=Text=
{{#Wiki_filter:. FimtEnergy Nuclear Operating Company 5501 Norrh Sfate Roufe 2 Oak Harbor. Ohio 43449 Matk 8. Bezilla                                                                                                   4 79-321-7676 Vice President - Nuclear                                                                                    Fax: 419-321-7582 Doc ket N umber 5 0-346 License Number NPF-3 Serial Number 1 - 1 409 A p r i l 1, 2005 hlr. James L. Caldwell, Administrator United States Nuclear Regulatory Commission Region I l l 2443 Warrenville Road, Suite 2 10 Lisle, IL 00532-4352 SulJject: Submittal of Revision 8 of the Davis-Besse Nuclear Power Station Operational Improvement Plan Operating Cycle 14
{{#Wiki_filter:. FimtEnergy Nuclear Operating Company 5501 Norrh Sfate Roufe 2 Oak Harbor. Ohio 43449 Matk 8. Bezilla Vice President - Nuclear 4 79-32 1-7676 Fax: 419-321-7582 Doc ke t N umber 5 0- 3 46 License Number NPF-3 Serial Number 1 - 1 409 A p r i l 1, 2005 hlr. James L. Caldwell, Administrator United States Nuclear Regulatory Commission Region I l l 2443 Warrenville Road, Suite 2 10 Lisle, IL 00532-4352 SulJject: Submittal of Revision 8 of the Davis-Besse Nuclear Power Station Operational Improvement Plan Operating Cycle 14  


==Dear Mr. Caldwell:==
==Dear Mr. Caldwell:==
 
The purpose of this letter is to submit Revision 8 of the Davis-Besse Nuclear Po~krer Station (DBNPS) Operational Improvement Plan Operating Cycle 14, dated March 24. 2005, to the Nuclear Regulatory Commission (NRC). By {{letter dated|date=December 22, 2004|text=letter dated December 22, 2004}}, the FirstEnergy Nuclear Operating Company (FENOC) submitted Revision 7 (DBNPS Letter Serial Number 1 - 1396) of the DBNPS Operational Improvement Plan Operating Cycle 14. The NRC letter, dated March 8, 2004, Approval to Restart the Davis-Besse Nuclear Power Station, Closure of Coiifirniatory Action Letter, and Issuance of Confirmatory Order, (DBNPS Letter Log Number 1-4524) requires FENOC to notify the NRC of changes in the actions committed to in this Plan.
The purpose of this letter is to submit Revision 8 of the Davis-Besse Nuclear Po~krerStation (DBNPS) Operational Improvement Plan Operating Cycle 14, dated March 24. 2005, to the Nuclear Regulatory Commission (NRC). By letter dated December 22, 2004, the FirstEnergy Nuclear Operating Company (FENOC) submitted Revision 7 (DBNPS Letter Serial Number 1- 1396) of the DBNPS Operational Improvement Plan Operating Cycle 14. The NRC letter, dated March 8, 2004, Approval to Restart the Davis-Besse Nuclear Power Station, Closure of Coiifirniatory Action Letter, and Issuance of Confirmatory Order, (DBNPS Letter Log Number 1-4524) requires FENOC to notify the NRC of changes in the actions committed to in this Plan.
The DBNPS Operational Improvement Plan, Revision 8, supercedes all previous revisions in their entirety.
The DBNPS Operational Improvement Plan, Revision 8, supercedes all previous revisions i n their entirety.
This revision to the Plan includes the identification of initiative actions completed since the prior revision of the Plan, a change of sponsorship as a result of respoiisibility transitions fi-om the reorganization and a change of owner as a result of prograni and process transitions from the reorganization. The testing of maintenance staff for training improvements was divided into two separate components of: 1 ) maintenance staff testing; 2) and maintenance training curriculum changes. The maintenance staff testing is complete with the training element outstanding.
This revision to the Plan includes the identification of initiative actions completed since the prior revision of the Plan, a change of sponsorship as a result of respoiisibility transitions fi-om the reorganization and a change of owner as a result of prograni and process transitions from the reorganization. The testing of maintenance staff for training improvements was divided into two separate components of: 1 ) maintenance staff testing; 2) and maintenance training curriculum changes. The maintenance staff testing is complete with the training element outstanding.
Completion dates of two commitments within the Engineering Improvement ii1itiatii.e are extended through the cycle to include scope of work that requires a plant outage. Other changes to key actions and barrier attribute performance indicators are detailed in Attachment 2 of this letter.
Completion dates of two commitments within the Engineering Improvement ii1itiatii.e are extended through the cycle to include scope of work that requires a plant outage. Other changes to key actions and barrier attribute performance indicators are detailed in Attachment 2 of this letter.
Regulatory commitments are identified in the Commitment List (Attachment 1 ) n.ith changes i n comniitments from Revision 7 to Revision 8 identified in bold italicized text.
Regulatory commitments are identified in the Commitment List (Attachment 1 ) n.ith changes in comniitments from Revision 7 to Revision 8 identified in bold italicized text.  


Docket N uni be r 50-346 License Number NPF-3 Serial Number 1-1409 Page 2 of 2 FENOC will update the DBNPS Operational Improvement Plan Operating Cycle 14 periodically to provide a status of the actions, and will submit subsequent revisions to the NRC following these changes.
Docket N uni be r 5 0- 3 46 License Number NPF-3 Serial Number 1-1409 Page 2 of 2 FENOC will update the DBNPS Operational Improvement Plan Operating Cycle 14 periodically to provide a status of the actions, and will submit subsequent revisions to the NRC following these changes.
I f you have any questions or require further information, please contact Mr. Clark A. Price, Manager - Regulatory Compliance, at (41 9) 321 -8585.
If you have any questions or require further information, please contact Mr. Clark A. Price, Manager - Regulatory Compliance, at (41 9) 321 -8585.
Sincerely yours, Attachments Enclosure cc:     USNRC Document Control Desk S . A. Reynolds, Chairman NRC 0350 Panel J. B. Hopkins, DB- 1 NRC/NRR Senior Project Manager C. S . Thomas, DB-1 Senior Resident Inspector Utility Radiological Safety Board
Sincerely yours, Attachments Enclosure cc:
USNRC Document Control Desk S. A. Reynolds, Chairman NRC 0350 Panel J. B. Hopkins, DB-1 NRC/NRR Senior Project Manager C. S. Thomas, DB-1 Senior Resident Inspector Utility Radiological Safety Board  


Docket Number 50-346 License Number NPF-3 Serial Number 1- 1409 Page 1 o f 8 COMMITMENT LIST The following list identifies those actions committed to by FENOCs Davis-Besse Nuclear Power Station (DBNPS) in this document. Any other actions discussed in the submittal represent intended or planned actions by the DBNPS. They are described only for infomiation and are not regulatory commitments. Please notify the Manager - Regulatory Compliance (419-321 -8585) at the DBNPS of any questions regarding this document or associated regulatory commitments.
Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Page 1 of8 COMMITMENT LIST The following list identifies those actions committed to by FENOCs Davis-Besse Nuclear Power Station (DBNPS) in this document. Any other actions discussed in the submittal represent intended or planned actions by the DBNPS. They are described only for infomiation and are not regulatory commitments. Please notify the Manager - Regulatory Compliance (41 9-321 -8585) at the DBNPS of any questions regarding this document or associated regulatory commitments.
The following commitments are based on Revision 8 of the Davis-Besse Operational Improvement Plan Operating Cycle 14. Changes from previous commitments in Revision 7 of the Operational Improvement Plan are identified in bold Italics.
The following commitments are based on Revision 8 of the Davis-Besse Operational Improvement Plan Operating Cycle 14. Changes from previous commitments in Revision 7 of the Operational Improvement Plan are identified in bold Italics.
COMMITMENTS                                                       DUE DATE
: 1.
: 1. Organizational Effectiveness Improvement Initiative
: 2.
: 1. Improve individual and organizational performance through             June 30,2005 development and utilization of alignment tools at the Department/Section levels
: 3.
: 2. Implement FENOC Business Practices for:
: 4.
a) Focused Self-Assessments                                       Complete b) Ongoing Self-Assessments                                       Comp 1et e c) Benchmarking                                                   Complete d) Semi-Annual Collective Significance Self-Assessments           Complete
: 5.
: 3. Directors and Managers to attend a Leadership Academy to improve     Complete management ski 11s
: 6.
: 4. Provide formal Management Observation Skills Training                 Complete 5 . Enhance the Management Observation Program by ensuring               Co ni p 1ete personnel providing oversight monitoring are familiar with DBBP-OPS-000 1, Operations Expectations and Standards
: 7.
: 6. Implement actions to improve trending of major plant evolutions       Complete utilizing the Management Observation Program to track performance and feedback
: 8.
: 7. Provide face-to-face communications training to all site supervisors Comp 1ete and above
: 9.
: 8. Re-evaluate all Davis-Besse supervisors to assess competency for     December 3 1,2005 current positions
COMMITMENTS
: 9. Conduct Supervisor and Manager Talent Management Talks               C om p 1et e I O . Continue with the 4 Cs meetings, D-B Team Meetings, Town Hall     Periodic through Cycle 14 Meetings i n accordance with Davis-Besse Business Practices
: 1. Organizational Effectiveness Improvement Initiative Improve individual and organizational performance through development and utilization of alignment tools at the Department/Section levels Implement FENOC Business Practices for:
a)
Focused Self-Assessments b) Ongoing Self-Assessments c)
Benchmarking d)
Semi-Annual Collective Significance Self-Assessments Directors and Managers to attend a Leadership Academy to improve management ski 1 1 s Provide formal Management Observation Skills Training Enhance the Management Observation Program by ensuring personnel providing oversight monitoring are familiar with DBBP-OPS-000 1, Operations Expectations and Standards Implement actions to improve trending of major plant evolutions utilizing the Management Observation Program to track performance and feedback Provide face-to-face communications training to all site supervisors and above Re-evaluate all Davis-Besse supervisors to assess competency for current positions Conduct Supervisor and Manager Talent Management Talks IO. Continue with the 4 Cs meetings, D-B Team Meetings, Town Hall Meetings in accordance with Davis-Besse Business Practices DUE DATE June 30,2005 Complete C omp 1 et e Complete Complete Complete Complete Co ni p 1 et e Complete Co m p 1 e te December 3 1,2005 C om p 1 et e Periodic through Cycle 14


Docket Number 50-346 License Number NPF-3 Serial Number 1- 1409 Page 2 of 8 COMMITMENTS                                                       DUE DATE
Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Page 2 of 8 COMMITMENTS
: 2. Operations Improvement Initiative I . Implement Operations Improvements:
: 2. Operations Improvement Initiative DUE DATE I. Implement Operations Improvements:
: a. Initiate Operations Leadership Improvements                     Complete
: a. Initiate Operations Leadership Improvements Complete
: b. Initiate the 5 year staffing plan                               Coni p 1ete
: b. Initiate the 5 year staffing plan Co ni p 1 et e
: c. Implement improvements to Operations work stations             Coni p 1ete
: c. Implement improvements to Operations work stations Co ni p 1 et e
: d. Implement common FENOC Operations work process tools            Conrplete 2 . Improve Operator knowledge, skills and abilities through testing, Conrplere training and nientoring
: 2. Improve Operator knowledge, skills and abilities through testing, Conrplere training and nientoring
: 3. Implement the Operations Improvement Action Plan, including:       Comp 1ete
: 3. Implement the Operations Improvement Action Plan, including:
Co m p 1 ete
: a. Strengthening Operating Crews, including assessment of operators, training on procedure use, and improving command and control
: a. Strengthening Operating Crews, including assessment of operators, training on procedure use, and improving command and control
: b. Strengthening Operating Procedures, including validation of key operating procedures and use of reverse pre-job briefs
: b. Strengthening Operating Procedures, including validation of key operating procedures and use of reverse pre-job briefs
: c. Strengthening Operations Management, including use of Operations Oversight Managers until no longer needed
: c. Strengthening Operations Management, including use of Operations Oversight Managers until no longer needed
: d. Strengthening Independent Oversight of Operations
: d. Strengthening Independent Oversight of Operations
: 4. Strengthen Communications within Operations                         C onip 1et e 5 . Benchmark Conduct of Operations                                   C onip 1et e
: d. Implement common FENOC Operations work process tools Conrplete
: 6. Align Perforniance Indicators to Conduct of Operations             Complete
: 4. Strengthen Communications within Operations 5. Benchmark Conduct of Operations
: 6. Align Perforniance Indicators to Conduct of Operations C onip 1 et e C onip 1 et e Complete  


Docket Number 50-346 License Number NPF-3 Serial Number 1-1 409 Page 3 of 8 COMMITMENTS                                                           DUE DATE
Docket Number 50-346 License Number NPF-3 Serial Number 1-1 409 Page 3 of 8 COMMITMENTS DUE DATE
: 3. Maintenance Improvement Initiative
: 3. Maintenance Improvement Initiative
: 1. Utilize post-job evaluations, operating experience, and lessons       Complete learned from rework activities to identify improvements in Maintenance training and standards
: 1. Utilize post-job evaluations, operating experience, and lessons Complete learned from rework activities to identify improvements in Maintenance training and standards scheduling, and implementation of critical equipment outages to identify improvements training and development to establish improved ownership and accountability of Plant materiel condition
: 2. Perform an assessment of Maintenance effectiveness work planning,    Complete scheduling, and implementation of critical equipment outages to identify improvements
: 3. Implement improvements of Maintenance Supervision through            Complete training and development
: 4. Implen~entactions in the Maintenance individual commitment area      Contplete to establish improved ownership and accountability of Plant materiel condition
: 5. Perform testing of Maintenance staff knowledge, skills and abilities to identify improvement actions and incorporate into training
: 5. Perform testing of Maintenance staff knowledge, skills and abilities to identify improvement actions and incorporate into training
: a. Perforitr skill arid knowledge testing to iderrtijy areas for     Contplete irttpro vent erit
: 2. Perform an assessment of Maintenance effectiveness work planning, Complete
: b. Incorporate ideirtiJied additional or revised trairiirig, if arty. June 30, 2005 4.Training Improvement Initiative 1 . Implement actions to improve individual and organizational           Conip 1ete performance and alignment by developing and providing training on design and configuration control to appropriate site staff
: 3. Implement improvements of Maintenance Supervision through Complete
: 2. Establish engineering positional qualification requirements based on  Cortiplete the standard FENOC Engineering Organization and complete qualification training for incumbent and new engineers
: 4. Implen~ent actions in the Maintenance individual commitment area Contplete
: a. Perforitr skill arid knowledge testing to iderrtijy areas for Contplete irttpro vent erit
: b. Incorporate ideirtiJied additional or revised trairiirig, if arty.
June 30, 2005
: 4. Training Improvement Initiative 1. Implement actions to improve individual and organizational performance and alignment by developing and providing training on design and configuration control to appropriate site staff the standard FENOC Engineering Organization and complete qualification training for incumbent and new engineers Coni p 1 et e
: 2. Establish engineering positional qualification requirements based on Cortiplete


Docket Number 50-346 License Number NPF-3 Serial Number 1- 1409 Page 4 of 8 COMMITMENTS                                                           DUE DATE 5 . Work Management Improvement Initiative
Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Page 4 of 8 COMMITMENTS
: 5. Work Management Improvement Initiative
: 1. Conimon Process
: 1. Conimon Process
: a. Complete training and mentoring to support the effective           Complete transition into the FENOC Work Management Process
: a. Complete training and mentoring to support the effective transition into the FENOC Work Management Process
: b. Resolve gaps in process implementation and station procedures       Comp 1et e
: b. Resolve gaps in process implementation and station procedures
: c. Perform quarterly assessments of Condition Reports and             Periodic through Cycle 14 Workweek critiques to ensure opportunities for improvement are addressed
: c. Perform quarterly assessments of Condition Reports and Workweek critiques to ensure opportunities for improvement are addressed knowledge and awareness
: d. Implement Risk Management process to improve station               Complete knowledge and awareness
: d. Implement Risk Management process to improve station
: e. Monitor and improve Order quality                                   Comp 1et e
: e. Monitor and improve Order quality
: 2. Maintenance Backlog Reduction
: a. Complete walk-down and validation of the Order backlog to ensure proper category, priority, consolidation and elimination of invalid orders
: a. Complete walk-down and validation of the Order backlog to           Coni p 1et e ensure proper category, priority, consolidation and elimination of invalid orders
: b. Complete Cycle Plan identifying equipment outages and providing the framework for addressing backlog Order priorities and results of the System Health Report
: b. Complete Cycle Plan identifying equipment outages and               Complete providing the framework for addressing backlog Order priorities and results of the System Health Report
: c. Develop perfomiance indicators to monitor and manage Order backlog
: c. Develop perfomiance indicators to monitor and manage Order         Co m p 1et e backlog
: 3. Outage Perfonnance
: 3. Outage Perfonnance
: a. Forced Outage Schedule template and readiness                       Coni p 1et e
: a. Forced Outage Schedule template and readiness
: b. Mid-Cycle Outage Preparation                                       Cotttplete
: b. Mid-Cycle Outage Preparation
: c. Clarify expectations and improve contractor performance             Corrrplete
: c. Clarify expectations and improve contractor performance
: d. 14"' Refueling Outage Preparation                                   February 28,2006
: d. 14"' Refueling Outage Preparation
: 2. Maintenance Backlog Reduction DUE DATE Complete Co m p 1 et e Periodic through Cycle 14 Complete Co m p 1 et e Coni p 1 et e Complete Co m p 1 et e Coni p 1 et e Cotttplete Corrrplete February 28,2006  


Docket Number 50-346 License Number NPF-3 Serial Number 1- 1409 Pagc 5 of 8 COMMITMENTS                                                         DUE DATE
Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Pagc 5 of 8
: 6. Engineering
: 1.
                        -          Improvement Initiative
: 2.
: 1. Implement actions to improve Safety Margin:
: 3.
: a. Determine the Safety Margin for the top 10 Risk Significant       Coni p 1et e Systems and develop a plan to improve safety margins
: 4.
: b. Electrical System coordination improvements                       Tlt roirgli Cycle I4
: 5.
: c. Masonry/block wall re-analyses and design changes                 Tlirorrglr Cycle 14
: 6.
: d. Service Water improvements                                       Through Cycle 14
: 7.
: 2. Perform additional Latent Issues Reviews                             Periodic through Cycle 14
: 8.
: 3. Implement the Design Calculation Improvement Plan                     Through Cycle 14
: 9.
: 4. Enhance plant equipment performance through the FENOC                 Through Cycle 14 Equipment Re1i abi 1it y Program
: 10.
: 5. Develop and implement the plan to enhance System Engineering         Complete ownership of plant systems in support of Operations
: 11.
: 6. Schedule and conduct additional Program Compliance Reviews including:
: 12.
COMMITMENTS
: 6. Engineering Improvement Initiative Implement actions to improve Safety Margin:
: a. Determine the Safety Margin for the top 10 Risk Significant Systems and develop a plan to improve safety margins
: b. Electrical System coordination improvements
: c. Masonry/block wall re-analyses and design changes
: d. Service Water improvements Perform additional Latent Issues Reviews Implement the Design Calculation Improvement Plan Enhance plant equipment performance through the FENOC Equipment Re1 i abi 1 it y Program Develop and implement the plan to enhance System Engineering ownership of plant systems in support of Operations Schedule and conduct additional Program Compliance Reviews including:
: a. Qualification of Program Owners
: a. Qualification of Program Owners
: b. Development of Program Manuals
: b. Development of Program Manuals
: c. Creation of Performance Indicators
: c. Creation of Performance Indicators Establish the appropriate level of workload for Engineering Change Requests and develop a plan to reduce and maintain the backlogs to that level Perfomi on-going self-assessments to determine if the problem solving process, NOP-ER-3001 has been properly implemented during the previous period Perform independent outside assessments of the effectiveness of Engineering corrective and improvement actions in the areas of modifications, System Engineering, corrective actions, and calculations Implement electronic accessibility of design basis information and populate with 5 systems Expand the role of the Engineering Assessment Board (EAB) to include the review of Engineering Root Causes and Apparent Causes and Engineering Calculations Establish criteria and modify appropriate procedures to restrict the use of At-Risk Changes in the plant modification process DUE DATE Coni p 1 et e Tlt roirgli Cycle I4 Tlirorrglr Cycle 14 Through Cycle 14 Periodic through Cycle 14 Through Cycle 14 Through Cycle 14 Complete Complete Periodic through Cycle 14 Periodic through Cycle 14 Corr1plete C omp 1 et e Co nip 1 et e
: 7. Establish the appropriate level of workload for Engineering Change   Complete Requests and develop a plan to reduce and maintain the backlogs to that level
: 8. Perfomi on-going self-assessments to determine if the problem         Periodic through Cycle 14 solving process, NOP-ER-3001 has been properly implemented during the previous period
: 9. Perform independent outside assessments of the effectiveness of       Periodic through Cycle 14 Engineering corrective and improvement actions in the areas of modifications, System Engineering, corrective actions, and calculations
: 10. Implement electronic accessibility of design basis information and   Corr1plete populate with 5 systems
: 11. Expand the role of the Engineering Assessment Board (EAB) to         Comp 1ete include the review of Engineering Root Causes and Apparent Causes and Engineering Calculations
: 12. Establish criteria and modify appropriate procedures to restrict the Conip 1et e use of At-Risk Changes in the plant modification process


Docket Number 50-346 License Nuniber NPF-3 Serial Nuniber 1- 1409 At t achm et i t 1 Page 6 of 8 COMMITMENTS                                                     DUE DATE Engineering Improvement Initiative (Contd)
Docket Number 50-346 License Nuniber NPF-3 Serial Nuniber 1 - 1409 At t achm e t i t 1 Page 6 of 8 COMMITMENTS DUE DATE Engineering Improvement Initiative (Contd)
: 13. Re-institute the use of Quarterly System Health Reports and       Conip 1et e Design Basis Assessment Reports
: 13. Re-institute the use of Quarterly System Health Reports and
: 14. Assign a Program Owner for the Problem Solving Process             Complete
: 14. Assign a Program Owner for the Problem Solving Process
: 15. Develop and implenient actions necessary to improve the           Conip 1et e technical issues problem solving capabilities in the Engineering organization.
: 15. Develop and implenient actions necessary to improve the C onip 1 et e Complete Coni p 1 et e Design Basis Assessment Reports technical issues problem solving capabilities in the Engineering organization.
: 7. Continuous Safety Culture Improvement Initiative 1 . Monitor Safety Culture on a monthly basis                         Periodic through Cycle 14
: 7. Continuous Safety Culture Improvement Initiative
: 2. Assess Safety Culture using the FENOC Business Practice             December 3 1, 2005
: 1. Monitor Safety Culture on a monthly basis
: 3. Perform a Safety Culture assessnient utilizing an independent       Corrrplete outside organization
: 2. Assess Safety Culture using the FENOC Business Practice
: 4. Provide SCWE training to Site employees who have not               Complete completed the SCWE portion of the Site Employee Orientation Manual 5 . Provide refresher training on SCWE and Safety Culture to Davis-   Complete Besse Supervisors and above
: 3. Perform a Safety Culture assessnient utilizing an independent outside organization
: 6. NQA to perfomi two Safety Culture Assessments                       2004 Cortiplete 4Quarter 2005
: 4. Provide SCWE training to Site employees who have not completed the SCWE portion of the Site Employee Orientation Manual
: 7. Employee Concerns Program group to perform two surveys of the       2004 Corriplete Safety Conscious Work Environment                               4 Quarter 2005
: 5. Provide refresher training on SCWE and Safety Culture to Davis-Besse Supervisors and above
: 8. Perform an effectiveness assessment of the corrective actions       Coni p 1ete taken in response to the November 2003 SCWE survey results
: 6. NQA to perfomi two Safety Culture Assessments
: 7. Employee Concerns Program group to perform two surveys of the Safety Conscious Work Environment
: 8. Perform an effectiveness assessment of the corrective actions taken in response to the November 2003 SCWE survey results Periodic through Cycle 14 December 3 1, 2005 Corrrplete Complete Complete 2004 Cortiplete 4
Quarter 2005 2004 Corriplete 4 Quarter 2005 Co ni p 1 et e
: 8. Procedure Improvement Initiative
: 8. Procedure Improvement Initiative
: 1. Perform Self-Assessments on procedure use and adherence             Periodic through Cycle 14
: 1. Perform Self-Assessments on procedure use and adherence
: 2. Review the Davis-Besse procedure change process to ensure           Complete alignment with FENOC standards for procedure preparation and revisions
: 2. Review the Davis-Besse procedure change process to ensure Complete alignment with FENOC standards for procedure preparation and revisions
: 3. Provide training on procedure use and adherence                     Conip 1et e
: 3. Provide training on procedure use and adherence
: 4. Perform follow-up effectiveness reviews on procedure use and       September 30, 2005 adherence
: 4. Perform follow-up effectiveness reviews on procedure use and adherence Periodic through Cycle 14 Co nip 1 et e September 30, 2005  


Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Page 7 of 8 COMMITMENTS                                                     DUE DATE
Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Page 7 of 8 COMMITMENTS
: 9. Corrective Action Program Improvement Initiative
: 9. Corrective Action Program Improvement Initiative
: 1. Implement the Apparent Cause Improvement Plan:
: 1. Implement the Apparent Cause Improvement Plan:
: a. Strengthen procedural requirements for apparent cause         Complete evaluations, including analytical methods to be used
: a. Strengthen procedural requirements for apparent cause evaluations, including analytical methods to be used
: b. Corrective Action Review Board review of Apparent Cause       Complete Evaluations until standards are consistently met
: b. Corrective Action Review Board review of Apparent Cause Evaluations until standards are consistently met
: c. Identify Apparent Cause Evaluators                           Coni p 1et e
: c. Identify Apparent Cause Evaluators
: d. Develop Training Program and Expectations and provide         Coni p 1et e training to the Apparent Cause Evaluators (Initial Evaluator Classes and Additional Classes in 2004)
: d. Develop Training Program and Expectations and provide training to the Apparent Cause Evaluators (Initial Evaluator Classes and Additional Classes in 2004)
: e. Qualify the trained Apparent Cause Evaluators using the       Com p 1ete Systematic Approach to Training
: e. Qualify the trained Apparent Cause Evaluators using the Systematic Approach to Training
: f. On an interim basis, rotate team of apparent cause evaluators Conip 1ete to Support Services
: f. On an interim basis, rotate team of apparent cause evaluators to Support Services
: g. Company Nuclear Review Board (CNRB) review of selected       Periodic through Cycle 14 Apparent Cause Evaluations
: g. Company Nuclear Review Board (CNRB) review of selected Apparent Cause Evaluations
: 2. Establish the appropriate level of workload for Condition Report Conip 1ete Evaluations and Corrective Actions and develop a plan to reduce the backlogs to those levels
: 2. Establish the appropriate level of workload for Condition Report Evaluations and Corrective Actions and develop a plan to reduce the backlogs to those levels
: 3. Perform a focused Self-Assessment of implementation of the       Coni p 1ete Corrective Action Program using industry peers
: 3. Perform a focused Self-Assessment of implementation of the Corrective Action Program using industry peers
: 4. Reestablish the Corrective Action Program trending process       Coin p let e
: 4. Reestablish the Corrective Action Program trending process
: 5. Provide Apparent Cause training to Managers                     Coin p 1et e
: 5. Provide Apparent Cause training to Managers DUE DATE Complete Complete Co ni p 1 et e Co ni p 1 et e Co m p 1 et e Co nip 1 e te Periodic through Cycle 14 Co nip 1 e te Coni p 1 e te Coin p let e Coin p 1 et e  


Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Page 8 of 8 COMMITMENTS                                                     DUE DATE
Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Page 8 of 8
: 10. Internal and External Oversight Improvement Initiative
: 1.
: 1. Supplement quality oversight with off-site assistance to improve C on1p 1et e objectivity and ensure assessments are sufficiently critical
: 2.
: 2. Supplement management oversight with off-site assistance to       Conip 1et e improve objectivity and ensure assessments are sufficiently critical
: 3.
: 3. Focus more quality oversight on cross-functional activities and   Complete interfaces
: 4.
: 4. Review and revise the master assessment plan at all three FENOC   Co ni p 1et e sites 5 . Conduct an external assessment to evaluate the progress of       Com p 1et e organizational improvements in the areas of critical self-assessments and performance observations
: 5.
: 6. Utilize INPO Assist Visits to assess the effectiveness of         Cotrrplere Improvement Initiatives
: 6.
: 7. Perforni Quality Oversight of Engineering using the Continuous   Periodic through Cycle 14 Assessnient Process
: 7.
: 8. Conduct assessment activities of the Corrective Action Program   Periodic through Cycle 14 to evaluate effectiveness of corrective actions taken to improve impletnentation and improve trend evaluation
: 8.
COMMITMENTS
: 10. Internal and External Oversight Improvement Initiative Supplement quality oversight with off-site assistance to improve objectivity and ensure assessments are sufficiently critical Supplement management oversight with off-site assistance to improve objectivity and ensure assessments are sufficiently critical Focus more quality oversight on cross-functional activities and interfaces Review and revise the master assessment plan at all three FENOC sites Conduct an external assessment to evaluate the progress of organizational improvements in the areas of critical self-assessments and performance observations Utilize INPO Assist Visits to assess the effectiveness of Improvement Initiatives Perforni Quality Oversight of Engineering using the Continuous Assessnient Process Conduct assessment activities of the Corrective Action Program to evaluate effectiveness of corrective actions taken to improve impletnentation and improve trend evaluation DUE DATE C on1 p 1 et e Co nip 1 et e Complete C o ni p 1 et e Co m p 1 et e Cotrrplere Periodic through Cycle 14 Periodic through Cycle 14


Docket Number 50-346 Liccnse Number NPF-3 Serial Number 1-1 409 Page 1 o f 4 CHANGES TO CYCLE 14 OPERATIONAL IMPROVEMENT PLAN, REV. 8 ACTION/PI TITLE                              CHANGE NUMBER Key Actions Sponsor List, Page 6             Changed sponsor of Initiative 10 Internal and External Oversight Improvement to J. Rinckel. (Transfer of duties from reorganization is comDlete) 3.5      Perform testing of              Extended due date to Second Quarter Maintenance staff knowledge,    2005.
Docket Number 50-346 Liccnse Number NPF-3 Serial Number 1-1 409 Page 1 of4 6.lb CHANGES TO CYCLE 14 OPERATIONAL IMPROVEMENT PLAN, REV. 8 Implement actions to improve TITLE ACTION/PI NUMBER 6.lc 9.lg Key Actions safety margin: Electrical system coordination improvements lniprove Safety Margin:
skills and abilities to identify improvement actions and          Divided this commit men t into two incorporate into training.      parts in the OIP. Actions taken through 12/31/04 are documented as complete. Incorporation of any identified training needs is a sub-set with a due date of 6/30/05.
Masonryiblock wall re-analysis and design changes Company Nuclear Review Board (CNRB) review of selected Apparent Cause Evaluations Sponsor List, Page 6 Changed owner from R. Hansen to 1.
In keeping with the Systematic Approach to Training (SAT) process, the applicable Curriculum Review Committee (CRC) will review the results of the Knowledge Surveys and determine if any training is needed for the totics tested.
3.5 Perform testing of Maintenance staff knowledge, skills and abilities to identify improvement actions and incorporate into training.
6.lb      Implement actions to improve safety margin: Electrical system coordination improvements 6.lc      lniprove Safety Margin:
CHANGE Changed sponsor of Initiative 10 Internal and External Oversight Improvement to J. Rinckel. (Transfer of duties from reorganization is comDlete)
Masonryiblock wall re-analysis and design changes 9.lg      Company Nuclear Review          Changed owner from R. Hansen to 1.
Extended due date to Second Quarter 2005.
Board (CNRB) review of selected Apparent Cause Evaluations
Divided this commit men t into two parts in the OIP. Actions taken through 12/3 1/04 are documented as complete. Incorporation of any identified training needs is a sub-set with a due date of 6/30/05.
In keeping with the Systematic Approach to Training (SAT) process, the applicable Curriculum Review Committee (CRC) will review the results of the Knowledge Surveys and determine if any training is needed for the totics tested.  


Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 At t aclimen t 2 Page 2 of 4 ACTlONlPl NUMBER TITLE                            CHANGE Performance Indicators 1-04     Individual Error Rate         The Fleet PI Reference number changed to D-HP-01.
Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 At t ac limen t 2 Page 2 of 4 TITLE ACTlONlPl NUMBER Performance Indicators 1-04 1-05 1-06.2 1-1 1 1-12 P-0 1 P-06 M-05 M -06 Individual Error Rate Employee willingness to raise concerns Operator Work Arounds -
1-05      Employee willingness to raise  This Performance Indicator will be concerns                      assessed through the annual SCWE survey.
Level 2 Employee Willingness to Use the Corrective Action Pro gram Worker Confidence in Raising Safetv Concerns Corrective Action Program Effectiveness Program and Process Error Rate Management Field Observations are self-critical Effectiveness of Management and Supervisors CHANGE The Fleet PI Reference number changed to D-HP-01.
1-06.2    Operator Work Arounds -        Added ranking criteria and reworded Level 2                        Obi ective/Goal.
This Performance Indicator will be assessed through the annual SCWE survey.
1-1 1    Employee Willingness to Use    Added the Annual Safety Culture the Corrective Action          Assessment as a source reference.
Added ranking criteria and reworded Obi ective/Goal.
Pro gram                      Delete NQA.
Added the Annual Safety Culture Assessment as a source reference.
Changed owner from Griffith to Am i don .
Delete NQA.
1-12      Worker Confidence in          Changed owner from Griffith to Raising Safetv Concerns        Amidon.
Changed owner from Griffith to Am i don.
P-0 1    Corrective Action Program      Changed grading criteria for weighted Effectiveness                  values for backlog and root cause.
Changed owner from Griffith to Amidon.
Changed grading criteria for weighted values for backlog and root cause.
Changed from a pass/fail to a graded average.
Changed from a pass/fail to a graded average.
The Fleet PI Reference number changed to D-SPO-05.
The Fleet PI Reference number changed to D-SPO-05.
____
The Fleet PI Reference number changed to D-HP-02.
P-06      Program and Process Error      The Fleet PI Reference number Rate                          changed to D-HP-02.
Changed PI Reference in the Operational Improvement Plan to Annual Safety Culture Assessment, NQA Field Observations and Management Observations.
M-05      Management Field              Changed PI Reference in the Observations are self-critical Operational Improvement Plan to Annual Safety Culture Assessment, NQA Field Observations and Management Observations.
Changed to annual PI reporting.
Changed to annual PI reporting.
M -06      Effectiveness of Management    The Fleet PI Reference number and Supervisors                changed to XD-PDE-05.
The Fleet PI Reference number changed to XD-PDE-05.  


Docket Number 50-346 License Number NPF-3 Serial Nuniber 1- 1409 Attach M en t 2 Page 3 of 4 M-07       Talent Management and       Removed monthly from the Goal Personnel Development        statement in the Operational Improvement Plan. This is a semi-I                                              annual Performance Indicator.
Docket Number 50-346 License Number NPF-3 Serial Nuniber 1 - 1409 Attach M en t 2 Page 3 of 4 M-07 I
I    34-08      Leadership Development      Removed monthly from the Goal statement in the Operational I-----
I 34-08 I-----
Improvement Plan. This is a semi-annual Performance Indicator.
0-01.2 0-02 r---
0-01.2      Completion of Primary        Added criteria for Year-to-Date and Elements                    Y ear-End Expectancy.
0-03 I
r---  0-02        Investigation Responsiveness to DBOV Identified CRs Changed from measuring the responsiveness to DBOV-initiated CRs in units of days to measuring this responsiveness as a ratio (percentage) of the sites responsiveness to all CRs.
Talent Management and Personnel Development Leadership Development Completion of Primary Elements Investigation Responsiveness to DBOV Identified CRs CR DBOV Review Tim el i ness Removed monthly from the Goal statement in the Operational Improvement Plan. This is a semi-annual Performance Indicator.
Removed monthly from the Goal statement in the Operational Improvement Plan. This is a semi-annual Performance Indicator.
Added criteria for Year-to-Date and Y ear-End Expectancy.
Changed from measuring the responsiveness to DBOV-initiated CRs in units of days to measuring this responsiveness as a ratio (percentage) of the sites responsiveness to all CRs.
Additionally, CRs identified as immediately closed (CC) will no longer be included, since they require no response. DBOV-initiated CRs that DBOV answers are also not included since the indicator is monitoring line organization resDonsiveness to DBOV issues.
Additionally, CRs identified as immediately closed (CC) will no longer be included, since they require no response. DBOV-initiated CRs that DBOV answers are also not included since the indicator is monitoring line organization resDonsiveness to DBOV issues.
0-03      CR DBOV Review              Changed from measuring the 90 of CR I                Tim el i ness                reviews completed within 15 days to measuring the number of days required to complete 100% of the CR reviews.
Changed from measuring the 90 of CR reviews completed within 15 days to measuring the number of days required to complete 100% of the CR reviews.
Changed the goal from 90% of CR reviews to be accepted within 15 days to the goal of 100% of CR reviews to be accepted within 14 days.
Changed the goal from 90% of CR reviews to be accepted within 15 days to the goal of 100% of CR reviews to be accepted within 14 days.  


Docket Number 50-346 License Number NPF-3 Serial Number 1-1 409 Page 4 of 4 0-04       CA DBOV Verification   Changed from measuring the % of CA Timeliness              reviews completed within 30 days to measuring the number of days required to complete 100% of the CA reviews.
Docket Number 50-346 License Number NPF-3 Serial Number 1-1 409 Page 4 of 4 0-04 0-05 CA DBOV Verification Timeliness Timeliness of NQA Audit Report Issuances Changed from measuring the % of CA reviews completed within 30 days to measuring the number of days required to complete 100% of the CA reviews.
Changed the goal from 90% of CA reviews to be accepted within 30 days to the goal of 100% of CA reviews to be accepted within 30 days.
Changed the goal from 90% of CA reviews to be accepted within 30 days to the goal of 100% of CA reviews to be accepted within 30 days.
0-05      Timeliness of NQA Audit Deleted use of calendar days from end Report Issuances        of quarter and only use working days from end of quarter.
Deleted use of calendar days from end of quarter and only use working days from end of quarter.  


Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Enclosure Davis-Besse Nuclear Power Station Operational Improvenient Plan Operating Cycle 14 Revision 8 March 24,2005 (34 pages to follow)
Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Enclosure Davis-Besse Nuclear Power Station Operational Improvenient Plan Operating Cycle 14 Revision 8 March 24,2005 (34 pages to follow)  


sooz 'PZ WJeW 8 NOISIMH
sooz 'PZ WJeW 8 NOISIMH  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                                                   Cycle 14 Table of Contents                                                                                             Page Introduction ........................................................................................... 2 Barriers To Ensure Nuclear Safety .......................................................                 3 Davis-Besse Improvement Initiatives ....................................................                   6 Improvement Initiative Key Actions ......................................................                 7 Safety Barrier Attributes and Goals .......................................................               24
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 Table of Contents Page Introduction...........................................................................................
      . Individual ......................................................................................... 25
2 Barriers To Ensure Nuclear Safety.......................................................
      . Programs .......................................................................................... 28
3 Davis-Besse Improvement Initiatives....................................................
      . Management .....................................................................................        29
6 Improvement Initiative Key Actions......................................................
      . Oversight .......................................................................................... 31 Page 1 of 33                                             Revision 8
7 Safety Barrier Attributes and Goals.......................................................
24  
. Individual.........................................................................................
25 Programs 28 Management 29 Oversight 31 Page 1 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                                                     Cycle 14 Introduction To ensure continued improvements and sustained performance in Nuclear Safety and Plant Operation at the Davis-Besse Nuclear Power Station, the Leadership Team has developed this Improvement Plan to focus on key improvement initiatives and safety bamers essential to safe restart from the Reactor Pressure Vessel Head degradation extended plant outage and into subsequent operating cycles. This plan provides for a managed transition from the organizational and programmatic actions taken to support the Davis-Besse Return to Service Plan and Building Block Plans to that of normal plant operations and refueling outages.
Davis-Besse Nuclear Power Station Operational Improvement Plan Introduction To ensure continued improvements and sustained Power Station, the Leadership Team has developed Cycle 14 performance in Nuclear Safety and Plant Operation at the Davis-Besse Nuclear this Improvement Plan to focus on key improvement initiatives and safety bamers essential to safe restart from the Reactor Pressure Vessel Head degradation extended plant outage and into subsequent operating cycles. This plan provides for a managed transition from the organizational and programmatic actions taken to support the Davis-Besse Return to Service Plan and Building Block Plans to that of normal plant operations and refueling outages.
The initiatives discussed in this plan were derived from lessons learned during the extended plant outage which resulted from the significant Reactor Pressure Vessel Head degradation identified at the beginning of the 13h Refueling Outage. During the extended outage, numerous improvements were made in the areas of Safety Culture, Management, Human Performance, System Health and Programs as described in the Return to Service Plan and the Building Block Plans. However, additional improvements are required to achieve world class performance and to ensure that the safety bamers that failed to detect the significant RPV Head degradation are maintained to prevent a recurrence of an event in the future.
The initiatives discussed in this plan were derived from lessons learned during the extended plant outage which resulted from the significant Reactor Pressure Vessel Head degradation identified at the beginning of the 13h Refueling Outage. During the extended outage, numerous improvements were made in the areas of Safety Culture, Management, Human Performance, System Health and Programs as described in the Return to Service Plan and the Building Block Plans. However, additional improvements are required to achieve world class performance and to ensure that the safety bamers that failed to detect the significant RPV Head degradation are maintained to prevent a recurrence of an event in the future.
As described in the Return to Service Plan, the numerous root causes associated with the Reactor Pressure Vessel Head degradation could be grouped into the areas of Nuclear Safety Culture; ManagementPersonnel Development; Standards and Decision-making; Oversight and Assessments; and ProgramsKorrective ActionsRrocedure Compliance. Actions described in each of the Building Blocks were designed to address numerous significant improvements in each of those areas. This transition plan of Operational Improvements focuses on the four primary safety bamers of Individual, Programs, Management, and Oversight (as described in the following pages) to ensure improvements realized during the extended outage remain in place and are further built upon to improve performance in the future. This plan will ensure that the improvements made to Davis-Besse are built to last.
As described in the Return to Service Plan, the numerous root causes associated with the Reactor Pressure Vessel Head degradation could be grouped into the areas of Nuclear Safety Culture; ManagementPersonnel Development; Standards and Decision-making; Oversight and Assessments; and ProgramsKorrective ActionsRrocedure Compliance. Actions described in each of the Building Blocks were designed to address numerous significant improvements in each of those areas. This transition plan of Operational Improvements focuses on the four primary safety bamers of Individual, Programs, Management, and Oversight (as described in the following pages) to ensure improvements realized during the extended outage remain in place and are further built upon to improve performance in the future. This plan will ensure that the improvements made to Davis-Besse are built to last.
This plan will be used by the Davis-Besse Leadership Team on a monthly basis to monitor safety barrier attributes that would provide early detection of declining trends in performance and to focus on major initiatives to achieve operational excellence. This plan is a living document and will be periodically updated and revised to address completed actions and add new initiatives as determined and approved by the Senior Leadership Team.
This plan will be used by the Davis-Besse Leadership Team on a monthly basis to monitor safety barrier attributes that would provide early detection of declining trends in performance and to focus on major initiatives to achieve operational excellence. This plan is a living document and will be periodically updated and revised to address completed actions and add new initiatives as determined and approved by the Senior Leadership Team.  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                                                       Cycle 14 Barriers To Ensure Nuclear Safetv The safety of nuclear power relies heavily on the defense in depth concept. Nuclear power plants are designed with robust systems and redundant back-up safety systems in the unlikely event of a failure. However, systems and equipment must still be operated, maintained and designed by people to ensure reliability and availability if called upon to perform an intended safety function. The first barrier to ensure safety is the Individual. The operator, maintenance technician, engineer and all the other support personnel play an integral role in monitoring plant status and maintaining systems and equipment in top-notch condition. Thus, ensuring that the individuals that support nuclear power plant operation are highly qualified, trained and motivated to do the best job possible is an essential barrier to ensure nuclear safety.
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 Barriers To Ensure Nuclear Safetv The safety of nuclear power relies heavily on the defense in depth concept. Nuclear power plants are designed with robust systems and redundant back-up safety systems in the unlikely event of a failure. However, systems and equipment must still be operated, maintained and designed by people to ensure reliability and availability if called upon to perform an intended safety function. The first barrier to ensure safety is the Individual. The operator, maintenance technician, engineer and all the other support personnel play an integral role in monitoring plant status and maintaining systems and equipment in top-notch condition. Thus, ensuring that the individuals that support nuclear power plant operation are highly qualified, trained and motivated to do the best job possible is an essential barrier to ensure nuclear safety.
To guide the individual in performing their required job functions, numerous Programs have been put in place to address the operations, maintenance, design and licensing basis activities performed daily at the station. Programs are implemented by procedures and other written documents to ensure a consistent approach by the individual. Thus, programs are another essential barrier to ensure nuclear safety.
To guide the individual in performing their required job functions, numerous Programs have been put in place to address the operations, maintenance, design and licensing basis activities performed daily at the station. Programs are implemented by procedures and other written documents to ensure a consistent approach by the individual. Thus, programs are another essential barrier to ensure nuclear safety.
Management also plays a key role in nuclear safety. Management is responsible for providing the proper focus on priorities that ensure the plant is operated and maintained to high standards and expectations. Management is also responsible for creating a work environment that is conducive to a safety conscious work environment and strong safety culture, and to ensure there are adequate staffing levels of qualified and motivated individuals in every department. Management, therefore, is also considered one of the barriers essential to nuclear safety.
Management also plays a key role in nuclear safety. Management is responsible for providing the proper focus on priorities that ensure the plant is operated and maintained to high standards and expectations. Management is also responsible for creating a work environment that is conducive to a safety conscious work environment and strong safety culture, and to ensure there are adequate staffing levels of qualified and motivated individuals in every department. Management, therefore, is also considered one of the barriers essential to nuclear safety.
To ensure that the individual and management (using established programs and associated procedures) performs their duties to high standards and maintains the proper safety focus, Oversight organizations provide another barrier for nuclear safety. Oversight checks for adverse trends in performance and is independent of other pressures. Independent oversight, when properly used, can identify differences from industry norms for early detection of potential weaknesses developing in the safety barriers.
To ensure that the individual and management (using established programs and associated procedures) performs their duties to high standards and maintains the proper safety focus, Oversight organizations provide another barrier for nuclear safety. Oversight checks for adverse trends in performance and is independent of other pressures. Independent oversight, when properly used, can identify differences from industry norms for early detection of potential weaknesses developing in the safety barriers.
Together these four barriers work in conjunction to contribute to the safe operation of Davis-Besse.
Together these four barriers work in conjunction to contribute to the safe operation of Davis-Besse.  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                                 Cycle 14 This illustration represents how the four safety barriers failed, allowing the degradation of the RPV Head to go undetected for several years and serves to anchor the lessons learned and corrective actions taken to prevent recurrence.
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 This illustration represents how the four safety barriers failed, allowing the degradation of the RPV Head to go undetected for several years and serves to anchor the lessons learned and corrective actions taken to prevent recurrence.
Programs                             Oversight C
Programs Oversight C
H
H E
  -E            Individual                       Management E
Individual Management E  


Davis-Besse Nuclear Power Station Operational Improvement Plan                           Cycle 14 1 Barriers Demonstrating FENOCs Strong Safety Focus 1 C        L H
Davis-Besse Nuclear Power Station C
A L                                                          FENOC Vision:
H A
L                                                        People with a strong safety E
L L
G c            focus delivering top Feet operating performance E                      Strong  Experienced  Independent Competent Individual Programs Management      Oversight Page 5 of 33                   Revision 8
E Operational Improvement Plan G
E Cycle 14 1 Barriers Demonstrating FENOCs Strong Safety Focus 1 L
Competent Strong Experienced Individual Programs Management c
Independent Oversight FENOC Vision:
People with a strong safety focus delivering top Feet operating performance Page 5 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                                                 Cycle 14 Davis-Besse Initiatives:
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 Davis-Besse Initiatives:
Based on lessons learned from the Reactor Pressure Vessel Head degradation and during the extended plant outage, a series of key initiatives have been developed by the Leadership Team to focus on opportunities for continued improved performance. These initiatives extend beyond those significant improvements already realized during the extended outage and achieved prior to restart. These initiatives will provide additional improvements to further strengthen each of the four bamers. Details for each initiative are provided in the following pages. ~
Based on lessons learned from the Reactor Pressure Vessel Head degradation and during the extended plant outage, a series of key initiatives have been developed by the Leadership Team to focus on opportunities for continued improved performance. These initiatives extend beyond those significant improvements already realized during the extended outage and achieved prior to restart. These initiatives will provide additional improvements to further strengthen each of the four bamers. Details for each initiative are provided in the following pages.  
Barriers Enhanced
~
                                                                                                            -          -
Sponsor M. Bezilla B. Allen B. Allen B. Allen B. Allen S. Loehlein M. Bezilla M. Bezilla M. Bezilla J. Rinckel Davis-Besse In it iatives 1. Organizational Effectiveness Improvement
Davis-Besse Initiatives                                                E!!      ECT)
: 2.
                                                                                                                        -
Operations Improvement
8        f Sponsor                                                                                             &        b
: 3.
                                                                                                            -          -
Maintenance Improvement
M. Bezilla           1. Organizational Effectiveness Improvement                                   X B. Allen          2. Operations Improvement                                                     X          X B. Allen          3. Maintenance Improvement                                                   X B. Allen          4. Training Improvement                                                       X B. Allen          5. Work Management Improvement                                               X S. Loehlein          6. Engineering Improvement                                                   X          X M. Bezilla          7. Continuous Safety Culture Improvement                                                 X M. Bezilla          8. Procedure Improvement                                                     X M. Bezilla          9. Corrective Action Program Improvement                                     X          X J. Rinckel          IO. Internal and External Oversight Improvement                                             X
: 4.
Training Improvement
: 5.
Work Management Improvement
: 6.
Engineering Improvement
: 7.
Continuous Safety Culture Improvement
: 8.
Procedure Improvement
: 9.
Corrective Action Program Improvement IO. Internal and External Oversight Improvement Barriers Enhanced E !! 8 X
X X
X X
X X
X E
CT) -
f b
X X
X X
X  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                     Cycle 14 1 Organizational Effectiveness Improvement Initiative DESIRED OUTCOME: Improved Human Performance, Leadership and Team Alignment through Critical Self-assessments, Use of Operating Experience, Industry Benchmarking and Communications Key Actions
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 1 Organizational Effectiveness Improvement Initiative DESIRED OUTCOME: Improved Human Performance, Leadership and Team Alignment through Critical Self-assessments, Use of Operating Experience, Industry Benchmarking and Communications Key Actions 1. Improve individual and organizational performance through development and utilization of alignment tools at the De part men t/Sec t i o n I eve Is a) Focused Self-Assessments b) Ongoing Self-Assessments c) Benchmarking d) Semi-Annual Collective Significance Self-Assessments
: 1. Improve individual and organizational performance through Owner  I-!
: 2. Implement FENOC Business Practices for:
M. Trump nsor: M. Bezilla 2"dQtr 2005 development and utilization of alignment tools at the Department/Sect ion I eveIs
(Included in Focused Self-Assessment Business Practice)
: 2. Implement FENOC Business Practices for:                      L. Dohrmann a) Focused Self-Assessments                                                   Complete b) Ongoing Self-Assessments                                                   Complete c) Benchmarking                                                               Complete d) Semi-Annual Collective Significance Self-Assessments                       Complete (Included in Focused Self-Assessment Business Practice)
: 3. Directors and Managers to attend a Leadership Academy
: 3. Directors and Managers to attend a Leadership Academy           D. Haskins      Complete to improve management skills
: 4. Provide formal Management Observation Skills Training to improve management skills Owner M. Trump L. Dohrmann D. Haskins J. Reddington nsor: M. Bezilla I
: 4. Provide formal Management Observation Skills Training       J. Reddington     Complete Page 7 of 33                                   Revision 8
2"d Qtr 2005 Complete Complete Complete Complete Complete Com plete Page 7 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operat ionaI I mprovement Plan                                               Cycle 14 1 Organizational Effectiveness Improvement Initiative continued iponsor: M. Bezilla Key Actions                        Owner        Completion
Davis-Besse Nuclear Power Station Opera t iona I I m provemen t Plan Cycle 14 1 Organizational Effectiveness Improvement Initiative continued
: 5. Enhance the Management Observation Program by               K. Fehr        Complete ensuring personnel providing oversight monitoring are familiar with DBBP-OPS-0001, Operations Expectations and Standards
: 5.
: 6. Implement actions to improve trending of major plant       K. Fehr        Complete evolutions utilizing the Management Observation Program to track performance and feedback
: 6.
: 7. Provide face-to-face communications training to all site D. Haskins        Complete supervisors and above
: 7.
: 8. Re-evaluate all Davis-Besse supervisors to assess         D. Haskins      4thQtr 2005 competency for current positions
: 8.
: 9. Conduct Supervisor and Manager Talent Management         D. Haskins        Complete Talks
: 9.
: 10. Continue with the 4 Cs meetings, D-B Team Meetings,     M. Lark-Landis through Cycle 14 Town Hall Meetings in accordance with Davis-Besse Business Practices Page 8 of 33                                 Revision 8
Key Actions Enhance the Management Observation Program by ensuring personnel providing oversight monitoring are familiar with DBBP-OPS-0001, Operations Expectations and Standards Implement actions to improve trending of major plant evolutions utilizing the Management Observation Program to track performance and feedback Provide face-to-face communications training to all site supervisors and above Re-evaluate all Davis-Besse supervisors to assess competency for current positions Conduct Supervisor and Manager Talent Management Talks
: 10. Continue with the 4 Cs meetings, D-B Team Meetings, Town Hall Meetings in accordance with Davis-Besse Business Practices Owner K. Fehr K. Fehr D. Haskins D. Haskins D. Haskins M. Lark-Landis iponsor: M. Bezilla Completion Complete Complete Complete 4th Qtr 2005 Complete through Cycle 14 Page 8 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                     Cycle 14
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14
: 2. Operations Improvement Initiative DESIRED OUTCOME: Establish the clear leadership role of Operations through improved Organizational Effectiveness and Alignment to the FENOC Processes mnsor: B. Allen Key Actions                               Owner      Completion
: 2. Operations Improvement Initiative DESIRED OUTCOME: Establish the clear leadership role of Operations through improved Organizational Effectiveness and Alignment to the FENOC Processes Key Actions
: 1. Implement Operations Improvements:
: 1. Implement Operations Improvements:
: a. Initiate Operations Leadership Improvements                 K. Ostrowski    CompIete
: a. Initiate Operations Leadership Improvements
: b. Initiate the 5 year staffing plan                           K. Ostrowski    CompIete
: b. Initiate the 5 year staffing plan
: c. Implement improvements to Operations work stations             D. lmlay      Complete
: c. Implement improvements to Operations work stations
: d. Implement common FENOC Operations work process               K Ostrowski    Complete tools
: d. Implement common FENOC Operations work process
: 2. Improve Operator knowledge, skills and abilities through         M. Trump       Complete testing, training and mentoring Page 9 of 33                                   Revision 8
: 2. Improve Operator knowledge, skills and abilities through tools Owner K. Ostrowski K. Ostrowski D. lmlay K Ostrowski M. Trump mnsor: B. Allen Completion Co m p I ete Co m p I ete Complete Complete Complete testing, training and mentoring Page 9 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                       Cycle 14
Davis-Besse Nuclear Power Station K. Ostrowski K. Ostrowski K. Ostrowski Operational Improvement Plan Cycle 14 Complete Complete Complete
: 2. Operations Improvement Initiative continued Sponsor: 6. Allen Key Actions                               Owner    I Completion
: 2. Operations Improvement Initiative continued Key Actions
: 3. Implement the Operations Improvement Implementation Action       K. Ostrowski I  Complete Plan, including:
: 3. Implement the Operations Improvement Implementation Action Plan, including:
: a. Strengthening Operating Crews, including assessment of operators, training on procedure use, and improving command and control
: a. Strengthening Operating Crews, including assessment of operators, training on procedure use, and improving command and control
: b. Strengthening Operating Procedures, including validation of key operating procedures and use of reverse pre-job briefs
: b. Strengthening Operating Procedures, including validation of key operating procedures and use of reverse pre-job briefs
: c. Strengthening Operations Management, including use of Operations Oversight Managers until no longer needed
: c. Strengthening Operations Management, including use of Operations Oversight Managers until no longer needed
: d. Strengthening Independent Oversight of Operations
: d. Strengthening Independent Oversight of Operations
: 4. Strengthen Communications within Operations                     K. Ostrowski    Complete
: 4. Strengthen Communications within Operations
: 5. Benchmark Conduct of Operations                                 K. Ostrowski    Complete 1
: 5. Benchmark Conduct of Operations
I
: 16. Alian Performance Indicators to Conduct of Operations Sponsor: 6. Allen Owner I Completion K. Ostrowski I Complete I
: 6. Alian Performance Indicatorsto Conduct of Operations Y                                                          I K. Ostrowski I Complete Page 10 of 33                                   Revision 8
Y I
I Page 10 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                               Cycle 14
Davis-Besse Nuclear Power Station M. Stevens M. Stevens M. Stevens M. Stevens Operational Improvement Plan Cycle 14 Complete Complete Co m p I ete Complete
: 3. Maintenance improvement Initiative DESIRED OUTCOME: Improved Ownership and Materiel Condition of the Davis-Besse Nuclear Power Station Sponsor: B. Allen Key Actions                         Owner      I Completion
: 3. Maintenance improvement Initiative DESIRED OUTCOME: Improved Ownership and Materiel Condition of the Davis-Besse Nuclear Power Station Key Actions 1. Utilize post-job evaluations, operating experience, and lessons learned from rework activities to identify improvements in Maintenance training and standards
: 1. Utilize post-job evaluations, operating experience, and   M. Stevens    Complete lessons learned from rework activities to identify improvements in Maintenance training and standards
: 2. Perform an assessment of Maintenance effectiveness in work planning, scheduling, and implementation of critical equipment outages to identify improvements
: 2. Perform an assessment of Maintenance effectiveness in     M. Stevens    Complete work planning, scheduling, and implementation of critical equipment outages to identify improvements
: 3. Implement improvements of Maintenance Supervision through training and development
: 3. Implement improvements of Maintenance Supervision         M. Stevens    CompIete through training and development
: 4. Implement actions in the Maintenance individual commitment area to establish improved ownership and accountability of Plant materiel condition Sponsor: B. Allen Owner I Completion Page I I of 33 Revision 8  
: 4. Implement actions in the Maintenance individual commitment M. Stevens    Complete area to establish improved ownership and accountability of Plant materiel condition Page I I of 33                               Revision 8


Davis-Besse Nuclear Power Station Operational Improvement Plan                                               Cycle 14
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14
: 3. Maintenance Improvement Initiative continued bonsor: B. Allen Key Actions                           Owner    Completion
: 3. Maintenance Improvement Initiative continued Key Actions abilities to identify improvement actions and incorporate into training
: 5. Perform testing of Maintenance staff knowledge, skills and    M. Trump abilities to identify improvement actions and incorporate into training
: a. Perform skill and knowledge testing to identify areas for
: a. Perform skill and knowledge testing to identify areas for             CornpIete improvement
: b. Incorporate any identified training needs into training
: b. Incorporate any identified training needs into training               2"dQtr 2005 material Page 12 of 33                                 Revision 8
: 5. Perform testing of Maintenance staff knowledge, skills and imp rovemen t material Owner M. Trump bonsor: B. Allen Completion Corn p I et e 2"d Qtr 2005 Page 12 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                               Cycle 14 I,                                                                                   I
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 I,
: 4. Training Improvement Initiative DESIRED OUTCOME: Improved Individual And Organizational Performance through Training Key Actions                           Owner    Completion
I
: 1. Implement actions to improve individual and organizational M. Trump  CompIete performance and alignment by developing and providing training on design and configuration control to appropriate site staff
: 4. Training Improvement Initiative DESIRED OUTCOME: Improved Individual And Organizational Performance through Training Key Actions 1. Implement actions to improve individual and organizational performance and alignment by developing and providing training on design and configuration control to appropriate site staff
: 2. Establish engineering positional qualification requirements M. Trump  Complete based on the standard FENOC Engineering Organization and complete qualification training for incumbent and new engineers                                                                       I Page 13 of 33                                   Revision 8
: 2. Establish engineering positional qualification requirements based on the standard FENOC Engineering Organization and complete qualification training for incumbent and new engineers Owner M. Trump M. Trump Completion Com p I ete Complete I
Page 13 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                         Cycle 14
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 Key Actions
: 5. Work Management Improvement Initiative DESIRED OUTCOME: Provide for the effective and efficient cross-organizational utilization of resources in achieving a high standard of plant materiel condition by conducting the right work at the right time for the right reasons Sponsor: B. Allen Key Actions                                Owner        Cornpletion
: 1. Common Process
: 1. Common Process                                                W. Mugge Complete Complete through Cycle 14 Complete 1I    e. Monitor and improve Order quality                                             Complete Page 14 of 33                               Revision 8
: 5. Work Management Improvement Initiative Owner W. Mugge DESIRED OUTCOME: Provide for the effective and efficient cross-organizational utilization of resources in achieving a high standard of plant materiel condition by conducting the right work at the right time for the right reasons Sponsor: B. Allen Corn plet ion Complete Complete through Cycle 14 Complete Complete I1
: e. Monitor and improve Order quality Page 14 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                               Cycle 14
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 Sponsor: B. Allen Completion Complete Complete Com pl et e Complete Corn pl ete
: 5. Work Management Improvement Initiative continued Sponsor: B. Allen Key Actions                       Owner    Completion
: 5. Work Management Improvement Initiative continued I
: 2. Maintenance Backlog Reduction                              W. Mugge
Key Actions
: a. Complete walk-down and validation of the Order backlog               Complete to ensure proper category, priority, consolidation and elimination of invalid orders
: a. Complete walk-down and validation of the Order backlog to ensure proper category, priority, consolidation and elimination of invalid orders
: b. Complete Cycle Plan identifying equipment outages and               Complete providing the framework for addressing backlog Order priorities and results of the System Health Report
: b. Complete Cycle Plan identifying equipment outages and providing the framework for addressing backlog Order priorities and results of the System Health Report
: c. Develop performance indicators to monitor and manage                 Complete Order backlog
: c. Develop performance indicators to monitor and manage Order backlog
: 3. Outage Performance
: 3. Outage Performance
: a. Forced Outage Schedule template and readiness           W. Mugge    Complete
: 2. Maintenance Backlog Reduction
: b. Mid-Cycle Outage Preparation                           W. Bentley  Cornplete      I
: a. Forced Outage Schedule template and readiness
: c. Clarify expectations and improve contractor performance C. Hawley    Complete        I
: b. Mid-Cycle Outage Preparation
: d. 14'h Refueling Outage Preparation                       W. Bentlev    2/28/06 Page 15 of 33                                 Revision 8
: c. Clarify expectations and improve contractor performance
: d. 1 4'h Refueling Outage Preparation Complete 2/28/06 Owner W. Mugge W. Mugge W. Bentley C. Hawley W. Bentlev I
Page 15 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                   Cycle 14
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14
: 6. Engineering Improvement Initiative DESIRED OUTCOME: Improved quality of Engineering products, increased access to Design Basis information, and continued improvement in Safety Margins of the Station SI onsor: S. Loehlein Key Actions                             Owner        Completion
: 6. Engineering Improvement Initiative DESIRED OUTCOME: Improved quality of Engineering products, increased access to Design Basis information, and continued improvement in Safety Margins of the Station Key Actions
: 1. Implement actions to improve Safety Margin:                 J. Grabnar
: 1. Implement actions to improve Safety Margin:
: a. Determine the Safety Margin for the top 10 Risk                           Complete Significant Systems and develop a plan to improve safety margins
: a. Determine the Safety Margin for the top 10 Risk Significant Systems and develop a plan to improve safety margins b. Electrical System coo rd i nation i m p rove men t s
: b. Electrical System coo rdination improvements                          through Cycle 14
: c. Masonryhlock wall re-analyses and design changes
: c. Masonryhlock wall re-analyses and design changes                       through Cycle 14
: d. Service Water improvements
: d. Service Water improvements                                             through Cycle 14
: 2. Perform additional Latent Issues Reviews
: 2. Perform additional Latent Issues Reviews                     B. Boles    through Cycle 14
: 3. Implement the Design Calculation Improvement Plan
: 3. Implement the Design Calculation Improvement Plan           J. Grabnar through Cycle 14
: 4. Enhance plant equipment performance through the FENOC Equipment Reliability Program
: 4. Enhance plant equipment performance through the FENOC         R Hovland through Cycle 14 Equipment Reliability Program
: 5. Develop and implement the plan to enhance System Engineering ownership of plant systems in support of ODerations SI Owner J. Grabnar B. Boles J. Grabnar R Hovland B. Boles onsor: S. Loehlein Completion Complete through Cycle 14 through Cycle 14 through Cycle 14 through Cycle 14 through Cycle 14 through Cycle 14 Com p let e Page 16 of 33 Revision 8  
: 5. Develop and implement the plan to enhance System             B. Boles        Complete Engineering ownership of plant systems in support of ODerations Page 16 of 33                               Revision 8


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                       Cycle 14
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14
: 6. Engineering Improvement Initiative continued I ionsor: S. Loehlein Key Actions                               Owner        Completion
: 6. Engineering Improvement Initiative continued Key Actions
: 6. Schedule and conduct additional Program Compliance             R Hovland        Complete Reviews including:
: 6. Schedule and conduct additional Program Compliance Reviews including:
: a. Qualification of Program Owners
: a. Qualification of Program Owners
: b. Development of Program Manuals
: b. Development of Program Manuals
: c. Creation of Performance Indicators
: c. Creation of Performance Indicators
: 7. Establish the appropriate level of workload for Engineering     J. Grabnar      Complete Change Requests and develop a plan to reduce and maintain the backlogs to that level
: 7. Establish the appropriate level of workload for Engineering Change Requests and develop a plan to reduce and maintain the backlogs to that level
: 8. Perform on-going self-assessments to determine if the           R Hovland through Cycle 14 problem solving process, NOP-ER-3001 has been properly implemented during the previous period
: 8. Perform on-going self-assessments to determine if the problem solving process, NOP-ER-3001 has been properly implemented during the previous period
: 9. Perform independent outside assessments of the                   C. Price  through Cycle 14 effectiveness of Engineering corrective and improvement actions in the areas of modifications, System Engineering, corrective actions, and calculations
: 9. Perform independent outside assessments of the effectiveness of Engineering corrective and improvement actions in the areas of modifications, System Engineering, corrective actions, and calculations
: 10. Implement electronic accessibility of design basis information J. Grabnar        Complete and DoDulate with 5 svstems Page 17 of 33                                   Revision 8
: 10. Implement electronic accessibility of design basis information and DoDulate with 5 svstems I
Owner R Hovland J. Grabnar R Hovland C. Price J. Grabnar ionsor: S. Loehlein Completion Complete Complete through Cycle 14 through Cycle 14 Complete Page 17 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                       Cycle 14
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14
: 6. Engineering Improvement Initiative continued SI onsor: S. Loehlein Key Actions                             Owner        Completion
: 6. Engineering Improvement Initiative continued Key Actions
: 11. Expand the role of the Engineering Assessment Board             J. Powers      Complete (EAB) to include the review of Engineering Root Causes and Apparent Causes and Engineering Calculations
: 11. Expand the role of the Engineering Assessment Board (EAB) to include the review of Engineering Root Causes and Apparent Causes and Engineering Calculations
: 12. Establish criteria and modify appropriate procedures to       J. Grabnar        Complete restrict the use of At-Risk Changes in the plant modification process
: 12. Establish criteria and modify appropriate procedures to restrict the use of At-Risk Changes in the plant modification process
: 13. Re-institute the use of Quarterly System Health Reports and B. Boles            Complete Design Basis Assessment Reports                               J. Grabnar
: 13. Re-institute the use of Quarterly System Health Reports and Design Basis Assessment Reports
: 14. Assign a Program Owner for the Problem Solving Process           B. Boles        Complete
: 14. Assign a Program Owner for the Problem Solving Process
: 15. Develop and implement actions necessary to improve the         C. Hawley        Complete technical issues problem solving capabilities in the Engineering organization.
: 15. Develop and implement actions necessary to improve the technical issues problem solving capabilities in the Engineering organization.
Page 18 of 33                                 Revision 8
SI Owner J. Powers J. Grabnar B. Boles J. Grabnar B. Boles C. Hawley onsor: S. Loehlein Completion Complete Complete Complete Complete Complete Page 18 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                     Cycle 14
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14
: 7. Continuous Safety Culture Improvement Initiative DESIRED OUTCOME:         Demonstrate a continuously improving Safety Culture at the Davis-Besse Nuclear Power Station iponsor: M. Bezilla Key Actions                               Owner        Completion
: 7. Continuous Safety Culture Improvement Initiative DESIRED OUTCOME: Demonstrate a continuously improving Safety Culture at the Davis-Besse Nuclear Power Station Key Actions
: 1. Monitor Safety Culture on a monthly basis                       C. Price  through Cycle 14
: 1. Monitor Safety Culture on a monthly basis
: 2. Assess Safety Culture using the FENOC Business Practice         D. Haskins    4thQtr 2005
: 2. Assess Safety Culture using the FENOC Business Practice
: 3. Perform a Safety Culture assessment utilizing an independent     C. Price      Complete outside organization
: 3. Perform a Safety Culture assessment utilizing an independent
: 4. Provide SCWE training to Site employees who have not           L. Griffith    Complete completed the SCWE portion of the Site Employee Orientation Manual
: 4. Provide SCWE training to Site employees who have not outside organization completed the SCWE portion of the Site Employee Orientation Manual Davis-Besse Supervisors and above
: 5. Provide refresher training on SCWE and Safety Culture to       M. Trump        Complete Davis-Besse Supervisors and above
: 5. Provide refresher training on SCWE and Safety Culture to
: 6. NQA to perform two Safety Culture Assessments                   R. Hruby    2004 Complete 4thQtr 2005
: 6. NQA to perform two Safety Culture Assessments
: 7. Employee Concerns Program group to perform two surveys of       R. Amidon    2004 Complete the Safety Conscious Work Environment                                         4'h Qtr 2005
: 7. Employee Concerns Program group to perform two surveys of the Safety Conscious Work Environment
: 8. Perform an effectiveness assessment of the corrective actions R. Hansen        Complete taken in resDonse to the November 2003 SCWE survey results Page 19 of 33                                 Revision 8
: 8. Perform an effectiveness assessment of the corrective actions taken in resDonse to the November 2003 SCWE survey results Owner C. Price D. Haskins C. Price L. Griffith M. Trump R. Hruby R. Amidon R. Hansen iponsor: M. Bezilla Completion through Cycle 14 4th Qtr 2005 Complete Complete Complete 2004 Complete 4th Qtr 2005 2004 Complete 4'h Qtr 2005 Complete Page 19 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                              Cycle 14
Davis-Besse Nuclear Power Station Key Actions
: 8. Procedure Improvement Initiative DESIRED OUTCOME: Improved procedure use and adherence and standardized procedure change process Sponsor: M. Bezilla Key Actions                         Owner        Completion
: 1. Perform Self-Assessments on procedure use and adherence
: 1. Perform Self-Assessments on procedure use and           M. Trump  through Cycle 14 adherence
: 2. Review the Davis-Besse procedure change process to ensure alignment with FENOC standards for procedure preparation and revisions
: 2. Review the Davis-Besse procedure change process to   L. Dohrmann        Complete ensure alignment with FENOC standards for procedure preparation and revisions
: 3. Provide training on procedure use and adherence
: 3. Provide training on procedure use and adherence     J. Reddington      Complete
: 4. Perform follow-up effectiveness reviews on procedure use and adherence Operational Improvement Plan Cycle 14 Owner M. Trump L. Dohrmann J. Reddington M. Trump
: 4. Perform follow-up effectiveness reviews on procedure   M. Trump   3'd Quarter 2005 use and adherence Page 20 of 33                               Revision 8
: 8. Procedure Improvement Initiative DESIRED OUTCOME: Improved procedure use and adherence and standardized procedure change process Sponsor: M. Bezilla Completion through Cycle 14 Complete Complete 3'd Quarter 2005 Page 20 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                         Cycle 14
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14
: 9. Corrective Action Program Improvement Initiative DESIRED OUTCOME:             Improved effectiveness and implementation of the Corrective Action Program demonstrated through improved Station performance Sponsor: M. Bezilla Key Actions                               Owner        Completion
: 9. Corrective Action Program Improvement Initiative DESIRED OUTCOME:
Improved effectiveness and implementation of the Corrective Action Program demonstrated through improved Station performance Key Actions
: 1. Implement the Apparent Cause Improvement Plan:
: 1. Implement the Apparent Cause Improvement Plan:
: a. Strengthen procedural requirements for apparent cause       L. Dohrmann        Complete evaluations, including analytical methods to be used
: a. Strengthen procedural requirements for apparent cause evaluations, including analytical methods to be used
: b. Corrective Action Review Board review of Apparent Cause L. Dohrmann          Complete Evaluations until standards are consistently met
: b. Corrective Action Review Board review of Apparent Cause Evaluations until standards are consistently met
: c. Identify Apparent Cause Evaluators                           Managers        Complete
: c. Identify Apparent Cause Evaluators
: d. Develop Training Program and Expectations and provide     J. Reddington      Complete training to the Apparent Cause Evaluators (Initial Evaluator Classes and Additional Classes in 2004)
: d. Develop Training Program and Expectations and provide training to the Apparent Cause Evaluators (Initial Evaluator Classes and Additional Classes in 2004)
: e. Qualify the trained Apparent Cause Evaluators using the   J. Reddington      Complete Systematic Approach to Training
: e. Qualify the trained Apparent Cause Evaluators using the Systematic Approach to Training
: f. On an interim basis, rotate team of apparent cause         L. Dohrmann      Complete evaluators to Support Services
: f. On an interim basis, rotate team of apparent cause evaluators to Support Services
: g. Company Nuclear Review Board (CNRB) review of                 J. Rinckel through Cycle 14 selected Apparent Cause Evaluations Page 21 of 33                                     Revision 8
: g. Company Nuclear Review Board (CNRB) review of selected Apparent Cause Evaluations Owner L. Dohrmann L. Dohrmann Managers J. Reddington J. Reddington L. Dohrmann J. Rinckel Sponsor: M. Bezilla Completion Complete Complete Complete Complete Complete Complete through Cycle 14  
                                                                                -=
=-
Page 21 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                   Cycle 14
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14
: 9. Corrective Action Program Improvement Initiative continued Sponsor: M. Bezilla Key Actions                             Owner      Completion
: 9. Corrective Action Program Improvement Initiative continued Key Actions
: 2. Establish the appropriate level of workload for Condition L. Dohrmann    Complete Report Evaluations and Corrective Actions and develop a plan to reduce the backlogs to those levels
: 2. Establish the appropriate level of workload for Condition Report Evaluations and Corrective Actions and develop a plan to reduce the backlogs to those levels
: 3. Perform a focused Self-Assessment of implementation of       C. Price    Complete the Corrective Action Program using industry peers
: 3. Perform a focused Self-Assessment of implementation of the Corrective Action Program using industry peers
: 4. Reestablish the Corrective Action Program trending       L. Dohrmann    Complete process
: 4. Reestablish the Corrective Action Program trending process
: 5. Provide Apparent Cause training to Managers               L. Dohrmann     Complete I
: 5. Provide Apparent Cause training to Managers I
Page 22 of 33                                   Revision 8
Owner L. Dohrmann C. Price L. Dohrmann L. Dohrmann Sponsor: M. Bezilla Completion Complete Complete Complete Complete Page 22 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                         Cycle 14 I
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 I
: 10. Internal and External Oversight Improvement Initiative DESIRED OUTCOME:         Oversight activities are provided to ensure improved Station performance and the integrity of the Safety Barriers are sustained at the highest levels S msor: R. Hansen
: 10. Internal and External Oversight Improvement Initiative DESIRED OUTCOME:
  ~~
Oversight activities are provided to ensure improved Station performance and the integrity of the Safety Barriers are sustained at the highest levels Key Actions
Key Actions                              Owner        Completion
~~
: 1. Supplement quality oversight with off-site assistance to       S . Loehlein    CompI ete improve objectivity and ensure assessments are sufficiently critical
: 1. Supplement quality oversight with off-site assistance to improve objectivity and ensure assessments are sufficiently critical
: 2. Supplement management oversight with off-site                 K. Ostrowski      CompIete assistance to improve objectivity and ensure assessments are sufficiently critical
: 2. Supplement management oversight with off-site assistance to improve objectivity and ensure assessments are sufficiently critical
: 3. Focus more quality oversight on cross-functional activities S . Loehlein          Complete and interfaces
: 3. Focus more quality oversight on cross-functional activities and interfaces
: 4. Review and revise the master assessment plan at all three S. Loehlein            Complete FENOC sites
: 4. Review and revise the master assessment plan at all three FENOC sites
: 5. Conduct an external assessment to evaluate the progress         L. Myers        Complete of organizational improvements in the areas of critical self-assessments and performance observations
: 5. Conduct an external assessment to evaluate the progress of organizational improvements in the areas of critical self-assessments and performance observations
: 6. Utilize INPO Assist Visits to assess the effectiveness of       M. Bezilla       Complete Imwovement Initiatives Page 23 of 33                                   Revision 8
: 6. Utilize INPO Assist Visits to assess the effectiveness of I mwovement Initiatives S
Owner S. Loehlein K. Ostrowski S. Loehlein S. Loehlein L. Myers M. Bezilla msor: R. Hansen Completion Co m p I ete Co m p I ete Complete Complete Complete Complete Page 23 of 33 Revision 8  


DavislBesse Nuclear Power Station Operational Improvement Plan                                             Cycle 14
DavislBesse Nuclear Power Station Operational Improvement Plan Cycle 14
: 10. Internal and External Oversight Improvement Initiative continued iponsor: R. Hansen Key Actions                         Owner      Completion
: 10. Internal and External Oversight Improvement Initiative continued Key Actions
: 7. Perform Quality Oversight of Engineering using the     R. Hruby  through Cycle 14 Continuous Assessment Process
: 7. Perform Quality Oversight of Engineering using the Continuous Assessment Process
: 8. Conduct assessment activities of the Corrective Action R. Hruby  through Cycle 14 Program to evaluate effectiveness of corrective actions taken to improve implementation and improve trend evaluation Page 24 of 33                               Revision 8
: 8. Conduct assessment activities of the Corrective Action Program to evaluate effectiveness of corrective actions taken to improve implementation and improve trend evaluation Owner R. Hruby R. Hruby iponsor: R. Hansen Completion through Cycle 14 through Cycle 14 Page 24 of 33 Revision 8  


DavislBesse Nuclear Power Station Operational Improvement Plan                                                                                     Cycle 14 Safety Barrier Attributes and Goals Safety Bamer attributes and goals have been identified within this plan to provide a focus on key parameters to assess and ensure that safety barriers are being maintained. These attributes, which are grouped by each of the four barriers, will be monitored monthly by the Davis-Besse Leadership Team.
DavislBesse Nuclear Power Station Operational Improvement Plan Cycle 14 Safety Barrier Attributes and Goals Safety Bamer attributes and goals have been identified within this plan to provide a focus on key parameters to assess and ensure that safety barriers are being maintained. These attributes, which are grouped by each of the four barriers, will be monitored monthly by the Davis-Besse Leadership Team.
Performance indicators contain the criteria for monitoring each attribute. Some attributes will be monitored by periodic assessments such as surveys or self-assessments to determine if the goal for that attribute is being met. Monitoring sources for the performance indicators referenced in the Barrier Attributes are identified in the table below:
Performance indicators contain the criteria for monitoring each attribute. Some attributes will be monitored by periodic assessments such as surveys or self-assessments to determine if the goal for that attribute is being met. Monitoring sources for the performance indicators referenced in the Barrier Attributes are identified in the table below:
Kev       Performance Indicator Monitoriw Sources OIP       Operational Improvement Plan Performance Indicator Report MPR       FENOC Monthly Performance Report SHAR       SCWE Health Assessment Report Page 25 of 33                                                   Revision 8
Kev Performance Indicator Monitoriw Sources OIP MPR FENOC Monthly Performance Report SHAR SCWE Health Assessment Report Operational Improvement Plan Performance Indicator Report Page 25 of 33 Revision 8  


I DavislBesse Nuclear Power Station Operational Improvement Plan                                                                     Cycle 14 Individual Barrier Attributes Item           Attribute                             Goal                     Owner       PI   Monitoring Reference  Source 1-01 Human Performance       -
I DavislBesse Nuclear Power Station Operational Improvement Plan Cycle 14 Individual Barrier Attributes Item Attribute Goal Owner PI Reference Monitoring Source 1-01 Human Performance Success Days (Event Free Clock)
                                > 40 days on average                             Trump   D-SPO-03   MPR Success Days (Event Free Clock) 1-02 OSHA Recordable         -
> 40 days on average Trump D-SPO-03 MPR 1-02 OSHA Recordable Injuries (industrial Safety Performance)
                                < 4 OSHA Recordable injuries per year           Trump   D-SPO-02   MPR Injuries (industrial Safety Performance) 1-03  Radiation Protection    -
< 4 OSHA Recordable injuries per year Trump D-SPO-02 MPR  
                                < 2 events in any 4 consecutive quarters         Harder     1-03     OIP Events 1-04 Individual Error Rate   -
< 2 events in any 4 consecutive quarters Harder 1-03 OIP 1-03 1-04 1-05 Radiation Protection Events Individual Error Rate Employee willingness to raise concerns D-HP-01 MPR
                                < 0.36 individual errors per 10,000 hours         Trump    D-HP-01    MPR 1-05  Employee willingness to -
< 0.36 individual errors per 10,000 hours  
                                > 90% of individuals are willing to raise       Amidon    SCW E    OIP raise concerns          concerns to their supervisors or the Employee               Annual Concerns Program                                           Survey 1-06  Operator Work Arounds  Level 1:                                       Ostrowski  D-EMC-10  MPR Level 1 Work Arounds goal in accordance with               1-06.1 FENOC Monthly Performance Indicator AND Level 2:                                                   1-06.2    01P Provide Operations with reliable equipment and system controls to operate the station.
> 90% of individuals are willing to raise concerns to their supervisors or the Employee Concerns Program Level 1 :
Level 1 Work Arounds goal in accordance with FENOC Monthly Performance Indicator AND Level 2:
Provide Operations with reliable equipment and system controls to operate the station.
Minimize Operations Level 2 Work Arounds to 11 and prioritize to be worked through the Work Management process.
Minimize Operations Level 2 Work Arounds to 11 and prioritize to be worked through the Work Management process.
1-07 Control Room            Control Room Deficiencies goal in accordance    Ostrowski D-EMC-09   MPR Deficiencies            with FENOC Monthlv Performance Indicator Page 26 of 33                                             Revision 8
Control Room Deficiencies goal in accordance with FENOC Monthlv Performance Indicator Trump Amidon OIP SCW E Annual Survey D-EMC-10 1-06.1 Operator Work Arounds Ostrowski MPR 1-06 1-07 1-06.2 01 P MPR Control Room Deficiencies Ostrowski D-EMC-09 Page 26 of 33 Revision 8
 
Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 Item 1-08 1-09 1-1 0 1-1 1 Attribute Condition Report Self-Identified Rate Risk Performance Indicator (indicator of Cross-functional teamwork)
Condition Report SRO Review (SRO reviews for Operability are performed in a timely manner)
Employee willingness to use the Corrective Action Program Individual Barrier Attributes Goal 2 90% of Condition Reports are self-identified 2 75 Risk Assessment Indicator The Risk Assessment Indicator assesses each units risk of achieving safe and reliable operation. This indicator accomplishes this by measuring elements related to the probability and consequence of station events. Examples of elements making up this indicator include Probabilistic Safety Assessment, Aggregate System Health, Schedule Adherence, Activities Resulting in Reduced Trip-Logic, Schedule Stability, Scrams, Derates, Unplanned entry into Tech Specs, Entry into Abnormal Procedures
> 95% of SRO review required Condition Reports were reviewed for operability within 24 hours
< 5% of individuals are not willing to use the Corrective Action Program Owner Price Ostrowski Ostrowski Arnidon PI Reference 1-08 D-SPO-01 1-1 0 SCW E Survey and Annual Safety Culture Assessment Monitoring Source OIP MPR OIP OIP Page 27 of 33 Revision 8  


                                                                                                                  ,
I Item Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 Attribute Amidon 1-1 2 SCWUNQA OIP Surveys 1-1 3 1-1 4 Trump Worker confidence in raising safety concerns 1-1 3 OIP Training Programs meet industry standards and effectively improve station performance as measured by NOBP-TR-1501 Licensed Operator Reaualification Training Individual Barrier Attributes Goal
Davis-Besse Nuclear Power Station Operational Improvement Plan                                                                       Cycle 14 Individual Barrier Attributes Item          Attribute                               Goal                      Owner        PI    Monitoring Reference  Source 1-08 Condition Report        2 90% of Condition Reports are self-identified      Price      1-08    OIP Self-Identified Rate 1-09  Risk Performance        2 75 Risk Assessment Indicator                    Ostrowski  D-SPO-01    MPR Indicator (indicator of Cross-    The Risk Assessment Indicator assesses each functional teamwork)      units risk of achieving safe and reliable operation. This indicator accomplishes this by measuring elements related to the probability and consequence of station events. Examples of elements making up this indicator include Probabilistic Safety Assessment, Aggregate System Health, Schedule Adherence, Activities Resulting in Reduced Trip-Logic, Schedule Stability, Scrams, Derates, Unplanned entry into Tech Specs, Entry into Abnormal Procedures 1-10  Condition Report        -> 95% of SRO review required Condition          Ostrowski    1-1 0    OIP SRO Review              Reports were reviewed for operability within 24 (SRO reviews for        hours Operability are performed in a timely manner) 1-11  Employee willingness to  -
> 90% of workers believe they can raise nuclear safety or quality concerns without fear of retaliation
                                < 5% of individuals are not willing to use the   Arnidon    SCW E      OIP use the Corrective      Corrective Action Program                                 Survey and Action Program                                                                        Annual Safety Culture Assessment Page 27 of 33                                               Revision 8
_ _ _ _ _ ~
2 2.5 Training Program Performance Indicator
> 95% pass rate in the Licensed Operator Requalification Training Program PI I Monitoring Owner I Reference Source Trump I
01 P I
Page 28 of 33 Revision 8  


I Davis-Besse Nuclear Power Station Operational Improvement Plan                                                                   Cycle 14 Individual Barrier Attributes Item          Attribute                             Goal Owner  I    PI Reference I Monitoring Source 1-12  Worker confidence in    > 90% of workers believe they can raise nuclear Amidon  SCWUNQA      OIP raising safety concerns safety or quality concerns without fear of                Surveys retaliation
DavislBesse Nuclear Power Station Goal 2 8 Corrective Action Program Index Rating Operational Improvement Plan Owner Price Cycle 14 P-04 P-05 P-06 P-07 Proqrams Barrier Attributes Maintenance Rule System Reliability Number of Maintenance Rule (a)( 1 ) Systems Program and Process Error Rate Maintenance Rework I Itern I No repeat Maintenance Rule (a)(l) systems within the operating cycle
_____~
< 0.36 Program and Process Errors per 10,000 hours worked Attribute Hovland Trump PI Reference P-08 Monitoring Source Number of late Preventative Maintenance Activities 0 PMs past their late or defer to date AND c 10% of PMs closed beyond 60% of the allowed grace period Mugge D-SPO-05 MPR P-01 Corrective Action Program (Effectiveness of Corrective Action Proaram) 2 90% CR category accuracy rate I
1-13  Training Programs meet  2 2.5 Training Program Performance Indicator    Trump      1-1 3      OIP industry standards and effectively improve station performance as measured by NOBP-TR-1501 1-14  Licensed Operator ReaualificationTraining
Price P-02 01 P Condition Report (CR) category accuracy Apparent Cause evaluation quality P-02 P-03 P-03 OIP evaluations P-04 01 P P-05 OIP MPR D-H P-02
                                -
~
                                > 95% pass rate in the Licensed Operator Requalification Training Program Trump I          I  01P Page 28 of 33                                             Revision 8
< 1.0% rework Maintenance Rework PI OIP Dominy P-08 01 P Page 29 of 33 Revision 8  


DavislBesse Nuclear Power Station Operational Improvement Plan                                                                 Cycle 14 Proqrams Barrier Attributes I I Itern Attribute                            Goal                    Owner Price PI Reference D-SPO-05 Monitoring Source MPR P-01 Corrective Action      2 8 Corrective Action Program Index Rating Program (Effectiveness of Corrective Action Proaram)
Operational Improvement Plan Cycle 14 Manaaement Barrier Attributes Owner PI Reference Monitoring Source Item Attribute Goal M-01 OIP M-01 The Quality of Engineering Products 5 1.O score based on a (as measured by the Engineering Assessment Board)
P-02 Condition Report (CR) category accuracy P-03 Apparent Cause 2 90% CR category accuracy rate I  Price    P-02 P-03 01P OIP evaluation quality    evaluations P-04  Maintenance Rule                                                                P-04       01P System Reliability P-05 Number of Maintenance    No repeat Maintenance Rule (a)(l) systems    Hovland    P-05       OIP Rule (a)(1) Systems    within the operating cycle P-06 Program and Process    -
Grabnar Amidon
                              < 0.36 Program and Process Errors per 10,000  Trump    D-HP-02    MPR Error Rate            ~
~~
hours worked P-07 Maintenance Rework    -< 1.0% rework                                Dominy  Maintenance    OIP Rework PI P-08 Number of late          0 PMs past their late or defer to date        Mugge      P-08        01P Preventative          AND Maintenance Activities  c 10% of PMs closed beyond 60% of the allowed grace period Page 29 of 33                                            Revision 8
~
SCWE 3-4 SHAR M-02  
> 75% of employees that use the Employee Concerns Program report being satisfied with the process Satisfaction of employees using the Employee Concerns Program (ECP)
NRC Allegation Ratio Amidon SCWE 1-2  
< 2 times the industry average of NRC alleaations SHAR SHAR SHAR 01 P M-03 M-04 M-05  
< 15% SCWERT Non-Concurrence Ratio
< 2 times the industry average of NRC retaliation allegations AND Schrauder SCWE4-5 SCWE 1-3 Effectiveness of Safety Conscious Work Environment Review Team (SCWERT) in avoiding discrimination claims
~~
Management Field Observations are self critical
> 80% of the management field observations performed are self-critical D. Haskins Annual Safety Culture Assessment, NQA Field Observations and Management Observations


Operational Improvement Plan                                                                   Cycle 14 Manaaement Barrier Attributes Item          Attribute                             Goal                  Owner              PI   Monitoring Reference   Source M-01 The Quality of         5 1.O score based on a                       Grabnar          M-01      OIP Engineering Products    (as measured by the Engineering Assessment Board)                                                 ~~  ~
Davis-Besse Nuclear Power Station Cycle 14 Operational Improvement Plan Management Barrier Attributes  
M-02 Satisfaction of        > 75% of employees that use the Employee      Amidon        SCWE 3-4    SHAR employees using the    Concerns Program report being satisfied with Employee Concerns      the process Program (ECP)
~~
M-03 NRC Allegation Ratio    -
Owner Monitoring Source Attribute PI Reference Goal Item M-06 Price MPR Effectiveness of Management and Supervisors Managers and supervisors are generally effective with a few exceptions XD-PDE-05 (Management Commitment Area Only)
                            < 2 times the industry average of NRC        Amidon        SCWE 1-2    SHAR alleaations M-04 Effectiveness of Safety -< 15% SCWERT Non-Concurrence Ratio          Schrauder      SCWE4-5      SHAR Conscious Work          AND Environment Review    -< 2 times the industry average of NRC                      SCWE 1-3     SHAR Team (SCWERT) in        retaliation allegations avoiding discrimination claims
(Semi-Annual)
    ~~
(Semi-Annual)
M-05 Management Field        > 80% of the management field observations  D. Haskins Annual Safety    01P Observations are self  performed are self-critical                                  Culture critical                                                                          Assessment, NQA Field Observations and Management Observations
F-PDE-0 1 F-PD E-02 D-SPO-10 Talent Management and Personnel Development Goal in accordance with FENOC Performance indicator D. Haskins MPR M-07 M-08 M-09 M-1 0 M-11 Goal in accordance with FENOC Performance Indicator D. Haskins MPR Leadership Development Ostrowski MPR Reactivity Management
< 1 Level 2 Reactivity Management Event per year AND 0 Level 1 Reactivity Management Events per year.
Fuel Reliability Zero fuel defects Wilson D-SPO-07 MPR 01 P OIP OIP Maintenance Order Backlog M-11.1 M-11.2 M-1 1.3 Online:
< 50 Corrective Maintenance Orders AND
< 450 Elective Maintenance Orders Outaqe (prior to the startup from 14RFO):
< 250 Corrective/Elective Maintenance Orders Page 31 of 33 Revision 8


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                                  Cycle 14 Management Barrier Attributes
Davis-Besse Nuclear Power Station Item Attribute Goal M-12 Number of Temporary 5 5 during the Operating Cycle Modifications And 0 related to equipment and design deficiencies after restart from major outages Operational Improvement Plan Cycle 14 Owner H ovla n d M-12 Monitoring.
                                                                          ~~
Reference Source OIP Page 32 of 33 Revision 8  
Item         Attribute                           Goal                       Owner          PI    Monitoring Reference    Source M-06 Effectiveness of       Managers and supervisors are generally            Price    XD-PDE-05    MPR Management and        effective with a few exceptions                          (Management Supervisors                                                                      Commitment Area Only)
M-07 Talent Management and  Goal in accordance with FENOC Performance    D. Haskins    F-PDE-01    MPR Personnel Development indicator                                                    (Semi-Annual)
M-08 Leadership Development Goal in accordance with FENOC Performance    D. Haskins    F-PDE-02    MPR Indicator                                                    (Semi-Annual)
M-09 Reactivity Management  -
                            < 1 Level 2 Reactivity Management Event per  Ostrowski      D-SPO-10    MPR year AND 0 Level 1 Reactivity Management Events per year.
M-10 Fuel Reliability      Zero fuel defects                                  Wilson  D-SPO-07    MPR M-11 Maintenance Order      Online:                                                      M-11.1      01P Backlog              < 50 Corrective Maintenance Orders AND
                            < 450 Elective Maintenance Orders                            M-11.2      OIP Outaqe (prior to the startup from 14RFO):
                            < 250 Corrective/Elective Maintenance Orders                  M-11.3      OIP Page 31 of 33                                         Revision 8


Davis-Besse Nuclear Power Station Operational Improvement Plan Item         Attribute M-12 Number of Temporary Modifications Goal 5 5 during the Operating Cycle
Davis-Besse Nuclear Power Station Owner Hruby Operational Improvement Plan Cycle 14 PI Monitoring Reference Source DB-01 I 01 P 0-01.1 Item 0-01 Attribute Field Activity Assessments 0-02 Audit ReDOrt Issuance Responsiveness to QA Identified Issues 0-03 Oversiq ht Barrier Attributes Condition Report NQA Review Timeliness Goal 0-06 Field Observations:
                          -
Suspended. Replaced by 0-0 1.2. 0-0 1.2 developed to measure compliance with Assessment Program Requirements.
And 0 related to equipment and design deficiencies after restart from major outages Owner Hovland
AND Completion of Primary Elements:
                                                                                . Cycle 14 Reference M-12 Monitoring Source OIP Page 32 of 33                                       Revision 8
Deferral of < 1 Primary Element monthly Use of Industry Peer support Line organization response to Davis-Besse Oversight-initiated Condition Reports is within 90% - 1 10% of the average time required for the line organization to respond to all Condition ReDOrtS.
100% of Condition Report Investigations reviewed by NQA are accepted or rejected within 14 days after the investigation was comdete 100% of Corrective Actions verified or rejected by NQA within 30 days
< 25 working days from the end of the quarter 100% utilization of the scheduled INPO Assist Visits for 2004 0-01.2 01 P Hruby DB-02 01 P Hruby DB-03 OIP Hruby DB-04 Hruby DB-05 OIP Semi-Annual Assessment Donnellon Page 33 of 33 Revision 8  


Davis-Besse Nuclear Power Station Operational Improvement Plan                                                                  Cycle 14 Oversiqht Barrier Attributes Item            Attribute                            Goal                    Owner        PI    Monitoring Reference  Source 0-01    Field Activity                                                        Hruby      DB-01 I    01P Assessments          Field Observations:                                        0-01.1 Suspended. Replaced by 0-01.2. 0-01.2 developed to measure compliance with Assessment Program Requirements.
WElGW DIMENSIONAL WEIGHT 1 be used only for documents c
AND Completion of Primary Elements:                            0-01.2     01P Deferral of < 1 Primary Element monthly 0-02    Responsiveness to QA  Line organization response to Davis-Besse        Hruby      DB-02      01P Identified Issues    Oversight-initiated Condition Reports is within 90% - 110% of the average time required for the line organization to respond to all Condition ReDOrtS.
=
0-03 Condition Report NQA    100% of Condition Report Investigations          Hruby      DB-03      OIP Review Timeliness    reviewed by NQA are accepted or rejected within 14 days after the investigation was comdete 100% of Corrective Actions verified or rejected  Hruby      DB-04 by NQA within 30 days
I F o r u P s w ~ d w i d e E x p r e ~ ~
                              -
i I 5
                              < 25 working days from the end of the quarter    Hruby      DB-05 Audit ReDOrt Issuance 0-06    Use of Industry Peer  100% utilization of the scheduled INPO Assist  Donnellon    Semi-    OIP support              Visits for 2004                                            Annual Assessment Page 33 of 33                                          Revision 8
i - '
+
Do not use UPS 2nd Day Airs Q s over 13 Ounces in this envelq i ~ e z UPS @res Emelopes weight
* to the corresponding rates for ak, 1B02 Do not send cash or cash equ 8100 Irpedlted' n n ~ - U I " "
--*E---  
-Yrc nn.llpp-M-rcab.na.0lb.E.a
-tuywmr-
-arurb+
F&zzz&zzL 1623403 560600 3221498 I
TELEPHONE 0
SATURDAY DELIVERY 0 1Z 488 556 22 1007 607 1 Ill 11111 lllllllll11111111111lllllll1111111111 Ill1 Ill 1 1 2 488 556 22 1007 607 1 I
\\FIRST ENERGY CO 419-321 -7481 I
i IS501 N ST RT 2 I
IOAK HARBOR OH 43449 975
\\DAVIS-BESSE NUCLEAR POWER PLAN E?51 12 488 556 22 1007 607 1 rcI C D Y ~ M E X
i Mr. James Caldwell I Reg ion al Ad mi n is t ra tor 1
U. S. NRC, Region I l l
[ 2443 Warrenville Rd., Suite 210 E I
Lisle, IL 60532-4352 I( ~
~


1                                                                                              WElGW        DIMENSIONAL n n ~ - U I " "
6 0
WEIGHT
7 1
                                                                                                                                                                        --*E---
11 I I SHIFXYNT -
                                                                                                                                                                        -Yrc nn.llpp-M-Irpedlted' F oused be  r u only Psw      d w i d e cE x p=r ei ~II ~
I I j 0 10 1 Q 1 1202609 Sj(30 MW United Parcel Service, Louisville, KY LWq [ 4885 567B 1 I
for~documents                                                                                                          5      .
I}}
F&zzz&zzL rcab.na.0lb.E.a
                                                                                                                                                                        -tuywmr-i - '
                      -
                                  +
                                                                                                                                                                        -arurb+
Do not use UPS 2nd Day Airs      Q s over 13 Ounces in this envelq i ~ e z UPS @res Emelopes weight
* 0 to the corresponding rates for    ak,
                                    ..                                                                                SATURDAY DELIVERY 0 Do not send cash or cash equ 1B02 8100 1Z  488 556 22 1007 607 1 Ill111111 lll1 ll111111111                l11111111Ill1Ill 1 lll1 1 2 488 556 22 1007 607 1 1623403 560600 3221498 I                                       TELEPHONE                                                    I
                                            \FIRST ENERGY CO                  419-321-7481 I
                                            \DAVIS-BESSE NUCLEAR POWER PLAN i
IS501 N ST RT 2 I
IOAK HARBOR                          OH      43449 975
                                          !-                                      rcI  CDY~ME E?51                  12 488 556 22 1007 607 1 i Mr. James Caldwell 1 II X
I   Regional Administ rator 1
Ij U. S. NRC, Region I l l
[ 2443 Warrenville Rd., Suite 210 I Lisle, IL 60532-4352 I
0101Q 1 1202609 Sj(30 MW E
United Parcel Service, Louisville, KY       L I(
1706 ! ! ! !  ! ~~
Wq [ 4885 567B 1 SHIFXYNT -                                            I     I}}

Latest revision as of 20:51, 15 January 2025

FENOC - Submittal of Revision 8 of the Davis-Besse Nuclear Power Station Operational Improvement Plan Operating Cycle 14
ML050950080
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/01/2005
From: Bezilla M
FirstEnergy Nuclear Operating Co
To: Caldwell J
NRC/RGN-III
References
1-1409
Download: ML050950080 (50)


Text

. FimtEnergy Nuclear Operating Company 5501 Norrh Sfate Roufe 2 Oak Harbor. Ohio 43449 Matk 8. Bezilla Vice President - Nuclear 4 79-32 1-7676 Fax: 419-321-7582 Doc ke t N umber 5 0- 3 46 License Number NPF-3 Serial Number 1 - 1 409 A p r i l 1, 2005 hlr. James L. Caldwell, Administrator United States Nuclear Regulatory Commission Region I l l 2443 Warrenville Road, Suite 2 10 Lisle, IL 00532-4352 SulJject: Submittal of Revision 8 of the Davis-Besse Nuclear Power Station Operational Improvement Plan Operating Cycle 14

Dear Mr. Caldwell:

The purpose of this letter is to submit Revision 8 of the Davis-Besse Nuclear Po~krer Station (DBNPS) Operational Improvement Plan Operating Cycle 14, dated March 24. 2005, to the Nuclear Regulatory Commission (NRC). By letter dated December 22, 2004, the FirstEnergy Nuclear Operating Company (FENOC) submitted Revision 7 (DBNPS Letter Serial Number 1 - 1396) of the DBNPS Operational Improvement Plan Operating Cycle 14. The NRC letter, dated March 8, 2004, Approval to Restart the Davis-Besse Nuclear Power Station, Closure of Coiifirniatory Action Letter, and Issuance of Confirmatory Order, (DBNPS Letter Log Number 1-4524) requires FENOC to notify the NRC of changes in the actions committed to in this Plan.

The DBNPS Operational Improvement Plan, Revision 8, supercedes all previous revisions in their entirety.

This revision to the Plan includes the identification of initiative actions completed since the prior revision of the Plan, a change of sponsorship as a result of respoiisibility transitions fi-om the reorganization and a change of owner as a result of prograni and process transitions from the reorganization. The testing of maintenance staff for training improvements was divided into two separate components of: 1 ) maintenance staff testing; 2) and maintenance training curriculum changes. The maintenance staff testing is complete with the training element outstanding.

Completion dates of two commitments within the Engineering Improvement ii1itiatii.e are extended through the cycle to include scope of work that requires a plant outage. Other changes to key actions and barrier attribute performance indicators are detailed in Attachment 2 of this letter.

Regulatory commitments are identified in the Commitment List (Attachment 1 ) n.ith changes in comniitments from Revision 7 to Revision 8 identified in bold italicized text.

Docket N uni be r 5 0- 3 46 License Number NPF-3 Serial Number 1-1409 Page 2 of 2 FENOC will update the DBNPS Operational Improvement Plan Operating Cycle 14 periodically to provide a status of the actions, and will submit subsequent revisions to the NRC following these changes.

If you have any questions or require further information, please contact Mr. Clark A. Price, Manager - Regulatory Compliance, at (41 9) 321 -8585.

Sincerely yours, Attachments Enclosure cc:

USNRC Document Control Desk S. A. Reynolds, Chairman NRC 0350 Panel J. B. Hopkins, DB-1 NRC/NRR Senior Project Manager C. S. Thomas, DB-1 Senior Resident Inspector Utility Radiological Safety Board

Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Page 1 of8 COMMITMENT LIST The following list identifies those actions committed to by FENOCs Davis-Besse Nuclear Power Station (DBNPS) in this document. Any other actions discussed in the submittal represent intended or planned actions by the DBNPS. They are described only for infomiation and are not regulatory commitments. Please notify the Manager - Regulatory Compliance (41 9-321 -8585) at the DBNPS of any questions regarding this document or associated regulatory commitments.

The following commitments are based on Revision 8 of the Davis-Besse Operational Improvement Plan Operating Cycle 14. Changes from previous commitments in Revision 7 of the Operational Improvement Plan are identified in bold Italics.

1.
2.
3.
4.
5.
6.
7.
8.
9.

COMMITMENTS

1. Organizational Effectiveness Improvement Initiative Improve individual and organizational performance through development and utilization of alignment tools at the Department/Section levels Implement FENOC Business Practices for:

a)

Focused Self-Assessments b) Ongoing Self-Assessments c)

Benchmarking d)

Semi-Annual Collective Significance Self-Assessments Directors and Managers to attend a Leadership Academy to improve management ski 1 1 s Provide formal Management Observation Skills Training Enhance the Management Observation Program by ensuring personnel providing oversight monitoring are familiar with DBBP-OPS-000 1, Operations Expectations and Standards Implement actions to improve trending of major plant evolutions utilizing the Management Observation Program to track performance and feedback Provide face-to-face communications training to all site supervisors and above Re-evaluate all Davis-Besse supervisors to assess competency for current positions Conduct Supervisor and Manager Talent Management Talks IO. Continue with the 4 Cs meetings, D-B Team Meetings, Town Hall Meetings in accordance with Davis-Besse Business Practices DUE DATE June 30,2005 Complete C omp 1 et e Complete Complete Complete Complete Co ni p 1 et e Complete Co m p 1 e te December 3 1,2005 C om p 1 et e Periodic through Cycle 14

Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Page 2 of 8 COMMITMENTS

2. Operations Improvement Initiative DUE DATE I. Implement Operations Improvements:
a. Initiate Operations Leadership Improvements Complete
b. Initiate the 5 year staffing plan Co ni p 1 et e
c. Implement improvements to Operations work stations Co ni p 1 et e
2. Improve Operator knowledge, skills and abilities through testing, Conrplere training and nientoring
3. Implement the Operations Improvement Action Plan, including:

Co m p 1 ete

a. Strengthening Operating Crews, including assessment of operators, training on procedure use, and improving command and control
b. Strengthening Operating Procedures, including validation of key operating procedures and use of reverse pre-job briefs
c. Strengthening Operations Management, including use of Operations Oversight Managers until no longer needed
d. Strengthening Independent Oversight of Operations
d. Implement common FENOC Operations work process tools Conrplete
4. Strengthen Communications within Operations 5. Benchmark Conduct of Operations
6. Align Perforniance Indicators to Conduct of Operations C onip 1 et e C onip 1 et e Complete

Docket Number 50-346 License Number NPF-3 Serial Number 1-1 409 Page 3 of 8 COMMITMENTS DUE DATE

3. Maintenance Improvement Initiative
1. Utilize post-job evaluations, operating experience, and lessons Complete learned from rework activities to identify improvements in Maintenance training and standards scheduling, and implementation of critical equipment outages to identify improvements training and development to establish improved ownership and accountability of Plant materiel condition
5. Perform testing of Maintenance staff knowledge, skills and abilities to identify improvement actions and incorporate into training
2. Perform an assessment of Maintenance effectiveness work planning, Complete
3. Implement improvements of Maintenance Supervision through Complete
4. Implen~ent actions in the Maintenance individual commitment area Contplete
a. Perforitr skill arid knowledge testing to iderrtijy areas for Contplete irttpro vent erit
b. Incorporate ideirtiJied additional or revised trairiirig, if arty.

June 30, 2005

4. Training Improvement Initiative 1. Implement actions to improve individual and organizational performance and alignment by developing and providing training on design and configuration control to appropriate site staff the standard FENOC Engineering Organization and complete qualification training for incumbent and new engineers Coni p 1 et e
2. Establish engineering positional qualification requirements based on Cortiplete

Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Page 4 of 8 COMMITMENTS

5. Work Management Improvement Initiative
1. Conimon Process
a. Complete training and mentoring to support the effective transition into the FENOC Work Management Process
b. Resolve gaps in process implementation and station procedures
c. Perform quarterly assessments of Condition Reports and Workweek critiques to ensure opportunities for improvement are addressed knowledge and awareness
d. Implement Risk Management process to improve station
e. Monitor and improve Order quality
a. Complete walk-down and validation of the Order backlog to ensure proper category, priority, consolidation and elimination of invalid orders
b. Complete Cycle Plan identifying equipment outages and providing the framework for addressing backlog Order priorities and results of the System Health Report
c. Develop perfomiance indicators to monitor and manage Order backlog
3. Outage Perfonnance
a. Forced Outage Schedule template and readiness
b. Mid-Cycle Outage Preparation
c. Clarify expectations and improve contractor performance
d. 14"' Refueling Outage Preparation
2. Maintenance Backlog Reduction DUE DATE Complete Co m p 1 et e Periodic through Cycle 14 Complete Co m p 1 et e Coni p 1 et e Complete Co m p 1 et e Coni p 1 et e Cotttplete Corrrplete February 28,2006

Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Pagc 5 of 8

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

COMMITMENTS

6. Engineering Improvement Initiative Implement actions to improve Safety Margin:
a. Determine the Safety Margin for the top 10 Risk Significant Systems and develop a plan to improve safety margins
b. Electrical System coordination improvements
c. Masonry/block wall re-analyses and design changes
d. Service Water improvements Perform additional Latent Issues Reviews Implement the Design Calculation Improvement Plan Enhance plant equipment performance through the FENOC Equipment Re1 i abi 1 it y Program Develop and implement the plan to enhance System Engineering ownership of plant systems in support of Operations Schedule and conduct additional Program Compliance Reviews including:
a. Qualification of Program Owners
b. Development of Program Manuals
c. Creation of Performance Indicators Establish the appropriate level of workload for Engineering Change Requests and develop a plan to reduce and maintain the backlogs to that level Perfomi on-going self-assessments to determine if the problem solving process, NOP-ER-3001 has been properly implemented during the previous period Perform independent outside assessments of the effectiveness of Engineering corrective and improvement actions in the areas of modifications, System Engineering, corrective actions, and calculations Implement electronic accessibility of design basis information and populate with 5 systems Expand the role of the Engineering Assessment Board (EAB) to include the review of Engineering Root Causes and Apparent Causes and Engineering Calculations Establish criteria and modify appropriate procedures to restrict the use of At-Risk Changes in the plant modification process DUE DATE Coni p 1 et e Tlt roirgli Cycle I4 Tlirorrglr Cycle 14 Through Cycle 14 Periodic through Cycle 14 Through Cycle 14 Through Cycle 14 Complete Complete Periodic through Cycle 14 Periodic through Cycle 14 Corr1plete C omp 1 et e Co nip 1 et e

Docket Number 50-346 License Nuniber NPF-3 Serial Nuniber 1 - 1409 At t achm e t i t 1 Page 6 of 8 COMMITMENTS DUE DATE Engineering Improvement Initiative (Contd)

13. Re-institute the use of Quarterly System Health Reports and
14. Assign a Program Owner for the Problem Solving Process
15. Develop and implenient actions necessary to improve the C onip 1 et e Complete Coni p 1 et e Design Basis Assessment Reports technical issues problem solving capabilities in the Engineering organization.
7. Continuous Safety Culture Improvement Initiative
1. Monitor Safety Culture on a monthly basis
2. Assess Safety Culture using the FENOC Business Practice
3. Perform a Safety Culture assessnient utilizing an independent outside organization
4. Provide SCWE training to Site employees who have not completed the SCWE portion of the Site Employee Orientation Manual
5. Provide refresher training on SCWE and Safety Culture to Davis-Besse Supervisors and above
6. NQA to perfomi two Safety Culture Assessments
7. Employee Concerns Program group to perform two surveys of the Safety Conscious Work Environment
8. Perform an effectiveness assessment of the corrective actions taken in response to the November 2003 SCWE survey results Periodic through Cycle 14 December 3 1, 2005 Corrrplete Complete Complete 2004 Cortiplete 4

Quarter 2005 2004 Corriplete 4 Quarter 2005 Co ni p 1 et e

8. Procedure Improvement Initiative
1. Perform Self-Assessments on procedure use and adherence
2. Review the Davis-Besse procedure change process to ensure Complete alignment with FENOC standards for procedure preparation and revisions
3. Provide training on procedure use and adherence
4. Perform follow-up effectiveness reviews on procedure use and adherence Periodic through Cycle 14 Co nip 1 et e September 30, 2005

Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Page 7 of 8 COMMITMENTS

9. Corrective Action Program Improvement Initiative
1. Implement the Apparent Cause Improvement Plan:
a. Strengthen procedural requirements for apparent cause evaluations, including analytical methods to be used
b. Corrective Action Review Board review of Apparent Cause Evaluations until standards are consistently met
c. Identify Apparent Cause Evaluators
d. Develop Training Program and Expectations and provide training to the Apparent Cause Evaluators (Initial Evaluator Classes and Additional Classes in 2004)
e. Qualify the trained Apparent Cause Evaluators using the Systematic Approach to Training
f. On an interim basis, rotate team of apparent cause evaluators to Support Services
g. Company Nuclear Review Board (CNRB) review of selected Apparent Cause Evaluations
2. Establish the appropriate level of workload for Condition Report Evaluations and Corrective Actions and develop a plan to reduce the backlogs to those levels
3. Perform a focused Self-Assessment of implementation of the Corrective Action Program using industry peers
4. Reestablish the Corrective Action Program trending process
5. Provide Apparent Cause training to Managers DUE DATE Complete Complete Co ni p 1 et e Co ni p 1 et e Co m p 1 et e Co nip 1 e te Periodic through Cycle 14 Co nip 1 e te Coni p 1 e te Coin p let e Coin p 1 et e

Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Page 8 of 8

1.
2.
3.
4.
5.
6.
7.
8.

COMMITMENTS

10. Internal and External Oversight Improvement Initiative Supplement quality oversight with off-site assistance to improve objectivity and ensure assessments are sufficiently critical Supplement management oversight with off-site assistance to improve objectivity and ensure assessments are sufficiently critical Focus more quality oversight on cross-functional activities and interfaces Review and revise the master assessment plan at all three FENOC sites Conduct an external assessment to evaluate the progress of organizational improvements in the areas of critical self-assessments and performance observations Utilize INPO Assist Visits to assess the effectiveness of Improvement Initiatives Perforni Quality Oversight of Engineering using the Continuous Assessnient Process Conduct assessment activities of the Corrective Action Program to evaluate effectiveness of corrective actions taken to improve impletnentation and improve trend evaluation DUE DATE C on1 p 1 et e Co nip 1 et e Complete C o ni p 1 et e Co m p 1 et e Cotrrplere Periodic through Cycle 14 Periodic through Cycle 14

Docket Number 50-346 Liccnse Number NPF-3 Serial Number 1-1 409 Page 1 of4 6.lb CHANGES TO CYCLE 14 OPERATIONAL IMPROVEMENT PLAN, REV. 8 Implement actions to improve TITLE ACTION/PI NUMBER 6.lc 9.lg Key Actions safety margin: Electrical system coordination improvements lniprove Safety Margin:

Masonryiblock wall re-analysis and design changes Company Nuclear Review Board (CNRB) review of selected Apparent Cause Evaluations Sponsor List, Page 6 Changed owner from R. Hansen to 1.

3.5 Perform testing of Maintenance staff knowledge, skills and abilities to identify improvement actions and incorporate into training.

CHANGE Changed sponsor of Initiative 10 Internal and External Oversight Improvement to J. Rinckel. (Transfer of duties from reorganization is comDlete)

Extended due date to Second Quarter 2005.

Divided this commit men t into two parts in the OIP. Actions taken through 12/3 1/04 are documented as complete. Incorporation of any identified training needs is a sub-set with a due date of 6/30/05.

In keeping with the Systematic Approach to Training (SAT) process, the applicable Curriculum Review Committee (CRC) will review the results of the Knowledge Surveys and determine if any training is needed for the totics tested.

Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 At t ac limen t 2 Page 2 of 4 TITLE ACTlONlPl NUMBER Performance Indicators 1-04 1-05 1-06.2 1-1 1 1-12 P-0 1 P-06 M-05 M -06 Individual Error Rate Employee willingness to raise concerns Operator Work Arounds -

Level 2 Employee Willingness to Use the Corrective Action Pro gram Worker Confidence in Raising Safetv Concerns Corrective Action Program Effectiveness Program and Process Error Rate Management Field Observations are self-critical Effectiveness of Management and Supervisors CHANGE The Fleet PI Reference number changed to D-HP-01.

This Performance Indicator will be assessed through the annual SCWE survey.

Added ranking criteria and reworded Obi ective/Goal.

Added the Annual Safety Culture Assessment as a source reference.

Delete NQA.

Changed owner from Griffith to Am i don.

Changed owner from Griffith to Amidon.

Changed grading criteria for weighted values for backlog and root cause.

Changed from a pass/fail to a graded average.

The Fleet PI Reference number changed to D-SPO-05.

The Fleet PI Reference number changed to D-HP-02.

Changed PI Reference in the Operational Improvement Plan to Annual Safety Culture Assessment, NQA Field Observations and Management Observations.

Changed to annual PI reporting.

The Fleet PI Reference number changed to XD-PDE-05.

Docket Number 50-346 License Number NPF-3 Serial Nuniber 1 - 1409 Attach M en t 2 Page 3 of 4 M-07 I

I 34-08 I-----

0-01.2 0-02 r---

0-03 I

Talent Management and Personnel Development Leadership Development Completion of Primary Elements Investigation Responsiveness to DBOV Identified CRs CR DBOV Review Tim el i ness Removed monthly from the Goal statement in the Operational Improvement Plan. This is a semi-annual Performance Indicator.

Removed monthly from the Goal statement in the Operational Improvement Plan. This is a semi-annual Performance Indicator.

Added criteria for Year-to-Date and Y ear-End Expectancy.

Changed from measuring the responsiveness to DBOV-initiated CRs in units of days to measuring this responsiveness as a ratio (percentage) of the sites responsiveness to all CRs.

Additionally, CRs identified as immediately closed (CC) will no longer be included, since they require no response. DBOV-initiated CRs that DBOV answers are also not included since the indicator is monitoring line organization resDonsiveness to DBOV issues.

Changed from measuring the 90 of CR reviews completed within 15 days to measuring the number of days required to complete 100% of the CR reviews.

Changed the goal from 90% of CR reviews to be accepted within 15 days to the goal of 100% of CR reviews to be accepted within 14 days.

Docket Number 50-346 License Number NPF-3 Serial Number 1-1 409 Page 4 of 4 0-04 0-05 CA DBOV Verification Timeliness Timeliness of NQA Audit Report Issuances Changed from measuring the % of CA reviews completed within 30 days to measuring the number of days required to complete 100% of the CA reviews.

Changed the goal from 90% of CA reviews to be accepted within 30 days to the goal of 100% of CA reviews to be accepted within 30 days.

Deleted use of calendar days from end of quarter and only use working days from end of quarter.

Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1409 Enclosure Davis-Besse Nuclear Power Station Operational Improvenient Plan Operating Cycle 14 Revision 8 March 24,2005 (34 pages to follow)

sooz 'PZ WJeW 8 NOISIMH

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 Table of Contents Page Introduction...........................................................................................

2 Barriers To Ensure Nuclear Safety.......................................................

3 Davis-Besse Improvement Initiatives....................................................

6 Improvement Initiative Key Actions......................................................

7 Safety Barrier Attributes and Goals.......................................................

24

. Individual.........................................................................................

25 Programs 28 Management 29 Oversight 31 Page 1 of 33 Revision 8

Davis-Besse Nuclear Power Station Operational Improvement Plan Introduction To ensure continued improvements and sustained Power Station, the Leadership Team has developed Cycle 14 performance in Nuclear Safety and Plant Operation at the Davis-Besse Nuclear this Improvement Plan to focus on key improvement initiatives and safety bamers essential to safe restart from the Reactor Pressure Vessel Head degradation extended plant outage and into subsequent operating cycles. This plan provides for a managed transition from the organizational and programmatic actions taken to support the Davis-Besse Return to Service Plan and Building Block Plans to that of normal plant operations and refueling outages.

The initiatives discussed in this plan were derived from lessons learned during the extended plant outage which resulted from the significant Reactor Pressure Vessel Head degradation identified at the beginning of the 13h Refueling Outage. During the extended outage, numerous improvements were made in the areas of Safety Culture, Management, Human Performance, System Health and Programs as described in the Return to Service Plan and the Building Block Plans. However, additional improvements are required to achieve world class performance and to ensure that the safety bamers that failed to detect the significant RPV Head degradation are maintained to prevent a recurrence of an event in the future.

As described in the Return to Service Plan, the numerous root causes associated with the Reactor Pressure Vessel Head degradation could be grouped into the areas of Nuclear Safety Culture; ManagementPersonnel Development; Standards and Decision-making; Oversight and Assessments; and ProgramsKorrective ActionsRrocedure Compliance. Actions described in each of the Building Blocks were designed to address numerous significant improvements in each of those areas. This transition plan of Operational Improvements focuses on the four primary safety bamers of Individual, Programs, Management, and Oversight (as described in the following pages) to ensure improvements realized during the extended outage remain in place and are further built upon to improve performance in the future. This plan will ensure that the improvements made to Davis-Besse are built to last.

This plan will be used by the Davis-Besse Leadership Team on a monthly basis to monitor safety barrier attributes that would provide early detection of declining trends in performance and to focus on major initiatives to achieve operational excellence. This plan is a living document and will be periodically updated and revised to address completed actions and add new initiatives as determined and approved by the Senior Leadership Team.

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 Barriers To Ensure Nuclear Safetv The safety of nuclear power relies heavily on the defense in depth concept. Nuclear power plants are designed with robust systems and redundant back-up safety systems in the unlikely event of a failure. However, systems and equipment must still be operated, maintained and designed by people to ensure reliability and availability if called upon to perform an intended safety function. The first barrier to ensure safety is the Individual. The operator, maintenance technician, engineer and all the other support personnel play an integral role in monitoring plant status and maintaining systems and equipment in top-notch condition. Thus, ensuring that the individuals that support nuclear power plant operation are highly qualified, trained and motivated to do the best job possible is an essential barrier to ensure nuclear safety.

To guide the individual in performing their required job functions, numerous Programs have been put in place to address the operations, maintenance, design and licensing basis activities performed daily at the station. Programs are implemented by procedures and other written documents to ensure a consistent approach by the individual. Thus, programs are another essential barrier to ensure nuclear safety.

Management also plays a key role in nuclear safety. Management is responsible for providing the proper focus on priorities that ensure the plant is operated and maintained to high standards and expectations. Management is also responsible for creating a work environment that is conducive to a safety conscious work environment and strong safety culture, and to ensure there are adequate staffing levels of qualified and motivated individuals in every department. Management, therefore, is also considered one of the barriers essential to nuclear safety.

To ensure that the individual and management (using established programs and associated procedures) performs their duties to high standards and maintains the proper safety focus, Oversight organizations provide another barrier for nuclear safety. Oversight checks for adverse trends in performance and is independent of other pressures. Independent oversight, when properly used, can identify differences from industry norms for early detection of potential weaknesses developing in the safety barriers.

Together these four barriers work in conjunction to contribute to the safe operation of Davis-Besse.

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 This illustration represents how the four safety barriers failed, allowing the degradation of the RPV Head to go undetected for several years and serves to anchor the lessons learned and corrective actions taken to prevent recurrence.

Programs Oversight C

H E

Individual Management E

Davis-Besse Nuclear Power Station C

H A

L L

E Operational Improvement Plan G

E Cycle 14 1 Barriers Demonstrating FENOCs Strong Safety Focus 1 L

Competent Strong Experienced Individual Programs Management c

Independent Oversight FENOC Vision:

People with a strong safety focus delivering top Feet operating performance Page 5 of 33 Revision 8

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 Davis-Besse Initiatives:

Based on lessons learned from the Reactor Pressure Vessel Head degradation and during the extended plant outage, a series of key initiatives have been developed by the Leadership Team to focus on opportunities for continued improved performance. These initiatives extend beyond those significant improvements already realized during the extended outage and achieved prior to restart. These initiatives will provide additional improvements to further strengthen each of the four bamers. Details for each initiative are provided in the following pages.

~

Sponsor M. Bezilla B. Allen B. Allen B. Allen B. Allen S. Loehlein M. Bezilla M. Bezilla M. Bezilla J. Rinckel Davis-Besse In it iatives 1. Organizational Effectiveness Improvement

2.

Operations Improvement

3.

Maintenance Improvement

4.

Training Improvement

5.

Work Management Improvement

6.

Engineering Improvement

7.

Continuous Safety Culture Improvement

8.

Procedure Improvement

9.

Corrective Action Program Improvement IO. Internal and External Oversight Improvement Barriers Enhanced E !! 8 X

X X

X X

X X

X E

CT) -

f b

X X

X X

X

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 1 Organizational Effectiveness Improvement Initiative DESIRED OUTCOME: Improved Human Performance, Leadership and Team Alignment through Critical Self-assessments, Use of Operating Experience, Industry Benchmarking and Communications Key Actions 1. Improve individual and organizational performance through development and utilization of alignment tools at the De part men t/Sec t i o n I eve Is a) Focused Self-Assessments b) Ongoing Self-Assessments c) Benchmarking d) Semi-Annual Collective Significance Self-Assessments

2. Implement FENOC Business Practices for:

(Included in Focused Self-Assessment Business Practice)

3. Directors and Managers to attend a Leadership Academy
4. Provide formal Management Observation Skills Training to improve management skills Owner M. Trump L. Dohrmann D. Haskins J. Reddington nsor: M. Bezilla I

2"d Qtr 2005 Complete Complete Complete Complete Complete Com plete Page 7 of 33 Revision 8

Davis-Besse Nuclear Power Station Opera t iona I I m provemen t Plan Cycle 14 1 Organizational Effectiveness Improvement Initiative continued

5.
6.
7.
8.
9.

Key Actions Enhance the Management Observation Program by ensuring personnel providing oversight monitoring are familiar with DBBP-OPS-0001, Operations Expectations and Standards Implement actions to improve trending of major plant evolutions utilizing the Management Observation Program to track performance and feedback Provide face-to-face communications training to all site supervisors and above Re-evaluate all Davis-Besse supervisors to assess competency for current positions Conduct Supervisor and Manager Talent Management Talks

10. Continue with the 4 Cs meetings, D-B Team Meetings, Town Hall Meetings in accordance with Davis-Besse Business Practices Owner K. Fehr K. Fehr D. Haskins D. Haskins D. Haskins M. Lark-Landis iponsor: M. Bezilla Completion Complete Complete Complete 4th Qtr 2005 Complete through Cycle 14 Page 8 of 33 Revision 8

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14

2. Operations Improvement Initiative DESIRED OUTCOME: Establish the clear leadership role of Operations through improved Organizational Effectiveness and Alignment to the FENOC Processes Key Actions
1. Implement Operations Improvements:
a. Initiate Operations Leadership Improvements
b. Initiate the 5 year staffing plan
c. Implement improvements to Operations work stations
d. Implement common FENOC Operations work process
2. Improve Operator knowledge, skills and abilities through tools Owner K. Ostrowski K. Ostrowski D. lmlay K Ostrowski M. Trump mnsor: B. Allen Completion Co m p I ete Co m p I ete Complete Complete Complete testing, training and mentoring Page 9 of 33 Revision 8

Davis-Besse Nuclear Power Station K. Ostrowski K. Ostrowski K. Ostrowski Operational Improvement Plan Cycle 14 Complete Complete Complete

2. Operations Improvement Initiative continued Key Actions
3. Implement the Operations Improvement Implementation Action Plan, including:
a. Strengthening Operating Crews, including assessment of operators, training on procedure use, and improving command and control
b. Strengthening Operating Procedures, including validation of key operating procedures and use of reverse pre-job briefs
c. Strengthening Operations Management, including use of Operations Oversight Managers until no longer needed
d. Strengthening Independent Oversight of Operations
4. Strengthen Communications within Operations
5. Benchmark Conduct of Operations
16. Alian Performance Indicators to Conduct of Operations Sponsor: 6. Allen Owner I Completion K. Ostrowski I Complete I

Y I

I Page 10 of 33 Revision 8

Davis-Besse Nuclear Power Station M. Stevens M. Stevens M. Stevens M. Stevens Operational Improvement Plan Cycle 14 Complete Complete Co m p I ete Complete

3. Maintenance improvement Initiative DESIRED OUTCOME: Improved Ownership and Materiel Condition of the Davis-Besse Nuclear Power Station Key Actions 1. Utilize post-job evaluations, operating experience, and lessons learned from rework activities to identify improvements in Maintenance training and standards
2. Perform an assessment of Maintenance effectiveness in work planning, scheduling, and implementation of critical equipment outages to identify improvements
3. Implement improvements of Maintenance Supervision through training and development
4. Implement actions in the Maintenance individual commitment area to establish improved ownership and accountability of Plant materiel condition Sponsor: B. Allen Owner I Completion Page I I of 33 Revision 8

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14

3. Maintenance Improvement Initiative continued Key Actions abilities to identify improvement actions and incorporate into training
a. Perform skill and knowledge testing to identify areas for
b. Incorporate any identified training needs into training
5. Perform testing of Maintenance staff knowledge, skills and imp rovemen t material Owner M. Trump bonsor: B. Allen Completion Corn p I et e 2"d Qtr 2005 Page 12 of 33 Revision 8

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 I,

I

4. Training Improvement Initiative DESIRED OUTCOME: Improved Individual And Organizational Performance through Training Key Actions 1. Implement actions to improve individual and organizational performance and alignment by developing and providing training on design and configuration control to appropriate site staff
2. Establish engineering positional qualification requirements based on the standard FENOC Engineering Organization and complete qualification training for incumbent and new engineers Owner M. Trump M. Trump Completion Com p I ete Complete I

Page 13 of 33 Revision 8

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 Key Actions

1. Common Process
5. Work Management Improvement Initiative Owner W. Mugge DESIRED OUTCOME: Provide for the effective and efficient cross-organizational utilization of resources in achieving a high standard of plant materiel condition by conducting the right work at the right time for the right reasons Sponsor: B. Allen Corn plet ion Complete Complete through Cycle 14 Complete Complete I1
e. Monitor and improve Order quality Page 14 of 33 Revision 8

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 Sponsor: B. Allen Completion Complete Complete Com pl et e Complete Corn pl ete

5. Work Management Improvement Initiative continued I

Key Actions

a. Complete walk-down and validation of the Order backlog to ensure proper category, priority, consolidation and elimination of invalid orders
b. Complete Cycle Plan identifying equipment outages and providing the framework for addressing backlog Order priorities and results of the System Health Report
c. Develop performance indicators to monitor and manage Order backlog
3. Outage Performance
2. Maintenance Backlog Reduction
a. Forced Outage Schedule template and readiness
b. Mid-Cycle Outage Preparation
c. Clarify expectations and improve contractor performance
d. 1 4'h Refueling Outage Preparation Complete 2/28/06 Owner W. Mugge W. Mugge W. Bentley C. Hawley W. Bentlev I

Page 15 of 33 Revision 8

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14

6. Engineering Improvement Initiative DESIRED OUTCOME: Improved quality of Engineering products, increased access to Design Basis information, and continued improvement in Safety Margins of the Station Key Actions
1. Implement actions to improve Safety Margin:
a. Determine the Safety Margin for the top 10 Risk Significant Systems and develop a plan to improve safety margins b. Electrical System coo rd i nation i m p rove men t s
c. Masonryhlock wall re-analyses and design changes
d. Service Water improvements
2. Perform additional Latent Issues Reviews
3. Implement the Design Calculation Improvement Plan
4. Enhance plant equipment performance through the FENOC Equipment Reliability Program
5. Develop and implement the plan to enhance System Engineering ownership of plant systems in support of ODerations SI Owner J. Grabnar B. Boles J. Grabnar R Hovland B. Boles onsor: S. Loehlein Completion Complete through Cycle 14 through Cycle 14 through Cycle 14 through Cycle 14 through Cycle 14 through Cycle 14 Com p let e Page 16 of 33 Revision 8

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14

6. Engineering Improvement Initiative continued Key Actions
6. Schedule and conduct additional Program Compliance Reviews including:
a. Qualification of Program Owners
b. Development of Program Manuals
c. Creation of Performance Indicators
7. Establish the appropriate level of workload for Engineering Change Requests and develop a plan to reduce and maintain the backlogs to that level
8. Perform on-going self-assessments to determine if the problem solving process, NOP-ER-3001 has been properly implemented during the previous period
9. Perform independent outside assessments of the effectiveness of Engineering corrective and improvement actions in the areas of modifications, System Engineering, corrective actions, and calculations
10. Implement electronic accessibility of design basis information and DoDulate with 5 svstems I

Owner R Hovland J. Grabnar R Hovland C. Price J. Grabnar ionsor: S. Loehlein Completion Complete Complete through Cycle 14 through Cycle 14 Complete Page 17 of 33 Revision 8

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14

6. Engineering Improvement Initiative continued Key Actions
11. Expand the role of the Engineering Assessment Board (EAB) to include the review of Engineering Root Causes and Apparent Causes and Engineering Calculations
12. Establish criteria and modify appropriate procedures to restrict the use of At-Risk Changes in the plant modification process
13. Re-institute the use of Quarterly System Health Reports and Design Basis Assessment Reports
14. Assign a Program Owner for the Problem Solving Process
15. Develop and implement actions necessary to improve the technical issues problem solving capabilities in the Engineering organization.

SI Owner J. Powers J. Grabnar B. Boles J. Grabnar B. Boles C. Hawley onsor: S. Loehlein Completion Complete Complete Complete Complete Complete Page 18 of 33 Revision 8

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14

7. Continuous Safety Culture Improvement Initiative DESIRED OUTCOME: Demonstrate a continuously improving Safety Culture at the Davis-Besse Nuclear Power Station Key Actions
1. Monitor Safety Culture on a monthly basis
2. Assess Safety Culture using the FENOC Business Practice
3. Perform a Safety Culture assessment utilizing an independent
4. Provide SCWE training to Site employees who have not outside organization completed the SCWE portion of the Site Employee Orientation Manual Davis-Besse Supervisors and above
5. Provide refresher training on SCWE and Safety Culture to
6. NQA to perform two Safety Culture Assessments
7. Employee Concerns Program group to perform two surveys of the Safety Conscious Work Environment
8. Perform an effectiveness assessment of the corrective actions taken in resDonse to the November 2003 SCWE survey results Owner C. Price D. Haskins C. Price L. Griffith M. Trump R. Hruby R. Amidon R. Hansen iponsor: M. Bezilla Completion through Cycle 14 4th Qtr 2005 Complete Complete Complete 2004 Complete 4th Qtr 2005 2004 Complete 4'h Qtr 2005 Complete Page 19 of 33 Revision 8

Davis-Besse Nuclear Power Station Key Actions

1. Perform Self-Assessments on procedure use and adherence
2. Review the Davis-Besse procedure change process to ensure alignment with FENOC standards for procedure preparation and revisions
3. Provide training on procedure use and adherence
4. Perform follow-up effectiveness reviews on procedure use and adherence Operational Improvement Plan Cycle 14 Owner M. Trump L. Dohrmann J. Reddington M. Trump
8. Procedure Improvement Initiative DESIRED OUTCOME: Improved procedure use and adherence and standardized procedure change process Sponsor: M. Bezilla Completion through Cycle 14 Complete Complete 3'd Quarter 2005 Page 20 of 33 Revision 8

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14

9. Corrective Action Program Improvement Initiative DESIRED OUTCOME:

Improved effectiveness and implementation of the Corrective Action Program demonstrated through improved Station performance Key Actions

1. Implement the Apparent Cause Improvement Plan:
a. Strengthen procedural requirements for apparent cause evaluations, including analytical methods to be used
b. Corrective Action Review Board review of Apparent Cause Evaluations until standards are consistently met
c. Identify Apparent Cause Evaluators
d. Develop Training Program and Expectations and provide training to the Apparent Cause Evaluators (Initial Evaluator Classes and Additional Classes in 2004)
e. Qualify the trained Apparent Cause Evaluators using the Systematic Approach to Training
f. On an interim basis, rotate team of apparent cause evaluators to Support Services
g. Company Nuclear Review Board (CNRB) review of selected Apparent Cause Evaluations Owner L. Dohrmann L. Dohrmann Managers J. Reddington J. Reddington L. Dohrmann J. Rinckel Sponsor: M. Bezilla Completion Complete Complete Complete Complete Complete Complete through Cycle 14

=-

Page 21 of 33 Revision 8

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14

9. Corrective Action Program Improvement Initiative continued Key Actions
2. Establish the appropriate level of workload for Condition Report Evaluations and Corrective Actions and develop a plan to reduce the backlogs to those levels
3. Perform a focused Self-Assessment of implementation of the Corrective Action Program using industry peers
4. Reestablish the Corrective Action Program trending process
5. Provide Apparent Cause training to Managers I

Owner L. Dohrmann C. Price L. Dohrmann L. Dohrmann Sponsor: M. Bezilla Completion Complete Complete Complete Complete Page 22 of 33 Revision 8

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 I

10. Internal and External Oversight Improvement Initiative DESIRED OUTCOME:

Oversight activities are provided to ensure improved Station performance and the integrity of the Safety Barriers are sustained at the highest levels Key Actions

~~

1. Supplement quality oversight with off-site assistance to improve objectivity and ensure assessments are sufficiently critical
2. Supplement management oversight with off-site assistance to improve objectivity and ensure assessments are sufficiently critical
3. Focus more quality oversight on cross-functional activities and interfaces
4. Review and revise the master assessment plan at all three FENOC sites
5. Conduct an external assessment to evaluate the progress of organizational improvements in the areas of critical self-assessments and performance observations
6. Utilize INPO Assist Visits to assess the effectiveness of I mwovement Initiatives S

Owner S. Loehlein K. Ostrowski S. Loehlein S. Loehlein L. Myers M. Bezilla msor: R. Hansen Completion Co m p I ete Co m p I ete Complete Complete Complete Complete Page 23 of 33 Revision 8

DavislBesse Nuclear Power Station Operational Improvement Plan Cycle 14

10. Internal and External Oversight Improvement Initiative continued Key Actions
7. Perform Quality Oversight of Engineering using the Continuous Assessment Process
8. Conduct assessment activities of the Corrective Action Program to evaluate effectiveness of corrective actions taken to improve implementation and improve trend evaluation Owner R. Hruby R. Hruby iponsor: R. Hansen Completion through Cycle 14 through Cycle 14 Page 24 of 33 Revision 8

DavislBesse Nuclear Power Station Operational Improvement Plan Cycle 14 Safety Barrier Attributes and Goals Safety Bamer attributes and goals have been identified within this plan to provide a focus on key parameters to assess and ensure that safety barriers are being maintained. These attributes, which are grouped by each of the four barriers, will be monitored monthly by the Davis-Besse Leadership Team.

Performance indicators contain the criteria for monitoring each attribute. Some attributes will be monitored by periodic assessments such as surveys or self-assessments to determine if the goal for that attribute is being met. Monitoring sources for the performance indicators referenced in the Barrier Attributes are identified in the table below:

Kev Performance Indicator Monitoriw Sources OIP MPR FENOC Monthly Performance Report SHAR SCWE Health Assessment Report Operational Improvement Plan Performance Indicator Report Page 25 of 33 Revision 8

I DavislBesse Nuclear Power Station Operational Improvement Plan Cycle 14 Individual Barrier Attributes Item Attribute Goal Owner PI Reference Monitoring Source 1-01 Human Performance Success Days (Event Free Clock)

> 40 days on average Trump D-SPO-03 MPR 1-02 OSHA Recordable Injuries (industrial Safety Performance)

< 4 OSHA Recordable injuries per year Trump D-SPO-02 MPR

< 2 events in any 4 consecutive quarters Harder 1-03 OIP 1-03 1-04 1-05 Radiation Protection Events Individual Error Rate Employee willingness to raise concerns D-HP-01 MPR

< 0.36 individual errors per 10,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />

> 90% of individuals are willing to raise concerns to their supervisors or the Employee Concerns Program Level 1 :

Level 1 Work Arounds goal in accordance with FENOC Monthly Performance Indicator AND Level 2:

Provide Operations with reliable equipment and system controls to operate the station.

Minimize Operations Level 2 Work Arounds to 11 and prioritize to be worked through the Work Management process.

Control Room Deficiencies goal in accordance with FENOC Monthlv Performance Indicator Trump Amidon OIP SCW E Annual Survey D-EMC-10 1-06.1 Operator Work Arounds Ostrowski MPR 1-06 1-07 1-06.2 01 P MPR Control Room Deficiencies Ostrowski D-EMC-09 Page 26 of 33 Revision 8

Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 Item 1-08 1-09 1-1 0 1-1 1 Attribute Condition Report Self-Identified Rate Risk Performance Indicator (indicator of Cross-functional teamwork)

Condition Report SRO Review (SRO reviews for Operability are performed in a timely manner)

Employee willingness to use the Corrective Action Program Individual Barrier Attributes Goal 2 90% of Condition Reports are self-identified 2 75 Risk Assessment Indicator The Risk Assessment Indicator assesses each units risk of achieving safe and reliable operation. This indicator accomplishes this by measuring elements related to the probability and consequence of station events. Examples of elements making up this indicator include Probabilistic Safety Assessment, Aggregate System Health, Schedule Adherence, Activities Resulting in Reduced Trip-Logic, Schedule Stability, Scrams, Derates, Unplanned entry into Tech Specs, Entry into Abnormal Procedures

> 95% of SRO review required Condition Reports were reviewed for operability within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

< 5% of individuals are not willing to use the Corrective Action Program Owner Price Ostrowski Ostrowski Arnidon PI Reference 1-08 D-SPO-01 1-1 0 SCW E Survey and Annual Safety Culture Assessment Monitoring Source OIP MPR OIP OIP Page 27 of 33 Revision 8

I Item Davis-Besse Nuclear Power Station Operational Improvement Plan Cycle 14 Attribute Amidon 1-1 2 SCWUNQA OIP Surveys 1-1 3 1-1 4 Trump Worker confidence in raising safety concerns 1-1 3 OIP Training Programs meet industry standards and effectively improve station performance as measured by NOBP-TR-1501 Licensed Operator Reaualification Training Individual Barrier Attributes Goal

> 90% of workers believe they can raise nuclear safety or quality concerns without fear of retaliation

_ _ _ _ _ ~

2 2.5 Training Program Performance Indicator

> 95% pass rate in the Licensed Operator Requalification Training Program PI I Monitoring Owner I Reference Source Trump I

01 P I

Page 28 of 33 Revision 8

DavislBesse Nuclear Power Station Goal 2 8 Corrective Action Program Index Rating Operational Improvement Plan Owner Price Cycle 14 P-04 P-05 P-06 P-07 Proqrams Barrier Attributes Maintenance Rule System Reliability Number of Maintenance Rule (a)( 1 ) Systems Program and Process Error Rate Maintenance Rework I Itern I No repeat Maintenance Rule (a)(l) systems within the operating cycle

< 0.36 Program and Process Errors per 10,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> worked Attribute Hovland Trump PI Reference P-08 Monitoring Source Number of late Preventative Maintenance Activities 0 PMs past their late or defer to date AND c 10% of PMs closed beyond 60% of the allowed grace period Mugge D-SPO-05 MPR P-01 Corrective Action Program (Effectiveness of Corrective Action Proaram) 2 90% CR category accuracy rate I

Price P-02 01 P Condition Report (CR) category accuracy Apparent Cause evaluation quality P-02 P-03 P-03 OIP evaluations P-04 01 P P-05 OIP MPR D-H P-02

~

< 1.0% rework Maintenance Rework PI OIP Dominy P-08 01 P Page 29 of 33 Revision 8

Operational Improvement Plan Cycle 14 Manaaement Barrier Attributes Owner PI Reference Monitoring Source Item Attribute Goal M-01 OIP M-01 The Quality of Engineering Products 5 1.O score based on a (as measured by the Engineering Assessment Board)

Grabnar Amidon

~~

~

SCWE 3-4 SHAR M-02

> 75% of employees that use the Employee Concerns Program report being satisfied with the process Satisfaction of employees using the Employee Concerns Program (ECP)

NRC Allegation Ratio Amidon SCWE 1-2

< 2 times the industry average of NRC alleaations SHAR SHAR SHAR 01 P M-03 M-04 M-05

< 15% SCWERT Non-Concurrence Ratio

< 2 times the industry average of NRC retaliation allegations AND Schrauder SCWE4-5 SCWE 1-3 Effectiveness of Safety Conscious Work Environment Review Team (SCWERT) in avoiding discrimination claims

~~

Management Field Observations are self critical

> 80% of the management field observations performed are self-critical D. Haskins Annual Safety Culture Assessment, NQA Field Observations and Management Observations

Davis-Besse Nuclear Power Station Cycle 14 Operational Improvement Plan Management Barrier Attributes

~~

Owner Monitoring Source Attribute PI Reference Goal Item M-06 Price MPR Effectiveness of Management and Supervisors Managers and supervisors are generally effective with a few exceptions XD-PDE-05 (Management Commitment Area Only)

(Semi-Annual)

(Semi-Annual)

F-PDE-0 1 F-PD E-02 D-SPO-10 Talent Management and Personnel Development Goal in accordance with FENOC Performance indicator D. Haskins MPR M-07 M-08 M-09 M-1 0 M-11 Goal in accordance with FENOC Performance Indicator D. Haskins MPR Leadership Development Ostrowski MPR Reactivity Management

< 1 Level 2 Reactivity Management Event per year AND 0 Level 1 Reactivity Management Events per year.

Fuel Reliability Zero fuel defects Wilson D-SPO-07 MPR 01 P OIP OIP Maintenance Order Backlog M-11.1 M-11.2 M-1 1.3 Online:

< 50 Corrective Maintenance Orders AND

< 450 Elective Maintenance Orders Outaqe (prior to the startup from 14RFO):

< 250 Corrective/Elective Maintenance Orders Page 31 of 33 Revision 8

Davis-Besse Nuclear Power Station Item Attribute Goal M-12 Number of Temporary 5 5 during the Operating Cycle Modifications And 0 related to equipment and design deficiencies after restart from major outages Operational Improvement Plan Cycle 14 Owner H ovla n d M-12 Monitoring.

Reference Source OIP Page 32 of 33 Revision 8

Davis-Besse Nuclear Power Station Owner Hruby Operational Improvement Plan Cycle 14 PI Monitoring Reference Source DB-01 I 01 P 0-01.1 Item 0-01 Attribute Field Activity Assessments 0-02 Audit ReDOrt Issuance Responsiveness to QA Identified Issues 0-03 Oversiq ht Barrier Attributes Condition Report NQA Review Timeliness Goal 0-06 Field Observations:

Suspended. Replaced by 0-0 1.2. 0-0 1.2 developed to measure compliance with Assessment Program Requirements.

AND Completion of Primary Elements:

Deferral of < 1 Primary Element monthly Use of Industry Peer support Line organization response to Davis-Besse Oversight-initiated Condition Reports is within 90% - 1 10% of the average time required for the line organization to respond to all Condition ReDOrtS.

100% of Condition Report Investigations reviewed by NQA are accepted or rejected within 14 days after the investigation was comdete 100% of Corrective Actions verified or rejected by NQA within 30 days

< 25 working days from the end of the quarter 100% utilization of the scheduled INPO Assist Visits for 2004 0-01.2 01 P Hruby DB-02 01 P Hruby DB-03 OIP Hruby DB-04 Hruby DB-05 OIP Semi-Annual Assessment Donnellon Page 33 of 33 Revision 8

WElGW DIMENSIONAL WEIGHT 1 be used only for documents c

=

I F o r u P s w ~ d w i d e E x p r e ~ ~

i I 5

i - '

+

Do not use UPS 2nd Day Airs Q s over 13 Ounces in this envelq i ~ e z UPS @res Emelopes weight

  • to the corresponding rates for ak, 1B02 Do not send cash or cash equ 8100 Irpedlted' n n ~ - U I " "

--*E---

-Yrc nn.llpp-M-rcab.na.0lb.E.a

-tuywmr-

-arurb+

F&zzz&zzL 1623403 560600 3221498 I

TELEPHONE 0

SATURDAY DELIVERY 0 1Z 488 556 22 1007 607 1 Ill 11111 lllllllll11111111111lllllll1111111111 Ill1 Ill 1 1 2 488 556 22 1007 607 1 I

\\FIRST ENERGY CO 419-321 -7481 I

i IS501 N ST RT 2 I

IOAK HARBOR OH 43449 975

\\DAVIS-BESSE NUCLEAR POWER PLAN E?51 12 488 556 22 1007 607 1 rcI C D Y ~ M E X

i Mr. James Caldwell I Reg ion al Ad mi n is t ra tor 1

U. S. NRC, Region I l l

[ 2443 Warrenville Rd., Suite 210 E I

Lisle, IL 60532-4352 I( ~

~

6 0

7 1

11 I I SHIFXYNT -

I I j 0 10 1 Q 1 1202609 Sj(30 MW United Parcel Service, Louisville, KY LWq [ 4885 567B 1 I