| number = ML18010A817
| number = ML18010A817
| issue date = 09/30/1992
| issue date = 09/30/1992
| title = Monthly Operating Rept for Sept 1992 for Harris Nuclear Power Plant Unit 1.W/921013 Ltr
| title = Monthly Operating Rept for Sept 1992 for Harris Nuclear Power Plant Unit 1
| author name = Crenshaw A, Vaughn G
| author name = Crenshaw A, Vaughn G
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:~cczr.ka.~~zv                   ra.~am~Ox ozwOX 8.~nOx SvSrnc REGULATOR% INFORMATION DISTRIBUTION YSTEM             (RIDS) r         '
{{#Wiki_filter:~cczr.ka.~~zv ra.~am~Ox ozwOX 8.~nOx SvSrnc REGULATOR% INFORMATION DISTRIBUTION YSTEM (RIDS) r FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAWiA.
DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                   05000400 AUTH. NAME             AUTHOR AFFILIATION CRENSHAWiA.           Carolina Power       &   Light Co.
Carolina Power
VAUGHNiG.E.           Carolina Power       &   Light Co.
& Light Co.
RECIP.NAME             RECIPIENT AFFILIATION
VAUGHNiG.E.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400


==SUBJECT:==
==SUBJECT:==
Monthly operating Power   Plant Unit     1 re~921013 epttr. 1992
Monthly operating re~
                                                -                for Harris Nuclear DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR             ENCL   SIZE:
ept 1992 for Harris Nuclear Power Plant Unit 1 921013 tr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application       for permit renewal filed.                                   05000400   ~
NOTES:Application for permit renewal filed.
RECIPIENT             COPIES              RECIPIENT          COPIES ID CODE/NAME           LTTR ENCL          ID CODE/NAME      LTTR ENCL PD2-1 LA                     3      3      PD2-1 PD              1    1 LE,N                         1      1 INTERNAL: ACRS                         10    10      AEOD/DOA              1    1 AEOD/DSP/TPAB               1     1       NRR/J~OLP /LPEB10     1    1 NRR/DOEA/OEAB                1      1      REC   V%LE       Ol   1     1 RGN2                        1     1 EXTERNAL    EG&G BRYCEg J H              1     1       NRC PDR                1     1 NSIC                        1
05000400
                                                                                                '0 NOTE TO ALL "RIDS" RECIPIENTS:
~
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL EG&G BRYCEg J H
NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NRR/J~OLP /LPEB10 REC V%LE Ol NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 NOTE TO ALL "RIDS" RECIPIENTS:
'0 PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 24   ENCL   24
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24


CNILL Carolina Power & Light Company P.O. Box 165 ~ New Hill, NC 27562 G. E. VAUGHN Vice President Harris Nuclear Project OCT   ) g 1992 File Number: SHF/10-15505 Letter Number: HO-923029 Document Control Desk United States Nuclear Regulatory Commission Washington,       DC   20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
CNILL Carolina Power & Light Company P.O. Box 165 ~ New Hill,NC 27562 G. E. VAUGHN Vice President Harris Nuclear Project OCT
)
g 1992 File Number:
SHF/10-15505 Letter Number:
HO-923029 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT


==Dear     Sirs:==
==Dear Sirs:==
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power
& Light Company herewith submits the report of operation statistics and shutdown experience for the month of September 1992.
Yours very truly, G.
E. Vaughn Vice President Harris Nuclear Project APC:dac Enclosure cc:
Mr. S.
D. Ebneter (NRC-RII)
Mr. R.
G. Oehl (DOE)
Mr. J.
E. Tedrow (NRC-SHNPP)
~s9210190271 920930
~
~
s r
<>t PDR
-" ADOCK 05000400 R
r PDR MIS/DATAREP/1/OS4 ZEWrr'1/


In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of September 1992.
~ ~
Yours very  truly, G. E. Vaughn Vice President Harris Nuclear Project APC:dac Enclosure cc:      Mr. S. D. Ebneter (NRC-RII)
Mr. R. G. Oehl (DOE)
Mr. J. E. Tedrow (NRC-SHNPP)
  ~s9210190271
      <>t
      ~
            ~                    920930 PDR      -"
ADOCK    05000400 R              r      s. r PDR MIS/DATAREP/1/OS4 ZEWrr'1/
 
  ~~
e
e


DOCKET NO.:             050-400 UNIT:             Harris Unit   1 DATE:           September 1992 COMPLETED BY:   Amanda Crenshaw OPERATIONS  
DOCKET NO.:
050-400 UNIT:
Harris Unit 1 DATE:
September 1992 COMPLETED BY:
Amanda Crenshaw OPERATIONS


==SUMMARY==
==SUMMARY==
 
Harris Unit 1 operated at 37.25 percent Availability Factor for the referenced month and a 33.78 percent Capacity Factor.
Harris Unit 1 operated at 37.25 percent Availability Factor for the referenced month and a 33.78 percent Capacity Factor. There was one significant power reduction and one refueling outage in September. Details are provided on the Unit Shutdowns and Power Reduction Sheets.
There was one significant power reduction and one refueling outage in September.
There are 157 fuel assemblies in the reactor vessel, 759 spent fuel assemblies stored in the Spent Fuel Pools. 413 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.       182 of the spent fuel assemblies are from CP&L's Robinson Plant. In addition to the spent fuel, 60 new fuel assemblies received from Westinghouse are in dry storage racks.
Details are provided on the Unit Shutdowns and Power Reduction Sheets.
There are 157 fuel assemblies in the reactor vessel, 759 spent fuel assemblies stored in the Spent Fuel Pools.
413 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.
182 of the spent fuel assemblies are from CP&L's Robinson Plant.
In addition to the spent fuel, 60 new fuel assemblies received from Westinghouse are in dry storage racks.
MISKDATAREP$2%0S4
MISKDATAREP$2%0S4


CPbL. CO RUM DATE   30/08/92       ~
CPbL. CO gg'INT PERFORMANCE DATA SYSTEM
gg'INT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT PAGE RPD36-000 RUH TIME - 14:13:57               HARRIS UNIT   1 DOCKET HO. 050-400 COMPLETED BY AMANDA CREHSHAM OPERATING STATUS                                        TELEPHONE   (919)362-2808 UNIT NAME: HARRIS UNIT 1                           NOTES 2 ~ REPORTIHG PERIOD: SEPTEMBER 92                   I 3 4 LICENSED THERMAL POWER <MWT): 2775               I See Operations Summary.
, RUM DATE 30/08/92
4,  HAMEPLATE RATING (GROSS NWE): 950.9             I 5 4 DESIGN ELECTRICAL RATING (NET MWE): '900.0
~
: 6. NAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 I 7 i MAX DEPENDABLE CAPACITY (NET MWE): 860.0
OPERATING DATA REPORT RUH TIME - 14:13:57 HARRIS UNIT 1
: 8. IF CHANGES OCCUR IH CAPACITY RATINGS <ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:     N/A POWER LEVEL TO WHICH RESTRICTED   IF AHY (HET NWE):         95/
PAGE RPD36-000 OPERATING STATUS DOCKET HO. 050-400 COMPLETED BY AMANDA CREHSHAM TELEPHONE (919)362-2808 2 ~
REASONS FOR. RESTRICTION IF ANY:     Due to problems with Governor Valve !/4, unit power was maintained at 95/ until the plant entered Refueling Outage number 4. The governor. valve will be repaired during the outage.
3 4 4,
THIS         YR TO         CUMUL MONTH          DATE          ATIVE HOURS IH REPORTING PERIOD                   720.00         6575.00        47496.00
5 4 6.
: 12. NUMBER OF HOURS REACTOR CRITICAL             268.22         5806.17        38794.17
7 i 8.
: 33. REACTOR RESERVE SHUTDOWN HRS                     .00              .00            .00 I4. HOURS GENERATOR ON LINE                     268.22         5777.05        38333.15 f5. UNIT RESERVE SHUTDOWN HOURS                     .80             .00            .00 f6. GROSS THERMAL ENERGY GEH. (NWH)         698101.20     (5539291.82    101535416.30 f7. GROSS ELEC. ENERGY GEH. (MWH)           231540.00       5197085.00    33798448.00
UNIT NAME:
: 18. NET ELEC. ENERGY GENERATED (MWH)         209)77.00      4852892.00    3)45)555.00 UNIT SERVICE FACTOR                         37.25           87.86          80.70
HARRIS UNIT 1
: 20. UNIT   AVAILABIL1TYFACTOR                     37 25           87.86          80. 70
NOTES REPORTIHG PERIOD:
: 21. UNIT   CAP. FACTOR (USING MDC NET)             33.78           85.82          77.00
SEPTEMBER 92 I
: 22. UNIT   CAP. FACTOR (USING DER HET)             32.28           82.0$          73.58
LICENSED THERMAL POWER
: 23. UNIT   FORCED OUTAGE RATE                         .00           5.65            4.13 24* SHUTDOMHS SCHED OVER HEXT 6 MOHTHS (TYPES'ATEJ AND DURATION OF EACH):
<MWT): 2775 I
Refueling Outage number 4 began on September 12, 1992 and is scheduled for completion November 21, 1992.
See Operations Summary.
: 25. IF SHUTDOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF START 'UP: 11-10 (Init.         Crit.)
HAMEPLATE RATING (GROSS NWE): 950.9 I
: 26. UNITS IH TEST STATUS (PRIOR TO COMNERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16  9 MIS/DATAREF/3/OS4
DESIGN ELECTRICAL RATING (NET MWE): '900.0 NAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 I
MAX DEPENDABLE CAPACITY (NET MWE): 860.0 IF CHANGES OCCUR IH CAPACITY RATINGS <ITEMS 3 THRU 7)
SINCE LAST REPORT, GIVE REASONS:
N/A POWER LEVEL TO WHICH RESTRICTED IF AHY (HET NWE):
95/
REASONS FOR. RESTRICTION IF ANY:
Due to problems with Governor Valve !/4, unit power was maintained at 95/ until the plant entered Refueling Outage number 4.
The governor. valve will be repaired during the outage.
THIS MONTH YR TO DATE CUMUL ATIVE HOURS IH REPORTING PERIOD 720.00 12.
NUMBER OF HOURS REACTOR CRITICAL 268.22 33.
REACTOR RESERVE SHUTDOWN HRS
.00 I4.
HOURS GENERATOR ON LINE 268.22 f5. UNIT RESERVE SHUTDOWN HOURS
.80 f6.
GROSS THERMAL ENERGY GEH.
(NWH) 698101.20 f7.
GROSS ELEC.
ENERGY GEH.
(MWH) 231540.00 18.
NET ELEC.
ENERGY GENERATED (MWH) 209)77.00 UNIT SERVICE FACTOR 37.25 20.
UNIT AVAILABIL1TYFACTOR 37 25 21.
UNIT CAP.
FACTOR (USING MDC NET) 33.78 22.
UNIT CAP.
FACTOR (USING DER HET) 32.28 23.
UNIT FORCED OUTAGE RATE
.00 24*
SHUTDOMHS SCHED OVER HEXT 6 MOHTHS (TYPES'ATEJ Refueling Outage number 4 began on September 12, for completion November 21, 1992.
6575.00 47496.00 5806.17 38794.17
.00
.00 5777.05 38333.15
.00
.00 (5539291.82 101535416.30 5197085.00 33798448.00 4852892.00 3)45)555.00 87.86 80.70 87.86
: 80. 70 85.82 77.00 82.0$
73.58 5.65 4.13 AND DURATION OF EACH):
1992 and is scheduled 25.
26.
IF SHUTDOWN AT EHD OF REPORT
: PERIOD, ESTIMATED DATE OF START 'UP: 11-10 (Init. Crit.)
UNITS IH TEST STATUS (PRIOR TO COMNERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS/DATAREF/3/OS4 1.16 9


E lf )
E lf )


CPIlL,. CO                   iNT   PERFORHANCE DATA SYSTEH               PAGE
CPIlL,. CO iNT PERFORHANCE DATA SYSTEH
~.RUN 'DATE   10/08/92   APPEAR IX B AVERAGE DAILY POWER LEVEL         RPD39-000 RUN TIHE     14:13:57               KARRIS UNIT i DOCKET NO. 050-400 COHPLETED BY AHANDA CRENSHAW TELEPHONE (919)362-2808 SEPTEHBER DAY     AVG. DAILY POWER LEVEL       DAY   AVG. DAILY POWER LEVEL (HWE-NET)                            (HWE-NET) 827                   18             -f2 825 20 827 828                   22 827 801 797 2$
~.RUN 'DATE 10/08/92 APPEAR IX B AVERAGE DAILY POWER LEVEL RUN TIHE 14:13:57 KARRIS UNIT i PAGE RPD39-000 SEPTEHBER DOCKET NO. 050-400 COHPLETED BY AHANDA CRENSHAW TELEPHONE (919)362-2808 DAY AVG. DAILY POWER LEVEL (HWE-NET)
798                   27 36 t5 f.fh 8 MIS/DATAREP/4/OS4
DAY AVG. DAILY POWER LEVEL (HWE-NET) 827 18
-f2 825 20 827 828 827 801 797 22 2$
798 27 36 t5 f.fh 8 MIS/DATAREP/4/OS4


h E
h E


5 V
5V H
H                                                UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:                             Harris DATE:                             10/06/92 COMPLETED BY:                A. P. Crenshaw TELEPHONE:                  (919) 362-2808 O
O UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: September 1992 UNIT NAME:
REPORT MONTH: September  1992 T1                      R~  Method                                                      Cause & Corrective No.       Date       y       Duration       e      of                        System    Component                    Action to (Hours)       a     Shutting    Event          Code 4    Code 5                Prevent Recurrence P
DATE:
e                      s Reactor'icensee Down      Report &#xb9; 0
COMPLETED BY:
n 92416   920911       S       0.00                             N/A           ZZ       ZZZZZ       Unit ramped down in preparation for refueling outage 4 which commenced on 9/1 2/92 at 04:13.
TELEPHONE:
1                 2                                                      3                      4 F: Forced         Reason:                                                Method:                Exhibit G-Instructions S: Scheduled       A-Equipment Failure (Explain)                         1-Manual                for Preparation of Data B-Maintenance or Test                                 2-Manual Scram          Entry Sheets for Licensee C-Refueling                                           3-Automatic Scram      Event Report (LER) File D-Regulatory Restriction                               4-Continued            (NUREG%161)
Harris 10/06/92 A. P. Crenshaw (919) 362-2808 No.
E-Operator Training & License Examination             5-Reduced Load F-Administrative                                      6-Other                 5 G-Operational Error (Explain)                                                 Exhibit 1 -Same Source H-Other (Explain)
Date T1 y
P e
Duration (Hours)
R~
e a
s 0
n Method of Shutting Down Reactor'icensee Event Report &#xb9; System Code 4 Component Code 5 Cause & Corrective Action to Prevent Recurrence 92416 920911 S
0.00 N/A ZZ ZZZZZ Unit ramped down in preparation for refueling outage 4 which commenced on 9/1 2/92 at 04:13.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG%161) 5 Exhibit 1 -Same Source


1>>
UNIT SHUTDOWNS AND POWER REDUCTION 1>>
f~ ~
f~ ~
Ik 4r 4
Ik4r 4
                                                                                                                                                                ~ ~
~
UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:                                         Harris DATE:                                           10/06/92 COMPLETED BY:                            A. P. Crenshaw TELEPHONE:                                (919) 362-2808 REPORT MONTH: September   1992 T'                    R~    Method                                                              Cause  8c Corrective No.       Date           Duration       e        of                    System      Component                          Action to (Hours)     a     Shutting      Event      Code 4      Code 5                      Prevent Recurrence P
~
e                      s Reactor'icensee Down        Report &#xb9; 0
UNIT NAME:
n 92%17      920912            451.78                              N/A         ZZ         ZZZZZ       Unit was shutdown for the scheduled cycle 5 refueling outage.
DATE:
1                   2                                                      3                        4 F: Forced           Reason:                                                Method:                  Exhibit G-Instructions S: Scheduled       A-Equipment Failure (Explain)                         1-Manual                for Preparation of Data 8-Maintenance or Test                                 2-Manual Scram          Entry Sheets for Licensee C-Refueling                                           3-Automatic Scram        Event Report (LER) File D-Regulatory Restriction                               4-Continued              (NUREG%1 61)
COMPLETED BY:
E-Operator Training & License Examination             5-Reduced Load F-Administrative                                      6-Other                 5 G-Operational Error (Explain)                                                   Exhibit 1 - Same Source H-Other (Explain)
TELEPHONE:
Harris 10/06/92 A. P. Crenshaw (919) 362-2808 REPORT MONTH: September 1992 No.
92%17 Date 920912 T'
P e
Duration (Hours) 451.78 R~
e a
s 0
n Method of Shutting Down Reactor'icensee Event Report &#xb9; N/A System Code 4 ZZ Component Code 5 ZZZZZ Cause 8c Corrective Action to Prevent Recurrence Unit was shutdown for the scheduled cycle 5 refueling outage.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain) 8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG%1 61) 5 Exhibit 1 - Same Source


p ~}}
p
~}}

Latest revision as of 06:40, 7 January 2025

Monthly Operating Rept for Sept 1992 for Harris Nuclear Power Plant Unit 1
ML18010A817
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/30/1992
From: Crenshaw A, Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-923029, NUDOCS 9210190271
Download: ML18010A817 (12)


Text

~cczr.ka.~~zv ra.~am~Ox ozwOX 8.~nOx SvSrnc REGULATOR% INFORMATION DISTRIBUTION YSTEM (RIDS) r FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAWiA.

Carolina Power

& Light Co.

VAUGHNiG.E.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Monthly operating re~

ept 1992 for Harris Nuclear Power Plant Unit 1 921013 tr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed.

05000400

~

RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL EG&G BRYCEg J H

NSIC COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NRR/J~OLP /LPEB10 REC V%LE Ol NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 NOTE TO ALL "RIDS" RECIPIENTS:

'0 PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

CNILL Carolina Power & Light Company P.O. Box 165 ~ New Hill,NC 27562 G. E. VAUGHN Vice President Harris Nuclear Project OCT

)

g 1992 File Number:

SHF/10-15505 Letter Number:

HO-923029 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power

& Light Company herewith submits the report of operation statistics and shutdown experience for the month of September 1992.

Yours very truly, G.

E. Vaughn Vice President Harris Nuclear Project APC:dac Enclosure cc:

Mr. S.

D. Ebneter (NRC-RII)

Mr. R.

G. Oehl (DOE)

Mr. J.

E. Tedrow (NRC-SHNPP)

~s9210190271 920930

~

~

s r

<>t PDR

-" ADOCK 05000400 R

r PDR MIS/DATAREP/1/OS4 ZEWrr'1/

~ ~

e

DOCKET NO.:

050-400 UNIT:

Harris Unit 1 DATE:

September 1992 COMPLETED BY:

Amanda Crenshaw OPERATIONS

SUMMARY

Harris Unit 1 operated at 37.25 percent Availability Factor for the referenced month and a 33.78 percent Capacity Factor.

There was one significant power reduction and one refueling outage in September.

Details are provided on the Unit Shutdowns and Power Reduction Sheets.

There are 157 fuel assemblies in the reactor vessel, 759 spent fuel assemblies stored in the Spent Fuel Pools.

413 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.

182 of the spent fuel assemblies are from CP&L's Robinson Plant.

In addition to the spent fuel, 60 new fuel assemblies received from Westinghouse are in dry storage racks.

MISKDATAREP$2%0S4

CPbL. CO gg'INT PERFORMANCE DATA SYSTEM

, RUM DATE 30/08/92

~

OPERATING DATA REPORT RUH TIME - 14:13:57 HARRIS UNIT 1

PAGE RPD36-000 OPERATING STATUS DOCKET HO. 050-400 COMPLETED BY AMANDA CREHSHAM TELEPHONE (919)362-2808 2 ~

3 4 4,

5 4 6.

7 i 8.

UNIT NAME:

HARRIS UNIT 1

NOTES REPORTIHG PERIOD:

SEPTEMBER 92 I

LICENSED THERMAL POWER

<MWT): 2775 I

See Operations Summary.

HAMEPLATE RATING (GROSS NWE): 950.9 I

DESIGN ELECTRICAL RATING (NET MWE): '900.0 NAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 I

MAX DEPENDABLE CAPACITY (NET MWE): 860.0 IF CHANGES OCCUR IH CAPACITY RATINGS <ITEMS 3 THRU 7)

SINCE LAST REPORT, GIVE REASONS:

N/A POWER LEVEL TO WHICH RESTRICTED IF AHY (HET NWE):

95/

REASONS FOR. RESTRICTION IF ANY:

Due to problems with Governor Valve !/4, unit power was maintained at 95/ until the plant entered Refueling Outage number 4.

The governor. valve will be repaired during the outage.

THIS MONTH YR TO DATE CUMUL ATIVE HOURS IH REPORTING PERIOD 720.00 12.

NUMBER OF HOURS REACTOR CRITICAL 268.22 33.

REACTOR RESERVE SHUTDOWN HRS

.00 I4.

HOURS GENERATOR ON LINE 268.22 f5. UNIT RESERVE SHUTDOWN HOURS

.80 f6.

GROSS THERMAL ENERGY GEH.

(NWH) 698101.20 f7.

GROSS ELEC.

ENERGY GEH.

(MWH) 231540.00 18.

NET ELEC.

ENERGY GENERATED (MWH) 209)77.00 UNIT SERVICE FACTOR 37.25 20.

UNIT AVAILABIL1TYFACTOR 37 25 21.

UNIT CAP.

FACTOR (USING MDC NET) 33.78 22.

UNIT CAP.

FACTOR (USING DER HET) 32.28 23.

UNIT FORCED OUTAGE RATE

.00 24*

SHUTDOMHS SCHED OVER HEXT 6 MOHTHS (TYPES'ATEJ Refueling Outage number 4 began on September 12, for completion November 21, 1992.

6575.00 47496.00 5806.17 38794.17

.00

.00 5777.05 38333.15

.00

.00 (5539291.82 101535416.30 5197085.00 33798448.00 4852892.00 3)45)555.00 87.86 80.70 87.86

80. 70 85.82 77.00 82.0$

73.58 5.65 4.13 AND DURATION OF EACH):

1992 and is scheduled 25.

26.

IF SHUTDOWN AT EHD OF REPORT

PERIOD, ESTIMATED DATE OF START 'UP: 11-10 (Init. Crit.)

UNITS IH TEST STATUS (PRIOR TO COMNERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS/DATAREF/3/OS4 1.16 9

E lf )

CPIlL,. CO iNT PERFORHANCE DATA SYSTEH

~.RUN 'DATE 10/08/92 APPEAR IX B AVERAGE DAILY POWER LEVEL RUN TIHE 14:13:57 KARRIS UNIT i PAGE RPD39-000 SEPTEHBER DOCKET NO. 050-400 COHPLETED BY AHANDA CRENSHAW TELEPHONE (919)362-2808 DAY AVG. DAILY POWER LEVEL (HWE-NET)

DAY AVG. DAILY POWER LEVEL (HWE-NET) 827 18

-f2 825 20 827 828 827 801 797 22 2$

798 27 36 t5 f.fh 8 MIS/DATAREP/4/OS4

h E

5V H

O UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: September 1992 UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Harris 10/06/92 A. P. Crenshaw (919) 362-2808 No.

Date T1 y

P e

Duration (Hours)

R~

e a

s 0

n Method of Shutting Down Reactor'icensee Event Report ¹ System Code 4 Component Code 5 Cause & Corrective Action to Prevent Recurrence 92416 920911 S

0.00 N/A ZZ ZZZZZ Unit ramped down in preparation for refueling outage 4 which commenced on 9/1 2/92 at 04:13.

1 F:

Forced S:

Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG%161) 5 Exhibit 1 -Same Source

UNIT SHUTDOWNS AND POWER REDUCTION 1>>

f~ ~

Ik4r 4

~

~

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Harris 10/06/92 A. P. Crenshaw (919) 362-2808 REPORT MONTH: September 1992 No.

92%17 Date 920912 T'

P e

Duration (Hours) 451.78 R~

e a

s 0

n Method of Shutting Down Reactor'icensee Event Report ¹ N/A System Code 4 ZZ Component Code 5 ZZZZZ Cause 8c Corrective Action to Prevent Recurrence Unit was shutdown for the scheduled cycle 5 refueling outage.

1 F:

Forced S:

Scheduled 2

Reason:

A-Equipment Failure (Explain) 8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG%1 61) 5 Exhibit 1 - Same Source

p

~