| title = Rev 15 to Emergency Operating Procedure EOP 8.1, Loca.
| title = Rev 15 to Emergency Operating Procedure EOP 8.1, Loca
| author name =  
| author name =  
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
Line 21: Line 21:
ENCLOSURE 2 ATTACHMENT 4 CONSUMERS POWER COMPANY PALISADES PLANT DOCKET 50-255 Emergency Operating Procedure EOP 8.1 "Loss Of Coolant Accident" (Abridged)
ENCLOSURE 2 ATTACHMENT 4 CONSUMERS POWER COMPANY PALISADES PLANT DOCKET 50-255 Emergency Operating Procedure EOP 8.1 "Loss Of Coolant Accident" (Abridged)
August 15, 1983 15 Pages
August 15, 1983 15 Pages
(--8308230464 830815 I   ~DR ADOCK 05000255
(--8308230464 830815  
                                'l PDR NU080983-NL01
'l I  
~DR ADOCK 05000255 PDR NU080983-NL01  


PALISADES NUCLEAR PLANT                             Proc No EOP 8.1 EMERGENCY OPERATING PROCEDURE                             Revision 15 Page 1 of 8 TITLE:   LOSS OF COOLANT ACCIDENT Definition:   Leak rate exceeds capacity of operable charging pumps.
PALISADES NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE TITLE:
1.0     SYMPTOMS Any one or more of the following symptoms may be present.
LOSS OF COOLANT ACCIDENT Definition:
: a. Standby Charging Pumps start.
Leak rate exceeds capacity of operable charging pumps.
1.0 SYMPTOMS Any one or more of the following symptoms may be present.
: a.
Standby Charging Pumps start.
CAUTION Pressurizer level may not be a true indication of PCS fluid inventory.
CAUTION Pressurizer level may not be a true indication of PCS fluid inventory.
: b. Pressurizer level abnormal.         (Low or High)
: b.
: c. Pressurizer low pressure.
Pressurizer level abnormal.
: d. Containment high radiation.
(Low or High)
: e. Containment high pressure and/or temperature.
: c.
: f. Containment high humidity.
Pressurizer low pressure.
: g. Containment sump level increasing.
: d.
: h. Volume Control Tank level decreasing.
Containment high radiation.
: i. Quench Tank high level, temperature or pressure.
: e.
: j. High startup rate alarm (Control Rod ejection).
Containment high pressure and/or temperature.
: k. High power level Reactor trip (Control Rod ejection).
: f.
2.0     AUTOMATIC ACTIONS
Containment high humidity.
        *a. Standby Charging Pumps start.
: g.
: b. Reactor trip.
Containment sump level increasing.
: c. Safety injection actuation.
: h.
: d. Containment spray actuation.
Volume Control Tank level decreasing.
: e. Containment isolation.
: i.
: f. Auxiliary Feedwater initiated.
Quench Tank high level, temperature or pressure.
: g. Main Steam Isolation Valves close on Containment High Pressure (5.3 psig) -k;'*E-50A, ;':;'*CV-0510, and ;':;'*E-5013, ;':;'*CV-0501.
: j.
pa0480-0015a-89-93
High startup rate alarm (Control Rod ejection).
: k.
High power level Reactor trip (Control Rod ejection).
2.0 AUTOMATIC ACTIONS  
*a.
Standby Charging Pumps start.
: b.
Reactor trip.
: c.
Safety injection actuation.
: d.
Containment spray actuation.
: e.
Containment isolation.
: f.
Auxiliary Feedwater initiated.
Proc No EOP 8.1 Revision 15 Page 1 of 8
: g.
Main Steam Isolation Valves close on Containment High Pressure (5.3 psig) -k;'*E-50A, ;':;'*CV-0510, and ;':;'*E-5013, ;':;'*CV-0501.
pa0480-0015a-89-93  


PALISADES NUCLEAR PLANT                           Proc No EOP 8.1 EMERGENCY OPERATING PROCEDURE                       Revision 15 Page 2 of 8 TITLE: LOSS OF COOLANT ACCIDENT
3.0 3.1 3.2
* 3.0 3.1 3.2 IMMEDIATE ACTIONS Trip the reactor; perform     EO~ 1 Immediate Actions.
.3,3 3.4 3.5 PALISADES NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE TITLE:
Verify safety injection actuated. Initiate manually, if PCS pressure is less than or equal to 1605 psia or containment pressure is greater than 5 psig.
LOSS OF COOLANT ACCIDENT IMMEDIATE ACTIONS Trip the reactor; perform EO~ 1 Immediate Actions.
  .3,3    At PCS pressure of 1250 psia, or if containment pressure reaches 5 psig, manually actuate containment isolation:
Proc No EOP 8.1 Revision 15 Page 2 of 8 Verify safety injection actuated.
Initiate manually, if PCS pressure is less than or equal to 1605 psia or containment pressure is greater than 5 psig.
At PCS pressure of 1250 psia, or if containment pressure reaches 5 psig, manually actuate containment isolation:
Push the manual initiate push buttons for Containment High Radiation (Left and Right Channels) located on the front of panel ;':;':EC-13.
Push the manual initiate push buttons for Containment High Radiation (Left and Right Channels) located on the front of panel ;':;':EC-13.
3.4    If containment pressure increases to 5 psig, verify Containment Spray initiated, If necessary, manually initiate Containment Spray.
If containment pressure increases to 5 psig, verify Containment Spray initiated, If necessary, manually initiate Containment Spray.
3.5    Attempt to locate and isolate the break if possible:
Attempt to locate and isolate the break if possible:
: a. Isolate letdown line by closing **CV-2009 (outside containment) or
: a.
              ;':;'i"CV-2001 (inside containment).
Isolate letdown line by closing **CV-2009 (outside containment) or  
: b. Verify PORVs and isolation MOVs* closed* .
;':;'i"CV-2001 (inside containment).
* c.
: b.
d.
Verify PORVs and isolation MOVs* closed*.
Isolate PCS sample lines.       (Close ;b':CV-1910 and ;'n':CV-1911).
: c.
Isolate PCS sample lines.
(Close ;b':CV-1910 and ;'n':CV-1911).
: d.
Check Acoustical Monitor Panel ;':;':EC-51 and Pressurizer Relief Valves Discharge Temperature Indicators for symptoms of pressurizer relief valve leakage.
Check Acoustical Monitor Panel ;':;':EC-51 and Pressurizer Relief Valves Discharge Temperature Indicators for symptoms of pressurizer relief valve leakage.
: e. Check Quench Tank level, pressure and temperature indications normal.
: e.
3.6     Check that the Main Steam Isolation Valves have closed on Containment High Pressure (5 psig) -::;':E-50A, -:d:CV-0510 and -::;':£-SOB, ;':;'*CV-0501.
Check Quench Tank level, pressure and temperature indications normal.
3.7     Place Turbine Generator Turning Gear Motor **K-2 Control Switch in "PULL TO LOCK".
3.6 Check that the Main Steam Isolation Valves have closed on Containment High Pressure (5 psig) -::;':E-50A, -:d:CV-0510 and -::;':£-SOB, ;':;'*CV-0501.
3.8     ACTIVATE SITE EMERGENCY PLAN.       REFER TO SITE EMERGENCY IMPLE}illNTING PROCEDURE EI-1.
3.7 Place Turbine Generator Turning Gear Motor **K-2 Control Switch in "PULL TO LOCK".
4-.0   SUBSEQUENT ACTIONS NOTE:  Use Attachment 6 as a guide only for subsequent action items. If break has been isolated and criteria in Attachment 6 are satisfied, proceed as shown in Attachment 6.
3.8 ACTIVATE SITE EMERGENCY PLAN.
4.1 Verify all immediate actions have been initiated .
REFER TO SITE EMERGENCY IMPLE}illNTING PROCEDURE EI-1.
NOTE:  This procedure is to be performed in conjunction with EOP 1.
4-.0 NOTE:
pa0480-0015a-89-93
4.1 NOTE:
SUBSEQUENT ACTIONS Use Attachment 6 as a guide only for subsequent action items.
If break has been isolated and criteria in Attachment 6 are satisfied, proceed as shown in Attachment 6.
Verify all immediate actions have been initiated.
This procedure is to be performed in conjunction with EOP 1.
pa0480-0015a-89-93  


PALISADES NUCLEAR PLANT                       Proc No EOP 8. I EMERGENCY OPERATING PROCEDURE                     Revision 15 Page 3 of 8 TITLE:     LOSS OF COOLANT ACCIDENT
4.2 4.3 4.4 PALISADES NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE TITLE:
* CAUTION If a SIS signal is received or priamry pressure drops below 1605 psia after the start of a Loss of Offsite Power, the equipment on this checklist shall be started by placing the NOfil1AL SHUTDOw'N SEQUENCER switches to the TEST position and holding them for 45 seconds (until the DBA sequencers timeout).
LOSS OF COOLANT ACCIDENT CAUTION If a SIS signal is received or priamry pressure drops below 1605 psia after the start of a Loss of Offsite Power, the equipment on this checklist shall be started by placing the NOfil1AL SHUTDOw'N SEQUENCER switches to the TEST position and holding them for 45 seconds (until the DBA sequencers timeout).
4.2    Verify minimum operating safety injection equipment using checksheet.
Proc No EOP 8. I Revision 15 Page 3 of 8 Verify minimum operating safety injection equipment using checksheet.
(Attachment 1) 4.3    Verify minimum operating safeguards equipment if Containment High Pressure Trip is activated. (Attachment 2) 4.4    When the containment high pressure signal has cleared, stop containment spray:
(Attachment 1)
: a. Reset the Containment High Pressure Isolation Signal (this will close the iodine removal valves "l;*kCV-0437A and ;b'*CV-0437B) .
Verify minimum operating safeguards equipment if Containment High Pressure Trip is activated.
                                *. -                                      * ~ J.
(Attachment 2)
: b. Turn off the Containment Spray Pumps ;'d*P-54A, °ld*P-54B and ;'d*P-54C.
When the containment high pressure signal has cleared, stop containment spray:
: c. Close the Containment Spray Header Valves ;'d*CV-3001 and ;b'*CV-3002.
: a.
4.5     Verify containment isolation.     (Attachment 3) 4.6     Review diagnostic sheet (Attachment 4) to confirm accident diagnosis.
Reset the Containment High Pressure Isolation Signal (this will close the iodine removal valves "l;*kCV-0437A and ;b'*CV-0437B).  
4.7    Attempt to establish and maintain hot and cold leg temperature and PCS pressure within the operating region of the 50°F subcooling saturation curve (Use EOP 1, Attachment 2 or the subcooling curve posted in the Control Room.)
* ~
NOTE:  Use all available indications in determining 50°F subcooling, ie, use hot and cold leg temperatures, several incore thermocouples, and PCS pressure.
J.
4.8     If 50°F subcooling cannot be maintained, assume that there have been voids formed within the PCS:
: b.
: a. Substantial void formation would be indicated by one or more of the following:
Turn off the Containment Spray Pumps ;'d*P-54A, °ld*P-54B and ;'d*P-54C.
: 1. Core outlet temperature readings higher than saturation conditions.
: c.
: 2. Increased core nT above full power (47°F).
Close the Containment Spray Header Valves ;'d*CV-3001 and ;b'*CV-3002.
: 3. Startup neutron detectors showing erratic indication.
4.5 Verify containment isolation.
: 4. Incore thermocouples showing erratic indication.
(Attachment 3) 4.6 4.7 NOTE:
pa0480-0015a-89-93
Review diagnostic sheet (Attachment 4) to confirm accident diagnosis.
Attempt to establish and maintain hot and cold leg temperature and PCS pressure within the operating region of the 50°F subcooling saturation curve (Use EOP 1, Attachment 2 or the subcooling curve posted in the Control Room.)
Use all available indications in determining 50°F subcooling, ie, use hot and cold leg temperatures, several incore thermocouples, and PCS pressure.
4.8 If 50°F subcooling cannot be maintained, assume that there have been voids formed within the PCS:
: a.
Substantial void formation would be indicated by one or more of the following:
: 1.
Core outlet temperature readings higher than saturation conditions.
: 2.
Increased core nT above full power (47°F).
: 3.
Startup neutron detectors showing erratic indication.
: 4.
Incore thermocouples showing erratic indication.
pa0480-0015a-89-93  


PALISADES* NUCLEAR PLANT                       Proc No EOP 8. 1 EMERGENCY OPERATING PROCEDURE                       Revision 15 Page 4 of 8 TITLE:   LOSS OF COOLANT ACCIDENT
NOTE:
* b.
4.9 4.10 NOTE:
5.
PALISADES* NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE TITLE:
6.
LOSS OF COOLANT ACCIDENT
: 5.
Th increasing or erratic.
Th increasing or erratic.
T c
: 6.
erratic.
T erratic.
c Proc No EOP 8. 1 Revision 15 Page 4 of 8
: b.
If void formation exists, increase PCS pressure by ensuring:
If void formation exists, increase PCS pressure by ensuring:
: 1. All pressurizer heaters on.
: 1.
: 2. Pressurizer Spray Valves closed C-:;-;',CV-1057 and ;'n'<CV-1059 ) .
All pressurizer heaters on.
: 3. Maximum charging and minimum letdown.
: 2.
: 4. HPSI pumps running ;';;'<P-66A, ;b'*P-66B, and ;'d'P-66C.
Pressurizer Spray Valves closed C-:;-;',CV-1057 and ;'n'<CV-1059 ).
NOTE:  A reduction in the subcooled margin is preferable to violation of PCS boundary through excess pressure for existing temperature.
: 3.
: c. If 50&deg;F subcooling is established but voids remain, vent the Reactor Vessel head in accordance with Step 4.0 (18) of ONP 21.
Maximum charging and minimum letdown.
: 4.
HPSI pumps running ;';;'<P-66A, ;b'*P-66B, and ;'d'P-66C.
A reduction in the subcooled margin is preferable to violation of PCS boundary through excess pressure for existing temperature.
: c.
If 50&deg;F subcooling is established but voids remain, vent the Reactor Vessel head in accordance with Step 4.0 (18) of ONP 21.
CAUTION There is a possibility of excessive radiation if a sample line is opened.
CAUTION There is a possibility of excessive radiation if a sample line is opened.
Extreme care and caution must be used.
Extreme care and caution must be used.
4.9    Periodically notify the Chemistry Department to sample containment atmosphere for Hydrogen and Primary Coolant for assessment of fuel damage. Perform ONP 22 and ONP 11 as necessary.
Periodically notify the Chemistry Department to sample containment atmosphere for Hydrogen and Primary Coolant for assessment of fuel damage.
4.10    30 MINUTES AFTER LOCA, STOP BORIC ACID INJECTION VIA THE CHARGING PUl1PS:
Perform ONP 22 and ONP 11 as necessary.
: a. Turn selector switch for Charging Pumps **P-55B and **P-55C from auto to manual and turn HS for ;'d*P-55B and ;b'<P-55C to off.
30 MINUTES AFTER LOCA, STOP BORIC ACID INJECTION VIA THE CHARGING PUl1PS:
: b. Turn HS for Charging Pump **P-SSA to off.
: a.
NOTE:  If there is a low level indicated in the pressurizer, it may be necessary to rack out breaker ;';;'*052-1205 for ;';;'*P-55A in order to stop ;'<;'*P-55A.
Turn selector switch for Charging Pumps **P-55B and **P-55C from auto to manual and turn HS for ;'d*P-55B and ;b'<P-55C to off.
: c. Turn HS for Boric Acid Pumps **P-56A and **P-56B to off.
: b.
: d. Close Boric Acid Pump Feed Valve **M0-2140 and Gravity Feed Valves
Turn HS for Charging Pump **P-SSA to off.
              ;';;'*M0-2169 and id*M0-2170.
If there is a low level indicated in the pressurizer, it may be necessary to rack out breaker ;';;'*052-1205 for ;';;'*P-55A in order to stop ;'<;'*P-55A.
: e. Check closed VCT Outlet Valve **M0-2087 .
: c.
* f.
Turn HS for Boric Acid Pumps **P-56A and **P-56B to off.
g.
: d.
Close Boric Acid Pump Feed Valve **M0-2140 and Gravity Feed Valves  
;';;'*M0-2169 and id*M0-2170.
: e.
Check closed VCT Outlet Valve **M0-2087.
: f.
Open SIRW Outlet to Charging Pumps ;'n'*M0-2160.
Open SIRW Outlet to Charging Pumps ;'n'*M0-2160.
Run each Charging Pump ;';;'*P-55A, ;';;'<P-55B and ;'d:p-55c for at least five (5) minutes to flush the concentrated boric acid through the lines. Turn Charging Pumps off or run as needed to control pressure.
: g.
pa0480-0015a-89-93
Run each Charging Pump ;';;'*P-55A, ;';;'<P-55B and ;'d:p-55c for at least five (5) minutes to flush the concentrated boric acid through the lines.
Turn Charging Pumps off or run as needed to control pressure.
pa0480-0015a-89-93  


PALISADES NUCLEAR PLANT                         Proc No EOP 8.1 EMERGENCY OPERATING PROCEDUHE                      Revision 15 Page 5 of 8 TITLE:  LOSS OF COOLANT ACCIDENT NOTE:  If PCS pressure is g:t;"eater than 275 psig, LPSI pumps may be stopped.
NOTE:
4.11 NOTE:
4.12 NOTE:
PALISADES NUCLEAR PLANT EMERGENCY OPERATING PROCEDUHE TITLE:
LOSS OF COOLANT ACCIDENT Proc No EOP 8.1 Revision 15 Page 5 of 8 If PCS pressure is g:t;"eater than 275 psig, LPSI pumps may be stopped.
Do not attempt to ope-rate LPSI valve "i'd*M0-3008 *when containment sump level is greater thari 85% indicated.
Do not attempt to ope-rate LPSI valve "i'd*M0-3008 *when containment sump level is greater thari 85% indicated.
4.11    ONE HOUR AFTER LOCA, BEGIN PLANT COOLDOWN:
ONE HOUR AFTER LOCA, BEGIN PLANT COOLDOWN:
: a. Open Steam Bypass to Condenser Valve "i'*kCV-0511.
: a.
: b. Open Steam Dumps to Atmosphere, Valves *'*"i'*CV-0779, *'d.*CV-0780, "i'd*CV-0781, and "i'd*CV-0782 as necessary to establish and maintain plant cooldown at 75&deg;F per .hour.
Open Steam Bypass to Condenser Valve "i'*kCV-0511.
NOTE:  Steam flow through two of the four Steam Dumps should be adequate to establish an initial cooldown rate of 75&deg;F per hour.
: b.
4.12    IF THE RECIRCULATION ACTUATION SIGNAL           rs RECEIVED:
Open Steam Dumps to Atmosphere, Valves *'*"i'*CV-0779, *'d.*CV-0780, "i'd*CV-0781, and "i'd*CV-0782 as necessary to establish and maintain plant cooldown at 75&deg;F per.hour.
CAUTION Prior to receipt of RAS, place handswitches for i**CV-3027 and ""'*CV-3056 (HS-3027A f""'*HS-3056A) to the closed position.~ .
Steam flow through two of the four Steam Dumps should be adequate to establish an initial cooldown rate of 75&deg;F per hour.
: a. Verify the following:
IF THE RECIRCULATION ACTUATION SIGNAL rs RECEIVED:
: 1. Low Pressure Safety Injection Pumps stop.             (-,'d<P-67A and
CAUTION Prior to receipt of RAS, place handswitches for i**CV-3027 and ""'*CV-3056 (HS-3027A f""'*HS-3056A) to the closed position.~.
                    .,...,.,P-67B)
: a.
: 2. Containment Sump Isolation Valves open.         (-,',-,'<CV-3029 and
Verify the following:
                    -,'d*CV-3030)
: 1.
: 3. Safety Injection and Refueling Tank Isolation Valves close.
Low Pressure Safety Injection Pumps stop.
(-,'d<P-67A and  
.,...,.,P-67B)
: 2.
Containment Sump Isolation Valves open.
(-,',-,'<CV-3029 and  
-,'d*CV-3030)
: 3.
Safety Injection and Refueling Tank Isolation Valves close.
(**CV-3031 and **CV-3057)
(**CV-3031 and **CV-3057)
: 4. Each running HPSI pump has a minimum flow of at least 30 gpm.
: 4.
: 5. SI Pump Minimum Flow Stop Valves close permissive lights are lighted.
Each running HPSI pump has a minimum flow of at least 30 gpm.
: 6. Component Cooling Heat Exchanger Service Water Outlet Valves transfer to alternate supply *'<*'*HIC-0881 and *'d*HIC-0882.
: 5.
NOTE:  If necessary, dispatch operator to adjust '"'"HIC-0881 and/or ""'<HIC-0882 to maintain less than or equal to 105&deg;F outlet temperature on Component Cooling Heat Exchangers .
SI Pump Minimum Flow Stop Valves close permissive lights are lighted.
pa0480-0015a-89-93
: 6.
Component Cooling Heat Exchanger Service Water Outlet Valves transfer to alternate supply *'<*'*HIC-0881 and *'d*HIC-0882.
If necessary, dispatch operator to adjust '"'"HIC-0881 and/or ""'<HIC-0882 to maintain less than or equal to 105&deg;F outlet temperature on Component Cooling Heat Exchangers.
pa0480-0015a-89-93  


PALISADES NUCLEAR PLANT                       Proc No EOP 8.1 EMERGENCY OPERATING PROCEDURE                       Revision 15 Page 6 of 8 TITLE:       LOSS OF COOLANT ACCIDENT
NOTE:
* b. Perform the following:
PALISADES NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE TITLE:
: 1. If each running HPSI pump is not maintaining at least 30 gpm flow, first trip the Charging Pumps one at a time and then the HPSI pumps one at a time until each running HPSI pump is maintaining at least 30 gpm flow or until only one HPSI pump is running.
LOSS OF COOLANT ACCIDENT
: 2. Place the keys in SIRWT Recirculation Valve handswitches
: b.
                  **HS-3027B and **HS-3056B and place in the closed position.
Perform the following:
: 3. Monitor the radiation levels in the Auxiliary Building and the ESS sumps for signs of leakage from the SIS equipment.
Proc No EOP 8.1 Revision 15 Page 6 of 8
: 1.
If each running HPSI pump is not maintaining at least 30 gpm flow, first trip the Charging Pumps one at a time and then the HPSI pumps one at a time until each running HPSI pump is maintaining at least 30 gpm flow or until only one HPSI pump is running.
: 2.
Place the keys in SIRWT Recirculation Valve handswitches  
**HS-3027B and **HS-3056B and place in the closed position.
: 3.
Monitor the radiation levels in the Auxiliary Building and the ESS sumps for signs of leakage from the SIS equipment.
CAUTION Do not perform Step 4 if contain-ment pressure exceeds 4 psig.
CAUTION Do not perform Step 4 if contain-ment pressure exceeds 4 psig.
: 4. Align the safeguards sump discharge to the containment by closing ;';;';-l-'1V-DRW151 (sump discharge to DWD) and opening
: 4.
                  ;b"CV-1103 and 'l'd>CV-1104 (Containment Sump Drain Valves).
Align the safeguards sump discharge to the containment by closing ;';;';-l-'1V-DRW151 (sump discharge to DWD) and opening  
: 5. If only one service water pump is running, start another service water pump. If only one service water pump can be operated, align the fire water system to the service water system by opening 'l'0 "t1V-FP130 and ;';-;';-f1V-FP131. This action is required to provide sufficient cooling water flow to the Engineered Safeguards Room coolers.
;b"CV-1103 and 'l'd>CV-1104 (Containment Sump Drain Valves).
NOTE:  If containment isolation signal is present, refer to Attachment 5.
: 5.
: c. If reactor pressure is less than 230 psia and the safety injection system is lined up for cold leg injection, perform the following:
If only one service water pump is running, start another service water pump.
If only one service water pump can be operated, align the fire water system to the service water system by opening 'l'0 "t1V-FP130 and ;';-;';-f1V-FP131.
This action is required to provide sufficient cooling water flow to the Engineered Safeguards Room coolers.
If containment isolation signal is present, refer to Attachment 5.
: c.
If reactor pressure is less than 230 psia and the safety injection system is lined up for cold leg injection, perform the following:
CAUTION If only one Containment Spray Pump is running, do not open more than one.Containment Spray Valve Ci';"CV-3001 or ;'d>CV-3002) and one HPSI pump supply valve ('l'>;'*CV-3071 or ;'c;'*CV-3070) at the same time.
CAUTION If only one Containment Spray Pump is running, do not open more than one.Containment Spray Valve Ci';"CV-3001 or ;'d>CV-3002) and one HPSI pump supply valve ('l'>;'*CV-3071 or ;'c;'*CV-3070) at the same time.
: 1. If CHP has been reset:
: 1.
(a)   Check closed **CV-3001 and **CV-3002 .
If CHP has been reset:
(b)   Start **P-54A, **P-54B or **P-54C.
(a)
(c)   Open **CV-3071 to supply cooled water from the Shutdown Cooling Heat Exchangers to the suction of ;'d*P-66A.
Check closed **CV-3001 and **CV-3002.
pa0480-0015a-89-93
(b)
Start **P-54A, **P-54B or **P-54C.
(c)
Open **CV-3071 to supply cooled water from the Shutdown Cooling Heat Exchangers to the suction of ;'d*P-66A.
pa0480-0015a-89-93  


PALISADES NUCLEAR PLANT                                 Proc No EOP 8.1 EMERGENCY OPERATING PROCEDURE                                Revision 15 Page 7 of 8 TITLE:          LOSS OF COOLANT ACCIDENT (d) Open ;'d*CV-3070 to supply cooled water from the Shutdown Cooling \Heat Exchangers to the suction of ;'d*P-66B and
4.13 NOTE:
                          -ld*P-66C:*
PALISADES NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE TITLE:
: 2.     If the CHP signal is present:
LOSS OF COOLANT ACCIDENT Proc No EOP 8.1 Revision 15 Page 7 of 8 (d)
(a) If two or more Containment Spray Pumps are running.
Open ;'d*CV-3070 to supply cooled water from the Shutdown Cooling \\Heat Exchangers to the suction of ;'d*P-66B and  
(b) Open ;';-;'*CV-3071 to supply cooled water from the Shutdown Cooling Heat Exchangers to the suction of **P-66A.
-ld*P-66C:*
(c) Open **CV-3070 to supply cooled water from the Shutdown Cooling Heat Exchangers to the suction of -/d*P-66B and
: 2.
                          ;h'*P-66C.
If the CHP signal is present:
4.13    TWO HOURS AFTER LOCA, ISOLATE OR VENT SAFETY INJECTION TANKS:
(a)
NOTE:  In the event of a large LOCA, the tanks will already be empty and this step will be unnecessary.
If two or more Containment Spray Pumps are running.
: a. Isolate Safety Injection Tanks **T-82A, **T-82B, **T-82C and
(b)
              ;',;'*T-82D.
Open ;';-;'*CV-3071 to supply cooled water from the Shutdown Cooling Heat Exchangers to the suction of **P-66A.
                                      *. ._ -                                              o,t j_
(c)
: 1. Unlock and close breakers **052-2229 (MCC-22), **052-2429 (MCC-24), -/;-;'*052-2129 (l'lCC-21), and -/;-;'*052-2329 (MCC-23).
Open **CV-3070 to supply cooled water from the Shutdown Cooling Heat Exchangers to the suction of -/d*P-66B and  
: 2.     Close ;'*-l*I-10-3041, ;'*-l*M0-3045, ;';;'*M0-3049 and ;'d*l'I0-3052.
;h'*P-66C.
: b. If unable to isolate one or more Safety Injection Tanks, vent the unisolated SI Tanks as follows:
TWO HOURS AFTER LOCA, ISOLATE OR VENT SAFETY INJECTION TANKS:
: 1.     Open Vent Valve ;'d>CV-3067, ;'d*CV-3065, ;'d>CV-3063 or ;'r;'>CV-3051 on the tank to be vented **T-82A, **T-82B, **T-82C or **T-82D.
In the event of a large LOCA, the tanks will already be empty and this step will be unnecessary.
: 2.     This will allow the nitrogen to flow into the Clean Waste Receiver Tanks **T-64A, **T-64B, **T-64C or **T-64D and blow at least one of their rupture discs and pass into the containment atmosphere.
: a.
: 3.     Repeat Steps (1) and (2) for each unisolated tank until all are vented.
Isolate Safety Injection Tanks **T-82A, **T-82B, **T-82C and  
4 .. 14 SIX HOURS AFTER LOCA, PROCEED AS FOLLOWS:
;',;'*T-82D.
: a. With PCS pressure less than 160 psia, align HPSI for hot and cold leg injection for long term cooling: *
o,t j_
: 1. Close **M0-3080, then open **M0-3082 .
: 1.
* 2.     Close ;'d>M0-3081, then open -,',;'*M0-3083.
Unlock and close breakers **052-2229 (MCC-22), **052-2429 (MCC-24), -/;-;'*052-2129 (l'lCC-21), and -/;-;'*052-2329 (MCC-23).
pa0480-0015a-89-93
: 2.
Close ;'*-l*I-10-3041, ;'*-l*M0-3045, ;';;'*M0-3049 and ;'d*l'I0-3052.
: b.
If unable to isolate one or more Safety Injection Tanks, vent the unisolated SI Tanks as follows:
: 1.
Open Vent Valve ;'d>CV-3067, ;'d*CV-3065, ;'d>CV-3063 or ;'r;'>CV-3051 on the tank to be vented **T-82A, **T-82B, **T-82C or **T-82D.
: 2.
This will allow the nitrogen to flow into the Clean Waste Receiver Tanks **T-64A, **T-64B, **T-64C or **T-64D and blow at least one of their rupture discs and pass into the containment atmosphere.
: 3.
Repeat Steps (1) and (2) for each unisolated tank until all are vented.
4.. 14 SIX HOURS AFTER LOCA, PROCEED AS FOLLOWS:
: a.
With PCS pressure less than 160 psia, align HPSI for hot and cold leg injection for long term cooling: *
: 1.
Close **M0-3080, then open **M0-3082.
: 2.
Close ;'d>M0-3081, then open -,',;'*M0-3083.
pa0480-0015a-89-93  


PALISADES NUCLEAR PLANT                         Proc No EDP 8.1 EMERGENCY OPERATING PROCEDURE                        Revision 15 Page 8 of 8 TITLE:  LOSS OF COOLANT ACCIDENT NOTE:  Verify flow to hot leg Nwnber 1 on ;'d*FI-0316A and/or ;'d*FI-0317A.
NOTE:
          ;';;'*FI-0316A will indicate hot leg injection from HPSI Pwnp ;';;'*P-66A, and
NOTE:
          ;'d*FI-0317A will indicate hot leg injection from HPSI Pump ;'d*P-66B or
NOTE:
          ;';;'*P-66C. Verify flow to cold'legs on ;'d*FI-0308, ;'""FI-0310, ;';;'*FI-0312, and ;'d*FI-0313. Total flow to hot leg Number 1 should approximately equal total flow to cold legs.
PALISADES NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE TITLE:
: 3. Procedure ended.
LOSS OF COOLANT ACCIDENT Proc No EDP 8.1 Revision 15 Page 8 of 8 Verify flow to hot leg Nwnber 1 on ;'d*FI-0316A and/or ;'d*FI-0317A.  
: b.     With PCS pressure greater than or equal to 160 psia, place the Shutdown Cooling System in operation:
;';;'*FI-0316A will indicate hot leg injection from HPSI Pwnp ;';;'*P-66A, and  
: 1. Verify at least 50&deg;F subcooling will be maintained at entry pressure for Shutdown Cooling using loop cold leg temperatures and several incore thermocouples.
;'d*FI-0317A will indicate hot leg injection from HPSI Pump ;'d*P-66B or  
: 2. Enter shutdown cooling per SOP 3:
;';;'*P-66C.
NOTE:  When using SOP 3, ignore any reference to Primary Coolant Pumps; any reference to pressurizer spray is to be considered as auxiliary spray.
Verify flow to cold'legs on ;'d*FI-0308, ;'""FI-0310, ;';;'*FI-0312, and ;'d*FI-0313.
(a) If necessary, throttle or secure HPSI and/or charging pump flow to maintain pressurizer level.
Total flow to hot leg Number 1 should approximately equal total flow to cold legs.
(b) If voiding is apparent during depressurization (ie, pressurizer level is erratic), stop auxiliary spray to the pressurizer and vent noncondensibles from the reactor vessel head and/or the pressurizer in accordance with Step 4.0 (18) and (19) of ONP 21.
: 3.
(c) If the **PS-0104 interlock prevents the opening of either
Procedure ended.
                          ;'d*M0-3015 or ;';;'*~10-3016, *refer to Attachment 7.
: b.
NOTE:  If there is a high radioactivity           level in the Primary Coolant System, circulation of this fluid in the         Shutdown Cooling System may result in high area radioactivity readings           in the Auxiliary Building. The activity level of the PCS should           be determined prior to initiating Shutdown Cooling System flow.
With PCS pressure greater than or equal to 160 psia, place the Shutdown Cooling System in operation:
: 3. If shutdown cooling cannot be established:
: 1.
(a) Maintain Steam Generator heat removal, using the Steam Bypass to Condenser or the Steam Dumps to Atmosphere, while attempting to establish shutdown cooling.
Verify at least 50&deg;F subcooling will be maintained at entry pressure for Shutdown Cooling using loop cold leg temperatures and several incore thermocouples.
(b) If heat removal by Steam Generators can no longer be maintained, open PORVs and block valves **M0-1042A,
: 2.
                          **M0-1043A, **PRV~l042B and **PRV-1043B. Continue cold leg injection with at least one HPSI pump. Once Shutdown Cooling entry conditions are met, close the PORVs and their block valves ;';;"M0-1042A, ;';;';MV-1043A, ;';;"PRV-1042B and **PRV-1043B and establish shutdown cooling as described in Step 4.14.b.
Enter shutdown cooling per SOP 3:
pa0480-0015a-89-93
When using SOP 3, ignore any reference to Primary Coolant Pumps; any reference to pressurizer spray is to be considered as auxiliary spray.
(a)
If necessary, throttle or secure HPSI and/or charging pump flow to maintain pressurizer level.
(b)
If voiding is apparent during depressurization (ie, pressurizer level is erratic), stop auxiliary spray to the pressurizer and vent noncondensibles from the reactor vessel head and/or the pressurizer in accordance with Step 4.0 (18) and (19) of ONP 21.
(c) If the **PS-0104 interlock prevents the opening of either  
;'d*M0-3015 or ;';;'*~10-3016, *refer to Attachment 7.
If there is a high radioactivity level in the Primary Coolant System, circulation of this fluid in the Shutdown Cooling System may result in high area radioactivity readings in the Auxiliary Building.
The activity level of the PCS should be determined prior to initiating Shutdown Cooling System flow.
: 3.
If shutdown cooling cannot be established:
(a)
Maintain Steam Generator heat removal, using the Steam Bypass to Condenser or the Steam Dumps to Atmosphere, while attempting to establish shutdown cooling.
(b)
If heat removal by Steam Generators can no longer be maintained, open PORVs and block valves **M0-1042A,  
**M0-1043A, **PRV~l042B and **PRV-1043B.
Continue cold leg injection with at least one HPSI pump.
Once Shutdown Cooling entry conditions are met, close the PORVs and their block valves ;';;"M0-1042A, ;';;';MV-1043A, ;';;"PRV-1042B and **PRV-1043B and establish shutdown cooling as described in Step 4.14.b.
pa0480-0015a-89-93  


Proc No EOP 8.1 Attachment 1 Revision 15 CHECKSHEET FOR MINIMUM SAFEGUARDS            Page 1 of 1 Equipment fed from bus C and/or D/G 1-1 (**K-6AG) 2400V
CHECKSHEET FOR MINIMUM SAFEGUARDS Proc No EOP 8.1 Revision 15 Page 1 of 1 Equipment fed from bus C and/or D/G 1-1 (**K-6AG) 2400V
: 1. 1 HP Safety Injection Pump running **P-66B
: 1.
            .2. 1 LP Safety Injection Pump running **P-67B - - - - -
1 HP Safety Injection Pump running **P-66B -----
: 3. 1 Component Cooling Water Pump running **P-52A - - - - - or **P-52C - - - - -
.2.
: 4. 1 Service Water Pump running **P-7B
1 LP Safety Injection Pump running **P-67B -----
: 5. 1 Auxiliary Feedwater Pump running **P-8A - - - - -
: 3.
                                .. 480V
1 Component Cooling Water Pump running **P-52A ----- or **P-52C -----
: 6. 1 Charging ~ **P-SSC - - - - -
: 4.
: 7. 4 HP Safety Injection Valves open
1 Service Water Pump running **P-7B -----
                  **M0-3007'
: 5.
                              ----- **M0-3009 ----- **M0-3011 ----- **M0-3013 -----
1 Auxiliary Feedwater Pump running **P-8A -----
: 8. 2 LP Safety Injection Valves open **M0-3008 - - - - - **M0-3010       -----)m
.. 480V
: 9. 2 Boric Acid gravity feed stops open **M0-2169 * - - - - - **H0-2170 _ _ _.....;fA.=.
: 6.
: 10. 1 Containment Air Cooler recirculation fan **V-4A                                 0 11.
1 Charging ~  
Volume Control Tank Outlet Isolation Valve closed **M0-2087 u
**P-SSC -----
OR Equipment fed from bus D and/or D/G 1-2 (**K-6BG) z 2400V                                                          0
: 7.
: 12. 1 HP Safety Injection Pump running **P-66A
4 HP Safety Injection Valves open  
                                                                  ----- or **P-66C -----1~-
**M0-3007'  
: 13. 1 LP Safety Injection Pump running **P-67A
**M0-3009  
                                                                  -----                             <(
**M0-3011  
14.
**M0-3013
15.
: 8.
1 Component Cooling Water Pump running 1 Service Water Pump running **P-7A
2 LP Safety Injection Valves open **M0-3008 ----- **M0-3010 -----)m
                                                              **P-52B or **P-7C                   !
: 9.
                                                                                                  *~
2 Boric Acid gravity feed stops open **M0-2169 *----- **H0-2170 ___
480V                                       ----
.....;fA.=. 0 u
: 16. 2 Charging Pumps **P-SSA               and **P-SSB
: 10.
: 17. 4 Redundant HP Safety Injection Valves open                                     z ll'.il:3
1 Containment Air Cooler recirculation fan **V-4A -----
                  **M0-3062
: 11.
                              ----- **M0-3064 ----- **M0-3066 ----- **M0-3068
Volume Control Tank Outlet Isolation Valve closed **M0-2087 OR E qui pmen t fed from bus D and/or D/G 1-2 (**K-6BG) 2400V z
: 18. 2 LP Safety Injection Valves open **M0-3012
0
                                                                  ----- **M0-3014 -----
: 12.
: 19. 1 Boric Acid Pumped Feed Stop Valve open **M0-2140
1 HP Safety Injection Pump running **P-66A ----- or **P-66C -----1~-
: 20. 1 Boric Acid Pump running **P-56A
: 13.
: 21. 3 Containment Air Cooler Recirculation fans running
1 LP Safety Injection Pump running **P-67A -----
                  'f..-kV-lA                               **V-3A
: 14.
                            ----- 'f..~V-2A - - - - -            -----
1 Component Cooling Water Pump running **P-52B -----
Completed By:                 I Signature     Date Reviewed By:                       I pa0480-0015b-89-93                                             Shift Supervisor     Date
: 15.
1 Service Water Pump running **P-7A or **P-7C 480V
: 16.
2 Charging Pumps **P-SSA and **P-SSB -----
: 17.
4 Redundant HP Safety Injection Valves open  
**M0-3062  
**M0-3064  
**M0-3066  
**M0-3068
: 18.
2 LP Safety Injection Valves open **M0-3012  
**M0-3014  
<(
*~ z ll'.il:3
: 19.
1 Boric Acid Pumped Feed Stop Valve open **M0-2140 -----
: 20.
1 Boric Acid Pump running **P-56A -----
: 21.
3 Containment Air Cooler Recirculation fans running  
'f..-kV-lA  
'f..~V-2A  
**V-3A Completed By:
I Signature Date Reviewed By:
I pa0480-0015b-89-93 Shift Supervisor Date  


Proc No EOP 8.1 Attachment 2 Revision 15 Page 1 of 1 I 1.
I CHECK SHEET FOR MINIMUM SAFEGUARDS WITH CONTAINMENT HIGH PRESSURE
CHECK SHEET FOR MINIMUM SAFEGUARDS Complete Attachment 1.
: 1.
WITH CONTAINMENT HIGH PRESSURE
Complete Attachment 1.
: 2. 2 Containment Spray Valves open **CV-3001             and **CV-3002
Proc No EOP 8.1 Revision 15 Page 1 of 1
: 3. 4 Containment Air Cooler High Capacity Service Water Valves open
: 2.
      **CV-0861           **CV-0864             **CV~0867
2 Containment Spray Valves open **CV-3001 and **CV-3002
: 4. 2 Iodine Removal Valves (open after 1 minute time delay)
: 3.
      **CV-0437A     -
4 Containment Air Cooler High Capacity Service Water Valves open  
                -----      **CV-0437B
**CV-0861  
                                          ----~
**CV-0864  
**CV~0867
: 4.
2 Iodine Removal Valves (open after 1 minute time delay)  
**CV-0437A  
**CV-0437B  
----~
and From 2400 V bus lC and/or Diesel Generator 1-1
and From 2400 V bus lC and/or Diesel Generator 1-1
: 5. 2 Containment Spray Pumps **P-54B             **P-54C
: 5. 2 Containment Spray Pumps **P-54B  
                                          -----              ----~
**P-54C  
----~
or From 2400 V bus ID and/or Diesel Generator 1-2
or From 2400 V bus ID and/or Diesel Generator 1-2
: 6. 1 Containment Spray Pump ~""*P-54A Completed By:               I Signature     Date Reviewed By:                     I Shift Supervisor     Date pa0480-0015c-89-93
: 6.
1 Containment Spray Pump ~""*P-54A -----
Completed By:
I Signature Date Reviewed By:
I Shift Supervisor Date pa0480-0015c-89-93  


                                                                        *Proc No EOP 8.1 Attachment 3 Revision 15 Page 1 of 2 CONTAINMENT ISOLATION CHECKLIST All containment isolation CV's have latching circuits, the handswitches have to be placed to closed position prior to open position.
CONTAINMENT ISOLATION CHECKLIST
VALVE NO.               DESCRIPTION                                              CLOSED
*Proc No EOP 8.1 Revision 15 Page 1 of 2 All containment isolation CV's have latching circuits, the handswitches have to be placed to closed position prior to open position.
**CV-1808               Containment Purge Exhaust Isolation Valve
VALVE NO.  
**CV-1814               Air Room Supply
**CV-1808  
**CV-1806               Containment Purg_e Exhaust Isolation Valve
**CV-1814  
**CV-1501           -  Containment Htg Steam Return "1..-kCV-1101           Containment Vent Hdr
**CV-1806  
**CV-1807               Containment Purge Exhaust Isolation Valve
**CV-1501 "1..-kCV-1101  
**CV-1813               Air Room Supply
**CV-1807  
-1.-kCV-1805           Containm~nt  Purge Exhaust Isolation Valve
**CV-1813  
**CV-1502               Conta1nment Htg. Steam Return "1.."*CV-1102           Containment Vent Hdr
-1.-kCV-1805  
'fr:.cv-1064           Clean Waste Receiver Tanks Vent
**CV-1502 "1.."*CV-1102  
**CV-1103               Containment Sump Drain (SIS or CHR)
'fr:.cv-1064  
*":.cv-0911             Component Cooling water Return
**CV-1103  
**CV-1002               Primary System Drain Tank Outlet
*":.cv-0911  
**CV-1036               Clean Waste Receiver Tanks Recirc Outlet
**CV-1002  
**CV-1044               Clean Waste Receiver Tanks Outlet
**CV-1036  
**CV-1104               Containment Sump Drain (SIS or CHR)
**CV-1044  
**CV-0940               Component Cooling Water Return
**CV-1104  
**CV-1007               Primary  Syst~m Drain Tank Outlet
**CV-0940  
**CV-1038               Clean Waste Receiver Tanks Recirc Outlet
**CV-1007  
**CV-1045               Clean Waste Receiver Tanks Outlet
**CV-1038  
*":*cV-1065             Clean Waste Receiver Tanks Vent Steam Generator -1..~*E-SOB Bottom Blowdown Completed By:                 I       I Signature   Time     Date pa0480-0015d-89-93
**CV-1045  
*":*cV-1065 pa0480-0015d-89-93 DESCRIPTION Containment Purge Exhaust Isolation Valve Air Room Supply Containment Purg_e Exhaust Isolation Valve Containment Htg Steam Return Containment Vent Hdr Containment Purge Exhaust Isolation Valve Air Room Supply Containm~nt Purge Exhaust Isolation Valve Conta1nment Htg. Steam Return Containment Vent Hdr Clean Waste Receiver Tanks Vent Containment Sump Drain (SIS or CHR)
Component Cooling water Return Primary System Drain Tank Outlet Clean Waste Receiver Tanks Recirc Outlet Clean Waste Receiver Tanks Outlet Containment Sump Drain (SIS or CHR)
Component Cooling Water Return Primary Syst~m Drain Tank Outlet Clean Waste Receiver Tanks Recirc Outlet Clean Waste Receiver Tanks Outlet Clean Waste Receiver Tanks Vent Steam Generator -1..~*E-SOB Bottom Blowdown Completed By:
I I
CLOSED Signature Time Date  


Proc No EOP 8.1 Attachment 3 Revision 15 Page 2 of 2 CONTAINMENT ISOLATION CHECKLIST
VALVE NO  
* VALVE NO
**CV-0771  
  **CV-0771 DESCRIPTION Steam Generator  -:.~~E-50A Bottom Blowdown CLOSED
**CV-0767 m':CV-0768  
  **CV-0767             Steam Generator **E-50A Bottom Blowdown m':CV-0768           Steam Generator **E-50B Bottom Blowdown
**CV-1503  
  **CV-1503             Containment Htg Steam Inlet
**CV-0738  
  **CV-0738           - Steam Genterator **E-50B Top Blowdown
**CV-0739  
  **CV-0739             Steam Generator **E-50A Top Blowdown
**CV-0910  
  **CV-0910             Component Cooling Water Inlet (SIS)
-!.-kCV-0939  
  -!.-kCV-0939         Shield Cooling Surge Tank Fill
**CV-1004  
  **CV-1004             Clean Waste Receiver Tanks Inlet
-.!.-kCV-1037  
  -.!.-kCV-1037         Clean Waste Receiver Tanks Recirculation Inlet
"!.'"*CV-1358  
  "!.'"*CV-1358
-:.-::cv-1001  
  -:.-::cv-1001
**CV-1910  
  **CV-1910 Nitrogen Supply Primary System Drain Tank Recirculation Inlet Primary System Sampling
'l."*CV-1911  
  'l."*CV-1911         Primary System Sampling
-k-kCV-2009  
  -k-kCV-2009           Letdown Stop
'1.-A-CV-2083  
  '1.-A-CV-2083         Controlled Bleedof f
-k-.':CV-0155  
  -k-.':CV-0155         Demineralized Water Supply
-l:-kCV-0501  
  -l:-kCV-0501         Main Steam Isolation Valve (on CHP)
**CV-0510 pa0480-0015d-89-93 CONTAINMENT ISOLATION CHECKLIST DESCRIPTION Steam Generator -:.~~E-50A Bottom Blowdown Steam Generator **E-50A Bottom Blowdown Steam Generator **E-50B Bottom Blowdown Containment Htg Steam Inlet Steam Genterator **E-50B Top Blowdown Steam Generator **E-50A Top Blowdown Component Cooling Water Inlet (SIS)
  **CV-0510            Main Steam Isolation Valve (on CHP)
Shield Cooling Surge Tank Fill Clean Waste Receiver Tanks Inlet Clean Waste Receiver Tanks Recirculation Inlet Nitrogen Supply Primary System Drain Tank Recirculation Inlet Primary System Sampling Primary System Sampling Letdown Stop Controlled Bleedof f Demineralized Water Supply Main Steam Isolation Valve (on CHP)
* Completed By:
Main Steam Isolation Valve (on CHP)
Pages 1 and 2 Reviewed By:
Completed By:
Signature Shift Supervisor I
I Signature Pages 1 and 2 Reviewed By:
I Date Date I
I Shift Supervisor Proc No EOP 8.1 Revision 15 Page 2 of 2
I Ti.
* CLOSED I Ti.
Time pa0480-0015d-89-93
Date I
Date Time  


Proc No EOP 8.1 Attachment 4 Revision 15 Page 1 of 1 ACCIDENT IDENTIFICATJON LARGE BREAKS PRESSURIZER -PRESSURE DECR~ASING*RAPIDLY I     '---
Proc No EOP 8.1 Revision 15 Page 1 of 1 ACCIDENT IDENTIFICATJON LARGE BREAKS PRESSURIZER -PRESSURE DECR~ASING*RAPIDLY I
I I
I I
I OBSERVE STEAM GENERATOR PRESSURES__.
OBSERVE STEAM I
ABNORMALLY LOW IN ONE
GENERATOR PRESSURES__.
                                                                        ' STEAM GENERATOR PRESSURES OR BOTH STEAM GENERATORS                 - ">C:
ABNORMALLY LOW IN ONE OR BOTH STEAM GENERATORS i
                                                . i\~*
STEAM LINE RUPTURE 1
I INITIALLY NORMAL OR RISING i
J OBSERVE CONTAINMENT PRESSURE I INCREASING I I
STEAM LINE LOCA OR RUPTURE                                                        S.G. TUBE RUPTURE 1
STEAM BREAK INSIDE CONTAINMENT J,
J                                                                    OBSERVE OBSERVE                                                        CONTAINMENT PRESSURE CONTAINMENT PRESSURE                                                RADIATION AND SUMP LEVEL I INCREASING I I
pa0480-0015e-89-93 NORMAL
NORMAL              - -;:--*-I INCREASING i
'I STEAM BREAK I
                                                                              --------          I-   NORMAL I
OUTSIDE CONTAINMENT I SEE EOP 7 i
J VERIFY HIGH   !
- ">C:  
1 RADIATION AIR EJECTOR DISCHARGE
. i\\~*  
                                                                                                        \
' STEAM GENERATOR PRESSURES I INITIALLY NORMAL OR RISING LOCA OR S.G. TUBE RUPTURE OBSERVE CONTAINMENT PRESSURE RADIATION AND SUMP LEVEL  
STEAM BREAK        'I STEAM  BREAK OUTSIDE I
- -;:--*-I INCREASING i I-NORMAL II
                                                                                                ~
*..L ~.
INSIDE                                                              LOCA CONTAINMENT            CONTAINMENT            ...II,
LOCA p I SEE EOP 8. 1 I J
                                                  * ..L
I VERIFY HIGH !
                                                        ~.                                      ~
RADIATION 1
J,                    ,;,
AIR EJECTOR DISCHARGE  
                                                                          '                            lEOP I SEE EOP 7  i            p            I SEE EOP         8.1  I        I SEE      8 *2 I pa0480-0015e-89-93
\\  
~  
~
l I SEE EOP 8
* 2 I  


iJlraE .ll.                                       1 MIN...
I I
: l.                                                                                                               &#xa9; C.B. BI PBESS n  CD r-------                                                                             *11111;-Dl"~;t-?~
iJlraE.ll.
CLEAmll?
: l.
llE&CTDR TR IPPEDT I .,
n S.  
(lTTlCH. I)                          , - - - COJ:DillMEllT ISOL.
*s.
'      S. I     TES      I ID                                                                    YES   I ID IES (AftACB. 3)                  (j'I PCS  50- s-cl                -
: 0.
I
F c
    *s.                       l                                                                                             l                                                             I IES      IO  I 0.
0
                    .I   TRIP RElCTDI i
: 0.
I 1
-L
MlMUlLLY STlRT I
- A N
T.
A
... C CD r-------
llE&CTDR TR IPPEDT I
TES I
ID l
. I TRIP RElCTDI I i
@1 IDDS INSERTED?
I YES I
ID
!TRIP CLUTCH p/SJ J
CD I SAFETY I IJECTI OM lCTUlTEDT I
YES I
ID IM&MUlLLY IM ITllTEI CD I TRIP &LL PCP CD I CDllTllMMEllT ISDUTIDM *SIGMlLT I
YES I
MD l
1 MIN...
I I SDLlTE llREU.,  
.------i_I( CAUSE CORRECTED)!
I  
!REACTOR SHUTDDllRtl I
YES I MO 1-I PZR.. 20~ ' l I YES I
MO 1--
lna.. 1100 rsnl I
YES I MD 1-I *nv c sqs 0 t l I
YES I MO r-
*11111;-Dl"~;t-?~
(lTTlCH. I)
YES I
ID 1
MlMUlLLY I STlRT EQUIP.
l I C.B. HI PRESS7 I YES l
llD I
I NIM.OP ES.T ATT.lCH. 2.
TES I 110 I
MANUALLY I START EQUIP.
I I EXIT THIS I i-..--..i PROCEDURE
., GD TD ONP-21
&#xa9; C.B. BI PBESS CLEAmll?
IES I.,
l I
RlllET C.B.
RlllET C.B.
ISOLA.TIOll IES          10 l         I 1
ISOLA.TIOll SIGNAL l  
                                                                                                                                                                                                *al) RAISE Pm H1ESS m
'l'llRll OFF CORTAIRMESr SPRAY POIPS CLOSE co~
F
SPRAY llEAllER VALVE; I
          @1 I
COJ:DillMEllT ISOL.
IDDS INSERTED?
(AftACB. 3)
YES    I ID EQUIP.
IES 10 l
l SIGNAL l
(5)
(5)   MAllllALLY ISOU.TE IIF PCS <1250 PSIA PZH B'l'llS PZH SPRAY MAX CBC.
MAllllALLY ISOU.TE IIF PCS <1250 PSIA OH C.P.>5PSIG 1
                                                                                                                                                                                                                    ~  . f
IES 110  
                                                                                                                          'l'llRll OFF
&#xa9; EXITTO APPLIC.
                      !TRIP CLUTCH      p/SJ                                                    I C.B. HI PRESS7 I                                          OH C.P.>5PSIG llillu:mJllS c                      J                          I YES l      llD  I  CORTAIRMESr 3 BPSI Pp    cm.
PROC.  
0  CD I  SAFETY I IJECTI OM I SDLlTE llREU .,
*c I
                                              .------i_I( CAUSE CORRECTED)!                                      I  '  SPRAY POIPS 1                              .1
I MUUlLLY.
: 0. I lCTUlTEDT YES    I ID I
                                                          !REACTOR SHUTDDllRtl NIM.OP ES.T ATT.lCH. 2 .
CLOSE                                                    vom    PORIWl'IOI co~                                                        EXISTS!
    -L                                                    I          I          1-
                              '                              YES          MO                      TES  I    110        SPRAY llEAllER              IES           110 I
IM&MUlLLY IM ITllTEI I
  -                                                                                                    I VALVE; A                                                        PZR .. 20~ '  l N
CD I    TRIP &LL PCP '                          I I
YES    I    MO  1--                        MANUALLY START          I                            &#xa9;     EXITTO T. CD I              '
CDllTllMMEllT                          lna .. 1100 rsnl EQUIP.
I APPLIC.
PROC.
A ISDUTIDM *SIGMlLT I YES I MD l
I YES I MD 1-I *nv c sqs 0 t l I EXIT THIS i-..--..i PROCEDURE
                                                                                            ., GD TD ONP-21 I
I YES I MO r-
  ... C I
MUUlLLY .
llllTIUE 1:
llllTIUE 1:
      *c                                                                                                                                                                            BEAD 1250 PSI !
1250 PSI J
                '            J f PCS ... so 0 sua- I                               INFORMATION COPY                                                     1 I CY I   BREU ISDUBLE?
f PCS... so0 sua-I COOLED?
COOLED?
INFORMATION COPY D
                                                                                                                                                                                .G SAMPLE PCS
E N
* I ID                          I   YES   I   no   1--
*T EDP_
D    I YES                                                                                                                                                                  C.B. AIR
8.1 CY I BREU ISDUBLE?
                                                                '~-------""RESET l
I YES I
E              ACTIVATE : s I TE EMERGENCY PLU I                                                                  RESTART                                                                        I N                        I        I SIS            PCP'S
ID l
      *T EDP_                                      I 8.1                              &#xa9;,@,f;!C.*_SUISEQUENl ACTIOI .
ACTIVATE : s I TE I EMERGENCY PLU I
                                                . .. PROCEDURE .STEP. .MUMBERS.
I I
: 30.                                                                             6!!_                                                                                                                          Pree 110 EDP 8.1.
YES I no 1--
r.mt.                                                                           rnm_    2 HOURS                                              6 llOURS Attachment 6 ReTis1011 15 Page lot l
'~-------""RESET SIS I  
                                        '"p-z""1:-:P-::R-::E-=s-=s-
&#xa9;,@,f;!C.*_SUISEQUENl ACTIOI.  
                                                                  ..-::2-::1-::i5                       COMM EH CE
... PROCEDURE.STEP..MUMBERS.
(!)  PCS 50* S-C                                                                                 PCS COOLING          e 0 ISOLATE OR VDiT 1--------.:!;@~l~PZ:.:::R_:PRESS..::::;::...:<::1::6:.o.rr---i-:S~D===CL:"G'-10'-PE:.:R';A~B..::L.=..iE YES              NO                                                              SI TANKS                                           n:s no .                         YES           HO 15&deg;F/HR n:s      llO SECURE                      SECURE                                                                                                        ESTABLISH
RESTART PCP'S I
            *(!!)RAISE PZR ~*      BORIC ACID                                                                                                                                                              EST. SD BORIC ACID                                                                                                    HOT A!ID COLD   r.m' CHARGING                                                                                                                                                                CLG. PER PZR BTllS 011                                CHARGING IIIJECl"IOll               SOP 3. THIS                            HO P'LR SPRAY OTr      ' LPSI PROCEDURE MAX CHG.                                                                                                                                                                                COMPLETE VERIFJ' l"LOll TO Miii :t.mXlllll .
(j') I PCS 50- s-cl I IES IO I 1
HOT AlllJ COLD LECS                                                         OPEN 3 BPSI Pp Oii.                                                                              RAS?                                                                                                                                    BOTH PZR THIS PROCEDU!ll!:
*al) RAISE Pm H1ESS PZH B'l'llS m PZH SPRAY ~
PORV 1 S no      no                                                          COMPLETI!:                                                            RUN ~ I vom rcRMA1'IO!                                                                                                                                                                                                                                        HPS I Pp EXISTS?
MAX CBC.
VERIFY:
llillu:mJllS 3 BPSI Pp cm.
LPSl-Pps TRIP C.8. SUMP VLVS OPEN; SIRWT VLYS I  CLOSE;      .
.1 vom PORIWl'IOI EXISTS!
JIOTE:-RAS. CAN. OCCUR AT                30 GPM FLOW ALMOST ANYTIME              /HPSI Pp; DEPEHDIHG OH THE    MINIFLOW CY'S BREAK SIZE AHO THE.            CLOSE; HUMBER OF PUMPS      CC HX OUT RUHHIHG                    :::.1os 0 H5 30278 '
I BEAD 1
HS 3056B TO CLOSE; ROUTE ESS ROOM SUMPS Q  SAMPLE PCS
. G SAMPLE PCS
* T.C.B
* C.B. AIR I
* C.B. AIR                                                                                        . (ATTACH 5)
f
INFORMATION COPY}}
 
(!)
PCS 50* S-C n:s llO
*(!!)RAISE PZR ~*
PZR BTllS 011 P'LR SPRAY OTr MAX CHG.
Miii :t.mXlllll.
3 BPSI Pp Oii.
vom rcRMA1'IO!
EXISTS?
Q SAMPLE PCS
* C.B. AIR
: 30.
r.mt.  
'"p-z""1:-:P-::R-::E-=s-=s-..  
-::2-::1-::i5 YES NO SECURE BORIC ACID CHARGING LPSI SECURE BORIC ACID CHARGING JIOTE:-RAS. CAN. OCCUR AT ALMOST ANYTIME DEPEHDIHG OH THE BREAK SIZE AHO THE.
HUMBER OF PUMPS RUHHIHG COMM EH CE 6!!_
rnm_
PCS COOLING e 15&deg;F/HR RAS?
no no VERIFY:
LPSl-Pps TRIP C.8. SUMP VLVS OPEN; SIRWT VLYS I CLOSE; 30 GPM FLOW
/HPSI Pp; MINIFLOW CY'S CLOSE; CC HX OUT
:::.1os 0 H5 30278 '
HS 3056B TO CLOSE; ROUTE ESS ROOM SUMPS T.C.B *
. (ATTACH 5)
INFORMATION COPY 2 HOURS 6 llOURS 0
ISOLATE OR VDiT 1--------.:!;@~l~PZ:.:::R_:PRESS..::::;::...:<::1::6:.o.rr---i-:S~D===CL:"G'-10'-P E:.:R';A~B..::L.=..iE SI TANKS n:s no.
YES HO ESTABLISH HOT A!ID COLD r.m' IIIJECl"IOll VERIFJ' l"LOll TO HOT AlllJ COLD LECS THIS PROCEDU!ll!:
COMPLETI!:
EST. SD CLG. PER SOP 3. THIS PROCEDURE COMPLETE HO Pree 110 EDP 8.1.
ReTis1011 15 Page lot l OPEN BOTH PZR PORV 1 S RUN
~ I HPS I Pp}}

Latest revision as of 09:57, 6 January 2025

Rev 15 to Emergency Operating Procedure EOP 8.1, Loca
ML18051A550
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/15/1983
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18051A543 List:
References
TASK-15-02, TASK-15-2, TASK-RR EOP-8.1, NUDOCS 8308230404
Download: ML18051A550 (16)


Text

ENCLOSURE 2 ATTACHMENT 4 CONSUMERS POWER COMPANY PALISADES PLANT DOCKET 50-255 Emergency Operating Procedure EOP 8.1 "Loss Of Coolant Accident" (Abridged)

August 15, 1983 15 Pages

(--8308230464 830815

'l I

~DR ADOCK 05000255 PDR NU080983-NL01

PALISADES NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE TITLE:

LOSS OF COOLANT ACCIDENT Definition:

Leak rate exceeds capacity of operable charging pumps.

1.0 SYMPTOMS Any one or more of the following symptoms may be present.

a.

Standby Charging Pumps start.

CAUTION Pressurizer level may not be a true indication of PCS fluid inventory.

b.

Pressurizer level abnormal.

(Low or High)

c.

Pressurizer low pressure.

d.

Containment high radiation.

e.

Containment high pressure and/or temperature.

f.

Containment high humidity.

g.

Containment sump level increasing.

h.

Volume Control Tank level decreasing.

i.

Quench Tank high level, temperature or pressure.

j.

High startup rate alarm (Control Rod ejection).

k.

High power level Reactor trip (Control Rod ejection).

2.0 AUTOMATIC ACTIONS

  • a.

Standby Charging Pumps start.

b.

Reactor trip.

c.

Safety injection actuation.

d.

Containment spray actuation.

e.

Containment isolation.

f.

Auxiliary Feedwater initiated.

Proc No EOP 8.1 Revision 15 Page 1 of 8

g.

Main Steam Isolation Valves close on Containment High Pressure (5.3 psig) -k;'*E-50A, ;':;'*CV-0510, and ;':;'*E-5013, ;':;'*CV-0501.

pa0480-0015a-89-93

3.0 3.1 3.2

.3,3 3.4 3.5 PALISADES NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE TITLE:

LOSS OF COOLANT ACCIDENT IMMEDIATE ACTIONS Trip the reactor; perform EO~ 1 Immediate Actions.

Proc No EOP 8.1 Revision 15 Page 2 of 8 Verify safety injection actuated.

Initiate manually, if PCS pressure is less than or equal to 1605 psia or containment pressure is greater than 5 psig.

At PCS pressure of 1250 psia, or if containment pressure reaches 5 psig, manually actuate containment isolation:

Push the manual initiate push buttons for Containment High Radiation (Left and Right Channels) located on the front of panel ;':;':EC-13.

If containment pressure increases to 5 psig, verify Containment Spray initiated, If necessary, manually initiate Containment Spray.

Attempt to locate and isolate the break if possible:

a.

Isolate letdown line by closing **CV-2009 (outside containment) or

'
;'i"CV-2001 (inside containment).
b.

Verify PORVs and isolation MOVs* closed*.

c.

Isolate PCS sample lines.

(Close ;b':CV-1910 and ;'n':CV-1911).

d.

Check Acoustical Monitor Panel ;':;':EC-51 and Pressurizer Relief Valves Discharge Temperature Indicators for symptoms of pressurizer relief valve leakage.

e.

Check Quench Tank level, pressure and temperature indications normal.

3.6 Check that the Main Steam Isolation Valves have closed on Containment High Pressure (5 psig) -::;':E-50A, -:d:CV-0510 and -::;':£-SOB, ;':;'*CV-0501.

3.7 Place Turbine Generator Turning Gear Motor **K-2 Control Switch in "PULL TO LOCK".

3.8 ACTIVATE SITE EMERGENCY PLAN.

REFER TO SITE EMERGENCY IMPLE}illNTING PROCEDURE EI-1.

4-.0 NOTE:

4.1 NOTE:

SUBSEQUENT ACTIONS Use Attachment 6 as a guide only for subsequent action items.

If break has been isolated and criteria in Attachment 6 are satisfied, proceed as shown in Attachment 6.

Verify all immediate actions have been initiated.

This procedure is to be performed in conjunction with EOP 1.

pa0480-0015a-89-93

4.2 4.3 4.4 PALISADES NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE TITLE:

LOSS OF COOLANT ACCIDENT CAUTION If a SIS signal is received or priamry pressure drops below 1605 psia after the start of a Loss of Offsite Power, the equipment on this checklist shall be started by placing the NOfil1AL SHUTDOw'N SEQUENCER switches to the TEST position and holding them for 45 seconds (until the DBA sequencers timeout).

Proc No EOP 8. I Revision 15 Page 3 of 8 Verify minimum operating safety injection equipment using checksheet.

(Attachment 1)

Verify minimum operating safeguards equipment if Containment High Pressure Trip is activated.

(Attachment 2)

When the containment high pressure signal has cleared, stop containment spray:

a.

Reset the Containment High Pressure Isolation Signal (this will close the iodine removal valves "l;*kCV-0437A and ;b'*CV-0437B).

  • ~

J.

b.

Turn off the Containment Spray Pumps ;'d*P-54A, °ld*P-54B and ;'d*P-54C.

c.

Close the Containment Spray Header Valves ;'d*CV-3001 and ;b'*CV-3002.

4.5 Verify containment isolation.

(Attachment 3) 4.6 4.7 NOTE:

Review diagnostic sheet (Attachment 4) to confirm accident diagnosis.

Attempt to establish and maintain hot and cold leg temperature and PCS pressure within the operating region of the 50°F subcooling saturation curve (Use EOP 1, Attachment 2 or the subcooling curve posted in the Control Room.)

Use all available indications in determining 50°F subcooling, ie, use hot and cold leg temperatures, several incore thermocouples, and PCS pressure.

4.8 If 50°F subcooling cannot be maintained, assume that there have been voids formed within the PCS:

a.

Substantial void formation would be indicated by one or more of the following:

1.

Core outlet temperature readings higher than saturation conditions.

2.

Increased core nT above full power (47°F).

3.

Startup neutron detectors showing erratic indication.

4.

Incore thermocouples showing erratic indication.

pa0480-0015a-89-93

NOTE:

4.9 4.10 NOTE:

PALISADES* NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE TITLE:

LOSS OF COOLANT ACCIDENT

5.

Th increasing or erratic.

6.

T erratic.

c Proc No EOP 8. 1 Revision 15 Page 4 of 8

b.

If void formation exists, increase PCS pressure by ensuring:

1.

All pressurizer heaters on.

2.

Pressurizer Spray Valves closed C-:;-;',CV-1057 and ;'n'<CV-1059 ).

3.

Maximum charging and minimum letdown.

4.

HPSI pumps running ;';;'<P-66A, ;b'*P-66B, and ;'d'P-66C.

A reduction in the subcooled margin is preferable to violation of PCS boundary through excess pressure for existing temperature.

c.

If 50°F subcooling is established but voids remain, vent the Reactor Vessel head in accordance with Step 4.0 (18) of ONP 21.

CAUTION There is a possibility of excessive radiation if a sample line is opened.

Extreme care and caution must be used.

Periodically notify the Chemistry Department to sample containment atmosphere for Hydrogen and Primary Coolant for assessment of fuel damage.

Perform ONP 22 and ONP 11 as necessary.

30 MINUTES AFTER LOCA, STOP BORIC ACID INJECTION VIA THE CHARGING PUl1PS:

a.

Turn selector switch for Charging Pumps **P-55B and **P-55C from auto to manual and turn HS for ;'d*P-55B and ;b'<P-55C to off.

b.

Turn HS for Charging Pump **P-SSA to off.

If there is a low level indicated in the pressurizer, it may be necessary to rack out breaker ;';;'*052-1205 for ;';;'*P-55A in order to stop ;'<;'*P-55A.

c.

Turn HS for Boric Acid Pumps **P-56A and **P-56B to off.

d.

Close Boric Acid Pump Feed Valve **M0-2140 and Gravity Feed Valves

';;'*M0-2169 and id*M0-2170.
e.

Check closed VCT Outlet Valve **M0-2087.

f.

Open SIRW Outlet to Charging Pumps ;'n'*M0-2160.

g.

Run each Charging Pump ;';;'*P-55A, ;';;'<P-55B and ;'d:p-55c for at least five (5) minutes to flush the concentrated boric acid through the lines.

Turn Charging Pumps off or run as needed to control pressure.

pa0480-0015a-89-93

NOTE:

4.11 NOTE:

4.12 NOTE:

PALISADES NUCLEAR PLANT EMERGENCY OPERATING PROCEDUHE TITLE:

LOSS OF COOLANT ACCIDENT Proc No EOP 8.1 Revision 15 Page 5 of 8 If PCS pressure is g:t;"eater than 275 psig, LPSI pumps may be stopped.

Do not attempt to ope-rate LPSI valve "i'd*M0-3008 *when containment sump level is greater thari 85% indicated.

ONE HOUR AFTER LOCA, BEGIN PLANT COOLDOWN:

a.

Open Steam Bypass to Condenser Valve "i'*kCV-0511.

b.

Open Steam Dumps to Atmosphere, Valves *'*"i'*CV-0779, *'d.*CV-0780, "i'd*CV-0781, and "i'd*CV-0782 as necessary to establish and maintain plant cooldown at 75°F per.hour.

Steam flow through two of the four Steam Dumps should be adequate to establish an initial cooldown rate of 75°F per hour.

IF THE RECIRCULATION ACTUATION SIGNAL rs RECEIVED:

CAUTION Prior to receipt of RAS, place handswitches for i**CV-3027 and ""'*CV-3056 (HS-3027A f""'*HS-3056A) to the closed position.~.

a.

Verify the following:

1.

Low Pressure Safety Injection Pumps stop.

(-,'d<P-67A and

.,...,.,P-67B)

2.

Containment Sump Isolation Valves open.

(-,',-,'<CV-3029 and

-,'d*CV-3030)

3.

Safety Injection and Refueling Tank Isolation Valves close.

(**CV-3031 and **CV-3057)

4.

Each running HPSI pump has a minimum flow of at least 30 gpm.

5.

SI Pump Minimum Flow Stop Valves close permissive lights are lighted.

6.

Component Cooling Heat Exchanger Service Water Outlet Valves transfer to alternate supply *'<*'*HIC-0881 and *'d*HIC-0882.

If necessary, dispatch operator to adjust '"'"HIC-0881 and/or ""'<HIC-0882 to maintain less than or equal to 105°F outlet temperature on Component Cooling Heat Exchangers.

pa0480-0015a-89-93

NOTE:

PALISADES NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE TITLE:

LOSS OF COOLANT ACCIDENT

b.

Perform the following:

Proc No EOP 8.1 Revision 15 Page 6 of 8

1.

If each running HPSI pump is not maintaining at least 30 gpm flow, first trip the Charging Pumps one at a time and then the HPSI pumps one at a time until each running HPSI pump is maintaining at least 30 gpm flow or until only one HPSI pump is running.

2.

Place the keys in SIRWT Recirculation Valve handswitches

    • HS-3027B and **HS-3056B and place in the closed position.
3.

Monitor the radiation levels in the Auxiliary Building and the ESS sumps for signs of leakage from the SIS equipment.

CAUTION Do not perform Step 4 if contain-ment pressure exceeds 4 psig.

4.

Align the safeguards sump discharge to the containment by closing ;';;';-l-'1V-DRW151 (sump discharge to DWD) and opening

b"CV-1103 and 'l'd>CV-1104 (Containment Sump Drain Valves).
5.

If only one service water pump is running, start another service water pump.

If only one service water pump can be operated, align the fire water system to the service water system by opening 'l'0 "t1V-FP130 and ;';-;';-f1V-FP131.

This action is required to provide sufficient cooling water flow to the Engineered Safeguards Room coolers.

If containment isolation signal is present, refer to Attachment 5.

c.

If reactor pressure is less than 230 psia and the safety injection system is lined up for cold leg injection, perform the following:

CAUTION If only one Containment Spray Pump is running, do not open more than one.Containment Spray Valve Ci';"CV-3001 or ;'d>CV-3002) and one HPSI pump supply valve ('l'>;'*CV-3071 or ;'c;'*CV-3070) at the same time.

1.

If CHP has been reset:

(a)

Check closed **CV-3001 and **CV-3002.

(b)

Start **P-54A, **P-54B or **P-54C.

(c)

Open **CV-3071 to supply cooled water from the Shutdown Cooling Heat Exchangers to the suction of ;'d*P-66A.

pa0480-0015a-89-93

4.13 NOTE:

PALISADES NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE TITLE:

LOSS OF COOLANT ACCIDENT Proc No EOP 8.1 Revision 15 Page 7 of 8 (d)

Open ;'d*CV-3070 to supply cooled water from the Shutdown Cooling \\Heat Exchangers to the suction of ;'d*P-66B and

-ld*P-66C:*

2.

If the CHP signal is present:

(a)

If two or more Containment Spray Pumps are running.

(b)

Open ;';-;'*CV-3071 to supply cooled water from the Shutdown Cooling Heat Exchangers to the suction of **P-66A.

(c)

Open **CV-3070 to supply cooled water from the Shutdown Cooling Heat Exchangers to the suction of -/d*P-66B and

h'*P-66C.

TWO HOURS AFTER LOCA, ISOLATE OR VENT SAFETY INJECTION TANKS:

In the event of a large LOCA, the tanks will already be empty and this step will be unnecessary.

a.

Isolate Safety Injection Tanks **T-82A, **T-82B, **T-82C and

',;'*T-82D.

o,t j_

1.

Unlock and close breakers **052-2229 (MCC-22), **052-2429 (MCC-24), -/;-;'*052-2129 (l'lCC-21), and -/;-;'*052-2329 (MCC-23).

2.

Close ;'*-l*I-10-3041, ;'*-l*M0-3045, ;';;'*M0-3049 and ;'d*l'I0-3052.

b.

If unable to isolate one or more Safety Injection Tanks, vent the unisolated SI Tanks as follows:

1.

Open Vent Valve ;'d>CV-3067, ;'d*CV-3065, ;'d>CV-3063 or ;'r;'>CV-3051 on the tank to be vented **T-82A, **T-82B, **T-82C or **T-82D.

2.

This will allow the nitrogen to flow into the Clean Waste Receiver Tanks **T-64A, **T-64B, **T-64C or **T-64D and blow at least one of their rupture discs and pass into the containment atmosphere.

3.

Repeat Steps (1) and (2) for each unisolated tank until all are vented.

4.. 14 SIX HOURS AFTER LOCA, PROCEED AS FOLLOWS:

a.

With PCS pressure less than 160 psia, align HPSI for hot and cold leg injection for long term cooling: *

1.

Close **M0-3080, then open **M0-3082.

2.

Close ;'d>M0-3081, then open -,',;'*M0-3083.

pa0480-0015a-89-93

NOTE:

NOTE:

NOTE:

PALISADES NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE TITLE:

LOSS OF COOLANT ACCIDENT Proc No EDP 8.1 Revision 15 Page 8 of 8 Verify flow to hot leg Nwnber 1 on ;'d*FI-0316A and/or ;'d*FI-0317A.

';;'*FI-0316A will indicate hot leg injection from HPSI Pwnp ;';;'*P-66A, and
'd*FI-0317A will indicate hot leg injection from HPSI Pump ;'d*P-66B or
';;'*P-66C.

Verify flow to cold'legs on ;'d*FI-0308, ;'""FI-0310, ;';;'*FI-0312, and ;'d*FI-0313.

Total flow to hot leg Number 1 should approximately equal total flow to cold legs.

3.

Procedure ended.

b.

With PCS pressure greater than or equal to 160 psia, place the Shutdown Cooling System in operation:

1.

Verify at least 50°F subcooling will be maintained at entry pressure for Shutdown Cooling using loop cold leg temperatures and several incore thermocouples.

2.

Enter shutdown cooling per SOP 3:

When using SOP 3, ignore any reference to Primary Coolant Pumps; any reference to pressurizer spray is to be considered as auxiliary spray.

(a)

If necessary, throttle or secure HPSI and/or charging pump flow to maintain pressurizer level.

(b)

If voiding is apparent during depressurization (ie, pressurizer level is erratic), stop auxiliary spray to the pressurizer and vent noncondensibles from the reactor vessel head and/or the pressurizer in accordance with Step 4.0 (18) and (19) of ONP 21.

(c) If the **PS-0104 interlock prevents the opening of either

'd*M0-3015 or ;';;'*~10-3016, *refer to Attachment 7.

If there is a high radioactivity level in the Primary Coolant System, circulation of this fluid in the Shutdown Cooling System may result in high area radioactivity readings in the Auxiliary Building.

The activity level of the PCS should be determined prior to initiating Shutdown Cooling System flow.

3.

If shutdown cooling cannot be established:

(a)

Maintain Steam Generator heat removal, using the Steam Bypass to Condenser or the Steam Dumps to Atmosphere, while attempting to establish shutdown cooling.

(b)

If heat removal by Steam Generators can no longer be maintained, open PORVs and block valves **M0-1042A,

    • M0-1043A, **PRV~l042B and **PRV-1043B.

Continue cold leg injection with at least one HPSI pump.

Once Shutdown Cooling entry conditions are met, close the PORVs and their block valves ;';;"M0-1042A, ;';;';MV-1043A, ;';;"PRV-1042B and **PRV-1043B and establish shutdown cooling as described in Step 4.14.b.

pa0480-0015a-89-93

CHECKSHEET FOR MINIMUM SAFEGUARDS Proc No EOP 8.1 Revision 15 Page 1 of 1 Equipment fed from bus C and/or D/G 1-1 (**K-6AG) 2400V

1.

1 HP Safety Injection Pump running **P-66B -----

.2.

1 LP Safety Injection Pump running **P-67B -----

3.

1 Component Cooling Water Pump running **P-52A ----- or **P-52C -----

4.

1 Service Water Pump running **P-7B -----

5.

1 Auxiliary Feedwater Pump running **P-8A -----

.. 480V

6.

1 Charging ~

    • P-SSC -----
7.

4 HP Safety Injection Valves open

    • M0-3007'
    • M0-3009
    • M0-3011
    • M0-3013
8.

2 LP Safety Injection Valves open **M0-3008 ----- **M0-3010 -----)m

9.

2 Boric Acid gravity feed stops open **M0-2169 *----- **H0-2170 ___

.....;fA.=. 0 u

10.

1 Containment Air Cooler recirculation fan **V-4A -----

11.

Volume Control Tank Outlet Isolation Valve closed **M0-2087 OR E qui pmen t fed from bus D and/or D/G 1-2 (**K-6BG) 2400V z

0

12.

1 HP Safety Injection Pump running **P-66A ----- or **P-66C -----1~-

13.

1 LP Safety Injection Pump running **P-67A -----

14.

1 Component Cooling Water Pump running **P-52B -----

15.

1 Service Water Pump running **P-7A or **P-7C 480V

16.

2 Charging Pumps **P-SSA and **P-SSB -----

17.

4 Redundant HP Safety Injection Valves open

    • M0-3062
    • M0-3064
    • M0-3066
    • M0-3068
18.

2 LP Safety Injection Valves open **M0-3012

    • M0-3014

<(

  • ~ z ll'.il:3
19.

1 Boric Acid Pumped Feed Stop Valve open **M0-2140 -----

20.

1 Boric Acid Pump running **P-56A -----

21.

3 Containment Air Cooler Recirculation fans running

'f..-kV-lA

'f..~V-2A

    • V-3A Completed By:

I Signature Date Reviewed By:

I pa0480-0015b-89-93 Shift Supervisor Date

I CHECK SHEET FOR MINIMUM SAFEGUARDS WITH CONTAINMENT HIGH PRESSURE

1.

Complete Attachment 1.

Proc No EOP 8.1 Revision 15 Page 1 of 1

2.

2 Containment Spray Valves open **CV-3001 and **CV-3002

3.

4 Containment Air Cooler High Capacity Service Water Valves open

    • CV-0861
    • CV-0864
    • CV~0867
4.

2 Iodine Removal Valves (open after 1 minute time delay)

    • CV-0437A
    • CV-0437B

~

and From 2400 V bus lC and/or Diesel Generator 1-1

5. 2 Containment Spray Pumps **P-54B
    • P-54C

~

or From 2400 V bus ID and/or Diesel Generator 1-2

6.

1 Containment Spray Pump ~""*P-54A -----

Completed By:

I Signature Date Reviewed By:

I Shift Supervisor Date pa0480-0015c-89-93

CONTAINMENT ISOLATION CHECKLIST

  • Proc No EOP 8.1 Revision 15 Page 1 of 2 All containment isolation CV's have latching circuits, the handswitches have to be placed to closed position prior to open position.

VALVE NO.

    • CV-1808
    • CV-1814
    • CV-1806
    • CV-1501 "1..-kCV-1101
    • CV-1807
    • CV-1813

-1.-kCV-1805

    • CV-1502 "1.."*CV-1102

'fr:.cv-1064

    • CV-1103
  • ":.cv-0911
    • CV-1002
    • CV-1036
    • CV-1044
    • CV-1104
    • CV-0940
    • CV-1007
    • CV-1038
    • CV-1045
  • ":*cV-1065 pa0480-0015d-89-93 DESCRIPTION Containment Purge Exhaust Isolation Valve Air Room Supply Containment Purg_e Exhaust Isolation Valve Containment Htg Steam Return Containment Vent Hdr Containment Purge Exhaust Isolation Valve Air Room Supply Containm~nt Purge Exhaust Isolation Valve Conta1nment Htg. Steam Return Containment Vent Hdr Clean Waste Receiver Tanks Vent Containment Sump Drain (SIS or CHR)

Component Cooling water Return Primary System Drain Tank Outlet Clean Waste Receiver Tanks Recirc Outlet Clean Waste Receiver Tanks Outlet Containment Sump Drain (SIS or CHR)

Component Cooling Water Return Primary Syst~m Drain Tank Outlet Clean Waste Receiver Tanks Recirc Outlet Clean Waste Receiver Tanks Outlet Clean Waste Receiver Tanks Vent Steam Generator -1..~*E-SOB Bottom Blowdown Completed By:

I I

CLOSED Signature Time Date

VALVE NO

    • CV-0771
    • CV-0767 m':CV-0768
    • CV-1503
    • CV-0738
    • CV-0739
    • CV-0910

-!.-kCV-0939

    • CV-1004

-.!.-kCV-1037

"!.'"*CV-1358

-:.-::cv-1001

    • CV-1910

'l."*CV-1911

-k-kCV-2009

'1.-A-CV-2083

-k-.':CV-0155

-l:-kCV-0501

    • CV-0510 pa0480-0015d-89-93 CONTAINMENT ISOLATION CHECKLIST DESCRIPTION Steam Generator -:.~~E-50A Bottom Blowdown Steam Generator **E-50A Bottom Blowdown Steam Generator **E-50B Bottom Blowdown Containment Htg Steam Inlet Steam Genterator **E-50B Top Blowdown Steam Generator **E-50A Top Blowdown Component Cooling Water Inlet (SIS)

Shield Cooling Surge Tank Fill Clean Waste Receiver Tanks Inlet Clean Waste Receiver Tanks Recirculation Inlet Nitrogen Supply Primary System Drain Tank Recirculation Inlet Primary System Sampling Primary System Sampling Letdown Stop Controlled Bleedof f Demineralized Water Supply Main Steam Isolation Valve (on CHP)

Main Steam Isolation Valve (on CHP)

Completed By:

I Signature Pages 1 and 2 Reviewed By:

I Shift Supervisor Proc No EOP 8.1 Revision 15 Page 2 of 2

  • CLOSED I Ti.

Date I

Date Time

Proc No EOP 8.1 Revision 15 Page 1 of 1 ACCIDENT IDENTIFICATJON LARGE BREAKS PRESSURIZER -PRESSURE DECR~ASING*RAPIDLY I

I I

OBSERVE STEAM I

GENERATOR PRESSURES__.

ABNORMALLY LOW IN ONE OR BOTH STEAM GENERATORS i

STEAM LINE RUPTURE 1

J OBSERVE CONTAINMENT PRESSURE I INCREASING I I

STEAM BREAK INSIDE CONTAINMENT J,

pa0480-0015e-89-93 NORMAL

'I STEAM BREAK I

OUTSIDE CONTAINMENT I SEE EOP 7 i

- ">C:

. i\\~*

' STEAM GENERATOR PRESSURES I INITIALLY NORMAL OR RISING LOCA OR S.G. TUBE RUPTURE OBSERVE CONTAINMENT PRESSURE RADIATION AND SUMP LEVEL

- -;:--*-I INCREASING i I-NORMAL II

  • ..L ~.

LOCA p I SEE EOP 8. 1 I J

I VERIFY HIGH !

RADIATION 1

AIR EJECTOR DISCHARGE

\\

~

~

l I SEE EOP 8

  • 2 I

I I

iJlraE.ll.

l.

n S.

  • s.
0.

F c

0

0.

-L

- A N

T.

A

... C CD r-------

llE&CTDR TR IPPEDT I

TES I

ID l

. I TRIP RElCTDI I i

@1 IDDS INSERTED?

I YES I

ID

!TRIP CLUTCH p/SJ J

CD I SAFETY I IJECTI OM lCTUlTEDT I

YES I

ID IM&MUlLLY IM ITllTEI CD I TRIP &LL PCP CD I CDllTllMMEllT ISDUTIDM *SIGMlLT I

YES I

MD l

1 MIN...

I I SDLlTE llREU.,

.------i_I( CAUSE CORRECTED)!

I

!REACTOR SHUTDDllRtl I

YES I MO 1-I PZR.. 20~ ' l I YES I

MO 1--

lna.. 1100 rsnl I

YES I MD 1-I *nv c sqs 0 t l I

YES I MO r-

  • 11111;-Dl"~;t-?~

(lTTlCH. I)

YES I

ID 1

MlMUlLLY I STlRT EQUIP.

l I C.B. HI PRESS7 I YES l

llD I

I NIM.OP ES.T ATT.lCH. 2.

TES I 110 I

MANUALLY I START EQUIP.

I I EXIT THIS I i-..--..i PROCEDURE

., GD TD ONP-21

© C.B. BI PBESS CLEAmll?

IES I.,

l I

RlllET C.B.

ISOLA.TIOll SIGNAL l

'l'llRll OFF CORTAIRMESr SPRAY POIPS CLOSE co~

SPRAY llEAllER VALVE; I

COJ:DillMEllT ISOL.

(AftACB. 3)

IES 10 l

(5)

MAllllALLY ISOU.TE IIF PCS <1250 PSIA OH C.P.>5PSIG 1

IES 110

© EXITTO APPLIC.

PROC.

  • c I

I MUUlLLY.

llllTIUE 1:

1250 PSI J

f PCS... so0 sua-I COOLED?

INFORMATION COPY D

E N

  • T EDP_

8.1 CY I BREU ISDUBLE?

I YES I

ID l

ACTIVATE : s I TE I EMERGENCY PLU I

I I

YES I no 1--

'~-------""RESET SIS I

©,@,f;!C.*_SUISEQUENl ACTIOI.

... PROCEDURE.STEP..MUMBERS.

RESTART PCP'S I

(j') I PCS 50- s-cl I IES IO I 1

  • al) RAISE Pm H1ESS PZH B'l'llS m PZH SPRAY ~

MAX CBC.

llillu:mJllS 3 BPSI Pp cm.

.1 vom PORIWl'IOI EXISTS!

I BEAD 1

. G SAMPLE PCS

  • C.B. AIR I

f

(!)

PCS 50* S-C n:s llO

  • (!!)RAISE PZR ~*

PZR BTllS 011 P'LR SPRAY OTr MAX CHG.

Miii :t.mXlllll.

3 BPSI Pp Oii.

vom rcRMA1'IO!

EXISTS?

Q SAMPLE PCS

  • C.B. AIR
30.

r.mt.

'"p-z""1:-:P-::R-::E-=s-=s-..

-::2-::1-::i5 YES NO SECURE BORIC ACID CHARGING LPSI SECURE BORIC ACID CHARGING JIOTE:-RAS. CAN. OCCUR AT ALMOST ANYTIME DEPEHDIHG OH THE BREAK SIZE AHO THE.

HUMBER OF PUMPS RUHHIHG COMM EH CE 6!!_

rnm_

PCS COOLING e 15°F/HR RAS?

no no VERIFY:

LPSl-Pps TRIP C.8. SUMP VLVS OPEN; SIRWT VLYS I CLOSE; 30 GPM FLOW

/HPSI Pp; MINIFLOW CY'S CLOSE; CC HX OUT

.1os 0 H5 30278 '

HS 3056B TO CLOSE; ROUTE ESS ROOM SUMPS T.C.B *

. (ATTACH 5)

INFORMATION COPY 2 HOURS 6 llOURS 0

ISOLATE OR VDiT 1--------.:!;@~l~PZ:.:::R_:PRESS..::::;::...:<::1::6:.o.rr---i-:S~D===CL:"G'-10'-P E:.:R';A~B..::L.=..iE SI TANKS n:s no.

YES HO ESTABLISH HOT A!ID COLD r.m' IIIJECl"IOll VERIFJ' l"LOll TO HOT AlllJ COLD LECS THIS PROCEDU!ll!:

COMPLETI!:

EST. SD CLG. PER SOP 3. THIS PROCEDURE COMPLETE HO Pree 110 EDP 8.1.

ReTis1011 15 Page lot l OPEN BOTH PZR PORV 1 S RUN

~ I HPS I Pp