Rev. 1 - 1/22/81 | OPERATING DATA REPORT DOCKET NO. 50-346 DATE Annust 7. 1980 i | ||
COMPLETED BY Bilal Sarsour TELEPHONE 259-5000 Ext.251 1 | |||
I OPERATING STATUS f | |||
N'''' | |||
: 1. Unit Name: | : 1. Unit Name: | ||
: 2. Reporting Period: | Davis-Besse Wir di Julv. 1980 | ||
: 2. Reporting Period: | |||
2772 | |||
: 3. Licensed Thermal Power (MWt): | : 3. Licensed Thermal Power (MWt): | ||
925 | |||
: 4. Nameplate Rating (Gross MWe): | : 4. Nameplate Rating (Gross MWe): | ||
906 | |||
: 5. Design Electrical Rating (Net MWe): | : 5. Design Electrical Rating (Net MWe): | ||
934 | |||
: 6. Maximum Dependable Capacity (Gross MWe): | : 6. Maximum Dependable Capacity (Gross MWe): | ||
: 7. Maximum Dependable Capacity (Net MWe): | 890 | ||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: | : 7. Maximum Dependable Capacity (Net MWe): | ||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: | |||
t i' | |||
: 9. Power Level To Which Restricted,if Any (Net MWe): | : 9. Power Level To Which Restricted,if Any (Net MWe): | ||
: 10. Reasons For Restrictions.If Any: | : 10. Reasons For Restrictions.If Any: | ||
1 1 | 1 1 | ||
l | l This Month Yr.-to-Date Cumulative 744 5.111 79.616 II. Hours in Reporting Period | ||
: 12. Number Of Hours Reactor Was Critical | ) | ||
;1l | 0 2.07R 11.na? | ||
: 14. Hours Generator On-Line 0 | : 12. Number Of Hours Reactor Was Critical 0 | ||
: 15. Unit Reserve Shutdown Hours | 0 2,875.8 | ||
;1l | |||
: | : 13. Reactor Reserve Shutdown Hours n | ||
1.583.559 | ?,nna 7 11,RR1.0 | ||
: | : 14. Hours Generator On-Line 0 | ||
: 19. Unit Service Factor | 0 1.728 | ||
: 20. Unit ' Availability Factor | : 15. Unit Reserve Shutdown Hours 0 | ||
4.687.305 24.886.812 | |||
: 16. Gross Thermal Energy Generated (MWH) 0 1.583.559 R;107 07n i | |||
: 17. Gross Electrical Energy Generated (MWH) 0 1.4R1_7R7 7.654.365 | |||
. i | |||
: 18. Net Electrical Energy Generated (MWH) 9 10 1 A7 1 | |||
: 19. Unit Service Factor I | |||
39.3 54.6 | |||
: 20. Unit ' Availability Factor | |||
: 21. Unit Capacity Factor (Using MDC Net) | : 21. Unit Capacity Factor (Using MDC Net) | ||
* | * 17 6 35.9 l | ||
d | 15.3 d | ||
: 22. Unit Capacity Factor (Using DER Net) | 12.0 | ||
: 23. Unit ; orced Outage Rate | : 22. Unit Capacity Factor (Using DER Net) 0 14.3 25.6 | ||
: 24. Shr.tdowns Scheduled Over Next 6 Monti.s (Type. Date.and Duration of Each): | : 23. Unit ; orced Outage Rate | ||
i August 11, 1980 | ) | ||
: 24. Shr.tdowns Scheduled Over Next 6 Monti.s (Type. Date.and Duration of Each): | |||
i August 11, 1980 | |||
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup: | : 25. If Shut Down At End Of Report Period, Estimated Date of Startup: | ||
: 26. Units in Test States (Prior to Commercial Operation): | |||
INITIAL CRITICALITY INITIA L ELECTRICITY | Forecast Achieved l | ||
i INITIAL CRITICALITY INITIA L ELECTRICITY | |||
. COMMERCIAL OPERATION l | |||
-810 2 0 3 0 SW | |||
,w e- | |||
, - - +_- | |||
ev /}} | |||
Latest revision as of 15:03, 23 December 2024
| ML20003A367 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/22/1981 |
| From: | Sarsour B TOLEDO EDISON CO. |
| To: | |
| Shared Package | |
| ML20003A329 | List: |
| References | |
| NUDOCS 8102030564 | |
| Download: ML20003A367 (1) | |
Text
-
i
'I Rev. 1 - 1/22/81 i
OPERATING DATA REPORT DOCKET NO. 50-346 DATE Annust 7. 1980 i
COMPLETED BY Bilal Sarsour TELEPHONE 259-5000 Ext.251 1
I OPERATING STATUS f
N'
- 1. Unit Name:
Davis-Besse Wir di Julv. 1980
- 2. Reporting Period:
2772
- 3. Licensed Thermal Power (MWt):
925
- 4. Nameplate Rating (Gross MWe):
906
- 5. Design Electrical Rating (Net MWe):
934
- 6. Maximum Dependable Capacity (Gross MWe):
890
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
t i'
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
1 1
l This Month Yr.-to-Date Cumulative 744 5.111 79.616 II. Hours in Reporting Period
)
0 2.07R 11.na?
- 12. Number Of Hours Reactor Was Critical 0
0 2,875.8
- 1l
- 13. Reactor Reserve Shutdown Hours n
?,nna 7 11,RR1.0
- 14. Hours Generator On-Line 0
0 1.728
- 15. Unit Reserve Shutdown Hours 0
4.687.305 24.886.812
- 16. Gross Thermal Energy Generated (MWH) 0 1.583.559 R;107 07n i
- 17. Gross Electrical Energy Generated (MWH) 0 1.4R1_7R7 7.654.365
. i
- 18. Net Electrical Energy Generated (MWH) 9 10 1 A7 1
- 19. Unit Service Factor I
39.3 54.6
- 20. Unit ' Availability Factor
- 21. Unit Capacity Factor (Using MDC Net)
- 17 6 35.9 l
15.3 d
12.0
- 22. Unit Capacity Factor (Using DER Net) 0 14.3 25.6
- 23. Unit ; orced Outage Rate
)
- 24. Shr.tdowns Scheduled Over Next 6 Monti.s (Type. Date.and Duration of Each):
i August 11, 1980
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units in Test States (Prior to Commercial Operation):
Forecast Achieved l
i INITIAL CRITICALITY INITIA L ELECTRICITY
. COMMERCIAL OPERATION l
-810 2 0 3 0 SW
,w e-
, - - +_-
ev /