ML19347C959: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML19347C959
| number = ML19347C959
| issue date = 03/03/1981
| issue date = 03/03/1981
| title = Provides Submittal Schedules for Proposed Upgrade to Emergency Feedwater sys,NUREG-0737 Item II E.1.2,in Response to NRC 810128 Ltr
| title = Provides Submittal Schedules for Proposed Upgrade to Emergency Feedwater sys,NUREG-0737 Item II E.1.2,in Response to NRC
| author name = Baynard P
| author name = Baynard P
| author affiliation = FLORIDA POWER CORP.
| author affiliation = FLORIDA POWER CORP.
Line 12: Line 12:
| case reference number = RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.1.2, TASK-TM
| case reference number = RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.1.2, TASK-TM
| document report number = 3-011-03, 3-11-3, NUDOCS 8103100387
| document report number = 3-011-03, 3-11-3, NUDOCS 8103100387
| title reference date = 01-28-1981
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:i 1
{{#Wiki_filter:i Rorida Power Co n PO a a r so ns March 3, 1981 File: 3-0-30
.                                                                                                                    l Rorida Power Co n PO a a r so ns March 3, 1981 File: 3-0-30
#3-011-03 Mr. Robert W. Reid Branch Chief Operating Reactors Branch #4 Division of Operating Reactors et[1]_1Q f U. S. Nuclear Regulatory Comission Q
                  #3-011-03 Mr. Robert W. Reid Branch Chief Operating Reactors Branch #4 Division of Operating Reactors U. S. Nuclear Regulatory Comission Washington, D. C. 20555                                       et[1]_1QQf NY            k fv'Q
Washington, D. C. 20555 Y
k
'Q N
fv g$h d


==Subject:==
==Subject:==
Crystal River Unit 3 Docket No. 50-302                             % p '0    e g$h dC-Operating License No. DPR-72                   2.A NUREG-0737 Item II E.1.2                         /       v           .((2 Emergency Feedwater System Upgrade                                 ,
Crystal River Unit 3 p '0 C
e
Docket No. 50-302 e
2.A
.((2 Operating License No. DPR-72 NUREG-0737 Item II E.1.2
/
v Emergency Feedwater System Upgrade e


==Dear Mr. Reid:==
==Dear Mr. Reid:==
I E By letter dated December 19, 1980, Florida Power Corporation submitted a preliminary description of the proposed upgrade to the Emergency Feed-water System at Crystal River Unit 3.                 Your letter dated January 28, 1981, stated that our proposed upgrade was conceptually acceptable and we should proceed with our design.                 Also, your letter requested our schedules for submittal of other information required for your review and final approval.             Florida Power Corporation hereby states the requested submittal schedules to be as follows:
I E By {{letter dated|date=December 19, 1980|text=letter dated December 19, 1980}}, Florida Power Corporation submitted a preliminary description of the proposed upgrade to the Emergency Feed-water System at Crystal River Unit 3.
June 15, 1981     A revised reliability analysis will be submitted which addresses the concerns as stated in your January 28, 1981, letter.
Your {{letter dated|date=January 28, 1981|text=letter dated January 28, 1981}}, stated that our proposed upgrade was conceptually acceptable and we should proceed with our design.
August 3, 1981 A final system description will be submit-ted for your approval.                     ,
Also, your letter requested our schedules for submittal of other information required for your review and final approval.
90 days prior     A proposed change to the Standard Techni-                             gf to final im-       cal Specifications will be submitted for                             OTb plementation       your approval.
Florida Power Corporation hereby states the requested submittal schedules to be as follows:
Spring 1983       Final implementation of the upgrade will Refueling Out- be completed.
June 15, 1981 A revised reliability analysis will be submitted which addresses the concerns as stated in your {{letter dated|date=January 28, 1981|text=January 28, 1981, letter}}.
age
August 3, 1981 A final system description will be submit-ted for your approval.
[g 8103100387 General Office 32o1 wty tourtn street soutn . P O Box 14042. st Petersourg Fionca 33733 813-866-5151
90 days prior A proposed change to the Standard Techni-gf to final im-cal Specifications will be submitted for OTb plementation your approval.
Spring 1983 Final implementation of the upgrade will Refueling Out-be completed.
[g age 8103100387 General Office 32o1 wty tourtn street soutn. P O Box 14042. st Petersourg Fionca 33733 813-866-5151


4 W
4 W
Mr. Robert W. Reid                 Page Two                           March 3, 1981 The implementation schedule as delineated above allows ample time for your review and approval and the necessary delivery time for hardware.
Mr. Robert W. Reid Page Two March 3, 1981 The implementation schedule as delineated above allows ample time for your review and approval and the necessary delivery time for hardware.
Also, worthy of note in your assessment of our schedules is the fact that a lengthy outage will be reqaired to perform an upgrade of this magnitude.
Also, worthy of note in your assessment of our schedules is the fact that a lengthy outage will be reqaired to perform an upgrade of this magnitude.
Very truly yours, FLORIDA POWER CORPORATION c.f     hjrato(
Very truly yours, FLORIDA POWER CORPORATION hjrato(
Dr. P. Y. Baynard Manager Nuclear Support Services Mardis(T01)D1-1 E
c.f Dr. P. Y. Baynard Manager Nuclear Support Services Mardis(T01)D1-1 E
F-(
F-(
e- =y-,e- --<-.g             e . -nv--y--- <**y e- s .- -,
='
                        ,          ,    y        ,  <r--, ,+, ,                    .-  e-- -y}}
e--
y
<r--,
,+,,
e-
=y-,e-t
--<-.g e--
-y e
-nv--y---
<**y e-s.- -,}}

Latest revision as of 05:57, 24 December 2024

Provides Submittal Schedules for Proposed Upgrade to Emergency Feedwater sys,NUREG-0737 Item II E.1.2,in Response to NRC
ML19347C959
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/03/1981
From: Baynard P
FLORIDA POWER CORP.
To: Reid R
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.1.2, TASK-TM 3-011-03, 3-11-3, NUDOCS 8103100387
Download: ML19347C959 (2)


Text

i Rorida Power Co n PO a a r so ns March 3, 1981 File: 3-0-30

  1. 3-011-03 Mr. Robert W. Reid Branch Chief Operating Reactors Branch #4 Division of Operating Reactors et[1]_1Q f U. S. Nuclear Regulatory Comission Q

Washington, D. C. 20555 Y

k

'Q N

fv g$h d

Subject:

Crystal River Unit 3 p '0 C

Docket No. 50-302 e

2.A

.((2 Operating License No. DPR-72 NUREG-0737 Item II E.1.2

/

v Emergency Feedwater System Upgrade e

Dear Mr. Reid:

I E By letter dated December 19, 1980, Florida Power Corporation submitted a preliminary description of the proposed upgrade to the Emergency Feed-water System at Crystal River Unit 3.

Your letter dated January 28, 1981, stated that our proposed upgrade was conceptually acceptable and we should proceed with our design.

Also, your letter requested our schedules for submittal of other information required for your review and final approval.

Florida Power Corporation hereby states the requested submittal schedules to be as follows:

June 15, 1981 A revised reliability analysis will be submitted which addresses the concerns as stated in your January 28, 1981, letter.

August 3, 1981 A final system description will be submit-ted for your approval.

90 days prior A proposed change to the Standard Techni-gf to final im-cal Specifications will be submitted for OTb plementation your approval.

Spring 1983 Final implementation of the upgrade will Refueling Out-be completed.

[g age 8103100387 General Office 32o1 wty tourtn street soutn. P O Box 14042. st Petersourg Fionca 33733 813-866-5151

4 W

Mr. Robert W. Reid Page Two March 3, 1981 The implementation schedule as delineated above allows ample time for your review and approval and the necessary delivery time for hardware.

Also, worthy of note in your assessment of our schedules is the fact that a lengthy outage will be reqaired to perform an upgrade of this magnitude.

Very truly yours, FLORIDA POWER CORPORATION hjrato(

c.f Dr. P. Y. Baynard Manager Nuclear Support Services Mardis(T01)D1-1 E

F-(

='

e--

y

<r--,

,+,,

e-

=y-,e-t

--<-.g e--

-y e

-nv--y---

<**y e-s.- -,