ML19338D981: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML19338D981
| number = ML19338D981
| issue date = 08/19/1980
| issue date = 08/19/1980
| title = Responds to NRC 800623 Ltr Re Violations Noted in IE Insp Repts 50-413/80-10 & 50-414/80-10.Corrective Actions:Util Will Insp Addl Component Support Welds
| title = Responds to NRC Re Violations Noted in IE Insp Repts 50-413/80-10 & 50-414/80-10.Corrective Actions:Util Will Insp Addl Component Support Welds
| author name = Parker W
| author name = Parker W
| author affiliation = DUKE POWER CO.
| author affiliation = DUKE POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8009240290
| document report number = NUDOCS 8009240290
| title reference date = 06-23-1980
| package number = ML19338D977
| package number = ML19338D977
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:,                                             -
{{#Wiki_filter:,
1,     ,,
1, n.,f.
n .,f.   ~.,
~.,
e, DUKE POWER dd.,, <NM*f-No E0a;.
e, DUKE POWER dd. NM*f E0a;
                                                                                      ''   ,        ~
,, < N o
'4                                                     Powra Bu Lonwo           *
. ~
                                                                                                ' C ? .'
' C ?.'
422 SocTn Cnuncu STazzT, CH.AHLOTTz, N. C. 282 82 30 IJJG 25 a 9             3g WILLIAM O. PARKER.JR, Vier Parsectav                                                                       Tttcp on e t: Anta 704 Strase PaoouCTion                                                                                 373-4083 August 19, 1980
'4 Powra Bu Lonwo 422 SocTn Cnuncu STazzT, CH.AHLOTTz, N. C. 282 82 30 IJJG 25 a 9 3 g WILLIAM O. PARKER.JR, Vier Parsectav Tttcp on t: Anta 704 e
                                                                                                                                      !
Strase PaoouCTion 373-4083 August 19, 1980 Mr. James P. O'Reilly,. Director U. S. Nuclear Regulatory Commission Region II i
                                                                        .
101 Marietta Street, Suite 3100 l
Mr. James P. O'Reilly,. Director                                                                               I U. S. Nuclear Regulatory Commission Region II                                                                                                     i 101 Marietta Street, Suite 3100                                                                               l Atlanta, Georgia 30303 Re: RII:WPK                                                                           .
Atlanta, Georgia 30303 Re: RII:WPK l
l 50-413/80-10                                                                                           )
50-413/80-10
50-414/80-10                                                                                           l
)
50-414/80-10


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==
i l
l This letter supplements the response to Infraction No. 413/80-10-01 which was transmitted by my letter of July 13, 1980. We now plan to inspect an additional 50 component support welds of > 5/16 inch.
This letter supplements the response to Infraction No. 413/80-10-01 which was transmitted by my letter of July 13, 1980. We now plan to inspect an additional 50 component support welds of > 5/16 inch.       _
The results of this inspection should be available by October 1, 1980.
The results of this inspection should be available by October 1, 1980.
A final report will be submitted at that time.
A final report will be submitted at that time.
1 If there are any questions in regard to this item, please contact                                             i R. O. Sharpe at (704)373-8466.
If there are any questions in regard to this item, please contact i
Very truly yours, l
R. O. Sharpe at (704)373-8466.
,                                                                    ,    N
l Very truly yours, N
  .
William O. Parker, Jr.
William O. Parker, Jr.
I
I ROS:vr cc: NRC Resident Inspector Catawba Nuclear Station l
                                                                                                                                      '
i L
ROS:vr cc: NRC Resident Inspector Catawba Nuclear Station                                                                                 !
r 800924'O 29O w
,                                                                                                                                      l i
- -a
L r
- -}}
800924'O         29O w                   - -a               -              ..    --            _-. -_            --          -            -        _ - -}}

Latest revision as of 14:35, 25 December 2024

Responds to NRC Re Violations Noted in IE Insp Repts 50-413/80-10 & 50-414/80-10.Corrective Actions:Util Will Insp Addl Component Support Welds
ML19338D981
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/19/1980
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19338D977 List:
References
NUDOCS 8009240290
Download: ML19338D981 (1)


Text

,

1, n.,f.

~.,

e, DUKE POWER dd. NM*f E0a;

,, < N o

. ~

' C ?.'

'4 Powra Bu Lonwo 422 SocTn Cnuncu STazzT, CH.AHLOTTz, N. C. 282 82 30 IJJG 25 a 9 3 g WILLIAM O. PARKER.JR, Vier Parsectav Tttcp on t: Anta 704 e

Strase PaoouCTion 373-4083 August 19, 1980 Mr. James P. O'Reilly,. Director U. S. Nuclear Regulatory Commission Region II i

101 Marietta Street, Suite 3100 l

Atlanta, Georgia 30303 Re: RII:WPK l

50-413/80-10

)

50-414/80-10

Dear Mr. O'Reilly:

l This letter supplements the response to Infraction No. 413/80-10-01 which was transmitted by my letter of July 13, 1980. We now plan to inspect an additional 50 component support welds of > 5/16 inch.

The results of this inspection should be available by October 1, 1980.

A final report will be submitted at that time.

If there are any questions in regard to this item, please contact i

R. O. Sharpe at (704)373-8466.

l Very truly yours, N

William O. Parker, Jr.

I ROS:vr cc: NRC Resident Inspector Catawba Nuclear Station l

i L

r 800924'O 29O w

- -a

- -