OPERATING DATA REPORT DOCKET NO. 50-346 DATE Annust 7. 1980 i
                                                                                                                ,                                i OPERATING DATA REPORT DOCKET NO. 50-346 DATE Annust 7. 1980       i COMPLETED BY Bilal Sarsour TELEPHONE 259-5000 Ext.251 1                                                                                                                                                 I OPERATING STATUS                                                                                                       !
COMPLETED BY Bilal Sarsour TELEPHONE 259-5000 Ext.251 1
Davis-Besse Wir di N''''                                         f
I OPERATING STATUS f
N''''
: 1. Unit Name:
: 1. Unit Name:
: 2. Reporting Period:         Julv. 1980                                                                                      ,
Davis-Besse Wir di Julv. 1980
: 2. Reporting Period:
2772
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):
2772
925
: 4. Nameplate Rating (Gross MWe):
: 4. Nameplate Rating (Gross MWe):
925
906
: 5. Design Electrical Rating (Net MWe): 906
: 5. Design Electrical Rating (Net MWe):
                                                                                                                                                  ;
934
: 6. Maximum Dependable Capacity (Gross MWe):           934
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):             890
890
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:                         t i
: 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
t i'
: 9. Power Level To Which Restricted,if Any (Net MWe):
: 9. Power Level To Which Restricted,if Any (Net MWe):
: 10. Reasons For Restrictions.If Any:
: 10. Reasons For Restrictions.If Any:
1 1
1 1
l' This Month               Yr.-to-Date         Cumulative 744                   5.111               79.616 II. Hours in Reporting Period 0                     2.07R               11.na?                 )
l This Month Yr.-to-Date Cumulative 744 5.111 79.616 II. Hours in Reporting Period
: 12. Number Of Hours Reactor Was Critical                                                               2,875.8 0                    0
)
;1l                 13. Reactor Reserve Shutdown Hours 11,RR1.0 n                    ?,nna 7
0 2.07R 11.na?
: 14. Hours Generator On-Line 0                   0                     1.728                   !
: 12. Number Of Hours Reactor Was Critical 0
: 15. Unit Reserve Shutdown Hours                                                                                                 !
0 2,875.8
: 16. Gross Thermal Energy Generated (MWH)                    0                    4.687.305             24.886.812       -
;1l
: 17. Gross Electrical Energy Generated (MWH)                 0         _ _ ,
: 13. Reactor Reserve Shutdown Hours n
1.583.559           R;107 07n               i
?,nna 7 11,RR1.0
: 18. Net Electrical Energy Generated (MWH)                   0                     1.4R1_7R7           7.654.365           .i 9                     10 1                 A7 1
: 14. Hours Generator On-Line 0
: 19. Unit Service Factor                                                                                                       I
0 1.728
: 20. Unit ' Availability Factor                     _
: 15. Unit Reserve Shutdown Hours 0
39.3                54.6 17 6                35.9                      l
4.687.305 24.886.812
: 16. Gross Thermal Energy Generated (MWH) 0 1.583.559 R;107 07n i
: 17. Gross Electrical Energy Generated (MWH) 0 1.4R1_7R7 7.654.365
. i
: 18. Net Electrical Energy Generated (MWH) 9 10 1 A7 1
: 19. Unit Service Factor I
39.3 54.6
: 20. Unit ' Availability Factor
: 21. Unit Capacity Factor (Using MDC Net)
: 21. Unit Capacity Factor (Using MDC Net)
* _._      _
* 17 6 35.9 l
d                     12.0                 15.3
15.3 d
: 22. Unit Capacity Factor (Using DER Net)
12.0
: 23. Unit ; orced Outage Rate                               0                    14.3                25.6
: 22. Unit Capacity Factor (Using DER Net) 0 14.3 25.6
: 24. Shr.tdowns Scheduled Over Next 6 Monti.s (Type. Date.and Duration of Each):                                                 )
: 23. Unit ; orced Outage Rate
i August 11, 1980                     ,
)
: 24. Shr.tdowns Scheduled Over Next 6 Monti.s (Type. Date.and Duration of Each):
i August 11, 1980
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
Forecast            Achieved                l i                    26. Units in Test States (Prior to Commercial Operation):
: 26. Units in Test States (Prior to Commercial Operation):
INITIAL CRITICALITY INITIA L ELECTRICITY
Forecast Achieved l
                                            . COMMERCIAL OPERATION
i INITIAL CRITICALITY INITIA L ELECTRICITY
                                                                                                                                      '"              l
. COMMERCIAL OPERATION l
            -810 2 0 3 0 SW
-810 2 0 3 0 SW
                    ,w     e-   , - - +_-                                                                                                     ev /}}
,w e-
, - - +_-
ev /}}

Latest revision as of 15:03, 23 December 2024

Revised Monthly Operating Rept for Jul 1980
ML20003A367
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/22/1981
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20003A329 List:
References
NUDOCS 8102030564
Download: ML20003A367 (1)


Text

-

i

'I Rev. 1 - 1/22/81 i

OPERATING DATA REPORT DOCKET NO. 50-346 DATE Annust 7. 1980 i

COMPLETED BY Bilal Sarsour TELEPHONE 259-5000 Ext.251 1

I OPERATING STATUS f

N'

1. Unit Name:

Davis-Besse Wir di Julv. 1980

2. Reporting Period:

2772

3. Licensed Thermal Power (MWt):

925

4. Nameplate Rating (Gross MWe):

906

5. Design Electrical Rating (Net MWe):

934

6. Maximum Dependable Capacity (Gross MWe):

890

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

t i'

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions.If Any:

1 1

l This Month Yr.-to-Date Cumulative 744 5.111 79.616 II. Hours in Reporting Period

)

0 2.07R 11.na?

12. Number Of Hours Reactor Was Critical 0

0 2,875.8

1l
13. Reactor Reserve Shutdown Hours n

?,nna 7 11,RR1.0

14. Hours Generator On-Line 0

0 1.728

15. Unit Reserve Shutdown Hours 0

4.687.305 24.886.812

16. Gross Thermal Energy Generated (MWH) 0 1.583.559 R;107 07n i
17. Gross Electrical Energy Generated (MWH) 0 1.4R1_7R7 7.654.365

. i

18. Net Electrical Energy Generated (MWH) 9 10 1 A7 1
19. Unit Service Factor I

39.3 54.6

20. Unit ' Availability Factor
21. Unit Capacity Factor (Using MDC Net)
  • 17 6 35.9 l

15.3 d

12.0

22. Unit Capacity Factor (Using DER Net) 0 14.3 25.6
23. Unit ; orced Outage Rate

)

24. Shr.tdowns Scheduled Over Next 6 Monti.s (Type. Date.and Duration of Each):

i August 11, 1980

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units in Test States (Prior to Commercial Operation):

Forecast Achieved l

i INITIAL CRITICALITY INITIA L ELECTRICITY

. COMMERCIAL OPERATION l

-810 2 0 3 0 SW

,w e-

, - - +_-

ev /