{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Reset a Recirc Flow Control Valve Lockout JPM Number:     3302.0116 Revision Number: 00 Date: 7/30/03 Developed By:     T. Pickley                     7/30/03 Instructor                       Date Validated By:     J. Anderson                     10/17/03 SME or Instructor                 Date Review By:     P. Ryan                       _8/18/03 Operations Representative         Date
{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Reset a Recirc Flow Control Valve Lockout JPM Number: 3302.0116 Revision Number: 00 Date: 7/30/03 Developed By:
T. Pickley 7/30/03 Instructor Date Validated By:
J. Anderson 10/17/03 SME or Instructor Date Review By:
P. Ryan
_8/18/03 Operations Representative Date


JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:   All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:
________      1. Task description and number, JPM description and number are identified.
All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________      2. Knowledge and Abilities (K/A) references are included.
: 1. Task description and number, JPM description and number are identified.
________      3. Performance location specified. (in-plant, control room, or simulator)
: 2. Knowledge and Abilities (K/A) references are included.
________      4. Initial setup conditions are identified.
: 3. Performance location specified. (in-plant, control room, or simulator)
________      5. Initiating and terminating cues are properly identified.
: 4. Initial setup conditions are identified.
________      6. Task standards identified and verified by SME review.
: 5. Initiating and terminating cues are properly identified.
________      7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 6. Task standards identified and verified by SME review.
________      8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
Procedure Rev. _____ Date _____________
________      9. Pilot test the JPM:
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: b. ensure performance time is accurate.
________      10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________      11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
: 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                                   Date SME/Instructor                                                   Date SME/Instructor                                                   Date Page 2 of 9
SME/Instructor Date SME/Instructor Date SME/Instructor Date


CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116                               REVISION: 00 Revision Record (Summary)
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 Page 3 of 9 Revision Record (Summary)
: 1. Revision 00,   This is a new JPM Page 3 of 9
: 1. Revision 00, This is a new JPM


CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116                                                                     REVISION: 00 Operators Name:                                             SSN:
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 Page 4 of 9 Operators Name:
Job Title: NLO RO SRO STA SRO Cert JPM Title/Number: 3302.0116, Reset a Recirc Flow Control Valve Lockout Revision Number:       00 Task Number and Title: 330201.16, Complete in plant actions to perform FCV Lockout/Reset Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate                             Faulted:     No Perform                 Alternate Path:     No Time Critical:       No Estimated Time to Complete: 10 _minutes                 Actual Time Used:             minutes
SSN:
Job
 
==Title:==
NLO RO SRO STA SRO Cert JPM Title/Number: 3302.0116, Reset a Recirc Flow Control Valve Lockout Revision Number:
00 Task Number and
 
==Title:==
330201.16, Complete in plant actions to perform FCV Lockout/Reset Suggested Testing Environment:
Simulator Actual Testing Environment: I Simulator Plant Control Room Testing Method:
 
Simulate Faulted:
 
No I
Perform Alternate Path:
 
No Time Critical:
 
No Estimated Time to Complete: 10 _minutes Actual Time Used:
minutes


==References:==
==References:==
Line 46: Line 70:


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?             Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                       Satisfactory                 Unsatisfactory Comments:
 
Yes
 
No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
 
Satisfactory
 
Unsatisfactory Comments:
Evaluators Name: __________________________
Evaluators Name: __________________________
Evaluators Signature:                                                           Date:
Evaluators Signature:
Page 4 of 9
Date:


CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116                                                                           REVISION: 00 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 Page 5 of 9 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
SIMULATOR SET-UP CONDITIONS:
SIMULATOR SET-UP CONDITIONS:
The simulator can be operating at any power with Recirc in operation. Manually lockout the B Recirc Flow Control Valve and then restart the HPU. Lower the Flow controller output to cause a 5%-10% Servo Error.
The simulator can be operating at any power with Recirc in operation. Manually lockout the B Recirc Flow Control Valve and then restart the HPU. Lower the Flow controller output to cause a 5%-10% Servo Error.
Line 61: Line 92:


==REFERENCES:==
==REFERENCES:==
CPS 3302.01 Reactor Recirculation EVALUATOR INSTRUCTIONS:
CPS 3302.01 Reactor Recirculation EVALUATOR INSTRUCTIONS:
Amplifying cues are provided within the JPM steps.
Amplifying cues are provided within the JPM steps.
INITIAL CONDITIONS AND INITIATING CUE:
INITIAL CONDITIONS AND INITIATING CUE:
The B Recirc Flow Control Valve was manually locked out to perform maintenance. The maintenance is complete and the HPU has been restarted. You are to reset the Flow Control Valve lockout.
The B Recirc Flow Control Valve was manually locked out to perform maintenance. The maintenance is complete and the HPU has been restarted. You are to reset the Flow Control Valve lockout.
START TIME:
START TIME:  
Page 5 of 9
 
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 Page 6 of 9


CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116                                                                        REVISION: 00
==========================================================================
==========================================================================
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
==========================================================================
==========================================================================
PERFORMANCE STEPS
PERFORMANCE STEPS 1.
: 1.       Maintain steady state power and balanced recirc loop flows, if possible, by adjusting the operable FCV.
Maintain steady state power and balanced recirc loop flows, if possible, by adjusting the operable FCV.
Standard No adjustment needed CUE Comments SAT       UNSAT         Comment Number
Standard No adjustment needed CUE Comments SAT UNSAT Comment Number 2.
: 2.       Determine/correct the cause of the lockout from alarm indicators on 1H13-P614 and/or the annunciators on 1H13-P680.
Determine/correct the cause of the lockout from alarm indicators on 1H13-P614 and/or the annunciators on 1H13-P680.
Standard Determines that annunciator 5003-4H is due to the manual lockout.
Standard Determines that annunciator 5003-4H is due to the manual lockout.
CUE Comments SAT       UNSAT         Comment Number Page 6 of 9
CUE Comments SAT UNSAT Comment Number


CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116                                                                 REVISION: 00
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 Page 7 of 9 3.
: 3.       Reset any FCV runback signal per section 8.4.2.
Reset any FCV runback signal per section 8.4.2.
Standard No FCV runback signal is present.
Standard No FCV runback signal is present.
CUE Comments SAT     UNSAT       Comment Number
CUE Comments SAT UNSAT Comment Number
*4.     Zero the A(B) loop SERVO ERROR.
*4.
Standard Raises the Flow Controller output with the slide switch to Zero the SERVO ERROR CUE Comments SAT     UNSAT       Comment Number
Zero the A(B) loop SERVO ERROR.
: 5.       Restore the HPU A(B) equipment to normal operation per CPS 3302.02, Reactor Recirculation Flow Control Hydraulic System.
Standard Raises the Flow Controller output with the slide switch to Zero the SERVO ERROR CUE Comments SAT UNSAT Comment Number 5.
Standard The HPU is already running CUE Comments SAT     UNSAT       Comment Number Page 7 of 9
Restore the HPU A(B) equipment to normal operation per CPS 3302.02, Reactor Recirculation Flow Control Hydraulic System.
Standard The HPU is already running CUE Comments SAT UNSAT Comment Number


CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116                                                                     REVISION: 00
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 Page 8 of 9
*6.       Depress the A(B) FCV A/B Motion Inhibit Reset.
*6.
Depress the A(B) FCV A/B Motion Inhibit Reset.
Verify the lead HPU becomes operational, and FCV motion is no longer inhibited.
Verify the lead HPU becomes operational, and FCV motion is no longer inhibited.
Standard Depresses the B FCV Motion Inhibit Reset switch CUE Comments           Annunciator 5003-4H will reset and the Motion Inhibit light for FCV B will go out. If asked about the status of the B lead RR HPU, respond that it is in service.
Standard Depresses the B FCV Motion Inhibit Reset switch CUE Comments Annunciator 5003-4H will reset and the Motion Inhibit light for FCV B will go out. If asked about the status of the B lead RR HPU, respond that it is in service.
SAT     UNSAT         Comment Number STOP TIME: _____________
SAT UNSAT Comment Number STOP TIME:_____________
TERMINATING CUES:
TERMINATING CUES:
The B Recirc Flow Control Valve lockout is reset.
The B Recirc Flow Control Valve lockout is reset.
K/A REFERENCE NUMBERS Importance Rating K/A SYSTEM NUMBER                                             K/A NUMBER             RO                 SRO 202002                                                         A4.08                   3.3               3.3 Page 8 of 9
K/A REFERENCE NUMBERS Importance Rating K/A SYSTEM NUMBER K/A NUMBER RO SRO 202002 A4.08 3.3 3.3


CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116                                                               REVISION: 00 INITIATING CUE The B Recirc Flow Control Valve was manually locked out to perform maintenance. The maintenance is complete and the HPU has been restarted. You are to reset the Flow Control Valve lockout.
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 Page 9 of 9 INITIATING CUE The B Recirc Flow Control Valve was manually locked out to perform maintenance. The maintenance is complete and the HPU has been restarted. You are to reset the Flow Control Valve lockout.}}
Page 9 of 9}}

Latest revision as of 03:32, 16 January 2025

Initial Walkthrough JPM 3302.0116
ML041070483
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/06/2004
From: James Anderson, Pickley T, Ryan P
Exelon Generation Co, Exelon Nuclear
To:
Office of Nuclear Reactor Regulation
References
-RFPFR, 50-461/04-301, JPM 3302.0116, Rev 00 50-461/04-301
Download: ML041070483 (12)


Text

CLINTON POWER STATION Job Performance Measure Reset a Recirc Flow Control Valve Lockout JPM Number: 3302.0116 Revision Number: 00 Date: 7/30/03 Developed By:

T. Pickley 7/30/03 Instructor Date Validated By:

J. Anderson 10/17/03 SME or Instructor Date Review By:

P. Ryan

_8/18/03 Operations Representative Date

Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:

All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 Page 3 of 9 Revision Record (Summary)

1. Revision 00, This is a new JPM

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 Page 4 of 9 Operators Name:

SSN:

Job

Title:

NLO RO SRO STA SRO Cert JPM Title/Number: 3302.0116, Reset a Recirc Flow Control Valve Lockout Revision Number:

00 Task Number and

Title:

330201.16, Complete in plant actions to perform FCV Lockout/Reset Suggested Testing Environment:

Simulator Actual Testing Environment: I Simulator Plant Control Room Testing Method:

Simulate Faulted:

No I

Perform Alternate Path:

No Time Critical:

No Estimated Time to Complete: 10 _minutes Actual Time Used:

minutes

References:

CPS 3302.01, Reactor Recirculation EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes

No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory

Unsatisfactory Comments:

Evaluators Name: __________________________

Evaluators Signature:

Date:

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 Page 5 of 9 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

SIMULATOR SET-UP CONDITIONS:

The simulator can be operating at any power with Recirc in operation. Manually lockout the B Recirc Flow Control Valve and then restart the HPU. Lower the Flow controller output to cause a 5%-10% Servo Error.

TASK STANDARDS:

The FCV lock out is reset.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

None PROCEDURAL/

REFERENCES:

CPS 3302.01 Reactor Recirculation EVALUATOR INSTRUCTIONS:

Amplifying cues are provided within the JPM steps.

INITIAL CONDITIONS AND INITIATING CUE:

The B Recirc Flow Control Valve was manually locked out to perform maintenance. The maintenance is complete and the HPU has been restarted. You are to reset the Flow Control Valve lockout.

START TIME:

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 Page 6 of 9

==============================================================

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

==============================================================

PERFORMANCE STEPS 1.

Maintain steady state power and balanced recirc loop flows, if possible, by adjusting the operable FCV.

Standard No adjustment needed CUE Comments SAT UNSAT Comment Number 2.

Determine/correct the cause of the lockout from alarm indicators on 1H13-P614 and/or the annunciators on 1H13-P680.

Standard Determines that annunciator 5003-4H is due to the manual lockout.

CUE Comments SAT UNSAT Comment Number

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 Page 7 of 9 3.

Reset any FCV runback signal per section 8.4.2.

Standard No FCV runback signal is present.

CUE Comments SAT UNSAT Comment Number

  • 4.

Zero the A(B) loop SERVO ERROR.

Standard Raises the Flow Controller output with the slide switch to Zero the SERVO ERROR CUE Comments SAT UNSAT Comment Number 5.

Restore the HPU A(B) equipment to normal operation per CPS 3302.02, Reactor Recirculation Flow Control Hydraulic System.

Standard The HPU is already running CUE Comments SAT UNSAT Comment Number

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 Page 8 of 9

  • 6.

Depress the A(B) FCV A/B Motion Inhibit Reset.

Verify the lead HPU becomes operational, and FCV motion is no longer inhibited.

Standard Depresses the B FCV Motion Inhibit Reset switch CUE Comments Annunciator 5003-4H will reset and the Motion Inhibit light for FCV B will go out. If asked about the status of the B lead RR HPU, respond that it is in service.

SAT UNSAT Comment Number STOP TIME:_____________

TERMINATING CUES:

The B Recirc Flow Control Valve lockout is reset.

K/A REFERENCE NUMBERS Importance Rating K/A SYSTEM NUMBER K/A NUMBER RO SRO 202002 A4.08 3.3 3.3

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 Page 9 of 9 INITIATING CUE The B Recirc Flow Control Valve was manually locked out to perform maintenance. The maintenance is complete and the HPU has been restarted. You are to reset the Flow Control Valve lockout.