{{#Wiki_filter:Nebraska Public Power District                                               SKL034-50-58 (36403)
{{#Wiki_filter:Nebraska Public Power District SKL034-50-58 (36403)
Cooper Nuclear Station                                                                 Page 1 of 149 Job Performance Measure for Operations                                                   Revision: 00 Task No.: 283016S0101 Obtain and Interpret a GARDEL Periodic Report Trainee:                                             Examiner:
Cooper Nuclear Station Page 1 of 149 Job Performance Measure for Operations Revision: 00 Task No.: 283016S0101 Obtain and Interpret a GARDEL Periodic Report Trainee:
Pass           Fail     Examiner Signature:                                     Date:
Examiner:
Pass Fail Examiner Signature:
Date:
Additional Program Information:
Additional Program Information:
: 1.       Appropriate Performance Locations: CR / SIM
: 1.
: 2.       Appropriate Trainee level: RO / SRO
Appropriate Performance Locations: CR / SIM
: 3.       Evaluation Method: Perform
: 2.
: 4.       Performance Time: 10 minutes
Appropriate Trainee level: RO / SRO
: 5.       NRC K/As 2.1.7 Imp. 3.7/4.4 Directions to Examiner:
: 3.
: 1.       This JPM evaluates the trainee=s ability to Obtain and Interpret a Gardel Periodic Case.
Evaluation Method: Perform
: 2.       If this JPM is performed on the Simulator, only the cues preceded by # should be given.
: 4.
: 3.       All blanks must be filled out with either initials or an NP for Anot performed@; an explanation may also be written in the space, if desired, by the examiner.
Performance Time: 10 minutes
: 5.
NRC K/As 2.1.7 Imp. 3.7/4.4 Directions to Examiner:
: 1.
This JPM evaluates the trainee=s ability to Obtain and Interpret a Gardel Periodic Case.
: 2.
If this JPM is performed on the Simulator, only the cues preceded by # should be given.
: 3.
All blanks must be filled out with either initials or an NP for Anot performed@; an explanation may also be written in the space, if desired, by the examiner.
Directions to Trainee:
Directions to Trainee:
When I tell you to begin, you are to Obtain and Evaluate a Gardel Official Case by completing attachment 2 of 6.LOG.601. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin, you are to Obtain and Evaluate a Gardel Official Case by completing attachment 2 of 6.LOG.601. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
Line 33: Line 43:
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
If being performed in the Simulator:
If being performed in the Simulator:
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.  


Nebraska Public Power District                                         SKL034-50-58 (36403)
Nebraska Public Power District SKL034-50-58 (36403)
Cooper Nuclear Station                                                         Page 2 of 149 Job Performance Measure for Operations                                         Revision: 00 Task No.: 283016S0101 Obtain and Interpret a GARDEL Periodic Report General Conditions:
Cooper Nuclear Station Page 2 of 149 Job Performance Measure for Operations Revision: 00 Task No.: 283016S0101 Obtain and Interpret a GARDEL Periodic Report General Conditions:
: 1.     The Reactor is at approximately 100% power.
: 1.
The Reactor is at approximately 100% power.
General  
General  


==References:==
==References:==
: 1.     Procedure 6.LOG.601 Daily Surveillance Log.
: 1.
Procedure 6.LOG.601 Daily Surveillance Log.
General Tools and Equipment:
General Tools and Equipment:
: 1.     None Special Conditions, References, Tools, Equipment:
: 1.
: 1.     Simulator Setup: See Attachment 1.
None Special Conditions, References, Tools, Equipment:
: 2.     Critical steps denoted by *.
: 1.
: 3.     Simulator cues denoted by #.
Simulator Setup: See Attachment 1.
: 2.
Critical steps denoted by *.
: 3.
Simulator cues denoted by #.
Task Standards:
Task Standards:
: 1.     100% of critical elements successfully completed without error.
: 1.
: 2.     100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 2.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
The Control Room Supervisor directs you to obtain a Gardel Periodic Case and verify that Thermal Limits are within Specification by completing Attachment 2 of 6.LOG.601. Inform the CRS when you have completed you review of the official case.
The Control Room Supervisor directs you to obtain a Gardel Periodic Case and verify that Thermal Limits are within Specification by completing Attachment 2 of 6.LOG.601. Inform the CRS when you have completed you review of the official case.
NOTE: Give the candidate Attachment 2 of 6.LOG.601 and tell the candidate to begin.
NOTE: Give the candidate Attachment 2 of 6.LOG.601 and tell the candidate to begin.  


Nebraska Public Power District                                       SKL034-50-58 (36403)
Nebraska Public Power District SKL034-50-58 (36403)
Cooper Nuclear Station                                                       Page 3 of 149 Job Performance Measure for Operations                                       Revision: 00 Task No.: 283016S0101 Obtain and Interpret a GARDEL Periodic Report Performance Checklist                         Standards                       Initials The Operator demands and prints a Periodic Case.
Cooper Nuclear Station Page 3 of 149 Job Performance Measure for Operations Revision: 00 Task No.: 283016S0101 Obtain and Interpret a GARDEL Periodic Report Performance Checklist Standards Initials
: 1. Demand a Gardel          CUE:   Gardel Official Case prints.
: 1.
Periodic Case                                                              _______*
Demand a Gardel Periodic Case The Operator demands and prints a Periodic Case.
                                #CUE: Remove the periodic case from the printer and give the Candidate the attached Periodic Case
CUE:
: 2. Scans the periodic case and records the highest   Value for the highest MFLCPR is recorded on value of MFLCPR.          Attachment 2.                                   _______*
Gardel Official Case prints.  
: 3. Scans the periodic case and records the highest   Value for the highest MFLPD is recorded on value of MFLPD.           Attachment 2.                                    _______
#CUE: Remove the periodic case from the printer and give the Candidate the attached Periodic Case
: 4. Scans the periodic case and records the highest   Value for the highest MAPRAT is recorded on value of MAPRAT.          Attachment 2.                                   _______
: 2.
: 5. Scans the periodic case and records reactor       Reactor power is recorded on Attachment 2 power.                                                                    _______
Scans the periodic case and records the highest value of MFLCPR.
: 6. Scans the periodic case and records lowest       Value for the lowest MCPR is recorded on value of MCPR.           Attachment 2.                                    _______
Value for the highest MFLCPR is recorded on.
: 7. Scans the periodic case and records lowest       Value for the APRM GAF is recorded on value of APRM GAF        Attachment 2.
: 3.
CRS informed that MFLCPR value is greater
Scans the periodic case and records the highest value of MFLPD.
: 8. Informs the CRS that     than 1.
Value for the highest MFLPD is recorded on.
MCPR is out of limits.
: 4.
                                #CUE: Acknowledge the report. Inform the         _______*
Scans the periodic case and records the highest value of MAPRAT.
candidate that the JPM is complete.
Value for the highest MAPRAT is recorded on.
: 5.
Scans the periodic case and records reactor power.
Reactor power is recorded on Attachment 2
: 6.
Scans the periodic case and records lowest value of MCPR.
Value for the lowest MCPR is recorded on.
: 7.
Scans the periodic case and records lowest value of APRM GAF Value for the APRM GAF is recorded on.
: 8.
Informs the CRS that MCPR is out of limits.
CRS informed that MFLCPR value is greater than 1.
#CUE: Acknowledge the report. Inform the candidate that the JPM is complete.  


ATTACHMENT 1 Cooper Nuclear Station                                                                                 GARDEL Gardel: Periodic Report                 Todays Date           Current Time A       C     E     B       D       F       Thermal Power     2418.6       MWth     99.98%
ATTACHMENT 1 Cooper Nuclear Station GARDEL Gardel: Periodic Report Todays Date Current Time A
APRM             100.1 100.5 100.7 100.6 100.3 100.7             Elect. Power       827.1       MWel APRM GAF         1.006 1.012 1.017 1.017 1.014 1.017             Efficiency         34.18%
C E
APRM -%CTP       -0.57 -1.15 -1.70 -1.67 -1.37 -1.70             Coolant Flow       70.5         Mlb/hr 95.95%
B D
LPRM Status     Normal                                           APRM ave.         100.53 ADAPT           ON TIP+LPRM The 4 most limiting bundles of the core MFLCPR   Position   MCPR   CPRLIM MFLPD   Position     LHGR LHGRLIM   MAPRAT     Position   APLHGR   ALHLIM 1.004     19-32   1.467   1.370 0.800   31-44-04   10.718     13.397 0.887     19-28-05   9.228     10.399 1.004     15-32   1.471   1.370 0.798   35-44-04   10.689     13.397 0.887     21-32-05   9.102     10.257 1.003     23-38   1.532   1.370 0.798   11-38-04   10.686     13.397 0.882     25-34-04   9.289     10.535 1.002     37-24   1.541   1.370 0.794   15-42-04   10.637     13.397 0.805     35-44-04   8.159     10.138 PCIUTL     Position   19-28-04 Control Rod Withdrawal Simulator 02   06   10   14   18 22 26   30   34   38 42   46 50                 Parameters CR withdrawal         4.81%
F Thermal Power 2418.6 MWth 99.98%
51 Ave. Xenon conc.     1593.85E12/cm3 Xenon symmetry       -0.03%
APRM 100.1 100.5 100.7 100.6 100.3 100.7 Elect. Power 827.1 MWel APRM GAF 1.006 1.012 1.017 1.017 1.014 1.017 Efficiency 34.18%
47 Core press drop       18.04 psi Average void         47.08%
APRM -%CTP  
43                             16 Total bypass flow     17.25%
-0.57 -1.15 -1.70 -1.67
K-effective           1.00159 39 Cycle burnup         2032 GWD/Mt Total pow peaking     2.461 35 Sup plate pres drop   13.19 psi 31 Heat Balance Parameters Feed water flow       9.49 Mlb/hr 27           16               12               16 Feed water temp.     363.66 F Absolute press       1009.78 psi 23 Inlet subcooling     31.33 Btu/lb CR drive temp.       100.00 F 19 CR drive flow         0.02Mlb/hr Cleanup inlet temp. 514.91 F 15 Cleanup system flow 0.11 Mlb/hr Ext. Recirc pump A   2.28 MW 11                             16 Ext. Recirc pump B   2.29 MW Steam flow           9.51 Mlb/hr 07 Sup plate pres drop 15.03 psi 03
-1.37
-1.70 Coolant Flow 70.5 Mlb/hr 95.95%
LPRM Status Normal APRM ave.
100.53 ADAPT ON TIP+LPRM The 4 most limiting bundles of the core MFLCPR Position MCPR CPRLIM MFLPD Position LHGR LHGRLIM MAPRAT Position APLHGR ALHLIM 1.004 19-32 1.467 1.370 0.800 31-44-04 10.718 13.397 0.887 19-28-05 9.228 10.399 1.004 15-32 1.471 1.370 0.798 35-44-04 10.689 13.397 0.887 21-32-05 9.102 10.257 1.003 23-38 1.532 1.370 0.798 11-38-04 10.686 13.397 0.882 25-34-04 9.289 10.535 1.002 37-24 1.541 1.370 0.794 15-42-04 10.637 13.397 0.805 35-44-04 8.159 10.138 Control Rod Withdrawal PCIUTL Position 19-28-04 02 06 10 14 18 22 26 30 34 38 42 46 50 Simulator Parameters CR withdrawal 4.81%
51 Ave. Xenon conc.
1593.85E12/cm3 Xenon symmetry  
-0.03%
47 Core press drop 18.04 psi Average void 47.08%
43 16 Total bypass flow 17.25%
K-effective 1.00159 39 Cycle burnup 2032 GWD/Mt Total pow peaking 2.461 35 Sup plate pres drop 13.19 psi 31 Heat Balance Parameters Feed water flow 9.49 Mlb/hr 27 16 12 16 Feed water temp.
363.66 F Absolute press 1009.78 psi 23 Inlet subcooling 31.33 Btu/lb CR drive temp.
100.00 F 19 CR drive flow 0.02Mlb/hr Cleanup inlet temp.
514.91 F 15 Cleanup system flow 0.11 Mlb/hr Ext. Recirc pump A 2.28 MW 11 16 Ext. Recirc pump B 2.29 MW Steam flow 9.51 Mlb/hr 07 Sup plate pres drop 15.03 psi 03  


Nebraska Public Power District                                             SKL034-50-58 (36403)
Nebraska Public Power District SKL034-50-58 (36403)
Cooper Nuclear Station                                                             Page 5 of 149 Job Performance Measure for Operations                                               Revision: 00 Task No.: 283016S0101 ATTACHMENT 2 Directions to Trainee:
Cooper Nuclear Station Page 5 of 149 Job Performance Measure for Operations Revision: 00 Task No.: 283016S0101 ATTACHMENT 2 Directions to Trainee:
When I tell you to begin, you are to obtain and interpret a Gardel Periodic Case. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin, you are to obtain and interpret a Gardel Periodic Case. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
If being simulated In-Plant or Control Room:
If being simulated In-Plant or Control Room:
Line 88: Line 130:
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.
General Conditions:
General Conditions:
: 1.       The Reactor is at approximately 100% power.
: 1.
The Reactor is at approximately 100% power.
Initiating Cue(s):
Initiating Cue(s):
The Control Room Supervisor directs you to obtain a Gardel Periodic Case and to log Official case in 6.LOG.601 Attachment 2 to verify operation is within limits.
The Control Room Supervisor directs you to obtain a Gardel Periodic Case and to log Official case in 6.LOG.601 Attachment 2 to verify operation is within limits.
Inform the CRS when you have completed you review of the official case.
Inform the CRS when you have completed you review of the official case.  


Nebraska Public Power District                                             SKL034-50-57 (36402)
Nebraska Public Power District SKL034-50-57 (36402)
Cooper Nuclear Station                                                               Page 6 of 149 Job Performance Measure for Operations                                                 Revision: 00 Task No.: 299012O0301 Determine Isolation Boundaries Trainee:                                           Examiner:
Cooper Nuclear Station Page 6 of 149 Job Performance Measure for Operations Revision: 00 Task No.: 299012O0301 Determine Isolation Boundaries Trainee:
Pass         Fail       Examiner Signature:                                   Date:
Examiner:
Pass Fail Examiner Signature:
Date:
Additional Program Information:
Additional Program Information:
: 1. Appropriate Performance Locations: CR / SIM
: 1.
: 2. Appropriate Trainee level: RO / SRO
Appropriate Performance Locations: CR / SIM
: 3. Evaluation Method: Perform
: 2.
: 4. Performance Time: 15 minutes
Appropriate Trainee level: RO / SRO
: 5. NRC K/As 2.1.24 2.8/3.1 Directions to Examiner:
: 3.
: 4. This JPM evaluates the trainees ability to determine appropriate mechanical isolation boundaries.
Evaluation Method: Perform
: 5. If this JPM is performed on the Simulator, only the cues preceded by #should be given.
: 4.
: 6. All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
Performance Time: 15 minutes
: 5.
NRC K/As 2.1.24 2.8/3.1 Directions to Examiner:
: 4.
This JPM evaluates the trainees ability to determine appropriate mechanical isolation boundaries.
: 5.
If this JPM is performed on the Simulator, only the cues preceded by #should be given.
: 6.
All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
Directions to Trainee:
Directions to Trainee:
When I tell you to begin, you are to use station documents to determine the minimum mechanical/piping boundaries required to isolate the RHR 1A pump for removal. RHR 1A Motor has already been tagged and removed. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin, you are to use station documents to determine the minimum mechanical/piping boundaries required to isolate the RHR 1A pump for removal. RHR 1A Motor has already been tagged and removed. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
Line 110: Line 163:
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
General Conditions:
General Conditions:
N/A
N/A  


Nebraska Public Power District                                         SKL034-50-57 (36402)
Nebraska Public Power District SKL034-50-57 (36402)
Cooper Nuclear Station                                                         Page 7 of 149 Job Performance Measure for Operations                                         Revision: 00 Task No.: 299012O0301 Determine Isolation Boundaries General  
Cooper Nuclear Station Page 7 of 149 Job Performance Measure for Operations Revision: 00 Task No.: 299012O0301 Determine Isolation Boundaries General  


==References:==
==References:==
: 1.     Procedure 0.49 General Tools and Equipment:
: 1.
: 1.     Set of Mechanical Prints
Procedure 0.49 General Tools and Equipment:
: 2.     Copy of 2040 Sheet 1
: 1.
: 3.     Copy of 2031 Sheet 2 Special Conditions, References, Tools, Equipment:
Set of Mechanical Prints
: 1.     Simulator Setup: N/A.
: 2.
: 2.     Critical steps denoted by *.
Copy of 2040 Sheet 1
: 3.     Simulator cues denoted by #.
: 3.
Copy of 2031 Sheet 2 Special Conditions, References, Tools, Equipment:
: 1.
Simulator Setup: N/A.
: 2.
Critical steps denoted by *.
: 3.
Simulator cues denoted by #.
Task Standards:
Task Standards:
: 1.     100% of critical elements successfully completed without error.
: 1.
: 2.     100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 2.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
The Control Room Supervisor directs you to determine the minimum mechanical/piping isolation boundaries required to isolate the RHR 1A pump for removal. RHR 1A Motor has already been tagged and removed. Find and highlight all valves required to be positioned to support this task.
The Control Room Supervisor directs you to determine the minimum mechanical/piping isolation boundaries required to isolate the RHR 1A pump for removal. RHR 1A Motor has already been tagged and removed. Find and highlight all valves required to be positioned to support this task.  


Nebraska Public Power District                                       SKL034-50-57 (36402)
Nebraska Public Power District SKL034-50-57 (36402)
Cooper Nuclear Station                                                       Page 8 of 149 Job Performance Measure for Operations                                           Revision: 00 Task No.: 299012O0301 Determine Isolation Boundaries Performance Checklist                         Standards                       Initials
Cooper Nuclear Station Page 8 of 149 Job Performance Measure for Operations Revision: 00 Task No.: 299012O0301 Determine Isolation Boundaries Performance Checklist Standards Initials
: 9. May reference             References procedure 0.49                         _______
: 9.
procedure 0.49.
May reference procedure 0.49.
NOTE: Steps 2 thru 12 can be completed in any order Finds BR 2040 Sheet 1
References procedure 0.49 NOTE: Steps 2 thru 12 can be completed in any order
: 10. References BR 2040 CUE:     When the candidate successfully           _______*
: 10. References BR 2040 Sheet 1 Finds BR 2040 Sheet 1 CUE:
Sheet 1 locates 2040 Sheet 1 Provide a copy for the candidate to mark up.
When the candidate successfully locates 2040 Sheet 1 Provide a copy for the candidate to mark up.
: 11. Highlights RHR-MO-RHR-MO-15A is highlighted.                        _______*
: 11. Highlights RHR-MO-15A.
15A.
RHR-MO-15A is highlighted.
: 12. Highlights RHR-MO-RHR-MO-13A is highlighted.                        _______*
: 12. Highlights RHR-MO-13A.
13A.
RHR-MO-13A is highlighted.
: 13. Highlights RHR-98.         RHR-98 is highlighted.                             _______*
: 13. Highlights RHR-98.
: 14. Highlights RHR-58.         RHR-58 is highlighted.                             _______*
RHR-98 is highlighted.
: 15. Highlights RHR-11         RHR-11 is highlighted.                             _______*
: 14. Highlights RHR-58.
: 16. Highlights RHR drain       RHR-35, RHR 36 and/or RHR 34 are path.                                                                        _______
RHR-58 is highlighted.
highlighted.
: 15. Highlights RHR-11 RHR-11 is highlighted.
: 17. References BR 2031        Finds BR 2031 Sheet 2.
: 16. Highlights RHR drain path.
Sheet 2 to find REC Isolation valves.         #CUE: When the candidate successfully             _______*
RHR-35, RHR 36 and/or RHR 34 are highlighted.
locates 2031 Sheet 2 Provide a copy for the candidate to mark up.
: 17. References BR 2031 Sheet 2 to find REC Isolation valves.
Finds BR 2031 Sheet 2.
#CUE: When the candidate successfully locates 2031 Sheet 2 Provide a copy for the candidate to mark up.  


Nebraska Public Power District                                       SKL034-50-57 (36402)
Nebraska Public Power District SKL034-50-57 (36402)
Cooper Nuclear Station                                                       Page 9 of 149 Job Performance Measure for Operations                                         Revision: 00 Task No.: 299012O0301 Determine Isolation Boundaries Performance Checklist                           Standards                       Initials
Cooper Nuclear Station Page 9 of 149 Job Performance Measure for Operations Revision: 00 Task No.: 299012O0301 Determine Isolation Boundaries Performance Checklist Standards Initials
: 18. Highlights REC-75.         REC-75 is highlighted.                           _______*
: 18. Highlights REC-75.
REC-75 is highlighted.
: 19. Highlights REC-76.
REC-76 is highlighted.
REC-76 is highlighted.
: 19. Highlights REC-76.                                                         _______*
: 20. Highlights REC Drain Path.
: 20. Highlights REC Drain REC-87, 397 and 83 are highlighted.              _______
REC-87, 397 and 83 are highlighted.
Path.
: 21. Informs the CRS that the boundaries are identified.
Gives the highlighted drawings to the examiner.
Gives the highlighted drawings to the examiner.  
: 21. Informs the CRS that the boundaries are                                                           _______
#CUE: Acknowledges receipt of the highlighted prints. This JPM is complete.  
identified.               #CUE: Acknowledges receipt of the highlighted prints. This JPM is complete.


Nebraska Public Power District                                       SKL034-50-57 (36402)
Nebraska Public Power District SKL034-50-57 (36402)
Cooper Nuclear Station                                                       Page 10 of 149 Job Performance Measure for Operations                                         Revision: 00 ATTACHMENT 1 Directions to Trainee:
Cooper Nuclear Station Page 10 of 149 Job Performance Measure for Operations Revision: 00 ATTACHMENT 1 Directions to Trainee:
When I tell you to begin, you are to use station documents to determine the minimum mechanical/piping boundaries required to isolate the RHR 1A pump for removal. RHR 1A Motor has already been tagged and removed. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin, you are to use station documents to determine the minimum mechanical/piping boundaries required to isolate the RHR 1A pump for removal. RHR 1A Motor has already been tagged and removed. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
If being simulated In-Plant or Control Room:
If being simulated In-Plant or Control Room:
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
General Conditions:
General Conditions:
: 1. The plant is shutdown in a refueling outage.
: 1.
: 2. RHR Loop A is not required to be operable.
The plant is shutdown in a refueling outage.
: 2.
RHR Loop A is not required to be operable.
Initiating Cue(s):
Initiating Cue(s):
The Control Room Supervisor directs you to determine the minimum mechanical/piping isolation boundaries required to isolate the RHR 1A pump for removal. RHR 1A Motor has already been tagged and removed. Find and highlight all valves required to be positioned to support this task.
The Control Room Supervisor directs you to determine the minimum mechanical/piping isolation boundaries required to isolate the RHR 1A pump for removal. RHR 1A Motor has already been tagged and removed. Find and highlight all valves required to be positioned to support this task.  


Nebraska Public Power District                                                 SKL034-30-52 (16532)
Nebraska Public Power District SKL034-30-52 (16532)
Cooper Nuclear Station                                                               Page 11 of 149 Job Performance Measure for Operations                                                   Revision 02 Task No.:
Cooper Nuclear Station Page 11 of 149 Job Performance Measure for Operations Revision 02 Task No.:
Task
Task


==Title:==
==Title:==
Radiation Protection Table Top Trainee:                                           Examiner:
Radiation Protection Table Top Trainee:
Pass       Fail       Examiner Signature:                                     Date:
Examiner:
Pass Fail Examiner Signature:
Date:
Time Started: ____________ Time Finished: _____________
Time Started: ____________ Time Finished: _____________
Additional Program Information:
Additional Program Information:
: 1. Appropriate Performance Locations: CR, SIM, Class
: 1.
: 2. Appropriate Trainee level: SO, RO, SRO
Appropriate Performance Locations: CR, SIM, Class
: 3. Evaluation Method:       Simulate       Perform
: 2.
: 4. Performance Time: 10 minutes
Appropriate Trainee level: SO, RO, SRO
: 5. NRC K/A 2.3.1 (4.2)
: 3.
Evaluation Method: Simulate Perform
: 4.
Performance Time: 10 minutes
: 5.
NRC K/A 2.3.1 (4.2)
Directions to Examiner:
Directions to Examiner:
: 1. This JPM evaluates the trainee's ability to determine if certain work can be performed within the confines of the Code of Federal Regulations and CNS procedures.
: 1.
: 2. This JPM can be performed any place the operator can access appropriate procedures.
This JPM evaluates the trainee's ability to determine if certain work can be performed within the confines of the Code of Federal Regulations and CNS procedures.
: 3. All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space if desired by the examiner.
: 2.
This JPM can be performed any place the operator can access appropriate procedures.
: 3.
All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space if desired by the examiner.
Directions to Trainee:
Directions to Trainee:
When I tell you to begin, you are to determine whether you can perform in-vessel work for which you are specially qualified. If you find you cannot perform the work state the reason you cannot. If you can perform the work state what authorization, if any is required prior to performing the work. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
When I tell you to begin, you are to determine whether you can perform in-vessel work for which you are specially qualified. If you find you cannot perform the work state the reason you cannot. If you can perform the work state what authorization, if any is required prior to performing the work. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
General Conditions:
General Conditions:
: 1. The plant is shutdown to perform in-vessel work.
: 1.
: 2. Your on-site exposure is within 10% of the average work group exposure.
The plant is shutdown to perform in-vessel work.
: 2.
Your on-site exposure is within 10% of the average work group exposure.
General  
General  


==References:==
==References:==
10CFR20 9.ALARA.1 Personnel dosimetry and Occupational Radiation Exposure program.


10CFR20 9.ALARA.1 Personnel dosimetry and Occupational Radiation Exposure program.
Nebraska Public Power District SKL034-30-52 (16532)
 
Cooper Nuclear Station Page 12 of 149 Job Performance Measure for Operations Revision 02 Task No.:
Nebraska Public Power District                                         SKL034-30-52 (16532)
Cooper Nuclear Station                                                           Page 12 of 149 Job Performance Measure for Operations                                             Revision 02 Task No.:
Task
Task


==Title:==
==Title:==
Radiation Protection Table Top General Tools and Equipment:
Radiation Protection Table Top General Tools and Equipment:
: 1.     None.
: 1.
None.
Special Conditions, References, Tools, Equipment:
Special Conditions, References, Tools, Equipment:
: 1.     Critical checks denoted by "*".
: 1.
: 2.     Simulator cues denoted by "#".
Critical checks denoted by "*".
: 2.
Simulator cues denoted by "#".
Task Standards:
Task Standards:
: 1.     100% of critical elements successfully completed without error.
: 1.
100% of critical elements successfully completed without error.
Initiating Cue(s):
Initiating Cue(s):
You have unique skills to perform special in vessel work. Performance of the work is expected to result in a whole body dose of 500 mrem and a shallow dose to the skin of fingers of 7.5 Rem. Your Shift Manager directs you to determine based on your dose history, as provided whether you can perform this work.
You have unique skills to perform special in vessel work. Performance of the work is expected to result in a whole body dose of 500 mrem and a shallow dose to the skin of fingers of 7.5 Rem. Your Shift Manager directs you to determine based on your dose history, as provided whether you can perform this work.  


Nebraska Public Power District                                               SKL034-30-52 (16532)
Nebraska Public Power District SKL034-30-52 (16532)
Cooper Nuclear Station                                                             Page 13 of 149 Job Performance Measure for Operations                                               Revision 02 Task No.:
Cooper Nuclear Station Page 13 of 149 Job Performance Measure for Operations Revision 02 Task No.:
Task
Task


==Title:==
==Title:==
Radiation Protection Table Top Performance Checklist                                 Standards                     Initials
Radiation Protection Table Top Performance Checklist Standards Initials
: 1. Refer to 9.ALARA.1             9.ALARA.1 referenced.                             ________
: 1. Refer to 9.ALARA.1 9.ALARA.1 referenced.
: 2. Pertinent personal Dose Dose History is reviewed.                         ________
: 2. Pertinent personal Dose history is reviewed.
history is reviewed.
Dose History is reviewed.
: 3. Pertinent job dose projections for the job are     Dose projections are reviewed.
: 3. Pertinent job dose projections for the job are reviewed.
________
Dose projections are reviewed.
reviewed.
: 4. Compares the job requirements to the amount of dose that can be received.
: 4. Compares the job requirements to the amount Job requirements are reviewed.
Job requirements are reviewed.
of dose that can be                                                              ________
: 5. Informs the SM that he cannot perform this job.
received.
SM informed.
SM informed.
: 5. Informs the SM that he CUE: Acknowledge the report and ask the           ________*
CUE: Acknowledge the report and ask the operator what impediment exists for performance.
cannot perform this job.
: 6. Informs the SM why he/she cannot perform the job.
operator what impediment exists for performance.
SM informed that the reason is that he/she is limited to 1000 mrem/year because his/her lifetime dose is in excess of the lifetime TEDE guideline and extensions to this limit cannot be granted.
SM informed that the reason is that he/she is limited to 1000 mrem/year because his/her lifetime dose is in excess of the lifetime TEDE
CUE: Acknowledge the report and inform the operator that the JPM is complete.  
: 6. Informs the SM why he/she      guideline and extensions to this limit cannot cannot perform the job.        be granted.                                       ________*
CUE: Acknowledge the report and inform the operator that the JPM is complete.


Nebraska Public Power District                                               SKL034-30-52 (16532)
Nebraska Public Power District SKL034-30-52 (16532)
Cooper Nuclear Station                                                               Page 14 of 149 Job Performance Measure for Operations                                                   Revision 02 ATTACHMENT 1 Directions to Trainee:
Cooper Nuclear Station Page 14 of 149 Job Performance Measure for Operations Revision 02 ATTACHMENT 1 Directions to Trainee:
When I tell you to begin, you are to determine whether you can perform in-vessel work for which you are specially qualified. If you find you cannot perform the work state the reason you cannot and if you can perform the work state what authorization, if any is required prior to performing the work. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
When I tell you to begin, you are to determine whether you can perform in-vessel work for which you are specially qualified. If you find you cannot perform the work state the reason you cannot and if you can perform the work state what authorization, if any is required prior to performing the work. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
General Conditions:
General Conditions:
: 1.     The plant is shutdown to perform in-vessel work.
: 1.
: 2.     Your on-site exposure is within 10% of the average work group exposure.
The plant is shutdown to perform in-vessel work.
: 2.
Your on-site exposure is within 10% of the average work group exposure.
Initiating Cues:
Initiating Cues:
You have unique skills to perform special in vessel work. Performance of the work is expected to result in a whole body dose of 500 mrem and a shallow dose to the skin of fingers of 7.5 Rem. Your Shift Manager directs you to determine based on your dose history, as provided whether you can perform this work.
You have unique skills to perform special in vessel work. Performance of the work is expected to result in a whole body dose of 500 mrem and a shallow dose to the skin of fingers of 7.5 Rem. Your Shift Manager directs you to determine based on your dose history, as provided whether you can perform this work.  


Nebraska Public Power District                                     SKL034-30-52 (16532)
Nebraska Public Power District SKL034-30-52 (16532)
Cooper Nuclear Station                                                   Page 15 of 149 Job Performance Measure for Operations                                       Revision 02 Your Pertinent Statistics Your Age: 32 years                         Lifetime TEDE: 35 Rem TEDE so far this year: 0.75 Rem Extremities SDE dose so far this year: 35 Rem NCR Form 116 has previously been signed.
Cooper Nuclear Station Page 15 of 149 Job Performance Measure for Operations Revision 02 Your Pertinent Statistics Your Age: 32 years Lifetime TEDE: 35 Rem TEDE so far this year: 0.75 Rem Extremities SDE dose so far this year: 35 Rem NCR Form 116 has previously been signed.
Pertinent Job Dose Projections for the one individual performing this job Projected Whole Body Dose: 0.5 Rem Extremities SDE dose: 7.5 Rem
Pertinent Job Dose Projections for the one individual performing this job Projected Whole Body Dose: 0.5 Rem Extremities SDE dose: 7.5 Rem  


Nebraska Public Power District                                                 SKL034-50-56 (36401)
Nebraska Public Power District SKL034-50-56 (36401)
Cooper Nuclear Station                                                                 Page 16 of 149 Job Performance Measure for Operations                                                     Revision 00 Task No.: 259019P0401 Determine RPV Water Level Instrumentation Availability During LOCA Conditions Trainee:                                             Examiner:
Cooper Nuclear Station Page 16 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259019P0401 Determine RPV Water Level Instrumentation Availability During LOCA Conditions Trainee:
Pass       Fail         Examiner Signature:                                     Date:
Examiner:
Pass Fail Examiner Signature:
Date:
Additional Program Information:
Additional Program Information:
: 1. Appropriate Performance Locations: Classroom / Simulator
: 1.
: 2. Appropriate Trainee Levels: RO/SRO/STE
Appropriate Performance Locations: Classroom / Simulator
: 3. Evaluation Method: Perform
: 2.
: 4. Performance Time: 10 minutes
Appropriate Trainee Levels: RO/SRO/STE
: 5. NRC K/A: 295028.EA2.03(CFR: 41.10 / 43.5 / 45.13)(3.7/3.9)
: 3.
Evaluation Method: Perform
: 4.
Performance Time: 10 minutes
: 5.
NRC K/A: 295028.EA2.03(CFR: 41.10 / 43.5 / 45.13)(3.7/3.9)
Directions to Examiner:
Directions to Examiner:
: 1. This JPM evaluates the trainee's ability to determine RPV water level instrumentation availability during LOCA conditions.
: 1.
: 2. All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
This JPM evaluates the trainee's ability to determine RPV water level instrumentation availability during LOCA conditions.
: 3. Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.
: 2.
: 4. Brief the trainee and tell the trainee to begin.
All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
: 3.
Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.
: 4.
Brief the trainee and tell the trainee to begin.
Directions to Trainee:
Directions to Trainee:
When I tell you to begin, you are to determine RPV water level instrumentation availability during LOCA conditions. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin, you are to determine RPV water level instrumentation availability during LOCA conditions. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
During task performance, it is recommended that you limit your discussion/demonstration to the minimum required. The examiner may ask questions of you if necessary to understand your actions.
During task performance, it is recommended that you limit your discussion/demonstration to the minimum required. The examiner may ask questions of you if necessary to understand your actions.  


Nebraska Public Power District                                           SKL034-50-56 (36401)
Nebraska Public Power District SKL034-50-56 (36401)
Cooper Nuclear Station                                                         Page 17 of 149 Job Performance Measure for Operations                                           Revision 00 Task No.: 259019P0401 Determine RPV Water Level Instrumentation Availability During LOCA Conditions General Conditions:
Cooper Nuclear Station Page 17 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259019P0401 Determine RPV Water Level Instrumentation Availability During LOCA Conditions General Conditions:
A LOCA has occurred with the following stable plant conditions:
A LOCA has occurred with the following stable plant conditions:
Narrow range RPV water level         + 0" (indicated)
Narrow range RPV water level  
Shutdown Range                       + 0 (indicated)
+ 0" (indicated)
Steam Nozzle Range                   + 0 (indicated)
Shutdown Range  
Wide range RPV water level           - 140" (indicated)
+ 0 (indicated)
Fuel zone RPV water level           - 145 " (indicated)
Steam Nozzle Range  
RPV pressure                         55 psig (6 SRVs open)
+ 0 (indicated)
Drywell pressure                     53.1 psig (drywell spray unavailable)
Wide range RPV water level  
Drywell temp                         330 °F (All PC-TI-505's and 510's)
- 140" (indicated)
Fuel zone RPV water level  
- 145 " (indicated)
RPV pressure 55 psig (6 SRVs open)
Drywell pressure 53.1 psig (drywell spray unavailable)
Drywell temp 330 °F (All PC-TI-505's and 510's)
General  
General  


==References:==
==References:==
: 1. Procedure 5.8
: 1.
: 2. EOP/SAP Graphs General Tools and Equipment:
Procedure 5.8
: 1. EOP/SAP Graphs Special Conditions, References, Tools, Equipment:
: 2.
: 1. Critical checks denoted by "*".
EOP/SAP Graphs General Tools and Equipment:
: 1.
EOP/SAP Graphs Special Conditions, References, Tools, Equipment:
: 1.
Critical checks denoted by "*".  


Nebraska Public Power District                                           SKL034-50-56 (36401)
Nebraska Public Power District SKL034-50-56 (36401)
Cooper Nuclear Station                                                           Page 18 of 149 Job Performance Measure for Operations                                               Revision 00 Task No.: 259019P0401 Determine RPV Water Level Instrumentation Availability During LOCA Conditions Task Standards:
Cooper Nuclear Station Page 18 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259019P0401 Determine RPV Water Level Instrumentation Availability During LOCA Conditions Task Standards:
: 1.     100% of critical elements successfully completed without error.
: 1.
: 2.     100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 2.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
You are to determine RPV water level instrumentation availability during LOCA conditions.
You are to determine RPV water level instrumentation availability during LOCA conditions.
Complete the table below with the status of RPV level instruments return this Attachment to the examiner when you have completed this task.
Complete the table below with the status of RPV level instruments return this Attachment to the examiner when you have completed this task.  


Nebraska Public Power District                                       SKL034-50-56 (36401)
Nebraska Public Power District SKL034-50-56 (36401)
Cooper Nuclear Station                                                       Page 19 of 149 Job Performance Measure for Operations                                         Revision 00 Task No.: 259019P0401 Determine RPV Water Level Instrumentation Availability During LOCA Conditions Performance Checklist       Standards                                         Initials NOTE:         Steps may be performed concurrently or in any order
Cooper Nuclear Station Page 19 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259019P0401 Determine RPV Water Level Instrumentation Availability During LOCA Conditions Performance Checklist Standards Initials NOTE:
: 1. Refer to EOP/SAG The operator refers to EOP/SAG Graphs.           _______
Steps may be performed concurrently or in any order
Graphs.
: 1. Refer to EOP/SAG Graphs.
The operator refers to EOP/SAG Graphs.
: 2. Refer to EOP/SAG Graphs.
The operator refers to EOP/SAG Graphs.
Determines Narrow range RPV water level is Not Available
: 3. Refer to EOP/SAG Graphs.
The operator refers to EOP/SAG Graphs.
Determines Steam Nozzle Range RPV water level is Not Available
: 4. Refer to EOP/SAG Graphs.
The operator refers to EOP/SAG Graphs.
Determines Shutdown Range RPV water level is Not Available
: 5. Refer to EOP/SAG Graphs.
The operator refers to EOP/SAG Graphs.
The operator refers to EOP/SAG Graphs.
: 2. Refer to EOP/SAG        Determines Narrow range RPV water level is Not   _______*
Determines Wide range RPV water level is Not Available
Graphs.                Available The operator refers to EOP/SAG Graphs.
: 6. Refer to EOP/SAG Graphs.
: 3. Refer to EOP/SAG       Determines Steam Nozzle Range RPV water level Graphs.                 is Not Available                                  _______*
The operator refers to EOP/SAG Graphs.
The operator refers to EOP/SAG Graphs.
: 4. Refer to EOP/SAG        Determines Shutdown Range RPV water level is Graphs.                Not Available                                    _______*
Determines Fuel Zone RPV water level is Available for Trending
: 5. Refer to EOP/SAG        The operator refers to EOP/SAG Graphs.
: 7. Turns in completed paperwork.
Determines Wide range RPV water level is Not      _______*
Returns completed Attachment 1 to evaluator.  
Graphs.
Available The operator refers to EOP/SAG Graphs.
: 6. Refer to EOP/SAG        Determines Fuel Zone RPV water level is Available _______*
Graphs.                for Trending
: 7. Turns in completed     Returns completed Attachment 1 to evaluator.      _______
paperwork.


Nebraska Public Power District                                           SKL034-50-56 (36401)
Nebraska Public Power District SKL034-50-56 (36401)
Cooper Nuclear Station                                                           Page 20 of 149 Job Performance Measure for Operations                                               Revision 00 ATTACHMENT 1 Directions to Trainee:
Cooper Nuclear Station Page 20 of 149 Job Performance Measure for Operations Revision 00 ATTACHMENT 1 Directions to Trainee:
You are to determine RPV water level instrumentation availability during LOCA conditions.
You are to determine RPV water level instrumentation availability during LOCA conditions.
Complete the table below with the status of RPV level instruments and return this attachment to the examiner when you have completed this task.
Complete the table below with the status of RPV level instruments and return this attachment to the examiner when you have completed this task.
General Conditions:
General Conditions:
A LOCA has occurred with the following stable plant conditions:
A LOCA has occurred with the following stable plant conditions:
- Narrow range RPV water level               + 0" (indicated)
Narrow range RPV water level  
- Shutdown Range RPV water level             + 0 (indicated)
+ 0" (indicated)
- Steam Nozzle Range RPV water level         + 0 (indicated)
Shutdown Range RPV water level  
- Wide range RPV water level                 - 140" (indicated)
+ 0 (indicated)
- Fuel zone RPV water level                   - 145 " (indicated)
Steam Nozzle Range RPV water level  
- RPV pressure                               55 psig (6 SRVs open)
+ 0 (indicated)
- Drywell pressure                           53.1 psig (drywell spray unavailable)
Wide range RPV water level  
- Drywell temp                               330 °F (All PC-TI-505's and 510's)
- 140" (indicated)
Fuel zone RPV water level  
- 145 " (indicated)
RPV pressure 55 psig (6 SRVs open)
Drywell pressure 53.1 psig (drywell spray unavailable)  
- Drywell temp 330 °F (All PC-TI-505's and 510's)
What is the status of RPV water level instruments?
What is the status of RPV water level instruments?
Level Instrument               AFT = Available for Trending, NA = Not Available Narrow range RPV water level Shutdown Range RPV water level Steam Nozzle Range RPV water level Wide range RPV water level Fuel zone RPV water level
Level Instrument AFT = Available for Trending, NA = Not Available Narrow range RPV water level Shutdown Range RPV water level Steam Nozzle Range RPV water level Wide range RPV water level Fuel zone RPV water level  


Nebraska Public Power District                                                   SKL034-30-26 (6253)
Nebraska Public Power District SKL034-30-26 (6253)
Cooper Nuclear Station                                                               Page 21 of 149 Job Performance Measure for Operations                                                     Revision 07 Task No. 344050O0503 Security Emergency Trainee:                                           Examiner:
Cooper Nuclear Station Page 21 of 149 Job Performance Measure for Operations Revision 07 Task No. 344050O0503 Security Emergency Trainee:
Pass       Fail       Examiner Signature:                                     Date:
Examiner:
Pass Fail Examiner Signature:
Date:
Time Started: ____________ Time Finished: _____________
Time Started: ____________ Time Finished: _____________
Additional Program Information:
Additional Program Information:
: 1. Appropriate Performance Locations: SIM / CR
: 1.
: 2. Appropriate Trainee Level: SRO / STE
Appropriate Performance Locations: SIM / CR
: 3. Evaluation Method: Perform
: 2.
: 4. Performance Time: 25 minutes
Appropriate Trainee Level: SRO / STE
: 5. NRC K/A 2.4.28 (2.3/3.3)
: 3.
Evaluation Method: Perform
: 4.
Performance Time: 25 minutes
: 5.
NRC K/A 2.4.28 (2.3/3.3)
Directions to Examiner:
Directions to Examiner:
: 1. This JPM evaluates the trainee's ability to perform the required actions for a Security Emergency.
: 1.
: 2. All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
This JPM evaluates the trainee's ability to perform the required actions for a Security Emergency.
: 3. Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.
: 2.
: 4. Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.
All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
: 3.
Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.
: 4.
Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.
Directions to Trainee:
Directions to Trainee:
When I tell you to begin, you are to respond to a Security Emergency as appropriate to the provided conditions. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin, you are to respond to a Security Emergency as appropriate to the provided conditions. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task. ALL PLANT ANNOUNCEMENTS WILL BE SIMULATED!
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task. ALL PLANT ANNOUNCEMENTS WILL BE SIMULATED!  


Nebraska Public Power District                                               SKL034-30-26 (6253)
Nebraska Public Power District SKL034-30-26 (6253)
Cooper Nuclear Station                                                               Page 22 of 149 Job Performance Measure for Operations                                                   Revision 07 Task No. 344050O0503 Security Emergency General Conditions:
Cooper Nuclear Station Page 22 of 149 Job Performance Measure for Operations Revision 07 Task No. 344050O0503 Security Emergency General Conditions:
: 1.     The plant is operating at 30% power.
: 1.
: 2.     The Shift Manager has delegated you to direct the plant response.
The plant is operating at 30% power.
: 3.     The board operators are available ONLY to support control room actions.
: 2.
: 4.     You must personally perform any communications required for this situation.
The Shift Manager has delegated you to direct the plant response.
: 5.     The Shift Manager will perform all Emergency Director required actions.
: 3.
The board operators are available ONLY to support control room actions.
: 4.
You must personally perform any communications required for this situation.
: 5.
The Shift Manager will perform all Emergency Director required actions.
General  
General  


==References:==
==References:==
: 1.     Emergency Procedure 5.5SECURITY General Tools and Equipment:
: 1.
: 1.     Site communication System.
Emergency Procedure 5.5SECURITY General Tools and Equipment:
: 2.     Emergency Telephone number book.
: 1.
Site communication System.
: 2.
Emergency Telephone number book.
Special Conditions, References, Tools, Equipment:
Special Conditions, References, Tools, Equipment:
: 1.     Critical checks denoted by "*".
: 1.
Critical checks denoted by "*".
Task Standards:
Task Standards:
: 1.     100% of critical elements successfully completed without error.
: 1.
: 2.     100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 2.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
At 9:35 p.m. you are informed by the Operations Manager that armed intruders have been seen in the protected area. The intruders last known location was the 903 corridor outside the door to the reactor building. The intruders are carrying automatic rifles, pistols and grenades.
At 9:35 p.m. you are informed by the Operations Manager that armed intruders have been seen in the protected area. The intruders last known location was the 903 corridor outside the door to the reactor building. The intruders are carrying automatic rifles, pistols and grenades.
You are to perform the required control room actions for this situation until directed to stop by the evaluator.
You are to perform the required control room actions for this situation until directed to stop by the evaluator.  


Nebraska Public Power District                                           SKL034-30-26 (6253)
Nebraska Public Power District SKL034-30-26 (6253)
Cooper Nuclear Station                                                           Page 23 of 149 Job Performance Measure for Operations                                             Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist       Standards                                               Initials
Cooper Nuclear Station Page 23 of 149 Job Performance Measure for Operations Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist Standards Initials
: 1. Obtain Procedure         Current revision of 5.5SECURITY obtained.
: 1. Obtain Procedure 5.5SECURITY.
5.5SECURITY.            (Note: May be given if the operator goes to           ________
Current revision of 5.5SECURITY obtained.
procedure rack or lock box in simulator.)
(Note: May be given if the operator goes to procedure rack or lock box in simulator.)
: 2. Contact the Security     Security Shift Supervisor contacted and asked to Shift Supervisor to      confirm the threat.
: 2. Contact the Security Shift Supervisor to confirm threat.
confirm threat.
Security Shift Supervisor contacted and asked to confirm the threat.  
                            #CUE:   As the Security Shift Supervisor, indicate that the intruders posses explosive devices and automatic weapons. An actual Security Threat exists with high potential for significant               ________
#CUE: As the Security Shift Supervisor, indicate that the intruders posses explosive devices and automatic weapons. An actual Security Threat exists with high potential for significant structural damage and personnel injury. Security is in a Code Red  
structural damage and personnel injury. Security is in a Code Red
#CUE: Security has just made the following plant announcement, All Station Personnel, Imminent Security Threat exists, seek shelter inside the nearest building. Code Red.
                            #CUE:   Security has just made the following plant announcement, All Station Personnel, Imminent Security Threat exists, seek shelter inside the nearest building. Code Red.
: 3. Determines that an Actual Threat exists and enters 5.5Security.
: 3. Determines that an       Enters Attachment 2 Actual Threat exists and enters 5.5Security   # CUE: If asked, a credible insider threat           ________*
Enters Attachment 2
Attachment 2.                      DOES NOT exist.
# CUE: If asked, a credible insider threat DOES NOT exist.  
                            #CUE: The SM directs you to DIRECT actions per Attachment 2 and he/she will complete remaining actions in Section 4.
#CUE: The SM directs you to DIRECT actions per Attachment 2 and he/she will complete remaining actions in Section 4.  


Nebraska Public Power District                                         SKL034-30-26 (6253)
Nebraska Public Power District SKL034-30-26 (6253)
Cooper Nuclear Station                                                       Page 24 of 149 Job Performance Measure for Operations                                           Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist       Standards                                           Initials
Cooper Nuclear Station Page 24 of 149 Job Performance Measure for Operations Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist Standards Initials
: 4. Directs the reactor be   RO directed to scram the reactor.
: 4. Directs the reactor be scrammed.
scrammed.
RO directed to scram the reactor.  
                            # CUE: As the RO, acknowledge the order           ________*
# CUE: As the RO, acknowledge the order and report that the reactor is scrammed. All control rods are fully inserted. RPV water level and pressure are stable. No EOP entry conditions were met during the scram.
and report that the reactor is scrammed. All control rods are fully inserted. RPV water level and pressure are stable. No EOP entry conditions were met during the scram.
: 5. Directs level be maintained high is level band using RCIC BOP/RO/WCO directed to maintain level high in the band using RCIC per 2.2.67.1.  
: 5. Directs level be         BOP/RO/WCO directed to maintain level high in maintained high is level the band using RCIC per 2.2.67.1.
# CUE:
band using RCIC                                                            ________*
As the BOP/WCO/RO, acknowledge the order and report that RCIC is running and level is being controlled  
                            # CUE:     As the BOP/WCO/RO, acknowledge the order and report that RCIC is running and level is being controlled
+20to +45 using RCIC.
                                        +20to +45 using RCIC.
: 6. Directs Reactor Cooldown.
: 6. Directs Reactor         RO/BOP/WCO directed to cooldown reactor not to Cooldown.                exceed 90 degrees per hour.
RO/BOP/WCO directed to cooldown reactor not to exceed 90 degrees per hour.  
                            # CUE:     As the BOP/WCO/RO, acknowledge         ________*
# CUE:
the order and report that Reactor pressure is being lowered to 500 psig using Turbine Bypass Valves (or as directed in order by SRO).
As the BOP/WCO/RO, acknowledge the order and report that Reactor pressure is being lowered to 500 psig using Turbine Bypass Valves (or as directed in order by SRO).
: 7. Directs maximizing       RO/BOP/WCO directed to maximize CRD CRD for injection.      injection per 5.8.4.
: 7. Directs maximizing CRD for injection.
                            # CUE:     As the BOP/WCO/RO, acknowledge         ________
RO/BOP/WCO directed to maximize CRD injection per 5.8.4.  
the order and report that you will review procedure and perform when RB Station Operator is available.
# CUE:
As the BOP/WCO/RO, acknowledge the order and report that you will review procedure and perform when RB Station Operator is available.  


Nebraska Public Power District                                           SKL034-30-26 (6253)
Nebraska Public Power District SKL034-30-26 (6253)
Cooper Nuclear Station                                                         Page 25 of 149 Job Performance Measure for Operations                                             Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist         Standards                                           Initials
Cooper Nuclear Station Page 25 of 149 Job Performance Measure for Operations Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist Standards Initials
: 8. Directs the BOP to        BOP/WCO directed to ensure that BF-C-1A, ensure that BF-C-1A,       EMERGE BSTR FAN is running.
: 8. Directs the BOP to ensure that BF-C-1A, EMERGE BSTR FAN is running.
EMERGE BSTR FAN is running.                  # CUE:   As the BOP/WCO, acknowledge the         ________*
BOP/WCO directed to ensure that BF-C-1A, EMERGE BSTR FAN is running.  
order and report that BF-C-1A, EMERG BSTR FAN is running.
# CUE:
: 9. Directs rapid isolation of RO/BOP/WCO directed to remove RWCU from RWCU.                      service.
As the BOP/WCO, acknowledge the order and report that BF-C-1A, EMERG BSTR FAN is running.
                              # CUE:   As the BOP/WCO/RO, acknowledge the order and report that RWCU has       ________*
: 9. Directs rapid isolation of RWCU.
been removed from service and isolated. You are following up per 2.2.66.
RO/BOP/WCO directed to remove RWCU from service.  
: 10. Directs the BOP to       BOP/WCO directed to start and run unloaded start and run unloaded    both DGs.
# CUE:
both DGs.
As the BOP/WCO/RO, acknowledge the order and report that RWCU has been removed from service and isolated. You are following up per 2.2.66.
                              # CUE:   As the BOP/WCO acknowledge the order. (If prestart checks are waived,   ________*
: 10. Directs the BOP to start and run unloaded both DGs.
report that both DGs are running unloaded.)
BOP/WCO directed to start and run unloaded both DGs.  
NOTE:     Controls for the fire pumps do not exist in the simulator.
# CUE:
As the BOP/WCO acknowledge the order. (If prestart checks are waived, report that both DGs are running unloaded.)
NOTE:
Controls for the fire pumps do not exist in the simulator.  


Nebraska Public Power District                                             SKL034-30-26 (6253)
Nebraska Public Power District SKL034-30-26 (6253)
Cooper Nuclear Station                                                         Page 26 of 149 Job Performance Measure for Operations                                             Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist         Standards                                           Initials
Cooper Nuclear Station Page 26 of 149 Job Performance Measure for Operations Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist Standards Initials
: 11. Directs or Starts Electric Directs the BOP/WCO to start the 1E or 1D Fire Fire pump 1E or 1D.        Pump or places the 1E or 1D fire pump control switch to start.
: 11. Directs or Starts Electric Fire pump 1E or 1D.
                                # CUE:   If BOP/WCO directed, then acknowledge the order as the BOP and report that the diesel or motor   ________
Directs the BOP/WCO to start the 1E or 1D Fire Pump or places the 1E or 1D fire pump control switch to start.  
* driven Fire Pump is running. (If the CRS starts the pump the RED light is ON and the GREEN light is OFF for the pump started.)
# CUE:
If BOP/WCO directed, then acknowledge the order as the BOP and report that the diesel or motor driven Fire Pump is running. (If the CRS starts the pump the RED light is ON and the GREEN light is OFF for the pump started.)  


Nebraska Public Power District                                             SKL034-30-26 (6253)
Nebraska Public Power District SKL034-30-26 (6253)
Cooper Nuclear Station                                                           Page 27 of 149 Job Performance Measure for Operations                                             Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist       Standards                                             Initials
Cooper Nuclear Station Page 27 of 149 Job Performance Measure for Operations Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist Standards Initials
: 12. Directs Station          Station Operators directed to obtain fire fighting Operators/UT Fire        gear and to report to the Control Room.
: 12. Directs Station Operators/UT Fire Brigade to obtain fire fighting gear and report to the Control Room.
Brigade to obtain fire fighting gear and report # CUE:   Indicate that the Radwaste Station to the Control Room.              Operator and UT Fire Brigade personnel have reported to the Control Room.
Station Operators directed to obtain fire fighting gear and to report to the Control Room.
                              #CUE:     The Turbine Building operator contacts the Control Room and reports that he is unable to get to the Control Room at this time. He is just outside the #1 DG room and the 903 area just outside the doors to the control building is blocked by the         ________
# CUE:
* armed intruders. The intruders are currently unaware of his presence.
Indicate that the Radwaste Station Operator and UT Fire Brigade personnel have reported to the Control Room.  
The Station Operator requests direction from you.
#CUE:
                              #CUE:     The Reactor Building operator contacts the Control Room and reports that he is unable to get out of the Reactor Building at this time. He is in the SE Quad (859 elevation).
The Turbine Building operator contacts the Control Room and reports that he is unable to get to the Control Room at this time. He is just outside the #1 DG room and the 903 area just outside the doors to the control building is blocked by the armed intruders. The intruders are currently unaware of his presence.
The Station Operator requests direction from you.  
#CUE:
The Reactor Building operator contacts the Control Room and reports that he is unable to get out of the Reactor Building at this time. He is in the SE Quad (859 elevation).
The intruders are currently unaware of his presence. The Station Operator requests direction from you.
The intruders are currently unaware of his presence. The Station Operator requests direction from you.
: 13. Directs the Duty        The Duty Chem/RP Tech is called to the control Chem/RP Tech to          room.
: 13. Directs the Duty Chem/RP Tech to report to the control room.
report to the control room.                   # CUE:   The Duty Chem/RP Tech reports to           ________*
The Duty Chem/RP Tech is called to the control room.  
the control room.
# CUE:
The Duty Chem/RP Tech reports to the control room.  


Nebraska Public Power District                                           SKL034-30-26 (6253)
Nebraska Public Power District SKL034-30-26 (6253)
Cooper Nuclear Station                                                           Page 28 of 149 Job Performance Measure for Operations                                             Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist       Standards                                             Initials
Cooper Nuclear Station Page 28 of 149 Job Performance Measure for Operations Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist Standards Initials
: 14. Directs the TB Station  TB Station Operator directed to enter the DG Operator to card into    room and RB Station Operator told to stay in Vital the DG room and RB       Area.
: 14. Directs the TB Station Operator to card into the DG room and RB Station Operator told to stay in Vital Area.
Station Operator told to                                                     ________*
TB Station Operator directed to enter the DG room and RB Station Operator told to stay in Vital Area.  
stay in Vital Area.     # CUE:   TB operator acknowledges the order and reports that he has entered the DG room and RB Station Operator is remaining in current location (or as directed).
# CUE:
TB operator acknowledges the order and reports that he has entered the DG room and RB Station Operator is remaining in current location (or as directed).
PROVIDE THE FOLLOWING CUE:
PROVIDE THE FOLLOWING CUE:
Annunciators 9-3-3/G-5 ASD Room Door Open and 9-3-3/F-5 ASD Switch Position Abnormal have just alarmed.
Annunciators 9-3-3/G-5 ASD Room Door Open and 9-3-3/F-5 ASD Switch Position Abnormal have just alarmed.
: 15. Responds to ASD         Directs RB Station Operator to open EE-DSC-Abnormal indications    125ASD or EE-DSC-125B.
: 15. Responds to ASD Abnormal indications Directs RB Station Operator to open EE-DSC-125ASD or EE-DSC-125B.  
                              # CUE:   If asked as RB Station Operator, report that you can get to EE-DSC-125ASD.
# CUE:
                              # CUE:   If asked if anyone has been dispatched to CB-903, report that no operator is currently in that area.
If asked as RB Station Operator, report that you can get to EE-DSC-125ASD.  
                              # CUE:   If the SRO directs and operator to         ________*
# CUE:
CB-903 to open EE-DSC-125B, report that you have opened EE-DSC-125B
If asked if anyone has been dispatched to CB-903, report that no operator is currently in that area.  
                              # CUE:   As RB Station Operator dispatched to open disconnect, report that EE-DSC-125ASD is open.
# CUE:
                              # CUE:   The JPM is complete.
If the SRO directs and operator to CB-903 to open EE-DSC-125B, report that you have opened EE-DSC-125B  
# CUE:
As RB Station Operator dispatched to open disconnect, report that EE-DSC-125ASD is open.  
# CUE:
The JPM is complete.  


Nebraska Public Power District                                               SKL034-30-26 (6253)
Nebraska Public Power District SKL034-30-26 (6253)
Cooper Nuclear Station                                                               Page 29 of 149 Job Performance Measure for Operations                                                   Revision 07 ATTACHMENT 1 Directions to Trainee:
Cooper Nuclear Station Page 29 of 149 Job Performance Measure for Operations Revision 07 ATTACHMENT 1 Directions to Trainee:
When I tell you to begin, you are to respond to a Security Emergency as appropriate to the provided conditions. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin, you are to respond to a Security Emergency as appropriate to the provided conditions. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task. ALL PLANT ANNOUNCEMENTS WILL BE SIMULATED!
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task. ALL PLANT ANNOUNCEMENTS WILL BE SIMULATED!
Line 464: Line 612:
Initiating Cue(s):
Initiating Cue(s):
At 9:35 p.m. you are informed by the Security Shift Supervisor that armed intruders have been seen in the protected area. The intruders last known location was the 903 corridor outside the door to the reactor building. The intruders are carrying automatic rifles, pistols and grenades.
At 9:35 p.m. you are informed by the Security Shift Supervisor that armed intruders have been seen in the protected area. The intruders last known location was the 903 corridor outside the door to the reactor building. The intruders are carrying automatic rifles, pistols and grenades.
You are to perform the required control room actions for this situation until directed to stop by the evaluator.
You are to perform the required control room actions for this situation until directed to stop by the evaluator.  


Nebraska Public Power District                                               SKL034-20-114 (29981)
Nebraska Public Power District SKL034-20-114 (29981)
Cooper Nuclear Station                                                               Page 30 of 149 Job Performance Measure for Operations                                                     Revision 01 Task No. 341033W0303 Determine Shift Staffing Requirements for Mode Change Trainee:                                           Examiner:
Cooper Nuclear Station Page 30 of 149 Job Performance Measure for Operations Revision 01 Task No. 341033W0303 Determine Shift Staffing Requirements for Mode Change Trainee:
Pass       Fail       Examiner Signature:                                     Date:
Examiner:
Pass Fail Examiner Signature:
Date:
Time Started: ____________ Time Finished: _____________
Time Started: ____________ Time Finished: _____________
Additional Program Information:
Additional Program Information:
: 6. Appropriate Performance Locations: SIM / CR
: 6.
: 7. Appropriate Trainee Level: SRO
Appropriate Performance Locations: SIM / CR
: 8. Evaluation Method: Perform
: 7.
: 9. Performance Time: N/A
Appropriate Trainee Level: SRO
: 10. NRC K/A 2.1.4 (3.4)
: 8.
Evaluation Method: Perform
: 9.
Performance Time: N/A
: 10.
NRC K/A 2.1.4 (3.4)
Directions to Examiner:
Directions to Examiner:
: 1. This JPM evaluates the trainee's ability to determine shift staffing requirements for a mode change.
: 1.
: 2. All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
This JPM evaluates the trainee's ability to determine shift staffing requirements for a mode change.
: 3. Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.
: 2.
: 4. Brief the trainee and tell the trainee to begin.
All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
: 3.
Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.
: 4.
Brief the trainee and tell the trainee to begin.
Directions to Trainee:
Directions to Trainee:
When I tell you to begin, you are to evaluate the staff available and determine if a change in Modes can occur without incurring an LCO condition. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin, you are to evaluate the staff available and determine if a change in Modes can occur without incurring an LCO condition. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.  


Nebraska Public Power District                                           SKL034-20-114 (29981)
Nebraska Public Power District SKL034-20-114 (29981)
Cooper Nuclear Station                                                             Page 31 of 149 Job Performance Measure for Operations                                                 Revision 01 Task No. 341033W0303 Determine Shift Staffing Requirements for Mode Change General Conditions:
Cooper Nuclear Station Page 31 of 149 Job Performance Measure for Operations Revision 01 Task No. 341033W0303 Determine Shift Staffing Requirements for Mode Change General Conditions:
: 1.     The plant conditions are as follows:
: 1.
* Reactor Pressure is 0 psig
The plant conditions are as follows:
* Coolant temperature is 200ºF
Reactor Pressure is 0 psig Coolant temperature is 200ºF Mode Switch is in Shutdown
* Mode Switch is in Shutdown
: 2.
: 2.     Your Shift complement is comprised of:
Your Shift complement is comprised of:
* One SRO (you)
One SRO (you)
* Two ROs
Two ROs Three Non-Licensed Nuclear Plant Operators One RP/Chem Tech General  
* Three Non-Licensed Nuclear Plant Operators
* One RP/Chem Tech General  


==References:==
==References:==
: 1.     Conduct of Operations Procedure 2.0.3 General Tools and Equipment:
: 1.
: 1.     None Special Conditions, References, Tools, Equipment:
Conduct of Operations Procedure 2.0.3 General Tools and Equipment:
: 1.     Critical checks denoted by "*".
: 1.
None Special Conditions, References, Tools, Equipment:
: 1.
Critical checks denoted by "*".
Task Standards:
Task Standards:
: 3.     100% of critical elements successfully completed without error.
: 3.
: 4.     100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 4.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
During your shift Reactor Coolant temperature is expected to rise to 215ºF as a result of Shutdown Cooling being removed from service. As the Senior Licensed person on your shift, you are to determine two things; 1. Do you have sufficient staff now and 2. will you have sufficient staff to allow you to raise Coolant Temperature to 215ºF during your shift. If not determine how many additional staff types are needed and document your findings on .
During your shift Reactor Coolant temperature is expected to rise to 215ºF as a result of Shutdown Cooling being removed from service. As the Senior Licensed person on your shift, you are to determine two things; 1. Do you have sufficient staff now and 2. will you have sufficient staff to allow you to raise Coolant Temperature to 215ºF during your shift. If not determine how many additional staff types are needed and document your findings on.  


Nebraska Public Power District                                     SKL034-20-114 (29981)
Nebraska Public Power District SKL034-20-114 (29981)
Cooper Nuclear Station                                                   Page 32 of 149 Job Performance Measure for Operations                                       Revision 01 Task No. 341033W0303 Determine Shift Staffing Requirements for Mode Change
Cooper Nuclear Station Page 32 of 149 Job Performance Measure for Operations Revision 01 Task No. 341033W0303 Determine Shift Staffing Requirements for Mode Change  


Nebraska Public Power District                                           SKL034-20-114 (29981)
Nebraska Public Power District SKL034-20-114 (29981)
Cooper Nuclear Station                                                           Page 33 of 149 Job Performance Measure for Operations                                             Revision 01 Task No. 341033W0303 Determine Shift Staffing Requirements for Mode Change Performance Checklist         Standards                                             Initials
Cooper Nuclear Station Page 33 of 149 Job Performance Measure for Operations Revision 01 Task No. 341033W0303 Determine Shift Staffing Requirements for Mode Change Performance Checklist Standards Initials
: 16.       Obtain                                                                 ________
: 16.
Procedure 2.0.3.           Current revision of 2.0.3 obtained.
Obtain Procedure 2.0.3.
: 17.       Determine section of Procedure       The SRO turns to Section 10, Control Room and       ________
Current revision of 2.0.3 obtained.
2.0.3.                    Shift Staffing Requirements.
: 17.
: 18.       Determines the     The SRO may use Tech Specs to confirm that the     ________
Determine section of Procedure 2.0.3.
current mode.              Unit is in MODE 4.
The SRO turns to Section 10, Control Room and Shift Staffing Requirements.
: 19. Determines the mode to be entered when         The SRO may use Tech Specs to confirm that the
: 18.
________*
Determines the current mode.
temperature rises to      Unit will be entering Mode 3 within the shift.
The SRO may use Tech Specs to confirm that the Unit is in MODE 4.
215ºF Your Shift complement is comprised of:
: 19. Determines the mode to be entered when temperature rises to 215ºF The SRO may use Tech Specs to confirm that the Unit will be entering Mode 3 within the shift.
: 20. Determines that the
: 20. Determines that the current shift staff is adequate until the mode change.
* One SRO (you) current shift staff is
Your Shift complement is comprised of:
* Two ROs                                           ________*
One SRO (you)
adequate until the
Two ROs Three Non-Licensed Nuclear Plant Operators One RP/Chem Tech
* Three Non-Licensed Nuclear Plant Operators mode change.
: 21. Determines which staff types are required.
* One RP/Chem Tech For Mode 3 the SRO determines that the following staff types are needed:
For Mode 3 the SRO determines that the following staff types are needed:
* Two SRO (so there is a SM and a CRS)
* Two SRO (so there is a SM and a CRS)
: 21. Determines which
* Three RO (RO, BOP, WCO)
* Three RO (RO, BOP, WCO) staff types are required.                                                      ________*
* Three Non-Licensed Nuclear Plant Operators
* Three Non-Licensed Nuclear Plant Operators
* One STE
* One STE
* One RP/Chem Tech The SRO writes the additional needed staff on Attachment 1.
* One RP/Chem Tech
: 22. Writes the needed
: 22. Writes the needed Staff on Attachment 1.
The SRO writes the additional needed staff on.
* One SRO (so there is a SM and a CRS)
* One SRO (so there is a SM and a CRS)
Staff on Attachment 1.                                                        ________*
* One RO (RO, BOP, WCO)
* One RO (RO, BOP, WCO)
* One STE
* One STE  


Nebraska Public Power District                                     SKL034-20-114 (29981)
Nebraska Public Power District SKL034-20-114 (29981)
Cooper Nuclear Station                                                     Page 34 of 149 Job Performance Measure for Operations                                       Revision 01 Task No. 341033W0303 Determine Shift Staffing Requirements for Mode Change Performance Checklist       Standards                                         Initials
Cooper Nuclear Station Page 34 of 149 Job Performance Measure for Operations Revision 01 Task No. 341033W0303 Determine Shift Staffing Requirements for Mode Change Performance Checklist Standards Initials
: 23. Turns in completed Returns completed Attachment 1 to evaluator. _______
: 23. Turns in completed paperwork.
paperwork.
Returns completed Attachment 1 to evaluator.  


Nebraska Public Power District                                             SKL034-20-114 (29981)
Nebraska Public Power District SKL034-20-114 (29981)
Cooper Nuclear Station                                                             Page 35 of 149 Job Performance Measure for Operations                                                 Revision 01 ATTACHMENT 1 Directions to Trainee:
Cooper Nuclear Station Page 35 of 149 Job Performance Measure for Operations Revision 01 ATTACHMENT 1 Directions to Trainee:
When I tell you to begin, you are to evaluate the staff available and determine if a change in Modes can occur without incurring an LCO condition. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin, you are to evaluate the staff available and determine if a change in Modes can occur without incurring an LCO condition. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
General Conditions:
General Conditions:
: 1.     The plant conditions are as follows:
: 1.
* Reactor Pressure is 0 psig
The plant conditions are as follows:
* Coolant temperature is 200ºF
Reactor Pressure is 0 psig Coolant temperature is 200ºF Mode Switch is in Shutdown
* Mode Switch is in Shutdown
: 2.
: 2.     Your Shift complement is comprised of:
Your Shift complement is comprised of:
* One SRO (you)
One SRO (you)
* Two ROs
Two ROs Three Non-Licensed Nuclear Plant Operators One RP/Chem Tech Initiating Cue(s):
* Three Non-Licensed Nuclear Plant Operators
During your shift Reactor Coolant temperature is expected to rise to 215ºF as a result of Shutdown Cooling being removed from service. As the Senior Licensed person on your shift, you are to determine two things; 1. Do you have sufficient staff now and 2. Will you have sufficient staff to allow you to raise Coolant Temperature to 215ºF during your shift? If not determine how many additional staff types are needed and document your findings on.
* One RP/Chem Tech Initiating Cue(s):
Current Staff: Adequate in current mode Inadequate in current mode (Check one)
During your shift Reactor Coolant temperature is expected to rise to 215ºF as a result of Shutdown Cooling being removed from service. As the Senior Licensed person on your shift, you are to determine two things; 1. Do you have sufficient staff now and 2. Will you have sufficient staff to allow you to raise Coolant Temperature to 215ºF during your shift? If not determine how many additional staff types are needed and document your findings on .
Current Staff:           Adequate in current mode         Inadequate in current mode (Check one)
Additional needed staff:
Additional needed staff:
_________________________________________________________________
Staff required at 215ºF: Current staff adequate Additional staff needed.
____
(Check one)  
Staff required at 215ºF:               Current staff adequate             Additional staff needed.
(Check one)


Nebraska Public Power District                             SKL034-20-114 (29981)
Nebraska Public Power District SKL034-20-114 (29981)
Cooper Nuclear Station                                             Page 36 of 149 Job Performance Measure for Operations                               Revision 01 Additional needed staff:
Cooper Nuclear Station Page 36 of 149 Job Performance Measure for Operations Revision 01 Additional needed staff:  
_________________________________________________________________
____


Nebraska Public Power District                                               SKL034-20-113 (29979)
Nebraska Public Power District SKL034-20-113 (29979)
Cooper Nuclear Station                                                                 Page 37 of 149 Job Performance Measure for Operations                                                     Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)
Cooper Nuclear Station Page 37 of 149 Job Performance Measure for Operations Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)
Trainee:                                             Examiner:
Trainee:
Pass       Fail       Examiner Signature:                                       Date:
Examiner:
Pass Fail Examiner Signature:
Date:
Additional Program Information:
Additional Program Information:
: 1. Appropriate Performance Locations: Simulator Only
: 1.
: 2. Appropriate Trainee Level: RO / SRO
Appropriate Performance Locations: Simulator Only
: 3. Evaluation Method:           Perform in Simulator Only.
: 2.
: 4. Performance Time: 18 minutes
Appropriate Trainee Level: RO / SRO
: 5. NRC K/A 202001 K1.06 3.6/3.6 Directions to Examiner:
: 3.
: 1. This JPM evaluates the trainee's ability to perform the daily Jet Pump and Recirc Pump Flow Check of the Daily Tech Specs Surveillance Log.
Evaluation Method: Perform in Simulator Only.
: 2. Provide the Reactor Recirc and Jet Pump values to the candidate; do not allow them to take the readings form the simulator.
: 4.
: 3. All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
Performance Time: 18 minutes
: 4. Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.
: 5.
: 5. Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.
NRC K/A 202001 K1.06 3.6/3.6 Directions to Examiner:
: 1.
This JPM evaluates the trainee's ability to perform the daily Jet Pump and Recirc Pump Flow Check of the Daily Tech Specs Surveillance Log.
: 2.
Provide the Reactor Recirc and Jet Pump values to the candidate; do not allow them to take the readings form the simulator.
: 3.
All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
: 4.
Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.
: 5.
Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.
Directions to Trainee:
Directions to Trainee:
When I tell you to begin, you are to perform the activities associated with daily Jet Pump AND Recirc Pump Flow Check. Before you start, I will state the general plant conditions, the initiating cues and answer any questions you may have.
When I tell you to begin, you are to perform the activities associated with daily Jet Pump AND Recirc Pump Flow Check. Before you start, I will state the general plant conditions, the initiating cues and answer any questions you may have.
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.
General Conditions:
General Conditions:
: 1. The plant is operating at rated power with DEH in Mode 4.
: 1.
: 2. Both Reactor Recirculation pumps are operating with pump flows balanced.
The plant is operating at rated power with DEH in Mode 4.
: 3. Data is provided for the readings to be taken.
: 2.
Both Reactor Recirculation pumps are operating with pump flows balanced.
: 3.
Data is provided for the readings to be taken.  


Nebraska Public Power District                                           SKL034-20-113 (29979)
Nebraska Public Power District SKL034-20-113 (29979)
Cooper Nuclear Station                                                           Page 38 of 149 Job Performance Measure for Operations                                               Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)
Cooper Nuclear Station Page 38 of 149 Job Performance Measure for Operations Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)
General  
General  


==References:==
==References:==
: 1.     Procedure 6.LOG.601 General Tools and Equipment:
: 1.
: 1.     Calculator.
Procedure 6.LOG.601 General Tools and Equipment:
: 2.     Jet pump operability curves.
: 1.
Calculator.
: 2.
Jet pump operability curves.
Special Conditions, References, Tools, Equipment:
Special Conditions, References, Tools, Equipment:
: 1.     Simulator Setup: See Attachment 1.
: 1.
: 2.     Critical checks denoted by "*".
Simulator Setup: See Attachment 1.
: 3.     Simulator cues denoted by "#".
: 2.
Critical checks denoted by "*".
: 3.
Simulator cues denoted by "#".
Task Standards:
Task Standards:
: 1.     100% of critical elements successfully completed without error.
: 1.
: 2.     100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 2.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
RO.
RO.
Line 616: Line 794:
: 12) and Recirc Pump Flow Check (6.LOG.601 Attachment 13) as part of the routine shift activities to ensure that it has been performed correctly. Notify the SM when the task is complete.
: 12) and Recirc Pump Flow Check (6.LOG.601 Attachment 13) as part of the routine shift activities to ensure that it has been performed correctly. Notify the SM when the task is complete.


Nebraska Public Power District                                     SKL034-20-113 (29979)
Nebraska Public Power District SKL034-20-113 (29979)
Cooper Nuclear Station                                                       Page 39 of 149 Job Performance Measure for Operations                                         Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)
Cooper Nuclear Station Page 39 of 149 Job Performance Measure for Operations Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)
Performance Checklist       Standards                                         Initials NOTE: 1. This is the RO Section.
Performance Checklist Standards Initials NOTE: 1. This is the RO Section.
: 2. Steps 1 - 5 may be in any order.
: 2. Steps 1 - 5 may be in any order.
Record Core flow from Recorder NBI-FRDPR-95
: 1. Record indicated core flow (106 lb/hr)
: 1. Record indicated core  (Green Pen) (+/- 2).
Record Core flow from Recorder NBI-FRDPR-95 (Green Pen) (+/- 2).
flow (106 lb/hr)                                                          _______*
CUE:
CUE:   Core Flow = 62 Record RR pump flow, from RR-FR-163 for Pumps
Core Flow = 62
: 2. Record RR pump flow    A & B (+/- 2).
: 2. Record RR pump flow (103 gpm)
(103 gpm)                                                                  _______*
Record RR pump flow, from RR-FR-163 for Pumps A & B (+/- 2).
CUE:   Pump A = 38.5; Pump B = 38.5 Record RRMG Set speed from the following (+/- 2):
CUE:
: 3. Record RRMG Set              a. RRFC-SI-1A for RRMG A speed                        b. RRFC-SI-1B for RRMG B                     _______*
Pump A = 38.5; Pump B = 38.5
CUE:   RRMG A = 79; RRMG B = 80.
: 3. Record RRMG Set speed Record RRMG Set speed from the following (+/- 2):
: a. RRFC-SI-1A for RRMG A
: b. RRFC-SI-1B for RRMG B CUE:
RRMG A = 79; RRMG B = 80.  


Nebraska Public Power District                                         SKL034-20-113 (29979)
Nebraska Public Power District SKL034-20-113 (29979)
Cooper Nuclear Station                                                         Page 40 of 149 Job Performance Measure for Operations                                           Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)
Cooper Nuclear Station Page 40 of 149 Job Performance Measure for Operations Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)
Performance Checklist       Standards                                           Initials Record Jet Pump Flow from the following (+/- 2):
Performance Checklist Standards Initials
: 4. Record Jet Pump Flow Record Jet Pump Flow from the following (+/- 2):
: a. NBI-FI-92A for LOOP A
: a. NBI-FI-92A for LOOP A
: b. NBI-FI-92B for LOOP B
: b. NBI-FI-92B for LOOP B CUE:
: 4. Record Jet Pump Flow                    CUE:   LOOP A = 31; LOOP B = 31                     _______*
LOOP A = 31; LOOP B = 31
Record differential pressures from individual jet pump instruments NBI-FI-78A through NBI-FI-78Z on Panel 9-38 in control room (+/- 2).
: 5. Record Jet Pump Differential Pressure Record differential pressures from individual jet pump instruments NBI-FI-78A through NBI-FI-78Z on Panel 9-38 in control room (+/- 2).
CUE: 1 = 31         11 = 32 2 = 32       12 = 30 3 = 31       13 = 20
CUE: 1 = 31 11 = 32 2 = 32 12 = 30 3 = 31 13 = 20 4 = 31 14 = 32 5 = 36 15 = 34 6 = 34 16 = 35 7 = 33 17 = 32 8 = 32 18 = 31 9 = 33 19 = 33 10 = 33 20 = 32 Note G, H, I, O, P & Q are not used.
: 5. Record Jet Pump                4 = 31       14 = 32 Differential Pressure          5 = 36       15 = 34                         _______*
: 6. Record Loop B and Loop A Average Add JP #1 through 10 and divide by 10 for LOOP B, then add JP #11 through 20 and divide by 10 for LOOP A (+/- 2).
6 = 34       16 = 35 7 = 33       17 = 32 8 = 32       18 = 31 9 = 33       19 = 33 10 = 33       20 = 32 Note G, H, I, O, P & Q are not used.
CUE:
Add JP #1 through 10 and divide by 10 for LOOP B, then add JP #11 through 20 and divide by 10 for
Average 32.6 for LOOP B and 31.1 for LOOP A.  
: 6. Record Loop B and      LOOP A (+/- 2).
Loop A Average                                                              _______*
CUE:   Average 32.6 for LOOP B and 31.1 for LOOP A.


Nebraska Public Power District                                             SKL034-20-113 (29979)
Nebraska Public Power District SKL034-20-113 (29979)
Cooper Nuclear Station                                                               Page 41 of 149 Job Performance Measure for Operations                                                 Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)
Cooper Nuclear Station Page 41 of 149 Job Performance Measure for Operations Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)
Performance Checklist           Standards                                             Initials NOTE:   Curves are contained in the binder labeled Cooper Nuclear Station Jet Pump Operability Graphs and Instability Noise Level Data.
Performance Checklist Standards Initials NOTE: Curves are contained in the binder labeled Cooper Nuclear Station Jet Pump Operability Graphs and Instability Noise Level Data.
: 7. Verify RR pump flow       Check 1 Determine that the values recorded in and RRMG set speed        Items B and C are within the limits of the curve       _______*
: 7. Verify RR pump flow and RRMG set speed within limits.
within limits.            (SAT checked).
Check 1 Determine that the values recorded in Items B and C are within the limits of the curve (SAT checked).
: 8. Verify JP flow and         Check 2 Determine that the values recorded in RRMG set speed            Items C and D are within or outside the limits of the _______
: 8.
within limits.            curve (SAT checked).
Verify JP flow and RRMG set speed within limits.
Check 2 Determine that the values recorded in Items C and D are within or outside the limits of the curve (SAT checked).
NOTE: Jet Pump 13 is outside the Operability Graphs. The candidate should determine that it falls outside the limit.
NOTE: Jet Pump 13 is outside the Operability Graphs. The candidate should determine that it falls outside the limit.
: 9. Jet Pump p differs       Check 3 Determine that Jet Pump p differs by by < 20% from              20% from established patterns for (UNSAT             _______*
: 9.
established patterns.      checked for Loop A).
Jet Pump p differs by < 20% from established patterns.
: 10. Verify check 1 and 2 SAT or check 3 SAT.       Verify check 1 and check 2 SAT or check 3 is SAT (Check 3 is SAT).                                     _______*
Check 3 Determine that Jet Pump p differs by 20% from established patterns for (UNSAT checked for Loop A).
: 11. Verify operation is not in Stability Exclusion     Determines operation is outside Stability Exclusion Region of Power to        Region of Power to Flow Map using core flow value recorded in Item A on previous page and 2.1.10         _______*
: 10. Verify check 1 and 2 SAT or check 3 SAT.
Flow Map.
Verify check 1 and check 2 SAT or check 3 is SAT (Check 3 is SAT).
Power to Flow Map.
: 11. Verify operation is not in Stability Exclusion Region of Power to Flow Map.
Determines operation is outside Stability Exclusion Region of Power to Flow Map using core flow value recorded in Item A on previous page and 2.1.10 Power to Flow Map.  


Nebraska Public Power District                                         SKL034-20-113 (29979)
Nebraska Public Power District SKL034-20-113 (29979)
Cooper Nuclear Station                                                         Page 42 of 149 Job Performance Measure for Operations                                           Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)
Cooper Nuclear Station Page 42 of 149 Job Performance Measure for Operations Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)
Performance Checklist       Standards                                             Initials
Performance Checklist Standards Initials
: 12. Verify loop flow mismatch is within limit when at < 51.45 Determine Step is N/A.
: 12. Verify loop flow mismatch is within limit when at < 51.45 x106 lbs/hr core flow.
_______
Determine Step is N/A.
x106 lbs/hr core flow.
: 13. Verify loop flow mismatch is within limits when 51.45x106 lbs/hr core flow.
: 13. Verify loop flow mismatch is within     Determine Item D values (previous page of limits when 51.45x106 6.LOG.601) for Loop A and Loop B flow mismatch       _______*
Determine Item D values (previous page of 6.LOG.601) for Loop A and Loop B flow mismatch is 3.67x106 lbs/hr (SAT entered into block).
lbs/hr core flow.      is 3.67x106 lbs/hr (SAT entered into block).
: 14. Verify Recirc Pump operating or RHR Pump operating in SDC.
: 14. Verify Recirc Pump operating or RHR       Determine Step is N/A.
Determine Step is N/A.
Pump operating in                                                            _______
: 15. Inform the CRS that the task is complete.
SDC.
Inform Control Room Supervisor that the daily Jet Pump and Recirc Pump Flow Check is Complete and Jet Pump 13 d/p is low out of spec.  
Inform Control Room Supervisor that the daily Jet Pump and Recirc Pump Flow Check is Complete
#CUE: The CRS Acknowledges the report.  
: 15. Inform the CRS that    and Jet Pump 13 d/p is low out of spec.
the task is complete.                                                        _______
                            #CUE: The CRS Acknowledges the report.


Nebraska Public Power District                                       SKL034-20-113 (29979)
Nebraska Public Power District SKL034-20-113 (29979)
Cooper Nuclear Station                                                         Page 43 of 149 Job Performance Measure for Operations                                             Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)
Cooper Nuclear Station Page 43 of 149 Job Performance Measure for Operations Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)
SRO Section Performance Checklist       Standards                                             Initials NOTE: 1. SRO Section
SRO Section Performance Checklist Standards Initials NOTE: 1. SRO Section
: 2. Declares Jet Pump 13 inop.
: 2. Declares Jet Pump 13 inop.
: 1. Reviews Attachment      Reviews Attachment 12 Jet Pump Operability 12 Jet Pump           Items A, B, C and D. Notes that all have been filled _______
: 1. Reviews Attachment 12 Jet Pump Operability Items.
Operability Items. out correctly.
Reviews Attachment 12 Jet Pump Operability Items A, B, C and D. Notes that all have been filled out correctly.
: 2. Reviews Attachment 12 Jet Pump           Reviews Attachment 12 Jet Pump Operability Operability Checks 1,  Items 1, 2, and 3. Notes that Check 3 should be       _______*
: 2. Reviews Attachment 12 Jet Pump Operability Checks 1, 2 and 3.
2 and 3.                checked Unsat and denotes it.
Reviews Attachment 12 Jet Pump Operability Items 1, 2, and 3. Notes that Check 3 should be checked Unsat and denotes it.
: 3. Reviews Attachment      Reviews Attachment 13 RECIRC Pump Flow 13 RECIRC Pump         Checks, NBI-FRDPR-95 is outside of the Exclusion Flow Checks Checks    Region. Checks that it is marked SAT correctly.       _______*
: 3. Reviews Attachment 13 RECIRC Pump Flow Checks Checks Reviews Attachment 13 RECIRC Pump Flow Checks, NBI-FRDPR-95 is outside of the Exclusion Region. Checks that it is marked SAT correctly.
: 4. Reviews Attachment      Reviews Attachment 13 RECIRC Pump Flow 13 RECIRC Pump         Checks, NBI-FI-92A/B Mismatch should be N/Aed Flow Checks Checks    for this flow.                                       _______
: 4. Reviews Attachment 13 RECIRC Pump Flow Checks Checks Reviews Attachment 13 RECIRC Pump Flow Checks, NBI-FI-92A/B Mismatch should be N/Aed for this flow.
: 5. Reviews Attachment      Reviews Attachment 13 RECIRC Pump Flow 13 RECIRC Pump         Checks, NBI-FI-92A/B Mismatch should be marked Flow Checks Checks    SAT. Checks that it is marked SAT correctly.         _______*
: 5. Reviews Attachment 13 RECIRC Pump Flow Checks Checks Reviews Attachment 13 RECIRC Pump Flow Checks, NBI-FI-92A/B Mismatch should be marked SAT. Checks that it is marked SAT correctly.
: 6. Reviews Attachment 13 RECIRC Pump         Reviews Attachment 13 RECIRC Pump Flow Flow Checks Checks    Checks, Recirc Pump operating or RHR Pump           _______
: 6. Reviews Attachment 13 RECIRC Pump Flow Checks Checks Reviews Attachment 13 RECIRC Pump Flow Checks, Recirc Pump operating or RHR Pump operating in SDC is marked N/A.  
operating in SDC is marked N/A.


Nebraska Public Power District                                           SKL034-20-113 (29979)
Nebraska Public Power District SKL034-20-113 (29979)
Cooper Nuclear Station                                                         Page 44 of 149 Job Performance Measure for Operations                                             Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)
Cooper Nuclear Station Page 44 of 149 Job Performance Measure for Operations Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)
Performance Checklist       Standards                                             Initials Notifies the Reactor Engineer that Jet Pump 13 d/p is low out of spec.
Performance Checklist Standards Initials
: 7. Notifies Reactor Engineer                CUE: As reactor engineer respond to the report and tell the CRS that it was not low last time the     _______
: 7. Notifies Reactor Engineer Notifies the Reactor Engineer that Jet Pump 13 d/p is low out of spec.
surveillance was run.
CUE: As reactor engineer respond to the report and tell the CRS that it was not low last time the surveillance was run.
Contacts the Shift Manager and tells him that Jet Pump 13 is low out of spec and that was not that
: 8. Notifies the Shift Manager Contacts the Shift Manager and tells him that Jet Pump 13 is low out of spec and that was not that way last surveillance.
: 8. Notifies the Shift      way last surveillance.
CUE: Respond as the Shift Manager and tell the CRS that the JPM is completed.  
Manager CUE: Respond as the Shift Manager and tell the         _______
CRS that the JPM is completed.


Nebraska Public Power District                                               SKL034-20-113 (29979)
Nebraska Public Power District SKL034-20-113 (29979)
Cooper Nuclear Station                                                               Page 45 of 149 Job Performance Measure for Operations                                                   Revision 01 ATTACHMENT 1 Directions to Trainee:
Cooper Nuclear Station Page 45 of 149 Job Performance Measure for Operations Revision 01 ATTACHMENT 1 Directions to Trainee:
When I tell you to begin, you are to perform the daily Jet Pump and Recirc Pump Flow Check.
When I tell you to begin, you are to perform the daily Jet Pump and Recirc Pump Flow Check.
Before you start, I will state the general plant conditions, the initiating cues and answer any questions you may have.
Before you start, I will state the general plant conditions, the initiating cues and answer any questions you may have.
Line 711: Line 886:
RO.
RO.
The Control Room Supervisor directs you to perform the daily Jet Pump (6.LOG.601 2) and Recirc Pump Flow Check (6.LOG.601 Attachment 13) as part of the routine shift activities. Notify the CRS when the task is complete.
The Control Room Supervisor directs you to perform the daily Jet Pump (6.LOG.601 2) and Recirc Pump Flow Check (6.LOG.601 Attachment 13) as part of the routine shift activities. Notify the CRS when the task is complete.
Jet Pumps         1 = 31             11 = 32 2 = 32             12 = 30 3 = 31             13 = 20 4 = 31             14 = 32 5 = 36             15 = 34 6 = 34             16 = 35 7 = 33             17 = 32 8 = 32             18 = 31 9 = 33             19 = 33 10 = 33             20 = 32 SRO.
Jet Pumps 1 = 31 11 = 32 2 = 32 12 = 30 3 = 31 13 = 20 4 = 31 14 = 32 5 = 36 15 = 34 6 = 34 16 = 35 7 = 33 17 = 32 8 = 32 18 = 31 9 = 33 19 = 33 10 = 33 20 = 32 SRO.
Perform the control room supervisors review of the daily jet pump (6.log.601 attachment 12) and recirc pump flow check (6.log.601 attachment 13) as part of the routine shift activities to ensure that it has been performed correctly. Notify the Shift Manager when the task is complete.
Perform the control room supervisors review of the daily jet pump (6.log.601 attachment 12) and recirc pump flow check (6.log.601 attachment 13) as part of the routine shift activities to ensure that it has been performed correctly. Notify the Shift Manager when the task is complete.  


Nebraska Public Power District                                         SKL034-20-113 (29979)
Nebraska Public Power District SKL034-20-113 (29979)
Cooper Nuclear Station                                                             Page 46 of 149 Job Performance Measure for Operations                                               Revision 01 ATTACHMENT 12                     JET PUMP OPERABILITY             RO SECTION ATTACHMENT 12 JET PUMP OPERABILITY NOTE - If in single loop operation, mark idle loop N/A.
Cooper Nuclear Station Page 46 of 149 Job Performance Measure for Operations Revision 01 ATTACHMENT 12 JET PUMP OPERABILITY RO SECTION ATTACHMENT 12 JET PUMP OPERABILITY NOTE - If in single loop operation, mark idle loop N/A.
JET PUMP P (%)
JET PUMP P (%)
LOOP   LOOP         LOOP ITEMS                    A      B     JP #   B         JP # LOOP A 6
ITEMS LOOP A
Core Flow (10 lb/hr) NBI-FRDPR-A                                                              1                 11 95 RR Pump Flow (103 gpm) RR-FR-B                                                              2                 12 163 RRMG Set Speed (%) RRFC-SI-C                                                              3                13 1A/B D     JP Flow (106 lb/hr) NBI-FI-92A/B                       4                 14 5                 15 6                 16 7                 17 8                 18 9                 19 10               20 LOOP              LOOP B Avg             A Avg UNSA OPERABILIT APPLICABL          ATT. 21 CHECKS                         SAT   T     Y LIMIT   E MODE           NOTE Loop A:                           1 (b), 2 (b)    50 Item B and C values             9 1
LOOP B
within curve limits (a)       Loop B:
JP #
LOOP B
JP #
LOOP A A
Core Flow (106 lb/hr) NBI-FRDPR-95 1
11 B
RR Pump Flow (103 gpm) RR-FR-163 2
12 C
RRMG Set Speed (%) RRFC-SI-1A/B 3
13 D
JP Flow (106 lb/hr) NBI-FI-92A/B 4
14 5
15 6
16 7
17 8
18 9
19 10 20 LOOP B Avg LOOP A Avg CHECKS SAT UNSA T
OPERABILIT Y LIMIT APPLICABL E MODE ATT. 21 NOTE Loop A:
9 1
Item B and C values within curve limits (a)
Loop B:
9 Loop A:
9 Loop A:
Item C and D values             9 2                                                          SAT within curve limits (a)       Loop B:
9 2
Item C and D values within curve limits (a)
Loop B:
9 Loop A:
9 Loop A:
Jet Pump P differs by           9 3    20% from established patterns (a, c)       Loop B:
9 3
9
Jet Pump P differs by 20% from established patterns (a, c)
Loop B:
9 SAT 1 (b), 2 (b) 50


Nebraska Public Power District                                             SKL034-20-113 (29979)
Nebraska Public Power District SKL034-20-113 (29979)
Cooper Nuclear Station                                                           Page 47 of 149 Job Performance Measure for Operations                                               Revision 01 Loop A:
Cooper Nuclear Station Page 47 of 149 Job Performance Measure for Operations Revision 01 Loop A:
Checks 1 and 2 SAT, or         9 SAT Check 3 SAT Loop B:
9 Checks 1 and 2 SAT, or Check 3 SAT Loop B:
9 (a) Refer to Jet Pump Operability Curves maintained in Control Room.
9 SAT (a) Refer to Jet Pump Operability Curves maintained in Control Room.
(b) Required to be performed within 24 hours after > 25% RTP and required to be performed within 4 hours after associated recirculation loop is in service.
(b) Required to be performed within 24 hours after > 25% RTP and required to be performed within 4 hours after associated recirculation loop is in service.
(c) If any Jet Pump P vs. established pattern is not within curve limits, immediately notify Reactor Engineering.
(c) If any Jet Pump P vs. established pattern is not within curve limits, immediately notify Reactor Engineering.  


Nebraska Public Power District                                           SKL034-20-113 (29979)
Nebraska Public Power District SKL034-20-113 (29979)
Cooper Nuclear Station                                                               Page 48 of 149 Job Performance Measure for Operations                                                   Revision 01 3                         RECIRC PUMP FLOW CHECKS RO     Section ATTACHMENT 13 RECIRC PUMP FLOW CHECKS 0700-1000   1900-2200 OPERABILITY APPLICABLE ATT. 21 CHECKS                    SAT/UNSAT SAT/UNSAT        LIMIT        MODES          NOTES Core Flow,                               MCO NBI-DPR/FR-95, value is not in Stability                                       SAT            1, 2          49 Exclusion Region of Power to Flow Map (a)
Cooper Nuclear Station Page 48 of 149 Job Performance Measure for Operations Revision 01 3
JP Flow, NBI-FI-92A/B,                           MCO values for Loop A and Loop B flow mis-match SAT          1 (c), 2 (c)  48, 127 is 7.35x106 lbs/hr at
RECIRC PUMP FLOW CHECKS RO Section ATTACHMENT 13 RECIRC PUMP FLOW CHECKS CHECKS 0700-1000 SAT/UNSAT 1900-2200 SAT/UNSAT OPERABILITY LIMIT APPLICABLE MODES ATT. 21 NOTES Core Flow, NBI-DPR/FR-95, value is not in Stability Exclusion Region of Power to Flow Map (a)
    < 51.45x106 lbs/hr Rated Core Flow (b) (d)
MCO SAT 1, 2 49 JP Flow, NBI-FI-92A/B, values for Loop A and Loop B flow mis-match is 7.35x106 lbs/hr at  
JP Flow, NBI-FI-92A/B,                           MCO values for Loop A and Loop B flow mis-match SAT          1 (c), 2 (c)  48, 127 is 3.67x106 lbs/hr at 51.45x106 lbs/hr Rated Core Flow (b) (d)
< 51.45x106 lbs/hr Rated Core Flow (b) (d)
(a) Refer to power to flow map in Procedure 2.1.10.
MCO SAT 1 (c), 2 (c) 48, 127 JP Flow, NBI-FI-92A/B, values for Loop A and Loop B flow mis-match is 3.67x106 lbs/hr at 51.45x106 lbs/hr Rated Core Flow (b) (d)
MCO SAT 1 (c), 2 (c) 48, 127 (a) Refer to power to flow map in Procedure 2.1.10.
(b) Per Technical Specification and TRM Bases, a recirculation loop is considered not in operation when the mis-match between total jet pump flows of the two loops is greater than required limits. The loop with the lower flow must be considered not in operation.
(b) Per Technical Specification and TRM Bases, a recirculation loop is considered not in operation when the mis-match between total jet pump flows of the two loops is greater than required limits. The loop with the lower flow must be considered not in operation.
(c) Required to be performed within 24 hours after both recirculation loops are in service.
(c) Required to be performed within 24 hours after both recirculation loops are in service.
(d) If a flow mismatch results in one loop considered not in operation, contact FRED to manually insert single loop operation limits into GARDEL.
(d) If a flow mismatch results in one loop considered not in operation, contact FRED to manually insert single loop operation limits into GARDEL.
0700-1000 1900-2200 READING   READING    OPERABILITY    APPLICABLE        ATT. 21 CHECK                      (9) (e)   (9) (e)     LIMIT         MODES           NOTES 3 (when Reactor Verify Recirc Pump                                     RR Pump or Pressure is operating or RHR Pump                                       SDC in                         66 less than SDC operating in SDC                                      Operation Pressure Permissive) (f)
CHECK 0700-1000 READING (9) (e) 1900-2200 READING (9) (e)
(e) 9 indicates at least one RR pump or SDC Subsystem is in service.
OPERABILITY LIMIT APPLICABLE MODES ATT. 21 NOTES Verify Recirc Pump operating or RHR Pump operating in SDC RR Pump or SDC in Operation 3 (when Reactor Pressure is less than SDC Pressure Permissive) (f) 66 (e) 9 indicates at least one RR pump or SDC Subsystem is in service.
(f) Required to be met within 2 hours after reactor steam dome pressure is less than the shutdown cooling permissive pressure.
(f) Required to be met within 2 hours after reactor steam dome pressure is less than the shutdown cooling permissive pressure.  


Nebraska Public Power District                                         SKL034-20-113 (29979)
Nebraska Public Power District SKL034-20-113 (29979)
Cooper Nuclear Station                                                             Page 49 of 149 Job Performance Measure for Operations                                                 Revision 01 Attachment 12                JET PUMP OPERABILITY                 SRO Section ATTACHMENT 12 JET PUMP OPERABILITY NOTE - If in single loop operation, mark idle loop N/A.
Cooper Nuclear Station Page 49 of 149 Job Performance Measure for Operations Revision 01 2
JET PUMP OPERABILITY SRO Section ATTACHMENT 12 JET PUMP OPERABILITY NOTE - If in single loop operation, mark idle loop N/A.
JET PUMP P (%)
JET PUMP P (%)
LOOP     LOOP           LOOP ITEMS                  A        B     JP #   B         JP # LOOP A 6
ITEMS LOOP A
Core Flow (10 lb/hr) NBI-DPR/FR-A                                                  62           1     31         11     32 95 RR Pump Flow (103 gpm) RR-FR-                                                       30 B                                            38.5     38.5     2     32         12 163 RRMG Set Speed (%) RRFC-SI-C                                            79       80     3     31         13     20 1A/B D     JP Flow (106 lb/hr) NBI-FI-92A/B       31       31     4     31         14     32 5     36         15     34 6     34         16     35 7     33         17     32 8     32         18     31 9     33         19     33 10     33         20     32 LOOP             LOOP 32.6               31.1 B Avg            A Avg UNSA OPERABILIT APPLICABL            ATT. 21 CHECKS                       SAT     T       Y LIMIT     E MODE         NOTE Loop A:                               1 (b), 2 (b)    50 9
LOOP B
Item B and C values         9 1
JP #
within curve limits (a)   Loop B:
LOOP B
JP #
LOOP A A
Core Flow (106 lb/hr) NBI-DPR/FR-95 62 1
31 11 32 B
RR Pump Flow (103 gpm) RR-FR-163 38.5 38.5 2
32 12 30 C
RRMG Set Speed (%) RRFC-SI-1A/B 79 80 3
31 13 20 D
JP Flow (106 lb/hr) NBI-FI-92A/B 31 31 4
31 14 32 5
36 15 34 6
34 16 35 7
33 17 32 8
32 18 31 9
33 19 33 10 33 20 32 LOOP B Avg 32.6 LOOP A Avg 31.1 CHECKS SAT UNSA T
OPERABILIT Y LIMIT APPLICABL E MODE ATT. 21 NOTE Loop A:
9 9
1 Item B and C values within curve limits (a)
Loop B:
9 9
9 9
Loop A:
Loop A:
9 Item C and D values         9 2                                                            SAT within curve limits (a)   Loop B:
9 9
2 Item C and D values within curve limits (a)
Loop B:
9 9
9 9
Loop A:
Loop A:
Jet Pump P differs by        9 9
3    20% from established patterns (a, c)    Loop B:
9 9
9 9
3 Jet Pump P differs by 20% from established patterns (a, c)
Loop B:
9 9
SAT 1 (b), 2 (b) 50


Nebraska Public Power District                                             SKL034-20-113 (29979)
Nebraska Public Power District SKL034-20-113 (29979)
Cooper Nuclear Station                                                           Page 50 of 149 Job Performance Measure for Operations                                               Revision 01 Loop A:
Cooper Nuclear Station Page 50 of 149 Job Performance Measure for Operations Revision 01 Loop A:
9 Checks 1 and 2 SAT, or         9 SAT Check 3 SAT Loop B:
9 9
Checks 1 and 2 SAT, or Check 3 SAT Loop B:
9 9
9 9
(a) Refer to Jet Pump Operability Curves maintained in Control Room.
SAT (a) Refer to Jet Pump Operability Curves maintained in Control Room.
(b) Required to be performed within 24 hours after > 25% RTP and required to be performed within 4 hours after associated recirculation loop is in service.
(b) Required to be performed within 24 hours after > 25% RTP and required to be performed within 4 hours after associated recirculation loop is in service.
(c) If any Jet Pump P vs. established pattern is not within curve limits, immediately notify Reactor Engineering.
(c) If any Jet Pump P vs. established pattern is not within curve limits, immediately notify Reactor Engineering.  


Nebraska Public Power District                                             SKL034-20-113 (29979)
Nebraska Public Power District SKL034-20-113 (29979)
Cooper Nuclear Station                                                                 Page 51 of 149 Job Performance Measure for Operations                                                     Revision 01 Attachment 13                          RECIRC PUMP FLOW CHECKS       SRO Section ATTACHMENT 13 RECIRC PUMP FLOW CHECKS 0700-1000       1900-2200 OPERABILITY APPLICABLE ATT. 21 CHECKS                    SAT/UNSAT SAT/UNSAT            LIMIT      MODES          NOTES Core Flow, NBI-DPR/FR-95, value is not in Stability                 SAT          MCO          SAT          1, 2            49 Exclusion Region of Power to Flow Map (a)
Cooper Nuclear Station Page 51 of 149 Job Performance Measure for Operations Revision 01 3
JP Flow, NBI-FI-92A/B, values for Loop A and Loop B flow mis-match N/A          MCO          SAT        1 (c), 2 (c)    48, 127 is 7.35x106 lbs/hr at
RECIRC PUMP FLOW CHECKS SRO Section ATTACHMENT 13 RECIRC PUMP FLOW CHECKS CHECKS 0700-1000 SAT/UNSAT 1900-2200 SAT/UNSAT OPERABILITY LIMIT APPLICABLE MODES ATT. 21 NOTES Core Flow, NBI-DPR/FR-95, value is not in Stability Exclusion Region of Power to Flow Map (a)
    < 51.45x106 lbs/hr Rated Core Flow (b) (d)
SAT MCO SAT 1, 2 49 JP Flow, NBI-FI-92A/B, values for Loop A and Loop B flow mis-match is 7.35x106 lbs/hr at  
JP Flow, NBI-FI-92A/B, values for Loop A and Loop B flow mis-match SAT          MCO          SAT        1 (c), 2 (c)    48, 127 is 3.67x106 lbs/hr at 51.45x106 lbs/hr Rated Core Flow (b) (d)
< 51.45x106 lbs/hr Rated Core Flow (b) (d)
(a) Refer to power to flow map in Procedure 2.1.10.
N/A MCO SAT 1 (c), 2 (c) 48, 127 JP Flow, NBI-FI-92A/B, values for Loop A and Loop B flow mis-match is 3.67x106 lbs/hr at 51.45x106 lbs/hr Rated Core Flow (b) (d)
SAT MCO SAT 1 (c), 2 (c) 48, 127 (a) Refer to power to flow map in Procedure 2.1.10.
(b) Per Technical Specification and TRM Bases, a recirculation loop is considered not in operation when the mis-match between total jet pump flows of the two loops is greater than required limits. The loop with the lower flow must be considered not in operation.
(b) Per Technical Specification and TRM Bases, a recirculation loop is considered not in operation when the mis-match between total jet pump flows of the two loops is greater than required limits. The loop with the lower flow must be considered not in operation.
(c) Required to be performed within 24 hours after both recirculation loops are in service.
(c) Required to be performed within 24 hours after both recirculation loops are in service.
(d) If a flow mismatch results in one loop considered not in operation, contact FRED to manually insert single loop operation limits into GARDEL.
(d) If a flow mismatch results in one loop considered not in operation, contact FRED to manually insert single loop operation limits into GARDEL.
0700-1000     1900-2200 READING       READING    OPERABILITY  APPLICABLE        ATT. 21 CHECK                        (9) (e)       (9) (e)     LIMIT       MODES           NOTES 3 (when Reactor Verify Recirc Pump                                         RR Pump or Pressure is operating or RHR Pump                   N/A           N/A       SDC in                         66 less than SDC operating in SDC                                            Operation Pressure Permissive) (f)
CHECK 0700-1000 READING (9) (e) 1900-2200 READING (9) (e)
(e) 9 indicates at least one RR pump or SDC Subsystem is in service.
OPERABILITY LIMIT APPLICABLE MODES ATT. 21 NOTES Verify Recirc Pump operating or RHR Pump operating in SDC N/A N/A RR Pump or SDC in Operation 3 (when Reactor Pressure is less than SDC Pressure Permissive) (f) 66 (e) 9 indicates at least one RR pump or SDC Subsystem is in service.
(f) Required to be met within 2 hours after reactor steam dome pressure is less than the shutdown cooling permissive pressure.
(f) Required to be met within 2 hours after reactor steam dome pressure is less than the shutdown cooling permissive pressure.  


Nebraska Public Power District                                                   SKL034-50-29 (8908)
Nebraska Public Power District SKL034-50-29 (8908)
Cooper Nuclear Station                                                                 Page 52 of 149 Job Performance Measure for Operations                                                   Revision 02 Task No. 341013O0303 Approve Radioactive Discharge-Release Permit Trainee:                                             Examiner:
Cooper Nuclear Station Page 52 of 149 Job Performance Measure for Operations Revision 02 Task No. 341013O0303 Approve Radioactive Discharge-Release Permit Trainee:
Pass       Fail       Examiner Signature:                                     Date:
Examiner:
Pass Fail Examiner Signature:
Date:
Additional Program Information:
Additional Program Information:
: 11. Appropriate Performance Locations: SIM / CR
: 11.
: 12. Appropriate Trainee Level: SRO
Appropriate Performance Locations: SIM / CR
: 13. Evaluation Method: Perform
: 12.
: 4. Performance Time: 10 minutes
Appropriate Trainee Level: SRO
: 5. NRC K/As           2.1.34 (2.9); 2.1.32 (3.4/3.8)
: 13.
Evaluation Method: Perform
: 4.
Performance Time: 10 minutes
: 5.
NRC K/As 2.1.34 (2.9); 2.1.32 (3.4/3.8)
Directions to Examiner:
Directions to Examiner:
: 1. This JPM evaluates the trainees ability to complete a radioactive discharge / release permit.
: 1.
: 2. All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
This JPM evaluates the trainees ability to complete a radioactive discharge / release permit.
: 3. Give the trainee his copy of the Directions to the Trainee (Attachment 2) and Liquid Radwaste Discharge Form (Attachment 1) when ready to start the JPM.
: 2.
: 4. Brief the trainee, and tell the trainee to begin.
All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
: 3.
Give the trainee his copy of the Directions to the Trainee (Attachment 2) and Liquid Radwaste Discharge Form (Attachment 1) when ready to start the JPM.
: 4.
Brief the trainee, and tell the trainee to begin.
Directions to Trainee:
Directions to Trainee:
When I tell you to begin, you are to review and complete the radioactive discharge/release permit as Shift Manager. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin, you are to review and complete the radioactive discharge/release permit as Shift Manager. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.  
    ====================================================================
 
====================================================================
General Conditions:
General Conditions:
: 1. The plant is operating at 100%.
: 1.
: 2. CWP A, B, and D are in service.
The plant is operating at 100%.
: 3. De-icing is in progress.
: 2.
: 4. The FDST radioactive discharge was started at 0905, Jan 6.
CWP A, B, and D are in service.
: 5. The FDST radioactive discharge was stopped at 1355, Jan 6.
: 3.
: 6. FDST final level is 10.5%.
De-icing is in progress.
: 4.
The FDST radioactive discharge was started at 0905, Jan 6.
: 5.
The FDST radioactive discharge was stopped at 1355, Jan 6.
: 6.
FDST final level is 10.5%.  


Nebraska Public Power District                                         SKL034-50-29 (8908)
Nebraska Public Power District SKL034-50-29 (8908)
Cooper Nuclear Station                                                       Page 53 of 149 Job Performance Measure for Operations                                         Revision 02 Task No. 341013O0303 Approve Radioactive Discharge-Release Permit General  
Cooper Nuclear Station Page 53 of 149 Job Performance Measure for Operations Revision 02 Task No. 341013O0303 Approve Radioactive Discharge-Release Permit General  


==References:==
==References:==
: 1. 8.8.11, Liquid Radioactive Waste Discharge Authorization General Tools and Equipment:
: 1.
: 1. Scientific calculator Special Conditions, References, Tools, Equipment:
8.8.11, Liquid Radioactive Waste Discharge Authorization General Tools and Equipment:
: 1. Critical steps denoted by *.
: 1.
Scientific calculator Special Conditions, References, Tools, Equipment:
: 1.
Critical steps denoted by *.
Task Standards:
Task Standards:
: 1. 100% of critical elements successfully completed without error.
: 1.
: 2. 100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 2.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
As Shift Manager complete the Liquid Radioactive Waste Discharge Form for the FDST (Attachment 1) and inform me when all required actions are complete.
As Shift Manager complete the Liquid Radioactive Waste Discharge Form for the FDST (Attachment 1) and inform me when all required actions are complete.  


Nebraska Public Power District                                           SKL034-50-29 (8908)
Nebraska Public Power District SKL034-50-29 (8908)
Cooper Nuclear Station                                                         Page 54 of 149 Job Performance Measure for Operations                                             Revision 02 Task No. 341013O0303 Approve Radioactive Discharge-Release Permit Performance Checklist                           Standards                     Initials
Cooper Nuclear Station Page 54 of 149 Job Performance Measure for Operations Revision 02 Task No. 341013O0303 Approve Radioactive Discharge-Release Permit Performance Checklist Standards Initials
: 1. Records Stop Run Data in     Operator records Date as 1/6/xx, records time Section 5.                    as 1355 and records % tank level as 10.5.       ________
: 1. Records Stop Run Data in Section 5.
: 2. Records dilution flow.       Operator refers to Section 4.1 and records dilution flow of 308400 gpm.                     _______*
Operator records Date as 1/6/xx, records time as 1355 and records % tank level as 10.5.
: 3. Records volume of release. Operator calculates volume of release as 16368.625 (using Usable tank volume and start and stop tank %).
: 2. Records dilution flow.
_______*
Operator refers to Section 4.1 and records dilution flow of 308400 gpm.
: 3. Records volume of release.
Operator calculates volume of release as 16368.625 (using Usable tank volume and start and stop tank %).
NOTE: Acceptable value: 16360 to 16380 gallons.
NOTE: Acceptable value: 16360 to 16380 gallons.
: 4. Records total time of         Operator calculates total time of discharge in discharge.                    minutes (subtracting start time from end time)   _______*
: 4. Records total time of discharge.
and records 290 minutes.
Operator calculates total time of discharge in minutes (subtracting start time from end time) and records 290 minutes.
: 5. Records discharge flow.       Operator calculates discharge flow (divides volume of release by total time of discharge)   _______*
: 5. Records discharge flow.
and records 56-57 gpm.
Operator calculates discharge flow (divides volume of release by total time of discharge) and records 56-57 gpm.
: 6. Records River Level.         Operator records river level as 880 ft MSL.
: 6. Records River Level.
________
Operator records river level as 880 ft MSL.  
                                  #CUE: River level is 880 ft MSL.
#CUE: River level is 880 ft MSL.
: 7. Removes Discharge In         Operator would remove or direct control room Progress Tags from running    operator to remove the tags from the running CWPs.                         CWPs.                                            ________
: 7. Removes Discharge In Progress Tags from running CWPs.
                                  #CUE: Tags are removed.
Operator would remove or direct control room operator to remove the tags from the running CWPs.  
#CUE: Tags are removed.  


Nebraska Public Power District                                           SKL034-50-29 (8908)
Nebraska Public Power District SKL034-50-29 (8908)
Cooper Nuclear Station                                                         Page 55 of 149 Job Performance Measure for Operations                                             Revision 02 Task No. 341013O0303 Approve Radioactive Discharge-Release Permit Performance Checklist                           Standards                     Initials
Cooper Nuclear Station Page 55 of 149 Job Performance Measure for Operations Revision 02 Task No. 341013O0303 Approve Radioactive Discharge-Release Permit Performance Checklist Standards Initials
: 8. Records total river flow.     Operator contacts chemistry for total river flow and records 5.9E7 l/min.
: 8. Records total river flow.
                                  #CUE: Chemistry reports total river flow is     ________
Operator contacts chemistry for total river flow and records 5.9E7 l/min.  
5.9E7 l/min. (This may be completed by the Chemist after SM signature.)
#CUE: Chemistry reports total river flow is 5.9E7 l/min. (This may be completed by the Chemist after SM signature.)
: 9. Completes discharge permit. Operator signs form as Shift Manager and forwards to Chemistry for review.               ________
: 9. Completes discharge permit.
                                  #CUE: Accept form as Chemist.
Operator signs form as Shift Manager and forwards to Chemistry for review.  
#CUE: Accept form as Chemist.  


Nebraska Public Power District                                                   SKL034-50-29 (8908)
Nebraska Public Power District SKL034-50-29 (8908)
Cooper Nuclear Station                                                                       Page 56 of 8 Job Performance Measure for Operations                                                       Revision: 02 Attachment 1LIQUID RADIOACTIVE WASTE DISCHARGE FORM ATTACHMENT 1 LIQUID RADIOACTIVE WASTE DISCHARGE FORM Section 1.       REQUEST FOR ANALYSIS OF RADIOACTIVE LIQUID WASTE PRIOR TO DISCHARGE To: Chemistry           From: Shift Manager               Tank To Be Discharged: FDST Started Recirculation For Sample:                               Time: 0300 Date: 1/6/xx Recirculation Of Tank Complete:                                 Time: 0500 Date: 1/6/xx Estimated Volume To Be Discharged: 98%-10.5% = 87.5%
Cooper Nuclear Station Page 56 of 8 Job Performance Measure for Operations Revision: 02 LIQUID RADIOACTIVE WASTE DISCHARGE FORM ATTACHMENT 1 LIQUID RADIOACTIVE WASTE DISCHARGE FORM Section 1. REQUEST FOR ANALYSIS OF RADIOACTIVE LIQUID WASTE PRIOR TO DISCHARGE To: Chemistry From: Shift Manager Tank To Be Discharged: FDST Started Recirculation For Sample:
Shift Manager: Mark Helen                                       Time: 0555             Date: 1/6/xx Section 2.       THIS SECTION TO BE COMPLETED BY PERSON TAKING SAMPLE Monitor Source Check Informed Control Room And Performed Source Check                             Initials: REW Sample Point: 18                                               Time: 0635             Date: 1/6/xx Signature: Ray Moname Section 3.       AUTHORIZATION TO RELEASE RADIOACTIVE LIQUID WASTE To: Shift Manager             From: Chemistry         Release Authorization Number:
Time: 0300 Date: 1/6/xx Recirculation Of Tank Complete:
Total Ci/ml: 3.74E-5 Total Concentration is < 1.0E-02 Ci/ml                                                         YES/NO Signature: Ray Moname 31 Day Dose, Percent Of Annual Limit For Each Value Is 2.0E+00                               YES/NO Signature: Ray Moname You Are Authorized To Release Subject Tank With Either Of Following Restrictions:
Time: 0500 Date: 1/6/xx Estimated Volume To Be Discharged: 98%-10.5% = 87.5%
Shift Manager: Mark Helen Time: 0555 Date: 1/6/xx Section 2. THIS SECTION TO BE COMPLETED BY PERSON TAKING SAMPLE Monitor Source Check Informed Control Room And Performed Source Check Initials: REW Sample Point: 18 Time: 0635 Date: 1/6/xx Signature: Ray Moname Section 3. AUTHORIZATION TO RELEASE RADIOACTIVE LIQUID WASTE To: Shift Manager From: Chemistry Release Authorization Number:
Total Ci/ml: 3.74E-5 Total Concentration is < 1.0E-02 Ci/ml YES/NO Signature: Ray Moname 31 Day Dose, Percent Of Annual Limit For Each Value Is 2.0E+00 YES/NO Signature: Ray Moname You Are Authorized To Release Subject Tank With Either Of Following Restrictions:
Maximum Liquid Waste Discharge Rate (gpm)
Maximum Liquid Waste Discharge Rate (gpm)
: 1)   100                   2)     N/A             3) N/A Minimum Dilution Flow To Canal (gpm)
: 1) 100
: 1)         159,000         2)       159,000       3) 159,000 Discharge Monitor Alarm Setpoint (Ci/ml)
: 2) N/A
: 1)   6.22E-3               2)     N/A             3) N/A NOTE - Terminate Discharge If Above Specifications Cannot Be Maintained. Contents Of This Tank Are Within Chemical Parameters For Discharge.
: 3) N/A Minimum Dilution Flow To Canal (gpm)
Chemistry: Ray Moname                                           Time: 0707             Date: 1/6/xx
: 1) 159,000 2) 159,000
: 3) 159,000 Discharge Monitor Alarm Setpoint (Ci/ml)
: 1) 6.22E-3
: 2) N/A
: 3) N/A NOTE - Terminate Discharge If Above Specifications Cannot Be Maintained. Contents Of This Tank Are Within Chemical Parameters For Discharge.
Chemistry: Ray Moname Time: 0707 Date: 1/6/xx  


Nebraska Public Power District                                     SKL034-50-29 (8908)
Nebraska Public Power District SKL034-50-29 (8908)
Cooper Nuclear Station                                                     Page 57 of 8 Job Performance Measure for Operations                                     Revision: 02 Section 4. SHIFT MANAGER APPROVAL TO RELEASE 4.1 Circle Appropriate Discharge Canal Flow Rate:
Cooper Nuclear Station Page 57 of 8 Job Performance Measure for Operations Revision: 02 Section 4. SHIFT MANAGER APPROVAL TO RELEASE 4.1 Circle Appropriate Discharge Canal Flow Rate:
NUMBER OF            AVERAGE CW DISCHARGE FLOWRATE (gpm)
AVERAGE CW DISCHARGE FLOWRATE (gpm)
OPERATING CW PUMPS                   DE-ICING               NO DE-ICING 4                     378,600                 631,000 3                     308,400                 514,000 2                     193,200                 322,000 1                     118,800                 198,000 4.2 To: Operations Personnel           From: Shift Manager The Subject Tank Contents Are Approved For Release Subject To The Following Restrictions:
NUMBER OF OPERATING CW PUMPS DE-ICING NO DE-ICING 4
: 1) Maximum Liquid Disch Rate: 100         gpm (Section 3)
378,600 631,000 3
: 2) Minimum Dilution Flow To Canal Of: 159000     gpm (Section 3)
308,400 514,000 2
193,200 322,000 1
118,800 198,000 4.2 To: Operations Personnel From: Shift Manager The Subject Tank Contents Are Approved For Release Subject To The Following Restrictions:
: 1) Maximum Liquid Disch Rate: 100 gpm (Section 3)
: 2) Minimum Dilution Flow To Canal Of: 159000 gpm (Section 3)
: 3) Alarm Limits Specified (Section 3)
: 3) Alarm Limits Specified (Section 3)
: 4) Tank Volume Verified: 98         (Compare To Section 1)
: 4) Tank Volume Verified: 98 (Compare To Section 1)
: 5) DISCHARGE IN PROGRESS Tags Installed On Running Circ Water Pumps.
: 5) DISCHARGE IN PROGRESS Tags Installed On Running Circ Water Pumps.
Approval To Release:
Approval To Release:
Shift Manager:   Mark Helen                 Time: 0804 Date:         1/6/xx
Shift Manager:
Mark Helen Time: 0804 Date:
1/6/xx  


Nebraska Public Power District                                 SKL034-50-29 (8908)
Nebraska Public Power District SKL034-50-29 (8908)
Cooper Nuclear Station                                                 Page 58 of 8 Job Performance Measure for Operations                                 Revision: 02 Section 5. To: Chemist         From: Shift Manager The Subject Discharge Has Been Completed And The Following Data Obtained During The Discharge:
Cooper Nuclear Station Page 58 of 8 Job Performance Measure for Operations Revision: 02 Section 5. To: Chemist From: Shift Manager The Subject Discharge Has Been Completed And The Following Data Obtained During The Discharge:
START                                         STOP RUN                               % TANK    RUN                          % TANK NUMBER       DATE     TIME       LEVEL     NUMBER   DATE     TIME       LEVEL 1             1/6/xx   0905       98         1 2                                             2 3                                             3 4                                             4 Usable Tank Volumes (0% to 100%)
START RUN NUMBER DATE TIME  
% TANK LEVEL STOP RUN NUMBER DATE TIME  
% TANK LEVEL 1
1/6/xx 0905 98 1
2 2
3 3
4 4
Usable Tank Volumes (0% to 100%)
FDST - 18,707 gal WST A - 20,015 gal WST B - 20,015 gal
FDST - 18,707 gal WST A - 20,015 gal WST B - 20,015 gal
: 1) Dilution Flow (Section 4.1):           gpm
: 1) Dilution Flow (Section 4.1):
: 2) Volume Of Release:               gal
gpm
: 3) Total Time Of Discharge:               min
: 2) Volume Of Release:
: 4) Discharge Flow:             gpm
gal
: 5) River Level:           ft MSL
: 3) Total Time Of Discharge:
min
: 4) Discharge Flow:
gpm
: 5) River Level:
ft MSL
: 6) Remove DISCHARGE IN PROGRESS Tags From Running Circ Water Pumps.
: 6) Remove DISCHARGE IN PROGRESS Tags From Running Circ Water Pumps.
: 7) Total River Flow:             l/min (Determined By The Chemist)
: 7) Total River Flow:
Shift Manager:                                     Time:           Date:
l/min (Determined By The Chemist)
Chemist Review:                                                   Date:
Shift Manager:
Time:
Date:
Chemist Review:
Date:  


Nebraska Public Power District                                           SKL034-50-29 (8908)
Nebraska Public Power District SKL034-50-29 (8908)
Cooper Nuclear Station                                                             Page 59 of 8 Job Performance Measure for Operations                                             Revision: 02 ATTACHMENT 2 Directions to Trainee:
Cooper Nuclear Station Page 59 of 8 Job Performance Measure for Operations Revision: 02 ATTACHMENT 2 Directions to Trainee:
When I tell you to begin, you are to review and complete the radioactive discharge/release permit as Shift Manager. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin, you are to review and complete the radioactive discharge/release permit as Shift Manager. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
General Conditions:
General Conditions:
Line 893: Line 1,175:
: 6. FDST final level is 10.5%.
: 6. FDST final level is 10.5%.
Initiating Cue(s):
Initiating Cue(s):
As Shift Manager complete the Liquid Radioactive Waste Discharge Form for the FDST and inform me when all required actions are complete.
As Shift Manager complete the Liquid Radioactive Waste Discharge Form for the FDST and inform me when all required actions are complete.  


Nebraska Public Power District                                         SKL034-30-62 (36404)
Nebraska Public Power District SKL034-30-62 (36404)
Cooper Nuclear Station                                                         Page 60 of 149 Job Performance Measure for Operations                                             Revision 00 ATWS SCENARIO EAL Trainee:                                       Examiner:
Cooper Nuclear Station Page 60 of 149 Job Performance Measure for Operations Revision 00 ATWS SCENARIO EAL Trainee:
Pass:         Fail:     Examiner signature:                                   Date:
Examiner:
Pass:
Fail:
Examiner signature:
Date:
Additional Program Information:
Additional Program Information:
: 1. Appropriate Performance Locations: SIM
: 1.
: 2. Appropriate Trainee Level: SRO
Appropriate Performance Locations: SIM
: 3. Evaluation Method: Perform
: 2.
: 4. Performance Time: 20 minutes
Appropriate Trainee Level: SRO
: 5. NRC K/A 2.4.41 2.3/4.1 Directions to Examiner:
: 3.
: 1. This JPM evaluates the trainee's ability to determine the Emergency Action Level from an ATWS Scenario (Scenario 1).
Evaluation Method: Perform
: 2. Observe the trainee during performance of the JPM for proper use of self-checking methods.
: 4.
: 3. All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space if desired by the examiner.
Performance Time: 20 minutes
: 5.
NRC K/A 2.4.41 2.3/4.1 Directions to Examiner:
: 1.
This JPM evaluates the trainee's ability to determine the Emergency Action Level from an ATWS Scenario (Scenario 1).
: 2.
Observe the trainee during performance of the JPM for proper use of self-checking methods.
: 3.
All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space if desired by the examiner.
General Conditions:
General Conditions:
: 1. As seen during the previous simulator scenario.
: 1.
As seen during the previous simulator scenario.
General  
General  


==References:==
==References:==
: 1. EPIP 5.7.1, Emergency Classification, Revision 33 General Tools and Equipment:
: 1.
None
EPIP 5.7.1, Emergency Classification, Revision 33 General Tools and Equipment:
None  


Nebraska Public Power District                                     SKL034-30-62 (36404)
Nebraska Public Power District SKL034-30-62 (36404)
Cooper Nuclear Station                                                   Page 61 of 149 Job Performance Measure for Operations                                       Revision 00 ATWS SCENARIO EAL Special Conditions, References, Tools, Equipment:
Cooper Nuclear Station Page 61 of 149 Job Performance Measure for Operations Revision 00 ATWS SCENARIO EAL Special Conditions, References, Tools, Equipment:
: 1.     Simulator Setup: NA
: 1.
: 2.     Critical checks denoted by "*".
Simulator Setup: NA
: 3.     Simulator cues denoted by "#".
: 2.
Critical checks denoted by "*".
: 3.
Simulator cues denoted by "#".
Task Standards:
Task Standards:
: 1.     Accurately classify the event using the correct plant procedure.
: 1.
Accurately classify the event using the correct plant procedure.
Initiating Cue(s):
Initiating Cue(s):
The Shift Manager has directed you to determine what the highest Emergency Action Level was during the previous scenario. Notify the Shift Manager when the task is complete.
The Shift Manager has directed you to determine what the highest Emergency Action Level was during the previous scenario. Notify the Shift Manager when the task is complete.  


Nebraska Public Power District                                 SKL034-30-62 (36404)
Nebraska Public Power District SKL034-30-62 (36404)
Cooper Nuclear Station                                               Page 62 of 149 Job Performance Measure for Operations                                 Revision 00 ATWS SCENARIO EAL Performance Checklist                       Standards                   Initials
Cooper Nuclear Station Page 62 of 149 Job Performance Measure for Operations Revision 00 ATWS SCENARIO EAL Performance Checklist Standards Initials
: 1. Consult EAL.         Candidate consults EAL procedure.
: 1. Consult EAL.
_______
Candidate consults EAL procedure.
Candidate identifies that a Site Area Emergency would have been declared per
: 2. EAL classification.
: 2. EAL classification. EAL 3.3.4. This is because boron was
Candidate identifies that a Site Area Emergency would have been declared per EAL 3.3.4. This is because boron was injected to shut down the reactor.
_______*
: 3. Inform the SM that the task is complete.
injected to shut down the reactor.
Inform Shift Manager that the Emergency Classification is complete.  
Inform Shift Manager that the Emergency Classification is complete.
#CUE: The SM Acknowledges that it is complete. This JPM is complete.  
: 3. Inform the SM that the task is complete.                                               _______
                          #CUE: The SM Acknowledges that it is complete. This JPM is complete.


Nebraska Public Power District                   SKL034-30-62 (36404)
Nebraska Public Power District SKL034-30-62 (36404)
Cooper Nuclear Station                                 Page 63 of 149 Job Performance Measure for Operations                   Revision 00 ATWS SCENARIO EAL
Cooper Nuclear Station Page 63 of 149 Job Performance Measure for Operations Revision 00 ATWS SCENARIO EAL  


Nebraska Public Power District                                   SKL034-30-62 (36404)
Nebraska Public Power District SKL034-30-62 (36404)
Cooper Nuclear Station                                                   Page 64 of 149 Job Performance Measure for Operations                                     Revision 00 ATTACHMENT 1 Directions to Candidate:
Cooper Nuclear Station Page 64 of 149 Job Performance Measure for Operations Revision 00 ATTACHMENT 1 Directions to Candidate:
When I tell you to begin, you are to determine the Emergency Action Level from the ATWS Scenario you just experienced. Before you start, I will state the general plant conditions, the initiating cues and answer any questions you may have.
When I tell you to begin, you are to determine the Emergency Action Level from the ATWS Scenario you just experienced. Before you start, I will state the general plant conditions, the initiating cues and answer any questions you may have.
General Conditions:
General Conditions:
: 1.     As seen during the previous simulator scenario.
: 1.
As seen during the previous simulator scenario.
Initiating Cues:
Initiating Cues:
The Shift Manager has directed you to determine what the highest Emergency Action Level was during the previous scenario. Notify the Shift Manager when the task is complete.
The Shift Manager has directed you to determine what the highest Emergency Action Level was during the previous scenario. Notify the Shift Manager when the task is complete.  
 
Nebraska Public Power District SKL034-21-56 (8779)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 65 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401


Nebraska Public Power District                                                SKL034-21-56 (8779)
Cooper Nuclear Station                                                                  Revision 02 Job Performance Measure                                                              Page 65 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401
=======================================================================
=======================================================================
=
=
Line 955: Line 1,255:


==Title:==
==Title:==
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)  
 
========================================================================
========================================================================
Trainee:                                                 Examiner:
Trainee:
Pass [ ]; Fail [ ] Examiner Signature:                                         Date:
Examiner:
Pass [ ]; Fail [ ] Examiner Signature:
Date:
Additional Program Information:
Additional Program Information:
NOTE THIS IS AN ALTERNATE PATH JPM.
NOTE THIS IS AN ALTERNATE PATH JPM.
: 1. Appropriate Performance Locations: CR/SIM
: 1. Appropriate Performance Locations: CR/SIM
: 2. Appropriate Trainee Level: RO/SRO
: 2. Appropriate Trainee Level: RO/SRO
: 3. Evaluation Method: Perform               Simulate
: 3. Evaluation Method: Perform Simulate
: 4. Performance Time: 8 minutes
: 4. Performance Time: 8 minutes
: 5. NRC K/As 202001 A2.03 (3.6/3.7)
: 5. NRC K/As 202001 A2.03 (3.6/3.7)
Directions to Examiner:
Directions to Examiner:
NOTE THIS IS AN ALTERNATE PATH JPM. The flow subtracting network will fail and require manual input of total core flow.
NOTE THIS IS AN ALTERNATE PATH JPM. The flow subtracting network will fail and require manual input of total core flow.
: 5. This JPM evaluates the trainees ability to respond to a Reactor Recirculation pump trip per 2.4RR, Reactor Recirculation Abnormal.
: 5.
: 6. If this JPM is performed on the Simulator, only the cues preceded by # should be given.
This JPM evaluates the trainees ability to respond to a Reactor Recirculation pump trip per 2.4RR, Reactor Recirculation Abnormal.
: 7. All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
: 6.
: 8. Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.
If this JPM is performed on the Simulator, only the cues preceded by # should be given.
: 9. Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.
: 7.
All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
: 8.
Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.
: 9.
Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.  
 
Nebraska Public Power District SKL034-21-56 (8779)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 66 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401


Nebraska Public Power District                                                  SKL034-21-56 (8779)
Cooper Nuclear Station                                                                    Revision 02 Job Performance Measure                                                                Page 66 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401
=======================================================================
=======================================================================
=
=
Line 981: Line 1,290:


==Title:==
==Title:==
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)  
 
========================================================================
========================================================================
Directions to Trainee:
Directions to Trainee:
Line 988: Line 1,298:
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
If being performed in the Simulator:
If being performed in the Simulator:
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.  
    ====================================================================
 
====================================================================
General Conditions:
General Conditions:
: 7. The plant is operating at power.
: 7.
: 8. You are the Control Room Operator.
The plant is operating at power.
: 8.
You are the Control Room Operator.
General  
General  


==References:==
==References:==
: 1. Procedure 2.4RR, Reactor Recirculation Abnormal
: 1.
: 2. Procedure 2.2.68.1, Reactor Recirculation System Operations
Procedure 2.4RR, Reactor Recirculation Abnormal
: 2.
Procedure 2.2.68.1, Reactor Recirculation System Operations  
 
Nebraska Public Power District SKL034-21-56 (8779)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 67 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401


Nebraska Public Power District                                            SKL034-21-56 (8779)
Cooper Nuclear Station                                                            Revision 02 Job Performance Measure                                                        Page 67 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401
=======================================================================
=======================================================================
=
=
Line 1,006: Line 1,322:


==Title:==
==Title:==
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)  
 
========================================================================
========================================================================
General Tools and Equipment:
General Tools and Equipment:
: 1. None Special Conditions, References, Tools, Equipment:
: 1.
: 1. Simulator Setup: See Attachment 1.
None Special Conditions, References, Tools, Equipment:
: 2. Critical steps denoted by *.
: 1.
: 3. Simulator cues denoted by #.
Simulator Setup: See Attachment 1.
: 2.
Critical steps denoted by *.
: 3.
Simulator cues denoted by #.
Task Standards:
Task Standards:
: 1. 100% of critical elements successfully completed without error.
: 1.
: 2. 100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 2.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
The Control Room Supervisor directs you to perform actions as appropriate to panel 9-4 and panel 9-5 indications.
The Control Room Supervisor directs you to perform actions as appropriate to panel 9-4 and panel 9-5 indications.  
 
Nebraska Public Power District SKL034-21-56 (8779)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 68 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401


Nebraska Public Power District                                            SKL034-21-56 (8779)
Cooper Nuclear Station                                                              Revision 02 Job Performance Measure                                                          Page 68 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401
=======================================================================
=======================================================================
=
=
Line 1,026: Line 1,350:


==Title:==
==Title:==
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)  
 
========================================================================
========================================================================
Performance Checklist                           Standards                       Initials
Performance Checklist Standards Initials
: 1. Assume the watch at panel     The operator positions himself in a position to 9-5.                          monitor panel 9-5.
: 1. Assume the watch at panel 9-5.
ACTION:     After the candidate assumes the watch, activate TRIGGER E1 to trip B Reactor Recirculation Pump.
The operator positions himself in a position to monitor panel 9-5.
: 2. Recognize and report trip of   The operator recognizes and reports the trip Recirc pump.                  of B Reactor Recirculation pump.                       *
ACTION:
                                  #CUE: Acknowledge the report as CRS.
After the candidate assumes the watch, activate TRIGGER E1 to trip B Reactor Recirculation Pump.
: 2. Recognize and report trip of Recirc pump.
The operator recognizes and reports the trip of B Reactor Recirculation pump.  
#CUE: Acknowledge the report as CRS.
Directs the operator to perform his actions per the abnormal.
Directs the operator to perform his actions per the abnormal.
: 3. Take appropriate immediate     The operator evaluates 2.4RR immediate actions.                      actions; determines none apply.
: 3. Take appropriate immediate actions.
: 4. Obtain procedure 2.4RR.       The operator obtains a copy of 2.4RR.
The operator evaluates 2.4RR immediate actions; determines none apply.
: 5. Enter Attachment 1 of 2.4RR   Operator enters Attachment 1 of 2.4RR.
: 4. Obtain procedure 2.4RR.
                                                                                            *
The operator obtains a copy of 2.4RR.
: 6. Evaluate need to enter         Operator evaluates the need to enter Attachment 3 for stability    Attachment 3 for stability exclusion region; exclusion region.              determines entry is required.
: 5. Enter Attachment 1 of 2.4RR Operator enters Attachment 1 of 2.4RR.
                                  #CUE: Acknowledge the report as CRS and another operator will address stability exclusion region.
: 6. Evaluate need to enter for stability exclusion region.
Operator evaluates the need to enter for stability exclusion region; determines entry is required.  
#CUE: Acknowledge the report as CRS and another operator will address stability exclusion region.  
 
Nebraska Public Power District SKL034-21-56 (8779)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 69 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401


Nebraska Public Power District                                                SKL034-21-56 (8779)
Cooper Nuclear Station                                                                  Revision 02 Job Performance Measure                                                              Page 69 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401
=======================================================================
=======================================================================
=
=
Line 1,048: Line 1,379:


==Title:==
==Title:==
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)  
 
========================================================================
========================================================================
Performance Checklist                             Standards                       Initials
Performance Checklist Standards Initials
: 7. Ensure RRMG Set B GEN           Operator ensures RRMG Set B GEN FIELD FIELD BKR open.                BKR open.
: 7. Ensure RRMG Set B GEN FIELD BKR open.
* CUE:   RRMG Set B GEN FIELD BKR green light is illuminated, the red light is out.
Operator ensures RRMG Set B GEN FIELD BKR open.
: 8. Close RR-MO-53B, PUMP           Operator closes RR-MO-53B, PUMP DISCHARGE VLV.                DISCHARGE VLV.
CUE:
* CUE:   RR-MO-53B green light is lit and the red light is out.
RRMG Set B GEN FIELD BKR green light is illuminated, the red light is out.
: 8. Close RR-MO-53B, PUMP DISCHARGE VLV.
Operator closes RR-MO-53B, PUMP DISCHARGE VLV.
CUE:
RR-MO-53B green light is lit and the red light is out.
NOTE: The operator should continue with the remaining 2.4RR steps while waiting for the RR-MO-53B valve.
NOTE: The operator should continue with the remaining 2.4RR steps while waiting for the RR-MO-53B valve.
: 9. After RR-MO-53B has been       Operator opens RR-MO-53B after it has has closed for 5 minutes, open    been closed for 5 minutes (-0, + 5 minutes).
: 9. After RR-MO-53B has been closed for 5 minutes, open valve.
valve.
Operator opens RR-MO-53B after it has has been closed for 5 minutes (-0, + 5 minutes).
CUE:   RR-MO-53B green light is out and red light is lit (after valve has been opened).
CUE:
: 10. Ensure operating RRMG is       Operator ensures A RRMG is powered by transferred to Startup        the Startup Transformer.
RR-MO-53B green light is out and red light is lit (after valve has been opened).
Transformer per Procedure 2.2.18.                        CUE:   A RRMG is powered by the Startup Transformer (Breaker 1CS is closed).
: 10. Ensure operating RRMG is transferred to Startup Transformer per Procedure 2.2.18.
Operator ensures A RRMG is powered by the Startup Transformer.
CUE:
A RRMG is powered by the Startup Transformer (Breaker 1CS is closed).  
 
Nebraska Public Power District SKL034-21-56 (8779)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 70 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401


Nebraska Public Power District                                              SKL034-21-56 (8779)
Cooper Nuclear Station                                                              Revision 02 Job Performance Measure                                                          Page 70 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401
=======================================================================
=======================================================================
=
=
Line 1,069: Line 1,409:


==Title:==
==Title:==
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)  
 
========================================================================
========================================================================
Performance Checklist                             Standards                     Initials
Performance Checklist Standards Initials
: 11. Maintain oil outlet            Operator directs Station Operator to maintain temperature for tripped        oil outlet temperature for tripped RRMG 90&deg;F RRMG 90&deg;F to 130&deg;F.            to 130&deg;F.
: 11. Maintain oil outlet temperature for tripped RRMG 90&deg;F to 130&deg;F.
                                    #CUE: Acknowledge/repeat back order as Station Operator.
Operator directs Station Operator to maintain oil outlet temperature for tripped RRMG 90&deg;F to 130&deg;F.  
: 12. Monitor loop cooldown rate      Operator monitors loop cooldown rate on on RR-TR-165, RR               RR-TR-165, RR SUCTION & FEEDWATER SUCTION & FEEDWATER            TEMP.
#CUE: Acknowledge/repeat back order as Station Operator.
TEMP.
: 12. Monitor loop cooldown rate on RR-TR-165, RR SUCTION & FEEDWATER TEMP.
CUE:     Loop temperature has dropped 6&deg;F over the last 5 minutes.
Operator monitors loop cooldown rate on RR-TR-165, RR SUCTION & FEEDWATER TEMP.
: 13. Concurrently enter Single       Operator obtains a copy of 2.2.68.1.
CUE:
Loop Operation per Procedure 2.2.68.1.
Loop temperature has dropped 6&deg;F over the last 5 minutes.
: 14. Dispatch Operators to           Operator dispatches Operators to R-976-W R-976-W and Non-Critical       and Non-Critical Switchgear Room to record Switchgear Room to record       lockout relays and targets for tripped pump.
: 13. Concurrently enter Single Loop Operation per Procedure 2.2.68.1.
lockout relays and targets for tripped pump.                   #CUE: Overcurrent (51 relay) is tripped for breaker 1DN (in Non-Critical Switchgear Room). There are no lockouts at Reactor Building 976 West.
Operator obtains a copy of 2.2.68.1.
: 15. If total core flow < 20%,       Operator determines Core Flow is above 20%
: 14. Dispatch Operators to R-976-W and Non-Critical Switchgear Room to record lockout relays and targets for tripped pump.
concurrently enter              rated.
Operator dispatches Operators to R-976-W and Non-Critical Switchgear Room to record lockout relays and targets for tripped pump.  
Attachment 2.
#CUE: Overcurrent (51 relay) is tripped for breaker 1DN (in Non-Critical Switchgear Room). There are no lockouts at Reactor Building 976 West.
CUE:     Indicated core flow is 41 Mlbm/hr.
: 15. If total core flow < 20%,
concurrently enter.
Operator determines Core Flow is above 20%
rated.
CUE:
Indicated core flow is 41 Mlbm/hr.  
 
Nebraska Public Power District SKL034-21-56 (8779)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 71 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401


Nebraska Public Power District                                              SKL034-21-56 (8779)
Cooper Nuclear Station                                                              Revision 02 Job Performance Measure                                                          Page 71 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401
=======================================================================
=======================================================================
=
=
Line 1,093: Line 1,440:


==Title:==
==Title:==
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)  
 
========================================================================
========================================================================
Performance Checklist                             Standards                   Initials
Performance Checklist Standards Initials
: 16. Align RRMG H&V System           Operator aligns RRMG H&V System per per Procedure 2.2.85.            Procedure 2.2.85.
: 16. Align RRMG H&V System per Procedure 2.2.85.
                                      #CUE: When operator initiates action to align ventilation, inform him that another operator will perform the ventilation alignment.
Operator aligns RRMG H&V System per Procedure 2.2.85.  
: 17. Raise core flow to               Operator determines core flow is >
#CUE: When operator initiates action to align ventilation, inform him that another operator will perform the ventilation alignment.
    > 29.5x106 lbs/hr, if possible. 29.5x106 lbs/hr CUE:   Indicated core flow is 41 Mlbm/hr.
: 17. Raise core flow to  
: 18. Determine if reverse flow       Operator determines reverse flow summer is summer is functioning.          NOT functioning as annunciator 9-4-3/E-7 is
> 29.5x106 lbs/hr, if possible.
* NOT in and indicated core flow is NOT approximately equal to difference between NBI-FI-92A and NBI-FI-92B CUE:   9-4-3/E-7 is NOT alarming.
Operator determines core flow is >
CUE:   NBI-FI-92A reads 37 Mlbm/hr.
29.5x106 lbs/hr CUE:
Indicated core flow is 41 Mlbm/hr.
: 18. Determine if reverse flow summer is functioning.
Operator determines reverse flow summer is NOT functioning as annunciator 9-4-3/E-7 is NOT in and indicated core flow is NOT approximately equal to difference between NBI-FI-92A and NBI-FI-92B CUE:
9-4-3/E-7 is NOT alarming.
CUE:
NBI-FI-92A reads 37 Mlbm/hr.
NBI-FI-92B reads 4 Mlbm/hr.
NBI-FI-92B reads 4 Mlbm/hr.
: 19. Initiate an emergency Work      Operator initiate an emergency Work Order to Order to repair or replace      repair or replace reverse flow summer reverse flow summer              (NBI-SUM-97).
: 19. Initiate an emergency Work Order to repair or replace reverse flow summer (NBI-SUM-97).
(NBI-SUM-97).
Operator initiate an emergency Work Order to repair or replace reverse flow summer (NBI-SUM-97).  
                                      #CUE: Another operator will perform this task.
#CUE: Another operator will perform this task.  
 
Nebraska Public Power District SKL034-21-56 (8779)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 72 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401


Nebraska Public Power District                                                  SKL034-21-56 (8779)
Cooper Nuclear Station                                                                    Revision 02 Job Performance Measure                                                                Page 72 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401
=======================================================================
=======================================================================
=
=
Line 1,115: Line 1,470:


==Title:==
==Title:==
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)  
 
========================================================================
========================================================================
Performance Checklist                                 Standards                     Initials
Performance Checklist Standards Initials
: 20. Determine difference               Operator determines difference between between NBI-FI-92A and             NBI-FI-92A and NBI-FI-92B loop flows is
: 20. Determine difference between NBI-FI-92A and NBI-FI-92B loop flows.
* NBI-FI-92B loop flows.              31x106 lbs/hr.
Operator determines difference between NBI-FI-92A and NBI-FI-92B loop flows is 31x106 lbs/hr.
NOTE: Entering substitute value for point B012 is accomplished using an IDT terminal and pressing the Bogey Value button. On screen prompts will guide the rest of the substitution.
NOTE: Entering substitute value for point B012 is accomplished using an IDT terminal and pressing the Bogey Value button. On screen prompts will guide the rest of the substitution.
: 21. Enter substitute value for         Operator enters difference between PMIS Point B012.                  NBI-FI-92A and NBI-FI-92B loop flows as
: 21. Enter substitute value for PMIS Point B012.
* substitute for PMIS Point B012.
Operator enters difference between NBI-FI-92A and NBI-FI-92B loop flows as substitute for PMIS Point B012.
CUE:     PMIS Point B012 has been substituted for.
CUE:
                                        #CUE: SIMULATOR ONLY. Ask the candidate to verify that the core flow value has updated on the power to flow map.
PMIS Point B012 has been substituted for.  
: 22. Verify value substituted for       Operator enters turn-on code of PFMAP and PMIS Point B012 (Simulator        verifies core flow value matches value ONLY).                            substituted.
#CUE: SIMULATOR ONLY. Ask the candidate to verify that the core flow value has updated on the power to flow map.
: 22. Verify value substituted for PMIS Point B012 (Simulator ONLY).
Operator enters turn-on code of PFMAP and verifies core flow value matches value substituted.
NOTE: As soon as the student attempts to contact the Reactor Engineer, tell them that the JPM is complete.
NOTE: As soon as the student attempts to contact the Reactor Engineer, tell them that the JPM is complete.
: 23. Initiate actions to notify the     Initiate actions to notify the Reactor Engineer Reactor Engineer about            that MCPR needs to be adjusted for single MCPR.                              loop operations
: 23. Initiate actions to notify the Reactor Engineer about MCPR.
Initiate actions to notify the Reactor Engineer that MCPR needs to be adjusted for single loop operations  
 
Nebraska Public Power District SKL034-21-56 (8779)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 73 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401


Nebraska Public Power District                                              SKL034-21-56 (8779)
Cooper Nuclear Station                                                                Revision 02 Job Performance Measure                                                            Page 73 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401
=======================================================================
=======================================================================
=
=
Line 1,136: Line 1,496:


==Title:==
==Title:==
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)  
 
========================================================================
========================================================================
ATTACHMENT 1 SIMULATOR SET-UP A. Materials required None B. Initialize the Simulator in any full power IC (IC-18, 19 or 20 suggested)
ATTACHMENT 1 SIMULATOR SET-UP A. Materials required None B. Initialize the Simulator in any full power IC (IC-18, 19 or 20 suggested)
Batch File name - none.
Batch File name - none.
C. Change the Simulator conditions from those of the IC as follows:
C. Change the Simulator conditions from those of the IC as follows:
: 1. Triggers Number             File Name                                 Description E1                   None             trgset 11 "zlorrmgfbb(1)==1"
: 1. Triggers Number File Name Description E1 None trgset 11 "zlorrmgfbb(1)==1"  
                                          ^B Recirc MG Field Breaker green light on
^B Recirc MG Field Breaker green light on
: 2. Malfunctions Number                   Title               Trigger     TD     Severity   Ramp     Initial RR04D       B Reactor Recirculation           E1       N/A       N/A       N/A       N/A Pump Drive Motor Breaker Trip (1DN)
: 2. Malfunctions Number Title Trigger TD Severity Ramp Initial RR04D B Reactor Recirculation Pump Drive Motor Breaker Trip (1DN)
: 3. Remotes Number                         Title                   Trigger     TD     Value   Ramp None
E1 N/A N/A N/A N/A
: 3. Remotes Number Title Trigger TD Value Ramp None  
 
Nebraska Public Power District SKL034-21-56 (8779)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 74 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401


Nebraska Public Power District                                                SKL034-21-56 (8779)
Cooper Nuclear Station                                                                Revision 02 Job Performance Measure                                                            Page 74 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401
=======================================================================
=======================================================================
=
=
Line 1,153: Line 1,516:


==Title:==
==Title:==
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)
Respond to a Trip of a Reactor Recirc Pump (Alternate Path)  
 
========================================================================
========================================================================
: 4. Overrides Instrument                       Tag           Trigger       TD   Value   Ramp 9-4-3/E-7, RECIRC LOOP B             RA:MUX08C108           A           0     OFF       0 OUT OF SERVICE Total Core Flow                     ZAONBIDPRFR95[2]         E1       0:10     41     0:10 A Loop Flow                           ZAONBIFI92A           E1       0:12     37     0:12 B Loop Flow                           ZAONBIFI92B           E1       0:15     4     1:00
: 4. Overrides Instrument Tag Trigger TD Value Ramp 9-4-3/E-7, RECIRC LOOP B OUT OF SERVICE RA:MUX08C108 A
0 OFF 0
Total Core Flow ZAONBIDPRFR95[2]
E1 0:10 41 0:10 A Loop Flow ZAONBIFI92A E1 0:12 37 0:12 B Loop Flow ZAONBIFI92B E1 0:15 4
1:00
: 5. Panel Set-up (suggested.)
: 5. Panel Set-up (suggested.)
: a. Insert listed overrides and malfunctions.
: a. Insert listed overrides and malfunctions.
Line 1,162: Line 1,530:
: d. Ensure B Reactor Recirculation pump is aligned to the Normal Transformer.
: d. Ensure B Reactor Recirculation pump is aligned to the Normal Transformer.
: e. Ensure that the curser on the power to flow map is within the normal operating region.
: e. Ensure that the curser on the power to flow map is within the normal operating region.
Note: If this JPM is to be performed more than once, snap the Simulator into an IC after the panel set-up is complete.
Note: If this JPM is to be performed more than once, snap the Simulator into an IC after the panel set-up is complete.  


Nebraska Public Power District                                             SKL034-21-56 (8779)
Nebraska Public Power District SKL034-21-56 (8779)
Cooper Nuclear Station                                                               Page 75 of 11 Job Performance Measure for Operations                                                 Revision: 02 ATTACHMENT 2 Directions to Trainee:
Cooper Nuclear Station Page 75 of 11 Job Performance Measure for Operations Revision: 02 ATTACHMENT 2 Directions to Trainee:
When I tell you to begin, you are to perform actions as appropriate to panel 9-4 and 9-5 indications. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin, you are to perform actions as appropriate to panel 9-4 and 9-5 indications. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
If being simulated In-Plant or Control Room:
If being simulated In-Plant or Control Room:
Line 1,176: Line 1,544:
: 11. Optimum Water Chemistry is out of service.
: 11. Optimum Water Chemistry is out of service.
Initiating Cue(s):
Initiating Cue(s):
The Control Room Supervisor directs you to perform actions as appropriate to panel 9-4 and panel 9-5 indications.
The Control Room Supervisor directs you to perform actions as appropriate to panel 9-4 and panel 9-5 indications.  


Nebraska Public Power District                                                 SKL034-22-03 (36408)
Nebraska Public Power District SKL034-22-03 (36408)
Cooper Nuclear Station                                                                 Page 76 of 149 Job Performance Measure for Operations                                                     Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)
Cooper Nuclear Station Page 76 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)
Trainee:                                             Examiner:
Trainee:
Pass         Fail       Examiner Signature:                                       Date:
Examiner:
Pass Fail Examiner Signature:
Date:
Additional Program Information:
Additional Program Information:
THIS IS AN ALTERNATE PATH JPM
THIS IS AN ALTERNATE PATH JPM
: 1. Appropriate Performance Locations: CR / SIM
: 1.
: 2. Appropriate Trainee level: RO / SRO
Appropriate Performance Locations: CR / SIM
: 3. Evaluation Method:       Simulate       Perform
: 2.
: 4. Performance Time: 20 minutes
Appropriate Trainee level: RO / SRO
: 5. NRC K/A 259001 A4.02 (3.9/3.7)
: 3.
Evaluation Method: Simulate Perform
: 4.
Performance Time: 20 minutes
: 5.
NRC K/A 259001 A4.02 (3.9/3.7)
Directions to Examiner:
Directions to Examiner:
THIS IS AN ALTERNATE PATH JPM. THE INITIAL ATTEMPT TO RESET THE NOTE:        RFPT TRIP WILL FAIL AND REQUIRE USE OF THE ALTERNATIVE METHOD TO RESET THE TRIP.
NOTE:
: 1. This JPM evaluates the trainee's ability to perform a quick start of a RFPT
THIS IS AN ALTERNATE PATH JPM. THE INITIAL ATTEMPT TO RESET THE RFPT TRIP WILL FAIL AND REQUIRE USE OF THE ALTERNATIVE METHOD TO RESET THE TRIP.
: 2. If this JPM is performed on the Simulator, only the cues preceded by "#" should be given.
: 1.
: 3. All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space if desired by the examiner.
This JPM evaluates the trainee's ability to perform a quick start of a RFPT
: 4. DO NOT place the simulator in RUN until the student is ready to perform the JPM.
: 2.
If this JPM is performed on the Simulator, only the cues preceded by "#" should be given.
: 3.
All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space if desired by the examiner.
: 4.
DO NOT place the simulator in RUN until the student is ready to perform the JPM.
(RFP must be coasting down or on turning gear < 5 minutes to use this procedure section.)
(RFP must be coasting down or on turning gear < 5 minutes to use this procedure section.)
: 5. Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.
: 5.
: 6. Brief the trainee, place the simulator in run, and tell the trainee to begin.
Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.
: 6.
Brief the trainee, place the simulator in run, and tell the trainee to begin.
Directions to Trainee:
Directions to Trainee:
When I tell you to begin, you are to perform a quick start of the A RFPT. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
When I tell you to begin, you are to perform a quick start of the A RFPT. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
If being simulated In-Plant or Control Room:
If being simulated In-Plant or Control Room:
When simulating, physically point to any meters, gauges, recorders and controls you
When simulating, physically point to any meters, gauges, recorders and controls you  


Nebraska Public Power District                                             SKL034-22-03 (36408)
Nebraska Public Power District SKL034-22-03 (36408)
Cooper Nuclear Station                                                             Page 77 of 149 Job Performance Measure for Operations                                                 Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path) would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
Cooper Nuclear Station Page 77 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path) would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
If being performed in the Simulator:
If being performed in the Simulator:
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.  
    ====================================================================
 
====================================================================
General Conditions:
General Conditions:
: 1.     The Reactor has scrammed.
: 1.
: 2.     Both RFPs have tripped on high level.
The Reactor has scrammed.
: 2.
Both RFPs have tripped on high level.
General  
General  


==References:==
==References:==
: 1.     Procedure 2.2.28
: 1.
: 8.     Procedure 2.2.28.1 General Tools and Equipment:
Procedure 2.2.28
: 1.     None Special Conditions, References, Tools, Equipment:
: 8.
: 1.     Simulator Setup: See Attachment 1.
Procedure 2.2.28.1 General Tools and Equipment:
: 2.     Critical checks denoted by "*".
: 1.
: 3.     Simulator cues denoted by "#".
None Special Conditions, References, Tools, Equipment:
: 1.
Simulator Setup: See Attachment 1.
: 2.
Critical checks denoted by "*".
: 3.
Simulator cues denoted by "#".
Task Standards:
Task Standards:
: 1.     100% of critical elements successfully completed without error.
: 1.
: 2.     100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 2.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
The Control Room Supervisor directs you to restart A RFP in Reactor Pressure Follow Mode and raise RPV water level to the GREEN Band using the quick restart hard card.
The Control Room Supervisor directs you to restart A RFP in Reactor Pressure Follow Mode and raise RPV water level to the GREEN Band using the quick restart hard card.  


Nebraska Public Power District                                           SKL034-22-03 (36408)
Nebraska Public Power District SKL034-22-03 (36408)
Cooper Nuclear Station                                                         Page 78 of 149 Job Performance Measure for Operations                                             Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)
Cooper Nuclear Station Page 78 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)
Performance Checklist         Standards                                         Initials Ensure RFPT coasting from trip or not on turning
Performance Checklist Standards Initials
: 1. Ensure RFPT time        gear > 5 minutes after trip.
: 1.
limit is met.                                                              _______
Ensure RFPT time limit is met.
Ensure RFPT coasting from trip or not on turning gear > 5 minutes after trip.
CUE: RFPTs are still coasting down.
CUE: RFPTs are still coasting down.
NOTE:       RFPT Trips are as follows:
NOTE:
RFPT Trips are as follows:
: 1. Low pump suction pressure of 260 psig after a 15 second time delay
: 1. Low pump suction pressure of 260 psig after a 15 second time delay
: 2. Exhaust casing high pressure at 7" Hgv
: 2. Exhaust casing high pressure at 7" Hgv
Line 1,238: Line 1,633:
: 4. Low lube oil pressure of 10 psig
: 4. Low lube oil pressure of 10 psig
: 5. Thrust bearing wear at 10 psig oil pressure
: 5. Thrust bearing wear at 10 psig oil pressure
: 6. High reactor water level of 52.5" (Tech Spec < 54")
: 6. High reactor water level of 52.5" (Tech Spec < 54")
: 7. Electrical overspeed at 5950 rpm
: 7. Electrical overspeed at 5950 rpm
: 8. Mechanical overspeed at 6050 to 6150 rpm
: 8. Mechanical overspeed at 6050 to 6150 rpm
: 9. Emergency trip pushbutton operation Ensure RFPT trips (except high water level) are reset. Check the following annunciators are clear:
: 9. Emergency trip pushbutton operation
                                    - A-1/A-6 (Low Suction Pressure),
: 2. Ensure RFPT trips are reset.
                                    - A-1/B-4 (Exhaust Hood High Temp),
Ensure RFPT trips (except high water level) are reset. Check the following annunciators are clear:  
                                    - A-1/B-5 (Low Vacuum Trip),
- A-1/A-6 (Low Suction Pressure),  
                                    - A-1/B-6 (Thrust Bearing Trip),
- A-1/B-4 (Exhaust Hood High Temp),  
: 2. Ensure RFPT trips are            - A-1/C-4 (Low Oil Pressure Pre Trip) reset.                    Ensure reactor water level is < 54               _______
- A-1/B-5 (Low Vacuum Trip),  
Check RFPT/Main Turbine high RPV water level trip amber lights (panel 9-5)
- A-1/B-6 (Thrust Bearing Trip),  
CUE: All trips (except high RPV water level) are reset.
- A-1/C-4 (Low Oil Pressure Pre Trip)
Ensure reactor water level is < 54 Check RFPT/Main Turbine high RPV water level trip amber lights (panel 9-5)
CUE: All trips (except high RPV water level) are reset.  


Nebraska Public Power District                                           SKL034-22-03 (36408)
Nebraska Public Power District SKL034-22-03 (36408)
Cooper Nuclear Station                                                         Page 79 of 149 Job Performance Measure for Operations                                             Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)
Cooper Nuclear Station Page 79 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)
At Panel 9-5, reset at least 2 of the HIGH WATER
: 3. Ensure High RPV water level RFPT trips are reset.
: 3. Ensure High RPV water      LEVEL TRIPS.
At Panel 9-5, reset at least 2 of the HIGH WATER LEVEL TRIPS.
level RFPT trips are
CUE: All 3 High RPV water level trips were in and now have been reset.
_______*
: 4. Ensure RFP-CS-RFPT-A RFPT A Control Station is in MDVP Operator ensures RFP-CS-RFPT-A is in MDVP CUE: RFP-CS-RFPT-A is in MDVP
reset.                    CUE: All 3 High RPV water level trips were in and now have been reset.
: 5. Ensure OUTPUT on RFP-CS-RFPT-A is adjusted to minimum.
: 4. Ensure RFP-CS-RFPT-       Operator ensures RFP-CS-RFPT-A is in MDVP A RFPT A Control
Operator ensures OUTPUT on RFP-CS-RFPT-A is adjusted to minimum.
_______
CUE: OUTPUT on RFP-CS-RFPT-A is adjusted to minimum.
Station is in MDVP        CUE: RFP-CS-RFPT-A is in MDVP Operator ensures OUTPUT on RFP-CS-RFPT-A
: 6. Attempt to reset A RFPT Press and hold RFPT A TRIP RESET button.
: 5. Ensure OUTPUT on          is adjusted to minimum.
Note the RFPT A HP and LP STOP valves are NOT open.
RFP-CS-RFPT-A is                                                             _______
adjusted to minimum.     CUE: OUTPUT on RFP-CS-RFPT-A is adjusted to minimum.
Press and hold RFPT A TRIP RESET button.
Note the RFPT A HP and LP STOP valves are
: 6. Attempt to reset A      NOT open.
RFPT                                                                          _______
CUE: HP and LP STOP valves red light are OFF Green lights are ON.
CUE: HP and LP STOP valves red light are OFF Green lights are ON.
: 7. Recognize and report       Recognize and report the A RFPT trip reset the trip reset failure. failure.                                           _______
: 7. Recognize and report the trip reset failure.
Press and hold RFPT A OVERSPEED TRIP BLOCK and RFPT A OVERSPEED TRIP RESET.
Recognize and report the A RFPT trip reset failure.
: 8. Reset A RFPT CUE: HP and LP STOP valves red lights are ON       _______*
: 8. Reset A RFPT Press and hold RFPT A OVERSPEED TRIP BLOCK and RFPT A OVERSPEED TRIP RESET.
Green lights are OFF.
CUE: HP and LP STOP valves red lights are ON Green lights are OFF.
Ensure RF-FCV-11A, MIN FLOW VALVE, is
: 9.
: 9. Ensure RF-11A is        open.
Ensure RF-11A is OPEN Ensure RF-FCV-11A, MIN FLOW VALVE, is open.
OPEN                                                                        _______
CUE: RF-FCV-11A Red light is ON and Green light OFF.  
CUE: RF-FCV-11A Red light is ON and Green light OFF.


Nebraska Public Power District                                             SKL034-22-03 (36408)
Nebraska Public Power District SKL034-22-03 (36408)
Cooper Nuclear Station                                                           Page 80 of 149 Job Performance Measure for Operations                                             Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)
Cooper Nuclear Station Page 80 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)
At a HMI, select FEEDPUMP A screen for desired RFP to be started.
: 10. Select RFP At a HMI, select FEEDPUMP A screen for desired RFP to be started.
: 10. Select RFP CUE: A RFP selected                               _______
CUE: A RFP selected
: 11. Select Quick Restart.
Select QUICK RESTART start type.
Select QUICK RESTART start type.
: 11. Select Quick Restart.
CUE: Quick restart selected
CUE: Quick restart selected                         _______*
: 12. Select HP Start.
If extraction steam is available, select LP START.
If extraction steam is available, select LP START.
Otherwise, select HP START.
Otherwise, select HP START.  
: 12. Select HP Start.                                                              _______*
.CUE: HP Start selected
                              .CUE: HP Start selected
: 13. Press green Start button and confirm start in pop-up box.
                              .
Press green START button and confirm start in pop-up box CUE: Start in Pop-up box.
Press green START button and confirm start in
: 14. Continue Button After RFP A(B) reaches MINIMUM GOVERNOR, depress green CONTINUE button.
: 13. Press green Start        pop-up box button and confirm start                                                       _______*
in pop-up box.            CUE: Start in Pop-up box.
After RFP A(B) reaches MINIMUM GOVERNOR, depress green CONTINUE button.
: 14. Continue Button                                                                _______*
CUE: green CONTINUE button depressed.
CUE: green CONTINUE button depressed.
Ensure injection path is aligned to the reactor vessel, as dictated by plant conditions
: 15. Ensure injection path Ensure injection path is aligned to the reactor vessel, as dictated by plant conditions CUE: Path lined up
: 15. Ensure injection path                                                          _______
: 16. Raise speed Use UP arrow to raise RFP speed to raise RFP discharge pressure.
CUE: Path lined up Use UP arrow to raise RFP speed to raise RFP discharge pressure.
CUE: RFP speed rising.  
: 16. Raise speed              CUE: RFP speed rising.                               _______


Nebraska Public Power District                                           SKL034-22-03 (36408)
Nebraska Public Power District SKL034-22-03 (36408)
Cooper Nuclear Station                                                         Page 81 of 149 Job Performance Measure for Operations                                             Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)
Cooper Nuclear Station Page 81 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)
Place RFP in desired mode (e.g., AUTO or REACTOR PRESSURE FOLLOW).
: 17. Place In Reactor Pressure Follow Place RFP in desired mode (e.g., AUTO or REACTOR PRESSURE FOLLOW).
: 17. Place In Reactor Pressure Follow            CUE: In Reactor pressure follow                   _______*
CUE: In Reactor pressure follow
If required, adjust STARTUP MASTER controller using UP/DOWN arrows or RAMP FUNCTION, to adjust LEVEL SETPOINT as desired.
: 18. Raise Level If required, adjust STARTUP MASTER controller using UP/DOWN arrows or RAMP FUNCTION, to adjust LEVEL SETPOINT as desired.
: 18. Raise Level                                                                  _______*
CUE Level at 35
CUE Level at 35 Inform the Control Room Supervisor that 1A RFP has been restarted and injecting into the RPV
: 19. Inform the CRS that the task is Complete.
: 19. Inform the CRS that the task is Complete.                                                            _______
Inform the Control Room Supervisor that 1A RFP has been restarted and injecting into the RPV  
                              #CUE:       CRS acknowledges the report.
#CUE:
CRS acknowledges the report.  


Nebraska Public Power District                                               SKL034-22-03 (36408)
Nebraska Public Power District SKL034-22-03 (36408)
Cooper Nuclear Station                                                             Page 82 of 149 Job Performance Measure for Operations                                                 Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)
Cooper Nuclear Station Page 82 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)
ATTACHMENT 1 SIMULATOR SET-UP A. Materials Required                           None B. Initialize the Simulator in IC               Any IC that will support this JPM C. Run Batch File                               None D. Change the simulator Number                   Title             Tgr   TD   Sev Ramp     Initial conditions as follows:
ATTACHMENT 1 SIMULATOR SET-UP A. Materials Required None B. Initialize the Simulator in IC Any IC that will support this JPM C. Run Batch File None D. Change the simulator conditions as follows:
: 1. Triggers         None Shutdown
Number Title Tgr TD Sev Ramp Initial
: 2. Malfunctions     RR19                     Cooling Loss                   100 of Mass N/A                     N/A
: 1. Triggers None
: 3. Remotes           None N/A                     N/A RFPT-A Trip
: 2. Malfunctions RR19 Shutdown Cooling Loss of Mass 100 N/A N/A
: 4. Overrides         ZDIRFSWRFTRA[1]         Reset                         OFF Pushbutton
: 3. Remotes None N/A N/A
: 4. Overrides ZDIRFSWRFTRA[1]
RFPT-A Trip Reset Pushbutton OFF
: 5. Panel Setup
: a. Place the Simulator in run.
: a. Place the Simulator in run.
: b. Use Monitor Parameter RRMRVLOSS to reset malfunction RR19.
: b. Use Monitor Parameter RRMRVLOSS to reset malfunction RR19.
Line 1,322: Line 1,712:
: d. Secure two Condensate and Condensate Booster pumps.
: d. Secure two Condensate and Condensate Booster pumps.
: e. If water level needs to be lowered insert RR19.
: e. If water level needs to be lowered insert RR19.
: 5. Panel Setup
: f. Ensure the A RFP is still coasting down or is on the turning gear.
: f. Ensure the A RFP is still coasting down or is on the turning gear.
: g. Ensure RPV water level is < +50" (narrow range).
: g. Ensure RPV water level is < +50" (narrow range).
: h. Insert listed switch override.
: h. Insert listed switch override.
: i. Place the Simulator in FREEZE until the operator is ready to begin.
: i. Place the Simulator in FREEZE until the operator is ready to begin.
Note: If this JPM is to be performed more than once, take a SNAPSHOT after the panel setup is complete.
Note: If this JPM is to be performed more than once, take a SNAPSHOT after the panel setup is complete.  


Nebraska Public Power District                                       SKL034-22-03 (36408)
Nebraska Public Power District SKL034-22-03 (36408)
Cooper Nuclear Station                                                       Page 83 of 149 Job Performance Measure for Operations                                           Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)
Cooper Nuclear Station Page 83 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)  


Nebraska Public Power District                                             SKL034-22-03 (36408)
Nebraska Public Power District SKL034-22-03 (36408)
Cooper Nuclear Station                                                             Page 84 of 149 Job Performance Measure for Operations                                                 Revision 00 ATTACHMENT 2 Directions to Trainee:
Cooper Nuclear Station Page 84 of 149 Job Performance Measure for Operations Revision 00 ATTACHMENT 2 Directions to Trainee:
When I tell you to begin, you are to perform a quick start of the A RFPT. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
When I tell you to begin, you are to perform a quick start of the A RFPT. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
If being simulated In-Plant or Control Room:
If being simulated In-Plant or Control Room:
Line 1,343: Line 1,732:
: 2. Both RFPs have tripped on high level.
: 2. Both RFPs have tripped on high level.
Initiating Cues:
Initiating Cues:
The Control Room Supervisor directs you to restart A RFP in Reactor Pressure Follow Mode and raise RPV water level to the GREEN Band using the quick restart hard card.
The Control Room Supervisor directs you to restart A RFP in Reactor Pressure Follow Mode and raise RPV water level to the GREEN Band using the quick restart hard card.  
 
Nebraska Public Power District SKL034-21-48 (7405)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 85 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101


Nebraska Public Power District                                                  SKL034-21-48 (7405)
Cooper Nuclear Station                                                                    Revision 02 Job Performance Measure                                                                Page 85 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101
=======================================================================
=======================================================================
=
=
Line 1,352: Line 1,742:


==Title:==
==Title:==
Manually Initiate HPCI (Hard Card) (Alternate Path)
Manually Initiate HPCI (Hard Card) (Alternate Path)  
 
========================================================================
========================================================================
Trainee:                                                 Examiner:
Trainee:
Pass [ ]; Fail [ ] Examiner Signature:                                           Date:
Examiner:
Pass [ ]; Fail [ ] Examiner Signature:
Date:
Additional Program Information:
Additional Program Information:
NOTE THIS IS AN ALTERNATE PATH JPM.
NOTE THIS IS AN ALTERNATE PATH JPM.
: 1. Appropriate Performance Locations: CR/SIM
: 1. Appropriate Performance Locations: CR/SIM
: 2. Appropriate Trainee Level: RO/SRO
: 2. Appropriate Trainee Level: RO/SRO
: 3. Evaluation Method: Perform               Simulate
: 3. Evaluation Method: Perform Simulate
: 4. Performance Time: 8 minutes
: 4. Performance Time: 8 minutes
: 5. NRC K/As 206000 K3.02 (3.8/3.8) and A4.01 (3.8/3.7)
: 5. NRC K/As 206000 K3.02 (3.8/3.8) and A4.01 (3.8/3.7)
Directions to Examiner:
Directions to Examiner:
NOTE THIS IS AN ALTERNATE PATH JPM. THE FLOW CONTROLLER WILL FAIL TO OPERATE IN AUTOMATIC AND MUST BE PLACED IN MANUAL.
NOTE THIS IS AN ALTERNATE PATH JPM. THE FLOW CONTROLLER WILL FAIL TO OPERATE IN AUTOMATIC AND MUST BE PLACED IN MANUAL.
: 10. This JPM evaluates the trainees ability to perform the injection mode of operation of HPCI per the guidance of procedure 2.2.33.1, High Pressure Coolant Injection System Operations (hard card).
: 10. This JPM evaluates the trainees ability to perform the injection mode of operation of HPCI per the guidance of procedure 2.2.33.1, High Pressure Coolant Injection System Operations (hard card).
: 11. If this JPM is performed on the Simulator, only the cues preceded by # should be given.
: 11. If this JPM is performed on the Simulator, only the cues preceded by # should be given.
: 12. All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
: 12. All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
: 13. Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.
: 13. Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.
: 14. Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.
: 14. Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.  
 
Nebraska Public Power District SKL034-21-48 (7405)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 86 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101


Nebraska Public Power District                                                  SKL034-21-48 (7405)
Cooper Nuclear Station                                                                    Revision 02 Job Performance Measure                                                                Page 86 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101
=======================================================================
=======================================================================
=
=
Line 1,378: Line 1,772:


==Title:==
==Title:==
Manually Initiate HPCI (Hard Card) (Alternate Path)
Manually Initiate HPCI (Hard Card) (Alternate Path)  
 
========================================================================
========================================================================
Directions to Trainee:
Directions to Trainee:
Line 1,385: Line 1,780:
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
If being performed in the Simulator:
If being performed in the Simulator:
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.  
    ====================================================================
 
====================================================================
General Conditions:
General Conditions:
: 12. The Reactor is shutdown following a scram.
: 12. The Reactor is shutdown following a scram.
Line 1,395: Line 1,791:


==References:==
==References:==
: 1. Procedure 2.2.33.1, High Pressure Coolant Injection System Operation.
: 1.
Procedure 2.2.33.1, High Pressure Coolant Injection System Operation.  
 
Nebraska Public Power District SKL034-21-48 (7405)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 87 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101


Nebraska Public Power District                                            SKL034-21-48 (7405)
Cooper Nuclear Station                                                              Revision 02 Job Performance Measure                                                          Page 87 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101
=======================================================================
=======================================================================
=
=
Line 1,404: Line 1,802:


==Title:==
==Title:==
Manually Initiate HPCI (Hard Card) (Alternate Path)
Manually Initiate HPCI (Hard Card) (Alternate Path)  
 
========================================================================
========================================================================
General Tools and Equipment:
General Tools and Equipment:
: 1. None Special Conditions, References, Tools, Equipment:
: 1.
: 1. Simulator Setup: See Attachment 1.
None Special Conditions, References, Tools, Equipment:
: 2. Critical steps denoted by *.
: 1.
: 3. Simulator cues denoted by #.
Simulator Setup: See Attachment 1.
: 2.
Critical steps denoted by *.
: 3.
Simulator cues denoted by #.
Task Standards:
Task Standards:
: 2. 100% of critical elements successfully completed without error.
: 2.
: 2. 100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 2.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
The Control Room Supervisor directs you to place HPCI in the injection mode at rated flow using the hard card. Inform the CRS when HPCI is injecting at rated flow.
The Control Room Supervisor directs you to place HPCI in the injection mode at rated flow using the hard card. Inform the CRS when HPCI is injecting at rated flow.  
 
Nebraska Public Power District SKL034-21-48 (7405)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 88 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101


Nebraska Public Power District                                              SKL034-21-48 (7405)
Cooper Nuclear Station                                                                Revision 02 Job Performance Measure                                                            Page 88 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101
=======================================================================
=======================================================================
=
=
Line 1,424: Line 1,830:


==Title:==
==Title:==
Manually Initiate HPCI (Hard Card) (Alternate Path)
Manually Initiate HPCI (Hard Card) (Alternate Path)  
 
========================================================================
========================================================================
Performance Checklist                               Standards                     Initials
Performance Checklist Standards Initials
: 24. Place GLAND SEAL CNDSR           The operator places the control switch for the BLOWER control switch in        GLAND SEAL CNDSR BLOWER in START.
: 24. Place GLAND SEAL CNDSR BLOWER control switch in START.
START.
The operator places the control switch for the GLAND SEAL CNDSR BLOWER in START.
CUE:     The red light for the GLAND SEAL CNDSR BLOWER is lit, the green light is out.
CUE:
: 25. Checks High Water Level         Checks and Resets REACTOR HI WTR Trip                            LEVEL TRIP SIGNAL.
The red light for the GLAND SEAL CNDSR BLOWER is lit, the green light is out.
: 25. Checks High Water Level Trip Checks and Resets REACTOR HI WTR LEVEL TRIP SIGNAL.
CUE: REACTOR HI WTR LEVEL TRIP yellow light is OFF.
CUE: REACTOR HI WTR LEVEL TRIP yellow light is OFF.
: 26. Open HPCI-MO-14, STM TO         The operator places the control switch for the TURB VLV.                        HPCI-MO-14 in OPEN.
: 26. Open HPCI-MO-14, STM TO TURB VLV.
* CUE:     HPCI-MO-14 red light is on, green light is off.
The operator places the control switch for the HPCI-MO-14 in OPEN.
: 27. Start AUXILIARY OIL PUMP         The operator places the control switch for the by placing control switch in    Auxiliary Oil Pump switch to START.
CUE:
* START.
HPCI-MO-14 red light is on, green light is off.
CUE:     HPCI Aux Oil pump red light is on, green light is off.
: 27. Start AUXILIARY OIL PUMP by placing control switch in START.
: 28. Open HPCI-MO-19,                 The operator places the control switch for the INJECTION VALVE.                HPCI-MO-19 in OPEN.
The operator places the control switch for the Auxiliary Oil Pump switch to START.
* CUE:     HPCI-MO-19 red light is on, green light is off.
CUE:
HPCI Aux Oil pump red light is on, green light is off.
: 28. Open HPCI-MO-19, INJECTION VALVE.
The operator places the control switch for the HPCI-MO-19 in OPEN.
CUE:
HPCI-MO-19 red light is on, green light is off.  
 
Nebraska Public Power District SKL034-21-48 (7405)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 89 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101


Nebraska Public Power District                                              SKL034-21-48 (7405)
Cooper Nuclear Station                                                                Revision 02 Job Performance Measure                                                            Page 89 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101
=======================================================================
=======================================================================
=
=
Line 1,447: Line 1,861:


==Title:==
==Title:==
Manually Initiate HPCI (Hard Card) (Alternate Path)
Manually Initiate HPCI (Hard Card) (Alternate Path)  
 
========================================================================
========================================================================
Performance Checklist                             Standards                     Initials
Performance Checklist Standards Initials
: 29. Adjust FLOW                     Operator attempts to control HPCI flow with CONTROLLER                     the Set Tape.
: 29. Adjust FLOW CONTROLLER HPCI-FIC-108 setpoint to maintain desired HPCI flow, as necessary.
HPCI-FIC-108 setpoint to maintain desired HPCI flow,     CUE:     HPCI flow remains almost zero, as necessary.                            irrespective of Set Tape setting.
Operator attempts to control HPCI flow with the Set Tape.
: 30. Operator recognizes and         Operator reports to CRS that HPCI controller reports failed controller      has failed in automatic.
CUE:
                                    #CUE: CRS acknowledges, directs operator to continue with HPCI injection
HPCI flow remains almost zero, irrespective of Set Tape setting.
: 31. Operator places HPCI           Operator turns HPCI controller controller in manual.          AUTO/BAL/MAN switch to MAN.
: 30. Operator recognizes and reports failed controller Operator reports to CRS that HPCI controller has failed in automatic.  
* CUE:     HPCI controller AUTO/BAL/MAN switch is in MAN.
#CUE: CRS acknowledges, directs operator to continue with HPCI injection
: 32. Operator adjusts HPCI           Operator turns HPCI controller manual knob controller in manual to        clockwise to raise flow, counter-clockwise to
: 31. Operator places HPCI controller in manual.
* control flow.`                  lower flow until flow is 4250 gpm.
Operator turns HPCI controller AUTO/BAL/MAN switch to MAN.
CUE:     HPCI flow responds to manual control knob adjustment as appropriate.
CUE:
: 33. Operator reports HPCI is in     Operator reports HPCI is in injection mode at injection mode at rated flow. rated flow per the hard card.
HPCI controller AUTO/BAL/MAN switch is in MAN.
CUE:     CRS acknowledges report.
: 32. Operator adjusts HPCI controller in manual to control flow.`
Operator turns HPCI controller manual knob clockwise to raise flow, counter-clockwise to lower flow until flow is 4250 gpm.
CUE:
HPCI flow responds to manual control knob adjustment as appropriate.
: 33. Operator reports HPCI is in injection mode at rated flow.
Operator reports HPCI is in injection mode at rated flow per the hard card.
CUE:
CRS acknowledges report.  
 
Nebraska Public Power District SKL034-21-48 (7405)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 90 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101


Nebraska Public Power District                                              SKL034-21-48 (7405)
Cooper Nuclear Station                                                                  Revision 02 Job Performance Measure                                                            Page 90 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101
=======================================================================
=======================================================================
=
=
Line 1,469: Line 1,892:


==Title:==
==Title:==
Manually Initiate HPCI (Hard Card) (Alternate Path)
Manually Initiate HPCI (Hard Card) (Alternate Path)  
 
========================================================================
========================================================================
ATTACHMENT 1 SIMULATOR SET-UP A. Materials required None C. Initialize the Simulator in any IC that will support HPCI injection mode after a scram (IC-18, 19 or 20 suggested)
ATTACHMENT 1 SIMULATOR SET-UP A. Materials required None C. Initialize the Simulator in any IC that will support HPCI injection mode after a scram (IC-18, 19 or 20 suggested)
Batch File name - none.
Batch File name - none.
C. Change the Simulator conditions from those of the IC as follows:
C. Change the Simulator conditions from those of the IC as follows:
: 1. Triggers Number             File Name                                 Description None
: 1. Triggers Number File Name Description None
: 2. Malfunctions Number                 Title                 Trigger   TD       Severity   Ramp     Initial RC01       RCIC System Failure to               A       N/A       N/A       N/A       N/A Auto Start HP01       HPCI System Failure to               A       N/A       N/A       N/A       N/A Auto Start
: 2. Malfunctions Number Title Trigger TD Severity Ramp Initial RC01 RCIC System Failure to Auto Start A
: 3. Remotes Number                       Title                     Trigger       TD     Value     Ramp None
N/A N/A N/A N/A HP01 HPCI System Failure to Auto Start A
N/A N/A N/A N/A
: 3. Remotes Number Title Trigger TD Value Ramp None  
 
Nebraska Public Power District SKL034-21-48 (7405)
Cooper Nuclear Station Revision 02 Job Performance Measure Page 91 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101


Nebraska Public Power District                                            SKL034-21-48 (7405)
Cooper Nuclear Station                                                              Revision 02 Job Performance Measure                                                          Page 91 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101
=======================================================================
=======================================================================
=
=
Line 1,485: Line 1,912:


==Title:==
==Title:==
Manually Initiate HPCI (Hard Card) (Alternate Path)
Manually Initiate HPCI (Hard Card) (Alternate Path)  
 
========================================================================
========================================================================
: 4. Overrides Instrument                     Tag             Trigger   TD     Value     Ramp HPCI Set Tape                     ZAIHPCIFIC108[2]           A       0       200       0
: 4. Overrides Instrument Tag Trigger TD Value Ramp HPCI Set Tape ZAIHPCIFIC108[2]
A 0
200 0
: 5. Panel Set-up (suggested. Any setup is allowed that supports performance of the HPCI injection mode)
: 5. Panel Set-up (suggested. Any setup is allowed that supports performance of the HPCI injection mode)
: a. Insert listed overrides and malfunctions.
: a. Insert listed overrides and malfunctions.
Line 1,495: Line 1,925:
: e. Reset HPCI high level trip signal (if present).
: e. Reset HPCI high level trip signal (if present).
: f. Place the Simulator in FREEZE.
: f. Place the Simulator in FREEZE.
Note:   If this JPM is to be performed more than once, snap the Simulator into an IC after the panel set-up is complete.
Note:
If this JPM is to be performed more than once, snap the Simulator into an IC after the panel set-up is complete.  


Nebraska Public Power District                                             SKL034-21-48(7405)
Nebraska Public Power District SKL034-21-48(7405)
Cooper Nuclear Station                                                               Page 92 of 8 Job Performance Measure for Operations                                               Revision: 02 ATTACHMENT 2 Directions to Trainee:
Cooper Nuclear Station Page 92 of 8 Job Performance Measure for Operations Revision: 02 ATTACHMENT 2 Directions to Trainee:
When I tell you to begin, you are to operate HPCI in the injection mode at rated flow using the hard card. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin, you are to operate HPCI in the injection mode at rated flow using the hard card. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
If being simulated In-Plant or Control Room:
If being simulated In-Plant or Control Room:
Line 1,510: Line 1,941:
: 19. SBGT and REC have been aligned to support HPCI operation.
: 19. SBGT and REC have been aligned to support HPCI operation.
Initiating Cue(s):
Initiating Cue(s):
The Control Room Supervisor directs you to place HPCI in the injection mode at rated flow using the hard card. Inform the CRS when HPCI is injecting at rated flow.
The Control Room Supervisor directs you to place HPCI in the injection mode at rated flow using the hard card. Inform the CRS when HPCI is injecting at rated flow.  


Nebraska Public Power District                         SKL034-21-60(8901)
Nebraska Public Power District SKL034-21-60(8901)
Cooper Nuclear Station                                       Page 93 of 8 Job Performance Measure for Operations                       Revision: 01 Task No.: 213003P0101
Cooper Nuclear Station Page 93 of 8 Job Performance Measure for Operations Revision: 01 Task No.: 213003P0101  
  ==================================================================
 
==================================================================
Task
Task


==Title:==
==Title:==
Verify a Group 3 Primary Containment Isolation (Alternate Path)
Verify a Group 3 Primary Containment Isolation (Alternate Path)  
  ==================================================================
 
==================================================================
Trainee:
Trainee:
Examiner:
Examiner:
Pass:         Fail:           Examiner Signature:
Pass: Fail: Examiner Signature:
Date:
Date:
NOTE THIS IS AN ALTERNATE PATH JPM.
NOTE THIS IS AN ALTERNATE PATH JPM.
Additional Program Information:
Additional Program Information:
: 1. Appropriate Performance Locations: CR / SIM
: 1. Appropriate Performance Locations: CR / SIM
: 2. Appropriate Trainee level: RO / SRO / STE
: 2. Appropriate Trainee level: RO / SRO / STE
: 3. Evaluation Method: Perform           Simulate
: 3. Evaluation Method: Perform Simulate
: 4. Performance Time: 8 minutes
: 4. Performance Time: 8 minutes
: 5. NRC K/As 2.1.31 (4.2/3.9) and 223002 A4.01 (3.6/3.5)
: 5. NRC K/As 2.1.31 (4.2/3.9) and 223002 A4.01 (3.6/3.5)
Line 1,537: Line 1,970:
: 17. If this JPM is performed on the Simulator, only the cues preceded by A#@ should be given.
: 17. If this JPM is performed on the Simulator, only the cues preceded by A#@ should be given.
: 18. All blanks must be filled out with either initials or an ANP@ for Anot performed@; an explanation may also be written in the space, if desired, by the examiner.
: 18. All blanks must be filled out with either initials or an ANP@ for Anot performed@; an explanation may also be written in the space, if desired, by the examiner.
: 19. IF asked, it is acceptable to use the hard card to perform the isolation verification.
: 19. IF asked, it is acceptable to use the hard card to perform the isolation verification.  
 
Nebraska Public Power District SKL034-21-60(8901)
Cooper Nuclear Station Page 94 of 8 Job Performance Measure for Operations Revision: 01 Task No.: 213003P0101


Nebraska Public Power District                                            SKL034-21-60(8901)
==================================================================
Cooper Nuclear Station                                                            Page 94 of 8 Job Performance Measure for Operations                                            Revision: 01 Task No.: 213003P0101
    ==================================================================
Task
Task


==Title:==
==Title:==
Verify a Group 3 Primary Containment Isolation (Alternate Path)
Verify a Group 3 Primary Containment Isolation (Alternate Path)  
    ==================================================================
 
==================================================================
: 20. Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.
: 20. Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.
: 21. Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.
: 21. Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.
Line 1,563: Line 1,998:
: 1. Procedure 2.1.22, Recovering from a Group Isolation.
: 1. Procedure 2.1.22, Recovering from a Group Isolation.
General Tools and Equipment:
General Tools and Equipment:
: 1. None Special Conditions, References, Tools, Equipment:
: 1. None Special Conditions, References, Tools, Equipment:  
 
Nebraska Public Power District SKL034-21-60(8901)
Cooper Nuclear Station Page 95 of 8 Job Performance Measure for Operations Revision: 01 Task No.: 213003P0101


Nebraska Public Power District                                      SKL034-21-60(8901)
==================================================================
Cooper Nuclear Station                                                    Page 95 of 8 Job Performance Measure for Operations                                    Revision: 01 Task No.: 213003P0101
  ==================================================================
Task
Task


==Title:==
==Title:==
Verify a Group 3 Primary Containment Isolation (Alternate Path)
Verify a Group 3 Primary Containment Isolation (Alternate Path)  
  ==================================================================
 
==================================================================
: 1. Simulator Setup: See Attachment 1.
: 1. Simulator Setup: See Attachment 1.
: 2. Critical steps denoted by A*@.
: 2. Critical steps denoted by A*@.
: 3. Simulator cues denoted by A#@.
: 3. Simulator cues denoted by A#@.
Task Standards:
Task Standards:
: 3. 100% of critical elements successfully completed without error.
: 3.
: 2. 100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 2.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
The Control Room Supervisor directs you to verify a Group 3 Primary Containment Isolation. Inform the CRS when you have completed the verification.
The Control Room Supervisor directs you to verify a Group 3 Primary Containment Isolation. Inform the CRS when you have completed the verification.  


Nebraska Public Power District                         SKL034-21-60(8901)
Nebraska Public Power District SKL034-21-60(8901)
Cooper Nuclear Station                                       Page 96 of 8 Job Performance Measure for Operations                       Revision: 01 Task No.: 213003P0101
Cooper Nuclear Station Page 96 of 8 Job Performance Measure for Operations Revision: 01 Task No.: 213003P0101  
  ==================================================================
 
==================================================================
Task
Task


==Title:==
==Title:==
Verify a Group 3 Primary Containment Isolation (Alternate Path)
Verify a Group 3 Primary Containment Isolation (Alternate Path)  
  ==================================================================
 
Performance Checklist               Standards               Initials
==================================================================
: 34. Obtains 2.1.22         Hard Card (or procedure 2.1.22)
Performance Checklist Standards Initials
Attachment 1 Hard Card   obtained (or 2.1.22).
: 34. Obtains 2.1.22 Hard Card (or 2.1.22).
: 35. Verifies Group 3       Observes the four Group 3 isolation signal is      Isolation Indicating lights on present.                panel 9-5 are OFF.
Hard Card (or procedure 2.1.22) obtained
CUE: Channel A and B (4) White indicating lights are OFF.
: 35. Verifies Group 3 isolation signal is present.
: 36. Verifies RWCU-MO-15     Operator observes indicating is closed.              lights for RWCU-MO-15 on panel 9-3 and determines valve failed to close.
Observes the four Group 3 Isolation Indicating lights on panel 9-5 are OFF.
CUE: The green light is OFF and the Red light is ON.
CUE: Channel A and B (4) White indicating lights are OFF.
: 37. Manually closes         Operator places the control RWCU-MO-15.             switch for RWCU-MO-15 in CLOSE and observes the green light ON and the red light OFF.
: 36. Verifies RWCU-MO-15 is closed.
CUE: When control switch is
Operator observes indicating lights for RWCU-MO-15 on panel 9-3 and determines valve failed to close.
* placed to CLOSE then green light is ON and red light is OFF.
CUE: The green light is OFF and the Red light is ON.
: 38. Verifies RWCU-MO-18     Operator observes indicating is closed.              lights for RWCU-MO-18 on panel 9-3 and determines valve failed to close.
: 37. Manually closes RWCU-MO-15.
Operator places the control switch for RWCU-MO-15 in CLOSE and observes the green light ON and the red light OFF.
CUE: When control switch is placed to CLOSE then green light is ON and red light is OFF.
: 38. Verifies RWCU-MO-18 is closed.
Operator observes indicating lights for RWCU-MO-18 on panel 9-3 and determines valve failed to close.  
 
Nebraska Public Power District SKL034-21-60(8901)
Cooper Nuclear Station Page 97 of 8 Job Performance Measure for Operations Revision: 01 Task No.: 213003P0101


Nebraska Public Power District                        SKL034-21-60(8901)
==================================================================
Cooper Nuclear Station                                      Page 97 of 8 Job Performance Measure for Operations                      Revision: 01 Task No.: 213003P0101
  ==================================================================
Task
Task


==Title:==
==Title:==
Verify a Group 3 Primary Containment Isolation (Alternate Path)
Verify a Group 3 Primary Containment Isolation (Alternate Path)  
  ==================================================================
 
Performance Checklist               Standards               Initials CUE: The green light is OFF and the Red light is ON.
==================================================================
: 39. Manually closes         Operator places the control RWCU-MO-18.             switch for RWCU-MO-18 in CLOSE and observes the green light ON and the red light OFF.
Performance Checklist Standards Initials CUE: The green light is OFF and the Red light is ON.
* CUE: When control switch is placed to CLOSE then green light is ON and red light is OFF.
: 39. Manually closes RWCU-MO-18.
: 40. Crack open RWCU-MO-     Operator places the control 74, Demin Suction      switch for RWCU-MO-74 in OPEN Bypass Valve.          position until dual valve position indication is observed.
Operator places the control switch for RWCU-MO-18 in CLOSE and observes the green light ON and the red light OFF.
CUE: Both green light and red light are ON.
CUE: When control switch is placed to CLOSE then green light is ON and red light is OFF.
: 41. Informs CRS that the   CRS informed that the Group 3 group 3 isolation      isolation is verified and that has been verified.      RWCU-MO-15 and 18 failed to isolate and were manually closed.
: 40. Crack open RWCU-MO-74, Demin Suction Bypass Valve.
                            #CUE: As the CRS acknowledge the report.
Operator places the control switch for RWCU-MO-74 in OPEN position until dual valve position indication is observed.
CUE: Both green light and red light are ON.
: 41. Informs CRS that the group 3 isolation has been verified.
CRS informed that the Group 3 isolation is verified and that RWCU-MO-15 and 18 failed to isolate and were manually closed.  
#CUE: As the CRS acknowledge the report.  


Nebraska Public Power District                             SKL034-21-60(8901)
Nebraska Public Power District SKL034-21-60(8901)
Cooper Nuclear Station                                           Page 98 of 8 Job Performance Measure for Operations                           Revision: 01 Task No.: 213003P0101
Cooper Nuclear Station Page 98 of 8 Job Performance Measure for Operations Revision: 01 Task No.: 213003P0101  
  ==================================================================
 
==================================================================
Task
Task


==Title:==
==Title:==
Verify a Group 3 Primary Containment Isolation (Alternate Path)
Verify a Group 3 Primary Containment Isolation (Alternate Path)  
  ==================================================================
 
==================================================================
ATTACHMENT 1 SIMULATOR SET-UP A. Materials required None B. Initialize the Simulator in any IC with the reactor at 100%
ATTACHMENT 1 SIMULATOR SET-UP A. Materials required None B. Initialize the Simulator in any IC with the reactor at 100%
power.(IC-18, 19 or 20 suggested)
power.(IC-18, 19 or 20 suggested)
Batch File name - none.
Batch File name - none.
C. Change the Simulator conditions from those of the IC as follows:
C. Change the Simulator conditions from those of the IC as follows:
: 1. Triggers Number         File Name                       Description E8     Group 2 isolation   zlopcisrelk5ac[1]==0
: 1. Triggers Number File Name Description E8 Group 2 isolation zlopcisrelk5ac[1]==0
: 2. Malfunctions Number           Title         Trigger   TD     Severit   Ramp   Initi y              al RP12     Group 3 Isolation         A       0       NA       NA     NA Failure
: 2. Malfunctions Number Title Trigger TD Severit y
: 3. Remotes Number               Title               Trigger       TD   Value   Ramp None
Ramp Initi al RP12 Group 3 Isolation Failure A
0 NA NA NA
: 3. Remotes Number Title Trigger TD Value Ramp None  
 
Nebraska Public Power District SKL034-21-60(8901)
Cooper Nuclear Station Page 99 of 8 Job Performance Measure for Operations Revision: 01 Task No.: 213003P0101


Nebraska Public Power District                        SKL034-21-60(8901)
==================================================================
Cooper Nuclear Station                                      Page 99 of 8 Job Performance Measure for Operations                      Revision: 01 Task No.: 213003P0101
  ==================================================================
Task
Task


==Title:==
==Title:==
Verify a Group 3 Primary Containment Isolation (Alternate Path)
Verify a Group 3 Primary Containment Isolation (Alternate Path)  
  ==================================================================
 
: 4. Overrides Instrument               Tag         Trigge   TD   Value   Ramp r
==================================================================
Group 3 ISOL IND         zlopcisrelk26(1)     8     0   OFF     0 LIGHT Group 3 ISOL IND         zlopcisrelk26(2)     8     0   OFF     0 LIGHT Group 3 ISOL IND         zlopcisrelk27(1)     8     0   OFF     0 LIGHT Group 3 ISOL IND         zlopcisrelk27(2)     8     0   OFF     0 LIGHT
: 4. Overrides Instrument Tag Trigge r
: 5. Panel Set-up (suggested. Any setup that results in a Group 3 isolation signal.)
TD Value Ramp Group 3 ISOL IND LIGHT zlopcisrelk26(1) 8 0
OFF 0
Group 3 ISOL IND LIGHT zlopcisrelk26(2) 8 0
OFF 0
Group 3 ISOL IND LIGHT zlopcisrelk27(1) 8 0
OFF 0
Group 3 ISOL IND LIGHT zlopcisrelk27(2) 8 0
OFF 0
: 5.
Panel Set-up (suggested. Any setup that results in a Group 3 isolation signal.)
: a. Place the Simulator in RUN.
: a. Place the Simulator in RUN.
Insert a scram.
Insert a scram.
: c. Verify a Group 3 isolation signal is present (low reactor water level).
: c. Verify a Group 3 isolation signal is present (low reactor water level).
: i. Place the Simulator in FREEZE.
: i. Place the Simulator in FREEZE.
Note:   If this JPM is to be performed more than once, snap the Simulator into an IC after the panel set-up is complete.
Note: If this JPM is to be performed more than once, snap the Simulator into an IC after the panel set-up is complete.  


Nebraska Public Power District                                           SKL034-21-60(8901)
Nebraska Public Power District SKL034-21-60(8901)
Cooper Nuclear Station                                                           Page 100 of 8 Job Performance Measure for Operations                                             Revision: 1 ATTACHMENT 2 Directions to Trainee:
Cooper Nuclear Station Page 100 of 8 Job Performance Measure for Operations Revision: 1 ATTACHMENT 2 Directions to Trainee:
When I tell you to begin, you are to Verify a Group 3 Primary Containment Isolation per the hard card. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin, you are to Verify a Group 3 Primary Containment Isolation per the hard card. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
If being simulated In-Plant or Control Room:
If being simulated In-Plant or Control Room:
Line 1,662: Line 2,125:
: c. EOP 1A has been entered.
: c. EOP 1A has been entered.
Initiating Cue(s):
Initiating Cue(s):
The Control Room Supervisor directs you to verify a Group 3 Primary Containment Isolation. Inform the CRS when you have completed the verification.
The Control Room Supervisor directs you to verify a Group 3 Primary Containment Isolation. Inform the CRS when you have completed the verification.  


Nebraska Public Power District                                                   SKL034-21-31 (2641)
Nebraska Public Power District SKL034-21-31 (2641)
Cooper Nuclear Station                                                               Page 101 of 149 Job Performance Measure for Operations                                                     Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Trainee:                                               Examiner:
Cooper Nuclear Station Page 101 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Trainee:
Pass         Fail       Examiner Signature:                                       Date:
Examiner:
Pass Fail Examiner Signature:
Date:
Additional Program Information:
Additional Program Information:
: 1.     Appropriate Performance Locations: CR / SIM
: 1.
: 2.     Appropriate Trainee level: RO / SRO
Appropriate Performance Locations: CR / SIM
: 3.     Evaluation Method:       Simulate       Perform
: 2.
: 4.     Performance Time: 20 minutes
Appropriate Trainee level: RO / SRO
: 5.     NRC K/A:262001 A4.04 (3.6/3.7)
: 3.
Evaluation Method: Simulate Perform
: 4.
Performance Time: 20 minutes
: 5.
NRC K/A:262001 A4.04 (3.6/3.7)
Directions to Examiner:
Directions to Examiner:
: 22. This JPM evaluates the trainee's ability to perform transfer of 4160 bus 1G from DG2 to the Emergency Transformer.
: 22.
: 23. If this JPM is performed on the Simulator, only the cues preceded by A#@ should be given.
This JPM evaluates the trainee's ability to perform transfer of 4160 bus 1G from DG2 to the Emergency Transformer.
: 24. All blanks must be filled out with either initials or an ANP@ for Anot performed@; an explanation may also be written in the space, if desired, by the examiner.
: 23.
: 25. Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.
If this JPM is performed on the Simulator, only the cues preceded by A#@ should be given.
: 26. Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.
: 24.
All blanks must be filled out with either initials or an ANP@ for Anot performed@; an explanation may also be written in the space, if desired, by the examiner.
: 25.
Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.
: 26.
Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.
Directions to Trainee:
Directions to Trainee:
When I tell you to begin, you are to perform the required actions to transfer 4160V bus 1G from DG2 to the Emergency Transformer. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin, you are to perform the required actions to transfer 4160V bus 1G from DG2 to the Emergency Transformer. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
Line 1,684: Line 2,159:
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
If being performed in the Simulator:
If being performed in the Simulator:
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.  
 
Nebraska Public Power District SKL034-21-31 (2641)
Cooper Nuclear Station Page 102 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer


Nebraska Public Power District                                              SKL034-21-31 (2641)
Cooper Nuclear Station                                                          Page 102 of 149 Job Performance Measure for Operations                                                Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer
=====================================================================
=====================================================================
General Conditions:
General Conditions:
: 1.     DG2 is supplying 4160 VAC bus 1G.
: 1.
: 2.     The Emergency Transformer is available.
DG2 is supplying 4160 VAC bus 1G.
: 3.     Breaker 1GB has failed.
: 2.
The Emergency Transformer is available.
: 3.
Breaker 1GB has failed.
General  
General  


==References:==
==References:==
: 1.                     Procedure   2.2.18, 4160V Auxiliary Power Distribution System
: 1.
: 2.                     Procedure   2.2.20.1, Diesel Generator Operations General Tools and Equipment:
Procedure 2.2.18, 4160V Auxiliary Power Distribution System
: 1.     None Special Conditions, References, Tools, Equipment:
: 2.
: 1.     Simulator Setup: See Attachment 1.
Procedure 2.2.20.1, Diesel Generator Operations General Tools and Equipment:
: 2.     Critical steps denoted by A*@.
: 1.
: 3.     Simulator cues denoted by A#@.
None Special Conditions, References, Tools, Equipment:
: 1.
Simulator Setup: See Attachment 1.
: 2.
Critical steps denoted by A*@.
: 3.
Simulator cues denoted by A#@.
Task Standards:
Task Standards:
: 22. 100% of critical elements successfully completed without error.
: 22.
: 2.     100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 2.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
The Control Room Supervisor directs you to perform transfer of 4160V bus 1G from DG2 to the Emergency Transformer. Inform Control Room Supervisor when 4160V bus 1G is being carried by the Emergency Transformer.
The Control Room Supervisor directs you to perform transfer of 4160V bus 1G from DG2 to the Emergency Transformer. Inform Control Room Supervisor when 4160V bus 1G is being carried by the Emergency Transformer.  


Nebraska Public Power District                                               SKL034-21-31 (2641)
Nebraska Public Power District SKL034-21-31 (2641)
Cooper Nuclear Station                                                           Page 103 of 149 Job Performance Measure for Operations                                               Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist                                 Standards                       Initials
Cooper Nuclear Station Page 103 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist Standards Initials
: 1. Obtain copy of 2.2.18 and       Operator obtains a copy of procedure 2.2.18 2.2.20.1.                      and 2.2.20.1.                                   _________
: 1. Obtain copy of 2.2.18 and 2.2.20.1.
: 2. Ensure risk has been           The operator determines that risk need not be assessed, per Procedure         assessed as breaker is already open due to a    _________
Operator obtains a copy of procedure 2.2.18 and 2.2.20.1.
0.49, for placing Breaker       failure.
: 2. Ensure risk has been assessed, per Procedure 0.49, for placing Breaker 1FS, EMERGENCY XFMR BKR, for Bus 1F in PULL-TO-LOCK The operator determines that risk need not be assessed as breaker is already open due to a failure.
1FS, EMERGENCY XFMR BKR, for Bus 1F in             #CUE:       IF asked as CRS, inform the PULL-TO-LOCK                                operator that risk has been evaluated.
#CUE:
: 3. Ensure the Emergency           The operator verifies voltage available from Transformer is energized        the Emergency Transformer.                       _________
IF asked as CRS, inform the operator that risk has been evaluated.
: 3. Ensure the Emergency Transformer is energized The operator verifies voltage available from the Emergency Transformer.
CUE: Emergency Transformer secondary voltage is 4440VAC.
CUE: Emergency Transformer secondary voltage is 4440VAC.
: 4. Inform Shift Manager both       Inform Shift Manager to declare both off-site off-site circuits are          circuits inoperable and to enter the             _________
: 4. Inform Shift Manager both off-site circuits are inoperable.
inoperable.                    appropriate Condition and Required Action of LCO 3.8.1, AC Sources - Operating.
Inform Shift Manager to declare both off-site circuits inoperable and to enter the appropriate Condition and Required Action of LCO 3.8.1, AC Sources - Operating.  
                                    #CUE:       SM acknowledges the information.
#CUE:
: 5. Verify 1GS racked in.           Ensure Breaker 1GS, EMERGENCY TRANSFORMER FEED TO 4160V BUS 1G,               _________
SM acknowledges the information.
is racked in.
: 5. Verify 1GS racked in.
CUE: 1GS Breaker RED light OFF, GREEN light ON.
Ensure Breaker 1GS, EMERGENCY TRANSFORMER FEED TO 4160V BUS 1G, is racked in.
CUE: 1GS Breaker RED light OFF, GREEN light ON.  


Nebraska Public Power District                                               SKL034-21-31 (2641)
Nebraska Public Power District SKL034-21-31 (2641)
Cooper Nuclear Station                                                           Page 104 of 149 Job Performance Measure for Operations                                               Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist                                 Standards                       Initials
Cooper Nuclear Station Page 104 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist Standards Initials
: 6. Start signals clear           Ensure DG2 auto start signals clear.
: 6. Start signals clear Ensure DG2 auto start signals clear.
_________
CUE: Drywell pressure is.5 pig and steady Reactor water level being controlled 15" to 40".
CUE: Drywell pressure is .5 pig and steady Reactor water level being controlled 15" to 40".
CUE: 4160V Bus 1F/1G are energized
CUE: 4160V Bus 1F/1G are energized
: 7. Depress local RESET           Direct SO to locally at DG2 Control Panel, button                        press and release EMERGENCY to NORMAL           ________*
: 7. Depress local RESET button Direct SO to locally at DG2 Control Panel, press and release EMERGENCY to NORMAL RESET button  
RESET button
#CUE:
                                  #CUE:     Station Operator reports EMERGENCY to NORMAL RESET button has been depressed and released
Station Operator reports EMERGENCY to NORMAL RESET button has been depressed and released
: 8. Place into Droop Parallel     Direct SO to locally at DG2 Control Panel, to Parallel.                  ensure DROOP PARALLEL switch is in               ________*
: 8. Place into Droop Parallel to Parallel.
PARALLEL.
Direct SO to locally at DG2 Control Panel, ensure DROOP PARALLEL switch is in PARALLEL.  
                                  #CUE:     Station Operator reports DROOP PARALLEL switch is in PARALLEL.
#CUE:
: 9. Speed control check           Adjust speed of DG2 by placing DIESEL GEN 2 GOVERNOR SWITCH to RAISE or LOWER             _________
Station Operator reports DROOP PARALLEL switch is in PARALLEL.
to verify DG2 frequency control.
: 9. Speed control check Adjust speed of DG2 by placing DIESEL GEN 2 GOVERNOR SWITCH to RAISE or LOWER to verify DG2 frequency control.
CUE: DG2 frequency is 59.6 Hz CUE: DG2 frequency rises to 60.0 Hz
CUE: DG2 frequency is 59.6 Hz CUE: DG2 frequency rises to 60.0 Hz  


Nebraska Public Power District                                             SKL034-21-31 (2641)
Nebraska Public Power District SKL034-21-31 (2641)
Cooper Nuclear Station                                                         Page 105 of 149 Job Performance Measure for Operations                                             Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist                               Standards                       Initials
Cooper Nuclear Station Page 105 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist Standards Initials
: 10. Voltage control check       Adjust voltage of DG2 by placing DIESEL GEN 2 VOLTAGE REGULATOR switch RAISE or LOWER to maintain DG2 voltage at       _________
: 10. Voltage control check Adjust voltage of DG2 by placing DIESEL GEN 2 VOLTAGE REGULATOR switch RAISE or LOWER to maintain DG2 voltage at 4160 volts.
4160 volts.
CUE: DG voltage is 4050 volts.
CUE: DG voltage is 4050 volts.
CUE: DG voltage rises to 4160 volts.
CUE: DG voltage rises to 4160 volts.
: 11. Synch switch to 1GS         Place SYNCH SWITCH 1GS to 1GS.
: 11. Synch switch to 1GS Place SYNCH SWITCH 1GS to 1GS.
CUE: SYNCH SWITCH is in 1GS position             ________ *
CUE: SYNCH SWITCH is in 1GS position
: 12. Adjust speed               Using DIESEL GEN 2 GOVERNOR switch, adjust engine speed so SYNCHROSCOPE is rotating very slowly in counter-clockwise       _________
: 12. Adjust speed Using DIESEL GEN 2 GOVERNOR switch, adjust engine speed so SYNCHROSCOPE is rotating very slowly in counter-clockwise (slow) direction.
(slow) direction.
CUE: If the operator indicates that he is placing the governor switch to raise indicate that the SYNCHROSCOPE is speeding up in the clockwise (fast) direction.
CUE: If the operator indicates that he is placing the governor switch to raise indicate that the SYNCHROSCOPE is speeding up in the clockwise (fast) direction.
CUE: If the operator indicates that he is placing the governor switch to lower indicate that the SYNCHROSCOPE starting to rotate in the counter-clockwise (slow) direction.
CUE: If the operator indicates that he is placing the governor switch to lower indicate that the SYNCHROSCOPE starting to rotate in the counter-clockwise (slow) direction.  


Nebraska Public Power District                                           SKL034-21-31 (2641)
Nebraska Public Power District SKL034-21-31 (2641)
Cooper Nuclear Station                                                         Page 106 of 149 Job Performance Measure for Operations                                             Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist                               Standards                     Initials
Cooper Nuclear Station Page 106 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist Standards Initials
: 13. Adjust voltage               Using DIESEL GEN 2 VOLTAGE REGULATOR switch, adjust Bus 1G voltage to slightly lower than EMERGENCY XFMR           ________
: 13. Adjust voltage Using DIESEL GEN 2 VOLTAGE REGULATOR switch, adjust Bus 1G voltage to slightly lower than EMERGENCY XFMR VOLTAGE CUE: (Before adjustment) DG2 Voltage reads 4160 volts.
* VOLTAGE CUE: (Before adjustment) DG2 Voltage reads 4160 volts.
CUE: XFMR Transformer voltage is 4449 volts.
CUE: XFMR Transformer voltage is 4449 volts.
CUE: (after adjustment) DG2 voltage reads 4430 volts.
CUE: (after adjustment) DG2 voltage reads 4430 volts.
: 14. Close 1GS                   When SYNCHROSCOPE is at 1 o=clock, the operator closes Breaker 1GS and check switch spring returns to NORMAL AFTER           ________*
: 14. Close 1GS When SYNCHROSCOPE is at 1 o=clock, the operator closes Breaker 1GS and check switch spring returns to NORMAL AFTER CLOSE (red flagged)
CLOSE (red flagged)
CUE: Switch returns to center position (red flagged). 1GS Breaker, GREEN light is OFF, RED light is ON.
CUE: Switch returns to center position (red flagged). 1GS Breaker , GREEN light is OFF, RED light is ON.
: 15. Adjust kVARS The Operator adjust DG2 kVARS so that they are slightly positive (~200 kVARS) using DIESEL GEN 2 VOLTAGE REGULATOR switch. (100 - 300 KVARs)
: 15. Adjust kVARS                 The Operator adjust DG2 kVARS so that they are slightly positive (~200 kVARS) using DIESEL GEN 2 VOLTAGE REGULATOR                 _________
CUE: DG2 kVARS reads 40 kVARS CUE: DG2 kVARS reads 200 kVARS  
switch. (100 - 300 KVARs)
CUE: DG2 kVARS reads 40 kVARS CUE: DG2 kVARS reads 200 kVARS


Nebraska Public Power District                                           SKL034-21-31 (2641)
Nebraska Public Power District SKL034-21-31 (2641)
Cooper Nuclear Station                                                         Page 107 of 149 Job Performance Measure for Operations                                             Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist                               Standards                       Initials
Cooper Nuclear Station Page 107 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist Standards Initials
: 16. Bkr 1FS Pull-To-Lock.       Verify switch for 1FS in PULL-TO-LOCK (PTL)
: 16. Bkr 1FS Pull-To-Lock.
CUE: 1FS Breaker is still tagged               _________
Verify switch for 1FS in PULL-TO-LOCK (PTL)
: 17. Lower DG2 Load               Reduce load on DG2 to 1000 KW using DIESEL GEN 2 GOVERNOR switch.                   _________
CUE: 1FS Breaker is still tagged
: 17. Lower DG2 Load Reduce load on DG2 to 1000 KW using DIESEL GEN 2 GOVERNOR switch.
CUE: DG2 load is 2200 KW CUE: DG2 load is 1000 KW
CUE: DG2 load is 2200 KW CUE: DG2 load is 1000 KW
: 18. Place SYNCH SWITCH to       Place SYNCH SWITCH 1GS to OFF OFF                                                                          _________
: 18. Place SYNCH SWITCH to OFF Place SYNCH SWITCH 1GS to OFF CUE: SYNCH SWITCH is in OFF
CUE: SYNCH SWITCH is in OFF
: 19. DG2 Cooldown After engine has cooled and cylinder exhaust temperature have dropped (~5 minutes),
: 19. DG2 Cooldown                 After engine has cooled and cylinder exhaust temperature have dropped (~5 minutes),
remove DG2 from services per 2.2.20.1.  
remove DG2 from services per 2.2.20.1.         _________
#CUE: Five minutes have elapsed.  
                                  #CUE: Five minutes have elapsed.
#CUE: Station Operator reports engine temperatures are cooling down.
                                  #CUE: Station Operator reports engine temperatures are cooling down.
: 20. Lower DG2 load (2.2.20.1)
: 20. Lower DG2 load               Lower DG2 load to 400 kW and 1000 kW (2.2.20.1)                                                                   _________
Lower DG2 load to 400 kW and 1000 kW CUE: DG2 load is 600 kW  
CUE: DG2 load is 600 kW
#CUE: 15 minutes have elapsed.  
                                  #CUE: 15 minutes have elapsed.


Nebraska Public Power District                                           SKL034-21-31 (2641)
Nebraska Public Power District SKL034-21-31 (2641)
Cooper Nuclear Station                                                         Page 108 of 149 Job Performance Measure for Operations                                             Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist                             Standards                       Initials
Cooper Nuclear Station Page 108 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist Standards Initials
: 21. Lower to 400 KW             Lower DG2 load to 400 KW
: 21. Lower to 400 KW Lower DG2 load to 400 KW CUE: DG2 load is 400 kW
_________
: 22. Lower kVARs Reduce DG2 kVARs as low as possible.
CUE: DG2 load is 400 kW
: 22. Lower kVARs                 Reduce DG2 kVARs as low as possible.
_________
CUE: DG2 kVARs is 50 KVA
CUE: DG2 kVARs is 50 KVA
: 23. Open EG2                   Open DIESEL GEN 2 BKR EG2
: 23. Open EG2 Open DIESEL GEN 2 BKR EG2 CUE: BKR EG2 is NORMAL AFTER TRIP (green flagged). Green light is ON. Red light is OFF.
________*
: 24. Inform CRS Inform CRS that the Emergency Transformer is carrying 4160 V Bus 1G.
CUE: BKR EG2 is NORMAL AFTER TRIP (green flagged). Green light is ON. Red light is OFF.
CUE: CRS acknowledges. This JPM is complete. (Stop JPM at this point even if candidate continues.)  
: 24. Inform CRS                 Inform CRS that the Emergency Transformer is carrying 4160 V Bus 1G.
_________
CUE: CRS acknowledges. This JPM is complete. (Stop JPM at this point even if candidate continues.)


Nebraska Public Power District                                               SKL034-21-31 (2641)
Nebraska Public Power District SKL034-21-31 (2641)
Cooper Nuclear Station                                                           Page 109 of 149 Job Performance Measure for Operations                                               Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer ATTACHMENT 1 SIMULATOR SET-UP A. Materials required None B. Initialize the Simulator in any at power IC (IC-18, 19 or 20 suggested)
Cooper Nuclear Station Page 109 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer ATTACHMENT 1 SIMULATOR SET-UP A.
Materials required None B.
Initialize the Simulator in any at power IC (IC-18, 19 or 20 suggested)
Batch File name - none.
Batch File name - none.
C. Change the Simulator conditions from those of the IC as follows:
C.
: 1. Triggers Number               File Name                               Description None
Change the Simulator conditions from those of the IC as follows:
: 2. Malfunctions Number                     Title             Trigger     TD     Severity   Ramp   Initial None
: 1. Triggers Number File Name Description None
: 3. Remotes Number                           Title                   Trigger     TD     Value   Ramp None
: 2. Malfunctions Number Title Trigger TD Severity Ramp Initial None
: 4. Overrides Instrument                     Tag             Trigger     TD   Value   Ramp None
: 3. Remotes Number Title Trigger TD Value Ramp None
: 4. Overrides Instrument Tag Trigger TD Value Ramp None  


Nebraska Public Power District                                           SKL034-21-31 (2641)
Nebraska Public Power District SKL034-21-31 (2641)
Cooper Nuclear Station                                                         Page 110 of 149 Job Performance Measure for Operations                                               Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer
Cooper Nuclear Station Page 110 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer
: 5. Panel Set-up (suggested. Any setup is allowed that supports performance of the bus transfer)
: 5. Panel Set-up (suggested. Any setup is allowed that supports performance of the bus transfer)
: a. Place Bkr 1FS & 1GB in PTL and place Danger Tag on C/S
: a. Place Bkr 1FS & 1GB in PTL and place Danger Tag on C/S
Line 1,814: Line 2,294:
: e. At DG2 local panel, depress & release EMERGENCY to NORMAL RESET pushbutton.
: e. At DG2 local panel, depress & release EMERGENCY to NORMAL RESET pushbutton.
: f. At DG2 local panel, place DROOP PARALLEL switch in PARALLEL.
: f. At DG2 local panel, place DROOP PARALLEL switch in PARALLEL.
Note: If this JPM is to be performed more than once, snap the simulator into an IC after the panel setup is complete.
Note: If this JPM is to be performed more than once, snap the simulator into an IC after the panel setup is complete.  


Nebraska Public Power District                                               SKL034-21-31 (2641)
Nebraska Public Power District SKL034-21-31 (2641)
Cooper Nuclear Station                                                           Page 111 of 12 Job Performance Measure for Operations                                                 Revision 05 ATTACHMENT 2 Directions to Trainee:
Cooper Nuclear Station Page 111 of 12 Job Performance Measure for Operations Revision 05 ATTACHMENT 2 Directions to Trainee:
When I tell you to begin, you are to perform the required actions to transfer 4160V bus 1G from DG2 to the Emergency Transformer. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin, you are to perform the required actions to transfer 4160V bus 1G from DG2 to the Emergency Transformer. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
If being simulated In-Plant or Control Room:
If being simulated In-Plant or Control Room:
Line 1,828: Line 2,308:
: 3. Breaker 1GB has failed.
: 3. Breaker 1GB has failed.
Initiating Cues:
Initiating Cues:
The Control Room Supervisor directs you to perform transfer of 4160V bus 1G from DG2 to the Emergency Transformer. Inform Control Room Supervisor when 4160V bus 1G is being carried by the Emergency Transformer.
The Control Room Supervisor directs you to perform transfer of 4160V bus 1G from DG2 to the Emergency Transformer. Inform Control Room Supervisor when 4160V bus 1G is being carried by the Emergency Transformer.  


Nebraska Public Power District                                                 SKL034-30-51 (16531)
Nebraska Public Power District SKL034-30-51 (16531)
Cooper Nuclear Station                                                                   Page 112 of 5 Job Performance Measure for Operations                                                     Revision 01 Task Number: 200363G0501 Install EOP PTMs 57, 58, 59 and 60 Trainee:                                                 Examiner:
Cooper Nuclear Station Page 112 of 5 Job Performance Measure for Operations Revision 01 Task Number: 200363G0501 Install EOP PTMs 57, 58, 59 and 60 Trainee:
Pass:   Fail:     Examiner Signature:                                       Date:
Examiner:
Pass: Fail: Examiner Signature:
Date:
Additional Program Information:
Additional Program Information:
: 1)     Appropriate Performance Locations: Simulator
: 1)
: 2)     Appropriate Trainee Level: SO / RO / SRO
Appropriate Performance Locations: Simulator
: 3. Evaluation Method:       Simulate     Perform
: 2)
: 4. Performance Time: 10 minutes
Appropriate Trainee Level: SO / RO / SRO
: 5. NRC K/A 295037 EA1.11 (3.5/3.6),
: 3.
Evaluation Method: Simulate Perform
: 4.
Performance Time: 10 minutes
: 5.
NRC K/A 295037 EA1.11 (3.5/3.6),
Directions to Examiner:
Directions to Examiner:
: 1. This JPM evaluates the trainee's ability to Install the EOP PTMs that bypass the low level group 1 isolation during an ATWAS.
: 1.
: 2. All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
This JPM evaluates the trainee's ability to Install the EOP PTMs that bypass the low level group 1 isolation during an ATWAS.
: 3. Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.
: 2.
: 4. Brief the trainee and tell the trainee to begin.
All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
: 3.
Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.
: 4.
Brief the trainee and tell the trainee to begin.
Directions to Trainee:
Directions to Trainee:
When I tell you to begin, you are to install EOP PTMs 57, 58, 59 and 60 to bypass the low level group 1 isolation. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
When I tell you to begin, you are to install EOP PTMs 57, 58, 59 and 60 to bypass the low level group 1 isolation. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.  
  =====================================================================
 
=====================================================================  


Nebraska Public Power District                                         SKL034-30-51 (16531)
Nebraska Public Power District SKL034-30-51 (16531)
Cooper Nuclear Station                                                           Page 113 of 5 Job Performance Measure for Operations                                             Revision 01 Task Number: 200363G0501 Install EOP PTMs 57, 58, 59 and 60 General Conditions:
Cooper Nuclear Station Page 113 of 5 Job Performance Measure for Operations Revision 01 Task Number: 200363G0501 Install EOP PTMs 57, 58, 59 and 60 General Conditions:
: 23. An ATWAS has occurred.
: 23.
: 2.     The MSIVs are open.
An ATWAS has occurred.
: 2.
The MSIVs are open.
General  
General  


==References:==
==References:==
: 1.     EMERGENCY OPERATING PROCEDURE 5.8.20.
: 1.
EMERGENCY OPERATING PROCEDURE 5.8.20.
General Tools and Equipment:
General Tools and Equipment:
: 1.     Safety Glasses
: 1.
: 2.     Electrical Safety Equipment Special Conditions, References, Tools, Equipment:
Safety Glasses
: 1.     Critical checks denoted by "*.
: 2.
Electrical Safety Equipment Special Conditions, References, Tools, Equipment:
: 1.
Critical checks denoted by "*.
Task Standards:
Task Standards:
: 4.     100% of critical elements successfully completed without error.
: 4.
: 2.     100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 2.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
The CRS directs you to bypass the low level MSIV isolation per 5.8.20 and to inform him when it is complete.
The CRS directs you to bypass the low level MSIV isolation per 5.8.20 and to inform him when it is complete.  


Nebraska Public Power District                                               SKL034-30-51 (16531)
Nebraska Public Power District SKL034-30-51 (16531)
Cooper Nuclear Station                                                               Page 114 of 5 Job Performance Measure for Operations                                                 Revision 01 Task Number: 200363G0501 Install EOP PTMs 57, 58, 59 and 60 Performance Checklist                               Standards                     Initials
Cooper Nuclear Station Page 114 of 5 Job Performance Measure for Operations Revision 01 Task Number: 200363G0501 Install EOP PTMs 57, 58, 59 and 60 Performance Checklist Standards Initials
: 3. Obtain a copy of EOP 5.8.20.     Current revision of EOP 5.8.20 is obtained.
: 3. Obtain a copy of EOP 5.8.20.
: 4. Verifies the MSIVs are           MSIV position is verified.
Current revision of EOP 5.8.20 is obtained.
OPEN.
: 4. Verifies the MSIVs are OPEN.
MSIV position is verified.
CUE: All MSIV red position indicating lights are lit and the green lights are extinguished.
CUE: All MSIV red position indicating lights are lit and the green lights are extinguished.
: 5. Ensure following RR sample       Ensure following valves closed (PNL 9-4) :
: 5. Ensure following RR sample valves CLOSED.
valves CLOSED.                  RR-AO-740, OUTBD ISOL VLV and RR-AO-741, IND ISOL VLV .
Ensure following valves closed (PNL 9-4) :
RR-AO-740, OUTBD ISOL VLV and RR-AO-741, IND ISOL VLV.
CUE:RR-AO-740, OUTBD ISOL VLV and RR-AO-741, IND ISOL VLV GREEN lights ON RED lights OFF.
CUE:RR-AO-740, OUTBD ISOL VLV and RR-AO-741, IND ISOL VLV GREEN lights ON RED lights OFF.
Caution: If the student fails to put on safety glasses prior to installing the PTMs the JPM cannot proceed. If the JPM is being used for evaluation purposes the JPM is concluded at that point and marked unsat.
Caution: If the student fails to put on safety glasses prior to installing the PTMs the JPM cannot proceed. If the JPM is being used for evaluation purposes the JPM is concluded at that point and marked unsat.
: 6. Puts on required safety           As a minimum safety glass are worn during equipment.                        the performance of this task.                           *
: 6. Puts on required safety equipment.
: 7. Install EOP PTM Number 57         EOP PTM Number 57 installed.
As a minimum safety glass are worn during the performance of this task.
by jumpering between
: 7. Install EOP PTM Number 57 by jumpering between Terminals DD1 and DD2 (BAY-1, PNL 9-15).
* Terminals DD1 and DD2             CUE: Jumper is installed.
EOP PTM Number 57 installed.
(BAY-1, PNL 9-15).
CUE: Jumper is installed.
: 8. Install EOP PTM Number 58         EOP PTM Number 58 installed.
: 8. Install EOP PTM Number 58 by jumpering between Terminals BB1 and BB2 (BAY-3, PNL 9-15).
by jumpering between
EOP PTM Number 58 installed.
* Terminals BB1 and BB2             CUE: Jumper is installed.
CUE: Jumper is installed.
(BAY-3, PNL 9-15).
: 9. Install EOP PTM Number 59 by jumpering between Terminals DD1 and DD2 (BAY-1, PNL 9-17).
: 9. Install EOP PTM Number 59         EOP PTM Number 59 installed.
EOP PTM Number 59 installed.
by jumpering between
CUE: Jumper is installed.
* Terminals DD1 and DD2             CUE: Jumper is installed.
: 10. Install EOP PTM Number 60 by jumpering between Terminals BB1 and BB2 (BAY-3, PNL 9-17).
(BAY-1, PNL 9-17).
EOP PTM Number 60 installed.
: 10. Install EOP PTM Number 60         EOP PTM Number 60 installed.
CUE: Jumper is installed.  
by jumpering between Terminals BB1 and BB2             CUE: Jumper is installed.                              *
(BAY-3, PNL 9-17).


Nebraska Public Power District                                         SKL034-30-51 (16531)
Nebraska Public Power District SKL034-30-51 (16531)
Cooper Nuclear Station                                                         Page 115 of 5 Job Performance Measure for Operations                                           Revision 01 Task Number: 200363G0501 Install EOP PTMs 57, 58, 59 and 60 Performance Checklist                             Standards                 Initials
Cooper Nuclear Station Page 115 of 5 Job Performance Measure for Operations Revision 01 Task Number: 200363G0501 Install EOP PTMs 57, 58, 59 and 60 Performance Checklist Standards Initials
: 11. Informs the CRS that the low       CRS is informed.
: 11. Informs the CRS that the low level MSIV isolation is bypassed per 5.8.20.
level MSIV isolation is bypassed per 5.8.20.               CUE: As the Control Room Supervisor acknowledge the report.
CRS is informed.
CUE: As the Control Room Supervisor acknowledge the report.  


Nebraska Public Power District                                               SKL034-30-51(16531)
Nebraska Public Power District SKL034-30-51(16531)
Cooper Nuclear Station                                                             Page 116 of 4 Job Performance Measure for Operations                                                 Revision 01 ATTACHMENT 1 When I tell you to begin, you are to install EOP PTMs 57, 58, 59 and 60 to bypass the low level group 1 isolation. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
Cooper Nuclear Station Page 116 of 4 Job Performance Measure for Operations Revision 01 ATTACHMENT 1 When I tell you to begin, you are to install EOP PTMs 57, 58, 59 and 60 to bypass the low level group 1 isolation. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
General Conditions:
General Conditions:
Line 1,906: Line 2,407:
: 2. The MSIVs are open.
: 2. The MSIVs are open.
Initiating Cues:
Initiating Cues:
The CRS directs you to bypass the low level MSIV isolation per 5.8.20 and to inform him when it is complete.
The CRS directs you to bypass the low level MSIV isolation per 5.8.20 and to inform him when it is complete.  
 
Nebraska Public Power District SKL034-22-02 (36407)
Cooper Nuclear Station Revision 00 Job Performance Measure Page 117 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101


Nebraska Public Power District                                          SKL034-22-02 (36407)
Cooper Nuclear Station                                                              Revision 00 Job Performance Measure                                                        Page 117 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101
==================================================================
==================================================================
=
=
Line 1,915: Line 2,417:


==Title:==
==Title:==
Align REC after REC isolation on Low Pressure
Align REC after REC isolation on Low Pressure  
 
==================================================================
==================================================================
=
=
Trainee:                                         Examiner:
Trainee:
Pass         Fail     Examiner Signature:                                 Date:
Examiner:
Pass Fail Examiner Signature:
Date:
Additional Program Information:
Additional Program Information:
: 1.     Appropriate Performance Locations: CR/SIM
: 1.
: 2.     Appropriate Trainee Level: RO/SRO
Appropriate Performance Locations: CR/SIM
: 3.     Evaluation Method:       Simulate       Perform
: 2.
: 4.     Performance Time: 10 minutes
Appropriate Trainee Level: RO/SRO
: 5.     NRC K/A 295018; AA1.03 (3.3/3.4)
: 3.
Evaluation Method: Simulate Perform
: 4.
Performance Time: 10 minutes
: 5.
NRC K/A 295018; AA1.03 (3.3/3.4)
Directions to Examiner:
Directions to Examiner:
: 1.     This JPM evaluates the trainee's ability to Restore REC after REC isolation on Low Pressure.
: 1.
: 2.     If this JPM is performed on the Simulator, only the cues preceded by "#" should be given.
This JPM evaluates the trainee's ability to Restore REC after REC isolation on Low Pressure.
: 3.     All blanks must be filled out with either initials or an "NP" for "not performed", an explanation may also be written in the space, if desired, by the examiner.
: 2.
If this JPM is performed on the Simulator, only the cues preceded by "#" should be given.
: 3.
All blanks must be filled out with either initials or an "NP" for "not performed", an explanation may also be written in the space, if desired, by the examiner.
Directions to Trainee:
Directions to Trainee:
When I tell you to begin, you are to restore REC flow for Drywell Cooling after REC isolation on Low Pressure, per the Hardcard.
When I tell you to begin, you are to restore REC flow for Drywell Cooling after REC isolation on Low Pressure, per the Hardcard.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them to restore REC flow for Drywell Cooling after REC isolation on Low Pressure.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them to restore REC flow for Drywell Cooling after REC isolation on Low Pressure.  
 
==================================================================
==================================================================
=
=
General Conditions:
General Conditions:
: 1.     The Reactor was scrammed due to loss of REC per 5.2REC.
: 1.
: 2.     REC Isolation was due to REC Augmented Radwaste Supply pipe break down stream of REC-MO-1329, AUGMENTED RADWASTE SUPPLY
The Reactor was scrammed due to loss of REC per 5.2REC.
: 3.     The REC pipe break has been isolated.
: 2.
REC Isolation was due to REC Augmented Radwaste Supply pipe break down stream of REC-MO-1329, AUGMENTED RADWASTE SUPPLY
: 3.
The REC pipe break has been isolated.  
 
Nebraska Public Power District SKL034-22-02 (36407)
Cooper Nuclear Station Revision 00 Job Performance Measure Page 118 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101


Nebraska Public Power District                            SKL034-22-02 (36407)
Cooper Nuclear Station                                            Revision 00 Job Performance Measure                                        Page 118 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101
==================================================================
==================================================================
=
=
Line 1,947: Line 2,465:


==Title:==
==Title:==
Align REC after REC isolation on Low Pressure
Align REC after REC isolation on Low Pressure  
 
==================================================================
==================================================================
=
=  
 
Nebraska Public Power District SKL034-22-02 (36407)
Cooper Nuclear Station Revision 00 Job Performance Measure Page 119 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101


Nebraska Public Power District                                    SKL034-22-02 (36407)
Cooper Nuclear Station                                                    Revision 00 Job Performance Measure                                                Page 119 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101
==================================================================
==================================================================
=
=
Line 1,958: Line 2,478:


==Title:==
==Title:==
Align REC after REC isolation on Low Pressure
Align REC after REC isolation on Low Pressure  
 
==================================================================
==================================================================
=
=
Line 1,964: Line 2,485:


==References:==
==References:==
SOP 2.2.65.1 General Tools and Equipment:
SOP 2.2.65.1 General Tools and Equipment:
None Special Conditions, References, Tools, Equipment:
None Special Conditions, References, Tools, Equipment:
: 1.     Simulator Setup: See Attachment 1.
: 1.
: 2.     Critical checks denoted by "*".
Simulator Setup: See Attachment 1.
: 3.     Simulator cues denoted by "#".
: 2.
: 4.     Faulted steps denoted by "".
Critical checks denoted by "*".
: 3.
Simulator cues denoted by "#".
: 4.
Faulted steps denoted by "".
Task Standards:
Task Standards:
: 5. 100% of critical elements successfully completed without error.
: 5.
: 2. 100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 2.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
You are the Balance of Plant Operator. The CRS has directed you restore REC after REC isolation on Low Pressure Inform the CRS when REC is restored for Drywell Cooling NOTE:           Tell Trainee to begin. Place Simulator in RUN
You are the Balance of Plant Operator. The CRS has directed you restore REC after REC isolation on Low Pressure Inform the CRS when REC is restored for Drywell Cooling NOTE:
Tell Trainee to begin. Place Simulator in RUN  
 
Nebraska Public Power District SKL034-22-02 (36407)
Cooper Nuclear Station Revision 00 Job Performance Measure Page 120 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101


Nebraska Public Power District                                  SKL034-22-02 (36407)
Cooper Nuclear Station                                                    Revision 00 Job Performance Measure                                              Page 120 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101
==================================================================
==================================================================
=
=
Line 1,984: Line 2,512:


==Title:==
==Title:==
Align REC after REC isolation on Low Pressure
Align REC after REC isolation on Low Pressure  
 
==================================================================
==================================================================
=
=
Performance Standards                       Initials Checklist
Performance Checklist Standards Initials
: 1. Obtain copy of    The operator obtains a copy of SOP 2.2.65.1 or SOP 2.2.65.1     Hard Card.                                         _______
: 1. Obtain copy of SOP 2.2.65.1 The operator obtains a copy of SOP 2.2.65.1 or Hard Card.
CUE: None.
CUE: None.
: 2. Determine         Ensure low pressure isolation not due to leakage cause of REC      or leak isolated.                                 _______*
: 2. Determine cause of REC isolation Ensure low pressure isolation not due to leakage or leak isolated.
isolation CUE: REC piping break has been repaired.
CUE: REC piping break has been repaired.
: 3. Verify two REC     Ensure two REC pumps are running.
: 3. Verify two REC pumps in Operation Ensure two REC pumps are running.
pumps in Operation              CUE: REC Pumps B and D are in service.       ________*
CUE: REC Pumps B and D are in service.
: 4. Verify REC         Ensure one of following valves are OPEN:
: 4. Verify REC critical loop supplied.
critical loop    REC-MO-711, NORTH CRITICAL LOOP                   _______*
Ensure one of following valves are OPEN:
supplied.        SUPPLY.
REC-MO-711, NORTH CRITICAL LOOP SUPPLY.
Or REC-MO-714, SOUTH CRITICAL LOOP SUPPLY.
Or REC-MO-714, SOUTH CRITICAL LOOP SUPPLY.
CUE: REC-MO-711, NORTH CRITICAL LOOP SUPPLY and REC-MO-714, SOUTH CRITICAL LOOP SUPPLY are OPEN
CUE: REC-MO-711, NORTH CRITICAL LOOP SUPPLY and REC-MO-714, SOUTH CRITICAL LOOP SUPPLY are OPEN  
 
Nebraska Public Power District SKL034-22-02 (36407)
Cooper Nuclear Station Revision 00 Job Performance Measure Page 121 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101


Nebraska Public Power District                                  SKL034-22-02 (36407)
Cooper Nuclear Station                                                    Revision 00 Job Performance Measure                                                Page 121 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101
==================================================================
==================================================================
=
=
Line 2,007: Line 2,537:


==Title:==
==Title:==
Align REC after REC isolation on Low Pressure
Align REC after REC isolation on Low Pressure  
 
==================================================================
==================================================================
=
=
Performance Standards                       Initials Checklist
Performance Checklist Standards Initials
: 5. Checking           If drywell temperature 260&deg;F on PC-TI-505A Drywell          through PC-TI-505E, place DRYWELL REC ISOL Temperature      VALVE CONTROL switch to OPEN.
: 5. Checking Drywell Temperature If drywell temperature 260&deg;F on PC-TI-505A through PC-TI-505E, place DRYWELL REC ISOL VALVE CONTROL switch to OPEN.
_______*
CUE: PC-TI-505A through PC-TI-505E reading 253&deg;F.
CUE: PC-TI-505A through PC-TI-505E reading 253&deg;F.
: 6. Throttle open     Throttle open REC HX outlet valve for a HX that REC HX outlet    was in service, as necessary, while maintaining     _______
: 6. Throttle open REC HX outlet valve Throttle open REC HX outlet valve for a HX that was in service, as necessary, while maintaining REC CRIT LOOP SUPPLY PRESS in green band.
valve            REC CRIT LOOP SUPPLY PRESS in green band.
REC-MO-712, HX A OUTLET VLV.
REC-MO-712, HX A OUTLET VLV.
REC-MO-713, HX B OUTLET VLV.
REC-MO-713, HX B OUTLET VLV.
CUE: REC-MO-712, HX A OUTLET VLV is open.
CUE: REC-MO-712, HX A OUTLET VLV is open.
: 7. Start third REC   Start third REC pump.                               _______*
: 7. Start third REC pump Start third REC pump.
pump CUE: REC Pump C is in service
CUE: REC Pump C is in service
: 8. Throttle open     Throttle open REC HX outlet valve, as necessary,   _______*
: 8. Throttle open REC HX outlet valve Throttle open REC HX outlet valve, as necessary, to obtain following conditions:
REC HX outlet    to obtain following conditions:
REC CRIT LOOP SUPPLY PRESS 62 psig.
valve            REC CRIT LOOP SUPPLY PRESS 62 psig.
REC HEADER PRESSURE in top of green band.
REC HEADER PRESSURE in top of green band.
CUE: REC-MO-712, HX A OUTLET VLV is open.
CUE: REC-MO-712, HX A OUTLET VLV is open.  
 
Nebraska Public Power District SKL034-22-02 (36407)
Cooper Nuclear Station Revision 00 Job Performance Measure Page 122 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101


Nebraska Public Power District                                  SKL034-22-02 (36407)
Cooper Nuclear Station                                                    Revision 00 Job Performance Measure                                                Page 122 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101
==================================================================
==================================================================
=
=
Line 2,034: Line 2,563:


==Title:==
==Title:==
Align REC after REC isolation on Low Pressure
Align REC after REC isolation on Low Pressure  
 
==================================================================
==================================================================
=
=
Performance Standards                       Initials Checklist
Performance Checklist Standards Initials
: 9. Open REC-         Perform following simultaneously:                  _______*
: 9. Open REC-MO-700, NON-CRITICAL HEADER SUPPLY.
MO-700, NON-     Open REC-MO-700, NON-CRITICAL HEADER CRITICAL          SUPPLY.
Perform following simultaneously:
HEADER            Continue throttling open REC HX outlet valve, as SUPPLY.          necessary, to maintain REC HEADER PRESSURE in green band.
Open REC-MO-700, NON-CRITICAL HEADER SUPPLY.
Continue throttling open REC HX outlet valve, as necessary, to maintain REC HEADER PRESSURE in green band.
CUE: REC-MO-700, NON-CRITICAL HEADER SUPPLY is open.
CUE: REC-MO-700, NON-CRITICAL HEADER SUPPLY is open.
: 10. Ensure REC        Ensure REC HX outlet valve full open.              _______*
: 10. Ensure REC HX outlet valve full open Ensure REC HX outlet valve full open.
HX outlet valve full open             CUE: REC-MO-712, HX A OUTLET VLV is open.
CUE: REC-MO-712, HX A OUTLET VLV is open.
: 11. Open REC-         If REC-AO-710, RWCU NON-REGEN HX INLET,             _______*
: 11. Open REC-AO-710, RWCU NON-REGEN HX INLET If REC-AO-710, RWCU NON-REGEN HX INLET, not closed for leak isolation, open REC-AO-710.
AO-710,          not closed for leak isolation, open REC-AO-710.
CUE: REC-MO-712, HX A OUTLET VLV is open.
RWCU NON-REGEN HX              CUE: REC-MO-712, HX A OUTLET VLV is INLET                        open.
: 12. Verify REC-MO-1329, AUGMENTED RADWASTE SUPPLY is closed.
: 12. Verify REC-      If REC-MO-1329, AUGMENTED RADWASTE                 _______*
If REC-MO-1329, AUGMENTED RADWASTE SUPPLY, not closed for leak isolation and cooling desired, open REC-MO-1329.
MO-1329,         SUPPLY, not closed for leak isolation and cooling AUGMENTED        desired, open REC-MO-1329.
CUE: REC-MO-1329, AUGMENTED RADWASTE SUPPLY, is closed.
RADWASTE SUPPLY is            CUE: REC-MO-1329, AUGMENTED closed.                    RADWASTE SUPPLY, is closed.
: 13. DRYWELL REC ISOL VALVE CONTROL switch to AUTO Place DRYWELL REC ISOL VALVE CONTROL switch to AUTO.
: 13. DRYWELL           Place DRYWELL REC ISOL VALVE CONTROL               _______*
CUE: REC-MO-712, HX A OUTLET VLV is open.  
REC ISOL        switch to AUTO.
 
VALVE CONTROL              CUE: REC-MO-712, HX A OUTLET VLV is switch to                  open.
Nebraska Public Power District SKL034-22-02 (36407)
AUTO
Cooper Nuclear Station Revision 00 Job Performance Measure Page 123 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101


Nebraska Public Power District                                SKL034-22-02 (36407)
Cooper Nuclear Station                                                  Revision 00 Job Performance Measure                                            Page 123 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101
==================================================================
==================================================================
=
=
Line 2,062: Line 2,591:


==Title:==
==Title:==
Align REC after REC isolation on Low Pressure
Align REC after REC isolation on Low Pressure  
 
==================================================================
==================================================================
=
=
Performance Standards                       Initials Checklist Notify CRS that REC is restored for Drywell
Performance Checklist Standards Initials
: 14. Notify CRS.      Cooling
: 14. Notify CRS.
                            #CUE: Respond as the CRS and acknowledge the report.
Notify CRS that REC is restored for Drywell Cooling  
#CUE: Respond as the CRS and acknowledge the report.  


SKL034-22-02 (36407)
SKL034-22-02 (36407)
Page 124 of 149 Revision 00 ATTACHMENT 1 SIMULATOR SET-UP A. Materials Required SOP 2.2.65.1 B. Initialize the Simulator in IC-20 or any IC that will support REC isolation.
Page 124 of 149 Revision 00 ATTACHMENT 1 SIMULATOR SET-UP A.
C. Change the simulator conditions as follows:
Materials Required SOP 2.2.65.1 B.
: 1.       Perform Mitigating Scram Actions.
Initialize the Simulator in IC-20 or any IC that will support REC isolation.
: 2.       Close the in service heat exchanger outlet valve until the REC system isolates on low pressure. Close REC-MO-1329, AUGMENTED RADWASTE SUPPLY
C.
: 3.       Place simulator in freeze.
Change the simulator conditions as follows:
Note: If this JPM is to be performed more than once, snap the simulator into an available IC after the panel setup is complete.
: 1.
Perform Mitigating Scram Actions.
: 2.
Close the in service heat exchanger outlet valve until the REC system isolates on low pressure. Close REC-MO-1329, AUGMENTED RADWASTE SUPPLY
: 3.
Place simulator in freeze.
Note: If this JPM is to be performed more than once, snap the simulator into an available IC after the panel setup is complete.  


SKL034-22-02 (36407)
SKL034-22-02 (36407)
Line 2,082: Line 2,619:
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them to restore REC flow for Drywell Cooling after REC isolation on Low Pressure.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them to restore REC flow for Drywell Cooling after REC isolation on Low Pressure.
General Conditions:
General Conditions:
: 1.     The Reactor was scrammed due to loss of REC per 5.2REC.
: 1.
: 2.     REC Isolation was due to REC Augmented Radwaste Supply pipe break down stream of REC-MO-1329, AUGMENTED RADWASTE SUPPLY
The Reactor was scrammed due to loss of REC per 5.2REC.
: 3.     The REC pipe break has been isolated.
: 2.
REC Isolation was due to REC Augmented Radwaste Supply pipe break down stream of REC-MO-1329, AUGMENTED RADWASTE SUPPLY
: 3.
The REC pipe break has been isolated.
Initiating Cues:
Initiating Cues:
You are the Balance of Plant Operator. The CRS has directed you restore REC after REC isolation on Low Pressure Inform the CRS when REC is restored for Drywell Cooling.
You are the Balance of Plant Operator. The CRS has directed you restore REC after REC isolation on Low Pressure Inform the CRS when REC is restored for Drywell Cooling.  


Nebraska Public Power District                                                   SKL034-22-01(36406)
Nebraska Public Power District SKL034-22-01(36406)
Cooper Nuclear Station                                                                 Page 126 of 12 Job Performance Measure for Operations                                                       Revision 00 Task No.: 261003O0101 Task
Cooper Nuclear Station Page 126 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task


==Title:==
==Title:==
SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)
SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)
Trainee:                                             Examiner:
Trainee:
Pass           Fail       Examiner Signature:                                     Date:
Examiner:
Pass Fail Examiner Signature:
Date:
Time Started: ____________ Time Finished: _____________
Time Started: ____________ Time Finished: _____________
THIS IS AN ALTERNATE PATH JPM Additional Program Information:
THIS IS AN ALTERNATE PATH JPM Additional Program Information:
: 1.       Appropriate Performance Locations: CR / SIM
: 1.
: 2.       Appropriate Trainee level: RO / SRO
Appropriate Performance Locations: CR / SIM
: 3.       Evaluation Method:       Simulate       Perform
: 2.
: 4.       Performance Time: 15 minutes
Appropriate Trainee level: RO / SRO
: 5.       NRC K/A 261000 A4.03 (3.0/3.0)
: 3.
Evaluation Method: Simulate Perform
: 4.
Performance Time: 15 minutes
: 5.
NRC K/A 261000 A4.03 (3.0/3.0)
Directions to Examiner:
Directions to Examiner:
: 1.       This JPM evaluates the trainee's ability to manipulate the SGT controls in order to start SGT in support of HPCI operation.
: 1.
: 2.       If this JPM is performed on the Simulator, only the cues preceded by "#" should be given.
This JPM evaluates the trainee's ability to manipulate the SGT controls in order to start SGT in support of HPCI operation.
: 3.       All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space if desired by the examiner.
: 2.
: 4.       Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.
If this JPM is performed on the Simulator, only the cues preceded by "#" should be given.
: 5.       Brief the trainee, place the simulator in run, and tell the trainee to begin.
: 3.
All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space if desired by the examiner.
: 4.
Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.
: 5.
Brief the trainee, place the simulator in run, and tell the trainee to begin.
Directions to Trainee:
Directions to Trainee:
When I tell you to begin, you are to start the SGT system to support HPCI operation. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
When I tell you to begin, you are to start the SGT system to support HPCI operation. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
If being simulated In-Plant or Control Room:
If being simulated In-Plant or Control Room:
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.  


Nebraska Public Power District                                             SKL034-22-01(36406)
Nebraska Public Power District SKL034-22-01(36406)
Cooper Nuclear Station                                                             Page 127 of 12 Job Performance Measure for Operations                                                 Revision 00 Task No.: 261003O0101 Task
Cooper Nuclear Station Page 127 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task


==Title:==
==Title:==
Line 2,121: Line 2,673:
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.
General Conditions:
General Conditions:
: 1.     The Standby Gas Treatment System is required to support HPCI operation.
: 1.
The Standby Gas Treatment System is required to support HPCI operation.
General  
General  


==References:==
==References:==
: 1.     Procedure 2.2.73.
: 1.
Procedure 2.2.73.
General Tools and Equipment:
General Tools and Equipment:
: 1.     None Special Conditions, References, Tools, Equipment:
: 1.
: 1.     Simulator Setup: See Attachment 1.
None Special Conditions, References, Tools, Equipment:
: 2.     Critical checks denoted by "*".
: 1.
: 3.     Simulator cues denoted by "#".
Simulator Setup: See Attachment 1.
: 2.
Critical checks denoted by "*".
: 3.
Simulator cues denoted by "#".
Task Standards:
Task Standards:
: 1.     100% of critical elements successfully completed without error.
: 1.
: 2.     100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 2.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
The Control Room Supervisor directs you to start SGT to support HPCI operation. Inform the CRS when SGT is running to support HPCI.
The Control Room Supervisor directs you to start SGT to support HPCI operation. Inform the CRS when SGT is running to support HPCI.  


Nebraska Public Power District                                         SKL034-22-01(36406)
Nebraska Public Power District SKL034-22-01(36406)
Cooper Nuclear Station                                                         Page 128 of 12 Job Performance Measure for Operations                                             Revision 00 Task No.: 261003O0101 Task
Cooper Nuclear Station Page 128 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task


==Title:==
==Title:==
SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)
SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)
Performance Checklist     Standards                                                 Initials
Performance Checklist Standards Initials
: 1. Obtains the current revision of Procedure Current revision of 2.2.73 is obtained.                 _______
: 1. Obtains the current revision of Procedure 2.2.73.
2.2.73.
Current revision of 2.2.73 is obtained.
: 2. Determine the SGT train 1A is determined to be the preferred train. _______
: 2. Determine the preferred SGT train.
preferred SGT train.
SGT train 1A is determined to be the preferred train.
: 3. Start EF-R-1E, SGT A EXHAUST FAN.
EF-R-1E, SGT A EXHAUST FAN switch is placed to RUN.
EF-R-1E, SGT A EXHAUST FAN switch is placed to RUN.
: 3. Start EF-R-1E, SGT A
CUE: SGT Fan Red running light is ON and the Green light is OFF
_______*
: 4. Verifies the inlet and discharge valves OPEN.
EXHAUST FAN.
Position of SGT-AO-249, SGT A INLET and SGT-AO-251, SGT A DISCHARGE are checked.
CUE: SGT Fan Red running light is ON and the Green light is OFF Position of SGT-AO-249, SGT A INLET and SGT-AO-251, SGT A DISCHARGE are checked.
CUE: SGT-AO-249, SGT A INLET RED light is On and the GREEN light is OFF.
: 4. Verifies the inlet and CUE: SGT-AO-249, SGT A INLET RED light is On discharge valves                                                                _______
and the GREEN light is OFF.
OPEN.
SGT-AO-251, SGT A DISCHARGE red light is ON and the GREEN light is OFF.
SGT-AO-251, SGT A DISCHARGE red light is ON and the GREEN light is OFF.
: 5. Verifies SGT-DPIC-546 is in Manual.
SGT-DPIC-546 is verified in Manual.
SGT-DPIC-546 is verified in Manual.
: 5. Verifies SGT-DPIC-
_______
546 is in Manual.
CUE: SGT-DPIC-546 is in Manual.
CUE: SGT-DPIC-546 is in Manual.
D pushbutton is depressed until parameter V is
: 6. Toggles SGT-DPIC-546 until Parameter V is displayed.
: 6. Toggles SGT-DPIC-displayed.
D pushbutton is depressed until parameter V is displayed.
546 until Parameter V                                                           _______*
CUE: Parameter V is displayed.  
is displayed.
CUE: Parameter V is displayed.


Nebraska Public Power District                                           SKL034-22-01(36406)
Nebraska Public Power District SKL034-22-01(36406)
Cooper Nuclear Station                                                         Page 129 of 12 Job Performance Measure for Operations                                           Revision 00 Task No.: 261003O0101 Task
Cooper Nuclear Station Page 129 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task


==Title:==
==Title:==
SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)
SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)
Performance Checklist     Standards                                               Initials SGT-DPIC-546 is adjusted to obtain 800 scfm on
Performance Checklist Standards Initials
: 7. Adjusts SGT-DPIC-SGT-FI-545, SGT DISCHARGE HEADER FLOW.
: 7. Adjusts SGT-DPIC-546 to ensure 800 CFM SGT-DPIC-546 is adjusted to obtain 800 scfm on SGT-FI-545, SGT DISCHARGE HEADER FLOW.
546 to ensure 800                                                            _______*
CUE: SGT-FI-545 indicates 900 CFM.
CFM CUE: SGT-FI-545 indicates 900 CFM.
: 8. Checks High Moisture is clear.
Checks that Annunciator K-1/A-2 SGT A HI Moisture.
Checks that Annunciator K-1/A-2 SGT A HI Moisture.
: 8. Checks High Moisture
_______
is clear.
CUE: Annunciator is in alarm.
CUE: Annunciator is in alarm.
Checks Annunciator K-1/A-2 SGT A HI Moisture and informs CRS of Alarm
: 9. Checks Annunciator K-1/A-2 SGT A HI Moisture Checks Annunciator K-1/A-2 SGT A HI Moisture and informs CRS of Alarm
: 9. Checks Annunciator K-1/A-2 SGT A HI     #CUE: CRS acknowledges the report and directs A       _______
#CUE: CRS acknowledges the report and directs A SBGT be secured and B SBGT train started to support HPCI operation, alarm card actions will not be performed due to not emergency condition.
Moisture              SBGT be secured and B SBGT train started to support HPCI operation, alarm card actions will not be performed due to not emergency condition.
: 10. Determines Reactor Building HV System Operation Ensure Reactor Building H&V System running and maintaining Reactor Building pressure at -0.25" wg.
Ensure Reactor Building H&V System running and
CUE: Reactor Building pressure at -0.3" wg..
: 10. Determines Reactor maintaining Reactor Building pressure at -0.25" wg.
: 11. Verifies SGT-DPIC-546 is in Manual.
Building HV System                                                            _______
Operation CUE: Reactor Building pressure at -0.3" wg..
SGT-DPIC-546 is verified in Manual.
SGT-DPIC-546 is verified in Manual.
: 11. Verifies SGT-DPIC-
CUE: SGT-DPIC-546 is in Manual.  
_______
546 is in Manual.
CUE: SGT-DPIC-546 is in Manual.


Nebraska Public Power District                                         SKL034-22-01(36406)
Nebraska Public Power District SKL034-22-01(36406)
Cooper Nuclear Station                                                       Page 130 of 12 Job Performance Measure for Operations                                         Revision 00 Task No.: 261003O0101 Task
Cooper Nuclear Station Page 130 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task


==Title:==
==Title:==
SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)
SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)
Performance Checklist     Standards                                               Initials D pushbutton is depressed until parameter V is
Performance Checklist Standards Initials
: 12. Toggles SGT-DPIC-displayed.
: 12. Toggles SGT-DPIC-546 until Parameter V is displayed.
546 until Parameter V                                                       _______
D pushbutton is depressed until parameter V is displayed.
is displayed.
CUE: Parameter V is displayed.
CUE: Parameter V is displayed.
SGT-DPIC-546 is adjusted to obtain ~ 100 scfm on
: 13. Adjusts SGT-DPIC-546 to ensure ~ 100 CFM SGT-DPIC-546 is adjusted to obtain ~ 100 scfm on SGT-FI-545, SGT DISCHARGE HEADER FLOW.
: 13. Adjusts SGT-DPIC-SGT-FI-545, SGT DISCHARGE HEADER FLOW.
CUE: SGT-FI-545 indicates 100 CFM.
546 to ensure ~ 100                                                          _______*
: 14. Check SGT heaters Verifies SGT heaters are off.
CFM CUE: SGT-FI-545 indicates 100 CFM.
CUE: SGT heaters GREEN lights ON, RED light OFF
Verifies SGT heaters are off.
: 15. Stop EF-R-1E, SGT A EXHAUST FAN.
: 14. Check SGT heaters                                                            _______
EF-R-1E, SGT A EXHAUST FAN switch is placed to AUTO.
CUE: SGT heaters GREEN lights ON, RED light OFF EF-R-1E, SGT A EXHAUST FAN switch is placed to AUTO.
CUE: SGT Fan Red running light is OFF and the Green light is ON
: 15. Stop EF-R-1E, SGT
: 16. Verifies the inlet and discharge valves CLOSED.
_______*
Position of SGT-AO-249, SGT A INLET and SGT-AO-251, SGT A DISCHARGE are checked.
A EXHAUST FAN.
CUE: SGT-AO-249, SGT A INLET RED light is OFF and the GREEN light is ON.
CUE: SGT Fan Red running light is OFF and the Green light is ON Position of SGT-AO-249, SGT A INLET and SGT-AO-251, SGT A DISCHARGE are checked.
SGT-AO-251, SGT A DISCHARGE red light is OFF and the GREEN light is ON.  
: 16. Verifies the inlet and CUE: SGT-AO-249, SGT A INLET RED light is OFF discharge valves              and the GREEN light is ON.                    _______
CLOSED.
SGT-AO-251, SGT A DISCHARGE red light is OFF and the GREEN light is ON.


Nebraska Public Power District                                         SKL034-22-01(36406)
Nebraska Public Power District SKL034-22-01(36406)
Cooper Nuclear Station                                                       Page 131 of 12 Job Performance Measure for Operations                                         Revision 00 Task No.: 261003O0101 Task
Cooper Nuclear Station Page 131 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task


==Title:==
==Title:==
SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)
SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)
Performance Checklist     Standards                                               Initials Ensure SGT-AO-271, SGT B DILUTION AIR, in AUTO and valve closed.
Performance Checklist Standards Initials
: 17. Verifies SGT-AO-271, SGT B DILUTION         CUE: SGT-AO-271, SGT B DILUTION AIR, in AUTO         _______
: 17. Verifies SGT-AO-271, SGT B DILUTION AIR, in AUTO Ensure SGT-AO-271, SGT B DILUTION AIR, in AUTO and valve closed.
AIR, in AUTO                  and valve RED light is OFF and the GREEN light is ON.
CUE: SGT-AO-271, SGT B DILUTION AIR, in AUTO and valve RED light is OFF and the GREEN light is ON.
: 18. Start EF-R-1F, SGT B EXHAUST FAN.
EF-R-1F, SGT B EXHAUST FAN switch is placed to RUN.
EF-R-1F, SGT B EXHAUST FAN switch is placed to RUN.
: 18. Start EF-R-1F, SGT B
CUE: SGT Fan Red running light is ON and the Green light is OFF
_______*
: 19. Verifies the inlet and discharge valves OPEN.
EXHAUST FAN.
Position of SGT-AO-250, SGT B INLET and SGT-AO-252, SGT B DISCHARGE are checked.
CUE: SGT Fan Red running light is ON and the Green light is OFF Position of SGT-AO-250, SGT B INLET and SGT-AO-252, SGT B DISCHARGE are checked.
CUE: SGT-AO-250, SGT A INLET RED light is On and the GREEN light is OFF.
: 19. Verifies the inlet and CUE: SGT-AO-250, SGT A INLET RED light is On discharge valves                                                            _______
and the GREEN light is OFF.
OPEN.
SGT-AO-252, SGT A DISCHARGE red light is ON and the GREEN light is OFF.
SGT-AO-252, SGT A DISCHARGE red light is ON and the GREEN light is OFF.
: 20. Verifies SGT-DPIC-546 is in Manual.
SGT-DPIC-546 is verified in Manual.
SGT-DPIC-546 is verified in Manual.
: 20. Verifies SGT-DPIC-
_______
546 is in Manual.
CUE: SGT-DPIC-546 is in Manual.
CUE: SGT-DPIC-546 is in Manual.
D pushbutton is depressed until parameter V is
: 21. Toggles SGT-DPIC-546 until Parameter V is displayed.
: 21. Toggles SGT-DPIC-displayed.
D pushbutton is depressed until parameter V is displayed.
546 until Parameter V                                                       _______*
CUE: Parameter V is displayed.  
is displayed.
CUE: Parameter V is displayed.


Nebraska Public Power District                                       SKL034-22-01(36406)
Nebraska Public Power District SKL034-22-01(36406)
Cooper Nuclear Station                                                     Page 132 of 12 Job Performance Measure for Operations                                       Revision 00 Task No.: 261003O0101 Task
Cooper Nuclear Station Page 132 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task


==Title:==
==Title:==
SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)
SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)
Performance Checklist     Standards                                             Initials SGT-DPIC-546 is adjusted to obtain 800 scfm on
Performance Checklist Standards Initials
: 22. Adjusts SGT-DPIC-SGT-FI-545, SGT DISCHARGE HEADER FLOW.
: 22. Adjusts SGT-DPIC-546 to ensure 800 CFM SGT-DPIC-546 is adjusted to obtain 800 scfm on SGT-FI-545, SGT DISCHARGE HEADER FLOW.
546 to ensure 800                                                        _______*
CUE: SGT-FI-545 indicates 900 CFM.
CFM CUE: SGT-FI-545 indicates 900 CFM.
: 23. Ensures High Moisture is clear.
Ensures that Annunciator K-2/A-2 SGT B HI
Ensures that Annunciator K-2/A-2 SGT B HI Moisture is clear.
: 23. Ensures High          Moisture is clear.
_______
Moisture is clear.
CUE: Annunciator is clear.
CUE: Annunciator is clear.
CRS is informed.
: 24. Informs CRS that the task is complete.
: 24. Informs CRS that the
CRS is informed.
_______
#CUE: Acknowledge the report and inform the candidate that the JPM is complete.  
task is complete.     #CUE: Acknowledge the report and inform the candidate that the JPM is complete.


Nebraska Public Power District                                           SKL034-22-01(36406)
Nebraska Public Power District SKL034-22-01(36406)
Cooper Nuclear Station                                                         Page 133 of 12 Job Performance Measure for Operations                                             Revision 00 Task No.: 261003O0101 Task
Cooper Nuclear Station Page 133 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task


==Title:==
==Title:==
Line 2,274: Line 2,806:
Batch File Name - none.
Batch File Name - none.
C. Change the Simulator conditions from those of the IC as follows:
C. Change the Simulator conditions from those of the IC as follows:
: 1. Triggers Number                                                     Description 1         ZAOSGTFI545 >0.13         Ramps moisture reading when SBGT flow greater than 500 cfm
: 1. Triggers Number Description 1
: 2. Malfunctions Number                 Title           Trigger   TD     Severity   Ramp       Initial none
ZAOSGTFI545 >0.13 Ramps moisture reading when SBGT flow greater than 500 cfm
: 3. Remotes Number                         Title                 Trigger       Value       Ramp None
: 2. Malfunctions Number Title Trigger TD Severity Ramp Initial none
: 4. Overrides Instrument                     Tag       Trigger     TD     Value   Ramp 18A2M04 0 TO 100% SGT A                                   1     30 sec 53.3358   30 sec CARBON FILTER INLET RH 18A2M05 0 TO 100% SGT A HI-                               1     30 sec 53.3358   30 sec EFF FILTER RH INDICATOR
: 3. Remotes Number Title Trigger Value Ramp None
: 4. Overrides Instrument Tag Trigger TD Value Ramp 18A2M04 0 TO 100% SGT A CARBON FILTER INLET RH 1
30 sec 53.3358 30 sec 18A2M05 0 TO 100% SGT A HI-EFF FILTER RH INDICATOR 1
30 sec 53.3358 30 sec  


Nebraska Public Power District                                           SKL034-22-01(36406)
Nebraska Public Power District SKL034-22-01(36406)
Cooper Nuclear Station                                                           Page 134 of 12 Job Performance Measure for Operations                                             Revision 00 Task No.: 261003O0101 Task
Cooper Nuclear Station Page 134 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task


==Title:==
==Title:==
SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)
SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)
Instrument                     Tag       Trigger     TD       Value     Ramp K-1 A-02 SGT A MOISTURE HIGH                             1     58 sec     OFF
Instrument Tag Trigger TD Value Ramp K-1 A-02 SGT A MOISTURE HIGH 1
58 sec OFF
: 5. Panel Setup
: 5. Panel Setup
: a. Ensure that SGT train 1A is the preferred SGT train.
: a. Ensure that SGT train 1A is the preferred SGT train.
Setup for the Exam:
Setup for the Exam:
a) Initialize the simulator in any power IC.
a) Initialize the simulator in any power IC.
Note: If this JPM is to be performed more than once, snap the simulator into an IC after the panel setup is complete.
Note: If this JPM is to be performed more than once, snap the simulator into an IC after the panel setup is complete.  


Nebraska Public Power District                                             SKL034-22-01 (36406)
Nebraska Public Power District SKL034-22-01 (36406)
Cooper Nuclear Station                                                               Page 12 of 12 Job Performance Measure for Operations                                                 Revision 00 ATTACHMENT 2 Directions to Trainee:
Cooper Nuclear Station Page 12 of 12 Job Performance Measure for Operations Revision 00 ATTACHMENT 2 Directions to Trainee:
When I tell you to begin, you are to start the SGT system to support HCI operation.
When I tell you to begin, you are to start the SGT system to support HCI operation.
If being simulated In-Plant or Control Room:
If being simulated In-Plant or Control Room:
Line 2,299: Line 2,835:
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.
General Conditions:
General Conditions:
: 1.     The Standby Gas Treatment System is required to support HPCI operation.
: 1.
The Standby Gas Treatment System is required to support HPCI operation.
Initiating Cues:
Initiating Cues:
The Control Room Supervisor directs you to start SGT to support HPCI operation. Inform the CRS when SGT is running to support HPCI.
The Control Room Supervisor directs you to start SGT to support HPCI operation. Inform the CRS when SGT is running to support HPCI.  
 
Nebraska Public Power District SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations Revision 03 136 of 149 Task No.: 200134I0504


Nebraska Public Power District                              SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations                        Revision 03 Task No.: 200134I0504
=====================================================================
=====================================================================
Task
Task


==Title:==
==Title:==
Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)
Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)  
====================================================================
 
====================================================================
=
=
Trainee:                               Examiner:
Trainee:
Pass       Fail     Examiner                             Date:
Examiner:
Signature:
Pass Fail Examiner Signature:
Date:
THIS IS AN ALTERNATE PATH JPM Additional Program Information:
THIS IS AN ALTERNATE PATH JPM Additional Program Information:
: 27. Appropriate Performance Locations: Plant
: 27.
: 28. Appropriate Trainee Level: SO / RO / SRO
Appropriate Performance Locations: Plant
: 29. Evaluation Method: Simulate
: 28.
: 30. Performance Time: 25 minutes
Appropriate Trainee Level: SO / RO / SRO
: 31. NRC K/A: 262002 K4.01(3.4/3.4)
: 29.
Evaluation Method: Simulate
: 30.
Performance Time: 25 minutes
: 31.
NRC K/A: 262002 K4.01(3.4/3.4)
Directions to Examiner:
Directions to Examiner:
NOTE:     This is an Alternate Path JPM. The alternate source supplying load will not work and the manual bypass switch must be used.
NOTE:
: 24. This JPM evaluates the trainee's ability to respond to a no-break power panel failure
This is an Alternate Path JPM. The alternate source supplying load will not work and the manual bypass switch must be used.
: 24.
This JPM evaluates the trainee's ability to respond to a no-break power panel failure
: 2. All blanks must be filled out with either initials or an ANP@ for Anot performed@; an explanation may also be written in the space, if desired, by the examiner.
: 2. All blanks must be filled out with either initials or an ANP@ for Anot performed@; an explanation may also be written in the space, if desired, by the examiner.
: 3. Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.
: 3.
: 4. Brief the trainee and tell the trainee to begin.
Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.
136 of 149
: 4.
Brief the trainee and tell the trainee to begin.  


Nebraska Public Power District                                                 SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations                                           Revision 03 Task No.: 200134I0504
Nebraska Public Power District SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations Revision 03 137 of 149 Task No.: 200134I0504  
=====================================================================
 
=====================================================================
Task
Task


==Title:==
==Title:==
Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)
Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)  
  ====================================================================
 
=
====================================================================
=
Directions to Trainee:
Directions to Trainee:
When I tell you to begin you are to perform the assigned Control Building Operator=s actions to respond to a no break power panel failure. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin you are to perform the assigned Control Building Operator=s actions to respond to a no break power panel failure. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.  
  =====================================================================
 
=====================================================================
General Conditions:
General Conditions:
: 1. The plant has experienced a no break power panel failure.
: 1.
: 2. The Rx has scrammed.
The plant has experienced a no break power panel failure.
: 3. An attempt to transfer NBPP to MCC-R by placing NBPP PWR TRANSFER switch to MCC-R has failed.
: 2.
: 4. The electricians have determined that the fault is not in the NBPP itself.
The Rx has scrammed.
: 5. Both switches have been placed to ALT at the 120v AC supplies for the gaitronics.
: 3.
: 6. Control Room Operators have performed actions 4.1 through 4.3.11 of 5.3NBPP.
An attempt to transfer NBPP to MCC-R by placing NBPP PWR TRANSFER switch to MCC-R has failed.
: 4.
The electricians have determined that the fault is not in the NBPP itself.
: 5.
Both switches have been placed to ALT at the 120v AC supplies for the gaitronics.
: 6.
Control Room Operators have performed actions 4.1 through 4.3.11 of 5.3NBPP.
General  
General  


==References:==
==References:==
: 1. 5.3NBPP (NO BREAK POWER FAILURE)
: 1.
5.3NBPP (NO BREAK POWER FAILURE)
General Tools and Equipment:
General Tools and Equipment:
: 1)     Key for access to Control Building 903' doors.
: 1)
Key for access to Control Building 903' doors.
Special Conditions, References, Tools, Equipment:
Special Conditions, References, Tools, Equipment:
: 1. Critical checks denoted by "*".
: 1. Critical checks denoted by "*".
Task Standards:
Task Standards:  
137 of 149
 
Nebraska Public Power District SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations Revision 03 138 of 149 Task No.: 200134I0504


Nebraska Public Power District                                        SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations                                Revision 03 Task No.: 200134I0504
=====================================================================
=====================================================================
Task
Task


==Title:==
==Title:==
Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)
Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)  
  ====================================================================
 
====================================================================
=
=
: 2. 100% of critical elements successfully completed without error.
: 2.
: 2. 100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 2.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
You have been assigned to carry out actions for a no break power panel failure in accordance with 5.3NBPP. The Control Room Supervisor (CRS) directs you to perform all the necessary Control Building Operator=s actions for restoring power from the Alternate Supply (MCC-R). Notify the CRS when the NBPP is energized.
You have been assigned to carry out actions for a no break power panel failure in accordance with 5.3NBPP. The Control Room Supervisor (CRS) directs you to perform all the necessary Control Building Operator=s actions for restoring power from the Alternate Supply (MCC-R). Notify the CRS when the NBPP is energized.  
138 of 149


Nebraska Public Power District                               SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations                       Revision 03 Task No.: 200134I0504
Nebraska Public Power District SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations Revision 03 139 of 149 Task No.: 200134I0504  
=====================================================================
 
=====================================================================
Task
Task


==Title:==
==Title:==
Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)
Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)  
  ====================================================================
 
====================================================================
=
=
Performance                     Standard                   Initials Checklist
Performance Checklist Standard Initials
: 3. Obtain a copy of   Obtain a copy of 5.3NBPP, NO BREAK 5.3NBPP                POWER FAILURE                         _________
: 3. Obtain a copy of 5.3NBPP Obtain a copy of 5.3NBPP, NO BREAK POWER FAILURE
_
: d. Ensure MCC-R FEED TO NBPP is in ON.
: d. Ensure MCC-R FEED   Ensure EE-DSC-NBPP(AC), MCC-R FEED TO NBPP is in ON. TO NBPP TRANSFMR (Cable Spreading     _________
Ensure EE-DSC-NBPP(AC), MCC-R FEED TO NBPP TRANSFMR (Cable Spreading near NBPP), is in ON.
near NBPP), is in ON.                 _*
CUE: Indicate the handle is in the UP position.
CUE: Indicate the handle is in the UP position.
: e. Contact the Rx Building Operator.
: e. Contact the Rx     Contacts the Reactor Building Building            Operator to ensure that MCC-R,         _________
Contacts the Reactor Building Operator to ensure that MCC-R, Breaker 2B, NO BREAK AC POWER SUPPLY, is closed and reset.
Operator.          Breaker 2B, NO BREAK AC POWER         _*
CUE: Respond as the Rx Bldg Operator, that MCC-R, Breaker 2B, NO BREAK AC POWER SUPPLY, is closed and reset.
SUPPLY, is closed and reset.
: f. Open breaker At Inverter A, open INVERTER OUTPUT breaker.
CUE: Respond as the Rx Bldg Operator, that MCC-R, Breaker 2B, NO BREAK AC POWER SUPPLY, is closed and reset.
CUE: Indicate the handle is in the DOWN position.
: f. Open breaker       At Inverter A, open INVERTER OUTPUT breaker.                               _________
: 1. Ensure breaker is closed.
_*
At Inverter A, ensure SUPPLY TO NBPP breaker is closed.
CUE: Indicate the handle is in the DOWN position.
CUE: Indicate the handle is in the UP position.  
: 1. Ensure breaker is   At Inverter A, ensure SUPPLY TO closed.                NBPP breaker is closed.               _________
_
CUE: Indicate the handle is in the UP position.
139 of 149


Nebraska Public Power District                               SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations                       Revision 03 Task No.: 200134I0504
Nebraska Public Power District SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations Revision 03 140 of 149 Task No.: 200134I0504  
=====================================================================
 
=====================================================================
Task
Task


==Title:==
==Title:==
Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)
Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)  
  ====================================================================
 
====================================================================
=
=
Performance                     Standard                 Initials Checklist
Performance Checklist Standard Initials
: 2. Ensure breaker is   At Inverter A, ensure ALTERNATE AC closed.                INPUT TO STATIC SWITCH breaker is closed.                               _________
: 2. Ensure breaker is closed.
_
At Inverter A, ensure ALTERNATE AC INPUT TO STATIC SWITCH breaker is closed.
CUE: Indicate the handle is in the UP position.
CUE: Indicate the handle is in the UP position.
: 3. Depress button. At Inverter A, depress ALTERNATE SOURCE SUPPLYING LOAD button.         _________
: 3. Depress button.
_
At Inverter A, depress ALTERNATE SOURCE SUPPLYING LOAD button.
CUE: The red ALT SOURCE SUPPLYING LOAD light is off.   (NBPP is still de-energized)
CUE: The red ALT SOURCE SUPPLYING LOAD light is off. (NBPP is still de-energized)
: g. Place MAN BP SW     Place MANUAL BYPASS SWITCH to to ALT SOURCE TO    ALTERNATE SOURCE TO LOAD.             _________
: g. Place MAN BP SW to ALT SOURCE TO LOAD.
LOAD.                                                      _*
Place MANUAL BYPASS SWITCH to ALTERNATE SOURCE TO LOAD.
CUE: Point to ALTERNATE SOURCE TO LOAD position.
CUE: Point to ALTERNATE SOURCE TO LOAD position.
: h. Depress ALT         Depress ALTERNATE SOURCE SUPPLYING SOURCE SUPPLYING   LOAD button.                           _________
: h. Depress ALT SOURCE SUPPLYING LOAD button.
LOAD button.                                               _*
Depress ALTERNATE SOURCE SUPPLYING LOAD button.
CUE: The red ALT SOURCE SUPPLYING LOAD light is on. (NBPP is energized)
CUE: The red ALT SOURCE SUPPLYING LOAD light is on. (NBPP is energized)
NOTE: The Gaitronics do not need to be transferred
NOTE: The Gaitronics do not need to be transferred
: i. Notifies CRS.       Notifies CRS that NBPP is 140 of 149
: i. Notifies CRS.
Notifies CRS that NBPP is  


Nebraska Public Power District                             SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations                       Revision 03 Task No.: 200134I0504
Nebraska Public Power District SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations Revision 03 141 of 149 Task No.: 200134I0504  
=====================================================================
 
=====================================================================
Task
Task


==Title:==
==Title:==
Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)
Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)  
====================================================================
 
====================================================================
=
=
Performance                     Standard                   Initials Checklist energized.                             _________
Performance Checklist Standard Initials energized.
_
CUE: As the CRS respond to the report.  
CUE: As the CRS respond to the report.
141 of 149


Nebraska Public Power District                                       SKL034-10-95 (7456)
Nebraska Public Power District SKL034-10-95 (7456)
Cooper Nuclear Station                                                       Page 142 of 6 Job Performance Measure for Operations                                           Revision 03 ATTACHMENT 1 Directions to Trainee:
Cooper Nuclear Station Page 142 of 6 Job Performance Measure for Operations Revision 03 142 of 149 ATTACHMENT 1 Directions to Trainee:
When I tell you to begin you are to perform the assigned Control Building Operator=s actions to respond to a no break power panel failure. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When I tell you to begin you are to perform the assigned Control Building Operator=s actions to respond to a no break power panel failure. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
Line 2,447: Line 3,009:
: 6. Control Room Operators have performed actions 4.1 through 4.3.11 of 5.3NBPP.
: 6. Control Room Operators have performed actions 4.1 through 4.3.11 of 5.3NBPP.
Initiating Cues:
Initiating Cues:
You have been assigned to carry out actions for a no break power panel failure in accordance with 5.3NBPP. The Control Room Supervisor (CRS) directs you to perform all the necessary Control Building Operator=s actions for restoring power from the Alternate Supply (MCC-R). Notify the CRS when the NBPP is energized.
You have been assigned to carry out actions for a no break power panel failure in accordance with 5.3NBPP. The Control Room Supervisor (CRS) directs you to perform all the necessary Control Building Operator=s actions for restoring power from the Alternate Supply (MCC-R). Notify the CRS when the NBPP is energized.  
142 of 149


Nebraska Public Power District                                                 SKL034-40-84 (18851)
Nebraska Public Power District SKL034-40-84 (18851)
Cooper Nuclear Station                                                               Page 143 of 149 Job Performance Measure for Operations                                                     Revision 03 Task Number: 200390A0501 5.3ALT-STRATEGY, Inject Fire Protection Water to RHR Trainee:                                             Examiner:
Cooper Nuclear Station Page 143 of 149 Job Performance Measure for Operations Revision 03 Task Number: 200390A0501 5.3ALT-STRATEGY, Inject Fire Protection Water to RHR Trainee:
Pass         Fail         Examiner Signature:                                     Date:
Examiner:
Pass Fail Examiner Signature:
Date:
Additional Program Information:
Additional Program Information:
: 1. Appropriate Performance Locations: In Plant
: 1.
: 2. Appropriate Trainee Levels: RO / SRO
Appropriate Performance Locations: In Plant
: 3. Evaluation Method: Simulate
: 2.
: 4. Performance Time: 15 minutes
Appropriate Trainee Levels: RO / SRO
: 5. NRC K/A 295003.AA1.03 (4.4 / 4.4)
: 3.
Evaluation Method: Simulate
: 4.
Performance Time: 15 minutes
: 5.
NRC K/A 295003.AA1.03 (4.4 / 4.4)
Directions to Examiner:
Directions to Examiner:
: 1. This JPM evaluates the trainee's ability to inject fire protection water into the RHR System during a complete loss of AC and DC power.
: 1.
: 2. If this JPM is to be performed on the Simulator, only the cues preceded by "#" should be given.
This JPM evaluates the trainee's ability to inject fire protection water into the RHR System during a complete loss of AC and DC power.
: 3. All blanks must be filled out with either initials or an NP for not performed, and an explanation may also be written in the space if desired by the examiner.
: 2.
: 4. Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.
If this JPM is to be performed on the Simulator, only the cues preceded by "#" should be given.
: 5. Brief the trainee and tell the trainee to begin.
: 3.
All blanks must be filled out with either initials or an NP for not performed, and an explanation may also be written in the space if desired by the examiner.
: 4.
Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.
: 5.
Brief the trainee and tell the trainee to begin.
Directions to Trainee:
Directions to Trainee:
When I tell you to begin, you are to perform the actions to align Fire Protection to RHR Subsystem A, using SWBP A in accordance with Procedure 5.3ALT-STRATEGY. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
When I tell you to begin, you are to perform the actions to align Fire Protection to RHR Subsystem A, using SWBP A in accordance with Procedure 5.3ALT-STRATEGY. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation. ALL PLANT ANNOUNCEMENTS WILL BE SIMULATED!
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation. ALL PLANT ANNOUNCEMENTS WILL BE SIMULATED!  


Nebraska Public Power District                                         SKL034-40-84 (18851)
Nebraska Public Power District SKL034-40-84 (18851)
Cooper Nuclear Station                                                       Page 144 of 149 Job Performance Measure for Operations                                           Revision 03 Task Number: 200390A0501 5.3ALT-STRATEGY, Inject Fire Protection Water to RHR General Conditions:
Cooper Nuclear Station Page 144 of 149 Job Performance Measure for Operations Revision 03 Task Number: 200390A0501 5.3ALT-STRATEGY, Inject Fire Protection Water to RHR General Conditions:
: 1.     The Plant has experience a total loss of A/C and D/C power.
: 1.
: 2.     Reactor Pressure is 600 psig.
The Plant has experience a total loss of A/C and D/C power.
: 3.     Procedure 5.3ALT-STRATEGY, Alternate Core Cooling Mitigating Strategies, has been entered.
: 2.
: 4.     Another SO has completed the breaker alignments per step 1.1 Attachment 1 of 5.3ALT-STRATEGY.
Reactor Pressure is 600 psig.
: 5.     Fire Protection header is intact.
: 3.
Procedure 5.3ALT-STRATEGY, Alternate Core Cooling Mitigating Strategies, has been entered.
: 4.
Another SO has completed the breaker alignments per step 1.1 Attachment 1 of 5.3ALT-STRATEGY.
: 5.
Fire Protection header is intact.
General  
General  


==References:==
==References:==
: 1.     Procedure 5.3ALT-STRATEGY General Tools and Equipment:
: 1.
: 1.     3 Fire Hose
Procedure 5.3ALT-STRATEGY General Tools and Equipment:
: 2.     Fire hose Wrench Special Conditions, References, Tools, Equipment:
: 1.
: 1.     Critical checks denoted by "*."
3 Fire Hose
: 2.     Simulator cues denoted by "#."
: 2.
Fire hose Wrench Special Conditions, References, Tools, Equipment:
: 1.
Critical checks denoted by "*."
: 2.
Simulator cues denoted by "#."
Task Standards:
Task Standards:
: 1.     100% of critical elements successfully completed without error.
: 1.
: 2.     100% of safety and radiological work practices.
100% of critical elements successfully completed without error.
: 2.
100% of safety and radiological work practices.
Initiating Cue(s):
Initiating Cue(s):
The CRS has directed you to align Fire Protection Water to RHR Subsystem A using SWBP A in accordance with 5.3ALT-STRATEGY, Attachment 1. You are to inform the CRS when Fire Protection Water is aligned to RHR.
The CRS has directed you to align Fire Protection Water to RHR Subsystem A using SWBP A in accordance with 5.3ALT-STRATEGY, Attachment 1. You are to inform the CRS when Fire Protection Water is aligned to RHR.  


Nebraska Public Power District                                               SKL034-40-84 (18851)
Nebraska Public Power District SKL034-40-84 (18851)
Cooper Nuclear Station                                                             Page 145 of 149 Job Performance Measure for Operations                                                   Revision 03 Task Number: 200390A0501 5.3ALT-STRATEGY, Inject Fire Protection Water to RHR Performance Checklist         Standards                                                 Initials The Operator obtains a copy of the current
Cooper Nuclear Station Page 145 of 149 Job Performance Measure for Operations Revision 03 Task Number: 200390A0501 5.3ALT-STRATEGY, Inject Fire Protection Water to RHR Performance Checklist Standards Initials
: 32. Obtain procedure revision of procedure 5.3ALT-STRATEGY                     _______
: 32. Obtain procedure The Operator obtains a copy of the current revision of procedure 5.3ALT-STRATEGY NOTE - Equipment is stored C-882-N by MCC-T.
NOTE - Equipment is stored C-882-N by MCC-T.
NOTE - The Operator must show that they are capable of obtaining the required equipment, but does not have to take them to the specified locations, to get credit for the task element.
NOTE - The Operator must show that they are capable of obtaining the required equipment, but does not have to take them to the specified locations, to get credit for the task element.
: 25. C-882 N, gets hose.
The Operator obtains the 3 hose.
The Operator obtains the 3 hose.
: 25. C-882 N, gets hose.
CUE: Hose is obtained.
* CUE: Hose is obtained.
: 3. Remove existing 21/2 hose at Hose Station No.
: 3. Remove existing 21/2       The Operator removes the 21/2 hose
16 The Operator removes the 21/2 hose CUE: The hose is removed.
* hose at Hose Station No.
: j. 4. C-882 N, attaches hose.
16                        CUE: The hose is removed.
The Operator attaches the 3 hose to FP-315, Hose Station No. 16.
The Operator attaches the 3 hose to FP-315,
: j. 4. C-882 N, attaches      Hose Station No. 16.
* hose.
CUE: The hose is attached.
CUE: The hose is attached.
The Operator removes the pipe cap from SW-641, GW System Supply from SWB Pump A. (Outlet
: k. 5. C-882 N, removes pipe cap.
: k. 5. C-882 N, removes        of SWBP A Pump Inlet Strainer)
The Operator removes the pipe cap from SW-641, GW System Supply from SWB Pump A. (Outlet of SWBP A Pump Inlet Strainer)
* pipe      cap.
CUE: The pipe cap is removed.
CUE: The pipe cap is removed.
: l. 6. C-882 N, attaches hose.
The Operator attaches the 3 hose to SW-641 connection.
The Operator attaches the 3 hose to SW-641 connection.
: l. 6. C-882 N, attaches
CUE: The hose is attached.  
* hose.
CUE: The hose is attached.


Nebraska Public Power District                                         SKL034-40-84 (18851)
Nebraska Public Power District SKL034-40-84 (18851)
Cooper Nuclear Station                                                         Page 146 of 149 Job Performance Measure for Operations                                             Revision 03 Task Number: 200390A0501 5.3ALT-STRATEGY, Inject Fire Protection Water to RHR Performance Checklist         Standards                                           Initials The Operator ensures that the SW-77, SWBP A
Cooper Nuclear Station Page 146 of 149 Job Performance Measure for Operations Revision 03 Task Number: 200390A0501 5.3ALT-STRATEGY, Inject Fire Protection Water to RHR Performance Checklist Standards Initials
: m. 7. C-882 N, ensures       Suction valve is closed.
: m. 7. C-882 N, ensures SW-84 is CLOSED.
SW-84            is CLOSED.                   CUE: The hand wheel has stopped moving in the       _______
The Operator ensures that the SW-77, SWBP A Suction valve is closed.
clockwise direction.
CUE: The hand wheel has stopped moving in the clockwise direction.
: n. 8. C-882 N, ensures the SW-121 is CLOSED.
The Operator ensures that the SW-121, Emergency Core Flooding Tell-Tale Drain valve is CLOSED. (SW-121 is in a contaminated area.
The Operator ensures that the SW-121, Emergency Core Flooding Tell-Tale Drain valve is CLOSED. (SW-121 is in a contaminated area.
He can call for RP support or obtain PCs, or since
He can call for RP support or obtain PCs, or since this is an Emergency Procedure, he can complete the task and then ask for RP support.)
: n. 8. C-882 N, ensures the this is an Emergency Procedure, he can complete SW-121 is CLOSED.
the task and then ask for RP support.)             _______
CUE: The hand wheel has stopped moving in the clockwise direction.
CUE: The hand wheel has stopped moving in the clockwise direction.
The Operator ensures that the SW-119 Emergency Core Flooding Supply Root valve is
: o. 9. C-882 N, ensures valve is OPEN.
: o. 9. C-882 N, ensures       OPEN.
The Operator ensures that the SW-119 Emergency Core Flooding Supply Root valve is OPEN.
valve is OPEN.
_______*
CUE: The hand wheel has stopped moving in the counter-clockwise direction.
CUE: The hand wheel has stopped moving in the counter-clockwise direction.
The Operator ensures that the SW-120, Emergency Core Flooding Supply Shutoff valve is
: p. 10. C-882 N, ensures valve is OPEN.
: p. 10. C-882 N, ensures      OPEN.
The Operator ensures that the SW-120, Emergency Core Flooding Supply Shutoff valve is OPEN.
valve is OPEN.
_______*
CUE: The hand wheel has stopped moving in the counter-clockwise direction.
CUE: The hand wheel has stopped moving in the counter-clockwise direction.
: q. 11. C-882 N, ensures valve is OPEN.
The Operator ensures that the SW-641, GW System Supply from SWBP A is OPEN.
The Operator ensures that the SW-641, GW System Supply from SWBP A is OPEN.
: q. 11. C-882 N, ensures valve is OPEN.            CUE: The valve Operator has been turned
CUE: The valve Operator has been turned Counter Clockwise now is pointing straight up.  
_______*
Counter Clockwise now is pointing straight up.


Nebraska Public Power District                                         SKL034-40-84 (18851)
Nebraska Public Power District SKL034-40-84 (18851)
Cooper Nuclear Station                                                       Page 147 of 149 Job Performance Measure for Operations                                           Revision 03 Task Number: 200390A0501 5.3ALT-STRATEGY, Inject Fire Protection Water to RHR Performance Checklist         Standards                                         Initials The Operator slowly opens FP-315.
Cooper Nuclear Station Page 147 of 149 Job Performance Measure for Operations Revision 03 Task Number: 200390A0501 5.3ALT-STRATEGY, Inject Fire Protection Water to RHR Performance Checklist Standards Initials
: r. 12. Slowly opens FP-CUE: The hand wheel has stopped moving in the 315.
: r. 12. Slowly opens FP-315.
counter-clockwise direction and the hose is _______*
The Operator slowly opens FP-315.
charged.
CUE: The hand wheel has stopped moving in the counter-clockwise direction and the hose is charged.
: s. 13. Notifies CRS that task is completed.
The operator informs the CRS that Fire Water is aligned to the RHR System via SWBP A.
The operator informs the CRS that Fire Water is aligned to the RHR System via SWBP A.
: s. 13. Notifies CRS that task
CUE: The CRS acknowledges the report.  
_______
is completed.
CUE: The CRS acknowledges the report.


Nebraska Public Power District                                                 SKL034-40-84 (18851)
Nebraska Public Power District SKL034-40-84 (18851)
Cooper Nuclear Station                                                             Page 148 of 149 Job Performance Measure for Operations                                                   Revision 03 Task Number: None ATTACHMENT 1 Directions to Trainee:
Cooper Nuclear Station Page 148 of 149 Job Performance Measure for Operations Revision 03 Task Number: None ATTACHMENT 1 Directions to Trainee:
When I tell you to begin, you are to perform the actions to align Fire Protection to RHR Subsystem A, using SWBP A in accordance with Procedure 5.3ALT-STRATEGY. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
When I tell you to begin, you are to perform the actions to align Fire Protection to RHR Subsystem A, using SWBP A in accordance with Procedure 5.3ALT-STRATEGY. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.
If being simulated In-Plant or Control Room:
If being simulated In-Plant or Control Room:
Line 2,559: Line 3,131:
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation. ALL PLANT ANNOUNCEMENTS WILL BE SIMULATED!
During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation. ALL PLANT ANNOUNCEMENTS WILL BE SIMULATED!
General Conditions:
General Conditions:
: 1.     The Plant has experience a total loss of A/C and D/C power.
: 1.
: 2.     Reactor Pressure is 600 psig.
The Plant has experience a total loss of A/C and D/C power.
: 3.     Procedure 5.3ALT-STRATEGY, Alternate Core Cooling Mitigating Strategies, has been entered
: 2.
: 4.     Another SO has completed the breaker alignments per step 1.1 Attachment 1 of 5.3ALT-STRATEGY.
Reactor Pressure is 600 psig.
: 5.     Fire Protection header is intact.
: 3.
Procedure 5.3ALT-STRATEGY, Alternate Core Cooling Mitigating Strategies, has been entered
: 4.
Another SO has completed the breaker alignments per step 1.1 Attachment 1 of 5.3ALT-STRATEGY.
: 5.
Fire Protection header is intact.
Initiating Cues:
Initiating Cues:
The CRS has directed you to align Fire Protection Water to RHR Subsystem A using SWBP A in accordance with 5.3ALT-STRATEGY, Attachment 1. You are to inform the CRS when Fire Protection Water is aligned to RHR.
The CRS has directed you to align Fire Protection Water to RHR Subsystem A using SWBP A in accordance with 5.3ALT-STRATEGY, Attachment 1. You are to inform the CRS when Fire Protection Water is aligned to RHR.  


Nebraska Public Power District                       SKL034-40-84 (18851)
Nebraska Public Power District SKL034-40-84 (18851)
Cooper Nuclear Station                                   Page 149 of 149 Job Performance Measure for Operations                       Revision 03 Task Number: None}}
Cooper Nuclear Station Page 149 of 149 Job Performance Measure for Operations Revision 03 Task Number: None}}

Latest revision as of 05:52, 14 January 2025

2009-09-DRAFT Jpms
ML100880141
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/21/2009
From:
NRC Region 4
To:
Nebraska Public Power District (NPPD)
References
50-298/09-09
Download: ML100880141 (149)


Text

Nebraska Public Power District SKL034-50-58 (36403)

Cooper Nuclear Station Page 1 of 149 Job Performance Measure for Operations Revision: 00 Task No.: 283016S0101 Obtain and Interpret a GARDEL Periodic Report Trainee:

Examiner:

Pass Fail Examiner Signature:

Date:

Additional Program Information:

1.

Appropriate Performance Locations: CR / SIM

2.

Appropriate Trainee level: RO / SRO

3.

Evaluation Method: Perform

4.

Performance Time: 10 minutes

5.

NRC K/As 2.1.7 Imp. 3.7/4.4 Directions to Examiner:

1.

This JPM evaluates the trainee=s ability to Obtain and Interpret a Gardel Periodic Case.

2.

If this JPM is performed on the Simulator, only the cues preceded by # should be given.

3.

All blanks must be filled out with either initials or an NP for Anot performed@; an explanation may also be written in the space, if desired, by the examiner.

Directions to Trainee:

When I tell you to begin, you are to Obtain and Evaluate a Gardel Official Case by completing attachment 2 of 6.LOG.601. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

If being performed in the Simulator:

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.

Nebraska Public Power District SKL034-50-58 (36403)

Cooper Nuclear Station Page 2 of 149 Job Performance Measure for Operations Revision: 00 Task No.: 283016S0101 Obtain and Interpret a GARDEL Periodic Report General Conditions:

1.

The Reactor is at approximately 100% power.

General

References:

1.

Procedure 6.LOG.601 Daily Surveillance Log.

General Tools and Equipment:

1.

None Special Conditions, References, Tools, Equipment:

1.

Simulator Setup: See Attachment 1.

2.

Critical steps denoted by *.

3.

Simulator cues denoted by #.

Task Standards:

1.

100% of critical elements successfully completed without error.

2.

100% of safety and radiological work practices.

Initiating Cue(s):

The Control Room Supervisor directs you to obtain a Gardel Periodic Case and verify that Thermal Limits are within Specification by completing Attachment 2 of 6.LOG.601. Inform the CRS when you have completed you review of the official case.

NOTE: Give the candidate Attachment 2 of 6.LOG.601 and tell the candidate to begin.

Nebraska Public Power District SKL034-50-58 (36403)

Cooper Nuclear Station Page 3 of 149 Job Performance Measure for Operations Revision: 00 Task No.: 283016S0101 Obtain and Interpret a GARDEL Periodic Report Performance Checklist Standards Initials

1.

Demand a Gardel Periodic Case The Operator demands and prints a Periodic Case.

CUE:

Gardel Official Case prints.

  1. CUE: Remove the periodic case from the printer and give the Candidate the attached Periodic Case
2.

Scans the periodic case and records the highest value of MFLCPR.

Value for the highest MFLCPR is recorded on.

3.

Scans the periodic case and records the highest value of MFLPD.

Value for the highest MFLPD is recorded on.

4.

Scans the periodic case and records the highest value of MAPRAT.

Value for the highest MAPRAT is recorded on.

5.

Scans the periodic case and records reactor power.

Reactor power is recorded on Attachment 2

6.

Scans the periodic case and records lowest value of MCPR.

Value for the lowest MCPR is recorded on.

7.

Scans the periodic case and records lowest value of APRM GAF Value for the APRM GAF is recorded on.

8.

Informs the CRS that MCPR is out of limits.

CRS informed that MFLCPR value is greater than 1.

  1. CUE: Acknowledge the report. Inform the candidate that the JPM is complete.

ATTACHMENT 1 Cooper Nuclear Station GARDEL Gardel: Periodic Report Todays Date Current Time A

C E

B D

F Thermal Power 2418.6 MWth 99.98%

APRM 100.1 100.5 100.7 100.6 100.3 100.7 Elect. Power 827.1 MWel APRM GAF 1.006 1.012 1.017 1.017 1.014 1.017 Efficiency 34.18%

APRM -%CTP

-0.57 -1.15 -1.70 -1.67

-1.37

-1.70 Coolant Flow 70.5 Mlb/hr 95.95%

LPRM Status Normal APRM ave.

100.53 ADAPT ON TIP+LPRM The 4 most limiting bundles of the core MFLCPR Position MCPR CPRLIM MFLPD Position LHGR LHGRLIM MAPRAT Position APLHGR ALHLIM 1.004 19-32 1.467 1.370 0.800 31-44-04 10.718 13.397 0.887 19-28-05 9.228 10.399 1.004 15-32 1.471 1.370 0.798 35-44-04 10.689 13.397 0.887 21-32-05 9.102 10.257 1.003 23-38 1.532 1.370 0.798 11-38-04 10.686 13.397 0.882 25-34-04 9.289 10.535 1.002 37-24 1.541 1.370 0.794 15-42-04 10.637 13.397 0.805 35-44-04 8.159 10.138 Control Rod Withdrawal PCIUTL Position 19-28-04 02 06 10 14 18 22 26 30 34 38 42 46 50 Simulator Parameters CR withdrawal 4.81%

51 Ave. Xenon conc.

1593.85E12/cm3 Xenon symmetry

-0.03%

47 Core press drop 18.04 psi Average void 47.08%

43 16 Total bypass flow 17.25%

K-effective 1.00159 39 Cycle burnup 2032 GWD/Mt Total pow peaking 2.461 35 Sup plate pres drop 13.19 psi 31 Heat Balance Parameters Feed water flow 9.49 Mlb/hr 27 16 12 16 Feed water temp.

363.66 F Absolute press 1009.78 psi 23 Inlet subcooling 31.33 Btu/lb CR drive temp.

100.00 F 19 CR drive flow 0.02Mlb/hr Cleanup inlet temp.

514.91 F 15 Cleanup system flow 0.11 Mlb/hr Ext. Recirc pump A 2.28 MW 11 16 Ext. Recirc pump B 2.29 MW Steam flow 9.51 Mlb/hr 07 Sup plate pres drop 15.03 psi 03

Nebraska Public Power District SKL034-50-58 (36403)

Cooper Nuclear Station Page 5 of 149 Job Performance Measure for Operations Revision: 00 Task No.: 283016S0101 ATTACHMENT 2 Directions to Trainee:

When I tell you to begin, you are to obtain and interpret a Gardel Periodic Case. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

If being performed in the Simulator:

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.

General Conditions:

1.

The Reactor is at approximately 100% power.

Initiating Cue(s):

The Control Room Supervisor directs you to obtain a Gardel Periodic Case and to log Official case in 6.LOG.601 Attachment 2 to verify operation is within limits.

Inform the CRS when you have completed you review of the official case.

Nebraska Public Power District SKL034-50-57 (36402)

Cooper Nuclear Station Page 6 of 149 Job Performance Measure for Operations Revision: 00 Task No.: 299012O0301 Determine Isolation Boundaries Trainee:

Examiner:

Pass Fail Examiner Signature:

Date:

Additional Program Information:

1.

Appropriate Performance Locations: CR / SIM

2.

Appropriate Trainee level: RO / SRO

3.

Evaluation Method: Perform

4.

Performance Time: 15 minutes

5.

NRC K/As 2.1.24 2.8/3.1 Directions to Examiner:

4.

This JPM evaluates the trainees ability to determine appropriate mechanical isolation boundaries.

5.

If this JPM is performed on the Simulator, only the cues preceded by #should be given.

6.

All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.

Directions to Trainee:

When I tell you to begin, you are to use station documents to determine the minimum mechanical/piping boundaries required to isolate the RHR 1A pump for removal. RHR 1A Motor has already been tagged and removed. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

General Conditions:

N/A

Nebraska Public Power District SKL034-50-57 (36402)

Cooper Nuclear Station Page 7 of 149 Job Performance Measure for Operations Revision: 00 Task No.: 299012O0301 Determine Isolation Boundaries General

References:

1.

Procedure 0.49 General Tools and Equipment:

1.

Set of Mechanical Prints

2.

Copy of 2040 Sheet 1

3.

Copy of 2031 Sheet 2 Special Conditions, References, Tools, Equipment:

1.

Simulator Setup: N/A.

2.

Critical steps denoted by *.

3.

Simulator cues denoted by #.

Task Standards:

1.

100% of critical elements successfully completed without error.

2.

100% of safety and radiological work practices.

Initiating Cue(s):

The Control Room Supervisor directs you to determine the minimum mechanical/piping isolation boundaries required to isolate the RHR 1A pump for removal. RHR 1A Motor has already been tagged and removed. Find and highlight all valves required to be positioned to support this task.

Nebraska Public Power District SKL034-50-57 (36402)

Cooper Nuclear Station Page 8 of 149 Job Performance Measure for Operations Revision: 00 Task No.: 299012O0301 Determine Isolation Boundaries Performance Checklist Standards Initials

9.

May reference procedure 0.49.

References procedure 0.49 NOTE: Steps 2 thru 12 can be completed in any order

10. References BR 2040 Sheet 1 Finds BR 2040 Sheet 1 CUE:

When the candidate successfully locates 2040 Sheet 1 Provide a copy for the candidate to mark up.

11. Highlights RHR-MO-15A.

RHR-MO-15A is highlighted.

12. Highlights RHR-MO-13A.

RHR-MO-13A is highlighted.

13. Highlights RHR-98.

RHR-98 is highlighted.

14. Highlights RHR-58.

RHR-58 is highlighted.

15. Highlights RHR-11 RHR-11 is highlighted.
16. Highlights RHR drain path.

RHR-35, RHR 36 and/or RHR 34 are highlighted.

17. References BR 2031 Sheet 2 to find REC Isolation valves.

Finds BR 2031 Sheet 2.

  1. CUE: When the candidate successfully locates 2031 Sheet 2 Provide a copy for the candidate to mark up.

Nebraska Public Power District SKL034-50-57 (36402)

Cooper Nuclear Station Page 9 of 149 Job Performance Measure for Operations Revision: 00 Task No.: 299012O0301 Determine Isolation Boundaries Performance Checklist Standards Initials

18. Highlights REC-75.

REC-75 is highlighted.

19. Highlights REC-76.

REC-76 is highlighted.

20. Highlights REC Drain Path.

REC-87, 397 and 83 are highlighted.

21. Informs the CRS that the boundaries are identified.

Gives the highlighted drawings to the examiner.

  1. CUE: Acknowledges receipt of the highlighted prints. This JPM is complete.

Nebraska Public Power District SKL034-50-57 (36402)

Cooper Nuclear Station Page 10 of 149 Job Performance Measure for Operations Revision: 00 ATTACHMENT 1 Directions to Trainee:

When I tell you to begin, you are to use station documents to determine the minimum mechanical/piping boundaries required to isolate the RHR 1A pump for removal. RHR 1A Motor has already been tagged and removed. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

General Conditions:

1.

The plant is shutdown in a refueling outage.

2.

RHR Loop A is not required to be operable.

Initiating Cue(s):

The Control Room Supervisor directs you to determine the minimum mechanical/piping isolation boundaries required to isolate the RHR 1A pump for removal. RHR 1A Motor has already been tagged and removed. Find and highlight all valves required to be positioned to support this task.

Nebraska Public Power District SKL034-30-52 (16532)

Cooper Nuclear Station Page 11 of 149 Job Performance Measure for Operations Revision 02 Task No.:

Task

Title:

Radiation Protection Table Top Trainee:

Examiner:

Pass Fail Examiner Signature:

Date:

Time Started: ____________ Time Finished: _____________

Additional Program Information:

1.

Appropriate Performance Locations: CR, SIM, Class

2.

Appropriate Trainee level: SO, RO, SRO

3.

Evaluation Method: Simulate Perform

4.

Performance Time: 10 minutes

5.

NRC K/A 2.3.1 (4.2)

Directions to Examiner:

1.

This JPM evaluates the trainee's ability to determine if certain work can be performed within the confines of the Code of Federal Regulations and CNS procedures.

2.

This JPM can be performed any place the operator can access appropriate procedures.

3.

All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space if desired by the examiner.

Directions to Trainee:

When I tell you to begin, you are to determine whether you can perform in-vessel work for which you are specially qualified. If you find you cannot perform the work state the reason you cannot. If you can perform the work state what authorization, if any is required prior to performing the work. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.

General Conditions:

1.

The plant is shutdown to perform in-vessel work.

2.

Your on-site exposure is within 10% of the average work group exposure.

General

References:

10CFR20 9.ALARA.1 Personnel dosimetry and Occupational Radiation Exposure program.

Nebraska Public Power District SKL034-30-52 (16532)

Cooper Nuclear Station Page 12 of 149 Job Performance Measure for Operations Revision 02 Task No.:

Task

Title:

Radiation Protection Table Top General Tools and Equipment:

1.

None.

Special Conditions, References, Tools, Equipment:

1.

Critical checks denoted by "*".

2.

Simulator cues denoted by "#".

Task Standards:

1.

100% of critical elements successfully completed without error.

Initiating Cue(s):

You have unique skills to perform special in vessel work. Performance of the work is expected to result in a whole body dose of 500 mrem and a shallow dose to the skin of fingers of 7.5 Rem. Your Shift Manager directs you to determine based on your dose history, as provided whether you can perform this work.

Nebraska Public Power District SKL034-30-52 (16532)

Cooper Nuclear Station Page 13 of 149 Job Performance Measure for Operations Revision 02 Task No.:

Task

Title:

Radiation Protection Table Top Performance Checklist Standards Initials

1. Refer to 9.ALARA.1 9.ALARA.1 referenced.
2. Pertinent personal Dose history is reviewed.

Dose History is reviewed.

3. Pertinent job dose projections for the job are reviewed.

Dose projections are reviewed.

4. Compares the job requirements to the amount of dose that can be received.

Job requirements are reviewed.

5. Informs the SM that he cannot perform this job.

SM informed.

CUE: Acknowledge the report and ask the operator what impediment exists for performance.

6. Informs the SM why he/she cannot perform the job.

SM informed that the reason is that he/she is limited to 1000 mrem/year because his/her lifetime dose is in excess of the lifetime TEDE guideline and extensions to this limit cannot be granted.

CUE: Acknowledge the report and inform the operator that the JPM is complete.

Nebraska Public Power District SKL034-30-52 (16532)

Cooper Nuclear Station Page 14 of 149 Job Performance Measure for Operations Revision 02 ATTACHMENT 1 Directions to Trainee:

When I tell you to begin, you are to determine whether you can perform in-vessel work for which you are specially qualified. If you find you cannot perform the work state the reason you cannot and if you can perform the work state what authorization, if any is required prior to performing the work. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.

General Conditions:

1.

The plant is shutdown to perform in-vessel work.

2.

Your on-site exposure is within 10% of the average work group exposure.

Initiating Cues:

You have unique skills to perform special in vessel work. Performance of the work is expected to result in a whole body dose of 500 mrem and a shallow dose to the skin of fingers of 7.5 Rem. Your Shift Manager directs you to determine based on your dose history, as provided whether you can perform this work.

Nebraska Public Power District SKL034-30-52 (16532)

Cooper Nuclear Station Page 15 of 149 Job Performance Measure for Operations Revision 02 Your Pertinent Statistics Your Age: 32 years Lifetime TEDE: 35 Rem TEDE so far this year: 0.75 Rem Extremities SDE dose so far this year: 35 Rem NCR Form 116 has previously been signed.

Pertinent Job Dose Projections for the one individual performing this job Projected Whole Body Dose: 0.5 Rem Extremities SDE dose: 7.5 Rem

Nebraska Public Power District SKL034-50-56 (36401)

Cooper Nuclear Station Page 16 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259019P0401 Determine RPV Water Level Instrumentation Availability During LOCA Conditions Trainee:

Examiner:

Pass Fail Examiner Signature:

Date:

Additional Program Information:

1.

Appropriate Performance Locations: Classroom / Simulator

2.

Appropriate Trainee Levels: RO/SRO/STE

3.

Evaluation Method: Perform

4.

Performance Time: 10 minutes

5.

NRC K/A: 295028.EA2.03(CFR: 41.10 / 43.5 / 45.13)(3.7/3.9)

Directions to Examiner:

1.

This JPM evaluates the trainee's ability to determine RPV water level instrumentation availability during LOCA conditions.

2.

All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.

3.

Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.

4.

Brief the trainee and tell the trainee to begin.

Directions to Trainee:

When I tell you to begin, you are to determine RPV water level instrumentation availability during LOCA conditions. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

During task performance, it is recommended that you limit your discussion/demonstration to the minimum required. The examiner may ask questions of you if necessary to understand your actions.

Nebraska Public Power District SKL034-50-56 (36401)

Cooper Nuclear Station Page 17 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259019P0401 Determine RPV Water Level Instrumentation Availability During LOCA Conditions General Conditions:

A LOCA has occurred with the following stable plant conditions:

Narrow range RPV water level

+ 0" (indicated)

Shutdown Range

+ 0 (indicated)

Steam Nozzle Range

+ 0 (indicated)

Wide range RPV water level

- 140" (indicated)

Fuel zone RPV water level

- 145 " (indicated)

RPV pressure 55 psig (6 SRVs open)

Drywell pressure 53.1 psig (drywell spray unavailable)

Drywell temp 330 °F (All PC-TI-505's and 510's)

General

References:

1.

Procedure 5.8

2.

EOP/SAP Graphs General Tools and Equipment:

1.

EOP/SAP Graphs Special Conditions, References, Tools, Equipment:

1.

Critical checks denoted by "*".

Nebraska Public Power District SKL034-50-56 (36401)

Cooper Nuclear Station Page 18 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259019P0401 Determine RPV Water Level Instrumentation Availability During LOCA Conditions Task Standards:

1.

100% of critical elements successfully completed without error.

2.

100% of safety and radiological work practices.

Initiating Cue(s):

You are to determine RPV water level instrumentation availability during LOCA conditions.

Complete the table below with the status of RPV level instruments return this Attachment to the examiner when you have completed this task.

Nebraska Public Power District SKL034-50-56 (36401)

Cooper Nuclear Station Page 19 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259019P0401 Determine RPV Water Level Instrumentation Availability During LOCA Conditions Performance Checklist Standards Initials NOTE:

Steps may be performed concurrently or in any order

1. Refer to EOP/SAG Graphs.

The operator refers to EOP/SAG Graphs.

2. Refer to EOP/SAG Graphs.

The operator refers to EOP/SAG Graphs.

Determines Narrow range RPV water level is Not Available

3. Refer to EOP/SAG Graphs.

The operator refers to EOP/SAG Graphs.

Determines Steam Nozzle Range RPV water level is Not Available

4. Refer to EOP/SAG Graphs.

The operator refers to EOP/SAG Graphs.

Determines Shutdown Range RPV water level is Not Available

5. Refer to EOP/SAG Graphs.

The operator refers to EOP/SAG Graphs.

Determines Wide range RPV water level is Not Available

6. Refer to EOP/SAG Graphs.

The operator refers to EOP/SAG Graphs.

Determines Fuel Zone RPV water level is Available for Trending

7. Turns in completed paperwork.

Returns completed Attachment 1 to evaluator.

Nebraska Public Power District SKL034-50-56 (36401)

Cooper Nuclear Station Page 20 of 149 Job Performance Measure for Operations Revision 00 ATTACHMENT 1 Directions to Trainee:

You are to determine RPV water level instrumentation availability during LOCA conditions.

Complete the table below with the status of RPV level instruments and return this attachment to the examiner when you have completed this task.

General Conditions:

A LOCA has occurred with the following stable plant conditions:

Narrow range RPV water level

+ 0" (indicated)

Shutdown Range RPV water level

+ 0 (indicated)

Steam Nozzle Range RPV water level

+ 0 (indicated)

Wide range RPV water level

- 140" (indicated)

Fuel zone RPV water level

- 145 " (indicated)

RPV pressure 55 psig (6 SRVs open)

Drywell pressure 53.1 psig (drywell spray unavailable)

- Drywell temp 330 °F (All PC-TI-505's and 510's)

What is the status of RPV water level instruments?

Level Instrument AFT = Available for Trending, NA = Not Available Narrow range RPV water level Shutdown Range RPV water level Steam Nozzle Range RPV water level Wide range RPV water level Fuel zone RPV water level

Nebraska Public Power District SKL034-30-26 (6253)

Cooper Nuclear Station Page 21 of 149 Job Performance Measure for Operations Revision 07 Task No. 344050O0503 Security Emergency Trainee:

Examiner:

Pass Fail Examiner Signature:

Date:

Time Started: ____________ Time Finished: _____________

Additional Program Information:

1.

Appropriate Performance Locations: SIM / CR

2.

Appropriate Trainee Level: SRO / STE

3.

Evaluation Method: Perform

4.

Performance Time: 25 minutes

5.

NRC K/A 2.4.28 (2.3/3.3)

Directions to Examiner:

1.

This JPM evaluates the trainee's ability to perform the required actions for a Security Emergency.

2.

All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.

3.

Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.

4.

Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.

Directions to Trainee:

When I tell you to begin, you are to respond to a Security Emergency as appropriate to the provided conditions. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task. ALL PLANT ANNOUNCEMENTS WILL BE SIMULATED!

Nebraska Public Power District SKL034-30-26 (6253)

Cooper Nuclear Station Page 22 of 149 Job Performance Measure for Operations Revision 07 Task No. 344050O0503 Security Emergency General Conditions:

1.

The plant is operating at 30% power.

2.

The Shift Manager has delegated you to direct the plant response.

3.

The board operators are available ONLY to support control room actions.

4.

You must personally perform any communications required for this situation.

5.

The Shift Manager will perform all Emergency Director required actions.

General

References:

1.

Emergency Procedure 5.5SECURITY General Tools and Equipment:

1.

Site communication System.

2.

Emergency Telephone number book.

Special Conditions, References, Tools, Equipment:

1.

Critical checks denoted by "*".

Task Standards:

1.

100% of critical elements successfully completed without error.

2.

100% of safety and radiological work practices.

Initiating Cue(s):

At 9:35 p.m. you are informed by the Operations Manager that armed intruders have been seen in the protected area. The intruders last known location was the 903 corridor outside the door to the reactor building. The intruders are carrying automatic rifles, pistols and grenades.

You are to perform the required control room actions for this situation until directed to stop by the evaluator.

Nebraska Public Power District SKL034-30-26 (6253)

Cooper Nuclear Station Page 23 of 149 Job Performance Measure for Operations Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist Standards Initials

1. Obtain Procedure 5.5SECURITY.

Current revision of 5.5SECURITY obtained.

(Note: May be given if the operator goes to procedure rack or lock box in simulator.)

2. Contact the Security Shift Supervisor to confirm threat.

Security Shift Supervisor contacted and asked to confirm the threat.

  1. CUE: As the Security Shift Supervisor, indicate that the intruders posses explosive devices and automatic weapons. An actual Security Threat exists with high potential for significant structural damage and personnel injury. Security is in a Code Red
  1. CUE: Security has just made the following plant announcement, All Station Personnel, Imminent Security Threat exists, seek shelter inside the nearest building. Code Red.
3. Determines that an Actual Threat exists and enters 5.5Security.

Enters Attachment 2

  1. CUE: If asked, a credible insider threat DOES NOT exist.
  1. CUE: The SM directs you to DIRECT actions per Attachment 2 and he/she will complete remaining actions in Section 4.

Nebraska Public Power District SKL034-30-26 (6253)

Cooper Nuclear Station Page 24 of 149 Job Performance Measure for Operations Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist Standards Initials

4. Directs the reactor be scrammed.

RO directed to scram the reactor.

  1. CUE: As the RO, acknowledge the order and report that the reactor is scrammed. All control rods are fully inserted. RPV water level and pressure are stable. No EOP entry conditions were met during the scram.
5. Directs level be maintained high is level band using RCIC BOP/RO/WCO directed to maintain level high in the band using RCIC per 2.2.67.1.
  1. CUE:

As the BOP/WCO/RO, acknowledge the order and report that RCIC is running and level is being controlled

+20to +45 using RCIC.

6. Directs Reactor Cooldown.

RO/BOP/WCO directed to cooldown reactor not to exceed 90 degrees per hour.

  1. CUE:

As the BOP/WCO/RO, acknowledge the order and report that Reactor pressure is being lowered to 500 psig using Turbine Bypass Valves (or as directed in order by SRO).

7. Directs maximizing CRD for injection.

RO/BOP/WCO directed to maximize CRD injection per 5.8.4.

  1. CUE:

As the BOP/WCO/RO, acknowledge the order and report that you will review procedure and perform when RB Station Operator is available.

Nebraska Public Power District SKL034-30-26 (6253)

Cooper Nuclear Station Page 25 of 149 Job Performance Measure for Operations Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist Standards Initials

8. Directs the BOP to ensure that BF-C-1A, EMERGE BSTR FAN is running.

BOP/WCO directed to ensure that BF-C-1A, EMERGE BSTR FAN is running.

  1. CUE:

As the BOP/WCO, acknowledge the order and report that BF-C-1A, EMERG BSTR FAN is running.

9. Directs rapid isolation of RWCU.

RO/BOP/WCO directed to remove RWCU from service.

  1. CUE:

As the BOP/WCO/RO, acknowledge the order and report that RWCU has been removed from service and isolated. You are following up per 2.2.66.

10. Directs the BOP to start and run unloaded both DGs.

BOP/WCO directed to start and run unloaded both DGs.

  1. CUE:

As the BOP/WCO acknowledge the order. (If prestart checks are waived, report that both DGs are running unloaded.)

NOTE:

Controls for the fire pumps do not exist in the simulator.

Nebraska Public Power District SKL034-30-26 (6253)

Cooper Nuclear Station Page 26 of 149 Job Performance Measure for Operations Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist Standards Initials

11. Directs or Starts Electric Fire pump 1E or 1D.

Directs the BOP/WCO to start the 1E or 1D Fire Pump or places the 1E or 1D fire pump control switch to start.

  1. CUE:

If BOP/WCO directed, then acknowledge the order as the BOP and report that the diesel or motor driven Fire Pump is running. (If the CRS starts the pump the RED light is ON and the GREEN light is OFF for the pump started.)

Nebraska Public Power District SKL034-30-26 (6253)

Cooper Nuclear Station Page 27 of 149 Job Performance Measure for Operations Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist Standards Initials

12. Directs Station Operators/UT Fire Brigade to obtain fire fighting gear and report to the Control Room.

Station Operators directed to obtain fire fighting gear and to report to the Control Room.

  1. CUE:

Indicate that the Radwaste Station Operator and UT Fire Brigade personnel have reported to the Control Room.

  1. CUE:

The Turbine Building operator contacts the Control Room and reports that he is unable to get to the Control Room at this time. He is just outside the #1 DG room and the 903 area just outside the doors to the control building is blocked by the armed intruders. The intruders are currently unaware of his presence.

The Station Operator requests direction from you.

  1. CUE:

The Reactor Building operator contacts the Control Room and reports that he is unable to get out of the Reactor Building at this time. He is in the SE Quad (859 elevation).

The intruders are currently unaware of his presence. The Station Operator requests direction from you.

13. Directs the Duty Chem/RP Tech to report to the control room.

The Duty Chem/RP Tech is called to the control room.

  1. CUE:

The Duty Chem/RP Tech reports to the control room.

Nebraska Public Power District SKL034-30-26 (6253)

Cooper Nuclear Station Page 28 of 149 Job Performance Measure for Operations Revision 07 Task No. 344050O0503 Security Emergency Performance Checklist Standards Initials

14. Directs the TB Station Operator to card into the DG room and RB Station Operator told to stay in Vital Area.

TB Station Operator directed to enter the DG room and RB Station Operator told to stay in Vital Area.

  1. CUE:

TB operator acknowledges the order and reports that he has entered the DG room and RB Station Operator is remaining in current location (or as directed).

PROVIDE THE FOLLOWING CUE:

Annunciators 9-3-3/G-5 ASD Room Door Open and 9-3-3/F-5 ASD Switch Position Abnormal have just alarmed.

15. Responds to ASD Abnormal indications Directs RB Station Operator to open EE-DSC-125ASD or EE-DSC-125B.
  1. CUE:

If asked as RB Station Operator, report that you can get to EE-DSC-125ASD.

  1. CUE:

If asked if anyone has been dispatched to CB-903, report that no operator is currently in that area.

  1. CUE:

If the SRO directs and operator to CB-903 to open EE-DSC-125B, report that you have opened EE-DSC-125B

  1. CUE:

As RB Station Operator dispatched to open disconnect, report that EE-DSC-125ASD is open.

  1. CUE:

The JPM is complete.

Nebraska Public Power District SKL034-30-26 (6253)

Cooper Nuclear Station Page 29 of 149 Job Performance Measure for Operations Revision 07 ATTACHMENT 1 Directions to Trainee:

When I tell you to begin, you are to respond to a Security Emergency as appropriate to the provided conditions. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task. ALL PLANT ANNOUNCEMENTS WILL BE SIMULATED!

General Conditions:

1. The plant is operating at 30% power.
2. The Shift Manager has delegated you to direct the plant response.
3. The board operators are available ONLY to support control room actions.
4. You must personally perform any communications required for this situation.
5. The Shift Manager will perform all Emergency Director required actions.

Initiating Cue(s):

At 9:35 p.m. you are informed by the Security Shift Supervisor that armed intruders have been seen in the protected area. The intruders last known location was the 903 corridor outside the door to the reactor building. The intruders are carrying automatic rifles, pistols and grenades.

You are to perform the required control room actions for this situation until directed to stop by the evaluator.

Nebraska Public Power District SKL034-20-114 (29981)

Cooper Nuclear Station Page 30 of 149 Job Performance Measure for Operations Revision 01 Task No. 341033W0303 Determine Shift Staffing Requirements for Mode Change Trainee:

Examiner:

Pass Fail Examiner Signature:

Date:

Time Started: ____________ Time Finished: _____________

Additional Program Information:

6.

Appropriate Performance Locations: SIM / CR

7.

Appropriate Trainee Level: SRO

8.

Evaluation Method: Perform

9.

Performance Time: N/A

10.

NRC K/A 2.1.4 (3.4)

Directions to Examiner:

1.

This JPM evaluates the trainee's ability to determine shift staffing requirements for a mode change.

2.

All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.

3.

Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.

4.

Brief the trainee and tell the trainee to begin.

Directions to Trainee:

When I tell you to begin, you are to evaluate the staff available and determine if a change in Modes can occur without incurring an LCO condition. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

Nebraska Public Power District SKL034-20-114 (29981)

Cooper Nuclear Station Page 31 of 149 Job Performance Measure for Operations Revision 01 Task No. 341033W0303 Determine Shift Staffing Requirements for Mode Change General Conditions:

1.

The plant conditions are as follows:

Reactor Pressure is 0 psig Coolant temperature is 200ºF Mode Switch is in Shutdown

2.

Your Shift complement is comprised of:

One SRO (you)

Two ROs Three Non-Licensed Nuclear Plant Operators One RP/Chem Tech General

References:

1.

Conduct of Operations Procedure 2.0.3 General Tools and Equipment:

1.

None Special Conditions, References, Tools, Equipment:

1.

Critical checks denoted by "*".

Task Standards:

3.

100% of critical elements successfully completed without error.

4.

100% of safety and radiological work practices.

Initiating Cue(s):

During your shift Reactor Coolant temperature is expected to rise to 215ºF as a result of Shutdown Cooling being removed from service. As the Senior Licensed person on your shift, you are to determine two things; 1. Do you have sufficient staff now and 2. will you have sufficient staff to allow you to raise Coolant Temperature to 215ºF during your shift. If not determine how many additional staff types are needed and document your findings on.

Nebraska Public Power District SKL034-20-114 (29981)

Cooper Nuclear Station Page 32 of 149 Job Performance Measure for Operations Revision 01 Task No. 341033W0303 Determine Shift Staffing Requirements for Mode Change

Nebraska Public Power District SKL034-20-114 (29981)

Cooper Nuclear Station Page 33 of 149 Job Performance Measure for Operations Revision 01 Task No. 341033W0303 Determine Shift Staffing Requirements for Mode Change Performance Checklist Standards Initials

16.

Obtain Procedure 2.0.3.

Current revision of 2.0.3 obtained.

17.

Determine section of Procedure 2.0.3.

The SRO turns to Section 10, Control Room and Shift Staffing Requirements.

18.

Determines the current mode.

The SRO may use Tech Specs to confirm that the Unit is in MODE 4.

19. Determines the mode to be entered when temperature rises to 215ºF The SRO may use Tech Specs to confirm that the Unit will be entering Mode 3 within the shift.
20. Determines that the current shift staff is adequate until the mode change.

Your Shift complement is comprised of:

One SRO (you)

Two ROs Three Non-Licensed Nuclear Plant Operators One RP/Chem Tech

21. Determines which staff types are required.

For Mode 3 the SRO determines that the following staff types are needed:

  • Three Non-Licensed Nuclear Plant Operators
  • One RP/Chem Tech
22. Writes the needed Staff on Attachment 1.

The SRO writes the additional needed staff on.

Nebraska Public Power District SKL034-20-114 (29981)

Cooper Nuclear Station Page 34 of 149 Job Performance Measure for Operations Revision 01 Task No. 341033W0303 Determine Shift Staffing Requirements for Mode Change Performance Checklist Standards Initials

23. Turns in completed paperwork.

Returns completed Attachment 1 to evaluator.

Nebraska Public Power District SKL034-20-114 (29981)

Cooper Nuclear Station Page 35 of 149 Job Performance Measure for Operations Revision 01 ATTACHMENT 1 Directions to Trainee:

When I tell you to begin, you are to evaluate the staff available and determine if a change in Modes can occur without incurring an LCO condition. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

General Conditions:

1.

The plant conditions are as follows:

Reactor Pressure is 0 psig Coolant temperature is 200ºF Mode Switch is in Shutdown

2.

Your Shift complement is comprised of:

One SRO (you)

Two ROs Three Non-Licensed Nuclear Plant Operators One RP/Chem Tech Initiating Cue(s):

During your shift Reactor Coolant temperature is expected to rise to 215ºF as a result of Shutdown Cooling being removed from service. As the Senior Licensed person on your shift, you are to determine two things; 1. Do you have sufficient staff now and 2. Will you have sufficient staff to allow you to raise Coolant Temperature to 215ºF during your shift? If not determine how many additional staff types are needed and document your findings on.

Current Staff: Adequate in current mode Inadequate in current mode (Check one)

Additional needed staff:

Staff required at 215ºF: Current staff adequate Additional staff needed.

(Check one)

Nebraska Public Power District SKL034-20-114 (29981)

Cooper Nuclear Station Page 36 of 149 Job Performance Measure for Operations Revision 01 Additional needed staff:

Nebraska Public Power District SKL034-20-113 (29979)

Cooper Nuclear Station Page 37 of 149 Job Performance Measure for Operations Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)

Trainee:

Examiner:

Pass Fail Examiner Signature:

Date:

Additional Program Information:

1.

Appropriate Performance Locations: Simulator Only

2.

Appropriate Trainee Level: RO / SRO

3.

Evaluation Method: Perform in Simulator Only.

4.

Performance Time: 18 minutes

5.

NRC K/A 202001 K1.06 3.6/3.6 Directions to Examiner:

1.

This JPM evaluates the trainee's ability to perform the daily Jet Pump and Recirc Pump Flow Check of the Daily Tech Specs Surveillance Log.

2.

Provide the Reactor Recirc and Jet Pump values to the candidate; do not allow them to take the readings form the simulator.

3.

All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.

4.

Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.

5.

Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.

Directions to Trainee:

When I tell you to begin, you are to perform the activities associated with daily Jet Pump AND Recirc Pump Flow Check. Before you start, I will state the general plant conditions, the initiating cues and answer any questions you may have.

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.

General Conditions:

1.

The plant is operating at rated power with DEH in Mode 4.

2.

Both Reactor Recirculation pumps are operating with pump flows balanced.

3.

Data is provided for the readings to be taken.

Nebraska Public Power District SKL034-20-113 (29979)

Cooper Nuclear Station Page 38 of 149 Job Performance Measure for Operations Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)

General

References:

1.

Procedure 6.LOG.601 General Tools and Equipment:

1.

Calculator.

2.

Jet pump operability curves.

Special Conditions, References, Tools, Equipment:

1.

Simulator Setup: See Attachment 1.

2.

Critical checks denoted by "*".

3.

Simulator cues denoted by "#".

Task Standards:

1.

100% of critical elements successfully completed without error.

2.

100% of safety and radiological work practices.

Initiating Cue(s):

RO.

The Control Room Supervisor directs you to perform the daily Jet Pump (6.LOG.601 Attachment

12) and Recirc Pump Flow Check (6.LOG.601 Attachment 13) as part of the routine shift activities. Notify the CRS when the task is complete.

SRO.

Perform the Control Room Supervisors review of the daily Jet Pump (6.LOG.601 Attachment

12) and Recirc Pump Flow Check (6.LOG.601 Attachment 13) as part of the routine shift activities to ensure that it has been performed correctly. Notify the SM when the task is complete.

Nebraska Public Power District SKL034-20-113 (29979)

Cooper Nuclear Station Page 39 of 149 Job Performance Measure for Operations Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)

Performance Checklist Standards Initials NOTE: 1. This is the RO Section.

2. Steps 1 - 5 may be in any order.
1. Record indicated core flow (106 lb/hr)

Record Core flow from Recorder NBI-FRDPR-95 (Green Pen) (+/- 2).

CUE:

Core Flow = 62

2. Record RR pump flow (103 gpm)

Record RR pump flow, from RR-FR-163 for Pumps A & B (+/- 2).

CUE:

Pump A = 38.5; Pump B = 38.5

3. Record RRMG Set speed Record RRMG Set speed from the following (+/- 2):
a. RRFC-SI-1A for RRMG A
b. RRFC-SI-1B for RRMG B CUE:

RRMG A = 79; RRMG B = 80.

Nebraska Public Power District SKL034-20-113 (29979)

Cooper Nuclear Station Page 40 of 149 Job Performance Measure for Operations Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)

Performance Checklist Standards Initials

4. Record Jet Pump Flow Record Jet Pump Flow from the following (+/- 2):
a. NBI-FI-92A for LOOP A
b. NBI-FI-92B for LOOP B CUE:

LOOP A = 31; LOOP B = 31

5. Record Jet Pump Differential Pressure Record differential pressures from individual jet pump instruments NBI-FI-78A through NBI-FI-78Z on Panel 9-38 in control room (+/- 2).

CUE: 1 = 31 11 = 32 2 = 32 12 = 30 3 = 31 13 = 20 4 = 31 14 = 32 5 = 36 15 = 34 6 = 34 16 = 35 7 = 33 17 = 32 8 = 32 18 = 31 9 = 33 19 = 33 10 = 33 20 = 32 Note G, H, I, O, P & Q are not used.

6. Record Loop B and Loop A Average Add JP #1 through 10 and divide by 10 for LOOP B, then add JP #11 through 20 and divide by 10 for LOOP A (+/- 2).

CUE:

Average 32.6 for LOOP B and 31.1 for LOOP A.

Nebraska Public Power District SKL034-20-113 (29979)

Cooper Nuclear Station Page 41 of 149 Job Performance Measure for Operations Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)

Performance Checklist Standards Initials NOTE: Curves are contained in the binder labeled Cooper Nuclear Station Jet Pump Operability Graphs and Instability Noise Level Data.

7. Verify RR pump flow and RRMG set speed within limits.

Check 1 Determine that the values recorded in Items B and C are within the limits of the curve (SAT checked).

8.

Verify JP flow and RRMG set speed within limits.

Check 2 Determine that the values recorded in Items C and D are within or outside the limits of the curve (SAT checked).

NOTE: Jet Pump 13 is outside the Operability Graphs. The candidate should determine that it falls outside the limit.

9.

Jet Pump p differs by < 20% from established patterns.

Check 3 Determine that Jet Pump p differs by 20% from established patterns for (UNSAT checked for Loop A).

10. Verify check 1 and 2 SAT or check 3 SAT.

Verify check 1 and check 2 SAT or check 3 is SAT (Check 3 is SAT).

11. Verify operation is not in Stability Exclusion Region of Power to Flow Map.

Determines operation is outside Stability Exclusion Region of Power to Flow Map using core flow value recorded in Item A on previous page and 2.1.10 Power to Flow Map.

Nebraska Public Power District SKL034-20-113 (29979)

Cooper Nuclear Station Page 42 of 149 Job Performance Measure for Operations Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)

Performance Checklist Standards Initials

12. Verify loop flow mismatch is within limit when at < 51.45 x106 lbs/hr core flow.

Determine Step is N/A.

13. Verify loop flow mismatch is within limits when 51.45x106 lbs/hr core flow.

Determine Item D values (previous page of 6.LOG.601) for Loop A and Loop B flow mismatch is 3.67x106 lbs/hr (SAT entered into block).

14. Verify Recirc Pump operating or RHR Pump operating in SDC.

Determine Step is N/A.

15. Inform the CRS that the task is complete.

Inform Control Room Supervisor that the daily Jet Pump and Recirc Pump Flow Check is Complete and Jet Pump 13 d/p is low out of spec.

  1. CUE: The CRS Acknowledges the report.

Nebraska Public Power District SKL034-20-113 (29979)

Cooper Nuclear Station Page 43 of 149 Job Performance Measure for Operations Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)

SRO Section Performance Checklist Standards Initials NOTE: 1. SRO Section

2. Declares Jet Pump 13 inop.
1. Reviews Attachment 12 Jet Pump Operability Items.

Reviews Attachment 12 Jet Pump Operability Items A, B, C and D. Notes that all have been filled out correctly.

2. Reviews Attachment 12 Jet Pump Operability Checks 1, 2 and 3.

Reviews Attachment 12 Jet Pump Operability Items 1, 2, and 3. Notes that Check 3 should be checked Unsat and denotes it.

3. Reviews Attachment 13 RECIRC Pump Flow Checks Checks Reviews Attachment 13 RECIRC Pump Flow Checks, NBI-FRDPR-95 is outside of the Exclusion Region. Checks that it is marked SAT correctly.
4. Reviews Attachment 13 RECIRC Pump Flow Checks Checks Reviews Attachment 13 RECIRC Pump Flow Checks, NBI-FI-92A/B Mismatch should be N/Aed for this flow.
5. Reviews Attachment 13 RECIRC Pump Flow Checks Checks Reviews Attachment 13 RECIRC Pump Flow Checks, NBI-FI-92A/B Mismatch should be marked SAT. Checks that it is marked SAT correctly.
6. Reviews Attachment 13 RECIRC Pump Flow Checks Checks Reviews Attachment 13 RECIRC Pump Flow Checks, Recirc Pump operating or RHR Pump operating in SDC is marked N/A.

Nebraska Public Power District SKL034-20-113 (29979)

Cooper Nuclear Station Page 44 of 149 Job Performance Measure for Operations Revision 01 Task No.: 202012O0201 PERFORM JET PUMP OPERABILITY CHECK (RO or SRO)

Performance Checklist Standards Initials

7. Notifies Reactor Engineer Notifies the Reactor Engineer that Jet Pump 13 d/p is low out of spec.

CUE: As reactor engineer respond to the report and tell the CRS that it was not low last time the surveillance was run.

8. Notifies the Shift Manager Contacts the Shift Manager and tells him that Jet Pump 13 is low out of spec and that was not that way last surveillance.

CUE: Respond as the Shift Manager and tell the CRS that the JPM is completed.

Nebraska Public Power District SKL034-20-113 (29979)

Cooper Nuclear Station Page 45 of 149 Job Performance Measure for Operations Revision 01 ATTACHMENT 1 Directions to Trainee:

When I tell you to begin, you are to perform the daily Jet Pump and Recirc Pump Flow Check.

Before you start, I will state the general plant conditions, the initiating cues and answer any questions you may have.

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.

General Conditions:

1. The plant is operating at rated power with DEH in Mode 4.
2. Both Reactor Recirculation pumps are operating with pump flows balanced.

Initiating Cues:

RO.

The Control Room Supervisor directs you to perform the daily Jet Pump (6.LOG.601 2) and Recirc Pump Flow Check (6.LOG.601 Attachment 13) as part of the routine shift activities. Notify the CRS when the task is complete.

Jet Pumps 1 = 31 11 = 32 2 = 32 12 = 30 3 = 31 13 = 20 4 = 31 14 = 32 5 = 36 15 = 34 6 = 34 16 = 35 7 = 33 17 = 32 8 = 32 18 = 31 9 = 33 19 = 33 10 = 33 20 = 32 SRO.

Perform the control room supervisors review of the daily jet pump (6.log.601 attachment 12) and recirc pump flow check (6.log.601 attachment 13) as part of the routine shift activities to ensure that it has been performed correctly. Notify the Shift Manager when the task is complete.

Nebraska Public Power District SKL034-20-113 (29979)

Cooper Nuclear Station Page 46 of 149 Job Performance Measure for Operations Revision 01 ATTACHMENT 12 JET PUMP OPERABILITY RO SECTION ATTACHMENT 12 JET PUMP OPERABILITY NOTE - If in single loop operation, mark idle loop N/A.

JET PUMP P (%)

ITEMS LOOP A

LOOP B

JP #

LOOP B

JP #

LOOP A A

Core Flow (106 lb/hr) NBI-FRDPR-95 1

11 B

RR Pump Flow (103 gpm) RR-FR-163 2

12 C

RRMG Set Speed (%) RRFC-SI-1A/B 3

13 D

JP Flow (106 lb/hr) NBI-FI-92A/B 4

14 5

15 6

16 7

17 8

18 9

19 10 20 LOOP B Avg LOOP A Avg CHECKS SAT UNSA T

OPERABILIT Y LIMIT APPLICABL E MODE ATT. 21 NOTE Loop A:

9 1

Item B and C values within curve limits (a)

Loop B:

9 Loop A:

9 2

Item C and D values within curve limits (a)

Loop B:

9 Loop A:

9 3

Jet Pump P differs by 20% from established patterns (a, c)

Loop B:

9 SAT 1 (b), 2 (b) 50

Nebraska Public Power District SKL034-20-113 (29979)

Cooper Nuclear Station Page 47 of 149 Job Performance Measure for Operations Revision 01 Loop A:

9 Checks 1 and 2 SAT, or Check 3 SAT Loop B:

9 SAT (a) Refer to Jet Pump Operability Curves maintained in Control Room.

(b) Required to be performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after > 25% RTP and required to be performed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after associated recirculation loop is in service.

(c) If any Jet Pump P vs. established pattern is not within curve limits, immediately notify Reactor Engineering.

Nebraska Public Power District SKL034-20-113 (29979)

Cooper Nuclear Station Page 48 of 149 Job Performance Measure for Operations Revision 01 3

RECIRC PUMP FLOW CHECKS RO Section ATTACHMENT 13 RECIRC PUMP FLOW CHECKS CHECKS 0700-1000 SAT/UNSAT 1900-2200 SAT/UNSAT OPERABILITY LIMIT APPLICABLE MODES ATT. 21 NOTES Core Flow, NBI-DPR/FR-95, value is not in Stability Exclusion Region of Power to Flow Map (a)

MCO SAT 1, 2 49 JP Flow, NBI-FI-92A/B, values for Loop A and Loop B flow mis-match is 7.35x106 lbs/hr at

< 51.45x106 lbs/hr Rated Core Flow (b) (d)

MCO SAT 1 (c), 2 (c) 48, 127 JP Flow, NBI-FI-92A/B, values for Loop A and Loop B flow mis-match is 3.67x106 lbs/hr at 51.45x106 lbs/hr Rated Core Flow (b) (d)

MCO SAT 1 (c), 2 (c) 48, 127 (a) Refer to power to flow map in Procedure 2.1.10.

(b) Per Technical Specification and TRM Bases, a recirculation loop is considered not in operation when the mis-match between total jet pump flows of the two loops is greater than required limits. The loop with the lower flow must be considered not in operation.

(c) Required to be performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after both recirculation loops are in service.

(d) If a flow mismatch results in one loop considered not in operation, contact FRED to manually insert single loop operation limits into GARDEL.

CHECK 0700-1000 READING (9) (e) 1900-2200 READING (9) (e)

OPERABILITY LIMIT APPLICABLE MODES ATT. 21 NOTES Verify Recirc Pump operating or RHR Pump operating in SDC RR Pump or SDC in Operation 3 (when Reactor Pressure is less than SDC Pressure Permissive) (f) 66 (e) 9 indicates at least one RR pump or SDC Subsystem is in service.

(f) Required to be met within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after reactor steam dome pressure is less than the shutdown cooling permissive pressure.

Nebraska Public Power District SKL034-20-113 (29979)

Cooper Nuclear Station Page 49 of 149 Job Performance Measure for Operations Revision 01 2

JET PUMP OPERABILITY SRO Section ATTACHMENT 12 JET PUMP OPERABILITY NOTE - If in single loop operation, mark idle loop N/A.

JET PUMP P (%)

ITEMS LOOP A

LOOP B

JP #

LOOP B

JP #

LOOP A A

Core Flow (106 lb/hr) NBI-DPR/FR-95 62 1

31 11 32 B

RR Pump Flow (103 gpm) RR-FR-163 38.5 38.5 2

32 12 30 C

RRMG Set Speed (%) RRFC-SI-1A/B 79 80 3

31 13 20 D

JP Flow (106 lb/hr) NBI-FI-92A/B 31 31 4

31 14 32 5

36 15 34 6

34 16 35 7

33 17 32 8

32 18 31 9

33 19 33 10 33 20 32 LOOP B Avg 32.6 LOOP A Avg 31.1 CHECKS SAT UNSA T

OPERABILIT Y LIMIT APPLICABL E MODE ATT. 21 NOTE Loop A:

9 9

1 Item B and C values within curve limits (a)

Loop B:

9 9

Loop A:

9 9

2 Item C and D values within curve limits (a)

Loop B:

9 9

Loop A:

9 9

3 Jet Pump P differs by 20% from established patterns (a, c)

Loop B:

9 9

SAT 1 (b), 2 (b) 50

Nebraska Public Power District SKL034-20-113 (29979)

Cooper Nuclear Station Page 50 of 149 Job Performance Measure for Operations Revision 01 Loop A:

9 9

Checks 1 and 2 SAT, or Check 3 SAT Loop B:

9 9

SAT (a) Refer to Jet Pump Operability Curves maintained in Control Room.

(b) Required to be performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after > 25% RTP and required to be performed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after associated recirculation loop is in service.

(c) If any Jet Pump P vs. established pattern is not within curve limits, immediately notify Reactor Engineering.

Nebraska Public Power District SKL034-20-113 (29979)

Cooper Nuclear Station Page 51 of 149 Job Performance Measure for Operations Revision 01 3

RECIRC PUMP FLOW CHECKS SRO Section ATTACHMENT 13 RECIRC PUMP FLOW CHECKS CHECKS 0700-1000 SAT/UNSAT 1900-2200 SAT/UNSAT OPERABILITY LIMIT APPLICABLE MODES ATT. 21 NOTES Core Flow, NBI-DPR/FR-95, value is not in Stability Exclusion Region of Power to Flow Map (a)

SAT MCO SAT 1, 2 49 JP Flow, NBI-FI-92A/B, values for Loop A and Loop B flow mis-match is 7.35x106 lbs/hr at

< 51.45x106 lbs/hr Rated Core Flow (b) (d)

N/A MCO SAT 1 (c), 2 (c) 48, 127 JP Flow, NBI-FI-92A/B, values for Loop A and Loop B flow mis-match is 3.67x106 lbs/hr at 51.45x106 lbs/hr Rated Core Flow (b) (d)

SAT MCO SAT 1 (c), 2 (c) 48, 127 (a) Refer to power to flow map in Procedure 2.1.10.

(b) Per Technical Specification and TRM Bases, a recirculation loop is considered not in operation when the mis-match between total jet pump flows of the two loops is greater than required limits. The loop with the lower flow must be considered not in operation.

(c) Required to be performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after both recirculation loops are in service.

(d) If a flow mismatch results in one loop considered not in operation, contact FRED to manually insert single loop operation limits into GARDEL.

CHECK 0700-1000 READING (9) (e) 1900-2200 READING (9) (e)

OPERABILITY LIMIT APPLICABLE MODES ATT. 21 NOTES Verify Recirc Pump operating or RHR Pump operating in SDC N/A N/A RR Pump or SDC in Operation 3 (when Reactor Pressure is less than SDC Pressure Permissive) (f) 66 (e) 9 indicates at least one RR pump or SDC Subsystem is in service.

(f) Required to be met within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after reactor steam dome pressure is less than the shutdown cooling permissive pressure.

Nebraska Public Power District SKL034-50-29 (8908)

Cooper Nuclear Station Page 52 of 149 Job Performance Measure for Operations Revision 02 Task No. 341013O0303 Approve Radioactive Discharge-Release Permit Trainee:

Examiner:

Pass Fail Examiner Signature:

Date:

Additional Program Information:

11.

Appropriate Performance Locations: SIM / CR

12.

Appropriate Trainee Level: SRO

13.

Evaluation Method: Perform

4.

Performance Time: 10 minutes

5.

NRC K/As 2.1.34 (2.9); 2.1.32 (3.4/3.8)

Directions to Examiner:

1.

This JPM evaluates the trainees ability to complete a radioactive discharge / release permit.

2.

All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.

3.

Give the trainee his copy of the Directions to the Trainee (Attachment 2) and Liquid Radwaste Discharge Form (Attachment 1) when ready to start the JPM.

4.

Brief the trainee, and tell the trainee to begin.

Directions to Trainee:

When I tell you to begin, you are to review and complete the radioactive discharge/release permit as Shift Manager. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

========================================================

General Conditions:

1.

The plant is operating at 100%.

2.

CWP A, B, and D are in service.

3.

De-icing is in progress.

4.

The FDST radioactive discharge was started at 0905, Jan 6.

5.

The FDST radioactive discharge was stopped at 1355, Jan 6.

6.

FDST final level is 10.5%.

Nebraska Public Power District SKL034-50-29 (8908)

Cooper Nuclear Station Page 53 of 149 Job Performance Measure for Operations Revision 02 Task No. 341013O0303 Approve Radioactive Discharge-Release Permit General

References:

1.

8.8.11, Liquid Radioactive Waste Discharge Authorization General Tools and Equipment:

1.

Scientific calculator Special Conditions, References, Tools, Equipment:

1.

Critical steps denoted by *.

Task Standards:

1.

100% of critical elements successfully completed without error.

2.

100% of safety and radiological work practices.

Initiating Cue(s):

As Shift Manager complete the Liquid Radioactive Waste Discharge Form for the FDST (Attachment 1) and inform me when all required actions are complete.

Nebraska Public Power District SKL034-50-29 (8908)

Cooper Nuclear Station Page 54 of 149 Job Performance Measure for Operations Revision 02 Task No. 341013O0303 Approve Radioactive Discharge-Release Permit Performance Checklist Standards Initials

1. Records Stop Run Data in Section 5.

Operator records Date as 1/6/xx, records time as 1355 and records % tank level as 10.5.

2. Records dilution flow.

Operator refers to Section 4.1 and records dilution flow of 308400 gpm.

3. Records volume of release.

Operator calculates volume of release as 16368.625 (using Usable tank volume and start and stop tank %).

NOTE: Acceptable value: 16360 to 16380 gallons.

4. Records total time of discharge.

Operator calculates total time of discharge in minutes (subtracting start time from end time) and records 290 minutes.

5. Records discharge flow.

Operator calculates discharge flow (divides volume of release by total time of discharge) and records 56-57 gpm.

6. Records River Level.

Operator records river level as 880 ft MSL.

  1. CUE: River level is 880 ft MSL.
7. Removes Discharge In Progress Tags from running CWPs.

Operator would remove or direct control room operator to remove the tags from the running CWPs.

  1. CUE: Tags are removed.

Nebraska Public Power District SKL034-50-29 (8908)

Cooper Nuclear Station Page 55 of 149 Job Performance Measure for Operations Revision 02 Task No. 341013O0303 Approve Radioactive Discharge-Release Permit Performance Checklist Standards Initials

8. Records total river flow.

Operator contacts chemistry for total river flow and records 5.9E7 l/min.

  1. CUE: Chemistry reports total river flow is 5.9E7 l/min. (This may be completed by the Chemist after SM signature.)
9. Completes discharge permit.

Operator signs form as Shift Manager and forwards to Chemistry for review.

  1. CUE: Accept form as Chemist.

Nebraska Public Power District SKL034-50-29 (8908)

Cooper Nuclear Station Page 56 of 8 Job Performance Measure for Operations Revision: 02 LIQUID RADIOACTIVE WASTE DISCHARGE FORM ATTACHMENT 1 LIQUID RADIOACTIVE WASTE DISCHARGE FORM Section 1. REQUEST FOR ANALYSIS OF RADIOACTIVE LIQUID WASTE PRIOR TO DISCHARGE To: Chemistry From: Shift Manager Tank To Be Discharged: FDST Started Recirculation For Sample:

Time: 0300 Date: 1/6/xx Recirculation Of Tank Complete:

Time: 0500 Date: 1/6/xx Estimated Volume To Be Discharged: 98%-10.5% = 87.5%

Shift Manager: Mark Helen Time: 0555 Date: 1/6/xx Section 2. THIS SECTION TO BE COMPLETED BY PERSON TAKING SAMPLE Monitor Source Check Informed Control Room And Performed Source Check Initials: REW Sample Point: 18 Time: 0635 Date: 1/6/xx Signature: Ray Moname Section 3. AUTHORIZATION TO RELEASE RADIOACTIVE LIQUID WASTE To: Shift Manager From: Chemistry Release Authorization Number:

Total Ci/ml: 3.74E-5 Total Concentration is < 1.0E-02 Ci/ml YES/NO Signature: Ray Moname 31 Day Dose, Percent Of Annual Limit For Each Value Is 2.0E+00 YES/NO Signature: Ray Moname You Are Authorized To Release Subject Tank With Either Of Following Restrictions:

Maximum Liquid Waste Discharge Rate (gpm)

1) 100
2) N/A
3) N/A Minimum Dilution Flow To Canal (gpm)
1) 159,000 2) 159,000
3) 159,000 Discharge Monitor Alarm Setpoint (Ci/ml)
1) 6.22E-3
2) N/A
3) N/A NOTE - Terminate Discharge If Above Specifications Cannot Be Maintained. Contents Of This Tank Are Within Chemical Parameters For Discharge.

Chemistry: Ray Moname Time: 0707 Date: 1/6/xx

Nebraska Public Power District SKL034-50-29 (8908)

Cooper Nuclear Station Page 57 of 8 Job Performance Measure for Operations Revision: 02 Section 4. SHIFT MANAGER APPROVAL TO RELEASE 4.1 Circle Appropriate Discharge Canal Flow Rate:

AVERAGE CW DISCHARGE FLOWRATE (gpm)

NUMBER OF OPERATING CW PUMPS DE-ICING NO DE-ICING 4

378,600 631,000 3

308,400 514,000 2

193,200 322,000 1

118,800 198,000 4.2 To: Operations Personnel From: Shift Manager The Subject Tank Contents Are Approved For Release Subject To The Following Restrictions:

1) Maximum Liquid Disch Rate: 100 gpm (Section 3)
2) Minimum Dilution Flow To Canal Of: 159000 gpm (Section 3)
3) Alarm Limits Specified (Section 3)
4) Tank Volume Verified: 98 (Compare To Section 1)
5) DISCHARGE IN PROGRESS Tags Installed On Running Circ Water Pumps.

Approval To Release:

Shift Manager:

Mark Helen Time: 0804 Date:

1/6/xx

Nebraska Public Power District SKL034-50-29 (8908)

Cooper Nuclear Station Page 58 of 8 Job Performance Measure for Operations Revision: 02 Section 5. To: Chemist From: Shift Manager The Subject Discharge Has Been Completed And The Following Data Obtained During The Discharge:

START RUN NUMBER DATE TIME

% TANK LEVEL STOP RUN NUMBER DATE TIME

% TANK LEVEL 1

1/6/xx 0905 98 1

2 2

3 3

4 4

Usable Tank Volumes (0% to 100%)

FDST - 18,707 gal WST A - 20,015 gal WST B - 20,015 gal

1) Dilution Flow (Section 4.1):

gpm

2) Volume Of Release:

gal

3) Total Time Of Discharge:

min

4) Discharge Flow:

gpm

5) River Level:

ft MSL

6) Remove DISCHARGE IN PROGRESS Tags From Running Circ Water Pumps.
7) Total River Flow:

l/min (Determined By The Chemist)

Shift Manager:

Time:

Date:

Chemist Review:

Date:

Nebraska Public Power District SKL034-50-29 (8908)

Cooper Nuclear Station Page 59 of 8 Job Performance Measure for Operations Revision: 02 ATTACHMENT 2 Directions to Trainee:

When I tell you to begin, you are to review and complete the radioactive discharge/release permit as Shift Manager. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

General Conditions:

1. The plant is operating at 100%.
2. CWP A, B, and D are in service.
3. De-icing is in progress.
4. The FDST radioactive discharge was started at 0905, Jan 6.
5. The FDST radioactive discharge was stopped at 1355, Jan 6.
6. FDST final level is 10.5%.

Initiating Cue(s):

As Shift Manager complete the Liquid Radioactive Waste Discharge Form for the FDST and inform me when all required actions are complete.

Nebraska Public Power District SKL034-30-62 (36404)

Cooper Nuclear Station Page 60 of 149 Job Performance Measure for Operations Revision 00 ATWS SCENARIO EAL Trainee:

Examiner:

Pass:

Fail:

Examiner signature:

Date:

Additional Program Information:

1.

Appropriate Performance Locations: SIM

2.

Appropriate Trainee Level: SRO

3.

Evaluation Method: Perform

4.

Performance Time: 20 minutes

5.

NRC K/A 2.4.41 2.3/4.1 Directions to Examiner:

1.

This JPM evaluates the trainee's ability to determine the Emergency Action Level from an ATWS Scenario (Scenario 1).

2.

Observe the trainee during performance of the JPM for proper use of self-checking methods.

3.

All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space if desired by the examiner.

General Conditions:

1.

As seen during the previous simulator scenario.

General

References:

1.

EPIP 5.7.1, Emergency Classification, Revision 33 General Tools and Equipment:

None

Nebraska Public Power District SKL034-30-62 (36404)

Cooper Nuclear Station Page 61 of 149 Job Performance Measure for Operations Revision 00 ATWS SCENARIO EAL Special Conditions, References, Tools, Equipment:

1.

Simulator Setup: NA

2.

Critical checks denoted by "*".

3.

Simulator cues denoted by "#".

Task Standards:

1.

Accurately classify the event using the correct plant procedure.

Initiating Cue(s):

The Shift Manager has directed you to determine what the highest Emergency Action Level was during the previous scenario. Notify the Shift Manager when the task is complete.

Nebraska Public Power District SKL034-30-62 (36404)

Cooper Nuclear Station Page 62 of 149 Job Performance Measure for Operations Revision 00 ATWS SCENARIO EAL Performance Checklist Standards Initials

1. Consult EAL.

Candidate consults EAL procedure.

2. EAL classification.

Candidate identifies that a Site Area Emergency would have been declared per EAL 3.3.4. This is because boron was injected to shut down the reactor.

3. Inform the SM that the task is complete.

Inform Shift Manager that the Emergency Classification is complete.

  1. CUE: The SM Acknowledges that it is complete. This JPM is complete.

Nebraska Public Power District SKL034-30-62 (36404)

Cooper Nuclear Station Page 63 of 149 Job Performance Measure for Operations Revision 00 ATWS SCENARIO EAL

Nebraska Public Power District SKL034-30-62 (36404)

Cooper Nuclear Station Page 64 of 149 Job Performance Measure for Operations Revision 00 ATTACHMENT 1 Directions to Candidate:

When I tell you to begin, you are to determine the Emergency Action Level from the ATWS Scenario you just experienced. Before you start, I will state the general plant conditions, the initiating cues and answer any questions you may have.

General Conditions:

1.

As seen during the previous simulator scenario.

Initiating Cues:

The Shift Manager has directed you to determine what the highest Emergency Action Level was during the previous scenario. Notify the Shift Manager when the task is complete.

Nebraska Public Power District SKL034-21-56 (8779)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 65 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401

===========================================================

=

Task

Title:

Respond to a Trip of a Reactor Recirc Pump (Alternate Path)

============================================================

Trainee:

Examiner:

Pass [ ]; Fail [ ] Examiner Signature:

Date:

Additional Program Information:

NOTE THIS IS AN ALTERNATE PATH JPM.

1. Appropriate Performance Locations: CR/SIM
2. Appropriate Trainee Level: RO/SRO
3. Evaluation Method: Perform Simulate
4. Performance Time: 8 minutes
5. NRC K/As 202001 A2.03 (3.6/3.7)

Directions to Examiner:

NOTE THIS IS AN ALTERNATE PATH JPM. The flow subtracting network will fail and require manual input of total core flow.

5.

This JPM evaluates the trainees ability to respond to a Reactor Recirculation pump trip per 2.4RR, Reactor Recirculation Abnormal.

6.

If this JPM is performed on the Simulator, only the cues preceded by # should be given.

7.

All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.

8.

Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.

9.

Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.

Nebraska Public Power District SKL034-21-56 (8779)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 66 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401

===========================================================

=

Task

Title:

Respond to a Trip of a Reactor Recirc Pump (Alternate Path)

============================================================

Directions to Trainee:

When I tell you to begin, you are to perform actions as appropriate to panel 9-4 and 9-5 indications. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

If being performed in the Simulator:

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.

========================================================

General Conditions:

7.

The plant is operating at power.

8.

You are the Control Room Operator.

General

References:

1.

Procedure 2.4RR, Reactor Recirculation Abnormal

2.

Procedure 2.2.68.1, Reactor Recirculation System Operations

Nebraska Public Power District SKL034-21-56 (8779)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 67 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401

===========================================================

=

Task

Title:

Respond to a Trip of a Reactor Recirc Pump (Alternate Path)

============================================================

General Tools and Equipment:

1.

None Special Conditions, References, Tools, Equipment:

1.

Simulator Setup: See Attachment 1.

2.

Critical steps denoted by *.

3.

Simulator cues denoted by #.

Task Standards:

1.

100% of critical elements successfully completed without error.

2.

100% of safety and radiological work practices.

Initiating Cue(s):

The Control Room Supervisor directs you to perform actions as appropriate to panel 9-4 and panel 9-5 indications.

Nebraska Public Power District SKL034-21-56 (8779)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 68 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401

===========================================================

=

Task

Title:

Respond to a Trip of a Reactor Recirc Pump (Alternate Path)

============================================================

Performance Checklist Standards Initials

1. Assume the watch at panel 9-5.

The operator positions himself in a position to monitor panel 9-5.

ACTION:

After the candidate assumes the watch, activate TRIGGER E1 to trip B Reactor Recirculation Pump.

2. Recognize and report trip of Recirc pump.

The operator recognizes and reports the trip of B Reactor Recirculation pump.

  1. CUE: Acknowledge the report as CRS.

Directs the operator to perform his actions per the abnormal.

3. Take appropriate immediate actions.

The operator evaluates 2.4RR immediate actions; determines none apply.

4. Obtain procedure 2.4RR.

The operator obtains a copy of 2.4RR.

5. Enter Attachment 1 of 2.4RR Operator enters Attachment 1 of 2.4RR.
6. Evaluate need to enter for stability exclusion region.

Operator evaluates the need to enter for stability exclusion region; determines entry is required.

  1. CUE: Acknowledge the report as CRS and another operator will address stability exclusion region.

Nebraska Public Power District SKL034-21-56 (8779)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 69 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401

===========================================================

=

Task

Title:

Respond to a Trip of a Reactor Recirc Pump (Alternate Path)

============================================================

Performance Checklist Standards Initials

7. Ensure RRMG Set B GEN FIELD BKR open.

Operator ensures RRMG Set B GEN FIELD BKR open.

CUE:

RRMG Set B GEN FIELD BKR green light is illuminated, the red light is out.

8. Close RR-MO-53B, PUMP DISCHARGE VLV.

Operator closes RR-MO-53B, PUMP DISCHARGE VLV.

CUE:

RR-MO-53B green light is lit and the red light is out.

NOTE: The operator should continue with the remaining 2.4RR steps while waiting for the RR-MO-53B valve.

9. After RR-MO-53B has been closed for 5 minutes, open valve.

Operator opens RR-MO-53B after it has has been closed for 5 minutes (-0, + 5 minutes).

CUE:

RR-MO-53B green light is out and red light is lit (after valve has been opened).

10. Ensure operating RRMG is transferred to Startup Transformer per Procedure 2.2.18.

Operator ensures A RRMG is powered by the Startup Transformer.

CUE:

A RRMG is powered by the Startup Transformer (Breaker 1CS is closed).

Nebraska Public Power District SKL034-21-56 (8779)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 70 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401

===========================================================

=

Task

Title:

Respond to a Trip of a Reactor Recirc Pump (Alternate Path)

============================================================

Performance Checklist Standards Initials

11. Maintain oil outlet temperature for tripped RRMG 90°F to 130°F.

Operator directs Station Operator to maintain oil outlet temperature for tripped RRMG 90°F to 130°F.

  1. CUE: Acknowledge/repeat back order as Station Operator.
12. Monitor loop cooldown rate on RR-TR-165, RR SUCTION & FEEDWATER TEMP.

Operator monitors loop cooldown rate on RR-TR-165, RR SUCTION & FEEDWATER TEMP.

CUE:

Loop temperature has dropped 6°F over the last 5 minutes.

13. Concurrently enter Single Loop Operation per Procedure 2.2.68.1.

Operator obtains a copy of 2.2.68.1.

14. Dispatch Operators to R-976-W and Non-Critical Switchgear Room to record lockout relays and targets for tripped pump.

Operator dispatches Operators to R-976-W and Non-Critical Switchgear Room to record lockout relays and targets for tripped pump.

  1. CUE: Overcurrent (51 relay) is tripped for breaker 1DN (in Non-Critical Switchgear Room). There are no lockouts at Reactor Building 976 West.
15. If total core flow < 20%,

concurrently enter.

Operator determines Core Flow is above 20%

rated.

CUE:

Indicated core flow is 41 Mlbm/hr.

Nebraska Public Power District SKL034-21-56 (8779)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 71 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401

===========================================================

=

Task

Title:

Respond to a Trip of a Reactor Recirc Pump (Alternate Path)

============================================================

Performance Checklist Standards Initials

16. Align RRMG H&V System per Procedure 2.2.85.

Operator aligns RRMG H&V System per Procedure 2.2.85.

  1. CUE: When operator initiates action to align ventilation, inform him that another operator will perform the ventilation alignment.
17. Raise core flow to

> 29.5x106 lbs/hr, if possible.

Operator determines core flow is >

29.5x106 lbs/hr CUE:

Indicated core flow is 41 Mlbm/hr.

18. Determine if reverse flow summer is functioning.

Operator determines reverse flow summer is NOT functioning as annunciator 9-4-3/E-7 is NOT in and indicated core flow is NOT approximately equal to difference between NBI-FI-92A and NBI-FI-92B CUE:

9-4-3/E-7 is NOT alarming.

CUE:

NBI-FI-92A reads 37 Mlbm/hr.

NBI-FI-92B reads 4 Mlbm/hr.

19. Initiate an emergency Work Order to repair or replace reverse flow summer (NBI-SUM-97).

Operator initiate an emergency Work Order to repair or replace reverse flow summer (NBI-SUM-97).

  1. CUE: Another operator will perform this task.

Nebraska Public Power District SKL034-21-56 (8779)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 72 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401

===========================================================

=

Task

Title:

Respond to a Trip of a Reactor Recirc Pump (Alternate Path)

============================================================

Performance Checklist Standards Initials

20. Determine difference between NBI-FI-92A and NBI-FI-92B loop flows.

Operator determines difference between NBI-FI-92A and NBI-FI-92B loop flows is 31x106 lbs/hr.

NOTE: Entering substitute value for point B012 is accomplished using an IDT terminal and pressing the Bogey Value button. On screen prompts will guide the rest of the substitution.

21. Enter substitute value for PMIS Point B012.

Operator enters difference between NBI-FI-92A and NBI-FI-92B loop flows as substitute for PMIS Point B012.

CUE:

PMIS Point B012 has been substituted for.

  1. CUE: SIMULATOR ONLY. Ask the candidate to verify that the core flow value has updated on the power to flow map.
22. Verify value substituted for PMIS Point B012 (Simulator ONLY).

Operator enters turn-on code of PFMAP and verifies core flow value matches value substituted.

NOTE: As soon as the student attempts to contact the Reactor Engineer, tell them that the JPM is complete.

23. Initiate actions to notify the Reactor Engineer about MCPR.

Initiate actions to notify the Reactor Engineer that MCPR needs to be adjusted for single loop operations

Nebraska Public Power District SKL034-21-56 (8779)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 73 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401

===========================================================

=

Task

Title:

Respond to a Trip of a Reactor Recirc Pump (Alternate Path)

============================================================

ATTACHMENT 1 SIMULATOR SET-UP A. Materials required None B. Initialize the Simulator in any full power IC (IC-18, 19 or 20 suggested)

Batch File name - none.

C. Change the Simulator conditions from those of the IC as follows:

1. Triggers Number File Name Description E1 None trgset 11 "zlorrmgfbb(1)==1"

^B Recirc MG Field Breaker green light on

2. Malfunctions Number Title Trigger TD Severity Ramp Initial RR04D B Reactor Recirculation Pump Drive Motor Breaker Trip (1DN)

E1 N/A N/A N/A N/A

3. Remotes Number Title Trigger TD Value Ramp None

Nebraska Public Power District SKL034-21-56 (8779)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 74 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:202022C0401

===========================================================

=

Task

Title:

Respond to a Trip of a Reactor Recirc Pump (Alternate Path)

============================================================
4. Overrides Instrument Tag Trigger TD Value Ramp 9-4-3/E-7, RECIRC LOOP B OUT OF SERVICE RA:MUX08C108 A

0 OFF 0

Total Core Flow ZAONBIDPRFR95[2]

E1 0:10 41 0:10 A Loop Flow ZAONBIFI92A E1 0:12 37 0:12 B Loop Flow ZAONBIFI92B E1 0:15 4

1:00

5. Panel Set-up (suggested.)
a. Insert listed overrides and malfunctions.
b. Place the Simulator in RUN.
c. Ensure A Reactor Recirculation pump is aligned to the Startup Transformer.
d. Ensure B Reactor Recirculation pump is aligned to the Normal Transformer.
e. Ensure that the curser on the power to flow map is within the normal operating region.

Note: If this JPM is to be performed more than once, snap the Simulator into an IC after the panel set-up is complete.

Nebraska Public Power District SKL034-21-56 (8779)

Cooper Nuclear Station Page 75 of 11 Job Performance Measure for Operations Revision: 02 ATTACHMENT 2 Directions to Trainee:

When I tell you to begin, you are to perform actions as appropriate to panel 9-4 and 9-5 indications. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

If being performed in the Simulator:

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.

General Conditions:

9. The plant is operating at power.
10. You are the CRO - Reactor Operator (RO) (9-5 PNL).
11. Optimum Water Chemistry is out of service.

Initiating Cue(s):

The Control Room Supervisor directs you to perform actions as appropriate to panel 9-4 and panel 9-5 indications.

Nebraska Public Power District SKL034-22-03 (36408)

Cooper Nuclear Station Page 76 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)

Trainee:

Examiner:

Pass Fail Examiner Signature:

Date:

Additional Program Information:

THIS IS AN ALTERNATE PATH JPM

1.

Appropriate Performance Locations: CR / SIM

2.

Appropriate Trainee level: RO / SRO

3.

Evaluation Method: Simulate Perform

4.

Performance Time: 20 minutes

5.

NRC K/A 259001 A4.02 (3.9/3.7)

Directions to Examiner:

NOTE:

THIS IS AN ALTERNATE PATH JPM. THE INITIAL ATTEMPT TO RESET THE RFPT TRIP WILL FAIL AND REQUIRE USE OF THE ALTERNATIVE METHOD TO RESET THE TRIP.

1.

This JPM evaluates the trainee's ability to perform a quick start of a RFPT

2.

If this JPM is performed on the Simulator, only the cues preceded by "#" should be given.

3.

All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space if desired by the examiner.

4.

DO NOT place the simulator in RUN until the student is ready to perform the JPM.

(RFP must be coasting down or on turning gear < 5 minutes to use this procedure section.)

5.

Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.

6.

Brief the trainee, place the simulator in run, and tell the trainee to begin.

Directions to Trainee:

When I tell you to begin, you are to perform a quick start of the A RFPT. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you

Nebraska Public Power District SKL034-22-03 (36408)

Cooper Nuclear Station Page 77 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path) would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

If being performed in the Simulator:

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.

========================================================

General Conditions:

1.

The Reactor has scrammed.

2.

Both RFPs have tripped on high level.

General

References:

1.

Procedure 2.2.28

8.

Procedure 2.2.28.1 General Tools and Equipment:

1.

None Special Conditions, References, Tools, Equipment:

1.

Simulator Setup: See Attachment 1.

2.

Critical checks denoted by "*".

3.

Simulator cues denoted by "#".

Task Standards:

1.

100% of critical elements successfully completed without error.

2.

100% of safety and radiological work practices.

Initiating Cue(s):

The Control Room Supervisor directs you to restart A RFP in Reactor Pressure Follow Mode and raise RPV water level to the GREEN Band using the quick restart hard card.

Nebraska Public Power District SKL034-22-03 (36408)

Cooper Nuclear Station Page 78 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)

Performance Checklist Standards Initials

1.

Ensure RFPT time limit is met.

Ensure RFPT coasting from trip or not on turning gear > 5 minutes after trip.

CUE: RFPTs are still coasting down.

NOTE:

RFPT Trips are as follows:

1. Low pump suction pressure of 260 psig after a 15 second time delay
2. Exhaust casing high pressure at 7" Hgv
3. Exhaust casing high temperature of 23°F
4. Low lube oil pressure of 10 psig
5. Thrust bearing wear at 10 psig oil pressure
6. High reactor water level of 52.5" (Tech Spec < 54")
7. Electrical overspeed at 5950 rpm
8. Mechanical overspeed at 6050 to 6150 rpm
9. Emergency trip pushbutton operation
2. Ensure RFPT trips are reset.

Ensure RFPT trips (except high water level) are reset. Check the following annunciators are clear:

- A-1/A-6 (Low Suction Pressure),

- A-1/B-4 (Exhaust Hood High Temp),

- A-1/B-5 (Low Vacuum Trip),

- A-1/B-6 (Thrust Bearing Trip),

- A-1/C-4 (Low Oil Pressure Pre Trip)

Ensure reactor water level is < 54 Check RFPT/Main Turbine high RPV water level trip amber lights (panel 9-5)

CUE: All trips (except high RPV water level) are reset.

Nebraska Public Power District SKL034-22-03 (36408)

Cooper Nuclear Station Page 79 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)

3. Ensure High RPV water level RFPT trips are reset.

At Panel 9-5, reset at least 2 of the HIGH WATER LEVEL TRIPS.

CUE: All 3 High RPV water level trips were in and now have been reset.

4. Ensure RFP-CS-RFPT-A RFPT A Control Station is in MDVP Operator ensures RFP-CS-RFPT-A is in MDVP CUE: RFP-CS-RFPT-A is in MDVP
5. Ensure OUTPUT on RFP-CS-RFPT-A is adjusted to minimum.

Operator ensures OUTPUT on RFP-CS-RFPT-A is adjusted to minimum.

CUE: OUTPUT on RFP-CS-RFPT-A is adjusted to minimum.

6. Attempt to reset A RFPT Press and hold RFPT A TRIP RESET button.

Note the RFPT A HP and LP STOP valves are NOT open.

CUE: HP and LP STOP valves red light are OFF Green lights are ON.

7. Recognize and report the trip reset failure.

Recognize and report the A RFPT trip reset failure.

8. Reset A RFPT Press and hold RFPT A OVERSPEED TRIP BLOCK and RFPT A OVERSPEED TRIP RESET.

CUE: HP and LP STOP valves red lights are ON Green lights are OFF.

9.

Ensure RF-11A is OPEN Ensure RF-FCV-11A, MIN FLOW VALVE, is open.

CUE: RF-FCV-11A Red light is ON and Green light OFF.

Nebraska Public Power District SKL034-22-03 (36408)

Cooper Nuclear Station Page 80 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)

10. Select RFP At a HMI, select FEEDPUMP A screen for desired RFP to be started.

CUE: A RFP selected

11. Select Quick Restart.

Select QUICK RESTART start type.

CUE: Quick restart selected

12. Select HP Start.

If extraction steam is available, select LP START.

Otherwise, select HP START.

.CUE: HP Start selected

13. Press green Start button and confirm start in pop-up box.

Press green START button and confirm start in pop-up box CUE: Start in Pop-up box.

14. Continue Button After RFP A(B) reaches MINIMUM GOVERNOR, depress green CONTINUE button.

CUE: green CONTINUE button depressed.

15. Ensure injection path Ensure injection path is aligned to the reactor vessel, as dictated by plant conditions CUE: Path lined up
16. Raise speed Use UP arrow to raise RFP speed to raise RFP discharge pressure.

CUE: RFP speed rising.

Nebraska Public Power District SKL034-22-03 (36408)

Cooper Nuclear Station Page 81 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)

17. Place In Reactor Pressure Follow Place RFP in desired mode (e.g., AUTO or REACTOR PRESSURE FOLLOW).

CUE: In Reactor pressure follow

18. Raise Level If required, adjust STARTUP MASTER controller using UP/DOWN arrows or RAMP FUNCTION, to adjust LEVEL SETPOINT as desired.

CUE Level at 35

19. Inform the CRS that the task is Complete.

Inform the Control Room Supervisor that 1A RFP has been restarted and injecting into the RPV

  1. CUE:

CRS acknowledges the report.

Nebraska Public Power District SKL034-22-03 (36408)

Cooper Nuclear Station Page 82 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)

ATTACHMENT 1 SIMULATOR SET-UP A. Materials Required None B. Initialize the Simulator in IC Any IC that will support this JPM C. Run Batch File None D. Change the simulator conditions as follows:

Number Title Tgr TD Sev Ramp Initial

1. Triggers None
2. Malfunctions RR19 Shutdown Cooling Loss of Mass 100 N/A N/A
3. Remotes None N/A N/A
4. Overrides ZDIRFSWRFTRA[1]

RFPT-A Trip Reset Pushbutton OFF

5. Panel Setup
a. Place the Simulator in run.
b. Use Monitor Parameter RRMRVLOSS to reset malfunction RR19.
c. Place the Mode Switch to Shutdown.
d. Secure two Condensate and Condensate Booster pumps.
e. If water level needs to be lowered insert RR19.
f. Ensure the A RFP is still coasting down or is on the turning gear.
g. Ensure RPV water level is < +50" (narrow range).
h. Insert listed switch override.
i. Place the Simulator in FREEZE until the operator is ready to begin.

Note: If this JPM is to be performed more than once, take a SNAPSHOT after the panel setup is complete.

Nebraska Public Power District SKL034-22-03 (36408)

Cooper Nuclear Station Page 83 of 149 Job Performance Measure for Operations Revision 00 Task No.: 259058G401 Perform a Quick Restart of RFPT A (Hard Card) (Alternate Path)

Nebraska Public Power District SKL034-22-03 (36408)

Cooper Nuclear Station Page 84 of 149 Job Performance Measure for Operations Revision 00 ATTACHMENT 2 Directions to Trainee:

When I tell you to begin, you are to perform a quick start of the A RFPT. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

If being performed in the Simulator:

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.

General Conditions:

1. The Reactor has scrammed.
2. Both RFPs have tripped on high level.

Initiating Cues:

The Control Room Supervisor directs you to restart A RFP in Reactor Pressure Follow Mode and raise RPV water level to the GREEN Band using the quick restart hard card.

Nebraska Public Power District SKL034-21-48 (7405)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 85 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101

===========================================================

=

Task

Title:

Manually Initiate HPCI (Hard Card) (Alternate Path)

============================================================

Trainee:

Examiner:

Pass [ ]; Fail [ ] Examiner Signature:

Date:

Additional Program Information:

NOTE THIS IS AN ALTERNATE PATH JPM.

1. Appropriate Performance Locations: CR/SIM
2. Appropriate Trainee Level: RO/SRO
3. Evaluation Method: Perform Simulate
4. Performance Time: 8 minutes
5. NRC K/As 206000 K3.02 (3.8/3.8) and A4.01 (3.8/3.7)

Directions to Examiner:

NOTE THIS IS AN ALTERNATE PATH JPM. THE FLOW CONTROLLER WILL FAIL TO OPERATE IN AUTOMATIC AND MUST BE PLACED IN MANUAL.

10. This JPM evaluates the trainees ability to perform the injection mode of operation of HPCI per the guidance of procedure 2.2.33.1, High Pressure Coolant Injection System Operations (hard card).
11. If this JPM is performed on the Simulator, only the cues preceded by # should be given.
12. All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.
13. Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.
14. Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.

Nebraska Public Power District SKL034-21-48 (7405)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 86 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101

===========================================================

=

Task

Title:

Manually Initiate HPCI (Hard Card) (Alternate Path)

============================================================

Directions to Trainee:

When I tell you to begin, you are to operate HPCI in the injection mode at rated flow using the hard card. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

If being performed in the Simulator:

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.

========================================================

General Conditions:

12. The Reactor is shutdown following a scram.
13. Reactor pressure is currently being maintained by another operator.
14. Suppression Pool Cooling will be placed in service by another operator.
15. SBGT and REC have been aligned to support HPCI operation.

General

References:

1.

Procedure 2.2.33.1, High Pressure Coolant Injection System Operation.

Nebraska Public Power District SKL034-21-48 (7405)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 87 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101

===========================================================

=

Task

Title:

Manually Initiate HPCI (Hard Card) (Alternate Path)

============================================================

General Tools and Equipment:

1.

None Special Conditions, References, Tools, Equipment:

1.

Simulator Setup: See Attachment 1.

2.

Critical steps denoted by *.

3.

Simulator cues denoted by #.

Task Standards:

2.

100% of critical elements successfully completed without error.

2.

100% of safety and radiological work practices.

Initiating Cue(s):

The Control Room Supervisor directs you to place HPCI in the injection mode at rated flow using the hard card. Inform the CRS when HPCI is injecting at rated flow.

Nebraska Public Power District SKL034-21-48 (7405)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 88 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101

===========================================================

=

Task

Title:

Manually Initiate HPCI (Hard Card) (Alternate Path)

============================================================

Performance Checklist Standards Initials

24. Place GLAND SEAL CNDSR BLOWER control switch in START.

The operator places the control switch for the GLAND SEAL CNDSR BLOWER in START.

CUE:

The red light for the GLAND SEAL CNDSR BLOWER is lit, the green light is out.

25. Checks High Water Level Trip Checks and Resets REACTOR HI WTR LEVEL TRIP SIGNAL.

CUE: REACTOR HI WTR LEVEL TRIP yellow light is OFF.

26. Open HPCI-MO-14, STM TO TURB VLV.

The operator places the control switch for the HPCI-MO-14 in OPEN.

CUE:

HPCI-MO-14 red light is on, green light is off.

27. Start AUXILIARY OIL PUMP by placing control switch in START.

The operator places the control switch for the Auxiliary Oil Pump switch to START.

CUE:

HPCI Aux Oil pump red light is on, green light is off.

28. Open HPCI-MO-19, INJECTION VALVE.

The operator places the control switch for the HPCI-MO-19 in OPEN.

CUE:

HPCI-MO-19 red light is on, green light is off.

Nebraska Public Power District SKL034-21-48 (7405)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 89 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101

===========================================================

=

Task

Title:

Manually Initiate HPCI (Hard Card) (Alternate Path)

============================================================

Performance Checklist Standards Initials

29. Adjust FLOW CONTROLLER HPCI-FIC-108 setpoint to maintain desired HPCI flow, as necessary.

Operator attempts to control HPCI flow with the Set Tape.

CUE:

HPCI flow remains almost zero, irrespective of Set Tape setting.

30. Operator recognizes and reports failed controller Operator reports to CRS that HPCI controller has failed in automatic.
  1. CUE: CRS acknowledges, directs operator to continue with HPCI injection
31. Operator places HPCI controller in manual.

Operator turns HPCI controller AUTO/BAL/MAN switch to MAN.

CUE:

HPCI controller AUTO/BAL/MAN switch is in MAN.

32. Operator adjusts HPCI controller in manual to control flow.`

Operator turns HPCI controller manual knob clockwise to raise flow, counter-clockwise to lower flow until flow is 4250 gpm.

CUE:

HPCI flow responds to manual control knob adjustment as appropriate.

33. Operator reports HPCI is in injection mode at rated flow.

Operator reports HPCI is in injection mode at rated flow per the hard card.

CUE:

CRS acknowledges report.

Nebraska Public Power District SKL034-21-48 (7405)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 90 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101

===========================================================

=

Task

Title:

Manually Initiate HPCI (Hard Card) (Alternate Path)

============================================================

ATTACHMENT 1 SIMULATOR SET-UP A. Materials required None C. Initialize the Simulator in any IC that will support HPCI injection mode after a scram (IC-18, 19 or 20 suggested)

Batch File name - none.

C. Change the Simulator conditions from those of the IC as follows:

1. Triggers Number File Name Description None
2. Malfunctions Number Title Trigger TD Severity Ramp Initial RC01 RCIC System Failure to Auto Start A

N/A N/A N/A N/A HP01 HPCI System Failure to Auto Start A

N/A N/A N/A N/A

3. Remotes Number Title Trigger TD Value Ramp None

Nebraska Public Power District SKL034-21-48 (7405)

Cooper Nuclear Station Revision 02 Job Performance Measure Page 91 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:206005O0101

===========================================================

=

Task

Title:

Manually Initiate HPCI (Hard Card) (Alternate Path)

============================================================
4. Overrides Instrument Tag Trigger TD Value Ramp HPCI Set Tape ZAIHPCIFIC108[2]

A 0

200 0

5. Panel Set-up (suggested. Any setup is allowed that supports performance of the HPCI injection mode)
a. Insert listed overrides and malfunctions.
b. Place the Simulator in RUN.
c. Trip both RFPs.
d. Trip the CRD pump.
e. Reset HPCI high level trip signal (if present).
f. Place the Simulator in FREEZE.

Note:

If this JPM is to be performed more than once, snap the Simulator into an IC after the panel set-up is complete.

Nebraska Public Power District SKL034-21-48(7405)

Cooper Nuclear Station Page 92 of 8 Job Performance Measure for Operations Revision: 02 ATTACHMENT 2 Directions to Trainee:

When I tell you to begin, you are to operate HPCI in the injection mode at rated flow using the hard card. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

If being performed in the Simulator:

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.

General Conditions:

16. The Reactor is shutdown following a scram.
17. Reactor pressure is being maintained by another operator.
18. Suppression Pool Cooling will be placed in service by another operator.
19. SBGT and REC have been aligned to support HPCI operation.

Initiating Cue(s):

The Control Room Supervisor directs you to place HPCI in the injection mode at rated flow using the hard card. Inform the CRS when HPCI is injecting at rated flow.

Nebraska Public Power District SKL034-21-60(8901)

Cooper Nuclear Station Page 93 of 8 Job Performance Measure for Operations Revision: 01 Task No.: 213003P0101

======================================================

Task

Title:

Verify a Group 3 Primary Containment Isolation (Alternate Path)

======================================================

Trainee:

Examiner:

Pass: Fail: Examiner Signature:

Date:

NOTE THIS IS AN ALTERNATE PATH JPM.

Additional Program Information:

1. Appropriate Performance Locations: CR / SIM
2. Appropriate Trainee level: RO / SRO / STE
3. Evaluation Method: Perform Simulate
4. Performance Time: 8 minutes
5. NRC K/As 2.1.31 (4.2/3.9) and 223002 A4.01 (3.6/3.5)

Directions to Examiner:

NOTE:THIS IS AN ALTERNATE PATH JPM. THE RWCU-MO-15 and RWCU-MO-18 WILL FAIL TO AUTOMATICALLY CLOSE AND MUST BE MANUALLY CLOSED.

15. This JPM evaluates the trainee=s ability to verify a Group 3 Primary Containment Isolation per the hard card in procedure 2.1.22, Recovering from a Group Isolation.
16. This JPM is an alternate path, it evaluates the trainee=s ability to identify a failure of Group 3 Primary Containment Isolation valves to close and to take action to ensure the Primary Containment Isolation occurs.
17. If this JPM is performed on the Simulator, only the cues preceded by A#@ should be given.
18. All blanks must be filled out with either initials or an ANP@ for Anot performed@; an explanation may also be written in the space, if desired, by the examiner.
19. IF asked, it is acceptable to use the hard card to perform the isolation verification.

Nebraska Public Power District SKL034-21-60(8901)

Cooper Nuclear Station Page 94 of 8 Job Performance Measure for Operations Revision: 01 Task No.: 213003P0101

======================================================

Task

Title:

Verify a Group 3 Primary Containment Isolation (Alternate Path)

======================================================
20. Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.
21. Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.

Directions to Trainee:

When I tell you to begin, you are to verify a Group 3 Primary Containment Isolation using the hard card. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

If being performed in the Simulator:

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.

General Conditions:

20. The Reactor is shutdown following a transient and scram.
21. EOP 1A has been entered.

General

References:

1. Procedure 2.1.22, Recovering from a Group Isolation.

General Tools and Equipment:

1. None Special Conditions, References, Tools, Equipment:

Nebraska Public Power District SKL034-21-60(8901)

Cooper Nuclear Station Page 95 of 8 Job Performance Measure for Operations Revision: 01 Task No.: 213003P0101

======================================================

Task

Title:

Verify a Group 3 Primary Containment Isolation (Alternate Path)

======================================================
1. Simulator Setup: See Attachment 1.
2. Critical steps denoted by A*@.
3. Simulator cues denoted by A#@.

Task Standards:

3.

100% of critical elements successfully completed without error.

2.

100% of safety and radiological work practices.

Initiating Cue(s):

The Control Room Supervisor directs you to verify a Group 3 Primary Containment Isolation. Inform the CRS when you have completed the verification.

Nebraska Public Power District SKL034-21-60(8901)

Cooper Nuclear Station Page 96 of 8 Job Performance Measure for Operations Revision: 01 Task No.: 213003P0101

======================================================

Task

Title:

Verify a Group 3 Primary Containment Isolation (Alternate Path)

======================================================

Performance Checklist Standards Initials

34. Obtains 2.1.22 Hard Card (or 2.1.22).

Hard Card (or procedure 2.1.22) obtained

35. Verifies Group 3 isolation signal is present.

Observes the four Group 3 Isolation Indicating lights on panel 9-5 are OFF.

CUE: Channel A and B (4) White indicating lights are OFF.

36. Verifies RWCU-MO-15 is closed.

Operator observes indicating lights for RWCU-MO-15 on panel 9-3 and determines valve failed to close.

CUE: The green light is OFF and the Red light is ON.

37. Manually closes RWCU-MO-15.

Operator places the control switch for RWCU-MO-15 in CLOSE and observes the green light ON and the red light OFF.

CUE: When control switch is placed to CLOSE then green light is ON and red light is OFF.

38. Verifies RWCU-MO-18 is closed.

Operator observes indicating lights for RWCU-MO-18 on panel 9-3 and determines valve failed to close.

Nebraska Public Power District SKL034-21-60(8901)

Cooper Nuclear Station Page 97 of 8 Job Performance Measure for Operations Revision: 01 Task No.: 213003P0101

======================================================

Task

Title:

Verify a Group 3 Primary Containment Isolation (Alternate Path)

======================================================

Performance Checklist Standards Initials CUE: The green light is OFF and the Red light is ON.

39. Manually closes RWCU-MO-18.

Operator places the control switch for RWCU-MO-18 in CLOSE and observes the green light ON and the red light OFF.

CUE: When control switch is placed to CLOSE then green light is ON and red light is OFF.

40. Crack open RWCU-MO-74, Demin Suction Bypass Valve.

Operator places the control switch for RWCU-MO-74 in OPEN position until dual valve position indication is observed.

CUE: Both green light and red light are ON.

41. Informs CRS that the group 3 isolation has been verified.

CRS informed that the Group 3 isolation is verified and that RWCU-MO-15 and 18 failed to isolate and were manually closed.

  1. CUE: As the CRS acknowledge the report.

Nebraska Public Power District SKL034-21-60(8901)

Cooper Nuclear Station Page 98 of 8 Job Performance Measure for Operations Revision: 01 Task No.: 213003P0101

======================================================

Task

Title:

Verify a Group 3 Primary Containment Isolation (Alternate Path)

======================================================

ATTACHMENT 1 SIMULATOR SET-UP A. Materials required None B. Initialize the Simulator in any IC with the reactor at 100%

power.(IC-18, 19 or 20 suggested)

Batch File name - none.

C. Change the Simulator conditions from those of the IC as follows:

1. Triggers Number File Name Description E8 Group 2 isolation zlopcisrelk5ac[1]==0
2. Malfunctions Number Title Trigger TD Severit y

Ramp Initi al RP12 Group 3 Isolation Failure A

0 NA NA NA

3. Remotes Number Title Trigger TD Value Ramp None

Nebraska Public Power District SKL034-21-60(8901)

Cooper Nuclear Station Page 99 of 8 Job Performance Measure for Operations Revision: 01 Task No.: 213003P0101

======================================================

Task

Title:

Verify a Group 3 Primary Containment Isolation (Alternate Path)

======================================================
4. Overrides Instrument Tag Trigge r

TD Value Ramp Group 3 ISOL IND LIGHT zlopcisrelk26(1) 8 0

OFF 0

Group 3 ISOL IND LIGHT zlopcisrelk26(2) 8 0

OFF 0

Group 3 ISOL IND LIGHT zlopcisrelk27(1) 8 0

OFF 0

Group 3 ISOL IND LIGHT zlopcisrelk27(2) 8 0

OFF 0

5.

Panel Set-up (suggested. Any setup that results in a Group 3 isolation signal.)

a. Place the Simulator in RUN.

Insert a scram.

c. Verify a Group 3 isolation signal is present (low reactor water level).
i. Place the Simulator in FREEZE.

Note: If this JPM is to be performed more than once, snap the Simulator into an IC after the panel set-up is complete.

Nebraska Public Power District SKL034-21-60(8901)

Cooper Nuclear Station Page 100 of 8 Job Performance Measure for Operations Revision: 1 ATTACHMENT 2 Directions to Trainee:

When I tell you to begin, you are to Verify a Group 3 Primary Containment Isolation per the hard card. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

If being performed in the Simulator:

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.

General Conditions:

b. The Reactor is shutdown following a transient and scram.
c. EOP 1A has been entered.

Initiating Cue(s):

The Control Room Supervisor directs you to verify a Group 3 Primary Containment Isolation. Inform the CRS when you have completed the verification.

Nebraska Public Power District SKL034-21-31 (2641)

Cooper Nuclear Station Page 101 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Trainee:

Examiner:

Pass Fail Examiner Signature:

Date:

Additional Program Information:

1.

Appropriate Performance Locations: CR / SIM

2.

Appropriate Trainee level: RO / SRO

3.

Evaluation Method: Simulate Perform

4.

Performance Time: 20 minutes

5.

NRC K/A:262001 A4.04 (3.6/3.7)

Directions to Examiner:

22.

This JPM evaluates the trainee's ability to perform transfer of 4160 bus 1G from DG2 to the Emergency Transformer.

23.

If this JPM is performed on the Simulator, only the cues preceded by A#@ should be given.

24.

All blanks must be filled out with either initials or an ANP@ for Anot performed@; an explanation may also be written in the space, if desired, by the examiner.

25.

Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.

26.

Brief the trainee, place the Simulator in RUN, and tell the trainee to begin.

Directions to Trainee:

When I tell you to begin, you are to perform the required actions to transfer 4160V bus 1G from DG2 to the Emergency Transformer. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

If being performed in the Simulator:

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.

Nebraska Public Power District SKL034-21-31 (2641)

Cooper Nuclear Station Page 102 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer

=========================================================

General Conditions:

1.

DG2 is supplying 4160 VAC bus 1G.

2.

The Emergency Transformer is available.

3.

Breaker 1GB has failed.

General

References:

1.

Procedure 2.2.18, 4160V Auxiliary Power Distribution System

2.

Procedure 2.2.20.1, Diesel Generator Operations General Tools and Equipment:

1.

None Special Conditions, References, Tools, Equipment:

1.

Simulator Setup: See Attachment 1.

2.

Critical steps denoted by A*@.

3.

Simulator cues denoted by A#@.

Task Standards:

22.

100% of critical elements successfully completed without error.

2.

100% of safety and radiological work practices.

Initiating Cue(s):

The Control Room Supervisor directs you to perform transfer of 4160V bus 1G from DG2 to the Emergency Transformer. Inform Control Room Supervisor when 4160V bus 1G is being carried by the Emergency Transformer.

Nebraska Public Power District SKL034-21-31 (2641)

Cooper Nuclear Station Page 103 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist Standards Initials

1. Obtain copy of 2.2.18 and 2.2.20.1.

Operator obtains a copy of procedure 2.2.18 and 2.2.20.1.

2. Ensure risk has been assessed, per Procedure 0.49, for placing Breaker 1FS, EMERGENCY XFMR BKR, for Bus 1F in PULL-TO-LOCK The operator determines that risk need not be assessed as breaker is already open due to a failure.
  1. CUE:

IF asked as CRS, inform the operator that risk has been evaluated.

3. Ensure the Emergency Transformer is energized The operator verifies voltage available from the Emergency Transformer.

CUE: Emergency Transformer secondary voltage is 4440VAC.

4. Inform Shift Manager both off-site circuits are inoperable.

Inform Shift Manager to declare both off-site circuits inoperable and to enter the appropriate Condition and Required Action of LCO 3.8.1, AC Sources - Operating.

  1. CUE:

SM acknowledges the information.

5. Verify 1GS racked in.

Ensure Breaker 1GS, EMERGENCY TRANSFORMER FEED TO 4160V BUS 1G, is racked in.

CUE: 1GS Breaker RED light OFF, GREEN light ON.

Nebraska Public Power District SKL034-21-31 (2641)

Cooper Nuclear Station Page 104 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist Standards Initials

6. Start signals clear Ensure DG2 auto start signals clear.

CUE: Drywell pressure is.5 pig and steady Reactor water level being controlled 15" to 40".

CUE: 4160V Bus 1F/1G are energized

7. Depress local RESET button Direct SO to locally at DG2 Control Panel, press and release EMERGENCY to NORMAL RESET button
  1. CUE:

Station Operator reports EMERGENCY to NORMAL RESET button has been depressed and released

8. Place into Droop Parallel to Parallel.

Direct SO to locally at DG2 Control Panel, ensure DROOP PARALLEL switch is in PARALLEL.

  1. CUE:

Station Operator reports DROOP PARALLEL switch is in PARALLEL.

9. Speed control check Adjust speed of DG2 by placing DIESEL GEN 2 GOVERNOR SWITCH to RAISE or LOWER to verify DG2 frequency control.

CUE: DG2 frequency is 59.6 Hz CUE: DG2 frequency rises to 60.0 Hz

Nebraska Public Power District SKL034-21-31 (2641)

Cooper Nuclear Station Page 105 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist Standards Initials

10. Voltage control check Adjust voltage of DG2 by placing DIESEL GEN 2 VOLTAGE REGULATOR switch RAISE or LOWER to maintain DG2 voltage at 4160 volts.

CUE: DG voltage is 4050 volts.

CUE: DG voltage rises to 4160 volts.

11. Synch switch to 1GS Place SYNCH SWITCH 1GS to 1GS.

CUE: SYNCH SWITCH is in 1GS position

12. Adjust speed Using DIESEL GEN 2 GOVERNOR switch, adjust engine speed so SYNCHROSCOPE is rotating very slowly in counter-clockwise (slow) direction.

CUE: If the operator indicates that he is placing the governor switch to raise indicate that the SYNCHROSCOPE is speeding up in the clockwise (fast) direction.

CUE: If the operator indicates that he is placing the governor switch to lower indicate that the SYNCHROSCOPE starting to rotate in the counter-clockwise (slow) direction.

Nebraska Public Power District SKL034-21-31 (2641)

Cooper Nuclear Station Page 106 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist Standards Initials

13. Adjust voltage Using DIESEL GEN 2 VOLTAGE REGULATOR switch, adjust Bus 1G voltage to slightly lower than EMERGENCY XFMR VOLTAGE CUE: (Before adjustment) DG2 Voltage reads 4160 volts.

CUE: XFMR Transformer voltage is 4449 volts.

CUE: (after adjustment) DG2 voltage reads 4430 volts.

14. Close 1GS When SYNCHROSCOPE is at 1 o=clock, the operator closes Breaker 1GS and check switch spring returns to NORMAL AFTER CLOSE (red flagged)

CUE: Switch returns to center position (red flagged). 1GS Breaker, GREEN light is OFF, RED light is ON.

15. Adjust kVARS The Operator adjust DG2 kVARS so that they are slightly positive (~200 kVARS) using DIESEL GEN 2 VOLTAGE REGULATOR switch. (100 - 300 KVARs)

CUE: DG2 kVARS reads 40 kVARS CUE: DG2 kVARS reads 200 kVARS

Nebraska Public Power District SKL034-21-31 (2641)

Cooper Nuclear Station Page 107 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist Standards Initials

16. Bkr 1FS Pull-To-Lock.

Verify switch for 1FS in PULL-TO-LOCK (PTL)

CUE: 1FS Breaker is still tagged

17. Lower DG2 Load Reduce load on DG2 to 1000 KW using DIESEL GEN 2 GOVERNOR switch.

CUE: DG2 load is 2200 KW CUE: DG2 load is 1000 KW

18. Place SYNCH SWITCH to OFF Place SYNCH SWITCH 1GS to OFF CUE: SYNCH SWITCH is in OFF
19. DG2 Cooldown After engine has cooled and cylinder exhaust temperature have dropped (~5 minutes),

remove DG2 from services per 2.2.20.1.

  1. CUE: Five minutes have elapsed.
  1. CUE: Station Operator reports engine temperatures are cooling down.
20. Lower DG2 load (2.2.20.1)

Lower DG2 load to 400 kW and 1000 kW CUE: DG2 load is 600 kW

  1. CUE: 15 minutes have elapsed.

Nebraska Public Power District SKL034-21-31 (2641)

Cooper Nuclear Station Page 108 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer Performance Checklist Standards Initials

21. Lower to 400 KW Lower DG2 load to 400 KW CUE: DG2 load is 400 kW
22. Lower kVARs Reduce DG2 kVARs as low as possible.

CUE: DG2 kVARs is 50 KVA

23. Open EG2 Open DIESEL GEN 2 BKR EG2 CUE: BKR EG2 is NORMAL AFTER TRIP (green flagged). Green light is ON. Red light is OFF.
24. Inform CRS Inform CRS that the Emergency Transformer is carrying 4160 V Bus 1G.

CUE: CRS acknowledges. This JPM is complete. (Stop JPM at this point even if candidate continues.)

Nebraska Public Power District SKL034-21-31 (2641)

Cooper Nuclear Station Page 109 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer ATTACHMENT 1 SIMULATOR SET-UP A.

Materials required None B.

Initialize the Simulator in any at power IC (IC-18, 19 or 20 suggested)

Batch File name - none.

C.

Change the Simulator conditions from those of the IC as follows:

1. Triggers Number File Name Description None
2. Malfunctions Number Title Trigger TD Severity Ramp Initial None
3. Remotes Number Title Trigger TD Value Ramp None
4. Overrides Instrument Tag Trigger TD Value Ramp None

Nebraska Public Power District SKL034-21-31 (2641)

Cooper Nuclear Station Page 110 of 149 Job Performance Measure for Operations Revision 05 Task Number: 245056G0101 Transfer of 4160V Bus 1G from DG2 to Emergency Transformer

5. Panel Set-up (suggested. Any setup is allowed that supports performance of the bus transfer)
a. Place Bkr 1FS & 1GB in PTL and place Danger Tag on C/S
b. Place 2nd SW pump B in service
c. Place B RHR loop in Suppression Pool Cooling using Div 2 power sources
d. Place Bkr 1GS to NORMAL AFTER TRIP
e. At DG2 local panel, depress & release EMERGENCY to NORMAL RESET pushbutton.
f. At DG2 local panel, place DROOP PARALLEL switch in PARALLEL.

Note: If this JPM is to be performed more than once, snap the simulator into an IC after the panel setup is complete.

Nebraska Public Power District SKL034-21-31 (2641)

Cooper Nuclear Station Page 111 of 12 Job Performance Measure for Operations Revision 05 ATTACHMENT 2 Directions to Trainee:

When I tell you to begin, you are to perform the required actions to transfer 4160V bus 1G from DG2 to the Emergency Transformer. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

If being performed in the Simulator:

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.

General Conditions:

1. DG2 is supplying 4160 VAC bus 1G.
2. The Emergency Transformer is available.
3. Breaker 1GB has failed.

Initiating Cues:

The Control Room Supervisor directs you to perform transfer of 4160V bus 1G from DG2 to the Emergency Transformer. Inform Control Room Supervisor when 4160V bus 1G is being carried by the Emergency Transformer.

Nebraska Public Power District SKL034-30-51 (16531)

Cooper Nuclear Station Page 112 of 5 Job Performance Measure for Operations Revision 01 Task Number: 200363G0501 Install EOP PTMs 57, 58, 59 and 60 Trainee:

Examiner:

Pass: Fail: Examiner Signature:

Date:

Additional Program Information:

1)

Appropriate Performance Locations: Simulator

2)

Appropriate Trainee Level: SO / RO / SRO

3.

Evaluation Method: Simulate Perform

4.

Performance Time: 10 minutes

5.

NRC K/A 295037 EA1.11 (3.5/3.6),

Directions to Examiner:

1.

This JPM evaluates the trainee's ability to Install the EOP PTMs that bypass the low level group 1 isolation during an ATWAS.

2.

All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space, if desired, by the examiner.

3.

Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.

4.

Brief the trainee and tell the trainee to begin.

Directions to Trainee:

When I tell you to begin, you are to install EOP PTMs 57, 58, 59 and 60 to bypass the low level group 1 isolation. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

=========================================================

Nebraska Public Power District SKL034-30-51 (16531)

Cooper Nuclear Station Page 113 of 5 Job Performance Measure for Operations Revision 01 Task Number: 200363G0501 Install EOP PTMs 57, 58, 59 and 60 General Conditions:

23.

An ATWAS has occurred.

2.

The MSIVs are open.

General

References:

1.

EMERGENCY OPERATING PROCEDURE 5.8.20.

General Tools and Equipment:

1.

Safety Glasses

2.

Electrical Safety Equipment Special Conditions, References, Tools, Equipment:

1.

Critical checks denoted by "*.

Task Standards:

4.

100% of critical elements successfully completed without error.

2.

100% of safety and radiological work practices.

Initiating Cue(s):

The CRS directs you to bypass the low level MSIV isolation per 5.8.20 and to inform him when it is complete.

Nebraska Public Power District SKL034-30-51 (16531)

Cooper Nuclear Station Page 114 of 5 Job Performance Measure for Operations Revision 01 Task Number: 200363G0501 Install EOP PTMs 57, 58, 59 and 60 Performance Checklist Standards Initials

3. Obtain a copy of EOP 5.8.20.

Current revision of EOP 5.8.20 is obtained.

4. Verifies the MSIVs are OPEN.

MSIV position is verified.

CUE: All MSIV red position indicating lights are lit and the green lights are extinguished.

5. Ensure following RR sample valves CLOSED.

Ensure following valves closed (PNL 9-4) :

RR-AO-740, OUTBD ISOL VLV and RR-AO-741, IND ISOL VLV.

CUE:RR-AO-740, OUTBD ISOL VLV and RR-AO-741, IND ISOL VLV GREEN lights ON RED lights OFF.

Caution: If the student fails to put on safety glasses prior to installing the PTMs the JPM cannot proceed. If the JPM is being used for evaluation purposes the JPM is concluded at that point and marked unsat.

6. Puts on required safety equipment.

As a minimum safety glass are worn during the performance of this task.

7. Install EOP PTM Number 57 by jumpering between Terminals DD1 and DD2 (BAY-1, PNL 9-15).

EOP PTM Number 57 installed.

CUE: Jumper is installed.

8. Install EOP PTM Number 58 by jumpering between Terminals BB1 and BB2 (BAY-3, PNL 9-15).

EOP PTM Number 58 installed.

CUE: Jumper is installed.

9. Install EOP PTM Number 59 by jumpering between Terminals DD1 and DD2 (BAY-1, PNL 9-17).

EOP PTM Number 59 installed.

CUE: Jumper is installed.

10. Install EOP PTM Number 60 by jumpering between Terminals BB1 and BB2 (BAY-3, PNL 9-17).

EOP PTM Number 60 installed.

CUE: Jumper is installed.

Nebraska Public Power District SKL034-30-51 (16531)

Cooper Nuclear Station Page 115 of 5 Job Performance Measure for Operations Revision 01 Task Number: 200363G0501 Install EOP PTMs 57, 58, 59 and 60 Performance Checklist Standards Initials

11. Informs the CRS that the low level MSIV isolation is bypassed per 5.8.20.

CRS is informed.

CUE: As the Control Room Supervisor acknowledge the report.

Nebraska Public Power District SKL034-30-51(16531)

Cooper Nuclear Station Page 116 of 4 Job Performance Measure for Operations Revision 01 ATTACHMENT 1 When I tell you to begin, you are to install EOP PTMs 57, 58, 59 and 60 to bypass the low level group 1 isolation. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

General Conditions:

1. An ATWAS has occurred.
2. The MSIVs are open.

Initiating Cues:

The CRS directs you to bypass the low level MSIV isolation per 5.8.20 and to inform him when it is complete.

Nebraska Public Power District SKL034-22-02 (36407)

Cooper Nuclear Station Revision 00 Job Performance Measure Page 117 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101

======================================================

=

Task

Title:

Align REC after REC isolation on Low Pressure

======================================================

=

Trainee:

Examiner:

Pass Fail Examiner Signature:

Date:

Additional Program Information:

1.

Appropriate Performance Locations: CR/SIM

2.

Appropriate Trainee Level: RO/SRO

3.

Evaluation Method: Simulate Perform

4.

Performance Time: 10 minutes

5.

NRC K/A 295018; AA1.03 (3.3/3.4)

Directions to Examiner:

1.

This JPM evaluates the trainee's ability to Restore REC after REC isolation on Low Pressure.

2.

If this JPM is performed on the Simulator, only the cues preceded by "#" should be given.

3.

All blanks must be filled out with either initials or an "NP" for "not performed", an explanation may also be written in the space, if desired, by the examiner.

Directions to Trainee:

When I tell you to begin, you are to restore REC flow for Drywell Cooling after REC isolation on Low Pressure, per the Hardcard.

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them to restore REC flow for Drywell Cooling after REC isolation on Low Pressure.

======================================================

=

General Conditions:

1.

The Reactor was scrammed due to loss of REC per 5.2REC.

2.

REC Isolation was due to REC Augmented Radwaste Supply pipe break down stream of REC-MO-1329, AUGMENTED RADWASTE SUPPLY

3.

The REC pipe break has been isolated.

Nebraska Public Power District SKL034-22-02 (36407)

Cooper Nuclear Station Revision 00 Job Performance Measure Page 118 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101

======================================================

=

Task

Title:

Align REC after REC isolation on Low Pressure

======================================================

=

Nebraska Public Power District SKL034-22-02 (36407)

Cooper Nuclear Station Revision 00 Job Performance Measure Page 119 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101

======================================================

=

Task

Title:

Align REC after REC isolation on Low Pressure

======================================================

=

General

References:

SOP 2.2.65.1 General Tools and Equipment:

None Special Conditions, References, Tools, Equipment:

1.

Simulator Setup: See Attachment 1.

2.

Critical checks denoted by "*".

3.

Simulator cues denoted by "#".

4.

Faulted steps denoted by "".

Task Standards:

5.

100% of critical elements successfully completed without error.

2.

100% of safety and radiological work practices.

Initiating Cue(s):

You are the Balance of Plant Operator. The CRS has directed you restore REC after REC isolation on Low Pressure Inform the CRS when REC is restored for Drywell Cooling NOTE:

Tell Trainee to begin. Place Simulator in RUN

Nebraska Public Power District SKL034-22-02 (36407)

Cooper Nuclear Station Revision 00 Job Performance Measure Page 120 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101

======================================================

=

Task

Title:

Align REC after REC isolation on Low Pressure

======================================================

=

Performance Checklist Standards Initials

1. Obtain copy of SOP 2.2.65.1 The operator obtains a copy of SOP 2.2.65.1 or Hard Card.

CUE: None.

2. Determine cause of REC isolation Ensure low pressure isolation not due to leakage or leak isolated.

CUE: REC piping break has been repaired.

3. Verify two REC pumps in Operation Ensure two REC pumps are running.

CUE: REC Pumps B and D are in service.

4. Verify REC critical loop supplied.

Ensure one of following valves are OPEN:

REC-MO-711, NORTH CRITICAL LOOP SUPPLY.

Or REC-MO-714, SOUTH CRITICAL LOOP SUPPLY.

CUE: REC-MO-711, NORTH CRITICAL LOOP SUPPLY and REC-MO-714, SOUTH CRITICAL LOOP SUPPLY are OPEN

Nebraska Public Power District SKL034-22-02 (36407)

Cooper Nuclear Station Revision 00 Job Performance Measure Page 121 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101

======================================================

=

Task

Title:

Align REC after REC isolation on Low Pressure

======================================================

=

Performance Checklist Standards Initials

5. Checking Drywell Temperature If drywell temperature 260°F on PC-TI-505A through PC-TI-505E, place DRYWELL REC ISOL VALVE CONTROL switch to OPEN.

CUE: PC-TI-505A through PC-TI-505E reading 253°F.

6. Throttle open REC HX outlet valve Throttle open REC HX outlet valve for a HX that was in service, as necessary, while maintaining REC CRIT LOOP SUPPLY PRESS in green band.

REC-MO-712, HX A OUTLET VLV.

REC-MO-713, HX B OUTLET VLV.

CUE: REC-MO-712, HX A OUTLET VLV is open.

7. Start third REC pump Start third REC pump.

CUE: REC Pump C is in service

8. Throttle open REC HX outlet valve Throttle open REC HX outlet valve, as necessary, to obtain following conditions:

REC CRIT LOOP SUPPLY PRESS 62 psig.

REC HEADER PRESSURE in top of green band.

CUE: REC-MO-712, HX A OUTLET VLV is open.

Nebraska Public Power District SKL034-22-02 (36407)

Cooper Nuclear Station Revision 00 Job Performance Measure Page 122 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101

======================================================

=

Task

Title:

Align REC after REC isolation on Low Pressure

======================================================

=

Performance Checklist Standards Initials

9. Open REC-MO-700, NON-CRITICAL HEADER SUPPLY.

Perform following simultaneously:

Open REC-MO-700, NON-CRITICAL HEADER SUPPLY.

Continue throttling open REC HX outlet valve, as necessary, to maintain REC HEADER PRESSURE in green band.

CUE: REC-MO-700, NON-CRITICAL HEADER SUPPLY is open.

10. Ensure REC HX outlet valve full open Ensure REC HX outlet valve full open.

CUE: REC-MO-712, HX A OUTLET VLV is open.

11. Open REC-AO-710, RWCU NON-REGEN HX INLET If REC-AO-710, RWCU NON-REGEN HX INLET, not closed for leak isolation, open REC-AO-710.

CUE: REC-MO-712, HX A OUTLET VLV is open.

12. Verify REC-MO-1329, AUGMENTED RADWASTE SUPPLY is closed.

If REC-MO-1329, AUGMENTED RADWASTE SUPPLY, not closed for leak isolation and cooling desired, open REC-MO-1329.

CUE: REC-MO-1329, AUGMENTED RADWASTE SUPPLY, is closed.

13. DRYWELL REC ISOL VALVE CONTROL switch to AUTO Place DRYWELL REC ISOL VALVE CONTROL switch to AUTO.

CUE: REC-MO-712, HX A OUTLET VLV is open.

Nebraska Public Power District SKL034-22-02 (36407)

Cooper Nuclear Station Revision 00 Job Performance Measure Page 123 of 149 JOB PERFORMANCE MEASURE FOR OPERATIONS Task No.:208018C0101

======================================================

=

Task

Title:

Align REC after REC isolation on Low Pressure

======================================================

=

Performance Checklist Standards Initials

14. Notify CRS.

Notify CRS that REC is restored for Drywell Cooling

  1. CUE: Respond as the CRS and acknowledge the report.

SKL034-22-02 (36407)

Page 124 of 149 Revision 00 ATTACHMENT 1 SIMULATOR SET-UP A.

Materials Required SOP 2.2.65.1 B.

Initialize the Simulator in IC-20 or any IC that will support REC isolation.

C.

Change the simulator conditions as follows:

1.

Perform Mitigating Scram Actions.

2.

Close the in service heat exchanger outlet valve until the REC system isolates on low pressure. Close REC-MO-1329, AUGMENTED RADWASTE SUPPLY

3.

Place simulator in freeze.

Note: If this JPM is to be performed more than once, snap the simulator into an available IC after the panel setup is complete.

SKL034-22-02 (36407)

Page 125 of 149 Revision 00 ATTACHMENT 2 Directions to Trainee:

When I tell you to begin, you are to restore REC flow for Drywell Cooling after REC isolation on Low Pressure, per the Hardcard.

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them to restore REC flow for Drywell Cooling after REC isolation on Low Pressure.

General Conditions:

1.

The Reactor was scrammed due to loss of REC per 5.2REC.

2.

REC Isolation was due to REC Augmented Radwaste Supply pipe break down stream of REC-MO-1329, AUGMENTED RADWASTE SUPPLY

3.

The REC pipe break has been isolated.

Initiating Cues:

You are the Balance of Plant Operator. The CRS has directed you restore REC after REC isolation on Low Pressure Inform the CRS when REC is restored for Drywell Cooling.

Nebraska Public Power District SKL034-22-01(36406)

Cooper Nuclear Station Page 126 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task

Title:

SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)

Trainee:

Examiner:

Pass Fail Examiner Signature:

Date:

Time Started: ____________ Time Finished: _____________

THIS IS AN ALTERNATE PATH JPM Additional Program Information:

1.

Appropriate Performance Locations: CR / SIM

2.

Appropriate Trainee level: RO / SRO

3.

Evaluation Method: Simulate Perform

4.

Performance Time: 15 minutes

5.

NRC K/A 261000 A4.03 (3.0/3.0)

Directions to Examiner:

1.

This JPM evaluates the trainee's ability to manipulate the SGT controls in order to start SGT in support of HPCI operation.

2.

If this JPM is performed on the Simulator, only the cues preceded by "#" should be given.

3.

All blanks must be filled out with either initials or an NP for not performed; an explanation may also be written in the space if desired by the examiner.

4.

Give the trainee his copy of the Directions to the Trainee (Attachment 2) when ready to start the JPM.

5.

Brief the trainee, place the simulator in run, and tell the trainee to begin.

Directions to Trainee:

When I tell you to begin, you are to start the SGT system to support HPCI operation. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

Nebraska Public Power District SKL034-22-01(36406)

Cooper Nuclear Station Page 127 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task

Title:

SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)

If being performed in the Simulator:

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.

General Conditions:

1.

The Standby Gas Treatment System is required to support HPCI operation.

General

References:

1.

Procedure 2.2.73.

General Tools and Equipment:

1.

None Special Conditions, References, Tools, Equipment:

1.

Simulator Setup: See Attachment 1.

2.

Critical checks denoted by "*".

3.

Simulator cues denoted by "#".

Task Standards:

1.

100% of critical elements successfully completed without error.

2.

100% of safety and radiological work practices.

Initiating Cue(s):

The Control Room Supervisor directs you to start SGT to support HPCI operation. Inform the CRS when SGT is running to support HPCI.

Nebraska Public Power District SKL034-22-01(36406)

Cooper Nuclear Station Page 128 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task

Title:

SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)

Performance Checklist Standards Initials

1. Obtains the current revision of Procedure 2.2.73.

Current revision of 2.2.73 is obtained.

2. Determine the preferred SGT train.

SGT train 1A is determined to be the preferred train.

3. Start EF-R-1E, SGT A EXHAUST FAN.

EF-R-1E, SGT A EXHAUST FAN switch is placed to RUN.

CUE: SGT Fan Red running light is ON and the Green light is OFF

4. Verifies the inlet and discharge valves OPEN.

Position of SGT-AO-249, SGT A INLET and SGT-AO-251, SGT A DISCHARGE are checked.

CUE: SGT-AO-249, SGT A INLET RED light is On and the GREEN light is OFF.

SGT-AO-251, SGT A DISCHARGE red light is ON and the GREEN light is OFF.

5. Verifies SGT-DPIC-546 is in Manual.

SGT-DPIC-546 is verified in Manual.

CUE: SGT-DPIC-546 is in Manual.

6. Toggles SGT-DPIC-546 until Parameter V is displayed.

D pushbutton is depressed until parameter V is displayed.

CUE: Parameter V is displayed.

Nebraska Public Power District SKL034-22-01(36406)

Cooper Nuclear Station Page 129 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task

Title:

SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)

Performance Checklist Standards Initials

7. Adjusts SGT-DPIC-546 to ensure 800 CFM SGT-DPIC-546 is adjusted to obtain 800 scfm on SGT-FI-545, SGT DISCHARGE HEADER FLOW.

CUE: SGT-FI-545 indicates 900 CFM.

8. Checks High Moisture is clear.

Checks that Annunciator K-1/A-2 SGT A HI Moisture.

CUE: Annunciator is in alarm.

9. Checks Annunciator K-1/A-2 SGT A HI Moisture Checks Annunciator K-1/A-2 SGT A HI Moisture and informs CRS of Alarm
  1. CUE: CRS acknowledges the report and directs A SBGT be secured and B SBGT train started to support HPCI operation, alarm card actions will not be performed due to not emergency condition.
10. Determines Reactor Building HV System Operation Ensure Reactor Building H&V System running and maintaining Reactor Building pressure at -0.25" wg.

CUE: Reactor Building pressure at -0.3" wg..

11. Verifies SGT-DPIC-546 is in Manual.

SGT-DPIC-546 is verified in Manual.

CUE: SGT-DPIC-546 is in Manual.

Nebraska Public Power District SKL034-22-01(36406)

Cooper Nuclear Station Page 130 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task

Title:

SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)

Performance Checklist Standards Initials

12. Toggles SGT-DPIC-546 until Parameter V is displayed.

D pushbutton is depressed until parameter V is displayed.

CUE: Parameter V is displayed.

13. Adjusts SGT-DPIC-546 to ensure ~ 100 CFM SGT-DPIC-546 is adjusted to obtain ~ 100 scfm on SGT-FI-545, SGT DISCHARGE HEADER FLOW.

CUE: SGT-FI-545 indicates 100 CFM.

14. Check SGT heaters Verifies SGT heaters are off.

CUE: SGT heaters GREEN lights ON, RED light OFF

15. Stop EF-R-1E, SGT A EXHAUST FAN.

EF-R-1E, SGT A EXHAUST FAN switch is placed to AUTO.

CUE: SGT Fan Red running light is OFF and the Green light is ON

16. Verifies the inlet and discharge valves CLOSED.

Position of SGT-AO-249, SGT A INLET and SGT-AO-251, SGT A DISCHARGE are checked.

CUE: SGT-AO-249, SGT A INLET RED light is OFF and the GREEN light is ON.

SGT-AO-251, SGT A DISCHARGE red light is OFF and the GREEN light is ON.

Nebraska Public Power District SKL034-22-01(36406)

Cooper Nuclear Station Page 131 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task

Title:

SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)

Performance Checklist Standards Initials

17. Verifies SGT-AO-271, SGT B DILUTION AIR, in AUTO Ensure SGT-AO-271, SGT B DILUTION AIR, in AUTO and valve closed.

CUE: SGT-AO-271, SGT B DILUTION AIR, in AUTO and valve RED light is OFF and the GREEN light is ON.

18. Start EF-R-1F, SGT B EXHAUST FAN.

EF-R-1F, SGT B EXHAUST FAN switch is placed to RUN.

CUE: SGT Fan Red running light is ON and the Green light is OFF

19. Verifies the inlet and discharge valves OPEN.

Position of SGT-AO-250, SGT B INLET and SGT-AO-252, SGT B DISCHARGE are checked.

CUE: SGT-AO-250, SGT A INLET RED light is On and the GREEN light is OFF.

SGT-AO-252, SGT A DISCHARGE red light is ON and the GREEN light is OFF.

20. Verifies SGT-DPIC-546 is in Manual.

SGT-DPIC-546 is verified in Manual.

CUE: SGT-DPIC-546 is in Manual.

21. Toggles SGT-DPIC-546 until Parameter V is displayed.

D pushbutton is depressed until parameter V is displayed.

CUE: Parameter V is displayed.

Nebraska Public Power District SKL034-22-01(36406)

Cooper Nuclear Station Page 132 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task

Title:

SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)

Performance Checklist Standards Initials

22. Adjusts SGT-DPIC-546 to ensure 800 CFM SGT-DPIC-546 is adjusted to obtain 800 scfm on SGT-FI-545, SGT DISCHARGE HEADER FLOW.

CUE: SGT-FI-545 indicates 900 CFM.

23. Ensures High Moisture is clear.

Ensures that Annunciator K-2/A-2 SGT B HI Moisture is clear.

CUE: Annunciator is clear.

24. Informs CRS that the task is complete.

CRS is informed.

  1. CUE: Acknowledge the report and inform the candidate that the JPM is complete.

Nebraska Public Power District SKL034-22-01(36406)

Cooper Nuclear Station Page 133 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task

Title:

SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)

ATTACHMENT 1 SIMULATOR SET-UP A. Materials Required None B. Initialize the Simulator to a full power IC.

Batch File Name - none.

C. Change the Simulator conditions from those of the IC as follows:

1. Triggers Number Description 1

ZAOSGTFI545 >0.13 Ramps moisture reading when SBGT flow greater than 500 cfm

2. Malfunctions Number Title Trigger TD Severity Ramp Initial none
3. Remotes Number Title Trigger Value Ramp None
4. Overrides Instrument Tag Trigger TD Value Ramp 18A2M04 0 TO 100% SGT A CARBON FILTER INLET RH 1

30 sec 53.3358 30 sec 18A2M05 0 TO 100% SGT A HI-EFF FILTER RH INDICATOR 1

30 sec 53.3358 30 sec

Nebraska Public Power District SKL034-22-01(36406)

Cooper Nuclear Station Page 134 of 12 Job Performance Measure for Operations Revision 00 Task No.: 261003O0101 Task

Title:

SGT SYSTEM SUPPORT FOR HPCI OPERATIONS (Alternate Path)

Instrument Tag Trigger TD Value Ramp K-1 A-02 SGT A MOISTURE HIGH 1

58 sec OFF

5. Panel Setup
a. Ensure that SGT train 1A is the preferred SGT train.

Setup for the Exam:

a) Initialize the simulator in any power IC.

Note: If this JPM is to be performed more than once, snap the simulator into an IC after the panel setup is complete.

Nebraska Public Power District SKL034-22-01 (36406)

Cooper Nuclear Station Page 12 of 12 Job Performance Measure for Operations Revision 00 ATTACHMENT 2 Directions to Trainee:

When I tell you to begin, you are to start the SGT system to support HCI operation.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

If being performed in the Simulator:

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation.

General Conditions:

1.

The Standby Gas Treatment System is required to support HPCI operation.

Initiating Cues:

The Control Room Supervisor directs you to start SGT to support HPCI operation. Inform the CRS when SGT is running to support HPCI.

Nebraska Public Power District SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations Revision 03 136 of 149 Task No.: 200134I0504

=========================================================

Task

Title:

Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)

========================================================

=

Trainee:

Examiner:

Pass Fail Examiner Signature:

Date:

THIS IS AN ALTERNATE PATH JPM Additional Program Information:

27.

Appropriate Performance Locations: Plant

28.

Appropriate Trainee Level: SO / RO / SRO

29.

Evaluation Method: Simulate

30.

Performance Time: 25 minutes

31.

NRC K/A: 262002 K4.01(3.4/3.4)

Directions to Examiner:

NOTE:

This is an Alternate Path JPM. The alternate source supplying load will not work and the manual bypass switch must be used.

24.

This JPM evaluates the trainee's ability to respond to a no-break power panel failure

2. All blanks must be filled out with either initials or an ANP@ for Anot performed@; an explanation may also be written in the space, if desired, by the examiner.
3.

Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.

4.

Brief the trainee and tell the trainee to begin.

Nebraska Public Power District SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations Revision 03 137 of 149 Task No.: 200134I0504

=========================================================

Task

Title:

Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)

========================================================

=

Directions to Trainee:

When I tell you to begin you are to perform the assigned Control Building Operator=s actions to respond to a no break power panel failure. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

=========================================================

General Conditions:

1.

The plant has experienced a no break power panel failure.

2.

The Rx has scrammed.

3.

An attempt to transfer NBPP to MCC-R by placing NBPP PWR TRANSFER switch to MCC-R has failed.

4.

The electricians have determined that the fault is not in the NBPP itself.

5.

Both switches have been placed to ALT at the 120v AC supplies for the gaitronics.

6.

Control Room Operators have performed actions 4.1 through 4.3.11 of 5.3NBPP.

General

References:

1.

5.3NBPP (NO BREAK POWER FAILURE)

General Tools and Equipment:

1)

Key for access to Control Building 903' doors.

Special Conditions, References, Tools, Equipment:

1. Critical checks denoted by "*".

Task Standards:

Nebraska Public Power District SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations Revision 03 138 of 149 Task No.: 200134I0504

=========================================================

Task

Title:

Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)

========================================================

=

2.

100% of critical elements successfully completed without error.

2.

100% of safety and radiological work practices.

Initiating Cue(s):

You have been assigned to carry out actions for a no break power panel failure in accordance with 5.3NBPP. The Control Room Supervisor (CRS) directs you to perform all the necessary Control Building Operator=s actions for restoring power from the Alternate Supply (MCC-R). Notify the CRS when the NBPP is energized.

Nebraska Public Power District SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations Revision 03 139 of 149 Task No.: 200134I0504

=========================================================

Task

Title:

Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)

========================================================

=

Performance Checklist Standard Initials

3. Obtain a copy of 5.3NBPP Obtain a copy of 5.3NBPP, NO BREAK POWER FAILURE
d. Ensure MCC-R FEED TO NBPP is in ON.

Ensure EE-DSC-NBPP(AC), MCC-R FEED TO NBPP TRANSFMR (Cable Spreading near NBPP), is in ON.

CUE: Indicate the handle is in the UP position.

e. Contact the Rx Building Operator.

Contacts the Reactor Building Operator to ensure that MCC-R, Breaker 2B, NO BREAK AC POWER SUPPLY, is closed and reset.

CUE: Respond as the Rx Bldg Operator, that MCC-R, Breaker 2B, NO BREAK AC POWER SUPPLY, is closed and reset.

f. Open breaker At Inverter A, open INVERTER OUTPUT breaker.

CUE: Indicate the handle is in the DOWN position.

1. Ensure breaker is closed.

At Inverter A, ensure SUPPLY TO NBPP breaker is closed.

CUE: Indicate the handle is in the UP position.

Nebraska Public Power District SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations Revision 03 140 of 149 Task No.: 200134I0504

=========================================================

Task

Title:

Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)

========================================================

=

Performance Checklist Standard Initials

2. Ensure breaker is closed.

At Inverter A, ensure ALTERNATE AC INPUT TO STATIC SWITCH breaker is closed.

CUE: Indicate the handle is in the UP position.

3. Depress button.

At Inverter A, depress ALTERNATE SOURCE SUPPLYING LOAD button.

CUE: The red ALT SOURCE SUPPLYING LOAD light is off. (NBPP is still de-energized)

g. Place MAN BP SW to ALT SOURCE TO LOAD.

Place MANUAL BYPASS SWITCH to ALTERNATE SOURCE TO LOAD.

CUE: Point to ALTERNATE SOURCE TO LOAD position.

h. Depress ALT SOURCE SUPPLYING LOAD button.

Depress ALTERNATE SOURCE SUPPLYING LOAD button.

CUE: The red ALT SOURCE SUPPLYING LOAD light is on. (NBPP is energized)

NOTE: The Gaitronics do not need to be transferred

i. Notifies CRS.

Notifies CRS that NBPP is

Nebraska Public Power District SKL034-10-95 Cooper Nuclear Station Course Type 7456 Job Performance Measure for Operations Revision 03 141 of 149 Task No.: 200134I0504

=========================================================

Task

Title:

Respond to No Break Power Panel Failure (Control Bldg. Actions) (Alternate Path)

========================================================

=

Performance Checklist Standard Initials energized.

CUE: As the CRS respond to the report.

Nebraska Public Power District SKL034-10-95 (7456)

Cooper Nuclear Station Page 142 of 6 Job Performance Measure for Operations Revision 03 142 of 149 ATTACHMENT 1 Directions to Trainee:

When I tell you to begin you are to perform the assigned Control Building Operator=s actions to respond to a no break power panel failure. Before you start, I will state the general plant conditions, the Initiating Cues, and answer any questions you may have.

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

General Conditions:

1. The plant has experienced a no break power panel failure.
2. The Rx has scrammed.
3. An attempt to transfer NBPP to MCC-R by placing NBPP PWR TRANSFER switch to MCC-R has failed.
4. The electricians have determined that the fault is not in the NBPP itself.
5. Both switches have been placed to ALT at the 120v AC supplies for the gaitronics.
6. Control Room Operators have performed actions 4.1 through 4.3.11 of 5.3NBPP.

Initiating Cues:

You have been assigned to carry out actions for a no break power panel failure in accordance with 5.3NBPP. The Control Room Supervisor (CRS) directs you to perform all the necessary Control Building Operator=s actions for restoring power from the Alternate Supply (MCC-R). Notify the CRS when the NBPP is energized.

Nebraska Public Power District SKL034-40-84 (18851)

Cooper Nuclear Station Page 143 of 149 Job Performance Measure for Operations Revision 03 Task Number: 200390A0501 5.3ALT-STRATEGY, Inject Fire Protection Water to RHR Trainee:

Examiner:

Pass Fail Examiner Signature:

Date:

Additional Program Information:

1.

Appropriate Performance Locations: In Plant

2.

Appropriate Trainee Levels: RO / SRO

3.

Evaluation Method: Simulate

4.

Performance Time: 15 minutes

5.

NRC K/A 295003.AA1.03 (4.4 / 4.4)

Directions to Examiner:

1.

This JPM evaluates the trainee's ability to inject fire protection water into the RHR System during a complete loss of AC and DC power.

2.

If this JPM is to be performed on the Simulator, only the cues preceded by "#" should be given.

3.

All blanks must be filled out with either initials or an NP for not performed, and an explanation may also be written in the space if desired by the examiner.

4.

Give the trainee his copy of the Directions to the Trainee (Attachment 1) when ready to start the JPM.

5.

Brief the trainee and tell the trainee to begin.

Directions to Trainee:

When I tell you to begin, you are to perform the actions to align Fire Protection to RHR Subsystem A, using SWBP A in accordance with Procedure 5.3ALT-STRATEGY. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation. ALL PLANT ANNOUNCEMENTS WILL BE SIMULATED!

Nebraska Public Power District SKL034-40-84 (18851)

Cooper Nuclear Station Page 144 of 149 Job Performance Measure for Operations Revision 03 Task Number: 200390A0501 5.3ALT-STRATEGY, Inject Fire Protection Water to RHR General Conditions:

1.

The Plant has experience a total loss of A/C and D/C power.

2.

Reactor Pressure is 600 psig.

3.

Procedure 5.3ALT-STRATEGY, Alternate Core Cooling Mitigating Strategies, has been entered.

4.

Another SO has completed the breaker alignments per step 1.1 Attachment 1 of 5.3ALT-STRATEGY.

5.

Fire Protection header is intact.

General

References:

1.

Procedure 5.3ALT-STRATEGY General Tools and Equipment:

1.

3 Fire Hose

2.

Fire hose Wrench Special Conditions, References, Tools, Equipment:

1.

Critical checks denoted by "*."

2.

Simulator cues denoted by "#."

Task Standards:

1.

100% of critical elements successfully completed without error.

2.

100% of safety and radiological work practices.

Initiating Cue(s):

The CRS has directed you to align Fire Protection Water to RHR Subsystem A using SWBP A in accordance with 5.3ALT-STRATEGY, Attachment 1. You are to inform the CRS when Fire Protection Water is aligned to RHR.

Nebraska Public Power District SKL034-40-84 (18851)

Cooper Nuclear Station Page 145 of 149 Job Performance Measure for Operations Revision 03 Task Number: 200390A0501 5.3ALT-STRATEGY, Inject Fire Protection Water to RHR Performance Checklist Standards Initials

32. Obtain procedure The Operator obtains a copy of the current revision of procedure 5.3ALT-STRATEGY NOTE - Equipment is stored C-882-N by MCC-T.

NOTE - The Operator must show that they are capable of obtaining the required equipment, but does not have to take them to the specified locations, to get credit for the task element.

25. C-882 N, gets hose.

The Operator obtains the 3 hose.

CUE: Hose is obtained.

3. Remove existing 21/2 hose at Hose Station No.

16 The Operator removes the 21/2 hose CUE: The hose is removed.

j. 4. C-882 N, attaches hose.

The Operator attaches the 3 hose to FP-315, Hose Station No. 16.

CUE: The hose is attached.

k. 5. C-882 N, removes pipe cap.

The Operator removes the pipe cap from SW-641, GW System Supply from SWB Pump A. (Outlet of SWBP A Pump Inlet Strainer)

CUE: The pipe cap is removed.

l. 6. C-882 N, attaches hose.

The Operator attaches the 3 hose to SW-641 connection.

CUE: The hose is attached.

Nebraska Public Power District SKL034-40-84 (18851)

Cooper Nuclear Station Page 146 of 149 Job Performance Measure for Operations Revision 03 Task Number: 200390A0501 5.3ALT-STRATEGY, Inject Fire Protection Water to RHR Performance Checklist Standards Initials

m. 7. C-882 N, ensures SW-84 is CLOSED.

The Operator ensures that the SW-77, SWBP A Suction valve is closed.

CUE: The hand wheel has stopped moving in the clockwise direction.

n. 8. C-882 N, ensures the SW-121 is CLOSED.

The Operator ensures that the SW-121, Emergency Core Flooding Tell-Tale Drain valve is CLOSED. (SW-121 is in a contaminated area.

He can call for RP support or obtain PCs, or since this is an Emergency Procedure, he can complete the task and then ask for RP support.)

CUE: The hand wheel has stopped moving in the clockwise direction.

o. 9. C-882 N, ensures valve is OPEN.

The Operator ensures that the SW-119 Emergency Core Flooding Supply Root valve is OPEN.

CUE: The hand wheel has stopped moving in the counter-clockwise direction.

p. 10. C-882 N, ensures valve is OPEN.

The Operator ensures that the SW-120, Emergency Core Flooding Supply Shutoff valve is OPEN.

CUE: The hand wheel has stopped moving in the counter-clockwise direction.

q. 11. C-882 N, ensures valve is OPEN.

The Operator ensures that the SW-641, GW System Supply from SWBP A is OPEN.

CUE: The valve Operator has been turned Counter Clockwise now is pointing straight up.

Nebraska Public Power District SKL034-40-84 (18851)

Cooper Nuclear Station Page 147 of 149 Job Performance Measure for Operations Revision 03 Task Number: 200390A0501 5.3ALT-STRATEGY, Inject Fire Protection Water to RHR Performance Checklist Standards Initials

r. 12. Slowly opens FP-315.

The Operator slowly opens FP-315.

CUE: The hand wheel has stopped moving in the counter-clockwise direction and the hose is charged.

s. 13. Notifies CRS that task is completed.

The operator informs the CRS that Fire Water is aligned to the RHR System via SWBP A.

CUE: The CRS acknowledges the report.

Nebraska Public Power District SKL034-40-84 (18851)

Cooper Nuclear Station Page 148 of 149 Job Performance Measure for Operations Revision 03 Task Number: None ATTACHMENT 1 Directions to Trainee:

When I tell you to begin, you are to perform the actions to align Fire Protection to RHR Subsystem A, using SWBP A in accordance with Procedure 5.3ALT-STRATEGY. Before you start, I will state the general plant conditions, the Initiating Cues and answer any questions you may have.

If being simulated In-Plant or Control Room:

When simulating, physically point to any meters, gauges, recorders and controls you would be using. State the position of controls as you would have manipulated them in order to complete the assigned task.

If being performed in the Simulator:

During task performance, state the actions you are taking, e.g.: repositioning controls and observing instrumentation. ALL PLANT ANNOUNCEMENTS WILL BE SIMULATED!

General Conditions:

1.

The Plant has experience a total loss of A/C and D/C power.

2.

Reactor Pressure is 600 psig.

3.

Procedure 5.3ALT-STRATEGY, Alternate Core Cooling Mitigating Strategies, has been entered

4.

Another SO has completed the breaker alignments per step 1.1 Attachment 1 of 5.3ALT-STRATEGY.

5.

Fire Protection header is intact.

Initiating Cues:

The CRS has directed you to align Fire Protection Water to RHR Subsystem A using SWBP A in accordance with 5.3ALT-STRATEGY, Attachment 1. You are to inform the CRS when Fire Protection Water is aligned to RHR.

Nebraska Public Power District SKL034-40-84 (18851)

Cooper Nuclear Station Page 149 of 149 Job Performance Measure for Operations Revision 03 Task Number: None