Florida Power CO R PO H A 1 iO N April 14, 1980 File:
Florida Power CO R PO H A 1 iO N April 14, 1980 File:   3-0-3-a-3
3-0-3-a-3 Director Office of Nuclear Reactor Regulation Division of Operating Reactors U.S. Nuclear Regulatory Conni:sion Washington, DC 20555
,                        Director Office of Nuclear Reactor Regulation Division of Operating Reactors U.S. Nuclear Regulatory Conni:sion Washington, DC 20555


==Subject:==
==Subject:==
Line 27: Line 26:


==Dear Sir:==
==Dear Sir:==
Enclosed are three (3) originals and forty (40) copies of the Report BAW-1607, Revision 1, April 1980, Crystal River Unit 3 Cycle 3 Reload Report.
Enclosed are three (3) originals and forty (40) copies of the Report BAW-1607, Revision 1, April 1980, Crystal River Unit 3 Cycle 3 Reload Report.
This   report     was     prepared       justifying       the     operation     of Crystal River Unit 3 (Cycle 3) at a rated thermal power of 2544 MWt.     The accident and transient analyses presented in this report are conservative with respect to continued opera-tion of Crystal River Unit 3 (Cycle 3) at the current licensed power level of 2452 MWt, and are within the bounds of the safety analyses presented in the Crystal River Unit 3 FSAR.
This report was prepared justifying the operation of Crystal River Unit 3 (Cycle 3) at a rated thermal power of 2544 MWt.
The accident and transient analyses presented in this report are conservative with respect to continued opera-tion of Crystal River Unit 3 (Cycle 3) at the current licensed power level of 2452 MWt, and are within the bounds of the safety analyses presented in the Crystal River Unit 3 FSAR.
Section 8, " Proposed Modifications to Technical Specifications of BAW-1607", is included for completeness of information only. A formal Technical Specification Change Request will be filed under separate cover.
Section 8, " Proposed Modifications to Technical Specifications of BAW-1607", is included for completeness of information only. A formal Technical Specification Change Request will be filed under separate cover.
8 0 042 so N/
8 0 042 so N/
General Office 3201 inirty-fourtn street soutn . P O Box 14042. st Petersburg. Fiorda 33733 813-866-5151
General Office 3201 inirty-fourtn street soutn. P O Box 14042. st Petersburg. Fiorda 33733 813-866-5151


Director                                               Page Two Office of Nuclear Reactor Regulation           April 14, 1980 Please advise if further discussion is desired.
Director Page Two Office of Nuclear Reactor Regulation April 14, 1980 Please advise if further discussion is desired.
Sincerely, FLORIDA POWER CORPORATION
Sincerely, FLORIDA POWER CORPORATION
          /"f Ronald M. Brigh Acting Manager Nuclear Support Services Enclosures O'Shea(Reload)CN-94 cc:   Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Suite 3100 101 Marietta Street Atlanta, GA 30303
/"f Ronald M. Brigh Acting Manager Nuclear Support Services Enclosures O'Shea(Reload)CN-94 cc:
Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Suite 3100 101 Marietta Street Atlanta, GA 30303


~
~
1>                                           .        .
1 >
STATE OF FLORIDA COUNTY OF PINELLAS i   R. M. Bright states that he is the Acting Manager, Nuclear Support Services, of Florida Power Corporation ; that he is authorized on the part of said company to sign and file with
STATE OF FLORIDA COUNTY OF PINELLAS i
the Nuclear Regulatory Comission         the     information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge,
R.
information and belief.                                                   -
M.
c t                                                   N 1                                             R. M. 'Bfighf l
Bright states that he is the Acting Manager, Nuclear Support Services, of Florida Power Corporation ; that he is authorized on the part of said company to sign and file with 4
Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 14th day of April,1980.
the Nuclear Regulatory Comission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information and belief.
c N
t 1
R. M. 'Bfighf l
Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 14th day of April,1980.
i i
i i
AX o                   m Notary Public Notary Public, State of Florida at Large, My Commission Expires: August-8, 1983 l
AX o m
Notary Public Notary Public, State of Florida at Large, My Commission Expires: August-8, 1983 l
1 0'Shea(Reload)DN94 l
1 0'Shea(Reload)DN94 l
l
l


UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION IN THE MATTER OF                   )
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION IN THE MATTER OF
                                        )             DOCKET NO. 50-302 -
)
FLORIDA POWER CORPORATION         )                                             I CERTIFICATE OF SERVICE R. M. Bright deposes and says that the following has been served on the Chief Executive of Citrus County, Florida by ' deposit in the United States mail, addressed as follows:
)
Chai rman i
DOCKET NO. 50-302 -
Board of County Connissioners of Citrus County Citrus County Courthouse Inverness, Florida 32650 i'   An original copy of the Crystal River Unit 3 Cycle 3 Reload Report BAW-1607 Rev. 1 April 1980.
FLORIDA POWER CORPORATION
-                                                      FLORIDA POWER CORPORATION d ] M L,d R. M. Bri ght /
)
Acting Manager
I CERTIFICATE OF SERVICE R. M. Bright deposes and says that the following has been served on the Chief Executive of Citrus County, Florida by ' deposit in the United States mail, addressed as follows:
;                                                      Nuclear Support Servicer 4
Chai rman Board of County i
Connissioners of Citrus County Citrus County Courthouse Inverness, Florida 32650 i'
An original copy of the Crystal River Unit 3 Cycle 3 Reload Report BAW-1607 Rev. 1 April 1980.
FLORIDA POWER CORPORATION d ] M L,d R. M. Bri ght
/
Acting Manager Nuclear Support Servicer 4
SWORN TO AND SUBSCRIBED BEFORE ME THIS 14th DAY OF APRIL,1980.
SWORN TO AND SUBSCRIBED BEFORE ME THIS 14th DAY OF APRIL,1980.
i, x)
i, x) fA uf Notary Public Notary Public State of Florida at Large My Commission expires: August 8, 1983 (NOTARIAL ~ SEAL)
Notary Public fA uf Notary Public State of Florida at Large My Commission expires: August 8, 1983
.~.
,    (NOTARIAL ~ SEAL)
        .~.
j s
j s
                                                                                    .a}}
.a}}

Latest revision as of 02:54, 2 January 2025

Forwards BAW-1607,Revision 1, Cycle 3 Reload Rept, Justifying Operation of Cycle 3 at Rated Thermal Power of 2544 Mw.Formal Tech Spec Change Request Will Be Filed Under Separate Cover
ML19309F026
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/14/1980
From: Richard Bright
FLORIDA POWER CORP.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19309F027 List:
References
3--3-A-3, 3-0-3-A-3, NUDOCS 8004280351
Download: ML19309F026 (3)


Text

> -

e c

Florida Power CO R PO H A 1 iO N April 14, 1980 File:

3-0-3-a-3 Director Office of Nuclear Reactor Regulation Division of Operating Reactors U.S. Nuclear Regulatory Conni:sion Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72

Dear Sir:

Enclosed are three (3) originals and forty (40) copies of the Report BAW-1607, Revision 1, April 1980, Crystal River Unit 3 Cycle 3 Reload Report.

This report was prepared justifying the operation of Crystal River Unit 3 (Cycle 3) at a rated thermal power of 2544 MWt.

The accident and transient analyses presented in this report are conservative with respect to continued opera-tion of Crystal River Unit 3 (Cycle 3) at the current licensed power level of 2452 MWt, and are within the bounds of the safety analyses presented in the Crystal River Unit 3 FSAR.

Section 8, " Proposed Modifications to Technical Specifications of BAW-1607", is included for completeness of information only. A formal Technical Specification Change Request will be filed under separate cover.

8 0 042 so N/

General Office 3201 inirty-fourtn street soutn. P O Box 14042. st Petersburg. Fiorda 33733 813-866-5151

Director Page Two Office of Nuclear Reactor Regulation April 14, 1980 Please advise if further discussion is desired.

Sincerely, FLORIDA POWER CORPORATION

/"f Ronald M. Brigh Acting Manager Nuclear Support Services Enclosures O'Shea(Reload)CN-94 cc:

Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Suite 3100 101 Marietta Street Atlanta, GA 30303

~

1 >

STATE OF FLORIDA COUNTY OF PINELLAS i

R.

M.

Bright states that he is the Acting Manager, Nuclear Support Services, of Florida Power Corporation ; that he is authorized on the part of said company to sign and file with 4

the Nuclear Regulatory Comission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information and belief.

c N

t 1

R. M. 'Bfighf l

Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 14th day of April,1980.

i i

AX o m

Notary Public Notary Public, State of Florida at Large, My Commission Expires: August-8, 1983 l

1 0'Shea(Reload)DN94 l

l

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION IN THE MATTER OF

)

)

DOCKET NO. 50-302 -

FLORIDA POWER CORPORATION

)

I CERTIFICATE OF SERVICE R. M. Bright deposes and says that the following has been served on the Chief Executive of Citrus County, Florida by ' deposit in the United States mail, addressed as follows:

Chai rman Board of County i

Connissioners of Citrus County Citrus County Courthouse Inverness, Florida 32650 i'

An original copy of the Crystal River Unit 3 Cycle 3 Reload Report BAW-1607 Rev. 1 April 1980.

FLORIDA POWER CORPORATION d ] M L,d R. M. Bri ght

/

Acting Manager Nuclear Support Servicer 4

SWORN TO AND SUBSCRIBED BEFORE ME THIS 14th DAY OF APRIL,1980.

i, x) fA uf Notary Public Notary Public State of Florida at Large My Commission expires: August 8, 1983 (NOTARIAL ~ SEAL)

.~.

j s

.a