ML19332D467: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:m | {{#Wiki_filter:m w | ||
~; | |||
g O. | |||
s- | |||
g O. | ~ | ||
W$LF CREEK 6 | |||
NUCLEAR OPERATING CORPORATION a. | |||
r Fonest T. Rhodes | |||
*.,g% % | |||
W$LF CREEK | November 27, 1989 ET 89-0102 | ||
- U. S. Nuclear Regulatory Coennission ATTN: | |||
Document Control Desk | |||
!~ | |||
Mail-Station Pl-137 | |||
--Washington, D. C. | |||
-20555 i. | |||
Subjects- Docket No. 50-482: . Response to Generic Letter 89-21, | Subjects-Docket No. 50-482:. Response to Generic Letter 89-21, | ||
' Request for Information.Concerning Status.of Implemen-tation of Unresolved Safety Issue (USI) Requirements' Gentlemen:- | |||
~ | |||
Gentlemen:- | The purpose of this letter is to provide Wolf Creek Nuclear Operating Corporation's (WCNOC) response -to Generic Letter 89-21, | ||
' Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) Requirements *. The. Generic Letter requests WCNOC to review and. report the status of' implementation of USIs-for which a final technical resolution | |||
The purpose of this letter is to provide Wolf Creek Nuclear Operating Corporation's | ~has been achieved and which are applicable to Wolf Creek Generating Station (WCGS).- from the= Generic Letter has' been utilized, in accordance with the instructions provided,- and is provided as an attachment p | ||
Information Concerning Status of Implementation of Unresolved Safety Issue (USI) Requirements *. The. Generic Letter requests WCNOC to review and. report the status of' implementation of USIs-for which a final technical resolution | -to-this letter. | ||
L The status provided in the attachment is based on a review of applicable generic ~ letters, NUREG documents, NRC Safety Evaluation Report for WCGS (NUREG-0881) its supplements and other correspondence between the NRC and the WCGS' Operating Agent. | |||
1 If you have any questions concerning this matter, please contact me or l | |||
L | _Mr. O. L. Maynard of my staff. | ||
The status provided in the attachment is based on a review of applicable generic ~ letters, | |||
1 If you have any questions concerning this matter, | |||
Very truly yours. | Very truly yours. | ||
M4s | M4s n | ||
Forrest T. Rhodes Vice President Engineering & Technical Services FTR/aem Attachment cc: | |||
B. L. Bartlett (NRC), w/a E. J. Holler (NRC), w/a R. D. Martin (NRC), w/a D. V. Pickett (NRC), w/a 8912040006 891127 p | |||
PDR fiDOC f 05000482 P | |||
FDC I | |||
P.O. Box 411/ Burhngton, KS 66839 / Phone; (316) 364-8831 An Equal opportunny Employer MF/>CVET | |||
~ | |||
j p_ | |||
' Y _.. | |||
Attachment to ET 89-0102 Page 1 of 4 e | |||
~' | |||
j | TABLE 1. | ||
p_ | W5tESOLVED SAFETY ISSIES FGt WlICH A FINAL TECIMICAL RESOLUTIGI HAS BEEN ACHIEVED | ||
*i USI/WA REF. DOCIDEllT/ - | |||
Attachment to ET 89-0102 | IItBBER TITLE GEIERIC LETTER APPLICABILITY STATUS /DATE* | ||
ItDWIRKS A-1 Water Hamner SECY 84-119 All C-9/84 NUREG-0881 NUREG-0927, Rev. 1 NUREG-0881, Supp. 5 NUREG-0993, Rev. 1 NRC I.R. 84-27. | |||
Page 1 of 4 | S/G Water W r NUREG-0737 Item test canpleted 9/84. | ||
I.A.2.3 NRC I.R. 84-49 closes SER Open SRP Revisions Item 84-00-55. | |||
e | A-2/ | ||
Asymmetric Blowdown NUREG-0609 PWR C-3/85 NUREG-0881, Supp. 5 Section 3.6.1.1 MPA D-10 Loads on Reactor Primary GL 84-04, GDC-4 Coolant Systems A-3 Westinghouse Steam SECY 88-272 W-PWR NC NUREG-0881 and 10GJIRC 85-158 (6/14/85) | |||
TABLE 1. | Generator Tube Integrity SECY 86-97 i | ||
NUREG-0844 GL 85-02 i | |||
IItBBER | (No Requirements) | ||
A-1 | I A-4 CE Steam Generator Tube SET 88-272 CE-PWR NA Integrity SET 86-97 NUREG-0844 (No Requirements) | ||
I.A.2.3 | A-5 B&W Steam Generator SECY 88-272 B&W-PWR NA Tube Integrity SECY 86-97 NUREG-0844 (No Requirements) | ||
A-2/ | * C - COMPLETE NC - NO CHANGES NECESSARY NA - NOT APPLICABLE I - INCOMPLETE j | ||
Generator Tube Integrity SECY 86-97 i | E - EVALUATING ACTIONS REQUIRED | ||
I | ~ | ||
A-4 | |||
A-5 | |||
* C - COMPLETE NC - NO CHANGES NECESSARY NA - NOT APPLICABLE I - INCOMPLETE j | |||
.:.[ | |||
^ | |||
y.[ ' | |||
Attcchment.to ET 89-0102 | |||
y.[ ' | ^ | ||
Pags 2 of 4~ | |||
Attcchment.to ET 89-0102 | USI/WA REF. DOCtNUIT/ | ||
NtNEER TITLE GEIERIC LETTER APPLICABILITY | |||
Pags 2 of 4~ | - STATUS DATE* | ||
IIDWWIKS | |||
_y A-6 Mark I Short-Term NUREG-0408 | |||
. Mark I-BWR NA~ | |||
USI/WA | Program A-7/ | ||
NtNEER | Mark I Long-Term NUREG-0661 Mark I-BWR NA D-01 Program NUREG 0661, Supp. 1 GL 79-57 A-8 Mark II Containment NUREG-0808 Mark II-BWR NA' Pool Dynamic Loads NUREG-0487, Supp. 1/2 NUREG-0802 SRP 6.2.1.1C GDC 16 A-9 Anticipated Transients NUREG-0460. Vol. 4 All C-12/88 | ||
_y A-6 | .NRC letter dated 12/6/87 issued SER on. | ||
Program A-7/ | Without Scram 10 CFR 50.62 design. PMt 01858 installed AMSAC. | ||
Without Scram | |||
NRC I.R. 88-34 and 88-41 reviewed implementation. | NRC I.R. 88-34 and 88-41 reviewed implementation. | ||
A-10/ | A-10/ | ||
Toughness | BWR Feedwater Nozzle NUREG-0619 BWR NA MPA B-25 Cracking Letter frcun DG Eisenhut dated 11/30/80 GL 81-11 A-11 Reactor Vessel Material NUREG-0744, Rev. 1 All NC NUR M-0881 Supp. 5-' | ||
82-26 A-12 | Toughness 10 CFR 50.60/ | ||
licensees - 9/72, | 82-26 A-12 Fracture Toughness of NUREG-0577.-Rev. 1 PWR NA NUREG-0881, Supp. 5 Steam Generator and SRP Revision Reactor Coolant Pump 5.3.4 Supports A-17 Systems Interaction Ltr: DeYoung to All NC NUREG-0881. Internal Flooding to. | ||
NURG-1174. NUREG- | licensees - 9/72, be addressed in the IPE (G.L. 88-20). | ||
NURG-1174. NUREG-Letter dated 10/31/89 indicates IPE 1229 NUREG/CR-3922, will be completed 9/92. | |||
NUREG/CR-4261, NUREG/ | NUREG/CR-4261, NUREG/ | ||
CR-4470, GL 89-18 (No Requirements) | CR-4470, GL 89-18 (No Requirements) 4 m | ||
.m.5w | |||
-.._.m | |||
___._.._-m.- | |||
..i.--_m a.i m | |||
m | |||
.m-m m | |||
m. | |||
m_. | |||
.=m,y_ | |||
.. m | |||
~ | |||
H Atts.chment to ET 89-0102 e | |||
r Page 3 of 4 | |||
'USI/fFA REF. D00tBEllT/ | |||
IIINEER TITLE GEIERIC LETTER APPLICABILITY STATUS DATE* | |||
RBIRRKS i | |||
A-24/ | |||
H | Qualification of Class NUREG-0588, Rev. 1 All C-11/85 License Condition'2.C(4). SIJEtC 85 MPA B-60 IE Safety-Related SRP 3.11 (11/29/85) and NRC letter dated 3/17/86 l | ||
Atts.chment to ET 89-0102 | Equipnent 10 CFR 50.49 closes License Condition. NRC I.R.~87-24 l | ||
GL 82-09, GL 84-24 GL 85-15 A-26/ | |||
Reactor Vessel Pressure DOR Letters to PWR C-12/86.. | |||
License Condition 2.C(13). NRC letter MPA B-04 Transient Protection licensees 8/76' dated 10/14/86 accepts proposed design.- | |||
NUREG-0224 PPEL implemented during first ' refueling.. | |||
NUREG-0371 NRC I.R. 87-18 reviewed implementation of. | |||
SRP 5.2 USI A-26 GL 88-11 A-31 Residual Heat Removal NUREG-0606 All OLs After NC NUREG-0881, Section 5.4.3' Shutdown Requirements RG 1.113, 01/79. | |||
IIINEER | RG 1.139 SRP 5.4.7 A-36/ | ||
GL 82-09, GL 84-24 | Control of Heavy Loads NUREG-0612 All C-3/85 NUREG-0881 Supp. 5. Section 9.1.4. | ||
C-10, Near Spent Fuel SRP-9.1.5 SER Open Item 84-00-132 closed in NRC C-25 GL 81-07, GL 83-42, I.R. 85-04. | |||
GL 85-15 | GL 85-11 Letter frce DG Eisenhut dated 12/22/80 A-39 Determination of SRV NUREG-0802 BWR NA Pool Dynamic Loads NUREGs-0763, 0783, 0802 and Pressure Transients NUREG-0661 SRP 6.2.1.1.C A-40 Seismic Design SRP Revisions, NUREG/ | ||
All C-9/89 NUREG-0881. NUREG-1233. NRC letter. | |||
A-26/ | Criteri a CR-4776, NUREG/CR-0054, dated 3/25/89 and ET 89-0076 (9/22/89). | ||
NUREG-0224 | |||
NUREG-0371 | |||
SRP 5.2 | |||
RG 1.139 SRP 5.4.7 A-36/ | |||
C-10, | |||
GL 85-11 Letter frce DG Eisenhut dated 12/22/80 A-39 | |||
Criteri a | |||
NUREG/CR-3480 NUREG/ | NUREG/CR-3480 NUREG/ | ||
CR-1582, NUREG/CR-1161, NUREG-1233, NUREG-4776 NUREG/CP-3805 NUREG/CR-5349 NUREG/CR-3509 W | CR-1582, NUREG/CR-1161, NUREG-1233, NUREG-4776 NUREG/CP-3805 NUREG/CR-5349 NUREG/CR-3509 W | ||
~ | |||
---:-m- - | |||
" Attachment to ET 89-0102 Pcge 4 of 4. | |||
USI/WA | |||
~ REF. DOCINENT/ | |||
NtsBER TITLE GEIERIC LETTER APPLICABItITY STATUS DATE* | |||
RDMAKS M | |||
l A-42 Pipe Cracks in Bolling NUREG-0313, Rev. 1 BWR NA t | |||
MPA B-05 Water Reactors NUR E-0313. Rev. 2 l | |||
GL 81-03, GL 88-01 l | |||
Pcge 4 of 4. | A-43 Containment Emergency NUREG-0510.- | ||
All C-1/85 NUREG-0881, SER Open Item 84-00-56 l | |||
USI/WA | Sump Performance' NUREG 0869, Rev. 1 | ||
. closed in NRC I.R. 84-49. | |||
l NUREG-0897, RG 1.82 (Rev. 0), SRP 6.2.2 GL 85-22 l | |||
No Requirements A-44 Station Blackout RG 1.155 All Evaluation C-4/89 NO 89-0072 (4/17/89) | |||
MPA B-05 Water Reactors | NUREG-1032 Procedures I-10/91 Procedure revisions to be c e pleted' NUREG-1109 6 months after NRR acce s SBO 10 CFR 50.63 evaluation. Current s ule is' for NRR to issue SER 4/91. | ||
l | A-45 Shutdown Decay Heat NUREG-1289 All NC NURE-0881. | ||
A-44 | Subsumed into the IPE Removal Requirements NUREG/CR-5230 (Generic letter 88-20). Ietter SECY 88-260 dated 10/31/89 indicates-IPE will' (No Requirements) be completed 9/92. | ||
NUREG-1032 | A-46 Seismic Qualification NUREG-1030 All NA NUREG-0881, Supp. 5 of Equipnent in NUREG-1211/ | ||
A-45 | Operating Plants GL 87-02, GL 87-03 A-47 Safety Implication NUREG-1217, NUREG-All E-3/90 NUREG-0881. Generic Letter 89-19. | ||
A-46 | of Control Systems 1218 GL 89-19 A-48 Hydrogen Control 10 CER 50.44 All, except NA NUREG-0881, Supp. 5 Measures and Effects SECY 89-122 PWRs with of Hydrogen Burns large dry containments A-49 Pressurized Thermal RGs 1.154, 1.99 PWR C-11/88 NUREG-0881 Supp. 5 KMIJIRC 86-015 Shock SECY 82-465 (1/23/86) and MM 88-0290 (11/7/88). | ||
Operating Plants | |||
of Control Systems | |||
SEX:Y 83-288 SECY 81-687 | SEX:Y 83-288 SECY 81-687 | ||
.10 CFR 50.61/ | |||
GL 88-11 4 | GL 88-11 4 | ||
w | |||
~c | |||
:~~ | |||
..-a | |||
..}} | |||
Latest revision as of 02:31, 31 December 2024
| ML19332D467 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 11/27/1989 |
| From: | Rhodes F WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| REF-GTECI-MI, REF-GTECI-SC, TASK-***, TASK-OR ET-89-0102, ET-89-102, GL-89-21, NUDOCS 8912040006 | |
| Download: ML19332D467 (5) | |
Text
m w
~;
g O.
s-
~
W$LF CREEK 6
NUCLEAR OPERATING CORPORATION a.
r Fonest T. Rhodes
- .,g% %
November 27, 1989 ET 89-0102
- U. S. Nuclear Regulatory Coennission ATTN:
Document Control Desk
!~
Mail-Station Pl-137
--Washington, D. C.
-20555 i.
Subjects-Docket No. 50-482:. Response to Generic Letter 89-21,
' Request for Information.Concerning Status.of Implemen-tation of Unresolved Safety Issue (USI) Requirements' Gentlemen:-
~
The purpose of this letter is to provide Wolf Creek Nuclear Operating Corporation's (WCNOC) response -to Generic Letter 89-21,
' Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) Requirements *. The. Generic Letter requests WCNOC to review and. report the status of' implementation of USIs-for which a final technical resolution
~has been achieved and which are applicable to Wolf Creek Generating Station (WCGS).- from the= Generic Letter has' been utilized, in accordance with the instructions provided,- and is provided as an attachment p
-to-this letter.
L The status provided in the attachment is based on a review of applicable generic ~ letters, NUREG documents, NRC Safety Evaluation Report for WCGS (NUREG-0881) its supplements and other correspondence between the NRC and the WCGS' Operating Agent.
1 If you have any questions concerning this matter, please contact me or l
_Mr. O. L. Maynard of my staff.
Very truly yours.
M4s n
Forrest T. Rhodes Vice President Engineering & Technical Services FTR/aem Attachment cc:
B. L. Bartlett (NRC), w/a E. J. Holler (NRC), w/a R. D. Martin (NRC), w/a D. V. Pickett (NRC), w/a 8912040006 891127 p
PDR fiDOC f 05000482 P
FDC I
P.O. Box 411/ Burhngton, KS 66839 / Phone; (316) 364-8831 An Equal opportunny Employer MF/>CVET
~
j p_
' Y _..
Attachment to ET 89-0102 Page 1 of 4 e
~'
TABLE 1.
W5tESOLVED SAFETY ISSIES FGt WlICH A FINAL TECIMICAL RESOLUTIGI HAS BEEN ACHIEVED
- i USI/WA REF. DOCIDEllT/ -
IItBBER TITLE GEIERIC LETTER APPLICABILITY STATUS /DATE*
ItDWIRKS A-1 Water Hamner SECY 84-119 All C-9/84 NUREG-0881 NUREG-0927, Rev. 1 NUREG-0881, Supp. 5 NUREG-0993, Rev. 1 NRC I.R. 84-27.
S/G Water W r NUREG-0737 Item test canpleted 9/84.
I.A.2.3 NRC I.R. 84-49 closes SER Open SRP Revisions Item 84-00-55.
A-2/
Asymmetric Blowdown NUREG-0609 PWR C-3/85 NUREG-0881, Supp. 5 Section 3.6.1.1 MPA D-10 Loads on Reactor Primary GL 84-04, GDC-4 Coolant Systems A-3 Westinghouse Steam SECY 88-272 W-PWR NC NUREG-0881 and 10GJIRC 85-158 (6/14/85)
Generator Tube Integrity SECY 86-97 i
(No Requirements)
I A-4 CE Steam Generator Tube SET 88-272 CE-PWR NA Integrity SET 86-97 NUREG-0844 (No Requirements)
A-5 B&W Steam Generator SECY 88-272 B&W-PWR NA Tube Integrity SECY 86-97 NUREG-0844 (No Requirements)
- C - COMPLETE NC - NO CHANGES NECESSARY NA - NOT APPLICABLE I - INCOMPLETE j
E - EVALUATING ACTIONS REQUIRED
~
.:.[
^
y.[ '
Attcchment.to ET 89-0102
^
Pags 2 of 4~
USI/WA REF. DOCtNUIT/
NtNEER TITLE GEIERIC LETTER APPLICABILITY
- STATUS DATE*
IIDWWIKS
_y A-6 Mark I Short-Term NUREG-0408
. Mark I-BWR NA~
Program A-7/
Mark I Long-Term NUREG-0661 Mark I-BWR NA D-01 Program NUREG 0661, Supp. 1 GL 79-57 A-8 Mark II Containment NUREG-0808 Mark II-BWR NA' Pool Dynamic Loads NUREG-0487, Supp. 1/2 NUREG-0802 SRP 6.2.1.1C GDC 16 A-9 Anticipated Transients NUREG-0460. Vol. 4 All C-12/88
.NRC letter dated 12/6/87 issued SER on.
Without Scram 10 CFR 50.62 design. PMt 01858 installed AMSAC.
NRC I.R. 88-34 and 88-41 reviewed implementation.
A-10/
BWR Feedwater Nozzle NUREG-0619 BWR NA MPA B-25 Cracking Letter frcun DG Eisenhut dated 11/30/80 GL 81-11 A-11 Reactor Vessel Material NUREG-0744, Rev. 1 All NC NUR M-0881 Supp. 5-'
Toughness 10 CFR 50.60/
82-26 A-12 Fracture Toughness of NUREG-0577.-Rev. 1 PWR NA NUREG-0881, Supp. 5 Steam Generator and SRP Revision Reactor Coolant Pump 5.3.4 Supports A-17 Systems Interaction Ltr: DeYoung to All NC NUREG-0881. Internal Flooding to.
licensees - 9/72, be addressed in the IPE (G.L. 88-20).
NURG-1174. NUREG-Letter dated 10/31/89 indicates IPE 1229 NUREG/CR-3922, will be completed 9/92.
NUREG/CR-4261, NUREG/
CR-4470, GL 89-18 (No Requirements) 4 m
.m.5w
-.._.m
___._.._-m.-
..i.--_m a.i m
m
.m-m m
m.
m_.
.=m,y_
.. m
~
H Atts.chment to ET 89-0102 e
r Page 3 of 4
'USI/fFA REF. D00tBEllT/
IIINEER TITLE GEIERIC LETTER APPLICABILITY STATUS DATE*
RBIRRKS i
A-24/
Qualification of Class NUREG-0588, Rev. 1 All C-11/85 License Condition'2.C(4). SIJEtC 85 MPA B-60 IE Safety-Related SRP 3.11 (11/29/85) and NRC letter dated 3/17/86 l
Equipnent 10 CFR 50.49 closes License Condition. NRC I.R.~87-24 l
GL 82-09, GL 84-24 GL 85-15 A-26/
Reactor Vessel Pressure DOR Letters to PWR C-12/86..
License Condition 2.C(13). NRC letter MPA B-04 Transient Protection licensees 8/76' dated 10/14/86 accepts proposed design.-
NUREG-0224 PPEL implemented during first ' refueling..
NUREG-0371 NRC I.R. 87-18 reviewed implementation of.
SRP 5.2 USI A-26 GL 88-11 A-31 Residual Heat Removal NUREG-0606 All OLs After NC NUREG-0881, Section 5.4.3' Shutdown Requirements RG 1.113, 01/79.
Control of Heavy Loads NUREG-0612 All C-3/85 NUREG-0881 Supp. 5. Section 9.1.4.
C-10, Near Spent Fuel SRP-9.1.5 SER Open Item 84-00-132 closed in NRC C-25 GL 81-07, GL 83-42, I.R. 85-04.
GL 85-11 Letter frce DG Eisenhut dated 12/22/80 A-39 Determination of SRV NUREG-0802 BWR NA Pool Dynamic Loads NUREGs-0763, 0783, 0802 and Pressure Transients NUREG-0661 SRP 6.2.1.1.C A-40 Seismic Design SRP Revisions, NUREG/
All C-9/89 NUREG-0881. NUREG-1233. NRC letter.
Criteri a CR-4776, NUREG/CR-0054, dated 3/25/89 and ET 89-0076 (9/22/89).
NUREG/CR-3480 NUREG/
CR-1582, NUREG/CR-1161, NUREG-1233, NUREG-4776 NUREG/CP-3805 NUREG/CR-5349 NUREG/CR-3509 W
~
---:-m- -
" Attachment to ET 89-0102 Pcge 4 of 4.
USI/WA
~ REF. DOCINENT/
NtsBER TITLE GEIERIC LETTER APPLICABItITY STATUS DATE*
RDMAKS M
l A-42 Pipe Cracks in Bolling NUREG-0313, Rev. 1 BWR NA t
MPA B-05 Water Reactors NUR E-0313. Rev. 2 l
A-43 Containment Emergency NUREG-0510.-
All C-1/85 NUREG-0881, SER Open Item 84-00-56 l
Sump Performance' NUREG 0869, Rev. 1
. closed in NRC I.R. 84-49.
l NUREG-0897, RG 1.82 (Rev. 0), SRP 6.2.2 GL 85-22 l
No Requirements A-44 Station Blackout RG 1.155 All Evaluation C-4/89 NO 89-0072 (4/17/89)
NUREG-1032 Procedures I-10/91 Procedure revisions to be c e pleted' NUREG-1109 6 months after NRR acce s SBO 10 CFR 50.63 evaluation. Current s ule is' for NRR to issue SER 4/91.
A-45 Shutdown Decay Heat NUREG-1289 All NC NURE-0881.
Subsumed into the IPE Removal Requirements NUREG/CR-5230 (Generic letter 88-20). Ietter SECY 88-260 dated 10/31/89 indicates-IPE will' (No Requirements) be completed 9/92.
A-46 Seismic Qualification NUREG-1030 All NA NUREG-0881, Supp. 5 of Equipnent in NUREG-1211/
Operating Plants GL 87-02, GL 87-03 A-47 Safety Implication NUREG-1217, NUREG-All E-3/90 NUREG-0881. Generic Letter 89-19.
of Control Systems 1218 GL 89-19 A-48 Hydrogen Control 10 CER 50.44 All, except NA NUREG-0881, Supp. 5 Measures and Effects SECY 89-122 PWRs with of Hydrogen Burns large dry containments A-49 Pressurized Thermal RGs 1.154, 1.99 PWR C-11/88 NUREG-0881 Supp. 5 KMIJIRC 86-015 Shock SECY 82-465 (1/23/86) and MM 88-0290 (11/7/88).
SEX:Y 83-288 SECY 81-687
.10 CFR 50.61/
GL 88-11 4
w
~c
- ~~
..-a
..