IR 05000445/2012404: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (5 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML120340330 | | number = ML120340330 | ||
| issue date = 02/01/2012 | | issue date = 02/01/2012 | ||
| title = IR 5000445-12-404 & | | title = IR 5000445-12-404 & 05000446--12-404, on 01/12/2012, Comanche Peak Nuclear Power Plant-NRC Security | ||
| author name = Hay M | | author name = Hay M | ||
| author affiliation = NRC/RGN-IV/DRS/PSB-1 | | author affiliation = NRC/RGN-IV/DRS/PSB-1 | ||
| addressee name = Flores R | | addressee name = Flores R | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:February 1, 2012 | ||
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT- NRC SECURITY INSPECTION REPORT 05000445/2012404 AND 05000446/2012404 | ==SUBJECT:== | ||
COMANCHE PEAK NUCLEAR POWER PLANT-NRC SECURITY INSPECTION REPORT 05000445/2012404 AND 05000446/2012404 | |||
==Dear Mr. Flores:== | ==Dear Mr. Flores:== | ||
On January 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Comanche Peak Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 12, 2012, with Mr. M. Lucas, Site Vice President, and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the | On January 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Comanche Peak Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 12, 2012, with Mr. M. Lucas, Site Vice President, and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. | |||
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
There were no NRC-identified or self-revealing findings identified during this inspection. | |||
However, a licensee-identified violation which was determined to be of very low security significance is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy. | However, a licensee-identified violation which was determined to be of very low security significance is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy. | ||
If you contest any NCV in the enclosed report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspectors at Comanche Peak Nuclear Power Plant. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | If you contest any NCV in the enclosed report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the UNITED STATES NUCLEAR REGULATORY COMMISSION RE GIO N I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspectors at Comanche Peak Nuclear Power Plant. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | |||
Sincerely, | |||
/RA/ | |||
Michael C. Hay, Chief | |||
Plant Support Branch-1 | |||
Division of Reactor Safety | |||
Docket No.: 50-445; 50-446 License No.: NPF-87; NPF-89 | |||
Nonpublic Enclosure: | |||
NRC Inspection Report 05000445/2012404, 05000446/2012404 | NRC Inspection Report 05000445/2012404, 05000446/2012404 w/Attachment: Supplemental Information | ||
cc w/enclosure: | |||
Mr. Timothy Hope Nuclear Licensing Manager Comanche Peak Nuclear Power Plant, Units 1 & 2 Luminant Generation Company LLC FM 56, 5 Miles North of Glen Rose Glen Rose, TX 76043 | Mr. Timothy Hope Nuclear Licensing Manager Comanche Peak Nuclear Power Plant, Units 1 & 2 Luminant Generation Company LLC FM 56, 5 Miles North of Glen Rose Glen Rose, TX 76043 | ||
}} | }} | ||
Latest revision as of 20:22, 12 January 2025
| ML120340330 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/01/2012 |
| From: | Hay M Plant Support Branch-1 |
| To: | Flores R Luminant Generation Co |
| References | |
| IR-12-404 | |
| Download: ML120340330 (4) | |
Text
February 1, 2012
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT-NRC SECURITY INSPECTION REPORT 05000445/2012404 AND 05000446/2012404
Dear Mr. Flores:
On January 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Comanche Peak Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 12, 2012, with Mr. M. Lucas, Site Vice President, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
There were no NRC-identified or self-revealing findings identified during this inspection.
However, a licensee-identified violation which was determined to be of very low security significance is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.
If you contest any NCV in the enclosed report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the UNITED STATES NUCLEAR REGULATORY COMMISSION RE GIO N I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspectors at Comanche Peak Nuclear Power Plant.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Michael C. Hay, Chief
Plant Support Branch-1
Division of Reactor Safety
Docket No.: 50-445; 50-446 License No.: NPF-87; NPF-89
Nonpublic Enclosure:
NRC Inspection Report 05000445/2012404, 05000446/2012404 w/Attachment: Supplemental Information
cc w/enclosure:
Mr. Timothy Hope Nuclear Licensing Manager Comanche Peak Nuclear Power Plant, Units 1 & 2 Luminant Generation Company LLC FM 56, 5 Miles North of Glen Rose Glen Rose, TX 76043