| number = ML061590282
| number = ML061590282
| issue date = 07/03/2006
| issue date = 07/03/2006
| title = Letter Withdrawal of Relief Requests Regarding Third Interval Inservice Inspection Requirements of the ASME Code (TAC MC8790, TAC MC8792)
| title = Letter Withdrawal of Relief Requests Regarding Third Interval Inservice Inspection Requirements of the ASME Code
| author name = Brown E
| author name = Brown E
| author affiliation = NRC/NRR/ADRO/DORL/LPLD
| author affiliation = NRC/NRR/ADRO/DORL/LPLD
Line 21: Line 21:


==SUBJECT:==
==SUBJECT:==
BROWNS FERRY NUCLEAR PLANT, UNIT 3 WITHDRAWAL OF RELIEF REQUESTS REGARDING THIRD INTERVAL INSERVICE INSPECTION REQUIREMENTS OF THE ASME CODE (TAC NOS. MC8790 AND MC8792)
BROWNS FERRY NUCLEAR PLANT, UNIT 3 WITHDRAWAL OF RELIEF REQUESTS REGARDING THIRD INTERVAL INSERVICE INSPECTION REQUIREMENTS OF THE ASME CODE (TAC NOS. MC8790 AND MC8792)


==Dear Mr. Singer:==
==Dear Mr. Singer:==
 
By {{letter dated|date=October 19, 2005|text=letter dated October 19, 2005}}, the Tennessee Valley Authority (TVA) submitted Relief Request No. 3-PDI-2 for Browns Ferry Nuclear Plant (BFN) Unit 3 from the inservice inspection requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI, for the volumetric examination of reactor pressure vessel nozzle-to-vessel welds. The Nuclear Regulatory Commission (NRC) staff requested additional information pertaining to the difference between TVAs request and ASME Code Case N-613-1 endorsed in Regulatory Guide (RG) 1.147, Revision 14. TVA subsequently requested that the relief request be withdrawn in a {{letter dated|date=May 25, 2006|text=letter dated May 25, 2006}} as TVA will adopt the use of ASME Code Case N-613-1 as endorsed in RG 1.147.
By letter dated October 19, 2005, the Tennessee Valley Authority (TVA) submitted Relief Request No. 3-PDI-2 for Browns Ferry Nuclear Plant (BFN) Unit 3 from the inservice inspection requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI, for the volumetric examination of reactor pressure vessel nozzle-to-vessel welds. The Nuclear Regulatory Commission (NRC) staff requested additional information pertaining to the difference between TVAs request and ASME Code Case N-613-1 endorsed in Regulatory Guide (RG) 1.147, Revision 14. TVA subsequently requested that the relief request be withdrawn in a letter dated May 25, 2006 as TVA will adopt the use of ASME Code Case N-613-1 as endorsed in RG 1.147.
By the same {{letter dated|date=October 19, 2005|text=letter dated October 19, 2005}}, TVA submitted Relief Request No. 3-ISI-16 for BFN Unit 3 from the inservice inspection requirements of the ASME Code, Section XI, for pressure retaining piping welds subject to examination using qualified procedures, personnel and equipment. The NRC staff requested information as to the differences between this relief request and ASME Code Case N-695, which was endorsed in RG 1.147. Subsequently, TVA will adopt the use of this code case and withdrew this relief request in a {{letter dated|date=May 25, 2006|text=letter dated May 25, 2006}}.
By the same letter dated October 19, 2005, TVA submitted Relief Request No. 3-ISI-16 for BFN Unit 3 from the inservice inspection requirements of the ASME Code, Section XI, for pressure retaining piping welds subject to examination using qualified procedures, personnel and equipment. The NRC staff requested information as to the differences between this relief request and ASME Code Case N-695, which was endorsed in RG 1.147. Subsequently, TVA will adopt the use of this code case and withdrew this relief request in a letter dated May 25, 2006.
The purpose of this letter is to advise that the above cited applications are being treated as withdrawn. This completes the NRC Staff's review of Relief Requests 3-PDI-2 and 3-ISI-16 submittals under TAC Nos. MC8790 and MC8792.
The purpose of this letter is to advise that the above cited applications are being treated as withdrawn. This completes the NRC Staff's review of Relief Requests 3-PDI-2 and 3-ISI-16 submittals under TAC Nos. MC8790 and MC8792.
Sincerely,
Sincerely,
                                              /RA/
/RA/
Eva A. Brown, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-296 cc: See next page
Eva A. Brown, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-296 cc: See next page


ML061590282                                                         NRR-106 OFFICE             LPL2-2/PM           LPL2-2/PM           LPL2-2/LA           LPL2-2/BC NAME               LRegner:bt         EBrown             RSola for           MMarshall BClayton DATE               06/29/06           06/29/06           06/30/06           07/03/06
ML061590282 NRR-106 OFFICE LPL2-2/PM LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME LRegner:bt EBrown RSola for BClayton MMarshall DATE 06/29/06 06/29/06 06/30/06 07/03/06


Mr. Karl W. Singer                             BROWNS FERRY NUCLEAR PLANT Tennessee Valley Authority cc:
Mr. Karl W. Singer BROWNS FERRY NUCLEAR PLANT Tennessee Valley Authority cc:
Mr. Ashok S. Bhatnagar, Senior Vice President Mr. Robert G. Jones, General Manager Nuclear Operations                            Browns Ferry Site Operations Tennessee Valley Authority                   Browns Ferry Nuclear Plant 6A Lookout Place                             Tennessee Valley Authority 1101 Market Street                           P.O. Box 2000 Chattanooga, TN 37402-2801                   Decatur, AL 35609 Mr. Larry S. Bryant, Vice President           Mr. Glenn W. Morris, Manager Nuclear Engineering & Technical Services     Corporate Nuclear Licensing Tennessee Valley Authority                       and Industry Affairs 6A Lookout Place                             Tennessee Valley Authority 1101 Market Street                            4X Blue Ridge Chattanooga, TN 37402-2801                    1101 Market Street Chattanooga, TN 37402-2801 Brian OGrady, Site Vice President Browns Ferry Nuclear Plant                   Mr. William D. Crouch, Manager Tennessee Valley Authority                   Licensing and Industry Affairs P.O. Box 2000                                 Browns Ferry Nuclear Plant Decatur, AL 35609                             Tennessee Valley Authority P.O. Box 2000 Mr. Robert J. Beecken, Vice President         Decatur, AL 35609 Nuclear Support Tennessee Valley Authority                   Senior Resident Inspector 6A Lookout Place                             U.S. Nuclear Regulatory Commission 1101 Market Street                           Browns Ferry Nuclear Plant Chattanooga, TN 37402-2801                   10833 Shaw Road Athens, AL 35611-6970 General Counsel Tennessee Valley Authority                   State Health Officer ET 11A                                       Alabama Dept. of Public Health 400 West Summit Hill Drive                   RSA Tower - Administration Knoxville, TN 37902                           Suite 1552 P.O. Box 303017 Mr. John C. Fornicola, Manager               Montgomery, AL 36130-3017 Nuclear Assurance and Licensing Tennessee Valley Authority                   Chairman 6A Lookout Place                             Limestone County Commission 1101 Market Street                            310 West Washington Street Chattanooga, TN 37402-2801                   Athens, AL 35611 Mr. Bruce Aukland, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609}}
Mr. Ashok S. Bhatnagar, Senior Vice President Nuclear Operations Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Larry S. Bryant, Vice President Nuclear Engineering & Technical Services Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Brian OGrady, Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Robert J. Beecken, Vice President Nuclear Support Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 General Counsel Tennessee Valley Authority ET 11A 400 West Summit Hill Drive Knoxville, TN 37902 Mr. John C. Fornicola, Manager Nuclear Assurance and Licensing Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Bruce Aukland, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Robert G. Jones, General Manager Browns Ferry Site Operations Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Glenn W. Morris, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. William D. Crouch, Manager Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Senior Resident Inspector U.S. Nuclear Regulatory Commission Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970 State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, AL 36130-3017 Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611}}

Latest revision as of 08:33, 15 January 2025

Letter Withdrawal of Relief Requests Regarding Third Interval Inservice Inspection Requirements of the ASME Code
ML061590282
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 07/03/2006
From: Ellen Brown
NRC/NRR/ADRO/DORL/LPLD
To: Singer K
Tennessee Valley Authority
Brown Eva, NRR/DLPM, 415-2315
References
TAC MC8790, TAC MC8792
Download: ML061590282 (3)


Text

July 3, 2006 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT, UNIT 3 WITHDRAWAL OF RELIEF REQUESTS REGARDING THIRD INTERVAL INSERVICE INSPECTION REQUIREMENTS OF THE ASME CODE (TAC NOS. MC8790 AND MC8792)

Dear Mr. Singer:

By letter dated October 19, 2005, the Tennessee Valley Authority (TVA) submitted Relief Request No. 3-PDI-2 for Browns Ferry Nuclear Plant (BFN) Unit 3 from the inservice inspection requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, for the volumetric examination of reactor pressure vessel nozzle-to-vessel welds. The Nuclear Regulatory Commission (NRC) staff requested additional information pertaining to the difference between TVAs request and ASME Code Case N-613-1 endorsed in Regulatory Guide (RG) 1.147, Revision 14. TVA subsequently requested that the relief request be withdrawn in a letter dated May 25, 2006 as TVA will adopt the use of ASME Code Case N-613-1 as endorsed in RG 1.147.

By the same letter dated October 19, 2005, TVA submitted Relief Request No. 3-ISI-16 for BFN Unit 3 from the inservice inspection requirements of the ASME Code,Section XI, for pressure retaining piping welds subject to examination using qualified procedures, personnel and equipment. The NRC staff requested information as to the differences between this relief request and ASME Code Case N-695, which was endorsed in RG 1.147. Subsequently, TVA will adopt the use of this code case and withdrew this relief request in a letter dated May 25, 2006.

The purpose of this letter is to advise that the above cited applications are being treated as withdrawn. This completes the NRC Staff's review of Relief Requests 3-PDI-2 and 3-ISI-16 submittals under TAC Nos. MC8790 and MC8792.

Sincerely,

/RA/

Eva A. Brown, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-296 cc: See next page

ML061590282 NRR-106 OFFICE LPL2-2/PM LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME LRegner:bt EBrown RSola for BClayton MMarshall DATE 06/29/06 06/29/06 06/30/06 07/03/06

Mr. Karl W. Singer BROWNS FERRY NUCLEAR PLANT Tennessee Valley Authority cc:

Mr. Ashok S. Bhatnagar, Senior Vice President Nuclear Operations Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Larry S. Bryant, Vice President Nuclear Engineering & Technical Services Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Brian OGrady, Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Robert J. Beecken, Vice President Nuclear Support Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 General Counsel Tennessee Valley Authority ET 11A 400 West Summit Hill Drive Knoxville, TN 37902 Mr. John C. Fornicola, Manager Nuclear Assurance and Licensing Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Bruce Aukland, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Robert G. Jones, General Manager Browns Ferry Site Operations Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Glenn W. Morris, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. William D. Crouch, Manager Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Senior Resident Inspector U.S. Nuclear Regulatory Commission Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970 State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, AL 36130-3017 Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611