ML17262B053: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML17262B053
| number = ML17262B053
| issue date = 09/30/1992
| issue date = 09/30/1992
| title = Monthly Operating Rept for Sept 1992 for Re Ginna Nuclear Power Plant.W/921015 Ltr
| title = Monthly Operating Rept for Sept 1992 for Re Ginna Nuclear Power Plant
| author name = Dodge R, Mecredy R
| author name = Dodge R, Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ycczI.FR<rFo pgvgauvrow ozMo                                         pa.prox         svsvzM
{{#Wiki_filter:ycczI.FR<rFo pgvgauvrow ozMo pa.prox svsvzM
    ,g "\
,g
                                                                                                /
"\\
ACCESSION NBR:9210200504             DOC.DATE:,92/09/30 NOTARIZED: NO                     DOCKET &#xb9; FACIL:50-;.244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                     G 05000244 AUTQ.NAME             AUTHOR AFFILIATION DODGE,R.E.           Rochester Gas & Electric Corp.
/
MECREDY,R.C.         Rochester Gas & Electric Corp.
ACCESSION NBR:9210200504 DOC.DATE:,92/09/30 NOTARIZED: NO DOCKET &#xb9; FACIL:50-;.244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
RECIP.NAME           RECIPIENT AFFILIATION Monthly operating rept         for Sept 1992         for     Ginna Nuclear l
05000244 AUTQ.NAME AUTHOR AFFILIATION DODGE,R.E.
                                                      'UBJECT:
Rochester Gas
RE Power Plant.W/921015         ltr.
& Electric Corp.
DISTRIBUTION CODE: ZE24D         COPIES RECEIVED:LTR /               ENCL      SIZE:
MECREDY,R.C.
TITLE: Monthly Operating Report (per Tech Spec                     )
Rochester Gas
NOTES:License Exp date       in accordance with 10CFR2,2.109(9/19/72);                   05000244 S RECIPIENT           COPIES                    RECIPIENT          COPIES ID CODE/NAME           LTTR ENCL                ID CODE/NAME      LTTR ENCL PD1-3 LA                   3      3      PD1-3 PD                      1    1 JOHNSONiA                   1      1 INTERNAL: AEOD/DOA                     1      1      AEOD/DSP/TPAB                1    1 NRR DLPQ LPEB10             1      1      NRR/DOEA/OEAB                1    1 G FI         01        1      1      RGN1                          1    1 EXTERNAL: EG&G BRYCEiJ.H               1      1      NRC PDR                      1    1 NSIC                   ~
& Electric Corp.
1      1
RECIP.NAME RECIPIENT AFFILIATION
    ~go p~>po     pp (g p NOTE TO ALL "RIDS" RECIPIENTS:
'UBJECT:
Monthly operating rept for Sept 1992 for RE Ginna Nuclear Power Plant.W/921015 ltr.
DISTRIBUTION CODE:
ZE24D COPIES RECEIVED:LTR
/
ENCLl SIZE:
TITLE: Monthly Operating Report (per Tech Spec
)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72);
05000244 S
RECIPIENT ID CODE/NAME PD1-3 LA JOHNSONiA INTERNAL: AEOD/DOA NRR DLPQ LPEB10 G FI 01 EXTERNAL: EG&G BRYCEiJ.H NSIC
~go p~>po pp (g p COPIES LTTR ENCL 3
3 1
1 1
1 1
1 1
1 1
1
~
1 1
RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN1 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               14         ENCL   14
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 14


HgV y civvy       uzztz                                                           I ~ t OAIIS
y civvy uzztz
    >'III(ij(jr'Zrieruu 4
>'III(ij(jr'Zrieruu I re:ill ZixrZ 4
I re:ill     ZixrZ                                                                         j $ VAlE ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 TELEPHONE AREA CODE 7IE 546-2700 GINNA STATION October 15, 1992 US     Nuclear Regulatory Commission Document             Control Desk Washington,             DC 20555
ROCHESTER GAS HgV I ~ t OAIIS j
$VAlE AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 TELEPHONE AREA CODE 7IE 546-2700 GINNA STATION October 15, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555


==Subject:==
==Subject:==
Monthly Report for September, 1992 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244
Monthly Report for September, 1992 Operating Status Information R.
 
E. Ginna Nuclear Power Plant Docket No. 50-244
==Dear        Sir:==


==Dear Sir:==
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of September, 1992.
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of September, 1992.
Very truly yours, Robert C. Mec edy RCM/
Very truly yours, Robert C.
Attachments cc:. Mr. Thomas T. Martin             NRC (1) 2QO'8,08 9210200504 '720930 PDR       ADOCK 05000244 R                           PDR
Mec edy RCM/
Attachments cc:.
Mr. Thomas T. Martin NRC (1) 2QO'8,08 9210200504
'720930 PDR ADOCK 05000244 R
PDR


c OPERATING DATA REPORT DOCKET NO. 50-244 DATE    Octo   r 15   1992 COMPLETED BY Robert E. Dodge TELEPHONE     315   524-4446   ext. 396
c OPERATING DATA REPORT DOCKET NO.
      %%RATING STATUS
DATE COMPLETED BY 50-244 Octo r 15 1992
: 1.       Unit Name: R.E GINHA NUCLEAR P(NER PUUIT                               Notes: The unit operated at approx.
%%RATING STATUS Robert E. Dodge TELEPHONE 315 524-4446 ext. 396 1.
: 2.        Reporting Period:         Se tember   1992                                         97% reactor power level for
2.
: 3.        Licensed Thermal Power (Wt):                 1520                                 the entire report period.
3.
: 4.        Nameplate Rating (Gross MWe):                 490 5  ~      Design Electrical Rating (Het We):             470
4.
: 6.        MaxicLm Dependable Capacity (Gross MWe):       490
5 ~
: 7.        Maxiram Dependable Capacity (Het MWe):         470
6.
: 8.        If Changes Occur in Capacity Ratings (Items Humber 3 Through 7) Since Last Report, Give Reasons:
7.
: 9.       Power Level to Which Restricted, If Any (Net MWe):
8.
: 10.       Reasons For Restrictions, If Any:
Notes:
This Month       Yr.-to-gate             Cunuiative
The unit operated at approx.
: 11.       Hours In Report Period                                   720                6 575                  200 681.45
97% reactor power level for the entire report period.
: 12.      Nwher of Hours Reactor Was Critical                     720                5 424.71              158 755.67
Unit Name:
: 13.      Reactor Reserve Shutdown Hours                                                                       1 687.55    *
R.E GINHA NUCLEAR P(NER PUUIT Reporting Period:
: 14.      Hours Generator On-Line                                 720                5 328.75              156 034.13
Se tember 1992 Licensed Thermal Power (Wt):
: 15.      Unit Reserve Shutdown Hours                                                                               8.5    *
1520 Nameplate Rating (Gross MWe):
: 16.      Gross Thermal Energy Generated (MWH)               1 059 758            7 574 10S            220 788 621
490 Design Electrical Rating (Het We):
: 17.      Gross Electrical Energy Generated (HWH)             357 488            2 560 097              72 889 704
470 MaxicLm Dependable Capacity (Gross MWe):
: 18.      Net Electrical Energy Generated (MWH)               339 653            2 429 704              69 182 251
490 Maxiram Dependable Capacity (Het MWe):
: 19.      Unit Service Factor                                     100%                   81.05%                   77.91%
470 If Changes Occur in Capacity Ratings (Items Humber 3 Through 7) Since Last Report, Give Reasons:
: 20.       Unit  Availability Factor                                100%                   S1.05%                   77.91%
9.
: 21.      Unit  Capacity Factor (Using  MDC Het)                  100.37%                78.62%                   74.69%
Power Level to Which Restricted, If Any (Net MWe):
: 22.       Unit  Capacity Factor (Using  DER Net)                  100.37%               78.62%                   74.69%
10.
: 23.       Unit  Forced Outage Rate                                                        2.85%                     5.95/
Reasons For Restrictions, If Any:
: 24.       Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
This Month Yr.-to-gate Cunuiative 11.
Refuelin and Maintenance - March 19 1993 45 da s
12.
: 25.       If Shut Down At End Of Report Period, Estimated Date of Startup:
13.
: 26.       Units In Test Status (Prior to Ccmnercial Operation):                     Forecast               Achieved INITIAL CRITICALITY INITIAL ELECTRICITY CCMMERCIAL OPERATION
14.
      *CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975
15.
    **CUMULATIVE TOTAL COMMEHCIHG NOVEMBER     8, 1969
16.
17.
18.
19.
20.
21.
22.
23.
Hours In Report Period Nwher of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (HWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Het)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate 720 720 720 1 059 758 357 488 339 653 100%
100%
100.37%
100.37%
6 575 5 424.71 5 328.75 7 574 10S 2 560 097 2 429 704 81.05%
S1.05%
78.62%
78.62%
2.85%
200 681.45 158 755.67 1 687.55 156 034.13 8.5 220 788 621 72 889 704 69 182 251 77.91%
77.91%
74.69%
74.69%
5.95/
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refuelin and Maintenance
- March 19 1993 45 da s 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
26.
Units In Test Status (Prior to Ccmnercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY CCMMERCIAL OPERATION
*CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975
**CUMULATIVE TOTAL COMMEHCIHG NOVEMBER 8, 1969


e                   t                             t AVERAGE DAILY UNIT POWER LEVEL 50-244 DOCKET NO.
e t
UNIT R.E. Ginna Nuclear Power   Plant DATE Octobe   15 1992 COMPLETED BY Robert E. Do ge TELEPHONE 1 315   524-4446   ext. 396 MONTH      Se tember   1992 DAY AVERAGE DAILY POWER LEVEL           DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                              (MWe-Net) 1~           472                       17.           471
t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
: 2.           472                       18.           473 3 ~           472                       19.           473 472                       20.           474
UNIT DATE COMPLETED BY 50-244 R.E.
: 5.           382                      21.           474
Ginna Nuclear Power Plant Octobe 15 1992 Robert E.
: 6.           474                       22.           474
Do ge MONTH TELEPHONE 1
: 7.            474                      23.           475
315 524-4446 ext.
: 8.            478                      24.           475
396 Se tember 1992 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
: 9.            475                      25.           475
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
: 10.          475                      26.           477 473                      27.           480
472 17.
: 12.           473                       28.           477
471 2.
: 13.           472                       29.           478
472 18.
: 14.           473                       30.           478
473 3
: 15.           473                       31 ~
~
: 16.           473 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
472 19.
473 5.
472 382 20.
21.
474 474 6.
7.
8.
9.
10.
474 474 478 475 475 473 22.
23.
24.
25.
26.
27.
474 475 475 475 477 480 12.
473 28.
477 13.
472 29.
478 14.
473 30.
478 15.
473 31 ~
16.
473 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.


1)O(:Kl:1'O.           SO-244 UNITNAhtl'. R E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS
1)O(:Kl:1'O.
(:Oht P LI:.TI:D It Y ge REPORT MONTH     ~~BR 1992               1.FI FpljONir 315 524 4446         ext 39 ohio o o C4 C
SO-244 UNITNAhtl'. R E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS
0 ocoo-00 ca l.icensee       Ew 0
(:OhtP LI:.TI:D ItY ge REPORT MONTH ~~BR 1992 1.FI FpljONir 315 524 4446 ext 39 Ho.
c 0 Ih C                    Cause   5 Corrective Ho.            Date                    IA                      Event            0      0 D                          Action to a~ o      0      >                              lO        Q 0
Date o
0                                          0                              Prevent Recurrence A~                                Report tx.'IA 4      IA tL                C                        Q 0
o a
O Cl 92-07         09-05-92 S         0                                                               Planned maintenance on transmission lines.
~
3 F: Forced             Reason:                                               Method:                                Fxhibit G - Instructions St    Scheduled      A-Etluipment Failure (Explain)                       I-Manual                              for Preparation of Data B-Maintenance or Test                                 2-Manual Scram.                        Entry Sheets for Licensee C-Refueling                                           3-Automatic Scram.                    Event Report (LER) File (NUREG-D-Regulatory Restriction                             4-Other (Explain)                      ol6I)
o A~
E&perator Training & License Exatnination F-Administrative G-Operational Error (Explain)
C4 C0 IA00 tL ca o-0 oco0 ohio tx.'IA C
REV. 4/8$ 4949          Hither (Explain)                                                                             Exhibit I - Same Source
0 Cl l.icensee Event Report 4
Ew 0
0 lO 0 IA Q c0 Ih 0C Q
D0 O
Cause 5 Corrective Action to Prevent Recurrence 92-07 09-05-92 S
0 Planned maintenance on transmission lines.
F: Forced St Scheduled REV. 4/8$
4949 Reason:
A-Etluipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training & License Exatnination F-Administrative G-Operational Error (Explain)
Hither (Explain) 3 Method:
I-Manual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-ol6I)
Exhibit I - Same Source


NARRATIVE  
NARRATIVE  


==SUMMARY==
==SUMMARY==
OP OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power   Plant DATE October 15   1992 COMPLETED BY Robert E. Dodge TELEPHONE 1 315   524-4446   ext. 396 MONTH     Se tember 1992 The unit operated at approximately 97% Reactor Power Level for the entire month of September, with the exception on September 5, 1992. A power reduction to 61% was initiated to perform mainten-ance on transmission lines and returned to full power that same day.}}
OP OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE October 15 1992 COMPLETED BY Robert E.
Dodge TELEPHONE 1
315 524-4446 ext.
396 MONTH Se tember 1992 The unit operated at approximately 97% Reactor Power Level for the entire month of September, with the exception on September 5,
1992.
A power reduction to 61% was initiated to perform mainten-ance on transmission lines and returned to full power that same day.}}

Latest revision as of 10:18, 8 January 2025

Monthly Operating Rept for Sept 1992 for Re Ginna Nuclear Power Plant
ML17262B053
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/30/1992
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9210200504
Download: ML17262B053 (6)


Text

ycczI.FR<rFo pgvgauvrow ozMo pa.prox svsvzM

,g

"\\

/

ACCESSION NBR:9210200504 DOC.DATE:,92/09/30 NOTARIZED: NO DOCKET ¹ FACIL:50-;.244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTQ.NAME AUTHOR AFFILIATION DODGE,R.E.

Rochester Gas

& Electric Corp.

MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

'UBJECT:

Monthly operating rept for Sept 1992 for RE Ginna Nuclear Power Plant.W/921015 ltr.

DISTRIBUTION CODE:

ZE24D COPIES RECEIVED:LTR

/

ENCLl SIZE:

TITLE: Monthly Operating Report (per Tech Spec

)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72);

05000244 S

RECIPIENT ID CODE/NAME PD1-3 LA JOHNSONiA INTERNAL: AEOD/DOA NRR DLPQ LPEB10 G FI 01 EXTERNAL: EG&G BRYCEiJ.H NSIC

~go p~>po pp (g p COPIES LTTR ENCL 3

3 1

1 1

1 1

1 1

1 1

1

~

1 1

RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN1 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14

y civvy uzztz

>'III(ij(jr'Zrieruu I re:ill ZixrZ 4

ROCHESTER GAS HgV I ~ t OAIIS j

$VAlE AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 TELEPHONE AREA CODE 7IE 546-2700 GINNA STATION October 15, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for September, 1992 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of September, 1992.

Very truly yours, Robert C.

Mec edy RCM/

Attachments cc:.

Mr. Thomas T. Martin NRC (1) 2QO'8,08 9210200504

'720930 PDR ADOCK 05000244 R

PDR

c OPERATING DATA REPORT DOCKET NO.

DATE COMPLETED BY 50-244 Octo r 15 1992

%%RATING STATUS Robert E. Dodge TELEPHONE 315 524-4446 ext. 396 1.

2.

3.

4.

5 ~

6.

7.

8.

Notes:

The unit operated at approx.

97% reactor power level for the entire report period.

Unit Name:

R.E GINHA NUCLEAR P(NER PUUIT Reporting Period:

Se tember 1992 Licensed Thermal Power (Wt):

1520 Nameplate Rating (Gross MWe):

490 Design Electrical Rating (Het We):

470 MaxicLm Dependable Capacity (Gross MWe):

490 Maxiram Dependable Capacity (Het MWe):

470 If Changes Occur in Capacity Ratings (Items Humber 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

This Month Yr.-to-gate Cunuiative 11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

Hours In Report Period Nwher of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (HWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Het)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate 720 720 720 1 059 758 357 488 339 653 100%

100%

100.37%

100.37%

6 575 5 424.71 5 328.75 7 574 10S 2 560 097 2 429 704 81.05%

S1.05%

78.62%

78.62%

2.85%

200 681.45 158 755.67 1 687.55 156 034.13 8.5 220 788 621 72 889 704 69 182 251 77.91%

77.91%

74.69%

74.69%

5.95/

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance

- March 19 1993 45 da s 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

26.

Units In Test Status (Prior to Ccmnercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY CCMMERCIAL OPERATION

  • CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975
    • CUMULATIVE TOTAL COMMEHCIHG NOVEMBER 8, 1969

e t

t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY 50-244 R.E.

Ginna Nuclear Power Plant Octobe 15 1992 Robert E.

Do ge MONTH TELEPHONE 1

315 524-4446 ext.

396 Se tember 1992 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~

472 17.

471 2.

472 18.

473 3

~

472 19.

473 5.

472 382 20.

21.

474 474 6.

7.

8.

9.

10.

474 474 478 475 475 473 22.

23.

24.

25.

26.

27.

474 475 475 475 477 480 12.

473 28.

477 13.

472 29.

478 14.

473 30.

478 15.

473 31 ~

16.

473 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

1)O(:Kl:1'O.

SO-244 UNITNAhtl'. R E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS

(:OhtP LI:.TI:D ItY ge REPORT MONTH ~~BR 1992 1.FI FpljONir 315 524 4446 ext 39 Ho.

Date o

o a

~

o A~

C4 C0 IA00 tL ca o-0 oco0 ohio tx.'IA C

0 Cl l.icensee Event Report 4

Ew 0

0 lO 0 IA Q c0 Ih 0C Q

D0 O

Cause 5 Corrective Action to Prevent Recurrence 92-07 09-05-92 S

0 Planned maintenance on transmission lines.

F: Forced St Scheduled REV. 4/8$

4949 Reason:

A-Etluipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training & License Exatnination F-Administrative G-Operational Error (Explain)

Hither (Explain) 3 Method:

I-Manual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-ol6I)

Exhibit I - Same Source

NARRATIVE

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE October 15 1992 COMPLETED BY Robert E.

Dodge TELEPHONE 1

315 524-4446 ext.

396 MONTH Se tember 1992 The unit operated at approximately 97% Reactor Power Level for the entire month of September, with the exception on September 5,

1992.

A power reduction to 61% was initiated to perform mainten-ance on transmission lines and returned to full power that same day.