{{#Wiki_filter:Tennessee Valley Authority. Post Office Box 2000, Soddy-Daisy, Tennessee 373;&
{{#Wiki_filter:Tennessee Valley Authority. Post Office Box 2000, Soddy-Daisy, Tennessee 373;&
September 15,                   2000 U.S. Nuclear Regulatory Commission ATTN:           Document Control Desk Washington, D.C. 20555 Gentlemen:
September 15, 2000 U.S. Nuclear Regulatory Commission ATTN:
In the Matter of                                                   ))            Docket Nos. 50-327 Tennessee Valley Authority                                                                    50-328 SEQUOYAH NUCLEAR PLANT                               (SQN) - UNITS 1 AND 2 - EMERGENCY         PLAN IMPLEMENTING PROCEDURE                               (EPIP) REVISIONS In accordance with the requirements of 10 CFR 50, Appendix E, Section V, the enclosure provides the following EPIP:
Document Control Desk Washington, D.C.
EPIP                        Revision                                     Title EPIP-2                                16                    Notification of Unusual Event EPIP-3                                19                    Alert EPIP-4                                19                      Site Area Emergency EPIP-5                                25                      General Emergency EPIP-7                                18                    Activation and Operation of the Operations Support Center (OSC)
20555 Gentlemen:
EPIP-14                              15                      Radiological Control Response EPIP-17                              20                      Emergency Equipment and Supplies If you have any questions concerning this matter,                                       please telephone me at (423) 843-7170 or J. D. Smith at (423) 843-6672.
In the Matter of Tennessee Valley Authority Docket Nos. 50-327 50-328 SEQUOYAH NUCLEAR PLANT (SQN)
Since:
UNITS 1 AND 2 -
V'edr'--Sdlas Licensing and Industry Affairs Manager Enclosure cc:       See page 2 pvk(
EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP) REVISIONS In accordance with the requirements of 10 CFR 50, Appendix E, Section V, the enclosure provides the following EPIP:
Revision 16 19 19 25 18 15 20 Title Notification of Unusual Event Alert Site Area Emergency General Emergency Activation and Operation of the Operations Support Center (OSC)
Radiological Control Response Emergency Equipment and Supplies If you have any telephone me at (423) 843-6672.
questions concerning this matter, please (423) 843-7170 or J.
D. Smith at Since:
V'edr'--Sdlas Licensing and Industry Affairs Manager Enclosure cc:
See page 2 pvk(
EPIP EPIP-2 EPIP-3 EPIP-4 EPIP-5 EPIP-7 EPIP-14 EPIP-17
) )


U.S. Nuclear Regulatory Commission Page 2 September 15, 2000 cc: Mr. R. W. Hernan, Project Manager (Enclosure)
U.S. Nuclear Regulatory Commission Page 2 September 15, 2000 cc:
U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector (Enclosure will be provided by Sequoyah Nuclear Plant SQN Document Control Unit) 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37384-3624 Regional Administrator (Enclosure)
Mr.
U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303-3415
R.
W. Hernan, Project Manager (Enclosure)
U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector (Enclosure will be provided by Sequoyah Nuclear Plant SQN Document Control Unit) 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37384-3624 Regional Administrator (Enclosure)
U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 Atlanta, Georgia 30303-3415


TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-2 NOTIFICATION OF UNUSUAL EVENT Revision 16 QUALITY RELATED PREPARED/PROOFREAD BY: W. P. Brooks RESPONSIBLE ORGANIZATION: Emergency Preparedness APPROVED BY: John Casey EFFECTIVE DATE: 08/31/2000 Level Of Use: Reference REVISION DESCRIPTION: Intent Change, Editorial changes,   Added steps for standardization with WBN, BFN, and Corp., Format change for ease of use. Revisions are not shown due to extent of format changes.
TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-2 NOTIFICATION OF UNUSUAL EVENT Revision 16 QUALITY RELATED PREPARED/PROOFREAD BY: W. P. Brooks RESPONSIBLE ORGANIZATION: Emergency Preparedness APPROVED BY: John Casey EFFECTIVE DATE: 08/31/2000 Level Of Use: Reference REVISION DESCRIPTION: Intent Change, Editorial changes, Added steps for standardization with WBN, BFN, and Corp., Format change for ease of use. Revisions are not shown due to extent of format changes.


Date 1.0   PURPOSE 1.1   To provide a method for timely notifications of appropriate individuals when the Shift Manager (SM) has determined by EPIP-1 that events have occurred that are classified as a NOTIFICATION OF UNUSUAL EVENT.
Date 1.0 PURPOSE 1.1 To provide a method for timely notifications of appropriate individuals when the Shift Manager (SM) has determined by EPIP-1 that events have occurred that are classified as a NOTIFICATION OF UNUSUAL EVENT.
1.2   To provide the Site Emergency Director (SED) a method for periodic reanalysis of current conditions to determine whether the NOTIFICATION OF UNUSUAL EVENT should be terminated, continued, or upgraded to a more serious classification.
1.2 To provide the Site Emergency Director (SED) a method for periodic reanalysis of current conditions to determine whether the NOTIFICATION OF UNUSUAL EVENT should be terminated, continued, or upgraded to a more serious classification.  


==2.0   REFERENCES==
==2.0 REFERENCES==
2.1 Interface Documents A.
SPP-3.5, "Regulatory Reporting Requirements" B.
EPIP-3, "Alert" C.
EPIP-4, "Site Area Emergency" D.
EPIP-5, "General Emergency" E. EPIP-10, "Medical Emergency Response" F.
EPIP-14, "Radiological Control Response" G. CECC EPIP-9, "Emergency Radiological Monitoring Procedures" H.
PHYSI-32, "Security Instructions For Members Of The Security Force".
3.0 INSTRUCTION 3.1 ACTIVATION OF THE REP Upon classifying events as a NOTIFICATION OF UNUSUAL EVENT in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SM shall:
[1]
ANNOUNCE to Operating Crew:
"A Notification of Unusual Event has been declared based on (Describe the Conditions). I will be the Site Emergency Director."
LI FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


2.1  Interface Documents A. SPP-3.5,      "Regulatory Reporting Requirements" B. EPIP-3,      "Alert" C. EPIP-4,      "Site Area Emergency" D. EPIP-5,      "General Emergency" E. EPIP-10,    "Medical Emergency Response" F. EPIP-14,    "Radiological Control Response" G. CECC EPIP-9,        "Emergency Radiological Monitoring Procedures" H. PHYSI-32, "Security Instructions For Members Of The Security Force".
Date 3.1 ACTIVATION OF THE REP (Continued)
3.0    INSTRUCTION 3.1    ACTIVATION OF THE REP Upon classifying events as a NOTIFICATION OF UNUSUAL EVENT in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SM shall:
NOTE ODS should be notified within 5 minutes after declaration of the event
[1]  ANNOUNCE to Operating Crew:
[2]
            "A Notification of Unusual Event has been declared based on (Describe the Conditions). I will be the Site Emergency Director."  LI FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
COMPLETE Notification of Unusual Event (NOUE) Notification Form (Page 6).
 
El
Date 3.1   ACTIVATION OF THE REP (Continued)
[3]
NOTE     ODS should be notified within 5 minutes after declaration of the event
NOTIFY ODS.
[2]   COMPLETE Notification of Unusual Event (NOUE) Notification Form (Page 6).                                                       El
[a]
[3]   NOTIFY ODS.
CALL ODS.
[a]   CALL ODS.
IRindown Line or r 5-751-1700 or 1 5-751-2495I or 1 9-785-1700 Initial Time
IRindown Line or r 5-751-1700 or 1 5-751-2495I or 1 9-785-1700 Initial Time
[b]
[b]   READ completed Form (Page 6) to ODS.                           3l
READ completed Form (Page 6) to ODS.
[c]   FAX ODS NOUE Notification Form (Page 6).                       El 15-751-8620 FAX     1
3l
[4]   IF ODS CANNOT be contacted within 10 minutes of the declaration, THEN
[c]
[a]   NOTIFY Tennessee Emergency Management Agency (TEMA).
FAX ODS NOUE Notification Form (Page 6).
S00-262-3             or   196741-0001       or 1888-616-8091 (satellite)
El 15-751-8620 FAX 1
Initial Time
[4]
[b]   READ completed Form (page 6) to TEMA.                           D
IF ODS CANNOT be contacted within 10 minutes of the declaration, THEN
[c]   FAX TEMA NOUE Notification Form (Page 6).                       II 9-1-615-242-9635 FAX
[a]
[5] ANNOUNCE to plant personnel:
NOTIFY Tennessee Emergency Management Agency (TEMA).
            "ATTENTION PLANT PERSONNEL. ATTENTION PLANT PERSONNEL.
S00-262-3 or 196741-0001 or 1888-616-8091 (satellite)
A NOTIFICATION OF UNUSUAL EVENT HAS BEEN DECLARED BASED ON (Describethe Conditions), AFFECTING UNIT(s)                   "    []
Initial Time
REPEAT Announcement.                                               El
[b]
[6] IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."                     []
READ completed Form (page 6) to TEMA.
D
[c]
FAX TEMA NOUE Notification Form (Page 6).
II 9-1-615-242-9635 FAX
[5] ANNOUNCE to plant personnel:  
"ATTENTION PLANT PERSONNEL. ATTENTION PLANT PERSONNEL.
A NOTIFICATION OF UNUSUAL EVENT HAS BEEN DECLARED BASED ON (Describe the Conditions), AFFECTING UNIT(s)
[]
REPEAT Announcement.
El
[6] IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."
[]
FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


Date 3.1   ACTIVATION OF THE REP (Continued)
Date 3.1 ACTIVATION OF THE REP (Continued)
[7]   MONITOR radiation monitors.
[7]
MONITOR radiation monitors.
IF radiation monitors indicate unplanned radiological release, THEN
IF radiation monitors indicate unplanned radiological release, THEN
[a] NOTIFY RADCON Shift Supervisor to EVALUATE implementation of CECC EPIP-9, "Emergency Radiological Monitoring Procedures" and EPIP-14, "Radiological Control Response."
[a] NOTIFY RADCON Shift Supervisor to EVALUATE implementation of CECC EPIP-9, "Emergency Radiological Monitoring Procedures" and EPIP-14, "Radiological Control Response."
[b] PERFORM Dose Assessment.
[b] PERFORM Dose Assessment.
NOTIFY Chemistry Shift Supervisor to perform a dose assessment using EPIP-14.
NOTIFY Chemistry Shift Supervisor to perform a dose assessment using EPIP-14.
r 7285 Lai       or r6348 L       or FPager 350-40732
r 7285 Lai or r6348 L or FPager 350-40732
[c] REFER to EPIP-1, Radiological Effluents Section, AND EVALUATE need for additional classifications.                   El
[c] REFER to EPIP-1, Radiological Effluents Section, AND EVALUATE need for additional classifications.
[8] IF there is a security threat, THEN NOTIFY Security Shift Supervisor to implement PHYSI-32,"Security Instructions For Members Of The Security Force."                         []
El
[8] IF there is a security threat, THEN NOTIFY Security Shift Supervisor to implement PHYSI-32,"Security Instructions For Members Of The Security Force."
[]
61or5
61or5
[9] NOTIFY Plant Management in accordance with SPP-3.5 AND PROVIDE NOUE Notification information.                                   El NOTE I     NRC notification should be made as soon as practicable, but within 1 hour of "NOTIFICATION OF UNUSUAL EVENT" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.
[9] NOTIFY Plant Management in accordance with SPP-3.5 AND PROVIDE NOUE Notification information.
NOTE 2     Do not dial "1" prior to the number when using ENS phones.
El NOTE I NRC notification should be made as soon as practicable, but within 1 hour of "NOTIFICATION OF UNUSUAL EVENT" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.
NOTE 2 Do not dial "1" prior to the number when using ENS phones.
[10] NOTIFY NRC of plan activation via ENS in accordance with SPP-3.5.
[10] NOTIFY NRC of plan activation via ENS in accordance with SPP-3.5.
r(301) 816-5100 (Main)         (301) 951-0550 (Backup)   9-1-(301) 816-5151 (Fax)
r(301) 816-5100 (Main)
(301) 951-0550 (Backup) 9-1-(301) 816-5151 (Fax)
Initial Time FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
Initial Time FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


Date 3.1     ACTIVATION OF THE REP (Continued)
Date 3.1 ACTIVATION OF THE REP (Continued)
[11] NOTIFY Site Emergency Preparedness as soon as practicable when notification does not interfere with emergency actions or notifications in progress.                         LI John Casey         Work 8     =-7658     Pager 350-20372           Car 9-280-6616 Bill Peggram      Work 843-83601         Pager 350-30388         Home 9-842-3020
[11] NOTIFY Site Emergency Preparedness as soon as practicable when notification does not interfere with emergency actions or notifications in progress.
John Casey Bill Peggram Work 8  
=-7658 Pager 350-20372 Work 843-83601 Pager 350-30388 Car 9-280-6616 Home 9-842-3020
[12] MONITOR plant conditions AND EVALUATE using EPIP-1, AND
[12] MONITOR plant conditions AND EVALUATE using EPIP-1, AND
[a]   IF plant conditions warrant, THEN UPGRADE to a higher classification AND INITIATE EPIP-3 or EPIP-4 or EPIP-5.                                   LI
[a]
[b]   IF additional conditions satisfy criteria of other NOUE's OR Conditions warrant a need for follow-up information, THEN COMPLETE NOUE Follow-up Form (page 7), AND REPORT to ODS for State notification at:
IF plant conditions warrant, THEN UPGRADE to a higher classification AND INITIATE EPIP-3 or EPIP-4 or EPIP-5.
or F9-785-17001 Ringdown Line     or 15-751-1700 1 or       5-71-249 AND FAX ODS NOUE Follow-up Form (Page 7).             15- 51-8620 FAX I OR-
[b]
[c]   TERMINATE emergency, when situation no longer exists, by informing ODS and Duty Plant Manager             AND COMPLETE NOUE Follow-up Form (Page 7) with Time and Date Event Terminated and FAX to ODS.                         LI END OF SECTION I FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
IF additional conditions satisfy criteria of other NOUE's OR Conditions warrant a need for follow-up information, THEN COMPLETE NOUE Follow-up Form (page 7), AND REPORT to ODS for State notification at:
Ringdown Line or 15-751-1700 1 or 5-71-249 AND FAX ODS NOUE Follow-up Form (Page 7).
15-OR-or F9-785-17001 51-8620 FAX I
[c]
TERMINATE emergency, when situation no longer exists, by informing ODS and Duty Plant Manager AND COMPLETE NOUE Follow-up Form (Page 7) with Time and Date Event Terminated and FAX to ODS.
END OF SECTION I FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN LI LI LI


NOTIFICATION OF UNUSUAL EVENT NOTIFICATION FORM
NOTIFICATION OF UNUSUAL EVENT NOTIFICATION FORM
: 1. 0] THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.
: 1. 0] THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.
OR El THIS IS A DRILL. THIS IS A DRILL.
OR El THIS IS A DRILL. THIS IS A DRILL.
: 2. This is                           at Sequoyah Nuclear Plant.
: 2. This is at Sequoyah Nuclear Plant.
(Your Name)
(Your Name)
: 3. There has been a NOTIFICATION OF UNUSUAL EVENT declared at Sequoyah Nuclear Plant.
: 3. There has been a NOTIFICATION OF UNUSUAL EVENT declared at Sequoyah Nuclear Plant.
Affecting           LI Unit 1   OR     El Unit 2   OR       El Both Units 1 & 2
Affecting LI Unit 1 OR El Unit 2 OR El Both Units 1 & 2
: 4. EAL Designator:
: 4. EAL Designator:
: 5. Brief Description of Event
: 5. Brief Description of Event
: 6. Plant conditions are:             LI Stable     17 Deteriorating
: 6. Plant conditions are:
LI Stable 17 Deteriorating
: 7. Radiological Conditions are:
: 7. Radiological Conditions are:
[] No Abnormal Release Off-site
[] No Abnormal Release Off-site
[] Airborne Release Off-site LI Liquid Release Off-site F1 Release Information Not Known
[] Airborne Release Off-site LI Liquid Release Off-site F1 Release Information Not Known
: 8. Event Declared: Time:                               Date:
: 8. Event Declared: Time:
: 9. Event Terminated: Time:                             Date:
Date:
: 9. Event Terminated: Time:
Date:
: 10. Protective Action Recommendation: L7 None at This Time.
: 10. Protective Action Recommendation: L7 None at This Time.
: 11. "Please Repeat the Information You Have Received to Ensure Accuracy."               13 FAX TO THE ODS AT 751-8620 AFTER COMPLETING THE NOTIFICATION FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
: 11. "Please Repeat the Information You Have Received to Ensure Accuracy."
13 FAX TO THE ODS AT 751-8620 AFTER COMPLETING THE NOTIFICATION FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


NOTIFICATION OF UNUSAL EVENT FOLLOW-UP FORM
NOTIFICATION OF UNUSAL EVENT FOLLOW-UP FORM
: 1. 0] THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.
: 1. 0] THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.
OR El THIS IS A DRILL. THIS IS A DRILL.
OR El THIS IS A DRILL. THIS IS A DRILL.
: 2. This is                               at Sequoyah Nuclear Plant.
: 2. This is at Sequoyah Nuclear Plant.
(Your Name)
(Your Name)
: 3. This is Follow-up Information Regarding the NOTIFICATION OF UNUSUAL EVENT declared at Sequoyah Nuclear Plant.
: 3. This is Follow-up Information Regarding the NOTIFICATION OF UNUSUAL EVENT declared at Sequoyah Nuclear Plant.
Affecting           El Unit 1   OR     El Unit 2   OR       1l Both Units 1 & 2
Affecting El Unit 1 OR El Unit 2 OR 1l Both Units 1 & 2
: 4. Reactor             Unit I         El Shutdown         El At Power Unit 2         El Shutdown         El At Power
: 4.
: 5. Plant conditions are:           13 Stable     E3 Deteriorating
: 5.
: 6. Additional EAL Designator (s):
: 6.
: 7. The Following Significant Changes in Plant Conditions Have Occurred:
7.
Reactor Unit I El Shutdown El At Power Unit 2 El Shutdown El At Power Plant conditions are:
13 Stable E3 Deteriorating Additional EAL Designator (s):
The Following Significant Changes in Plant Conditions Have Occurred:
: 8. The Following Significant Changes in Radiological Conditions Have Occurred:
: 8. The Following Significant Changes in Radiological Conditions Have Occurred:
: 9. Protective Action Recommendation: El None at This Time
: 9. Protective Action Recommendation: El None at This Time
: 10. Event Terminated:         Time:                           Date:
: 10. Event Terminated:
: 11. "Please Repeat the Information You Have Received to Ensure Accuracy."                 LI
Time:
: 12. Name                                     Date                   Time (Preparer's Name)
Date:
: 13. FAX TO THE ODS AT 751-8620 AFTER COMPLETING THE NOTIFICATION                       .ll FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
: 11. "Please Repeat the Information You Have Received to Ensure Accuracy."
LI
: 12. Name Date Time (Preparer's Name)
: 13. FAX TO THE ODS AT 751-8620 AFTER COMPLETING THE NOTIFICATION  
.ll FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-3 ALERT Revision 19 QUALITY RELATED PREPARED/PROOFREAD BY:               W. P. Brooks RESPONSIBLE ORGANIZATION: Emergqency Preparedness APPROVED BY:       John H. Casey EFFECTIVE DATE: 8/31/2000 Level of Use: Reference REVISION DESCRIPTION:       Intent Change, Editorial changes, Added steps for standardization with WBN, BFN, and Corp., Format change for ease of use. Revisions not shown due to extent of format changes.
TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-3 ALERT Revision 19 QUALITY RELATED PREPARED/PROOFREAD BY:
W. P. Brooks RESPONSIBLE ORGANIZATION: Emergqency Preparedness APPROVED BY:
John H. Casey EFFECTIVE DATE: 8/31/2000 Level of Use: Reference REVISION DESCRIPTION:
Intent Change, Editorial changes, Added steps for standardization with WBN, BFN, and Corp., Format change for ease of use. Revisions not shown due to extent of format changes.


Date 1.0   PURPOSE 1.1   To provide a method for timely notifications of appropriate individuals when the Shift Manager (SM)/Site Emergency Director (SED) has determined by EPIP-1 that events have occurred that are classified as a ALERT.
Date 1.0 PURPOSE 1.1 To provide a method for timely notifications of appropriate individuals when the Shift Manager (SM)/Site Emergency Director (SED) has determined by EPIP-1 that events have occurred that are classified as a ALERT.
1.2   To provide the Site Emergency Director (SED) a method for periodic reanalysis of current conditions to determine whether the ALERT should be terminated, continued, or upgraded to a more serious classification.
1.2 To provide the Site Emergency Director (SED) a method for periodic reanalysis of current conditions to determine whether the ALERT should be terminated, continued, or upgraded to a more serious classification.  


==2.0     REFERENCES==
==2.0 REFERENCES==
 
2.1 Interface Documents A.
2.1     Interface Documents A. SPP-3.5,         "Regulatory Reporting Requirements" B. EPIP-4,           "Site Area Emergency" C. EPIP-5,           "General Emergency" D. EPIP-6,           "Activation and Operation Of The Technical Support Center" E. EPIP-7            "Activation and Operation of the Operations Support Center (OSC)"
SPP-3.5, B.
F. EPIP-8,            "Personnel Accountability And Evacuation" G. EPIP-10,          "Medical Emergency Response" H. EPIP-14,          "Radiological Control Response" I. EPIP-16,          "Termination And Recovery" J. CECC EPIP-9,      "Emergency Environmental Radiological Monitoring Procedures" K. PHYSI-32,          "Security Instructions For Members Of The Security Force".
EPIP-4, C.
EPIP-5, D.
EPIP-6, E.
EPIP-7 F.
EPIP-8, G.
EPIP-10, H.
EPIP-14, I.
EPIP-16, J.
CECC EPIP-9, K.
PHYSI-32, "Regulatory Reporting Requirements" "Site Area Emergency" "General Emergency" "Activation and Operation Of The Technical Support Center" "Activation and Operation of the Operations Support Center (OSC)"  
"Personnel Accountability And Evacuation" "Medical Emergency Response" "Radiological Control Response" "Termination And Recovery" "Emergency Environmental Radiological Monitoring Procedures" "Security Instructions For Members Of The Security Force".
3.0 INSTRUCTION
3.0 INSTRUCTION
[1]   IF TSC is NOT STAFFED, THEN GO TO Section 3.1. (Page 3)                                             0
[1]
[2]   IF TSC is OPERATIONAL, (SED transferred to TSC), THEN GO TO Section 3.2. (Page 7).                                           El FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SON
IF TSC is NOT STAFFED, THEN GO TO Section 3.1. (Page 3)
[2]
IF TSC is OPERATIONAL, (SED transferred to TSC), THEN GO TO Section 3.2. (Page 7).
FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SON 0
El


Date 3.1 ACTIVATION OF THE REP BY SM Upon classifying events as an ALERT in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SM shall:
Date 3.1 ACTIVATION OF THE REP BY SM Upon classifying events as an ALERT in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SM shall:
[1]     ANNOUNCE to Operating Crew:
[1]
                "An ALERT has been declared based on (Describethe Conditions).
ANNOUNCE to Operating Crew:  
I will be the Site Emergency Director."                                       El
"An ALERT has been declared based on (Describe the Conditions).
[2]     ACTIVATE Emergency Paging System (EPS), THEN                                   El (SM may delegate these tasks to Operations Clerk if available.
I will be the Site Emergency Director."
El
[2]
ACTIVATE Emergency Paging System (EPS), THEN El (SM may delegate these tasks to Operations Clerk if available.
MSS also may be used if necessary.)
MSS also may be used if necessary.)
[a]         CONFIRM response by reviewing 20 minute printed report available in the TSC.                                       El
[a]
[b]         CALL personnel to staff unanswered positions (Use REP Duty Roster and Call List).                               El
CONFIRM response by reviewing 20 minute printed report available in the TSC.
[3]     IF EPS fails, THEN
El
[a]       CALL Operation Duty Specialist (ODS) AT:
[b]
Ringdown Line       or   5-71700-          or r5-751-             orl 9-785-1700 AND DIRECT ODS to activate EPS.                                         El
CALL personnel to staff unanswered positions (Use REP Duty Roster and Call List).
[b]       IF EPS still will not activate, THEN (SM may delegate these tasks to Operations Clerk ifavailable.
El
[3]
IF EPS fails, THEN
[a]
CALL Operation Duty Specialist (ODS) AT:
Ringdown Line or 5-71700 or r5-751-orl 9-785-1700 AND DIRECT ODS to activate EPS.
El
[b]
IF EPS still will not activate, THEN (SM may delegate these tasks to Operations Clerk if available.
MSS also may be used if necessary.)
MSS also may be used if necessary.)
CALL personnel to staff TSC/OSC positions (Use REP Duty Roster and Call List).                               D
CALL personnel to staff TSC/OSC positions (Use REP Duty Roster and Call List).
[4]     ANNOUNCE to plant personnel:
D
                    "ATTENTION PLANT PERSONNEL. ATTENTION PLANT PERSONNEL. AN ALERT HAS BEEN DECLARED BASED ON (Describethe condition), AFFECTING UNIT(s)
[4]
ALL TSC AND OSC PERSONNEL REPORT TO THE EMERGENCY FACILITIES IMMEDIATELY."                                             El REPEAT Announcement.
ANNOUNCE to plant personnel:  
OPS 41-SQN FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS,
"ATTENTION PLANT PERSONNEL. ATTENTION PLANT PERSONNEL. AN ALERT HAS BEEN DECLARED BASED ON (Describe the condition), AFFECTING UNIT(s)
ALL TSC AND OSC PERSONNEL REPORT TO THE EMERGENCY FACILITIES IMMEDIATELY."
El REPEAT Announcement.
FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


Date 3.1 ACTIVATION OF THE REP BY SM (Continued)
Date 3.1 ACTIVATION OF THE REP BY SM (Continued)
NOTE If plant conditions do not warrant personnel accountability at this time, continue to assess the situation and re-evaluate the need for accountability.
NOTE If plant conditions do not warrant personnel accountability at this time, continue to assess the situation and re-evaluate the need for accountability.
[5]     MONITOR plant conditions, WHEN plant conditions warrant, THEN
[5]
MONITOR plant conditions, WHEN plant conditions warrant, THEN
[a] NOTIFY Security Shift Supervisor to implement EPIP-8, "Personnel Accountability and Evacuation."
[a] NOTIFY Security Shift Supervisor to implement EPIP-8, "Personnel Accountability and Evacuation."
Wor               1 6568                               El
Wor 1 6568 El
[b] ACTIVATE emergency sirens for personnel assembly.                                       Initial Time NOTE     ODS should be notified within 5 minutes after declaration of the event.
[b] ACTIVATE emergency sirens for personnel assembly.
[6] COMPLETE ALERT Notification Form (Page 10).                               II
Initial Time NOTE ODS should be notified within 5 minutes after declaration of the event.
[7]   NOTIFY ODS.
[6]
COMPLETE ALERT Notification Form (Page 10).
II
[7]
NOTIFY ODS.
[a] CALL ODS.
[a] CALL ODS.
Ringdown Line], or 5j-751-1700     or 15-751-249:5   or   j 9-785-17001 Initial Time
Ringdown Line], or 5j-751-1700 or 15-751-249:5 or j 9-785-17001 Initial Time
[b] READ completed Form (Page 10) to ODS.                             i]
[b] READ completed Form (Page 10) to ODS.
[c] FAX ODS ALERT Notification Form (Page 10).                         []
i]
I 5-751-8620 FAX]
[c] FAX ODS ALERT Notification Form (Page 10).
[8] IF ODS CANNOT be contacted within 10 minutes of the declaration, THEN
[]
I 5-751-8620 FAX]
[8]
IF ODS CANNOT be contacted within 10 minutes of the declaration, THEN
[a] NOTIFY Tennessee Emergency Management Agency (TEMA).
[a] NOTIFY Tennessee Emergency Management Agency (TEMA).
8                   or 19-1615-741-0001     or   888-616-8091 (satellite)
8 or 19-1615-741-0001 or 888-616-8091 (satellite)
Initial Time
Initial Time
[b] READ completed Form (Page 10) to TEMA.                             il
[b] READ completed Form (Page 10) to TEMA.
[c] FAX TEMA ALERT Notification Form (Page 10).                       El I 9-1-615-242-9635 FAX I OPS 41-SQN FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS,
il
[c] FAX TEMA ALERT Notification Form (Page 10).
El I 9-1-615-242-9635 FAX I FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


Date 3.1   ACTIVATION OF THE REP BY SM (Continued)
Date 3.1 ACTIVATION OF THE REP BY SM (Continued)
[9]   NOTIFY RADCON Shift Supervisor,
[9]
[a] STATE "AN ALERT HAS BEEN DECLARED, BASED UPON (Describe the conditions), AFFECTING UNIT(s)       3l"
NOTIFY RADCON Shift Supervisor,
[b] DIRECT to implement EPIP-1 4, "Radiological Control Response."                                                   El
[a] STATE "AN ALERT HAS BEEN DECLARED, BASED UPON (Describe the conditions), AFFECTING UNIT(s) l" 3
[c] IF radiation monitors indicate unplanned radiological release, THEN DIRECT to EVALUATE implementation of CECC EPIP-9, "Emergency Radiological Monitoring Procedures."               []
[b] DIRECT to implement EPIP-1 4, "Radiological Control Response."
El
[c] IF radiation monitors indicate unplanned radiological release, THEN DIRECT to EVALUATE implementation of CECC EPIP-9, "Emergency Radiological Monitoring Procedures."
[]
[10] NOTIFY Chemistry Shift Supervisor,
[10] NOTIFY Chemistry Shift Supervisor,
[a] STATE: "AN ALERT HAS BEEN DECLARED, BASED UPON (Describethe conditions), AFFECTING UNIT(s) -     ."290 7285 La~b     or   3   Lab     or [Pager 350-40732
[a] STATE: "AN ALERT HAS BEEN DECLARED, BASED UPON (Describe the conditions), AFFECTING UNIT(s) -
[b] DIRECT to implement EPIP-14.                                   El
."290 7285 La~b or 3
Lab or [Pager 350-40732
[b] DIRECT to implement EPIP-14.
El
[11] MONITOR radiation monitors.
[11] MONITOR radiation monitors.
WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment.
WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment.
[a] NOTIFY Chemistry Shift Supervisor to perform a dose assessment using EPIP-14.                                     El r7285           or   6348ab       or [Pager 350-40 7 32
[a] NOTIFY Chemistry Shift Supervisor to perform a dose assessment using EPIP-14.
[b] REFER to EPIP-1, Radiological Effluents Section, AND EVALUATE need for additional classifications.                 El
El r7285 or 6348ab or [Pager 350-40 7 32
[12] IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."                       El
[b] REFER to EPIP-1, Radiological Effluents Section, AND EVALUATE need for additional classifications.
[13] IF there is a security threat, THEN NOTIFY Security Shift Supervisor to implement PHYSI-32, "Security Instructions For Members Of The Security Force" 164         or     16 FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
El
[12] IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."
El
[13] IF there is a security threat, THEN NOTIFY Security Shift Supervisor to implement PHYSI-32, "Security Instructions For Members Of The Security Force" 164 or 16 FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


Date 3.1   ACTIVATION OF THE REP BY SM (Continued)
Date 3.1 ACTIVATION OF THE REP BY SM (Continued)
[14] NOTIFY Plant Management in accordance with SPP-3.5 AND PROVIDE ALERT Notification Information.                                         El NOTE 1 NRC notification should be made as soon as practicable, but within 1 hour of "ALERT" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.
[14] NOTIFY Plant Management in accordance with SPP-3.5 AND PROVIDE ALERT Notification Information.
El NOTE 1 NRC notification should be made as soon as practicable, but within 1 hour of "ALERT" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.
NOTE 2 Do not dial "1" prior to the number when using ENS phones.
NOTE 2 Do not dial "1" prior to the number when using ENS phones.
[15] NOTIFY NRC of plan activation via ENS in accordance with SPP-3.5.
[15] NOTIFY NRC of plan activation via ENS in accordance with SPP-3.5.
(301) 816-510     ainI       (301) 951-0550 (Backup)       9-1-(301) 816-5151 (Fax)i Initial   Time
(301) 816-510 ainI (301) 951-0550 (Backup) 9-1-(301) 816-5151 (Fax)i Initial Time
[16] MONITOR plant conditions AND EVALUATE using EPIP-1 until TSC is staffed, AND
[16] MONITOR plant conditions AND EVALUATE using EPIP-1 until TSC is staffed, AND
[a] IF plant conditions warrant, THEN UPGRADE to a higher classification AND INITIATE EPIP-4 or EPIP-5.                                                 El
[a]
[b] IF additional conditions satisfy criteria of other ALERT's OR Conditions warrant a need for follow-up information, THEN COMPLETE ALERT Follow-up Form (Page 11), AND REPORT to ODS for State notification at:
IF plant conditions warrant, THEN UPGRADE to a higher classification AND INITIATE EPIP-4 or EPIP-5.
[Ringdown Line       or F5-751-17001   or P-751-24951           or   9-785-17001 AND FAX ODS ALERT Follow-up Form (Page 11). 15-751-8620 FAX I END OF SECTON FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
El
[b] IF additional conditions satisfy criteria of other ALERT's OR Conditions warrant a need for follow-up information, THEN COMPLETE ALERT Follow-up Form (Page 11),
AND REPORT to ODS for State notification at:
[Ringdown Line or F5-751-17001 or P-751-24951 or 9-785-17001 AND FAX ODS ALERT Follow-up Form (Page 11). 15-751-8620 FAX I END OF SECTON FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


Date 3.2 ACTIVATION OF THE REP BY TSC Upon classifying events as a ALERT in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SED shall:
Date 3.2 ACTIVATION OF THE REP BY TSC Upon classifying events as a ALERT in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SED shall:
NOTE If plant conditions do not warrant personnel accountability at this time, continue to assess the situation and re-evaluate the need for accountability.
NOTE If plant conditions do not warrant personnel accountability at this time, continue to assess the situation and re-evaluate the need for accountability.
[1]     MONITOR plant conditions, IF plant conditions warrant, THEN
[1]
[a] DIRECT TSC Security Manager or Security Shift Supervisor to implement EPIP-8, "Personnel Accountability and Evacuation."       El
MONITOR plant conditions, IF plant conditions warrant, THEN
                        ~3~flor
[a] DIRECT TSC Security Manager or Security Shift Supervisor to implement EPIP-8, "Personnel Accountability and Evacuation."
El  
~3~flor
[b] DIRECT SM to ACTIVATE emergency sirens for personnel assembly.
[b] DIRECT SM to ACTIVATE emergency sirens for personnel assembly.
Initial   Time
Initial Time
[2] IF ALERT Classification has been declared by SM, THEN GO TO Step [6]     OR appropriate Step based on SM turnover.             El NOTE ODS should be notified within 5 minutes after declaration of the event.
[2] IF ALERT Classification has been declared by SM, THEN GO TO Step [6]
[3] COMPLETE ALERT Notification Form (Page 10).                             LI
OR appropriate Step based on SM turnover.
[4] NOTIFY ODS.
El NOTE ODS should be notified within 5 minutes after declaration of the event.
[3]
COMPLETE ALERT Notification Form (Page 10).
LI
[4]
NOTIFY ODS.
[a] CALL ODS.
[a] CALL ODS.
5           I or     575-2           or         -1700 Initial Time
5 I or 575-2 or  
[b] READ completed Form (Page 10) to ODS.                                 LI
-1700 Initial Time
[c] FAX ODS ALERT Notification Form (Page 10).                           LI 5-751-8620 FAX     I 41-SON FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS
[b] READ completed Form (Page 10) to ODS.
LI
[c] FAX ODS ALERT Notification Form (Page 10).
LI 5-751-8620 FAX I
FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SON


Date 3.2   ACTIVATION OF THE REP BY TSC (Continued)
Date 3.2 ACTIVATION OF THE REP BY TSC (Continued)
[5] IF ODS CANNOT be contacted within 10 minutes of the declaration, THEN
[5]
[a] NOTIFY Tennessee Emergency Management Agency (TEMA).
IF ODS CANNOT be contacted within 10 minutes of the declaration, THEN
or 19-1-615-741-0001 1 or   888-616-8091 (satellite)I
[a]
[j9-1-800-262-330 Initial Time
NOTIFY Tennessee Emergency Management Agency (TEMA).
[b] READ completed Form (Page 10) to TEMA.
[j9-1-800-262-330 or 1 9-1-615-741-0001 1 or 888-616-8091 (satellite)I Initial Time
[c]   FAX TEMA ALERT Notification Form (Page 10).                       II 1 9-1-615-242-9635 FAX I NOTE The Dose Assessment function is transferred to the CECC once they are staffed.
[b]
[6]   MONITOR radiation monitors.
READ completed Form (Page 10) to TEMA.
[c]
FAX TEMA ALERT Notification Form (Page 10).
II 1 9-1-615-242-9635 FAX I NOTE The Dose Assessment function is transferred to the CECC once they are staffed.
[6]
MONITOR radiation monitors.
WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment.
WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment.
[a] DIRECT TSC Chemistry Manager or Chemistry Shift Supervisor to perform a dose assessment using EPIP-14, "Radiological Control Response".                         El 7285 Lab]     or F6348 Lab   or I Pager 350-40732
[a]
[b] DIRECT TSC RADCON Manager to evaluate need to implement CECC EPIP-9 "Emergency Radiological Monitoring Procedures."                                           El
DIRECT TSC Chemistry Manager or Chemistry Shift Supervisor to perform a dose assessment using EPIP-14, "Radiological Control Response".
[c] REFER to EPIP-1, Radiological Effluents Section, AND EVALUATE need for additional classifications.                     El
El 7285 Lab]
[7] IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."                           El
or F6348 Lab or I Pager 350-40732
[8] IF there is a security threat, THEN DIRECT TSC Security Manager or Security Shift Supervisor to implement PHYSI-32,"Security Instructions For Members Of The Security Force."                                                   El or       6568 FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
[b]
DIRECT TSC RADCON Manager to evaluate need to implement CECC EPIP-9 "Emergency Radiological Monitoring Procedures."
El
[c]
REFER to EPIP-1, Radiological Effluents Section, AND EVALUATE need for additional classifications.
El
[7]
IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."
El
[8]
IF there is a security threat, THEN DIRECT TSC Security Manager or Security Shift Supervisor to implement PHYSI-32,"Security Instructions For Members Of The Security Force."
El or 6568 FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


Date 3.2 ACTIVATION OF THE REP BY TSC               (Continued) within 1 hour of NOTE 1 NRC notification should be made as soon as practicable, but "ALERT" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.
Date 3.2 ACTIVATION OF THE REP BY TSC (Continued)
NOTE 1 NRC notification should be made as soon as practicable, but within 1 hour of "ALERT" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.
NOTE 2 Do not dial "1" prior to the number when using ENS phones.
NOTE 2 Do not dial "1" prior to the number when using ENS phones.
[9] ENSURE NRC has been notified of plan activation via ENS in accordance with SPP-3.5.
[9] ENSURE NRC has been notified of plan activation via ENS in accordance with SPP-3.5.
(301) 816-5100 (Main)I     (301) 951-0550 (Backup)         9-301)86-51(ax~I Initial     Time
(301) 816-5100 (Main)I (301) 951-0550 (Backup) 9-301)86-51(ax~I Initial Time
[10] MONITOR plant conditions AND EVALUATE using EPIP-1, AND
[10] MONITOR plant conditions AND EVALUATE using EPIP-1, AND
[a] IF plant conditions warrant, THEN UPGRADE to a higher classification, AND INITIATE EPIP-4 or EPIP-5.                                                       El
[a] IF plant conditions warrant, THEN UPGRADE to a higher classification, AND INITIATE EPIP-4 or EPIP-5.
[b]   IF additional conditions satisfy criteria of other ALERT's OR Conditions warrant a need for follow-up information, THEN COMPLETE ALERT Follow-up Form (Page 11), AND REPORT to CECC Director for State notification at:
El
RingdownLine       or     5-751-1614       or       5-751"1680 AND FAX CECC ALERT Follow-up Form (Page 11)               5-751-1682 FAXI OR
[b]
[c] IF situation no longer exists, THEN TERMINATE emergency per EPIP-16, "Termination and Recovery," AND                                                             0 COMPLETE ALERT Follow-up Form (Page 11) including Time and Date Event Terminated and FAX to CECC.                                 []
IF additional conditions satisfy criteria of other ALERT's OR Conditions warrant a need for follow-up information, THEN COMPLETE ALERT Follow-up Form (Page 11), AND REPORT to CECC Director for State notification at:
RingdownLine or 5-751-1614 or 5-751"1680 AND FAX CECC ALERT Follow-up Form (Page 11) 5-751-1682 FAXI OR
[c] IF situation no longer exists, THEN TERMINATE emergency per EPIP-16, "Termination and Recovery," AND 0
COMPLETE ALERT Follow-up Form (Page 11) including Time and Date Event Terminated and FAX to CECC.
[]
1 END OF SECTION FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
1 END OF SECTION FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


Line 242: Line 387:
: 1. 03 THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.
: 1. 03 THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.
OR 13 THIS IS A DRILL. THIS IS A DRILL.
OR 13 THIS IS A DRILL. THIS IS A DRILL.
: 2. This is                             at Sequoyah Nuclear Plant.
: 2. This is at Sequoyah Nuclear Plant.
(Your Name)
(Your Name)
: 3. There has been a ALERT declared at Sequoyah Nuclear Plant.
: 3. There has been a ALERT declared at Sequoyah Nuclear Plant.
Affecting   17 Unit 1       OR     E3 Unit 2   OR       E3 Both Units 1 & 2
Affecting 17 Unit 1 OR E3 Unit 2 OR E3 Both Units 1 & 2
: 4. EAL Designator:
: 4.
: 5. Brief Description of Event
EAL Designator:
: 6. Plant conditions are:         E3 Stable     E3 Deteriorating
: 5.
Brief Description of Event
: 6. Plant conditions are:
E3 Stable E3 Deteriorating
: 7. Radiological Conditions are:
: 7. Radiological Conditions are:
1] No Abnormal Release Off-site
1] No Abnormal Release Off-site  
                      -1Airborne Release Off-site El Liquid Release Off-site
-1 Airborne Release Off-site El Liquid Release Off-site  
                      -1Release Information Not Known
-1 Release Information Not Known
: 8. Event Declared: Time:                                         Date:
: 8.
: 9. Event Terminated: Time:                                     Date:
: 9.
: 10. Protective Action Recommendation: 17 None at This Time.
: 10.
: 11. "Please Repeat the Information You Have Received to Ensure Accuracy."         E3 FAX TO THE ODS AT 751-8620 AFTER COMPLETING THE NOTIFICATION FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SON
11.
Event Declared: Time:
Date:
Event Terminated: Time:
Date:
Protective Action Recommendation:
17 None at This Time.  
"Please Repeat the Information You Have Received to Ensure Accuracy."
E3 FAX TO THE ODS AT 751-8620 AFTER COMPLETING THE NOTIFICATION FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SON


EPIP-3 SQN                               ALERT                           Rev. 19 Page 11 of 11 ALERT FOLLOW-UP FORM
EPIP-3 SQN ALERT Rev. 19 Page 11 of 11 ALERT FOLLOW-UP FORM
: 1. 0 THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.
: 1. 0 THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.
OR El THIS IS A DRILL. THIS IS A DRILL.
OR El THIS IS A DRILL. THIS IS A DRILL.
: 2. This is                                   at Sequoyah Nuclear Plant.
: 2. This is at Sequoyah Nuclear Plant.
(Your Name)
(Your Name)
: 3. This is Follow-Up Information Regarding the ALERT declared at Sequoyah Nuclear Plant Affecting   0I Unit 1       OR     LI Unit 2     OR       El Both Units 1 & 2
: 3. This is Follow-Up Information Regarding the ALERT declared at Sequoyah Nuclear Plant Affecting 0I Unit 1 OR LI Unit 2 OR El Both Units 1 & 2
: 4. Reactor                 Unit 1 El Shutdown         EL At Power Unit 2 El Shutdown         El At Power
: 4. Reactor Unit 1 El Shutdown EL At Power Unit 2 El Shutdown El At Power
: 5. Plant conditions are:         El Stable     LI Deteriorating
: 5. Plant conditions are:
El Stable LI Deteriorating
: 6. Additional EAL Designator (s):
: 6. Additional EAL Designator (s):
: 7. Site Assembly and Accountability is on going. El YES             El NO OR EL COMPLETED
: 7. Site Assembly and Accountability is on going. El YES El NO OR EL COMPLETED
: 8. The Following Significant Changes in Plant Conditions Have Occurred:
: 8. The Following Significant Changes in Plant Conditions Have Occurred:
: 9. The Following Significant Changes in Radiological Conditions Have Occurred:
: 9. The Following Significant Changes in Radiological Conditions Have Occurred:
: 10. Protective Action Recommendation: LI None at This Time
: 10. Protective Action Recommendation: LI None at This Time
: 11. Event Terminated: Time:                                 Date:
: 11. Event Terminated: Time:
: 12. "Please Repeat the Information You Have Received to Ensure Accuracy."             EL
Date:
: 13. Name                                       Date                       Time (Preparer's Name)
: 12. "Please Repeat the Information You Have Received to Ensure Accuracy."
: 14. FAX TO THE ODS AT 751-8620 OR CECC at 751-1682 AFTER COMPLETING THE NOTIFICATION                                                       El FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
EL
: 13. Name Date Time (Preparer's Name)
: 14. FAX TO THE ODS AT 751-8620 OR CECC at 751-1682 AFTER COMPLETING THE NOTIFICATION El FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-4 SITE AREA EMERGENCY Revision 19 QUALITY RELATED PREPARED/PROOFREAD BY: W. P. Brooks RESPONSIBLE ORGANIZATION: Emercqency Preparedness APPROVED BY:     John H. Casey EFFECTIVE DATE: 08/31/2000 Level of Use: Reference REVISION DESCRIPTION:       Intent Change, Editorial changes, Added steps for standardization with WBN, BFN, and Corp., Format change for ease of use.
TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-4 SITE AREA EMERGENCY Revision 19 QUALITY RELATED PREPARED/PROOFREAD BY: W. P. Brooks RESPONSIBLE ORGANIZATION: Emercqency Preparedness APPROVED BY:
John H. Casey EFFECTIVE DATE: 08/31/2000 Level of Use: Reference REVISION DESCRIPTION:
Intent Change, Editorial changes, Added steps for standardization with WBN, BFN, and Corp., Format change for ease of use.
Revisions not shown due to extent of format changes.
Revisions not shown due to extent of format changes.


EPIP-4 SON                   SITE AREA EMERGENCY                     Rev. 19 Page 2 of 11 Date 1.0     PURPOSE 1.1     To provide a method for timely notifications of appropriate individuals when the Shift Manager (SM)/Site Emergency Director (SED) has determined by EPIP-1 and the REP Appendix B that events have occurred that are classified as a SITE AREA EMERGENCY.
EPIP-4 SON SITE AREA EMERGENCY Rev. 19 Page 2 of 11 Date 1.0 PURPOSE 1.1 To provide a method for timely notifications of appropriate individuals when the Shift Manager (SM)/Site Emergency Director (SED) has determined by EPIP-1 and the REP Appendix B that events have occurred that are classified as a SITE AREA EMERGENCY.
1.2     To provide the SED a method for periodic reanalysis of current conditions to determine whether the SITE AREA EMERGENCY should be terminated, continued, or upgraded to a more serious classification.
1.2 To provide the SED a method for periodic reanalysis of current conditions to determine whether the SITE AREA EMERGENCY should be terminated, continued, or upgraded to a more serious classification.  


==2.0     REFERENCES==
==2.0 REFERENCES==
2.1 Interface Documents A.
SPP-3.5 B.
EPIP-5, C.
EPIP-6, D.
EPIP-7, E.
EPIP-8, F.
EPIP-10, G.
EPIP-14, H.
EPIP-16, I.
CECC EPIP-9 J.
PHYSI-32, "Regulatory Reportinp Requirements" "General Emergency "Activation And Operation Of The Technical Support Center "Activation And Operation Of The Operations Support Center" "Personnel Accountability And evacuation" "Medical Emergency Response" "Radiological Control Response" "Termination And Recovery" "Emergency Environmental Radiological Monitoring Procedures" "Security Instructions For Members Of The Security Force" 3.0 INSTRUCTION
[1]
IF TSC IS NOT STAFFED, THEN GO TO Step 3.1 [1].
(Page 3)
[2]
IF TSC IS OPERATIONAL, (SED transferred to TSC), THEN GO TO Step 3.2 [1].
(Page 7)
FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN El El


2.1      Interface Documents A. SPP-3.5              "Regulatory Reportinp Requirements" B. EPIP-5,              "General Emergency C. EPIP-6,              "Activation And Operation Of The Technical Support Center D. EPIP-7,              "Activation And Operation Of The Operations Support Center" E. EPIP-8,              "Personnel Accountability And evacuation" F. EPIP-10,            "Medical Emergency Response" G. EPIP-14,            "Radiological Control Response" H. EPIP-16,            "Termination And Recovery" I. CECC EPIP-9          "Emergency Environmental Radiological Monitoring Procedures" J. PHYSI-32,            "Security Instructions For Members Of The Security Force" 3.0 INSTRUCTION
EPIP-4 SQN SITE AREA EMERGENCY Rev. 19 Page 3 of 11 Date 3.1 ACTIVATION OF THE REP BY SM Upon classifying events as a SITE AREA EMERGENCY in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SM shall:
[1]        IF TSC IS NOT STAFFED, THEN GO TO Step 3.1 [1].    (Page 3)                                          El
[1]
[2]        IF TSC IS OPERATIONAL, (SED transferred to TSC), THEN GO TO Step 3.2 [1].  (Page 7)                                          El FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
ANNOUNCE to Operating Crew:  
 
"A SITE AREA EMERGENCY has been declared based on (Describe the Conditions).
EPIP-4 SQN               SITE AREA EMERGENCY                         Rev. 19 Page 3 of 11 Date 3.1 ACTIVATION OF THE REP BY SM Upon classifying events as a SITE AREA EMERGENCY in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SM shall:
I will be the Site Emergency Director."
[1]   ANNOUNCE to Operating Crew:
ED
            "A SITE AREA EMERGENCY has been declared based on (Describethe Conditions).
[2]
I will be the Site Emergency Director."                                   ED
IF Emergency Paging System (EPS) has not been previously initiated, THEN ACTIVATE EPS AND LI (SM may delegate these tasks to Operations Clerk if available.
[2]   IF Emergency Paging System (EPS) has not been previously initiated, THEN ACTIVATE EPS AND                                                         LI (SM may delegate these tasks to Operations Clerk if available.
MSS also may be used if necessary.)
MSS also may be used ifnecessary.)
[a]
[a]       CONFIRM response by reviewing 20 minute printed report available in the TSC.                                 El
CONFIRM response by reviewing 20 minute printed report available in the TSC.
[b]       CALL personnel to staff unanswered positions.
El
(Use REP Duty Roster and Call List)                           LI
[b]
[3]   IF EPS fails, THEN
CALL personnel to staff unanswered positions.
[a]       CALL Operation Duty Specialist (ODS) AT RingdownLine I or [71700               or         951 or 9-785-1700 AND DIRECT ODS to activate EPS.                               LI
(Use REP Duty Roster and Call List)
[b]       IF EPS still will not activate, THEN (SM may delegate these tasks to Operations Clerk if available.
LI
[3]
IF EPS fails, THEN
[a]
CALL Operation Duty Specialist (ODS) AT RingdownLine I or [71700 or 951 or 9-785-1700 AND DIRECT ODS to activate EPS.
LI
[b]
IF EPS still will not activate, THEN (SM may delegate these tasks to Operations Clerk if available.
MSS also may be used if necessary.)
MSS also may be used if necessary.)
CALL personnel to staff TSC/OSC positions.
CALL personnel to staff TSC/OSC positions.
(Use REP Duty Roster and Call List)                           El
(Use REP Duty Roster and Call List)
[4]   ANNOUNCE to plant personnel:
El
            "ATTENTION PLANT PERSONNEL. ATTENTION PLANT PERSONNEL. A SITE AREA EMERGENCY HAS BEEN DECLARED BASED ON (Describethe Conditions), AFFECTING UNIT(s) __         ALL TSC AND OSC PERSONNEL REPORT TO THE EMERGENCY FACILITIES IIMMEDIATELY."                               LI REPEAT Announcement.                                                     MI FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SON
[4]
ANNOUNCE to plant personnel:  
"ATTENTION PLANT PERSONNEL. ATTENTION PLANT PERSONNEL. A SITE AREA EMERGENCY HAS BEEN DECLARED BASED ON (Describe the Conditions), AFFECTING UNIT(s) __
ALL TSC AND OSC PERSONNEL REPORT TO THE EMERGENCY FACILITIES IIMMEDIATELY."
LI REPEAT Announcement.
MI FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SON


EPIP-4 SQN               SITE AREA EMERGENCY                   Rev. 19 Page 4 of 11 Date 3.1 ACTIVATION OF THE REP BY SM           (Continued)
EPIP-4 SQN SITE AREA EMERGENCY Rev. 19 Page 4 of 11 Date 3.1 ACTIVATION OF THE REP BY SM (Continued)
[5]     IF personnel accountability has not been previously initiated, THEN
[5]
[a]   NOTIFY Security Shift Supervisor to implement EPIP-8 "Personnel Accountability and Evacuation."
IF personnel accountability has not been previously initiated, THEN
6144             or                                             E8
[a]
[b]   ACTIVATE emergency sirens for personnel assembly.
NOTIFY Security Shift Supervisor to implement EPIP-8 "Personnel Accountability and Evacuation."
Initial   Time NOTE ODS should be notified within 5 minutes after declaration of the event.
6144 or E8
[6]   COMPLETE SAE Notification Form (Page 10).                                   El
[b]
[7]   NOTIFY ODS.
ACTIVATE emergency sirens for personnel assembly.
[a] CALL ODS.
Initial Time NOTE ODS should be notified within 5 minutes after declaration of the event.
Ringdown Line I or 15-751-1700       or 15-751-24951 or 19-785-1700 Initial   Time
[6]
[b]   READ completed Form (Page 10) to ODS.                               D
COMPLETE SAE Notification Form (Page 10).
[c]   FAX ODS SAE Notification Form (Page 10).                           []
El
[7]
NOTIFY ODS.
[a]
CALL ODS.
Ringdown Line I or 15-751-1700 or 15-751-24951 or 19-785-1700 Initial Time
[b]
READ completed Form (Page 10) to ODS.
D
[c]
FAX ODS SAE Notification Form (Page 10).
[]
1 5-751-8620 FAX 1
1 5-751-8620 FAX 1
[8] IF ODS CANNOT be contacted within 10 minutes of the declaration, THEN
[8]
[a]   NOTIFY Tennessee Emergency Management Agency (TEMA) 9-1"800"262-3300 1 °rl 9-1-615-741-00011     or   888-616-8091 (satellite)
IF ODS CANNOT be contacted within 10 minutes of the declaration, THEN
Initial   Time
[a]
[b] READ completed Form (page 10) to TEMA                               0i
NOTIFY Tennessee Emergency Management Agency (TEMA) 9-1"800"262-3300 1 °rl 9-1-615-741-00011 or 888-616-8091 (satellite)
[c] FAX TEMA SAE Notification Form (Page 10)                           El I
Initial Time
1 9-1-615-242-9635 FAX FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SON
[b]
READ completed Form (page 10) to TEMA 0i
[c]
FAX TEMA SAE Notification Form (Page 10)
El 1 9-1-615-242-9635 FAX I
FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SON


EPIP-4 SQN               SITE AREA EMERGENCY                   Rev. 19 Page 5 of 11 Date 3.1   ACTIVATION OF THE REP BY SM           (Continued)
EPIP-4 SQN SITE AREA EMERGENCY Rev. 19 Page 5 of 11 Date 3.1 ACTIVATION OF THE REP BY SM (Continued)
[9]   NOTIFY RADCON Shift Supervisor,
[9]
[a]   STATE "A SITE AREA EMERGENCY HAS BEEN DECLARED, BASED UPON (Describethe conditions), AFFECTING UNIT(s)   _ ." E
NOTIFY RADCON Shift Supervisor,
[b]   DIRECT to implement EPIP-14, "Radiological Control Response."                                           ED
[a]
[c]   DIRECT to implement CECC EPIP-9, "Emergency Radiological Monitoring Procedures."               ED
STATE "A SITE AREA EMERGENCY HAS BEEN DECLARED, BASED UPON (Describe the conditions), AFFECTING UNIT(s)  
[10]   NOTIFY Chemistry Shift Supervisor,
." E
[a]   STATE: "A SITE AREA EMERGENCY HAS BEEN DECLARED, BASED UPON (Describethe Conditions),
[b]
AFFECTING UNIT(s)       _   "                              I 7285 Laa      or F6348 Lab I or IPager 350-40732
DIRECT to implement EPIP-14, "Radiological Control Response."
[b]   DIRECT to implement EPIP-14.                                 D
ED
[11]   MONITOR radiation monitors.
[c]
DIRECT to implement CECC EPIP-9, "Emergency Radiological Monitoring Procedures."
ED
[10]
NOTIFY Chemistry Shift Supervisor,
[a]
STATE: "A SITE AREA EMERGENCY HAS BEEN DECLARED, BASED UPON (Describe the Conditions),
AFFECTING UNIT(s) _
I a
7285 La or F6348 Lab I or I Pager 350-40732
[b]
DIRECT to implement EPIP-14.
D
[11]
MONITOR radiation monitors.
WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment.
WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment.
[a]   NOTIFY Chemistry Shift Supervisor to perform a dose assessment using EPIP-14.                             El S7285 La         or r6348 Lab     or iPager 350-40732I
[a]
[b]   REFER TO EPIP-1, Radiological Effluents Section, AND EVALUATE need for additional classifications.                 []
NOTIFY Chemistry Shift Supervisor to perform a dose assessment using EPIP-14.
[12]   IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."                     El
El S7285 La or r6348 Lab or iPager 350-40732I
[13]   IF there is a security threat, THEN NOTIFY Security Shift Supervisor to implement PHYSI-32, "Security Instructions For Members Of The Security Force."
[b]
J     or                                             ET FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
REFER TO EPIP-1, Radiological Effluents Section, AND EVALUATE need for additional classifications.
[]
[12]
IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."
El
[13]
IF there is a security threat, THEN NOTIFY Security Shift Supervisor to implement PHYSI-32, "Security Instructions For Members Of The Security Force."
J or ET FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


EPIP-4 SQN               SITE AREA EMERGENCY                       Rev. 19 Page 6 of 11 Date 3.1   ACTIVATION OF THE REP BY SM             (Continued)
EPIP-4 SQN SITE AREA EMERGENCY Rev. 19 Page 6 of 11 Date 3.1 ACTIVATION OF THE REP BY SM (Continued)
[14]   NOTIFY Plant Management in accordance with SPP-3.5 AND PROVIDE SAE Notification Information.                                       El NOTE 1 NRC notification should be made as soon as practicable, but within 1 hour of "SITE AREA EMERGENCY" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.
[14] NOTIFY Plant Management in accordance with SPP-3.5 AND PROVIDE SAE Notification Information.
El NOTE 1 NRC notification should be made as soon as practicable, but within 1 hour of "SITE AREA EMERGENCY" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.
NOTE 2 Do not dial "1" prior to the number when using ENS phones.
NOTE 2 Do not dial "1" prior to the number when using ENS phones.
[15]   NOTIFY NRC of plan activation via ENS in accordance with SPP-3.5.
[15] NOTIFY NRC of plan activation via ENS in accordance with SPP-3.5.
(301) 816-5100 (Mai     F       951-0550 (Backup) ]
(301) 816-5100 (Mai F  
                                    -(301)                      9-1-(301) 816-5151 (Fax)
-(301) 951-0550 (Backup) ] 9-1-(301) 816-5151 (Fax)
Initial Time
Initial Time
[16]   MONITOR plant conditions AND EVALUATE using EPIP-1 until TSC is staffed, AND
[16]
[a] IF plant conditions warrant, THEN UPGRADE to a higher classification AND INITIATE EPIP-5.                                                         El
MONITOR plant conditions AND EVALUATE using EPIP-1 until TSC is staffed, AND
[b] IF additional conditions satisfy criteria of other SITE AREA EMERGENCIES                     OR Conditions warrant a need for follow-up information, THEN COMPLETE SAE Follow-up Form (Page 11), AND REPORT to ODS for State notification at:
[a]
Ringdown Line     or   5-751-1700       or   5-751-2495 1 or9         5"1700 AND FAX ODS SAE Follow-up Form (Page 11)             15-751-860FA I END OF SECTION :
IF plant conditions warrant, THEN UPGRADE to a higher classification AND INITIATE EPIP-5.
El
[b]
IF additional conditions satisfy criteria of other SITE AREA EMERGENCIES OR Conditions warrant a need for follow-up information, THEN COMPLETE SAE Follow-up Form (Page 11), AND REPORT to ODS for State notification at:
Ringdown Line or 5-751-1700 or 5-751-2495 1 or9 5"1700 AND FAX ODS SAE Follow-up Form (Page 11) 15-751-860FA I END OF SECTION :
FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


EPIP-4 SQN                 SITE AREA EMERGENCY                   Rev. 19 Page 7 of 11 Date 3.2   ACTIVATION OF THE REP BY TSC Upon classifying events as a SITE AREA EMERGENCY in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SED shall:
EPIP-4 SQN SITE AREA EMERGENCY Rev. 19 Page 7 of 11 Date 3.2 ACTIVATION OF THE REP BY TSC Upon classifying events as a SITE AREA EMERGENCY in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SED shall:
[1]   IF personnel accountability has not been previously initiated, THEN
[1]
[a]   DIRECT TSC Security Manager or Security Shift Supervisor to implement EPIP-8 "Personnel Accountability and Evacuation."                                                     El or6
IF personnel accountability has not been previously initiated, THEN
[b]   DIRECT SM to ACTIVATE emergency sirens for personnel assembly.
[a]
Initial Time
DIRECT TSC Security Manager or Security Shift Supervisor to implement EPIP-8 "Personnel Accountability and Evacuation."
[2]   IF Site Area Emergency classification has been declared by SM, THEN GO TO Step [6]     OR appropriate Step based on SM turnover.           0]
El or6
[b]
DIRECT SM to ACTIVATE emergency sirens for personnel assembly.
Initial Time
[2]
IF Site Area Emergency classification has been declared by SM, THEN GO TO Step [6]
OR appropriate Step based on SM turnover.
0]
NOTE CECC Director should be notified within 5 minutes after declaration of the event.
NOTE CECC Director should be notified within 5 minutes after declaration of the event.
[3]   COMPLETE SAE Notification Form (Page 10).                               El
[3]
[4]   NOTIFY CECC Director.
COMPLETE SAE Notification Form (Page 10).
[a]   CALL CECC Director.
El
RingdownLi       or   5-751-1     i or   1 5-751-1680 Initial     Time
[4]
[b]   READ completed Form (Page 10) to CECC Director.                   El
NOTIFY CECC Director.
[c]   FAX CECC SAE Notification Form (Page 10).                         El 15-751-1682 FAx FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
[a]
CALL CECC Director.
RingdownLi or 5-751-1 i
or 1 5-751-1680 Initial Time
[b]
READ completed Form (Page 10) to CECC Director.
El
[c]
FAX CECC SAE Notification Form (Page 10).
El 15-751-1682 FAx FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


EPIP-4 SQN                 SITE AREA EMERGENCY                   Rev. 19 Page 8 of 11 Date 3.2   ACTIVATION OF THE REP BY TSC (Continued)
EPIP-4 SQN SITE AREA EMERGENCY Rev. 19 Page 8 of 11 Date 3.2 ACTIVATION OF THE REP BY TSC (Continued)
[5] IF CECC Director CANNOT be contacted within 10 minutes of the declaration, THEN
[5]
[a]     NOTIFY Tennessee Emergency Management Agency (TEMA).
IF CECC Director CANNOT be contacted within 10 minutes of the declaration, THEN
9180262-33             or 19-1-65-741-0001 1 or     1888-616-8091   (satellite)
[a]
NOTIFY Tennessee Emergency Management Agency (TEMA).
9180262-33 or 19-1-65-741-0001 1 or 1888-616-8091 (satellite)
Initial Time
Initial Time
[b]     READ completed Form (Page 10) to TEMA.                             El
[b]
[c]   FAX TEMA SAE Notification Form (Page 10).                           D I 9-1-615-242-9635   FAX   1
READ completed Form (Page 10) to TEMA.
[6]   DIRECT TSC RADCON Manager to implement CECC EPIP-9 "Emergency Radiological Monitoring Procedures."               El NOTE The Dose Assessment function is transferred to the CECC once they are staffed.
El
[7]   MONITOR radiation monitors.
[c]
FAX TEMA SAE Notification Form (Page 10).
D I 9-1-615-242-9635 FAX 1
[6]
DIRECT TSC RADCON Manager to implement CECC EPIP-9 "Emergency Radiological Monitoring Procedures."
El NOTE The Dose Assessment function is transferred to the CECC once they are staffed.
[7]
MONITOR radiation monitors.
WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment
WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment
[a]   DIRECT TSC Chemistry Manager or Chemistry Shift Supervisor to perform a dose assessment using EPIP-14, "Radiological Control Response."                           El 7285 L         or   I6348 Lab   or FIager 350-40732
[a]
[b]   REFER TO EPIP-1, Radiological Effluents Section, AND EVALUATE need for additional classifications.                       El
DIRECT TSC Chemistry Manager or Chemistry Shift Supervisor to perform a dose assessment using EPIP-14, "Radiological Control Response."
[8]   IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."                           El
El 7285 L or I6348 Lab or FIager 350-40732
[9]   IF there is a security threat, THEN DIRECT TSC Security Manager or Security Shift Supervisor to implement PHYSI-32, "Security Instructions For Members Of The Security Force."                                                   El 6144or                   6 FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
[b]
REFER TO EPIP-1, Radiological Effluents Section, AND EVALUATE need for additional classifications.
El
[8]
IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."
El
[9]
IF there is a security threat, THEN DIRECT TSC Security Manager or Security Shift Supervisor to implement PHYSI-32, "Security Instructions For Members Of The Security Force."
El 6144or 6
FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


EPIP-4 SQN               SITE AREA EMERGENCY                       Rev. 19 Page 9 of 11 Date 3.2 ACTIVATION OF THE REP BY TSC             (Continued)
EPIP-4 SQN SITE AREA EMERGENCY Rev. 19 Page 9 of 11 Date 3.2 ACTIVATION OF THE REP BY TSC (Continued)
NOTE 1 NRC notification should be made as soon as practicable, but within 1 hour of "SITE AREA EMERGENCY" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.
NOTE 1 NRC notification should be made as soon as practicable, but within 1 hour of "SITE AREA EMERGENCY" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.
NOTE 2 Do not dial "1" prior to the number when using ENS phones.
NOTE 2 Do not dial "1" prior to the number when using ENS phones.
[10] ENSURE NRC has been notified of plan activation via ENS in accordance with SPP-3.5.
[10] ENSURE NRC has been notified of plan activation via ENS in accordance with SPP-3.5.
(301) 816-5100 (Main)       (301) 951-0550 (Bac             9-1-(301) 816-5151 (Fax)
(301) 816-5100 (Main)
Initial   Time
(301) 951-0550 (Bac 9-1-(301) 816-5151 (Fax)
[11] MONITOR plant conditions AND EVALUATE using EPIP-1, AND
Initial Time
[a]   IF plant conditions warrant, THEN UPGRADE to a higher classification, AND INITIATE EPIP-5                                                         El
[11] MONITOR plant conditions AND EVALUATE using EPIP-1, AND
[b]   IF additional conditions satisfy criteria of other SITE AREA EMERGENCY's                   OR Conditions warrant a need for follow-up information, THEN COMPLETE SAE Follow-up Form (Page 11),                     AND REPORT to CECC Director for State notification at:
[a]
Ringdown Line       or 1   16           or     5-751-1680I AND FAX CECC SAE Follow-up Form (Page 11)                 5-751-1682 FAXI OR
IF plant conditions warrant, THEN UPGRADE to a higher classification, AND INITIATE EPIP-5
[c]   IF situation no longer exists, THEN TERMINATE emergency per EPIP-16, "Termination and Recovery," AND                                                     El COMPLETE SAE Follow-up Form (Page 11) including                       El Time and Date Event Terminated and FAX to CECC.
[b]
I END OF SECTION         I FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
IF additional conditions satisfy criteria of other SITE AREA EMERGENCY's OR Conditions warrant a need for follow-up information, THEN COMPLETE SAE Follow-up Form (Page 11),
AND REPORT to CECC Director for State notification at:
Ringdown Line or 1 16 or 5-751-1680I AND FAX CECC SAE Follow-up Form (Page 11) 5-751-1682 FAXI OR
[c]
IF situation no longer exists, THEN TERMINATE emergency per EPIP-16, "Termination and Recovery," AND COMPLETE SAE Follow-up Form (Page 11) including Time and Date Event Terminated and FAX to CECC.
El El El I END OF SECTION I FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


EPIP-4 SON                   SITE AREA EMERGENCY                     Rev. 19 Page 10 of 11 SITE AREA EMERGENCY NOTIFICATION FORM
EPIP-4 SON SITE AREA EMERGENCY Rev. 19 Page 10 of 11 SITE AREA EMERGENCY NOTIFICATION FORM
: 1. El THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.
: 1. El THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.
OR 0] THIS IS A DRILL. THIS IS A DRILL.
OR 0] THIS IS A DRILL. THIS IS A DRILL.
: 2. This is                           at Sequoyah Nuclear Plant.
: 2. This is at Sequoyah Nuclear Plant.
(Your Name)
(Your Name)
: 3. There has been a SITE AREA EMERGENCY declared at Sequoyah Nuclear Plant.
: 3. There has been a SITE AREA EMERGENCY declared at Sequoyah Nuclear Plant.
Affecting   El Unit 1       OR     El Unit 2   OR       El Both Units 1 & 2
Affecting El Unit 1 OR El Unit 2 OR El Both Units 1 & 2
: 4. EAL Designator:
: 4. EAL Designator:
: 5. Brief Description of Event
: 5.
: 6. Plant conditions are:     El Stable     El Deteriorating
Brief Description of Event
: 7. Radiological Conditions are:
: 6. Plant conditions are:
El Stable El Deteriorating
: 7.
Radiological Conditions are:
El No Abnormal Release Off-site El Airborne Release Off-site El Liquid Release Off-site El Release Information Not Known
El No Abnormal Release Off-site El Airborne Release Off-site El Liquid Release Off-site El Release Information Not Known
: 8. Event Declared: Time:                               Date:
: 8. Event Declared: Time:
: 9. Event Terminated: Time:                               Date:
Date:
: 9. Event Terminated: Time:
Date:
: 10. The Meteorological Conditions Are: (Use MET Tower elevation 46, alternate elevation 90.)
: 10. The Meteorological Conditions Are: (Use MET Tower elevation 46, alternate elevation 90.)
Wind Speed                   mph       Wind Direction From
Wind Speed mph Wind Direction From
: 11. Protective Action Recommendation: [] None at This Time.
: 11. Protective Action Recommendation: [] None at This Time.
: 12. "Please Repeat the Information You Have Received to Ensure Accuracy."                   El FAX TO THE ODS AT 751-8620 AFTER COMPLETING THE NOTIFICATION.
: 12. "Please Repeat the Information You Have Received to Ensure Accuracy."
El FAX TO THE ODS AT 751-8620 AFTER COMPLETING THE NOTIFICATION.
FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


EPIP-4 SQN                 SITE AREA EMERGENCY                         Rev. 19 Page 11 of 11 SITE AREA EMERGENCY FOLLOW-UP FORM
EPIP-4 SQN SITE AREA EMERGENCY Rev. 19 Page 11 of 11 SITE AREA EMERGENCY FOLLOW-UP FORM
: 1. El THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.
: 1. El THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.
OR El THIS IS A DRILL. THIS IS A DRILL.
OR El THIS IS A DRILL. THIS IS A DRILL.
: 2. This is                                 at Sequoyah Nuclear Plant.
: 2. This is at Sequoyah Nuclear Plant.
(Your Name)
(Your Name)
: 3. This is Follow-Up Information Regarding the SITE AREA EMERGENCY declared at Sequoyah Nuclear Plant Affecting   El Unit 1         OR     El Unit 2     OR       El Both Units 1 & 2
: 3. This is Follow-Up Information Regarding the SITE AREA EMERGENCY declared at Sequoyah Nuclear Plant Affecting El Unit 1 OR El Unit 2 OR El Both Units 1 & 2
: 4. Reactor             Unit 1       ED Shutdown       El At Power Unit 2       ED Shutdown       El At Power
: 4. Reactor Unit 1 ED Shutdown El At Power Unit 2 ED Shutdown El At Power
: 5. Plant conditions are:         ED Stable     0] Deteriorating
: 5. Plant conditions are:
ED Stable 0] Deteriorating
: 6. Additional EAL Designator (s):
: 6. Additional EAL Designator (s):
: 7. Site Assembly and Accountability is on going. El YES           D NO OR D COMPLETED
: 7. Site Assembly and Accountability is on going. El YES D NO OR D COMPLETED
: 8. The Following Significant Changes in Plant Conditions Have Occurred:
: 8. The Following Significant Changes in Plant Conditions Have Occurred:
: 9. The Following Significant Changes in Radiological Conditions Have Occurred:
: 9. The Following Significant Changes in Radiological Conditions Have Occurred:
: 10. The Meteorological Conditions Are: (Use MET Tower elevation 46, alternate elevation 90.)
: 10. The Meteorological Conditions Are: (Use MET Tower elevation 46, alternate elevation 90.)
Wind Speed                     mph     Wind Direction From
Wind Speed mph Wind Direction From
: 11. Protective Action Recommendation: 171 None at This Time
: 11. Protective Action Recommendation:
: 12. Event Terminated:Time:                         Date:
171 None at This Time
: 13. "Please Repeat the Information You Have Received to Ensure Accuracy."                   0Z
: 12. Event Terminated:Time:
: 14. Name                                       Date                     Time (Preparer's Name)
Date:
: 15. FAX TO THE ODS AT 751-8620 OR CECC AT 751-1682 AFTER COMPLETING THE NOTIFICATION                                                             ED FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
: 13. "Please Repeat the Information You Have Received to Ensure Accuracy."
0Z
: 14. Name Date Time (Preparer's Name)
: 15. FAX TO THE ODS AT 751-8620 OR CECC AT 751-1682 AFTER COMPLETING THE NOTIFICATION ED FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-5 GENERAL EMERGENCY Revision 25 QUALITY RELATED PREPARED/PROOFREAD BY: W. P. Brooks RESPONSIBLE ORGANIZATION: Emergiency Preparedness APPROVED BY:       John H. Casey EFFECTIVE DATE: 8-31-2000 Level of Use: Reference REVISION DESCRIPTION: Intent Change, Editorial changes, Added steps for     standardization with WBN, BFN, and Corp., Format change for ease of use.
TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-5 GENERAL EMERGENCY Revision 25 QUALITY RELATED PREPARED/PROOFREAD BY: W. P. Brooks RESPONSIBLE ORGANIZATION: Emergiency Preparedness APPROVED BY:
John H. Casey EFFECTIVE DATE: 8-31-2000 Level of Use: Reference REVISION DESCRIPTION:
Intent Change, Editorial changes, Added steps for standardization with WBN, BFN, and Corp., Format change for ease of use.
Revisions not shown due to extent of format changes.
Revisions not shown due to extent of format changes.


EPIP-5 SQN               GENERAL EMERGENCY                       Rev. 25 Page 2 of 14 Date 1.0   PURPOSE 1.1 To provide a method for timely notifications of appropriate individuals when the Shift Manager (SM)/Site Emergency Director (SED) has determined by EPIP-1 that events have occurred that are classified as a GENERAL EMERGENCY 1.2 To provide the SED/SM a method for periodic reanalysis of current conditions to determine whether the GENERAL EMERGENCY should be terminated or continued.
EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 2 of 14 Date 1.0 PURPOSE 1.1 To provide a method for timely notifications of appropriate individuals when the Shift Manager (SM)/Site Emergency Director (SED) has determined by EPIP-1 that events have occurred that are classified as a GENERAL EMERGENCY 1.2 To provide the SED/SM a method for periodic reanalysis of current conditions to determine whether the GENERAL EMERGENCY should be terminated or continued.  


==2.0   REFERENCES==
==2.0 REFERENCES==
2.1 Interface Documents A.
SPP-3.5 B.
EPIP-6, C.
EPIP-7, D.
EPIP-8, E.
EPIP-10, F.
EPIP-14, G.
EPIP-16, H.
CECC EPIP-9, I.
PHYSI-32, "Regulatory Reporting Requirements" "Activation and Operation of the Technical Support Center" "Activation and Operation of the Operations Support Center" "Personnel Accountability and Evacuation" "Medical Emergency Response" "Radiological Control Response" "Termination and Recovery" "Emergency Environmental Radiological Monitoring Procedures" "Security Instructions For Members Of The Security Force" 3.0 INSTRUCTION
[1]
IF TSC is NOT STAFFED, THEN El GO TO Section 3.1. (Page 3)
[2]
IF TSC is OPERATIONAL, (SED transferred to TSC), THEN GO TO Section 3.2. (Page 8)
El FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


2.1    Interface Documents A. SPP-3.5                "Regulatory Reporting Requirements" B. EPIP-6,                "Activation and Operation of the Technical Support Center" C. EPIP-7,                "Activation and Operation of the Operations Support Center" D. EPIP-8,                "Personnel Accountability and Evacuation" E. EPIP-10,                "Medical Emergency Response" F. EPIP-14,                "Radiological Control Response" G. EPIP-16,                "Termination and Recovery" H. CECC EPIP-9,            "Emergency Environmental Radiological Monitoring Procedures" I. PHYSI-32,              "Security Instructions For Members Of The Security Force" 3.0  INSTRUCTION
EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 3 of 14 Date 3.1 ACTIVATION OF THE REP BY SM Upon classifying events as a GENERAL EMERGENCY in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SM shall:
[1]    IF TSC is NOT STAFFED, THEN GO TO Section 3.1. (Page 3)                                            El
[1]
[2]    IF TSC is OPERATIONAL, (SED transferred to TSC), THEN GO TO Section 3.2. (Page 8)                                            El FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
ANNOUNCE to Operating Crew:  
 
"A GENERAL EMERGENCY has been declared based on (Describe the Conditions).
EPIP-5 SQN                   GENERAL EMERGENCY                             Rev. 25 Page 3 of 14 Date 3.1   ACTIVATION OF THE REP BY SM Upon classifying events as a GENERAL EMERGENCY in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SM shall:
I will be the Site Emergency Director."
[1]     ANNOUNCE to Operating Crew:
[2]
            "A GENERAL EMERGENCY has been declared based on (Describe the Conditions).
IF Emergency Paging System (EPS) has not been previously initiated, THEN ACTIVATE EPS AND (SM may delegate these tasks to Operations Clerk if available.
I will be the Site Emergency Director."                                           0
[2]     IF Emergency Paging System (EPS) has not been previously initiated, THEN ACTIVATE EPS AND                                                                   El (SM may delegate these tasks to Operations Clerk if available.
MSS also may be used if necessary.)
MSS also may be used if necessary.)
[a]       CONFIRM response by reviewing 20 minute printed report available in the TSC.                                           13
[a]
[b]        CALL personnel to staff unanswered positions                           D]
[b]
(Use REP Duty Roster and Call List).
CONFIRM response by reviewing 20 minute printed report available in the TSC.
[3]     IF EPS fails, THEN
CALL personnel to staff unanswered positions (Use REP Duty Roster and Call List).
[a]       CALL Operation Duty Specialist (ODS), AT IRingdown Lne     or 15-751-1700]         or 17         2495]     or  F9-785-1700 I AND DIRECT ODS to activate EPS.
[3]
[b]      IF EPS still will not activate, THEN (SM may delegate these tasks to Operations Clerk if available.
IF EPS fails, THEN
[a]
CALL Operation Duty Specialist (ODS), AT IRingdown Lne or 15-751-1700]
or 17 2495]
AND DIRECT ODS to activate EPS.
or F9-785-1700 I IF EPS still will not activate, THEN (SM may delegate these tasks to Operations Clerk if available.
MSS also may be used if necessary.)
MSS also may be used if necessary.)
CALL personnel to staff TSC/OSC positions (Use REP Duty Roster and Call List).                                   F-FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
CALL personnel to staff TSC/OSC positions (Use REP Duty Roster and Call List).
FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN 0
El 13 D]
[b]
F-


EPIP-5 SQN                 GENERAL EMERGENCY                     Rev. 25 Page 4 of 14 Date 3.1 ACTIVATION OF THE REP BY SM (Continued)
EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 4 of 14 Date 3.1 ACTIVATION OF THE REP BY SM (Continued)
[4]     ANNOUNCE to plant personnel:
[4]
            "ATTENTION PLANT PERSONNEL. ATTENTION PLANT PERSONNEL. A GENERAL EMERGENCY HAS BEEN DECLARED BASED ON (Describethe condition), AFFECTING UNIT(s)
ANNOUNCE to plant personnel:  
"ATTENTION PLANT PERSONNEL. ATTENTION PLANT PERSONNEL. A GENERAL EMERGENCY HAS BEEN DECLARED BASED ON (Describe the condition), AFFECTING UNIT(s)
ALL TSC AND OSC PERSONNEL REPORT TO THE EMERGENCY FACILITIES IMMEDIATELY."
ALL TSC AND OSC PERSONNEL REPORT TO THE EMERGENCY FACILITIES IMMEDIATELY."
REPEAT Announcement.                                                     El
REPEAT Announcement.
[5]     IF personnel accountability has not been previously initiated, THEN
[5]
IF personnel accountability has not been previously initiated, THEN
[a] NOTIFY Security Shift Supervisor to implement EPIP-8, "Personnel Accountability and Evacuation."
[a] NOTIFY Security Shift Supervisor to implement EPIP-8, "Personnel Accountability and Evacuation."
6144           or         6568                                 El
6144 or 6568
[b] ACTIVATE emergency sirens for personnel assembly.
[b] ACTIVATE emergency sirens for personnel assembly.
Initial   Time NOTE   ODS should be notified within 5 minutes after declaration of the event.
Initial Time NOTE ODS should be notified within 5 minutes after declaration of the event.
[6]   COMPLETE GE Notification Form (Page 13).                                 El
[6]
[7]   NOTIFY ODS.
COMPLETE GE Notification Form (Page 13).
[7]
NOTIFY ODS.
[a] CALL ODS.
[a] CALL ODS.
SRingdown           or or     51-1700   or i   _751-24951 or   19-785-1:7:00]
SRingdown or or 51-1700 or i
Initial   Time
_751-24951 or Initial Time
[b] READ completed Form (Page 13) to ODS.                               El D
[b] READ completed Form (Page 13) to ODS.
[c] FAX ODS GE Notification Form (Page 13).
[c] FAX ODS GE Notification Form (Page 13).
1 5-751-8620 FAXI FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
1 5-751-8620 FAXI FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN El El El El D
1 9-785-1:7:00]


EPIP-5 SQN                 GENERAL EMERGENCY                   Rev. 25 Page 5 of 14 Date 3.1 ACTIVATION OF THE REP BY SM (Continued)
EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 5 of 14 Date 3.1 ACTIVATION OF THE REP BY SM (Continued)
[8] IF ODS CANNOT be contacted within 10 minutes of the declaration, THEN
[8]
IF ODS CANNOT be contacted within 10 minutes of the declaration, THEN
[a] NOTIFY Tennessee Emergency Management Agency (TEMA).
[a] NOTIFY Tennessee Emergency Management Agency (TEMA).
I1 00-262-33001 or 1-1-615-741-00               or 888-616-8091 (satellite)
I1 00-262-33001 or 1-1-615-741-00 or 888-616-8091 (satellite)
Initial     Time
Initial Time
[1] READ completed Form (Page 13) to TEMA.                           ED
[1]
[2] FAX TEMA GE Notification Form (Page 13).                         []
READ completed Form (Page 13) to TEMA.
I 9-1-615-242-9635 FAX
ED
[b] NOTIFY Hamilton County Emergency Management Agency (EMA)           AND 9-69   or       2-7777 1or1     20022           Initial   Time READ completed Form (Page 13) to Hamilton County EMA AND             LI
[2]
FAX TEMA GE Notification Form (Page 13).
[]
I 9-1-615-242-9635 FAX
[b] NOTIFY Hamilton County Emergency Management Agency (EMA)
AND 9-69 or 2-7777 1or1 20022 Initial Time READ completed Form (Page 13) to Hamilton County EMA AND LI
[c] NOTIFY Bradley County EMA.
[c] NOTIFY Bradley County EMA.
19-476-060         or 1 9-476-75111         Initial   Time READ completed Form (Page 13) to Bradley County EMA.                 El
19-476-060 or 1 9-476-75111 Initial Time READ completed Form (Page 13) to Bradley County EMA.
[9] NOTIFY RADCON Shift Supervisor,
El
[a] STATE "A GENERAL EMERGENCY HAS BEEN DECLARED, BASED UPON (Describethe conditions),
[9]
AFFECTING UNIT(s)                     ."                            I)I
NOTIFY RADCON Shift Supervisor,
[b] DIRECT to implement EPIP-14, "Radiological Control Response."                                                           LI
[a] STATE "A GENERAL EMERGENCY HAS BEEN DECLARED, BASED UPON (Describe the conditions),
[c] DIRECT to implement CECC EPIP-9, "Emergency Radiological Monitoring Procedures".                       El FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
AFFECTING UNIT(s)
I)I
[b] DIRECT to implement EPIP-14, "Radiological Control Response."
LI
[c] DIRECT to implement CECC EPIP-9, "Emergency Radiological Monitoring Procedures".
El FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


EPIP-5 SQN                 GENERAL EMERGENCY                   Rev. 25 Page 6 of 14 Date 3.1 ACTIVATION OF THE REP BY SM (Continued)
EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 6 of 14 Date 3.1 ACTIVATION OF THE REP BY SM (Continued)
[10] NOTIFY Chemistry Shift Supervisor,
[10] NOTIFY Chemistry Shift Supervisor,
[a] STATE: "A GENERAL EMERGENCY HAS BEEN DECLARED, BASED UPON (Describethe conditions). AFFECTING UNIT(s)             ." ED 7285 Lab] or       L6348 Lab I or [Pager 350-40732
[a] STATE: "A GENERAL EMERGENCY HAS BEEN DECLARED, BASED UPON (Describe the conditions). AFFECTING UNIT(s)  
[b] DIRECT to implement EPIP-14.                                           El
." ED 7285 Lab] or L6348 Lab I or [Pager 350-40732
[b] DIRECT to implement EPIP-14.
[11] MONITOR radiation monitors.
[11] MONITOR radiation monitors.
WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment.
WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment.
[a] NOTIFY Chemistry Shift Supervisor to perform a dose assessment using EPIP-14                                             0 or   6   ab     or Pager 350-40732]
[a] NOTIFY Chemistry Shift Supervisor to perform a dose assessment using EPIP-14 or 6
[b] REFER to Protective Action Recommendation Logic Diagram (Page 12) AND IF change in PAR required, THEN                                       0 COMPLETE GE Follow-up Form (Page 14) AND REPORT to ODS for State notification at:
ab or Pager 350-40732]
IRingdowoTe Ior         15-751-17o01   or 1-751-249I   or 19-785-17001 AND FAX ODS GE Follow-up Form (Page 14) iFA I5-751-86i20
[b] REFER to Protective Action Recommendation Logic Diagram (Page 12) AND IF change in PAR required, THEN COMPLETE GE Follow-up Form (Page 14) AND REPORT to ODS for State notification at:
[12] IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."                             El
0 0
[13] IF there is a security threat, THEN NOTIFY Security Shift Supervisor to implement PHYSI-32, "Security Instructions For Members Of The Security Force"                     El 6144       or         58 FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
El IRingdowoTe Ior 15-751-17o01 or 1-751-249I AND FAX ODS GE Follow-up Form (Page 14)
I 5-751-86i20 iFA or 19-785-17001
[12] IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."
[13] IF there is a security threat, THEN NOTIFY Security Shift Supervisor to implement PHYSI-32, "Security Instructions For Members Of The Security Force" 6144 or 58 FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN El El


EPIP-5 SQN                  GENERAL EMERGENCY                        Rev. 25 Page 7 of 14 Date 3.1 ACTIVATION OF THE REP BY SM (Continued)
3.1 ACTIVATION OF THE REP BY SM (Continued)
[14] NOTIFY Plant Management in accordance with SPP-3.5 AND PROVIDE GE Notification Information.                                               D NOTE 1 NRC notification should be made as soon as practicable, but within 1 hour of "GENERAL EMERGENCY" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.
[14] NOTIFY Plant Management in accordance with SPP-3.5 AND PROVIDE GE Notification Information.
D NOTE 1 NRC notification should be made as soon as practicable, but within 1 hour of "GENERAL EMERGENCY" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.
NOTE 2 Do not dial "1" prior to the number when using ENS phones.
NOTE 2 Do not dial "1" prior to the number when using ENS phones.
[15] NOTIFY NRC of plan activation via ENS in accordance with SPP-3.5.
[15] NOTIFY NRC of plan activation via ENS in accordance with SPP-3.5.
(301) 816-5100 (Main)       (301) 951-0550 (Backup       9-1-(301) 816-5151 (Fax)
(301) 816-5100 (Main)
Initial   Time
(301) 951-0550 (Backup 9-1-(301) 816-5151 (Fax)
Initial Time
[16] MONITOR plant conditions AND EVALUATE using EPIP-1 until TSC is staffed, AND
[16] MONITOR plant conditions AND EVALUATE using EPIP-1 until TSC is staffed, AND
[a]   IF additional conditions satisfy criteria of other GENERAL EMERGENCYs                           OR
[a]
[b]   IF changes to Protective Action Recommendations               OR
IF additional conditions satisfy criteria of other GENERAL EMERGENCYs OR
[c]   IF conditions warrant a need for follow-up information, THEN COMPLETE GE Follow-up Form (Page 14), AND REPORT to ODS for State notification at:
[b]
IRingdownL         or   15-751-17ol0   or   15-751-2495       or   E9-785-17600 AND FAX ODS GE Follow-up Form (Page 14)                     i5-751-8620 FAXI END OF SECTION FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
IF changes to Protective Action Recommendations OR
[c]
IF conditions warrant a need for follow-up information, THEN COMPLETE GE Follow-up Form (Page 14), AND REPORT to ODS for State notification at:
IRingdownL or 15-751-17ol0 or 15-751-2495 or E9-785-17600 AND FAX ODS GE Follow-up Form (Page 14) i5-751-8620 FAXI END OF SECTION FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 7 of 14 Date


EPIP-5 SQN                 GENERAL EMERGENCY                     Rev. 25 Page 8 of 14 Date 3.2 ACTIVATION OF THE REP BY TSC Upon classifying events as a GENERAL EMERGENCY in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SED shall:
EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 8 of 14 Date 3.2 ACTIVATION OF THE REP BY TSC Upon classifying events as a GENERAL EMERGENCY in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SED shall:
[1]     IF personnel accountability has not been previously initiated, THEN
[1]
[a] DIRECT TSC Security Manager or Security Shift Supervisor to implement EPIP-8, "Personnel Accountability and Evacuation."       El 6144                             6or
IF personnel accountability has not been previously initiated, THEN
[a] DIRECT TSC Security Manager or Security Shift Supervisor to implement EPIP-8, "Personnel Accountability and Evacuation."
6144 6or
[b] DIRECT SM to ACTIVATE emergency sirens for personnel assembly.
[b] DIRECT SM to ACTIVATE emergency sirens for personnel assembly.
Initial   Time
Initial Time
[2] IF GENERAL EMERGENCY Classification has been declared by SM, THEN GO TO Step [6]     OR   appropriate Step based on SM turnover.               El NOTE   CECC Director should be notified within 5 minutes after declaration of the event
[2] IF GENERAL EMERGENCY Classification has been declared by SM, THEN GO TO Step [6]
[3] COMPLETE GE Notification Form (Page 13).                                     El
OR appropriate Step based on SM turnover.
[4] NOTIFY CECC Director.
NOTE CECC Director should be notified within 5 minutes after declaration of the event
[3]
COMPLETE GE Notification Form (Page 13).
[4]
NOTIFY CECC Director.
[a] CALL CECC Director.
[a] CALL CECC Director.
or 1 5-751 -1 4     or     5-751-16181 I RingdownLe Initial Time
or 1 5-751 -1 4 or 5 -751-16181 Initial Time
[b] READ completed Form (Page 13) to CECC Director.
[b] READ completed Form (Page 13) to CECC Director.
[c] FAX CECC GE Notification Form (Page 13).                                 El 15-751-16827Fx FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
[c] FAX CECC GE Notification Form (Page 13).
15-751-16827Fx FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN El El El El I RingdownLe


EPIP-5 SQN                 GENERAL EMERGENCY                     Rev. 25 Page 9 of 14 Date 3.2 ACTIVATION OF THE REP BY TSC (Continued)
EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 9 of 14 Date 3.2 ACTIVATION OF THE REP BY TSC (Continued)
[5]   IF CECC Director CANNOT be contacted within 10 minutes of the declaration, THEN
[5]
IF CECC Director CANNOT be contacted within 10 minutes of the declaration, THEN
[a] NOTIFY Tennessee Emergency Management Agency (TEMA).
[a] NOTIFY Tennessee Emergency Management Agency (TEMA).
9-1-800-262-3300 1 or F9--615-741-0001 I or F888-616-8091 (satellite)
9-1-800-262-3300 1 or F9--615-741-0001 I or F888-616-8091 (satellite)
Initial     Time
Initial Time
[1] READ completed Form (Page 13) to TEMA.                             Dl
[1] READ completed Form (Page 13) to TEMA.
[2] FAX TEMA GE Notification Form (Page 13).                           El 1 9-1-615-242-9635 FAX I
Dl
[b] NOTIFY Hamilton County Emergency Management Agency (EMA)           AND 19-209-69o     o   1 9-622-77771 or   19-622-0022 1         Initial   Time READ completed Form (Page 13) to Hamilton County EMA.                 El
[2] FAX TEMA GE Notification Form (Page 13).
[c] NOTIFY Bradley County EMA AND 9-476-06         or     9-476-75¶11           Initial   Time READ completed Form (Page 13) to Bradley County EMA.                   El
El 1 9-1-615-242-9635 FAX I
[6] IF CECC EPIP-9 "Emergency Radiological Monitoring Procedures."
[b] NOTIFY Hamilton County Emergency Management Agency (EMA)
has not been previously initiated, THEN DIRECT TSC RADCON Manager to implement CECC EPIP-9                             El FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
AND 19-209-69o o
1 9-622-77771 or 19-622-0022 1 Initial Time READ completed Form (Page 13) to Hamilton County EMA.
El
[c] NOTIFY Bradley County EMA AND 9-476-06 or 9-476-75¶11 Initial Time READ completed Form (Page 13) to Bradley County EMA.
El
[6]
IF CECC EPIP-9 "Emergency Radiological Monitoring Procedures."
has not been previously initiated, THEN DIRECT TSC RADCON Manager to implement CECC EPIP-9 El FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


EPIP-5 SQN                 GENERAL EMERGENCY                   Rev. 25 Page 10 of 14 Date 3.2   ACTIVATION OF THE REP BY TSC (Continued)
EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 10 of 14 Date 3.2 ACTIVATION OF THE REP BY TSC (Continued)
NOTE     The Dose Assessment function is transferred to the CECC once they are staffed.
NOTE The Dose Assessment function is transferred to the CECC once they are staffed.
[7]   MONITOR radiation monitors.
[7]
MONITOR radiation monitors.
WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment.
WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment.
[a] DIRECT TSC Chemistry Manager or Chemistry Shift Supervisor to perform a dose assessment using EPIP-14, "Radiological Control Response."     El 7285 Lab     or [ 6348 Lab   or Pager 350-40732
[a]
[b]   REFER to Protective Action Recommendation Logic Diagram (Page 12) AND IF change in PAR required, THEN                                       Rl COMPLETE GE Follow-up Form (Page 14) AND REPORT to CECC Director for State notification at:
DIRECT TSC Chemistry Manager or Chemistry Shift Supervisor to perform a dose assessment using EPIP-14, "Radiological Control Response."
Ringdo     ine   or   15-751-16147 or   15-751-16801 AND FAX CECC GE Follow-up Form (Page 14)             5-751-1682
El 7285 Lab or [ 6348 Lab or Pager 350-40732
[8]   IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."                             El
[b]
[9]   IF there is a security threat, THEN DIRECT TSC Security Manager or Security Shift Supervisor to implement         El PHYSI-32,"Security Instructions For Members Of The Security Force".
REFER to Protective Action Recommendation Logic Diagram (Page 12) AND Rl IF change in PAR required, THEN COMPLETE GE Follow-up Form (Page 14) AND REPORT to CECC Director for State notification at:
or     1 6i FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
Ringdo ine or 15-751-16147 or 15-751-16801 AND FAX CECC GE Follow-up Form (Page 14) 5-751-1682
[8]
IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."
[9]
IF there is a security threat, THEN DIRECT TSC Security Manager or Security Shift Supervisor to implement PHYSI-32,"Security Instructions For Members Of The Security Force".
or 1 6 i FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN El El


EPIP-5 SQN                   GENERAL EMERGENCY                         Rev. 25 Page 11 of 14 Date 3.2   ACTIVATION OF THE REP BY TSC (Continued)
EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 11 of 14 Date 3.2 ACTIVATION OF THE REP BY TSC (Continued)
NOTE I NRC notification should be made as soon as practicable, but within 1 hour of "GENERAL EMERGENCY" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.
NOTE I NRC notification should be made as soon as practicable, but within 1 hour of "GENERAL EMERGENCY" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.
NOTE 2 Do not dial "1" prior to the number when using ENS phones.
NOTE 2 Do not dial "1" prior to the number when using ENS phones.
[10]   ENSURE NRC has been notified of plan activation via ENS in accordance with SPP-3.5.
[10]
(301) 816-5100 (Main)         (301) 951-0550 (Backup)       1 9-1-(301) 816-5151 (Fax)I Initial Time NOTE Protective Action Recommendation are the responsibility of the CECC Director after assuming that responsibility from the SED.
ENSURE NRC has been notified of plan activation via ENS in accordance with SPP-3.5.
[11]   MONITOR plant conditions AND EVALUATE using EPIP-1, AND
(301) 816-5100 (Main)
[a]   IF additional conditions satisfy criteria of other GENERAL EMERGENCYs                           OR
(301) 951-0550 (Backup) 1 9-1-(301) 816-5151 (Fax)I Initial Time NOTE Protective Action Recommendation are the responsibility of the CECC Director after assuming that responsibility from the SED.
[b]   IF change to Protective Action Recommendations             OR
[11] MONITOR plant conditions AND EVALUATE using EPIP-1, AND
[c]     IF conditions warrant a need for follow-up information, THEN COMPLETE GE Follow-up Form (page 14),                   AND REPORT to CECC Director for State notification at:
[a]
I Ringdown Linel or     15-751-1614       or     5-751-1680J AND FAX CECC GE Follow-up Form (Page 14)                         15-751-1682FA OR
IF additional conditions satisfy criteria of other GENERAL EMERGENCYs OR
[d]   IF situation no longer exists, THEN TERMINATE emergency per EPIP-16, "Termination and Recovery," AND             El COMPLETE GE Follow-up Form (Page 14) including                 ri           11 Time and Date Event Terminated and FAX to CECC.             5F751-1682 FAXI END OF SECTION               I FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
[b]
IF change to Protective Action Recommendations OR
[c]
IF conditions warrant a need for follow-up information, THEN COMPLETE GE Follow-up Form (page 14),
AND REPORT to CECC Director for State notification at:
I Ringdown Linel or 15-751-1614 or 5-751-1680J AND FAX CECC GE Follow-up Form (Page 14)
OR
[d]
IF situation no longer exists, THEN TERMINATE emergency per EPIP-16, "Termination and Recovery," AND COMPLETE GE Follow-up Form (Page 14) including ri Time and Date Event Terminated and FAX to CECC.
5F751-1682 FAXI END OF SECTION I
FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN El 11 15-751-1682FA


EPIP-5 SQN                   GENERAL EMERGENCY                               Rev. 25 Page 12 of 14 PROTECTIVE ACTION RECOMMENDATION LOGIC DIAGRAM SGENERAL EMERGENCY DECLARED SEQUOYAH NUCLEAR PLANT C                  At NOTES                       ,.,-or    beyond 5 MILES Projected or aYlf conditions are not known                   Measured Dose Then Answer NO.                             S>  the Table 1 /......                                R A*l*il RE.CUMMINUA I IOIN 1 ICONTINUE ASSESSMENT.                                                                           I VP%..'LJI          Miles Radius Modify protective actions                                                         and 10 Mile*s downwind NO based on available plant and                                                   and SHELTEFSremainder o1 field monitoring information.                                                             10 Mil
EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 12 of 14 PROTECTIVE ACTION RECOMMENDATION LOGIC DIAGRAM SGENERAL EMERGENCY DECLARED SEQUOYAH NUCLEAR PLANT NOTES aYlf conditions are not known Then Answer NO.
* EPZ Locate and evacuate additional localized hotspots Indiction of      SvereCor 0
ICONTINUE ASSESSMENT.
TABLE 1 Daag>    hevaue RADIOACTIVITY RELEASE DOSE TYPE               LIMIT 3.9E-6 microCI/cc of Iodine 131 Measured                                 I/*sthere Loss of Physica*
Modify protective actions based on available plant and field monitoring information.
1 REM/hr External Dose I REM TEDE Projected                                             N                     (     RECOMME,NDATION 2 5 REM Thyroid CDE                                                    YES  EVACUATE 2 Miles Radius and 5 Mile s downwind
Locate and evacuate additional localized hotspots TABLE 1 RADIOACTIVITY RELEASE DOSE TYPE LIMIT 3.9E-6 microCI/cc of Iodine 131 Measured 1 REM/hr External Dose I REM TEDE Projected 5 REM Thyroid CDE C
                                      - .          orbeyond                                        nd TABLE 2                              2MILESProjected or              SHELTER re mainder of 10 Measured Dose                                Mile EPZ SEVERE CORE DAMAGE INDICATIONS                                     > al      h
At
: 1. Containment Radiation                               NO
,.,-or beyond 5 MILES Projected or Measured Dose S> the Table 1 /......
                                                                                                                © Monitor Reading on RM-90-271 or 272 is                                                                                 DATION 3
VP%..'LJI I 
    > 28 REM/hr.                                                                   EVACUATE 2 Miles Radiu:
NO and 10 Mile*
SRECOMMENI or                                     or beyond the                                  anc I
and SHELTEF 10 Mil Indiction of SvereCor Daag>
: 2. Containment Radiation                     SITE BOUNDARY                        SHELTER rE.mainder of Monitor Reading on                     Projected or Measured                            10 Mile EPZ RM-90-273or 274 is
hevaue I/*s there Loss of Physica*
    > 29 REM/hr.                                                                                   Li or
N
: 3. Reactor coolant Activity of                                                 NO%
(
    > 300 microCI/gm Dose Equivalent 1-131.                                                               RECOMMENDATION 4 or                                                                       SHELTER 2 Miles Radius
: RECOMME, YES EVACUATE and 5 Mile orbeyond 2MILES Projected or SHELTER re Measured Dose Mile h
: 4. Inadequate core cooling as                                                                   and indicated by "red" or                                                               SHELTER 5 Miles "orange" path from core                                                                   Downwind cooling status tree.
al NO SRECOMMENI EVACUATE 2 or beyond the anc SITE BOUNDARY SHELTER rE Projected or Measured 10 Mile L i NO%
G FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN
0
© Miles Radiu:
I
.mainder of EPZ FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN RE.CUMMINUA I IOIN 1 Miles Radius s downwind Sremainder o1
* EPZ NDATION 2 2 Miles Radius s downwind nd mainder of 10 EPZ TABLE 2 SEVERE CORE DAMAGE INDICATIONS
: 1. Containment Radiation Monitor Reading on RM-90-271 or 272 is  
> 28 REM/hr.
or
: 2. Containment Radiation Monitor Reading on RM-90-273or 274 is  
> 29 REM/hr.
or
: 3. Reactor coolant Activity of  
> 300 microCI/gm Dose Equivalent 1-131.
or
: 4. Inadequate core cooling as indicated by "red" or "orange" path from core cooling status tree.
RECOMMENDATION 4 SHELTER 2 Miles Radius and SHELTER 5 Miles Downwind G
R A*l*il DATION 3


EPIP-5 SQN                   GENERAL EMERGENCY                           Rev. 25 Page 13 of 14 GENERAL EMERGENCY NOTIFICATION FORM
EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 13 of 14 El RECOMMENDATION 1
[a] EVACUATE 2 mile radius and 10 miles downwind AND
[b] SHELTER remainder 10 mile EPZ El RECOMMENDATION 2
[a] EVACUATE 2 mile radius and 5 miles downwind AND
[b] SHELTER remainder 10 mile EPZ El RECOMMENDATION 3
[a] EVACUATE to 2 mile radius AND
[b] SHELTER remainder 10 mile EPZ
[El RECOMMENDATION 4
[a] SHELTER to 2 mile radius AND
[b] SHELTER 5 miles downwind
: 12. "Please Repeat the Information You Have Received to Ensure Accuracy."
E FAX TO THE ODS AT 751-8620 AFTER COMPLETING THE NOTIFICATION FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN GENERAL EMERGENCY NOTIFICATION FORM
: 1. 0 THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.
: 1. 0 THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.
OR El THIS IS A DRILL. THIS IS A DRILL.
OR El THIS IS A DRILL. THIS IS A DRILL.
: 2. This is                               at Sequoyah Nuclear Plant.
: 2. This is at Sequoyah Nuclear Plant.
(Your Name)
(Your Name)
: 3. There has been a GENERAL EMERGENCY declared at Sequoyah Nuclear Plant.
: 3. There has been a GENERAL EMERGENCY declared at Sequoyah Nuclear Plant.
Affecting   El Unit 1       OR       El Unit 2   OR       El Both Units 1 & 2
Affecting El Unit 1 OR El Unit 2 OR El Both Units 1 & 2
: 4. EAL Designator:
: 4.
: 5. Brief Description of Event
EAL Designator:
: 6. Plant conditions are:       El Stable       E- Deteriorating
: 5.
: 7. Radiological Conditions are:
Brief Description of Event
: 6. Plant conditions are:
El Stable E-Deteriorating
: 7.
Radiological Conditions are:
El No Abnormal Release Off-site El Airborne Release Off-site El Liquid Release Off-site El Release Information Not Known
El No Abnormal Release Off-site El Airborne Release Off-site El Liquid Release Off-site El Release Information Not Known
: 8. Event Declared: Time:                                     Date:
: 8. Event Declared: Time:
: 9. Event Terminated: Time:                                   Date:
Date:
: 9. Event Terminated: Time:
Date:
: 10. The Meteorological Conditions Are: (Use MET Tower elevation 46, alternate elevation 90.)
: 10. The Meteorological Conditions Are: (Use MET Tower elevation 46, alternate elevation 90.)
Wind Speed                       mph     Wind Direction From
Wind Speed mph Wind Direction From
: 11. Protective Action Recommendation: (For Determination See PAR Logic Diagram Page 12)
: 11. Protective Action Recommendation: (For Determination See PAR Logic Diagram Page 12)
El RECOMMENDATION 1          [a] EVACUATE 2 mile radius and 10 miles downwind AND
[b] SHELTER remainder 10 mile EPZ El RECOMMENDATION 2          [a] EVACUATE 2 mile radius and 5 miles downwind AND
[b] SHELTER remainder 10 mile EPZ El RECOMMENDATION 3          [a] EVACUATE to 2 mile radius AND
[b] SHELTER remainder 10 mile EPZ
[El RECOMMENDATION 4          [a] SHELTER to 2 mile radius AND
[b] SHELTER 5 miles downwind
: 12. "Please Repeat the Information You Have Received to Ensure Accuracy."                    E FAX TO THE ODS AT 751-8620 AFTER COMPLETING THE NOTIFICATION FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN


EPIP-5 SQN                   GENERAL EMERGENCY                                                             Rev. 25 Page 14 of 14 GENERAL EMERGENCY FOLLOW-UP FORM
EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 14 of 14 GENERAL EMERGENCY FOLLOW-UP FORM
: 1. 13 THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.
: 1. 13 THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.
OR 0l THIS IS A DRILL. THIS IS A DRILL.
OR 0l THIS IS A DRILL. THIS IS A DRILL.
: 2. This is                                                         at Sequoyah Nuclear Plant.
: 2. This is at Sequoyah Nuclear Plant.
(Your Name)
(Your Name)
: 3. This is Follow-up Information Regarding the GENERAL EMERGENCY declared at Sequoyah Nuclear Plant Affecting   D3 Unit 1             OR                     13 Unit 2             OR             El Both Units 1 & 2
: 3. This is Follow-up Information Regarding the GENERAL EMERGENCY declared at Sequoyah Nuclear Plant Affecting D3 Unit 1 OR 13 Unit 2 OR El Both Units 1 & 2
: 4. Reactor             Unit I                   R3 Shutdown                       E3 At Power Unit 2                   13 Shutdown                         13 At Power
: 4. Reactor Unit I R3 Shutdown E3 At Power Unit 2 13 Shutdown 13 At Power
: 5. Plant conditions are:               E3 Stable                       El Deteriorating
: 5. Plant conditions are:
E3 Stable El Deteriorating
: 6. Additional EAL Designator (s):
: 6. Additional EAL Designator (s):
: 7. The Following Significant Changes in Plant Conditions Have Occurred:
: 7. The Following Significant Changes in Plant Conditions Have Occurred:
: 8. Evacuation of nonessential site personnel is on going:
: 8. Evacuation of nonessential site personnel is on going:
E3 YES               13 NO                       OR               E3 COMPLETED
E3 YES 13 NO OR E3 COMPLETED
: 9. The Following Significant Changes in Radiological Conditions Have Occurred:
: 9. The Following Significant Changes in Radiological Conditions Have Occurred:
: 10. The Following Changes To Protective Action Recommendations Have Occurred:
: 10. The Following Changes To Protective Action Recommendations Have Occurred:
: 11. The Meteorological Conditions Are: (Use MET Tower elevation 46, alternate elevation 90.)
: 11. The Meteorological Conditions Are: (Use MET Tower elevation 46, alternate elevation 90.)
Wind Speed                                             mph               Wind Direction From
Wind Speed mph Wind Direction From
: 12. Event Terminated:Time:                                                   Date:
: 12. Event Terminated:Time:
: 13. "Please Repeat the Information You Have Received to Ensure Accuracy."                                                                   13
Date:
: 14. Name                                                                 Date                                       Time
: 13. "Please Repeat the Information You Have Received to Ensure Accuracy."
                  "(Preparer'sName)
13
: 15. FAX TO THE ODS AT 751-8620 OR CECC AT 751-1682 AFTER COMPLETING THE NOTIFICATION.                                                                                                           13
: 14. Name Date Time  
                                .. ..  ... ..  .. .
"(Preparer's Name)
                                              ..... .. S..
: 15. FAX TO THE ODS AT 751-8620 OR CECC AT 751-1682 AFTER COMPLETING THE NOTIFICATION.
                                                        .....  ...  = .i .. *=,sl 'l'*l 'l   II ~ b IJ A u i'il*J   b'' ,* i iV       s b* ,liA P 1'UKWAKU LU1VWLIILU        rKULLDUILL                         IU   L1iIL1iAyL1..       I rIrtIxr-"1t,,                 ii
13 S..  
=.i  
*=,sl  
'l'*l  
'l II ~ b IJ A u i'il*J b''
i iV b*,liA s
P 1'UKWAKU LU1VWLIILU rKULLDUILL IU L1iIL1iAyL1..
I rIrtIxr-"1t,,  
ii


TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-7 ACTIVATION AND OPERATION OF THE OPERATIONS SUPPORT CENTER (OSC)
TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-7 ACTIVATION AND OPERATION OF THE OPERATIONS SUPPORT CENTER (OSC)
Revision 18 QUALITY RELATED PREPARED/PROOFREAD BY: W. P. Brooks RESPONSIBLE ORGANIZATION: Emergency Preparedness APPROVED BY:         John Casey EFFECTIVE DATE:           9-1-2000 LEVEL OF USE: REFERENCE REVISION DESCRIPTION: Intent Change: Revision changed the reporting requirement for the OSC; modified responsibilities of the MSS; added support from DCRM and Material Coordinator; updated terminology from REX to HIS-20; changed Operations Advisor reporting from TSC Ops Manager to TSC Operations Communicator; revised position titles; and revised checklist items to several checklists.
Revision 18 QUALITY RELATED PREPARED/PROOFREAD BY: W. P. Brooks RESPONSIBLE ORGANIZATION: Emergency Preparedness APPROVED BY:
John Casey EFFECTIVE DATE:
9-1-2000 LEVEL OF USE: REFERENCE REVISION DESCRIPTION:
Intent Change: Revision changed the reporting requirement for the OSC; modified responsibilities of the MSS; added support from DCRM and Material Coordinator; updated terminology from REX to HIS-20; changed Operations Advisor reporting from TSC Ops Manager to TSC Operations Communicator; revised position titles; and revised checklist items to several checklists.


SNI SQN ACTIVATION AND OPERATION OF THE OPERATIONS SUPPORT CENTER EPIP-7 Rev. 18 1                                                                       1 Page 2 of 36 TABLE OF CONTENTS Section Title                                                                                                           Page T able of C ontents ........................................................................................         2 1.0     P UR P O SE ..................................................................................................       3 2.0     R E FE R E NC E S .............................................................................................       3 3.0     INSTRUCTIONS .......................................................................................                 3 3.1     An Alert or Higher Classification .................................................................                   3 3.2     A ctivation of O SC .......................................................................................           3 3.2.1   Shift Manager Actions .................................................................................               3 3 .2 .2 C all List ....................................................................................................   ..4 3.2 .3   R esponse ..................................................................................................         4 3.2.4   Maintenance Shift Supervisor (MSS) .........................................................                         5 3.2.5   O S C O peration ............................................................................................         5 3.2.6   OSC Manager ...........................................................................................               6 3.2.7   Assistant OSC Manager .............................................................................                   7 3.2.8   OSC RADCON Supervisor .........................................................................                       7 3.2.9   OSC RADCON Briefer ...............................................................................                   7 3.2.10   OSC Operations Advisor .............................................................................                 7 3.2.11   Personnel Pool Manager .............................................................................                 7 3.2.12   Fire Operations Advisor ...............................................................................               8 3.2.13   Chemistry Shift Supervisor .........................................................................                   8 3.2.14   OSC Log Keeper .......................................................................................               8 3 .2 .15 OS C C lerk ..................................................................................................       8 3.2.16   OSC Site Security Advisor ...........................................................................                 8 3.2 .17   OS C Briefers ..............................................................................................         8 3.2.18   OSC Industrial Safety Advisor .....................................................................                   8 3.2.19   DCRM Coordinator ......................................................................................               9 3.2.20   OSC Nuclear Stores Coordinator ................................................................                       9 3.3       Deactivation ...............................................................................................         9 4.0       RE C O R D S ..................................................................................................       9 4 .1     QA R ecords ...............................................................................................           9 4.2       Non-Q A R ecords ........................................................................................             9 APPENDICES Appendix A, OSC Manager Checklist .........................................................                           10 Appendix B, Emergency Conditions Data Sheet .........................................                                 12 Appendix C, Assistant OSC Manager Checklist ...........................................                               14 Appendix D, OSC Team Tracking/Briefing/Debriefing Forms .....................                                         16 Appendix E, OSC RADCON Supervisor Checklist ......................................                                     18 Appendix F, OSC RADCON Briefer Checklist .............................................                               20 Appendix G, OSC Operations Advisor Checklist ........................................                                 21 Appendix H, Fire Operations Advisor Checklist ..........................................                             22 Appendix I, OSC Log Keeper Checklist .....................................................                           23 Appendix J, OSC Clerical Staff Checklist ...................................................                         24 Appendix K, OSC Site Security Advisor .....................................................                           25 Appendix L, OSC Briefer Checklist ..............................................................                       26 Appendix M, OSC Industrial Safety Checklist ............................................                               28 Appendix N, OSC Personnel Pool Manager Checklist ................................                                     29 Appendix 0, DCRM Coordinator Checklist .................................................                               30 Appendix P, OSC Material Coordinator Checklist ......................................                                 31 Appendix Q, Operations Support Center Telephone Listing .......................                                       32 Appendix R, Personnel Pool Mgr. Log .......................................................                           33 Appendix S, ERO Roster and Call-In Form .................................................                             34 SOURCE NOTES .......................................................................................                   36
SNI ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev. 18 1
1 Page 2 of 36 TABLE OF CONTENTS Section Title Page T able of C ontents........................................................................................
2 1.0 P U R P O S E..................................................................................................
3 2.0 R E FE R E N C E S.............................................................................................
3 3.0 INSTRUCTIONS.......................................................................................
3 3.1 An Alert or Higher Classification.................................................................
3 3.2 A ctivation of O SC.......................................................................................
3 3.2.1 Shift Manager Actions.................................................................................
3 3.2.2 C all List....................................................................................................  
.. 4 3.2.3 R esponse..................................................................................................
4 3.2.4 Maintenance Shift Supervisor (MSS).........................................................
5 3.2.5 O S C O peration............................................................................................
5 3.2.6 OSC Manager...........................................................................................
6 3.2.7 Assistant OSC Manager.............................................................................
7 3.2.8 OSC RADCON Supervisor.........................................................................
7 3.2.9 OSC RADCON Briefer...............................................................................
7 3.2.10 OSC Operations Advisor.............................................................................
7 3.2.11 Personnel Pool Manager.............................................................................
7 3.2.12 Fire Operations Advisor...............................................................................
8 3.2.13 Chemistry Shift Supervisor.........................................................................
8 3.2.14 OSC Log Keeper.......................................................................................
8 3.2.15 O S C C lerk..................................................................................................
8 3.2.16 OSC Site Security Advisor...........................................................................
8 3.2.17 O S C B riefers..............................................................................................
8 3.2.18 OSC Industrial Safety Advisor.....................................................................
8 3.2.19 DCRM Coordinator......................................................................................
9 3.2.20 OSC Nuclear Stores Coordinator................................................................
9 3.3 D eactivation...............................................................................................
9 4.0 R E C O R D S..................................................................................................
9 4.1 Q A R ecords...............................................................................................
9 4.2 Non-Q A R ecords........................................................................................
9 APPENDICES Appendix A, OSC Manager Checklist.........................................................
10 Appendix B, Emergency Conditions Data Sheet.........................................
12 Appendix C, Assistant OSC Manager Checklist...........................................
14 Appendix D, OSC Team Tracking/Briefing/Debriefing Forms..................... 16 Appendix E, OSC RADCON Supervisor Checklist...................................... 18 Appendix F, OSC RADCON Briefer Checklist.............................................
20 Appendix G, OSC Operations Advisor Checklist........................................ 21 Appendix H, Fire Operations Advisor Checklist.......................................... 22 Appendix I, OSC Log Keeper Checklist.....................................................
23 Appendix J, OSC Clerical Staff Checklist...................................................
24 Appendix K, OSC Site Security Advisor.....................................................
25 Appendix L, OSC Briefer Checklist..............................................................
26 Appendix M, OSC Industrial Safety Checklist............................................ 28 Appendix N, OSC Personnel Pool Manager Checklist................................ 29 Appendix 0, DCRM Coordinator Checklist.................................................
30 Appendix P, OSC Material Coordinator Checklist......................................
31 Appendix Q, Operations Support Center Telephone Listing....................... 32 Appendix R, Personnel Pool Mgr. Log.......................................................
33 Appendix S, ERO Roster and Call-In Form.................................................
34 SOURCE NOTES.......................................................................................
36


ACTIVATION AND OPERATION OF THE                 EPIP SQN             OPERATIONS SUPPORT CENTER                       Rev.18 Page 3 of 36 1.0   PURPOSE The purpose of this procedure is to describe the activation of the Operations Support Center (OSC), describe the OSC organization, and provide for OSC operation once it has been staffed. The OSC is activated during an "Alert,"
ACTIVATION AND OPERATION OF THE EPIP SQN OPERATIONS SUPPORT CENTER Rev.18 Page 3 of 36 1.0 PURPOSE The purpose of this procedure is to describe the activation of the Operations Support Center (OSC), describe the OSC organization, and provide for OSC operation once it has been staffed. The OSC is activated during an "Alert,"  
      "Site Area Emergency," or "General Emergency."
"Site Area Emergency," or "General Emergency."  


==2.0   REFERENCES==
==2.0 REFERENCES==
Developmental Documents A.
EPIP-6, "Activation and Operation of the Technical Support Center" B.
EPIP-8, "Personnel Accountability and Evacuation" C.
EPIP-14, "Radiological Control Response" D.
EPIP-16, "Termination and Recovery" 3.0 INSTRUCTIONS 3.1 An Alert or higher Emergency Classification At an Alert or higher Emergency Classification, the OSC Manager will report directly to the OSC and shall be responsible for implementing this procedure and coordinating OSC personnel and activities.
3.2 Activation of OSC 3.2.1 Shift Manager (SM) Actions The SM will activate the OSC by announcing the emergency condition by one or more of the following methods:
A.
Plant Public Address (PA) announcement.
B.
The Shift Manager or operations clerk will normally activate the Emergency Paging System (EPS) or contact the persons designated on the REP Duty Roster and/or Call List. If the EPS cannot be activated from the site, the SM will contact the Operations Duty Specialist (ODS) and have the EPS activated from the CECC.
C.
The SM may activate the onsite emergency sirens at an "Alert" and shall activate the sirens at a "Site Area Emergency" or "General Emergency".


Developmental Documents A. EPIP-6, "Activation and Operation of the Technical Support Center" B. EPIP-8, "Personnel Accountability and Evacuation" C. EPIP-14, "Radiological Control Response" D. EPIP-16, "Termination and Recovery" 3.0  INSTRUCTIONS 3.1  An Alert or higher Emergency Classification At an Alert or higher Emergency Classification, the OSC Manager will report directly to the OSC and shall be responsible for implementing this procedure and coordinating OSC personnel and activities.
I ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.o18 N
3.2  Activation of OSC 3.2.1 Shift Manager (SM) Actions The SM will activate the OSC by announcing the emergency condition by one or more of the following methods:
ON Page 4 of 36 3.2.2 Call List The Emergency Preparedness Manager (EPM) shall maintain a REP Duty Roster and Call List book listing key OSC personnel by name, plant and home telephone numbers. The REP Call List and Duty Roster book will be updated at least quarterly by the EPM or designee with input by the appropriate section/group supervisors. This book will be provided to the SM and will also be maintained in the TSC and OSC.
A. Plant Public Address (PA) announcement.
3.2.3
B. The Shift Manager or operations clerk will normally activate the Emergency Paging System (EPS) or contact the persons designated on the REP Duty Roster and/or Call List. If the EPS cannot be activated from the site, the SM will contact the Operations Duty Specialist (ODS) and have the EPS activated from the CECC.
C. The SM may activate the onsite emergency sirens at an "Alert" and shall activate the sirens at a "Site Area Emergency" or "General Emergency".


I    ACTIVATION AND OPERATION OF THE                EPIP-7 Rev.o18 SQN                      OPERATIONS SUPPORT CENTER Page 4 of 36 N      ON 3.2.2        Call List The Emergency Preparedness Manager (EPM) shall maintain a REP Duty Roster and Call List book listing key OSC personnel by name, plant and home telephone numbers. The REP Call List and Duty Roster book will be updated at least quarterly by the EPM or designee with input by the appropriate section/group supervisors. This book will be provided to the SM and will also be maintained in the TSC and OSC.
===Response===
3.2.3        Response The following personnel should report to the OSC or the assigned OSC support location upon announcement of an "ALERT" or higher emergency classification, or at the direction of the SED:
The following personnel should report to the OSC or the assigned OSC support location upon announcement of an "ALERT" or higher emergency classification, or at the direction of the SED:
A. OSC Manager B. Assistant OSC Manager C. Maintenance Shift Supervisor D. OSC RADCON Supervisor E. Fire Operations Advisor F. OSC Operations Advisor G. Two Instrument Maintenance Briefers H. Two Mechanical Maintenance Briefers I. Two Electrical Maintenance Briefers J. RADCON Briefer K. Chemistry Shift Supervisor L. OSC Personnel Pool Manager M. Two Duty Damage Control Teams(0)
A.
N. RADCON Lab Supervisor
OSC Manager B.
: 0. Other plant staff the OSC Manager determines to be necessary to support OSC functions will be called:
Assistant OSC Manager C.
: 1. OSC Clerks
Maintenance Shift Supervisor D.
: 2. OSC Log Keeper
OSC RADCON Supervisor E.
: 3. HIS-20 Operator
Fire Operations Advisor F.
: 4. Maintenance Personnel needed for support
OSC Operations Advisor G.
: 5. Operations Personnel needed for support
Two Instrument Maintenance Briefers H.
: 6. Transmission and Customer Service
Two Mechanical Maintenance Briefers I.
: 7. Technical Support Personnel needed for support
Two Electrical Maintenance Briefers J.
: 8. DCRM support
RADCON Briefer K.
: 9. Materials support
Chemistry Shift Supervisor L.
OSC Personnel Pool Manager M.
Two Duty Damage Control Teams(0)
N.
RADCON Lab Supervisor
: 0.
Other plant staff the OSC Manager determines to be necessary to support OSC functions will be called:
: 1.
OSC Clerks
: 2.
OSC Log Keeper
: 3.
HIS-20 Operator
: 4.
Maintenance Personnel needed for support
: 5.
Operations Personnel needed for support
: 6.
Transmission and Customer Service
: 7.
Technical Support Personnel needed for support
: 8.
DCRM support
: 9.
Materials support
: 10. Industrial Safety support
: 10. Industrial Safety support
: 11. Security Advisor (1) A team will dress-out and standby for assignment.
: 11.
Security Advisor (1) A team will dress-out and standby for assignment.


ACTIVATION AND OPERATION OF THE                   IEPIP-7 SQN             OPERATIONS SUPPORT CENTER                         Rev.18 36 Page 5 of 3.2.4 Maintenance Shift Supervisor (MSS)
ACTIVATION AND OPERATION OF THE IEPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 5 of 36 3.2.4 Maintenance Shift Supervisor (MSS)
The Maintenance Shift Supervisor (MSS) shall ensure that the OSC and Tool Room are unlocked and open for access when required. The MSS maintains responsibility as single point maintenance contact for the Shift Manager until the OSC Manager is in place. The MSS initiates OSC setup and may sign designated actions on the Assistant OSC Manager's Checklist.
The Maintenance Shift Supervisor (MSS) shall ensure that the OSC and Tool Room are unlocked and open for access when required.
The MSS maintains responsibility as single point maintenance contact for the Shift Manager until the OSC Manager is in place. The MSS initiates OSC setup and may sign designated actions on the Assistant OSC Manager's Checklist.
The MSS may assist in the activation of the Emergency Response Organization to ensure adequate personnel are available. The MSS will provide a briefing to the OSC Manager when he arrives and then becomes the second Assistant OSC Manager.
The MSS may assist in the activation of the Emergency Response Organization to ensure adequate personnel are available. The MSS will provide a briefing to the OSC Manager when he arrives and then becomes the second Assistant OSC Manager.
3.2.5 OSC Operation The OSC shall operate to ensure the following actions are taken:
3.2.5 OSC Operation The OSC shall operate to ensure the following actions are taken:
A. All personnel or teams previously tasked by the Control Room or Site Emergency Director prior to OSC staffing and activation shall be located and assigned a Team Tracking Letter designation for tracking and debriefing purposes.
A.
B. All teams shall be briefed and/or coordinated with the OSC prior to dispatch and debriefed by the OSC upon task completion. The exceptions are:
All personnel or teams previously tasked by the Control Room or Site Emergency Director prior to OSC staffing and activation shall be located and assigned a Team Tracking Letter designation for tracking and debriefing purposes.
            "* AUO teams responding to procedure driven missions or are otherwise under the direction of the SM. These teams shall be tracked on the OSC Ops tracking board via communication between the Control Room Communicator and the OSC Operations Advisor.
B.
            "" The Fire Brigade or Medical Emergency Response Team may be briefed in route by radio when response time is critical. These teams will be tracked by the OSC.
All teams shall be briefed and/or coordinated with the OSC prior to dispatch and debriefed by the OSC upon task completion. The exceptions are:  
              "* If an Emergency Response Team is responding or near the task area prior to OSC staffing the team may be briefed by radio or telephone and shall be tracked by the OSC.
"* AUO teams responding to procedure driven missions or are otherwise under the direction of the SM. These teams shall be tracked on the OSC Ops tracking board via communication between the Control Room Communicator and the OSC Operations Advisor.  
              "* RADCON Survey Teams and Chemistry Teams may be dispatched directly from their respective labs provided they are coordinated through the OSC RADCON Supervisor and tracked on the RADCON/CHEM board C. Each potential damage control and repair team member shall have qualifications verified and dosimetry issued prior to assignment to a response team.
"" The Fire Brigade or Medical Emergency Response Team may be briefed in route by radio when response time is critical. These teams will be tracked by the OSC.  
D. RADCON and Operations should be members of each response team.
"* If an Emergency Response Team is responding or near the task area prior to OSC staffing the team may be briefed by radio or telephone and shall be tracked by the OSC.  
E. Each team should have a radio for communications with the OSC. The Operations or RADCON member of each team should be the radio talker. Muted radios are available for use in radio-sensitive areas of the plant.
"* RADCON Survey Teams and Chemistry Teams may be dispatched directly from their respective labs provided they are coordinated through the OSC RADCON Supervisor and tracked on the RADCON/CHEM board C.
F. RADCON shall maintain sufficient respiratory protection equipment available for issue in a manner that will not delay teams response.
Each potential damage control and repair team member shall have qualifications verified and dosimetry issued prior to assignment to a response team.
D.
RADCON and Operations should be members of each response team.
E.
Each team should have a radio for communications with the OSC. The Operations or RADCON member of each team should be the radio talker. Muted radios are available for use in radio-sensitive areas of the plant.
F.
RADCON shall maintain sufficient respiratory protection equipment available for issue in a manner that will not delay teams response.


AND OPERATION OF THE             I EPIP-7 SQN               OPERATIONS SUPPORT CENTER                           Rev.18 Page 6 of 36 3.2.5 OSC Operation (Continued)
AND OPERATION OF THE I EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 6 of 36 3.2.5 OSC Operation (Continued)
G. Teams should respond with damage control tool kits to the assigned task.
G.
H. If a person/team is unable to complete a mission or is reassigned a task after briefing, the OSC shall be immediately notified by the team leader.
Teams should respond with damage control tool kits to the assigned task.
: 1. At least one Emergency Response Team is on standby at all times.
H.
If a person/team is unable to complete a mission or is reassigned a task after briefing, the OSC shall be immediately notified by the team leader.
: 1.
At least one Emergency Response Team is on standby at all times.
3.2.6 OSC Manager The OSC Manager is responsible for directing repairs and corrective actions; performing damage assessment; coordinating repair activities with the TSC; coordinating maintenance teams and ensuring proper briefings and accompaniment by RADCON; activating the Fire Brigade, Search and Rescue, and Medical Emergency Response Teams as necessary; relocation of the OSC in accordance with 3.2.6.A; deactivating the OSC. Appendix A, OSC Manager Checklist, shall be used to ensure required actions are completed.
3.2.6 OSC Manager The OSC Manager is responsible for directing repairs and corrective actions; performing damage assessment; coordinating repair activities with the TSC; coordinating maintenance teams and ensuring proper briefings and accompaniment by RADCON; activating the Fire Brigade, Search and Rescue, and Medical Emergency Response Teams as necessary; relocation of the OSC in accordance with 3.2.6.A; deactivating the OSC. Appendix A, OSC Manager Checklist, shall be used to ensure required actions are completed.
A. Relocate OSC personnel and equipment to an alternate OSC location when conditions require:
A.
: 1. Direct OSC RADCON Supervisor to make habitability survey for the OSC if a release has occurred. Surveys are to include direct radiation readings, area swipes, and air activity monitoring.
Relocate OSC personnel and equipment to an alternate OSC location when conditions require:
: 2. Inform the SED if conditions exceed habitability criteria.
: 1.
: 3. Relocate the OSC (upon direction from the SED) to the backup OSC in the O&PS building if it meets habitability requirements.
Direct OSC RADCON Supervisor to make habitability survey for the OSC if a release has occurred. Surveys are to include direct radiation readings, area swipes, and air activity monitoring.
: 4.     If the backup OSC does not meet habitability criteria, than an alternate location must be selected based on the following criteria:
: 2.
: a.     Location has adequate access to the plant (preferably is within the Protected Area), has a current radiological survey, is upwind from plant, and has adequate ventilation control.
Inform the SED if conditions exceed habitability criteria.
: b. Location has adequate communications capabilities (including three telephone circuits).
: 3.
: c. Physical size: space for at least 25 persons.
Relocate the OSC (upon direction from the SED) to the backup OSC in the O&PS building if it meets habitability requirements.
: d. Provides access to appropriate reference materials, tools, safety equipment, etc.
: 4.
If the backup OSC does not meet habitability criteria, than an alternate location must be selected based on the following criteria:
: a.
Location has adequate access to the plant (preferably is within the Protected Area), has a current radiological survey, is upwind from plant, and has adequate ventilation control.
: b.
Location has adequate communications capabilities (including three telephone circuits).
: c.
Physical size: space for at least 25 persons.
: d.
Provides access to appropriate reference materials, tools, safety equipment, etc.


3.2.7   Assistant OSC Manager The Assistant OSC Manager maintains continuous communication with the Maintenance Manager in the TSC, ensuring that OSC tasks are entered on the team tracking board/system; initiates an OSC Team Briefing/Debriefing Form, (Appendix D) for each task; assigns tasks to briefing teams; coordinates and directs damage control and repair activities as directed by the OSC Manager; ensures RADCON support for each team; ensures all teams (except as indicated in 3.2.5.B) are briefed before dispatch in accordance with Appendix D; ensures all teams are debriefed upon return to the OSC in accordance with Appendix D. When available, a qualified individual may assume communications and/or boardwriting responsibilities as delegated by the Assistant OSC Manager. Appendix C, Assistant OSC Manager Checklist, shall be used to ensure required actions are completed.
3.2.7 Assistant OSC Manager The Assistant OSC Manager maintains continuous communication with the Maintenance Manager in the TSC, ensuring that OSC tasks are entered on the team tracking board/system; initiates an OSC Team Briefing/Debriefing Form, (Appendix D) for each task; assigns tasks to briefing teams; coordinates and directs damage control and repair activities as directed by the OSC Manager; ensures RADCON support for each team; ensures all teams (except as indicated in 3.2.5.B) are briefed before dispatch in accordance with Appendix D; ensures all teams are debriefed upon return to the OSC in accordance with Appendix D. When available, a qualified individual may assume communications and/or boardwriting responsibilities as delegated by the Assistant OSC Manager. Appendix C, Assistant OSC Manager Checklist, shall be used to ensure required actions are completed.
3.2.8   OSC RADCON Supervisor The OSC RADCON Supervisor provides and coordinates RADCON resources; assigns a HIS-20 Operator and calls in additional support as needed; directs the RADCON Lab through the Lab Supervisor; informs the TSC RADCON Manager, OSC Manager and OSC RADCON briefer of current radiological conditions; enters data on the Radcon/Chem tracking board; provides RADCON support for emergency response teams as warranted.
3.2.8 OSC RADCON Supervisor The OSC RADCON Supervisor provides and coordinates RADCON resources; assigns a HIS-20 Operator and calls in additional support as needed; directs the RADCON Lab through the Lab Supervisor; informs the TSC RADCON Manager, OSC Manager and OSC RADCON briefer of current radiological conditions; enters data on the Radcon/Chem tracking board; provides RADCON support for emergency response teams as warranted.
Appendix E, OSC RADCON Supervisor Checklist, shall be used to ensure required actions are completed.
Appendix E, OSC RADCON Supervisor Checklist, shall be used to ensure required actions are completed.
3.2.9   OSC RADCON Briefer The OSC RADCON briefer remains informed of the site radiological conditions; provides technical assistance for radiological concerns; assist in technical briefings of OSC teams; ensures each team has a RADCON member present during briefing or may be dispatched with the team; completes applicable portions of Appendix D. Appendix F, OSC RADCON Briefer Checklist, shall be used to ensure required actions are completed.
3.2.9 OSC RADCON Briefer The OSC RADCON briefer remains informed of the site radiological conditions; provides technical assistance for radiological concerns; assist in technical briefings of OSC teams; ensures each team has a RADCON member present during briefing or may be dispatched with the team; completes applicable portions of Appendix D. Appendix F, OSC RADCON Briefer Checklist, shall be used to ensure required actions are completed.
3.2.10 OSC Operations Advisor The OSC Operations Advisor provides operational advice, plant status, and important system parameters to support the operation; provides Operations personnel as part of OSC response teams as warranted; maintains the Operations tracking board in the OSC. Provide Operations personnel, advice, and plant status to support the entire OSC including briefing emergency response teams as needed. Keeps the TSC Operations Communicator and Control Room Communicator informed of OSC team activities. May provide briefing/debriefing to AUOs as requested by the Control Room Crew and/or SED. Appendix G, OSC Operations Advisor Checklist, shall be used to ensure required actions are completed.
3.2.10 OSC Operations Advisor The OSC Operations Advisor provides operational advice, plant status, and important system parameters to support the operation; provides Operations personnel as part of OSC response teams as warranted; maintains the Operations tracking board in the OSC. Provide Operations personnel, advice, and plant status to support the entire OSC including briefing emergency response teams as needed. Keeps the TSC Operations Communicator and Control Room Communicator informed of OSC team activities. May provide briefing/debriefing to AUOs as requested by the Control Room Crew and/or SED. Appendix G, OSC Operations Advisor Checklist, shall be used to ensure required actions are completed.
3.2.11   Personnel Pool Manager The OSC Personnel Pool Manager provides and coordinates a pool of qualified maintenance personnel to staff damage control and repair teams.
3.2.11 Personnel Pool Manager The OSC Personnel Pool Manager provides and coordinates a pool of qualified maintenance personnel to staff damage control and repair teams.
He also tracks individual team members and assesses their future availability for other assignments. Appendix N, Personnel Pool Manager Checklist, shall be used to ensure required actions are complete. The Personnel Pool Manager Log (Appendix R) should be used to manage information regarding individual qualifications and OSC assignments.
He also tracks individual team members and assesses their future availability for other assignments. Appendix N, Personnel Pool Manager Checklist, shall be used to ensure required actions are complete. The Personnel Pool Manager Log (Appendix R) should be used to manage information regarding individual qualifications and OSC assignments.


ACTIVATION AND OPERATION OF THE                   EPIP-7 SQN                 OPERATIONS SUPPORT CENTER                       Rev.18 1                                     1 Page 8 of 36 3.2.12 Fire Operations Advisor The Fire Operations Advisor initiates fire response, medical emergency response, hazardous material containment; provides personnel to support Nuclear Security in searches of hazardous areas. Provides evaluations of the plant environment and recommendations to OSC management on safety aspects of the response team tasks. Contacts the site and/or corporate Safety Specialist as necessary. Maintain status of Fire Ops personnel.
ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 1
1 Page 8 of 36 3.2.12 Fire Operations Advisor The Fire Operations Advisor initiates fire response, medical emergency response, hazardous material containment; provides personnel to support Nuclear Security in searches of hazardous areas. Provides evaluations of the plant environment and recommendations to OSC management on safety aspects of the response team tasks. Contacts the site and/or corporate Safety Specialist as necessary.
Maintain status of Fire Ops personnel.
Appendix H, Fire Operations Advisor Checklist, shall be used to ensure required actions are completed.
Appendix H, Fire Operations Advisor Checklist, shall be used to ensure required actions are completed.
3.2.13 Chemistry Shift Supervisor The Chemistry Shift Supervisor in the CHEM lab provides first-line direction of Chemistry support personnel; calls in additional support as required; briefs Chemistry personnel on emergency events and status; initiates onsite/off-site dose assessment, per EPIP-14, as directed by the TSC or the Ops. SM; provides Chemistry support to the OSC as needed.
3.2.13 Chemistry Shift Supervisor The Chemistry Shift Supervisor in the CHEM lab provides first-line direction of Chemistry support personnel; calls in additional support as required; briefs Chemistry personnel on emergency events and status; initiates onsite/off-site dose assessment, per EPIP-14, as directed by the TSC or the Ops. SM; provides Chemistry support to the OSC as needed.
3.2.14 OSC Log Keeper The OSC Log Keeper ensures status boards are continuously updated to reflect current plant conditions and collects/maintain all original copies of generated documents. Appendix I, OSC Log Keeper, shall be used to ensure required actions are completed.
3.2.14 OSC Log Keeper The OSC Log Keeper ensures status boards are continuously updated to reflect current plant conditions and collects/maintain all original copies of generated documents. Appendix I, OSC Log Keeper, shall be used to ensure required actions are completed.
3.2.15 OSC Clerk The OSC Clerk provides logistics support to the OSC. Appendix J, OSC Clerical Staff, shall be used to ensure required actions are completed.
3.2.15 OSC Clerk The OSC Clerk provides logistics support to the OSC. Appendix J, OSC Clerical Staff, shall be used to ensure required actions are completed.
3.2.16 OSC Site Security Advisor The OSC Site Security Advisor coordinates Nuclear Security activities from the OSC when requested by the TSC Security Mgr or OSC Mgr; supports response to fire, medical emergencies, or other security responses; conducts search and rescue operations. Appendix K, OSC Nuclear Security Advisor, shall be used to ensure required actions are completed.
3.2.16 OSC Site Security Advisor The OSC Site Security Advisor coordinates Nuclear Security activities from the OSC when requested by the TSC Security Mgr or OSC Mgr; supports response to fire, medical emergencies, or other security responses; conducts search and rescue operations. Appendix K, OSC Nuclear Security Advisor, shall be used to ensure required actions are completed.
3.2.17 OSC Briefer The OSC Briefer provide and coordinate resources to support the OSC Manager; provide damage and repair assessments; remain informed of the site conditions; assist in technical briefings of OSC emergency response teams; and complete applicable portions of Appendix D. Appendix L, OSC Briefer Checklist, shall be used to ensure required actions are completed.
3.2.17 OSC Briefer The OSC Briefer provide and coordinate resources to support the OSC Manager; provide damage and repair assessments; remain informed of the site conditions; assist in technical briefings of OSC emergency response teams; and complete applicable portions of Appendix D. Appendix L, OSC Briefer Checklist, shall be used to ensure required actions are completed.
3.2.18 OSC Industrial Safety Advisor Industrial Safety issues are normally handled by the team briefer and/or assistance from Fire Ops when needed. If necessary, Fire Ops will contact site/corp Safety Specialist. When requested, Appendix M, Industrial Safety Advisor Checklist shall be used to ensure required actions are completed.
3.2.18 OSC Industrial Safety Advisor Industrial Safety issues are normally handled by the team briefer and/or assistance from Fire Ops when needed. If necessary, Fire Ops will contact site/corp Safety Specialist. When requested, Appendix M, Industrial Safety Advisor Checklist shall be used to ensure required actions are completed.


I     ACTIVATION AND OPERATION OF THE                 EPIP-7 SQN             OPERATIONS SUPPORT CENTER                       Rev.o18 1                                   1 Page 9 of 36 3.2.19 DCRM Coordinator The DCRM Coordinator provides support to OSC personnel by providing drawings, documents, vendor manuals and provides other support as requested. When requested, Appendix 0, DCRM Coordinator Checklist, shall be used to ensure required actions are completed.
I ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.o18 1
3.2.20 OSC Materials Coordinator The Materials Coordinator provides support to the OSC by determining materials availability, coordinating between Power Stores and the OSC and by expediting materials needed. When requested, Appendix P, OSC Materials Coordinator Checklist shall be used to ensure required actions are completed 3.3   Deactivation The OSC will be deactivated when directed by the SED. Appendix A, OSC Manager Checklist, may be used to ensure required actions are completed.
1 Page 9 of 36 3.2.19 DCRM Coordinator The DCRM Coordinator provides support to OSC personnel by providing drawings, documents, vendor manuals and provides other support as requested. When requested, Appendix 0, DCRM Coordinator Checklist, shall be used to ensure required actions are completed.
4.0   RECORDS 4.1   QA Records The following records generated during real emergency events are considered QA Records. These shall be forwarded to the EP Manager who shall submit QA Records and any other records deemed necessary to corporate Emergency Preparedness for maintenance.
3.2.20 OSC Materials Coordinator The Materials Coordinator provides support to the OSC by determining materials availability, coordinating between Power Stores and the OSC and by expediting materials needed. When requested, Appendix P, OSC Materials Coordinator Checklist shall be used to ensure required actions are completed 3.3 Deactivation The OSC will be deactivated when directed by the SED. Appendix A, OSC Manager Checklist, may be used to ensure required actions are completed.
A. Appendix B, Emergency Conditions Data Sheets B. Appendix D, OSC Team Briefing/Debriefing Forms C. Appendices for OSC Position Checklists D. OSC Log Sheets 4.2   Non-QA Records The appendices and checklists to this procedure necessary to demonstrate key actions during NRC evaluated exercises, drills, or used to establish/support NRC Performance Indicators will be retained by the SQN EP Manager for at least 2 years.
4.0 RECORDS 4.1 QA Records The following records generated during real emergency events are considered QA Records. These shall be forwarded to the EP Manager who shall submit QA Records and any other records deemed necessary to corporate Emergency Preparedness for maintenance.
A.
Appendix B, Emergency Conditions Data Sheets B.
Appendix D, OSC Team Briefing/Debriefing Forms C.
Appendices for OSC Position Checklists D.
OSC Log Sheets 4.2 Non-QA Records The appendices and checklists to this procedure necessary to demonstrate key actions during NRC evaluated exercises, drills, or used to establish/support NRC Performance Indicators will be retained by the SQN EP Manager for at least 2 years.


ACTIVATION AND OPERATION OF THE               IEPIP-7 SQN                   OPERATIONS SUPPORT CENTER                     Rev.18 IPagle 10 of 36 Date:
ACTIVATION AND OPERATION OF THE IEPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 IPagle 10 of 36 Date:
APPENDIX A Page 1 of 2 OSC MANAGER CHECKLIST INITIAL ACTIVATION OF THE OPERATIONS SUPPORT CENTER Time/
APPENDIX A Page 1 of 2 OSC MANAGER CHECKLIST INITIAL ACTIVATION OF THE OPERATIONS SUPPORT CENTER Time/
Initials
Initials
: 1. Swipe Accountability Reader.
: 1.
: 2. Ensure OSC set-up using materials in OSC Storage closet.
Swipe Accountability Reader.
: 3. Establish a log of activities and communications.
: 2.
: 4. Ensure OSC Briefing Area set-up using materials in OSC storage closet.
Ensure OSC set-up using materials in OSC Storage closet.
: 5. Obtain briefing from the MSS.
: 3.
: 6. Establish communications with the TSC and obtain an update of the emergency conditions. Appendix B should be used as a guideline.
Establish a log of activities and communications.
: 7. Determine location and function of persons/teams currently and previously tasked by the TSC or Control Room and ensure assignment of Team Tracking Letter designation.
: 4.
_8.                 Ensure Activation of OSC.
Ensure OSC Briefing Area set-up using materials in OSC storage closet.
: a. Ensure minimum staffing in OSC. (See note below)
: 5.
: b. Ensure OSC set-up complete.
Obtain briefing from the MSS.
: c. Ensure OSC habitability OR relocate OSC in accordance with 3.2.6.A.
: 6.
: d. Ensure OSC support personnel are notified of activation, if needed.
Establish communications with the TSC and obtain an update of the emergency conditions. Appendix B should be used as a guideline.
: 9. Brief OSC Personnel on Plant Conditions, unless SED has provided briefing.
: 7.
: 10. Announce to the OSC and notify the SED the time that OSC is operational and activated.
Determine location and function of persons/teams currently and previously tasked by the TSC or Control Room and ensure assignment of Team Tracking Letter designation.
: 11. Establish necessary emergency teams.
_8.
Ensure Activation of OSC.
: a.
Ensure minimum staffing in OSC. (See note below)
: b.
Ensure OSC set-up complete.
: c.
Ensure OSC habitability OR relocate OSC in accordance with 3.2.6.A.
: d.
Ensure OSC support personnel are notified of activation, if needed.
: 9.
Brief OSC Personnel on Plant Conditions, unless SED has provided briefing.
: 10.
Announce to the OSC and notify the SED the time that OSC is operational and activated.
: 11.
Establish necessary emergency teams.
NOTE: Minimum staffing requirements are one representative from Mechanical Maintenance, Electrical Maintenance and Instrument Maintenance.
NOTE: Minimum staffing requirements are one representative from Mechanical Maintenance, Electrical Maintenance and Instrument Maintenance.
Continued Next Page
Continued Next Page


AICTIVATION AND OPERATION OF THE                 EPIP-7 SQN             OPERATIONS SUPPORT CENTER                       Rev.18 I Page 11 of 36 Date:
AI CTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 I Page 11 of 36 Date:
APPENDIX A Page 2 of 2 OSC MANAGER CHECKLIST OPERATIONAL RESPONSIBILITIES
APPENDIX A Page 2 of 2 OSC MANAGER CHECKLIST OPERATIONAL RESPONSIBILITIES  
    "* Demonstrate command and control of the OSC throughout the emergency.
"* Demonstrate command and control of the OSC throughout the emergency.  
    "* Direct Asst. OSC Manager to form teams for accident assessment and repair and Announce the intent to form OSC teams.
"* Direct Asst. OSC Manager to form teams for accident assessment and repair and Announce the intent to form OSC teams.  
    "* Approve and Announce the dispatching of teams from the OSC.
"* Approve and Announce the dispatching of teams from the OSC.  
    "* Provide supplemental staffing for the OSC if needed.
"* Provide supplemental staffing for the OSC if needed.  
    "* Periodically direct key OSC positions to provide status summary to OSC staff or perform briefing yourself.
"* Periodically direct key OSC positions to provide status summary to OSC staff or perform briefing yourself.  
    "* Update the SED and TSC Maintenance Manager as needed.
"* Update the SED and TSC Maintenance Manager as needed.  
    "* Ensure that team activities are prioritized and synchronized with the TSC.
"* Ensure that team activities are prioritized and synchronized with the TSC.  
    "* Announce results of OSC teams following debriefing.
"* Announce results of OSC teams following debriefing.  
    "* If event duration expected to exceed 12 hours, then establish relief rotations using Appendix S.
"* If event duration expected to exceed 12 hours, then establish relief rotations using Appendix S.  
    "* Request habitability survey by RADCON if a release has occurred.
"* Request habitability survey by RADCON if a release has occurred.  
    "* Relocate the OSC as habitability conditions dictate.
"* Relocate the OSC as habitability conditions dictate.  
    "* Maintain a log of communications and activities.
"* Maintain a log of communications and activities.  
    "* Informs TSC of as-found plant conditions and status of emergency conditions.
"* Informs TSC of as-found plant conditions and status of emergency conditions.
* Ensure the Emergency Response Teams Tracking Boards/System, Radiological Status Boards and other visual displays are kept current.
Ensure the Emergency Response Teams Tracking Boards/System, Radiological Status Boards and other visual displays are kept current.
DEACTIVATION RESPONSIBILITIES
DEACTIVATION RESPONSIBILITIES Ensure all assigned tasks and assignments are completed.
* Ensure all assigned tasks and assignments are completed.
Ensure all emergency response teams have been debriefed.
* Ensure all emergency response teams have been debriefed.
Ensure all emergency equipment and supplies have been returned to their specified storage locations.
* Ensure all emergency equipment and supplies have been returned to their specified storage locations.
Review all records for completeness and forward all records to the Emergency Preparedness Manager.
* Review all records for completeness and forward all records to the Emergency Preparedness Manager.


IAI                                     AND OPERATION OF THE OPERATIONS SUPPORT CENTER EPIP-7 Rev.18 SQN Page 12 of 36 Date:
IAI AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 12 of 36 Date:
APPENDIX B Page 1 of 2 OSC MANAGER BRIEFING OUTLINE Emergency Classification: (check one)
APPENDIX B Page 1 of 2 OSC MANAGER BRIEFING OUTLINE Emergency Classification: (check one)
[1 UNUSUAL EVENT [-] ALERT [ SITE AREA EMERGENCY [-] GENERAL EMERGENCY Affected Unit:     [-1 UNIT I        [-- UNIT 2            [I BOTH UNITS 1 & 2 Event
[1 UNUSUAL EVENT [-] ALERT [
SITE AREA EMERGENCY [-] GENERAL EMERGENCY Affected Unit:
[
Event


== Description:==
== Description:==
 
-1 UNIT I
UNIT STATUS: [- UNIT I
[-- UNIT 2
[I BOTH UNITS 1 & 2 UNIT STATUS: [- UNIT I
[1 UNIT 2 Time Emergency Classified:
[1 UNIT 2 Time Emergency Classified:
Primary Plant Condition:     UNIT 1 Mode:       1II, "-2, 1-113, 1-14, [-15, or [-16 UNIT 2 Mode:    [11,   12, [-13, [:14, [1]5, or [-16 Electrical Lineup:
Primary Plant Condition:
DESCRIPTION OF ANY ABNORMAL LINEUP Diesel Generators:        DG I Operating [-1 Yes / [1 No DG 2 Operating [E Yes / R[ No Offsite Power Avail able:     1 Yes/ RI No Major Mechanical P roblems:
UNIT 1 Mode:
UNIT 2 Mode:
1II, "-2, 1-113, 1-14, [-15, or [-16
[11, 12, [-13, [:14, [1]5, or [-16 Electrical Lineup:
Diesel Generators:
Offsite Power Avail Major Mechanical P DESCRIPTION OF ANY ABNORMAL LINEUP DG I Operating [-1 Yes / [1 No DG 2 Operating [E Yes / R[ No able:
1 Yes/ RI No roblems:
Major Electrical Problems:
Major Electrical Problems:
Continued Next Page
Continued Next Page


SQ               I   ACTIVATION AND OPERATION OF THE     EPIP-7 Rev. 18 SQN                     OPERATIONS SUPPORT CENTER         1Pagle 13 of 36 Date:
SQ I
ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev. 18 1Pagle 13 of 36 Date:
APPENDIX B Page 2 of 2 OSC MANAGER BRIEFING OUTLINE Major Instrument and Control Problems:
APPENDIX B Page 2 of 2 OSC MANAGER BRIEFING OUTLINE Major Instrument and Control Problems:
Environmental Problems High Rad Levels:
Environmental Problems High Rad Levels:
Line 785: Line 1,315:
Other:
Other:
Recorded by:
Recorded by:
Time: _  _  _  _ _
Time:
Date:
Date:


I                         ACTIVATION AND OPERATION OF THE                     I EPIP-7 SQN                     OPERATIONS SUPPORT CENTER                           Rev.18 Page 14 of 36 Date:
I ACTIVATION AND OPERATION OF THE I EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 14 of 36 Date:
APPENDIX C Page 1 of 2 ASSISTANT OSC MANAGER CHECKLIST INITIAL ACTIVATION OF THE OSC Time/
APPENDIX C Page 1 of 2 ASSISTANT OSC MANAGER CHECKLIST INITIAL ACTIVATION OF THE OSC Time/
Initials
Initials
: 1. Swipe Accountability Reader- Assistant OSC Manager.
: 1.
Swipe Accountability Reader-Assistant OSC Manager.
Swipe Accountability Reader - Maintenance Shift Supervisor.
Swipe Accountability Reader - Maintenance Shift Supervisor.
: 2. Obtain keys at Work Coordination Center and open cafeteria (if locked), the OSC, and OSC storage room. (May be signed off by MSS)
: 2.
: 3. Ensure the minimum maintenance personnelare staffed or have been called in as necessary, (May be signed off by MSS)
Obtain keys at Work Coordination Center and open cafeteria (if locked), the OSC, and OSC storage room. (May be signed off by MSS)
J[Mechanical     Craft       (Electrical Craft                 Instrumentation Craft ONSITE   Hi 1 on shift               Li 1 on shift CALL-IN   Hi 1 onsite within 1 hour Li 1 onsite within 30 minutes       Li 1 onsite within 30 minutes CALL-IN   __                              1 onsite within 1 hour       Li 1 onsite within 1 hour TOTAL     TOTAL:                     2 Available onsite within 30     TOTAL 2 onsite within 1 hour         minutes and                   2 onsite within 1 hour TOTAL 3 onsite within 1 hour
: 3.
: 4. Open the Tool Room if it is not staffed. (May be signed off by MSS)
Ensure the minimum maintenance personnelare staffed or have been called in as necessary, (May be signed off by MSS)
: 5. Establish a log of activities and communications.
J[
: 6. Establish contact with Maintenance Manager in the TSC (Bridge x104 or 6478).
Mechanical Craft (Electrical Craft Instrumentation Craft ONSITE Hi 1 on shift Li 1 on shift CALL-IN Hi 1 onsite within 1 hour Li 1 onsite within 30 minutes Li 1 onsite within 30 minutes CALL-IN 1 onsite within 1 hour Li 1 onsite within 1 hour TOTAL TOTAL:
: 7. Obtain initial briefing and status of Operations and Maintenance tasks related to the emergencies that are underway from MSS, OSC Manager, or SM.
2 Available onsite within 30 TOTAL 2 onsite within 1 hour minutes and 2 onsite within 1 hour TOTAL 3 onsite within 1 hour
: 8. Ensure all emergency response teams previously tasked are assigned team tracking letter designation and entered on the Emergency Response Team Tracking Board/System.
: 4.
: 9. Assign a team briefer to any teams previously dispatched.
Open the Tool Room if it is not staffed. (May be signed off by MSS)
: 5.
Establish a log of activities and communications.
: 6.
Establish contact with Maintenance Manager in the TSC (Bridge x104 or 6478).
: 7.
Obtain initial briefing and status of Operations and Maintenance tasks related to the emergencies that are underway from MSS, OSC Manager, or SM.
: 8.
Ensure all emergency response teams previously tasked are assigned team tracking letter designation and entered on the Emergency Response Team Tracking Board/System.
: 9.
Assign a team briefer to any teams previously dispatched.
: 10. Ensure that two emergency response teams are pre-staged in the OSC staging area of the cafeteria.
: 10. Ensure that two emergency response teams are pre-staged in the OSC staging area of the cafeteria.
: 11. Notify Power Stores (X 7155) and the Tool Room (X 7755) (if staffed), advise them to remain staffed during the emergency unless released by the Site Emergency Director.
: 11. Notify Power Stores (X 7155) and the Tool Room (X 7755) (if staffed), advise them to remain staffed during the emergency unless released by the Site Emergency Director.
Continued Next Page
Continued Next Page


I     ACTIVATION AND OPERATION OF THE                 EPIP-7 SQN                     OPERATIONS SUPPORT CENTER                       Rev.18 Page 15 of 36 Date:
I ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 15 of 36 Date:
APPENDIX C Page 2 of 2 ASSISTANT OSC MANAGER INITIAL ACTIVATION OF THE OSC Continued
APPENDIX C Page 2 of 2 ASSISTANT OSC MANAGER INITIAL ACTIVATION OF THE OSC Continued
: 12. Verify the priorities of teams dispatched from the OSC, or being formed, with the TSC.
: 12. Verify the priorities of teams dispatched from the OSC, or being formed, with the TSC.
: 13. Review the OSC Team Tracking Board/System and reconcile any discrepancies with information obtained from briefing sources.
: 13. Review the OSC Team Tracking Board/System and reconcile any discrepancies with information obtained from briefing sources.
OPERATIONAL RESPONSIBILITIES
OPERATIONAL RESPONSIBILITIES  
"* Assist the OSC Manager in providing direction and control to the OSC areas.
"* Assist the OSC Manager in providing direction and control to the OSC areas.  
"* Open OSC, and OSC storage room.
"* Open OSC, and OSC storage room.  
"* Receive direction from SM/SED until OSC Manager arrives.
"* Receive direction from SM/SED until OSC Manager arrives.  
"* Oversee the operations of the OSC Teams and coordinate the supporting activities using Appendix D, "OSC Team Briefing/Debriefing Form".
"* Oversee the operations of the OSC Teams and coordinate the supporting activities using Appendix D, "OSC Team Briefing/Debriefing Form".  
"* Maintains continuous communication with Maintenance Manager in the TSC.
"* Maintains continuous communication with Maintenance Manager in the TSC.  
"* Receives TSC-assigned tasks, enters them on the Team Tracking Board/System, informs the OSC Manager, and assigns the task to a specific OSC Team Briefer.
"* Receives TSC-assigned tasks, enters them on the Team Tracking Board/System, informs the OSC Manager, and assigns the task to a specific OSC Team Briefer.  
"* Keeps the OSC Manager informed of important communications from the TSC.
"* Keeps the OSC Manager informed of important communications from the TSC.  
"* Coordinate with OSC RADCON Supervisor and Operations Advisor as needed regarding OSC Team activities (determines if teams need RADCON and/or Operations support).
"* Coordinate with OSC RADCON Supervisor and Operations Advisor as needed regarding OSC Team activities (determines if teams need RADCON and/or Operations support).  
"* Maintain log of communications and activities.
"* Maintain log of communications and activities.
DEACTIVATION RESPONSIBILITIES
DEACTIVATION RESPONSIBILITIES  
"* Ensure all assigned tasks and assignments are completed.
"* Ensure all assigned tasks and assignments are completed.  
"* Ensure all emergency response teams have been accounted for and debriefed.
"* Ensure all emergency response teams have been accounted for and debriefed.  
"* Ensure all emergency equipment and supplies have been returned to their specified storage locations.
"* Ensure all emergency equipment and supplies have been returned to their specified storage locations.  
"* Ensure all log and team briefing forms are completed and signed.
"* Ensure all log and team briefing forms are completed and signed.


I       TIVATION AND OPERATION OF THE                     EPIP-7 Rev.18 SQN                 OPERATIONS SUPPORT CENTER Page 16 of 36 PPENDIX D Page 1 of 2 OSC TEAM BRIEFING/DEBRIEFING FORM                      TEAM ASST. MGR.               TEAM TASK: LU Inspection         U I rouble Snooung     U   e.pai
I TIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 16 of 36 PPENDIX D Page 1 of 2 ASST. MGR.  
          /
/
Init/Ti me TASK LOCATION: (Bldg, EL., Rm. Name, etc)
In it/Ti me Date TEAM TEAM TASK: LU Inspection U I rouble Snooung U
Date            El ASSIGN Team next Letter designator (A, B, C etc.):
e.pai TASK LOCATION: (Bldg, EL., Rm. Name, etc)
El ASSIGN Team next Letter designator (A, B, C etc.):
D3 ENTER on Team Tracking Board.
D3 ENTER on Team Tracking Board.
13 INFORM OSC Mgr. of task and make PA Announcement in OSC.
13 INFORM OSC Mgr. of task and make PA Announcement in OSC.
13 ASSIGN task to Lead Briefer Name:
13 ASSIGN task to Lead Briefer Name:
Heads-up to Briefer: [] Ops E] R/C       13 Safety 13   Other RAD SUPV.                 RADCON REQUIREMENTS: RWP: LI Yes RWP #                             LjNo E] SCBA E] Respirator [] Dressout E] Other I             Emergency Exposure Approved by SED: []Yes (REM Init/Time                 (Ref: EPIP-15)                           I-No KI ISSUE Approved by TSC Radcon Mgr.: []Yes LINo (Ref: EPIP-14)
Heads-up to Briefer: [] Ops E] R/C 13 Safety 13 Other RAD SUPV.
BRIEFER                           Team Members Names                 Discipline (MM, EM, IM, etc.)
RADCON REQUIREMENTS: RWP: LI Yes RWP #
LjNo E] SCBA E] Respirator
[] Dressout E] Other I
Emergency Exposure Approved by SED: []Yes (REM Init/Time (Ref: EPIP-15)
I-No KI ISSUE Approved by TSC Radcon Mgr.: []Yes LINo (Ref: EPIP-14)
BRIEFER Team Members Names Discipline (MM, EM, IM, etc.)
Team Leader Name:.
Team Leader Name:.
Init/Time AUO (Use Page 2 to conduct   RADCON Tech briefing)
Init/Time AUO (Use Page 2 to conduct RADCON Tech briefing)
Briefing conducted by:
Briefing conducted by:
Communication Method: E] Phone#                   E] Pager#
Communication Method: E] Phone#
[] Messenger                 [_] OSC Hotline (x6406)_
E] Pager#
13 Radio Ch#       Radio Sensitive Area (0-TI-OPS-000-063.0) I Yes 13 No EL Contact OSC Briefer Every           Minutes OSC MGR.                 FINAL   APPROVAL     TO RELEASE     TEAM
[] Messenger
            /           Team Necessary? E] Yes E] No Init/Time         Radiological Condition Change Since Briefing? [] Yes [] No E] ANNOUNCE, on the OSC P/A, Intention to Dispatch the Team.
[_] OSC Hotline (x6406)_
TEAM LEADER               DEBRIEFING (Use Page 2 to conduct debriefing) or BRIEFER/                Debriefing conducted by:
13 Radio Ch#
Init/Time         LI PROVIDE Summary to the OSC Manager.
Radio Sensitive Area (0-TI-OPS-000-063.0)
M_UPDATE the OSC Team Tracking Board.
I Yes 13 No EL Contact OSC Briefer Every Minutes OSC MGR.
")SC MGR.               F1 ANNOUNCE Team results over the OSC P/A system.
FINAL APPROVAL TO RELEASE TEAM  
I           13 ENSURE TSC is informed of Team results.
/
Init/Tim e                       . ..      ...    . .
Team Necessary? E] Yes E] No Init/Time Radiological Condition Change Since Briefing? [] Yes [] No E] ANNOUNCE, on the OSC P/A, Intention to Dispatch the Team.
Continued Next Page
TEAM LEADER DEBRIEFING (Use Page 2 to conduct debriefing) or BRIEFER Debriefing conducted by:  
/
Init/Time LI PROVIDE Summary to the OSC Manager.
M_ UPDATE the OSC Team Tracking Board.  
")SC MGR.
F1 ANNOUNCE Team results over the OSC P/A system.
I 13 ENSURE TSC is informed of Team results.
Init/Tim e Continued Next Page OSC TEAM BRIEFING/DEBRIEFING FORM


I                   I     ACTIVATION AND OPERATION OF THE               I EPIP-7 SQN                     OPERATIONS SUPPORT CENTER                       Rev.18 1                                     1 Pagje 17 of 36 Date:
I I
APPENDIX D Page 2 of 2 EMERGENCY RESPONSE TEAM BRIEFING/DEBRIEFING CHECKLIST BRIEFING E-1     Description of problems -Team Priority I-     Plant system status r-     Plant radiological status F-E     Route to/from work area
ACTIVATION AND OPERATION OF THE I EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 1
    --    Hazards between OSC and work location r-     Radiation Work Permit (RWP)
1 Pagje 17 of 36 Date:
    --    RADCON support
APPENDIX D Page 2 of 2 EMERGENCY RESPONSE TEAM BRIEFING/DEBRIEFING CHECKLIST BRIEFING E-1 Description of problems -Team Priority I-Plant system status r-Plant radiological status F-E Route to/from work area Hazards between OSC and work location r-Radiation Work Permit (RWP)
    --    OPS support F-1   Procedures to be used El     Tools needed (See tool pouch description in O-PI-REM-000-001 .Q, "Quarterly Tool Kit Inventory".)
RADCON support OPS support F-1 Procedures to be used El Tools needed (See tool pouch description in O-PI-REM-000-001.Q, "Quarterly Tool Kit Inventory".)
El     Equipment needed
El Equipment needed Clearance required/Hold Order#
      --  Clearance required/Hold Order#
E-l Safety evaluation of job El Communication with OSC E-l Copy of Briefing Form (Appendix D) given to team with phone number(s).
E-l   Safety evaluation of job El     Communication with OSC E-l   Copy of Briefing Form (Appendix D) given to team with phone number(s).
E]
E]     Key(s) needed for task.
Key(s) needed for task.
DEBRIEFING El     Was assignment completed?             El Observations from the Field El     Equipment                           r-   Hazards El     Radiological conditions               ['1 Unusual sounds, etc.
DEBRIEFING El Was assignment completed?
El Observations from the Field El Equipment r-Hazards El Radiological conditions
['1 Unusual sounds, etc.  
-I Other information El Team directed to Personnel Pc Manager NOTES: (Observations/Damage Assessment/Recommendations, etc.)
0ol
0ol
        -I  Other information                    El  Team directed to Personnel Pc Manager NOTES: (Observations/Damage Assessment/Recommendations, etc.)


I     ACTIVATION AND OPERATION OF THE                         EPIP-7 Rev.18 SQN                       OPERATIONS SUPPORT CENTER Page 18 of 36 Date:
I ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 18 of 36 Date:
APPENDIX E Page 1 of 2 OSC RADCON SUPERVISOR CHECKLIST INITIAL ACTIVATION OF THE OSC Time/
APPENDIX E Page 1 of 2 OSC RADCON SUPERVISOR CHECKLIST INITIAL ACTIVATION OF THE OSC Time/
Initials
Initials
: 1. Swipe Accountability Reader.
: 1.
: 2. Fill out the Organizational/Staffing Chart and obtain OSC badge.
Swipe Accountability Reader.
: 3. Establish a log of activities and communications.
: 2.
: 4. Ensure a) HIS-20 printout is brought from the RADCON Lab to the OSC; b) a HIS-20 Computer Operator is assigned to provide computer access or use the printout for RADCON qualification checks of Emergency Response Team members; c) any Emergency Response Team members already assigned tasks in the field have acceptable RAD and qualifications (Contact MSS to for names and assigned task of individuals);
Fill out the Organizational/Staffing Chart and obtain OSC badge.
: 3.
Establish a log of activities and communications.
: 4.
Ensure a) HIS-20 printout is brought from the RADCON Lab to the OSC; b) a HIS-20 Computer Operator is assigned to provide computer access or use the printout for RADCON qualification checks of Emergency Response Team members; c) any Emergency Response Team members already assigned tasks in the field have acceptable RAD and qualifications (Contact MSS to for names and assigned task of individuals);
d) the Personnel Pool Manager is notified when the HIS-20 operator is assigned and given the name of the HIS-20 operator.
d) the Personnel Pool Manager is notified when the HIS-20 operator is assigned and given the name of the HIS-20 operator.
: 5. Establish communications with the TSC RADCON Manager and the RADCON Lab Supervisor. (Bridge 103, mute telephone when not speaking. or X 6472/6463 TSC and X 6417 Lab).
: 5.
: 6. Ensure adequate RADCON staffing available for OSC support. (Dosimetry support, boardwriters, RWP support, HIS-20 operators)
Establish communications with the TSC RADCON Manager and the RADCON Lab Supervisor. (Bridge 103, mute telephone when not speaking. or X 6472/6463 TSC and X 6417 Lab).
: 7. Locate all RADCON/CHEM personnel/teams currently and previously tasked and ensure that teams are identified on RADCON/CHEM Team Tracking Board for tracking and debriefing.
: 6.
: 8. Control eating and drinking in the OSC until habitability has been established.
Ensure adequate RADCON staffing available for OSC support. (Dosimetry support, boardwriters, RWP support, HIS-20 operators)
: 9. Ensure habitability surveys have been initiated for the of OSC, TSC, and Control Room.
: 7.
Locate all RADCON/CHEM personnel/teams currently and previously tasked and ensure that teams are identified on RADCON/CHEM Team Tracking Board for tracking and debriefing.
: 8.
Control eating and drinking in the OSC until habitability has been established.
: 9.
Ensure habitability surveys have been initiated for the of OSC, TSC, and Control Room.
: 10. Verify the minimum number of ANSI qualified RADCON personnel currently onsite and ensure that at least a total of eight (8) are available onsite within approximately 30 and at least 14 are available onsite within one hour of the SITE AREA EMERGENCY declaration [six (6) additional ANSI qualified RADCON personnel within the second 30 minutes]. The RADCON Lab Supervisor is counted as a 60 minute responder.
: 10. Verify the minimum number of ANSI qualified RADCON personnel currently onsite and ensure that at least a total of eight (8) are available onsite within approximately 30 and at least 14 are available onsite within one hour of the SITE AREA EMERGENCY declaration [six (6) additional ANSI qualified RADCON personnel within the second 30 minutes]. The RADCON Lab Supervisor is counted as a 60 minute responder.
OPERATIONAL RESPONSIBILITIES
OPERATIONAL RESPONSIBILITIES Brief Emergency response Teams.
* Brief Emergency response Teams.
Provide and coordinate RADCON resources as necessary.
* Provide and coordinate RADCON resources as necessary.
Continued Next Page
Continued Next Page


SI   ACTIVATION AND OPERATION OF THE             I EPIP-7 SQN                     OPERATIONS SUPPORT CENTER                   Rev.18 IPage 19 of 36 Date:
SI ACTIVATION AND OPERATION OF THE I EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 IPage 19 of 36 Date:
APPENDIX E Page 2 of 2 OSC RADCON SUPERVISOR CHECKLIST OPERATIONAL RESPONSIBILITIES Continued
APPENDIX E Page 2 of 2 OSC RADCON SUPERVISOR CHECKLIST OPERATIONAL RESPONSIBILITIES Continued  
"* Direct RADCON personnel in the RADCON Lab.
"* Direct RADCON personnel in the RADCON Lab.  
"* Ensure all RADCON Teams are coordinated and tracked through the OSC.
"* Ensure all RADCON Teams are coordinated and tracked through the OSC.  
"* Ensure all Chemistry Teams are tracked through the OSC.
"* Ensure all Chemistry Teams are tracked through the OSC.  
"* Ensure Emergency Response Teams have adequate RADCON/dosimetry coverage present during briefings and field support.
"* Ensure Emergency Response Teams have adequate RADCON/dosimetry coverage present during briefings and field support.  
"* Brief the OSC Manager regularly on radiological conditions status (especially when radiological conditions are changing rapidly).
"* Brief the OSC Manager regularly on radiological conditions status (especially when radiological conditions are changing rapidly).  
"* Brief the TSC RADCON Manager on radiological conditions status.
"* Brief the TSC RADCON Manager on radiological conditions status.  
"* Provide assistance to the OSC Manager as needed.
"* Provide assistance to the OSC Manager as needed.  
"* Periodically verify habitability of TSC, OSC, and Control Room (especially during changing radiological conditions and at each emergency classification upgrade).
"* Periodically verify habitability of TSC, OSC, and Control Room (especially during changing radiological conditions and at each emergency classification upgrade).  
"* Recheck tracking board after accountability, after major changes in plant conditions and at emergency classification upgrades.
"* Recheck tracking board after accountability, after major changes in plant conditions and at emergency classification upgrades.  
"* Log on to the Intergated Computer System (ICS).
"* Log on to the Intergated Computer System (ICS).  
"* Periodically brief the RADCON and CHEM Lab personnel on plant status.
"* Periodically brief the RADCON and CHEM Lab personnel on plant status.  
"* Administer KI to emergency response teams according to EPIP-14 and inform the OSC manager. (Forward EPIP-14 KI Issue Report to the TSC RADCON Manager.)
"* Administer KI to emergency response teams according to EPIP-14 and inform the OSC manager. (Forward EPIP-14 KI Issue Report to the TSC RADCON Manager.)  
"* Ensure outlying teams/groups (i. e., line crews, warehouse) have dosimetry and are being protected throughout the emergency.
"* Ensure outlying teams/groups (i. e., line crews, warehouse) have dosimetry and are being protected throughout the emergency.  
  "* Ensure emergency responders' exposures are maintained As Low As Reasonably Achievable (ALARA).
"* Ensure emergency responders' exposures are maintained As Low As Reasonably Achievable (ALARA).
DEACTIVATION RESPONSIBILITY
DEACTIVATION RESPONSIBILITY  
  "* Ensure all teams are accounted for and properly debriefed.
"* Ensure all teams are accounted for and properly debriefed.  
  "* Ensure all logs and team briefing forms are completed and signed.
"* Ensure all logs and team briefing forms are completed and signed.


ACTIVATION AND OPERATION OF THE                   EPIP-7 SQN                       OPERATIONS SUPPORT CENTER                       Rev.18 Page 20 of 36 Date:
ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 20 of 36 Date:
APPENDIX F Page 1 of 1 OSC RADCON BRIEFER CHECKLIST INITIAL ACTIVATION OF THE OSC Time/
APPENDIX F Page 1 of 1 OSC RADCON BRIEFER CHECKLIST INITIAL ACTIVATION OF THE OSC Time/
Initials
Initials
Line 910: Line 1,474:
: 4. Establish a log of activities and communications.
: 4. Establish a log of activities and communications.
: 5. Locate all RADCON persons/teams currently and previously tasked and ensure assignment of Team Tracking Letter designator (AA, BB, etc.) for tracking and debriefing.
: 5. Locate all RADCON persons/teams currently and previously tasked and ensure assignment of Team Tracking Letter designator (AA, BB, etc.) for tracking and debriefing.
: 6. Establish communications on the RADCON Bridge (x103). Mute telephone when not speaking.
: 6.
OPERATIONAL RESPONSIBILITIES
Establish communications on the RADCON Bridge (x103). Mute telephone when not speaking.
    "* Provide radiological technical assistance to the Briefing Teams.
OPERATIONAL RESPONSIBILITIES  
    "* Provide radiological conditions for inclusion in the analysis of the job performed by the OSC Briefing Team.
"* Provide radiological technical assistance to the Briefing Teams.  
    "* Assist with portions of the OSC Team briefings and debriefings including a debriefing from the team RADCON member.
"* Provide radiological conditions for inclusion in the analysis of the job performed by the OSC Briefing Team.  
    "* Ensure each OSC team has a RADCON member present during briefings and field support as needed. (Dispatch with team if necessary)
"* Assist with portions of the OSC Team briefings and debriefings including a debriefing from the team RADCON member.  
      "* Complete applicable portions of Appendix D.
"* Ensure each OSC team has a RADCON member present during briefings and field support as needed. (Dispatch with team if necessary)  
      "* Inform the OSC RADCON Supervisor of any unexpected radiological conditions encountered.
"* Complete applicable portions of Appendix D.  
      "* Write on the RADCON status boards, RADCON Team Tracking Board and ensure wind direction arrow is kept current.
"* Inform the OSC RADCON Supervisor of any unexpected radiological conditions encountered.  
      "* Post radiological status information in the OSC Teams Staging Area.
"* Write on the RADCON status boards, RADCON Team Tracking Board and ensure wind direction arrow is kept current.  
      "* Ensure emergency responders exposures are maintained ALARA.
"* Post radiological status information in the OSC Teams Staging Area.  
"* Ensure emergency responders exposures are maintained ALARA.


I     CTIVATION AND OPERATION OF THE               EPIP-7 SQN                       OPERATIONS SUPPORT CENTER                     Rev.18 IPaNe 21 of 36 O
I CTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 O
Date:
IPaNe 21 of 36 Date:
APPENDIX G Page 1 of 1 OSC OPERATIONS ADVISOR CHECKLIST INITIAL ACTIVATION OF THE OSC Time/
APPENDIX G Page 1 of 1 OSC OPERATIONS ADVISOR CHECKLIST INITIAL ACTIVATION OF THE OSC Time/
Initials
Initials
Line 934: Line 1,499:
: 7. Announce on the portable radio OPS channel "OSC AUOs Report to the OSC" (Repeat).
: 7. Announce on the portable radio OPS channel "OSC AUOs Report to the OSC" (Repeat).
: 8. Ensure AUOs Swipe Accountability Reader at cafeteria entrance.
: 8. Ensure AUOs Swipe Accountability Reader at cafeteria entrance.
OPERATIONAL RESPONSIBILITIES
OPERATIONAL RESPONSIBILITIES Provide Operations personnel, advice, and plant status to support the entire OSC including briefing emergency response teams as needed (additional Operations personnel including AUOs can be used to assist).  
      "  Provide Operations personnel, advice, and plant status to support the entire OSC including briefing emergency response teams as needed (additional Operations personnel including AUOs can be used to assist).
"* Operate the ICS and provide plant operations advice to support the OSC.  
      "* Operate the ICS and provide plant operations advice to support the OSC.
"* Provide personnel for any operations actions that may be required while in the field.  
      "* Provide personnel for any operations actions that may be required while in the field.
"* Provide Operations personnel for damage control and repair teams.  
      "* Provide Operations personnel for damage control and repair teams.
"* Call-in additional AUOs/Operations personnel from offshift to support OSC activities, if requested.  
      "* Call-in additional AUOs/Operations personnel from offshift to support OSC activities, if requested.
"* Keep the TSC Operations Communicator and the Control Room Communicator appraised of the OSC Team priorities, assignments and activities while in the field.  
      "* Keep the TSC Operations Communicator and the Control Room Communicator appraised of the OSC Team priorities, assignments and activities while in the field.
"* Provide assistance to the OSC Manager as needed.  
      "* Provide assistance to the OSC Manager as needed.
"* Maintain the OSC Operations Tracking Board.  
      "* Maintain the OSC Operations Tracking Board.
"* Direct AUOs to maintain a log, and listen to the Operations Bridge (X102) to maintain a current awareness on plant status as needed.  
      "* Direct AUOs to maintain a log, and listen to the Operations Bridge (X102) to maintain a current awareness on plant status as needed.
"* Ensure OSC AUOs maintain accountability by swiping reader at cafeteria entrance.
      "* Ensure OSC AUOs maintain accountability by swiping reader at cafeteria entrance.


SQN                I     ACTIVATION OPERATIONSAND      OPERATION SUPPORT        OF THE CENTERI                EPIP-7 Rev. 18 I Page 22 of 36 Date:
I ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTERI Rev. 18 I Page 22 of 36 Date:
APPENDIX H Page 1 of 1 OSC FIRE OPERATIONS ADVISOR CHECKLIST INITIAL ACTIVATION OF THE OSC Time/
APPENDIX H Page 1 of 1 OSC FIRE OPERATIONS ADVISOR CHECKLIST INITIAL ACTIVATION OF THE OSC Time/
Initials
Initials
Line 956: Line 1,520:
: 6. Ensure that Fire Operations if responding to a fire or medical emergency is assigned a Team Tracking Letter designator for tracking and debriefing and team has been entered on tracking board.
: 6. Ensure that Fire Operations if responding to a fire or medical emergency is assigned a Team Tracking Letter designator for tracking and debriefing and team has been entered on tracking board.
: 7. Ensure sufficient SCBA equipment and air bottles for response teams are available at established entry points.
: 7. Ensure sufficient SCBA equipment and air bottles for response teams are available at established entry points.
Note: If Fire Operations is not involved in the emergency response, dispatch a Fire Operator to the MCR to operate panel 0-M-29. This operator will be tracked on a tracking board and will be recalled at the discretion of the Fire Brigade Leader.
Note:
OPERATIONAL RESPONSIBILITIES
If Fire Operations is not involved in the emergency response, dispatch a Fire Operator to the MCR to operate panel 0-M-29. This operator will be tracked on a tracking board and will be recalled at the discretion of the Fire Brigade Leader.
    "* Monitor plant status and initiate fire response.
OPERATIONAL RESPONSIBILITIES  
      "* Initiate medical emergency response as needed.
"* Monitor plant status and initiate fire response.  
      "* Initiate and provide first response for Hazardous Material Containment.
"* Initiate medical emergency response as needed.  
      "* Support Nuclear Security in searches of hazardous areas.
"* Initiate and provide first response for Hazardous Material Containment.  
      "* Provide assistance to the OSC Manager as needed.
"* Support Nuclear Security in searches of hazardous areas.  
      "* Periodically brief Fire Operations Unit personnel of plant status.
"* Provide assistance to the OSC Manager as needed.  
      "* Brief the team in the field by telephone/radio (if necessary) in order to decrease response time.
"* Periodically brief Fire Operations Unit personnel of plant status.  
      "* Request the SM to sound the fire alarm when needed to form the fire brigade or MERT.
"* Brief the team in the field by telephone/radio (if necessary) in order to decrease response time.  
      "* Provide evaluations of the plant environment, recommendations to OSC Management on safety aspects of response team task.
"* Request the SM to sound the fire alarm when needed to form the fire brigade or MERT.  
      "* Contact or call in the site/corporate Safety Specialist as necessary (see REND Section G).
"* Provide evaluations of the plant environment, recommendations to OSC Management on safety aspects of response team task.  
"* Contact or call in the site/corporate Safety Specialist as necessary (see REND Section G).


I     ACTIVATION AND OPERATION OF THE OPERATIONS SUPPORT CENTER I EPIP-7 Rev.18 SQN                                                                      1Page 23 of 36 Date:
I ACTIVATION AND OPERATION OF THE I EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 1Page 23 of 36 Date:
APPENDIX I Page 1 of 1 OSC LOG KEEPER CHECKLIST Time/
APPENDIX I Page 1 of 1 OSC LOG KEEPER CHECKLIST Time/
Initials
Initials
: 1. Swipe Accountability Reader.
: 1.
: 2. Fill out the Organizational/Staffing Chart and obtain OSC badge.
: 2.
: 3. Notify the OSC Manager of arrival.
: 3.
: 4. Establish a log of OSC activities and communications.
: 4.
: 5. Notify Boardwriter to report to the OSC if requested.
: 5.
: 6. Notify OSC Clerks to report to the OSC if requested.
: 6.
: 7. Notify other staff as determined by the OSC Manager if requested.
7.
OPERATIONAL RESPONSIBILITIES
Swipe Accountability Reader.
    "* Ensure the OSC Status Boards are continuously updated to reflect current plant conditions.
Fill out the Organizational/Staffing Chart and obtain OSC badge.
    "* Ensure a log is maintained of all important OSC activities.
Notify the OSC Manager of arrival.
    "* Collect and maintain all original copies of generated documents.
Establish a log of OSC activities and communications.
    "* Following OSC deactivation forward all records to the Emergency Preparedness Manager.
Notify Boardwriter to report to the OSC if requested.
    "* Retain completed original of OSC team briefing/debriefing form, Appendix D.
Notify OSC Clerks to report to the OSC if requested.
Notify other staff as determined by the OSC Manager if requested.
OPERATIONAL RESPONSIBILITIES  
"* Ensure the OSC Status Boards are continuously updated to reflect current plant conditions.  
"* Ensure a log is maintained of all important OSC activities.  
"* Collect and maintain all original copies of generated documents.  
"* Following OSC deactivation forward all records to the Emergency Preparedness Manager.  
"* Retain completed original of OSC team briefing/debriefing form, Appendix D.


I     CTIVATION AND OPERATION OF THE                 EPIP-7 Rev.18 SQN                       OPERATIONS SUPPORT CENTER Page 24 of 36 Date:
I CTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 24 of 36 Date:
APPENDIX J Page 1 of 1 OSC CLERICAL STAFF CHECKLIST Time/
APPENDIX J Page 1 of 1 OSC CLERICAL STAFF CHECKLIST Time/
Initials
Initials
Line 994: Line 1,566:
: 4. Establish a log of activities and communications.
: 4. Establish a log of activities and communications.
: 5. Ensure FAX is operable.
: 5. Ensure FAX is operable.
OPERATIONAL RESPONSIBILITIES
OPERATIONAL RESPONSIBILITIES  
    "* Uses call list to obtain staff for unfilled positions or replacement staff for shift turnovers as directed by the OSC Manager.
"* Uses call list to obtain staff for unfilled positions or replacement staff for shift turnovers as directed by the OSC Manager.  
    "* Assist in set-up and activation of the OSC.
"* Assist in set-up and activation of the OSC.  
    "* Answer telephones.
"* Answer telephones.  
    "* Distribute forms.
"* Distribute forms.  
    "* Ensure OSC responders have signed the OSC Roster, Appendix S when requested.
"* Ensure OSC responders have signed the OSC Roster, Appendix S when requested.  
    "* Establish OSC Shift change (Use Appendix S page 2 of 2 and ask appropriate Fitness For Duty Questions).
"* Establish OSC Shift change (Use Appendix S page 2 of 2 and ask appropriate Fitness For Duty Questions).  
    "* Operates FAX machine.
"* Operates FAX machine.  
    "* FAX Emergency Response Teams summary to Main Control Room (FAX# 6208) and TSC (FAX# 6461) as necessary.
"* FAX Emergency Response Teams summary to Main Control Room (FAX# 6208) and TSC (FAX# 6461) as necessary.
DEACTIVATION OF THE OSC
DEACTIVATION OF THE OSC  
      "* Transfers all log notes and other materials to the OSC Log Keeper.
"* Transfers all log notes and other materials to the OSC Log Keeper.  
      "* Deactivate the OSC by returning all equipment, materials, and supplies to designated storage areas.
"* Deactivate the OSC by returning all equipment, materials, and supplies to designated storage areas.


I                     I     ACTIVATION AND OPERATION OF THE                 EPIP-7 SQN                       OPERATIONS SUPPORT CENTER                     Rev.18 IPage 25 of 36 SI Date:
I I
ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 SI IPage 25 of 36 Date:
APPENDIX K Page 1 of 1 OSC SITE SECURITY ADVISOR CHECKLIST Time/
APPENDIX K Page 1 of 1 OSC SITE SECURITY ADVISOR CHECKLIST Time/
Initials Swipe Accountability Reader.
Initials
: 2. Fill out the Organizational/Staffing Chart and obtain OSC badge.
: 2.
: 3. Notify the OSC Manager of arrival.
: 3.
: 4. Establish communications with Site Security Manager in the TSC (X 6469).
: 4.
: 5. Establish a log of activities and communications.
: 5.
: 6. Establish contact with the CAS.
: 6.
: 7. Check status of emergency actions already in effect such as Accountability or Site Evacuation.
7.
OPERATIONAL RESPONSIBILITIES
Swipe Accountability Reader.
      "* Coordinate activities of Site Security personnel in support of OSC activities.
Fill out the Organizational/Staffing Chart and obtain OSC badge.
      "* Provide personnel to support Fire Operations in response to fire, medical emergency, or hazardous material containment.
Notify the OSC Manager of arrival.
      "* Forms, briefs and dispatches search and rescue teams with Fire Operations support.
Establish communications with Site Security Manager in the TSC (X 6469).
        "* Provide assistance to the OSC (including briefing teams) as needed.
Establish a log of activities and communications.
        "* Ensure the OSC Manager/OSC Staff are aware of security hazards that could affect emergency response activities.
Establish contact with the CAS.
        "* Ensure onsite Security personnel are apprised of radiological and plant conditions and associated hazards.
Check status of emergency actions already in effect such as Accountability or Site Evacuation.
        "* Ensure OSC Manager is aware of Security personnel locations and activities.
OPERATIONAL RESPONSIBILITIES  
"* Coordinate activities of Site Security personnel in support of OSC activities.  
"* Provide personnel to support Fire Operations in response to fire, medical emergency, or hazardous material containment.  
"* Forms, briefs and dispatches search and rescue teams with Fire Operations support.  
"* Provide assistance to the OSC (including briefing teams) as needed.  
"* Ensure the OSC Manager/OSC Staff are aware of security hazards that could affect emergency response activities.  
"* Ensure onsite Security personnel are apprised of radiological and plant conditions and associated hazards.  
"* Ensure OSC Manager is aware of Security personnel locations and activities.


ACTIVATION AND OPERATION OF THE                   IEPIP-7 Rev.18 SQN                       OPERATIONS SUPPORT CENTER Page 26 of 36 Date:
ACTIVATION AND OPERATION OF THE IEPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 26 of 36 Date:
APPENDIX L Page 1 of 2 OSC BRIEFER CHECKLIST INITIAL ACTIVATION OF THE OSC Time/
APPENDIX L Page 1 of 2 OSC BRIEFER CHECKLIST INITIAL ACTIVATION OF THE OSC Time/
Initials
Initials
Line 1,035: Line 1,615:
: 6. Establish contact with Personnel Pool Manager.
: 6. Establish contact with Personnel Pool Manager.
: 7. If assigned a team that is already working in the field, establish contact with the team leader and ensure that they are fully briefed on their task and obtain status (report results to the OSC Manager).
: 7. If assigned a team that is already working in the field, establish contact with the team leader and ensure that they are fully briefed on their task and obtain status (report results to the OSC Manager).
: 8. Verify and/or ensure the minimum (for the briefer's discipline) maintenance personnel have been called in as necessary,
: 8.
[Mechanical     Craft       Electrical Craft               Instrumentation Craft ONSITE     HI 1 on shift             R] 1 on shift CALL-IN     LI 1 onsite within 1 hour [1]1 onsite within 30 minutes [] 1 onsite within 30 minutes CALL-IN     __                            1 onsite within 1 hour     LI 1 onsite within 1 hour TOTAL       TOTAL:                     2 Available onsite within 30   TOTAL 2 onsite within 1 hour       minutes and                 2 onsite within 1 hour TOTAL 3 onsite within 1 hour
Verify and/or ensure the minimum (for the briefer's discipline) maintenance personnel have been called in as necessary,
[Mechanical Craft Electrical Craft Instrumentation Craft ONSITE HI 1 on shift R] 1 on shift CALL-IN LI 1 onsite within 1 hour
[1]1 onsite within 30 minutes [] 1 onsite within 30 minutes CALL-IN 1 onsite within 1 hour LI 1 onsite within 1 hour TOTAL TOTAL:
2 Available onsite within 30 TOTAL 2 onsite within 1 hour minutes and 2 onsite within 1 hour TOTAL 3 onsite within 1 hour
: 9. Verify that Maintenance Call List is available. As necessary call in additional maintenance personnel for your discipline.
: 9. Verify that Maintenance Call List is available. As necessary call in additional maintenance personnel for your discipline.
OPERATIONAL RESPONSIBILITIES
OPERATIONAL RESPONSIBILITIES  
      "* Provide Mechanical, Electrical, and Instrument technical expertise.
"* Provide Mechanical, Electrical, and Instrument technical expertise.
      "  Evaluate job conditions (including RADCON, Fire Operations, and Operational aspects of the task) and analyze the necessary precautions and methods best suited to safe performance of the task.
Evaluate job conditions (including RADCON, Fire Operations, and Operational aspects of the task) and analyze the necessary precautions and methods best suited to safe performance of the task.
      "  When possible combine Damage Assessment and Repair Teams.
When possible combine Damage Assessment and Repair Teams.
Continued Next Page
Continued Next Page


ACTIVATION AND OPERATION OF THE               IEPIP-7 SQN                 OPERATIONS SUPPORT CENTER                     Rev.18 Page 27 of 36 Date:
ACTIVATION AND OPERATION OF THE IEPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 27 of 36 Date:
APPENDIX L Page 2 of 2 OSC BRIEFER CHECKLIST OPERATIONAL RESPONSIBILITIES Continued
APPENDIX L Page 2 of 2 OSC BRIEFER CHECKLIST OPERATIONAL RESPONSIBILITIES Continued  
"* Brief the OSC Teams based on the analysis of the job.
"* Brief the OSC Teams based on the analysis of the job.  
"* Track the OSC Teams while in the field.
"* Track the OSC Teams while in the field.  
"* Debrief the OSC Teams after completion of the Task.
"* Debrief the OSC Teams after completion of the Task.  
"* Complete applicable portions of the OSC Team Briefing/Tracking and Debriefing Forms (Appendix D) and forward to OSC Manager.
"* Complete applicable portions of the OSC Team Briefing/Tracking and Debriefing Forms (Appendix D) and forward to OSC Manager.


I       TIVATION AND OPERATION OF THE               IEPIP-7 Rev.18 SQN                       OPERATIONS SUPPORT CENTER Page 28 of 36 Date:
I TIVATION AND OPERATION OF THE IEPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 28 of 36 Date:
APPENDIX M Page 1 of 1 OSC INDUSTRIAL SAFETY ADVISOR CHECKLIST Time/
APPENDIX M Page 1 of 1 OSC INDUSTRIAL SAFETY ADVISOR CHECKLIST Time/
Initials
Initials
: 1. Swipe Accountability Reader.
: 1.
: 2. Fill out the Organizational/Staffing chart and obtain OSC badge.
Swipe Accountability Reader.
: 2.
Fill out the Organizational/Staffing chart and obtain OSC badge.
: 3. Notify the OSC Manager of arrival.
: 3. Notify the OSC Manager of arrival.
: 4. Establish a log of activities and communications.
: 4. Establish a log of activities and communications.
: 5. Notify the Assistant OSC Manager of arrival.
: 5. Notify the Assistant OSC Manager of arrival.
: 6. Notify Fire Ops Advisor of arrival.
: 6. Notify Fire Ops Advisor of arrival.
OPERATIONAL RESPONSIBILITIES 9   Provide and coordinate Industrial Safety personnel needed to support the OSC.
OPERATIONAL RESPONSIBILITIES 9 Provide and coordinate Industrial Safety personnel needed to support the OSC.
0   Evaluate plant environment.
0 Evaluate plant environment.
* Provide recommendations to OSC management concerning the safety aspects of Emergency Response team tasks.
Provide recommendations to OSC management concerning the safety aspects of Emergency Response team tasks.


SQ                     ACTIVATION AND OPERATION OF THE                 EPIP-7 SQN                     OPERATIONS SUPPORT CENTER                     Rev. 1829 of 36 1Page 1 1 Date:
SQ ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev. 18 1 1 1Page 29 of 36 Date:
APPENDIX N Page 1 of 1 PERSONNEL POOL MANAGER CHECKLIST INITIAL ACTIVATION OF THE OSC Time/
APPENDIX N Page 1 of 1 PERSONNEL POOL MANAGER CHECKLIST INITIAL ACTIVATION OF THE OSC Time/
Initials
Initials
: 1. Swipe Accountability Reader.
: 1.
: 2. Fill out the organization/Staffing Chart and obtain OSC badge.
: 2.
: 3. Establish a log of communications and activities.
: 3.
: 4. Establish communications with the Assistant OSC Manager and/or Briefer.
: 4.
: 5. Locate all teams previously tasked and ensure assignment of Team Tracking Letter designation for tracking and debriefing.
: 5.
: 6. Ensure at least two teams are fully staged outside OSC in the cafeteria.
6.
OPERATIONAL RESPONSIBILITIES
Swipe Accountability Reader.
    "* Form teams as requested by the OSC.
Fill out the organization/Staffing Chart and obtain OSC badge.
    "* Manage personnel in the OSC Staging Area by:
Establish a log of communications and activities.
Establish communications with the Assistant OSC Manager and/or Briefer.
Locate all teams previously tasked and ensure assignment of Team Tracking Letter designation for tracking and debriefing.
Ensure at least two teams are fully staged outside OSC in the cafeteria.
OPERATIONAL RESPONSIBILITIES  
"* Form teams as requested by the OSC.  
"* Manage personnel in the OSC Staging Area by:
: 1. Directing personnel to enter keycards into the Accountability Card Reader (at cafeteria entrance).
: 1. Directing personnel to enter keycards into the Accountability Card Reader (at cafeteria entrance).
: 2. Directing responders (potential OSC teams) to check-in with the HIS-20 Operator.
: 2. Directing responders (potential OSC teams) to check-in with the HIS-20 Operator.
: 3. Requiring potential/actual OSC Team members to dress out.
: 3. Requiring potential/actual OSC Team members to dress out.
: 4. Maintain command and control (quiet/orderly) in OSC Staging Area.
: 4. Maintain command and control (quiet/orderly) in OSC Staging Area.  
      "* Recover personnel for future members.
"* Recover personnel for future members.  
      "* Ensure at least one team on standby at all times.
"* Ensure at least one team on standby at all times.  
      "* Validate qualifications of team members by completing the information on Appendix R, including remaining allowable dose (RAD)
"* Validate qualifications of team members by completing the information on Appendix R, including remaining allowable dose (RAD)


I   ACTIVATION AND OPERATION OF THE                 EPIP-7 Rev.18 SQN                     OPERATIONS SUPPORT CENTER DaPage 30 of 36 Date:
I ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Da Page 30 of 36 Date:
APPENDIX 0 Page 1 of 1 DCRM Coordinator Time/
APPENDIX 0 Page 1 of 1 DCRM Coordinator Time/
Initials
Initials
: 1. Swipe Accountability Reader.
: 1.
: 2. Fill out the Organizational/Staffing chart and obtain OSC badge.
: 2.
: 3. Notify the OSC Manager of arrival.
: 3.
: 4. Establish a log of activities.
: 4.
: 5. Log in on computer.
: 5.
: 6. Notify the Assistant OSC Manager and/or Briefing Teams DCRM information is available on request.
6.
OPERATIONAL RESPONSIBILITIES
Swipe Accountability Reader.
    "* Provide DCRM expertise as needed.
Fill out the Organizational/Staffing chart and obtain OSC badge.
    "* Provide drawings, documents, vendor manuals as requested.
Notify the OSC Manager of arrival.
    "* Assist in OSC logistics as requested.
Establish a log of activities.
Log in on computer.
Notify the Assistant OSC Manager and/or Briefing Teams DCRM information is available on request.
OPERATIONAL RESPONSIBILITIES  
"* Provide DCRM expertise as needed.  
"* Provide drawings, documents, vendor manuals as requested.  
"* Assist in OSC logistics as requested.


IACTIVATION         AND OPERATION OF THE               I EPIP-7 Rev.18 SQN                         OPERATIONS SUPPORT CENTER Page 33 of 36 Date:
IACTIVATION AND OPERATION OF THE I EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 33 of 36 Date:
APPENDIX R Page 1 of 1 PERSONNEL POOL MGR. LOG CRAFTSMAN SECTION NAME                                         SSN                             CRAFT HIS-20 OPERATOR SECTION HIS-20 OPERATOR:
APPENDIX R Page 1 of 1 PERSONNEL POOL MGR. LOG CRAFTSMAN SECTION NAME SSN CRAFT HIS-20 OPERATOR SECTION HIS-20 OPERATOR:
TLD#               RAD             SCBA               RESP               REP mRem             QUAL               QUAL             TRAINED w YES             w1 YES             w1 YES
TLD#
[I NO             [I NO             El NO PERSONNEL POOL MGR SECTION CRAFT:
RAD SCBA RESP REP mRem QUAL QUAL TRAINED w YES w1 YES w1 YES
RAD           ASSIGNED TO         BRIEFER                   COMMENTS mRem*               TEAM #
[I NO
[I NO El NO PERSONNEL POOL MGR SECTION CRAFT:
RAD ASSIGNED TO BRIEFER COMMENTS mRem*
TEAM #
(Same as above)
(Same as above)
I                   i            -  z I                   I              +
I I  
______        j.                   4-             4
+
______        .1.                 4
: j.
                    .1.                 4               I I                             i aepenaing   on asslgneu I rn WK. r¶.PLJ Will I IU mRem      can change can                                                                LU LJ RAD
4-4
  *verified RAD mi     em completion change t       epenAing Team on ametaskibeforeassignm. enU to ao=tU another teU
.1.
* after               of Assigned         task before assignment   Wto          U team.
4
.1.
4 I
I i
* RAD mRem can change aepenaing on asslgneu I rn WK.
r¶.PLJ Will I IU LU LJ
* RAD mi em can change t
epenAing on ametaskibeforeassignm. enU Wto ao=tU teU U verified after completion of Assigned Team task before assignment to another team.
I i
z


IACTIVATION SON                    OPERATIONSAND        OPERATION SUPPORT    CENTEROF THE       EPIP-7 Rev. 18 I Page 31 of 36 Date:
IACTIVATION AND OPERATION OF THE EPIP-7 SON OPERATIONS SUPPORT CENTER Rev. 18 I Page 31 of 36 Date:
APPENDIX P Page 1 of 1 OSC Materials Coordinator Time/
APPENDIX P Page 1 of 1 OSC Materials Coordinator Time/
Initials
Initials
: 1. Swipe Accountability Reader.
: 1.
: 2. Fill out the Organizational/Staffing chart and obtain OSC badge.
: 2.
: 3. Notify the OSC Manager of arrival.
: 3.
: 4. Establish a log of activities.
: 4.
: 5. Log in on computer.
: 5.
: 6. Establish contact Power Stores Personnel at X-7155.
: 6.
: 7. Notify the Assistant OSC Manager or Briefing Teams material expediting information is available on request.
7.
OPERATIONAL RESPONSIBILITIES
Swipe Accountability Reader.
      "* Provide coordination between Power Stores and OSC.
Fill out the Organizational/Staffing chart and obtain OSC badge.
      "* Provide materials as expeditiously as possible for emergency response.
Notify the OSC Manager of arrival.
      "* Operate computer to determine materials availability.
Establish a log of activities.
      "* Coordinate safety of warehouse personnel with the OSC Manager and RADCON Supervisor.
Log in on computer.
Establish contact Power Stores Personnel at X-7155.
Notify the Assistant OSC Manager or Briefing Teams material expediting information is available on request.
OPERATIONAL RESPONSIBILITIES  
"* Provide coordination between Power Stores and OSC.  
"* Provide materials as expeditiously as possible for emergency response.  
"* Operate computer to determine materials availability.  
"* Coordinate safety of warehouse personnel with the OSC Manager and RADCON Supervisor.


I   ACTIVATION AND OPERATION OF THE     IEPIP-7 Rev.18 SQN           OPERATIONS SUPPORT CENTER Page 32 of 36 Date:
I ACTIVATION AND OPERATION OF THE IEPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 32 of 36 Date:
APPENDIX Q Page 1 of 1 Telephone Lists can be found in the REND TELEPHONE LIST                   REND LOCATION FAX Machine Numbers             Section A Item # 8 CECC Numbers                     Section B Item # 1 TSC Numbers                     Section B Item # 9 OSC Numbers                     Section B Item # 10 Tennessee State Numbers         Section E Item # 2 Communications Support           Section I Medical Support Numbers         Section K Meteorological Support           Section L Numbers
APPENDIX Q Page 1 of 1 Telephone Lists can be found in the REND TELEPHONE LIST REND LOCATION FAX Machine Numbers Section A Item # 8 CECC Numbers Section B Item # 1 TSC Numbers Section B Item # 9 OSC Numbers Section B Item # 10 Tennessee State Numbers Section E Item # 2 Communications Support Section I Medical Support Numbers Section K Meteorological Support Section L Numbers


(
(
I                                   I     ACTIVATION AND OPERATION OF THE                 EPIP-7 SQN                           OPERATIONS SUPPORT CENTER                     Rev.18 Page 34 of 36 Date:
I I
Appendix S Page 1 of 2 ERO ROSTER NAME (Print) SIGNATURE                                   SSN               PS EROONAMEREPLACEMENT'S     NOTIFIED AND FFD POSITION   _    ____YES               NO I               I                   t           1                 I 1=               I                               t                 1-I
ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 34 of 36 Date:
: 1.               I                   I           t                 I I               f                   I           I                 t 1                   I
Appendix S Page 1 of 2 ERO ROSTER NAME (Print) SIGNATURE SSN ERO REPLACEMENT'S NOTIFIED PS ONAME AND FFD POSITION
_______________________________    I                *I*                   I         *t               I
____YES NO I
_______________________________    1               4                     I         I                 I
I t
_  _  _ _  1 I__            4                     a         i                 I       I I               i                   i         i                 I     I 11                                   L-Date of OSC Activation:                          EP Records Coordinator:
1 I
1=
I t
1-I
: 1.
I I
t I
I f
I I
t 1
I I  
*I*
I  
*t I
1 4
I I
I I__
1 4
a i
I I
EP Records Coordinator:
I i
i i
I I
11 L-Date of OSC Activation:


I  CTIVATION AND OPERATION OF THE                                                                IEPIP-7 Rev.18 SQN                      OPERATIONS SUPPORT CENTER Page 35 of 36 Appendix S Page 2 of 2 EMERGENCY RESPONDER NOTIFICATION FORM Fitness for Duty Person Calling                                                                          Date NaeTime                          Time                  Have Consumed you                  Are you Name                      Called            Needed                Alcohol 5 Hrs.                Fit for                  Comments to                    Prior to                      Duty?
4 4  
Report                Report Time?
+
YES NO YES            NO 4                       4             +               I           t1
I t1 I
___________________________  I                1-                     4             +               I 4.
1-4  
i                                                     1           t-t i                 i                       i             i                     -i     !            t
+
: 4.               +                     +             I               t           I           I
I
: 4.               i                       i             i       -    i                         1
: 4.
                                +                 4                     +               1             1           I 4                 F                     I             +               I           I 4                 1                     I             +               I           I             I I1                 i                     i             il             i           il           i i                                                    _____________________________
i 1
_______________________                                - __________________
t-t i
                                                                          - __________________                                    - _____________________________________________________________
i i
                                                                                                                      - ______________
i  
                                                                                                          - _______________
-i t
: 4.  
+  
+
I t
I I
: 4.
i i
i i
1
+
4  
+
1 1
I 4
F I  
+
I I
4 1
I  
+
I I
I I1 i
i il i
il i
ii I
CTIVATION AND OPERATION OF THE IEPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 35 of 36 Appendix S Page 2 of 2 EMERGENCY RESPONDER NOTIFICATION FORM Fitness for Duty Person Calling Date Have you Are you Na eTime Time Consumed Name Called Needed Alcohol 5 Hrs.
Fit for Comments to Prior to Duty?
Report Report Time?
YES NO YES NO


ACTIVATION AND OPERATION OF THE   EPIP'7 SQN           OPERATIONS SUPPORT CENTER         Rev.18 CPaEe                 36 of 36 S
ACTIVATION AND OPERATION OF THE EPIP'7 SQN OPERATIONS SUPPORT CENTER Rev.18 S
SOURCE NOTES REQUIREMENTS                                 IMPLEMENTING STATEMENT       SOURCE DOCUMENT             STATEMENT NP Radiological Emergency Plan (NP-REP)
CPaEe 36 of 36 SOURCE NOTES REQUIREMENTS STATEMENT SOURCE DOCUMENT NP Radiological Emergency Plan (NP-REP)
IMPLEMENTING STATEMENT


TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-14 RADIOLOGICAL CONTROL RESPONSE Revision 15 QUALITY RELATED PREPARED: W. P. Brooks RESPONSIBLE ORGANIZATION: Emergency Preparedness APPROVED BY: John Casey EFFECTIVE DATE: 9-1-2000 LEVEL OF USE: REFERENCE REVISION DESCRIPTION: Intent Change: Revision added Chemistry responsibility   to ensure minimum staffing level and need for additional call-in staff. Revised to reflect KI package change. Remove the RCSS role as TSC RADCON Manager. Added further directions for Chemistry on determining release and dose rates.
TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-14 RADIOLOGICAL CONTROL RESPONSE Revision 15 QUALITY RELATED PREPARED: W. P. Brooks RESPONSIBLE ORGANIZATION: Emergency Preparedness APPROVED BY: John Casey EFFECTIVE DATE: 9-1-2000 LEVEL OF USE: REFERENCE REVISION DESCRIPTION: Intent Change: Revision added Chemistry responsibility to ensure minimum staffing level and need for additional call-in staff. Revised to reflect KI package change. Remove the RCSS role as TSC RADCON Manager. Added further directions for Chemistry on determining release and dose rates.


TABLE OF CONTENTS Section Title                                                                                                     Page Table of Contents .............................................................................                 2 1.0     P URP O S E ..............................................................................................       3
TABLE OF CONTENTS Section Title Page Table of Contents.............................................................................
2 1.0 P U R P O S E..............................................................................................
3  


==2.0     REFERENCES==
==2.0 REFERENCES==
..................................................................................                    3 3.0     INSTRUCTIONS ...............................................................................                     3 3.1     Initiation of an Alert ...........................................................................               3 3.2     TSC Radcon Manager Responsibilities ............................................ 4 3.3     Activation of the Operations Support Center ......................................                               5 3.3.1   OSC RADCON Supervisor ................................................................                           5 3.4     Radcon Lab Responsibilities ..............................................................                       6 3.4.1   Designated RCSS .............................................................................                   6 3.5     Chemistry Response .........................................................................                     7 3.5.1   Designated Chemistry Personnel ......................................................                           7 3.6     General Response .............................................................................                   7 3.6.1   All RADCON Personnel .....................................................................                       7 3.7     Issuance of Potassium Iodide (KI) ......................................................                         9 3.8     Use of Silver Zeolite Cartridges .......................................................                       10 3.9     Personnel Decontamination and Facilities ...................................... 10 APPENDIXES Appendix A, Inplant Radiation Monitors ...........................................                             11 Appendix B, Potassium Iodide Issue Report ....................................                                 12 Appendix C, Occupational Thyroid Dose From Inhalation of Iodine-1 31 ................................................................             13 Appendix D, Methodology for Projecting TEDE ................................                                   14 Appendix E, Fitness For Duty Program Admin Call-In Sheet .......                                               24 SOURCE NOTES ..............................................................................                   25
3 3.0 INSTRUCTIONS...............................................................................
3 3.1 Initiation of an Alert...........................................................................
3 3.2 TSC Radcon Manager Responsibilities............................................
4 3.3 Activation of the Operations Support Center......................................
5 3.3.1 OSC RADCON Supervisor................................................................
5 3.4 Radcon Lab Responsibilities..............................................................
6 3.4.1 Designated RCSS.............................................................................
6 3.5 Chemistry Response.........................................................................
7 3.5.1 Designated Chemistry Personnel......................................................
7 3.6 General Response.............................................................................
7 3.6.1 All RADCON Personnel.....................................................................
7 3.7 Issuance of Potassium Iodide (KI)......................................................
9 3.8 Use of Silver Zeolite Cartridges.......................................................
10 3.9 Personnel Decontamination and Facilities......................................
10 APPENDIXES Appendix A, Inplant Radiation Monitors...........................................
11 Appendix B, Potassium Iodide Issue Report.................................... 12 Appendix C, Occupational Thyroid Dose From Inhalation of Iodine-1 31................................................................
13 Appendix D, Methodology for Projecting TEDE................................ 14 Appendix E, Fitness For Duty Program Admin Call-In Sheet.......
24 SOURCE NOTES..............................................................................
25


SQN           RADIOLOGICAL CONTROL RESPONSE                       EPIP-14 Rev. 15 Page 3 of 25 1.0   PURPOSE To describe the actions and responsibilities of Sequoyah's Radiological Control (RADCON) and Chemistry Sections in the event of a radiological emergency.
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 3 of 25 1.0 PURPOSE To describe the actions and responsibilities of Sequoyah's Radiological Control (RADCON) and Chemistry Sections in the event of a radiological emergency.  


==2.0   REFERENCES==
==2.0 REFERENCES==
 
2.1 Interface Documents A.
2.1   Interface Documents A. EPIP-7, "Activation and Operation of the Operations Support Center (OSC)"
EPIP-7, "Activation and Operation of the Operations Support Center (OSC)"
B.     EPIP-8, "Personnel Accountability and Evacuation" C.     CECC-EPIP-9, "Emergency Environmental Radiological Monitoring Procedures" D. RCI-20, "Radioiodine Monitoring During Accident Conditions" E. 0-TI-CEM-030-030.0, "Manual Calculation of Plant Gas, Iodine, and Particulate Release Rates for Offsite Dose Calculation Manual (ODCM)
B.
Compliance" 2.2   Developmental Documents A. EPIP-6, "Activation and Operation of the Technical Support Center" B. EPIP-10, "Medical Emergency Response" 3.0   INSTRUCTIONS 3.1   Initiation of an Alert Upon initiation of an Alert, Site Area Emergency, or General Emergency, the RADCON and Chemistry Sections will assemble a specific number of personnel as described below.
EPIP-8, "Personnel Accountability and Evacuation" C.
A. During normal and off-shifts a Radiological Emergency Plan (REP) activation will be announced over the public address system or the emergency sirens may be activated and the Emergency Paging System (EPS) will be activated. The RADCON Lab will be contacted by the Shift Manager or.designee. The RADCON Shift Supervisor (RCSS) will determine the number of ANSI qualified RADCON personnel currently onsite and shall ensure that at least a total of eight (8) (not counting him/herself) are available onsite within approximately 30 minutes and at least fourteen (14) (counting him/herself if qualified) are available onsite within one hour [six (6) additional ANSI qualified RADCON personnel within the second 30 minutes]. Call ins shall be in accordance with Appendix E ensuring that Fitness For Duty questions are asked and response documented. Additional RADCON support personnel may need to be called in using Appendix E.
CECC-EPIP-9, "Emergency Environmental Radiological Monitoring Procedures" D.
RCI-20, "Radioiodine Monitoring During Accident Conditions" E.
0-TI-CEM-030-030.0, "Manual Calculation of Plant Gas, Iodine, and Particulate Release Rates for Offsite Dose Calculation Manual (ODCM)
Compliance" 2.2 Developmental Documents A.
EPIP-6, "Activation and Operation of the Technical Support Center" B.
EPIP-10, "Medical Emergency Response" 3.0 INSTRUCTIONS 3.1 Initiation of an Alert Upon initiation of an Alert, Site Area Emergency, or General Emergency, the RADCON and Chemistry Sections will assemble a specific number of personnel as described below.
A. During normal and off-shifts a Radiological Emergency Plan (REP) activation will be announced over the public address system or the emergency sirens may be activated and the Emergency Paging System (EPS) will be activated. The RADCON Lab will be contacted by the Shift Manager or. designee. The RADCON Shift Supervisor (RCSS) will determine the number of ANSI qualified RADCON personnel currently onsite and shall ensure that at least a total of eight (8) (not counting him/herself) are available onsite within approximately 30 minutes and at least fourteen (14) (counting him/herself if qualified) are available onsite within one hour [six (6) additional ANSI qualified RADCON personnel within the second 30 minutes]. Call ins shall be in accordance with Appendix E ensuring that Fitness For Duty questions are asked and response documented. Additional RADCON support personnel may need to be called in using Appendix E.


SQN           RADIOLOGICAL CONTROL RESPONSE                     EPIP-14 Rev. 15 Page 4 of 25 3.1   Initiation of an Alert (Continued)
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 4 of 25 3.1 Initiation of an Alert (Continued)
B. The Chemistry Lab will be contacted by the Shift manager or designee.
B. The Chemistry Lab will be contacted by the Shift manager or designee.
The Chemistry Shift Supervisor (CSS) will determine the number of chemistry technicians currently onsite and shall ensure that at least a total of two (2) chemistry technicians (counting the CSS if qualified) are available onsite within approximately 30 minutes and at least a total of three (3) are available onsite within one hour if the Offsite Dose Assessment function has not been assumed by other staff. Call ins shall be in accordance with Appendix E ensuring that Fitness For Duty questions are asked and response documented. Additional (above the minimum required staffing) Chemistry support personnel may need to be called in, use Appendix E to document.
The Chemistry Shift Supervisor (CSS) will determine the number of chemistry technicians currently onsite and shall ensure that at least a total of two (2) chemistry technicians (counting the CSS if qualified) are available onsite within approximately 30 minutes and at least a total of three (3) are available onsite within one hour if the Offsite Dose Assessment function has not been assumed by other staff. Call ins shall be in accordance with Appendix E ensuring that Fitness For Duty questions are asked and response documented. Additional (above the minimum required staffing) Chemistry support personnel may need to be called in, use Appendix E to document.
Line 1,178: Line 1,874:
F. All response teams, except as listed in EPIP-7, will be dispatched from the OSC and should have a RADCON representative as a member. If the Fire Brigade, Medical Emergency Response Team or Damage Control Team is already responding they are not required to return to the OSC to be dispatched, but shall be tracked and briefed by the OSC in accordance with EPIP-7, Section 3.2.5. RADCON survey teams may be dispatched from the lab but shall be tracked by the OSC.
F. All response teams, except as listed in EPIP-7, will be dispatched from the OSC and should have a RADCON representative as a member. If the Fire Brigade, Medical Emergency Response Team or Damage Control Team is already responding they are not required to return to the OSC to be dispatched, but shall be tracked and briefed by the OSC in accordance with EPIP-7, Section 3.2.5. RADCON survey teams may be dispatched from the lab but shall be tracked by the OSC.
G. All response teams shall be debriefed by the OSC after completing their team assignment.
G. All response teams shall be debriefed by the OSC after completing their team assignment.
3.2   TSC RADCON Manager (RCM) Responsibilities The responsibilities and duties of the TSC RADCON representative are detailed in EPIP-6. A summary of the details associated with these responsibilities are provided below.
3.2 TSC RADCON Manager (RCM) Responsibilities The responsibilities and duties of the TSC RADCON representative are detailed in EPIP-6. A summary of the details associated with these responsibilities are provided below.
A. The primary responsibilities of the RCM are to direct onsite radiological surveillance activities, assess inplant and onsite radiological conditions and to make this information available to the Site Emergency Director (SED), the Central Emergency Control Center (CECC) and other TSC personnel as necessary, to support and coordinate protective actions.
A. The primary responsibilities of the RCM are to direct onsite radiological surveillance activities, assess inplant and onsite radiological conditions and to make this information available to the Site Emergency Director (SED), the Central Emergency Control Center (CECC) and other TSC personnel as necessary, to support and coordinate protective actions.


SQN           RADIOLOGICAL CONTROL RESPONSE                     EPIP-14 Rev. 15 Page 5 of 25 3.2   TSC RCM Responsibilities (Continued)
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 5 of 25 3.2 TSC RCM Responsibilities (Continued)
B. To facilitate the evaluation of in-plant radiological conditions and to establish trends. Appendix A lists the radiation monitors [i.e., Area Radiation Monitors (ARMs) and Continuous Air Monitors (CAMs)] that may be used.
B. To facilitate the evaluation of in-plant radiological conditions and to establish trends. Appendix A lists the radiation monitors [i.e., Area Radiation Monitors (ARMs) and Continuous Air Monitors (CAMs)] that may be used.
C. The RCM, together with other TSC personnel, evaluates plant conditions to anticipate future developments and formulates corrective action plans to address actual or postulated conditions. The RCM renders recommendations and advises the SED on radiological issues.
C. The RCM, together with other TSC personnel, evaluates plant conditions to anticipate future developments and formulates corrective action plans to address actual or postulated conditions. The RCM renders recommendations and advises the SED on radiological issues.
Line 1,188: Line 1,884:
F. When directed by the Site Emergency Director, establishes a contamination checkpoint for personnel and vehicles leaving the site.
F. When directed by the Site Emergency Director, establishes a contamination checkpoint for personnel and vehicles leaving the site.
G. Issues Potassium Iodide in accordance with 3.7 of this procedure.
G. Issues Potassium Iodide in accordance with 3.7 of this procedure.
3.3   Activation of the Operations Support Center 3.3.1 OSC RADCON Supervisor (RCS)
3.3 Activation of the Operations Support Center 3.3.1 OSC RADCON Supervisor (RCS)
The OSC RCS is a trained and qualified individual designated by the RADCON Manager. The approved alternates are listed in the Call List.
The OSC RCS is a trained and qualified individual designated by the RADCON Manager. The approved alternates are listed in the Call List.
The responsibilities and duties of the OSC RCS are detailed in EPIP-7. A summary of the details associated with these responsibilities are provided below:
The responsibilities and duties of the OSC RCS are detailed in EPIP-7. A summary of the details associated with these responsibilities are provided below:
A. The primary responsibilities of the OSC RCS are to ensure that, when required, a RADCON tech accompanies each team; detailed radiological briefings are provided to OSC team members; and the OSC Director and OSC Staff are knowledgeable of in-plant radiological conditions. He also serves as the interface between the TSC and the RADCON Lab.
A.
B. Maintains awareness of in-plant radiological conditions and related parameters and reports those conditions to the TSC RCM.
The primary responsibilities of the OSC RCS are to ensure that, when required, a RADCON tech accompanies each team; detailed radiological briefings are provided to OSC team members; and the OSC Director and OSC Staff are knowledgeable of in-plant radiological conditions. He also serves as the interface between the TSC and the RADCON Lab.
C. Communicates directly with the TSC to coordinate inplant response activities. Assists in the development of briefing notes, and radiological condition updates.
B.
D. In conjunction with the TSC, identifies the need, location, and extent of radiological surveillance activities required to assess or mitigate the consequences of the accident.
Maintains awareness of in-plant radiological conditions and related parameters and reports those conditions to the TSC RCM.
C.
Communicates directly with the TSC to coordinate inplant response activities. Assists in the development of briefing notes, and radiological condition updates.
D.
In conjunction with the TSC, identifies the need, location, and extent of radiological surveillance activities required to assess or mitigate the consequences of the accident.


SQN         RADIOLOGICAL CONTROL RESPONSE                       EPIP-14 Rev. 15 Page 6 of 25 3.3   Activation of the Operations Support Center (Continued)
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 6 of 25 3.3 Activation of the Operations Support Center (Continued)
E. All teams are dispatched from the OSC except as described in paragraph 3.1..F. The OSC RCS is responsible for ensuring that personnel making entries into the plant, including survey teams, are aware of any special precautions, plant conditions, or requirements and are assigned team tracking numbers.
E.
F. Ensure that OSC Team members are instructed to note their Remaining Allowable Dose (RAD) upon exiting the RCA and to provide their current RAD to the Personnel Pool Manager when they return to the OSC. The Personnel Pool Manager will update their RAD in his log.
All teams are dispatched from the OSC except as described in paragraph 3.1..F. The OSC RCS is responsible for ensuring that personnel making entries into the plant, including survey teams, are aware of any special precautions, plant conditions, or requirements and are assigned team tracking numbers.
F.
Ensure that OSC Team members are instructed to note their Remaining Allowable Dose (RAD) upon exiting the RCA and to provide their current RAD to the Personnel Pool Manager when they return to the OSC. The Personnel Pool Manager will update their RAD in his log.
Repetitive exposures of workers should be restricted by substituting other qualified personnel for team members, on reentry, to distribute exposures. As a minimum, OSC Team members' RAD shall be verified prior to entry into plant areas under a Site Area Emergency or General Emergency.
Repetitive exposures of workers should be restricted by substituting other qualified personnel for team members, on reentry, to distribute exposures. As a minimum, OSC Team members' RAD shall be verified prior to entry into plant areas under a Site Area Emergency or General Emergency.
G. Report all survey results as soon as possible to the TSC so they can make recommendations to the proper agencies to initiate any required protective actions.
G.
3.4   RADCON Lab Responsibilities 3.4.1 Designated RCSS The designated RCSS is responsible for managing the activities of the RADCON lab.
Report all survey results as soon as possible to the TSC so they can make recommendations to the proper agencies to initiate any required protective actions.
A. In the event of an Alert, Site Area Emergency, or General Emergency the OSC may become the staging area for entries into affected plant areas.
3.4 RADCON Lab Responsibilities 3.4.1 Designated RCSS The designated RCSS is responsible for managing the activities of the RADCON lab.
B. A RADCON Representative should accompany all emergency response teams when initial entries are made into affected plant areas.
A.
C. The RCSS is responsible for ensuring that adequate numbers of RADCON representatives are available, in accordance with paragraph 3.1 .A, to support emergency activities and that two (2) survey teams are dressed out and ready for briefing.
In the event of an Alert, Site Area Emergency, or General Emergency the OSC may become the staging area for entries into affected plant areas.
D. The RCSS is responsible for preparing and designating an onsite RADCON environmental monitoring team. Team members will prepare and operate the monitoring van in accordance with CECC-EPIP-9.
B.
A RADCON Representative should accompany all emergency response teams when initial entries are made into affected plant areas.
C.
The RCSS is responsible for ensuring that adequate numbers of RADCON representatives are available, in accordance with paragraph 3.1.A, to support emergency activities and that two (2) survey teams are dressed out and ready for briefing.
D.
The RCSS is responsible for preparing and designating an onsite RADCON environmental monitoring team. Team members will prepare and operate the monitoring van in accordance with CECC-EPIP-9.
Record all survey results. If results indicate offsite contamination, the survey areas may need to be expanded. Obtain further instructions and perform required surveillance.
Record all survey results. If results indicate offsite contamination, the survey areas may need to be expanded. Obtain further instructions and perform required surveillance.
E. The RCSS will dispatch survey teams to assembly areas, the OSC and TSC to evaluate radiological conditions, monitor radiation levels as conditions dictate and ensure updated habitability surveys are performed. These survey teams will continuously monitor contamination levels as needed both on personnel and floor/equipment areas and implement corrective actions (e.g., decontamination or zoning) as necessary.
E.
The RCSS will dispatch survey teams to assembly areas, the OSC and TSC to evaluate radiological conditions, monitor radiation levels as conditions dictate and ensure updated habitability surveys are performed. These survey teams will continuously monitor contamination levels as needed both on personnel and floor/equipment areas and implement corrective actions (e.g., decontamination or zoning) as necessary.


3.4   RADCON Lab Responsibilities (Continued)
3.4 RADCON Lab Responsibilities (Continued)
F. The RCSS will monitor the lab for habitability and will coordinate evacuation activities to the alternate lab location if warranted.
F.
G. The RCSS will ensure all survey teams are tracked by the OSC.
The RCSS will monitor the lab for habitability and will coordinate evacuation activities to the alternate lab location if warranted.
H. The RCSS will ensure DAC-hour exposure when available and RAD calculations are completed and reported to the OSC RCS.
G.
I. The RCSS will ensure respiratory protection is issued as needed.
The RCSS will ensure all survey teams are tracked by the OSC.
J. Ensure that HIS-20 entries are properly made and that all dosimetery is properly issued, collected and identified for each worker. Make arrangements to have TLD badges read, as soon as possible.
H.
3.5   Chemistry Response 3.5.1 Designated Chemistry Personnel The designated Chemistry personnel are responsible for managing the activities of the Chem Lab.
The RCSS will ensure DAC-hour exposure when available and RAD calculations are completed and reported to the OSC RCS.
A. The CSS is responsible for ensuring that adequate numbers of chemistry personnel are available in accordance with paragraph 3.1 .B.
I.
B. In the event of an alert, site area emergency or a general emergency, due to a radiological release, a plant total gas release rate (source term) may need to be determined in accordance with Appendix D of this procedure.
The RCSS will ensure respiratory protection is issued as needed.
C. Upon request of the Shift Manager (SM), Chemistry personnel will determine the plant source term that shall be reported to the SM for classification purposes and protective action recommendations to the state.
J.
D. The source term shall be reported to the CECC dose assessment staff, when the CECC is manned, for input into a preliminary dose assessment.
Ensure that HIS-20 entries are properly made and that all dosimetery is properly issued, collected and identified for each worker. Make arrangements to have TLD badges read, as soon as possible.
E. Projected dose at the site boundary, 2 miles and 5 miles may be determined in accordance with Appendix D.
3.5 Chemistry Response 3.5.1 Designated Chemistry Personnel The designated Chemistry personnel are responsible for managing the activities of the Chem Lab.
3.6   General Response 3.6.1 All RADCON Personnel All RADCON personnel should comply with the following:
A.
A.     The following precautions should be considered during emergency incidents.
The CSS is responsible for ensuring that adequate numbers of chemistry personnel are available in accordance with paragraph 3.1.B.
B.
In the event of an alert, site area emergency or a general emergency, due to a radiological release, a plant total gas release rate (source term) may need to be determined in accordance with Appendix D of this procedure.
C.
Upon request of the Shift Manager (SM), Chemistry personnel will determine the plant source term that shall be reported to the SM for classification purposes and protective action recommendations to the state.
D.
The source term shall be reported to the CECC dose assessment staff, when the CECC is manned, for input into a preliminary dose assessment.
E.
Projected dose at the site boundary, 2 miles and 5 miles may be determined in accordance with Appendix D.
3.6 General Response 3.6.1 All RADCON Personnel All RADCON personnel should comply with the following:
A.
The following precautions should be considered during emergency incidents.


Anticipated Conditions                 Protective Considerations
Anticipated Conditions Protective Considerations
: 1. Noble gas concentrations       If fuel damage has occurred
: 1.
          > 1 x 10- pci/cc               or is suspected, respirators should be worn (ensuring TEDE is ALARA).
Noble gas concentrations If fuel damage has occurred  
: 2. Iodine concentrations           SCBA
> 1 x 10- pci/cc or is suspected, respirators should be worn (ensuring TEDE is ALARA).
          > 10 DAC
: 2.
: 3. Particulate concentrations     Particulate mask or SCBA
Iodine concentrations SCBA  
          > 10 DAC                       (SCBA recommended if > 50 DAC).
> 10 DAC
: 4. Standing water> 1"               Rain suits, rubber boots, Extremity dosimetry.
: 3.
B. If it is necessary to evacuate the RADCON lab, then the personnel stationed in the lab will secure the equipment listed in EPIP-17, Appendix C. This equipment will be brought to the alternate lab by RADCON. This list is a minimum and if time permits and manpower allows, then efforts should be made to transport additional equipment and supplies to the alternate lab. The SED shall be informed when it becomes necessary to evacuate the 690' RADCON lab. If this situation develops, a RADCON Lab will be established adjacent to the TSC.
Particulate concentrations Particulate mask or SCBA  
> 10 DAC (SCBA recommended if > 50 DAC).
: 4.
Standing water> 1" Rain suits, rubber boots, Extremity dosimetry.
B.
If it is necessary to evacuate the RADCON lab, then the personnel stationed in the lab will secure the equipment listed in EPIP-17, Appendix C. This equipment will be brought to the alternate lab by RADCON. This list is a minimum and if time permits and manpower allows, then efforts should be made to transport additional equipment and supplies to the alternate lab. The SED shall be informed when it becomes necessary to evacuate the 690' RADCON lab. If this situation develops, a RADCON Lab will be established adjacent to the TSC.
This alternate lab should be set-up in the switchgear room, El 732' or other suitable area, as emergency conditions allow (the TSC RCM is responsible for making this determination). This lab will be equipped with necessary supplies and instrumentation needed to perform minimum radiological surveys and analysis required during an emergency.
This alternate lab should be set-up in the switchgear room, El 732' or other suitable area, as emergency conditions allow (the TSC RCM is responsible for making this determination). This lab will be equipped with necessary supplies and instrumentation needed to perform minimum radiological surveys and analysis required during an emergency.
C. If severe radiological conditions are suspected, the "Buddy System" shall be utilized.
C.
D. If time is available, an RWP should be issued to cover entry teams; if not, suitable protective measures should be taken in accordance with established procedures.
If severe radiological conditions are suspected, the "Buddy System" shall be utilized.
E. When accountability is initiated RADCON personnel shall secure work in a safe manner and proceed to the 690' RADCON Lab and/or other designated assembly areas. An accountability will be made in accordance with EPIP-8. RADCON representatives may be sent to the assembly areas to determine if any workers were in the affected plant areas at the time of the event. These people shall be separated from other plant workers and personnel contamination surveys should be initiated for all personnel.
D.
F. Radiation monitor readings may be obtained from Control Room personnel or an individual may be sent to the Control Room to record the necessary values. Readings are obtained from panels 0-M-12 and 1/2-M-30 and recorded on Appendix A. As radiation monitor readings are updated, the OSC RCS ensures labs will be contacted to ensure that their status boards are made current.
If time is available, an RWP should be issued to cover entry teams; if not, suitable protective measures should be taken in accordance with established procedures.
E.
When accountability is initiated RADCON personnel shall secure work in a safe manner and proceed to the 690' RADCON Lab and/or other designated assembly areas. An accountability will be made in accordance with EPIP-8. RADCON representatives may be sent to the assembly areas to determine if any workers were in the affected plant areas at the time of the event. These people shall be separated from other plant workers and personnel contamination surveys should be initiated for all personnel.
F.
Radiation monitor readings may be obtained from Control Room personnel or an individual may be sent to the Control Room to record the necessary values. Readings are obtained from panels 0-M-12 and 1/2-M-30 and recorded on Appendix A. As radiation monitor readings are updated, the OSC RCS ensures labs will be contacted to ensure that their status boards are made current.


SQN         RADIOLOGICAL CONTROL RESPONSE                     EPIP-14 Rev. 15 Page 9 of 25 3.6   General Response (Continued)
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 9 of 25 3.6 General Response (Continued)
G. As reports become available regarding the details of the emergency, RADCON personnel shall prepare all necessary equipment needed during recovery and report to the OSC as needed to ready survey or damage control team(s) for entry into the affected area(s).
G.
As reports become available regarding the details of the emergency, RADCON personnel shall prepare all necessary equipment needed during recovery and report to the OSC as needed to ready survey or damage control team(s) for entry into the affected area(s).
Upon notification from the RCS in the OSC, the survey team(s) may proceed to the specified area. It should be noted that depending on the type of accident, this initial survey may not be performed until hours or perhaps even days after the event. In this case, procedures may be developed describing the reentry steps to be followed. Other essential personnel may be required to assist in reentry activities.
Upon notification from the RCS in the OSC, the survey team(s) may proceed to the specified area. It should be noted that depending on the type of accident, this initial survey may not be performed until hours or perhaps even days after the event. In this case, procedures may be developed describing the reentry steps to be followed. Other essential personnel may be required to assist in reentry activities.
3.7   Issuance of Potassium Iodide (KI)
3.7 Issuance of Potassium Iodide (KI)
A. If a person's projected cumulative dose to the thyroid from inhalation of radioactive iodine might exceed 10 rem, the exposed person should be started immediately on a dose regimen of KI. Authorization to issue KI is the responsibility of the TSC RCM. He shall inform the SED prior to issuance. Anyone authorized to administer KI shall be familiar with the Food and Drug Administrations approved package insert and ensure that each proposed recipient is similarly informed. The initial dose of KI should not be delayed and those who begin therapy should continue the 10-day course of KI unless their thyroid dose is determined not to have exceeded 10 rem. An adequate supply of KI is stored onsite. It is supplied in blister packs which contain a full 10-day dose regime.
A.
If a person's projected cumulative dose to the thyroid from inhalation of radioactive iodine might exceed 10 rem, the exposed person should be started immediately on a dose regimen of KI. Authorization to issue KI is the responsibility of the TSC RCM. He shall inform the SED prior to issuance. Anyone authorized to administer KI shall be familiar with the Food and Drug Administrations approved package insert and ensure that each proposed recipient is similarly informed. The initial dose of KI should not be delayed and those who begin therapy should continue the 10-day course of KI unless their thyroid dose is determined not to have exceeded 10 rem. An adequate supply of KI is stored onsite. It is supplied in blister packs which contain a full 10-day dose regime.
Follow dosage schedules as outlined on the package.
Follow dosage schedules as outlined on the package.
B. Projected cumulative doses to the thyroid from inhalation of radioactive iodine can be estimated using Appendix C "Occupational Thyroid Dose from Inhalation of 1-131."
B.
C. Potassium iodide is stored in the OSC. KI has an approved shelf-life with the expiration date listed. To ensure that the KI supply is valid, these dates will be inspected and the KI replaced as necessary.
Projected cumulative doses to the thyroid from inhalation of radioactive iodine can be estimated using Appendix C "Occupational Thyroid Dose from Inhalation of 1-131."
D. A copy of the Food and Drug Administration approved instructions shall accompany issue of KI. Dosage schedules and other pertinent information are outlined on the package insert and should be followed closely.
C.
E. The issuing agent shall complete the Potassium Iodide Issue Report (Appendix B) for KI issued. A copy of this report will be routed to the TSC RCM in a timely manner.
Potassium iodide is stored in the OSC. KI has an approved shelf-life with the expiration date listed. To ensure that the KI supply is valid, these dates will be inspected and the KI replaced as necessary.
D.
A copy of the Food and Drug Administration approved instructions shall accompany issue of KI. Dosage schedules and other pertinent information are outlined on the package insert and should be followed closely.
E.
The issuing agent shall complete the Potassium Iodide Issue Report (Appendix B) for KI issued. A copy of this report will be routed to the TSC RCM in a timely manner.


SQN         RADIOLOGICAL CONTROL RESPONSE                     EPIP-14 Rev. 15 Page 10 of 25 3.8   Use of Silver Zeolite Cartridges A. During accident conditions noble gas concentrations may be present in significant quantities both inplant and offsite. The collection of these noble gases on charcoal cartridges during iodine sampling will interfere with subsequent iodine analysis.
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 10 of 25 3.8 Use of Silver Zeolite Cartridges A.
B. Silver zeolite cartridges are provided for use during periods of high noble gas concentrations. RCI-20 describes the utilization of and lists hazards associated with Silver Zeolite cartridge use.
During accident conditions noble gas concentrations may be present in significant quantities both inplant and offsite. The collection of these noble gases on charcoal cartridges during iodine sampling will interfere with subsequent iodine analysis.
3.9   Personnel Decontamination and Facilities A. RADCON will use established procedures for personnel decontamination. Decontamination facilities are available for use by Sequoyah personnel.
B.
B. Contaminated personnel are normally decontaminated at the 690' elevation decon facility. This facility is equipped with a wash sink, shower, and all necessary supplies. These supplies include various decontamination agents and soaps, towels, clean clothing, and other miscellaneous supplies.
Silver zeolite cartridges are provided for use during periods of high noble gas concentrations. RCI-20 describes the utilization of and lists hazards associated with Silver Zeolite cartridge use.
3.9 Personnel Decontamination and Facilities A.
RADCON will use established procedures for personnel decontamination. Decontamination facilities are available for use by Sequoyah personnel.
B.
Contaminated personnel are normally decontaminated at the 690' elevation decon facility. This facility is equipped with a wash sink, shower, and all necessary supplies. These supplies include various decontamination agents and soaps, towels, clean clothing, and other miscellaneous supplies.
Contaminated personnel requiring offsite medical attention are treated at the agreement hospital(s). The hospital has a complete staff that has been trained in the handling and care of contaminated patients.
Contaminated personnel requiring offsite medical attention are treated at the agreement hospital(s). The hospital has a complete staff that has been trained in the handling and care of contaminated patients.
Emergency Preparedness maintains a supply cabinet at the hospital's Emergency Room which contains posting materials and various other supplies. EPIP-10 contains guidelines for RADCON assistance during a medical emergency or hospital treatment.
Emergency Preparedness maintains a supply cabinet at the hospital's Emergency Room which contains posting materials and various other supplies. EPIP-10 contains guidelines for RADCON assistance during a medical emergency or hospital treatment.


SQN             RADIOLOGICAL CONTROL RESPONSE               EPIP-14 Rev. 15 Page 11 of 25 APPENDIX A Page 1 of 1 IN PLANT RADIATION NIONITORS Affected Unit DESCRIPTION             IDENTIFIER         INITIAL UPDATED READINGS READING DATE TIME READING PANEL 0-M-12 SPENT FUEL PIT AREA RADMON           1/2-RM-90-1                               mRlhr SFP AREA RADMON                     O-RM-90-5                                 mR/hr CCS HXS AREA RADMON                 1/2-RM-90-6                               mR/hr HOT SAMPLE ROOM AREA RADMON         1/2-RM-90-7                               mR/hr AFW PUMPS AREA RADMON               1/2-RM-90-8                               mR/hr CNDS WASTE TKS AREA RADMON           O-RM-90-9                                 mR/hr CVCS BD AREA RADMON                   1/2-RM-90-1 0                           mR/hr CNTMT SPRAY AND RHR PUMPS             O-RM-90-11                               mR/hr RADMON CNTMT UPPER COMPT RADMON-             1/2-RM-90 TOTAL GAS                             112B                                     CPM CNTMT LOWER COMPT RADMON TOTAL GAS                             112-RM-90 106B                                     CPM PANEL 112-M-30           1/2-RI-90-400 Low Range                               1iCI/cc SHIELD BLDG VENT MON RAD             Mid Range                               j.CI/cc INDICATOR                             High Range                               ýiCI/cc Effluent                   _.CI/sec SAMPLE ROOM POST ACCIDENT             1/2-RM-90-280 AREA MONITOR                                                                   mR/hr RHR POST ACCIDENT AREA MONITOR
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 11 of 25 APPENDIX A Page 1 of 1 IN PLANT RADIATION NIONITORS Affected Unit DESCRIPTION IDENTIFIER INITIAL UPDATED READINGS READING DATE TIME READING PANEL 0-M-12 SPENT FUEL PIT AREA RADMON 1/2-RM-90-1 mRlhr SFP AREA RADMON O-RM-90-5 mR/hr CCS HXS AREA RADMON 1/2-RM-90-6 mR/hr HOT SAMPLE ROOM AREA RADMON 1/2-RM-90-7 mR/hr AFW PUMPS AREA RADMON 1/2-RM-90-8 mR/hr CNDS WASTE TKS AREA RADMON O-RM-90-9 mR/hr CVCS BD AREA RADMON 1/2-RM-90-1 0 mR/hr CNTMT SPRAY AND RHR PUMPS O-RM-90-11 mR/hr RADMON CNTMT UPPER COMPT RADMON-1/2-RM-90 TOTAL GAS 112B CPM CNTMT LOWER COMPT RADMON TOTAL GAS 112-RM-90 106B CPM PANEL 112-M-30 1/2-RI-90-400 Low Range 1iCI/cc SHIELD BLDG VENT MON RAD Mid Range j.CI/cc INDICATOR High Range  
          -LO RNGE                     1/2-RM-90-290                           mR/hr
ýiCI/cc Effluent
          -HI RNGE                     1/2-RM-90-291                           mR/hr
_.CI/sec SAMPLE ROOM POST ACCIDENT 1/2-RM-90-280 AREA MONITOR mR/hr RHR POST ACCIDENT AREA MONITOR  
          -LO RNGE                     1/2-RM-90-292                           mR/hr
-LO RNGE 1/2-RM-90-290 mR/hr  
          -HI RNGE                     1/2-RM-90-293                           mR/hr Route to EP Manager                   Data Taker Signature Time Date
-HI RNGE 1/2-RM-90-291 mR/hr  
-LO RNGE 1/2-RM-90-292 mR/hr  
-HI RNGE 1/2-RM-90-293 mR/hr Route to EP Manager Data Taker Signature Time Date


                /          SQN                  RADIOLOGICAL CONTROL RESPONSE                                   EPIP-1 4 Rev. 15 Page 12 of 25 I                  I APPENDIX B Page 1 of 1 POTASSIUM IODIDE ISSUE REPORT TIME OF I NUMBER             INFORMATION         ISSUED BY     DATE NAME            SS NUMBER      EXPOSURE PERIOD INITIAL KI     OF DOSES   INSTRUCTIONS                       ISSUED DOSE           ISSUED         ISSUED
RADIOLOGICAL CONTROL RESPONSE APPENDIX B Page 1 of 1 POTASSIUM IODIDE ISSUE REPORT NAME SS NUMBER EXPOSURE PERIOD TIME OF I NUMBER INFORMATION ISSUED BY DATE INITIAL KI OF DOSES INSTRUCTIONS ISSUED DOSE ISSUED ISSUED
____________              1.             I                                     I             I               t                 I
: 1.
: i.             i                                     Ii            i                                 1 I               I                                       I                             t                 t I              i                      i              i            I                i                i i               4                       i               i           t                 i               T
I I
____________                1              1.                       1                           +                 I I             I                       I             I           t                 I               I
I t
____________                I             I                       I               +           I I                                     I               '1           1               t
I
_ _  _ _  I__            I                       i               i           i               Iii I-               I                                     *1           I               t                 I
: i.
____________              1.               I                     I               I           I                                 1 I.               I                     +               I           I
i I i i
____________              4               1                     1               I           I               I                 V 4               1                     1               I           t                 I               I
1 I
____________              4               4                     4               1           1                 1               t i               i                       1               i           t               -i               I
I I
____________                I               I                       I                                             I I               I                       I             1           1                 1 moute to r-mergency -repaey u ,e..au
t t
i 4
i i
t i
T 1
: 1.
1  
+
I I
I I
I t
I I
I I
I  
+
I I
I  
'1 1
t I__
I i
i i
i Ii I-I  
*1 I
t I
: 1.
I I
I I
1 I.
I  
+
I I
4 1
1 I
I I
V 4
1 1
I t
I I
4 4
4 1
1 1
t i
i 1
i t  
-i I
I I
I I
I I
I 1
1 1
moute to r-mergency repaey u,e..au SQN
/
I I
EPIP-1 4 Rev. 15 Page 12 of 25 I
i i
i I
i i


(sjnoq) ew!lj ainsodx3l 001-                                                          0M.                                                             L.                                                           L0 30-300"*
(sjnoq) ew!lj ainsodx3l 0M.
                  ....................................................................................................................................................................
L.
                  .....................................................................................................................................................................
wei Oý-+
                    ......................................................        .................................    ..... ..............  .............................................
Wei' 09 0---
                  ...............................................................................................................................................................
I.................
                                                                                                      .....................    .......:...  .............................................
3 I...............................
                  ......................................      ................  ..................
I...........................................
                                                                                                                                                        ..........
I.............
                            ................  :...: ------- ...........  *......
r.................
                                                                            --- :
30-300"*
                                                                                  .....
gO-00" I.
                                                                                                ...............................
LO-00" I 0
:::. ... ::.....................   :.........................
0 CD 90-300 L=
:-:
0 170-300*
:.......................                  ......                    gO-00" I.
SO-3O0" c VIo
                  ................................................
;o uoeieqetui wotjl esoo ploiAqj. IeuO!edflOOo I,.o s Oed o XIaN3ddV 9Z  
                    ....................    ...............................      .......................  ..............................        ................................................
-10 Cl:
                !                                                                                                                              .......................................................
Nd t'L-dId3 HSNOdSHU iQUINQO 1VOID1OIGVUa NOS 001-L0 I
                      . ........................        .....................    .......................................      ..............
                                                                ..............    .......  ..............................................    ........  ................................    .............
                      ........    ........................
                      ..............    .......................      ..........  ................................    .....................  ........  ..............................................
                                                                            .....  ....................................      ................ ..............  ................................    :.......
                      ..................    ........................
                      .....................      ........................                                                    -------------                            --------------  *.......
I     .........................      .....................................
                                                                              ...
                                                                                      ...................................
                                                                                    .. ................................................
                                                                                                                                            .............  :::::*,::::::::::::::::::::::::: ----
                                                                                                                                                ..........................................
                                                                                                                                                                                                ------        LO-00" I
                      ..................      ..........................      - ....................        ...............................    -------------------------------------
                      ......    ................    ................      ......    ..........................          .....................  .....................................
                                                                                    .........    ........................      .............  .................................................                        00
                < ............          .....  ............    ---------------                                                    .....................................................
                    ...  ..............    ....................    ....  ....    .... ..........    .......................
                    ........  .............      ...................      ....    ...................    ........................    ...................................................
                    ------  ....  ...............    .........                    .    ..    .                                                                                                                          CD
                            ........  ...............                                                                .......................                                                                  90-300 L=
                                                                                                                                            ............
                                                                  .......    .. ..................            ..........................    ........................      ...............................
                    .....................................
                                                ......................      ..... ........    ....................    .....................    .. ........................        .....................
                    ........................
                                                                                      .............  ....................      ..............    .....  ... ...... I.................    ...............
                    ..... ..............................................
                                                                                    ... ...........    .. ...................      .........    .....  ........    ....  ...................      .........
                    .......................................................                                                                                                                              .....
                                                                                    ........    ...............    ....................  .....    ...................      ........................
                    .......................................................
                                        ....  ..............................      ...........    ..............
wei O&#xfd;-+                                        .............................
                                                ..........................
                                          ...............................
::      ----------          --------..                        .....      ...........  :.........
                                                                                                                                                        *,.*.......................  .  .....3
:......                            0 Wei' 09  0---        .......................    ........................................................                                            ..................      ..........................    ...
                      ..... .................................................      I...............................      .............          ........    ........  ..........    ...................... 170-300*
                      ............  ..............................    ...........    .................................    :......  .........      ............    ...................      ...............
                      .......................................................        ..............................    ..  ....................  ...    ............  ..................      ..........
                      ........... I...........................................      .................................    ....................  .....  ..  ........  .....    ...................
                                                                                                                                                                                    ...    ..........    .....
                      .......................
                      .......................    ...............................
                                                ...............................                    :..........................
                                                                                      ...............
                                                                                    ................................................    ......  .:.....
                                                                                                                                                .......  ...                      ..  .........
                      .......................................................                  .............................................
                                                                                      .........                                                  ..................................          .............
                      .......................................................          ................... ...........................................                                                    .....
                      .......................................................          ...............................................            ..................................                          >
                      ..-............................................................                                                            ..................................
                      ........................................................................................................................... .......................................................
                                                                                                                                                  ..................................
                      .......................................................        -. :::::..
Ir..        ..............................
::::. ..............  ................
                      .......................
                      .......................  :::.............................
                                                    ............................            ...........
                                                                                      ................. -...............
                                                                                                          ------------          ...............  .................                                              SO-3O0" cVIo
          ;o uoeieqetui wotjl esoo ploiAqj. IeuO!edflOOo I, .o s Oed o XIaN3ddV 9Z               Cl:-10                                                  Nd t'L-dId3                                       HSNOdSHU iQUINQO 1VOID1OIGVUa                                                                                                           NOS


SQN               RADIOLOGICAL CONTROL RESPONSE                     EPIP-14 Rev. 15 Page 14 of 25 APPENDIX D Page 1 of 10 METHODOLOGY FOR PROJECTING TEDE A. TO DETERMINE THE PROJECTED OFF-SITE TEDE AND THYROID CDE.
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 14 of 25 APPENDIX D Page 1 of 10 METHODOLOGY FOR PROJECTING TEDE A. TO DETERMINE THE PROJECTED OFF-SITE TEDE AND THYROID CDE.
: 1. If there is a release to the environment from a ruptured Steam Generator (via atmospheric relief, safety valve, or un-isolated line break outside of containment) then go to Step 4 below.
: 1. If there is a release to the environment from a ruptured Steam Generator (via atmospheric relief, safety valve, or un-isolated line break outside of containment) then go to Step 4 below.
: 2. From the effected unit ICS Main Menu click on "GROUP DISP MENU" then click on "DOSE ASSESSMENT" (Fig. 2) and read the TEDE and THYROID CDE dose rate in REM at the SITE BOUNDARY (EAB), 2 MILES, and 5 MILES (Fig. 3).
: 2. From the effected unit ICS Main Menu click on "GROUP DISP MENU" then click on "DOSE ASSESSMENT" (Fig. 2) and read the TEDE and THYROID CDE dose rate in REM at the SITE BOUNDARY (EAB), 2 MILES, and 5 MILES (Fig. 3).
PROVIDE THESE VALUES TO THE SM/SED TO DETERMINE EVENT CLASSIFICATION AND PROTECTIVE ACTION RECOMMENDATIONS.
PROVIDE THESE VALUES TO THE SM/SED TO DETERMINE EVENT CLASSIFICATION AND PROTECTIVE ACTION RECOMMENDATIONS.
NOTE: Ifthe "DOSE ASSESSMENT" feature is not working then projected TEDE and THYROID CDE must be manually calculated. The following parameters will be required to determine TEDE and THYROID CDE at the desired distance: Plant Total Gaseous Rad Release Rate (Source Term), Wind Speed and, Atmospheric Stability Class. Revisions to the factors or any referenced software in this appendix requires revalidation of the calculations by Chemistry.
NOTE: If the "DOSE ASSESSMENT" feature is not working then projected TEDE and THYROID CDE must be manually calculated. The following parameters will be required to determine TEDE and THYROID CDE at the desired distance: Plant Total Gaseous Rad Release Rate (Source Term), Wind Speed and, Atmospheric Stability Class. Revisions to the factors or any referenced software in this appendix requires revalidation of the calculations by Chemistry.
: 3. The "PLANT TOTAL GASEOUS RAD RELEASE" may be determined as follows: From the effected unit ICS Main Menu type "SHOW RAD025. Enter the value in the blank in (page
: 3. The "PLANT TOTAL GASEOUS RAD RELEASE" may be determined as follows: From the effected unit ICS Main Menu type "SHOW RAD025. Enter the value in the blank in (page
: 16) C.1.c.
: 16) C.1.c.
PROVIDE THIS VALUE TO THE SM/SED TO DETERMINE EVENT CLASSIFICATION AND PROCEED WITH SECTION B.
PROVIDE THIS VALUE TO THE SM/SED TO DETERMINE EVENT CLASSIFICATION AND PROCEED WITH SECTION B.
OR
OR
: 4. Notify the Chemistry Shift Supervisor to complete Appendix A (if RAD025 is not available) or Appendix G (if RAD025 is available) of 0-TI-CEM-030-030.0. Enter the release rate pCi/sec value in the blank in (page 16) C.1 .c.
: 4. Notify the Chemistry Shift Supervisor to complete Appendix A (if RAD025 is not available) or Appendix G (if RAD025 is available) of 0-TI-CEM-030-030.0. Enter the release rate pCi/sec value in the blank in (page 16) C.1.c.
PROVIDE THIS VALUE TO THE SM/SED TO DETERMINE EVENT CLASSIFICATION AND PROCEED WITH SECTION B.
PROVIDE THIS VALUE TO THE SM/SED TO DETERMINE EVENT CLASSIFICATION AND PROCEED WITH SECTION B.


SQN             RADIOLOGICAL CONTROL RESPONSE                       EPIP-14 Rev. 15 Page 15 of 25 APPENDIX D Page 2 of 10 B. DETERMINE THE WIND SPEED AND ATMOSPHERIC STABILITY CLASS.
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 15 of 25 APPENDIX D Page 2 of 10 B. DETERMINE THE WIND SPEED AND ATMOSPHERIC STABILITY CLASS.
: 1. On the affected Unit ICS Main Menu click on "SECONDARY MIMICS" button.
: 1. On the affected Unit ICS Main Menu click on "SECONDARY MIMICS" button.
: a. On the Secondary Mimics page click on "MET DATA" button. (Figure 4)
: a. On the Secondary Mimics page click on "MET DATA" button. (Figure 4)
: b. From the "MET-TOWER LINK" page (Figure 5) or the "FRED MET DATA" page (Figure 6) record the 46 Meter Ave. Wind Speed (15 Min) = _             mph, Enter in blank in C.1 .a.
: b. From the "MET-TOWER LINK" page (Figure 5) or the "FRED MET DATA" page (Figure 6) record the 46 Meter Ave. Wind Speed (15 Min) = _
for NOTE: If not available, call the National Weather Service in Morristown, TN, (423) 586-8400 wind speed. Enter in blank in C.l.a.
mph, Enter in blank in C.1.a.
NOTE: If not available, call the National Weather Service in Morristown, TN, (423) 586-8400 for wind speed. Enter in blank in C.l.a.
: c. From the "FRED MET DATA" page record the Stability Class 46-10 Mtr 15 Min Avg. =
: c. From the "FRED MET DATA" page record the Stability Class 46-10 Mtr 15 Min Avg. =
(e.g., A, B, C, etc.). This is the atmospheric stability class. Enter in blank in C.l.b.
(e.g., A, B, C, etc.). This is the atmospheric stability class. Enter in blank in C.l.b.
: 2. If the Atmospheric Stability Class is not displayed then determine it as follows:
: 2. If the Atmospheric Stability Class is not displayed then determine it as follows:
: a. Return to the "MET-TOWER LINK" page (Figure 5) and click on the "STABILITY DELTA-T's" button.
: a. Return to the "MET-TOWER LINK" page (Figure 5) and click on the "STABILITY DELTA-T's" button.
: b. From the "STABILITY DELTA-T's" page (Figure 7) record the "VERTICAL AIR TEMP DELTA T 46-10 METERS (INSTANTANEOUS)"_=                         DEG F and refer to the table below.
: b. From the "STABILITY DELTA-T's" page (Figure 7) record the "VERTICAL AIR TEMP DELTA T 46-10 METERS (INSTANTANEOUS)"_=
DEG F and refer to the table below.
OR
OR
["46 METER AIR TEMP (INSTANTANEOUS)"_=                         DEG F] minus ["10 METER AIR TEMP (INSTANTANEOUS)" =                   DEG F]=           DEG F and refer to the table below.
["46 METER AIR TEMP (INSTANTANEOUS)"_=
: c. Using the Atmospheric Stability Class Table below with the DEG F value from 2.b. above, determine the stability class. Atmospheric Stability Class =         . Enter in blank in C.1.b.
DEG F] minus ["10 METER AIR TEMP (INSTANTANEOUS)" =
ATMOSPHERIC STABILITY CLASS TABLE DEG F                       CLASS
DEG F]=
                                    < minus 1.3 uF                     A 0          B
DEG F and refer to the table below.
                                    > minus 1.3 < minus 1.2 F 0          C
: c. Using the Atmospheric Stability Class Table below with the DEG F value from 2.b. above, determine the stability class. Atmospheric Stability Class =
                                    > minus 1.2 < minus 1.0 F 0          D
Enter in blank in C.1.b.
                                    > minus 1.0 < minus 0.4 F
ATMOSPHERIC STABILITY CLASS TABLE DEG F CLASS  
                                    > minus 0.4 < 0.9&deg;F                 E 0                        F
< minus 1.3 uF A  
                                    > 0.9 < 2.6 F
> minus 1.3 < minus 1.2 0F B
                                    > 2.6 OF                           G
> minus 1.2 < minus 1.00F C
> minus 1.0 < minus 0.40F D
> minus 0.4 < 0.9&deg;F E  
> 0.9 < 2.60 F F  
> 2.6 OF G


SQN             RADIOLOGICAL CONTROL RESPONSE                   EPIP-14 Rev. 15 Page 16 of 25 APPENDIX D Page 3 of 10 C. DETERMINE THE PROJECTED TOTAL DOSE EQUIVALENT (TEDE) AT THE SITE BOUNDARY, 2, OR 5 MILES.
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 16 of 25 APPENDIX D Page 3 of 10 C. DETERMINE THE PROJECTED TOTAL DOSE EQUIVALENT (TEDE) AT THE SITE BOUNDARY, 2, OR 5 MILES.
: 1. Obtain the appropriate meteorological and release rate data and enter below:
: 1. Obtain the appropriate meteorological and release rate data and enter below:
: a. Wind Speed =_                   mmi/hr from B.1.b.
: a. Wind Speed =_
: b. Stability Class =           from B.1.c or B.2.c.
mmi/hr from B.1.b.
: c. Plant Total Noble Gas Release Rate =                     ItCi/SEC from A.2 or A.3.
: b. Stability Class =
from B.1.c or B.2.c.
: c. Plant Total Noble Gas Release Rate =
ItCi/SEC from A.2 or A.3.
: 2. From the TEDE FACTOR TABLES, (Figure 1), find the appropriate table for the stability class. Then, find the desired distance range in miles on the vertical scale and the wind speed on the horizontal scale. Record the corresponding TEDE FACTOR in 3 below. For wind speeds that fall between the values in the table, default to the lower wind speed.
: 2. From the TEDE FACTOR TABLES, (Figure 1), find the appropriate table for the stability class. Then, find the desired distance range in miles on the vertical scale and the wind speed on the horizontal scale. Record the corresponding TEDE FACTOR in 3 below. For wind speeds that fall between the values in the table, default to the lower wind speed.
This is the more conservative value.
This is the more conservative value.
: 3. 0.62-1.99 miles TEDE FACTOR =                               rem/hour per p.Ci/sec.
: 3.
2.00-4.99 miles TEDE FACTOR =                               rem/hour per pCi/sec.
0.62-1.99 miles TEDE FACTOR =
5.00-10.0 miles TEDE FACTOR =                               rem/hour per pCi/sec.
rem/hour per p.Ci/sec.
: 4. Obtain an estimate of the release duration (t)=                       hour(s).
2.00-4.99 miles TEDE FACTOR =
: 5. TEDE = [TEDE FACTOR(@ desired distance)]x(Plant Total         Noble Gas Release Rate)x(t)=
rem/hour per pCi/sec.
REM @ 0.62-1.99 miles.   (Site Boundary)
5.00-10.0 miles TEDE FACTOR =
REM @ 2.00-4.99 miles.   (2 Miles)
rem/hour per pCi/sec.
REM @ 5.00-10.0 miles.   (5 Miles)
: 4. Obtain an estimate of the release duration (t)=
hour(s).
: 5. TEDE = [TEDE FACTOR(@ desired distance)]x(Plant Total Noble Gas Release Rate)x(t)=
REM @ 0.62-1.99 miles. (Site Boundary)
REM @ 2.00-4.99 miles. (2 Miles)
REM @ 5.00-10.0 miles. (5 Miles)
: 6. If Type II release due to fuel overheat or melt, Then multiply the calculated dose in step 5 by 3.2.
: 6. If Type II release due to fuel overheat or melt, Then multiply the calculated dose in step 5 by 3.2.
Step 5 x 3.2 =                         REM @ 0.62-1.99 miles. (Site Boundary)
Step 5 x 3.2 =
Step 5 x 3.2 =                         REM @ 2.00-4.99 miles. (2 Miles)
REM @ 0.62-1.99 miles. (Site Boundary)
Step 5 x 3.2 =                         REM @ 5.00-10.0 miles. (5 Miles)
Step 5 x 3.2 =
REM @ 2.00-4.99 miles. (2 Miles)
Step 5 x 3.2 =
REM @ 5.00-10.0 miles. (5 Miles)
: 7. Compute the Thyroid CDE at each distance by multiplying the TEDE values by a factor of ten. (CDE = TEDE x 10)
: 7. Compute the Thyroid CDE at each distance by multiplying the TEDE values by a factor of ten. (CDE = TEDE x 10)
REM @ 0.62-1.99 miles. (Site Boundary)
REM @ 0.62-1.99 miles. (Site Boundary)
Line 1,419: Line 2,165:
: 8. PROVIDE STEP 5 OR 6 AND STEP 7 VALUES TO THE SM/SED TO DETERMINE EVENT CLASSIFICATION AND PROTECTIVE ACTION RECOMMENDATIONS.
: 8. PROVIDE STEP 5 OR 6 AND STEP 7 VALUES TO THE SM/SED TO DETERMINE EVENT CLASSIFICATION AND PROTECTIVE ACTION RECOMMENDATIONS.


SQN                 RADIOLOGICAL CONTROL RESPONSE                                       EPIP-14 Rev. 15 Page 17 of 25 APPENDIX D Page 4 of 10 FIGURE 1 TEDE FACTOR TABLES TEDE FACTOR (rem/hr per gCi/s) FROM A GROUND-LEVEL RELEASE Stability   Class A                                       Wind Speed (mi/h) 6.7 mi/h   8.9 mi/h   11.2 rni/h 13.4 mi/hJ15.7 mi/h 17.9 mi/h   20.1 mi/h 22.4 mi/h miles    2.2 mi/h  4.5 mi/h 0.62-1.99   5.1E-10   2.5E-10I   2.OE-10   1.5E-10     1.OE-10 9.1E-11 8.1E-11       7.1E-11     6.1E-11   5.1E-11 2.00-4.99   1.7E-10   8.7E-11   7.OE-11   5.2E-11     3.5E-11 3.1E-11 2.8E-11       2.4E-11     2.1E-11   1.7E-11 6.3E-11   3.4E-11   2.8E-11   2.2E-11     1.6E-11 1.4E-11 1.3E-11         1.1E-11   9.5E-12   7.9E-12 5.0-10.0 Stability   Class B                                       Wind Speed (mi/h) 4.5 mi/h   6.7 mi/h   8.9 mi/h   11.2 mi/h 13.4 mi/h 15.7mi/h   17.9 mi/h 20.1 mi/h 22.4 mi/h miles    2.2 mi/h 0.62-1.99   2.3E-09   1.2E-09   9.4E-10   7.1 E-1 0   4.7E-10 4.3E-10 3.8E-10         3.3E-10   2.8E-10   2.3E-10 2.00-4.99   2.3E-10   1.2E-10   9.2E-11   6.8E-11     4.5E-11 4.1E-11 3.6E-11         3.2E-11   2.7E-11   -2.3E-11 8.2E-11   4.6E-11   3.7E-11   2.9E-11     2.1E-11 1.9E-11 1.7E-11         1.5E-11   1.2E-11   1.0E-11 5.0-10.0 Stability   Class C                                       Wind Speed (mi/h) 6.7 mi/h   8.9 mi/h   11.2 mi/h 13.4 mi/h 15.7 mi/h   17.9 mi/h 20.1 mi/h 22.4 mi/h miles    2.2 mi/h  4.5 mi/h 0.62-1.99   6.8E-09   3.5E-09   2.8E-09   2.1E-09     1.4E-09 1.2E-09 1.1E-09       9.6E-10   8.2E-10   6.8E-10 2.00-4.99   9.3E-10   4.5E-1 0   3.7E-10   2.8E-10     1.9E-10l 1.7E-10 1.5E-10       1.3E-10     1.1E-10   9.3E-11 1.6E-10   9.1E-11   7.5E-11   5.8E-11   4.2E-11 3.7E-11 3.3E-11         2.9E-11   2.5E-11     2.1E-11 5.0-10.0 Stability Class D                                       Wind Speed (mi/h) 4.5 mi/h 6.7 mi/h 8.9 mi/h       11.2 mi/h 13.4 mi/h 15.7 mi/h 17.9 mi/h 20.1 mi/h   22.4 mi/h miles    2.2 mi/h 0.62-1.99   2.0E-08   1.OE-08 8.OE-09 6.OE-09           4.1E-09 3.6E-09 3.2E-09       2.8E-09     2.4E-09   2.OE-09 2.00-4.99   3.3E-09   1.7E-09 1.4E-09 1.OE-09           6.8E-10 6.2E-10 5.5E-10       4.8E-10     4.1E-10   3.5E-10 6.9E-10   3.9E-10 3.2E-10 2.5E-10           1.8E-10 1.6E-10 1.4E-10         1.2E-10   1.OE-10   8.7E-11 5.0-10.0 Stability Class E                                       Wind Speed (mi/h) 4.5 mi/h   6.7 mi/h   8.9 mi/h   11.2 mi/h 13.4 mi/h 15.7 mi/h   17.9 mi/h 20.1 mi/h 22.4 mi/h miles    2.2 mi/h 0.62-1.99   3.5E-08   1.7E-08   1.4E-08   1.OE-08     7.OE-09 6.3E-09 5.6E-09         4.9E-09   4.2E-09   3.5E-09 2.00-4.99   6.6E-09   3.3E-09   2.7E-09   2.OE-09     1.3E-09 1.2E-09 1.1E-09         9.3E-10   7.9E-10   6.6E-10 1.5E-09   8.2E-10   6.7E-10   5.3E-10     3.8E-10 3.4E-10 3.1E-10         2.7E-10   2.3E-10   1.9E-10 5.0-10.0 Stability   Class F                                       Wind Speed (mi/h) 4.5 mi/h   6.7 mi/h   8.9 mi/h   11.2 mi/h 13.4 mi/h 15.7 mi/h   17.9 mi/h 20.1 mi/h 22.4 mi/h miles    2.2 mi/h 0.62-1.99   6.6E-08   3.3E-08   2.7E-08   2.OE-08     1.3E-08 1.2E-08 1.1E-08         9.3E-09   8.0E-09   6.6E-09 2.00-4.99   1.5E-08   7.6E-09   6.1 E-09   4.6E-09   3.1E-09 2.8E-09 2.5E-09         2.2E-09     1.8E-09   1.5E-09 5.0-10.0   3.8E-09   2.1E-09   1.7E-09   1.3E-09   9.6E-10 8.6E-10 7.7E-10         6.7E-10     5.7E-10   4.7E-10 Stability   Class G                                       Wind Speed (mi/h) 6.7 mi/h   8.9 mi/h   11.2 mi/h 13.4 mi/h 15.7 mi/h 17.9 mi/h 20.1 mi/h   22.4 mi/h miles    2.2 mi/h  4.5 mi/h 0.62-1.99   1.5E-07   7.2E-08   5.7E-08   4.3E-08     2.8E-08 2.5E-08 2.3E-08       2.OE-08     1.7E-08   1.4E-08 2.00-4-99   3.7E-08   1.6E-08   1.3E-08   9.5E-09     6.3E-09 5.6E-09 5.OE-09       4.4E-09     3.8E-09   3.2E-09 9.4E-09   5.OE-09   4.1E-09   3.2E-09     2.3E-09 2.OE-09 1.8E-09         1.5E-09   1.3E-09   1.1E-09 5.0-10.0
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 17 of 25 APPENDIX D Page 4 of 10 FIGURE 1 TEDE FACTOR TABLES TEDE FACTOR (rem/hr per gCi/s) FROM A GROUND-LEVEL RELEASE Stability Class A Wind Speed (mi/h) miles 2.2 mi/h 4.5 mi/h 6.7 mi/h 8.9 mi/h 11.2 rni/h 13.4 mi/hJ15.7 mi/h 17.9 mi/h 20.1 mi/h 22.4 mi/h 0.62-1.99 5.1E-10 2.5E-10I 2.OE-10 1.5E-10 1.OE-10 9.1E-11 8.1E-11 7.1E-11 6.1E-11 5.1E-11 2.00-4.99 1.7E-10 8.7E-11 7.OE-11 5.2E-11 3.5E-11 3.1E-11 2.8E-11 2.4E-11 2.1E-11 1.7E-11 5.0-10.0 6.3E-11 3.4E-11 2.8E-11 2.2E-11 1.6E-11 1.4E-11 1.3E-11 1.1E-11 9.5E-12 7.9E-12 Stability Class B Wind Speed (mi/h) miles 2.2 mi/h 4.5 mi/h 6.7 mi/h 8.9 mi/h 11.2 mi/h 13.4 mi/h 15.7mi/h 17.9 mi/h 20.1 mi/h 22.4 mi/h 0.62-1.99 2.3E-09 1.2E-09 9.4E-10 7.1 E-1 0 4.7E-10 4.3E-10 3.8E-10 3.3E-10 2.8E-10 2.3E-10 2.00-4.99 2.3E-10 1.2E-10 9.2E-11 6.8E-11 4.5E-11 4.1E-11 3.6E-11 3.2E-11 2.7E-11 -2.3E-11 5.0-10.0 8.2E-11 4.6E-11 3.7E-11 2.9E-11 2.1E-11 1.9E-11 1.7E-11 1.5E-11 1.2E-11 1.0E-11 Stability Class C Wind Speed (mi/h) miles 2.2 mi/h 4.5 mi/h 6.7 mi/h 8.9 mi/h 11.2 mi/h 13.4 mi/h 15.7 mi/h 17.9 mi/h 20.1 mi/h 22.4 mi/h 0.62-1.99 6.8E-09 3.5E-09 2.8E-09 2.1E-09 1.4E-09 1.2E-09 1.1E-09 9.6E-10 8.2E-10 6.8E-10 2.00-4.99 9.3E-10 4.5E-1 0 3.7E-10 2.8E-10 1.9E-10l 1.7E-10 1.5E-10 1.3E-10 1.1E-10 9.3E-11 5.0-10.0 1.6E-10 9.1E-11 7.5E-11 5.8E-11 4.2E-11 3.7E-11 3.3E-11 2.9E-11 2.5E-11 2.1E-11 Stability Class D Wind Speed (mi/h) miles 2.2 mi/h 4.5 mi/h 6.7 mi/h 8.9 mi/h 11.2 mi/h 13.4 mi/h 15.7 mi/h 17.9 mi/h 20.1 mi/h 22.4 mi/h 0.62-1.99 2.0E-08 1.OE-08 8.OE-09 6.OE-09 4.1E-09 3.6E-09 3.2E-09 2.8E-09 2.4E-09 2.OE-09 2.00-4.99 3.3E-09 1.7E-09 1.4E-09 1.OE-09 6.8E-10 6.2E-10 5.5E-10 4.8E-10 4.1E-10 3.5E-10 5.0-10.0 6.9E-10 3.9E-10 3.2E-10 2.5E-10 1.8E-10 1.6E-10 1.4E-10 1.2E-10 1.OE-10 8.7E-11 Stability Class E Wind Speed (mi/h) miles 2.2 mi/h 4.5 mi/h 6.7 mi/h 8.9 mi/h 11.2 mi/h 13.4 mi/h 15.7 mi/h 17.9 mi/h 20.1 mi/h 22.4 mi/h 0.62-1.99 3.5E-08 1.7E-08 1.4E-08 1.OE-08 7.OE-09 6.3E-09 5.6E-09 4.9E-09 4.2E-09 3.5E-09 2.00-4.99 6.6E-09 3.3E-09 2.7E-09 2.OE-09 1.3E-09 1.2E-09 1.1E-09 9.3E-10 7.9E-10 6.6E-10 5.0-10.0 1.5E-09 8.2E-10 6.7E-10 5.3E-10 3.8E-10 3.4E-10 3.1E-10 2.7E-10 2.3E-10 1.9E-10 Stability Class F Wind Speed (mi/h) miles 2.2 mi/h 4.5 mi/h 6.7 mi/h 8.9 mi/h 11.2 mi/h 13.4 mi/h 15.7 mi/h 17.9 mi/h 20.1 mi/h 22.4 mi/h 0.62-1.99 6.6E-08 3.3E-08 2.7E-08 2.OE-08 1.3E-08 1.2E-08 1.1E-08 9.3E-09 8.0E-09 6.6E-09 2.00-4.99 1.5E-08 7.6E-09 6.1 E-09 4.6E-09 3.1E-09 2.8E-09 2.5E-09 2.2E-09 1.8E-09 1.5E-09 5.0-10.0 3.8E-09 2.1E-09 1.7E-09 1.3E-09 9.6E-10 8.6E-10 7.7E-10 6.7E-10 5.7E-10 4.7E-10 Stability Class G Wind Speed (mi/h) miles 2.2 mi/h 4.5 mi/h 6.7 mi/h 8.9 mi/h 11.2 mi/h 13.4 mi/h 15.7 mi/h 17.9 mi/h 20.1 mi/h 22.4 mi/h 0.62-1.99 1.5E-07 7.2E-08 5.7E-08 4.3E-08 2.8E-08 2.5E-08 2.3E-08 2.OE-08 1.7E-08 1.4E-08 2.00-4-99 3.7E-08 1.6E-08 1.3E-08 9.5E-09 6.3E-09 5.6E-09 5.OE-09 4.4E-09 3.8E-09 3.2E-09 5.0-10.0 9.4E-09 5.OE-09 4.1E-09 3.2E-09 2.3E-09 2.OE-09 1.8E-09 1.5E-09 1.3E-09 1.1E-09


SQN RADIOLOGICAL CONTROL RESPONSE   EPIP-14 Rev. 15 Page 18 of 25 APPENDIX D Page 5 of 10 FIGURE 2 GROUP DISPLAY MENU
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 18 of 25 APPENDIX D Page 5 of 10 FIGURE 2 GROUP DISPLAY MENU


SQN                       RADIOLOGICAL CONTROL RESPONSE                                         EPIP-14 Rev. 15 Page 19 of 25 APPENDIX D Page 6 of 10 FIGURE 3 DOSE ASSESSMENT K.
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 19 of 25 APPENDIX D Page 6 of 10 FIGURE 3 DOSE ASSESSMENT SELECT FUINC.
                                                                                                                          -.. l 1.              Ld SELECT FUINC. KEY OR TUR*h-*.0         C1E 1     i)OOSL                         ._
KEY OR TUR*h-*.0 C1E 1
SQN       -   DOSE ASSESSMLN1 It,      t DATE: 5                 LL      "
i)OOSL SQN - DOSE ASSESSMLN1 DATE:
Q                                                                                            RECALCULATE TIME: I0               h)         U VALUE                 UNITS       QUALITY 1NPUITS:
5 TIME: I0 It, t
16                    MI/HR        GOOD OY2307A                     EDS METDATA 45M 15MIN AVG WIND SPEED
LL Q
                                                                                                            *.7i                    DEG OY2301A                     EDS METDATA 45M 15MIN AVG WIND DIRECTION (FROM) u                                              0 OY2319A                     EDS 15MIN STABILITY CLASS
h)
                                                                                                                -                  uCi/s        00 RAD025                     ICS RECALCULATE TOTAL NOBLE GAS RELEASE RATE 2.95e.-01                  uCils      voori IODINE                       .001
U 1NPUITS:
* TOTAL NOBLE GAS RELEASE RATE OUTPUT:                   HOURLY DOSE                                                   TEDE (Rem)                       THYROID CDE (Rem)
VALUE UNITS QUALITY OY2307A EDS METDATA 45M 15MIN AVG WIND SPEED 16 MI/HR GOOD OY2301A EDS METDATA 45M 15MIN AVG WIND DIRECTION (FROM)  
    ,,T-,-       If,, fv                                                                         77 -7 06                           7.47 0?
*.7i DEG OY2319A EDS 15MIN STABILITY CLASS u
3MI DUUMMAI
0 RAD025 ICS RECALCULATE TOTAL NOBLE GAS RELEASE RATE uCi/s 00 IODINE  
              '.                                                                                                                      0.OOel-J
.001
: 0. loc, &#xfd;U0 2 MILE:
* TOTAL NOBLE GAS RELEASE RATE 2.95e.-01 uCils voori OUTPUT:
HOURLY DOSE TEDE (Rem)
THYROID CDE (Rem)  
,,T-,-
If,, fv  
-7 77 06 7.47 0?
3MI DUUMMAI 2 MILE:
5 MILE:
5 MILE:
UE                    U I
: 0. loc, &#xfd;U0
                                                        .. O5... L... _ _2/,n~i,.
: 0. OOel-J UEU
_
.. O5... L...
* _~~~~- SIC Lt.L-L15      ,
2/,n~i,.
RQIM/&,'CK   .--
SIC Lt.L-L 15 RQIM/&,'CK CPU A rWnDE 1.
                                                                                                              . CPU    .,.A
_ _ _
                                                                                                                    .-..------    . ... 1 .
* _~~~~-
                                                                                                                              . .rWnDE w
Ld w
RECALCULATE I
K. l 1.


SQN RADIOLOGICAL CONTROL RESPONSE     EPIP-14 Rev. 15 Page 20 of 25 APPENDIX D Page 7 of 10 FIGURE 4 SECONDARY MIMICS PAGE
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 20 of 25 APPENDIX D Page 7 of 10 FIGURE 4 SECONDARY MIMICS PAGE


EPIP-14 SQN           RADIOLOGICAL CONT ROL RESPONSE Rev. 15 Page 21 of 25 APPENDIX D Page 8 of 10 FIGURE 5 MET-TOWER LINK PAGE m-                                           METEl*[9. 4*     9, D-TA                                                       "1=1 Ma       rGphs     reds                           p10-SEP-1996                                               13:35:24 SELECT FUNC. KEY OR TURN-ON CODE   METUATA >       --. -                                                          Q MET-TOWER LINK INSTANTANEOUS     15 MIH AVG AIR TEMPERATURE:     73.27 DEGF    73.01 WINDSPEED:     4.0   MPH     4.0 WINDDIRECTION FROMt 31.4 DEGREES     26 Em                                                                                              RAINFALL LAST HOUR:0.0     INCHES LAST 15 MIN:0.0     INCHES AIR TEMPERATURE:    74.04 DEGF    73.73    10 METER DEWPOINT 5.0 MPH      4.0              (HOURLY AVG):73.32 DEGF WIND SPEED:
SQN RADIOLOGICAL CONT ROL RESPONSE EPIP-14 Rev. 15 Page 21 of 25 APPENDIX D Page 8 of 10 FIGURE 5 MET-TOWER LINK PAGE m -
WINDDIRECTION FROM: 20.4 DEGREES      22          SOLOR RADIATION (HOURLY AVG): 0.0   LANGLEYS
METEl*[9. 4*
                                                                                                                      /MIN AIR TEMPERATURE:74.97 DEGF          74.61 4.1 MPH      2.6 WIND SPEED:
9, D-TA Ma rGphs reds p10-SEP-1996 13:35:24 SELECT FUNC.
12 WINDDIRECTION FROM: 43.5 DEGREES EMNOWI   iTT026 R          WK( 012Iwi n=1SEC LVL=         PR MSAC CPU A MOI
KEY OR TURN-ON CODE METUATA >
                                                                                                              .F6E
Q MET-TOWER LINK INSTANTANEOUS 15 MIH AVG AIR TEMPERATURE:
73.27 DEG F 73.01 WIND SPEED:
4.0 MPH 4.0 WIND DIRECTION FROMt 31.4 DEGREES 26 AIR TEMPERATURE:
WIND SPEED:
WIND DIRECTION FROM:
AIR TEMPERATURE:
WIND SPEED:
WIND DIRECTION FROM:
74.04 DEG F 73.73 5.0 MPH 4.0 20.4 DEGREES 22 74.97 DEG F 4.1 MPH 43.5 DEGREES RAINFALL LAST HOUR: 0.0 INCHES LAST 15 MIN:0.0 INCHES 10 METER DEW POINT (HOURLY AVG):73.32 DEG F SOLOR RADIATION (HOURLY AVG): 0.0 LANGLEYS  
/MIN 74.61 2.6 12 EMNOWI R
iTT026 WK( 012Iwi n=1SEC LVL=
PR MSAC CPU A MOI.F6E "1=1 Em


I SQN                RADIOLOGICAL CONTROL RESPONSE APPENDIX D Page 9 of 10 EPIP-14 Rev. 15 Page 22 of 25 FIGURE 6 MET DATA FOR FRED CALC PAGE 1997 15:01:36 Page 1   of GROUP DISPLAY F     -UK C     rFR                                                      seconds A FOR FRED CALC                                           Update rate 1.0 MET DAli QUAL VALUE                    UNITS   DESCRIPTION PID CD00 ~3.                      DEGREES 46 METER VECTOR WIND DIR (15 MIN) oY2301A                                        MPH      46 METER AVG W[ND SPEED (15 MIN)
RADIOLOGICAL CONTROL RESPONSE I
OY2307A
APPENDIX D Page 9 of 10 FIGURE 6 MET DATA FOR FRED CALC PAGE Page 1
                                    *,00:          INCHES  RAINFALL IN THE LAST 15 MINUTES OY2312A                                                STABILITY CLASS 10-46 MTR 15 MIN AVG OY2319A
of ISPLAY F  
                                                                                              ...
-UK rFR C
AM =-=-       . . . . . . . . . . . . .
A FOR FRED CALC QUAL CD00 VALUE
~3.
*,00:
Update rate 1.0 1997 15:01:36 seconds UNITS DESCRIPTION DEGREES MPH INCHES 46 METER VECTOR WIND DIR (15 MIN) 46 METER AVG W[ND SPEED (15 MIN)
RAINFALL IN THE LAST 15 MINUTES STABILITY CLASS 10-46 MTR 15 MIN AVG AM =-=-
SQN EPIP-14 Rev. 15 Page 22 of 25 GROUP D MET DAli PID oY2301A OY2307A OY2312A OY2319A


SQN         RADIOLOGICAL CONTROL RESPONSE                                             EPIP-14 Rev. 15 Page 23 of 25 APPENDIX D Page 10 of 10 FIGURE 7 STABILITY/DELTA-T PAGE ain*       Irends armGrphks  2s   Zo     ye's I~L~nt 1112                                   lo-SEP-1996 13:33:40
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 23 of 25 APPENDIX D Page 10 of 10 FIGURE 7 STABILITY/DELTA-T PAGE ain*
                                                                                                            -  0 SELECT FUNC. KEY OR TURN-ON CODE       MTDATA6 1 STABI LITY/DELTA-T 74.61 DEG F                    VERTICAL AIR TEMP DELTA-T      0.88 DEG F 10 METER AIR TEMP (15 MIN):                                 46-10 METERS (INSTANTANEOUS):
armGrphks Irends 2s Zo ye's I~L~nt 1112 lo-SEP-1996 13:33:40 SELECT FUNC.
73.73 DEG F                                                   1.69 DEG F 46 METER AIR TEMP (15 MIN):                                    VERTICAL AIR TEMP DELTA-T 91-10 METERS (INSTANTANEOUS):
KEY OR TURN-ON CODE MTDATA6 1 0
73.01 DEG F 91 METER AIR TEMP (15 MIN):
STABI LITY/DELTA-T 10 METER AIR TEMP (15 MIN):
10 METER AIR TEMP                                              STABILITY AIR TEMP 74.94 DEG F                    (INSTANTANEOUS) 46-10 MTR:    D (INSTANTANEOUS):
46 METER AIR TEMP (15 MIN):
STABILITY AIR TEMP 46 METER AIR TEMP                                      (INSTANTANEOUS) 91-10 MTR:    E 74.06 DEG F (INSTANTANEOUS):
91 METER AIR TEMP (15 MIN):
STABILITY AIR TEMP 91 METER AIR TEMP                                      (INSTANTANEOUS) 91-46 MTR:   D 73.25 DEG F (INSTANTANEOUS):
10 METER AIR TEMP (INSTANTANEOUS):
STABILITY AIR TEMP   D 46-10 MTR 15 MINUTE:
46 METER AIR TEMP (INSTANTANEOUS):
R       TI     N I WK=012/win=lSEC LVL=5     PRIM/BACKCPU A MODE 1
91 METER AIR TEMP (INSTANTANEOUS):
74.61 DEG F 73.73 DEG F 73.01 DEG F 74.94 DEG F 74.06 DEG F 73.25 DEG F VERTICAL AIR TEMP DELTA-T 0.88 DEG F 46-10 METERS (INSTANTANEOUS):
VERTICAL AIR TEMP DELTA-T 1.69 DEG F 91-10 METERS (INSTANTANEOUS):
STABILITY AIR TEMP (INSTANTANEOUS) 46-10 MTR:
STABILITY AIR TEMP (INSTANTANEOUS) 91-10 MTR:
STABILITY AIR TEMP (INSTANTANEOUS) 91-46 MTR:
D E
D STABILITY AIR TEMP 46-10 MTR 15 MINUTE:
D R
TI N
I WK=012/win=lSEC LVL=5 PRIM/BACKCPU A MODE 1


SQN             RADIOLOGICAL CONTROL RESPONSE                       EPIP-14 Rev. 15 Page 24 of 25 APPENDIX E Page 1 of 1 FITNESS FOR DUTY PROGRAM ADMINISTRATION CALL-IN SHEET Person Calling Date Give this message:   "This is (caller's name) at Sequoyah Nuclear Plant. An emergency has been declared, or a REP   drill is being conducted (as appropriate). Have you consumed any alcohol within the last five hours? Are you fit for duty? If you are fit for duty, please report to the RadCon Lab or Chemistry Lab and   the duty RADCON or Chemistry Shift Supervisor immediately."
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 24 of 25 APPENDIX E Page 1 of 1 FITNESS FOR DUTY PROGRAM ADMINISTRATION CALL-IN SHEET Person Calling Date Give this message: "This is (caller's name) at Sequoyah Nuclear Plant. An emergency has been declared, or a REP drill is being conducted (as appropriate). Have you consumed any alcohol within the last five hours? Are you fit for duty? If you are fit for duty, please report to the RadCon Lab or Chemistry Lab and the duty RADCON or Chemistry Shift Supervisor immediately."
NAME                   TIME       TIME         ALCOHOL 5           ARE       DUTY OFFICIAL CALLED     NEEDED         HRS. PRIOR       YOU FIT       COMMENTS TO         TO REPORT?           FOR REPORT             (Y/N)         DUTY?
NAME TIME TIME ALCOHOL 5 ARE DUTY OFFICIAL CALLED NEEDED HRS. PRIOR YOU FIT COMMENTS TO TO REPORT?
                                        +i           i                   i 4             4                 +           I I           I           4                   i           i 4           1                               -t I           I             I                 I           t I           I             I                 I           t I           I             I                 I           t I             I                 I           -t
FOR REPORT (Y/N)
DUTY?
+ i i
i 4
4  
+
I I
I 4
i i
4 1  
-t I
I I
I t
I I
I I
t I
I I
I t
I I
I  
-t


SQN           RADIOLOGICAL CONTROL RESPONSE   EPIP-14 Rev. 15 Page 25 of 25 SOURCE NOTES REQUIREMENTS                                           IMPLEMENTING SOURCE DOCUMENT               STATEMENT STATEMENT NP Radiological Emergency Plan (NP-REP)
SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 25 of 25 SOURCE NOTES REQUIREMENTS STATEMENT SOURCE DOCUMENT IMPLEMENTING STATEMENT NP Radiological Emergency Plan (NP-REP)
Paragraph 3.1.A           SQ963213PER                   Revise EPIP-14 to indicate fitness for duty questions are required for call-ins.
Paragraph 3.1.A Appendix D note Appendix D C.8 SQ963213PER SQ972164PER SQ972260PER factor change.
Appendix D note            SQ972164PER                  Require validation SQ972260PER                  after software or multiplication factor change.
99-002929-000 Revise EPIP-14 to indicate fitness for duty questions are required for call-ins.
Appendix D C.8            99-002929-000                  Added manual calculation for Thyroid CDE to match ICS.
Require validation after software or multiplication Added manual calculation for Thyroid CDE to match ICS.


TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-17 Emergency Equipment and Supplies Revision 20 QUALITY RELATED PREPARED/PROOFREAD BY: W. P. Brooks RESPONSIBLE ORGANIZATION:             Emergency Preparedness APPROVED BY         John Casey EFFECTIVE DATE: 09-07-2000 Level Of Use: Reference REVISION DESCRIPTION: Intent Change. Added additional supplies to Appendix E to address issues from PER 00-005294-000; Clarify instructions to ensure TSC/OSC position books are scanned quarterly for uncontrolled or outdated material (not just out dated forms) Appendix H and I to address issue from PER 00-006599-000; improvements in hardware; and self assessment recommendations.
TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-17 Emergency Equipment and Supplies Revision 20 QUALITY RELATED PREPARED/PROOFREAD BY: W. P. Brooks RESPONSIBLE ORGANIZATION:
Emergency Preparedness APPROVED BY John Casey EFFECTIVE DATE: 09-07-2000 Level Of Use: Reference REVISION DESCRIPTION: Intent Change. Added additional supplies to Appendix E to address issues from PER 00-005294-000; Clarify instructions to ensure TSC/OSC position books are scanned quarterly for uncontrolled or outdated material (not just out dated forms) Appendix H and I to address issue from PER 00-006599-000; improvements in hardware; and self assessment recommendations.


EPIP-17 EMERGENCY EQUIPMENT AND SUPPLIES                                                                     Revision 20 SQN                                                                                                                Page 2 of 19 TABLE OF CONTENTS Section                                                                                                           Title Page Table of C ontents ..............................................................................               2 1.0   P URP O S E ..............................................................................................     3 2.0   R EFERENC ES ..................................................................................                 3 3.0   INSTR UCTIO NS ................................................................................                 3 3.1   G eneral Instructions .........................................................................                 3 3.2   D etailed Instructions ..........................................................................               3 3.3   Completion of Appendices ................................................................                       4 4.0   R EC O R D S .........................................................................................         5 4.1   Q A R ecords ......................................................................................             5 4.2   N on Q A Records ................................................................................               5 APPENDICES Appendix A       Emergency Equipment - Main Control Room (MCR) .......                                               6 Appendix B       Emergency Equipment - Communication Room .................                                           7 Appendix C       Emergency Equipment - RADCON Lab ..............................                                     8 Appendix D       Site Medical Emergency Supplies ......................................                               9 Appendix E       Self-Contained Breathing Apparatus ................................                                 10 Appendix F       Emergency Equipment - RADCON Vans ...........................                                       11 Appendix G       Hospital Cabinet Inventory ...............................................                         12 Appendix H       Technical Support Center (TSC) ......................................                               13 Appendix I       Operations Support Center (OSC) ...................................                                 14 Appendix J       OSC Response Team Equipment .....................................                                   15 Appendix K       Emergency Equipment-480V Reactor MOV Board Room.....                                               16 Appendix L       Decon Facility - Service Building ......................................                           17 Appendix M       Responsibilities-Inventory and Maintenance ....................                                     18 SO URC E NOTES ......................................................................................               19
EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 2 of 19 TABLE OF CONTENTS Section Title Page Table of C ontents..............................................................................
2 1.0 P U R P O S E..............................................................................................
3 2.0 R EFER ENC ES..................................................................................
3 3.0 INSTR UCTIO NS................................................................................
3 3.1 G eneral Instructions.........................................................................
3 3.2 D etailed Instructions..........................................................................
3 3.3 Completion of Appendices................................................................
4 4.0 R EC O R D S.........................................................................................
5 4.1 Q A R ecords......................................................................................
5 4.2 N on Q A R ecords................................................................................
5 APPENDICES Appendix A Emergency Equipment - Main Control Room (MCR).......
6 Appendix B Emergency Equipment - Communication Room................. 7 Appendix C Emergency Equipment - RADCON Lab.............................. 8 Appendix D Site Medical Emergency Supplies...................................... 9 Appendix E Self-Contained Breathing Apparatus................................
10 Appendix F Emergency Equipment - RADCON Vans...........................
11 Appendix G Hospital Cabinet Inventory...............................................
12 Appendix H Technical Support Center (TSC)...................................... 13 Appendix I Operations Support Center (OSC)................................... 14 Appendix J OSC Response Team Equipment.....................................
15 Appendix K Emergency Equipment-480V Reactor MOV Board Room..... 16 Appendix L Decon Facility - Service Building...................................... 17 Appendix M Responsibilities-Inventory and Maintenance.................... 18 SO U R C E N O TES......................................................................................
19


EPIP-17 SQN               EMERGENCY EQUIPMENT AND SUPPLIES                                 Revision 20 Page 3 of 19 1.0 PURPOSE This instruction is used to comply with the requirements of the Radiological Emergency Plan for periodic inspection and maintenance of equipment and supplies.
EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 3 of 19 1.0 PURPOSE This instruction is used to comply with the requirements of the Radiological Emergency Plan for periodic inspection and maintenance of equipment and supplies.  


==2.0 REFERENCES==
==2.0 REFERENCES==
A. CECC EPIP-9, Attachment J.
A. CECC EPIP-9, Attachment J.
3.0 INSTRUCTIONS 3.1 General Instructions 3.1.1 The responsibility and frequency of inventories are specified in Appendix M.
3.0 INSTRUCTIONS 3.1 General Instructions 3.1.1 The responsibility and frequency of inventories are specified in Appendix M.
For the purposes of these inventories, monthly is defined as once per calendar month, quarterly is defined as once per calendar quarter, and annual is defined as once per calendar year.
For the purposes of these inventories, monthly is defined as once per calendar month, quarterly is defined as once per calendar quarter, and annual is defined as once per calendar year.
3.1.2 The individuals performing the inspection shall complete the appendices and the Emergency Preparedness Manager shall review the results as indicated and make arrangements to correct deficiencies.
3.1.2 The individuals performing the inspection shall complete the appendices and the Emergency Preparedness Manager shall review the results as indicated and make arrangements to correct deficiencies.
3.1.3 List any deviations and the disposition on the appropriate Appendix Data Sheet. Deficient, outdated or missing items shall be replaced.
3.1.3 List any deviations and the disposition on the appropriate Appendix Data Sheet. Deficient, outdated or missing items shall be replaced.
3.1.4 Special checks of certain material in the cabinets shall be performed. The following checks shall be made where applicable:
3.1.4 Special checks of certain material in the cabinets shall be performed. The following checks shall be made where applicable:
A. The protective clothing shall be checked for deterioration.
A. The protective clothing shall be checked for deterioration.
Line 1,498: Line 2,314:
D. Check to determine that flashlights are operable.
D. Check to determine that flashlights are operable.
E. Rezero all emergency dosimeters to assure proper operation.
E. Rezero all emergency dosimeters to assure proper operation.
3.2 Detailed Instructions 3.2.1 The emergency equipment, listed in Appendices A and B, are stored in cabinets provided with a lock or plastic seal. This provides a means of controlling access or determining that the cabinet has not been opened. An inventory list of the equipment may be posted on the outside of the cabinet.
3.2 Detailed Instructions 3.2.1 The emergency equipment, listed in Appendices A and B, are stored in cabinets provided with a lock or plastic seal. This provides a means of controlling access or determining that the cabinet has not been opened. An inventory list of the equipment may be posted on the outside of the cabinet.
The two cabinets are located in the Main Control Room corridor, and Communications Room.
The two cabinets are located in the Main Control Room corridor, and Communications Room.
3.2.2 Each cabinet and storage location, including the medical treatment area, shall be inventoried and required equipment inspected and checked for operation and/or condition. Equipment in certain cabinets is separated into Table A and Table B. Table A is a list of all non-perishable items stored in a small metal box equipped with a security seal within the cabinet itself. These items will be inventoried annually (preferably in January) and whenever a security seal has been found to be violated. Those items listed in Table B of these attachments are inventoried on a quarterly basis.
3.2.2 Each cabinet and storage location, including the medical treatment area, shall be inventoried and required equipment inspected and checked for operation and/or condition. Equipment in certain cabinets is separated into Table A and Table B. Table A is a list of all non-perishable items stored in a small metal box equipped with a security seal within the cabinet itself. These items will be inventoried annually (preferably in January) and whenever a security seal has been found to be violated. Those items listed in Table B of these attachments are inventoried on a quarterly basis.
3.2.3 The radiation monitoring instruments, which are in normal plant use, are located in the RADCON laboratory as listed in Appendix C.
3.2.3 The radiation monitoring instruments, which are in normal plant use, are located in the RADCON laboratory as listed in Appendix C.


EPIP-17 SQN               EMERGENCY EQUIPMENT AND SUPPLIES                               Revision 20 Page 4 of 19 3.2.4 The Site Medical Emergency Supplies listed in Appendix D are located in the site ambulance or the site medical station.
EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 4 of 19 3.2.4 The Site Medical Emergency Supplies listed in Appendix D are located in the site ambulance or the site medical station.
3.2.5 All self-contained breathing units in service on Appendix E shall be inventoried and inspected monthly by Fire Protection.
3.2.5 All self-contained breathing units in service on Appendix E shall be inventoried and inspected monthly by Fire Protection.
3.2.6 The emergency equipment, referenced in Appendix F is located in the environmental monitoring emergency vans. In the event of a radiological emergency that requires the emergency vans to be used, a RADCON technician will obtain the additional equipment listed in CECC-EPIP-9, Attachment J. This equipment will be transported to the vans.
3.2.6 The emergency equipment, referenced in Appendix F is located in the environmental monitoring emergency vans. In the event of a radiological emergency that requires the emergency vans to be used, a RADCON technician will obtain the additional equipment listed in CECC-EPIP-9, Attachment J. This equipment will be transported to the vans.
3.2.7 The emergency room supplies furnished by TVA for use of the agreement hospital(s) in case of injury to personnel involving radioactive materials are listed in Appendix G.
3.2.7 The emergency room supplies furnished by TVA for use of the agreement hospital(s) in case of injury to personnel involving radioactive materials are listed in Appendix G.
3.2.8 References and supplies listed in Appendix H are stored in the Technical Support Center for use during an emergency and Appendix I for the Operations Support Center. TSC/OSC position notebooks shall be scanned during the quarterly inventory for uncontrolled or outdated materials; not just outdated forms. Additionally, position seating/working areas should be scanned for uncontrolled or outdated materials.
3.2.8 References and supplies listed in Appendix H are stored in the Technical Support Center for use during an emergency and Appendix I for the Operations Support Center. TSC/OSC position notebooks shall be scanned during the quarterly inventory for uncontrolled or outdated materials; not just outdated forms. Additionally, position seating/working areas should be scanned for uncontrolled or outdated materials.
3.2.9 Protective clothing for use by the OSC response teams is located in the Operations Support Center storage room and is listed in Appendix J.
3.2.9 Protective clothing for use by the OSC response teams is located in the Operations Support Center storage room and is listed in Appendix J.
3.2.10 Protective clothing for use in contamination controls from affected plant areas in the Control Building are listed in Appendix K and is located in the 480 V Reactor MOV Board Room, Elevation 734.
3.2.10 Protective clothing for use in contamination controls from affected plant areas in the Control Building are listed in Appendix K and is located in the 480 V Reactor MOV Board Room, Elevation 734.
3.2.11 Supplies for decontamination of personnel are stored in the EI.690' Decon.
3.2.11 Supplies for decontamination of personnel are stored in the EI.690' Decon.
Room near the RadCon lab and are listed in Appendix L.
Room near the RadCon lab and are listed in Appendix L.
3.3 Completion of Appendices 3.3.1   If the particular items are present and in sufficient quantities and, when applicable, in good working condition, then check the "Yes" column.
3.3 Completion of Appendices 3.3.1 If the particular items are present and in sufficient quantities and, when applicable, in good working condition, then check the "Yes" column.
3.3.2 If a deficiency is noted, then check the "No" column and replace deficient items. All deficiencies must be corrected as soon as possible. If circumstances do not allow deficiencies to be corrected, then the appropriate supervisor shall be notified.
3.3.2 If a deficiency is noted, then check the "No" column and replace deficient items. All deficiencies must be corrected as soon as possible. If circumstances do not allow deficiencies to be corrected, then the appropriate supervisor shall be notified.
3.3.3 Under the "Remarks" column, explain the corrective actions taken.
3.3.3 Under the "Remarks" column, explain the corrective actions taken.
3.3.4 All comments in the "Remarks" column should be detailed enough to leave no doubt as to the actions taken. Comments to the effect - "batteries missing" will not suffice. A simple check in the "No" column will represent that a deficiency exists. Such comments do not allow a person to determine what, if any, action has been taken. Comments should read for example: "Batteries missing., replaced on March 5, 2000".
3.3.4 All comments in the "Remarks" column should be detailed enough to leave no doubt as to the actions taken. Comments to the effect - "batteries missing" will not suffice. A simple check in the "No" column will represent that a deficiency exists. Such comments do not allow a person to determine what, if any, action has been taken. Comments should read for example: "Batteries missing., replaced on March 5, 2000".


EPIP-1 7 SQN           EMERGENCY EQUIPMENT AND SUPPLIES                         Revision 20 Page 5 of 19 4.0 RECORDS 4.1 QA Records None 4.2 Non-QA Records The Appendices/Checklists in this Instruction are NON-QA documents and will be retained by the SQN Emergency Planning (EP) Manager for at least two years.
EPIP-1 7 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 5 of 19 4.0 RECORDS 4.1 QA Records None 4.2 Non-QA Records The Appendices/Checklists in this Instruction are NON-QA documents and will be retained by the SQN Emergency Planning (EP) Manager for at least two years.


EPIP-17 SQN                 EMERGENCY EQUIPMENT AND SUPPLIES                                                                 Revision 20 Page 6 of 19 APPENDIX A MAIN CONTROL ROOM CORRIDOR CABINET - CONTROL BUILDING TABLE A Quantity             Description                                                                 Yes No   Remarks Security seal intact: ................................................                .......
EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 6 of 19 APPENDIX A MAIN CONTROL ROOM CORRIDOR CABINET - CONTROL BUILDING TABLE A Quantity Description Yes No Remarks Security seal intact:................................................
NOTE: Table A will be inventoried annually (preferably in January) and whenever a security seal has been found to be violated.
NOTE: Table A will be inventoried annually (preferably in January) and whenever a security seal has been found to be violated.
12 pr.       Rubber overshoes - Various sizes ...................... -
12 pr.
6 pr.         Canvas gloves ...................................................- __
Rubber overshoes - Various sizes...................... -
12 pr.       Rubber gloves- Various sizes ..............................                             _
6 pr.
6             Ho o d s .....................................................................
Canvas gloves...................................................- __
2           P e n cils ....................................................................
12 pr.
2           Clipboards with paper .............................................
Rubber gloves-Various sizes..............................
2           Boxes sm oke tubes ................................................
6 H o o d s.....................................................................
2           A spirator bulbs ........................................................
2 P e n cils....................................................................
1           Lo g B oo k ................................................................
2 Clipboards w ith paper.............................................
4 rolls     Duct tape and/or masking tape ...............................
2 Boxes sm oke tubes................................................
Security seal replaced .........................................................              ...
2 A spirator bulbs........................................................
TABLE B Quantity               Description                                                               Yes No   Remarks 12             Pairs of paper overalls - Various sizes ........
1 Lo g B oo k................................................................
2             Ha rd hats .................................................................
4 rolls Duct tape and/or masking tape...............................
2             F la sh lig hts ..............................................................
Security seal replaced.........................................................
12             Spare flashlight batteries Expires: _                               _ ...........
TABLE B Quantity Description Yes No Remarks 12 Pairs of paper overalls - Various sizes........
2             Spare flashlight bulbs .............................................                   -_
2 H a rd hats.................................................................
1             F irst-a id kit ..............................................................-                 _
2 F la sh lig hts..............................................................
12           Face G oggles .........................................................
12 Spare flashlight batteries Expires: _
1             Radiation Survey Meter ..........................................
2 Spare flashlight bulbs.............................................
Cabinet Relocked or Resealed ............................................                           .    . _
1 F irst-a id kit..............................................................-
12 Face G oggles.........................................................
1 Radiation Survey M eter..........................................
Cabinet Relocked or Resealed............................................
Inspection performed by:
Inspection performed by:
RADCON Representative                                                               Date Review and Approval:
RADCON Representative Date Review and Approval:
Emergency Preparedness Manager                                                                   Date EP Mana-qershall retain the completed form as a Non-QA Record for at least 2 years.
Emergency Preparedness Manager Date EP Mana-qer shall retain the completed form as a Non-QA Record for at least 2 years.


EPIP-17 SQN                 EMERGENCY EQUIPMENT AND SUPPLIES                                                                   Revision 20 Page 7 of 19 APPENDIX B COMMUNICATIONS ROOM - CONTROL BUILDING TABLE A Quantity            Description                                                                      Yes No     Remarks Security seal intact: ......................................................................           w NOTE: Table A will be inventoried annually (preferably in January) and whenever a security seal has been found to be violated.
EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 7 of 19 APPENDIX B COMMUNICATIONS ROOM - CONTROL BUILDING Description TABLE A Yes No Remarks Security seal intact:......................................................................
6             Pairs of rubber overshoes ......................................
w NOTE: Table A will be inventoried annually (preferably in January) and whenever a security seal has been found to be violated.
6             Pairs canvas gloves ...........................................                           _
6 Pairs of rubber overshoes......................................
6             Pairs rubber gloves .............................................                        -_.
6 Pairs canvas gloves...........................................
6             Hoods .....................................................................
6 Pairs rubber gloves.............................................
2             Pencils ....................................................................
6 Hoods.....................................................................
2             Clipboards with paper .............................................
2 Pencils....................................................................
2             Boxes sm oke tubes ................................................
2 Clipboards with paper.............................................
2             Aspirator bulbs .....................................................                        -.
2 Boxes sm oke tubes................................................
1             Log Book ........................................................... ....
2 Aspirator bulbs.....................................................
Security seal replaced ................................................................
1 Log Book...............................................................
TABLE B Quantity              Description                                                                    Yes No     Remarks 6             Pairs of coveralls - various sizes .............................
Security seal replaced................................................................
2             Hardhats .................................................................
Description TABLE B Yes No Remarks 6
2             Flashlights ..............................................................
Pairs of coveralls - various sizes.............................
12           Spare flashlight batteries Expires:                                       ...........
2 Hardhats.................................................................
2             Spare flashlight         bulbs     .............................................
2 Flashlights..............................................................
1             First-aid kit ..............................................................
12 Spare flashlight batteries Expires:
Cabinet Relocked or Resealed ............................................
2 Spare flashlight bulbs.............................................
1 First-aid kit..............................................................
Cabinet Relocked or Resealed............................................
Inspection performed by:
Inspection performed by:
RADCON Representative                                                               Date Review and Approval:
RADCON Representative Review and Approval:
Emergency Preparedness Manager                                                                       Date EP Mana-gershall retain the completed form as a Non-QA Record for at least 2 years.
Emergency Preparedness Manager Date Date EP Mana-ger shall retain the completed form as a Non-QA Record for at least 2 years.
Quantity Quantity


EPIP-17 SQN                 EMERGENCY EQUIPMENT AND SUPPLIES                                                             Revision 20 Page 8 of 19 APPENDIX C RADIOLOGICAL CONTROL LABORATORY - SERVICE BUILDING Quantity          Description                                                                   Yes No     Remarks 1         Alpha Survey Meter (500,000 cpm) .............................
EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 8 of 19 APPENDIX C RADIOLOGICAL CONTROL LABORATORY - SERVICE BUILDING Description Yes No Remarks Quantity 1
1          Neutron dose rate survey meter
1 2
(.025 eV - 10 MeV/5,000 mR/hr) .................................
6 1
2          High Range Survey Instrument (1,000 R/hr with extendible probe) ..............................
5 10 5
6          ION Chamber Survey Meter (50 R/h) ..........................
1 5
1          ION Chamber Survey Meter (20,000 R/h)                                     .........
2 5
5          High volume Air Samplers (and support equipment)..._
10 5
10        Frisker Type Survey Meters (0-50,000 cpm) ............... _
1 Inspection performed by:
5          Low-volume air samplers (and support equipment) ..... _
RADCON Representative Review and Approval:
1          Portable Mini-S caler ....................................................
Emergency Preparedness Manager Date __
5          C a lcu lato rs ..................................................................
Date EP Mana-qer shall retain the completed form as a Non-QA Record for at least 2 years.
2          Cal/Response Ck Sources ..........................................
Alpha Survey Meter (500,000 cpm).............................
5          Noble Gas Sampling Syringes .....................................
Neutron dose rate survey meter
10        Silver Zeolite Cartridges ..............................................
(.025 eV - 10 MeV/5,000 mR/hr).................................
5          Marinelli B eakers .........................................................
High Range Survey Instrument (1,000 R/hr with extendible probe)..............................
1          Shielded Detector Pig ..................................................
ION Chamber Survey Meter (50 R/h)..........................
Inspection performed by:
ION Chamber Survey Meter (20,000 R/h)
RADCON Representative                                                              Date __
High volume Air Samplers (and support equipment)..._
Frisker Type Survey Meters (0-50,000 cpm)............... _
Low-volume air samplers (and support equipment)..... _
Portable M ini-S caler....................................................
C a lcu lato rs..................................................................
Cal/Response Ck Sources..........................................
Noble Gas Sampling Syringes.....................................
Silver Zeolite Cartridges..............................................
M arinelli B eakers.........................................................
Shielded Detector Pig..................................................
 
EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 9 of 19 APPENDIX D Page 1 of 1 SITE MEDICAL EMERGENCY SUPPLIES Check applicable column either Ambulance or Medical Station (only one needs to be checked, not both.)
EQUIPMENT AMBULANCE MEDICAL YES NO REMARKS STATION Blood Pressure Apparatuses I-Li Li Marion Ventilators with Oxygen 0
0 0
Oxygen - Large Tanks Li
[]
Li I.V. Setup
- fluids El El Ml El
-tubing El E]
l El
- needles El
[E El El Suctions - Portable 0
[]
E fL Anaphylaxis Kits 0
0
*]
0_
Immobilizing Equipment AMBULANCE MEDICAL YES NO STATION
- Stokes Baskets Li
[]
- Scoop Stretchers El El El El 3ack Boards El El El
-Hare Splints El Fl El E
-Air Splints El El El E
- Splints - arm, finger, and leg Dl El El 0_
- Extrication Collars El E]
El El Trauma Kits Containing Note: Trauma kits are located Li Burn Sheets, Triangular Bandages, Air in Auxiliary Building on Splints, Bite Sticks, Dressings, Pocket elevation 690 & 734 near Masks, Gloves, Scissors, Adhesive elevator Tape, Irrigating Solution, Cold Packs, Flashlight Sand Bags Li Disposable Gowns EQ E1 E_
Blankets El E1 0
Stretcher Straps E-n L
0 Mast Trousers Ei E]
El E_
Cleaning Solution AMBULANCE MEDICAL YES NO STATION
- Betadine Solution
[
[
E J
- Hydrogen Peroxide l
El El El
- Brushes El El El El--
Inspection Performed By:
Review and Approval:
Review and Approval:
Emergency Preparedness Manager                                                                 Date EP Mana-qershall retain the completed form as a Non-QA Record for at least 2 years.
Emergency Preparedness Manager Date Date EP Manacjer shall retain the completed form as a Non-QA Record for at least 2 years.


EPIP-17 SQN                     EMERGENCY EQUIPMENT AND SUPPLIES                                 Revision 20 Page 9 of 19 APPENDIX D Page 1 of 1 SITE MEDICAL EMERGENCY SUPPLIES Check applicable column either Ambulance or Medical Station (only one needs to be checked, not both.)
EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 10 of 19 APPENDIX E Page 1 of 1 SELF-CONTAINED BREATHING APPARATUS Quantity Description Yes No Remarks RELAY ROOM OUTSIDE TECHNICAL SUPPORT CENTER (EL 732) 12 12 2
EQUIPMENT                                AMBULANCE          MEDICAL    YES    NO    REMARKS STATION Blood Pressure Apparatuses                      I-                Li            Li    __
2 Self-contained breathing apparatus....................................
Marion Ventilators with Oxygen                  0                  0    0      -      __
Additional air cylinders........................................................
Oxygen - Large Tanks                            Li                []    Li            __
Sm all MSA face pieces.............................................
I.V. Setup
Large M SA face pieces......................................................
- fluids                                        El                El    Ml      El
-tubing                                        El                E]      l    El        __
- needles                                      El                [E    El      El Suctions - Portable                            0                  []      E  fL      __          _
Anaphylaxis Kits                                0                  0    *]      0_
Immobilizing Equipment            AMBULANCE          MEDICAL  YES      NO STATION
- Stokes Baskets                              Li                []                  _      ____
- Scoop Stretchers                            El                El    El      El 3ack Boards                                  El                      El      El        __
-Hare Splints                                  El                Fl    El      E        __
-Air Splints                                    El                El    El      E        __
- Splints - arm, finger, and leg                Dl                El    El      0_
- Extrication Collars                          El                E]    El      El Trauma Kits Containing          Note: Trauma kits are located  Li            __
Burn Sheets, TriangularBandages,Air            in Auxiliary Building on Splints, Bite Sticks, Dressings,Pocket        elevation 690 & 734 near Masks, Gloves, Scissors, Adhesive              elevator Tape, IrrigatingSolution, Cold Packs, Flashlight Sand Bags                                                          Li Disposable Gowns                              EQ                      E1 E_
Blankets                                      El                      E1 0              _
Stretcher Straps                              E-n                L    0              __
Mast Trousers                                  Ei                E]    El      E_
Cleaning Solution              AMBULANCE          MEDICAL    YES    NO STATION
  - Betadine Solution                            [                  [        E    J    _          _
  - Hydrogen Peroxide                              l              El    El    El      _
  - Brushes                                      El                  El    El      El--
Inspection Performed By:                            Date Review and Approval:
Emergency Preparedness Manager                                Date EP Manacjershall retain the completed form as a Non-QA Record for at least 2 years.
 
EPIP-17 SQN                EMERGENCY EQUIPMENT AND SUPPLIES                                                        Revision 20 Page 10 of 19 APPENDIX E Page 1 of 1 SELF-CONTAINED BREATHING APPARATUS Quantity Description                                                                       Yes No Remarks RELAY ROOM OUTSIDE TECHNICAL SUPPORT CENTER (EL 732) 12   Self-contained breathing apparatus ....................................
12    Additional air cylinders ........................................................
2    Sm all MSA face pieces .............................................
2    Large M SA face pieces ......................................................
SERVICE BUILDING EL 690 (PASF Units) 8 4
SERVICE BUILDING EL 690 (PASF Units) 8 4
Dual Purpose self-contained breathing apparatus ..............
3 3
Dual Purpose Airline Hoses ................................................
Dual Purpose self-contained breathing apparatus..............
I 3    Small MSA face pieces .......................................................
Dual Purpose Airline Hoses................................................
3    Large MSA face pieces ......................................................
Small MSA face pieces.......................................................
SERVICE BUILDING EL 690 (RADCON AND RADCHEM LABS) 16   Self-contained breathing apparatus ....................................                                         I SERVICE BUILDING (EL. 706) FIRE EQUIPMENT CAGE 6     Self-contained breathing apparatus ....................................
Large MSA face pieces......................................................
12   A dditional cylinders .............................................................
SERVICE BUILDING EL 690 (RADCON AND RADCHEM LABS) 16 Self-contained breathing apparatus....................................
Inspection performed by:                                                                                             I Fire Protection Representative                                                 Date Review and Approval:
SERVICE BUILDING (EL. 706) FIRE EQUIPMENT CAGE 6
Emergency Preparedness Manager                                                           Date EP Managershall retain the completed form as a Non-QA Record for at least 2 years.
Self-contained breathing apparatus....................................
12 A dditional cylinders.............................................................
Inspection performed by:
Fire Protection Representative Review and Approval:
Emergency Preparedness Manager Date Date EP Manager shall retain the completed form as a Non-QA Record for at least 2 years.
I I
I


EPIP-17 EMERGENCY EQUIPMENT AND SUPPLIES                             Revision 20 SQN                                                                          Page 11 of 19 APPENDIX F EMERGENCY EQUIPMENT ENVIROMENTAL MONITORING EMERGENCY VANS (SEE CECC-EPIP-9, ATTACHMENT J).
EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 11 of 19 APPENDIX F EMERGENCY EQUIPMENT ENVIROMENTAL MONITORING EMERGENCY VANS (SEE CECC-EPIP-9, ATTACHMENT J).
EP Mana-gershall retain the completed form as a Non-QA Record for at least 2 years.
EP Mana-ger shall retain the completed form as a Non-QA Record for at least 2 years.


EPIP-17 SQN                   EMERGENCY EQUIPMENT AND SUPPLIES                                           Revision 20 Page 12 of 19 APPENDIX G HOSPITAL CABINET INVENTORY EII North Park                 I-IErlanger
EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 12 of 19 APPENDIX G HOSPITAL CABINET INVENTORY EII North Park I-IErlanger
[SATI Quantity I                           Description                                     Remarks Protective Clothin g1 10 pair     Shoe covers 10 pkg       Dress out packages (coveralls, booties, gloves) 3           Surgical gowns 2 boxes     Surgical gloves 4 rolls   I Surgical tape fordressout - 2 inch Facility Preparation                                                       ______________
[SATI Quantity I Description Remarks Protective Clothin g1 10 pair Shoe covers 10 pkg Dress out packages (coveralls, booties, gloves) 3 Surgical gowns 2 boxes Surgical gloves 4 rolls I Surgical tape fordressout - 2 inch Facility Preparation I set Floor coverings (hospital specific) 1 roll Heavy duty paper (3 foot wide) 2 rolls 2 inch duct tape 1 roll Radiation Warning symbol tape (2 inch) 2 Step off pads 8
Iset    Floor coverings (hospital specific) 1 roll     Heavy duty paper (3 foot wide) 2 rolls     2 inch duct tape 1 roll     Radiation Warning symbol tape (2 inch) 2           Step off pads 8           Radiological barrier posting signs 1 Spool     Radiological barrier rope or ribbon 5           Traffic cones 10         Large rad waste plastic bags (trash can size) 10         Medium rad waste plastic bags (x-ray cassette size) 2 copies   Hospital specific booklet (1 at desk, 1 in cabinet)   Last Update:
Radiological barrier posting signs 1 Spool Radiological barrier rope or ribbon 5
1           Radioactive material label tape Decontamination Supplies 1           Decontamination table, backboard and bottles (min. total capacity of 10 gallons) 1           Flexible funnel with drain hose - optional 1           Decontamination media /soap product 1           NCRP # 65 Reference Handbook 12           Cotton swabs 20           Zip lock bags for sample collection 10           Labels for sample bags 2           Scissors 1           Wall poster with decontamination steps Health Physics Supplies                                                   (Serial # and cal due) 1           Bicron ISM (RSO-5 or 50) 2           Bicron Surveyor 50 1           Wound probe with cable 10         TLDs 10         Electronic dosimeters and tray 200         Smears 12           Radioactive Material tags 1           Masslin mop and 20 cloths Inspection Performed By:                                             Date Review and Approval:
Traffic cones 10 Large rad waste plastic bags (trash can size) 10 Medium rad waste plastic bags (x-ray cassette size) 2 copies Hospital specific booklet (1 at desk, 1 in cabinet)
Emergency Preparedness Manager               ____________
Last Update:
Date EP Mana-gershall retain the completed form as a Non-QA Record for at least 2 years.
1 Radioactive material label tape Decontamination Supplies 1
Decontamination table, backboard and bottles (min. total capacity of 10 gallons) 1 Flexible funnel with drain hose - optional 1
Decontamination media /soap product 1
NCRP # 65 Reference Handbook 12 Cotton swabs 20 Zip lock bags for sample collection 10 Labels for sample bags 2
Scissors 1
Wall poster with decontamination steps Health Physics Supplies (Serial # and cal due) 1 Bicron ISM (RSO-5 or 50) 2 Bicron Surveyor 50 1
Wound probe with cable 10 TLDs 10 Electronic dosimeters and tray 200 Smears 12 Radioactive Material tags 1
Masslin mop and 20 cloths Inspection Performed By:
Date Review and Approval:
Emergency Preparedness Manager ____________
Date EP Mana-ger shall retain the completed form as a Non-QA Record for at least 2 years.


EPIP-1 SQN                     EMERGENCY EQUIPMENT AND SUPPLIES                                                                     Revision 20 Page 13 of 19 APPENDIX H TECHNICAL SUPPORT CENTER Description                                                                                           Yes No     Remarks Qtv AssortEed      Dryboard Supplies (Erasers, markers, etc.) ................................-..
EPIP-1 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 13 of 19 APPENDIX H TECHNICAL SUPPORT CENTER Qtv AssortE Assort Assort(
Assort ad       Desktop Supplies (Stapler, Tape, Logbooks) ..............................                                   _
1 each 1
Assort( ed     Office Supplies (Pen, Pencils, Staples, Etc.) ............................... __
2 4
1 each          TSC Position Notebooks .....................................................................                   seating areas.)
4 3
2 5
Remarks seating areas.)
Inspection Performed By:
Date Review and Approval:
Emergency Preparedness Manager Date EP Managier shall retain the completed form as a Non-QA Record for at least 2 years.
Description Yes No ed Dryboard Supplies (Erasers, markers, etc.)................................-..
ad Desktop Supplies (Stapler, Tape, Logbooks)..............................
ed Office Supplies (Pen, Pencils, Staples, Etc.)............................... __
TSC Position Notebooks.....................................................................
(Scan/Check for uncontrolled/out-of-date materials in Position notebooks &
(Scan/Check for uncontrolled/out-of-date materials in Position notebooks &
1              Spare Roll of thermal Paper for Tracking Board ............................
Spare Roll of thermal Paper for Tracking Board............................
2              A SM E Steam Tables .....................................................................
A SM E Steam Tables.....................................................................
4              Communications Head Sets ....................................................                           -
Communications Head Sets....................................................
4              Sequoyah Phone Directories (latest edition) ............................... .
Sequoyah Phone Directories (latest edition)................................
3              Chattanooga Phone Directories (latest edition) .................
Chattanooga Phone Directories (latest edition)
2              TVA Phone Directories (latest edition) ........................................ .
TVA Phone Directories (latest edition).........................................
5              Electronic Display Projectors .........................................................
Electronic Display Projectors.........................................................
Verify wall maps are latest revision (see CECC EPIP-9) 2 Mile Map ................... Latest     Rev.                .....................................
Verify wall maps are latest revision (see CECC EPIP-9) 2 M ile M ap................... Latest Rev.
10 Mile Evac Map ........ Latest           Rev.                .....................................
10 Mile Evac Map........ Latest Rev.
50 Mile Sample Map .... Latest             Rev.         -      (2 copies) ....................
50 Mile Sample Map.... Latest Rev.
50 Mile Map ................. Latest       Rev.                 (1 0 copy) .......................
(2 copies)....................
50 Mile Map................. Latest Rev.
0 (1 copy).......................
Verify presence only (DCU controls contents)
Verify presence only (DCU controls contents)
REP (Radiological Emergency Plan) (4 copies) .............................. .
REP (Radiological Emergency Plan) (4 copies)...............................
REND (Radiological Emergency Notification Directory) (2 copies) ....
REND (Radiological Emergency Notification Directory) (2 copies)....
Central Emergency Control Center EPIP (CECC EPIP) (2 Copies) ...
Central Emergency Control Center EPIP (CECC EPIP) (2 Copies)...
S Q N E P IP (4 copies) .........................................................................
S Q N E P IP (4 copies).........................................................................
Severe Accident Management Guidance (SAMG) (4 copies) ............
Severe Accident Management Guidance (SAMG) (4 copies)............
Updated SQN FSAR .........................................                          ..........-.
Updated SQN FSAR.........................................
Unit 1 Technical Specifications (2 sets) .............................................
Unit 1 Technical Specifications (2 sets).............................................
Unit 2 Technical Specifications (2 sets) .............................................
Unit 2 Technical Specifications (2 sets).............................................
Site Health and Safety Manual .......................................................                   .
Site Health and Safety Manual........................................................
State of Tennessee Multijurisdictional REP Response Plan ..............
State of Tennessee Multijurisdictional REP Response Plan..............
INPO Emergency Resources Manual .................................................
INPO Emergency Resources Manual.................................................
System Operating Manual/System Operating Instructions (SO/SOl).
System Operating Manual/System Operating Instructions (SO/SOl).
Annunciator Response Manuals (AR) ................................................
Annunciator Response Manuals (AR)................................................
P eriodic Instructions (P I)....................................................................
P eriodic Instructions (P I)....................................................................
Abnormal Operating Procedures (AOP) (2 Sets) ...............................
Abnormal Operating Procedures (AOP) (2 Sets)...............................
Technical Instructions (TI) .........................................
Technical Instructions (TI).........................................
General Operating Instructions (GO) .................................................
General Operating Instructions (GO).................................................
SQN Offsite Dose Calculation Manual (ODCM)                                 ................-..
SQN Offsite Dose Calculation Manual (ODCM)
SQN Process Control Program (PCP) ............................................ .
SQN Process Control Program (PCP).............................................
Radiological Control Instructions (RCI) ...............................................
Radiological Control Instructions (RCI)...............................................
Radwaste Handling/Shipping Index (RHSI) ........................................
Radwaste Handling/Shipping Index (RHSI)........................................
Functional Restoration Guidelines (2 sets) ........................................
Functional Restoration Guidelines (2 sets)........................................
Emergency Instructions (2 sets) .........................................................
Emergency Instructions (2 sets).........................................................
Emergency Abnormal Procedures (EAPs) (2 sets) ............................
Emergency Abnormal Procedures (EAPs) (2 sets)............................
Emergency Contingency Actions (2 sets) ..........................................
Emergency Contingency Actions (2 sets)..........................................
Users Manual   - Meteorological Data Print Program (2 copies) ...........
Users Manual - Meteorological Data Print Program (2 copies)...........
Users Manual   - FRED (2 copies) ........................................................
Users Manual - FRED (2 copies)........................................................
Users Manual   - Meteorological Data Display .....                                  ............
Users Manual - Meteorological Data Display.....
Users Manual   - CECC       Information       System       ........................................
Users Manual - CECC Information System........................................
Users  Manual  - ICS ............................................................................
U sers M anual - IC S............................................................................
Inspection Performed By:                                                  Date Review and Approval:
Emergency Preparedness Manager                                                                        Date EP Managiershall retain the completed form as a Non-QA Record for at least 2 years.


EPIP-17 SQN                   EMERGENCY EQUIPMENT AND SUPPLIES                                                                     Revision 20 Page 14 of 19 APPENDIX I OPERATIONS SUPPORT CENTER (OSC)
EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 14 of 19 APPENDIX I OPERATIONS SUPPORT CENTER (OSC)
Quantity       Description                                                                                       Yes No Remarks Assorted       Desktop Supplies (stapler, tape, logbook) ............
Quantity Description Yes Assorted Desktop Supplies (stapler, tape, logbook)............
Assorted       Office Supplies (pens, pencils) .............................................
Assorted Office Supplies (pens, pencils).............................................
Assorted       Dryboard Supplies (eraser, markers, etc.) .............
Assorted Dryboard Supplies (eraser, markers, etc.).............
2               Spare Roll of thermal Paper for Tracking Board ...................
2 Spare Roll of thermal Paper for Tracking Board...................
1               S Q N E P IP s ..........................................................................
1 S Q N E P IP s..........................................................................
1 each         OSC Position Notebooks ......................................................
1 each OSC Position Notebooks......................................................
(Scan/Check for uncontrolled/out-of-date materials in Position Notebooks & seating areas.)
(Scan/Check for uncontrolled/out-of-date materials in Position Notebooks 2
2              SQN Telephone Book (latest edition) ................
SQN Telephone Book (latest edition) 2 TVA Telephone Book (latest edition)....................................
2               TVA Telephone Book (latest edition) ....................................
1 U ser M anual - IC S................................................................
1               User Manual - IC S ................................................................
4 Communication Headsets....................................................
4               Communication Headsets ....................................................
1 Polaroid Camera W/Film Expires_
1               Polaroid Camera W/Film Expires_                                   ............................
2 Team Tracking Status Boards..............................................
2               Team Tracking Status Boards                   ..............................................
1 Ops Tracking Status Boards.................................................
1               Ops Tracking Status Boards .................................................
1 RadCon/Chem Tracking Status Boards................................
1               RadCon/Chem Tracking Status Boards ................................
12 Spare flashlight batteries Expires.
12             Spare flashlight batteries Expires.                                ............................
6 Spare Pager Batteries Expires 2
6               Spare Pager Batteries Expires                                 ................................
Electronic Display Projectors................................................
2              Electronic Display Projectors ................................................
No Remarks
Plant Drawings (verify existence only DCU controls listing) .............. _                                        _
& seating areas.)
Verify wall maps are latest revision (see CECC EPIP-9 for latest map revision levels) 2 Mile Map                                     Latest Rev.                      ...............
Plant Drawings (verify existence only DCU controls listing).............. _
10 Mile Evac Sector Map                       Latest Rev.
Verify wall maps are latest revision (see CECC EPIP-9 for latest map revision levels) 2 Mile Map Latest Rev.
10 Mile Sampling Point Map Latest Rev.                                          ...............
10 Mile Evac Sector Map Latest Rev.
Tool Room Tool Kits: ...............................................
10 Mile Sampling Point Map Latest Rev.
Note: Tool Room tool kits are inventoried in accordance with 0-PI-REM-000.001Q Mechanical tool kit #1 Mechanical tool kit #2 Electrical tool kit #3 Mechanical tool kit #4 Mechanical tool kit #5 Mechanical tool kit #6 Electrical tool kit #7 Note: Additional Communications Equipment is checked under 0-PI-REM-244-001.0                                                       I Inspection Performed By:                                                     Date Review and Approval:
Tool Room Tool Kits:...............................................
Emergency Preparedness Manager                                                                           Date EP Manacqershall retain the completed form as a Non-QA Record for at least 2 years.
Note: Tool Room tool kits are inventoried in accordance with 0-PI-REM-000.001Q Mechanical tool kit #1 Mechanical tool kit #2 Electrical tool kit #3 Mechanical tool kit #4 Mechanical tool kit #5 Mechanical tool kit #6 Electrical tool kit #7 Note: Additional Communications Equipment is checked under 0-PI-REM-244-001.0 Inspection Performed By:
Date Review and Approval:
Emergency Preparedness Manager Date EP Manacqer shall retain the completed form as a Non-QA Record for at least 2 years.
I


EPIP-1 7 SQN                   EMERGENCY EQUIPMENT AND SUPPLIES                                                             Revision 20 Page 15 of 19 APPENDIX J OSC RESPONSE TEAM EQUIPMENT CAFETERIA OSC EQUIPMENT STORAGE ROOM Quantity                 Description                                                             Yes No Remarks 40 pr. Cotton liners ...............................................................
EPIP-1 7 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 15 of 19 APPENDIX J OSC RESPONSE TEAM EQUIPMENT CAFETERIA OSC EQUIPMENT STORAGE ROOM Quantity Description Yes No 40 pr.
40 pr. Rubber gloves - Various sizes ...............................................
Cotton liners...............................................................
40 pr. P lastic booties ........................................................................
40 pr.
40 pr. Rubber overshoes - Various sizes .........................................
Rubber gloves - Various sizes...............................................
30 pr. Coveralls - Various sizes .......................
40 pr.
30       Surgeon caps ...........................................................
P lastic booties........................................................................
30       Hoods...................................
40 pr.
4 rolls   Duct Tape and/or Masking Tape ............................................
Rubber overshoes - Various sizes.........................................
2         Ha rd hats ................................................................................
30 pr.
6 pr. C anvas gloves .......................................................................
Coveralls - Various sizes.......................
2         S pare flashlight bulbs ............................................................
30 Surgeon caps...........................................................
2000 doses KI (Expires                   j (#Pkgs * #Tablets/pkg = #doses) ......                                             I Door Relocked .......................................................................            .
30 Hoods...................................
4 rolls Duct Tape and/or Masking Tape............................................
2 H a rd hats................................................................................
6 pr.
C anvas gloves.......................................................................
2 S pare flashlight bulbs............................................................
2000 doses KI (Expires j (#Pkgs * #Tablets/pkg = #doses)......
Door Relocked.......................................................................
Inspection performed by:
Inspection performed by:
RADCON Representative                                                                 Date Review and Approval:
RADCON Representative Review and Approval:
Emergency Preparedness Manager                                                                   Date EP Mana er shall retain the completed form as a Non-QA Record for at least 2 years.
Emergency Preparedness Manager Date Date EP Mana er shall retain the completed form as a Non-QA Record for at least 2 years.
Remarks I


EPIP-1 7 SQN                 EMERGENCY EQUIPMENT AND SUPPLIES                                                                   Revision 20 Page 16 of 19 APPENDIX K 480V REACTOR BOARD ROOM AUXILIARY BUILDING (EL. 734)
EPIP-1 7 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 16 of 19 APPENDIX K 480V REACTOR BOARD ROOM AUXILIARY BUILDING (EL. 734)
Quantity   Description .................................................................         Yes No     Rem arks 40 pr. C otton liners ...............................................................-
Quantity Description.................................................................
40 pr. Rubber gloves - Various sizes                           ..................                . _
Yes No Rem arks 40 pr.
40 pr. Plastic booties ............................................................-
C otton liners...............................................................-
40 pr. Rubber overshoes - Various sizes                             .................              ..      _ _
40 pr.
30 pr. Paper coveralls ......................................................                 _
Rubber gloves - Various sizes 40 pr.
30         S urgeon   caps     .............................................................
Plastic booties............................................................-
1         Box of vinyl gloves ................................................                 ...-
40 pr.
4 rolls   Duct Tape   and/or       Masking         Tape     ...........................-   ...
Rubber overshoes - Various sizes 30 pr.
6 pr.     C anvas gloves ...........................................................
Paper coveralls......................................................
2         Fla shlig hts ..................................................................
30 S urgeon caps.............................................................
2         Spare flashlight bulbs ................................................
1 Box of vinyl gloves................................................
12         Spare flashlight batteries Expires_                                 .................
4 rolls Duct Tape and/or Masking Tape...........................-...
Cabinet Relocked or Resealed ............................................
6 pr.
C anvas gloves...........................................................
2 F la shlig hts..................................................................
2 Spare flashlight bulbs................................................
12 Spare flashlight batteries Expires_
Cabinet Relocked or Resealed............................................
Inspection performed by:
Inspection performed by:
RADCON Representative                                                                 Date Review and Approval:
RADCON Representative Date Review and Approval:
Emergency Preparedness Manager                                                                     Date EP Managershall retain the completed form as a Non-QA Record for at least 2 years.
Emergency Preparedness Manager Date EP Manager shall retain the completed form as a Non-QA Record for at least 2 years.


EPIP-17 SQN                     EMERGENCY EQUIPMENT AND SUPPLIES                             Revision 20 Page 17 of 19 APPENDIX L EL. 690' DECONTAMINATION ROOM MIN     SUGGESTED         QUANITY ITEM           QUANITY       QUANITY       ON HAND         REMARKS Disposable Gloves     1 box       2 boxes Gauze Pads       1 box       2 boxes Cotton Swabs       1 pkg       1 pkg Saline Solution   1 bottle   2 bottles Surgical Brushes     1 each     12 each Shampoo         1 bottle   2 bottles Soap         2 bars     5 bars Laundry detergent   none         I box Soap (liquid abrasive) none         1 bottle Mechanic's Hand Cleaner none       2 can Shaving Cream       1 can       1can Razors         2 each       5 each Paper Bath Towels     none       1 box Towels         5 each     25 each Scissors       1 pair     1 pair Petri Dishes     3 each     5 each Duct Tape       none       2 rolls Paper Coveralls     5 pair       10 pair Tennis Shoes (Sizes 7-   none         one pair               half sizes are OK
EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 17 of 19 APPENDIX L EL. 690' DECONTAMINATION ROOM MIN SUGGESTED QUANITY ITEM QUANITY QUANITY ON HAND REMARKS Disposable Gloves 1 box 2 boxes Gauze Pads 1 box 2 boxes Cotton Swabs 1 pkg 1 pkg Saline Solution 1 bottle 2 bottles Surgical Brushes 1 each 12 each Shampoo 1 bottle 2 bottles Soap 2 bars 5 bars Laundry detergent none I box Soap (liquid abrasive) none 1 bottle Mechanic's Hand Cleaner none 2 can Shaving Cream 1 can 1can Razors 2 each 5 each Paper Bath Towels none 1 box Towels 5 each 25 each Scissors 1 pair 1 pair Petri Dishes 3 each 5 each Duct Tape none 2 rolls Paper Coveralls 5 pair 10 pair Tennis Shoes (Sizes 7-none one pair half sizes are OK
: 12)                       each Inspection Performed By:
: 12) each Inspection Performed By:
RADCON Representative:                             Date:
RADCON Representative:
Date:
Reviewed By:
Reviewed By:
RADCON Shift Supervisor:                           Date:
RADCON Shift Supervisor:
EP Manager:                           Date:
Date:
EP Managershall retain the completed form as a Non-QA Record for at least 2 years.
EP Manager:
Date:
EP Manager shall retain the completed form as a Non-QA Record for at least 2 years.


EPIP-17 SQN         EMERGENCY EQUIPMENT AND SUPPLIES                   Revision 20 Page 18 of 19 APPENDIX M INVENTORY AND MAINTENANCE RESPONSIBILITIES Appendix                               Frequency Responsible RADCON A. Main Control Room - Corridor Cabinet Table A                       Annually Table B                       Quarterly B. Communications Room                         RADCON Control Building                   Annually Table A Table B                       Quarterly C. Radiological Control Lab           Monthly  RADCON Quarterly Fire Protection/Medical D. Medical Emergency Supplies E. Self-contained Respiratory                   Fire Protection Equipment                         Monthly Quarterly RADCON F. Emergency Vans Corporate EP G. Hospital Emergency Room Cabinet Quarterly H. Technical Support Center Cabinets,           EP Manager References & Supplies             Quarterly I. Operations Support Center Storage,           EP Manager References & Supplies             Quarterly J. OSC Response Team Storage,                   RADCON Service Bldg. EL. 706'             Quarterly K. 480V RX MOV Board Room                       RADCON EL. 734'                           Quarterly L. Decon. Facility, Service Building EL. 690'                   Monthly   RADCON
EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 18 of 19 APPENDIX M INVENTORY AND MAINTENANCE RESPONSIBILITIES Appendix A.
Main Control Room - Corridor Cabinet Table A Table B B.
Communications Room Control Building Table A Table B C.
Radiological Control Lab D.
Medical Emergency Supplies E.
Self-contained Respiratory Equipment F.
Emergency Vans G.
Hospital Emergency Room Cabinet H. Technical Support Center Cabinets, References & Supplies I.
Operations Support Center Storage, References & Supplies J.
OSC Response Team Storage, Service Bldg. EL. 706' K.
480V RX MOV Board Room EL. 734' L.
Decon. Facility, Service Building EL. 690' Frequency Annually Quarterly Annually Quarterly Monthly Quarterly Monthly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Responsible RADCON RADCON RADCON Fire Protection/Medical Fire Protection RADCON Corporate EP EP Manager EP Manager RADCON RADCON RADCON Monthly


EPIP-17 SQN             EMERGENCY EQUIPMENT AND SUPPLIES           Revision 20 Page 19 of 19 SOURCE NOTES REQUIREMENTS                                 IMPLEMENTING SOURCE DOCUMENT    STATEMENT STATEMENT H-10                       NUREG 0654        "Emergency Equipment Inspections" Appendix E, Section E       10 CFR 50 Section 8.0                 NP REP           "Emergency Response Facilities, Equipment, and Supplies" NUREG 0696        "Functional Criteria For Emergency Response Facilities"}}
EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 19 of 19 SOURCE NOTES REQUIREMENTS STATEMENT H-10 Appendix E, Section E Section 8.0 SOURCE DOCUMENT NUREG 0654 10 CFR 50 NP REP NUREG 0696 IMPLEMENTING STATEMENT "Emergency Equipment Inspections" "Emergency Response Facilities, Equipment, and Supplies" "Functional Criteria For Emergency Response Facilities"}}

Latest revision as of 02:03, 17 January 2025

Emergency Plan Implementing Procedures, EPIP-2 (Rev 16), EPIP-3 (Rev 19), EPIP-4 (Rev 19), EPIP-5 (Rev 25), EPIP-7 (Rev 18), EPIP-14 (Rev 15), and EPIP-17 (Rev 20)
ML003754740
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/15/2000
From: Salas P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
-RFPFR
Download: ML003754740 (125)


Text

Tennessee Valley Authority. Post Office Box 2000, Soddy-Daisy, Tennessee 373;&

September 15, 2000 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of Tennessee Valley Authority Docket Nos. 50-327 50-328 SEQUOYAH NUCLEAR PLANT (SQN)

UNITS 1 AND 2 -

EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP) REVISIONS In accordance with the requirements of 10 CFR 50, Appendix E, Section V, the enclosure provides the following EPIP:

Revision 16 19 19 25 18 15 20 Title Notification of Unusual Event Alert Site Area Emergency General Emergency Activation and Operation of the Operations Support Center (OSC)

Radiological Control Response Emergency Equipment and Supplies If you have any telephone me at (423) 843-6672.

questions concerning this matter, please (423) 843-7170 or J.

D. Smith at Since:

V'edr'--Sdlas Licensing and Industry Affairs Manager Enclosure cc:

See page 2 pvk(

EPIP EPIP-2 EPIP-3 EPIP-4 EPIP-5 EPIP-7 EPIP-14 EPIP-17

) )

U.S. Nuclear Regulatory Commission Page 2 September 15, 2000 cc:

Mr.

R.

W. Hernan, Project Manager (Enclosure)

U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector (Enclosure will be provided by Sequoyah Nuclear Plant SQN Document Control Unit) 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37384-3624 Regional Administrator (Enclosure)

U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St.,

SW, Suite 23T85 Atlanta, Georgia 30303-3415

TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-2 NOTIFICATION OF UNUSUAL EVENT Revision 16 QUALITY RELATED PREPARED/PROOFREAD BY: W. P. Brooks RESPONSIBLE ORGANIZATION: Emergency Preparedness APPROVED BY: John Casey EFFECTIVE DATE: 08/31/2000 Level Of Use: Reference REVISION DESCRIPTION: Intent Change, Editorial changes, Added steps for standardization with WBN, BFN, and Corp., Format change for ease of use. Revisions are not shown due to extent of format changes.

Date 1.0 PURPOSE 1.1 To provide a method for timely notifications of appropriate individuals when the Shift Manager (SM) has determined by EPIP-1 that events have occurred that are classified as a NOTIFICATION OF UNUSUAL EVENT.

1.2 To provide the Site Emergency Director (SED) a method for periodic reanalysis of current conditions to determine whether the NOTIFICATION OF UNUSUAL EVENT should be terminated, continued, or upgraded to a more serious classification.

2.0 REFERENCES

2.1 Interface Documents A.

SPP-3.5, "Regulatory Reporting Requirements" B.

EPIP-3, "Alert" C.

EPIP-4, "Site Area Emergency" D.

EPIP-5, "General Emergency" E. EPIP-10, "Medical Emergency Response" F.

EPIP-14, "Radiological Control Response" G. CECC EPIP-9, "Emergency Radiological Monitoring Procedures" H.

PHYSI-32, "Security Instructions For Members Of The Security Force".

3.0 INSTRUCTION 3.1 ACTIVATION OF THE REP Upon classifying events as a NOTIFICATION OF UNUSUAL EVENT in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SM shall:

[1]

ANNOUNCE to Operating Crew:

"A Notification of Unusual Event has been declared based on (Describe the Conditions). I will be the Site Emergency Director."

LI FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

Date 3.1 ACTIVATION OF THE REP (Continued)

NOTE ODS should be notified within 5 minutes after declaration of the event

[2]

COMPLETE Notification of Unusual Event (NOUE) Notification Form (Page 6).

El

[3]

NOTIFY ODS.

[a]

CALL ODS.

IRindown Line or r 5-751-1700 or 1 5-751-2495I or 1 9-785-1700 Initial Time

[b]

READ completed Form (Page 6) to ODS.

3l

[c]

FAX ODS NOUE Notification Form (Page 6).

El 15-751-8620 FAX 1

[4]

IF ODS CANNOT be contacted within 10 minutes of the declaration, THEN

[a]

NOTIFY Tennessee Emergency Management Agency (TEMA).

S00-262-3 or 196741-0001 or 1888-616-8091 (satellite)

Initial Time

[b]

READ completed Form (page 6) to TEMA.

D

[c]

FAX TEMA NOUE Notification Form (Page 6).

II 9-1-615-242-9635 FAX

[5] ANNOUNCE to plant personnel:

"ATTENTION PLANT PERSONNEL. ATTENTION PLANT PERSONNEL.

A NOTIFICATION OF UNUSUAL EVENT HAS BEEN DECLARED BASED ON (Describe the Conditions), AFFECTING UNIT(s)

[]

REPEAT Announcement.

El

[6] IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."

[]

FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

Date 3.1 ACTIVATION OF THE REP (Continued)

[7]

MONITOR radiation monitors.

IF radiation monitors indicate unplanned radiological release, THEN

[a] NOTIFY RADCON Shift Supervisor to EVALUATE implementation of CECC EPIP-9, "Emergency Radiological Monitoring Procedures" and EPIP-14, "Radiological Control Response."

[b] PERFORM Dose Assessment.

NOTIFY Chemistry Shift Supervisor to perform a dose assessment using EPIP-14.

r 7285 Lai or r6348 L or FPager 350-40732

[c] REFER to EPIP-1, Radiological Effluents Section, AND EVALUATE need for additional classifications.

El

[8] IF there is a security threat, THEN NOTIFY Security Shift Supervisor to implement PHYSI-32,"Security Instructions For Members Of The Security Force."

[]

61or5

[9] NOTIFY Plant Management in accordance with SPP-3.5 AND PROVIDE NOUE Notification information.

El NOTE I NRC notification should be made as soon as practicable, but within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of "NOTIFICATION OF UNUSUAL EVENT" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.

NOTE 2 Do not dial "1" prior to the number when using ENS phones.

[10] NOTIFY NRC of plan activation via ENS in accordance with SPP-3.5.

r(301) 816-5100 (Main)

(301) 951-0550 (Backup) 9-1-(301) 816-5151 (Fax)

Initial Time FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

Date 3.1 ACTIVATION OF THE REP (Continued)

[11] NOTIFY Site Emergency Preparedness as soon as practicable when notification does not interfere with emergency actions or notifications in progress.

John Casey Bill Peggram Work 8

=-7658 Pager 350-20372 Work 843-83601 Pager 350-30388 Car 9-280-6616 Home 9-842-3020

[12] MONITOR plant conditions AND EVALUATE using EPIP-1, AND

[a]

IF plant conditions warrant, THEN UPGRADE to a higher classification AND INITIATE EPIP-3 or EPIP-4 or EPIP-5.

[b]

IF additional conditions satisfy criteria of other NOUE's OR Conditions warrant a need for follow-up information, THEN COMPLETE NOUE Follow-up Form (page 7), AND REPORT to ODS for State notification at:

Ringdown Line or 15-751-1700 1 or 5-71-249 AND FAX ODS NOUE Follow-up Form (Page 7).

15-OR-or F9-785-17001 51-8620 FAX I

[c]

TERMINATE emergency, when situation no longer exists, by informing ODS and Duty Plant Manager AND COMPLETE NOUE Follow-up Form (Page 7) with Time and Date Event Terminated and FAX to ODS.

END OF SECTION I FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN LI LI LI

NOTIFICATION OF UNUSUAL EVENT NOTIFICATION FORM

1. 0] THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.

OR El THIS IS A DRILL. THIS IS A DRILL.

2. This is at Sequoyah Nuclear Plant.

(Your Name)

3. There has been a NOTIFICATION OF UNUSUAL EVENT declared at Sequoyah Nuclear Plant.

Affecting LI Unit 1 OR El Unit 2 OR El Both Units 1 & 2

4. EAL Designator:
5. Brief Description of Event
6. Plant conditions are:

LI Stable 17 Deteriorating

7. Radiological Conditions are:

[] No Abnormal Release Off-site

[] Airborne Release Off-site LI Liquid Release Off-site F1 Release Information Not Known

8. Event Declared: Time:

Date:

9. Event Terminated: Time:

Date:

10. Protective Action Recommendation: L7 None at This Time.
11. "Please Repeat the Information You Have Received to Ensure Accuracy."

13 FAX TO THE ODS AT 751-8620 AFTER COMPLETING THE NOTIFICATION FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

NOTIFICATION OF UNUSAL EVENT FOLLOW-UP FORM

1. 0] THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.

OR El THIS IS A DRILL. THIS IS A DRILL.

2. This is at Sequoyah Nuclear Plant.

(Your Name)

3. This is Follow-up Information Regarding the NOTIFICATION OF UNUSUAL EVENT declared at Sequoyah Nuclear Plant.

Affecting El Unit 1 OR El Unit 2 OR 1l Both Units 1 & 2

4.
5.
6.

7.

Reactor Unit I El Shutdown El At Power Unit 2 El Shutdown El At Power Plant conditions are:

13 Stable E3 Deteriorating Additional EAL Designator (s):

The Following Significant Changes in Plant Conditions Have Occurred:

8. The Following Significant Changes in Radiological Conditions Have Occurred:
9. Protective Action Recommendation: El None at This Time
10. Event Terminated:

Time:

Date:

11. "Please Repeat the Information You Have Received to Ensure Accuracy."

LI

12. Name Date Time (Preparer's Name)
13. FAX TO THE ODS AT 751-8620 AFTER COMPLETING THE NOTIFICATION

.ll FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-3 ALERT Revision 19 QUALITY RELATED PREPARED/PROOFREAD BY:

W. P. Brooks RESPONSIBLE ORGANIZATION: Emergqency Preparedness APPROVED BY:

John H. Casey EFFECTIVE DATE: 8/31/2000 Level of Use: Reference REVISION DESCRIPTION:

Intent Change, Editorial changes, Added steps for standardization with WBN, BFN, and Corp., Format change for ease of use. Revisions not shown due to extent of format changes.

Date 1.0 PURPOSE 1.1 To provide a method for timely notifications of appropriate individuals when the Shift Manager (SM)/Site Emergency Director (SED) has determined by EPIP-1 that events have occurred that are classified as a ALERT.

1.2 To provide the Site Emergency Director (SED) a method for periodic reanalysis of current conditions to determine whether the ALERT should be terminated, continued, or upgraded to a more serious classification.

2.0 REFERENCES

2.1 Interface Documents A.

SPP-3.5, B.

EPIP-4, C.

EPIP-5, D.

EPIP-6, E.

EPIP-7 F.

EPIP-8, G.

EPIP-10, H.

EPIP-14, I.

EPIP-16, J.

CECC EPIP-9, K.

PHYSI-32, "Regulatory Reporting Requirements" "Site Area Emergency" "General Emergency" "Activation and Operation Of The Technical Support Center" "Activation and Operation of the Operations Support Center (OSC)"

"Personnel Accountability And Evacuation" "Medical Emergency Response" "Radiological Control Response" "Termination And Recovery" "Emergency Environmental Radiological Monitoring Procedures" "Security Instructions For Members Of The Security Force".

3.0 INSTRUCTION

[1]

IF TSC is NOT STAFFED, THEN GO TO Section 3.1. (Page 3)

[2]

IF TSC is OPERATIONAL, (SED transferred to TSC), THEN GO TO Section 3.2. (Page 7).

FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SON 0

El

Date 3.1 ACTIVATION OF THE REP BY SM Upon classifying events as an ALERT in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SM shall:

[1]

ANNOUNCE to Operating Crew:

"An ALERT has been declared based on (Describe the Conditions).

I will be the Site Emergency Director."

El

[2]

ACTIVATE Emergency Paging System (EPS), THEN El (SM may delegate these tasks to Operations Clerk if available.

MSS also may be used if necessary.)

[a]

CONFIRM response by reviewing 20 minute printed report available in the TSC.

El

[b]

CALL personnel to staff unanswered positions (Use REP Duty Roster and Call List).

El

[3]

IF EPS fails, THEN

[a]

CALL Operation Duty Specialist (ODS) AT:

Ringdown Line or 5-71700 or r5-751-orl 9-785-1700 AND DIRECT ODS to activate EPS.

El

[b]

IF EPS still will not activate, THEN (SM may delegate these tasks to Operations Clerk if available.

MSS also may be used if necessary.)

CALL personnel to staff TSC/OSC positions (Use REP Duty Roster and Call List).

D

[4]

ANNOUNCE to plant personnel:

"ATTENTION PLANT PERSONNEL. ATTENTION PLANT PERSONNEL. AN ALERT HAS BEEN DECLARED BASED ON (Describe the condition), AFFECTING UNIT(s)

ALL TSC AND OSC PERSONNEL REPORT TO THE EMERGENCY FACILITIES IMMEDIATELY."

El REPEAT Announcement.

FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

Date 3.1 ACTIVATION OF THE REP BY SM (Continued)

NOTE If plant conditions do not warrant personnel accountability at this time, continue to assess the situation and re-evaluate the need for accountability.

[5]

MONITOR plant conditions, WHEN plant conditions warrant, THEN

[a] NOTIFY Security Shift Supervisor to implement EPIP-8, "Personnel Accountability and Evacuation."

Wor 1 6568 El

[b] ACTIVATE emergency sirens for personnel assembly.

Initial Time NOTE ODS should be notified within 5 minutes after declaration of the event.

[6]

COMPLETE ALERT Notification Form (Page 10).

II

[7]

NOTIFY ODS.

[a] CALL ODS.

Ringdown Line], or 5j-751-1700 or 15-751-249:5 or j 9-785-17001 Initial Time

[b] READ completed Form (Page 10) to ODS.

i]

[c] FAX ODS ALERT Notification Form (Page 10).

[]

I 5-751-8620 FAX]

[8]

IF ODS CANNOT be contacted within 10 minutes of the declaration, THEN

[a] NOTIFY Tennessee Emergency Management Agency (TEMA).

8 or 19-1615-741-0001 or 888-616-8091 (satellite)

Initial Time

[b] READ completed Form (Page 10) to TEMA.

il

[c] FAX TEMA ALERT Notification Form (Page 10).

El I 9-1-615-242-9635 FAX I FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

Date 3.1 ACTIVATION OF THE REP BY SM (Continued)

[9]

NOTIFY RADCON Shift Supervisor,

[a] STATE "AN ALERT HAS BEEN DECLARED, BASED UPON (Describe the conditions), AFFECTING UNIT(s) l" 3

[b] DIRECT to implement EPIP-1 4, "Radiological Control Response."

El

[c] IF radiation monitors indicate unplanned radiological release, THEN DIRECT to EVALUATE implementation of CECC EPIP-9, "Emergency Radiological Monitoring Procedures."

[]

[10] NOTIFY Chemistry Shift Supervisor,

[a] STATE: "AN ALERT HAS BEEN DECLARED, BASED UPON (Describe the conditions), AFFECTING UNIT(s) -

."290 7285 La~b or 3

Lab or [Pager 350-40732

[b] DIRECT to implement EPIP-14.

El

[11] MONITOR radiation monitors.

WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment.

[a] NOTIFY Chemistry Shift Supervisor to perform a dose assessment using EPIP-14.

El r7285 or 6348ab or [Pager 350-40 7 32

[b] REFER to EPIP-1, Radiological Effluents Section, AND EVALUATE need for additional classifications.

El

[12] IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."

El

[13] IF there is a security threat, THEN NOTIFY Security Shift Supervisor to implement PHYSI-32, "Security Instructions For Members Of The Security Force" 164 or 16 FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

Date 3.1 ACTIVATION OF THE REP BY SM (Continued)

[14] NOTIFY Plant Management in accordance with SPP-3.5 AND PROVIDE ALERT Notification Information.

El NOTE 1 NRC notification should be made as soon as practicable, but within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of "ALERT" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.

NOTE 2 Do not dial "1" prior to the number when using ENS phones.

[15] NOTIFY NRC of plan activation via ENS in accordance with SPP-3.5.

(301) 816-510 ainI (301) 951-0550 (Backup) 9-1-(301) 816-5151 (Fax)i Initial Time

[16] MONITOR plant conditions AND EVALUATE using EPIP-1 until TSC is staffed, AND

[a]

IF plant conditions warrant, THEN UPGRADE to a higher classification AND INITIATE EPIP-4 or EPIP-5.

El

[b] IF additional conditions satisfy criteria of other ALERT's OR Conditions warrant a need for follow-up information, THEN COMPLETE ALERT Follow-up Form (Page 11),

AND REPORT to ODS for State notification at:

[Ringdown Line or F5-751-17001 or P-751-24951 or 9-785-17001 AND FAX ODS ALERT Follow-up Form (Page 11). 15-751-8620 FAX I END OF SECTON FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

Date 3.2 ACTIVATION OF THE REP BY TSC Upon classifying events as a ALERT in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SED shall:

NOTE If plant conditions do not warrant personnel accountability at this time, continue to assess the situation and re-evaluate the need for accountability.

[1]

MONITOR plant conditions, IF plant conditions warrant, THEN

[a] DIRECT TSC Security Manager or Security Shift Supervisor to implement EPIP-8, "Personnel Accountability and Evacuation."

El

~3~flor

[b] DIRECT SM to ACTIVATE emergency sirens for personnel assembly.

Initial Time

[2] IF ALERT Classification has been declared by SM, THEN GO TO Step [6]

OR appropriate Step based on SM turnover.

El NOTE ODS should be notified within 5 minutes after declaration of the event.

[3]

COMPLETE ALERT Notification Form (Page 10).

LI

[4]

NOTIFY ODS.

[a] CALL ODS.

5 I or 575-2 or

-1700 Initial Time

[b] READ completed Form (Page 10) to ODS.

LI

[c] FAX ODS ALERT Notification Form (Page 10).

LI 5-751-8620 FAX I

FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SON

Date 3.2 ACTIVATION OF THE REP BY TSC (Continued)

[5]

IF ODS CANNOT be contacted within 10 minutes of the declaration, THEN

[a]

NOTIFY Tennessee Emergency Management Agency (TEMA).

[j9-1-800-262-330 or 1 9-1-615-741-0001 1 or 888-616-8091 (satellite)I Initial Time

[b]

READ completed Form (Page 10) to TEMA.

[c]

FAX TEMA ALERT Notification Form (Page 10).

II 1 9-1-615-242-9635 FAX I NOTE The Dose Assessment function is transferred to the CECC once they are staffed.

[6]

MONITOR radiation monitors.

WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment.

[a]

DIRECT TSC Chemistry Manager or Chemistry Shift Supervisor to perform a dose assessment using EPIP-14, "Radiological Control Response".

El 7285 Lab]

or F6348 Lab or I Pager 350-40732

[b]

DIRECT TSC RADCON Manager to evaluate need to implement CECC EPIP-9 "Emergency Radiological Monitoring Procedures."

El

[c]

REFER to EPIP-1, Radiological Effluents Section, AND EVALUATE need for additional classifications.

El

[7]

IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."

El

[8]

IF there is a security threat, THEN DIRECT TSC Security Manager or Security Shift Supervisor to implement PHYSI-32,"Security Instructions For Members Of The Security Force."

El or 6568 FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

Date 3.2 ACTIVATION OF THE REP BY TSC (Continued)

NOTE 1 NRC notification should be made as soon as practicable, but within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of "ALERT" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.

NOTE 2 Do not dial "1" prior to the number when using ENS phones.

[9] ENSURE NRC has been notified of plan activation via ENS in accordance with SPP-3.5.

(301) 816-5100 (Main)I (301) 951-0550 (Backup) 9-301)86-51(ax~I Initial Time

[10] MONITOR plant conditions AND EVALUATE using EPIP-1, AND

[a] IF plant conditions warrant, THEN UPGRADE to a higher classification, AND INITIATE EPIP-4 or EPIP-5.

El

[b]

IF additional conditions satisfy criteria of other ALERT's OR Conditions warrant a need for follow-up information, THEN COMPLETE ALERT Follow-up Form (Page 11), AND REPORT to CECC Director for State notification at:

RingdownLine or 5-751-1614 or 5-751"1680 AND FAX CECC ALERT Follow-up Form (Page 11) 5-751-1682 FAXI OR

[c] IF situation no longer exists, THEN TERMINATE emergency per EPIP-16, "Termination and Recovery," AND 0

COMPLETE ALERT Follow-up Form (Page 11) including Time and Date Event Terminated and FAX to CECC.

[]

1 END OF SECTION FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

ALERT NOTIFICATION FORM

1. 03 THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.

OR 13 THIS IS A DRILL. THIS IS A DRILL.

2. This is at Sequoyah Nuclear Plant.

(Your Name)

3. There has been a ALERT declared at Sequoyah Nuclear Plant.

Affecting 17 Unit 1 OR E3 Unit 2 OR E3 Both Units 1 & 2

4.

EAL Designator:

5.

Brief Description of Event

6. Plant conditions are:

E3 Stable E3 Deteriorating

7. Radiological Conditions are:

1] No Abnormal Release Off-site

-1 Airborne Release Off-site El Liquid Release Off-site

-1 Release Information Not Known

8.
9.
10.

11.

Event Declared: Time:

Date:

Event Terminated: Time:

Date:

Protective Action Recommendation:

17 None at This Time.

"Please Repeat the Information You Have Received to Ensure Accuracy."

E3 FAX TO THE ODS AT 751-8620 AFTER COMPLETING THE NOTIFICATION FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SON

EPIP-3 SQN ALERT Rev. 19 Page 11 of 11 ALERT FOLLOW-UP FORM

1. 0 THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.

OR El THIS IS A DRILL. THIS IS A DRILL.

2. This is at Sequoyah Nuclear Plant.

(Your Name)

3. This is Follow-Up Information Regarding the ALERT declared at Sequoyah Nuclear Plant Affecting 0I Unit 1 OR LI Unit 2 OR El Both Units 1 & 2
4. Reactor Unit 1 El Shutdown EL At Power Unit 2 El Shutdown El At Power
5. Plant conditions are:

El Stable LI Deteriorating

6. Additional EAL Designator (s):
7. Site Assembly and Accountability is on going. El YES El NO OR EL COMPLETED
8. The Following Significant Changes in Plant Conditions Have Occurred:
9. The Following Significant Changes in Radiological Conditions Have Occurred:
10. Protective Action Recommendation: LI None at This Time
11. Event Terminated: Time:

Date:

12. "Please Repeat the Information You Have Received to Ensure Accuracy."

EL

13. Name Date Time (Preparer's Name)
14. FAX TO THE ODS AT 751-8620 OR CECC at 751-1682 AFTER COMPLETING THE NOTIFICATION El FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-4 SITE AREA EMERGENCY Revision 19 QUALITY RELATED PREPARED/PROOFREAD BY: W. P. Brooks RESPONSIBLE ORGANIZATION: Emercqency Preparedness APPROVED BY:

John H. Casey EFFECTIVE DATE: 08/31/2000 Level of Use: Reference REVISION DESCRIPTION:

Intent Change, Editorial changes, Added steps for standardization with WBN, BFN, and Corp., Format change for ease of use.

Revisions not shown due to extent of format changes.

EPIP-4 SON SITE AREA EMERGENCY Rev. 19 Page 2 of 11 Date 1.0 PURPOSE 1.1 To provide a method for timely notifications of appropriate individuals when the Shift Manager (SM)/Site Emergency Director (SED) has determined by EPIP-1 and the REP Appendix B that events have occurred that are classified as a SITE AREA EMERGENCY.

1.2 To provide the SED a method for periodic reanalysis of current conditions to determine whether the SITE AREA EMERGENCY should be terminated, continued, or upgraded to a more serious classification.

2.0 REFERENCES

2.1 Interface Documents A.

SPP-3.5 B.

EPIP-5, C.

EPIP-6, D.

EPIP-7, E.

EPIP-8, F.

EPIP-10, G.

EPIP-14, H.

EPIP-16, I.

CECC EPIP-9 J.

PHYSI-32, "Regulatory Reportinp Requirements" "General Emergency "Activation And Operation Of The Technical Support Center "Activation And Operation Of The Operations Support Center" "Personnel Accountability And evacuation" "Medical Emergency Response" "Radiological Control Response" "Termination And Recovery" "Emergency Environmental Radiological Monitoring Procedures" "Security Instructions For Members Of The Security Force" 3.0 INSTRUCTION

[1]

IF TSC IS NOT STAFFED, THEN GO TO Step 3.1 [1].

(Page 3)

[2]

IF TSC IS OPERATIONAL, (SED transferred to TSC), THEN GO TO Step 3.2 [1].

(Page 7)

FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN El El

EPIP-4 SQN SITE AREA EMERGENCY Rev. 19 Page 3 of 11 Date 3.1 ACTIVATION OF THE REP BY SM Upon classifying events as a SITE AREA EMERGENCY in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SM shall:

[1]

ANNOUNCE to Operating Crew:

"A SITE AREA EMERGENCY has been declared based on (Describe the Conditions).

I will be the Site Emergency Director."

ED

[2]

IF Emergency Paging System (EPS) has not been previously initiated, THEN ACTIVATE EPS AND LI (SM may delegate these tasks to Operations Clerk if available.

MSS also may be used if necessary.)

[a]

CONFIRM response by reviewing 20 minute printed report available in the TSC.

El

[b]

CALL personnel to staff unanswered positions.

(Use REP Duty Roster and Call List)

LI

[3]

IF EPS fails, THEN

[a]

CALL Operation Duty Specialist (ODS) AT RingdownLine I or [71700 or 951 or 9-785-1700 AND DIRECT ODS to activate EPS.

LI

[b]

IF EPS still will not activate, THEN (SM may delegate these tasks to Operations Clerk if available.

MSS also may be used if necessary.)

CALL personnel to staff TSC/OSC positions.

(Use REP Duty Roster and Call List)

El

[4]

ANNOUNCE to plant personnel:

"ATTENTION PLANT PERSONNEL. ATTENTION PLANT PERSONNEL. A SITE AREA EMERGENCY HAS BEEN DECLARED BASED ON (Describe the Conditions), AFFECTING UNIT(s) __

ALL TSC AND OSC PERSONNEL REPORT TO THE EMERGENCY FACILITIES IIMMEDIATELY."

LI REPEAT Announcement.

MI FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SON

EPIP-4 SQN SITE AREA EMERGENCY Rev. 19 Page 4 of 11 Date 3.1 ACTIVATION OF THE REP BY SM (Continued)

[5]

IF personnel accountability has not been previously initiated, THEN

[a]

NOTIFY Security Shift Supervisor to implement EPIP-8 "Personnel Accountability and Evacuation."

6144 or E8

[b]

ACTIVATE emergency sirens for personnel assembly.

Initial Time NOTE ODS should be notified within 5 minutes after declaration of the event.

[6]

COMPLETE SAE Notification Form (Page 10).

El

[7]

NOTIFY ODS.

[a]

CALL ODS.

Ringdown Line I or 15-751-1700 or 15-751-24951 or 19-785-1700 Initial Time

[b]

READ completed Form (Page 10) to ODS.

D

[c]

FAX ODS SAE Notification Form (Page 10).

[]

1 5-751-8620 FAX 1

[8]

IF ODS CANNOT be contacted within 10 minutes of the declaration, THEN

[a]

NOTIFY Tennessee Emergency Management Agency (TEMA) 9-1"800"262-3300 1 °rl 9-1-615-741-00011 or 888-616-8091 (satellite)

Initial Time

[b]

READ completed Form (page 10) to TEMA 0i

[c]

FAX TEMA SAE Notification Form (Page 10)

El 1 9-1-615-242-9635 FAX I

FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SON

EPIP-4 SQN SITE AREA EMERGENCY Rev. 19 Page 5 of 11 Date 3.1 ACTIVATION OF THE REP BY SM (Continued)

[9]

NOTIFY RADCON Shift Supervisor,

[a]

STATE "A SITE AREA EMERGENCY HAS BEEN DECLARED, BASED UPON (Describe the conditions), AFFECTING UNIT(s)

." E

[b]

DIRECT to implement EPIP-14, "Radiological Control Response."

ED

[c]

DIRECT to implement CECC EPIP-9, "Emergency Radiological Monitoring Procedures."

ED

[10]

NOTIFY Chemistry Shift Supervisor,

[a]

STATE: "A SITE AREA EMERGENCY HAS BEEN DECLARED, BASED UPON (Describe the Conditions),

AFFECTING UNIT(s) _

I a

7285 La or F6348 Lab I or I Pager 350-40732

[b]

DIRECT to implement EPIP-14.

D

[11]

MONITOR radiation monitors.

WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment.

[a]

NOTIFY Chemistry Shift Supervisor to perform a dose assessment using EPIP-14.

El S7285 La or r6348 Lab or iPager 350-40732I

[b]

REFER TO EPIP-1, Radiological Effluents Section, AND EVALUATE need for additional classifications.

[]

[12]

IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."

El

[13]

IF there is a security threat, THEN NOTIFY Security Shift Supervisor to implement PHYSI-32, "Security Instructions For Members Of The Security Force."

J or ET FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

EPIP-4 SQN SITE AREA EMERGENCY Rev. 19 Page 6 of 11 Date 3.1 ACTIVATION OF THE REP BY SM (Continued)

[14] NOTIFY Plant Management in accordance with SPP-3.5 AND PROVIDE SAE Notification Information.

El NOTE 1 NRC notification should be made as soon as practicable, but within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of "SITE AREA EMERGENCY" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.

NOTE 2 Do not dial "1" prior to the number when using ENS phones.

[15] NOTIFY NRC of plan activation via ENS in accordance with SPP-3.5.

(301) 816-5100 (Mai F

-(301) 951-0550 (Backup) ] 9-1-(301) 816-5151 (Fax)

Initial Time

[16]

MONITOR plant conditions AND EVALUATE using EPIP-1 until TSC is staffed, AND

[a]

IF plant conditions warrant, THEN UPGRADE to a higher classification AND INITIATE EPIP-5.

El

[b]

IF additional conditions satisfy criteria of other SITE AREA EMERGENCIES OR Conditions warrant a need for follow-up information, THEN COMPLETE SAE Follow-up Form (Page 11), AND REPORT to ODS for State notification at:

Ringdown Line or 5-751-1700 or 5-751-2495 1 or9 5"1700 AND FAX ODS SAE Follow-up Form (Page 11) 15-751-860FA I END OF SECTION :

FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

EPIP-4 SQN SITE AREA EMERGENCY Rev. 19 Page 7 of 11 Date 3.2 ACTIVATION OF THE REP BY TSC Upon classifying events as a SITE AREA EMERGENCY in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SED shall:

[1]

IF personnel accountability has not been previously initiated, THEN

[a]

DIRECT TSC Security Manager or Security Shift Supervisor to implement EPIP-8 "Personnel Accountability and Evacuation."

El or6

[b]

DIRECT SM to ACTIVATE emergency sirens for personnel assembly.

Initial Time

[2]

IF Site Area Emergency classification has been declared by SM, THEN GO TO Step [6]

OR appropriate Step based on SM turnover.

0]

NOTE CECC Director should be notified within 5 minutes after declaration of the event.

[3]

COMPLETE SAE Notification Form (Page 10).

El

[4]

NOTIFY CECC Director.

[a]

CALL CECC Director.

RingdownLi or 5-751-1 i

or 1 5-751-1680 Initial Time

[b]

READ completed Form (Page 10) to CECC Director.

El

[c]

FAX CECC SAE Notification Form (Page 10).

El 15-751-1682 FAx FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

EPIP-4 SQN SITE AREA EMERGENCY Rev. 19 Page 8 of 11 Date 3.2 ACTIVATION OF THE REP BY TSC (Continued)

[5]

IF CECC Director CANNOT be contacted within 10 minutes of the declaration, THEN

[a]

NOTIFY Tennessee Emergency Management Agency (TEMA).

9180262-33 or 19-1-65-741-0001 1 or 1888-616-8091 (satellite)

Initial Time

[b]

READ completed Form (Page 10) to TEMA.

El

[c]

FAX TEMA SAE Notification Form (Page 10).

D I 9-1-615-242-9635 FAX 1

[6]

DIRECT TSC RADCON Manager to implement CECC EPIP-9 "Emergency Radiological Monitoring Procedures."

El NOTE The Dose Assessment function is transferred to the CECC once they are staffed.

[7]

MONITOR radiation monitors.

WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment

[a]

DIRECT TSC Chemistry Manager or Chemistry Shift Supervisor to perform a dose assessment using EPIP-14, "Radiological Control Response."

El 7285 L or I6348 Lab or FIager 350-40732

[b]

REFER TO EPIP-1, Radiological Effluents Section, AND EVALUATE need for additional classifications.

El

[8]

IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."

El

[9]

IF there is a security threat, THEN DIRECT TSC Security Manager or Security Shift Supervisor to implement PHYSI-32, "Security Instructions For Members Of The Security Force."

El 6144or 6

FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

EPIP-4 SQN SITE AREA EMERGENCY Rev. 19 Page 9 of 11 Date 3.2 ACTIVATION OF THE REP BY TSC (Continued)

NOTE 1 NRC notification should be made as soon as practicable, but within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of "SITE AREA EMERGENCY" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.

NOTE 2 Do not dial "1" prior to the number when using ENS phones.

[10] ENSURE NRC has been notified of plan activation via ENS in accordance with SPP-3.5.

(301) 816-5100 (Main)

(301) 951-0550 (Bac 9-1-(301) 816-5151 (Fax)

Initial Time

[11] MONITOR plant conditions AND EVALUATE using EPIP-1, AND

[a]

IF plant conditions warrant, THEN UPGRADE to a higher classification, AND INITIATE EPIP-5

[b]

IF additional conditions satisfy criteria of other SITE AREA EMERGENCY's OR Conditions warrant a need for follow-up information, THEN COMPLETE SAE Follow-up Form (Page 11),

AND REPORT to CECC Director for State notification at:

Ringdown Line or 1 16 or 5-751-1680I AND FAX CECC SAE Follow-up Form (Page 11) 5-751-1682 FAXI OR

[c]

IF situation no longer exists, THEN TERMINATE emergency per EPIP-16, "Termination and Recovery," AND COMPLETE SAE Follow-up Form (Page 11) including Time and Date Event Terminated and FAX to CECC.

El El El I END OF SECTION I FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

EPIP-4 SON SITE AREA EMERGENCY Rev. 19 Page 10 of 11 SITE AREA EMERGENCY NOTIFICATION FORM

1. El THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.

OR 0] THIS IS A DRILL. THIS IS A DRILL.

2. This is at Sequoyah Nuclear Plant.

(Your Name)

3. There has been a SITE AREA EMERGENCY declared at Sequoyah Nuclear Plant.

Affecting El Unit 1 OR El Unit 2 OR El Both Units 1 & 2

4. EAL Designator:
5.

Brief Description of Event

6. Plant conditions are:

El Stable El Deteriorating

7.

Radiological Conditions are:

El No Abnormal Release Off-site El Airborne Release Off-site El Liquid Release Off-site El Release Information Not Known

8. Event Declared: Time:

Date:

9. Event Terminated: Time:

Date:

10. The Meteorological Conditions Are: (Use MET Tower elevation 46, alternate elevation 90.)

Wind Speed mph Wind Direction From

11. Protective Action Recommendation: [] None at This Time.
12. "Please Repeat the Information You Have Received to Ensure Accuracy."

El FAX TO THE ODS AT 751-8620 AFTER COMPLETING THE NOTIFICATION.

FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

EPIP-4 SQN SITE AREA EMERGENCY Rev. 19 Page 11 of 11 SITE AREA EMERGENCY FOLLOW-UP FORM

1. El THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.

OR El THIS IS A DRILL. THIS IS A DRILL.

2. This is at Sequoyah Nuclear Plant.

(Your Name)

3. This is Follow-Up Information Regarding the SITE AREA EMERGENCY declared at Sequoyah Nuclear Plant Affecting El Unit 1 OR El Unit 2 OR El Both Units 1 & 2
4. Reactor Unit 1 ED Shutdown El At Power Unit 2 ED Shutdown El At Power
5. Plant conditions are:

ED Stable 0] Deteriorating

6. Additional EAL Designator (s):
7. Site Assembly and Accountability is on going. El YES D NO OR D COMPLETED
8. The Following Significant Changes in Plant Conditions Have Occurred:
9. The Following Significant Changes in Radiological Conditions Have Occurred:
10. The Meteorological Conditions Are: (Use MET Tower elevation 46, alternate elevation 90.)

Wind Speed mph Wind Direction From

11. Protective Action Recommendation:

171 None at This Time

12. Event Terminated:Time:

Date:

13. "Please Repeat the Information You Have Received to Ensure Accuracy."

0Z

14. Name Date Time (Preparer's Name)
15. FAX TO THE ODS AT 751-8620 OR CECC AT 751-1682 AFTER COMPLETING THE NOTIFICATION ED FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-5 GENERAL EMERGENCY Revision 25 QUALITY RELATED PREPARED/PROOFREAD BY: W. P. Brooks RESPONSIBLE ORGANIZATION: Emergiency Preparedness APPROVED BY:

John H. Casey EFFECTIVE DATE: 8-31-2000 Level of Use: Reference REVISION DESCRIPTION:

Intent Change, Editorial changes, Added steps for standardization with WBN, BFN, and Corp., Format change for ease of use.

Revisions not shown due to extent of format changes.

EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 2 of 14 Date 1.0 PURPOSE 1.1 To provide a method for timely notifications of appropriate individuals when the Shift Manager (SM)/Site Emergency Director (SED) has determined by EPIP-1 that events have occurred that are classified as a GENERAL EMERGENCY 1.2 To provide the SED/SM a method for periodic reanalysis of current conditions to determine whether the GENERAL EMERGENCY should be terminated or continued.

2.0 REFERENCES

2.1 Interface Documents A.

SPP-3.5 B.

EPIP-6, C.

EPIP-7, D.

EPIP-8, E.

EPIP-10, F.

EPIP-14, G.

EPIP-16, H.

CECC EPIP-9, I.

PHYSI-32, "Regulatory Reporting Requirements" "Activation and Operation of the Technical Support Center" "Activation and Operation of the Operations Support Center" "Personnel Accountability and Evacuation" "Medical Emergency Response" "Radiological Control Response" "Termination and Recovery" "Emergency Environmental Radiological Monitoring Procedures" "Security Instructions For Members Of The Security Force" 3.0 INSTRUCTION

[1]

IF TSC is NOT STAFFED, THEN El GO TO Section 3.1. (Page 3)

[2]

IF TSC is OPERATIONAL, (SED transferred to TSC), THEN GO TO Section 3.2. (Page 8)

El FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 3 of 14 Date 3.1 ACTIVATION OF THE REP BY SM Upon classifying events as a GENERAL EMERGENCY in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SM shall:

[1]

ANNOUNCE to Operating Crew:

"A GENERAL EMERGENCY has been declared based on (Describe the Conditions).

I will be the Site Emergency Director."

[2]

IF Emergency Paging System (EPS) has not been previously initiated, THEN ACTIVATE EPS AND (SM may delegate these tasks to Operations Clerk if available.

MSS also may be used if necessary.)

[a]

[b]

CONFIRM response by reviewing 20 minute printed report available in the TSC.

CALL personnel to staff unanswered positions (Use REP Duty Roster and Call List).

[3]

IF EPS fails, THEN

[a]

CALL Operation Duty Specialist (ODS), AT IRingdown Lne or 15-751-1700]

or 17 2495]

AND DIRECT ODS to activate EPS.

or F9-785-1700 I IF EPS still will not activate, THEN (SM may delegate these tasks to Operations Clerk if available.

MSS also may be used if necessary.)

CALL personnel to staff TSC/OSC positions (Use REP Duty Roster and Call List).

FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN 0

El 13 D]

[b]

F-

EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 4 of 14 Date 3.1 ACTIVATION OF THE REP BY SM (Continued)

[4]

ANNOUNCE to plant personnel:

"ATTENTION PLANT PERSONNEL. ATTENTION PLANT PERSONNEL. A GENERAL EMERGENCY HAS BEEN DECLARED BASED ON (Describe the condition), AFFECTING UNIT(s)

ALL TSC AND OSC PERSONNEL REPORT TO THE EMERGENCY FACILITIES IMMEDIATELY."

REPEAT Announcement.

[5]

IF personnel accountability has not been previously initiated, THEN

[a] NOTIFY Security Shift Supervisor to implement EPIP-8, "Personnel Accountability and Evacuation."

6144 or 6568

[b] ACTIVATE emergency sirens for personnel assembly.

Initial Time NOTE ODS should be notified within 5 minutes after declaration of the event.

[6]

COMPLETE GE Notification Form (Page 13).

[7]

NOTIFY ODS.

[a] CALL ODS.

SRingdown or or 51-1700 or i

_751-24951 or Initial Time

[b] READ completed Form (Page 13) to ODS.

[c] FAX ODS GE Notification Form (Page 13).

1 5-751-8620 FAXI FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN El El El El D

1 9-785-1:7:00]

EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 5 of 14 Date 3.1 ACTIVATION OF THE REP BY SM (Continued)

[8]

IF ODS CANNOT be contacted within 10 minutes of the declaration, THEN

[a] NOTIFY Tennessee Emergency Management Agency (TEMA).

I1 00-262-33001 or 1-1-615-741-00 or 888-616-8091 (satellite)

Initial Time

[1]

READ completed Form (Page 13) to TEMA.

ED

[2]

FAX TEMA GE Notification Form (Page 13).

[]

I 9-1-615-242-9635 FAX

[b] NOTIFY Hamilton County Emergency Management Agency (EMA)

AND 9-69 or 2-7777 1or1 20022 Initial Time READ completed Form (Page 13) to Hamilton County EMA AND LI

[c] NOTIFY Bradley County EMA.

19-476-060 or 1 9-476-75111 Initial Time READ completed Form (Page 13) to Bradley County EMA.

El

[9]

NOTIFY RADCON Shift Supervisor,

[a] STATE "A GENERAL EMERGENCY HAS BEEN DECLARED, BASED UPON (Describe the conditions),

AFFECTING UNIT(s)

I)I

[b] DIRECT to implement EPIP-14, "Radiological Control Response."

LI

[c] DIRECT to implement CECC EPIP-9, "Emergency Radiological Monitoring Procedures".

El FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 6 of 14 Date 3.1 ACTIVATION OF THE REP BY SM (Continued)

[10] NOTIFY Chemistry Shift Supervisor,

[a] STATE: "A GENERAL EMERGENCY HAS BEEN DECLARED, BASED UPON (Describe the conditions). AFFECTING UNIT(s)

." ED 7285 Lab] or L6348 Lab I or [Pager 350-40732

[b] DIRECT to implement EPIP-14.

[11] MONITOR radiation monitors.

WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment.

[a] NOTIFY Chemistry Shift Supervisor to perform a dose assessment using EPIP-14 or 6

ab or Pager 350-40732]

[b] REFER to Protective Action Recommendation Logic Diagram (Page 12) AND IF change in PAR required, THEN COMPLETE GE Follow-up Form (Page 14) AND REPORT to ODS for State notification at:

0 0

El IRingdowoTe Ior 15-751-17o01 or 1-751-249I AND FAX ODS GE Follow-up Form (Page 14)

I 5-751-86i20 iFA or 19-785-17001

[12] IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."

[13] IF there is a security threat, THEN NOTIFY Security Shift Supervisor to implement PHYSI-32, "Security Instructions For Members Of The Security Force" 6144 or 58 FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN El El

3.1 ACTIVATION OF THE REP BY SM (Continued)

[14] NOTIFY Plant Management in accordance with SPP-3.5 AND PROVIDE GE Notification Information.

D NOTE 1 NRC notification should be made as soon as practicable, but within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of "GENERAL EMERGENCY" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.

NOTE 2 Do not dial "1" prior to the number when using ENS phones.

[15] NOTIFY NRC of plan activation via ENS in accordance with SPP-3.5.

(301) 816-5100 (Main)

(301) 951-0550 (Backup 9-1-(301) 816-5151 (Fax)

Initial Time

[16] MONITOR plant conditions AND EVALUATE using EPIP-1 until TSC is staffed, AND

[a]

IF additional conditions satisfy criteria of other GENERAL EMERGENCYs OR

[b]

IF changes to Protective Action Recommendations OR

[c]

IF conditions warrant a need for follow-up information, THEN COMPLETE GE Follow-up Form (Page 14), AND REPORT to ODS for State notification at:

IRingdownL or 15-751-17ol0 or 15-751-2495 or E9-785-17600 AND FAX ODS GE Follow-up Form (Page 14) i5-751-8620 FAXI END OF SECTION FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 7 of 14 Date

EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 8 of 14 Date 3.2 ACTIVATION OF THE REP BY TSC Upon classifying events as a GENERAL EMERGENCY in accordance with EPIP-1, "Emergency Plan Classification Matrix," the SED shall:

[1]

IF personnel accountability has not been previously initiated, THEN

[a] DIRECT TSC Security Manager or Security Shift Supervisor to implement EPIP-8, "Personnel Accountability and Evacuation."

6144 6or

[b] DIRECT SM to ACTIVATE emergency sirens for personnel assembly.

Initial Time

[2] IF GENERAL EMERGENCY Classification has been declared by SM, THEN GO TO Step [6]

OR appropriate Step based on SM turnover.

NOTE CECC Director should be notified within 5 minutes after declaration of the event

[3]

COMPLETE GE Notification Form (Page 13).

[4]

NOTIFY CECC Director.

[a] CALL CECC Director.

or 1 5-751 -1 4 or 5 -751-16181 Initial Time

[b] READ completed Form (Page 13) to CECC Director.

[c] FAX CECC GE Notification Form (Page 13).

15-751-16827Fx FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN El El El El I RingdownLe

EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 9 of 14 Date 3.2 ACTIVATION OF THE REP BY TSC (Continued)

[5]

IF CECC Director CANNOT be contacted within 10 minutes of the declaration, THEN

[a] NOTIFY Tennessee Emergency Management Agency (TEMA).

9-1-800-262-3300 1 or F9--615-741-0001 I or F888-616-8091 (satellite)

Initial Time

[1] READ completed Form (Page 13) to TEMA.

Dl

[2] FAX TEMA GE Notification Form (Page 13).

El 1 9-1-615-242-9635 FAX I

[b] NOTIFY Hamilton County Emergency Management Agency (EMA)

AND 19-209-69o o

1 9-622-77771 or 19-622-0022 1 Initial Time READ completed Form (Page 13) to Hamilton County EMA.

El

[c] NOTIFY Bradley County EMA AND 9-476-06 or 9-476-75¶11 Initial Time READ completed Form (Page 13) to Bradley County EMA.

El

[6]

IF CECC EPIP-9 "Emergency Radiological Monitoring Procedures."

has not been previously initiated, THEN DIRECT TSC RADCON Manager to implement CECC EPIP-9 El FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN

EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 10 of 14 Date 3.2 ACTIVATION OF THE REP BY TSC (Continued)

NOTE The Dose Assessment function is transferred to the CECC once they are staffed.

[7]

MONITOR radiation monitors.

WHEN indication of an unplanned radiological release, THEN PERFORM Dose Assessment.

[a]

DIRECT TSC Chemistry Manager or Chemistry Shift Supervisor to perform a dose assessment using EPIP-14, "Radiological Control Response."

El 7285 Lab or [ 6348 Lab or Pager 350-40732

[b]

REFER to Protective Action Recommendation Logic Diagram (Page 12) AND Rl IF change in PAR required, THEN COMPLETE GE Follow-up Form (Page 14) AND REPORT to CECC Director for State notification at:

Ringdo ine or 15-751-16147 or 15-751-16801 AND FAX CECC GE Follow-up Form (Page 14) 5-751-1682

[8]

IF there are personnel injuries, THEN IMPLEMENT EPIP-10, "Medical Emergency Response."

[9]

IF there is a security threat, THEN DIRECT TSC Security Manager or Security Shift Supervisor to implement PHYSI-32,"Security Instructions For Members Of The Security Force".

or 1 6 i FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN El El

EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 11 of 14 Date 3.2 ACTIVATION OF THE REP BY TSC (Continued)

NOTE I NRC notification should be made as soon as practicable, but within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of "GENERAL EMERGENCY" declaration. Whenever NRC requests, a qualified person must provide a continuous update to NRC Operations Center.

NOTE 2 Do not dial "1" prior to the number when using ENS phones.

[10]

ENSURE NRC has been notified of plan activation via ENS in accordance with SPP-3.5.

(301) 816-5100 (Main)

(301) 951-0550 (Backup) 1 9-1-(301) 816-5151 (Fax)I Initial Time NOTE Protective Action Recommendation are the responsibility of the CECC Director after assuming that responsibility from the SED.

[11] MONITOR plant conditions AND EVALUATE using EPIP-1, AND

[a]

IF additional conditions satisfy criteria of other GENERAL EMERGENCYs OR

[b]

IF change to Protective Action Recommendations OR

[c]

IF conditions warrant a need for follow-up information, THEN COMPLETE GE Follow-up Form (page 14),

AND REPORT to CECC Director for State notification at:

I Ringdown Linel or 15-751-1614 or 5-751-1680J AND FAX CECC GE Follow-up Form (Page 14)

OR

[d]

IF situation no longer exists, THEN TERMINATE emergency per EPIP-16, "Termination and Recovery," AND COMPLETE GE Follow-up Form (Page 14) including ri Time and Date Event Terminated and FAX to CECC.

5F751-1682 FAXI END OF SECTION I

FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN El 11 15-751-1682FA

EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 12 of 14 PROTECTIVE ACTION RECOMMENDATION LOGIC DIAGRAM SGENERAL EMERGENCY DECLARED SEQUOYAH NUCLEAR PLANT NOTES aYlf conditions are not known Then Answer NO.

ICONTINUE ASSESSMENT.

Modify protective actions based on available plant and field monitoring information.

Locate and evacuate additional localized hotspots TABLE 1 RADIOACTIVITY RELEASE DOSE TYPE LIMIT 3.9E-6 microCI/cc of Iodine 131 Measured 1 REM/hr External Dose I REM TEDE Projected 5 REM Thyroid CDE C

At

,.,-or beyond 5 MILES Projected or Measured Dose S> the Table 1 /......

VP%..'LJI I 

NO and 10 Mile*

and SHELTEF 10 Mil Indiction of SvereCor Daag>

hevaue I/*s there Loss of Physica*

N

(

RECOMME, YES EVACUATE and 5 Mile orbeyond 2MILES Projected or SHELTER re Measured Dose Mile h

al NO SRECOMMENI EVACUATE 2 or beyond the anc SITE BOUNDARY SHELTER rE Projected or Measured 10 Mile L i NO%

0

© Miles Radiu:

I

.mainder of EPZ FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN RE.CUMMINUA I IOIN 1 Miles Radius s downwind Sremainder o1

  • EPZ NDATION 2 2 Miles Radius s downwind nd mainder of 10 EPZ TABLE 2 SEVERE CORE DAMAGE INDICATIONS
1. Containment Radiation Monitor Reading on RM-90-271 or 272 is

> 28 REM/hr.

or

2. Containment Radiation Monitor Reading on RM-90-273or 274 is

> 29 REM/hr.

or

3. Reactor coolant Activity of

> 300 microCI/gm Dose Equivalent 1-131.

or

4. Inadequate core cooling as indicated by "red" or "orange" path from core cooling status tree.

RECOMMENDATION 4 SHELTER 2 Miles Radius and SHELTER 5 Miles Downwind G

R A*l*il DATION 3

EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 13 of 14 El RECOMMENDATION 1

[a] EVACUATE 2 mile radius and 10 miles downwind AND

[b] SHELTER remainder 10 mile EPZ El RECOMMENDATION 2

[a] EVACUATE 2 mile radius and 5 miles downwind AND

[b] SHELTER remainder 10 mile EPZ El RECOMMENDATION 3

[a] EVACUATE to 2 mile radius AND

[b] SHELTER remainder 10 mile EPZ

[El RECOMMENDATION 4

[a] SHELTER to 2 mile radius AND

[b] SHELTER 5 miles downwind

12. "Please Repeat the Information You Have Received to Ensure Accuracy."

E FAX TO THE ODS AT 751-8620 AFTER COMPLETING THE NOTIFICATION FORWARD COMPLETED PROCEDURE TO EMERGENCY PREPAREDNESS, OPS 41-SQN GENERAL EMERGENCY NOTIFICATION FORM

1. 0 THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.

OR El THIS IS A DRILL. THIS IS A DRILL.

2. This is at Sequoyah Nuclear Plant.

(Your Name)

3. There has been a GENERAL EMERGENCY declared at Sequoyah Nuclear Plant.

Affecting El Unit 1 OR El Unit 2 OR El Both Units 1 & 2

4.

EAL Designator:

5.

Brief Description of Event

6. Plant conditions are:

El Stable E-Deteriorating

7.

Radiological Conditions are:

El No Abnormal Release Off-site El Airborne Release Off-site El Liquid Release Off-site El Release Information Not Known

8. Event Declared: Time:

Date:

9. Event Terminated: Time:

Date:

10. The Meteorological Conditions Are: (Use MET Tower elevation 46, alternate elevation 90.)

Wind Speed mph Wind Direction From

11. Protective Action Recommendation: (For Determination See PAR Logic Diagram Page 12)

EPIP-5 SQN GENERAL EMERGENCY Rev. 25 Page 14 of 14 GENERAL EMERGENCY FOLLOW-UP FORM

1. 13 THIS IS A REAL EMERGENCY EVENT. THIS IS A REAL EMERGENCY EVENT.

OR 0l THIS IS A DRILL. THIS IS A DRILL.

2. This is at Sequoyah Nuclear Plant.

(Your Name)

3. This is Follow-up Information Regarding the GENERAL EMERGENCY declared at Sequoyah Nuclear Plant Affecting D3 Unit 1 OR 13 Unit 2 OR El Both Units 1 & 2
4. Reactor Unit I R3 Shutdown E3 At Power Unit 2 13 Shutdown 13 At Power
5. Plant conditions are:

E3 Stable El Deteriorating

6. Additional EAL Designator (s):
7. The Following Significant Changes in Plant Conditions Have Occurred:
8. Evacuation of nonessential site personnel is on going:

E3 YES 13 NO OR E3 COMPLETED

9. The Following Significant Changes in Radiological Conditions Have Occurred:
10. The Following Changes To Protective Action Recommendations Have Occurred:
11. The Meteorological Conditions Are: (Use MET Tower elevation 46, alternate elevation 90.)

Wind Speed mph Wind Direction From

12. Event Terminated:Time:

Date:

13. "Please Repeat the Information You Have Received to Ensure Accuracy."

13

14. Name Date Time

"(Preparer's Name)

15. FAX TO THE ODS AT 751-8620 OR CECC AT 751-1682 AFTER COMPLETING THE NOTIFICATION.

13 S..

=.i

  • =,sl

'l'*l

'l II ~ b IJ A u i'il*J b

i iV b*,liA s

P 1'UKWAKU LU1VWLIILU rKULLDUILL IU L1iIL1iAyL1..

I rIrtIxr-"1t,,

ii

TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-7 ACTIVATION AND OPERATION OF THE OPERATIONS SUPPORT CENTER (OSC)

Revision 18 QUALITY RELATED PREPARED/PROOFREAD BY: W. P. Brooks RESPONSIBLE ORGANIZATION: Emergency Preparedness APPROVED BY:

John Casey EFFECTIVE DATE:

9-1-2000 LEVEL OF USE: REFERENCE REVISION DESCRIPTION:

Intent Change: Revision changed the reporting requirement for the OSC; modified responsibilities of the MSS; added support from DCRM and Material Coordinator; updated terminology from REX to HIS-20; changed Operations Advisor reporting from TSC Ops Manager to TSC Operations Communicator; revised position titles; and revised checklist items to several checklists.

SNI ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev. 18 1

1 Page 2 of 36 TABLE OF CONTENTS Section Title Page T able of C ontents........................................................................................

2 1.0 P U R P O S E..................................................................................................

3 2.0 R E FE R E N C E S.............................................................................................

3 3.0 INSTRUCTIONS.......................................................................................

3 3.1 An Alert or Higher Classification.................................................................

3 3.2 A ctivation of O SC.......................................................................................

3 3.2.1 Shift Manager Actions.................................................................................

3 3.2.2 C all List....................................................................................................

.. 4 3.2.3 R esponse..................................................................................................

4 3.2.4 Maintenance Shift Supervisor (MSS).........................................................

5 3.2.5 O S C O peration............................................................................................

5 3.2.6 OSC Manager...........................................................................................

6 3.2.7 Assistant OSC Manager.............................................................................

7 3.2.8 OSC RADCON Supervisor.........................................................................

7 3.2.9 OSC RADCON Briefer...............................................................................

7 3.2.10 OSC Operations Advisor.............................................................................

7 3.2.11 Personnel Pool Manager.............................................................................

7 3.2.12 Fire Operations Advisor...............................................................................

8 3.2.13 Chemistry Shift Supervisor.........................................................................

8 3.2.14 OSC Log Keeper.......................................................................................

8 3.2.15 O S C C lerk..................................................................................................

8 3.2.16 OSC Site Security Advisor...........................................................................

8 3.2.17 O S C B riefers..............................................................................................

8 3.2.18 OSC Industrial Safety Advisor.....................................................................

8 3.2.19 DCRM Coordinator......................................................................................

9 3.2.20 OSC Nuclear Stores Coordinator................................................................

9 3.3 D eactivation...............................................................................................

9 4.0 R E C O R D S..................................................................................................

9 4.1 Q A R ecords...............................................................................................

9 4.2 Non-Q A R ecords........................................................................................

9 APPENDICES Appendix A, OSC Manager Checklist.........................................................

10 Appendix B, Emergency Conditions Data Sheet.........................................

12 Appendix C, Assistant OSC Manager Checklist...........................................

14 Appendix D, OSC Team Tracking/Briefing/Debriefing Forms..................... 16 Appendix E, OSC RADCON Supervisor Checklist...................................... 18 Appendix F, OSC RADCON Briefer Checklist.............................................

20 Appendix G, OSC Operations Advisor Checklist........................................ 21 Appendix H, Fire Operations Advisor Checklist.......................................... 22 Appendix I, OSC Log Keeper Checklist.....................................................

23 Appendix J, OSC Clerical Staff Checklist...................................................

24 Appendix K, OSC Site Security Advisor.....................................................

25 Appendix L, OSC Briefer Checklist..............................................................

26 Appendix M, OSC Industrial Safety Checklist............................................ 28 Appendix N, OSC Personnel Pool Manager Checklist................................ 29 Appendix 0, DCRM Coordinator Checklist.................................................

30 Appendix P, OSC Material Coordinator Checklist......................................

31 Appendix Q, Operations Support Center Telephone Listing....................... 32 Appendix R, Personnel Pool Mgr. Log.......................................................

33 Appendix S, ERO Roster and Call-In Form.................................................

34 SOURCE NOTES.......................................................................................

36

ACTIVATION AND OPERATION OF THE EPIP SQN OPERATIONS SUPPORT CENTER Rev.18 Page 3 of 36 1.0 PURPOSE The purpose of this procedure is to describe the activation of the Operations Support Center (OSC), describe the OSC organization, and provide for OSC operation once it has been staffed. The OSC is activated during an "Alert,"

"Site Area Emergency," or "General Emergency."

2.0 REFERENCES

Developmental Documents A.

EPIP-6, "Activation and Operation of the Technical Support Center" B.

EPIP-8, "Personnel Accountability and Evacuation" C.

EPIP-14, "Radiological Control Response" D.

EPIP-16, "Termination and Recovery" 3.0 INSTRUCTIONS 3.1 An Alert or higher Emergency Classification At an Alert or higher Emergency Classification, the OSC Manager will report directly to the OSC and shall be responsible for implementing this procedure and coordinating OSC personnel and activities.

3.2 Activation of OSC 3.2.1 Shift Manager (SM) Actions The SM will activate the OSC by announcing the emergency condition by one or more of the following methods:

A.

Plant Public Address (PA) announcement.

B.

The Shift Manager or operations clerk will normally activate the Emergency Paging System (EPS) or contact the persons designated on the REP Duty Roster and/or Call List. If the EPS cannot be activated from the site, the SM will contact the Operations Duty Specialist (ODS) and have the EPS activated from the CECC.

C.

The SM may activate the onsite emergency sirens at an "Alert" and shall activate the sirens at a "Site Area Emergency" or "General Emergency".

I ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.o18 N

ON Page 4 of 36 3.2.2 Call List The Emergency Preparedness Manager (EPM) shall maintain a REP Duty Roster and Call List book listing key OSC personnel by name, plant and home telephone numbers. The REP Call List and Duty Roster book will be updated at least quarterly by the EPM or designee with input by the appropriate section/group supervisors. This book will be provided to the SM and will also be maintained in the TSC and OSC.

3.2.3

Response

The following personnel should report to the OSC or the assigned OSC support location upon announcement of an "ALERT" or higher emergency classification, or at the direction of the SED:

A.

OSC Manager B.

Assistant OSC Manager C.

Maintenance Shift Supervisor D.

OSC RADCON Supervisor E.

Fire Operations Advisor F.

OSC Operations Advisor G.

Two Instrument Maintenance Briefers H.

Two Mechanical Maintenance Briefers I.

Two Electrical Maintenance Briefers J.

RADCON Briefer K.

Chemistry Shift Supervisor L.

OSC Personnel Pool Manager M.

Two Duty Damage Control Teams(0)

N.

RADCON Lab Supervisor

0.

Other plant staff the OSC Manager determines to be necessary to support OSC functions will be called:

1.

OSC Clerks

2.

OSC Log Keeper

3.

HIS-20 Operator

4.

Maintenance Personnel needed for support

5.

Operations Personnel needed for support

6.

Transmission and Customer Service

7.

Technical Support Personnel needed for support

8.

DCRM support

9.

Materials support

10. Industrial Safety support
11.

Security Advisor (1) A team will dress-out and standby for assignment.

ACTIVATION AND OPERATION OF THE IEPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 5 of 36 3.2.4 Maintenance Shift Supervisor (MSS)

The Maintenance Shift Supervisor (MSS) shall ensure that the OSC and Tool Room are unlocked and open for access when required.

The MSS maintains responsibility as single point maintenance contact for the Shift Manager until the OSC Manager is in place. The MSS initiates OSC setup and may sign designated actions on the Assistant OSC Manager's Checklist.

The MSS may assist in the activation of the Emergency Response Organization to ensure adequate personnel are available. The MSS will provide a briefing to the OSC Manager when he arrives and then becomes the second Assistant OSC Manager.

3.2.5 OSC Operation The OSC shall operate to ensure the following actions are taken:

A.

All personnel or teams previously tasked by the Control Room or Site Emergency Director prior to OSC staffing and activation shall be located and assigned a Team Tracking Letter designation for tracking and debriefing purposes.

B.

All teams shall be briefed and/or coordinated with the OSC prior to dispatch and debriefed by the OSC upon task completion. The exceptions are:

"* AUO teams responding to procedure driven missions or are otherwise under the direction of the SM. These teams shall be tracked on the OSC Ops tracking board via communication between the Control Room Communicator and the OSC Operations Advisor.

"" The Fire Brigade or Medical Emergency Response Team may be briefed in route by radio when response time is critical. These teams will be tracked by the OSC.

"* If an Emergency Response Team is responding or near the task area prior to OSC staffing the team may be briefed by radio or telephone and shall be tracked by the OSC.

"* RADCON Survey Teams and Chemistry Teams may be dispatched directly from their respective labs provided they are coordinated through the OSC RADCON Supervisor and tracked on the RADCON/CHEM board C.

Each potential damage control and repair team member shall have qualifications verified and dosimetry issued prior to assignment to a response team.

D.

RADCON and Operations should be members of each response team.

E.

Each team should have a radio for communications with the OSC. The Operations or RADCON member of each team should be the radio talker. Muted radios are available for use in radio-sensitive areas of the plant.

F.

RADCON shall maintain sufficient respiratory protection equipment available for issue in a manner that will not delay teams response.

AND OPERATION OF THE I EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 6 of 36 3.2.5 OSC Operation (Continued)

G.

Teams should respond with damage control tool kits to the assigned task.

H.

If a person/team is unable to complete a mission or is reassigned a task after briefing, the OSC shall be immediately notified by the team leader.

1.

At least one Emergency Response Team is on standby at all times.

3.2.6 OSC Manager The OSC Manager is responsible for directing repairs and corrective actions; performing damage assessment; coordinating repair activities with the TSC; coordinating maintenance teams and ensuring proper briefings and accompaniment by RADCON; activating the Fire Brigade, Search and Rescue, and Medical Emergency Response Teams as necessary; relocation of the OSC in accordance with 3.2.6.A; deactivating the OSC. Appendix A, OSC Manager Checklist, shall be used to ensure required actions are completed.

A.

Relocate OSC personnel and equipment to an alternate OSC location when conditions require:

1.

Direct OSC RADCON Supervisor to make habitability survey for the OSC if a release has occurred. Surveys are to include direct radiation readings, area swipes, and air activity monitoring.

2.

Inform the SED if conditions exceed habitability criteria.

3.

Relocate the OSC (upon direction from the SED) to the backup OSC in the O&PS building if it meets habitability requirements.

4.

If the backup OSC does not meet habitability criteria, than an alternate location must be selected based on the following criteria:

a.

Location has adequate access to the plant (preferably is within the Protected Area), has a current radiological survey, is upwind from plant, and has adequate ventilation control.

b.

Location has adequate communications capabilities (including three telephone circuits).

c.

Physical size: space for at least 25 persons.

d.

Provides access to appropriate reference materials, tools, safety equipment, etc.

3.2.7 Assistant OSC Manager The Assistant OSC Manager maintains continuous communication with the Maintenance Manager in the TSC, ensuring that OSC tasks are entered on the team tracking board/system; initiates an OSC Team Briefing/Debriefing Form, (Appendix D) for each task; assigns tasks to briefing teams; coordinates and directs damage control and repair activities as directed by the OSC Manager; ensures RADCON support for each team; ensures all teams (except as indicated in 3.2.5.B) are briefed before dispatch in accordance with Appendix D; ensures all teams are debriefed upon return to the OSC in accordance with Appendix D. When available, a qualified individual may assume communications and/or boardwriting responsibilities as delegated by the Assistant OSC Manager. Appendix C, Assistant OSC Manager Checklist, shall be used to ensure required actions are completed.

3.2.8 OSC RADCON Supervisor The OSC RADCON Supervisor provides and coordinates RADCON resources; assigns a HIS-20 Operator and calls in additional support as needed; directs the RADCON Lab through the Lab Supervisor; informs the TSC RADCON Manager, OSC Manager and OSC RADCON briefer of current radiological conditions; enters data on the Radcon/Chem tracking board; provides RADCON support for emergency response teams as warranted.

Appendix E, OSC RADCON Supervisor Checklist, shall be used to ensure required actions are completed.

3.2.9 OSC RADCON Briefer The OSC RADCON briefer remains informed of the site radiological conditions; provides technical assistance for radiological concerns; assist in technical briefings of OSC teams; ensures each team has a RADCON member present during briefing or may be dispatched with the team; completes applicable portions of Appendix D. Appendix F, OSC RADCON Briefer Checklist, shall be used to ensure required actions are completed.

3.2.10 OSC Operations Advisor The OSC Operations Advisor provides operational advice, plant status, and important system parameters to support the operation; provides Operations personnel as part of OSC response teams as warranted; maintains the Operations tracking board in the OSC. Provide Operations personnel, advice, and plant status to support the entire OSC including briefing emergency response teams as needed. Keeps the TSC Operations Communicator and Control Room Communicator informed of OSC team activities. May provide briefing/debriefing to AUOs as requested by the Control Room Crew and/or SED. Appendix G, OSC Operations Advisor Checklist, shall be used to ensure required actions are completed.

3.2.11 Personnel Pool Manager The OSC Personnel Pool Manager provides and coordinates a pool of qualified maintenance personnel to staff damage control and repair teams.

He also tracks individual team members and assesses their future availability for other assignments. Appendix N, Personnel Pool Manager Checklist, shall be used to ensure required actions are complete. The Personnel Pool Manager Log (Appendix R) should be used to manage information regarding individual qualifications and OSC assignments.

ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 1

1 Page 8 of 36 3.2.12 Fire Operations Advisor The Fire Operations Advisor initiates fire response, medical emergency response, hazardous material containment; provides personnel to support Nuclear Security in searches of hazardous areas. Provides evaluations of the plant environment and recommendations to OSC management on safety aspects of the response team tasks. Contacts the site and/or corporate Safety Specialist as necessary.

Maintain status of Fire Ops personnel.

Appendix H, Fire Operations Advisor Checklist, shall be used to ensure required actions are completed.

3.2.13 Chemistry Shift Supervisor The Chemistry Shift Supervisor in the CHEM lab provides first-line direction of Chemistry support personnel; calls in additional support as required; briefs Chemistry personnel on emergency events and status; initiates onsite/off-site dose assessment, per EPIP-14, as directed by the TSC or the Ops. SM; provides Chemistry support to the OSC as needed.

3.2.14 OSC Log Keeper The OSC Log Keeper ensures status boards are continuously updated to reflect current plant conditions and collects/maintain all original copies of generated documents. Appendix I, OSC Log Keeper, shall be used to ensure required actions are completed.

3.2.15 OSC Clerk The OSC Clerk provides logistics support to the OSC. Appendix J, OSC Clerical Staff, shall be used to ensure required actions are completed.

3.2.16 OSC Site Security Advisor The OSC Site Security Advisor coordinates Nuclear Security activities from the OSC when requested by the TSC Security Mgr or OSC Mgr; supports response to fire, medical emergencies, or other security responses; conducts search and rescue operations. Appendix K, OSC Nuclear Security Advisor, shall be used to ensure required actions are completed.

3.2.17 OSC Briefer The OSC Briefer provide and coordinate resources to support the OSC Manager; provide damage and repair assessments; remain informed of the site conditions; assist in technical briefings of OSC emergency response teams; and complete applicable portions of Appendix D. Appendix L, OSC Briefer Checklist, shall be used to ensure required actions are completed.

3.2.18 OSC Industrial Safety Advisor Industrial Safety issues are normally handled by the team briefer and/or assistance from Fire Ops when needed. If necessary, Fire Ops will contact site/corp Safety Specialist. When requested, Appendix M, Industrial Safety Advisor Checklist shall be used to ensure required actions are completed.

I ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.o18 1

1 Page 9 of 36 3.2.19 DCRM Coordinator The DCRM Coordinator provides support to OSC personnel by providing drawings, documents, vendor manuals and provides other support as requested. When requested, Appendix 0, DCRM Coordinator Checklist, shall be used to ensure required actions are completed.

3.2.20 OSC Materials Coordinator The Materials Coordinator provides support to the OSC by determining materials availability, coordinating between Power Stores and the OSC and by expediting materials needed. When requested, Appendix P, OSC Materials Coordinator Checklist shall be used to ensure required actions are completed 3.3 Deactivation The OSC will be deactivated when directed by the SED. Appendix A, OSC Manager Checklist, may be used to ensure required actions are completed.

4.0 RECORDS 4.1 QA Records The following records generated during real emergency events are considered QA Records. These shall be forwarded to the EP Manager who shall submit QA Records and any other records deemed necessary to corporate Emergency Preparedness for maintenance.

A.

Appendix B, Emergency Conditions Data Sheets B.

Appendix D, OSC Team Briefing/Debriefing Forms C.

Appendices for OSC Position Checklists D.

OSC Log Sheets 4.2 Non-QA Records The appendices and checklists to this procedure necessary to demonstrate key actions during NRC evaluated exercises, drills, or used to establish/support NRC Performance Indicators will be retained by the SQN EP Manager for at least 2 years.

ACTIVATION AND OPERATION OF THE IEPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 IPagle 10 of 36 Date:

APPENDIX A Page 1 of 2 OSC MANAGER CHECKLIST INITIAL ACTIVATION OF THE OPERATIONS SUPPORT CENTER Time/

Initials

1.

Swipe Accountability Reader.

2.

Ensure OSC set-up using materials in OSC Storage closet.

3.

Establish a log of activities and communications.

4.

Ensure OSC Briefing Area set-up using materials in OSC storage closet.

5.

Obtain briefing from the MSS.

6.

Establish communications with the TSC and obtain an update of the emergency conditions. Appendix B should be used as a guideline.

7.

Determine location and function of persons/teams currently and previously tasked by the TSC or Control Room and ensure assignment of Team Tracking Letter designation.

_8.

Ensure Activation of OSC.

a.

Ensure minimum staffing in OSC. (See note below)

b.

Ensure OSC set-up complete.

c.

Ensure OSC habitability OR relocate OSC in accordance with 3.2.6.A.

d.

Ensure OSC support personnel are notified of activation, if needed.

9.

Brief OSC Personnel on Plant Conditions, unless SED has provided briefing.

10.

Announce to the OSC and notify the SED the time that OSC is operational and activated.

11.

Establish necessary emergency teams.

NOTE: Minimum staffing requirements are one representative from Mechanical Maintenance, Electrical Maintenance and Instrument Maintenance.

Continued Next Page

AI CTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 I Page 11 of 36 Date:

APPENDIX A Page 2 of 2 OSC MANAGER CHECKLIST OPERATIONAL RESPONSIBILITIES

"* Demonstrate command and control of the OSC throughout the emergency.

"* Direct Asst. OSC Manager to form teams for accident assessment and repair and Announce the intent to form OSC teams.

"* Approve and Announce the dispatching of teams from the OSC.

"* Provide supplemental staffing for the OSC if needed.

"* Periodically direct key OSC positions to provide status summary to OSC staff or perform briefing yourself.

"* Update the SED and TSC Maintenance Manager as needed.

"* Ensure that team activities are prioritized and synchronized with the TSC.

"* Announce results of OSC teams following debriefing.

"* If event duration expected to exceed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, then establish relief rotations using Appendix S.

"* Request habitability survey by RADCON if a release has occurred.

"* Relocate the OSC as habitability conditions dictate.

"* Maintain a log of communications and activities.

"* Informs TSC of as-found plant conditions and status of emergency conditions.

Ensure the Emergency Response Teams Tracking Boards/System, Radiological Status Boards and other visual displays are kept current.

DEACTIVATION RESPONSIBILITIES Ensure all assigned tasks and assignments are completed.

Ensure all emergency response teams have been debriefed.

Ensure all emergency equipment and supplies have been returned to their specified storage locations.

Review all records for completeness and forward all records to the Emergency Preparedness Manager.

IAI AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 12 of 36 Date:

APPENDIX B Page 1 of 2 OSC MANAGER BRIEFING OUTLINE Emergency Classification: (check one)

[1 UNUSUAL EVENT [-] ALERT [

SITE AREA EMERGENCY [-] GENERAL EMERGENCY Affected Unit:

[

Event

Description:

-1 UNIT I

[-- UNIT 2

[I BOTH UNITS 1 & 2 UNIT STATUS: [- UNIT I

[1 UNIT 2 Time Emergency Classified:

Primary Plant Condition:

UNIT 1 Mode:

UNIT 2 Mode:

1II, "-2, 1-113, 1-14, [-15, or [-16

[11, 12, [-13, [:14, [1]5, or [-16 Electrical Lineup:

Diesel Generators:

Offsite Power Avail Major Mechanical P DESCRIPTION OF ANY ABNORMAL LINEUP DG I Operating [-1 Yes / [1 No DG 2 Operating [E Yes / R[ No able:

1 Yes/ RI No roblems:

Major Electrical Problems:

Continued Next Page

SQ I

ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev. 18 1Pagle 13 of 36 Date:

APPENDIX B Page 2 of 2 OSC MANAGER BRIEFING OUTLINE Major Instrument and Control Problems:

Environmental Problems High Rad Levels:

Toxic Gas:

High Press. Steam Releases:

Other:

Recorded by:

Time:

Date:

I ACTIVATION AND OPERATION OF THE I EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 14 of 36 Date:

APPENDIX C Page 1 of 2 ASSISTANT OSC MANAGER CHECKLIST INITIAL ACTIVATION OF THE OSC Time/

Initials

1.

Swipe Accountability Reader-Assistant OSC Manager.

Swipe Accountability Reader - Maintenance Shift Supervisor.

2.

Obtain keys at Work Coordination Center and open cafeteria (if locked), the OSC, and OSC storage room. (May be signed off by MSS)

3.

Ensure the minimum maintenance personnelare staffed or have been called in as necessary, (May be signed off by MSS)

J[

Mechanical Craft (Electrical Craft Instrumentation Craft ONSITE Hi 1 on shift Li 1 on shift CALL-IN Hi 1 onsite within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Li 1 onsite within 30 minutes Li 1 onsite within 30 minutes CALL-IN 1 onsite within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Li 1 onsite within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> TOTAL TOTAL:

2 Available onsite within 30 TOTAL 2 onsite within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> minutes and 2 onsite within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> TOTAL 3 onsite within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />

4.

Open the Tool Room if it is not staffed. (May be signed off by MSS)

5.

Establish a log of activities and communications.

6.

Establish contact with Maintenance Manager in the TSC (Bridge x104 or 6478).

7.

Obtain initial briefing and status of Operations and Maintenance tasks related to the emergencies that are underway from MSS, OSC Manager, or SM.

8.

Ensure all emergency response teams previously tasked are assigned team tracking letter designation and entered on the Emergency Response Team Tracking Board/System.

9.

Assign a team briefer to any teams previously dispatched.

10. Ensure that two emergency response teams are pre-staged in the OSC staging area of the cafeteria.
11. Notify Power Stores (X 7155) and the Tool Room (X 7755) (if staffed), advise them to remain staffed during the emergency unless released by the Site Emergency Director.

Continued Next Page

I ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 15 of 36 Date:

APPENDIX C Page 2 of 2 ASSISTANT OSC MANAGER INITIAL ACTIVATION OF THE OSC Continued

12. Verify the priorities of teams dispatched from the OSC, or being formed, with the TSC.
13. Review the OSC Team Tracking Board/System and reconcile any discrepancies with information obtained from briefing sources.

OPERATIONAL RESPONSIBILITIES

"* Assist the OSC Manager in providing direction and control to the OSC areas.

"* Open OSC, and OSC storage room.

"* Receive direction from SM/SED until OSC Manager arrives.

"* Oversee the operations of the OSC Teams and coordinate the supporting activities using Appendix D, "OSC Team Briefing/Debriefing Form".

"* Maintains continuous communication with Maintenance Manager in the TSC.

"* Receives TSC-assigned tasks, enters them on the Team Tracking Board/System, informs the OSC Manager, and assigns the task to a specific OSC Team Briefer.

"* Keeps the OSC Manager informed of important communications from the TSC.

"* Coordinate with OSC RADCON Supervisor and Operations Advisor as needed regarding OSC Team activities (determines if teams need RADCON and/or Operations support).

"* Maintain log of communications and activities.

DEACTIVATION RESPONSIBILITIES

"* Ensure all assigned tasks and assignments are completed.

"* Ensure all emergency response teams have been accounted for and debriefed.

"* Ensure all emergency equipment and supplies have been returned to their specified storage locations.

"* Ensure all log and team briefing forms are completed and signed.

I TIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 16 of 36 PPENDIX D Page 1 of 2 ASST. MGR.

/

In it/Ti me Date TEAM TEAM TASK: LU Inspection U I rouble Snooung U

e.pai TASK LOCATION: (Bldg, EL., Rm. Name, etc)

El ASSIGN Team next Letter designator (A, B, C etc.):

D3 ENTER on Team Tracking Board.

13 INFORM OSC Mgr. of task and make PA Announcement in OSC.

13 ASSIGN task to Lead Briefer Name:

Heads-up to Briefer: [] Ops E] R/C 13 Safety 13 Other RAD SUPV.

RADCON REQUIREMENTS: RWP: LI Yes RWP #

LjNo E] SCBA E] Respirator

[] Dressout E] Other I

Emergency Exposure Approved by SED: []Yes (REM Init/Time (Ref: EPIP-15)

I-No KI ISSUE Approved by TSC Radcon Mgr.: []Yes LINo (Ref: EPIP-14)

BRIEFER Team Members Names Discipline (MM, EM, IM, etc.)

Team Leader Name:.

Init/Time AUO (Use Page 2 to conduct RADCON Tech briefing)

Briefing conducted by:

Communication Method: E] Phone#

E] Pager#

[] Messenger

[_] OSC Hotline (x6406)_

13 Radio Ch#

Radio Sensitive Area (0-TI-OPS-000-063.0)

I Yes 13 No EL Contact OSC Briefer Every Minutes OSC MGR.

FINAL APPROVAL TO RELEASE TEAM

/

Team Necessary? E] Yes E] No Init/Time Radiological Condition Change Since Briefing? [] Yes [] No E] ANNOUNCE, on the OSC P/A, Intention to Dispatch the Team.

TEAM LEADER DEBRIEFING (Use Page 2 to conduct debriefing) or BRIEFER Debriefing conducted by:

/

Init/Time LI PROVIDE Summary to the OSC Manager.

M_ UPDATE the OSC Team Tracking Board.

")SC MGR.

F1 ANNOUNCE Team results over the OSC P/A system.

I 13 ENSURE TSC is informed of Team results.

Init/Tim e Continued Next Page OSC TEAM BRIEFING/DEBRIEFING FORM

I I

ACTIVATION AND OPERATION OF THE I EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 1

1 Pagje 17 of 36 Date:

APPENDIX D Page 2 of 2 EMERGENCY RESPONSE TEAM BRIEFING/DEBRIEFING CHECKLIST BRIEFING E-1 Description of problems -Team Priority I-Plant system status r-Plant radiological status F-E Route to/from work area Hazards between OSC and work location r-Radiation Work Permit (RWP)

RADCON support OPS support F-1 Procedures to be used El Tools needed (See tool pouch description in O-PI-REM-000-001.Q, "Quarterly Tool Kit Inventory".)

El Equipment needed Clearance required/Hold Order#

E-l Safety evaluation of job El Communication with OSC E-l Copy of Briefing Form (Appendix D) given to team with phone number(s).

E]

Key(s) needed for task.

DEBRIEFING El Was assignment completed?

El Observations from the Field El Equipment r-Hazards El Radiological conditions

['1 Unusual sounds, etc.

-I Other information El Team directed to Personnel Pc Manager NOTES: (Observations/Damage Assessment/Recommendations, etc.)

0ol

I ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 18 of 36 Date:

APPENDIX E Page 1 of 2 OSC RADCON SUPERVISOR CHECKLIST INITIAL ACTIVATION OF THE OSC Time/

Initials

1.

Swipe Accountability Reader.

2.

Fill out the Organizational/Staffing Chart and obtain OSC badge.

3.

Establish a log of activities and communications.

4.

Ensure a) HIS-20 printout is brought from the RADCON Lab to the OSC; b) a HIS-20 Computer Operator is assigned to provide computer access or use the printout for RADCON qualification checks of Emergency Response Team members; c) any Emergency Response Team members already assigned tasks in the field have acceptable RAD and qualifications (Contact MSS to for names and assigned task of individuals);

d) the Personnel Pool Manager is notified when the HIS-20 operator is assigned and given the name of the HIS-20 operator.

5.

Establish communications with the TSC RADCON Manager and the RADCON Lab Supervisor. (Bridge 103, mute telephone when not speaking. or X 6472/6463 TSC and X 6417 Lab).

6.

Ensure adequate RADCON staffing available for OSC support. (Dosimetry support, boardwriters, RWP support, HIS-20 operators)

7.

Locate all RADCON/CHEM personnel/teams currently and previously tasked and ensure that teams are identified on RADCON/CHEM Team Tracking Board for tracking and debriefing.

8.

Control eating and drinking in the OSC until habitability has been established.

9.

Ensure habitability surveys have been initiated for the of OSC, TSC, and Control Room.

10. Verify the minimum number of ANSI qualified RADCON personnel currently onsite and ensure that at least a total of eight (8) are available onsite within approximately 30 and at least 14 are available onsite within one hour of the SITE AREA EMERGENCY declaration [six (6) additional ANSI qualified RADCON personnel within the second 30 minutes]. The RADCON Lab Supervisor is counted as a 60 minute responder.

OPERATIONAL RESPONSIBILITIES Brief Emergency response Teams.

Provide and coordinate RADCON resources as necessary.

Continued Next Page

SI ACTIVATION AND OPERATION OF THE I EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 IPage 19 of 36 Date:

APPENDIX E Page 2 of 2 OSC RADCON SUPERVISOR CHECKLIST OPERATIONAL RESPONSIBILITIES Continued

"* Direct RADCON personnel in the RADCON Lab.

"* Ensure all RADCON Teams are coordinated and tracked through the OSC.

"* Ensure all Chemistry Teams are tracked through the OSC.

"* Ensure Emergency Response Teams have adequate RADCON/dosimetry coverage present during briefings and field support.

"* Brief the OSC Manager regularly on radiological conditions status (especially when radiological conditions are changing rapidly).

"* Brief the TSC RADCON Manager on radiological conditions status.

"* Provide assistance to the OSC Manager as needed.

"* Periodically verify habitability of TSC, OSC, and Control Room (especially during changing radiological conditions and at each emergency classification upgrade).

"* Recheck tracking board after accountability, after major changes in plant conditions and at emergency classification upgrades.

"* Log on to the Intergated Computer System (ICS).

"* Periodically brief the RADCON and CHEM Lab personnel on plant status.

"* Administer KI to emergency response teams according to EPIP-14 and inform the OSC manager. (Forward EPIP-14 KI Issue Report to the TSC RADCON Manager.)

"* Ensure outlying teams/groups (i. e., line crews, warehouse) have dosimetry and are being protected throughout the emergency.

"* Ensure emergency responders' exposures are maintained As Low As Reasonably Achievable (ALARA).

DEACTIVATION RESPONSIBILITY

"* Ensure all teams are accounted for and properly debriefed.

"* Ensure all logs and team briefing forms are completed and signed.

ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 20 of 36 Date:

APPENDIX F Page 1 of 1 OSC RADCON BRIEFER CHECKLIST INITIAL ACTIVATION OF THE OSC Time/

Initials

1. Swipe Accountability Reader.
2. Fill out the Organizational/Staffing Chart and obtain OSC badge.
3. Notify the OSC RADCON Supervisor of arrival.
4. Establish a log of activities and communications.
5. Locate all RADCON persons/teams currently and previously tasked and ensure assignment of Team Tracking Letter designator (AA, BB, etc.) for tracking and debriefing.
6.

Establish communications on the RADCON Bridge (x103). Mute telephone when not speaking.

OPERATIONAL RESPONSIBILITIES

"* Provide radiological technical assistance to the Briefing Teams.

"* Provide radiological conditions for inclusion in the analysis of the job performed by the OSC Briefing Team.

"* Assist with portions of the OSC Team briefings and debriefings including a debriefing from the team RADCON member.

"* Ensure each OSC team has a RADCON member present during briefings and field support as needed. (Dispatch with team if necessary)

"* Complete applicable portions of Appendix D.

"* Inform the OSC RADCON Supervisor of any unexpected radiological conditions encountered.

"* Write on the RADCON status boards, RADCON Team Tracking Board and ensure wind direction arrow is kept current.

"* Post radiological status information in the OSC Teams Staging Area.

"* Ensure emergency responders exposures are maintained ALARA.

I CTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 O

IPaNe 21 of 36 Date:

APPENDIX G Page 1 of 1 OSC OPERATIONS ADVISOR CHECKLIST INITIAL ACTIVATION OF THE OSC Time/

Initials

1. Swipe Accountability Reader.
2. Fill out the Organizational/Staffing Chart and obtain OSC badge.
3. Establish a log of activities and communications.
4. Establish communications with the TSC Operations Communicator and the Control Room Communicator for updates and to obtain Operations support (Dial 101 on telephone).
5. Locate all Operations personnel/teams currently and previously tasked and ensure each is tracked on the Operations tracking board.
6. Activate the ICS terminal to the affected unit.
7. Announce on the portable radio OPS channel "OSC AUOs Report to the OSC" (Repeat).
8. Ensure AUOs Swipe Accountability Reader at cafeteria entrance.

OPERATIONAL RESPONSIBILITIES Provide Operations personnel, advice, and plant status to support the entire OSC including briefing emergency response teams as needed (additional Operations personnel including AUOs can be used to assist).

"* Operate the ICS and provide plant operations advice to support the OSC.

"* Provide personnel for any operations actions that may be required while in the field.

"* Provide Operations personnel for damage control and repair teams.

"* Call-in additional AUOs/Operations personnel from offshift to support OSC activities, if requested.

"* Keep the TSC Operations Communicator and the Control Room Communicator appraised of the OSC Team priorities, assignments and activities while in the field.

"* Provide assistance to the OSC Manager as needed.

"* Maintain the OSC Operations Tracking Board.

"* Direct AUOs to maintain a log, and listen to the Operations Bridge (X102) to maintain a current awareness on plant status as needed.

"* Ensure OSC AUOs maintain accountability by swiping reader at cafeteria entrance.

I ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTERI Rev. 18 I Page 22 of 36 Date:

APPENDIX H Page 1 of 1 OSC FIRE OPERATIONS ADVISOR CHECKLIST INITIAL ACTIVATION OF THE OSC Time/

Initials

1. Swipe Accountability Reader.
2. Fill out the Organizational/Staffing Chart and obtain OSC badge.
3. Establish a log of activities and communications.
4. Establish communications with the Fire Operations Unit or the Fire Station.
5. Verify that Fire Operations, if not responding to a fire or medical emergency, has reported to the designated assembly area. (see Note below)
6. Ensure that Fire Operations if responding to a fire or medical emergency is assigned a Team Tracking Letter designator for tracking and debriefing and team has been entered on tracking board.
7. Ensure sufficient SCBA equipment and air bottles for response teams are available at established entry points.

Note:

If Fire Operations is not involved in the emergency response, dispatch a Fire Operator to the MCR to operate panel 0-M-29. This operator will be tracked on a tracking board and will be recalled at the discretion of the Fire Brigade Leader.

OPERATIONAL RESPONSIBILITIES

"* Monitor plant status and initiate fire response.

"* Initiate medical emergency response as needed.

"* Initiate and provide first response for Hazardous Material Containment.

"* Support Nuclear Security in searches of hazardous areas.

"* Provide assistance to the OSC Manager as needed.

"* Periodically brief Fire Operations Unit personnel of plant status.

"* Brief the team in the field by telephone/radio (if necessary) in order to decrease response time.

"* Request the SM to sound the fire alarm when needed to form the fire brigade or MERT.

"* Provide evaluations of the plant environment, recommendations to OSC Management on safety aspects of response team task.

"* Contact or call in the site/corporate Safety Specialist as necessary (see REND Section G).

I ACTIVATION AND OPERATION OF THE I EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 1Page 23 of 36 Date:

APPENDIX I Page 1 of 1 OSC LOG KEEPER CHECKLIST Time/

Initials

1.
2.
3.
4.
5.
6.

7.

Swipe Accountability Reader.

Fill out the Organizational/Staffing Chart and obtain OSC badge.

Notify the OSC Manager of arrival.

Establish a log of OSC activities and communications.

Notify Boardwriter to report to the OSC if requested.

Notify OSC Clerks to report to the OSC if requested.

Notify other staff as determined by the OSC Manager if requested.

OPERATIONAL RESPONSIBILITIES

"* Ensure the OSC Status Boards are continuously updated to reflect current plant conditions.

"* Ensure a log is maintained of all important OSC activities.

"* Collect and maintain all original copies of generated documents.

"* Following OSC deactivation forward all records to the Emergency Preparedness Manager.

"* Retain completed original of OSC team briefing/debriefing form, Appendix D.

I CTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 24 of 36 Date:

APPENDIX J Page 1 of 1 OSC CLERICAL STAFF CHECKLIST Time/

Initials

1. Swipe Accountability Reader.
2. Fill out the Organizational/Staffing Chart and obtain OSC badge.
3. Notify the OSC Manager of arrival.
4. Establish a log of activities and communications.
5. Ensure FAX is operable.

OPERATIONAL RESPONSIBILITIES

"* Uses call list to obtain staff for unfilled positions or replacement staff for shift turnovers as directed by the OSC Manager.

"* Assist in set-up and activation of the OSC.

"* Answer telephones.

"* Distribute forms.

"* Ensure OSC responders have signed the OSC Roster, Appendix S when requested.

"* Establish OSC Shift change (Use Appendix S page 2 of 2 and ask appropriate Fitness For Duty Questions).

"* Operates FAX machine.

"* FAX Emergency Response Teams summary to Main Control Room (FAX# 6208) and TSC (FAX# 6461) as necessary.

DEACTIVATION OF THE OSC

"* Transfers all log notes and other materials to the OSC Log Keeper.

"* Deactivate the OSC by returning all equipment, materials, and supplies to designated storage areas.

I I

ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 SI IPage 25 of 36 Date:

APPENDIX K Page 1 of 1 OSC SITE SECURITY ADVISOR CHECKLIST Time/

Initials

2.
3.
4.
5.
6.

7.

Swipe Accountability Reader.

Fill out the Organizational/Staffing Chart and obtain OSC badge.

Notify the OSC Manager of arrival.

Establish communications with Site Security Manager in the TSC (X 6469).

Establish a log of activities and communications.

Establish contact with the CAS.

Check status of emergency actions already in effect such as Accountability or Site Evacuation.

OPERATIONAL RESPONSIBILITIES

"* Coordinate activities of Site Security personnel in support of OSC activities.

"* Provide personnel to support Fire Operations in response to fire, medical emergency, or hazardous material containment.

"* Forms, briefs and dispatches search and rescue teams with Fire Operations support.

"* Provide assistance to the OSC (including briefing teams) as needed.

"* Ensure the OSC Manager/OSC Staff are aware of security hazards that could affect emergency response activities.

"* Ensure onsite Security personnel are apprised of radiological and plant conditions and associated hazards.

"* Ensure OSC Manager is aware of Security personnel locations and activities.

ACTIVATION AND OPERATION OF THE IEPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 26 of 36 Date:

APPENDIX L Page 1 of 2 OSC BRIEFER CHECKLIST INITIAL ACTIVATION OF THE OSC Time/

Initials

1. Swipe Accountability Reader.
2. Fill out the Organizational/Staffing Chart and obtain OSC badge.
3. Establish the "OSC Team Hotline" on position speaker phone by dialing X6406.
4. Establish a log of OSC activities and communications.
5. Establish contact with emergency team leaders.
6. Establish contact with Personnel Pool Manager.
7. If assigned a team that is already working in the field, establish contact with the team leader and ensure that they are fully briefed on their task and obtain status (report results to the OSC Manager).
8.

Verify and/or ensure the minimum (for the briefer's discipline) maintenance personnel have been called in as necessary,

[Mechanical Craft Electrical Craft Instrumentation Craft ONSITE HI 1 on shift R] 1 on shift CALL-IN LI 1 onsite within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />

[1]1 onsite within 30 minutes [] 1 onsite within 30 minutes CALL-IN 1 onsite within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> LI 1 onsite within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> TOTAL TOTAL:

2 Available onsite within 30 TOTAL 2 onsite within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> minutes and 2 onsite within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> TOTAL 3 onsite within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />

9. Verify that Maintenance Call List is available. As necessary call in additional maintenance personnel for your discipline.

OPERATIONAL RESPONSIBILITIES

"* Provide Mechanical, Electrical, and Instrument technical expertise.

Evaluate job conditions (including RADCON, Fire Operations, and Operational aspects of the task) and analyze the necessary precautions and methods best suited to safe performance of the task.

When possible combine Damage Assessment and Repair Teams.

Continued Next Page

ACTIVATION AND OPERATION OF THE IEPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 27 of 36 Date:

APPENDIX L Page 2 of 2 OSC BRIEFER CHECKLIST OPERATIONAL RESPONSIBILITIES Continued

"* Brief the OSC Teams based on the analysis of the job.

"* Track the OSC Teams while in the field.

"* Debrief the OSC Teams after completion of the Task.

"* Complete applicable portions of the OSC Team Briefing/Tracking and Debriefing Forms (Appendix D) and forward to OSC Manager.

I TIVATION AND OPERATION OF THE IEPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 28 of 36 Date:

APPENDIX M Page 1 of 1 OSC INDUSTRIAL SAFETY ADVISOR CHECKLIST Time/

Initials

1.

Swipe Accountability Reader.

2.

Fill out the Organizational/Staffing chart and obtain OSC badge.

3. Notify the OSC Manager of arrival.
4. Establish a log of activities and communications.
5. Notify the Assistant OSC Manager of arrival.
6. Notify Fire Ops Advisor of arrival.

OPERATIONAL RESPONSIBILITIES 9 Provide and coordinate Industrial Safety personnel needed to support the OSC.

0 Evaluate plant environment.

Provide recommendations to OSC management concerning the safety aspects of Emergency Response team tasks.

SQ ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev. 18 1 1 1Page 29 of 36 Date:

APPENDIX N Page 1 of 1 PERSONNEL POOL MANAGER CHECKLIST INITIAL ACTIVATION OF THE OSC Time/

Initials

1.
2.
3.
4.
5.

6.

Swipe Accountability Reader.

Fill out the organization/Staffing Chart and obtain OSC badge.

Establish a log of communications and activities.

Establish communications with the Assistant OSC Manager and/or Briefer.

Locate all teams previously tasked and ensure assignment of Team Tracking Letter designation for tracking and debriefing.

Ensure at least two teams are fully staged outside OSC in the cafeteria.

OPERATIONAL RESPONSIBILITIES

"* Form teams as requested by the OSC.

"* Manage personnel in the OSC Staging Area by:

1. Directing personnel to enter keycards into the Accountability Card Reader (at cafeteria entrance).
2. Directing responders (potential OSC teams) to check-in with the HIS-20 Operator.
3. Requiring potential/actual OSC Team members to dress out.
4. Maintain command and control (quiet/orderly) in OSC Staging Area.

"* Recover personnel for future members.

"* Ensure at least one team on standby at all times.

"* Validate qualifications of team members by completing the information on Appendix R, including remaining allowable dose (RAD)

I ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Da Page 30 of 36 Date:

APPENDIX 0 Page 1 of 1 DCRM Coordinator Time/

Initials

1.
2.
3.
4.
5.

6.

Swipe Accountability Reader.

Fill out the Organizational/Staffing chart and obtain OSC badge.

Notify the OSC Manager of arrival.

Establish a log of activities.

Log in on computer.

Notify the Assistant OSC Manager and/or Briefing Teams DCRM information is available on request.

OPERATIONAL RESPONSIBILITIES

"* Provide DCRM expertise as needed.

"* Provide drawings, documents, vendor manuals as requested.

"* Assist in OSC logistics as requested.

IACTIVATION AND OPERATION OF THE I EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 33 of 36 Date:

APPENDIX R Page 1 of 1 PERSONNEL POOL MGR. LOG CRAFTSMAN SECTION NAME SSN CRAFT HIS-20 OPERATOR SECTION HIS-20 OPERATOR:

TLD#

RAD SCBA RESP REP mRem QUAL QUAL TRAINED w YES w1 YES w1 YES

[I NO

[I NO El NO PERSONNEL POOL MGR SECTION CRAFT:

RAD ASSIGNED TO BRIEFER COMMENTS mRem*

TEAM #

(Same as above)

I I

+

j.

4-4

.1.

4

.1.

4 I

I i

  • RAD mRem can change aepenaing on asslgneu I rn WK.

r¶.PLJ Will I IU LU LJ

  • RAD mi em can change t

epenAing on ametaskibeforeassignm. enU Wto ao=tU teU U verified after completion of Assigned Team task before assignment to another team.

I i

z

IACTIVATION AND OPERATION OF THE EPIP-7 SON OPERATIONS SUPPORT CENTER Rev. 18 I Page 31 of 36 Date:

APPENDIX P Page 1 of 1 OSC Materials Coordinator Time/

Initials

1.
2.
3.
4.
5.
6.

7.

Swipe Accountability Reader.

Fill out the Organizational/Staffing chart and obtain OSC badge.

Notify the OSC Manager of arrival.

Establish a log of activities.

Log in on computer.

Establish contact Power Stores Personnel at X-7155.

Notify the Assistant OSC Manager or Briefing Teams material expediting information is available on request.

OPERATIONAL RESPONSIBILITIES

"* Provide coordination between Power Stores and OSC.

"* Provide materials as expeditiously as possible for emergency response.

"* Operate computer to determine materials availability.

"* Coordinate safety of warehouse personnel with the OSC Manager and RADCON Supervisor.

I ACTIVATION AND OPERATION OF THE IEPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 32 of 36 Date:

APPENDIX Q Page 1 of 1 Telephone Lists can be found in the REND TELEPHONE LIST REND LOCATION FAX Machine Numbers Section A Item # 8 CECC Numbers Section B Item # 1 TSC Numbers Section B Item # 9 OSC Numbers Section B Item # 10 Tennessee State Numbers Section E Item # 2 Communications Support Section I Medical Support Numbers Section K Meteorological Support Section L Numbers

(

I I

ACTIVATION AND OPERATION OF THE EPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 34 of 36 Date:

Appendix S Page 1 of 2 ERO ROSTER NAME (Print) SIGNATURE SSN ERO REPLACEMENT'S NOTIFIED PS ONAME AND FFD POSITION

____YES NO I

I t

1 I

1=

I t

1-I

1.

I I

t I

I f

I I

t 1

I I

  • I*

I

  • t I

1 4

I I

I I__

1 4

a i

I I

EP Records Coordinator:

I i

i i

I I

11 L-Date of OSC Activation:

4 4

+

I t1 I

1-4

+

I

4.

i 1

t-t i

i i

i

-i t

4.

+

+

I t

I I

4.

i i

i i

1

+

4

+

1 1

I 4

F I

+

I I

4 1

I

+

I I

I I1 i

i il i

il i

ii I

CTIVATION AND OPERATION OF THE IEPIP-7 SQN OPERATIONS SUPPORT CENTER Rev.18 Page 35 of 36 Appendix S Page 2 of 2 EMERGENCY RESPONDER NOTIFICATION FORM Fitness for Duty Person Calling Date Have you Are you Na eTime Time Consumed Name Called Needed Alcohol 5 Hrs.

Fit for Comments to Prior to Duty?

Report Report Time?

YES NO YES NO

ACTIVATION AND OPERATION OF THE EPIP'7 SQN OPERATIONS SUPPORT CENTER Rev.18 S

CPaEe 36 of 36 SOURCE NOTES REQUIREMENTS STATEMENT SOURCE DOCUMENT NP Radiological Emergency Plan (NP-REP)

IMPLEMENTING STATEMENT

TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-14 RADIOLOGICAL CONTROL RESPONSE Revision 15 QUALITY RELATED PREPARED: W. P. Brooks RESPONSIBLE ORGANIZATION: Emergency Preparedness APPROVED BY: John Casey EFFECTIVE DATE: 9-1-2000 LEVEL OF USE: REFERENCE REVISION DESCRIPTION: Intent Change: Revision added Chemistry responsibility to ensure minimum staffing level and need for additional call-in staff. Revised to reflect KI package change. Remove the RCSS role as TSC RADCON Manager. Added further directions for Chemistry on determining release and dose rates.

TABLE OF CONTENTS Section Title Page Table of Contents.............................................................................

2 1.0 P U R P O S E..............................................................................................

3

2.0 REFERENCES

3 3.0 INSTRUCTIONS...............................................................................

3 3.1 Initiation of an Alert...........................................................................

3 3.2 TSC Radcon Manager Responsibilities............................................

4 3.3 Activation of the Operations Support Center......................................

5 3.3.1 OSC RADCON Supervisor................................................................

5 3.4 Radcon Lab Responsibilities..............................................................

6 3.4.1 Designated RCSS.............................................................................

6 3.5 Chemistry Response.........................................................................

7 3.5.1 Designated Chemistry Personnel......................................................

7 3.6 General Response.............................................................................

7 3.6.1 All RADCON Personnel.....................................................................

7 3.7 Issuance of Potassium Iodide (KI)......................................................

9 3.8 Use of Silver Zeolite Cartridges.......................................................

10 3.9 Personnel Decontamination and Facilities......................................

10 APPENDIXES Appendix A, Inplant Radiation Monitors...........................................

11 Appendix B, Potassium Iodide Issue Report.................................... 12 Appendix C, Occupational Thyroid Dose From Inhalation of Iodine-1 31................................................................

13 Appendix D, Methodology for Projecting TEDE................................ 14 Appendix E, Fitness For Duty Program Admin Call-In Sheet.......

24 SOURCE NOTES..............................................................................

25

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 3 of 25 1.0 PURPOSE To describe the actions and responsibilities of Sequoyah's Radiological Control (RADCON) and Chemistry Sections in the event of a radiological emergency.

2.0 REFERENCES

2.1 Interface Documents A.

EPIP-7, "Activation and Operation of the Operations Support Center (OSC)"

B.

EPIP-8, "Personnel Accountability and Evacuation" C.

CECC-EPIP-9, "Emergency Environmental Radiological Monitoring Procedures" D.

RCI-20, "Radioiodine Monitoring During Accident Conditions" E.

0-TI-CEM-030-030.0, "Manual Calculation of Plant Gas, Iodine, and Particulate Release Rates for Offsite Dose Calculation Manual (ODCM)

Compliance" 2.2 Developmental Documents A.

EPIP-6, "Activation and Operation of the Technical Support Center" B.

EPIP-10, "Medical Emergency Response" 3.0 INSTRUCTIONS 3.1 Initiation of an Alert Upon initiation of an Alert, Site Area Emergency, or General Emergency, the RADCON and Chemistry Sections will assemble a specific number of personnel as described below.

A. During normal and off-shifts a Radiological Emergency Plan (REP) activation will be announced over the public address system or the emergency sirens may be activated and the Emergency Paging System (EPS) will be activated. The RADCON Lab will be contacted by the Shift Manager or. designee. The RADCON Shift Supervisor (RCSS) will determine the number of ANSI qualified RADCON personnel currently onsite and shall ensure that at least a total of eight (8) (not counting him/herself) are available onsite within approximately 30 minutes and at least fourteen (14) (counting him/herself if qualified) are available onsite within one hour [six (6) additional ANSI qualified RADCON personnel within the second 30 minutes]. Call ins shall be in accordance with Appendix E ensuring that Fitness For Duty questions are asked and response documented. Additional RADCON support personnel may need to be called in using Appendix E.

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 4 of 25 3.1 Initiation of an Alert (Continued)

B. The Chemistry Lab will be contacted by the Shift manager or designee.

The Chemistry Shift Supervisor (CSS) will determine the number of chemistry technicians currently onsite and shall ensure that at least a total of two (2) chemistry technicians (counting the CSS if qualified) are available onsite within approximately 30 minutes and at least a total of three (3) are available onsite within one hour if the Offsite Dose Assessment function has not been assumed by other staff. Call ins shall be in accordance with Appendix E ensuring that Fitness For Duty questions are asked and response documented. Additional (above the minimum required staffing) Chemistry support personnel may need to be called in, use Appendix E to document.

C. Chemistry Shift Supervisor (CSS) shall perform Dose Assessment in accordance with Appendix D when notified by the Shift Manager or Site Emergency Director.

D. When the OSC is staffed by the OSC Radcon Supervisor (OSC RCS), the RCSS shall assemble two survey teams and dispatch them to the OSC for briefings and dressout.

E. The TSC and OSC are activated during an Alert, Site Area Emergency or General Emergency.

F. All response teams, except as listed in EPIP-7, will be dispatched from the OSC and should have a RADCON representative as a member. If the Fire Brigade, Medical Emergency Response Team or Damage Control Team is already responding they are not required to return to the OSC to be dispatched, but shall be tracked and briefed by the OSC in accordance with EPIP-7, Section 3.2.5. RADCON survey teams may be dispatched from the lab but shall be tracked by the OSC.

G. All response teams shall be debriefed by the OSC after completing their team assignment.

3.2 TSC RADCON Manager (RCM) Responsibilities The responsibilities and duties of the TSC RADCON representative are detailed in EPIP-6. A summary of the details associated with these responsibilities are provided below.

A. The primary responsibilities of the RCM are to direct onsite radiological surveillance activities, assess inplant and onsite radiological conditions and to make this information available to the Site Emergency Director (SED), the Central Emergency Control Center (CECC) and other TSC personnel as necessary, to support and coordinate protective actions.

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 5 of 25 3.2 TSC RCM Responsibilities (Continued)

B. To facilitate the evaluation of in-plant radiological conditions and to establish trends. Appendix A lists the radiation monitors [i.e., Area Radiation Monitors (ARMs) and Continuous Air Monitors (CAMs)] that may be used.

C. The RCM, together with other TSC personnel, evaluates plant conditions to anticipate future developments and formulates corrective action plans to address actual or postulated conditions. The RCM renders recommendations and advises the SED on radiological issues.

D. The TSC RCM communicates with the CECC Plant Radiological Communicator, providing pertinent in-plant radiological data so that appropriate offsite protective actions can be implemented in a timely manner.

E. The TSC RCM maintains communications with the OSC RADCON Supervisor (RCS), constantly evaluating inplant radiological conditions, recommending and identifying the need for radiological surveys.

F. When directed by the Site Emergency Director, establishes a contamination checkpoint for personnel and vehicles leaving the site.

G. Issues Potassium Iodide in accordance with 3.7 of this procedure.

3.3 Activation of the Operations Support Center 3.3.1 OSC RADCON Supervisor (RCS)

The OSC RCS is a trained and qualified individual designated by the RADCON Manager. The approved alternates are listed in the Call List.

The responsibilities and duties of the OSC RCS are detailed in EPIP-7. A summary of the details associated with these responsibilities are provided below:

A.

The primary responsibilities of the OSC RCS are to ensure that, when required, a RADCON tech accompanies each team; detailed radiological briefings are provided to OSC team members; and the OSC Director and OSC Staff are knowledgeable of in-plant radiological conditions. He also serves as the interface between the TSC and the RADCON Lab.

B.

Maintains awareness of in-plant radiological conditions and related parameters and reports those conditions to the TSC RCM.

C.

Communicates directly with the TSC to coordinate inplant response activities. Assists in the development of briefing notes, and radiological condition updates.

D.

In conjunction with the TSC, identifies the need, location, and extent of radiological surveillance activities required to assess or mitigate the consequences of the accident.

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 6 of 25 3.3 Activation of the Operations Support Center (Continued)

E.

All teams are dispatched from the OSC except as described in paragraph 3.1..F. The OSC RCS is responsible for ensuring that personnel making entries into the plant, including survey teams, are aware of any special precautions, plant conditions, or requirements and are assigned team tracking numbers.

F.

Ensure that OSC Team members are instructed to note their Remaining Allowable Dose (RAD) upon exiting the RCA and to provide their current RAD to the Personnel Pool Manager when they return to the OSC. The Personnel Pool Manager will update their RAD in his log.

Repetitive exposures of workers should be restricted by substituting other qualified personnel for team members, on reentry, to distribute exposures. As a minimum, OSC Team members' RAD shall be verified prior to entry into plant areas under a Site Area Emergency or General Emergency.

G.

Report all survey results as soon as possible to the TSC so they can make recommendations to the proper agencies to initiate any required protective actions.

3.4 RADCON Lab Responsibilities 3.4.1 Designated RCSS The designated RCSS is responsible for managing the activities of the RADCON lab.

A.

In the event of an Alert, Site Area Emergency, or General Emergency the OSC may become the staging area for entries into affected plant areas.

B.

A RADCON Representative should accompany all emergency response teams when initial entries are made into affected plant areas.

C.

The RCSS is responsible for ensuring that adequate numbers of RADCON representatives are available, in accordance with paragraph 3.1.A, to support emergency activities and that two (2) survey teams are dressed out and ready for briefing.

D.

The RCSS is responsible for preparing and designating an onsite RADCON environmental monitoring team. Team members will prepare and operate the monitoring van in accordance with CECC-EPIP-9.

Record all survey results. If results indicate offsite contamination, the survey areas may need to be expanded. Obtain further instructions and perform required surveillance.

E.

The RCSS will dispatch survey teams to assembly areas, the OSC and TSC to evaluate radiological conditions, monitor radiation levels as conditions dictate and ensure updated habitability surveys are performed. These survey teams will continuously monitor contamination levels as needed both on personnel and floor/equipment areas and implement corrective actions (e.g., decontamination or zoning) as necessary.

3.4 RADCON Lab Responsibilities (Continued)

F.

The RCSS will monitor the lab for habitability and will coordinate evacuation activities to the alternate lab location if warranted.

G.

The RCSS will ensure all survey teams are tracked by the OSC.

H.

The RCSS will ensure DAC-hour exposure when available and RAD calculations are completed and reported to the OSC RCS.

I.

The RCSS will ensure respiratory protection is issued as needed.

J.

Ensure that HIS-20 entries are properly made and that all dosimetery is properly issued, collected and identified for each worker. Make arrangements to have TLD badges read, as soon as possible.

3.5 Chemistry Response 3.5.1 Designated Chemistry Personnel The designated Chemistry personnel are responsible for managing the activities of the Chem Lab.

A.

The CSS is responsible for ensuring that adequate numbers of chemistry personnel are available in accordance with paragraph 3.1.B.

B.

In the event of an alert, site area emergency or a general emergency, due to a radiological release, a plant total gas release rate (source term) may need to be determined in accordance with Appendix D of this procedure.

C.

Upon request of the Shift Manager (SM), Chemistry personnel will determine the plant source term that shall be reported to the SM for classification purposes and protective action recommendations to the state.

D.

The source term shall be reported to the CECC dose assessment staff, when the CECC is manned, for input into a preliminary dose assessment.

E.

Projected dose at the site boundary, 2 miles and 5 miles may be determined in accordance with Appendix D.

3.6 General Response 3.6.1 All RADCON Personnel All RADCON personnel should comply with the following:

A.

The following precautions should be considered during emergency incidents.

Anticipated Conditions Protective Considerations

1.

Noble gas concentrations If fuel damage has occurred

> 1 x 10- pci/cc or is suspected, respirators should be worn (ensuring TEDE is ALARA).

2.

Iodine concentrations SCBA

> 10 DAC

3.

Particulate concentrations Particulate mask or SCBA

> 10 DAC (SCBA recommended if > 50 DAC).

4.

Standing water> 1" Rain suits, rubber boots, Extremity dosimetry.

B.

If it is necessary to evacuate the RADCON lab, then the personnel stationed in the lab will secure the equipment listed in EPIP-17, Appendix C. This equipment will be brought to the alternate lab by RADCON. This list is a minimum and if time permits and manpower allows, then efforts should be made to transport additional equipment and supplies to the alternate lab. The SED shall be informed when it becomes necessary to evacuate the 690' RADCON lab. If this situation develops, a RADCON Lab will be established adjacent to the TSC.

This alternate lab should be set-up in the switchgear room, El 732' or other suitable area, as emergency conditions allow (the TSC RCM is responsible for making this determination). This lab will be equipped with necessary supplies and instrumentation needed to perform minimum radiological surveys and analysis required during an emergency.

C.

If severe radiological conditions are suspected, the "Buddy System" shall be utilized.

D.

If time is available, an RWP should be issued to cover entry teams; if not, suitable protective measures should be taken in accordance with established procedures.

E.

When accountability is initiated RADCON personnel shall secure work in a safe manner and proceed to the 690' RADCON Lab and/or other designated assembly areas. An accountability will be made in accordance with EPIP-8. RADCON representatives may be sent to the assembly areas to determine if any workers were in the affected plant areas at the time of the event. These people shall be separated from other plant workers and personnel contamination surveys should be initiated for all personnel.

F.

Radiation monitor readings may be obtained from Control Room personnel or an individual may be sent to the Control Room to record the necessary values. Readings are obtained from panels 0-M-12 and 1/2-M-30 and recorded on Appendix A. As radiation monitor readings are updated, the OSC RCS ensures labs will be contacted to ensure that their status boards are made current.

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 9 of 25 3.6 General Response (Continued)

G.

As reports become available regarding the details of the emergency, RADCON personnel shall prepare all necessary equipment needed during recovery and report to the OSC as needed to ready survey or damage control team(s) for entry into the affected area(s).

Upon notification from the RCS in the OSC, the survey team(s) may proceed to the specified area. It should be noted that depending on the type of accident, this initial survey may not be performed until hours or perhaps even days after the event. In this case, procedures may be developed describing the reentry steps to be followed. Other essential personnel may be required to assist in reentry activities.

3.7 Issuance of Potassium Iodide (KI)

A.

If a person's projected cumulative dose to the thyroid from inhalation of radioactive iodine might exceed 10 rem, the exposed person should be started immediately on a dose regimen of KI. Authorization to issue KI is the responsibility of the TSC RCM. He shall inform the SED prior to issuance. Anyone authorized to administer KI shall be familiar with the Food and Drug Administrations approved package insert and ensure that each proposed recipient is similarly informed. The initial dose of KI should not be delayed and those who begin therapy should continue the 10-day course of KI unless their thyroid dose is determined not to have exceeded 10 rem. An adequate supply of KI is stored onsite. It is supplied in blister packs which contain a full 10-day dose regime.

Follow dosage schedules as outlined on the package.

B.

Projected cumulative doses to the thyroid from inhalation of radioactive iodine can be estimated using Appendix C "Occupational Thyroid Dose from Inhalation of 1-131."

C.

Potassium iodide is stored in the OSC. KI has an approved shelf-life with the expiration date listed. To ensure that the KI supply is valid, these dates will be inspected and the KI replaced as necessary.

D.

A copy of the Food and Drug Administration approved instructions shall accompany issue of KI. Dosage schedules and other pertinent information are outlined on the package insert and should be followed closely.

E.

The issuing agent shall complete the Potassium Iodide Issue Report (Appendix B) for KI issued. A copy of this report will be routed to the TSC RCM in a timely manner.

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 10 of 25 3.8 Use of Silver Zeolite Cartridges A.

During accident conditions noble gas concentrations may be present in significant quantities both inplant and offsite. The collection of these noble gases on charcoal cartridges during iodine sampling will interfere with subsequent iodine analysis.

B.

Silver zeolite cartridges are provided for use during periods of high noble gas concentrations. RCI-20 describes the utilization of and lists hazards associated with Silver Zeolite cartridge use.

3.9 Personnel Decontamination and Facilities A.

RADCON will use established procedures for personnel decontamination. Decontamination facilities are available for use by Sequoyah personnel.

B.

Contaminated personnel are normally decontaminated at the 690' elevation decon facility. This facility is equipped with a wash sink, shower, and all necessary supplies. These supplies include various decontamination agents and soaps, towels, clean clothing, and other miscellaneous supplies.

Contaminated personnel requiring offsite medical attention are treated at the agreement hospital(s). The hospital has a complete staff that has been trained in the handling and care of contaminated patients.

Emergency Preparedness maintains a supply cabinet at the hospital's Emergency Room which contains posting materials and various other supplies. EPIP-10 contains guidelines for RADCON assistance during a medical emergency or hospital treatment.

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 11 of 25 APPENDIX A Page 1 of 1 IN PLANT RADIATION NIONITORS Affected Unit DESCRIPTION IDENTIFIER INITIAL UPDATED READINGS READING DATE TIME READING PANEL 0-M-12 SPENT FUEL PIT AREA RADMON 1/2-RM-90-1 mRlhr SFP AREA RADMON O-RM-90-5 mR/hr CCS HXS AREA RADMON 1/2-RM-90-6 mR/hr HOT SAMPLE ROOM AREA RADMON 1/2-RM-90-7 mR/hr AFW PUMPS AREA RADMON 1/2-RM-90-8 mR/hr CNDS WASTE TKS AREA RADMON O-RM-90-9 mR/hr CVCS BD AREA RADMON 1/2-RM-90-1 0 mR/hr CNTMT SPRAY AND RHR PUMPS O-RM-90-11 mR/hr RADMON CNTMT UPPER COMPT RADMON-1/2-RM-90 TOTAL GAS 112B CPM CNTMT LOWER COMPT RADMON TOTAL GAS 112-RM-90 106B CPM PANEL 112-M-30 1/2-RI-90-400 Low Range 1iCI/cc SHIELD BLDG VENT MON RAD Mid Range j.CI/cc INDICATOR High Range

ýiCI/cc Effluent

_.CI/sec SAMPLE ROOM POST ACCIDENT 1/2-RM-90-280 AREA MONITOR mR/hr RHR POST ACCIDENT AREA MONITOR

-LO RNGE 1/2-RM-90-290 mR/hr

-HI RNGE 1/2-RM-90-291 mR/hr

-LO RNGE 1/2-RM-90-292 mR/hr

-HI RNGE 1/2-RM-90-293 mR/hr Route to EP Manager Data Taker Signature Time Date

RADIOLOGICAL CONTROL RESPONSE APPENDIX B Page 1 of 1 POTASSIUM IODIDE ISSUE REPORT NAME SS NUMBER EXPOSURE PERIOD TIME OF I NUMBER INFORMATION ISSUED BY DATE INITIAL KI OF DOSES INSTRUCTIONS ISSUED DOSE ISSUED ISSUED

1.

I I

I t

I

i.

i I i i

1 I

I I

t t

i 4

i i

t i

T 1

1.

1

+

I I

I I

I t

I I

I I

I

+

I I

I

'1 1

t I__

I i

i i

i Ii I-I

  • 1 I

t I

1.

I I

I I

1 I.

I

+

I I

4 1

1 I

I I

V 4

1 1

I t

I I

4 4

4 1

1 1

t i

i 1

i t

-i I

I I

I I

I I

I 1

1 1

moute to r-mergency repaey u,e..au SQN

/

I I

EPIP-1 4 Rev. 15 Page 12 of 25 I

i i

i I

i i

(sjnoq) ew!lj ainsodx3l 0M.

L.

wei Oý-+

Wei' 09 0---

I.................

3 I...............................

I...........................................

I.............

r.................30-300"*

gO-00" I.

LO-00" I 0

0 CD 90-300 L=

0 170-300*

SO-3O0" c VIo

o uoeieqetui wotjl esoo ploiAqj. IeuO!edflOOo I,.o s Oed o XIaN3ddV 9Z

-10 Cl:

Nd t'L-dId3 HSNOdSHU iQUINQO 1VOID1OIGVUa NOS 001-L0 I

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 14 of 25 APPENDIX D Page 1 of 10 METHODOLOGY FOR PROJECTING TEDE A. TO DETERMINE THE PROJECTED OFF-SITE TEDE AND THYROID CDE.

1. If there is a release to the environment from a ruptured Steam Generator (via atmospheric relief, safety valve, or un-isolated line break outside of containment) then go to Step 4 below.
2. From the effected unit ICS Main Menu click on "GROUP DISP MENU" then click on "DOSE ASSESSMENT" (Fig. 2) and read the TEDE and THYROID CDE dose rate in REM at the SITE BOUNDARY (EAB), 2 MILES, and 5 MILES (Fig. 3).

PROVIDE THESE VALUES TO THE SM/SED TO DETERMINE EVENT CLASSIFICATION AND PROTECTIVE ACTION RECOMMENDATIONS.

NOTE: If the "DOSE ASSESSMENT" feature is not working then projected TEDE and THYROID CDE must be manually calculated. The following parameters will be required to determine TEDE and THYROID CDE at the desired distance: Plant Total Gaseous Rad Release Rate (Source Term), Wind Speed and, Atmospheric Stability Class. Revisions to the factors or any referenced software in this appendix requires revalidation of the calculations by Chemistry.

3. The "PLANT TOTAL GASEOUS RAD RELEASE" may be determined as follows: From the effected unit ICS Main Menu type "SHOW RAD025. Enter the value in the blank in (page
16) C.1.c.

PROVIDE THIS VALUE TO THE SM/SED TO DETERMINE EVENT CLASSIFICATION AND PROCEED WITH SECTION B.

OR

4. Notify the Chemistry Shift Supervisor to complete Appendix A (if RAD025 is not available) or Appendix G (if RAD025 is available) of 0-TI-CEM-030-030.0. Enter the release rate pCi/sec value in the blank in (page 16) C.1.c.

PROVIDE THIS VALUE TO THE SM/SED TO DETERMINE EVENT CLASSIFICATION AND PROCEED WITH SECTION B.

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 15 of 25 APPENDIX D Page 2 of 10 B. DETERMINE THE WIND SPEED AND ATMOSPHERIC STABILITY CLASS.

1. On the affected Unit ICS Main Menu click on "SECONDARY MIMICS" button.
a. On the Secondary Mimics page click on "MET DATA" button. (Figure 4)
b. From the "MET-TOWER LINK" page (Figure 5) or the "FRED MET DATA" page (Figure 6) record the 46 Meter Ave. Wind Speed (15 Min) = _

mph, Enter in blank in C.1.a.

NOTE: If not available, call the National Weather Service in Morristown, TN, (423) 586-8400 for wind speed. Enter in blank in C.l.a.

c. From the "FRED MET DATA" page record the Stability Class 46-10 Mtr 15 Min Avg. =

(e.g., A, B, C, etc.). This is the atmospheric stability class. Enter in blank in C.l.b.

2. If the Atmospheric Stability Class is not displayed then determine it as follows:
a. Return to the "MET-TOWER LINK" page (Figure 5) and click on the "STABILITY DELTA-T's" button.
b. From the "STABILITY DELTA-T's" page (Figure 7) record the "VERTICAL AIR TEMP DELTA T 46-10 METERS (INSTANTANEOUS)"_=

DEG F and refer to the table below.

OR

["46 METER AIR TEMP (INSTANTANEOUS)"_=

DEG F] minus ["10 METER AIR TEMP (INSTANTANEOUS)" =

DEG F]=

DEG F and refer to the table below.

c. Using the Atmospheric Stability Class Table below with the DEG F value from 2.b. above, determine the stability class. Atmospheric Stability Class =

Enter in blank in C.1.b.

ATMOSPHERIC STABILITY CLASS TABLE DEG F CLASS

< minus 1.3 uF A

> minus 1.3 < minus 1.2 0F B

> minus 1.2 < minus 1.00F C

> minus 1.0 < minus 0.40F D

> minus 0.4 < 0.9°F E

> 0.9 < 2.60 F F

> 2.6 OF G

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 16 of 25 APPENDIX D Page 3 of 10 C. DETERMINE THE PROJECTED TOTAL DOSE EQUIVALENT (TEDE) AT THE SITE BOUNDARY, 2, OR 5 MILES.

1. Obtain the appropriate meteorological and release rate data and enter below:
a. Wind Speed =_

mmi/hr from B.1.b.

b. Stability Class =

from B.1.c or B.2.c.

c. Plant Total Noble Gas Release Rate =

ItCi/SEC from A.2 or A.3.

2. From the TEDE FACTOR TABLES, (Figure 1), find the appropriate table for the stability class. Then, find the desired distance range in miles on the vertical scale and the wind speed on the horizontal scale. Record the corresponding TEDE FACTOR in 3 below. For wind speeds that fall between the values in the table, default to the lower wind speed.

This is the more conservative value.

3.

0.62-1.99 miles TEDE FACTOR =

rem/hour per p.Ci/sec.

2.00-4.99 miles TEDE FACTOR =

rem/hour per pCi/sec.

5.00-10.0 miles TEDE FACTOR =

rem/hour per pCi/sec.

4. Obtain an estimate of the release duration (t)=

hour(s).

5. TEDE = [TEDE FACTOR(@ desired distance)]x(Plant Total Noble Gas Release Rate)x(t)=

REM @ 0.62-1.99 miles. (Site Boundary)

REM @ 2.00-4.99 miles. (2 Miles)

REM @ 5.00-10.0 miles. (5 Miles)

6. If Type II release due to fuel overheat or melt, Then multiply the calculated dose in step 5 by 3.2.

Step 5 x 3.2 =

REM @ 0.62-1.99 miles. (Site Boundary)

Step 5 x 3.2 =

REM @ 2.00-4.99 miles. (2 Miles)

Step 5 x 3.2 =

REM @ 5.00-10.0 miles. (5 Miles)

7. Compute the Thyroid CDE at each distance by multiplying the TEDE values by a factor of ten. (CDE = TEDE x 10)

REM @ 0.62-1.99 miles. (Site Boundary)

REM @ 2.00-4.99 miles. (2 Miles)

REM @ 5.00-10.0 miles. (5 Miles)

8. PROVIDE STEP 5 OR 6 AND STEP 7 VALUES TO THE SM/SED TO DETERMINE EVENT CLASSIFICATION AND PROTECTIVE ACTION RECOMMENDATIONS.

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 17 of 25 APPENDIX D Page 4 of 10 FIGURE 1 TEDE FACTOR TABLES TEDE FACTOR (rem/hr per gCi/s) FROM A GROUND-LEVEL RELEASE Stability Class A Wind Speed (mi/h) miles 2.2 mi/h 4.5 mi/h 6.7 mi/h 8.9 mi/h 11.2 rni/h 13.4 mi/hJ15.7 mi/h 17.9 mi/h 20.1 mi/h 22.4 mi/h 0.62-1.99 5.1E-10 2.5E-10I 2.OE-10 1.5E-10 1.OE-10 9.1E-11 8.1E-11 7.1E-11 6.1E-11 5.1E-11 2.00-4.99 1.7E-10 8.7E-11 7.OE-11 5.2E-11 3.5E-11 3.1E-11 2.8E-11 2.4E-11 2.1E-11 1.7E-11 5.0-10.0 6.3E-11 3.4E-11 2.8E-11 2.2E-11 1.6E-11 1.4E-11 1.3E-11 1.1E-11 9.5E-12 7.9E-12 Stability Class B Wind Speed (mi/h) miles 2.2 mi/h 4.5 mi/h 6.7 mi/h 8.9 mi/h 11.2 mi/h 13.4 mi/h 15.7mi/h 17.9 mi/h 20.1 mi/h 22.4 mi/h 0.62-1.99 2.3E-09 1.2E-09 9.4E-10 7.1 E-1 0 4.7E-10 4.3E-10 3.8E-10 3.3E-10 2.8E-10 2.3E-10 2.00-4.99 2.3E-10 1.2E-10 9.2E-11 6.8E-11 4.5E-11 4.1E-11 3.6E-11 3.2E-11 2.7E-11 -2.3E-11 5.0-10.0 8.2E-11 4.6E-11 3.7E-11 2.9E-11 2.1E-11 1.9E-11 1.7E-11 1.5E-11 1.2E-11 1.0E-11 Stability Class C Wind Speed (mi/h) miles 2.2 mi/h 4.5 mi/h 6.7 mi/h 8.9 mi/h 11.2 mi/h 13.4 mi/h 15.7 mi/h 17.9 mi/h 20.1 mi/h 22.4 mi/h 0.62-1.99 6.8E-09 3.5E-09 2.8E-09 2.1E-09 1.4E-09 1.2E-09 1.1E-09 9.6E-10 8.2E-10 6.8E-10 2.00-4.99 9.3E-10 4.5E-1 0 3.7E-10 2.8E-10 1.9E-10l 1.7E-10 1.5E-10 1.3E-10 1.1E-10 9.3E-11 5.0-10.0 1.6E-10 9.1E-11 7.5E-11 5.8E-11 4.2E-11 3.7E-11 3.3E-11 2.9E-11 2.5E-11 2.1E-11 Stability Class D Wind Speed (mi/h) miles 2.2 mi/h 4.5 mi/h 6.7 mi/h 8.9 mi/h 11.2 mi/h 13.4 mi/h 15.7 mi/h 17.9 mi/h 20.1 mi/h 22.4 mi/h 0.62-1.99 2.0E-08 1.OE-08 8.OE-09 6.OE-09 4.1E-09 3.6E-09 3.2E-09 2.8E-09 2.4E-09 2.OE-09 2.00-4.99 3.3E-09 1.7E-09 1.4E-09 1.OE-09 6.8E-10 6.2E-10 5.5E-10 4.8E-10 4.1E-10 3.5E-10 5.0-10.0 6.9E-10 3.9E-10 3.2E-10 2.5E-10 1.8E-10 1.6E-10 1.4E-10 1.2E-10 1.OE-10 8.7E-11 Stability Class E Wind Speed (mi/h) miles 2.2 mi/h 4.5 mi/h 6.7 mi/h 8.9 mi/h 11.2 mi/h 13.4 mi/h 15.7 mi/h 17.9 mi/h 20.1 mi/h 22.4 mi/h 0.62-1.99 3.5E-08 1.7E-08 1.4E-08 1.OE-08 7.OE-09 6.3E-09 5.6E-09 4.9E-09 4.2E-09 3.5E-09 2.00-4.99 6.6E-09 3.3E-09 2.7E-09 2.OE-09 1.3E-09 1.2E-09 1.1E-09 9.3E-10 7.9E-10 6.6E-10 5.0-10.0 1.5E-09 8.2E-10 6.7E-10 5.3E-10 3.8E-10 3.4E-10 3.1E-10 2.7E-10 2.3E-10 1.9E-10 Stability Class F Wind Speed (mi/h) miles 2.2 mi/h 4.5 mi/h 6.7 mi/h 8.9 mi/h 11.2 mi/h 13.4 mi/h 15.7 mi/h 17.9 mi/h 20.1 mi/h 22.4 mi/h 0.62-1.99 6.6E-08 3.3E-08 2.7E-08 2.OE-08 1.3E-08 1.2E-08 1.1E-08 9.3E-09 8.0E-09 6.6E-09 2.00-4.99 1.5E-08 7.6E-09 6.1 E-09 4.6E-09 3.1E-09 2.8E-09 2.5E-09 2.2E-09 1.8E-09 1.5E-09 5.0-10.0 3.8E-09 2.1E-09 1.7E-09 1.3E-09 9.6E-10 8.6E-10 7.7E-10 6.7E-10 5.7E-10 4.7E-10 Stability Class G Wind Speed (mi/h) miles 2.2 mi/h 4.5 mi/h 6.7 mi/h 8.9 mi/h 11.2 mi/h 13.4 mi/h 15.7 mi/h 17.9 mi/h 20.1 mi/h 22.4 mi/h 0.62-1.99 1.5E-07 7.2E-08 5.7E-08 4.3E-08 2.8E-08 2.5E-08 2.3E-08 2.OE-08 1.7E-08 1.4E-08 2.00-4-99 3.7E-08 1.6E-08 1.3E-08 9.5E-09 6.3E-09 5.6E-09 5.OE-09 4.4E-09 3.8E-09 3.2E-09 5.0-10.0 9.4E-09 5.OE-09 4.1E-09 3.2E-09 2.3E-09 2.OE-09 1.8E-09 1.5E-09 1.3E-09 1.1E-09

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 18 of 25 APPENDIX D Page 5 of 10 FIGURE 2 GROUP DISPLAY MENU

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 19 of 25 APPENDIX D Page 6 of 10 FIGURE 3 DOSE ASSESSMENT SELECT FUINC.

KEY OR TUR*h-*.0 C1E 1

i)OOSL SQN - DOSE ASSESSMLN1 DATE:

5 TIME: I0 It, t

LL Q

h)

U 1NPUITS:

VALUE UNITS QUALITY OY2307A EDS METDATA 45M 15MIN AVG WIND SPEED 16 MI/HR GOOD OY2301A EDS METDATA 45M 15MIN AVG WIND DIRECTION (FROM)

  • .7i DEG OY2319A EDS 15MIN STABILITY CLASS u

0 RAD025 ICS RECALCULATE TOTAL NOBLE GAS RELEASE RATE uCi/s 00 IODINE

.001

  • TOTAL NOBLE GAS RELEASE RATE 2.95e.-01 uCils voori OUTPUT:

HOURLY DOSE TEDE (Rem)

THYROID CDE (Rem)

,,T-,-

If,, fv

-7 77 06 7.47 0?

3MI DUUMMAI 2 MILE:

5 MILE:

0. loc, ýU0
0. OOel-J UEU

.. O5... L...

2/,n~i,.

SIC Lt.L-L 15 RQIM/&,'CK CPU A rWnDE 1.

_ _ _

  • _~~~~-

Ld w

RECALCULATE I

K. l 1.

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 20 of 25 APPENDIX D Page 7 of 10 FIGURE 4 SECONDARY MIMICS PAGE

SQN RADIOLOGICAL CONT ROL RESPONSE EPIP-14 Rev. 15 Page 21 of 25 APPENDIX D Page 8 of 10 FIGURE 5 MET-TOWER LINK PAGE m -

METEl*[9. 4*

9, D-TA Ma rGphs reds p10-SEP-1996 13:35:24 SELECT FUNC.

KEY OR TURN-ON CODE METUATA >

Q MET-TOWER LINK INSTANTANEOUS 15 MIH AVG AIR TEMPERATURE:

73.27 DEG F 73.01 WIND SPEED:

4.0 MPH 4.0 WIND DIRECTION FROMt 31.4 DEGREES 26 AIR TEMPERATURE:

WIND SPEED:

WIND DIRECTION FROM:

AIR TEMPERATURE:

WIND SPEED:

WIND DIRECTION FROM:

74.04 DEG F 73.73 5.0 MPH 4.0 20.4 DEGREES 22 74.97 DEG F 4.1 MPH 43.5 DEGREES RAINFALL LAST HOUR: 0.0 INCHES LAST 15 MIN:0.0 INCHES 10 METER DEW POINT (HOURLY AVG):73.32 DEG F SOLOR RADIATION (HOURLY AVG): 0.0 LANGLEYS

/MIN 74.61 2.6 12 EMNOWI R

iTT026 WK( 012Iwi n=1SEC LVL=

PR MSAC CPU A MOI.F6E "1=1 Em

RADIOLOGICAL CONTROL RESPONSE I

APPENDIX D Page 9 of 10 FIGURE 6 MET DATA FOR FRED CALC PAGE Page 1

of ISPLAY F

-UK rFR C

A FOR FRED CALC QUAL CD00 VALUE

~3.

  • ,00:

Update rate 1.0 1997 15:01:36 seconds UNITS DESCRIPTION DEGREES MPH INCHES 46 METER VECTOR WIND DIR (15 MIN) 46 METER AVG W[ND SPEED (15 MIN)

RAINFALL IN THE LAST 15 MINUTES STABILITY CLASS 10-46 MTR 15 MIN AVG AM =-=-

SQN EPIP-14 Rev. 15 Page 22 of 25 GROUP D MET DAli PID oY2301A OY2307A OY2312A OY2319A

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 23 of 25 APPENDIX D Page 10 of 10 FIGURE 7 STABILITY/DELTA-T PAGE ain*

armGrphks Irends 2s Zo ye's I~L~nt 1112 lo-SEP-1996 13:33:40 SELECT FUNC.

KEY OR TURN-ON CODE MTDATA6 1 0

STABI LITY/DELTA-T 10 METER AIR TEMP (15 MIN):

46 METER AIR TEMP (15 MIN):

91 METER AIR TEMP (15 MIN):

10 METER AIR TEMP (INSTANTANEOUS):

46 METER AIR TEMP (INSTANTANEOUS):

91 METER AIR TEMP (INSTANTANEOUS):

74.61 DEG F 73.73 DEG F 73.01 DEG F 74.94 DEG F 74.06 DEG F 73.25 DEG F VERTICAL AIR TEMP DELTA-T 0.88 DEG F 46-10 METERS (INSTANTANEOUS):

VERTICAL AIR TEMP DELTA-T 1.69 DEG F 91-10 METERS (INSTANTANEOUS):

STABILITY AIR TEMP (INSTANTANEOUS) 46-10 MTR:

STABILITY AIR TEMP (INSTANTANEOUS) 91-10 MTR:

STABILITY AIR TEMP (INSTANTANEOUS) 91-46 MTR:

D E

D STABILITY AIR TEMP 46-10 MTR 15 MINUTE:

D R

TI N

I WK=012/win=lSEC LVL=5 PRIM/BACKCPU A MODE 1

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 24 of 25 APPENDIX E Page 1 of 1 FITNESS FOR DUTY PROGRAM ADMINISTRATION CALL-IN SHEET Person Calling Date Give this message: "This is (caller's name) at Sequoyah Nuclear Plant. An emergency has been declared, or a REP drill is being conducted (as appropriate). Have you consumed any alcohol within the last five hours? Are you fit for duty? If you are fit for duty, please report to the RadCon Lab or Chemistry Lab and the duty RADCON or Chemistry Shift Supervisor immediately."

NAME TIME TIME ALCOHOL 5 ARE DUTY OFFICIAL CALLED NEEDED HRS. PRIOR YOU FIT COMMENTS TO TO REPORT?

FOR REPORT (Y/N)

DUTY?

+ i i

i 4

4

+

I I

I 4

i i

4 1

-t I

I I

I t

I I

I I

t I

I I

I t

I I

I

-t

SQN RADIOLOGICAL CONTROL RESPONSE EPIP-14 Rev. 15 Page 25 of 25 SOURCE NOTES REQUIREMENTS STATEMENT SOURCE DOCUMENT IMPLEMENTING STATEMENT NP Radiological Emergency Plan (NP-REP)

Paragraph 3.1.A Appendix D note Appendix D C.8 SQ963213PER SQ972164PER SQ972260PER factor change.

99-002929-000 Revise EPIP-14 to indicate fitness for duty questions are required for call-ins.

Require validation after software or multiplication Added manual calculation for Thyroid CDE to match ICS.

TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-17 Emergency Equipment and Supplies Revision 20 QUALITY RELATED PREPARED/PROOFREAD BY: W. P. Brooks RESPONSIBLE ORGANIZATION:

Emergency Preparedness APPROVED BY John Casey EFFECTIVE DATE: 09-07-2000 Level Of Use: Reference REVISION DESCRIPTION: Intent Change. Added additional supplies to Appendix E to address issues from PER 00-005294-000; Clarify instructions to ensure TSC/OSC position books are scanned quarterly for uncontrolled or outdated material (not just out dated forms) Appendix H and I to address issue from PER 00-006599-000; improvements in hardware; and self assessment recommendations.

EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 2 of 19 TABLE OF CONTENTS Section Title Page Table of C ontents..............................................................................

2 1.0 P U R P O S E..............................................................................................

3 2.0 R EFER ENC ES..................................................................................

3 3.0 INSTR UCTIO NS................................................................................

3 3.1 G eneral Instructions.........................................................................

3 3.2 D etailed Instructions..........................................................................

3 3.3 Completion of Appendices................................................................

4 4.0 R EC O R D S.........................................................................................

5 4.1 Q A R ecords......................................................................................

5 4.2 N on Q A R ecords................................................................................

5 APPENDICES Appendix A Emergency Equipment - Main Control Room (MCR).......

6 Appendix B Emergency Equipment - Communication Room................. 7 Appendix C Emergency Equipment - RADCON Lab.............................. 8 Appendix D Site Medical Emergency Supplies...................................... 9 Appendix E Self-Contained Breathing Apparatus................................

10 Appendix F Emergency Equipment - RADCON Vans...........................

11 Appendix G Hospital Cabinet Inventory...............................................

12 Appendix H Technical Support Center (TSC)...................................... 13 Appendix I Operations Support Center (OSC)................................... 14 Appendix J OSC Response Team Equipment.....................................

15 Appendix K Emergency Equipment-480V Reactor MOV Board Room..... 16 Appendix L Decon Facility - Service Building...................................... 17 Appendix M Responsibilities-Inventory and Maintenance.................... 18 SO U R C E N O TES......................................................................................

19

EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 3 of 19 1.0 PURPOSE This instruction is used to comply with the requirements of the Radiological Emergency Plan for periodic inspection and maintenance of equipment and supplies.

2.0 REFERENCES

A. CECC EPIP-9, Attachment J.

3.0 INSTRUCTIONS 3.1 General Instructions 3.1.1 The responsibility and frequency of inventories are specified in Appendix M.

For the purposes of these inventories, monthly is defined as once per calendar month, quarterly is defined as once per calendar quarter, and annual is defined as once per calendar year.

3.1.2 The individuals performing the inspection shall complete the appendices and the Emergency Preparedness Manager shall review the results as indicated and make arrangements to correct deficiencies.

3.1.3 List any deviations and the disposition on the appropriate Appendix Data Sheet. Deficient, outdated or missing items shall be replaced.

3.1.4 Special checks of certain material in the cabinets shall be performed. The following checks shall be made where applicable:

A. The protective clothing shall be checked for deterioration.

B. The smoke tubes and aspirator bulbs shall be checked for deterioration and that the tubes have not been broken or used.

C. Replace all flashlight batteries at the end of shelf-life with fresh batteries.

(Do not discard batteries. Return them to the tool room.)

D. Check to determine that flashlights are operable.

E. Rezero all emergency dosimeters to assure proper operation.

3.2 Detailed Instructions 3.2.1 The emergency equipment, listed in Appendices A and B, are stored in cabinets provided with a lock or plastic seal. This provides a means of controlling access or determining that the cabinet has not been opened. An inventory list of the equipment may be posted on the outside of the cabinet.

The two cabinets are located in the Main Control Room corridor, and Communications Room.

3.2.2 Each cabinet and storage location, including the medical treatment area, shall be inventoried and required equipment inspected and checked for operation and/or condition. Equipment in certain cabinets is separated into Table A and Table B. Table A is a list of all non-perishable items stored in a small metal box equipped with a security seal within the cabinet itself. These items will be inventoried annually (preferably in January) and whenever a security seal has been found to be violated. Those items listed in Table B of these attachments are inventoried on a quarterly basis.

3.2.3 The radiation monitoring instruments, which are in normal plant use, are located in the RADCON laboratory as listed in Appendix C.

EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 4 of 19 3.2.4 The Site Medical Emergency Supplies listed in Appendix D are located in the site ambulance or the site medical station.

3.2.5 All self-contained breathing units in service on Appendix E shall be inventoried and inspected monthly by Fire Protection.

3.2.6 The emergency equipment, referenced in Appendix F is located in the environmental monitoring emergency vans. In the event of a radiological emergency that requires the emergency vans to be used, a RADCON technician will obtain the additional equipment listed in CECC-EPIP-9, Attachment J. This equipment will be transported to the vans.

3.2.7 The emergency room supplies furnished by TVA for use of the agreement hospital(s) in case of injury to personnel involving radioactive materials are listed in Appendix G.

3.2.8 References and supplies listed in Appendix H are stored in the Technical Support Center for use during an emergency and Appendix I for the Operations Support Center. TSC/OSC position notebooks shall be scanned during the quarterly inventory for uncontrolled or outdated materials; not just outdated forms. Additionally, position seating/working areas should be scanned for uncontrolled or outdated materials.

3.2.9 Protective clothing for use by the OSC response teams is located in the Operations Support Center storage room and is listed in Appendix J.

3.2.10 Protective clothing for use in contamination controls from affected plant areas in the Control Building are listed in Appendix K and is located in the 480 V Reactor MOV Board Room, Elevation 734.

3.2.11 Supplies for decontamination of personnel are stored in the EI.690' Decon.

Room near the RadCon lab and are listed in Appendix L.

3.3 Completion of Appendices 3.3.1 If the particular items are present and in sufficient quantities and, when applicable, in good working condition, then check the "Yes" column.

3.3.2 If a deficiency is noted, then check the "No" column and replace deficient items. All deficiencies must be corrected as soon as possible. If circumstances do not allow deficiencies to be corrected, then the appropriate supervisor shall be notified.

3.3.3 Under the "Remarks" column, explain the corrective actions taken.

3.3.4 All comments in the "Remarks" column should be detailed enough to leave no doubt as to the actions taken. Comments to the effect - "batteries missing" will not suffice. A simple check in the "No" column will represent that a deficiency exists. Such comments do not allow a person to determine what, if any, action has been taken. Comments should read for example: "Batteries missing., replaced on March 5, 2000".

EPIP-1 7 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 5 of 19 4.0 RECORDS 4.1 QA Records None 4.2 Non-QA Records The Appendices/Checklists in this Instruction are NON-QA documents and will be retained by the SQN Emergency Planning (EP) Manager for at least two years.

EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 6 of 19 APPENDIX A MAIN CONTROL ROOM CORRIDOR CABINET - CONTROL BUILDING TABLE A Quantity Description Yes No Remarks Security seal intact:................................................

NOTE: Table A will be inventoried annually (preferably in January) and whenever a security seal has been found to be violated.

12 pr.

Rubber overshoes - Various sizes...................... -

6 pr.

Canvas gloves...................................................- __

12 pr.

Rubber gloves-Various sizes..............................

6 H o o d s.....................................................................

2 P e n cils....................................................................

2 Clipboards w ith paper.............................................

2 Boxes sm oke tubes................................................

2 A spirator bulbs........................................................

1 Lo g B oo k................................................................

4 rolls Duct tape and/or masking tape...............................

Security seal replaced.........................................................

TABLE B Quantity Description Yes No Remarks 12 Pairs of paper overalls - Various sizes........

2 H a rd hats.................................................................

2 F la sh lig hts..............................................................

12 Spare flashlight batteries Expires: _

2 Spare flashlight bulbs.............................................

1 F irst-a id kit..............................................................-

12 Face G oggles.........................................................

1 Radiation Survey M eter..........................................

Cabinet Relocked or Resealed............................................

Inspection performed by:

RADCON Representative Date Review and Approval:

Emergency Preparedness Manager Date EP Mana-qer shall retain the completed form as a Non-QA Record for at least 2 years.

EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 7 of 19 APPENDIX B COMMUNICATIONS ROOM - CONTROL BUILDING Description TABLE A Yes No Remarks Security seal intact:......................................................................

w NOTE: Table A will be inventoried annually (preferably in January) and whenever a security seal has been found to be violated.

6 Pairs of rubber overshoes......................................

6 Pairs canvas gloves...........................................

6 Pairs rubber gloves.............................................

6 Hoods.....................................................................

2 Pencils....................................................................

2 Clipboards with paper.............................................

2 Boxes sm oke tubes................................................

2 Aspirator bulbs.....................................................

1 Log Book...............................................................

Security seal replaced................................................................

Description TABLE B Yes No Remarks 6

Pairs of coveralls - various sizes.............................

2 Hardhats.................................................................

2 Flashlights..............................................................

12 Spare flashlight batteries Expires:

2 Spare flashlight bulbs.............................................

1 First-aid kit..............................................................

Cabinet Relocked or Resealed............................................

Inspection performed by:

RADCON Representative Review and Approval:

Emergency Preparedness Manager Date Date EP Mana-ger shall retain the completed form as a Non-QA Record for at least 2 years.

Quantity Quantity

EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 8 of 19 APPENDIX C RADIOLOGICAL CONTROL LABORATORY - SERVICE BUILDING Description Yes No Remarks Quantity 1

1 2

6 1

5 10 5

1 5

2 5

10 5

1 Inspection performed by:

RADCON Representative Review and Approval:

Emergency Preparedness Manager Date __

Date EP Mana-qer shall retain the completed form as a Non-QA Record for at least 2 years.

Alpha Survey Meter (500,000 cpm).............................

Neutron dose rate survey meter

(.025 eV - 10 MeV/5,000 mR/hr).................................

High Range Survey Instrument (1,000 R/hr with extendible probe)..............................

ION Chamber Survey Meter (50 R/h)..........................

ION Chamber Survey Meter (20,000 R/h)

High volume Air Samplers (and support equipment)..._

Frisker Type Survey Meters (0-50,000 cpm)............... _

Low-volume air samplers (and support equipment)..... _

Portable M ini-S caler....................................................

C a lcu lato rs..................................................................

Cal/Response Ck Sources..........................................

Noble Gas Sampling Syringes.....................................

Silver Zeolite Cartridges..............................................

M arinelli B eakers.........................................................

Shielded Detector Pig..................................................

EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 9 of 19 APPENDIX D Page 1 of 1 SITE MEDICAL EMERGENCY SUPPLIES Check applicable column either Ambulance or Medical Station (only one needs to be checked, not both.)

EQUIPMENT AMBULANCE MEDICAL YES NO REMARKS STATION Blood Pressure Apparatuses I-Li Li Marion Ventilators with Oxygen 0

0 0

Oxygen - Large Tanks Li

[]

Li I.V. Setup

- fluids El El Ml El

-tubing El E]

l El

- needles El

[E El El Suctions - Portable 0

[]

E fL Anaphylaxis Kits 0

0

  • ]

0_

Immobilizing Equipment AMBULANCE MEDICAL YES NO STATION

- Stokes Baskets Li

[]

- Scoop Stretchers El El El El 3ack Boards El El El

-Hare Splints El Fl El E

-Air Splints El El El E

- Splints - arm, finger, and leg Dl El El 0_

- Extrication Collars El E]

El El Trauma Kits Containing Note: Trauma kits are located Li Burn Sheets, Triangular Bandages, Air in Auxiliary Building on Splints, Bite Sticks, Dressings, Pocket elevation 690 & 734 near Masks, Gloves, Scissors, Adhesive elevator Tape, Irrigating Solution, Cold Packs, Flashlight Sand Bags Li Disposable Gowns EQ E1 E_

Blankets El E1 0

Stretcher Straps E-n L

0 Mast Trousers Ei E]

El E_

Cleaning Solution AMBULANCE MEDICAL YES NO STATION

- Betadine Solution

[

[

E J

- Hydrogen Peroxide l

El El El

- Brushes El El El El--

Inspection Performed By:

Review and Approval:

Emergency Preparedness Manager Date Date EP Manacjer shall retain the completed form as a Non-QA Record for at least 2 years.

EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 10 of 19 APPENDIX E Page 1 of 1 SELF-CONTAINED BREATHING APPARATUS Quantity Description Yes No Remarks RELAY ROOM OUTSIDE TECHNICAL SUPPORT CENTER (EL 732) 12 12 2

2 Self-contained breathing apparatus....................................

Additional air cylinders........................................................

Sm all MSA face pieces.............................................

Large M SA face pieces......................................................

SERVICE BUILDING EL 690 (PASF Units) 8 4

3 3

Dual Purpose self-contained breathing apparatus..............

Dual Purpose Airline Hoses................................................

Small MSA face pieces.......................................................

Large MSA face pieces......................................................

SERVICE BUILDING EL 690 (RADCON AND RADCHEM LABS) 16 Self-contained breathing apparatus....................................

SERVICE BUILDING (EL. 706) FIRE EQUIPMENT CAGE 6

Self-contained breathing apparatus....................................

12 A dditional cylinders.............................................................

Inspection performed by:

Fire Protection Representative Review and Approval:

Emergency Preparedness Manager Date Date EP Manager shall retain the completed form as a Non-QA Record for at least 2 years.

I I

I

EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 11 of 19 APPENDIX F EMERGENCY EQUIPMENT ENVIROMENTAL MONITORING EMERGENCY VANS (SEE CECC-EPIP-9, ATTACHMENT J).

EP Mana-ger shall retain the completed form as a Non-QA Record for at least 2 years.

EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 12 of 19 APPENDIX G HOSPITAL CABINET INVENTORY EII North Park I-IErlanger

[SATI Quantity I Description Remarks Protective Clothin g1 10 pair Shoe covers 10 pkg Dress out packages (coveralls, booties, gloves) 3 Surgical gowns 2 boxes Surgical gloves 4 rolls I Surgical tape fordressout - 2 inch Facility Preparation I set Floor coverings (hospital specific) 1 roll Heavy duty paper (3 foot wide) 2 rolls 2 inch duct tape 1 roll Radiation Warning symbol tape (2 inch) 2 Step off pads 8

Radiological barrier posting signs 1 Spool Radiological barrier rope or ribbon 5

Traffic cones 10 Large rad waste plastic bags (trash can size) 10 Medium rad waste plastic bags (x-ray cassette size) 2 copies Hospital specific booklet (1 at desk, 1 in cabinet)

Last Update:

1 Radioactive material label tape Decontamination Supplies 1

Decontamination table, backboard and bottles (min. total capacity of 10 gallons) 1 Flexible funnel with drain hose - optional 1

Decontamination media /soap product 1

NCRP # 65 Reference Handbook 12 Cotton swabs 20 Zip lock bags for sample collection 10 Labels for sample bags 2

Scissors 1

Wall poster with decontamination steps Health Physics Supplies (Serial # and cal due) 1 Bicron ISM (RSO-5 or 50) 2 Bicron Surveyor 50 1

Wound probe with cable 10 TLDs 10 Electronic dosimeters and tray 200 Smears 12 Radioactive Material tags 1

Masslin mop and 20 cloths Inspection Performed By:

Date Review and Approval:

Emergency Preparedness Manager ____________

Date EP Mana-ger shall retain the completed form as a Non-QA Record for at least 2 years.

EPIP-1 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 13 of 19 APPENDIX H TECHNICAL SUPPORT CENTER Qtv AssortE Assort Assort(

1 each 1

2 4

4 3

2 5

Remarks seating areas.)

Inspection Performed By:

Date Review and Approval:

Emergency Preparedness Manager Date EP Managier shall retain the completed form as a Non-QA Record for at least 2 years.

Description Yes No ed Dryboard Supplies (Erasers, markers, etc.)................................-..

ad Desktop Supplies (Stapler, Tape, Logbooks)..............................

ed Office Supplies (Pen, Pencils, Staples, Etc.)............................... __

TSC Position Notebooks.....................................................................

(Scan/Check for uncontrolled/out-of-date materials in Position notebooks &

Spare Roll of thermal Paper for Tracking Board............................

A SM E Steam Tables.....................................................................

Communications Head Sets....................................................

Sequoyah Phone Directories (latest edition)................................

Chattanooga Phone Directories (latest edition)

TVA Phone Directories (latest edition).........................................

Electronic Display Projectors.........................................................

Verify wall maps are latest revision (see CECC EPIP-9) 2 M ile M ap................... Latest Rev.

10 Mile Evac Map........ Latest Rev.

50 Mile Sample Map.... Latest Rev.

(2 copies)....................

50 Mile Map................. Latest Rev.

0 (1 copy).......................

Verify presence only (DCU controls contents)

REP (Radiological Emergency Plan) (4 copies)...............................

REND (Radiological Emergency Notification Directory) (2 copies)....

Central Emergency Control Center EPIP (CECC EPIP) (2 Copies)...

S Q N E P IP (4 copies).........................................................................

Severe Accident Management Guidance (SAMG) (4 copies)............

Updated SQN FSAR.........................................

Unit 1 Technical Specifications (2 sets).............................................

Unit 2 Technical Specifications (2 sets).............................................

Site Health and Safety Manual........................................................

State of Tennessee Multijurisdictional REP Response Plan..............

INPO Emergency Resources Manual.................................................

System Operating Manual/System Operating Instructions (SO/SOl).

Annunciator Response Manuals (AR)................................................

P eriodic Instructions (P I)....................................................................

Abnormal Operating Procedures (AOP) (2 Sets)...............................

Technical Instructions (TI).........................................

General Operating Instructions (GO).................................................

SQN Offsite Dose Calculation Manual (ODCM)

SQN Process Control Program (PCP).............................................

Radiological Control Instructions (RCI)...............................................

Radwaste Handling/Shipping Index (RHSI)........................................

Functional Restoration Guidelines (2 sets)........................................

Emergency Instructions (2 sets).........................................................

Emergency Abnormal Procedures (EAPs) (2 sets)............................

Emergency Contingency Actions (2 sets)..........................................

Users Manual - Meteorological Data Print Program (2 copies)...........

Users Manual - FRED (2 copies)........................................................

Users Manual - Meteorological Data Display.....

Users Manual - CECC Information System........................................

U sers M anual - IC S............................................................................

EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 14 of 19 APPENDIX I OPERATIONS SUPPORT CENTER (OSC)

Quantity Description Yes Assorted Desktop Supplies (stapler, tape, logbook)............

Assorted Office Supplies (pens, pencils).............................................

Assorted Dryboard Supplies (eraser, markers, etc.).............

2 Spare Roll of thermal Paper for Tracking Board...................

1 S Q N E P IP s..........................................................................

1 each OSC Position Notebooks......................................................

(Scan/Check for uncontrolled/out-of-date materials in Position Notebooks 2

SQN Telephone Book (latest edition) 2 TVA Telephone Book (latest edition)....................................

1 U ser M anual - IC S................................................................

4 Communication Headsets....................................................

1 Polaroid Camera W/Film Expires_

2 Team Tracking Status Boards..............................................

1 Ops Tracking Status Boards.................................................

1 RadCon/Chem Tracking Status Boards................................

12 Spare flashlight batteries Expires.

6 Spare Pager Batteries Expires 2

Electronic Display Projectors................................................

No Remarks

& seating areas.)

Plant Drawings (verify existence only DCU controls listing).............. _

Verify wall maps are latest revision (see CECC EPIP-9 for latest map revision levels) 2 Mile Map Latest Rev.

10 Mile Evac Sector Map Latest Rev.

10 Mile Sampling Point Map Latest Rev.

Tool Room Tool Kits:...............................................

Note: Tool Room tool kits are inventoried in accordance with 0-PI-REM-000.001Q Mechanical tool kit #1 Mechanical tool kit #2 Electrical tool kit #3 Mechanical tool kit #4 Mechanical tool kit #5 Mechanical tool kit #6 Electrical tool kit #7 Note: Additional Communications Equipment is checked under 0-PI-REM-244-001.0 Inspection Performed By:

Date Review and Approval:

Emergency Preparedness Manager Date EP Manacqer shall retain the completed form as a Non-QA Record for at least 2 years.

I

EPIP-1 7 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 15 of 19 APPENDIX J OSC RESPONSE TEAM EQUIPMENT CAFETERIA OSC EQUIPMENT STORAGE ROOM Quantity Description Yes No 40 pr.

Cotton liners...............................................................

40 pr.

Rubber gloves - Various sizes...............................................

40 pr.

P lastic booties........................................................................

40 pr.

Rubber overshoes - Various sizes.........................................

30 pr.

Coveralls - Various sizes.......................

30 Surgeon caps...........................................................

30 Hoods...................................

4 rolls Duct Tape and/or Masking Tape............................................

2 H a rd hats................................................................................

6 pr.

C anvas gloves.......................................................................

2 S pare flashlight bulbs............................................................

2000 doses KI (Expires j (#Pkgs * #Tablets/pkg = #doses)......

Door Relocked.......................................................................

Inspection performed by:

RADCON Representative Review and Approval:

Emergency Preparedness Manager Date Date EP Mana er shall retain the completed form as a Non-QA Record for at least 2 years.

Remarks I

EPIP-1 7 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 16 of 19 APPENDIX K 480V REACTOR BOARD ROOM AUXILIARY BUILDING (EL. 734)

Quantity Description.................................................................

Yes No Rem arks 40 pr.

C otton liners...............................................................-

40 pr.

Rubber gloves - Various sizes 40 pr.

Plastic booties............................................................-

40 pr.

Rubber overshoes - Various sizes 30 pr.

Paper coveralls......................................................

30 S urgeon caps.............................................................

1 Box of vinyl gloves................................................

4 rolls Duct Tape and/or Masking Tape...........................-...

6 pr.

C anvas gloves...........................................................

2 F la shlig hts..................................................................

2 Spare flashlight bulbs................................................

12 Spare flashlight batteries Expires_

Cabinet Relocked or Resealed............................................

Inspection performed by:

RADCON Representative Date Review and Approval:

Emergency Preparedness Manager Date EP Manager shall retain the completed form as a Non-QA Record for at least 2 years.

EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 17 of 19 APPENDIX L EL. 690' DECONTAMINATION ROOM MIN SUGGESTED QUANITY ITEM QUANITY QUANITY ON HAND REMARKS Disposable Gloves 1 box 2 boxes Gauze Pads 1 box 2 boxes Cotton Swabs 1 pkg 1 pkg Saline Solution 1 bottle 2 bottles Surgical Brushes 1 each 12 each Shampoo 1 bottle 2 bottles Soap 2 bars 5 bars Laundry detergent none I box Soap (liquid abrasive) none 1 bottle Mechanic's Hand Cleaner none 2 can Shaving Cream 1 can 1can Razors 2 each 5 each Paper Bath Towels none 1 box Towels 5 each 25 each Scissors 1 pair 1 pair Petri Dishes 3 each 5 each Duct Tape none 2 rolls Paper Coveralls 5 pair 10 pair Tennis Shoes (Sizes 7-none one pair half sizes are OK

12) each Inspection Performed By:

RADCON Representative:

Date:

Reviewed By:

RADCON Shift Supervisor:

Date:

EP Manager:

Date:

EP Manager shall retain the completed form as a Non-QA Record for at least 2 years.

EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 18 of 19 APPENDIX M INVENTORY AND MAINTENANCE RESPONSIBILITIES Appendix A.

Main Control Room - Corridor Cabinet Table A Table B B.

Communications Room Control Building Table A Table B C.

Radiological Control Lab D.

Medical Emergency Supplies E.

Self-contained Respiratory Equipment F.

Emergency Vans G.

Hospital Emergency Room Cabinet H. Technical Support Center Cabinets, References & Supplies I.

Operations Support Center Storage, References & Supplies J.

OSC Response Team Storage, Service Bldg. EL. 706' K.

480V RX MOV Board Room EL. 734' L.

Decon. Facility, Service Building EL. 690' Frequency Annually Quarterly Annually Quarterly Monthly Quarterly Monthly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Responsible RADCON RADCON RADCON Fire Protection/Medical Fire Protection RADCON Corporate EP EP Manager EP Manager RADCON RADCON RADCON Monthly

EPIP-17 SQN EMERGENCY EQUIPMENT AND SUPPLIES Revision 20 Page 19 of 19 SOURCE NOTES REQUIREMENTS STATEMENT H-10 Appendix E, Section E Section 8.0 SOURCE DOCUMENT NUREG 0654 10 CFR 50 NP REP NUREG 0696 IMPLEMENTING STATEMENT "Emergency Equipment Inspections" "Emergency Response Facilities, Equipment, and Supplies" "Functional Criteria For Emergency Response Facilities"