C~ ' | ; TOLEDO | ||
: EDISON September 29, 1980 Acranc P. CRouSE Docket No. 50-346 | : EDISON September 29, 1980 Acranc P. CRouSE Docket No. 50-346 UU'" | ||
License No. NPF-3 | License No. NPF-3 to191259-5221 Serial No. 652 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. | ||
20555 | |||
==Dear Mr. Denton:== | ==Dear Mr. Denton:== | ||
Attached please find 15 copies of the Primary Reactor Containment Integrated Leakage Rate Test report for the Davis-Besse Nuclear Power Station Unit 1, which is being submitted to the Nuclear Regulatory Commission in accordance with Appendix J of 10CFR Part 50. | Attached please find 15 copies of the Primary Reactor Containment Integrated Leakage Rate Test report for the Davis-Besse Nuclear Power Station Unit 1, which is being submitted to the Nuclear Regulatory Commission in accordance with Appendix J of 10CFR Part 50. | ||
The results of the test show that the actual measured containment vessel leakage, when the containment vessel is pressurized to the peak calculated accident pressure, is less than 75% of the maximum allowable leakage assumed in safety analyses. | The results of the test show that the actual measured containment vessel leakage, when the containment vessel is pressurized to the peak calculated accident pressure, The is less than 75% of the maximum allowable leakage assumed in safety analyses. | ||
Yours very truly, f f | containment vessel has, therefore, been assessed ~as being fully capable of performing its intended function in the operation of the Davis-Besse Nuclear Power Station Unit 1. | ||
RPC/ljk | Yours very truly, f f | ||
Attachment cc: | .i :^ | ||
RPC/ljk Attachment cc: | |||
Mr. Norman Haller., Director Of fice of Management Program Analysis Encl:, 2 Mr. Luis Reyes NRC Resident Inspector Encl: | |||
1 8010080 233 THE TCLEGO EDI3ON COMPANY EDISON PLAZA 300 MADISON AVENUE TOi.EDO, OH'O 43652}} | |||
Latest revision as of 16:37, 25 December 2024
| ML19337B628 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/29/1980 |
| From: | Crouse R TOLEDO EDISON CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19337B629 | List: |
| References | |
| 652, NUDOCS 8010080233 | |
| Download: ML19337B628 (1) | |
Text
0 e
C~ '
- TOLEDO
- EDISON September 29, 1980 Acranc P. CRouSE Docket No. 50-346 UU'"
License No. NPF-3 to191259-5221 Serial No. 652 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Denton:
Attached please find 15 copies of the Primary Reactor Containment Integrated Leakage Rate Test report for the Davis-Besse Nuclear Power Station Unit 1, which is being submitted to the Nuclear Regulatory Commission in accordance with Appendix J of 10CFR Part 50.
The results of the test show that the actual measured containment vessel leakage, when the containment vessel is pressurized to the peak calculated accident pressure, The is less than 75% of the maximum allowable leakage assumed in safety analyses.
containment vessel has, therefore, been assessed ~as being fully capable of performing its intended function in the operation of the Davis-Besse Nuclear Power Station Unit 1.
Yours very truly, f f
.i :^
RPC/ljk Attachment cc:
Mr. Norman Haller., Director Of fice of Management Program Analysis Encl:, 2 Mr. Luis Reyes NRC Resident Inspector Encl:
1 8010080 233 THE TCLEGO EDI3ON COMPANY EDISON PLAZA 300 MADISON AVENUE TOi.EDO, OH'O 43652