ML20003A328: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
E           TOLEDO
E TOLEDO
                                                                    % EDISON January 22, 1981                                         L81-115 FILE: RR 2 (P-6-80-04, -05,
% EDISON January 22, 1981 L81-115 FILE: RR 2 (P-6-80-04, -05,
                                                                            -06, -07, -08, Docket No. 50-346                                                     -09, -10, -11, License No. NPF-3                                                     -12)
-06, -07, -08, Docket No. 50-346
Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
-09, -10, -11, License No. NPF-3
-12)
Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555


==Dear Mr. Stello:==
==Dear Mr. Stello:==
Enclosed are ten copies of the Operating Data Report which has been revised for the months of April through December, 1980.
Enclosed are ten copies of the Operating Data Report which has been revised for the months of April through December, 1980.
Please replace the old Operating Data Reports contained in the Davis-Besse Unit 1 Monthly Operating Reports for each respective month with the attached revised sheets.                                                  .
Please replace the old Operating Data Reports contained in the Davis-Besse Unit 1 Monthly Operating Reports for each respective month with the attached revised sheets.
If you have any questions, please contact Bilal Sarsour at (419) 259-5000, Exten-sion 251.
If you have any questions, please contact Bilal Sarsour at (419) 259-5000, Exten-sion 251.
Yours truly,
Yours truly,
[4 0. W'#f~
[4 0. W'#f~
Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/1jk Enclosures cc:   Mr. James G. Keppler Regional Director, Region III Encl:   1 each                                                     ~
Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/1jk Enclosures cc:
C3 E:1 Mr. Norman Haller, Director                                                 @
Mr. James G. Keppler Regional Director, Region III Encl:
W
1 each C3
                                                                                              ,['
~
Office of Management Program Analysis                                   ,
E:1 Mr. Norman Haller, Director
Encl: 2 each                                                           u. .. fas
,['
:e            . .p ri Mr. Luis Reyes                                          '-
W Office of Management Program Analysis
UMU.      O
. fas
                                                                                        ^
.M Encl:
r9 NRC Resident Inspector                                             $      W
2 each u.
                                                                                            $[$
Mr. Luis Reyes UMU.
Encl: 1 each                                                     _Q
..p ri
                                                                              ,m       ui G
:e O
a M
r9 NRC Resident Inspector
THE TOLEDO EDlSCN COMPANY EDISON PLAZA 300 MADISON AVENUE   TOLEDO. OHIO 43652 810 2 03 0 5o3(L                                                                                 a}}
$[$
^
W Encl: 1 each
_Q G
,m ui a
M THE TOLEDO EDlSCN COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 810 2 03 0 5o3(L a}}

Latest revision as of 15:04, 23 December 2024

Forwards Revised Monthly Operating Repts for Apr-Dec 1980
ML20003A328
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/22/1981
From: Murray T
TOLEDO EDISON CO.
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20003A329 List:
References
L81-115, NUDOCS 8102030503
Download: ML20003A328 (1)


Text

.

E TOLEDO

% EDISON January 22, 1981 L81-115 FILE: RR 2 (P-6-80-04, -05,

-06, -07, -08, Docket No. 50-346

-09, -10, -11, License No. NPF-3

-12)

Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Stello:

Enclosed are ten copies of the Operating Data Report which has been revised for the months of April through December, 1980.

Please replace the old Operating Data Reports contained in the Davis-Besse Unit 1 Monthly Operating Reports for each respective month with the attached revised sheets.

If you have any questions, please contact Bilal Sarsour at (419) 259-5000, Exten-sion 251.

Yours truly,

[4 0. W'#f~

Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/1jk Enclosures cc:

Mr. James G. Keppler Regional Director, Region III Encl:

1 each C3

~

E:1 Mr. Norman Haller, Director

,['

W Office of Management Program Analysis

. fas

.M Encl:

2 each u.

Mr. Luis Reyes UMU.

..p ri

e O

r9 NRC Resident Inspector

$[$

^

W Encl: 1 each

_Q G

,m ui a

M THE TOLEDO EDlSCN COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 810 2 03 0 5o3(L a