Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone~pplweb.com May 10, 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-05 898 The April 2005 Monthly Opeiating Reports for Susquehanua SES Units I and 2 are attached. | |||
Very truly yours, JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. A. Blamey NRC Project Manager, Mr. R V. Guzman | Very truly yours, JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. A. Blamey NRC Project Manager, Mr. R V. Guzman | ||
OPERATING DATA REPORT DOCKET NO. 50-387 | OPERATING DATA REPORT DOCKET NO. | ||
: 1. Unit Name: | UNIT DATE COMPLETED BY TELEPHONE 50-387 One 05/10/2005 J. J. Hennings (570) 542-3747 OPERATING STATUS | ||
: 2. Reporting Period: | : 1. | ||
: 3. Design Electrical Rating (Net MWe): 1177 | Unit Name: | ||
: 4. Maximum Dependable Capacity (Net MWe): | Susquehanna Steam Electric Station (Ul) | ||
: 5. Hours in Reporting Period | : 2. | ||
: 6. Number of Hours Reactor Was Critical | Reporting Period: | ||
: 7. Hours Generator On-Line | April 2005 | ||
: 8. Unit Reserve Shutdown Hours | : 3. | ||
: 9. Net Electrical Energy Generated (MWH) | Design Electrical Rating (Net MWe): | ||
1177 | |||
: 4. | |||
Maximum Dependable Capacity (Net MWe): | |||
1135 | |||
: 5. | |||
Hours in Reporting Period | |||
: 6. | |||
Number of Hours Reactor Was Critical | |||
: 7. | |||
Hours Generator On-Line | |||
: 8. | |||
Unit Reserve Shutdown Hours | |||
: 9. | |||
Net Electrical Energy Generated (MWH) | |||
This Month 719 719 719 0 | |||
828,884 Yr.-to-Date 2879.0 2879.0 2879.0 0 | |||
3,335,084 Cumulative 191,952.0 160,867.0 158,479.0 0 | |||
163,975,526 NOTES: | |||
Page 1 of 1 | Page 1 of 1 | ||
UNIT SHUTDOWNS DOCKET NO. | UNIT SHUTDOWNS DOCKET NO. | ||
Date | UNIT DATE COMPLETED BY TELEPHONE 50-387 One 05/10/2005 J. J. Hennings (570) 542-3747 REPORT MONTH April 2005 No. | ||
Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down R eactor3' No Reactor shutdowns this month Summary: There were no power reductions greater than 20% this month. | |||
1. | |||
F. Forced S. Scheduled 2. | |||
F. Forced | Reason: | ||
A - Equipment Failure (Explain) | |||
Page 1 of I | B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain) 3. | ||
Method: | |||
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page 1 of I | |||
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-387 | SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: | ||
50-387 Completed by: J. J. Hennings Challenges to Main Steam Safety Relief Valves None. | |||
Date: | |||
05/10/05 Telephone: | |||
(570) 542-3747 | |||
OPERATING DATA REPORT DOCKET NO. 50-388 | OPERATING DATA REPORT DOCKET NO. | ||
: 5. Unit Name: | UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 05/10/05 J. J. Hennings (570) 542-3747 OPERATING STATUS | ||
: 6. Reporting Period: | : 5. | ||
: 7. Design Electrical Rating (Net MWe): 1182 | Unit Name: | ||
: 8. Maximum Dependable Capacity (Net MWe): | Susquehanna Steam Electric Station (U2) | ||
: 5. Hours in Reporting Period | : 6. Reporting Period: | ||
: 6. Number of Hours Reactor Was Critical | April 2005 | ||
: 7. Hours Generator On-Line | : 7. | ||
: 8. Unit Reserve Shutdown Hours | Design Electrical Rating (Net MWe): | ||
: 9. Net Electrical Energy Generated (MWH) | 1182 | ||
Page 1 of I | : 8. Maximum Dependable Capacity (Net MWe): | ||
1140 | |||
: 5. | |||
Hours in Reporting Period | |||
: 6. | |||
Number of Hours Reactor Was Critical | |||
: 7. | |||
Hours Generator On-Line | |||
: 8. | |||
Unit Reserve Shutdown Hours | |||
: 9. | |||
Net Electrical Energy Generated (MWH) | |||
NOTES: | |||
This Month 719 626.66 597.13 0 | |||
661,151 Yr.-to-Date 2879 2,198.6 2,128.2 0 | |||
2,316,193 Cumulative 177,192 154,878.4 152,820.9 0 | |||
161,131,333 Page 1 of I | |||
U t UNIT SHUTDOWNS DOCKET NO. | |||
2 | UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 05110105 J. J. Hennings (570) 542-3747 REPORT MONTH April 2005 No. | ||
Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3 | |||
2 4/10/05 F | |||
67.01 A | |||
2 Manual scram due to loss of a 125V DC battery charger. | |||
The unit was returned to service on 4/13/05. | The unit was returned to service on 4/13/05. | ||
3 | 3 4/28/05 F | ||
54.86 A | |||
2 Manual scram due to the loss of electrical supply to Main Transformer cooling. The unit was returned to service on 4130105. | |||
Summary: Two manual shutdowns were required in April. The 4110/05 shutdown was required because a 125V DC battery charger failed and could not be repaired in the short time required by Susquehanna's Technical Specifications. The electrical component impacting the charger was replaced and the unit was returned to service on 4/13/05. | Summary: Two manual shutdowns were required in April. The 4110/05 shutdown was required because a 125V DC battery charger failed and could not be repaired in the short time required by Susquehanna's Technical Specifications. The electrical component impacting the charger was replaced and the unit was returned to service on 4/13/05. | ||
The 4/28/05 shutdown was required to protect a main transformer from overheating due to the loss of the transformer cooling system electrical supply. An electrical short was repaired and the unit was returned to service on 4/30/05. | The 4/28/05 shutdown was required to protect a main transformer from overheating due to the loss of the transformer cooling system electrical supply. An electrical short was repaired and the unit was returned to service on 4/30/05. | ||
1. | |||
F. Forced | 2. | ||
3. | |||
Page 1 of 1 | F. Forced S. Scheduled Reason: | ||
A - Equipment Failure (Explain) | |||
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain) | |||
Method: | |||
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page 1 of 1 | |||
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: | SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: | ||
50-388 Date: | |||
05/10/05 Completed by: | |||
J. J. Hennings Telephone: | |||
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.}} | |||
Latest revision as of 18:38, 15 January 2025
| ML051440276 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 05/10/2005 |
| From: | Saccone R Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| PLA-05898 | |
| Download: ML051440276 (7) | |
Text
%
I I p l :--
% S I
I M
Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone~pplweb.com May 10, 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-05 898 The April 2005 Monthly Opeiating Reports for Susquehanua SES Units I and 2 are attached.
Very truly yours, JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. A. Blamey NRC Project Manager, Mr. R V. Guzman
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 05/10/2005 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1.
Unit Name:
Susquehanna Steam Electric Station (Ul)
- 2.
Reporting Period:
April 2005
- 3.
Design Electrical Rating (Net MWe):
1177
- 4.
Maximum Dependable Capacity (Net MWe):
1135
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
This Month 719 719 719 0
828,884 Yr.-to-Date 2879.0 2879.0 2879.0 0
3,335,084 Cumulative 191,952.0 160,867.0 158,479.0 0
163,975,526 NOTES:
Page 1 of 1
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 05/10/2005 J. J. Hennings (570) 542-3747 REPORT MONTH April 2005 No.
Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down R eactor3' No Reactor shutdowns this month Summary: There were no power reductions greater than 20% this month.
1.
F. Forced S. Scheduled 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain) 3.
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page 1 of I
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Completed by: J. J. Hennings Challenges to Main Steam Safety Relief Valves None.
Date:
05/10/05 Telephone:
(570) 542-3747
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 05/10/05 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 5.
Unit Name:
Susquehanna Steam Electric Station (U2)
- 6. Reporting Period:
April 2005
- 7.
Design Electrical Rating (Net MWe):
1182
- 8. Maximum Dependable Capacity (Net MWe):
1140
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
NOTES:
This Month 719 626.66 597.13 0
661,151 Yr.-to-Date 2879 2,198.6 2,128.2 0
2,316,193 Cumulative 177,192 154,878.4 152,820.9 0
161,131,333 Page 1 of I
U t UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 05110105 J. J. Hennings (570) 542-3747 REPORT MONTH April 2005 No.
Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
2 4/10/05 F
67.01 A
2 Manual scram due to loss of a 125V DC battery charger.
The unit was returned to service on 4/13/05.
3 4/28/05 F
54.86 A
2 Manual scram due to the loss of electrical supply to Main Transformer cooling. The unit was returned to service on 4130105.
Summary: Two manual shutdowns were required in April. The 4110/05 shutdown was required because a 125V DC battery charger failed and could not be repaired in the short time required by Susquehanna's Technical Specifications. The electrical component impacting the charger was replaced and the unit was returned to service on 4/13/05.
The 4/28/05 shutdown was required to protect a main transformer from overheating due to the loss of the transformer cooling system electrical supply. An electrical short was repaired and the unit was returned to service on 4/30/05.
1.
2.
3.
F. Forced S. Scheduled Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page 1 of 1
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Date:
05/10/05 Completed by:
J. J. Hennings Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.