ML072430939: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COM M ISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2007 Mr. Christopher M. Crane President and CEO AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2007 Mr. Christopher M. Crane President and CEO AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348


==SUBJECT:==
==SUBJECT:==
Line 22: Line 22:


==Dear Mr. Crane:==
==Dear Mr. Crane:==
On August 8, 2007, the NRC staff completed its performance review of Oyster Creek Nuclear Generating Station (Oyster Creek) for the first half of the calendar year 2007 assessment cycle.
On August 8, 2007, the NRC staff completed its performance review of Oyster Creek Nuclear Generating Station (Oyster Creek) for the first half of the calendar year 2007 assessment cycle.
Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only-Security Information" will include the security cornerstone review and resultant inspection plan.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only-Security Information" will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter for 2007 at Oyster Creek was within the Regulatory Response column of the NRCs Action Matrix based on one inspection finding being classified as having low to moderate safety significance (White) in the Emergency Planning (EP)
Plant performance for the most recent quarter for 2007 at Oyster Creek was within the Regulatory Response column of the NRCs Action Matrix based on one inspection finding being classified as having low to moderate safety significance (White) in the Emergency Planning (EP)
Cornerstone and all PIs indicating performance at a level requiring no additional NRC oversight (Green). The White finding, documented in a letter dated January 9, 2006, involved Oyster Creek staff not recognizing that plant parameters met emergency action level (EAL) thresholds during an event in August 2005.
Cornerstone and all PIs indicating performance at a level requiring no additional NRC oversight (Green). The White finding, documented in a {{letter dated|date=January 9, 2006|text=letter dated January 9, 2006}}, involved Oyster Creek staff not recognizing that plant parameters met emergency action level (EAL) thresholds during an event in August 2005.
Oyster Creek has performed an evaluation to identify causes and implemented corrective actions to address the EP White finding. The NRC has completed a supplemental inspection, in accordance with Inspection Procedure 95001, to review the actions to address the White EP finding and conducted a Regulatory Response meeting on June 7, 2007. This is documented in Inspection Report (IR) 05000219/2007007, dated July 16, 2007. As a result of our review, this finding is now closed and will no longer be considered for plant assessment purposes effective July 1, 2007. Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
Oyster Creek has performed an evaluation to identify causes and implemented corrective actions to address the EP White finding. The NRC has completed a supplemental inspection, in accordance with Inspection Procedure 95001, to review the actions to address the White EP finding and conducted a Regulatory Response meeting on June 7, 2007. This is documented in Inspection Report (IR) 05000219/2007007, dated July 16, 2007. As a result of our review, this finding is now closed and will no longer be considered for plant assessment purposes effective July 1, 2007. Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
In our Annual Assessment Letter dated March 2, 2007, we advised you of the continuation of the substantive cross-cutting issue in the human performance cross-cutting aspect of procedural adherence. We indicated that we would monitor Oyster Creek's progress in this area through the normal baseline inspection program, by the completion of a Problem Identification and Resolution semi-annual trend review during the second quarter of 2007 in accordance with IP 71152, and through an IP 95001 supplemental inspection to address the white EP finding. We indicated that effective corrective actions that resulted in consistent performance in the area of procedural adherence would support removal of this cross cutting issue.
In our Annual Assessment Letter dated March 2, 2007, we advised you of the continuation of the substantive cross-cutting issue in the human performance cross-cutting aspect of procedural adherence. We indicated that we would monitor Oyster Creek's progress in this area through the normal baseline inspection program, by the completion of a Problem Identification and Resolution semi-annual trend review during the second quarter of 2007 in accordance with IP 71152, and through an IP 95001 supplemental inspection to address the white EP finding. We indicated that effective corrective actions that resulted in consistent performance in the area of procedural adherence would support removal of this cross cutting issue.


C. Crane                                         2 Based on your performance in this assessment period, the NRC has determined that the substantive cross-cutting issue in the human performance aspect of procedure adherence will be closed, because Oyster Creek has demonstrated consistent performance necessary to support removal of this cross-cutting issue. We monitored the effectiveness of your corrective action plan through the normal baseline inspection program, by the completion of a Problem Identification and Resolution semi-annual trend review documented in IR 05000219/2007003, and through the 95001 supplemental inspection discussed above. In addition, at the annual assessment meeting on May 23, 2007, you discussed your root cause evaluation of this human performance cross cutting issue, your corrective actions taken, and how the effectiveness of these actions will ensure consistent performance in the area of procedural adherence in the future. We have noted that you have completed many of your planned corrective actions and that no procedural adherence related findings occurred during the last two quarters of this assessment period.
C. Crane 2
Based on your performance in this assessment period, the NRC has determined that the substantive cross-cutting issue in the human performance aspect of procedure adherence will be closed, because Oyster Creek has demonstrated consistent performance necessary to support removal of this cross-cutting issue. We monitored the effectiveness of your corrective action plan through the normal baseline inspection program, by the completion of a Problem Identification and Resolution semi-annual trend review documented in IR 05000219/2007003, and through the 95001 supplemental inspection discussed above. In addition, at the annual assessment meeting on May 23, 2007, you discussed your root cause evaluation of this human performance cross cutting issue, your corrective actions taken, and how the effectiveness of these actions will ensure consistent performance in the area of procedural adherence in the future. We have noted that you have completed many of your planned corrective actions and that no procedural adherence related findings occurred during the last two quarters of this assessment period.
Therefore, you have demonstrated consistent performance to support removal of this cross-cutting issue.
Therefore, you have demonstrated consistent performance to support removal of this cross-cutting issue.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
Line 37: Line 37:
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Dr. Ronald Bellamy at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Dr. Ronald Bellamy at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely,
                                              /RA/
/RA/
David C. Lew, Director Division of Reactor Projects Docket Nos. 50-219 License Nos. DPR-16
David C. Lew, Director Division of Reactor Projects Docket Nos. 50-219 License Nos. DPR-16


Line 43: Line 43:
Oyster Creek Nuclear Generating Station Inspection/ Activity Plan
Oyster Creek Nuclear Generating Station Inspection/ Activity Plan


C. Crane                                         3 cc w/encl:
C. Crane 3
cc w/encl:
Chief Operating Officer, AmerGen Site Vice President, Oyster Creek Nuclear Generating Station, AmerGen Plant Manager, Oyster Creek Generating Station, AmerGen Regulatory Assurance Manager Oyster Creek, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing, AmerGen Manager Licensing - Oyster Creek, AmerGen Vice President, General Counsel and Secretary, AmerGen T. ONeill, Associate General Counsel, Exelon Generation Company J. Fewell, Assistant General Counsel, Exelon Nuclear Correspondence Control Desk, AmerGen J. Matthews, Esquire, Morgan, Lewis & Bockius LLP Mayor of Lacey Township J. Lipoti, Ph.D., Assistant Director of Radiation Programs, State of New Jersey K. Tosch - Chief, Bureau of Nuclear Engineering, NJ Dept. of Environmental Protection R. Shadis, New England Coalition Staff N. Cohen, Coordinator - Unplug Salem Campaign W. Costanzo, Technical Advisor - Jersey Shore Nuclear Watch E. Gbur, Chairwoman - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance Institute of Nuclear Power Operations (INPO)
Chief Operating Officer, AmerGen Site Vice President, Oyster Creek Nuclear Generating Station, AmerGen Plant Manager, Oyster Creek Generating Station, AmerGen Regulatory Assurance Manager Oyster Creek, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing, AmerGen Manager Licensing - Oyster Creek, AmerGen Vice President, General Counsel and Secretary, AmerGen T. ONeill, Associate General Counsel, Exelon Generation Company J. Fewell, Assistant General Counsel, Exelon Nuclear Correspondence Control Desk, AmerGen J. Matthews, Esquire, Morgan, Lewis & Bockius LLP Mayor of Lacey Township J. Lipoti, Ph.D., Assistant Director of Radiation Programs, State of New Jersey K. Tosch - Chief, Bureau of Nuclear Engineering, NJ Dept. of Environmental Protection R. Shadis, New England Coalition Staff N. Cohen, Coordinator - Unplug Salem Campaign W. Costanzo, Technical Advisor - Jersey Shore Nuclear Watch E. Gbur, Chairwoman - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance Institute of Nuclear Power Operations (INPO)


C. Crane                                                     2 Based on your performance in this assessment period, the NRC has determined that the substantive cross-cutting issue in the human performance aspect of procedure adherence will be closed, because Oyster Creek has demonstrated consistent performance necessary to support removal of this cross-cutting issue. We monitored the effectiveness of your corrective action plan through the normal baseline inspection program, by the completion of a Problem Identification and Resolution semi-annual trend review documented in IR 05000219/2007003, and through the 95001 supplemental inspection discussed above. In addition, at the annual assessment meeting on May 23, 2007, you discussed your root cause evaluation of this human performance cross cutting issue, your corrective actions taken, and how the effectiveness of these actions will ensure consistent performance in the area of procedural adherence in the future. We have noted that you have completed many of your planned corrective actions and that no procedural adherence related findings occurred during the last two quarters of this assessment period. Therefore, you have demonstrated consistent performance to support removal of this cross-cutting issue.
C. Crane 2
Based on your performance in this assessment period, the NRC has determined that the substantive cross-cutting issue in the human performance aspect of procedure adherence will be closed, because Oyster Creek has demonstrated consistent performance necessary to support removal of this cross-cutting issue. We monitored the effectiveness of your corrective action plan through the normal baseline inspection program, by the completion of a Problem Identification and Resolution semi-annual trend review documented in IR 05000219/2007003, and through the 95001 supplemental inspection discussed above. In addition, at the annual assessment meeting on May 23, 2007, you discussed your root cause evaluation of this human performance cross cutting issue, your corrective actions taken, and how the effectiveness of these actions will ensure consistent performance in the area of procedural adherence in the future. We have noted that you have completed many of your planned corrective actions and that no procedural adherence related findings occurred during the last two quarters of this assessment period. Therefore, you have demonstrated consistent performance to support removal of this cross-cutting issue.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Dr. Ronald Bellamy at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Dr. Ronald Bellamy at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely,
                                                                  /RA/
/RA/
David C. Lew, Director Division of Reactor Projects Docket Nos. 50-219 License Nos. DPR-16
David C. Lew, Director Division of Reactor Projects Docket Nos. 50-219 License Nos. DPR-16


Line 57: Line 59:
Oyster Creek Nuclear Generating Station Inspection/ Activity Plan Distribution:
Oyster Creek Nuclear Generating Station Inspection/ Activity Plan Distribution:
see next page SUNSI Review Complete: __AAR_____ (Reviewers Initials)
see next page SUNSI Review Complete: __AAR_____ (Reviewers Initials)
DOCUMENT NAME: S:\ROP 8 Mid Cycle Review\Letters for Mid Cycle\Branch 6 Mid-cycle letters\OC 2007 Mid-Cycle Letter.wpd After declaring this document An Official Agency Record it will be released to the Public. To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE           RI/DRP                 RI/DRP                     RI/DRP NAME             ARosebrook             RBellamy                   DLew DATE             8/21/07                 8/26/07                   8/31/07 OFFICIAL RECORD COPY
DOCUMENT NAME: S:\\ROP 8 Mid Cycle Review\\Letters for Mid Cycle\\Branch 6 Mid-cycle letters\\OC 2007 Mid-Cycle Letter.wpd After declaring this document An Official Agency Record it will be released to the Public. To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME ARosebrook RBellamy DLew DATE 8/21/07 8/26/07 8/31/07 OFFICIAL RECORD COPY


Letter to Christopher M. Crane from Ronald R. Bellamy dated August 31, 2007 Distribution w/encl: VIA E-M AIL S. Collins, RA                               R. Laufer, RI OEDO M. Dapas, DRA                                E. Miller, PM, NRR D. Lew, DRP                                  G. W under, PM, NRR J. Clifford, DRP                              DRS Director and Deputy Director R. Bellam y, DRP                              DRS Branch Chiefs (6)
Letter to Christopher M. Crane from Ronald R. Bellamy dated August 31, 2007 Distribution w/encl: VIA E-MAIL S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP R. Bellamy, DRP S. Barber, DRP A. Rosebrook, DRP M. Ferdas, DRP, Sr Resident Inspector R. Treadway, DRP, Resident Inspector J. DeVries, DRP, Resident OA R. Laufer, RI OEDO E. Miller, PM, NRR G. W under, PM, NRR DRS Director and Deputy Director DRS Branch Chiefs (6)
S. Barber, DRP                                ROPreports@ nrc.gov A. Rosebrook, DRP                            RidsNrrDirslpab@nrc.gov M. Ferdas, DRP, Sr Resident Inspector        JW T1@ nrc.gov R. Treadway, DRP, Resident Inspector          Region I Docket Room (with concurrences)
ROPreports@nrc.gov RidsNrrDirslpab@nrc.gov JW T1@nrc.gov Region I Docket Room (with concurrences)
J. DeVries, DRP, Resident OA


Page 1 of 2                                                                                  Oyster Creek 08/27/2007    13:53:28                                                                Inspection / Activity Plan Report 22 07/01/2007 - 12/31/2008 Unit                                                                                                          No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                        on Site       Start    End            Type 71121         - OCC RAD SAFETY                                                                             1 1              IP 7112101              Access Control to Radiologically Significant Areas                                   07/16/2007 07/20/2007 Baseline Inspections 1             IP 7112102              ALARA Planning and Controls                                                           07/16/2007 07/20/2007 Baseline Inspections 1             IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                         07/16/2007 07/20/2007 Baseline Inspections 7111107       - HEAT SINK INSP                                                                             2 1              IP 7111107B              Heat Sink Performance                                                                08/13/2007 08/17/2007 Baseline Inspections 7111401       - EP EXERCISE & PI VERIFICATION                                                             4 1             IP 7111401              Exercise Evaluation                                                                   09/17/2007 09/21/2007 Baseline Inspections 1             IP 71151-EP01           Drill/Exercise Performance                                                           09/17/2007 09/21/2007 Baseline Inspections 1             IP 71151-EP02           ERO Drill Participation                                                               09/17/2007 09/21/2007 Baseline Inspections 1             IP 71151-EP03           Alert & Notification System                                                           09/17/2007 09/21/2007 Baseline Inspections 71121          - OCC RAD SAFETY                                                                            1 1              IP 7112101              Access Control to Radiologically Significant Areas                                   11/19/2007 11/23/2007 Baseline Inspections 1             IP 7112102              ALARA Planning and Controls                                                           11/19/2007 11/23/2007 Baseline Inspections 1             IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                         11/19/2007 11/23/2007 Baseline Inspections 1             IP 71151                Performance Indicator Verification                                                   11/19/2007 11/23/2007 Baseline Inspections 4/14EXM       - INITIAL OPERATOR LICENSING EXAMS                                                           4 1                U01688                FY08 - OYSTER CREEK INITIAL OPERATOR EXAM                                            03/23/2008 04/04/2008 Not Applicable 1                 U01688               FY08 - OYSTER CREEK INITIAL OPERATOR EXAM                                             04/13/2008 04/23/2008 Not Applicable MODS           - MODS AND 50.59                                                                             5 1             IP 7111102              Evaluation of Changes, Tests, or Experiments                                         01/14/2008 01/18/2008 Baseline Inspections 1             IP 7111117B              Permanent Plant Modifications                                                         01/14/2008 01/18/2008 Baseline Inspections 71111.12       - MAINTENANCE RULE                                                                           1 1              IP 7111112B              Maintenance Effectiveness                                                            02/11/2008 02/15/2008 Baseline Inspections 71121         - OCC RAD SAFETY                                                                             1 1              IP 7112101              Access Control to Radiologically Significant Areas                                   03/24/2008 03/28/2008 Baseline Inspections 1             IP 7112102              ALARA Planning and Controls                                                           03/24/2008 03/28/2008 Baseline Inspections 1             IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                         03/24/2008 03/28/2008 Baseline Inspections 71152B         - PI&R                                                                                       4 1              IP 71152B                Identification and Resolution of Problems                                            04/28/2008 05/02/2008 Baseline Inspections 1             IP 71152B                Identification and Resolution of Problems                                             05/19/2008 05/23/2008 Baseline Inspections TRI FIRE       - TRIENNIAL FIRE PROTECTION INSPECTION                                                       3 1              IP 7111105T              Fire Protection [Triennial]                                                          06/09/2008 06/13/2008 Baseline Inspections 1             IP 7111105T              Fire Protection [Triennial]                                                           06/23/2008 06/27/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
Oyster Creek Inspection / Activity Plan 07/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/27/2007 13:53:28 Report 22 1
71121
- OCC RAD SAFETY Baseline Inspections 07/16/2007 07/20/2007 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/16/2007 07/20/2007 1
7112102 IP ALARA Planning and Controls Baseline Inspections 07/16/2007 07/20/2007 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 2
7111107
- HEAT SINK INSP Baseline Inspections 08/13/2007 08/17/2007 1
7111107B IP Heat Sink Performance 4
7111401
- EP EXERCISE & PI VERIFICATION Baseline Inspections 09/17/2007 09/21/2007 1
7111401 IP Exercise Evaluation Baseline Inspections 09/17/2007 09/21/2007 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 09/17/2007 09/21/2007 1
71151-EP02 IP ERO Drill Participation Baseline Inspections 09/17/2007 09/21/2007 1
71151-EP03 IP Alert & Notification System 1
71121
- OCC RAD SAFETY Baseline Inspections 11/19/2007 11/23/2007 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/19/2007 11/23/2007 1
7112102 IP ALARA Planning and Controls Baseline Inspections 11/19/2007 11/23/2007 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 11/19/2007 11/23/2007 1
71151 IP Performance Indicator Verification 4
4/14EXM
- INITIAL OPERATOR LICENSING EXAMS Not Applicable 03/23/2008 04/04/2008 1
U01688 FY08 - OYSTER CREEK INITIAL OPERATOR EXAM Not Applicable 04/13/2008 04/23/2008 1
U01688 FY08 - OYSTER CREEK INITIAL OPERATOR EXAM 5
MODS
- MODS AND 50.59 Baseline Inspections 01/14/2008 01/18/2008 1
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 01/14/2008 01/18/2008 1
7111117B IP Permanent Plant Modifications 1
71111.12
- MAINTENANCE RULE Baseline Inspections 02/11/2008 02/15/2008 1
7111112B IP Maintenance Effectiveness 1
71121
- OCC RAD SAFETY Baseline Inspections 03/24/2008 03/28/2008 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/24/2008 03/28/2008 1
7112102 IP ALARA Planning and Controls Baseline Inspections 03/24/2008 03/28/2008 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 4
71152B
- PI&R Baseline Inspections 04/28/2008 05/02/2008 1
71152B IP Identification and Resolution of Problems Baseline Inspections 05/19/2008 05/23/2008 1
71152B IP Identification and Resolution of Problems 3
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 06/09/2008 06/13/2008 1
7111105T IP Fire Protection [Triennial]
Baseline Inspections 06/23/2008 06/27/2008 1
7111105T IP Fire Protection [Triennial]
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Page 2 of 2                                                                                Oyster Creek 08/27/2007    13:53:28                                                              Inspection / Activity Plan Report 22 07/01/2007 - 12/31/2008 Unit                                                                                                          No. of Staff   Planned Dates        Inspection Number      Inspection Activity                                                  Title                          on Site       Start    End            Type 7112201       - PUB RAD SAFETY - RETS                                                                     1 1              IP 7112201              Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems             06/09/2008 06/13/2008 Baseline Inspections EP            - EP PROGRAM INSPECTION                                                                      1 1              IP 7111402              Alert and Notification System Testing                                                 10/06/2008 10/10/2008 Baseline Inspections 1             IP 7111403              Emergency Response Organization Augmentation Testing                                 10/06/2008 10/10/2008 Baseline Inspections 1             IP 7111404              Emergency Action Level and Emergency Plan Changes                                     10/06/2008 10/10/2008 Baseline Inspections 1             IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies                     10/06/2008 10/10/2008 Baseline Inspections 1             IP 71151-EP01           Drill/Exercise Performance                                                           10/06/2008 10/10/2008 Baseline Inspections 1             IP 71151-EP02           ERO Drill Participation                                                               10/06/2008 10/10/2008 Baseline Inspections 1             IP 71151-EP03           Alert & Notification System                                                           10/06/2008 10/10/2008 Baseline Inspections 7111108G       - INSERVICE INSPECTION                                                                      1 1              IP 7111108G              Inservice Inspection Activities - BWR                                                 10/20/2008 10/24/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
Oyster Creek Inspection / Activity Plan 07/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/27/2007 13:53:28 Report 22 1
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 06/09/2008 06/13/2008 1
7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1
EP
- EP PROGRAM INSPECTION Baseline Inspections 10/06/2008 10/10/2008 1
7111402 IP Alert and Notification System Testing Baseline Inspections 10/06/2008 10/10/2008 1
7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 10/06/2008 10/10/2008 1
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 10/06/2008 10/10/2008 1
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/06/2008 10/10/2008 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/06/2008 10/10/2008 1
71151-EP02 IP ERO Drill Participation Baseline Inspections 10/06/2008 10/10/2008 1
71151-EP03 IP Alert & Notification System 1
7111108G
- INSERVICE INSPECTION Baseline Inspections 10/20/2008 10/24/2008 1
7111108G IP Inservice Inspection Activities - BWR This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 22:07, 14 January 2025

Mid-Cycle Performance Review and Inspection Plan
ML072430939
Person / Time
Site: Oyster Creek
Issue date: 08/31/2007
From: David Lew
Division Reactor Projects I
To: Crane C
AmerGen Energy Co
Bellamy R Rgn-I/DRP/Br6/610-337-5200
References
Download: ML072430939 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2007 Mr. Christopher M. Crane President and CEO AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

OYSTER CREEK NUCLEAR GENERATING STATION

Dear Mr. Crane:

On August 8, 2007, the NRC staff completed its performance review of Oyster Creek Nuclear Generating Station (Oyster Creek) for the first half of the calendar year 2007 assessment cycle.

Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only-Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter for 2007 at Oyster Creek was within the Regulatory Response column of the NRCs Action Matrix based on one inspection finding being classified as having low to moderate safety significance (White) in the Emergency Planning (EP)

Cornerstone and all PIs indicating performance at a level requiring no additional NRC oversight (Green). The White finding, documented in a letter dated January 9, 2006, involved Oyster Creek staff not recognizing that plant parameters met emergency action level (EAL) thresholds during an event in August 2005.

Oyster Creek has performed an evaluation to identify causes and implemented corrective actions to address the EP White finding. The NRC has completed a supplemental inspection, in accordance with Inspection Procedure 95001, to review the actions to address the White EP finding and conducted a Regulatory Response meeting on June 7, 2007. This is documented in Inspection Report (IR) 05000219/2007007, dated July 16, 2007. As a result of our review, this finding is now closed and will no longer be considered for plant assessment purposes effective July 1, 2007. Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

In our Annual Assessment Letter dated March 2, 2007, we advised you of the continuation of the substantive cross-cutting issue in the human performance cross-cutting aspect of procedural adherence. We indicated that we would monitor Oyster Creek's progress in this area through the normal baseline inspection program, by the completion of a Problem Identification and Resolution semi-annual trend review during the second quarter of 2007 in accordance with IP 71152, and through an IP 95001 supplemental inspection to address the white EP finding. We indicated that effective corrective actions that resulted in consistent performance in the area of procedural adherence would support removal of this cross cutting issue.

C. Crane 2

Based on your performance in this assessment period, the NRC has determined that the substantive cross-cutting issue in the human performance aspect of procedure adherence will be closed, because Oyster Creek has demonstrated consistent performance necessary to support removal of this cross-cutting issue. We monitored the effectiveness of your corrective action plan through the normal baseline inspection program, by the completion of a Problem Identification and Resolution semi-annual trend review documented in IR 05000219/2007003, and through the 95001 supplemental inspection discussed above. In addition, at the annual assessment meeting on May 23, 2007, you discussed your root cause evaluation of this human performance cross cutting issue, your corrective actions taken, and how the effectiveness of these actions will ensure consistent performance in the area of procedural adherence in the future. We have noted that you have completed many of your planned corrective actions and that no procedural adherence related findings occurred during the last two quarters of this assessment period.

Therefore, you have demonstrated consistent performance to support removal of this cross-cutting issue.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules and Practices, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Dr. Ronald Bellamy at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

David C. Lew, Director Division of Reactor Projects Docket Nos. 50-219 License Nos. DPR-16

Enclosure:

Oyster Creek Nuclear Generating Station Inspection/ Activity Plan

C. Crane 3

cc w/encl:

Chief Operating Officer, AmerGen Site Vice President, Oyster Creek Nuclear Generating Station, AmerGen Plant Manager, Oyster Creek Generating Station, AmerGen Regulatory Assurance Manager Oyster Creek, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing, AmerGen Manager Licensing - Oyster Creek, AmerGen Vice President, General Counsel and Secretary, AmerGen T. ONeill, Associate General Counsel, Exelon Generation Company J. Fewell, Assistant General Counsel, Exelon Nuclear Correspondence Control Desk, AmerGen J. Matthews, Esquire, Morgan, Lewis & Bockius LLP Mayor of Lacey Township J. Lipoti, Ph.D., Assistant Director of Radiation Programs, State of New Jersey K. Tosch - Chief, Bureau of Nuclear Engineering, NJ Dept. of Environmental Protection R. Shadis, New England Coalition Staff N. Cohen, Coordinator - Unplug Salem Campaign W. Costanzo, Technical Advisor - Jersey Shore Nuclear Watch E. Gbur, Chairwoman - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance Institute of Nuclear Power Operations (INPO)

C. Crane 2

Based on your performance in this assessment period, the NRC has determined that the substantive cross-cutting issue in the human performance aspect of procedure adherence will be closed, because Oyster Creek has demonstrated consistent performance necessary to support removal of this cross-cutting issue. We monitored the effectiveness of your corrective action plan through the normal baseline inspection program, by the completion of a Problem Identification and Resolution semi-annual trend review documented in IR 05000219/2007003, and through the 95001 supplemental inspection discussed above. In addition, at the annual assessment meeting on May 23, 2007, you discussed your root cause evaluation of this human performance cross cutting issue, your corrective actions taken, and how the effectiveness of these actions will ensure consistent performance in the area of procedural adherence in the future. We have noted that you have completed many of your planned corrective actions and that no procedural adherence related findings occurred during the last two quarters of this assessment period. Therefore, you have demonstrated consistent performance to support removal of this cross-cutting issue.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules and Practices, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Dr. Ronald Bellamy at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

David C. Lew, Director Division of Reactor Projects Docket Nos. 50-219 License Nos. DPR-16

Enclosure:

Oyster Creek Nuclear Generating Station Inspection/ Activity Plan Distribution:

see next page SUNSI Review Complete: __AAR_____ (Reviewers Initials)

DOCUMENT NAME: S:\\ROP 8 Mid Cycle Review\\Letters for Mid Cycle\\Branch 6 Mid-cycle letters\\OC 2007 Mid-Cycle Letter.wpd After declaring this document An Official Agency Record it will be released to the Public. To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME ARosebrook RBellamy DLew DATE 8/21/07 8/26/07 8/31/07 OFFICIAL RECORD COPY

Letter to Christopher M. Crane from Ronald R. Bellamy dated August 31, 2007 Distribution w/encl: VIA E-MAIL S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP R. Bellamy, DRP S. Barber, DRP A. Rosebrook, DRP M. Ferdas, DRP, Sr Resident Inspector R. Treadway, DRP, Resident Inspector J. DeVries, DRP, Resident OA R. Laufer, RI OEDO E. Miller, PM, NRR G. W under, PM, NRR DRS Director and Deputy Director DRS Branch Chiefs (6)

ROPreports@nrc.gov RidsNrrDirslpab@nrc.gov JW T1@nrc.gov Region I Docket Room (with concurrences)

Oyster Creek Inspection / Activity Plan 07/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/27/2007 13:53:28 Report 22 1

71121

- OCC RAD SAFETY Baseline Inspections 07/16/2007 07/20/2007 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/16/2007 07/20/2007 1

7112102 IP ALARA Planning and Controls Baseline Inspections 07/16/2007 07/20/2007 1

7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 2

7111107

- HEAT SINK INSP Baseline Inspections 08/13/2007 08/17/2007 1

7111107B IP Heat Sink Performance 4

7111401

- EP EXERCISE & PI VERIFICATION Baseline Inspections 09/17/2007 09/21/2007 1

7111401 IP Exercise Evaluation Baseline Inspections 09/17/2007 09/21/2007 1

71151-EP01 IP Drill/Exercise Performance Baseline Inspections 09/17/2007 09/21/2007 1

71151-EP02 IP ERO Drill Participation Baseline Inspections 09/17/2007 09/21/2007 1

71151-EP03 IP Alert & Notification System 1

71121

- OCC RAD SAFETY Baseline Inspections 11/19/2007 11/23/2007 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/19/2007 11/23/2007 1

7112102 IP ALARA Planning and Controls Baseline Inspections 11/19/2007 11/23/2007 1

7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 11/19/2007 11/23/2007 1

71151 IP Performance Indicator Verification 4

4/14EXM

- INITIAL OPERATOR LICENSING EXAMS Not Applicable 03/23/2008 04/04/2008 1

U01688 FY08 - OYSTER CREEK INITIAL OPERATOR EXAM Not Applicable 04/13/2008 04/23/2008 1

U01688 FY08 - OYSTER CREEK INITIAL OPERATOR EXAM 5

MODS

- MODS AND 50.59 Baseline Inspections 01/14/2008 01/18/2008 1

7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 01/14/2008 01/18/2008 1

7111117B IP Permanent Plant Modifications 1

71111.12

- MAINTENANCE RULE Baseline Inspections 02/11/2008 02/15/2008 1

7111112B IP Maintenance Effectiveness 1

71121

- OCC RAD SAFETY Baseline Inspections 03/24/2008 03/28/2008 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/24/2008 03/28/2008 1

7112102 IP ALARA Planning and Controls Baseline Inspections 03/24/2008 03/28/2008 1

7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 4

71152B

- PI&R Baseline Inspections 04/28/2008 05/02/2008 1

71152B IP Identification and Resolution of Problems Baseline Inspections 05/19/2008 05/23/2008 1

71152B IP Identification and Resolution of Problems 3

TRI FIRE

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 06/09/2008 06/13/2008 1

7111105T IP Fire Protection [Triennial]

Baseline Inspections 06/23/2008 06/27/2008 1

7111105T IP Fire Protection [Triennial]

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Oyster Creek Inspection / Activity Plan 07/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/27/2007 13:53:28 Report 22 1

7112201

- PUB RAD SAFETY - RETS Baseline Inspections 06/09/2008 06/13/2008 1

7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1

EP

- EP PROGRAM INSPECTION Baseline Inspections 10/06/2008 10/10/2008 1

7111402 IP Alert and Notification System Testing Baseline Inspections 10/06/2008 10/10/2008 1

7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 10/06/2008 10/10/2008 1

7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 10/06/2008 10/10/2008 1

7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/06/2008 10/10/2008 1

71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/06/2008 10/10/2008 1

71151-EP02 IP ERO Drill Participation Baseline Inspections 10/06/2008 10/10/2008 1

71151-EP03 IP Alert & Notification System 1

7111108G

- INSERVICE INSPECTION Baseline Inspections 10/20/2008 10/24/2008 1

7111108G IP Inservice Inspection Activities - BWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.