0 Rev. 1 - 1/22/81 OPERATLNG DATA REPORT DOCKET NO. 50-346 DATE   December 8, 1980 COMPLETED BY       Bilal Sarsour TELEPHONE     A14-754-5000, Ext.
0 Rev. 1 - 1/22/81 OPERATLNG DATA REPORT DOCKET NO.
OPERATING STATUS
50-346 DATE December 8, 1980 COMPLETED BY Bilal Sarsour TELEPHONE A14-754-5000, Ext.
: 1. Unit Name:           Davis-Besse Unit 1                              Notes
OPERATING STATUS Davis-Besse Unit 1 Notes
: 2. Reporting Period:       November, 1980
: 1. Unit Name:
: 3. Licensed Thermal Power (MWt):           2772
: 2. Reporting Period:
: 4. Nameplate Rating (Gross MWe):             925
November, 1980
: 5. Design Electrical Rating (Net MWe):       906
: 3. Licensed Thermal Power (MWt):
: 6. Maximum Dependable Capacity (Gross MWe):         934
2772 925
: 7. Maximum Dependable Capacity (Net MWe):           890
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):
906 934
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):
890
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 9. Power Level To which Restricted,If Any (Net MWe):
: 9. Power Level To which Restricted,If Any (Net MWe):
: 10. Reasons For Restrictions.If Any:
: 10. Reasons For Restrictions.If Any:
This Month             Yr to.Date           Cumulative
This Month Yr to.Date Cumulative
: 11. Hours in Reporting Period                               720                     8,040                 28,565
: 11. Hours in Reporting Period 720 8,040 28,565
: 12. Number Of Hours Reactor Was Critical                   684.7                   2,762.7               13,726.7
: 12. Number Of Hours Reactor Was Critical 684.7 2,762.7 13,726.7 1l
: 13. Reactor Reserve Shutdown flours                         '6.3                           6.3             2,882.1 1l        14. Hours Generator On Line                                 530.8                   2,539.5               12,413.8
: 13. Reactor Reserve Shutdown flours
: 15. Unit Reserve Shutdown Hours                               3.42                         3.42           1,731.42
'6.3 6.3 2,882.1
: 16. Gruss Thermal Energy Generated (MWH)         1.012.290                     5.699.595             25,899,102         .
: 14. Hours Generator On Line 530.8 2,539.5 12,413.8
: 17. Gross Electrical Energy Generated (MWH)         339.042         _,
: 15. Unit Reserve Shutdown Hours 3.42 3.42 1,731.42
1,922,601               8,646,11T
: 16. Gruss Thermal Energy Generated (MWH) 1.012.290 5.699.595 25,899,102
: 18. Net Electrical Energy Generated (MWH)           309.064                   1,792,851               7,963,429
: 17. Gross Electrical Energy Generated (MWH) 339.042 1,922,601 8,646,11T
: 19. Unit Service Factor                               73.7                                 31.6                 44.1
: 18. Net Electrical Energy Generated (MWH) 309.064 1,792,851 7,963,429
: 20. Unit Availability Factor                           74.2                                 31.6-               50.6
: 19. Unit Service Factor 73.7 31.6 44.1
: 21. Unii Capacity Factor iUsing MDC Net)               48.2                                 25.1                 33.3
: 20. Unit Availability Factor 74.2 31.6-50.6
: 22. Unit Capacity Factor IUsing DER Net)               47.4                                 24.6                 32.7
: 21. Unii Capacity Factor iUsing MDC Net) 48.2 25.1 33.3
: 23. Unit Forced Outage Rate                           10.7                                 13.6                 25.0 y
: 22. Unit Capacity Factor IUsing DER Net) 47.4 24.6 32.7
: 23. Unit Forced Outage Rate 10.7 13.6 25.0 y
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
:         26. Units in Test Status IPrior to Commercial Operation):                         Forecast             Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIA L OPER ATION 810203o5'10
: 26. Units in Test Status IPrior to Commercial Operation):
_}}
Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIA L OPER ATION 810203o5'10
..}}

Latest revision as of 15:03, 23 December 2024

Revised Monthly Operating Rept for Nov 1980
ML20003A385
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/22/1981
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20003A329 List:
References
NUDOCS 8102030590
Download: ML20003A385 (1)


Text

7

~

~

0 Rev. 1 - 1/22/81 OPERATLNG DATA REPORT DOCKET NO.

50-346 DATE December 8, 1980 COMPLETED BY Bilal Sarsour TELEPHONE A14-754-5000, Ext.

OPERATING STATUS Davis-Besse Unit 1 Notes

1. Unit Name:
2. Reporting Period:

November, 1980

3. Licensed Thermal Power (MWt):

2772 925

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

906 934

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

890

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted,If Any (Net MWe):
10. Reasons For Restrictions.If Any:

This Month Yr to.Date Cumulative

11. Hours in Reporting Period 720 8,040 28,565
12. Number Of Hours Reactor Was Critical 684.7 2,762.7 13,726.7 1l
13. Reactor Reserve Shutdown flours

'6.3 6.3 2,882.1

14. Hours Generator On Line 530.8 2,539.5 12,413.8
15. Unit Reserve Shutdown Hours 3.42 3.42 1,731.42
16. Gruss Thermal Energy Generated (MWH) 1.012.290 5.699.595 25,899,102
17. Gross Electrical Energy Generated (MWH) 339.042 1,922,601 8,646,11T
18. Net Electrical Energy Generated (MWH) 309.064 1,792,851 7,963,429
19. Unit Service Factor 73.7 31.6 44.1
20. Unit Availability Factor 74.2 31.6-50.6
21. Unii Capacity Factor iUsing MDC Net) 48.2 25.1 33.3
22. Unit Capacity Factor IUsing DER Net) 47.4 24.6 32.7
23. Unit Forced Outage Rate 10.7 13.6 25.0 y
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status IPrior to Commercial Operation):

Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIA L OPER ATION 810203o5'10

..