{{#Wiki_filter:==SUBJECT:==
{{#Wiki_filter:May 29, 2019
COOPER NUCLEAR STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000298/2019412
 
==SUBJECT:==
COOPER NUCLEAR STATION - NRC SECURITY BASELINE INSPECTION  
 
REPORT 05000298/2019412


==Dear Mr. Dent:==
==Dear Mr. Dent:==
Line 31: Line 35:


Sincerely,
Sincerely,
/RA/
/RA/  
Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-298 License No. DPR-46 Enclosure:
 
Inspection Report 05000298/2019412
Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety  
 
Docket No. 50-298 License No. DPR-46  
 
Enclosure:
Inspection Report 05000298/2019412  


U.S. NUCLEAR REGULATORY COMMISSION
Enclosure U.S. NUCLEAR REGULATORY COMMISSION  


==Inspection Report==
==Inspection Report==
Docket Number: 05000298 License Number: DPR-46 Report Number: 05000298/2019412 Enterprise Identifier: I-2019-412-0015 Licensee: Nebraska Public Power District Facility: Cooper Nuclear Station Location: Brownville, Nebraska Inspection Dates: April 23, 2019, to May 2, 2019 Inspectors: C. Jewett, Physical Security Inspector R. Lanfear, Physical Security Inspector Approved By: Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety Enclosure
Docket Number:
05000298  
 
License Number:
DPR-46  
 
Report Number:
05000298/2019412  
 
Enterprise Identifier: I-2019-412-0015  
 
Licensee:
Nebraska Public Power District  
 
Facility:
Cooper Nuclear Station  
 
Location:
Brownville, Nebraska  
 
Inspection Dates:
April 23, 2019, to May 2, 2019  
 
Inspectors:
C. Jewett, Physical Security Inspector  
 
R. Lanfear, Physical Security Inspector  
 
Approved By:
Jeremy R. Groom, Chief  
 
Plant Support Branch 1  
 
Division of Reactor Safety  


=SUMMARY=
=SUMMARY=
Line 45: Line 87:
Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report.
Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report.


List of Findings and Violations No findings were identified.
===List of Findings and Violations===
No findings were identified.


Additional Tracking Items Type Issue     Issued Number           Title                   Inspection       Status Procedure LER           05000298/53753         Security Measure         71153            Closed Suspended Due to Severe Weather
===Additional Tracking Items===
Type Issue  
 
Issued Number Title Inspection Procedure Status LER 05000298/53753 Security Measure Suspended Due to Severe Weather 71153 Closed


=INSPECTION SCOPES=
=INSPECTION SCOPES=
Line 56: Line 102:


==SAFEGUARDS==
==SAFEGUARDS==
==71130.05 - Protective Strategy Evaluation and Performance Evaluation Program==
==71130.05 - Protective Strategy Evaluation and Performance Evaluation Program==
{{IP sample|IP=IP 71130.05|count=2}}
{{IP sample|IP=IP 71130.05|count=2}}
Line 62: Line 107:
The inspectors evaluated the sites protective strategy and performance evaluation program.
The inspectors evaluated the sites protective strategy and performance evaluation program.


The inspectors also observed one licensee annual force on force exercise. The following elements were evaluated:
The inspectors also observed one licensee annual force on force exercise. The following elements were evaluated:  
 
Tier I: all requirements Tier II: all requirements Tier III: all requirements
Tier I: all requirements Tier II: all requirements Tier III: all requirements


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
 
===71153Follow-up of Events and Notices of Enforcement Discretion Licensee Event Reports===
===71153Follow-up of Events and Notices of Enforcement Discretion     Licensee Event Reports ===
{{IP sample|IP=IP 71153|count=1}}
{{IP sample|IP=IP 71153|count=1}}
The inspectors evaluated the following licensee event report:
The inspectors evaluated the following licensee event report:
Line 80: Line 125:


Condition Reports
Condition Reports
2017-06438       2018-05409         2018-07895         2018-07958 2018-08037
2017-06438
2019-02429       2019-02442         2019-02444         2019-02464 2019-02484
2018-05409
2018-07895
2018-07958
2018-08037
2019-02429
2019-02442
2019-02444
2019-02464
2019-02484
Procedures
Procedures
Number             Title                                             Revision
Number
Administrative     Safety/Security Interface Screen                  8
Title
Revision
Administrative
Procedure 0
Procedure 0
Security           Firearms and Personal Equipment Issuance, Control, 45
Safety/Security Interface Screen
Procedure 1.6      Testing, and Maintenance
 
Security           Security Team Training and Exercises              33
Security
Procedure 1.6
Firearms and Personal Equipment Issuance, Control,
Testing, and Maintenance
Security
Procedure 2.13
Procedure 2.13
Security           Patrol Duties                                      48
Security Team Training and Exercises
 
Security
Procedure 2.4
Procedure 2.4
Patrol Duties
Miscellaneous
Miscellaneous
Documents                                                             Revision
Documents
Number             Title                                             or Date
Number  
S-40               Perform Controller Duties in Security Drills       1
 
QA Audit 19-01     Security Program and Access Authorization         3/19/2019
Title
Cooper Nuclear Station Protective Strategy Plan   1/8/2019
Revision
Cooper Nuclear Station Adversary Training Course   11/17/2018
or Date
U.S. Nuclear Regulatory Commission - Operation     53753
S-40
Perform Controller Duties in Security Drills
QA Audit 19-01
Security Program and Access Authorization
3/19/2019
Cooper Nuclear Station Protective Strategy Plan
1/8/2019
Cooper Nuclear Station Adversary Training Course
11/17/2018
U.S. Nuclear Regulatory Commission - Operation
Center Event Reports
Center Event Reports
 
53753
ML19150A257
ML19150A257
SUNSI Review: ADAMS:             Non-Publicly Available   Non-Sensitive     Keyword: NRC-002
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: NRC-002
By: JRG           Yes No     Publicly Available       Sensitive
By: JRG Yes No
OFFICE         PSI:PSB1     PSI:PSB1       C:PSB1     C:PBC         C:PSB1
Publicly Available Sensitive
NAME           CJewett       RLanfear       JGroom     JKozal         JGroom
OFFICE
SIGNATURE           /RA/         /RA/           /RA/       /RA/           /RA/
PSI:PSB1
DATE             5/28/2019     5/28/2019       5/28/2019   5/27/2019     5/29/2019
PSI:PSB1
C:PSB1
C:PBC
C:PSB1
NAME
CJewett
RLanfear
JGroom
JKozal
JGroom
SIGNATURE  
/RA/  
/RA/  
/RA/  
/RA/  
/RA/
DATE
5/28/2019
5/28/2019
5/28/2019
5/27/2019
5/29/2019
}}
}}

Latest revision as of 02:17, 5 January 2025

NRC Security Baseline Inspection Report 05000298/2019412
ML19150A257
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/29/2019
From: Jeremy Groom
Plant Support Branch-1
To: Dent J
Nebraska Public Power District (NPPD)
Groom J
References
IR 2019412
Download: ML19150A257 (6)


Text

May 29, 2019

SUBJECT:

COOPER NUCLEAR STATION - NRC SECURITY BASELINE INSPECTION

REPORT 05000298/2019412

Dear Mr. Dent:

On April 26, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Cooper Nuclear Station. On May 2, 2019, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety

Docket No. 50-298 License No. DPR-46

Enclosure:

Inspection Report 05000298/2019412

Enclosure U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number:

05000298

License Number:

DPR-46

Report Number:

05000298/2019412

Enterprise Identifier: I-2019-412-0015

Licensee:

Nebraska Public Power District

Facility:

Cooper Nuclear Station

Location:

Brownville, Nebraska

Inspection Dates:

April 23, 2019, to May 2, 2019

Inspectors:

C. Jewett, Physical Security Inspector

R. Lanfear, Physical Security Inspector

Approved By:

Jeremy R. Groom, Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Security Baseline inspection at Cooper Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and self-revealed findings, violations, and additional items are summarized in the table below.

Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report.

List of Findings and Violations

No findings were identified.

Additional Tracking Items

Type Issue

Issued Number Title Inspection Procedure Status LER 05000298/53753 Security Measure Suspended Due to Severe Weather 71153 Closed

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.05 - Protective Strategy Evaluation and Performance Evaluation Program

The inspectors evaluated the sites protective strategy and performance evaluation program.

The inspectors also observed one licensee annual force on force exercise. The following elements were evaluated:

Tier I: all requirements Tier II: all requirements Tier III: all requirements

OTHER ACTIVITIES - BASELINE

71153Follow-up of Events and Notices of Enforcement Discretion Licensee Event Reports

The inspectors evaluated the following licensee event report:

(1) Licensee Event Report 05000298/53753, Security Measure Suspended Due to Severe Weather on November 25,

EXIT MEETINGS AND DEBRIEFS

On May 2, 2019, the inspectors presented the security baseline inspection results to Mr. J.

Dent, Jr., Vice President-Nuclear and Chief Nuclear Officer, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.

DOCUMENTS REVIEWED

Condition Reports

2017-06438

2018-05409

2018-07895

2018-07958

2018-08037

2019-02429

2019-02442

2019-02444

2019-02464

2019-02484

Procedures

Number

Title

Revision

Administrative

Procedure 0

Safety/Security Interface Screen

Security

Procedure 1.6

Firearms and Personal Equipment Issuance, Control,

Testing, and Maintenance

Security

Procedure 2.13

Security Team Training and Exercises

Security

Procedure 2.4

Patrol Duties

Miscellaneous

Documents

Number

Title

Revision

or Date

S-40

Perform Controller Duties in Security Drills

QA Audit 19-01

Security Program and Access Authorization

3/19/2019

Cooper Nuclear Station Protective Strategy Plan

1/8/2019

Cooper Nuclear Station Adversary Training Course

11/17/2018

U.S. Nuclear Regulatory Commission - Operation

Center Event Reports

53753

ML19150A257

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: NRC-002

By: JRG Yes No

Publicly Available Sensitive

OFFICE

PSI:PSB1

PSI:PSB1

C:PSB1

C:PBC

C:PSB1

NAME

CJewett

RLanfear

JGroom

JKozal

JGroom

SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

DATE

5/28/2019

5/28/2019

5/28/2019

5/27/2019

5/29/2019