Report 072-41/2013401 w/Attachment: Supplemental Information
Cover Letter Only Non Sensitive Publicly Available: DAH SUNSI Review Complete: DAH Sensitive Non-Publicly Available
Cover Letter w/enclosure Non Sensitive Publicly Available MD 3.4 Non-Public A.3 Sensitive Periodic Review Required Non-Publicly Available: DAH SPSI:PSB1 C:PSB-1 C:FCDB C:PSB-1 DHolman MHaire DBSpitzberg MHaire
/RA/
/RA/
/RA/
/RA/ D.A. Holman for 7/31/13 8/1/13 8/2/13 8/2/13