ML061710307: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:TASK TITLE:   Call Out For Shift Staffing JPM No.: S-103                                         REV: NRC2006301 TPO No.: T.AM05-01                                           K&A No.: 2.1.5 TASK No.: S-AM-029, Ensure minimum shift staffing           K&A IMP: 2.3/3.4 and authorize additional shift staffing as necessary.
{{#Wiki_filter:S-103 1
TRAINEE:                                               SRO EVALUATOR:                                             DATE:
TASK TITLE:
The Trainee: PASSED             this JPM.             TIME STARTED:
Call Out For Shift Staffing JPM No.: S-103 REV: NRC2006301 TPO No.: T.AM05-01 K&A No.: 2.1.5 TASK No.: S-AM-029, Ensure minimum shift staffing K&A IMP: 2.3/3.4 and authorize additional shift staffing as necessary.
FAILED                                   TIME FINISHED:
TRAINEE:
CRITICAL ELEMENTS:   (*) 2, 3                         JPM TIME:
SRO EVALUATOR:
CRITICAL TIME:   NA                                   APPROX COMPLETION TIME: 25 MINUTES EVALUATION METHOD:                                     LOCATION:
DATE:
X   PERFORM                               X   IN PLANT
The Trainee: PASSED this JPM.
_   SIMULATE                             X   SIMULATOR GENERAL  
TIME STARTED:
FAILED TIME FINISHED:
CRITICAL ELEMENTS: (*) 2, 3 JPM TIME:
CRITICAL TIME: NA APPROX COMPLETION TIME: 25 MINUTES EVALUATION METHOD:
LOCATION:
X PERFORM X IN PLANT
_ SIMULATE X SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. LS-AA-119 OVERTIME CONTROLS Rev 3
: 1. LS-AA-119 OVERTIME CONTROLS Rev 3
: 2. BwAP 320-1 SHIFT STAFFING. Rev 16 MATERIALS:
: 2. BwAP 320-1 SHIFT STAFFING. Rev 16 MATERIALS:
: 1. Overtime Tracking list, attachment 1
: 1.
: 2. LS-AA-119, Rev. 3
Overtime Tracking list, attachment 1
: 3. BwAP 320-1, Rev.16 TASK STANDARDS:
: 2.
: 1. Determine required shift staffing.
LS-AA-119, Rev. 3
: 2. Determine from staffing list which person is available to be forced to work overtime to ensure shift staffing requirements met.
: 3.
BwAP 320-1, Rev.16 TASK STANDARDS:
: 1.
Determine required shift staffing.
: 2.
Determine from staffing list which person is available to be forced to work overtime to ensure shift staffing requirements met.
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are a Unit Supervisor.
: 1.
: 2. Both Units are at 100% power.
You are a Unit Supervisor.
: 3. The current date and time is: 05/14/2006, 0900.
: 2.
Both Units are at 100% power.
: 3.
The current date and time is: 05/14/2006, 0900.
INITIATING CUES:
INITIATING CUES:
: 1. A fire brigade qualified NLO for shift N, May 16, 2006 has called in sick.
: 1. A fire brigade qualified NLO for shift N, May 16, 2006 has called in sick.
: 2. Without the NLO above, manning for shift N, May 16, 2006 is 4 non-fire brigade qualified NLOs, 3 fire brigade qualified NLOs, and the fire chief qualified field supervisor.
: 2. Without the NLO above, manning for shift N, May 16, 2006 is 4 non-fire brigade qualified NLOs, 3 fire brigade qualified NLOs, and the fire chief qualified field supervisor.
: 3. The Shift Manager has directed you to evaluate shift staffing for shift N, May 16, 2006.
: 3. The Shift Manager has directed you to evaluate shift staffing for shift N, May 16, 2006.
: 4. Inform the Shift Manger of your results.
: 4. Inform the Shift Manger of your results.  
1 S-103


S-103 2
RECORD START TIME:
RECORD START TIME:
NOTE: These steps may be performed in any order.
NOTE: These steps may be performed in any order.
Performance Step                 Standard       Circle Applicable
Performance Step Standard Circle Applicable
: 1. Refers to LS-AA-119       Perform the following:  SAT    UNSAT    N/A Overtime Controls main     o Locates copy of LS-AA- Comments:
: 1.
body.                        119 CUE:   If examinee locates LS-AA- o Identifies step 4.1.2 119 provide copy.            requirements for work CUE:  If examinee locates BwAP      hours.
Refers to LS-AA-119 Overtime Controls main body.
320-1 provide copy.
CUE:
*2. Determine one additional   Determine one additional SAT    UNSAT    N/A fire brigade member       fire brigade member      Comments:
If examinee locates LS-AA-119 provide copy.
required                  required:
CUE:
Note: Hand examinee copy of JPM   o  Refer to BwAP 320-1 Attachment 1, overtime
If examinee locates BwAP 320-1 provide copy.
* Determine 1 tracking list, (JPM pages     additional NLO 6 & 7) and provide the         required due to following cue.                 vacancy CUE:   The shift manager directs you to determine who is eligible for overtime to cover the vacancy.
Perform the following:
CUE:   All personnel on the overtime tracking list are fire brigade qualified.
o Locates copy of LS-AA-119 o Identifies step 4.1.2 requirements for work hours.
2 S-103
SAT UNSAT N/A Comments:
*2.
Determine one additional fire brigade member required Note: Hand examinee copy of JPM, overtime tracking list, (JPM pages 6 & 7) and provide the following cue.
CUE:
The shift manager directs you to determine who is eligible for overtime to cover the vacancy.
CUE:
All personnel on the overtime tracking list are fire brigade qualified.
Determine one additional fire brigade member required:
o Refer to BwAP 320-1 Determine 1 additional NLO required due to vacancy SAT UNSAT N/A Comments:


Performance Step               Standard         Circle Applicable
S-103 3
*3. Determines NLO 3 is the Checks each persons work SAT    UNSAT    N/A only NLO that can be   hours:                    Comments:
Performance Step Standard Circle Applicable  
forced.                o NLO 1 would violate the 72 hour limit.
*3.
o NLO 2 (NO) would violate 24 hour in 48 hour limit.
Determines NLO 3 is the only NLO that can be forced.
* NLO 3 (YES) is available.
Checks each persons work hours:
o NLO 4 (NO) would violate 24 hour in 48 hour limit and would violate the 72 hour limit.
o NLO 1 would violate the 72 hour limit.
o NLO 5 (NO) would violate 72 hour limit.
o NLO 2 (NO) would violate 24 hour in 48 hour limit.
o NLO 6 (NO) would violate the 24 hour in 48 hour limit.
NLO 3 (YES) is available.
o NLO 7 (NO) is already working shift N 5/16/06 o NLO 8 (NO) would violate 72 hour limit.
o NLO 4 (NO) would violate 24 hour in 48 hour limit and would violate the 72 hour limit.
* Informs Shift manager that ONLY NLO 3 is available to be forced.
o NLO 5 (NO) would violate 72 hour limit.
o NLO 6 (NO) would violate the 24 hour in 48 hour limit.
o NLO 7 (NO) is already working shift N 5/16/06 o
NLO 8 (NO) would violate 72 hour limit.
Informs Shift manager that ONLY NLO 3 is available to be forced.
SAT UNSAT N/A Comments:
(CUE:) THIS COMPLETES THIS JPM.
(CUE:) THIS COMPLETES THIS JPM.
RECORD STOP TIME:
RECORD STOP TIME:
COMMENTS:
COMMENTS:  
3 S-103


S-103 4
TASK CONDITIONS:
TASK CONDITIONS:
: 1.     You are a Unit Supervisor.
: 1.
: 2.     Both Units are at 100% power.
You are a Unit Supervisor.
: 3.     The current date and time is: 05/14/2006, 0900.
: 2.
Both Units are at 100% power.
: 3.
The current date and time is: 05/14/2006, 0900.
INITIATING CUES:
INITIATING CUES:
: 1.     A fire brigade qualified NLO for shift N, May 16, 2006 has called in sick.
: 1.
: 2.     Without the NLO above, manning for shift N, May 16, 2006 is 4 non-fire brigade qualified NLOs, 3 fire brigade qualified NLOs, and the fire chief qualified field supervisor.
A fire brigade qualified NLO for shift N, May 16, 2006 has called in sick.
: 3.     The Shift Manager has directed you to evaluate shift staffing for shift N, May 16, 2006.
: 2.
: 4.     Inform the Shift Manger of your results.
Without the NLO above, manning for shift N, May 16, 2006 is 4 non-fire brigade qualified NLOs, 3 fire brigade qualified NLOs, and the fire chief qualified field supervisor.
4 S-103
: 3.
The Shift Manager has directed you to evaluate shift staffing for shift N, May 16, 2006.
: 4.
Inform the Shift Manger of your results.  


S-103 5
SIMULATOR SETUP GUIDE:
SIMULATOR SETUP GUIDE:
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
COMMENTS:
COMMENTS:
* Provide copy of LS-AA-119, Rev 3
* Provide copy of LS-AA-119, Rev 3
* BwAP 320-1, Rev 16 5
* BwAP 320-1, Rev 16  
S-103


Crew 1         May May May May May May May May May May May May May May May May May May May May May 8 8   8   9   9   9 10 10 10 11 11 11 12 12 12 13 13 13 14 14 14 Mon         Tue         Wed         Thurs       Fri         Sat         Sun 1 2   3   1   2   3   1   2   3   1   2   3   1   2   3   1   2   3   1   2   3 NLO 1 266 1-01                                     12         12           12         12 xx           xx xx1        2            1     N1C         NX         NX         NX NLO 2 200 1-02                                                 12           12         12 xx         xx           xx         xx 1         2            1          1      NX         NX         NA NLO 3 251 1-03                                                 12           12         12 xx         xx           xx         xx 1         2            1          1      NA         NA         NB NLO 4 910 1-04                                                 12           12         12 xx         xx           xx         xx 1         2            1          1      NB         NB         NC NLO 5 233 1-05                                                 12           12         12 xx         xx           xx         xx 1         2            1          1      NC         NC         ND NLO 6 924 1-06                                                 12           12         12 xx         xx           xx         xx 1         2            1          1      ND         ND         NE NLO 7 724 1-07                                                 12           12         12 xx         xx           xx         xx 1       1          2            1          1      NE         NE         NX NLO 8 323 1-08                                     12         12           12         12 xx         xx 1          2       N1A         N2X         NX         NX         NX Crew 1         May May May May May May May May May May May May May May May May May May May May May 15 15 15 16 16 16 17 17 17 18 18 18 19 19 19 20 20 20 21 21 21 Mon         Tue         Wed         Thurs       Fri         Sat         Sun 1 2   3   1   2   3   1   2   3   1   2   3   1   2   3   1   2   3   1   2   3 NLO 1 266 1-01 12                     12         12             12         12         12 NA             xx1     N2X         N1A             DB         DC         DD NLO 2 200 1-02 12               12                                 12         12         12 xx NB             D1X         xx2         1         DC         DD         DE NLO 3 251 1-03 12                                     12         12         12         12 xx NC              1         xx2       D1A         DD         DE         DX NLO 4 910 1-04 12               12         12                     12         12         12 xx ND             D1X         D2X           1         DE         DX         DX NLO 5 233 1-05 12                         12         12         12         12         12 NE             xx1       D2C         D2D         DX         DX         DX S-103  (ATTACHMENT 1)
S-103 (ATTACHMENT 1)
Crew 1 May May May May May May May May May May May May May May May May May May May May May 8
8 8
9 9
9 10 10 10 11 11 11 12 12 12 13 13 13 14 14 14 Mon Tue Wed Thurs Fri Sat Sun 1
2 3
1 2
3 1
2 3
1 2
3 1
2 3
1 2
3 1
2 3
NLO 1 266 1-01 12 12 12 12 xx1 xx 2
xx 1
N1C NX NX NX NLO 2 200 1-02 12 12 12 xx 1
xx 2
xx 1
xx 1
NX NX NA NLO 3 251 1-03 12 12 12 xx 1
xx 2
xx 1
xx 1
NA NA NB NLO 4 910 1-04 12 12 12 xx 1
xx 2
xx 1
xx 1
NB NB NC NLO 5 233 1-05 12 12 12 xx 1
xx 2
xx 1
xx 1
NC NC ND NLO 6 924 1-06 12 12 12 xx 1
xx 2
xx 1
xx 1
ND ND NE NLO 7 724 1-07 12 12 12 1
xx 1
xx 2
xx 1
xx 1
NE NE NX NLO 8 323 1-08 12 12 12 12 xx 1
xx 2
N1A N2X NX NX NX Crew 1 May May May May May May May May May May May May May May May May May May May May May 15 15 15 16 16 16 17 17 17 18 18 18 19 19 19 20 20 20 21 21 21 Mon Tue Wed Thurs Fri Sat Sun 1
2 3
1 2
3 1
2 3
1 2
3 1
2 3
1 2
3 1
2 3
NLO 1 266 1-01 12 12 12 12 12 12 NA xx1 N2X N1A DB DC DD NLO 2 200 1-02 12 12 12 12 12 NB D1X xx2 xx 1
DC DD DE NLO 3 251 1-03 12 12 12 12 12 NC xx 1
xx2 D1A DD DE DX NLO 4 910 1-04 12 12 12 12 12 12 ND D1X D2X xx 1
DE DX DX NLO 5 233 1-05 12 12 12 12 12 12 NE xx1 D2C D2D DX DX DX  


NLO 6 924 1-06 12             12                                 12         12           12 xx NX             D1B         xx2         1         DX         DX         DA NLO 7 724 1-07 12         12                         12         12         12           12 xx 1   NX         N1A             2         D1X         DX         DA         DB NLO 8 323 1-08 12                                 12             12         12           12 xx         xx NX              1          2       N1X             DX         DB         DC Crew 1         May May May May May May May May May May May May May May May May May May May May May 22 22 22 23 23 23 24 24 24 25 25 25 26 26 26 27 27 27 28 28 28 Mon         Tue         Wed         Thurs       Fri         Sat         Sun 1 2   3   1   2   3   1   2   3   1   2   3   1   2   3   1   2   3   1   2   3 NLO 1 266 1-01                 8           8           8           8 N2X             T           T           T           T         xx1         xx2 NLO 2 200 1-02                 8           8           8           8 xx 1           T           T           T           T         xx1         xx2 NLO 3 251 1-03                 8           8           8           8 xx 1           T           T           T           T         xx1         xx2 NLO 4 910 1-04                 8           8           8           8 xx 1           T           T           T           T         xx1         xx2 NLO 5 233 1-05                 8           8           8           8 xx 1           T           T           T           T         xx1         xx2 NLO 6 924 1-06                 8           8           8           8 xx 1           T           T           T           T         xx1         xx2 NLO 7 724 1-07                 8           8           8           8 xx 1       1          T           T           T           T         xx1         xx2 NLO 8 323 1-08 12               8           8           8           8 N1B             T           T           T           T         xx1         xx2 S-103  (ATTACHMENT 1)
S-103 (ATTACHMENT 1)
NLO 6 924 1-06 12 12 12 12 12 NX D1B xx2 xx 1
DX DX DA NLO 7 724 1-07 12 12 12 12 12 12 1
NX N1A xx 2
D1X DX DA DB NLO 8 323 1-08 12 12 12 12 12 NX xx 1
xx 2
N1X DX DB DC Crew 1 May May May May May May May May May May May May May May May May May May May May May 22 22 22 23 23 23 24 24 24 25 25 25 26 26 26 27 27 27 28 28 28 Mon Tue Wed Thurs Fri Sat Sun 1
2 3
1 2
3 1
2 3
1 2
3 1
2 3
1 2
3 1
2 3
NLO 1 266 1-01 8
8 8
8 N2X T
T T
T xx1 xx2 NLO 2 200 1-02 8
8 8
8 xx 1
T T
T T
xx1 xx2 NLO 3 251 1-03 8
8 8
8 xx 1
T T
T T
xx1 xx2 NLO 4 910 1-04 8
8 8
8 xx 1
T T
T T
xx1 xx2 NLO 5 233 1-05 8
8 8
8 xx 1
T T
T T
xx1 xx2 NLO 6 924 1-06 8
8 8
8 xx 1
T T
T T
xx1 xx2 NLO 7 724 1-07 8
8 8
8 1
xx 1
T T
T T
xx1 xx2 NLO 8 323 1-08 12 8
8 8
8 N1B T
T T
T xx1 xx2  


TASK TITLE: Respond to a Fire Detection/Suppression System Alarm JPM No.:     S-105                                     REV:         NRC2006301 TPO No.:   8.E.AM-200                                 K&A No.:     2.1.14 TASK No.:   S-AM-200, Supervise actions for           K&A IMP:   2.5/3.3 combating a plant fire TRAINEE:                                               SRO EVALUATOR:                                             DATE:
S-105 1
The Trainee:       PASSED             this JPM.       TIME STARTED:
TASK TITLE: Respond to a Fire Detection/Suppression System Alarm JPM No.:
FAILED                             TIME FINISHED:
S-105 REV:
JPM TIME:             MINUTES CRITICAL ELEMENTS:       (*) 1, 3, 4, 8-10           APPROX COMPLETION TIME   15 MINUTES CRITICAL TIME:           NA EVALUATION METHOD:                                     LOCATION:
NRC2006301 TPO No.:
PERFORM                               X   IN PLANT X   SIMULATE                             X   SIMULATOR GENERAL  
8.E.AM-200 K&A No.:
2.1.14 TASK No.:
S-AM-200, Supervise actions for K&A IMP:
2.5/3.3 combating a plant fire TRAINEE:
SRO EVALUATOR:
DATE:
The Trainee:
PASSED this JPM.
TIME STARTED:
FAILED TIME FINISHED:
JPM TIME:
MINUTES CRITICAL ELEMENTS:
(*) 1, 3, 4, 8-10 APPROX COMPLETION TIME 15 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
PERFORM X IN PLANT X SIMULATE X SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. BwAR 0-37-A4, Rev. 13, UNIT 1 AREA FIRE.
: 1.
: 2. BwAP 1100-16, Rev. 22, Fire/Hazardous Spill and/or Injury Response.
BwAR 0-37-A4, Rev. 13, UNIT 1 AREA FIRE.
: 2.
BwAP 1100-16, Rev. 22, Fire/Hazardous Spill and/or Injury Response.
MATERIALS:
MATERIALS:
: 1. BwAR 0-37-A4, Rev. 13.
: 1.
: 2. Partially completed BwAP 1100-16, Rev. 22, Appendix A.
BwAR 0-37-A4, Rev. 13.
: 2.
Partially completed BwAP 1100-16, Rev. 22, Appendix A.
TASK STANDARDS:
TASK STANDARDS:
: 1. Perform Shift Manager designee required actions in response to a Fire Detection/Suppression System Alarm.
: 1.
: 2. Complete Shift Manager designee applicable actions of Fire/Haz-Mat Response/Checklist (Appendix A).
Perform Shift Manager designee required actions in response to a Fire Detection/Suppression System Alarm.
: 2.
Complete Shift Manager designee applicable actions of Fire/Haz-Mat Response/Checklist (Appendix A).
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are the Shift Managers Designee.
: 1.
: 2. Both Units are at full power.
You are the Shift Managers Designee.
: 2.
Both Units are at full power.
INITIATING CUES:
INITIATING CUES:
: 1. Annunciator 0-37-A4 for Unit 1 actuated a few minutes ago and has been acknowledged by the Unit 1 Admin NSO. An Alarm on 1PM09J has also been acknowledged.
: 1.
: 2. An NLO called the MCR via the emergency phone number to report a fire is in progress in the plant
Annunciator 0-37-A4 for Unit 1 actuated a few minutes ago and has been acknowledged by the Unit 1 Admin NSO. An Alarm on 1PM09J has also been acknowledged.
: 3. An NSO has completed the Unit Admin NSO portion of BwAP 1100-16, Appendix A, Fire/Haz-Mat Response/Checklist and has just forwarded it to you. (CUE: Hand examinee copy of the BwAP 1100-16 Appendix A Checklist with the NSO portion completed)
: 2.
: 4. Another SRO is currently evaluating EALs related to the event.
An NLO called the MCR via the emergency phone number to report a fire is in progress in the plant
: 5. You are directed to complete the Shift Manager/Designee portion of the Fire/Haz-Mat Response/Checklist
: 3.
: 6. Route the completed checklist to the Station Duty Officer when it is completed.
An NSO has completed the Unit Admin NSO portion of BwAP 1100-16, Appendix A, Fire/Haz-Mat Response/Checklist and has just forwarded it to you. (CUE: Hand examinee copy of the BwAP 1100-16 Appendix A Checklist with the NSO portion completed)
1 S-105
: 4.
Another SRO is currently evaluating EALs related to the event.
: 5.
You are directed to complete the Shift Manager/Designee portion of the Fire/Haz-Mat Response/Checklist
: 6.
Route the completed checklist to the Station Duty Officer when it is completed.  


RECORD START TIME Note: Pages 8-9 contain key of correctly filled out form.
S-105 2
PERFORMANCE STEP                   STANDARD           Circle applicable
RECORD START TIME Note: Pages 8-9 contain key of correctly filled out form.
*1. Perform BwAP 1100-16         Locate and Open BwAP      SAT    UNSAT      N/A Appendix A, Shift             1100-16.                  Comments:
PERFORMANCE STEP STANDARD Circle applicable  
Manager/Designee section,     Review / perform the steps 1 & 2.                 required actions of the CUE:   All Prerequisites,     SM or designee:
*1. Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, steps 1 & 2.
Precautions,
CUE:
* Contact Security Limitations and           Supervisor Actions have been met.
All Prerequisites, Precautions, Limitations and Actions have been met.
o Phone CUE:   As Security Shift Supervisor,               o Plant Page acknowledge the report   o Radio of the fire, and request for personnel.
CUE:
* NOTIFY the Security Shift Supervisor
As Security Shift Supervisor, acknowledge the report of the fire, and request for personnel.
Locate and Open BwAP 1100-16.
Review / perform the required actions of the SM or designee:
Contact Security Supervisor o Phone o Plant Page o Radio NOTIFY the Security Shift Supervisor
* Location of the fire
* Location of the fire
* Dispatch security personnel to the equipment cages
* Dispatch security personnel to the equipment cages
* Dispatch security personnel to fire area to control access
* Dispatch security personnel to fire area to control access Initial in block 1 NOTIFY security to OPEN any Security Barriers as needed Initial in block 2 SAT UNSAT N/A Comments:
* Initial in block 1
: 2.
* NOTIFY security to OPEN any Security Barriers as needed
Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 3.
* Initial in block 2
CUE:
: 2. Perform BwAP 1100-16         Review / perform the      SAT    UNSAT      N/A Appendix A, Shift             required actions of the    Comments:
As NSO, or Fire Brigade, confirm notification/dispatch of fire brigade.
Manager/Designee section,     SM or designee:
Review / perform the required actions of the SM or designee:
step 3.                       o  VERIFY the fire CUE:   As NSO, or Fire           brigade has been Brigade, confirm          notified/dispatched notification/dispatch      o Contact Admin NSO of fire brigade.              to verify fire brigade dispatched o Contact Fire Chief and/or fire brigade members.
o VERIFY the fire brigade has been notified/dispatched o Contact Admin NSO to verify fire brigade dispatched o Contact Fire Chief and/or fire brigade members.
o Phone o Plant Page o Radio
o Phone o Plant Page o Radio Initial in block 3 SAT UNSAT N/A Comments:
* Initial in block 3 2
S-105


PERFORMANCE STEP                 STANDARD           Circle applicable
S-105 3
*3. Perform BwAP 1100-16         Review / perform the      SAT    UNSAT      N/A Appendix A, Shift             required actions of the  Comments:
PERFORMANCE STEP STANDARD Circle applicable  
Manager/Designee section,     SM or designee:
*3. Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 4.
step 4.
CUE:
* Contact Rad Protection CUE:   As Rad Protection         o Phone acknowledge request for dispatch.             o Plant Page
As Rad Protection acknowledge request for dispatch.
* Initial in block 4
Review / perform the required actions of the SM or designee:
* Initial indicating the notification method used in block 4, other methods marked N/A.
Contact Rad Protection o Phone o Plant Page Initial in block 4 Initial indicating the notification method used in block 4, other methods marked N/A.
*4. Perform BwAP 1100-16         Review / perform the      SAT    UNSAT      N/A Appendix A, Shift             required actions of the  Comments:
SAT UNSAT N/A Comments:
Manager/Designee section,     SM or designee:
*4. Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 5.
step 5.
CUE:
* Contact Fire Chief CUE:   As Fire Chief, report     o Phone that the fire was wood that was staged for an     o Plant Page upcoming outage. The       o Radio fire is out, no injuries, small fire,     o Communicates via no equipment damaged,       Admin NSO no outside assistance
As Fire Chief, report that the fire was wood that was staged for an upcoming outage. The fire is out, no injuries, small fire, no equipment damaged, no outside assistance is necessary.
* COMMUNICATE with the is necessary.             Fire Chief to If asked report that     determine the access to the ESF         following:
If asked report that access to the ESF switchgear rooms is not impeded.
switchgear rooms is
Review / perform the required actions of the SM or designee:
* Conditions/status not impeded.                at fire scene
Contact Fire Chief o Phone o Plant Page o Radio o Communicates via Admin NSO COMMUNICATE with the Fire Chief to determine the following:
* Injuries
Conditions/status at fire scene Injuries Extent of fire Equipment damaged Assistance requirements Record applicable information block 5 Initial each sub step in block 5 (Assistance required information and initial is not required to be filled in)
* Extent of fire
SAT UNSAT N/A Comments:
* Equipment damaged
: 5.
* Assistance requirements
Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 6.
* Record applicable information block 5
Review / perform the required actions of the SM or designee:
* Initial each sub step in block 5 (Assistance required information and initial is not required to be filled in)
Determine that step 6 is not required to be performed SAT UNSAT N/A Comments:
: 5. Perform BwAP 1100-16         Review / perform the      SAT    UNSAT      N/A Appendix A, Shift             required actions of the  Comments:
Manager/Designee section,     SM or designee:
step 6.
* Determine that step 6 is not required to be performed 3
S-105


PERFORMANCE STEP                 STANDARD           Circle applicable
S-105 4
: 6. Perform BwAP 1100-16         Review / perform the      SAT    UNSAT      N/A Appendix A, Shift             required actions of the  Comments:
PERFORMANCE STEP STANDARD Circle applicable
Manager/Designee section,     SM or designee:
: 6.
step 7.
Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 7.
* Determine if EALs have CUE:   SM will review EALs.     been evaluated o Review EALs
CUE:
: 7. Perform BwAP 1100-16         Review / perform the      SAT    UNSAT      N/A Appendix A, Shift             required actions of the  Comments:
SM will review EALs.
Manager/Designee section,     SM or designee:
Review / perform the required actions of the SM or designee:
step 8.
Determine if EALs have been evaluated o
* NOTIFY the Station CUE:   Inform examinee           Fire Marshal, Station notifications have       Duty Officer, and already been performed   Chemistry by another SRO.
Review EALs SAT UNSAT N/A Comments:
* Initial each sub step CUE:   OP-AA-106-101 will be     in block 8 (Notify reviewed by another      Others and Notify SRO.                      other Fire Departments and initial is not required to be filled in)
: 7.
*8. Perform BwAP 1100-16         Request periodic status  SAT    UNSAT      N/A Appendix A, Shift             reports from the Exelon  Comments:
Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 8.
Manager/Designee section,     Fire Chief at no more step 9.                       than 20 minute intervals Note: If examinee determines and note on the update not required at checklist:
CUE:
this time (due to 20
Inform examinee notifications have already been performed by another SRO.
* Contact Fire Chief minute time limit on       o Phone updates), provide the following cue             o Plant Page CUE:   20 minutes have           o Radio elapsed since you last o  COMMUNICATE with the spoke with Fire Chief     Fire Chief to CUE:   As Fire Chief provide     determine the the following info as     following:
CUE:
an update:               o  Conditions/status The fire is out, the         at fire scene only visible damage is   o  Injuries charred paint/floor, and no assistance         o Extent of fire necessary.                o Equipment damaged o Assistance requirements Record update from Exelon Fire Chief
OP-AA-106-101 will be reviewed by another SRO.
* Initial in block 9 4
Review / perform the required actions of the SM or designee:
S-105
NOTIFY the Station Fire Marshal, Station Duty Officer, and Chemistry Initial each sub step in block 8 (Notify Others and Notify other Fire Departments and initial is not required to be filled in)
SAT UNSAT N/A Comments:
*8. Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 9.
Note: If examinee determines update not required at this time (due to 20 minute time limit on updates), provide the following cue CUE:
20 minutes have elapsed since you last spoke with Fire Chief CUE:
As Fire Chief provide the following info as an update:
The fire is out, the only visible damage is charred paint/floor, and no assistance necessary.
Request periodic status reports from the Exelon Fire Chief at no more than 20 minute intervals and note on the checklist:
Contact Fire Chief o Phone o Plant Page o Radio o
COMMUNICATE with the Fire Chief to determine the following:
o Conditions/status at fire scene o
Injuries o
Extent of fire o
Equipment damaged o
Assistance requirements Record update from Exelon Fire Chief Initial in block 9 SAT UNSAT N/A Comments:


PERFORMANCE STEP                 STANDARD           Circle applicable
S-105 5
  *9. Perform BwAP 1100-16         Perform the following    SAT    UNSAT      N/A Appendix A, Shift
PERFORMANCE STEP STANDARD Circle applicable  
* Contact the Work      Comments:
*9. Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 10.
Manager/Designee section,       Execution Center step 10.
CUE:
o Phone o Plant Page CUE:   Acknowledge notifications as WEC.     o Radio
Acknowledge notifications as WEC.
* Notify WEC to perform the following:
Perform the following Contact the Work Execution Center o Phone o Plant Page o Radio Notify WEC to perform the following:
* 0BwOS FP-Q5, Fire Brigade Cages Equipment Area Check surveillance
0BwOS FP-Q5, Fire Brigade Cages Equipment Area Check surveillance Initial in block 10 SAT UNSAT N/A Comments:
* Initial in block 10
*10. Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 11.
*10. Perform BwAP 1100-16         List Fire Brigade Team    SAT    UNSAT      N/A Appendix A, Shift             Members on the checklist: Comments:
CUE:
Manager/Designee section,
Team members are Chief: Dave Mills, Members: Morgan, Davito, Bannon, and Verchimak.
* Contact Fire Chief step 11.
List Fire Brigade Team Members on the checklist:
o Phone CUE:   Team members are Chief: Dave Mills,         o Plant Page Members: Morgan,           o Radio Davito, Bannon, and
Contact Fire Chief o Phone o Plant Page o Radio Request roster of Fire Brigade Members List Fire Brigade Chief and Fire Brigade Team Members in block
* Request roster of Fire Verchimak.                Brigade Members
: 11.
* List Fire Brigade Chief and Fire Brigade Team Members in block 11.
Initial in block 11 SAT UNSAT N/A Comments:
* Initial in block 11
: 11. Route the completed checklist CUE:
: 11. Route the completed           Route the completed      SAT    UNSAT      N/A checklist                     checklist for review      Comments:
Acknowledge request to route completed checklist.
CUE:  Acknowledge request to
Route the completed checklist for review Contact Station Duty Officer o Phone o Plant Page o Radio Route checklist to Station Duty Officer SAT UNSAT N/A Comments:
* Contact Station Duty route completed          Officer checklist.                o Phone o Plant Page o Radio
CUE: THIS COMPLETES THIS JPM.
* Route checklist to Station Duty Officer CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:  
RECORD STOP TIME COMMENTS:
5 S-105


S-105 6
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are the Shift Managers Designee.
: 1.
: 2. Both Units are at full power.
You are the Shift Managers Designee.
: 2.
Both Units are at full power.
INITIATING CUES:
INITIATING CUES:
: 1. Annunciator 0-37-A4 for Unit 1 actuated a few minutes ago and has been acknowledged by the Unit 1 Admin NSO. An Alarm on 1PM09J has also been acknowledged.
: 1.
: 2. An NLO called the MCR via the emergency phone number to report a fire is in progress in the plant
Annunciator 0-37-A4 for Unit 1 actuated a few minutes ago and has been acknowledged by the Unit 1 Admin NSO. An Alarm on 1PM09J has also been acknowledged.
: 3. An NSO has completed the Unit Admin NSO portion of BwAP 1100-16, Appendix A, Fire/Haz-Mat Response/Checklist and has just forwarded it to you.
: 2.
: 4. Another SRO is currently evaluating EALs related to the event.
An NLO called the MCR via the emergency phone number to report a fire is in progress in the plant
: 5. You are directed to complete the Shift Manager/Designee portion of the Fire/Haz-Mat Response/Checklist
: 3.
: 6. Route the completed checklist to the Station Duty Officer when it is completed.
An NSO has completed the Unit Admin NSO portion of BwAP 1100-16, Appendix A, Fire/Haz-Mat Response/Checklist and has just forwarded it to you.
6 S-105
: 4.
Another SRO is currently evaluating EALs related to the event.
: 5.
You are directed to complete the Shift Manager/Designee portion of the Fire/Haz-Mat Response/Checklist
: 6.
Route the completed checklist to the Station Duty Officer when it is completed.  


S-105 7
SIMULATOR SETUP GUIDE:
SIMULATOR SETUP GUIDE:
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
Line 224: Line 416:
* Complete items on Simulator Ready for Training Checklist. (N/A if JPM NOT performed in simulator)
* Complete items on Simulator Ready for Training Checklist. (N/A if JPM NOT performed in simulator)
* Place simulator in RUN. (N/A if JPM NOT performed in simulator)
* Place simulator in RUN. (N/A if JPM NOT performed in simulator)
* Insert IMF PN0749 ON(N/A if JPM NOT performed in simulator)
Insert IMF PN0749 ON(N/A if JPM NOT performed in simulator)
COMMENTS:
OMMENTS:
C
* Provide marked up copy of BwAP 1100-16, Appendix A, completed through step 15 (page 4, NSO actions)
* Provide marked up copy of BwAP 1100-16, Appendix A, completed through step 15 (page 4, NSO actions)
* Provide copy of BwAR 0-37-A4.
* Provide copy of BwAR 0-37-A4.
* The fire is on the 426 elevation of the U-1 Turbine Building outside of ESF Bus 141 room. The fire is a small fire and was in wood that was being staged for an upcoming outage.
* The fire is on the 426 elevation of the U-1 Turbine Building outside of ESF Bus 141 room. The fire is a small fire and was in wood that was being staged for an upcoming outage.  
7 S-105


KEY BwAP 1100-16 APPENDIX A KE Y Revision 22 Information Use FIRE/HAZ-MAT RESPONSE/CHECKLIST Nuclear Station Operator
BwAP 1100-16 Revision 22 Information Use S-105 8
__JN__ 1.     Name of Caller/Informant:                   Tom NLO__________________________________
APPENDIX A FIRE/HAZ-MAT RESPONSE/CHECKLIST Nuclear Station Operator
__JN__2.       Phone Number of Informant (if available):   7588______________________________________
__JN__1.
__JN__3.       Date:                                       Today_____________________________________
Name of Caller/Informant:
__JN__4.       Time:                                       __5 minutes ago____________________________
Tom NLO__________________________________
__JN__5.       Location of Fire/Spill (Bldg/Elev/Area):     Turbine Building 426 outside ESF Bus 141 room___
__JN__2.
__JN__6.       Size of Fire/Spill:                         Small_____________________________________
Phone Number of Informant (if available):
__JN__7.       Type of Fire Spill (Circle/Explain):         Wood/Trash/Rubbish: Wood staged for outage Flammable/Combustible Liquid:
7588______________________________________
__JN__3.
Date:
Today_____________________________________
__JN__4.
Time:
__5 minutes ago____________________________
__JN__5.
Location of Fire/Spill (Bldg/Elev/Area):
Turbine Building 426 outside ESF Bus 141 room___
__JN__6.
Size of Fire/Spill:
Small_____________________________________
__JN__7.
Type of Fire Spill (Circle/Explain):
Wood/Trash/Rubbish: Wood staged for outage Flammable/Combustible Liquid:
Plant Equipment:
Plant Equipment:
Other:                     ___________________
Other:
Type of Chemical:           ___________________
Type of Chemical:
__JN__8.       Notify the Shift Manager or designee of the situation.
__JN__8.
__JN__9.       Radio Announcement of location Fire/Spill (Include fire type/size or Chemical if known).
Notify the Shift Manager or designee of the situation.
__JN__10.     Sound Plant Fire Siren (10-15 seconds).
__JN__9.
__JN__11.     P.A. Announcement of location, type and size of fire/spill (Use EMER PAGE button and handset button concurrently).
Radio Announcement of location Fire/Spill (Include fire type/size or Chemical if known).
__JN__12.     Sound Plant Fire Siren (10-15 seconds).
__JN__10.
__JN__13.     P.A. Announcement of location, type and size of fire/spill (Use EMER PAGE button and handset button concurrently).
Sound Plant Fire Siren (10-15 seconds).
_N/A__14.     Notify Unit Operator(s) to refer to BwOP FP-100, Fire Response Guidelines for a fire in any of the following areas:
__JN__11.
{       VCT Room (11.6A-_)
P.A. Announcement of location, type and size of fire/spill (Use EMER PAGE button and handset button concurrently).
{       Aux Bldg. 426 Chemistry Lab/Office (11.6B-0)
__JN__12.
{       Kitchen/Locker Room Area (18.5-1)
Sound Plant Fire Siren (10-15 seconds).
{       RH Heat Exchanger Room (11.3_-_)
__JN__13.
{       Letdown Heat Exchanger Room (11.4C-_)
P.A. Announcement of location, type and size of fire/spill (Use EMER PAGE button and handset button concurrently).
{       DG Room/Switchgear Room Air Shaft (18._-_)
_N/A__14.
{       Radwaste Drumming Station and Radwaste Tunnel (14.1-0)
Notify Unit Operator(s) to refer to BwOP FP-100, Fire Response Guidelines for a fire in any of the following areas:
__JN__15.     Relay information to the Shift Manager.
{
NSO/Time         _Joe NSO____________/__Current Time_______
VCT Room (11.6A-_)
KEY S-105 8
{
KEY
Aux Bldg. 426 Chemistry Lab/Office (11.6B-0)
{
Kitchen/Locker Room Area (18.5-1)
{
RH Heat Exchanger Room (11.3_-_)
{
Letdown Heat Exchanger Room (11.4C-_)
{
DG Room/Switchgear Room Air Shaft (18._-_)
{
Radwaste Drumming Station and Radwaste Tunnel (14.1-0)
__JN__15.
Relay information to the Shift Manager.
NSO/Time
_Joe NSO____________/__Current Time_______
KKEEYY KKEEYY KKEEYY KKEEYY


KEY                                                                                                        KEY BwAP 1100-16 Revision 22 Information Use APPENDIX A (Cont)
BwAP 1100-16 Revision 22 Information Use S-105 9
APPENDIX A (Cont)
FIRE/HAZ-MAT RESPONSE/CHECKLIST Shift Manager/Designee
FIRE/HAZ-MAT RESPONSE/CHECKLIST Shift Manager/Designee
__SM__1.     Notify the Security Shift Supervisor of the incident location in order to dispatch security personnel to the fire/spill area and fire equipment/Haz-Mat Equipment cages and to provide access control as necessary.
__SM__1.
__SM__2.     Have Security OPEN any Security Barriers as needed (Track Way Gates, Doors, etc.)
Notify the Security Shift Supervisor of the incident location in order to dispatch security personnel to the fire/spill area and fire equipment/Haz-Mat Equipment cages and to provide access control as necessary.
__SM__3.     Verify the fire brigade has been notified/dispatched.
__SM__2.
Have Security OPEN any Security Barriers as needed (Track Way Gates, Doors, etc.)
__SM__3.
Verify the fire brigade has been notified/dispatched.
NOTE Appendix E contains information on the duties and requirements for Rad Protection Personnel.
NOTE Appendix E contains information on the duties and requirements for Rad Protection Personnel.
__SM__4.     Notify Rad Protection.
__SM__4.
__SM*__       {         x2240 *Examinee initials in space denoting notification method (only 1 method required)
Notify Rad Protection.
__SM*__       {         x2241
__SM*__
__SM*__       {         Plant Page
{
: 5. Communicate with the Fire Chief/Incident Commander to determine the following:
x2240 *Examinee initials in space denoting notification method (only 1 method required)
__SM__       z         Conditions/status at the fire scene             Small wood fire_________________________
__SM*__
__SM__       z         Injuries                                       No injuries, None, or N/A_________________
{
__SM__       z         Extent of fire                                 Fire is out, extinguished, etc.______________
x2241
__SM__       z         Equipment damaged                               No equipment damaged, none, or N/A_______
__SM*__
__SM__       z         Assistance required                             No outside assistance required, none, or N/A__
{
Plant Page
: 5.
Communicate with the Fire Chief/Incident Commander to determine the following:
__SM__
z Conditions/status at the fire scene Small wood fire_________________________
__SM__
z Injuries No injuries, None, or N/A_________________
__SM__
z Extent of fire Fire is out, extinguished, etc.______________
__SM__
z Equipment damaged No equipment damaged, none, or N/A_______
__SM__
z Assistance required No outside assistance required, none, or N/A__
NOTE Reported Fires in buildings outside the Protected area shall be handled by the off-site Fire Department. At Braidwoods owner controlled area at the Plant, notify Braidwood Fire Department (9-911 or 9-458-2121). At River Screen House, call Custer Twp. Fire Department (9-458-2119).
NOTE Reported Fires in buildings outside the Protected area shall be handled by the off-site Fire Department. At Braidwoods owner controlled area at the Plant, notify Braidwood Fire Department (9-911 or 9-458-2121). At River Screen House, call Custer Twp. Fire Department (9-458-2119).
: 6. If Off-Site Assistance Required:
: 6.
If Off-Site Assistance Required:
NOTE INFORM the Braidwood Fire Department with as much information as possible, i.e., type of fire/spill, size, location of fire/spill, point of plant entry, etc.
NOTE INFORM the Braidwood Fire Department with as much information as possible, i.e., type of fire/spill, size, location of fire/spill, point of plant entry, etc.
__N/A__       {         CALL Braidwood Fire Dept. (9-911 or 9-458-2121).
__N/A__
__N/A__       {         CALL Custer Twp Fire Dept. (9-458-2119) for River Screen House.
{
z         NOTIFY Security Shift Supervisor of the following:
CALL Braidwood Fire Dept. (9-911 or 9-458-2121).
__N/A__                 z       Off-Site Fire Dept. responding.
__N/A__
__N/A__                 z       Desired Plant Access Point.
{
__N/A__                 z       Location of Command Post Area.
CALL Custer Twp Fire Dept. (9-458-2119) for River Screen House.
z         Refer to the Exelon Nuclear Radiological Emergency Plan, Braidwood Annex, for emergency action levels.
z NOTIFY Security Shift Supervisor of the following:
__N/A__       z         Fire Chief notified of Off-Site response.
__N/A__
__N/A__       z         Site Communications Director notified of Off-Site response.
z Off-Site Fire Dept. responding.
KEY S-105 9
__N/A__
KEY
z Desired Plant Access Point.
__N/A__
z Location of Command Post Area.
z Refer to the Exelon Nuclear Radiological Emergency Plan, Braidwood Annex, for emergency action levels.
__N/A__
z Fire Chief notified of Off-Site response.
__N/A__
z Site Communications Director notified of Off-Site response.
KKEEYY KKEEYY KKEEYY KKEEYY


KEY                                          APPENDIX A (Cont)
BwAP 1100-16 Revision 22 Information Use 10 KKEEY S-105 APPENDIX A (Cont)
KEY BwAP 1100-16 Revision 22 Information Use FIRE/HAZ-MAT RESPONSE/CHECKLIST Shift Manager/Designee
FIRE/HAZ-MAT RESPONSE/CHECKLIST Shift Manager/Designee
__SM__7,     Refer to the Exelon Nuclear Radiological Emergency Plan, Braidwood Annex, for emergency action levels if not already referred to.
: __SM__7, Refer to the Exelon Nuclear Radiological Emergency Plan, Braidwood Annex, for emergency action levels if not already referred to.
: 8. Notify the following:
: 8.
__SM__       z         Station Fire Marshal
Notify the following:
__SM__       z         Station Duty Officer
__SM__
__SM__       z         Chemistry
z Station Fire Marshal
__
__SM__
* __      z        Others per OP-AA-106-101 (*will be completed by another SRO)
z Station Duty Officer
__N/A__       z         Notify other Fire Departments or other assistance as requested by the Exelon Fire Chief.
__SM__
__SM__9.     Request periodic status/damage reports from the Exelon Fire chief at no more than twenty (20) minute intervals.
z Chemistry z
Others per OP-AA-106-101 (*will be completed by another SRO)
__N/A__
z Notify other Fire Departments or other assistance as requested by the Exelon Fire Chief.
__SM__9.
Request periodic status/damage reports from the Exelon Fire chief at no more than twenty (20) minute intervals.
The fire is out, the only visible damage is charred paint/floor, no assistance necessary ---_____
The fire is out, the only visible damage is charred paint/floor, no assistance necessary ---_____
_____________________________________________________________________________
__SM__10.
_____________________________________________________________________________
Notify the WEC to perform the following:
_____________________________________________________________________________
z 0BwOS FP-Q5, Fire Brigade Cages Equipment Area Check Surveillance, must be performed for all Fire Brigade cage equipment used during a fire.
_____________________________________________________________________________
{
__SM__10. Notify the WEC to perform the following:
0BwOS HM-Q1, Operations Hazardous Materials Emergency Response Equipment Inventory, must be performed for each cage used during a Hazardous Material Spill.
z         0BwOS FP-Q5, Fire Brigade Cages Equipment Area Check Surveillance, must be performed for all Fire Brigade cage equipment used during a fire.
__SM__11.
{         0BwOS HM-Q1, Operations Hazardous Materials Emergency Response Equipment Inventory, must be performed for each cage used during a Hazardous Material Spill.
List Fire Brigade/Hazmat Team Members:
__SM__11. List Fire Brigade/Hazmat Team Members:
z Fire Brigade Chief:
z         Fire Brigade Chief:       Mills_______________________________
Mills_______________________________
z         Members:                 Morgan_____________________________
z Members:
Morgan_____________________________
Davito______________________________
Davito______________________________
Smith_______________________________
Smith_______________________________
Verchimak___________________________
Verchimak___________________________
: 12. The completed Fire Checklist SHALL be routed in the following order for review:
: 12.
____ _        a.       Station Duty Officer.
The completed Fire Checklist SHALL be routed in the following order for review:
: a.
Station Duty Officer.
NOTE The Fire Marshal will make copies of the Checklist for:
NOTE The Fire Marshal will make copies of the Checklist for:
: 1. Rad Protection Supervisor.
: 1. Rad Protection Supervisor.
: 2. EP Coordinator (if an Emergency Event declared).
: 2. EP Coordinator (if an Emergency Event declared).
: 3. Environmental Supervisor.
: 3. Environmental Supervisor.
__ ___        b.       Fire Marshal.
: b.
__ ___        c.       Operations Clerk.
Fire Marshal.
(Final)
: c.
KEY S-105 10                                  KE Y
Operations Clerk.
Y KKEEYY KKEEYY KKEEYY (Final)  


TASK TITLE: Initiate a LCOAR JPM No.:     S-204                                     REV:       NRC2006301 TPO No.:   8.E.AM-120                                 K&A No.:   2.2.23 TASK No.:   S-AM-073: Initiate/Terminate               K&A IMP:   2.6/3.8 an AAR/LCOAR TRAINEE:                                               SRO EVALUATOR:                                             DATE:
S-204 1
The Trainee:       PASSED             this JPM.       TIME STARTED:
TASK TITLE: Initiate a LCOAR JPM No.:
FAILED                             TIME FINISHED:
S-204 REV:
JPM TIME:             MINUTES CRITICAL ELEMENTS:       (*) 2, 3, 4                 APPROX COMPLETION TIME: 20 MINUTES CRITICAL TIME:           NA EVALUATION METHOD:                                     LOCATION:
NRC2006301 TPO No.:
X   PERFORM                               X   IN PLANT SIMULATE                             X   SIMULATOR GENERAL  
8.E.AM-120 K&A No.:
2.2.23 TASK No.:
S-AM-073: Initiate/Terminate K&A IMP:
2.6/3.8 an AAR/LCOAR TRAINEE:
SRO EVALUATOR:
DATE:
The Trainee:
PASSED this JPM.
TIME STARTED:
FAILED TIME FINISHED:
JPM TIME:
MINUTES CRITICAL ELEMENTS:
(*) 2, 3, 4 APPROX COMPLETION TIME: 20 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
X PERFORM X IN PLANT SIMULATE X SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BwOL 3.7.8, Rev 4, LCOAR Essential Service Water (SX) System Tech Spec 3.7.8.
: 1.
: 2. 1BwVSR 5.5.8.SX.1, Rev 5, ASME Surveillance Requirements for 1A Essential Service Water Pump.
1BwOL 3.7.8, Rev 4, LCOAR Essential Service Water (SX) System Tech Spec 3.7.8.
: 2.
1BwVSR 5.5.8.SX.1, Rev 5, ASME Surveillance Requirements for 1A Essential Service Water Pump.
MATERIALS:
MATERIALS:
: 1. 1BwOL 3.7.8 Rev 4.
: 1.
1BwOL 3.7.8 Rev 4.
TASK STANDARDS:
TASK STANDARDS:
: 1. Initiate LCOAR 3.7.8 for a failure of the 1A SX pump to perform its intended function.
: 1.
Initiate LCOAR 3.7.8 for a failure of the 1A SX pump to perform its intended function.
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are the Unit Supervisor.
: 1.
: 2. Both units are at full power.
You are the Unit Supervisor.
: 2.
Both units are at full power.
INITIATING CUES:
INITIATING CUES:
: 1. The Engineering staff notified you that the 1A SX pump has failed surveillance 1BwVSR 5.5.8.SX.1 ASME Surveillance Requirements for 1A Essential Service Water Pump, due to inadequate pump delta-P (10 minutes ago). Initiate the LCOAR. An IR (# 123456) and a WR (# 123456) have been written.
: 1.
: 2. No other inoperable equipment exists on either Unit.
The Engineering staff notified you that the 1A SX pump has failed surveillance 1BwVSR 5.5.8.SX.1 ASME Surveillance Requirements for 1A Essential Service Water Pump, due to inadequate pump delta-P (10 minutes ago). Initiate the LCOAR. An IR (# 123456) and a WR (# 123456) have been written.
: 3. Inform the Shift Manager when you have completed initiating the LCOAR.
: 2.
1 S-204
No other inoperable equipment exists on either Unit.
: 3.
Inform the Shift Manager when you have completed initiating the LCOAR.  


RECORD START TIME PERFORMANCE STEP                 STANDARD             Circle applicable
S-204 2
: 1. Refer to the LCOAR           Locate 1BwOL 3.7.8        SAT    UNSAT      N/A CUE:   After the examinee                               Comments:
RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable
demonstrates he/she can locate the LCOAR, provide a copy.
: 1.
Refer to the LCOAR CUE:
After the examinee demonstrates he/she can locate the LCOAR, provide a copy.
Note: If the examinee requests to review 1BwVSR 5.5.8.SX.1, provide the attached copy.
Note: If the examinee requests to review 1BwVSR 5.5.8.SX.1, provide the attached copy.
Examiners note: A correctly completed LOCAR form is included on pages 6-9. LCOAR completion steps may be performed in any order.
Locate 1BwOL 3.7.8 SAT UNSAT N/A Comments:
*2. Complete Section A,           Complete Section A.      SAT    UNSAT      N/A Notification, of 1BwOL 3.7.8 Notification, of 1BwOL   Comments:
Examiners note: A correctly completed LOCAR form is included on pages 6-9. LCOAR completion steps may be performed in any order.  
3.7.8:
*2. Complete Section A, Notification, of 1BwOL 3.7.8 Note: Underlined phrases or words to that effect are acceptable for completion of LCOAR paperwork.
* Present Mode: 1 Note: Underlined phrases or
Complete Section A.
* Initiating Event:
Notification, of 1BwOL 3.7.8:
words to that effect      Failure of 1BwVSR are acceptable for        5.5.8.SX.1 ASME due to completion of LCOAR      inadequate pump P paperwork.
Present Mode: 1 Initiating Event:
* SFD Performed:
Failure of 1BwVSR 5.5.8.SX.1 ASME due to inadequate pump P SFD Performed:
Performs SFD per page 2 and determines no loss of safety function exists
Performs SFD per page 2 and determines no loss of safety function exists Check No box (B.1.a) on page 2 Checks YES box on page 1 and initials next to YES Does this inoperability invalidate any previous SFD: No SAT UNSAT N/A Comments:
* Check No box (B.1.a) on page 2
* Checks YES box on page 1 and initials next to YES
* Does this inoperability invalidate any previous SFD: No 2
S-204


PERFORMANCE STEP               STANDARD             Circle applicable
S-204 3
  *2   Step 2 Continued                                       SAT    UNSAT      N/A CUE:   As Shift Manager,
PERFORMANCE STEP STANDARD Circle applicable  
* Notify Shift Manager  Comments:
*2 Step 2 Continued CUE:
acknowledge LCOAR        of LCOAR entry (Craig entry. Provide name       Ingold) of SM - Craig Ingold.
As Shift Manager, acknowledge LCOAR entry. Provide name of SM - Craig Ingold.
* Time Date:
Note: From cue sheet, IR
(#123456) and WR
#123456 written.
CUE:
C/O will be prepared at later time.
CUE:
Examiner sign for Unit NSO.
Notify Shift Manager of LCOAR entry (Craig Ingold)
Time Date:
(notification time and todays date)
(notification time and todays date)
Note: From cue sheet, IR
Was an IR written:
* Was an IR written:
Yes, #123456 Related WRs: Yes,  
(#123456) and WR            Yes, #123456
#123456 o
              #123456 written.
Related C/O(s): No SRO Signature:
* Related WRs: Yes,
                                          #123456 CUE:  C/O will be prepared  o Related C/O(s): No at later time.
* SRO Signature:
(examinees signature)
(examinees signature)
CUE:  Examiner sign for Unit
Unit NSO signature:
* Unit NSO signature:
(Unit NSO name signed by examiner)
NSO.                      (Unit NSO name signed by examiner)
SAT UNSAT N/A Comments:
*3. Complete LCOAR Index         On page 6 of 1BwOL 3.7.8, SAT    UNSAT      N/A Essential Service Water (SX)  sign and date Condition A Comments:
*3. Complete LCOAR Index Essential Service Water (SX)
System                        line and refer to page 7:
System On page 6 of 1BwOL 3.7.8, sign and date Condition A line and refer to page 7:
* Examinees signature
Examinees signature Todays date SAT UNSAT N/A Comments:
* Todays date
*4. Initiate LCOAR 1BwOL 3.7.8 Note: If examinee attempts to update LCO database, provide the following cue.
*4. Initiate LCOAR 1BwOL 3.7.8   On page 7 of 1BwOL 3.7.8, SAT    UNSAT      N/A Note: If examinee attempts    enter time, date and     Comments:
CUE: Another SRO will update LCO database.
to update LCO          signature in Condition database, provide the  column:
On page 7 of 1BwOL 3.7.8, enter time, date and signature in Condition column:
following cue.
JPM start time - 10 minutes.
* JPM start time - 10 CUE:  Another SRO will          minutes.
Todays date Examinees signature Notify SM LOCAR entry complete SAT UNSAT N/A Comments:
update LCO database.
CUE: THIS COMPLETES THIS JPM.
* Todays date
RECORD STOP TIME COMMENTS:  
* Examinees signature
* Notify SM LOCAR entry complete CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
3 S-204


S-204 4
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are the Unit Supervisor.
: 1. You are the Unit Supervisor.
Line 405: Line 685:
: 1. The Engineering staff notified you that the 1A SX pump has failed surveillance 1BwVSR 5.5.8.SX.1 ASME Surveillance Requirements for 1A Essential Service Water Pump, due to inadequate pump delta-P (10 minutes ago). Initiate the LCOAR. An IR (# 123456) and a WR (# 123456) have been written.
: 1. The Engineering staff notified you that the 1A SX pump has failed surveillance 1BwVSR 5.5.8.SX.1 ASME Surveillance Requirements for 1A Essential Service Water Pump, due to inadequate pump delta-P (10 minutes ago). Initiate the LCOAR. An IR (# 123456) and a WR (# 123456) have been written.
: 2. No other inoperable equipment exists on either Unit.
: 2. No other inoperable equipment exists on either Unit.
: 3. Inform the Shift Manager when you have completed initiating the LCOAR.
: 3. Inform the Shift Manager when you have completed initiating the LCOAR.  
4 S-204


S-204 5
SIMULATOR SETUP GUIDE:
SIMULATOR SETUP GUIDE:
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
Line 413: Line 693:
* Complete items on Simulator Ready for Training Checklist. (N/A if JPM NOT performed in simulator)
* Complete items on Simulator Ready for Training Checklist. (N/A if JPM NOT performed in simulator)
* Place simulator in RUN. (N/A if JPM NOT performed in simulator)
* Place simulator in RUN. (N/A if JPM NOT performed in simulator)
COMMENTS:
C OMMENTS:
* Provide copy of 1BwOL 3.7.8, Rev 4.
* Provide copy of 1BwOL 3.7.8, Rev 4.
* Provide marked up copy of 1BwVSR 5.5.8.SX.1, Rev 5.
* Provide marked up copy of 1BwVSR 5.5.8.SX.1, Rev 5.  
5 S-204


KEY                                          LCOAR KEY1BwOL 3.7.8 Revision 4 Reference Use ESSENTIAL SERVICE WATER (SX) SYSTEM TECH SPEC LCO 3.7.8 A. NOTIFICATION If it is discovered that a Surveillance was not performed within its specified Surveillance Frequency, complete Action Z (SR 3.0.3) prior to declaring the LCO not met.
1BwOL 3.7.8 Revision 4 Reference Use S-204 6
PRESENT MODE: 1               APPLICABLE MODE(S):         1, 2, 3, and 4 INITIATING EVENT(S): Failure of 1BwVSR 5.5.8.SX.1 ASME due to inadequate pump P SAFETY FUNCTION DETERMINATION (SFD)
LCOAR ESSENTIAL SERVICE WATER (SX) SYSTEM TECH SPEC LCO 3.7.8 A.
PERFORMED? (Page 2)                     YES, Examinee init. (SRO)
NOTIFICATION If it is discovered that a Surveillance was not performed within its specified Surveillance Frequency, complete Action Z (SR 3.0.3) prior to declaring the LCO not met.
DOES THIS INOPERABILITY INVALIDATE ANY PREVIOUS SFD?                   YES       NO LCO 3.0.3: APPLICABLE     MODE CHANGE ALLOWED?:         YES - Action C.2 SEPARATE CONDITION ENTRY ALLOWED:     NO COMPLETION TIME EXTENSION ALLOWED:   NO NAME OF SHIFT MANAGER NOTIFIED: C. Ingold                   TIME/DATE: Current time/date WAS AN ISSUE WRITTEN?       YES     NO RELATED WR(S):
PRESENT MODE: 1 APPLICABLE MODE(S):
WR 123456__________       WR ________________
1, 2, 3, and 4 INITIATING EVENT(S): Failure of 1BwVSR 5.5.8.SX.1 ASME due to inadequate pump P SAFETY FUNCTION DETERMINATION (SFD)
WR ________________       WR ________________
PERFORMED? (Page 2)
WR ________________       WR ________________
YES, Examinee init. (SRO)
WR ________________       WR ________________
DOES THIS INOPERABILITY INVALIDATE ANY PREVIOUS SFD?
WR ________________       WR ________________
YES NO LCO 3.0.3: APPLICABLE MODE CHANGE ALLOWED?:
RELATED C/O(S): NONE
YES - Action C.2 SEPARATE CONDITION ENTRY ALLOWED:
_______________        _______________          _______________
NO COMPLETION TIME EXTENSION ALLOWED: NO NAME OF SHIFT MANAGER NOTIFIED: C. Ingold TIME/DATE: Current time/date WAS AN ISSUE WRITTEN?
_______________        _______________          _______________
YES NO RELATED WR(S):
_______________        _______________          _______________
WR 123456__________
SRO signature: Examinee signature   TIME/DATE: Current time/date TIME/DATE: Current time/date Unit NSO signature: Examiners signature KEY                                                                        KE Y 6
WR ________________
S-204
WR ________________
WR ________________
WR ________________
WR ________________
WR ________________
WR ________________
WR ________________
WR ________________
RELATED C/O(S): NONE SRO signature: Examinee signature TIME/DATE: Current time/date Unit NSO signature: Examiners signature TIME/DATE: Current time/date KKEEYY KKEEYY KKEEYY KKEEYY


KEY            B. SAFETY FUNCTION DETERMINATION PROGRAM REQUIREMENTS KE Y 1BwOL 3.7.8 Revision 4 Reference Use
1BwOL 3.7.8 Revision 4 Reference Use S-204 7
: 1. LOSS OF SAFETY FUNCTION (LOSF) EVALUATION:
B.
SAFETY FUNCTION DETERMINATION PROGRAM REQUIREMENTS
: 1.
LOSS OF SAFETY FUNCTION (LOSF) EVALUATION:
Is there any inoperable or degraded SUPPORT SYSTEM or SUPPORTED SYSTEM equipment on the opposite/redundant train that, when coupled with this inoperable equipment, might result in a complete loss of a Tech Spec required safety function.
Is there any inoperable or degraded SUPPORT SYSTEM or SUPPORTED SYSTEM equipment on the opposite/redundant train that, when coupled with this inoperable equipment, might result in a complete loss of a Tech Spec required safety function.
: a. No - No LOSF exists. No further evaluation is necessary.
: a.
: b. Yes - A LOSF may exist. Using the SFDP and BwAP 340-1, evaluate which of the following conditions apply:
No - No LOSF exists. No further evaluation is necessary.
: 1)   The SSC is part of an LCO with multiple subsystems and the LCO specified function is intact. No LOSF exists.
: b.
: 2)   The SSC will still perform its required safety function as defined in the Safety Analysis Report (SAR). No LOSF exists.
Yes - A LOSF may exist. Using the SFDP and BwAP 340-1, evaluate which of the following conditions apply:
: 3)   A LOSF exists. Perform the Required Actions of the SSC LCO in which the LOSF exists for the specific Condition(s) that apply.
: 1)
: 2. LCO 3.0.6 - DELAYED LCOAR ENTRY CALCULATION.
The SSC is part of an LCO with multiple subsystems and the LCO specified function is intact. No LOSF exists.
: 2)
The SSC will still perform its required safety function as defined in the Safety Analysis Report (SAR). No LOSF exists.
: 3)
A LOSF exists. Perform the Required Actions of the SSC LCO in which the LOSF exists for the specific Condition(s) that apply.
: 2.
LCO 3.0.6 - DELAYED LCOAR ENTRY CALCULATION.
Perform this step only if No LOSF exists and it is desired to delay SUPPORTED SYSTEM LCOAR entry as allowed by LCO 3.0.6. A LOSF does not exist if the redundant train of the inoperable SUPPORTED SYSTEM(S) equipment is OPERABLE.
Perform this step only if No LOSF exists and it is desired to delay SUPPORTED SYSTEM LCOAR entry as allowed by LCO 3.0.6. A LOSF does not exist if the redundant train of the inoperable SUPPORTED SYSTEM(S) equipment is OPERABLE.
: a. Rules of Use:
: a.
: 1)   Rule 1: With a single SUPPORT SYSTEM inoperable, the affected SUPPORTED SYSTEM(s) LCOAR entry(s) is not required to be entered unless directed by the SUPPORT SYSTEM Required Actions.
Rules of Use:
: 2)   Rule 2: In the event additional SUPPORT SYSTEM(s) become inoperable during the Completion Time for restoration of the first SUPPORT SYSTEM, the LCOAR entry(s) of the SUPPORTED SYSTEM may be delayed by either the maximum allowed Completion Time of the SUPPORT SYSTEM(s), or 2 times the Completion Time for restoration of the SUPPORTED SYSTEM (applied at the time the second SUPPORT SYSTEM becomes inoperable), whichever is less.
: 1)
KEY                                                          KEY 7
Rule 1: With a single SUPPORT SYSTEM inoperable, the affected SUPPORTED SYSTEM(s) LCOAR entry(s) is not required to be entered unless directed by the SUPPORT SYSTEM Required Actions.
S-204
: 2)
Rule 2: In the event additional SUPPORT SYSTEM(s) become inoperable during the Completion Time for restoration of the first SUPPORT SYSTEM, the LCOAR entry(s) of the SUPPORTED SYSTEM may be delayed by either the maximum allowed Completion Time of the SUPPORT SYSTEM(s), or 2 times the Completion Time for restoration of the SUPPORTED SYSTEM (applied at the time the second SUPPORT SYSTEM becomes inoperable), whichever is less.
KKEEYY KKEEYY KKEEYY KKEEYY


KEY                                    LCOAR INDEX ESSENTIAL SERVICE WATER (SX) SYSTEM KEY 1BwOL 3.7.8 Revision 4 Reference Use SRO Sign and Date   Content                   Description               Page SRO: Examinee       Condition A   One unit-specific SX train inoperable.     7 signature Date: Todays date SRO:                Condition B   One unit-specific SX train inoperable.     8 Date:
1BwOL 3.7.8 Revision 4 Reference Use S-204 8
SRO:                Condition C   Opposite-unit SX train inoperable.         9 Date:
LCOAR INDEX ESSENTIAL SERVICE WATER (SX) SYSTEM SRO Sign and Date Content Description Page SRO: Examinee signature Date: Todays date Condition A One unit-specific SX train inoperable.
SRO:               Condition D  Required Action and associated Completion  10 Time of Condition A or B not met.
7 SRO:
Date:
Condition B One unit-specific SX train inoperable.
8 SRO:
Date:
Condition C Opposite-unit SX train inoperable.
9 SRO:
Date:
Date:
SRO:               Condition Z   SR 3.0.3                                   11 Date:
Condition D Required Action and associated Completion Time of Condition A or B not met.
SRO:                    N/A     Risk Assessment required by LCO 3.0.4.b   N/A Date:                            complete to allow MODE change.
10 SRO:
KEY                                                          KEY 8
Date:
S-204
Condition Z SR 3.0.3 11 SRO:
Date:
N/A Risk Assessment required by LCO 3.0.4.b complete to allow MODE change.
N/A KKEEYY KKEEYY KKEEYY KKEEYY


KEY                                  LCOAR ACTION CHART ESSENTIAL SERVICE WATER (SX) SYSTEM KE Y1BwOL 3.7.8 Revision 4 Reference Use CONDITION             REQUIRED ACTION         COMPLETION   ACTION MET TIME
1BwOL 3.7.8 Revision 4 Reference Use S-204 9
  ***********NOTE******** A.1   ********NOTES********
LCOAR ACTION CHART ESSENTIAL SERVICE WATER (SX) SYSTEM CONDITION REQUIRED ACTION COMPLETION TIME ACTION MET  
        ***                    1. Enter applicable Not applicable to Unit              Conditions and 1 during replacement of            Required Actions the SX suction                      of LCO 3.8.1, isolation valves during            "AC Sources -
***********NOTE********
Unit 2 Refueling 11                Operating," for while Unit 2 is in MODE            Emergency Diesel 5, 6, or defueled.                  Generator made
Not applicable to Unit 1 during replacement of the SX suction isolation valves during Unit 2 Refueling 11 while Unit 2 is in MODE 5, 6, or defueled.
  ***********************            inoperable by
A.
        ******                        SX.
One unit-specific SX train inoperable.
A. One unit-specific      2. Enter applicable SX train                      Conditions and inoperable.                  Required Actions of LCO 3.4.6, JPM start time minus            "RCS Loops -
JPM start time minus 10 minutes/Todays date Time/Date Examinee signature SRO A.1  
10 minutes/Todays              MODE 4," for date                            Residual Heat Time/Date                        Removal loops made inoperable Examinee signature              by SX.
********NOTES********
SRO                        **********************
: 1.
72 hours __________/____
Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources -
Restore                        Time/Date unit-specific SX                    SRO train to OPERABLE status.
Operating," for Emergency Diesel Generator made inoperable by SX.
KEY                                                            KEY (Final) 9 S-204
: 2.
Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops -
MODE 4," for Residual Heat Removal loops made inoperable by SX.
Restore unit-specific SX train to OPERABLE status.
72 hours
__________/____
Time/Date SRO KKEEYY KKEEYY KKEEYY KKEEYY (Final)  


TASK TITLE: Prepare/Perform a Liquid Radwaste Release JPM No.:     S-303                                     REV: NRC2006301 TPO No.:   8C.HP-001                                 K&A No.: 2.3.6 TASK No.:   S-HP-001, Authorize a liquid               K&A IMP: 2.1/3.1 radwaste release TRAINEE:                                               SRO EVALUATOR:                                             DATE:
S-303 1
The Trainee:       PASSED           this JPM.         TIME STARTED:
TASK TITLE: Prepare/Perform a Liquid Radwaste Release JPM No.:
FAILED                             TIME FINISHED:
S-303 REV: NRC2006301 TPO No.:
JPM TIME:             MINUTES CRITICAL ELEMENTS:       (*) 3, 5                     APPROX COMPLETION TIME:   30 MINUTES CRITICAL TIME:           NA EVALUATION METHOD:                                     LOCATION:
8C.HP-001 K&A No.: 2.3.6 TASK No.:
X   PERFORM                                   IN PLANT SIMULATE                             X   SIMULATOR GENERAL  
S-HP-001, Authorize a liquid K&A IMP: 2.1/3.1 radwaste release TRAINEE:
SRO EVALUATOR:
DATE:
The Trainee:
PASSED this JPM.
TIME STARTED:
FAILED TIME FINISHED:
JPM TIME:
MINUTES CRITICAL ELEMENTS:
(*) 3, 5 APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. BwOP WX-501T1, Rev. 38, Liquid Release Tank 0WX01T Release Form
: 1.
: 2. BwOP WX-501T2, Rev 5, Liquid Release Window Determination
BwOP WX-501T1, Rev. 38, Liquid Release Tank 0WX01T Release Form
: 3. BwOP WX-501T3, Rev 1, Authorization to Release Outside of Release Window MATERIALS:
: 2.
: 1. BwOP WX-501T1, Rev. 38, Liquid Release Tank 0WX01T Release Form
BwOP WX-501T2, Rev 5, Liquid Release Window Determination
: 2. BwOP WX-501T2, Rev 5, Liquid Release Window Determination
: 3.
: 3. BwOP WX-501T3, Rev 1, Authorization to Release Outside of Release Window TASK STANDARDS:
BwOP WX-501T3, Rev 1, Authorization to Release Outside of Release Window MATERIALS:
: 1. Complete Section G of a liquid release tank release form in accordance with BwOP WX-501T1.
: 1.
: 2. Determine release start time is outside release start time window.
BwOP WX-501T1, Rev. 38, Liquid Release Tank 0WX01T Release Form
: 2.
BwOP WX-501T2, Rev 5, Liquid Release Window Determination
: 3.
BwOP WX-501T3, Rev 1, Authorization to Release Outside of Release Window TASK STANDARDS:
: 1.
Complete Section G of a liquid release tank release form in accordance with BwOP WX-501T1.
: 2.
Determine release start time is outside release start time window.
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are the Unit 1 Unit Supervisor.
: 1.
: 2. Both Units are at full power.
You are the Unit 1 Unit Supervisor.
: 2.
Both Units are at full power.
INITIATING CUES:
INITIATING CUES:
: 1. The Shift Manager has handed you a portion of a 0WX01T liquid release package,
: 1.
            #L-06-100, completed through section F.5, and has directed you to complete Section G. (Hand examinee copy of BwOP WX-501T1). All previous sections of the release package have been successfully completed.
The Shift Manager has handed you a portion of a 0WX01T liquid release package,  
: 2. The current time is 0700 today. Due to scheduled work on the liquid release line, the release must be COMMENCED by 0900 today.
#L-06-100, completed through section F.5, and has directed you to complete Section G. (Hand examinee copy of BwOP WX-501T1). All previous sections of the release package have been successfully completed.
: 3. Release duration per BwOP WX-501T1 step D.6.g.2) is 120 minutes.
: 2.
: 4. The dechlorination skid is in operation.
The current time is 0700 today. Due to scheduled work on the liquid release line, the release must be COMMENCED by 0900 today.
: 5. Notify the Shift Manager when Section G of the release package is complete.
: 3.
1 S-303
Release duration per BwOP WX-501T1 step D.6.g.2) is 120 minutes.
: 4.
The dechlorination skid is in operation.
: 5.
Notify the Shift Manager when Section G of the release package is complete.  


RECORD START TIME Note:   Provide the examinee with a copy of Section G of BwOP WX-501T1 completed through Step F.5.
S-303 2
PERFORMANCE STEP                 STANDARD             Circle applicable
RECORD START TIME Note:
: 1. Obtain and record current     Obtain and record current  SAT      UNSAT      N/A Kankakee River flow data      Kankakee River flow data   Comments:
Provide the examinee with a copy of Section G of BwOP WX-501T1 completed through Step F.5.
NOTE: The USGS internet site by performing the can be accessed from   following:
PERFORMANCE STEP STANDARD Circle applicable
the computer desk top
: 1.
* Access the United from workgroup apps       States Geological menu or by using           Survey internet site normal internet           (usgs.gov).
Obtain and record current Kankakee River flow data NOTE: The USGS internet site can be accessed from the computer desk top from workgroup apps menu or by using normal internet access.
access.
NOTE: After examinee locates Kankakee river flow on usgs web site, indicator, provide following cue:
* Access water watch-NOTE: After examinee locates     current stream flow Kankakee river flow on     conditions for Illinois usgs web site,
CUE:
* Access USGS 05527500 indicator, provide         Kankakee River near following cue:             Wilmington Il flow CUE:   Kankakee river
Kankakee river discharge flow is 5680 cfs at 0700 on todays date.
* Record discharge flow discharge flow is 5680 cfs at 0700 on todays date.
NOTE: If examinee attempts to access the Unit 1 US turnover, provide the following cue:
NOTE: If examinee attempts to access the Unit 1 US turnover, provide   o Record Kankakee River the following cue:       flow in Unit 1 US turnover CUE:   Kankakee river flow has been logged in the Unit 1 US turnover.
CUE:
: 2. Determine CW blowdown flow   Determine CW blowdown     SAT      UNSAT      N/A flow per BwOP WX-501T2 as Comments:
Kankakee river flow has been logged in the Unit 1 US turnover.
follows:
Obtain and record current Kankakee River flow data by performing the following:
o   Record liquid release
* Access the United States Geological Survey internet site (usgs.gov).
                                        #L-06-100 NOTE: After examinee locates
* Access water watch-current stream flow conditions for Illinois
* Obtain and record CW blowdown flow            current Kankakee River indicator, provide          flow (5680 cfs) following cue:
* Access USGS 05527500 Kankakee River near Wilmington Il flow
* Record CW blowdown CUE:  CW blowdown flow is        flow 22,000 gpm.
* Record discharge flow o Record Kankakee River flow in Unit 1 US turnover SAT UNSAT N/A Comments:
o F2400 o OUR-CW032 2
: 2.
S-303
Determine CW blowdown flow NOTE: After examinee locates CW blowdown flow indicator, provide following cue:
CUE:
CW blowdown flow is 22,000 gpm.
Determine CW blowdown flow per BwOP WX-501T2 as follows:
o Record liquid release  
#L-06-100 Obtain and record current Kankakee River flow (5680 cfs)
Record CW blowdown flow o F2400 o OUR-CW032 SAT UNSAT N/A Comments:


PERFORMANCE STEP               STANDARD             Circle applicable
S-303 3
  *3 Determine the Liquid Release Determine the Liquid      SAT    UNSAT      N/A Window per BwOP WX-501T2     Release Window per BwOP  Comments:
PERFORMANCE STEP STANDARD Circle applicable  
CUE: After examinee locates WX-501T2 as follows:
*3 Determine the Liquid Release Window per BwOP WX-501T2 CUE: After examinee locates correct procedure, provide copy.
correct procedure, provide copy.
NOTE: After examinee locates liquid release spread sheet, inform student to use spreadsheet on computer desktop.
NOTE: After examinee locates
NOTE: A completed copy of the liquid release spread sheet is located on page 7.
* Access Liquid Release liquid release spread    Window spread sheet sheet, inform student     (k:/shift/excel/liquid to use spreadsheet on     release) computer desktop.
Determine the Liquid Release Window per BwOP WX-501T2 as follows:
o  Enter arrival date at NOTE: A completed copy of       Wilmington (tomorrows the liquid release       date) spread sheet is located on page 7.
Access Liquid Release Window spread sheet (k:/shift/excel/liquid release) o Enter arrival date at Wilmington (tomorrows date)
* Enter river flow rate (5680 cfs)
Enter river flow rate (5680 cfs)
* Enter release duration (120 mins from initial cue)
Enter release duration (120 mins from initial cue)
* Enter blowdown flow rate (22,000 gpm)
Enter blowdown flow rate (22,000 gpm)
* Record the Liquid Release Window times on BwOP WX-501T1
Record the Liquid Release Window times on BwOP WX-501T1 Target start time (1630)
* Target start time (1630)
Start after time (1300)
* Start after time (1300)
Start before time (2000)
* Start before time (2000)
SAT UNSAT N/A Comments:
: 4. Evaluate the expected time   Evaluate the expected     SAT    UNSAT      N/A of release                  time of release so that   Comments:
: 4.
both biocide treatment and the release can be accommodated by performing the following:
Evaluate the expected time of release CUE: Dechlorination skid is in operation. (from initial cue)
CUE:  Dechlorination skid is
Evaluate the expected time of release so that both biocide treatment and the release can be accommodated by performing the following:
* Check if in operation. (from      dechlorination skid in initial cue)              operation
Check if dechlorination skid in operation Verify CW blowdown flow 8000 gpm (22,000 from previous cue)
* Verify CW blowdown flow 8000 gpm (22,000 from previous cue) 3 S-303
SAT UNSAT N/A Comments:


PERFORMANCE STEP             STANDARD             Circle applicable
S-303 4
*5. Identify release will not Perform the following:    SAT    UNSAT      N/A start within desired time
PERFORMANCE STEP STANDARD Circle applicable  
* Determine release will Comments:
*5. Identify release will not start within desired time CUE:
be performed outside of release start time window (from initiating cue, release must start at 0900)
Acknowledge as SM notification of release performed outside start time window. Inform examinee another supervisor will perform BwOP WX-501T3.
* Determine BwOP WX-501T3 must be completed prior to authorizing release CUE:  Acknowledge as SM notification of    o Notify SM release will release performed    be performed outside outside start time    of release start time window. Inform        window examinee another  OR supervisor will perform BwOP WX-  o Notify SM to delay 501T3.                release until work completed OR o Notify SM to delay work until release completed within desired time window.
Perform the following:
Determine release will be performed outside of release start time window (from initiating cue, release must start at 0900)
Determine BwOP WX-501T3 must be completed prior to authorizing release o
Notify SM release will be performed outside of release start time window OR o Notify SM to delay release until work completed OR o Notify SM to delay work until release completed within desired time window.
SAT UNSAT N/A Comments:
CUE: THIS COMPLETES THIS JPM.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
RECORD STOP TIME COMMENTS:  
4 S-303


S-303 5
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are the Unit 1 Unit Supervisor.
: 1.
: 2. Both Units are at full power.
You are the Unit 1 Unit Supervisor.
: 2.
Both Units are at full power.
INITIATING CUES:
INITIATING CUES:
: 1. The Shift Manager has handed you a portion of a 0WX01T liquid release package, #L-06-100, completed through section F.5, and has directed you to complete Section G.
: 1.
The Shift Manager has handed you a portion of a 0WX01T liquid release package, #L-06-100, completed through section F.5, and has directed you to complete Section G.
All previous sections of the release package have been successfully completed.
All previous sections of the release package have been successfully completed.
: 2. The current time is 0700 today. Due to scheduled work on the liquid release line, the release must be COMMENCED by 0900 today.
: 2.
: 3. Release duration per BwOP WX-501T1 step D.6.g.2) is 120 minutes.
The current time is 0700 today. Due to scheduled work on the liquid release line, the release must be COMMENCED by 0900 today.
: 4. The dechlorination skid is in operation.
: 3.
: 5. Notify the Shift Manager when Section G of the release package is complete.
Release duration per BwOP WX-501T1 step D.6.g.2) is 120 minutes.
5 S-303
: 4.
The dechlorination skid is in operation.
: 5.
Notify the Shift Manager when Section G of the release package is complete.  


S-303 6
SIMULATOR SETUP GUIDE:
SIMULATOR SETUP GUIDE:
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
Line 568: Line 924:
* Clear data from INPUTS field of Liquid Release Window spread sheet prior to administering JPM.
* Clear data from INPUTS field of Liquid Release Window spread sheet prior to administering JPM.
* Clear computer history of recently accessed documents, programs, and web sites visited prior to administering JPM by performing the following:
* Clear computer history of recently accessed documents, programs, and web sites visited prior to administering JPM by performing the following:
* Right mouse click on task bar
Right mouse click on task bar Select properties Select advanced tab Select clear
* Select properties
* Select advanced tab
* Select clear
* Delete Liquid Release Window spreadsheet from computer desktop after administering JPM to all candidates.
* Delete Liquid Release Window spreadsheet from computer desktop after administering JPM to all candidates.
COMMENTS:
OMMENTS:
C
* BwOP WX-501T1, Rev. 38.
* BwOP WX-501T1, Rev. 38.
* BwOP WX-501T2, Rev 5.
* BwOP WX-501T2, Rev 5.
* BwOP WX-501T3, Rev 1.
* BwOP WX-501T3, Rev 1.  
6 S-303


KEY                                                              KEY Braidwood Release Time Calulator BwOP WX-501 and/or BwOP WX-526 Enter data into blue cells only.
S-303 7
INPUTS Arrival Date at Wilmington               mm/dd/yyyy   Tomorrow River Flow Rate                             CFS         5680 Release Duration                           Minutes       120 Blowdown Rate (F2400)                       GPM         22000 CALCULATED RESULTS Blowdown Time To River                     Minutes       120 River Time To Wilmington Intake           Minutes       420 Blowdown Peak Time To Wilmington Intake   Minutes       600 Margin                                     Minutes       420 Start After Time                                     Today  1300 Time      #VALUE!
BwOP WX-501 and/or BwOP WX-526 Enter data into blue cells only.
INPUTS Arrival Date at Wilmington mm/dd/yyyy Tomorrow River Flow Rate CFS 5680 Release Duration Minutes 120 Blowdown Rate (F2400)
GPM 22000 CALCULATED RESULTS Blowdown Time To River Minutes 120 River Time To Wilmington Intake Minutes 420 Blowdown Peak Time To Wilmington Intake Minutes 600 Margin Minutes 420 Start After Time
( = Peak Arrives at 10 PM)
( = Peak Arrives at 10 PM)
Normal Start                                        Today  1630 Time       #VALUE!
Time
#VALUE!
Normal Start
( = Center of Peak occurs at 2:30 AM)
( = Center of Peak occurs at 2:30 AM)
Start BeforeTime                                     Today  2000 Time      #VALUE!
Time Start BeforeTime
( = Peak Departs at 7 AM)
( = Peak Departs at 7 AM)
KEY                                                              KEY (Final) 7 S-303
Time Braidwood Release Time Calulator
#VALUE!
#VALUE!
Today 1300 Today 1630 Today 2000 KKEEYY KKEEYY KKEEYY KKEEYY (Final)  


TASK TITLE: Screen an Event for Reportability JPM No.:     S-402                                     REV:       NRC2006301 TPO No.:   8E.AM-102                                 K&A No.:   (2.4.30)
S-402 1
TASK No.:   S-AM-102: Screen Reportable or           K&A IMP:     2.2/3.6 Significant Events for Reportability TRAINEE:                                               SRO EVALUATOR:                                             DATE:
TASK TITLE: Screen an Event for Reportability JPM No.:
The Trainee:       PASSED           this JPM.         TIME STARTED:
S-402 REV:
FAILED                             TIME FINISHED:
NRC2006301 TPO No.:
JPM TIME:             MINUTES CRITICAL ELEMENTS:       (*) 2, 3                     APPROX COMPLETION TIME: 25 MINUTES CRITICAL TIME:           NA EVALUATION METHOD:                                     LOCATION:
8E.AM-102 K&A No.:
X   PERFORM                                   IN PLANT SIMULATE                             X   SIMULATOR GENERAL  
(2.4.30)
TASK No.:
S-AM-102: Screen Reportable or K&A IMP:
2.2/3.6 Significant Events for Reportability TRAINEE:
SRO EVALUATOR:
DATE:
The Trainee:
PASSED this JPM.
TIME STARTED:
FAILED TIME FINISHED:
JPM TIME:
MINUTES CRITICAL ELEMENTS:
(*) 2, 3 APPROX COMPLETION TIME: 25 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
Line 612: Line 987:
: 7. A NARS form has been transmitted to the state INITIATING CUES:
: 7. A NARS form has been transmitted to the state INITIATING CUES:
: 1. The Shift Manager has directed you to screen the event and determine ALL reporting requirements that are LESS THAN OR EQUAL TO 8 HOURS per the Exelon Reportability Reference Manual.
: 1. The Shift Manager has directed you to screen the event and determine ALL reporting requirements that are LESS THAN OR EQUAL TO 8 HOURS per the Exelon Reportability Reference Manual.
: 2. Inform the Shift Manager of applicable reporting requirements.
: 2. Inform the Shift Manager of applicable reporting requirements.  
1 S-402


RECORD START TIME PERFORMANCE STEP               STANDARD             Circle applicable
S-402 2
: 1. Refer to Exelon             Perform the following:    SAT    UNSAT      N/A Reportability Reference
RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable
* Locate and open Exelon Comments:
: 1.
Manual                         Reportability Note: If JPM is performed in   Reference Manual LS-simulator, examinee     AA-1020 will use simulator copy of Exelon Reportability Manual.
Refer to Exelon Reportability Reference Manual Note: If JPM is performed in simulator, examinee will use simulator copy of Exelon Reportability Manual.
If JPM NOT performed in simulator, provide examinee with a copy of Exelon Reportability Manual.
If JPM NOT performed in simulator, provide examinee with a copy of Exelon Reportability Manual.
*2. Screen Event                 Refer to Operations      SAT    UNSAT      N/A Note: See pages 6-9 for a   Decision Trees (LS-AA-   Comments:
Perform the following:
key of the operations 1020, page 89) decision trees.      Determine the following apply:
Locate and open Exelon Reportability Reference Manual LS-AA-1020 SAT UNSAT N/A Comments:
* SAF 1.1 - Emergency Plan Activated
*2. Screen Event Note: See pages 6-9 for a key of the operations decision trees.
* SAF 1.5 - ECCS Injection/Actuation
Refer to Operations Decision Trees (LS-AA-1020, page 89)
* SAF 1.6 - RPS Actuation with the reactor critical
Determine the following apply:
* SAF 1.7 - System Actuation Not Including RPS o SAF 1.23 - Occurrence of an Incident 2
SAF 1.1 - Emergency Plan Activated SAF 1.5 - ECCS Injection/Actuation SAF 1.6 - RPS Actuation with the reactor critical SAF 1.7 - System Actuation Not Including RPS o
S-402
SAF 1.23 - Occurrence of an Incident SAT UNSAT N/A Comments:


PERFORMANCE STEP         STANDARD             Circle applicable
S-402 3
*3. Determine Notification Use Operations Decision   SAT    UNSAT      N/A Trees to determine the   Comments:
PERFORMANCE STEP STANDARD Circle applicable  
following:
*3. Determine Notification Use Operations Decision Trees to determine the following:
* SAF 1.1 (LS-AA-1110, page 1) o 15 minute State and Local Notification (already performed per initial cue)
SAF 1.1 (LS-AA-1110, page 1) o 15 minute State and Local Notification (already performed per initial cue) 1 hr NRC Notification required o
* 1 hr NRC Notification required o 2 hr ANI and INPO Notification required
2 hr ANI and INPO Notification required SAF 1.5 (LS-AA-1110, page 16) 4 hr NRC Notification required SAF 1.6 (LS-AA-1110, page 20) 4 hr NRC Notification required SAF 1.7 (LS-AA-1110, page 24) 8 hr NRC Notification required o
* SAF 1.5 (LS-AA-1110, page 16)
SAF 1.23 LS-AA-1110 page 68) o Notify NEIL ASAP via telephone o
* 4 hr NRC Notification required
Evaluate other notifications and determine they do not apply SAT UNSAT N/A Comments:
* SAF 1.6 (LS-AA-1110, page 20)
CUE: THIS COMPLETES THIS JPM.
* 4 hr NRC Notification required
RECORD STOP TIME COMMENTS:  
* SAF 1.7 (LS-AA-1110, page 24)
* 8 hr NRC Notification required o SAF 1.23 LS-AA-1110 page 68) o Notify NEIL ASAP via telephone o Evaluate other notifications and determine they do not apply CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
3 S-402


S-402 4
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are the Unit 1 Unit Supervisor.
: 1. You are the Unit 1 Unit Supervisor.
Line 651: Line 1,022:
: 7. A NARS form has been transmitted to the state INITIATING CUES:
: 7. A NARS form has been transmitted to the state INITIATING CUES:
: 1. The Shift Manager has directed you to screen the event and determine ALL reporting requirements that are LESS THAN OR EQUAL TO 8 HOURS per the Exelon Reportability Reference Manual.
: 1. The Shift Manager has directed you to screen the event and determine ALL reporting requirements that are LESS THAN OR EQUAL TO 8 HOURS per the Exelon Reportability Reference Manual.
: 2. Inform the Shift Manager of applicable reporting requirements.
: 2. Inform the Shift Manager of applicable reporting requirements.  
4 S-402


S-402 5
SIMULATOR SETUP GUIDE:
SIMULATOR SETUP GUIDE:
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
Line 660: Line 1,031:
* Complete items on Simulator Ready for Training Checklist. (N/A if JPM NOT performed in simulator)
* Complete items on Simulator Ready for Training Checklist. (N/A if JPM NOT performed in simulator)
* Place simulator in RUN. (N/A if JPM NOT performed in simulator)
* Place simulator in RUN. (N/A if JPM NOT performed in simulator)
* Insert IMF TH06D 540000(N/A if JPM NOT performed in simulator)
Insert IMF TH06D 540000(N/A if JPM NOT performed in simulator)
COMMENTS:
COMMENTS:  
5 S-402


KEY EXAM MATERIAL KEY 6
S-402 6
S-402
KKEEYY KKEEYY EEXXAAM M M MAATTEERRIIAALL


KEY 7
S-402 7
S-402
KKEEYY


KEY (Final) 8 S-402}}
S-402 8
KKEEYY (Final)}}

Latest revision as of 08:24, 15 January 2025

Final As-Administered Administrative JPMs for the Braidwood Initial Examination - May 2006
ML061710307
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/15/2006
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
References
Download: ML061710307 (41)


Text

S-103 1

TASK TITLE:

Call Out For Shift Staffing JPM No.: S-103 REV: NRC2006301 TPO No.: T.AM05-01 K&A No.: 2.1.5 TASK No.: S-AM-029, Ensure minimum shift staffing K&A IMP: 2.3/3.4 and authorize additional shift staffing as necessary.

TRAINEE:

SRO EVALUATOR:

DATE:

The Trainee: PASSED this JPM.

TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*) 2, 3 JPM TIME:

CRITICAL TIME: NA APPROX COMPLETION TIME: 25 MINUTES EVALUATION METHOD:

LOCATION:

X PERFORM X IN PLANT

_ SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. LS-AA-119 OVERTIME CONTROLS Rev 3
2. BwAP 320-1 SHIFT STAFFING. Rev 16 MATERIALS:
1.

Overtime Tracking list, attachment 1

2.

LS-AA-119, Rev. 3

3.

BwAP 320-1, Rev.16 TASK STANDARDS:

1.

Determine required shift staffing.

2.

Determine from staffing list which person is available to be forced to work overtime to ensure shift staffing requirements met.

TASK CONDITIONS:

1.

You are a Unit Supervisor.

2.

Both Units are at 100% power.

3.

The current date and time is: 05/14/2006, 0900.

INITIATING CUES:

1. A fire brigade qualified NLO for shift N, May 16, 2006 has called in sick.
2. Without the NLO above, manning for shift N, May 16, 2006 is 4 non-fire brigade qualified NLOs, 3 fire brigade qualified NLOs, and the fire chief qualified field supervisor.
3. The Shift Manager has directed you to evaluate shift staffing for shift N, May 16, 2006.
4. Inform the Shift Manger of your results.

S-103 2

RECORD START TIME:

NOTE: These steps may be performed in any order.

Performance Step Standard Circle Applicable

1.

Refers to LS-AA-119 Overtime Controls main body.

CUE:

If examinee locates LS-AA-119 provide copy.

CUE:

If examinee locates BwAP 320-1 provide copy.

Perform the following:

o Locates copy of LS-AA-119 o Identifies step 4.1.2 requirements for work hours.

SAT UNSAT N/A Comments:

  • 2.

Determine one additional fire brigade member required Note: Hand examinee copy of JPM, overtime tracking list, (JPM pages 6 & 7) and provide the following cue.

CUE:

The shift manager directs you to determine who is eligible for overtime to cover the vacancy.

CUE:

All personnel on the overtime tracking list are fire brigade qualified.

Determine one additional fire brigade member required:

o Refer to BwAP 320-1 Determine 1 additional NLO required due to vacancy SAT UNSAT N/A Comments:

S-103 3

Performance Step Standard Circle Applicable

  • 3.

Determines NLO 3 is the only NLO that can be forced.

Checks each persons work hours:

o NLO 1 would violate the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit.

o NLO 2 (NO) would violate 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> limit.

NLO 3 (YES) is available.

o NLO 4 (NO) would violate 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> limit and would violate the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit.

o NLO 5 (NO) would violate 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit.

o NLO 6 (NO) would violate the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> limit.

o NLO 7 (NO) is already working shift N 5/16/06 o

NLO 8 (NO) would violate 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit.

Informs Shift manager that ONLY NLO 3 is available to be forced.

SAT UNSAT N/A Comments:

(CUE:) THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

S-103 4

TASK CONDITIONS:

1.

You are a Unit Supervisor.

2.

Both Units are at 100% power.

3.

The current date and time is: 05/14/2006, 0900.

INITIATING CUES:

1.

A fire brigade qualified NLO for shift N, May 16, 2006 has called in sick.

2.

Without the NLO above, manning for shift N, May 16, 2006 is 4 non-fire brigade qualified NLOs, 3 fire brigade qualified NLOs, and the fire chief qualified field supervisor.

3.

The Shift Manager has directed you to evaluate shift staffing for shift N, May 16, 2006.

4.

Inform the Shift Manger of your results.

S-103 5

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)

COMMENTS:

  • BwAP 320-1, Rev 16

S-103 (ATTACHMENT 1)

Crew 1 May May May May May May May May May May May May May May May May May May May May May 8

8 8

9 9

9 10 10 10 11 11 11 12 12 12 13 13 13 14 14 14 Mon Tue Wed Thurs Fri Sat Sun 1

2 3

1 2

3 1

2 3

1 2

3 1

2 3

1 2

3 1

2 3

NLO 1 266 1-01 12 12 12 12 xx1 xx 2

xx 1

N1C NX NX NX NLO 2 200 1-02 12 12 12 xx 1

xx 2

xx 1

xx 1

NX NX NA NLO 3 251 1-03 12 12 12 xx 1

xx 2

xx 1

xx 1

NA NA NB NLO 4 910 1-04 12 12 12 xx 1

xx 2

xx 1

xx 1

NB NB NC NLO 5 233 1-05 12 12 12 xx 1

xx 2

xx 1

xx 1

NC NC ND NLO 6 924 1-06 12 12 12 xx 1

xx 2

xx 1

xx 1

ND ND NE NLO 7 724 1-07 12 12 12 1

xx 1

xx 2

xx 1

xx 1

NE NE NX NLO 8 323 1-08 12 12 12 12 xx 1

xx 2

N1A N2X NX NX NX Crew 1 May May May May May May May May May May May May May May May May May May May May May 15 15 15 16 16 16 17 17 17 18 18 18 19 19 19 20 20 20 21 21 21 Mon Tue Wed Thurs Fri Sat Sun 1

2 3

1 2

3 1

2 3

1 2

3 1

2 3

1 2

3 1

2 3

NLO 1 266 1-01 12 12 12 12 12 12 NA xx1 N2X N1A DB DC DD NLO 2 200 1-02 12 12 12 12 12 NB D1X xx2 xx 1

DC DD DE NLO 3 251 1-03 12 12 12 12 12 NC xx 1

xx2 D1A DD DE DX NLO 4 910 1-04 12 12 12 12 12 12 ND D1X D2X xx 1

DE DX DX NLO 5 233 1-05 12 12 12 12 12 12 NE xx1 D2C D2D DX DX DX

S-103 (ATTACHMENT 1)

NLO 6 924 1-06 12 12 12 12 12 NX D1B xx2 xx 1

DX DX DA NLO 7 724 1-07 12 12 12 12 12 12 1

NX N1A xx 2

D1X DX DA DB NLO 8 323 1-08 12 12 12 12 12 NX xx 1

xx 2

N1X DX DB DC Crew 1 May May May May May May May May May May May May May May May May May May May May May 22 22 22 23 23 23 24 24 24 25 25 25 26 26 26 27 27 27 28 28 28 Mon Tue Wed Thurs Fri Sat Sun 1

2 3

1 2

3 1

2 3

1 2

3 1

2 3

1 2

3 1

2 3

NLO 1 266 1-01 8

8 8

8 N2X T

T T

T xx1 xx2 NLO 2 200 1-02 8

8 8

8 xx 1

T T

T T

xx1 xx2 NLO 3 251 1-03 8

8 8

8 xx 1

T T

T T

xx1 xx2 NLO 4 910 1-04 8

8 8

8 xx 1

T T

T T

xx1 xx2 NLO 5 233 1-05 8

8 8

8 xx 1

T T

T T

xx1 xx2 NLO 6 924 1-06 8

8 8

8 xx 1

T T

T T

xx1 xx2 NLO 7 724 1-07 8

8 8

8 1

xx 1

T T

T T

xx1 xx2 NLO 8 323 1-08 12 8

8 8

8 N1B T

T T

T xx1 xx2

S-105 1

TASK TITLE: Respond to a Fire Detection/Suppression System Alarm JPM No.:

S-105 REV:

NRC2006301 TPO No.:

8.E.AM-200 K&A No.:

2.1.14 TASK No.:

S-AM-200, Supervise actions for K&A IMP:

2.5/3.3 combating a plant fire TRAINEE:

SRO EVALUATOR:

DATE:

The Trainee:

PASSED this JPM.

TIME STARTED:

FAILED TIME FINISHED:

JPM TIME:

MINUTES CRITICAL ELEMENTS:

(*) 1, 3, 4, 8-10 APPROX COMPLETION TIME 15 MINUTES CRITICAL TIME:

NA EVALUATION METHOD:

LOCATION:

PERFORM X IN PLANT X SIMULATE X SIMULATOR GENERAL

REFERENCES:

1.

BwAR 0-37-A4, Rev. 13, UNIT 1 AREA FIRE.

2.

BwAP 1100-16, Rev. 22, Fire/Hazardous Spill and/or Injury Response.

MATERIALS:

1.

BwAR 0-37-A4, Rev. 13.

2.

Partially completed BwAP 1100-16, Rev. 22, Appendix A.

TASK STANDARDS:

1.

Perform Shift Manager designee required actions in response to a Fire Detection/Suppression System Alarm.

2.

Complete Shift Manager designee applicable actions of Fire/Haz-Mat Response/Checklist (Appendix A).

TASK CONDITIONS:

1.

You are the Shift Managers Designee.

2.

Both Units are at full power.

INITIATING CUES:

1.

Annunciator 0-37-A4 for Unit 1 actuated a few minutes ago and has been acknowledged by the Unit 1 Admin NSO. An Alarm on 1PM09J has also been acknowledged.

2.

An NLO called the MCR via the emergency phone number to report a fire is in progress in the plant

3.

An NSO has completed the Unit Admin NSO portion of BwAP 1100-16, Appendix A, Fire/Haz-Mat Response/Checklist and has just forwarded it to you. (CUE: Hand examinee copy of the BwAP 1100-16 Appendix A Checklist with the NSO portion completed)

4.

Another SRO is currently evaluating EALs related to the event.

5.

You are directed to complete the Shift Manager/Designee portion of the Fire/Haz-Mat Response/Checklist

6.

Route the completed checklist to the Station Duty Officer when it is completed.

S-105 2

RECORD START TIME Note: Pages 8-9 contain key of correctly filled out form.

PERFORMANCE STEP STANDARD Circle applicable

  • 1. Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, steps 1 & 2.

CUE:

All Prerequisites, Precautions, Limitations and Actions have been met.

CUE:

As Security Shift Supervisor, acknowledge the report of the fire, and request for personnel.

Locate and Open BwAP 1100-16.

Review / perform the required actions of the SM or designee:

Contact Security Supervisor o Phone o Plant Page o Radio NOTIFY the Security Shift Supervisor

  • Location of the fire
  • Dispatch security personnel to the equipment cages
  • Dispatch security personnel to fire area to control access Initial in block 1 NOTIFY security to OPEN any Security Barriers as needed Initial in block 2 SAT UNSAT N/A Comments:
2.

Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 3.

CUE:

As NSO, or Fire Brigade, confirm notification/dispatch of fire brigade.

Review / perform the required actions of the SM or designee:

o VERIFY the fire brigade has been notified/dispatched o Contact Admin NSO to verify fire brigade dispatched o Contact Fire Chief and/or fire brigade members.

o Phone o Plant Page o Radio Initial in block 3 SAT UNSAT N/A Comments:

S-105 3

PERFORMANCE STEP STANDARD Circle applicable

  • 3. Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 4.

CUE:

As Rad Protection acknowledge request for dispatch.

Review / perform the required actions of the SM or designee:

Contact Rad Protection o Phone o Plant Page Initial in block 4 Initial indicating the notification method used in block 4, other methods marked N/A.

SAT UNSAT N/A Comments:

  • 4. Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 5.

CUE:

As Fire Chief, report that the fire was wood that was staged for an upcoming outage. The fire is out, no injuries, small fire, no equipment damaged, no outside assistance is necessary.

If asked report that access to the ESF switchgear rooms is not impeded.

Review / perform the required actions of the SM or designee:

Contact Fire Chief o Phone o Plant Page o Radio o Communicates via Admin NSO COMMUNICATE with the Fire Chief to determine the following:

Conditions/status at fire scene Injuries Extent of fire Equipment damaged Assistance requirements Record applicable information block 5 Initial each sub step in block 5 (Assistance required information and initial is not required to be filled in)

SAT UNSAT N/A Comments:

5.

Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 6.

Review / perform the required actions of the SM or designee:

Determine that step 6 is not required to be performed SAT UNSAT N/A Comments:

S-105 4

PERFORMANCE STEP STANDARD Circle applicable

6.

Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 7.

CUE:

SM will review EALs.

Review / perform the required actions of the SM or designee:

Determine if EALs have been evaluated o

Review EALs SAT UNSAT N/A Comments:

7.

Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 8.

CUE:

Inform examinee notifications have already been performed by another SRO.

CUE:

OP-AA-106-101 will be reviewed by another SRO.

Review / perform the required actions of the SM or designee:

NOTIFY the Station Fire Marshal, Station Duty Officer, and Chemistry Initial each sub step in block 8 (Notify Others and Notify other Fire Departments and initial is not required to be filled in)

SAT UNSAT N/A Comments:

  • 8. Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 9.

Note: If examinee determines update not required at this time (due to 20 minute time limit on updates), provide the following cue CUE:

20 minutes have elapsed since you last spoke with Fire Chief CUE:

As Fire Chief provide the following info as an update:

The fire is out, the only visible damage is charred paint/floor, and no assistance necessary.

Request periodic status reports from the Exelon Fire Chief at no more than 20 minute intervals and note on the checklist:

Contact Fire Chief o Phone o Plant Page o Radio o

COMMUNICATE with the Fire Chief to determine the following:

o Conditions/status at fire scene o

Injuries o

Extent of fire o

Equipment damaged o

Assistance requirements Record update from Exelon Fire Chief Initial in block 9 SAT UNSAT N/A Comments:

S-105 5

PERFORMANCE STEP STANDARD Circle applicable

  • 9. Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 10.

CUE:

Acknowledge notifications as WEC.

Perform the following Contact the Work Execution Center o Phone o Plant Page o Radio Notify WEC to perform the following:

0BwOS FP-Q5, Fire Brigade Cages Equipment Area Check surveillance Initial in block 10 SAT UNSAT N/A Comments:

  • 10. Perform BwAP 1100-16 Appendix A, Shift Manager/Designee section, step 11.

CUE:

Team members are Chief: Dave Mills, Members: Morgan, Davito, Bannon, and Verchimak.

List Fire Brigade Team Members on the checklist:

Contact Fire Chief o Phone o Plant Page o Radio Request roster of Fire Brigade Members List Fire Brigade Chief and Fire Brigade Team Members in block

11.

Initial in block 11 SAT UNSAT N/A Comments:

11. Route the completed checklist CUE:

Acknowledge request to route completed checklist.

Route the completed checklist for review Contact Station Duty Officer o Phone o Plant Page o Radio Route checklist to Station Duty Officer SAT UNSAT N/A Comments:

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

S-105 6

TASK CONDITIONS:

1.

You are the Shift Managers Designee.

2.

Both Units are at full power.

INITIATING CUES:

1.

Annunciator 0-37-A4 for Unit 1 actuated a few minutes ago and has been acknowledged by the Unit 1 Admin NSO. An Alarm on 1PM09J has also been acknowledged.

2.

An NLO called the MCR via the emergency phone number to report a fire is in progress in the plant

3.

An NSO has completed the Unit Admin NSO portion of BwAP 1100-16, Appendix A, Fire/Haz-Mat Response/Checklist and has just forwarded it to you.

4.

Another SRO is currently evaluating EALs related to the event.

5.

You are directed to complete the Shift Manager/Designee portion of the Fire/Haz-Mat Response/Checklist

6.

Route the completed checklist to the Station Duty Officer when it is completed.

S-105 7

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon. (N/A if JPM NOT performed in simulator)
  • Complete items on Simulator Ready for Training Checklist. (N/A if JPM NOT performed in simulator)
  • Place simulator in RUN. (N/A if JPM NOT performed in simulator)

Insert IMF PN0749 ON(N/A if JPM NOT performed in simulator)

OMMENTS:

C

  • Provide marked up copy of BwAP 1100-16, Appendix A, completed through step 15 (page 4, NSO actions)
  • Provide copy of BwAR 0-37-A4.
  • The fire is on the 426 elevation of the U-1 Turbine Building outside of ESF Bus 141 room. The fire is a small fire and was in wood that was being staged for an upcoming outage.

BwAP 1100-16 Revision 22 Information Use S-105 8

APPENDIX A FIRE/HAZ-MAT RESPONSE/CHECKLIST Nuclear Station Operator

__JN__1.

Name of Caller/Informant:

Tom NLO__________________________________

__JN__2.

Phone Number of Informant (if available):

7588______________________________________

__JN__3.

Date:

Today_____________________________________

__JN__4.

Time:

__5 minutes ago____________________________

__JN__5.

Location of Fire/Spill (Bldg/Elev/Area):

Turbine Building 426 outside ESF Bus 141 room___

__JN__6.

Size of Fire/Spill:

Small_____________________________________

__JN__7.

Type of Fire Spill (Circle/Explain):

Wood/Trash/Rubbish: Wood staged for outage Flammable/Combustible Liquid:

Plant Equipment:

Other:

Type of Chemical:

__JN__8.

Notify the Shift Manager or designee of the situation.

__JN__9.

Radio Announcement of location Fire/Spill (Include fire type/size or Chemical if known).

__JN__10.

Sound Plant Fire Siren (10-15 seconds).

__JN__11.

P.A. Announcement of location, type and size of fire/spill (Use EMER PAGE button and handset button concurrently).

__JN__12.

Sound Plant Fire Siren (10-15 seconds).

__JN__13.

P.A. Announcement of location, type and size of fire/spill (Use EMER PAGE button and handset button concurrently).

_N/A__14.

Notify Unit Operator(s) to refer to BwOP FP-100, Fire Response Guidelines for a fire in any of the following areas:

{

VCT Room (11.6A-_)

{

Aux Bldg. 426 Chemistry Lab/Office (11.6B-0)

{

Kitchen/Locker Room Area (18.5-1)

{

RH Heat Exchanger Room (11.3_-_)

{

Letdown Heat Exchanger Room (11.4C-_)

{

DG Room/Switchgear Room Air Shaft (18._-_)

{

Radwaste Drumming Station and Radwaste Tunnel (14.1-0)

__JN__15.

Relay information to the Shift Manager.

NSO/Time

_Joe NSO____________/__Current Time_______

KKEEYY KKEEYY KKEEYY KKEEYY

BwAP 1100-16 Revision 22 Information Use S-105 9

APPENDIX A (Cont)

FIRE/HAZ-MAT RESPONSE/CHECKLIST Shift Manager/Designee

__SM__1.

Notify the Security Shift Supervisor of the incident location in order to dispatch security personnel to the fire/spill area and fire equipment/Haz-Mat Equipment cages and to provide access control as necessary.

__SM__2.

Have Security OPEN any Security Barriers as needed (Track Way Gates, Doors, etc.)

__SM__3.

Verify the fire brigade has been notified/dispatched.

NOTE Appendix E contains information on the duties and requirements for Rad Protection Personnel.

__SM__4.

Notify Rad Protection.

__SM*__

{

x2240 *Examinee initials in space denoting notification method (only 1 method required)

__SM*__

{

x2241

__SM*__

{

Plant Page

5.

Communicate with the Fire Chief/Incident Commander to determine the following:

__SM__

z Conditions/status at the fire scene Small wood fire_________________________

__SM__

z Injuries No injuries, None, or N/A_________________

__SM__

z Extent of fire Fire is out, extinguished, etc.______________

__SM__

z Equipment damaged No equipment damaged, none, or N/A_______

__SM__

z Assistance required No outside assistance required, none, or N/A__

NOTE Reported Fires in buildings outside the Protected area shall be handled by the off-site Fire Department. At Braidwoods owner controlled area at the Plant, notify Braidwood Fire Department (9-911 or 9-458-2121). At River Screen House, call Custer Twp. Fire Department (9-458-2119).

6.

If Off-Site Assistance Required:

NOTE INFORM the Braidwood Fire Department with as much information as possible, i.e., type of fire/spill, size, location of fire/spill, point of plant entry, etc.

__N/A__

{

CALL Braidwood Fire Dept. (9-911 or 9-458-2121).

__N/A__

{

CALL Custer Twp Fire Dept. (9-458-2119) for River Screen House.

z NOTIFY Security Shift Supervisor of the following:

__N/A__

z Off-Site Fire Dept. responding.

__N/A__

z Desired Plant Access Point.

__N/A__

z Location of Command Post Area.

z Refer to the Exelon Nuclear Radiological Emergency Plan, Braidwood Annex, for emergency action levels.

__N/A__

z Fire Chief notified of Off-Site response.

__N/A__

z Site Communications Director notified of Off-Site response.

KKEEYY KKEEYY KKEEYY KKEEYY

BwAP 1100-16 Revision 22 Information Use 10 KKEEY S-105 APPENDIX A (Cont)

FIRE/HAZ-MAT RESPONSE/CHECKLIST Shift Manager/Designee

__SM__7, Refer to the Exelon Nuclear Radiological Emergency Plan, Braidwood Annex, for emergency action levels if not already referred to.
8.

Notify the following:

__SM__

z Station Fire Marshal

__SM__

z Station Duty Officer

__SM__

z Chemistry z

Others per OP-AA-106-101 (*will be completed by another SRO)

__N/A__

z Notify other Fire Departments or other assistance as requested by the Exelon Fire Chief.

__SM__9.

Request periodic status/damage reports from the Exelon Fire chief at no more than twenty (20) minute intervals.

The fire is out, the only visible damage is charred paint/floor, no assistance necessary ---_____

__SM__10.

Notify the WEC to perform the following:

z 0BwOS FP-Q5, Fire Brigade Cages Equipment Area Check Surveillance, must be performed for all Fire Brigade cage equipment used during a fire.

{

0BwOS HM-Q1, Operations Hazardous Materials Emergency Response Equipment Inventory, must be performed for each cage used during a Hazardous Material Spill.

__SM__11.

List Fire Brigade/Hazmat Team Members:

z Fire Brigade Chief:

Mills_______________________________

z Members:

Morgan_____________________________

Davito______________________________

Smith_______________________________

Verchimak___________________________

12.

The completed Fire Checklist SHALL be routed in the following order for review:

a.

Station Duty Officer.

NOTE The Fire Marshal will make copies of the Checklist for:

1. Rad Protection Supervisor.
2. EP Coordinator (if an Emergency Event declared).
3. Environmental Supervisor.
b.

Fire Marshal.

c.

Operations Clerk.

Y KKEEYY KKEEYY KKEEYY (Final)

S-204 1

TASK TITLE: Initiate a LCOAR JPM No.:

S-204 REV:

NRC2006301 TPO No.:

8.E.AM-120 K&A No.:

2.2.23 TASK No.:

S-AM-073: Initiate/Terminate K&A IMP:

2.6/3.8 an AAR/LCOAR TRAINEE:

SRO EVALUATOR:

DATE:

The Trainee:

PASSED this JPM.

TIME STARTED:

FAILED TIME FINISHED:

JPM TIME:

MINUTES CRITICAL ELEMENTS:

(*) 2, 3, 4 APPROX COMPLETION TIME: 20 MINUTES CRITICAL TIME:

NA EVALUATION METHOD:

LOCATION:

X PERFORM X IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1.

1BwOL 3.7.8, Rev 4, LCOAR Essential Service Water (SX) System Tech Spec 3.7.8.

2.

1BwVSR 5.5.8.SX.1, Rev 5, ASME Surveillance Requirements for 1A Essential Service Water Pump.

MATERIALS:

1.

1BwOL 3.7.8 Rev 4.

TASK STANDARDS:

1.

Initiate LCOAR 3.7.8 for a failure of the 1A SX pump to perform its intended function.

TASK CONDITIONS:

1.

You are the Unit Supervisor.

2.

Both units are at full power.

INITIATING CUES:

1.

The Engineering staff notified you that the 1A SX pump has failed surveillance 1BwVSR 5.5.8.SX.1 ASME Surveillance Requirements for 1A Essential Service Water Pump, due to inadequate pump delta-P (10 minutes ago). Initiate the LCOAR. An IR (# 123456) and a WR (# 123456) have been written.

2.

No other inoperable equipment exists on either Unit.

3.

Inform the Shift Manager when you have completed initiating the LCOAR.

S-204 2

RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1.

Refer to the LCOAR CUE:

After the examinee demonstrates he/she can locate the LCOAR, provide a copy.

Note: If the examinee requests to review 1BwVSR 5.5.8.SX.1, provide the attached copy.

Locate 1BwOL 3.7.8 SAT UNSAT N/A Comments:

Examiners note: A correctly completed LOCAR form is included on pages 6-9. LCOAR completion steps may be performed in any order.

  • 2. Complete Section A, Notification, of 1BwOL 3.7.8 Note: Underlined phrases or words to that effect are acceptable for completion of LCOAR paperwork.

Complete Section A.

Notification, of 1BwOL 3.7.8:

Present Mode: 1 Initiating Event:

Failure of 1BwVSR 5.5.8.SX.1 ASME due to inadequate pump P SFD Performed:

Performs SFD per page 2 and determines no loss of safety function exists Check No box (B.1.a) on page 2 Checks YES box on page 1 and initials next to YES Does this inoperability invalidate any previous SFD: No SAT UNSAT N/A Comments:

S-204 3

PERFORMANCE STEP STANDARD Circle applicable

  • 2 Step 2 Continued CUE:

As Shift Manager, acknowledge LCOAR entry. Provide name of SM - Craig Ingold.

Note: From cue sheet, IR

(#123456) and WR #123456 written.

CUE:

C/O will be prepared at later time.

CUE:

Examiner sign for Unit NSO.

Notify Shift Manager of LCOAR entry (Craig Ingold)

Time Date:

(notification time and todays date)

Was an IR written:

Yes, #123456 Related WRs: Yes,

  1. 123456 o

Related C/O(s): No SRO Signature:

(examinees signature)

Unit NSO signature:

(Unit NSO name signed by examiner)

SAT UNSAT N/A Comments:

System On page 6 of 1BwOL 3.7.8, sign and date Condition A line and refer to page 7:

Examinees signature Todays date SAT UNSAT N/A Comments:

  • 4. Initiate LCOAR 1BwOL 3.7.8 Note: If examinee attempts to update LCO database, provide the following cue.

CUE: Another SRO will update LCO database.

On page 7 of 1BwOL 3.7.8, enter time, date and signature in Condition column:

JPM start time - 10 minutes.

Todays date Examinees signature Notify SM LOCAR entry complete SAT UNSAT N/A Comments:

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

S-204 4

TASK CONDITIONS:

1. You are the Unit Supervisor.
2. Both units are at full power.

INITIATING CUES:

1. The Engineering staff notified you that the 1A SX pump has failed surveillance 1BwVSR 5.5.8.SX.1 ASME Surveillance Requirements for 1A Essential Service Water Pump, due to inadequate pump delta-P (10 minutes ago). Initiate the LCOAR. An IR (# 123456) and a WR (# 123456) have been written.
2. No other inoperable equipment exists on either Unit.
3. Inform the Shift Manager when you have completed initiating the LCOAR.

S-204 5

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon. (N/A if JPM NOT performed in simulator)
  • Complete items on Simulator Ready for Training Checklist. (N/A if JPM NOT performed in simulator)
  • Place simulator in RUN. (N/A if JPM NOT performed in simulator)

C OMMENTS:

  • Provide copy of 1BwOL 3.7.8, Rev 4.
  • Provide marked up copy of 1BwVSR 5.5.8.SX.1, Rev 5.

1BwOL 3.7.8 Revision 4 Reference Use S-204 6

LCOAR ESSENTIAL SERVICE WATER (SX) SYSTEM TECH SPEC LCO 3.7.8 A.

NOTIFICATION If it is discovered that a Surveillance was not performed within its specified Surveillance Frequency, complete Action Z (SR 3.0.3) prior to declaring the LCO not met.

PRESENT MODE: 1 APPLICABLE MODE(S):

1, 2, 3, and 4 INITIATING EVENT(S): Failure of 1BwVSR 5.5.8.SX.1 ASME due to inadequate pump P SAFETY FUNCTION DETERMINATION (SFD)

PERFORMED? (Page 2)

YES, Examinee init. (SRO)

DOES THIS INOPERABILITY INVALIDATE ANY PREVIOUS SFD?

YES NO LCO 3.0.3: APPLICABLE MODE CHANGE ALLOWED?:

YES - Action C.2 SEPARATE CONDITION ENTRY ALLOWED:

NO COMPLETION TIME EXTENSION ALLOWED: NO NAME OF SHIFT MANAGER NOTIFIED: C. Ingold TIME/DATE: Current time/date WAS AN ISSUE WRITTEN?

YES NO RELATED WR(S):

WR 123456__________

WR ________________

WR ________________

WR ________________

WR ________________

WR ________________

WR ________________

WR ________________

WR ________________

WR ________________

RELATED C/O(S): NONE SRO signature: Examinee signature TIME/DATE: Current time/date Unit NSO signature: Examiners signature TIME/DATE: Current time/date KKEEYY KKEEYY KKEEYY KKEEYY

1BwOL 3.7.8 Revision 4 Reference Use S-204 7

B.

SAFETY FUNCTION DETERMINATION PROGRAM REQUIREMENTS

1.

LOSS OF SAFETY FUNCTION (LOSF) EVALUATION:

Is there any inoperable or degraded SUPPORT SYSTEM or SUPPORTED SYSTEM equipment on the opposite/redundant train that, when coupled with this inoperable equipment, might result in a complete loss of a Tech Spec required safety function.

a.

No - No LOSF exists. No further evaluation is necessary.

b.

Yes - A LOSF may exist. Using the SFDP and BwAP 340-1, evaluate which of the following conditions apply:

1)

The SSC is part of an LCO with multiple subsystems and the LCO specified function is intact. No LOSF exists.

2)

The SSC will still perform its required safety function as defined in the Safety Analysis Report (SAR). No LOSF exists.

3)

A LOSF exists. Perform the Required Actions of the SSC LCO in which the LOSF exists for the specific Condition(s) that apply.

2.

LCO 3.0.6 - DELAYED LCOAR ENTRY CALCULATION.

Perform this step only if No LOSF exists and it is desired to delay SUPPORTED SYSTEM LCOAR entry as allowed by LCO 3.0.6. A LOSF does not exist if the redundant train of the inoperable SUPPORTED SYSTEM(S) equipment is OPERABLE.

a.

Rules of Use:

1)

Rule 1: With a single SUPPORT SYSTEM inoperable, the affected SUPPORTED SYSTEM(s) LCOAR entry(s) is not required to be entered unless directed by the SUPPORT SYSTEM Required Actions.

2)

Rule 2: In the event additional SUPPORT SYSTEM(s) become inoperable during the Completion Time for restoration of the first SUPPORT SYSTEM, the LCOAR entry(s) of the SUPPORTED SYSTEM may be delayed by either the maximum allowed Completion Time of the SUPPORT SYSTEM(s), or 2 times the Completion Time for restoration of the SUPPORTED SYSTEM (applied at the time the second SUPPORT SYSTEM becomes inoperable), whichever is less.

KKEEYY KKEEYY KKEEYY KKEEYY

1BwOL 3.7.8 Revision 4 Reference Use S-204 8

LCOAR INDEX ESSENTIAL SERVICE WATER (SX) SYSTEM SRO Sign and Date Content Description Page SRO: Examinee signature Date: Todays date Condition A One unit-specific SX train inoperable.

7 SRO:

Date:

Condition B One unit-specific SX train inoperable.

8 SRO:

Date:

Condition C Opposite-unit SX train inoperable.

9 SRO:

Date:

Condition D Required Action and associated Completion Time of Condition A or B not met.

10 SRO:

Date:

Condition Z SR 3.0.3 11 SRO:

Date:

N/A Risk Assessment required by LCO 3.0.4.b complete to allow MODE change.

N/A KKEEYY KKEEYY KKEEYY KKEEYY

1BwOL 3.7.8 Revision 4 Reference Use S-204 9

LCOAR ACTION CHART ESSENTIAL SERVICE WATER (SX) SYSTEM CONDITION REQUIRED ACTION COMPLETION TIME ACTION MET

                      • NOTE********

Not applicable to Unit 1 during replacement of the SX suction isolation valves during Unit 2 Refueling 11 while Unit 2 is in MODE 5, 6, or defueled.

A.

One unit-specific SX train inoperable.

JPM start time minus 10 minutes/Todays date Time/Date Examinee signature SRO A.1

                • NOTES********
1.

Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources -

Operating," for Emergency Diesel Generator made inoperable by SX.

2.

Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops -

MODE 4," for Residual Heat Removal loops made inoperable by SX.

Restore unit-specific SX train to OPERABLE status.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

__________/____

Time/Date SRO KKEEYY KKEEYY KKEEYY KKEEYY (Final)

S-303 1

TASK TITLE: Prepare/Perform a Liquid Radwaste Release JPM No.:

S-303 REV: NRC2006301 TPO No.:

8C.HP-001 K&A No.: 2.3.6 TASK No.:

S-HP-001, Authorize a liquid K&A IMP: 2.1/3.1 radwaste release TRAINEE:

SRO EVALUATOR:

DATE:

The Trainee:

PASSED this JPM.

TIME STARTED:

FAILED TIME FINISHED:

JPM TIME:

MINUTES CRITICAL ELEMENTS:

(*) 3, 5 APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME:

NA EVALUATION METHOD:

LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1.

BwOP WX-501T1, Rev. 38, Liquid Release Tank 0WX01T Release Form

2.

BwOP WX-501T2, Rev 5, Liquid Release Window Determination

3.

BwOP WX-501T3, Rev 1, Authorization to Release Outside of Release Window MATERIALS:

1.

BwOP WX-501T1, Rev. 38, Liquid Release Tank 0WX01T Release Form

2.

BwOP WX-501T2, Rev 5, Liquid Release Window Determination

3.

BwOP WX-501T3, Rev 1, Authorization to Release Outside of Release Window TASK STANDARDS:

1.

Complete Section G of a liquid release tank release form in accordance with BwOP WX-501T1.

2.

Determine release start time is outside release start time window.

TASK CONDITIONS:

1.

You are the Unit 1 Unit Supervisor.

2.

Both Units are at full power.

INITIATING CUES:

1.

The Shift Manager has handed you a portion of a 0WX01T liquid release package,

  1. L-06-100, completed through section F.5, and has directed you to complete Section G. (Hand examinee copy of BwOP WX-501T1). All previous sections of the release package have been successfully completed.
2.

The current time is 0700 today. Due to scheduled work on the liquid release line, the release must be COMMENCED by 0900 today.

3.

Release duration per BwOP WX-501T1 step D.6.g.2) is 120 minutes.

4.

The dechlorination skid is in operation.

5.

Notify the Shift Manager when Section G of the release package is complete.

S-303 2

RECORD START TIME Note:

Provide the examinee with a copy of Section G of BwOP WX-501T1 completed through Step F.5.

PERFORMANCE STEP STANDARD Circle applicable

1.

Obtain and record current Kankakee River flow data NOTE: The USGS internet site can be accessed from the computer desk top from workgroup apps menu or by using normal internet access.

NOTE: After examinee locates Kankakee river flow on usgs web site, indicator, provide following cue:

CUE:

Kankakee river discharge flow is 5680 cfs at 0700 on todays date.

NOTE: If examinee attempts to access the Unit 1 US turnover, provide the following cue:

CUE:

Kankakee river flow has been logged in the Unit 1 US turnover.

Obtain and record current Kankakee River flow data by performing the following:

  • Access the United States Geological Survey internet site (usgs.gov).
  • Access water watch-current stream flow conditions for Illinois
  • Record discharge flow o Record Kankakee River flow in Unit 1 US turnover SAT UNSAT N/A Comments:
2.

Determine CW blowdown flow NOTE: After examinee locates CW blowdown flow indicator, provide following cue:

CUE:

CW blowdown flow is 22,000 gpm.

Determine CW blowdown flow per BwOP WX-501T2 as follows:

o Record liquid release

  1. L-06-100 Obtain and record current Kankakee River flow (5680 cfs)

Record CW blowdown flow o F2400 o OUR-CW032 SAT UNSAT N/A Comments:

S-303 3

PERFORMANCE STEP STANDARD Circle applicable

  • 3 Determine the Liquid Release Window per BwOP WX-501T2 CUE: After examinee locates correct procedure, provide copy.

NOTE: After examinee locates liquid release spread sheet, inform student to use spreadsheet on computer desktop.

NOTE: A completed copy of the liquid release spread sheet is located on page 7.

Determine the Liquid Release Window per BwOP WX-501T2 as follows:

Access Liquid Release Window spread sheet (k:/shift/excel/liquid release) o Enter arrival date at Wilmington (tomorrows date)

Enter river flow rate (5680 cfs)

Enter release duration (120 mins from initial cue)

Enter blowdown flow rate (22,000 gpm)

Record the Liquid Release Window times on BwOP WX-501T1 Target start time (1630)

Start after time (1300)

Start before time (2000)

SAT UNSAT N/A Comments:

4.

Evaluate the expected time of release CUE: Dechlorination skid is in operation. (from initial cue)

Evaluate the expected time of release so that both biocide treatment and the release can be accommodated by performing the following:

Check if dechlorination skid in operation Verify CW blowdown flow 8000 gpm (22,000 from previous cue)

SAT UNSAT N/A Comments:

S-303 4

PERFORMANCE STEP STANDARD Circle applicable

  • 5. Identify release will not start within desired time CUE:

Acknowledge as SM notification of release performed outside start time window. Inform examinee another supervisor will perform BwOP WX-501T3.

Perform the following:

Determine release will be performed outside of release start time window (from initiating cue, release must start at 0900)

Determine BwOP WX-501T3 must be completed prior to authorizing release o

Notify SM release will be performed outside of release start time window OR o Notify SM to delay release until work completed OR o Notify SM to delay work until release completed within desired time window.

SAT UNSAT N/A Comments:

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

S-303 5

TASK CONDITIONS:

1.

You are the Unit 1 Unit Supervisor.

2.

Both Units are at full power.

INITIATING CUES:

1.

The Shift Manager has handed you a portion of a 0WX01T liquid release package, #L-06-100, completed through section F.5, and has directed you to complete Section G.

All previous sections of the release package have been successfully completed.

2.

The current time is 0700 today. Due to scheduled work on the liquid release line, the release must be COMMENCED by 0900 today.

3.

Release duration per BwOP WX-501T1 step D.6.g.2) is 120 minutes.

4.

The dechlorination skid is in operation.

5.

Notify the Shift Manager when Section G of the release package is complete.

S-303 6

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
  • Complete items on Simulator Ready for Training Checklist.
  • Place simulator in RUN.
  • Verify/copy Liquid Release Window spreadsheet to computer desktop prior to administering JPM. Spreadsheet is located at k:/shift/excel/liquid release.
  • Clear data from INPUTS field of Liquid Release Window spread sheet prior to administering JPM.
  • Clear computer history of recently accessed documents, programs, and web sites visited prior to administering JPM by performing the following:

Right mouse click on task bar Select properties Select advanced tab Select clear

  • Delete Liquid Release Window spreadsheet from computer desktop after administering JPM to all candidates.

OMMENTS:

C

  • BwOP WX-501T1, Rev. 38.
  • BwOP WX-501T2, Rev 5.
  • BwOP WX-501T3, Rev 1.

S-303 7

BwOP WX-501 and/or BwOP WX-526 Enter data into blue cells only.

INPUTS Arrival Date at Wilmington mm/dd/yyyy Tomorrow River Flow Rate CFS 5680 Release Duration Minutes 120 Blowdown Rate (F2400)

GPM 22000 CALCULATED RESULTS Blowdown Time To River Minutes 120 River Time To Wilmington Intake Minutes 420 Blowdown Peak Time To Wilmington Intake Minutes 600 Margin Minutes 420 Start After Time

( = Peak Arrives at 10 PM)

Time

  1. VALUE!

Normal Start

( = Center of Peak occurs at 2:30 AM)

Time Start BeforeTime

( = Peak Departs at 7 AM)

Time Braidwood Release Time Calulator

  1. VALUE!
  1. VALUE!

Today 1300 Today 1630 Today 2000 KKEEYY KKEEYY KKEEYY KKEEYY (Final)

S-402 1

TASK TITLE: Screen an Event for Reportability JPM No.:

S-402 REV:

NRC2006301 TPO No.:

8E.AM-102 K&A No.:

(2.4.30)

TASK No.:

S-AM-102: Screen Reportable or K&A IMP:

2.2/3.6 Significant Events for Reportability TRAINEE:

SRO EVALUATOR:

DATE:

The Trainee:

PASSED this JPM.

TIME STARTED:

FAILED TIME FINISHED:

JPM TIME:

MINUTES CRITICAL ELEMENTS:

(*) 2, 3 APPROX COMPLETION TIME: 25 MINUTES CRITICAL TIME:

NA EVALUATION METHOD:

LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. LS-AA-1010, Rev. 9; Exelon Reportability Reference Manual Table of Contents.
2. LS-AA-1020, Rev. 8, Exelon Reportability Reference Manual Operations Decision Tree.
3. LS-MW-1110, Rev. 6, Exelon Reportability Reference Manual SAF 1.

MATERIALS:

1. Copies of the references listed above.

TASK STANDARDS:

1. Determine all reporting requirements of < 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> per the Exelon Reportability Reference Manual.

TASK CONDITIONS:

1. You are the Unit 1 Unit Supervisor.
2. Unit 1 was at 100% power
3. A RCS LOCA occurred and the reactor tripped and SI actuated.
4. All systems functioned as designed.
5. No release is in progress.
6. An Alert (FA1) has been declared
7. A NARS form has been transmitted to the state INITIATING CUES:
1. The Shift Manager has directed you to screen the event and determine ALL reporting requirements that are LESS THAN OR EQUAL TO 8 HOURS per the Exelon Reportability Reference Manual.
2. Inform the Shift Manager of applicable reporting requirements.

S-402 2

RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1.

Refer to Exelon Reportability Reference Manual Note: If JPM is performed in simulator, examinee will use simulator copy of Exelon Reportability Manual.

If JPM NOT performed in simulator, provide examinee with a copy of Exelon Reportability Manual.

Perform the following:

Locate and open Exelon Reportability Reference Manual LS-AA-1020 SAT UNSAT N/A Comments:

  • 2. Screen Event Note: See pages 6-9 for a key of the operations decision trees.

Refer to Operations Decision Trees (LS-AA-1020, page 89)

Determine the following apply:

SAF 1.1 - Emergency Plan Activated SAF 1.5 - ECCS Injection/Actuation SAF 1.6 - RPS Actuation with the reactor critical SAF 1.7 - System Actuation Not Including RPS o

SAF 1.23 - Occurrence of an Incident SAT UNSAT N/A Comments:

S-402 3

PERFORMANCE STEP STANDARD Circle applicable

  • 3. Determine Notification Use Operations Decision Trees to determine the following:

SAF 1.1 (LS-AA-1110, page 1) o 15 minute State and Local Notification (already performed per initial cue) 1 hr NRC Notification required o

2 hr ANI and INPO Notification required SAF 1.5 (LS-AA-1110, page 16) 4 hr NRC Notification required SAF 1.6 (LS-AA-1110, page 20) 4 hr NRC Notification required SAF 1.7 (LS-AA-1110, page 24) 8 hr NRC Notification required o

SAF 1.23 LS-AA-1110 page 68) o Notify NEIL ASAP via telephone o

Evaluate other notifications and determine they do not apply SAT UNSAT N/A Comments:

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

S-402 4

TASK CONDITIONS:

1. You are the Unit 1 Unit Supervisor.
2. Unit 1 was at 100% power
3. A RCS LOCA occurred and the reactor tripped and SI actuated.
4. All systems functioned as designed.
5. No release is in progress.
6. An Alert (FA1) has been declared
7. A NARS form has been transmitted to the state INITIATING CUES:
1. The Shift Manager has directed you to screen the event and determine ALL reporting requirements that are LESS THAN OR EQUAL TO 8 HOURS per the Exelon Reportability Reference Manual.
2. Inform the Shift Manager of applicable reporting requirements.

S-402 5

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. (N/A if JPM NOT performed in simulator)
  • If it is desired to simulate actual plant conditions, perform the following (otherwise N/A)
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon. (N/A if JPM NOT performed in simulator)
  • Complete items on Simulator Ready for Training Checklist. (N/A if JPM NOT performed in simulator)
  • Place simulator in RUN. (N/A if JPM NOT performed in simulator)

Insert IMF TH06D 540000(N/A if JPM NOT performed in simulator)

COMMENTS:

S-402 6

KKEEYY KKEEYY EEXXAAM M M MAATTEERRIIAALL

S-402 7

KKEEYY

S-402 8

KKEEYY (Final)