ML19309F826: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 14: | Line 14: | ||
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, OPERATING LICENSES-APPLICATION FOR & AMENDMENTS, TEXT-LICENSE APPLICATIONS & PERMITS | | document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, OPERATING LICENSES-APPLICATION FOR & AMENDMENTS, TEXT-LICENSE APPLICATIONS & PERMITS | ||
| page count = 2 | | page count = 2 | ||
| project = | |||
| stage = Request | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:80060103841 i | ||
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION IN THE MATTER OF: | BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION IN THE MATTER OF: | ||
THE DETROIT EDISON COMPANY | THE DETROIT EDISON COMPANY Docket No. 50-341 (Enrico Fermi Atomic Power Plant Unit No. 2) | ||
AMENDMENT NO. 29 TO AMENDED AND SUBSTITUTED APPLICATION FOR LICENSES THE DETROIT EDISON COMPANY, Applicant in the above captioned proceeding, hereby files Amendment No. 29 to its Amended and Substituted Application for Licenses for the purposes of transmitting additional information requested by the Regulatory Staff, including | AMENDMENT NO. 29 TO AMENDED AND SUBSTITUTED APPLICATION FOR LICENSES THE DETROIT EDISON COMPANY, Applicant in the above captioned proceeding, hereby files Amendment No. 29 to its Amended and Substituted Application for Licenses for the purposes of transmitting additional information requested by the Regulatory Staff, including revisions to Chapters 3 and 6, and additions to Appendix E of Applicant's Final Safety Analysis Report. | ||
In accordance with NRC Procedure RPOP 514, Revision 2, Applicant is filing three (3) copies of the Sargent and Lundy report entitled, " Structural Design Assessment for Safe-end Break, Enrico Fermi Power Plant Unit 2," Report SL-3647, March 14, 1980 (Rev. 2) . | In accordance with NRC Procedure RPOP 514, Revision 2, Applicant is filing three (3) copies of the Sargent and Lundy report entitled, " Structural Design Assessment for Safe-end Break, Enrico Fermi Power Plant Unit 2," | ||
In addition, Applicant is submitting three (3) copies of the following Detroit Edison drawings which are referenced in Applicant's response to NRC Question 110.15: | Report SL-3647, March 14, 1980 (Rev. 2). | ||
In addition, Applicant is submitting three (3) copies of the following Detroit Edison drawings which are referenced in Applicant's response to NRC Question 110.15: | |||
6WM-P44-2178-1; 6WM-P44-3058-1; 6WM-P44-3567-1; 6WM-P44-3988-1; 6WM-P44-4072-1; 6WM-P44-4119-1; 6WM-P44-4305-1; 6WM-P44-4306-1: 6WM-P44-4307-1; and 6WM-P44-5100-1. | |||
4 WHEREFORE, Applicant prays as in its Amended and Substituted Application for Licenses. | 4 WHEREFORE, Applicant prays as in its Amended and Substituted Application for Licenses. | ||
THE DETROIT EDISON COMPANY | THE DETROIT EDISON COMPANY By | ||
.N. | |||
Subspribed and sworn to before me this 28th day of A ril, 1980 | rh Charles M. | ||
Heldel Executive Vice President - | |||
Operations Subspribed and sworn to before me this 28th day of A ril, 1980 | |||
My Commission expires: | /Sherrin Von Allmen 7/ Notary Public, Wayne County, MI. | ||
My Commission expires: | |||
l | 2/11/81 l | ||
l }} | |||
Latest revision as of 02:41, 2 January 2025
| ML19309F826 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 04/30/1980 |
| From: | Heidel C DETROIT EDISON CO. |
| To: | |
| Shared Package | |
| ML19309F825 | List: |
| References | |
| NUDOCS 8005010386 | |
| Download: ML19309F826 (2) | |
Text
80060103841 i
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION IN THE MATTER OF:
THE DETROIT EDISON COMPANY Docket No. 50-341 (Enrico Fermi Atomic Power Plant Unit No. 2)
AMENDMENT NO. 29 TO AMENDED AND SUBSTITUTED APPLICATION FOR LICENSES THE DETROIT EDISON COMPANY, Applicant in the above captioned proceeding, hereby files Amendment No. 29 to its Amended and Substituted Application for Licenses for the purposes of transmitting additional information requested by the Regulatory Staff, including revisions to Chapters 3 and 6, and additions to Appendix E of Applicant's Final Safety Analysis Report.
In accordance with NRC Procedure RPOP 514, Revision 2, Applicant is filing three (3) copies of the Sargent and Lundy report entitled, " Structural Design Assessment for Safe-end Break, Enrico Fermi Power Plant Unit 2,"
Report SL-3647, March 14, 1980 (Rev. 2).
In addition, Applicant is submitting three (3) copies of the following Detroit Edison drawings which are referenced in Applicant's response to NRC Question 110.15:
6WM-P44-2178-1; 6WM-P44-3058-1; 6WM-P44-3567-1; 6WM-P44-3988-1; 6WM-P44-4072-1; 6WM-P44-4119-1; 6WM-P44-4305-1; 6WM-P44-4306-1: 6WM-P44-4307-1; and 6WM-P44-5100-1.
4 WHEREFORE, Applicant prays as in its Amended and Substituted Application for Licenses.
THE DETROIT EDISON COMPANY By
.N.
rh Charles M.
Heldel Executive Vice President -
Operations Subspribed and sworn to before me this 28th day of A ril, 1980
/Sherrin Von Allmen 7/ Notary Public, Wayne County, MI.
My Commission expires:
2/11/81 l
l