{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ary 28, 2016
{{#Wiki_filter:January 28, 2016


==SUBJECT:==
==SUBJECT:==
Line 28: Line 28:
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure(s), and your response, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure(s), and your response, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.


Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact Steve Hammann, at 610-337-5399, if you have any questions regarding this matter.
Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays).
 
UNITED STATES NUCLEAR REGULATORY COMMISSION
 
==REGION I==
2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 No reply to this letter is required. Please contact Steve Hammann, at 610-337-5399, if you have any questions regarding this matter.


Sincerely,
Sincerely,
/RA/
/RA/  
Raymond Powell, Chief Decommissioning and Technical Support Branch Division of Nuclear Materials Safety Enclosure: Inspection Report 05000271/2015010 cc w/encl: Distribution via ListServ
 
Raymond Powell, Chief Decommissioning and Technical Support Branch Division of Nuclear Materials Safety  
 
Enclosure:
Inspection Report 05000271/2015010  
 
cc w/encl:
Distribution via ListServ


=EXECUTIVE SUMMARY=
=EXECUTIVE SUMMARY=
Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.


Vermont Yankee Nuclear Power Station NRC Inspection Report No. 05000271/2015010 An announced quarterly inspection was completed at Vermont Yankee Nuclear Power Station (VY) on December 31, 2015. On-site inspections were conducted on October 26-29, and December 1-3, 2015. In-office reviews of information supplied by Entergy Nuclear Operations,
Vermont Yankee Nuclear Power Station NRC Inspection Report No. 05000271/2015010  
 
An announced quarterly inspection was completed at Vermont Yankee Nuclear Power Station (VY) on December 31, 2015. On-site inspections were conducted on October 26-29, and December 1-3, 2015. In-office reviews of information supplied by Entergy Nuclear Operations,
Inc. (Entergy) were also performed during the inspection period. The inspection included a review of spent fuel pool (SFP) safety, plant modifications, and decommissioning performance.
Inc. (Entergy) were also performed during the inspection period. The inspection included a review of spent fuel pool (SFP) safety, plant modifications, and decommissioning performance.


Line 44: Line 58:
Based on the results of this inspection, no findings of safety significance were identified.
Based on the results of this inspection, no findings of safety significance were identified.


ii    Inspection Report No. 05000271/2015010 C:\Users\ajk\Documents\LDPR-28.2015010.docx
Inspection Report No. 05000271/2015010 C:\\Users\\ajk\\Documents\\LDPR-28.2015010.docx


=REPORT DETAILS=
=REPORT DETAILS=


1.0 Background On January 12, 2015, VY certified the permanent removal of fuel from the reactor vessel
1.0 Background  
    [Agencywide Document and Access Management System (ADAMS) Accession No.
 
On January 12, 2015, VY certified the permanent removal of fuel from the reactor vessel  
[Agencywide Document and Access Management System (ADAMS) Accession No.


ML15013A426]. This met the requirements of 10 Code of Federal Regulations (CFR)50.82(a)(1)(i) and 50.82(a)(1)(ii). On January 20, 2015, the NRC notified VY that the Operating Reactor Assessment Program would cease on January 24, 2015 and that implementation of the Decommissioning Power Reactor Inspection Program would begin on January 25, 2015 (ADAMS Accession No. ML15020A482). VY is currently in the Post Operation Transition Phase of decommissioning as described in IMC 2561.
ML15013A426]. This met the requirements of 10 Code of Federal Regulations (CFR)50.82(a)(1)(i) and 50.82(a)(1)(ii). On January 20, 2015, the NRC notified VY that the Operating Reactor Assessment Program would cease on January 24, 2015 and that implementation of the Decommissioning Power Reactor Inspection Program would begin on January 25, 2015 (ADAMS Accession No. ML15020A482). VY is currently in the Post Operation Transition Phase of decommissioning as described in IMC 2561.
Line 56: Line 72:


====a. Inspection Scope====
====a. Inspection Scope====
(Inspection Procedures (IPs) 37801, 60801, 71801)
(Inspection Procedures (IPs) 37801, 60801, 71801)  
 
The inspector performed on-site inspections the weeks of October 26-29, and December 1-3, 2015. In-office reviews of information supplied by Entergy were also performed during the inspection period. The inspection consisted of observations by the inspector, interviews with Entergy personnel, a review of procedures and records, and plant walk-downs.
The inspector performed on-site inspections the weeks of October 26-29, and December 1-3, 2015. In-office reviews of information supplied by Entergy were also performed during the inspection period. The inspection consisted of observations by the inspector, interviews with Entergy personnel, a review of procedures and records, and plant walk-downs.


Line 65: Line 82:
The inspector reviewed the project to place the B.5.b pump at a fixed location with pre-connected piping. The inspector performed a walk-down of the B.5.b pump placement, interviewed personnel, and observed work in-progress. The inspector reviewed engineering change (EC) packages, condition reports, and work orders to determine if the B.5.b pump permanent placement project would fulfill its function.
The inspector reviewed the project to place the B.5.b pump at a fixed location with pre-connected piping. The inspector performed a walk-down of the B.5.b pump placement, interviewed personnel, and observed work in-progress. The inspector reviewed engineering change (EC) packages, condition reports, and work orders to determine if the B.5.b pump permanent placement project would fulfill its function.


Inspection Report No. 05000271/2015010 C:\Users\ajk\Documents\LDPR-28.2015010.docx
Inspection Report No. 05000271/2015010 C:\\Users\\ajk\\Documents\\LDPR-28.2015010.docx The inspector reviewed the project to channel spent fuel assemblies. The inspector interviewed personnel, observed spent fuel assemblies being moved from the spent fuel racks into the fuel prep machine, channels being placed on the fuel assemblies, and the fuel assemblies being returned to the spent fuel racks. The inspector reviewed plans, work orders, and condition reports to verify activities were performed in accordance with plant procedures, technical specifications (TS), and final safety analysis report (FSAR).
 
The inspector reviewed the project to channel spent fuel assemblies. The inspector interviewed personnel, observed spent fuel assemblies being moved from the spent fuel racks into the fuel prep machine, channels being placed on the fuel assemblies, and the fuel assemblies being returned to the spent fuel racks. The inspector reviewed plans, work orders, and condition reports to verify activities were performed in accordance with plant procedures, technical specifications (TS), and final safety analysis report (FSAR).


====b. Observations and Findings====
====b. Observations and Findings====
Line 82: Line 97:
====c. Conclusions====
====c. Conclusions====
Based on the results of this inspection, no findings of safety significance were identified.
Based on the results of this inspection, no findings of safety significance were identified.
3.0  
3.0  


=====Exit Meeting Summary=====
===Exit Meeting Summary===
On January 20, 2016, the inspector presented the inspection results, via teleconference, to Coley Chappell, Licensing Manager, and other members of Entergys staff. The inspectors confirmed that proprietary information was not removed from the site.
On January 20, 2016, the inspector presented the inspection results, via teleconference, to Coley Chappell, Licensing Manager, and other members of Entergys staff. The inspectors confirmed that proprietary information was not removed from the site.


Inspection Report No. 05000271/2015010 C:\Users\ajk\Documents\LDPR-28.2015010.docx PARTIAL LIST OF PERSONS CONTACTED Licensee M. Ball, Mechnical Design Engineer H. Breite, Sr. Lead Engineer J. Card, Mechanical Systems Engineer C. Chappell, Licensing and CA&A Manager C. Daniels, Plant Manager J. Meyer, Licensing M. Pletcher, Radiation Protection and Chemistry Manager J. Rogers, Design Engineering Manager M. Romeo, Decommissioning Plant Manager K. Whippie, Chemistry Supervisor A. Zander, Shift Manager ITEMS OPEN, CLOSED, AND DISCUSSED None LIST OF  
PARTIAL LIST OF PERSONS CONTACTED  
 
Licensee M. Ball, Mechnical Design Engineer H. Breite, Sr. Lead Engineer J. Card, Mechanical Systems Engineer C. Chappell, Licensing and CA&A Manager C. Daniels, Plant Manager J. Meyer, Licensing M. Pletcher, Radiation Protection and Chemistry Manager J. Rogers, Design Engineering Manager M. Romeo, Decommissioning Plant Manager K. Whippie, Chemistry Supervisor A. Zander, Shift Manager  
 
ITEMS OPEN, CLOSED, AND DISCUSSED  
 
None  
 
LIST OF  


=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=
Line 111: Line 135:
Groundwater Mitigation for Torus and Turbine Building
Groundwater Mitigation for Torus and Turbine Building
RWP 20150700, Refuel Floor Support Work, Rev. 05
RWP 20150700, Refuel Floor Support Work, Rev. 05
Water Inventory Spreadsheets, 10/26/15
Water Inventory Spreadsheets, 10/26/15  


Water Management Overview, 10/29/15
Water Management Overview, 10/29/15
Line 123: Line 147:
WO 00422166, Change B.5.b Discharge Relief Valve Setting
WO 00422166, Change B.5.b Discharge Relief Valve Setting
LIST OF ACRONYMS USED
LIST OF ACRONYMS USED
ADAMS             Agencywide Document and Access Management System
ADAMS
CFR               Code of Federal Regulations
Agencywide Document and Access Management System
EC                 Engineering Change
CFR  
Entergy           Entergy Nuclear Operations, Inc.
 
FSAR               Final Safety Analysis Report
Code of Federal Regulations
IMC               Inspection Manual Chapter
EC  
IP                 Inspection Procedure
 
NRC               U.S. Nuclear Regulatory Commission
Engineering Change
SFP               Spent Fuel Pool
Entergy
TS                 Technical Specifications
Entergy Nuclear Operations, Inc.
VY                 Vermont Yankee Nuclear Power Station
FSAR
Attachment
Final Safety Analysis Report
IMC  
 
Inspection Manual Chapter
IP  
 
Inspection Procedure
NRC  
 
U.S. Nuclear Regulatory Commission
SFP  
 
Spent Fuel Pool
TS  
 
Technical Specifications
VY  
 
Vermont Yankee Nuclear Power Station
}}
}}

Latest revision as of 05:21, 10 January 2025

IR 05000271/2015010, Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Vernon, VT
ML16028A091
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/28/2016
From: Racquel Powell
Division of Nuclear Materials Safety I
To: Wamser C
Entergy Nuclear Operations
References
IR 2015010
Download: ML16028A091 (9)


Text

January 28, 2016

SUBJECT:

NRC INSPECTION REPORT NO. 05000271/2015010, ENTERGY NUCLEAR OPERATIONS, INC., VERMONT YANKEE NUCLEAR POWER STATION, VERNON, VERMONT

Dear Mr. Wamser:

On December 31, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its quarterly inspection under Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program," at the permanently shut down Vermont Yankee Nuclear Power Station (VY). On-site inspections were performed on October 26-29, and December 1-3, 2015. In-office reviews of information supplied by Entergy Nuclear Operations, Inc. were also performed during the inspection period. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and the conditions of your license. The inspection consisted of observations by the inspector, interviews with personnel, and a review of procedures and records. The results of the inspection were discussed with Coley Chappell, Licensing Manager, and other members of the VY staff on January 20, 2016, and are described in the enclosed report. No findings of safety significance were identified.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure(s), and your response, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.

Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays).

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 No reply to this letter is required. Please contact Steve Hammann, at 610-337-5399, if you have any questions regarding this matter.

Sincerely,

/RA/

Raymond Powell, Chief Decommissioning and Technical Support Branch Division of Nuclear Materials Safety

Enclosure:

Inspection Report 05000271/2015010

cc w/encl:

Distribution via ListServ

EXECUTIVE SUMMARY

Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station NRC Inspection Report No. 05000271/2015010

An announced quarterly inspection was completed at Vermont Yankee Nuclear Power Station (VY) on December 31, 2015. On-site inspections were conducted on October 26-29, and December 1-3, 2015. In-office reviews of information supplied by Entergy Nuclear Operations,

Inc. (Entergy) were also performed during the inspection period. The inspection included a review of spent fuel pool (SFP) safety, plant modifications, and decommissioning performance.

The inspection consisted of observations by the inspector, interviews with Entergy personnel, a review of procedures and records, and plant walk-downs. The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561, Decommissioning Power Reactor Inspection Program."

Based on the results of this inspection, no findings of safety significance were identified.

Inspection Report No. 05000271/2015010 C:\\Users\\ajk\\Documents\\LDPR-28.2015010.docx

REPORT DETAILS

1.0 Background

On January 12, 2015, VY certified the permanent removal of fuel from the reactor vessel

[Agencywide Document and Access Management System (ADAMS) Accession No.

ML15013A426]. This met the requirements of 10 Code of Federal Regulations (CFR)50.82(a)(1)(i) and 50.82(a)(1)(ii). On January 20, 2015, the NRC notified VY that the Operating Reactor Assessment Program would cease on January 24, 2015 and that implementation of the Decommissioning Power Reactor Inspection Program would begin on January 25, 2015 (ADAMS Accession No. ML15020A482). VY is currently in the Post Operation Transition Phase of decommissioning as described in IMC 2561.

2.0 Post Operation Transition Phase Performance and Status Review

a. Inspection Scope

(Inspection Procedures (IPs) 37801, 60801, 71801)

The inspector performed on-site inspections the weeks of October 26-29, and December 1-3, 2015. In-office reviews of information supplied by Entergy were also performed during the inspection period. The inspection consisted of observations by the inspector, interviews with Entergy personnel, a review of procedures and records, and plant walk-downs.

The inspector reviewed the programs for the safe wet storage of spent fuel and verified that maintenance was being performed within the established frequencies and that the equipment was being properly maintained. The inspector performed a walk-down of the spent fuel pool (SFP), service water pumps, and fuel pool cooling heat exchangers to determine the material condition of the SFP and associated systems used to support SFP cooling.

The inspector reviewed the current status and future plans for radioactive water management at the site. The inspector performed a walk-down of various water tanks and water intrusion locations, reviewed current inventories, tank capacities, and groundwater intrusion rates. The inspector reviewed work orders and execution plans for activities taken to mitigate groundwater intrusion.

The inspector reviewed the project to place the B.5.b pump at a fixed location with pre-connected piping. The inspector performed a walk-down of the B.5.b pump placement, interviewed personnel, and observed work in-progress. The inspector reviewed engineering change (EC) packages, condition reports, and work orders to determine if the B.5.b pump permanent placement project would fulfill its function.

Inspection Report No. 05000271/2015010 C:\\Users\\ajk\\Documents\\LDPR-28.2015010.docx The inspector reviewed the project to channel spent fuel assemblies. The inspector interviewed personnel, observed spent fuel assemblies being moved from the spent fuel racks into the fuel prep machine, channels being placed on the fuel assemblies, and the fuel assemblies being returned to the spent fuel racks. The inspector reviewed plans, work orders, and condition reports to verify activities were performed in accordance with plant procedures, technical specifications (TS), and final safety analysis report (FSAR).

b. Observations and Findings

The inspector verified that safe wet storage of spent fuel was implemented adequately.

The inspector verified that the maintenance and surveillance program for systems and components had been conducted in accordance with the TS requirements and established procedures.

The inspector determined that radioactive water inventories were increasing due mainly to the intrusion of groundwater at the site. The inspector verified that the water inventory is tracked daily, that the groundwater intrusion rate has slowed considerably, and that the site has excess tank capacity. The inspector determined that VY is considering options regarding disposal of on-site radioactive water inventory and is also considering options for future action to further mitigate groundwater intrusion.

The inspector verified the B.5.b pump placement and pre-connected piping was completed and testing of the pump was satisfactory. The inspector also verified that the ECs were performed in accordance with site procedures and safety reviews had been performed adequately.

The inspector determined the channeling activities were performed safely and met the TS and FSAR requirements. The inspector noted the channeling activities were performed to ensure the fuel assemblies would meet requirements for transportation which would take place at a future date.

c. Conclusions

Based on the results of this inspection, no findings of safety significance were identified.

3.0

Exit Meeting Summary

On January 20, 2016, the inspector presented the inspection results, via teleconference, to Coley Chappell, Licensing Manager, and other members of Entergys staff. The inspectors confirmed that proprietary information was not removed from the site.

PARTIAL LIST OF PERSONS CONTACTED

Licensee M. Ball, Mechnical Design Engineer H. Breite, Sr. Lead Engineer J. Card, Mechanical Systems Engineer C. Chappell, Licensing and CA&A Manager C. Daniels, Plant Manager J. Meyer, Licensing M. Pletcher, Radiation Protection and Chemistry Manager J. Rogers, Design Engineering Manager M. Romeo, Decommissioning Plant Manager K. Whippie, Chemistry Supervisor A. Zander, Shift Manager

ITEMS OPEN, CLOSED, AND DISCUSSED

None

LIST OF

DOCUMENTS REVIEWED

Condition Reports

CR-VTY-2015-01355, 01533, 01550, 01620, 01638, 01680, 01730, 01767

Calculations and ECs

EC No.: 57228, B.5.b Enhancements

Procedures

AP-10090, Loss of Large Areas of the Plant Due to Fire or Explosion, Rev. 01

EGOP-10086, Service Water and Heat Exchanger Program, Rev. 00

OP 1100, Refuel Platform Operations, Rev. 46

OP-1101, Management of Refueling Activities and Fuel Assembly Movement, Rev. 56

OP 1102, Fuel Channel Operations, Rev. 26

V-EN-DC-324-DP, Decommissioning Plant Preventive Maintenance Program, Rev. 2

Procedures-Completed Surveillance Procedures

EN-NF-200, Attachment 9.1, Fuel Movement Form, completed move sheets for channeling

project

Miscellaneous

ALARA Plan 150024 - Prepare CILC Fuel Assemblies for Dry Fuel Storage, Rev. 0

CILC Fuel Channeling POD for 10/14, 10/15, 10/27, 10/28

Pullman Execution Plan (PEP), Heater Room Pipe Trench Water Mitigation Crack Injection and

Groundwater Mitigation for Torus and Turbine Building

RWP 20150700, Refuel Floor Support Work, Rev. 05

Water Inventory Spreadsheets, 10/26/15

Water Management Overview, 10/29/15

Ware Management Update - Overall Strategy, October 22, 2015

Work Orders

WO 00415473, Prepare CILC Fuel Assemblies For Dry Fuel Storage

WO 00411517-01, Install Permanent Vendor Installed Leak Repair

WO 00421602-13, P-70-1A: Replace Pump, Vendor to Perform Condensate Pit Permanent

Leak Repair

WO 00391444-08,12,13 - B.5.b. Enhancements

WO 00422166, Change B.5.b Discharge Relief Valve Setting

LIST OF ACRONYMS USED

ADAMS

Agencywide Document and Access Management System

CFR

Code of Federal Regulations

EC

Engineering Change

Entergy

Entergy Nuclear Operations, Inc.

FSAR

Final Safety Analysis Report

IMC

Inspection Manual Chapter

IP

Inspection Procedure

NRC

U.S. Nuclear Regulatory Commission

SFP

Spent Fuel Pool

TS

Technical Specifications

VY

Vermont Yankee Nuclear Power Station