ML19098B483: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:- - - - - - - - - - - - ~
{{#Wiki_filter:------------~
.
VIRGINIA ELECTRIC.A.ND POWER COMPANY RIOHMOND,VIRGINIA 23261 April 15, 1976, Attn:
VIRGINIA ELECTRIC .A.ND POWER COMPANY RIOHMOND,VIRGINIA 23261
Mr. Robert w. Reid, Chief Operating Reactors Branch 4 License Nos.
* April 15, 1976, 50-280 50-281 Attn: Mr. Robert w. Reid, Chief                                 License Nos. DPR-32 Operating Reactors Branch 4                                            DPR-37
50-280 50-281 DPR-32 DPR-37  


==Dear Mr. Rusche:==
==Dear Mr. Rusche:==
 
This report is made in response to the Directorate of Licensing {{letter dated|date=March 5, 1974|text=letter dated March 5, 1974}}, which requires the periodic inspection of Bergen-Patterson hydraulic shock suppressors until an improved seal material can be installed. There are six (6) Rex-Hanna model, 12" bore, 511 stroke hydraulic shock suppressors installed on each of our two Surry units. These are supplied by Bergen-Patterson. A 120 day inspection cycle has been incorporated to meet this surveillance requirement.
This report is made in response to the Directorate of Licensing letter dated March 5, 1974, which requires the periodic inspection of Bergen-Patterson hydraulic shock suppressors until an improved seal material can be installed. There are six (6) Rex-Hanna model, 12" bore, 5 11 stroke hydraulic shock suppressors installed on each of our two Surry units. These are supplied by Bergen-Patterson. A 120 day inspection cycle has been incorporated to meet this surveillance requirement.
Inspections of the following suppressors installed on Unit No. 1 were conducted during a recent forced outage. The inspection was completed on March 17, 1976.
Inspections of the following suppressors installed on Unit No. 1 were conducted during a recent forced outage. The inspection was completed on March 17, 1976.
Rex-Hanna Model, 12 11
Rex-Hanna Model, 12 11* Bore, 5" Stroke - Unit No. 1 Serial Numbers:
* Bore, 5" Stroke - Unit No. 1 Serial Numbers:   59170-1     59170-59170-5 59170-2    59170-59170-6 The criteria for inspection included:
59170-1 59170-2 59170-3 59170-4 59170-5 59170-6 The criteria for inspection included:
: a. Conditions of seals.
: a.
: b. Overall suppressor integrity
Conditions of seals.
: c. Close inspection for loss of fluid, leakage, and any evidence of distress.
: b.
Overall suppressor integrity
: c.
Close inspection for loss of fluid, leakage, and any evidence of distress.
: d. Verification of piston rod position and hydraulic fluid levels.
: d. Verification of piston rod position and hydraulic fluid levels.
The inspection confirmed that all suppressors were operable and in good mechanical condition. The condition of the seals and overall suppressor integrity were satisfactory. Hydraulic fluid levels were verified. Fluid was added as required to reservoirs that were below normal operating level.
The inspection confirmed that all suppressors were operable and in good mechanical condition. The condition of the seals and overall suppressor integrity were satisfactory. Hydraulic fluid levels were verified. Fluid was added as required to reservoirs that were below normal operating level.
Slightly weeping fittings were tightened to stop leakage.
Slightly weeping fittings were tightened to stop leakage.
Very truly yours, fe-L~
Very truly yours, fe-L~
: c. M. Stallings     ~
: c. M. Stallings  
~
Vice President-Power Supply and Production Operations}}
Vice President-Power Supply and Production Operations}}

Latest revision as of 03:28, 5 January 2025

Response to Letter of 3/5/1974, Submit Periodic Inspection Report of Suppressors Installed on Unit 1 Conducted During Forced Outage
ML19098B483
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/15/1976
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: Reid R, Rusche B
Office of Nuclear Reactor Regulation
References
Download: ML19098B483 (1)


Text


~

VIRGINIA ELECTRIC.A.ND POWER COMPANY RIOHMOND,VIRGINIA 23261 April 15, 1976, Attn:

Mr. Robert w. Reid, Chief Operating Reactors Branch 4 License Nos.

50-280 50-281 DPR-32 DPR-37

Dear Mr. Rusche:

This report is made in response to the Directorate of Licensing letter dated March 5, 1974, which requires the periodic inspection of Bergen-Patterson hydraulic shock suppressors until an improved seal material can be installed. There are six (6) Rex-Hanna model, 12" bore, 511 stroke hydraulic shock suppressors installed on each of our two Surry units. These are supplied by Bergen-Patterson. A 120 day inspection cycle has been incorporated to meet this surveillance requirement.

Inspections of the following suppressors installed on Unit No. 1 were conducted during a recent forced outage. The inspection was completed on March 17, 1976.

Rex-Hanna Model, 12 11* Bore, 5" Stroke - Unit No. 1 Serial Numbers:

59170-1 59170-2 59170-3 59170-4 59170-5 59170-6 The criteria for inspection included:

a.

Conditions of seals.

b.

Overall suppressor integrity

c.

Close inspection for loss of fluid, leakage, and any evidence of distress.

d. Verification of piston rod position and hydraulic fluid levels.

The inspection confirmed that all suppressors were operable and in good mechanical condition. The condition of the seals and overall suppressor integrity were satisfactory. Hydraulic fluid levels were verified. Fluid was added as required to reservoirs that were below normal operating level.

Slightly weeping fittings were tightened to stop leakage.

Very truly yours, fe-L~

c. M. Stallings

~

Vice President-Power Supply and Production Operations