{{#Wiki_filter:September 14, 2016 Dr. Kenan Unlu, Director The Pennsylvania State University Breazeale Nuclear Reactor Radiation Science and Engineering Center University Park, PA 16802-2301
{{#Wiki_filter:September 14, 2016 Dr. Kenan Unlu, Director The Pennsylvania State University Breazeale Nuclear Reactor Radiation Science and Engineering Center University Park, PA 16802-2301  


==SUBJECT:==
==SUBJECT:==
EXAMINATION REPORT NO. 50-005/OL-16-01, THE PENNSYLVANIA STATE UNIVERSITY BREAZEALE RESEARCH REACTOR
EXAMINATION REPORT NO. 50-005/OL-16-01, THE PENNSYLVANIA STATE UNIVERSITY BREAZEALE RESEARCH REACTOR  


==Dear Dr. Unlu:==
==Dear Dr. Unlu:==
During the week of August 22, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered operator licensing examinations at The Pennsylvania State University reactor.
During the week of August 22, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered operator licensing examinations at The Pennsylvania State University reactor.
The examination was conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2. Examination questions and preliminary findings were discussed at the conclusion of the examination with those members of your staff identified in the enclosed report.
The examination was conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2. Examination questions and preliminary findings were discussed at the conclusion of the examination with those members of your staff identified in the enclosed report.
In accordance with Title 10, Section 2.390 of the Code of Federal Regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. If you have any questions concerning this examination, please contact Phillip T. Young at 301-415-4094 or via e-mail at Phillip.young@nrc.gov.
In accordance with Title 10, Section 2.390 of the Code of Federal Regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. If you have any questions concerning this examination, please contact Phillip T. Young at 301-415-4094 or via e-mail at Phillip.young@nrc.gov.
Sincerely,
Sincerely,  
                                              /RA/
/RA/
Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-005
Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-005  


==Enclosures:==
==Enclosures:==
: 1. Examination Report No. 50-005/OL-16-01 cc without enclosures: see next page
: 1. Examination Report No. 50-005/OL-16-01 cc without enclosures: see next page


Dr. Kenan Unlu, Director                         September 14, 2016 The Pennsylvania State University Breazeale Nuclear Reactor Radiation Science and Engineering Center University Park, PA 16802-2301
Dr. Kenan Unlu, Director September 14, 2016 The Pennsylvania State University Breazeale Nuclear Reactor Radiation Science and Engineering Center University Park, PA 16802-2301  


==SUBJECT:==
==SUBJECT:==
EXAMINATION REPORT NO. 50-005/OL-16-01, THE PENNSYLVANIA STATE UNIVERSITY BREAZEALE RESEARCH REACTOR
EXAMINATION REPORT NO. 50-005/OL-16-01, THE PENNSYLVANIA STATE UNIVERSITY BREAZEALE RESEARCH REACTOR  


==Dear Dr. Unlu:==
==Dear Dr. Unlu:==
During the week of August 22, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered operator licensing examinations at youre The Pennsylvania State University reactor. The examination was conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2. Examination questions and preliminary findings were discussed at the conclusion of the examination with those members of your staff identified in the enclosed report.
During the week of August 22, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered operator licensing examinations at youre The Pennsylvania State University reactor. The examination was conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2. Examination questions and preliminary findings were discussed at the conclusion of the examination with those members of your staff identified in the enclosed report.
In accordance with Title 10, Section 2.390 of the Code of Federal Regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. If you have any questions concerning this examination, please contact Phillip T. Young at 301-415-4094 or via e-mail at Phillip.young@nrc.gov.
In accordance with Title 10, Section 2.390 of the Code of Federal Regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. If you have any questions concerning this examination, please contact Phillip T. Young at 301-415-4094 or via e-mail at Phillip.young@nrc.gov.
Sincerely,
Sincerely,  
                                                /RA/
/RA/
Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-005
Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-005  


==Enclosures:==
==Enclosures:==
: 1. Examination Report No. 50-005/OL-16-01 cc without enclosures: See next page DISTRIBUTION w/ encls.:
: 1. Examination Report No. 50-005/OL-16-01 cc without enclosures: See next page DISTRIBUTION w/ encls.:
PUBLIC AMendiola               OFont           AAdams         XYin ADAMS ACCESSION #: ML16242A210 OFFICE       NRR/DPR/PROB/CE               NRR/DPR/PROB/OLA           NRR/DPR/PROB/BC NAME         PYoung                       CRevelle                   AMendiola DATE         09/14/2016                   09/12/2016                 09/14/2016 OFFICIAL RECORD COPY
PUBLIC AMendiola OFont AAdams XYin ADAMS ACCESSION #: ML16242A210 OFFICE NRR/DPR/PROB/CE NRR/DPR/PROB/OLA NRR/DPR/PROB/BC NAME PYoung CRevelle AMendiola DATE 09/14/2016 09/12/2016 09/14/2016 OFFICIAL RECORD COPY  


Pennsylvania State University               Docket No. 50-005 cc:
Pennsylvania State University Docket No. 50-005 cc:
Jeffrey A. Leavey Manager of Radiation Protection The Pennsylvania State University 0201 Academic Project BL University Park, PA 16802 Dr. Neil A. Sharkey, Interim Vice President for Research of the Graduate School The Pennsylvania State University 304 Old Main University Park, PA 16802 Director, Bureau of Radiation Protection Department of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105 Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611 Mark A. Trump, Associate Director for Operations The Pennsylvania State University Breazeale Nuclear Reactor Radiation Science and Engineering Center University Park, PA 16802
Jeffrey A. Leavey Manager of Radiation Protection The Pennsylvania State University 0201 Academic Project BL University Park, PA 16802 Dr. Neil A. Sharkey, Interim Vice President for Research of the Graduate School The Pennsylvania State University 304 Old Main University Park, PA 16802 Director, Bureau of Radiation Protection Department of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105 Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611 Mark A. Trump, Associate Director for Operations The Pennsylvania State University Breazeale Nuclear Reactor Radiation Science and Engineering Center University Park, PA 16802  


U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT REPORT NO.:                   50-005/OL-16-01 FACILITY DOCKET NO.:           50-005 FACILITY LICENSE NO.:         R-2 FACILITY:                     The Pennsylvania State University Breazeale Reactor SUBMITTED BY:                 _____________/RA/_______             9/12/2016 Phillip T. Young, Chief Examiner           Date
U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT REPORT NO.:
50-005/OL-16-01 FACILITY DOCKET NO.:
50-005 FACILITY LICENSE NO.:
R-2 FACILITY:
The Pennsylvania State University Breazeale Reactor SUBMITTED BY:
_____________/RA/_______
9/12/2016 Phillip T. Young, Chief Examiner Date  


==SUMMARY==
==SUMMARY==
During the week of August 22, 2016, the NRC administered license examinations to two Senior Reactor Operator license candidates. The applicant passed all portions of the examination.
During the week of August 22, 2016, the NRC administered license examinations to two Senior Reactor Operator license candidates. The applicant passed all portions of the examination.
REPORT DETAILS
REPORT DETAILS
: 1.       Examiner: Phillip T. Young, Chief Examiner
: 1.
: 2.       Results:
Examiner: Phillip T. Young, Chief Examiner
RO PASS/FAIL       SRO PASS/FAIL       TOTAL PASS/FAIL Written                   0/0                 2/0                   2/0 Operating Tests           0/0                 2/0                   2/0 Overall                   0/0                 2/0                   2/0
: 2.
: 3.       Exit Meeting:
Results:
RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 0/0 2/0 2/0 Operating Tests 0/0 2/0 2/0 Overall 0/0 2/0 2/0
: 3.
Exit Meeting:
Phillip T. Young, Chief Examiner, NRC Dr. Kenan Unlu, Director PSU Reactor Alison Portanova, SRO PSU The examiner thanked the facility for their assistance in completing the examinations.
Phillip T. Young, Chief Examiner, NRC Dr. Kenan Unlu, Director PSU Reactor Alison Portanova, SRO PSU The examiner thanked the facility for their assistance in completing the examinations.
The examiner explained that question B.08 will be deleted from the examination because the structure of the columns created confusion to the applicants during the examination.
The examiner explained that question B.08 will be deleted from the examination because the structure of the columns created confusion to the applicants during the examination.
ENCLOSURE 1
ENCLOSURE 1  


U. S. NUCLEAR REGULATORY COMMISSION NON-POWER REACTOR INITIAL LICENSE EXAMINATION FACILITY:               PENN STATE UNIVERSITY REACTOR TYPE:           POOL TYPE, MODIFIED TRIGA DATE ADMINISTERED: 8/22/2016 CANDIDATE:     ___________________________________
U. S. NUCLEAR REGULATORY COMMISSION NON-POWER REACTOR INITIAL LICENSE EXAMINATION FACILITY:
PENN STATE UNIVERSITY REACTOR TYPE:
POOL TYPE, MODIFIED TRIGA DATE ADMINISTERED: 8/22/2016 CANDIDATE: ___________________________________
INSTRUCTIONS TO CANDIDATE:
INSTRUCTIONS TO CANDIDATE:
Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination. Points for each question are indicated in parentheses for each question. A 70%
Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination. Points for each question are indicated in parentheses for each question. A 70%
overall is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.
overall is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.
                                                  % OF CATEGORY          % OF     CANDIDATES CATEGORY                       CATEGORY VALUE        TOTAL        SCORE VALUE A. REACTOR THEORY, 20.00         33.3         _______        _______    THERMODYNAMICS, AND FACILITY OPERATING CHARACTISTICS B. NORMAL AND EMERGENCY 20.00         33.3         _______        _______    OPERATING PROCEDURES AND RADIOLOGICAL CONTROLS C. FACILITY AND RADIATION 20.00         33.3         _______        _______
CATEGORY VALUE
MONITORING SYSTEMS
% OF TOTAL CANDIDATES SCORE
___________                  TOTALS 60.00 FINAL GRADE ALL THE WORK DONE ON THIS EXAMINATION IS MY OWN. I HAVE NEITHER GIVEN NOR RECEIVED AID.
% OF CATEGORY VALUE CATEGORY 20.00 33.3 A. REACTOR THEORY, THERMODYNAMICS, AND FACILITY OPERATING CHARACTISTICS 20.00 33.3 B. NORMAL AND EMERGENCY OPERATING PROCEDURES AND RADIOLOGICAL CONTROLS 20.00 33.3 C. FACILITY AND RADIATION MONITORING SYSTEMS 60.00 FINAL GRADE TOTALS ALL THE WORK DONE ON THIS EXAMINATION IS MY OWN. I HAVE NEITHER GIVEN NOR RECEIVED AID.
CANDIDATE'S SIGNATURE
CANDIDATE'S SIGNATURE  


NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:
NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:
: 1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
: 1.
: 2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination.
Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
: 3. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
: 2.
: 4. Use black ink or dark pencil only to facilitate legible reproductions.
After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination.
: 5. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet.
: 3.
: 6. Mark your answers on the answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.
Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
: 7. The point value for each question is indicated in [brackets] after the question.
: 4.
: 8. If the intent of a question is unclear, ask questions of the examiner only.
Use black ink or dark pencil only to facilitate legible reproductions.
: 9. When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition turn in all scrap paper.
: 5.
: 10. Ensure all information you wish to have evaluated as part of your answer is on your answer sheet. Scrap paper will be disposed of immediately following the examination.
Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet.
: 11. To pass the examination you must achieve a grade of 70 percent or greater in each category.
: 6.
: 12. There is a time limit of three (3) hours for completion of the examination.
Mark your answers on the answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.
: 13. When you have completed and turned in you examination, leave the examination area. If you are observed in this area while the examination is still in progress, your license may be denied or revoked.
: 7.
The point value for each question is indicated in [brackets] after the question.
: 8.
If the intent of a question is unclear, ask questions of the examiner only.
: 9.
When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition turn in all scrap paper.
: 10.
Ensure all information you wish to have evaluated as part of your answer is on your answer sheet. Scrap paper will be disposed of immediately following the examination.
: 11.
To pass the examination you must achieve a grade of 70 percent or greater in each category.
: 12.
There is a time limit of three (3) hours for completion of the examination.
: 13.
When you have completed and turned in you examination, leave the examination area. If you are observed in this area while the examination is still in progress, your license may be denied or revoked.  
 
DR -
: Rem, Ci -
curies, E - Mev, R - feet Peak
)
(
=
Peak
)
(
1 1
2 2
2 2
 
1 Curie = 3.7 x 1010 dis/sec 1 kg = 2.21 lbm 1 Horsepower = 2.54 x 103 BTU/hr 1 Mw = 3.41 x 106 BTU/hr 1 BTU = 778 ft-lbf F = 9/5 C + 32 1 gal (H2O). 8 lbm C = 5/9 (F - 32) cP = 1.0 BTU/hr/lbm/F cp = 1 cal/sec/gm/C T
UA
=
H m
=
T c
m
=
Q p
 
K 1
S S
=
SCR eff
 
)
(-
CR
=
)
(-
CR
)
K (1
CR
=
)
K (1
CR 2
2 1
1 eff 2
eff 1
2 1
 
seconds 0.1
=
-1 eff
 
26.06
=
SUR eff K
1 K
1
=
M eff eff 1
0 CR CR
=
K 1
1
=
M 2
1 eff e
P
=
P t
0 P
)
(1
=
P 0
 
10 P
=
P SUR(t) 0 K
)
K (1
=
SDM eff eff
 
=


Q&= m&c p T = m&H = UA T eff = 0.1 seconds -1 S            S              CR1 (1 - K eff 1 ) = CR 2 (1 - K eff 2 )
eff
SCR =1 - Keff SUR = 26.06  eff                  M = -  10 - K eff                    CR1 (-M=          1 1 ) = CR 2 (-  CR
+
                                                                                                        = 2 1
=
                                                                                                              )
K 1)
                        -                  1 - K eff 1                                     1 - K eff CR2 t
K
P = P0 e                                  (1 -  )
(  
P = P0 10SUR(t)
=
* P=                  P0 (1 - K eff )                                                        -
eff eff
SDM =                                  =                                = +
K eff
( K effeff- 1)
K eff - K eff                            0.693                        =
        =          2        1 K eff k eff x K eff                    T=
1        2 6CiE(n)
DR = DR0 e- t        DR -        DR =          2 Rem,                  2 DR1 d 1 = DR 2 d 2 2
Ci -                      R curies, E - Mev, R - feet 2
(  2 -  )2  ( 1 -  )
                                                  =
Peak 2          Peak 1 1 Curie = 3.7 x 1010 dis/sec                                    1 kg = 2.21 lbm 1 Horsepower = 2.54 x 103 BTU/hr                                          1 Mw = 3.41 x 106 BTU/hr 1 BTU = 778 ft-lbf                                                        F = 9/5 C + 32 1 gal (H2O) . 8 lbm                                                      C = 5/9 (F - 32) cP = 1.0 BTU/hr/lbm/F                                                    cp = 1 cal/sec/gm/C


Section A     Reactor Theory, Thermo, and Facility Characteristics Question       A.01       [1.0 point]   (1.0)
K x
k K
K
=
eff eff eff eff 2
1 1
2
 
0.693
=
T e
DR
=
DR t
0 R
6CiE(n)
=
DR 2
d DR
=
d DR 2
2 2
1 2
1
 
Section A Reactor Theory, Thermo, and Facility Characteristics Question A.01
[1.0 point]
(1.0)
Which ONE of the following is true concerning the differences between prompt and delayed neutrons?
Which ONE of the following is true concerning the differences between prompt and delayed neutrons?
: a. Prompt neutrons account for less than one percent of the neutron population while delayed neutrons account for approximately ninety-nine percent of the neutron population.
: a. Prompt neutrons account for less than one percent of the neutron population while delayed neutrons account for approximately ninety-nine percent of the neutron population.
Line 117: Line 239:
: c. Prompt neutrons are released during the fission process while delayed neutrons are released during the decay of fission products.
: c. Prompt neutrons are released during the fission process while delayed neutrons are released during the decay of fission products.
: d. Prompt neutrons are the dominating factor in determining the reactor period while delayed neutrons have little effect on the reactor period.
: d. Prompt neutrons are the dominating factor in determining the reactor period while delayed neutrons have little effect on the reactor period.
Answer: A.01     c.
Answer: A.01
: c.  


==Reference:==
==Reference:==
Reactor Training Manual, Page 2-16.
Reactor Training Manual, Page 2-16.
Question       A.02       [1.0 point]   (2.0)
Question A.02
A reactor scram has resulted in the instantaneous insertion of .006 K/K of negative reactivity. Which one of the following is the stable negative reactor period resulting from the scram?
[1.0 point]
(2.0)
A reactor scram has resulted in the instantaneous insertion of.006 K/K of negative reactivity. Which one of the following is the stable negative reactor period resulting from the scram?
: a. 45 seconds
: a. 45 seconds
: b. 56 seconds
: b. 56 seconds
: c. 80 seconds
: c. 80 seconds
: d. 112 seconds Answer: A.02     c.
: d. 112 seconds Answer: A.02
: c.  


==Reference:==
==Reference:==
Burn, R., Introduction to Nuclear Reactor Operations, © 1982, § 4.6,
Burn, R., Introduction to Nuclear Reactor Operations, © 1982, § 4.6,  


Section A       Reactor Theory, Thermo, and Facility Characteristics Question         A.03         [1.0 point]   (3.0)
Section A Reactor Theory, Thermo, and Facility Characteristics Question A.03
[1.0 point]
(3.0)
Which ONE of the following isotopes has the largest microscopic cross-section for absorption for thermal neutrons?
Which ONE of the following isotopes has the largest microscopic cross-section for absorption for thermal neutrons?
: a. Sm149
: a. Sm149
: b. U235
: b. U235
: c. Xe135
: c. Xe135
: d. B10 Answer: A.03 c.
: d. B10 Answer: A.03
: c.  


==Reference:==
==Reference:==
Lamarsh, J. Introduction to Nuclear Engineering p. 738 Sm 149  (41,000 b); U235 (687 b); Xe135 (2.65 x 106 b); B10 (3840 b)
Lamarsh, J. Introduction to Nuclear Engineering p. 738 Sm149 (41,000 b); U235 (687 b); Xe135 (2.65 x 106 b); B10 (3840 b)
Question         A.04         [1.0 point]   (4.0)
Question A.04
[1.0 point]
(4.0)
When the excess reactivity (Kex) exceeds the delayed neutron fraction (), a reactor is said to be:
When the excess reactivity (Kex) exceeds the delayed neutron fraction (), a reactor is said to be:
: a. Subcritical
: a. Subcritical
: b. Critical
: b. Critical
: c. Within its shutdown margin requirements
: c. Within its shutdown margin requirements
: d. Prompt critical Answer: A.04       d.
: d. Prompt critical Answer: A.04
: d.  


==Reference:==
==Reference:==
Bevelacqua, J. 2009. Basic Health Physics. p.391 Question         A.05         [1.0 point]   (5.0)
Bevelacqua, J. 2009. Basic Health Physics. p.391 Question A.05
[1.0 point]
(5.0)
Complete the following sentence.
Complete the following sentence.
A dollar ($) is a unit of reactivity, where one dollar ($1) is equal to the     .
A dollar ($) is a unit of reactivity, where one dollar ($1) is equal to the
: a. Delayed neutron precursor decay constant ().
: a. Delayed neutron precursor decay constant ().
: b. Effective delayed neutron precursor decay constant (eff).
: b. Effective delayed neutron precursor decay constant (eff).
: c. Delayed neutron fraction ().
: c. Delayed neutron fraction ().
: d. Effective delayed neutron fraction (eff).
: d. Effective delayed neutron fraction (eff).
Answer: A.05       d.
Answer: A.05
: d.  


==Reference:==
==Reference:==
Reactor Theory (Neutron Characteristics) DOE-HDBK-1019/1-93 PROMPT AND DELAYED NEUTRON
Reactor Theory (Neutron Characteristics) DOE-HDBK-1019/1-93 PROMPT AND DELAYED NEUTRON  


Section A     Reactor Theory, Thermo, and Facility Characteristics Question       A.06       [1.0 point]     (6.0)
Section A Reactor Theory, Thermo, and Facility Characteristics Question A.06
[1.0 point]
(6.0)
In accordance with the PSBR Technical Specifications, the term "Shutdown Margin" describes:
In accordance with the PSBR Technical Specifications, the term "Shutdown Margin" describes:
: a. the time required for the rods to fully insert
: a. the time required for the rods to fully insert
: b. the departure from K-effective = 1.00
: b. the departure from K-effective = 1.00
: c. the amount of subcriticality, considering the worth of all rods
: c. the amount of subcriticality, considering the worth of all rods
: d. the amount of subcriticality with the most reactive rod fully withdrawn Answer: A.06     d.
: d. the amount of subcriticality with the most reactive rod fully withdrawn Answer: A.06
: d.  


==Reference:==
==Reference:==
PSBR Technical Specifications, Section 1.1.42.
PSBR Technical Specifications, Section 1.1.42.
Question       A.07       [1.0 point]     (7.0)
Question A.07
[1.0 point]
(7.0)
The count rate is 50 cps. An experimenter inserts an experiment into the core, and the count rate decreases to 25 cps. Given the initial Keff of the reactor was 0.8, what is the worth of the experiment?
The count rate is 50 cps. An experimenter inserts an experiment into the core, and the count rate decreases to 25 cps. Given the initial Keff of the reactor was 0.8, what is the worth of the experiment?
: a. = - 0.42
: a. = - 0.42
: b. = + 0.42
: b. = + 0.42
: c. = - 0.21
: c. = - 0.21
: d. = + 0.21 Answer: A.07 a.
: d. = + 0.21 Answer: A.07
: a.  


==Reference:==
==Reference:==
CR1 / CR2 = (1 - Keff2) / (1 - Keff1) 50 / 25 = (1 - Keff2) / (1 - 0.8)
CR1 / CR2 = (1 - Keff2) / (1 - Keff1) 50 / 25 = (1 - Keff2) / (1 - 0.8)
Therefore Keff2 = 0.6
Therefore Keff2 = 0.6  
              = Keff2 - Keff1 / Keff2
= Keff2 - Keff1 / Keff2
* Keff1 = (0.6 - 0.8)/(0.6
* Keff1 = (0.6 - 0.8)/(0.6
* 0.8) = - 0.41667
* 0.8) = - 0.41667  


Section A     Reactor Theory, Thermo, and Facility Characteristics Question         A.08       [1.0 point]     (8.0)
Section A Reactor Theory, Thermo, and Facility Characteristics Question A.08
[1.0 point]
(8.0)
The following graph for U-235 depicts
The following graph for U-235 depicts
: a. neutron energy distribution in the moderator
: a. neutron energy distribution in the moderator
: b. axial flux distribution in the core
: b. axial flux distribution in the core
: c. radial flux distribution in the core
: c. radial flux distribution in the core
: d. fission product yield distribution Answer: A.08       d.
: d. fission product yield distribution Answer: A.08
: d.  


==Reference:==
==Reference:==
DOE Manual Vol. 1, pg. 57 Question         A.09       [1.0 point]     (9.0)
DOE Manual Vol. 1, pg. 57 Question A.09
A nuclear reactor startup is being performed by adding equal amounts of positive reactivity and waiting for neutron population to stabilize. As the reactor approaches criticality, the numerical change in stable neutron population after each reactivity addition
[1.0 point]
          , and the time required for the neutron population to stabilize after each reactivity addition               .
(9.0)
A nuclear reactor startup is being performed by adding equal amounts of positive reactivity and waiting for neutron population to stabilize. As the reactor approaches criticality, the numerical change in stable neutron population after each reactivity addition  
, and the time required for the neutron population to stabilize after each reactivity addition
: a. increases; remains the ame
: a. increases; remains the ame
: b. increases; increases
: b. increases; increases
: c. remains the same; remains the same
: c. remains the same; remains the same
: d. remains the same; increases Answer: A.09       b.
: d. remains the same; increases Answer: A.09
: b.  


==Reference:==
==Reference:==
Question ID #P1766, NRC Generic Fundamentals Examination Question BankPWR2010
Question ID #P1766, NRC Generic Fundamentals Examination Question BankPWR2010  


Section A     Reactor Theory, Thermo, and Facility Characteristics Question       A.10     [1.0 point]     (10.0)
Section A Reactor Theory, Thermo, and Facility Characteristics Question A.10
Complete the following sentence. In a nuclear reactor, 95% of all Xenon production is directly produced through the .
[1.0 point]
(10.0)
Complete the following sentence. In a nuclear reactor, 95% of all Xenon production is directly produced through the.
: a. Decay of I-135
: a. Decay of I-135
: b. Fission of U-235
: b. Fission of U-235
: c. Beta decay of Cs-135
: c. Beta decay of Cs-135
: d. Fission of U-238 Answer: A.10     a.
: d. Fission of U-238 Answer: A.10
: a.  


==Reference:==
==Reference:==
DOE Fundamentals Handbook Nuclear Physics and Reactor Theory Vol. 2 Question       A.11     [1.0 point]     (11.0)
DOE Fundamentals Handbook Nuclear Physics and Reactor Theory Vol. 2 Question A.11
[1.0 point]
(11.0)
As primary coolant temperature increases, control rod worth:
As primary coolant temperature increases, control rod worth:
: a. decreases due to lower reflector efficiency.
: a. decreases due to lower reflector efficiency.
Line 216: Line 368:
: c. increases due to the increase in thermal diffusion length.
: c. increases due to the increase in thermal diffusion length.
: d. remains the same due to constant poison cross-section of the control rods..
: d. remains the same due to constant poison cross-section of the control rods..
Answer: A.11     c.
Answer: A.11
: c.  


==Reference:==
==Reference:==
Reactor Training Manual - Reactivity Feedback Question       A.12     [1.0 point]     (12.0)
Reactor Training Manual - Reactivity Feedback Question A.12
[1.0 point]
(12.0)
Excess reactivity is the amount of reactivity:
Excess reactivity is the amount of reactivity:
: a. associated with samples.
: a. associated with samples.
Line 225: Line 380:
: c. available above that which is required to make the reactor subcritical.
: c. available above that which is required to make the reactor subcritical.
: d. available above that which is required to keep the reactor critical.
: d. available above that which is required to keep the reactor critical.
Answer: A.12 d.
Answer: A.12
: d.  


==Reference:==
==Reference:==
Glasstone and Sesonske, Nuclear Reactor Engineering, Chapter 5, Section 5.114
Glasstone and Sesonske, Nuclear Reactor Engineering, Chapter 5, Section 5.114  


Section A     Reactor Theory, Thermo, and Facility Characteristics Question       A.13       [1.0 point]     (13.0)
Section A Reactor Theory, Thermo, and Facility Characteristics Rod Withdrawal (Inches)
Count Rate (cps) 0 55 2
58 4
60 6
61 8
69 10 85 12 275 Control Total Critical Rod Worth Worth Question A.13
[1.0 point]
(13.0)
You are conducting a reactor startup after installing 2 new fuel assemblies in the core. Given the following rod withdrawal data, estimate the rod position when criticality would occur. The initial count rate on the nuclear instrumentation prior to rod withdrawal is 55 cps.
You are conducting a reactor startup after installing 2 new fuel assemblies in the core. Given the following rod withdrawal data, estimate the rod position when criticality would occur. The initial count rate on the nuclear instrumentation prior to rod withdrawal is 55 cps.
: a. 11 in                             Rod Withdrawal      Count (Inches)      Rate (cps)
: a. 11 in
: b. 13 in 0              55
: b. 13 in
: c. 15 in                                   2              58
: c. 15 in
: d. 20 in                                   4              60 6              61 8              69 10              85 Answer: A.13       b.                     12            275 Reference Question       A.14       [1.0 point]     (14.0)
: d. 20 in Answer: A.13
: b.
Reference Question A.14
[1.0 point]
(14.0)
You are performing a 50 Watt Critical Rod Position. Given the following data, calculate what the Shutdown Margin, as defined by Technical Specifications, is in a clean cold core.
You are performing a 50 Watt Critical Rod Position. Given the following data, calculate what the Shutdown Margin, as defined by Technical Specifications, is in a clean cold core.
Core Reactivity Evaluation Data Control      Total    Critical Rod          Worth Worth Transient   $2.92     $1.75 Safety       $3.97     $2.63 Shim         $2.85     $1.84 Regulating     $2.92     $1.81 Total       $12.66 $8.03
Core Reactivity Evaluation Data Transient  
: a.     $0.66
$2.92  
: b.     $3.29
$1.75 Safety  
: c.     $4.06
$3.97  
: d.     $4.63 Answer: A.14       c.
$2.63 Shim  
$2.85  
$1.84 Regulating $2.92  
$1.81 Total  
$12.66 $8.03
: a.  
$0.66
: b.  
$3.29
: c.  
$4.06
: d.  
$4.63 Answer: A.14
: c.  


==Reference:==
==Reference:==
SDM = Critical worth - Most reactive Rod worth remaining out of core SDM = 8.03-3.97 = $4.06 PSU Exam Reference Material (Adapted CP-11 data)
SDM = Critical worth - Most reactive Rod worth remaining out of core SDM = 8.03-3.97 = $4.06 PSU Exam Reference Material (Adapted CP-11 data)  


Section A       Reactor Theory, Thermo, and Facility Characteristics Question       A.15       [1.0 point]   (15.0)
Section A Reactor Theory, Thermo, and Facility Characteristics Question A.15
[1.0 point]
(15.0)
In a subcritical reactor, K eff is increased from 0.861 to 0.946. Which ONE of the following is the amount of reactivity that was added to the reactor core?
In a subcritical reactor, K eff is increased from 0.861 to 0.946. Which ONE of the following is the amount of reactivity that was added to the reactor core?
: a. 0.085 delta k/k
: a. 0.085 delta k/k
Line 252: Line 434:
: c. 0.161 delta k/k
: c. 0.161 delta k/k
: d. 0.218 delta k/k.
: d. 0.218 delta k/k.
Answer: A.15       b.
Answer: A.15
: b.  


==Reference:==
==Reference:==
Reactor Training Manual - Reactor Kinectics Question       A.16       [1.0 point]   (16.0)
Reactor Training Manual - Reactor Kinectics Question A.16
[1.0 point]
(16.0)
If reactor power is increasing by a decade every minute, it has a period of:
If reactor power is increasing by a decade every minute, it has a period of:
: a. 13 sec
: a. 13 sec
: b. 26 sec
: b. 26 sec
: c. 52 sec
: c. 52 sec
: d. 65 sec Answer:       A.16 b.
: d. 65 sec Answer:
A.16
: b.  


==Reference:==
==Reference:==
Glasstone, S. and Sesonske, A, Nuclear Reactor Engineering, Kreiger Publishing, Malabar, Florida, 1991, P = Poe  t/T   10 = 1e60/T ln 10 = 60/T 2.3 = 60/T T = 60/2.3 T = 26 seconds Question       A.17       [1.0 point]   (17.0)
Glasstone, S. and Sesonske, A, Nuclear Reactor Engineering, Kreiger Publishing, Malabar, Florida, 1991, P = Poet/T 10 = 1e60/T ln 10 = 60/T 2.3 = 60/T T = 60/2.3 T = 26 seconds Question A.17
[1.0 point]
(17.0)
With the reactor critical at 10 KW a rod is pulled to insert a positive reactivity of $0.18.
With the reactor critical at 10 KW a rod is pulled to insert a positive reactivity of $0.18.
Which one of the following will be the stable reactor period as a result of this reactivity insertion?
Which one of the following will be the stable reactor period as a result of this reactivity insertion?
Line 269: Line 458:
: b. 45 seconds
: b. 45 seconds
: c. 55 seconds
: c. 55 seconds
: d. 65 seconds Answer:       A.17 b.
: d. 65 seconds Answer:
A.17
: b.  


==Reference:==
==Reference:==
Reactivity added = $0.18 x .007 = 0.00126
Reactivity added = $0.18 x.007 = 0.00126  
  = (-)/eff = .007 - .00126 = 45.6 seconds
  = (-)/eff =  
(.1) (.00126)
.007 -.00126 = 45.6 seconds
(.1) (.00126)  


Section A Reactor Theory, Thermo, and Facility Characteristics Section A     Reactor Theory, Thermo, and Facility Characteristics Question       A.18       [1.0 point]     (18.0)
Section A Reactor Theory, Thermo, and Facility Characteristics  
 
Section A Reactor Theory, Thermo, and Facility Characteristics Question A.18
[1.0 point]
(18.0)
Which ONE of the following conditions will INCREASE the core excess of a reactor?
Which ONE of the following conditions will INCREASE the core excess of a reactor?
: a. Higher moderator temperature (assume negative temperature coefficient)
: a. Higher moderator temperature (assume negative temperature coefficient)
: b. Insertion of a negative reactivity worth experiment
: b. Insertion of a negative reactivity worth experiment
: c. Burnout of a burnable poison
: c. Burnout of a burnable poison
: d. Fuel depletion Answer: A.18     c.
: d. Fuel depletion Answer: A.18
: c.  


==Reference:==
==Reference:==
DOE Fundamentals Handbook Nuclear Physics and Reactor Theory Vol. 2 Question       A.19       [1.0 point]     (19.0)
DOE Fundamentals Handbook Nuclear Physics and Reactor Theory Vol. 2 Question A.19
[1.0 point]
(19.0)
Following the reactor started up and it has been at 100% power for 3 hours. The Reactor Operator notes that several small control rod withdrawals are required to maintain power at 100%. Which of the following is the reason for the rod withdrawals?
Following the reactor started up and it has been at 100% power for 3 hours. The Reactor Operator notes that several small control rod withdrawals are required to maintain power at 100%. Which of the following is the reason for the rod withdrawals?
: a. Fuel temperatures are decreasing.
: a. Fuel temperatures are decreasing.
Line 290: Line 489:
: c. Pool water temperatures are decreasing.
: c. Pool water temperatures are decreasing.
: d. Samarium is burning out from equilibrium concentration.
: d. Samarium is burning out from equilibrium concentration.
Answer: A.19     b.
Answer: A.19
: b.  


==Reference:==
==Reference:==
Reactor Training Manual - Reactor Physics and Kinetics Question       A.20       [1.0 point]     (20.0)
Reactor Training Manual - Reactor Physics and Kinetics Question A.20
[1.0 point]
(20.0)
Given: Primary coolant flow rate is 500 gallons/minute and secondary flow rate is 700 gallons/minute. The T across the primary side of the heat exchanger is 13F and secondary inlet temperature to the heat exchanger is 73F. Assuming both the primary and secondary coolants have the same Cp value, which ONE of the following is the secondary outlet temperature?
Given: Primary coolant flow rate is 500 gallons/minute and secondary flow rate is 700 gallons/minute. The T across the primary side of the heat exchanger is 13F and secondary inlet temperature to the heat exchanger is 73F. Assuming both the primary and secondary coolants have the same Cp value, which ONE of the following is the secondary outlet temperature?
: a. 82 F
: a. 82 F
: b. 85 F
: b. 85 F
: c. 89 F
: c. 89 F
: d. 91 F Answer: A.20 a.
: d. 91 F Answer: A.20
: a.  


==Reference:==
==Reference:==
Tsec= (Flowpri/Flowsec) x Tpri Tsec= (500/700) x 13°F = 9.28°F Secondary outlet = 73°F + 9.28°F = 82.3°F


Tsec= (Flowpri/Flowsec) x Tpri Tsec= (500/700) x 13°F = 9.28°F Secondary outlet = 73°F + 9.28°F = 82.3°F
Section B Normal/Emergency Procedures & Radiological Controls Question B.01
 
[1.0 point]
Section B Normal/Emergency Procedures & Radiological Controls Question       B.01       [1.0 point]   (1.0)
(1.0)
While working on an experiment, you receive the following radiation doses: 100 mrem (),
While working on an experiment, you receive the following radiation doses: 100 mrem (),
25 mrem (), and 5 mrem (thermal neutrons). Which ONE of the following is your total dose?
25 mrem (), and 5 mrem (thermal neutrons). Which ONE of the following is your total dose?
Line 310: Line 514:
: b. 155 mrem
: b. 155 mrem
: c. 145 mrem
: c. 145 mrem
: d. 130 mrem Answer: B.01       d.
: d. 130 mrem Answer:
B.01
: d.  


==Reference:==
==Reference:==
Reactor Training Manual - Ionizing Radiation Question       B.02       [1.0 point]   (2.0)
Reactor Training Manual - Ionizing Radiation Question B.02
[1.0 point]
(2.0)
Which one of the following statements defines the Technical Specifications term "Channel Test?"
Which one of the following statements defines the Technical Specifications term "Channel Test?"
: a. The adjustment of a channel such that its output corresponds with acceptable accuracy to known values of the parameter which the channel measures.
: a. The adjustment of a channel such that its output corresponds with acceptable accuracy to known values of the parameter which the channel measures.
Line 319: Line 527:
: c. The introduction of a signal into a channel for verification of the operability of the channel.
: c. The introduction of a signal into a channel for verification of the operability of the channel.
: d. The combination of sensors, electronic circuits and output devices connected to measure and display the value of a parameter.
: d. The combination of sensors, electronic circuits and output devices connected to measure and display the value of a parameter.
Answer: B.02       c.
Answer:
B.02
: c.  


==Reference:==
==Reference:==
TS 1.1.6 Question       B.03       [1.0 point]   (3.0)
TS 1.1.6 Question B.03
[1.0 point]
(3.0)
A radioactive source generates a dose of 100 mr/hr at a distance of 10 feet. Using a two inch thick sheet of lead for shielding the reading drops to 50 mr/hr at a distance of 10 feet. What is the minimum number of sheets of the same lead shielding needed to drop the reading to less than 5 mr/hr at a distance of 10 ft?
A radioactive source generates a dose of 100 mr/hr at a distance of 10 feet. Using a two inch thick sheet of lead for shielding the reading drops to 50 mr/hr at a distance of 10 feet. What is the minimum number of sheets of the same lead shielding needed to drop the reading to less than 5 mr/hr at a distance of 10 ft?
: a. 1
: a. 1
: b. 3
: b. 3
: c. 5
: c. 5
: d. 7 Answer: B.03       c.
: d. 7 Answer:
B.03
: c.  


==Reference:==
==Reference:==
Two inches = one-half thickness (T1/2). Using 5 half-thickness will drop the dose by a factor of (1/2)5 = 1/32 100/32 = 3.13
Two inches = one-half thickness (T1/2). Using 5 half-thickness will drop the dose by a factor of (1/2)5 = 1/32 100/32 = 3.13  


Section B Normal/Emergency Procedures & Radiological Controls Question       B.04         [1.0 point]   (4.0)
Section B Normal/Emergency Procedures & Radiological Controls Question B.04
[1.0 point]
(4.0)
The following statement from the PSBR TS is a good example of a(n) ____________
The following statement from the PSBR TS is a good example of a(n) ____________
requirement.       The maximum excess reactivity above cold, clean, critical plus samarium poison of the core configuration with experiments and experimental facilities in place SHALL be 4.9% k/k
requirement.
The maximum excess reactivity above cold, clean, critical plus samarium poison of the core configuration with experiments and experimental facilities in place SHALL be 4.9% k/k
(~$7.00).
(~$7.00).
: a. Surveillance
: a. Surveillance
Line 340: Line 557:
: c. Administrative
: c. Administrative
: d. Limiting Condition for Operation (LCO)
: d. Limiting Condition for Operation (LCO)
Answer: B.04       d.
Answer:
B.04
: d.  


==Reference:==
==Reference:==
AP-5 and PSBR TS, Section 3.1.2 Question       B.05         [1.0 point]   (5.0)
AP-5 and PSBR TS, Section 3.1.2 Question B.05
In accordance with the facility Emergency Plan, a tornado event which damages the PSBR confinement structure is a good example of a(n)             type event classification.
[1.0 point]
(5.0)
In accordance with the facility Emergency Plan, a tornado event which damages the PSBR confinement structure is a good example of a(n) type event classification.
: a. Unusual Event
: a. Unusual Event
: b. Alert
: b. Alert
: c. Site Area Emergency
: c. Site Area Emergency
: d. General Emergency Answer: B.05       b.
: d. General Emergency Answer:
B.05
: b.  


==Reference:==
==Reference:==
EP-1, PSBR Emergency Procedure, Rev. 15 Question       B.06         [1.0 point]   (6.0)
EP-1, PSBR Emergency Procedure, Rev. 15 Question B.06
[1.0 point]
(6.0)
A small radioactive source is to be stored in an accessible area of the reactor building. The source reads 2 R/hr at 1 foot. Assuming no shielding is to be used, a Radiation Area barrier would have to be erected from the source at least a distance of approximately:
A small radioactive source is to be stored in an accessible area of the reactor building. The source reads 2 R/hr at 1 foot. Assuming no shielding is to be used, a Radiation Area barrier would have to be erected from the source at least a distance of approximately:
: a. 400 feet
: a. 400 feet
: b. 40 feet
: b. 40 feet
: c. 20 feet
: c. 20 feet
: d. 10 feet Answer: B.06       c.
: d. 10 feet Answer:
B.06
: c.  


==Reference:==
==Reference:==
DR1D12 = DR2D22
DR1D12 = DR2D22  


Section B Normal/Emergency Procedures & Radiological Controls Question           B.07           [1.0 point]         (7.0)
Section B Normal/Emergency Procedures & Radiological Controls Question B.07
[1.0 point]
(7.0)
Which ONE of the following would be classified as an OPERATIONAL EVENT?
Which ONE of the following would be classified as an OPERATIONAL EVENT?
: a. Operation in violation of a safety limit
: a. Operation in violation of a safety limit
: b. Release of fission products from a fuel element
: b. Release of fission products from a fuel element
: c. Unanticipated reactivity change greater than $1.00
: c. Unanticipated reactivity change greater than $1.00
: d. Reactor scram Answer: B.07           d.
: d. Reactor scram Answer:
B.07
: d.  


==Reference:==
==Reference:==
AP-4. - B.2 Question           B.08           [1.0 points, 0.25 each]                   (8.0)
AP-4. - B.2 Question B.08
[1.0 points, 0.25 each]
(8.0)
Deletd by the examiner Match the requirements (10 CFR 55) for maintaining an active operator license in column A with the correct time period from column B.
Deletd by the examiner Match the requirements (10 CFR 55) for maintaining an active operator license in column A with the correct time period from column B.
Column A                                         Column B
Column A Column B
: 1. Renewal of license                       a. 4 months
: 1.
: 2. Medical examination                           b. 1 year
Renewal of license
: 3. Console manipulation evaluation         c. 2 years
: a.
: 4. Requalification exam (written)     d. 6 years Answer: B.08 1 = d;         2; = c;       3 = b;         4=c
4 months
: 2.
Medical examination
: b.
1 year
: 3.
Console manipulation evaluation
: c.
2 years
: 4.
Requalification exam (written)
: d.
6 years Answer: B.08 1 = d; 2; = c; 3 = b; 4 = c  


==Reference:==
==Reference:==
10CFR55 Question           B.09           [1.0 point]         (9.0)
10CFR55 Question B.09
[1.0 point]
(9.0)
Which one of the following statements describes the basis for the Safety Limit?
Which one of the following statements describes the basis for the Safety Limit?
: a. High fuel temperature could result in clad melt.
: a. High fuel temperature could result in clad melt.
Line 384: Line 631:
: c. High fuel temperature combined with lack of adequate cooling could result in fuel melt.
: c. High fuel temperature combined with lack of adequate cooling could result in fuel melt.
: d. Excessive hydrogen produced as a result of the zirconium-water reaction is potentially explosive.
: d. Excessive hydrogen produced as a result of the zirconium-water reaction is potentially explosive.
Answer: B.09           b.
Answer:
B.09
: b.  


==Reference:==
==Reference:==
T.S. 2.1 - Basis
T.S. 2.1 - Basis  


Section B Normal/Emergency Procedures & Radiological Controls Question       B.10       [1.0 point]     (10.0)
Section B Normal/Emergency Procedures & Radiological Controls Question B.10
[1.0 point]
(10.0)
Reactor operations are being conducted around the clock over the weekend, during which time the Reactor Operator (RO) becomes ill and is taken to the hospital. Only the Senior Reactor Operator (SRO) and an experienced student remain in the facility. Reactor operations:
Reactor operations are being conducted around the clock over the weekend, during which time the Reactor Operator (RO) becomes ill and is taken to the hospital. Only the Senior Reactor Operator (SRO) and an experienced student remain in the facility. Reactor operations:
: a. must be discontinued because both an RO and an SRO must be in the facility to satisfy PSBR Administrative Policy
: a. must be discontinued because both an RO and an SRO must be in the facility to satisfy PSBR Administrative Policy
: b. must be discontinued because both an RO and an SRO must be in the facility to satisfy Technical Specifications
: b. must be discontinued because both an RO and an SRO must be in the facility to satisfy Technical Specifications
: c. may continue until a replacement RO can arrive at the facility within 30 minutes
: c. may continue until a replacement RO can arrive at the facility within 30 minutes
: d. may continue since the SRO can monitor the console while the student makes the required periodic tours Answer: B.10       a.
: d. may continue since the SRO can monitor the console while the student makes the required periodic tours Answer:
B.10
: a.  


==Reference:==
==Reference:==
AP-1 Question       B.11       [1.0 point]     (11.0)
AP-1 Question B.11
[1.0 point]
(11.0)
Finger ring dosimetry is typically issued for monitoring the exposure to the skin of the extremities.
Finger ring dosimetry is typically issued for monitoring the exposure to the skin of the extremities.
What is the 10 CFR 20 annual limit associated with determination of the shallow dose equivalent?
What is the 10 CFR 20 annual limit associated with determination of the shallow dose equivalent?
Line 403: Line 658:
: b. 500 millirem
: b. 500 millirem
: c. 5 rem
: c. 5 rem
: d. 50 rem Answer: B.11       d.
: d. 50 rem Answer:
B.11
: d.  


==Reference:==
==Reference:==
10 CFR 20 Question       B.12       [1.0 point]     (12.0)
10 CFR 20 Question B.12
[1.0 point]
(12.0)
A building evacuation alarm has just sounded. Where would you expect most people to muster IMMEDIATELY after acknowledging the alarm and need to evacuate from the PSBR?
A building evacuation alarm has just sounded. Where would you expect most people to muster IMMEDIATELY after acknowledging the alarm and need to evacuate from the PSBR?
: a. Reactor Bay
: a. Reactor Bay
: b. PSBR Lobby
: b. PSBR Lobby
: c. Academic Projects Building
: c. Academic Projects Building
: d. Entry gate at the lower end of the parking lot Answer: B.12       d.
: d. Entry gate at the lower end of the parking lot Answer:
B.12
: d.  


==Reference:==
==Reference:==
EP-13 Building Evacuation, Rev.4
EP-13 Building Evacuation, Rev.4  


Section B Normal/Emergency Procedures & Radiological Controls Question         B.13     [1.0 point, 0.25 points each]     (13.0)
Section B Normal/Emergency Procedures & Radiological Controls Question B.13
[1.0 point, 0.25 points each]
(13.0)
Match type of radiation (1 thru 4) with the proper penetrating power (a thru d)
Match type of radiation (1 thru 4) with the proper penetrating power (a thru d)
: a. Gamma                 1. Stopped by thin sheet of paper
: a. Gamma 1. Stopped by thin sheet of paper
: b. Beta                 2. Stopped by thin sheet of metal
: b. Beta 2. Stopped by thin sheet of metal
: c. Alpha                 3. Best shielded by light material
: c. Alpha 3. Best shielded by light material
: d. Neutron               4. Best shielded by dense material Answer: B.13         a. = 4;   b. = 2;     c. = 1;     d. = 3
: d. Neutron 4. Best shielded by dense material Answer:
B.13
: a. = 4;
: b. = 2;
: c. = 1;
: d. = 3  


==Reference:==
==Reference:==
Reactor Training Manual - Health Physics Question         B.14     [1.0 point]     (14.0)
Reactor Training Manual - Health Physics Question B.14
[1.0 point]
(14.0)
Prior to insertion into a pneumatic transfer system, a rabbit sample must be inspected by:
Prior to insertion into a pneumatic transfer system, a rabbit sample must be inspected by:
: a. the reactor operator
: a. the reactor operator
: b. the Health Physics office
: b. the Health Physics office
: c. the experimenter
: c. the experimenter
: d. the senior reactor operator Answer: B.14         d
: d. the senior reactor operator Answer:
B.14 d  


==Reference:==
==Reference:==
SOP-9.
SOP-9.
Question         B.15     [1.0 point]     (15.0)
Question B.15
[1.0 point]
(15.0)
In the event of a credible bomb threat, the person receiving the threat should...
In the event of a credible bomb threat, the person receiving the threat should...
: a. ask the person making the threat for his name and address.
: a. ask the person making the threat for his name and address.
Line 439: Line 712:
: c. immediately activate the Emergency Plan.
: c. immediately activate the Emergency Plan.
: d. immediately evacuate the reactor building and proceed to the facility gate.
: d. immediately evacuate the reactor building and proceed to the facility gate.
Answer: B.15         a
Answer:
B.15 a  


==Reference:==
==Reference:==
PSBR EP-8
PSBR EP-8  


Section B Normal/Emergency Procedures & Radiological Controls Question       B.16       [1.0 point]     (16.0)
Section B Normal/Emergency Procedures & Radiological Controls Question B.16
[1.0 point]
(16.0)
A room contains a source which, when exposed, results in a general area dose rate of 175 millirem per hour. This source is scheduled to be exposed continuously for 35 days. Select an acceptable method for controlling radiation exposure from the source within this room.
A room contains a source which, when exposed, results in a general area dose rate of 175 millirem per hour. This source is scheduled to be exposed continuously for 35 days. Select an acceptable method for controlling radiation exposure from the source within this room.
: a. Lock the room to prevent inadvertent entry into the room.
: a. Lock the room to prevent inadvertent entry into the room.
Line 450: Line 726:
: c. Equip the room with a motion detector that will alarm in the control room.
: c. Equip the room with a motion detector that will alarm in the control room.
: d. Post the area with the words "Danger-Radiation Area".
: d. Post the area with the words "Danger-Radiation Area".
Answer: B.16       a.
Answer:
B.16
: a.  


==Reference:==
==Reference:==
PSBR Training Manual, Chapter 7 and 10CFR20.1601(a)(3)
PSBR Training Manual, Chapter 7 and 10CFR20.1601(a)(3)
Question       B.17       [1.0 point]     (17.0)
Question B.17
[1.0 point]
(17.0)
The Safety System channels required to be operable in all modes of operation are:
The Safety System channels required to be operable in all modes of operation are:
: a. fuel element temperature scram, reactor high power scram, and manual scram
: a. fuel element temperature scram, reactor high power scram, and manual scram
: b. fuel element temperature scram and manual scram
: b. fuel element temperature scram and manual scram
: c. manual scram and reactor high power scram
: c. manual scram and reactor high power scram
: d. reactor high power scram, detector power supply scram, and fuel element temperature scram Answer: B.17       b.
: d. reactor high power scram, detector power supply scram, and fuel element temperature scram Answer:
B.17
: b.  


==Reference:==
==Reference:==
T.S. 3.2.4 Question       B.18       [1.0 point]     (18.0)
T.S. 3.2.4 Question B.18
[1.0 point]
(18.0)
Complete the following sentence. According to PSBR technical specifications, the time from SCRAM initiation to the full insertion of any control rod from a full up position SHALL be less than second(s).
Complete the following sentence. According to PSBR technical specifications, the time from SCRAM initiation to the full insertion of any control rod from a full up position SHALL be less than second(s).
: a. 0.1
: a. 0.1
: b. 0.5
: b. 0.5
: c. 1
: c. 1
: d. 2 Answer: B.18       c.
: d. 2 Answer:
B.18
: c.  


==Reference:==
==Reference:==
AP-5 PSU Technical specification 3.2.6 Scram Time
AP-5 PSU Technical specification 3.2.6 Scram Time  


Section B Normal/Emergency Procedures & Radiological Controls Question       B.19       [1.0 point]     (19.0)
Section B Normal/Emergency Procedures & Radiological Controls Question B.19
[1.0 point]
(19.0)
The capsule in a pneumatic transfer system fails to return from the reactor core at the proper time. The reactor operator must:
The capsule in a pneumatic transfer system fails to return from the reactor core at the proper time. The reactor operator must:
: a. turn off the RABBIT 1 fan
: a. turn off the RABBIT 1 fan
Line 478: Line 766:
: c. shutdown the reactor and turn off the RABBIT 1 fan and RABBIT 1 Master
: c. shutdown the reactor and turn off the RABBIT 1 fan and RABBIT 1 Master
: d. investigate the cause of the alarm and, if necessary, contact the RPO.
: d. investigate the cause of the alarm and, if necessary, contact the RPO.
Answer: B.19       c.
Answer:
B.19
: c.  


==Reference:==
==Reference:==
SOP-9.C.2 Question       B.20       [1.0 point]     (20.0)
SOP-9.C.2 Question B.20
[1.0 point]
(20.0)
Which of the following statements is true regarding radiation safety protocol at the PSBR?
Which of the following statements is true regarding radiation safety protocol at the PSBR?
: a. Category II individuals may escort a Category I individual only if they have watched the safety video first.
: a. Category II individuals may escort a Category I individual only if they have watched the safety video first.
Line 487: Line 779:
: c. Category II individuals may only perform work with sources of radiation only after watching the safety video.
: c. Category II individuals may only perform work with sources of radiation only after watching the safety video.
: d. Category I individuals do not have to watch the safety video and are typically escorted by Category III individuals.
: d. Category I individuals do not have to watch the safety video and are typically escorted by Category III individuals.
Answer: B.20 d.
Answer:
B.20
: d.  


==Reference:==
==Reference:==
AP Radiation Protection Orientation Requirements Section V.C - Category 3 includes student, staff, faculty, or facility industrial users working independently Section V.B - Category 2 individuals may have access to the facility during normal working hours (but may not independently work with radioactive materials or escort Category 1 persons) after receiving the following orientation Sections V.A - Category 1 individuals shall be accompanied by a Category 3 qualified individual who is authorized to serve as an escort
AP Radiation Protection Orientation Requirements Section V.C - Category 3 includes student, staff, faculty, or facility industrial users working independently Section V.B - Category 2 individuals may have access to the facility during normal working hours (but may not independently work with radioactive materials or escort Category 1 persons) after receiving the following orientation Sections V.A - Category 1 individuals shall be accompanied by a Category 3 qualified individual who is authorized to serve as an escort  


Section C Facility and Radiation Monitoring Systems Question       C.01       [1.0 point]   (1.0)
Section C Facility and Radiation Monitoring Systems Question C.01
[1.0 point]
(1.0)
What instrumentation region associated with the voltage is such that every primary ion produces an avalanche of secondary ions? This region also cannot differentiate between types of radiation.
What instrumentation region associated with the voltage is such that every primary ion produces an avalanche of secondary ions? This region also cannot differentiate between types of radiation.
: a. Region I, Recombination
: a. Region I, Recombination
: b. Region II, Ionization
: b. Region II, Ionization
: c. Region III, Proportional
: c. Region III, Proportional
: d. Region V, Geiger-Mueller Answer: C.01       d.
: d. Region V, Geiger-Mueller Answer:
C.01
: d.  


==Reference:==
==Reference:==
PSBR Training Manual Chapter 4.1.1 Question       C.02       [1.0 point]   (2.0)
PSBR Training Manual Chapter 4.1.1 Question C.02
[1.0 point]
(2.0)
Which ONE of the following is the purpose of the diffuser on the N-16 recirculation pump?
Which ONE of the following is the purpose of the diffuser on the N-16 recirculation pump?
: a. Increase heat transfer rate due to increased mixing within the core
: a. Increase heat transfer rate due to increased mixing within the core
: b. Increase transport time for N16 to reach the surface of the pool
: b. Increase transport time for N16 to reach the surface of the pool
: c. Breakup O16 bubbles in pool, thereby decreasing production of N16
: c. Breakup O16 bubbles in pool, thereby decreasing production of N16
: d. Decrease the activation rate of O16 to N16 due to reduced time in the core Answer: C.02       b.
: d. Decrease the activation rate of O16 to N16 due to reduced time in the core Answer:
C.02
: b.  


==Reference:==
==Reference:==
PSBR SAR 5.6 Question       C.03       [1.0 point]   (3.0)
PSBR SAR 5.6 Question C.03
[1.0 point]
(3.0)
What status alarm message will be indicated if the secondary outlet pressure is NOT greater than the primary inlet pressure by the preset amount?
What status alarm message will be indicated if the secondary outlet pressure is NOT greater than the primary inlet pressure by the preset amount?
: a. Heat exchanger differential pressure low
: a. Heat exchanger differential pressure low
: b. Heat exchanger differential pressure high
: b. Heat exchanger differential pressure high
: c. Reactor pool level low
: c. Reactor pool level low
: d. Reactor pool level high Answer: C.03       a.
: d. Reactor pool level high Answer:
C.03
: a.  


==Reference:==
==Reference:==
PSBR Training Manual Chapter 5.2.5
PSBR Training Manual Chapter 5.2.5  


Section C Facility and Radiation Monitoring Systems Question         C.04 [1.0 point]         (4.0)
Section C Facility and Radiation Monitoring Systems Question C.04
[1.0 point]
(4.0)
PSBR Technical Specifications requires fuel elements be stored in a safe array where the MAXIMUM keff is _______.
PSBR Technical Specifications requires fuel elements be stored in a safe array where the MAXIMUM keff is _______.
: a. 0.6
: a. 0.6
: b. 0.7
: b. 0.7
: c. 0.8
: c. 0.8
: d. 0.9 Answer: C.04       c.
: d. 0.9 Answer:
C.04
: c.  


==Reference:==
==Reference:==
PSBR Technical Specifications 5.4.a Question         C.05     [1.0 point]     (5.0)
PSBR Technical Specifications 5.4.a Question C.05
[1.0 point]
(5.0)
A signal of notification to Penn State University Police Services is initiated by:
A signal of notification to Penn State University Police Services is initiated by:
: a. reactor bay truck door open.
: a. reactor bay truck door open.
: b. UPS battery low.
: b. UPS battery low.
: c. emergency exhaust system initiation.
: c.
emergency exhaust system initiation.
: d. DCC-Z watchdog trip.
: d. DCC-Z watchdog trip.
Answer: C.05       b.
Answer:
C.05
: b.  


==Reference:==
==Reference:==
PSBR Training Manual, 4.2.9.1bv - Facilities Systems Support pg. 51 Question         C.06     [1.0 point]     (6.0)
PSBR Training Manual, 4.2.9.1bv - Facilities Systems Support pg. 51 Question C.06
[1.0 point]
(6.0)
Which ONE of the following materials is inserted in the top and bottom of the active fuel portion of each fuel element to reduce neutron leakage?
Which ONE of the following materials is inserted in the top and bottom of the active fuel portion of each fuel element to reduce neutron leakage?
: a. Aluminum
: a. Aluminum
: b. Boron
: b. Boron
: c. Cadmium
: c. Cadmium
: d. Graphite Answer: C.06       d.
: d. Graphite Answer:
C.06
: d.  


==Reference:==
==Reference:==
PSBR Training Manual Chapter 5.1.4
PSBR Training Manual Chapter 5.1.4  


Section C Facility and Radiation Monitoring Systems Question       C.07       [1.0 point]     (7.0)
Section C Facility and Radiation Monitoring Systems Question C.07
[1.0 point]
(7.0)
Which ONE of the following will initiate a reactor step back?
Which ONE of the following will initiate a reactor step back?
: a. Pool outlet conductivity low
: a. Pool outlet conductivity low
: b. Reactor key on
: b. Reactor key on
: c. Fuel temperature high
: c. Fuel temperature high
: d. Facility exhaust is off Answer: C.07       c.
: d. Facility exhaust is off Answer:
C.07
: c.  


==Reference:==
==Reference:==
PSBR Training Manual Chapter 4.2.9.1i Question       C.08       [1.0 point]     (8.0)
PSBR Training Manual Chapter 4.2.9.1i Question C.08
[1.0 point]
(8.0)
The power range channel consists of:
The power range channel consists of:
: a. A gamma ion chamber, in-core thermocouples, and the wide range monitor
: a. A gamma ion chamber, in-core thermocouples, and the wide range monitor
: b. A fission chamber, wide range channel, and power range monitor
: b. A fission chamber, wide range channel, and power range monitor
: c. A gamma ion chamber, in-core thermocouples, and the power range monitor
: c. A gamma ion chamber, in-core thermocouples, and the power range monitor
: d. A fission chamber, gamma ion chamber, and in-core thermocouples Answer: C.08       c.
: d. A fission chamber, gamma ion chamber, and in-core thermocouples Answer:
C.08
: c.  


==Reference:==
==Reference:==
PSBR SAR 7.2.3.1 & Training Manual 4.2.3 & 4.2.7 Question       C.09       [1.0 point]     (9.0)
PSBR SAR 7.2.3.1 & Training Manual 4.2.3 & 4.2.7 Question C.09
[1.0 point]
(9.0)
The pneumatic transfer system uses ________ to reduce the production of ________.
The pneumatic transfer system uses ________ to reduce the production of ________.
: a. CO2, N16
: a. CO2, N16
: b. CO2, Ar41
: b. CO2, Ar41
: c. Compressed air, Ar41
: c. Compressed air, Ar41
: d. D2O, N16 Answer: C.21       b.
: d. D2O, N16 Answer:
C.21
: b.  


==Reference:==
==Reference:==
PSBR SAR 10.2.6
PSBR SAR 10.2.6  


Section C Facility and Radiation Monitoring Systems Question       C.10       [1.0 point, 0.25 each]       (10.0)
Section C Facility and Radiation Monitoring Systems Question C.10
[1.0 point, 0.25 each]
(10.0)
Match the control rod drive mechanism from Column A with the correct function in Column B.
Match the control rod drive mechanism from Column A with the correct function in Column B.
Column A                           Column B
Column A Column B
: a. Potentiometer               1. Switch will reverse position according to whether the magnet is at or above its completely depressed position
: a. Potentiometer
: b. Rod down limit switch       2. Provides rod position indication
: 1. Switch will reverse position according to whether the magnet is at or above its completely depressed position
: c. Drive up limit switch       3. Switch reverses position according to whether the magnet is at or below its full up position
: b. Rod down limit switch
: d. Drive down limit switch     4. Foot is depressed by armature when rod is fully lowered Answer: C.10       a. = 2;     b. = 4;     c. = 3;     d. = 1
: 2. Provides rod position indication
: c. Drive up limit switch
: 3. Switch reverses position according to whether the magnet is at or below its full up position
: d. Drive down limit switch 4. Foot is depressed by armature when rod is fully lowered Answer:
C.10
: a. = 2;
: b. = 4;
: c. = 3;
: d. = 1  


==Reference:==
==Reference:==
PSBR Training Manual 4.2.11 Question       C.11       [1.0 point]     (11.0)
PSBR Training Manual 4.2.11 Question C.11
[1.0 point]
(11.0)
Which ONE of the following radiation monitoring systems will NOT activate the emergency evacuation alarm upon receipt of a high radiation alarm?
Which ONE of the following radiation monitoring systems will NOT activate the emergency evacuation alarm upon receipt of a high radiation alarm?
: a. Reactor pump room
: a. Reactor pump room
: b. Reactor bay air west
: b. Reactor bay air west
: c. Co60 bay
: c. Co60 bay
: d. Beam laboratory Answer: C.11       a.
: d. Beam laboratory Answer:
C.11
: a.  


==Reference:==
==Reference:==
PSBR SAR 7.7 Question       C.12       [1.0 point, 0.33 each]       (12.0)
PSBR SAR 7.7 Question C.12
Match the exhaust system filter in Column A with its purpose in Column B Column A               Column B
[1.0 point, 0.33 each]
: a. Pre-filter         1. High efficiency for removing fission gases
(12.0)
: b. Absolute filter     2. Filter atmospheric dust
Match the exhaust system filter in Column A with its purpose in Column B Column A Column B
: c. Carbon filter       3. High efficiency for removing particulate radiation Answer: C.12       a. = 2;     b. = 3;     c. = 1
: a. Pre-filter
: 1. High efficiency for removing fission gases
: b. Absolute filter
: 2. Filter atmospheric dust
: c. Carbon filter
: 3. High efficiency for removing particulate radiation Answer:
C.12
: a. = 2;
: b. = 3;
: c. = 1  


==Reference:==
==Reference:==
PSBR Training Manual 5.3.4.1
PSBR Training Manual 5.3.4.1  


Section C Facility and Radiation Monitoring Systems Question         C.13       [1.0 point]   (13.0)
Section C Facility and Radiation Monitoring Systems Question C.13
[1.0 point]
(13.0)
Which one of the following is correct for the air compressors?
Which one of the following is correct for the air compressors?
: a. Compressed air for the facility is provided by two air compressors located in the demineralizer room.
: a. Compressed air for the facility is provided by two air compressors located in the demineralizer room.
Line 603: Line 959:
: c. Normally, the 20 horsepower air compressor supplies the reactor transient rod, and the 1.5 horsepower air compressor supplies the rest of the facility.
: c. Normally, the 20 horsepower air compressor supplies the reactor transient rod, and the 1.5 horsepower air compressor supplies the rest of the facility.
: d. Both compressors are set to start at 60 psig and stop at 120 psig, are equipped with a low pressure alarm at 55 psig, and deliver air at about 80 psig to both the transient rod and the rest of the facility.
: d. Both compressors are set to start at 60 psig and stop at 120 psig, are equipped with a low pressure alarm at 55 psig, and deliver air at about 80 psig to both the transient rod and the rest of the facility.
Answer: C.13         b.
Answer:
C.13
: b.  


==Reference:==
==Reference:==
PSBR Training Manual, Section 5.3.1 Question         C.14       [1.0 point]   (14.0)
PSBR Training Manual, Section 5.3.1 Question C.14
[1.0 point]
(14.0)
PSBR uses the Compensated Ion Chamber as what measuring channel?
PSBR uses the Compensated Ion Chamber as what measuring channel?
: a. Linear power channel
: a. Linear power channel
: b. Wide range monitor
: b. Wide range monitor
: c. Percent power channel
: c. Percent power channel
: d. Not used as a measuring channel, used in experimental work Answer: C.14         d.
: d. Not used as a measuring channel, used in experimental work Answer:
C.14
: d.  


==Reference:==
==Reference:==
PSBR Training Manual 4.1.6 Question         C.15       [1.0 point]   (15.0)
PSBR Training Manual 4.1.6 Question C.15
[1.0 point]
(15.0)
Which ONE of the following experimental facilities provides for the irradiation of samples at the point of maximum neutron flux?
Which ONE of the following experimental facilities provides for the irradiation of samples at the point of maximum neutron flux?
: a. Central thimble
: a. Central thimble
: b. Vertical tubes
: b. Vertical tubes
: c. Beam ports
: c. Beam ports
: d. Pneumatic transfer system Answer: C.15         a.
: d. Pneumatic transfer system Answer:
C.15
: a.  


==Reference:==
==Reference:==
PSBR SAR 10.2.5
PSBR SAR 10.2.5  


Section C Facility and Radiation Monitoring Systems Question       C.16       [1.0 point]     (16.0)
Section C Facility and Radiation Monitoring Systems Question C.16
[1.0 point]
(16.0)
Which region of the pulse size versus applied voltage characteristic curve does the fission chamber operate?
Which region of the pulse size versus applied voltage characteristic curve does the fission chamber operate?
: a. Proportional
: a. Proportional
: b. Limited proportional
: b. Limited proportional
: c. Geiger-Mueller
: c. Geiger-Mueller
: d. Ion chamber Answer: C.16       a.
: d. Ion chamber Answer:
C.16
: a.  


==Reference:==
==Reference:==
PSBR Training Manual 4.1.1 Figure 4.1 and 4.1.7 Question       C.17 [1.0 point]       (17.0)
PSBR Training Manual 4.1.1 Figure 4.1 and 4.1.7 Question C.17
[1.0 point]
(17.0)
Per PSBR TS, what MAXIMUM water temperature would result in an alarm and an automatic stepback?
Per PSBR TS, what MAXIMUM water temperature would result in an alarm and an automatic stepback?
: a. 35oC
: a. 35oC
: b. 60oC
: b. 60oC
: c. 110oF
: c. 110oF
: d. 120oF Answer: C.17         a.
: d. 120oF Answer:
C.17
: a.  


==Reference:==
==Reference:==
PSBR TS 3.3.6 Question       C.18       [1.0 point]     (18.0)
PSBR TS 3.3.6 Question C.18
[1.0 point]
(18.0)
Which ONE of the following statements describes the moderating properties of zirconium-hydride in the PSBR TRIGA fuel elements when temperature increases?
Which ONE of the following statements describes the moderating properties of zirconium-hydride in the PSBR TRIGA fuel elements when temperature increases?
: a. The ratio of hydrogen atoms to zirconium atoms increases the effectiveness of the moderator
: a. The ratio of hydrogen atoms to zirconium atoms increases the effectiveness of the moderator
: b. The probability that a neutron will return to the fuel element before being captured elsewhere is a function of the temperature of the hydride
: b. The probability that a neutron will return to the fuel element before being captured elsewhere is a function of the temperature of the hydride
: c. Elevation of the hydride temperature increases the probability that a thermal neutron will escape the fuel-moderator element before being captured
: c. Elevation of the hydride temperature increases the probability that a thermal neutron will escape the fuel-moderator element before being captured
: d. The hydride mixture is very effective in slowing down neutrons with energies below 0.025 eV Answer: C.18       c.
: d. The hydride mixture is very effective in slowing down neutrons with energies below 0.025 eV Answer:
C.18
: c.  


==Reference:==
==Reference:==
PSBR SAR 4.2.3
PSBR SAR 4.2.3  


Section C Facility and Radiation Monitoring Systems Question       C.19       [1.0 point]   (19.0)
Section C Facility and Radiation Monitoring Systems Question C.19
[1.0 point]
(19.0)
Which ONE of the following conditions will automatically scram the operating reactor?
Which ONE of the following conditions will automatically scram the operating reactor?
: a. 18.25 feet of water above the top of the bottom grid plate
: a. 18.25 feet of water above the top of the bottom grid plate
: b. 102% reactor power
: b. 102% reactor power
: c. Bulk pool water temperature = 40oC
: c. Bulk pool water temperature = 40oC
: d. Loss of high voltage to the percent power channel Answer: C.19     d.
: d. Loss of high voltage to the percent power channel Answer:
C.19
: d.  


==Reference:==
==Reference:==
PSBR TS 3.2.4, 3.3.1, & 3.3.6 Question       C.20       [1.0 point]   (20.0)
PSBR TS 3.2.4, 3.3.1, & 3.3.6 Question C.20
[1.0 point]
(20.0)
Which ONE of the following is the neutron absorber in the PSBR reactor control rods?
Which ONE of the following is the neutron absorber in the PSBR reactor control rods?
: a. Powdered graphite
: a. Powdered graphite
: b. Zirconium hydride
: b. Zirconium hydride
: c. Powered boron carbide
: c. Powered boron carbide
: d. Aluminum oxide Answer: C.20     c.
: d. Aluminum oxide Answer:
C.20
: c.  


==Reference:==
==Reference:==
PSBR Training Manual Chapter 5.1.6}}
PSBR Training Manual Chapter 5.1.6}}

Latest revision as of 20:42, 9 January 2025

Examination Report No. 50-005-OL/16-01, the Pennsylvania State University Breazeale Nuclear Reactor
ML16242A210
Person / Time
Site: Pennsylvania State University
Issue date: 09/14/2016
From: Anthony Mendiola
Research and Test Reactors Oversight Branch
To: Unlu K
Pennsylvania State Univ
Anthony Mendiola
Shared Package
ML16229A286 List:
References
50-005/OL-16-01
Download: ML16242A210 (20)


Text

September 14, 2016 Dr. Kenan Unlu, Director The Pennsylvania State University Breazeale Nuclear Reactor Radiation Science and Engineering Center University Park, PA 16802-2301

SUBJECT:

EXAMINATION REPORT NO. 50-005/OL-16-01, THE PENNSYLVANIA STATE UNIVERSITY BREAZEALE RESEARCH REACTOR

Dear Dr. Unlu:

During the week of August 22, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered operator licensing examinations at The Pennsylvania State University reactor.

The examination was conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2. Examination questions and preliminary findings were discussed at the conclusion of the examination with those members of your staff identified in the enclosed report.

In accordance with Title 10, Section 2.390 of the Code of Federal Regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. If you have any questions concerning this examination, please contact Phillip T. Young at 301-415-4094 or via e-mail at Phillip.young@nrc.gov.

Sincerely,

/RA/

Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No.50-005

Enclosures:

1. Examination Report No. 50-005/OL-16-01 cc without enclosures: see next page

Dr. Kenan Unlu, Director September 14, 2016 The Pennsylvania State University Breazeale Nuclear Reactor Radiation Science and Engineering Center University Park, PA 16802-2301

SUBJECT:

EXAMINATION REPORT NO. 50-005/OL-16-01, THE PENNSYLVANIA STATE UNIVERSITY BREAZEALE RESEARCH REACTOR

Dear Dr. Unlu:

During the week of August 22, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered operator licensing examinations at youre The Pennsylvania State University reactor. The examination was conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2. Examination questions and preliminary findings were discussed at the conclusion of the examination with those members of your staff identified in the enclosed report.

In accordance with Title 10, Section 2.390 of the Code of Federal Regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. If you have any questions concerning this examination, please contact Phillip T. Young at 301-415-4094 or via e-mail at Phillip.young@nrc.gov.

Sincerely,

/RA/

Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No.50-005

Enclosures:

1. Examination Report No. 50-005/OL-16-01 cc without enclosures: See next page DISTRIBUTION w/ encls.:

PUBLIC AMendiola OFont AAdams XYin ADAMS ACCESSION #: ML16242A210 OFFICE NRR/DPR/PROB/CE NRR/DPR/PROB/OLA NRR/DPR/PROB/BC NAME PYoung CRevelle AMendiola DATE 09/14/2016 09/12/2016 09/14/2016 OFFICIAL RECORD COPY

Pennsylvania State University Docket No.50-005 cc:

Jeffrey A. Leavey Manager of Radiation Protection The Pennsylvania State University 0201 Academic Project BL University Park, PA 16802 Dr. Neil A. Sharkey, Interim Vice President for Research of the Graduate School The Pennsylvania State University 304 Old Main University Park, PA 16802 Director, Bureau of Radiation Protection Department of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105 Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611 Mark A. Trump, Associate Director for Operations The Pennsylvania State University Breazeale Nuclear Reactor Radiation Science and Engineering Center University Park, PA 16802

U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT REPORT NO.:

50-005/OL-16-01 FACILITY DOCKET NO.:

50-005 FACILITY LICENSE NO.:

R-2 FACILITY:

The Pennsylvania State University Breazeale Reactor SUBMITTED BY:

_____________/RA/_______

9/12/2016 Phillip T. Young, Chief Examiner Date

SUMMARY

During the week of August 22, 2016, the NRC administered license examinations to two Senior Reactor Operator license candidates. The applicant passed all portions of the examination.

REPORT DETAILS

1.

Examiner: Phillip T. Young, Chief Examiner

2.

Results:

RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 0/0 2/0 2/0 Operating Tests 0/0 2/0 2/0 Overall 0/0 2/0 2/0

3.

Exit Meeting:

Phillip T. Young, Chief Examiner, NRC Dr. Kenan Unlu, Director PSU Reactor Alison Portanova, SRO PSU The examiner thanked the facility for their assistance in completing the examinations.

The examiner explained that question B.08 will be deleted from the examination because the structure of the columns created confusion to the applicants during the examination.

ENCLOSURE 1

U. S. NUCLEAR REGULATORY COMMISSION NON-POWER REACTOR INITIAL LICENSE EXAMINATION FACILITY:

PENN STATE UNIVERSITY REACTOR TYPE:

POOL TYPE, MODIFIED TRIGA DATE ADMINISTERED: 8/22/2016 CANDIDATE: ___________________________________

INSTRUCTIONS TO CANDIDATE:

Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination. Points for each question are indicated in parentheses for each question. A 70%

overall is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.

CATEGORY VALUE

% OF TOTAL CANDIDATES SCORE

% OF CATEGORY VALUE CATEGORY 20.00 33.3 A. REACTOR THEORY, THERMODYNAMICS, AND FACILITY OPERATING CHARACTISTICS 20.00 33.3 B. NORMAL AND EMERGENCY OPERATING PROCEDURES AND RADIOLOGICAL CONTROLS 20.00 33.3 C. FACILITY AND RADIATION MONITORING SYSTEMS 60.00 FINAL GRADE TOTALS ALL THE WORK DONE ON THIS EXAMINATION IS MY OWN. I HAVE NEITHER GIVEN NOR RECEIVED AID.

CANDIDATE'S SIGNATURE

NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:

1.

Cheating on the examination means an automatic denial of your application and could result in more severe penalties.

2.

After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination.

3.

Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.

4.

Use black ink or dark pencil only to facilitate legible reproductions.

5.

Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet.

6.

Mark your answers on the answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.

7.

The point value for each question is indicated in [brackets] after the question.

8.

If the intent of a question is unclear, ask questions of the examiner only.

9.

When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition turn in all scrap paper.

10.

Ensure all information you wish to have evaluated as part of your answer is on your answer sheet. Scrap paper will be disposed of immediately following the examination.

11.

To pass the examination you must achieve a grade of 70 percent or greater in each category.

12.

There is a time limit of three (3) hours for completion of the examination.

13.

When you have completed and turned in you examination, leave the examination area. If you are observed in this area while the examination is still in progress, your license may be denied or revoked.

DR -

Rem, Ci -

curies, E - Mev, R - feet Peak

)

(

=

Peak

)

(

1 1

2 2

2 2

1 Curie = 3.7 x 1010 dis/sec 1 kg = 2.21 lbm 1 Horsepower = 2.54 x 103 BTU/hr 1 Mw = 3.41 x 106 BTU/hr 1 BTU = 778 ft-lbf F = 9/5 C + 32 1 gal (H2O). 8 lbm C = 5/9 (F - 32) cP = 1.0 BTU/hr/lbm/F cp = 1 cal/sec/gm/C T

UA

=

H m

=

T c

m

=

Q p

K 1

S S

=

SCR eff

)

(-

CR

=

)

(-

CR

)

K (1

CR

=

)

K (1

CR 2

2 1

1 eff 2

eff 1

2 1

seconds 0.1

=

-1 eff

26.06

=

SUR eff K

1 K

1

=

M eff eff 1

0 CR CR

=

K 1

1

=

M 2

1 eff e

P

=

P t

0 P

)

(1

=

P 0

10 P

=

P SUR(t) 0 K

)

K (1

=

SDM eff eff

=

eff

+

=

K 1)

K

(

=

eff eff

K x

k K

K

=

eff eff eff eff 2

1 1

2

0.693

=

T e

DR

=

DR t

0 R

6CiE(n)

=

DR 2

d DR

=

d DR 2

2 2

1 2

1

Section A Reactor Theory, Thermo, and Facility Characteristics Question A.01

[1.0 point]

(1.0)

Which ONE of the following is true concerning the differences between prompt and delayed neutrons?

a. Prompt neutrons account for less than one percent of the neutron population while delayed neutrons account for approximately ninety-nine percent of the neutron population.
b. Prompt neutrons are released during fast fissions while delayed neutrons are released during thermal fissions.
c. Prompt neutrons are released during the fission process while delayed neutrons are released during the decay of fission products.
d. Prompt neutrons are the dominating factor in determining the reactor period while delayed neutrons have little effect on the reactor period.

Answer: A.01

c.

Reference:

Reactor Training Manual, Page 2-16.

Question A.02

[1.0 point]

(2.0)

A reactor scram has resulted in the instantaneous insertion of.006 K/K of negative reactivity. Which one of the following is the stable negative reactor period resulting from the scram?

a. 45 seconds
b. 56 seconds
c. 80 seconds
d. 112 seconds Answer: A.02
c.

Reference:

Burn, R., Introduction to Nuclear Reactor Operations, © 1982, § 4.6,

Section A Reactor Theory, Thermo, and Facility Characteristics Question A.03

[1.0 point]

(3.0)

Which ONE of the following isotopes has the largest microscopic cross-section for absorption for thermal neutrons?

a. Sm149
b. U235
c. Xe135
d. B10 Answer: A.03
c.

Reference:

Lamarsh, J. Introduction to Nuclear Engineering p. 738 Sm149 (41,000 b); U235 (687 b); Xe135 (2.65 x 106 b); B10 (3840 b)

Question A.04

[1.0 point]

(4.0)

When the excess reactivity (Kex) exceeds the delayed neutron fraction (), a reactor is said to be:

a. Subcritical
b. Critical
c. Within its shutdown margin requirements
d. Prompt critical Answer: A.04
d.

Reference:

Bevelacqua, J. 2009. Basic Health Physics. p.391 Question A.05

[1.0 point]

(5.0)

Complete the following sentence.

A dollar ($) is a unit of reactivity, where one dollar ($1) is equal to the

a. Delayed neutron precursor decay constant ().
b. Effective delayed neutron precursor decay constant (eff).
c. Delayed neutron fraction ().
d. Effective delayed neutron fraction (eff).

Answer: A.05

d.

Reference:

Reactor Theory (Neutron Characteristics) DOE-HDBK-1019/1-93 PROMPT AND DELAYED NEUTRON

Section A Reactor Theory, Thermo, and Facility Characteristics Question A.06

[1.0 point]

(6.0)

In accordance with the PSBR Technical Specifications, the term "Shutdown Margin" describes:

a. the time required for the rods to fully insert
b. the departure from K-effective = 1.00
c. the amount of subcriticality, considering the worth of all rods
d. the amount of subcriticality with the most reactive rod fully withdrawn Answer: A.06
d.

Reference:

PSBR Technical Specifications, Section 1.1.42.

Question A.07

[1.0 point]

(7.0)

The count rate is 50 cps. An experimenter inserts an experiment into the core, and the count rate decreases to 25 cps. Given the initial Keff of the reactor was 0.8, what is the worth of the experiment?

a. = - 0.42
b. = + 0.42
c. = - 0.21
d. = + 0.21 Answer: A.07
a.

Reference:

CR1 / CR2 = (1 - Keff2) / (1 - Keff1) 50 / 25 = (1 - Keff2) / (1 - 0.8)

Therefore Keff2 = 0.6

= Keff2 - Keff1 / Keff2

  • Keff1 = (0.6 - 0.8)/(0.6
  • 0.8) = - 0.41667

Section A Reactor Theory, Thermo, and Facility Characteristics Question A.08

[1.0 point]

(8.0)

The following graph for U-235 depicts

a. neutron energy distribution in the moderator
b. axial flux distribution in the core
c. radial flux distribution in the core
d. fission product yield distribution Answer: A.08
d.

Reference:

DOE Manual Vol. 1, pg. 57 Question A.09

[1.0 point]

(9.0)

A nuclear reactor startup is being performed by adding equal amounts of positive reactivity and waiting for neutron population to stabilize. As the reactor approaches criticality, the numerical change in stable neutron population after each reactivity addition

, and the time required for the neutron population to stabilize after each reactivity addition

a. increases; remains the ame
b. increases; increases
c. remains the same; remains the same
d. remains the same; increases Answer: A.09
b.

Reference:

Question ID #P1766, NRC Generic Fundamentals Examination Question BankPWR2010

Section A Reactor Theory, Thermo, and Facility Characteristics Question A.10

[1.0 point]

(10.0)

Complete the following sentence. In a nuclear reactor, 95% of all Xenon production is directly produced through the.

a. Decay of I-135
b. Fission of U-235
c. Beta decay of Cs-135
d. Fission of U-238 Answer: A.10
a.

Reference:

DOE Fundamentals Handbook Nuclear Physics and Reactor Theory Vol. 2 Question A.11

[1.0 point]

(11.0)

As primary coolant temperature increases, control rod worth:

a. decreases due to lower reflector efficiency.
b. decreases due to higher neutron absorption in the moderator.
c. increases due to the increase in thermal diffusion length.
d. remains the same due to constant poison cross-section of the control rods..

Answer: A.11

c.

Reference:

Reactor Training Manual - Reactivity Feedback Question A.12

[1.0 point]

(12.0)

Excess reactivity is the amount of reactivity:

a. associated with samples.
b. needed to achieve prompt criticality.
c. available above that which is required to make the reactor subcritical.
d. available above that which is required to keep the reactor critical.

Answer: A.12

d.

Reference:

Glasstone and Sesonske, Nuclear Reactor Engineering, Chapter 5, Section 5.114

Section A Reactor Theory, Thermo, and Facility Characteristics Rod Withdrawal (Inches)

Count Rate (cps) 0 55 2

58 4

60 6

61 8

69 10 85 12 275 Control Total Critical Rod Worth Worth Question A.13

[1.0 point]

(13.0)

You are conducting a reactor startup after installing 2 new fuel assemblies in the core. Given the following rod withdrawal data, estimate the rod position when criticality would occur. The initial count rate on the nuclear instrumentation prior to rod withdrawal is 55 cps.

a. 11 in
b. 13 in
c. 15 in
d. 20 in Answer: A.13
b.

Reference Question A.14

[1.0 point]

(14.0)

You are performing a 50 Watt Critical Rod Position. Given the following data, calculate what the Shutdown Margin, as defined by Technical Specifications, is in a clean cold core.

Core Reactivity Evaluation Data Transient

$2.92

$1.75 Safety

$3.97

$2.63 Shim

$2.85

$1.84 Regulating $2.92

$1.81 Total

$12.66 $8.03

a.

$0.66

b.

$3.29

c.

$4.06

d.

$4.63 Answer: A.14

c.

Reference:

SDM = Critical worth - Most reactive Rod worth remaining out of core SDM = 8.03-3.97 = $4.06 PSU Exam Reference Material (Adapted CP-11 data)

Section A Reactor Theory, Thermo, and Facility Characteristics Question A.15

[1.0 point]

(15.0)

In a subcritical reactor, K eff is increased from 0.861 to 0.946. Which ONE of the following is the amount of reactivity that was added to the reactor core?

a. 0.085 delta k/k
b. 0.104 delta k/k
c. 0.161 delta k/k
d. 0.218 delta k/k.

Answer: A.15

b.

Reference:

Reactor Training Manual - Reactor Kinectics Question A.16

[1.0 point]

(16.0)

If reactor power is increasing by a decade every minute, it has a period of:

a. 13 sec
b. 26 sec
c. 52 sec
d. 65 sec Answer:

A.16

b.

Reference:

Glasstone, S. and Sesonske, A, Nuclear Reactor Engineering, Kreiger Publishing, Malabar, Florida, 1991, P = Poet/T 10 = 1e60/T ln 10 = 60/T 2.3 = 60/T T = 60/2.3 T = 26 seconds Question A.17

[1.0 point]

(17.0)

With the reactor critical at 10 KW a rod is pulled to insert a positive reactivity of $0.18.

Which one of the following will be the stable reactor period as a result of this reactivity insertion?

a. 10 seconds
b. 45 seconds
c. 55 seconds
d. 65 seconds Answer:

A.17

b.

Reference:

Reactivity added = $0.18 x.007 = 0.00126

(-)/eff

.007 -.00126 = 45.6 seconds

(.1) (.00126)

Section A Reactor Theory, Thermo, and Facility Characteristics

Section A Reactor Theory, Thermo, and Facility Characteristics Question A.18

[1.0 point]

(18.0)

Which ONE of the following conditions will INCREASE the core excess of a reactor?

a. Higher moderator temperature (assume negative temperature coefficient)
b. Insertion of a negative reactivity worth experiment
c. Burnout of a burnable poison
d. Fuel depletion Answer: A.18
c.

Reference:

DOE Fundamentals Handbook Nuclear Physics and Reactor Theory Vol. 2 Question A.19

[1.0 point]

(19.0)

Following the reactor started up and it has been at 100% power for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. The Reactor Operator notes that several small control rod withdrawals are required to maintain power at 100%. Which of the following is the reason for the rod withdrawals?

a. Fuel temperatures are decreasing.
b. Xenon is building in to equilibrium concentration.
c. Pool water temperatures are decreasing.
d. Samarium is burning out from equilibrium concentration.

Answer: A.19

b.

Reference:

Reactor Training Manual - Reactor Physics and Kinetics Question A.20

[1.0 point]

(20.0)

Given: Primary coolant flow rate is 500 gallons/minute and secondary flow rate is 700 gallons/minute. The T across the primary side of the heat exchanger is 13F and secondary inlet temperature to the heat exchanger is 73F. Assuming both the primary and secondary coolants have the same Cp value, which ONE of the following is the secondary outlet temperature?

a. 82 F
b. 85 F
c. 89 F
d. 91 F Answer: A.20
a.

Reference:

Tsec= (Flowpri/Flowsec) x Tpri Tsec= (500/700) x 13°F = 9.28°F Secondary outlet = 73°F + 9.28°F = 82.3°F

Section B Normal/Emergency Procedures & Radiological Controls Question B.01

[1.0 point]

(1.0)

While working on an experiment, you receive the following radiation doses: 100 mrem (),

25 mrem (), and 5 mrem (thermal neutrons). Which ONE of the following is your total dose?

a. 175 mrem
b. 155 mrem
c. 145 mrem
d. 130 mrem Answer:

B.01

d.

Reference:

Reactor Training Manual - Ionizing Radiation Question B.02

[1.0 point]

(2.0)

Which one of the following statements defines the Technical Specifications term "Channel Test?"

a. The adjustment of a channel such that its output corresponds with acceptable accuracy to known values of the parameter which the channel measures.
b. The qualitative verification of acceptable performance by observation of channel behavior.
c. The introduction of a signal into a channel for verification of the operability of the channel.
d. The combination of sensors, electronic circuits and output devices connected to measure and display the value of a parameter.

Answer:

B.02

c.

Reference:

TS 1.1.6 Question B.03

[1.0 point]

(3.0)

A radioactive source generates a dose of 100 mr/hr at a distance of 10 feet. Using a two inch thick sheet of lead for shielding the reading drops to 50 mr/hr at a distance of 10 feet. What is the minimum number of sheets of the same lead shielding needed to drop the reading to less than 5 mr/hr at a distance of 10 ft?

a. 1
b. 3
c. 5
d. 7 Answer:

B.03

c.

Reference:

Two inches = one-half thickness (T1/2). Using 5 half-thickness will drop the dose by a factor of (1/2)5 = 1/32 100/32 = 3.13

Section B Normal/Emergency Procedures & Radiological Controls Question B.04

[1.0 point]

(4.0)

The following statement from the PSBR TS is a good example of a(n) ____________

requirement.

The maximum excess reactivity above cold, clean, critical plus samarium poison of the core configuration with experiments and experimental facilities in place SHALL be 4.9% k/k

(~$7.00).

a. Surveillance
b. Limiting Safety System Settings (LSSS)
c. Administrative
d. Limiting Condition for Operation (LCO)

Answer:

B.04

d.

Reference:

AP-5 and PSBR TS, Section 3.1.2 Question B.05

[1.0 point]

(5.0)

In accordance with the facility Emergency Plan, a tornado event which damages the PSBR confinement structure is a good example of a(n) type event classification.

a. Unusual Event
b. Alert
c. Site Area Emergency
d. General Emergency Answer:

B.05

b.

Reference:

EP-1, PSBR Emergency Procedure, Rev. 15 Question B.06

[1.0 point]

(6.0)

A small radioactive source is to be stored in an accessible area of the reactor building. The source reads 2 R/hr at 1 foot. Assuming no shielding is to be used, a Radiation Area barrier would have to be erected from the source at least a distance of approximately:

a. 400 feet
b. 40 feet
c. 20 feet
d. 10 feet Answer:

B.06

c.

Reference:

DR1D12 = DR2D22

Section B Normal/Emergency Procedures & Radiological Controls Question B.07

[1.0 point]

(7.0)

Which ONE of the following would be classified as an OPERATIONAL EVENT?

a. Operation in violation of a safety limit
b. Release of fission products from a fuel element
c. Unanticipated reactivity change greater than $1.00
d. Reactor scram Answer:

B.07

d.

Reference:

AP-4. - B.2 Question B.08

[1.0 points, 0.25 each]

(8.0)

Deletd by the examiner Match the requirements (10 CFR 55) for maintaining an active operator license in column A with the correct time period from column B.

Column A Column B

1.

Renewal of license

a.

4 months

2.

Medical examination

b.

1 year

3.

Console manipulation evaluation

c.

2 years

4.

Requalification exam (written)

d.

6 years Answer: B.08 1 = d; 2; = c; 3 = b; 4 = c

Reference:

10CFR55 Question B.09

[1.0 point]

(9.0)

Which one of the following statements describes the basis for the Safety Limit?

a. High fuel temperature could result in clad melt.
b. Excessive gas pressure may result in loss of fuel element cladding integrity.
c. High fuel temperature combined with lack of adequate cooling could result in fuel melt.
d. Excessive hydrogen produced as a result of the zirconium-water reaction is potentially explosive.

Answer:

B.09

b.

Reference:

T.S. 2.1 - Basis

Section B Normal/Emergency Procedures & Radiological Controls Question B.10

[1.0 point]

(10.0)

Reactor operations are being conducted around the clock over the weekend, during which time the Reactor Operator (RO) becomes ill and is taken to the hospital. Only the Senior Reactor Operator (SRO) and an experienced student remain in the facility. Reactor operations:

a. must be discontinued because both an RO and an SRO must be in the facility to satisfy PSBR Administrative Policy
b. must be discontinued because both an RO and an SRO must be in the facility to satisfy Technical Specifications
c. may continue until a replacement RO can arrive at the facility within 30 minutes
d. may continue since the SRO can monitor the console while the student makes the required periodic tours Answer:

B.10

a.

Reference:

AP-1 Question B.11

[1.0 point]

(11.0)

Finger ring dosimetry is typically issued for monitoring the exposure to the skin of the extremities.

What is the 10 CFR 20 annual limit associated with determination of the shallow dose equivalent?

a. 100 millirem
b. 500 millirem
c. 5 rem
d. 50 rem Answer:

B.11

d.

Reference:

10 CFR 20 Question B.12

[1.0 point]

(12.0)

A building evacuation alarm has just sounded. Where would you expect most people to muster IMMEDIATELY after acknowledging the alarm and need to evacuate from the PSBR?

a. Reactor Bay
b. PSBR Lobby
c. Academic Projects Building
d. Entry gate at the lower end of the parking lot Answer:

B.12

d.

Reference:

EP-13 Building Evacuation, Rev.4

Section B Normal/Emergency Procedures & Radiological Controls Question B.13

[1.0 point, 0.25 points each]

(13.0)

Match type of radiation (1 thru 4) with the proper penetrating power (a thru d)

a. Gamma 1. Stopped by thin sheet of paper
b. Beta 2. Stopped by thin sheet of metal
c. Alpha 3. Best shielded by light material
d. Neutron 4. Best shielded by dense material Answer:

B.13

a. = 4;
b. = 2;
c. = 1;
d. = 3

Reference:

Reactor Training Manual - Health Physics Question B.14

[1.0 point]

(14.0)

Prior to insertion into a pneumatic transfer system, a rabbit sample must be inspected by:

a. the reactor operator
b. the Health Physics office
c. the experimenter
d. the senior reactor operator Answer:

B.14 d

Reference:

SOP-9.

Question B.15

[1.0 point]

(15.0)

In the event of a credible bomb threat, the person receiving the threat should...

a. ask the person making the threat for his name and address.
b. call 911 after the call has ended.
c. immediately activate the Emergency Plan.
d. immediately evacuate the reactor building and proceed to the facility gate.

Answer:

B.15 a

Reference:

PSBR EP-8

Section B Normal/Emergency Procedures & Radiological Controls Question B.16

[1.0 point]

(16.0)

A room contains a source which, when exposed, results in a general area dose rate of 175 millirem per hour. This source is scheduled to be exposed continuously for 35 days. Select an acceptable method for controlling radiation exposure from the source within this room.

a. Lock the room to prevent inadvertent entry into the room.
b. Equip the room with a device to visually display the current dose rate within the room.
c. Equip the room with a motion detector that will alarm in the control room.
d. Post the area with the words "Danger-Radiation Area".

Answer:

B.16

a.

Reference:

PSBR Training Manual, Chapter 7 and 10CFR20.1601(a)(3)

Question B.17

[1.0 point]

(17.0)

The Safety System channels required to be operable in all modes of operation are:

a. fuel element temperature scram, reactor high power scram, and manual scram
b. fuel element temperature scram and manual scram
c. manual scram and reactor high power scram
d. reactor high power scram, detector power supply scram, and fuel element temperature scram Answer:

B.17

b.

Reference:

T.S. 3.2.4 Question B.18

[1.0 point]

(18.0)

Complete the following sentence. According to PSBR technical specifications, the time from SCRAM initiation to the full insertion of any control rod from a full up position SHALL be less than second(s).

a. 0.1
b. 0.5
c. 1
d. 2 Answer:

B.18

c.

Reference:

AP-5 PSU Technical specification 3.2.6 Scram Time

Section B Normal/Emergency Procedures & Radiological Controls Question B.19

[1.0 point]

(19.0)

The capsule in a pneumatic transfer system fails to return from the reactor core at the proper time. The reactor operator must:

a. turn off the RABBIT 1 fan
b. reduce power and notify the SRO
c. shutdown the reactor and turn off the RABBIT 1 fan and RABBIT 1 Master
d. investigate the cause of the alarm and, if necessary, contact the RPO.

Answer:

B.19

c.

Reference:

SOP-9.C.2 Question B.20

[1.0 point]

(20.0)

Which of the following statements is true regarding radiation safety protocol at the PSBR?

a. Category II individuals may escort a Category I individual only if they have watched the safety video first.
b. Category III individuals include police officers making routine checks.
c. Category II individuals may only perform work with sources of radiation only after watching the safety video.
d. Category I individuals do not have to watch the safety video and are typically escorted by Category III individuals.

Answer:

B.20

d.

Reference:

AP Radiation Protection Orientation RequirementsSection V.C - Category 3 includes student, staff, faculty, or facility industrial users working independently Section V.B - Category 2 individuals may have access to the facility during normal working hours (but may not independently work with radioactive materials or escort Category 1 persons) after receiving the following orientation Sections V.A - Category 1 individuals shall be accompanied by a Category 3 qualified individual who is authorized to serve as an escort

Section C Facility and Radiation Monitoring Systems Question C.01

[1.0 point]

(1.0)

What instrumentation region associated with the voltage is such that every primary ion produces an avalanche of secondary ions? This region also cannot differentiate between types of radiation.

a. Region I, Recombination
b. Region II, Ionization
c. Region III, Proportional
d. Region V, Geiger-Mueller Answer:

C.01

d.

Reference:

PSBR Training Manual Chapter 4.1.1 Question C.02

[1.0 point]

(2.0)

Which ONE of the following is the purpose of the diffuser on the N-16 recirculation pump?

a. Increase heat transfer rate due to increased mixing within the core
b. Increase transport time for N16 to reach the surface of the pool
c. Breakup O16 bubbles in pool, thereby decreasing production of N16
d. Decrease the activation rate of O16 to N16 due to reduced time in the core Answer:

C.02

b.

Reference:

PSBR SAR 5.6 Question C.03

[1.0 point]

(3.0)

What status alarm message will be indicated if the secondary outlet pressure is NOT greater than the primary inlet pressure by the preset amount?

a. Heat exchanger differential pressure low
b. Heat exchanger differential pressure high
c. Reactor pool level low
d. Reactor pool level high Answer:

C.03

a.

Reference:

PSBR Training Manual Chapter 5.2.5

Section C Facility and Radiation Monitoring Systems Question C.04

[1.0 point]

(4.0)

PSBR Technical Specifications requires fuel elements be stored in a safe array where the MAXIMUM keff is _______.

a. 0.6
b. 0.7
c. 0.8
d. 0.9 Answer:

C.04

c.

Reference:

PSBR Technical Specifications 5.4.a Question C.05

[1.0 point]

(5.0)

A signal of notification to Penn State University Police Services is initiated by:

a. reactor bay truck door open.
b. UPS battery low.
c.

emergency exhaust system initiation.

d. DCC-Z watchdog trip.

Answer:

C.05

b.

Reference:

PSBR Training Manual, 4.2.9.1bv - Facilities Systems Support pg. 51 Question C.06

[1.0 point]

(6.0)

Which ONE of the following materials is inserted in the top and bottom of the active fuel portion of each fuel element to reduce neutron leakage?

a. Aluminum
b. Boron
c. Cadmium
d. Graphite Answer:

C.06

d.

Reference:

PSBR Training Manual Chapter 5.1.4

Section C Facility and Radiation Monitoring Systems Question C.07

[1.0 point]

(7.0)

Which ONE of the following will initiate a reactor step back?

a. Pool outlet conductivity low
b. Reactor key on
c. Fuel temperature high
d. Facility exhaust is off Answer:

C.07

c.

Reference:

PSBR Training Manual Chapter 4.2.9.1i Question C.08

[1.0 point]

(8.0)

The power range channel consists of:

a. A gamma ion chamber, in-core thermocouples, and the wide range monitor
b. A fission chamber, wide range channel, and power range monitor
c. A gamma ion chamber, in-core thermocouples, and the power range monitor
d. A fission chamber, gamma ion chamber, and in-core thermocouples Answer:

C.08

c.

Reference:

PSBR SAR 7.2.3.1 & Training Manual 4.2.3 & 4.2.7 Question C.09

[1.0 point]

(9.0)

The pneumatic transfer system uses ________ to reduce the production of ________.

a. CO2, N16
b. CO2, Ar41
c. Compressed air, Ar41
d. D2O, N16 Answer:

C.21

b.

Reference:

PSBR SAR 10.2.6

Section C Facility and Radiation Monitoring Systems Question C.10

[1.0 point, 0.25 each]

(10.0)

Match the control rod drive mechanism from Column A with the correct function in Column B.

Column A Column B

a. Potentiometer
1. Switch will reverse position according to whether the magnet is at or above its completely depressed position
b. Rod down limit switch
2. Provides rod position indication
c. Drive up limit switch
3. Switch reverses position according to whether the magnet is at or below its full up position
d. Drive down limit switch 4. Foot is depressed by armature when rod is fully lowered Answer:

C.10

a. = 2;
b. = 4;
c. = 3;
d. = 1

Reference:

PSBR Training Manual 4.2.11 Question C.11

[1.0 point]

(11.0)

Which ONE of the following radiation monitoring systems will NOT activate the emergency evacuation alarm upon receipt of a high radiation alarm?

a. Reactor pump room
b. Reactor bay air west
c. Co60 bay
d. Beam laboratory Answer:

C.11

a.

Reference:

PSBR SAR 7.7 Question C.12

[1.0 point, 0.33 each]

(12.0)

Match the exhaust system filter in Column A with its purpose in Column B Column A Column B

a. Pre-filter
1. High efficiency for removing fission gases
b. Absolute filter
2. Filter atmospheric dust
c. Carbon filter
3. High efficiency for removing particulate radiation Answer:

C.12

a. = 2;
b. = 3;
c. = 1

Reference:

PSBR Training Manual 5.3.4.1

Section C Facility and Radiation Monitoring Systems Question C.13

[1.0 point]

(13.0)

Which one of the following is correct for the air compressors?

a. Compressed air for the facility is provided by two air compressors located in the demineralizer room.
b. Either air compressor can supply the entire system.
c. Normally, the 20 horsepower air compressor supplies the reactor transient rod, and the 1.5 horsepower air compressor supplies the rest of the facility.
d. Both compressors are set to start at 60 psig and stop at 120 psig, are equipped with a low pressure alarm at 55 psig, and deliver air at about 80 psig to both the transient rod and the rest of the facility.

Answer:

C.13

b.

Reference:

PSBR Training Manual, Section 5.3.1 Question C.14

[1.0 point]

(14.0)

PSBR uses the Compensated Ion Chamber as what measuring channel?

a. Linear power channel
b. Wide range monitor
c. Percent power channel
d. Not used as a measuring channel, used in experimental work Answer:

C.14

d.

Reference:

PSBR Training Manual 4.1.6 Question C.15

[1.0 point]

(15.0)

Which ONE of the following experimental facilities provides for the irradiation of samples at the point of maximum neutron flux?

a. Central thimble
b. Vertical tubes
c. Beam ports
d. Pneumatic transfer system Answer:

C.15

a.

Reference:

PSBR SAR 10.2.5

Section C Facility and Radiation Monitoring Systems Question C.16

[1.0 point]

(16.0)

Which region of the pulse size versus applied voltage characteristic curve does the fission chamber operate?

a. Proportional
b. Limited proportional
c. Geiger-Mueller
d. Ion chamber Answer:

C.16

a.

Reference:

PSBR Training Manual 4.1.1 Figure 4.1 and 4.1.7 Question C.17

[1.0 point]

(17.0)

Per PSBR TS, what MAXIMUM water temperature would result in an alarm and an automatic stepback?

a. 35oC
b. 60oC
c. 110oF
d. 120oF Answer:

C.17

a.

Reference:

PSBR TS 3.3.6 Question C.18

[1.0 point]

(18.0)

Which ONE of the following statements describes the moderating properties of zirconium-hydride in the PSBR TRIGA fuel elements when temperature increases?

a. The ratio of hydrogen atoms to zirconium atoms increases the effectiveness of the moderator
b. The probability that a neutron will return to the fuel element before being captured elsewhere is a function of the temperature of the hydride
c. Elevation of the hydride temperature increases the probability that a thermal neutron will escape the fuel-moderator element before being captured
d. The hydride mixture is very effective in slowing down neutrons with energies below 0.025 eV Answer:

C.18

c.

Reference:

PSBR SAR 4.2.3

Section C Facility and Radiation Monitoring Systems Question C.19

[1.0 point]

(19.0)

Which ONE of the following conditions will automatically scram the operating reactor?

a. 18.25 feet of water above the top of the bottom grid plate
b. 102% reactor power
c. Bulk pool water temperature = 40oC
d. Loss of high voltage to the percent power channel Answer:

C.19

d.

Reference:

PSBR TS 3.2.4, 3.3.1, & 3.3.6 Question C.20

[1.0 point]

(20.0)

Which ONE of the following is the neutron absorber in the PSBR reactor control rods?

a. Powdered graphite
b. Zirconium hydride
c. Powered boron carbide
d. Aluminum oxide Answer:

C.20

c.

Reference:

PSBR Training Manual Chapter 5.1.6