{{#Wiki_filter:Activity                       Activity                 PMGR WBS Orig Total Activity Item
{{#Wiki_filter:Activity ID Activity Description WBS PMGR Orig Dur Total Float Comp Item Activity Description Early start Early finish Budgeted Quantity Resp Engr Key PMGR WBSPreds Succes INDIAN POINT SIREN UPGRADE PROJECT IPEC SIREN OPERABILITY SCHEDULE SIREN ACOUSTIC OUTPUT RESOLUTION TREE REMOVAL (Phillips)
                                                                                % Early       Early Budgeted Resp PMGR WBS KeyPreds  Succes 2007                                  2008 ID                        Description                  Dur Description Float Comp# start    finish Quantity Engr                      S    OCT            NOV            DEC          JAN          FEB      M INDIAN POINT SIREN UPGRADE PROJECT IPEC SIREN OPERABILITY SCHEDULE SIREN ACOUSTIC OUTPUT RESOLUTION TREE REMOVAL (Phillips)
S27031 DEVELOP PLAN AND SCHEDULE WITH VENDOR 250 0 24AUG07A 09OCT07
S27031       DEVELOP PLAN AND SCHEDULE WITH VENDOR               250     0 24AUG07A 09OCT07       PHILLIPS,           S27041*       DEVELOP PLAN AND SCHEDULE WITH VENDOR S27021       SURVEY FOLIAGE AND TREES                             17     3 01OCT07 17OCT07       PHILLIPS,           S27022           SURVEY FOLIAGE AND TREES S27041       REMOVE TREE INTERFERENCES                             38     0 10OCT07 16NOV07       PHILLIPS,   S27031* S27051*                           REMOVE TREE INTERFERENCES S27051       CONDUCT INDEPENDENT ANALYSIS OF EXCEPTIONS           33*     0 15OCT07* 16NOV07         PHILLIPS   S27041* S27061*                           CONDUCT INDEPENDENT ANALYSIS OF EXCEPTIONS S27022       FOLIAGE SURVEYS COMPLETE                               0     0         20OCT07*       PHILLIPS,   S27021                       FOLIAGE SURVEYS COMPLETE S27061       SUBMIT RESULTS REPORT TO FEMA                         14     0 17NOV07 30NOV07         PHILLIPS   S27051* S27062                                 SUBMIT RESULTS REPORT TO FEMA S27062       SUBMIT FINAL FOLIAGE REPORT TO FEMA                   0     0         30NOV07*       PHILLIPS   S27061                                         SUBMIT FINAL FOLIAGE REPORT TO FEMA CONTROL SYSTEM (Sheikh, Z)
: PHILLIPS, S27041*
S27541       DRAFT CONTROL SYSTEM RELIABILITY REPORT               8     30 02OCT07A 09OCT07       SHEIKH, ZE           S27551*       DRAFT CONTROL SYSTEM RELIABILITY REPORT S27551       FINALIZE CONTROL SYSTEM RELIABILITY REPORT           10     30 10OCT07 19OCT07       SHEIKH, ZE   S27541* S27411*           FINALIZE CONTROL SYSTEM RELIABILITY REPORT S27081       COMPLETE ADDITIONAL SYSTEM WORK (TUNING/FILTERS)     20     50 24DEC07 13JAN08         GARVEY     S27431*                                                             COMPLETE ADDITIONAL SYSTEM W SIREN TESTING FIELD MEASUREMENT TECHNIQUES (Miele)
S27021 SURVEY FOLIAGE AND TREES 17 3 01OCT07 17OCT07
S27101       DEVELOP CRITERIA FOR STEADY & REPEATABLE               3     0 01OCT07* 03OCT07         MIELE             S27111*   DEVELOP CRITERIA FOR STEADY & REPEATABLE S27111       CORRELATE DATA FROM PREVIOUS MEASUREMENTS             7     0 01OCT07 07OCT07         MIELE     S27101* S27121*     CORRELATE DATA FROM PREVIOUS MEASUREMENTS S27121       DETERM ALTERN APPROACH / FUTR FIELD MEASUREMENTS       7     0 08OCT07 14OCT07         MIELE     S27111* S27131*,       DETERM ALTERN APPROACH / FUTR FIELD MEASUREMENTS S27191*
: PHILLIPS, S27022 S27041 REMOVE TREE INTERFERENCES 38 0 10OCT07 16NOV07
S27131       OBTAIN EXPERT ENDORSEMENT OF NEW TECHNIQUE           10     0 15OCT07 24OCT07         MIELE     S27121* S27141*               OBTAIN EXPERT ENDORSEMENT OF NEW TECHNIQUE POST RESOLUTION QUALIFICATION TESTING (Miele)
: PHILLIPS, S27031*
S27231       DEVEL INDEP SND CONTOUR MAPS/ACT SND PRESS LVLS       15   137 01OCT07* 15OCT07         MIELE             S27183*         DEVEL INDEP SND CONTOUR MAPS/ACT SND PRESS LVLS S27191       DETERMINE NECESSARY AMOUNT OF FIELD                   2     24 15OCT07 16OCT07         MIELE     S27121* S27201           DETERMINE NECESSARY AMOUNT OF FIELD MEASUREMENTS MEASUREMENTS ENGR - SIRN IPEC SIREN UPGRADE PROJECT                                         IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION                      Run Date                                        10OCT07 11:33 NEW SIREN FEMA OPERABILITY FL-32 LT-S2                                                             SCHEDULE Sheet 1 of 6       © Primavera Systems, Inc.
S27051*
S27051 CONDUCT INDEPENDENT ANALYSIS OF EXCEPTIONS 33*
0 15OCT07*
16NOV07 PHILLIPS S27041*
S27061*
S27022 FOLIAGE SURVEYS COMPLETE 0
0 20OCT07*
: PHILLIPS, S27021 S27061 SUBMIT RESULTS REPORT TO FEMA 14 0 17NOV07 30NOV07 PHILLIPS S27051*
S27062 S27062 SUBMIT FINAL FOLIAGE REPORT TO FEMA 0
0 30NOV07*
PHILLIPS S27061 CONTROL SYSTEM (Sheikh, Z)
S27541 DRAFT CONTROL SYSTEM RELIABILITY REPORT 8
30 02OCT07A 09OCT07 SHEIKH, ZE S27551*
S27551 FINALIZE CONTROL SYSTEM RELIABILITY REPORT 10 30 10OCT07 19OCT07 SHEIKH, ZE S27541*
S27411*
S27081 COMPLETE ADDITIONAL SYSTEM WORK (TUNING/FILTERS) 20 50 24DEC07 13JAN08 GARVEY S27431*
SIREN TESTING FIELD MEASUREMENT TECHNIQUES (Miele)
S27101 DEVELOP CRITERIA FOR STEADY & REPEATABLE 3
0 01OCT07*
03OCT07 MIELE S27111*
S27111 CORRELATE DATA FROM PREVIOUS MEASUREMENTS 7
0 01OCT07 07OCT07 MIELE S27101*
S27121*
S27121 DETERM ALTERN APPROACH / FUTR FIELD MEASUREMENTS 7
0 08OCT07 14OCT07 MIELE S27111*
S27131*,
S27191*
S27131 OBTAIN EXPERT ENDORSEMENT OF NEW TECHNIQUE 10 0 15OCT07 24OCT07 MIELE S27121*
S27141*
POST RESOLUTION QUALIFICATION TESTING (Miele)
S27231 DEVEL INDEP SND CONTOUR MAPS/ACT SND PRESS LVLS 15 137 01OCT07*
15OCT07 MIELE S27183*
S27191 DETERMINE NECESSARY AMOUNT OF FIELD MEASUREMENTS 2
24 15OCT07 16OCT07 MIELE S27121*
S27201 2007 2008 S
OCT NOV DEC JAN FEB M
DEVELOP PLAN AND SCHEDULE WITH VENDOR SURVEY FOLIAGE AND TREES REMOVE TREE INTERFERENCES CONDUCT INDEPENDENT ANALYSIS OF EXCEPTIONS FOLIAGE SURVEYS COMPLETE SUBMIT RESULTS REPORT TO FEMA SUBMIT FINAL FOLIAGE REPORT TO FEMA DRAFT CONTROL SYSTEM RELIABILITY REPORT FINALIZE CONTROL SYSTEM RELIABILITY REPORT COMPLETE ADDITIONAL SYSTEM WO DEVELOP CRITERIA FOR STEADY & REPEATABLE CORRELATE DATA FROM PREVIOUS MEASUREMENTS DETERM ALTERN APPROACH / FUTR FIELD MEASUREMENTS OBTAIN EXPERT ENDORSEMENT OF NEW TECHNIQUE DEVEL INDEP SND CONTOUR MAPS/ACT SND PRESS LVLS DETERMINE NECESSARY AMOUNT OF FIELD MEASUREMENTS
© Primavera Systems, Inc.
ENGR - SIRN IPEC SIREN UPGRADE PROJECT NEW SIREN FEMA OPERABILITY FL-32 LT-S2 Sheet 1 of 6 IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION SCHEDULE Run Date 10OCT07 11:33


Activity                         Activity               PMGR WBS Orig Total Activity Item
Activity ID Activity Description WBS PMGR Orig Dur Total Float Comp Item Activity Description Early start Early finish Budgeted Quantity Resp Engr Key PMGR WBSPreds Succes POST RESOLUTION QUALIFICATION TESTING (Miele)
                                                                              % Early       Early Budgeted Resp PMGR WBS KeyPreds    Succes 2007                                  2008 ID                        Description                  Dur Description Float Comp# start      finish Quantity Engr                        S      OCT            NOV            DEC            JAN          FEB      M POST RESOLUTION QUALIFICATION TESTING (Miele)
S27183 COMP INDEP SND CONTOUR MAPS TO ATI FOR VALIDATN 2
S27183       COMP INDEP SND CONTOUR MAPS TO ATI FOR VALIDATN       2   137 16OCT07   17OCT07         MIELE     S27231*                       COMP INDEP SND CONTOUR MAPS TO ATI FOR VALIDATN S27141       SUBMIT FIELD MEASUREMENT TECHNIQUE TO FEMA             1     0 25OCT07   25OCT07         MIELE     S27131*   S27143                 SUBMIT FIELD MEASUREMENT TECHNIQUE TO FEMA S27143       ISSUE FIELD MEASUREMENT TECHNIQUE DESCRIPTION         0     0           25OCT07*         MIELE     S27141                             ISSUE FIELD MEASUREMENT TECHNIQUE DESCRIPTION S27161       REV DATA FROM ACOUSTIC TSTS FOR COMPLI W/ CRITER       5     3 02NOV07   06NOV07         MIELE     S27281,   S27201                        REV DATA FROM ACOUSTIC TSTS FOR COMPLI W/ CRITER S27288*
137 16OCT07 17OCT07 MIELE S27231*
S27201       FIELD TESTING OF LAB RESULTS                         10     0 10NOV07   19NOV07         MIELE     S27161,   S27185*,                             FIELD TESTING OF LAB RESULTS S27191,  S27211*
S27141 SUBMIT FIELD MEASUREMENT TECHNIQUE TO FEMA 1
S27285*
0 25OCT07 25OCT07 MIELE S27131*
S27201M     COMPLETE FIELD TESTING OF LAB RESULTS                 0     0           19NOV07*         MIELE                                                     COMPLETE FIELD TESTING OF LAB RESULTS S27211       PREPARE LAB/FIELD TEST REPORT                         4     0 20NOV07   23NOV07         MIELE     S27201*   S27209*                               PREPARE LAB/FIELD TEST REPORT S27185       PROD NEW ATI SND CONT MAPS FRM VALIDAT LAB DATA       10     94 20NOV07   29NOV07         MIELE     S27201*                                             PROD NEW ATI SND CONT MAPS FRM VALIDAT LAB DATA S27209       APPROVE LAB/FIELD TEST REPORT                         5     0 24NOV07   28NOV07         MIELE     S27211*   S27210*,                                 APPROVE LAB/FIELD TEST REPORT S27221*,
S27143 S27143 ISSUE FIELD MEASUREMENT TECHNIQUE DESCRIPTION 0
0 25OCT07*
MIELE S27141 S27161 REV DATA FROM ACOUSTIC TSTS FOR COMPLI W/ CRITER 5
3 02NOV07 06NOV07 MIELE
: S27281, S27288*
S27201 S27201 FIELD TESTING OF LAB RESULTS 10 0 10NOV07 19NOV07 MIELE
: S27161, S27191, S27285*
S27185*,
S27211*
S27201M COMPLETE FIELD TESTING OF LAB RESULTS 0
0 19NOV07*
MIELE S27211 PREPARE LAB/FIELD TEST REPORT 4
0 20NOV07 23NOV07 MIELE S27201*
S27209*
S27185 PROD NEW ATI SND CONT MAPS FRM VALIDAT LAB DATA 10 94 20NOV07 29NOV07 MIELE S27201*
S27209 APPROVE LAB/FIELD TEST REPORT 5
0 24NOV07 28NOV07 MIELE S27211*
S27210*,
S27221*,
S27402*
S27402*
S27221       SUBMIT LAB/FIELD TEST REPORT TO FEMA                   1     0 29NOV07   29NOV07         MIELE     S27209*   S27222                                   SUBMIT LAB/FIELD TEST REPORT TO FEMA S27222       SUBMIT LAB/FIELD TEST REPORT TO FEMA                   0     0           29NOV07*         MIELE     S27221                                               SUBMIT LAB/FIELD TEST REPORT TO FEMA S27210       DEVELOP RESOLUTION ACTION PLAN                         7     0 29NOV07   05DEC07         MIELE     S27209*   S27210M,                                     DEVELOP RESOLUTION ACTION PLAN S27212 S27210M     DEVELOP RESOLUTION ACTION PLAN                         0     0           05DEC07*         MIELE     S27210                                                 DEVELOP RESOLUTION ACTION PLAN S27212M     FUNDING APPROVED FOR RESOLUTION IMPLEMENTATION         0     0           23DEC07*         MIELE               S27212*,                                               FUNDING APPROVED FOR RESOLUTION IMPLEM S27212AM S27212AM     START SIREN RESOLUTION IMPLEMENTATION                 0     0 24DEC07*                   MIELE     S27212M             START SIREN RESOLUTION IMPLEMENTATION S27212       IMPLEMENT SIREN RESOLUTION                           60     0 24DEC07   22FEB08         MIELE     S27210,   S27232*                IMPLEMENT SIREN RESOLUTION S27212M*,
S27221 SUBMIT LAB/FIELD TEST REPORT TO FEMA 1
0 29NOV07 29NOV07 MIELE S27209*
S27222 S27222 SUBMIT LAB/FIELD TEST REPORT TO FEMA 0
0 29NOV07*
MIELE S27221 S27210 DEVELOP RESOLUTION ACTION PLAN 7
0 29NOV07 05DEC07 MIELE S27209*
: S27210M, S27212 S27210M DEVELOP RESOLUTION ACTION PLAN 0
0 05DEC07*
MIELE S27210 S27212M FUNDING APPROVED FOR RESOLUTION IMPLEMENTATION 0
0 23DEC07*
MIELE S27212*,
S27212AM S27212AM START SIREN RESOLUTION IMPLEMENTATION 0
0 24DEC07*
MIELE S27212M S27212 IMPLEMENT SIREN RESOLUTION 60 0 24DEC07 22FEB08 MIELE
: S27210, S27212M*,
S27431*
S27431*
S27232       FINAL ACCEPTANCE TESTING                             10     0 23FEB08   03MAR08                   S27212*                                                           FINAL ACCEPTANCE TESTING LAB TESTING (Lafferty)
S27232*
S27241       DRAFT TEST PLAN                                       1         27SEP07A 27SEP07A     LAFFERTY,J             S27251   DRAFT TEST PLAN S27242       RECEIVE QUOTE - ATI                                   4         01OCT07A 04OCT07A     LAFFERTY,J             S27243       RECEIVE QUOTE - ATI ENGR - SIRN IPEC SIREN UPGRADE PROJECT                                       IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION                          Run Date                                        10OCT07 11:33 NEW SIREN FEMA OPERABILITY FL-32 LT-S2                                                             SCHEDULE Sheet 2 of 6     © Primavera Systems, Inc.
S27232 FINAL ACCEPTANCE TESTING 10 0 23FEB08 03MAR08 S27212*
LAB TESTING (Lafferty)
S27241 DRAFT TEST PLAN 1
27SEP07A 27SEP07A LAFFERTY,J S27251 S27242 RECEIVE QUOTE - ATI 4
01OCT07A 04OCT07A LAFFERTY,J S27243 2007 2008 S
OCT NOV DEC JAN FEB M
COMP INDEP SND CONTOUR MAPS TO ATI FOR VALIDATN SUBMIT FIELD MEASUREMENT TECHNIQUE TO FEMA ISSUE FIELD MEASUREMENT TECHNIQUE DESCRIPTION REV DATA FROM ACOUSTIC TSTS FOR COMPLI W/ CRITER FIELD TESTING OF LAB RESULTS COMPLETE FIELD TESTING OF LAB RESULTS PREPARE LAB/FIELD TEST REPORT PROD NEW ATI SND CONT MAPS FRM VALIDAT LAB DATA APPROVE LAB/FIELD TEST REPORT SUBMIT LAB/FIELD TEST REPORT TO FEMA SUBMIT LAB/FIELD TEST REPORT TO FEMA DEVELOP RESOLUTION ACTION PLAN DEVELOP RESOLUTION ACTION PLAN FUNDING APPROVED FOR RESOLUTION IMPLEM START SIREN RESOLUTION IMPLEMENTATION IMPLEMENT SIREN RESOLUTION FINAL ACCEPTANCE TESTING DRAFT TEST PLAN RECEIVE QUOTE - ATI
© Primavera Systems, Inc.
ENGR - SIRN IPEC SIREN UPGRADE PROJECT NEW SIREN FEMA OPERABILITY FL-32 LT-S2 Sheet 2 of 6 IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION SCHEDULE Run Date 10OCT07 11:33


Activity                           Activity         PMGR WBSOrig Total Activity Item
Activity ID Activity Description WBS PMGR Orig Dur Total Float Comp Item Activity Description Early start Early finish Budgeted Quantity Resp Engr Key PMGR WBSPreds Succes LAB TESTING (Lafferty)
                                                                          % Early       Early Budgeted Resp PMGR WBS KeyPreds    Succes 2007                          2008 ID                          Description            Dur Description Float Comp# start      finish Quantity Engr                        S    OCT            NOV          DEC        JAN      FEB    M LAB TESTING (Lafferty)
S27249 PO TEST CHAMBER GA TECH 4
S27249       PO TEST CHAMBER GA TECH                           4     10 01OCT07A 04OCT07       LAFFERTY,J           S27281     PO TEST CHAMBER GA TECH S27251       REVIEW TEST PLAN                                   3         02OCT07A 04OCT07A     LAFFERTY,J   S27241   S27261,     REVIEW TEST PLAN S27271 S27341       REVIEW INSPECT/DISASSEMBLY PROCEDURE               4         03OCT07A 04OCT07A     LAFFERTY,J           S27342     REVIEW INSPECT/DISASSEMBLY PROCEDURE S27243       CHANGE ORDER - ATI (SPARES/CONSULT - 4 MOS)       2     2 04OCT07A 06OCT07       LAFFERTY,J   S27242   S27311,     CHANGE ORDER - ATI (SPARES/CONSULT - 4 MOS)
10 01OCT07A 04OCT07 LAFFERTY,J S27281 S27251 REVIEW TEST PLAN 3
S27331 S27331       ATI OBTAIN PARTS                                   3     2 04OCT07A 06OCT07       LAFFERTY,J   S27243   S27311       ATI OBTAIN PARTS S27261       DRAFT LAB TEST PROCEDURE                           5     0 04OCT07A 10OCT07         LIBBY     S27251   S27351*       DRAFT LAB TEST PROCEDURE S27244       RECEIVE QUOTE - WYLE                               1         05OCT07A 05OCT07A     LAFFERTY,J           S27245     RECEIVE QUOTE - WYLE S27247       CHANGE ORDER - BLUE RIDGE (LAB THIRD PARTY)       1     13 05OCT07A 01OCT07       LAFFERTY,J   S27246   S27281     CHANGE ORDER - BLUE RIDGE (LAB THIRD PARTY)
02OCT07A 04OCT07A LAFFERTY,J S27241
S27245       CHANGE ORDER - WYLE (CONSULT/LAB/REPORT)           3     11 05OCT07A 03OCT07       LAFFERTY,J   S27244   S27281       CHANGE ORDER - WYLE (CONSULT/LAB/REPORT)
: S27261, S27271 S27341 REVIEW INSPECT/DISASSEMBLY PROCEDURE 4
S27342       APPROVE INSPECT/DISASSEMBLY PROCEDURE             2     4 05OCT07A 04OCT07       LAFFERTY,J   S27341   S27311       APPROVE INSPECT/DISASSEMBLY PROCEDURE S27257       PO D & M ELECTRIC (SIREN REMOVAL)                 3     5 01OCT07* 03OCT07       LAFFERTY,J           S27311     PO D & M ELECTRIC (SIREN REMOVAL)
03OCT07A 04OCT07A LAFFERTY,J S27342 S27243 CHANGE ORDER - ATI (SPARES/CONSULT - 4 MOS) 2 2 04OCT07A 06OCT07 LAFFERTY,J S27242
S27361       OBTAIN TEST DETAILS STAND - ATI                   2     6 03OCT07* 04OCT07       LAFFERTY,J           S27371*     OBTAIN TEST DETAILS STAND - ATI S27246       RECEIVE QUOTE - BLUE RIDGE                         1   150 04OCT07* 04OCT07       LAFFERTY,J           S27247     RECEIVE QUOTE - BLUE RIDGE S27256       PR SWEC                                           1     0 05OCT07* 05OCT07       LAFFERTY,J           S27255*     PR SWEC S27371       FABRICATE TEST STAND                               4     6 05OCT07   08OCT07       LAFFERTY,J   S27361* S27281       FABRICATE TEST STAND S27255       PO SWEC                                           3     0 06OCT07   08OCT07       LAFFERTY,J   S27256* S27311*       PO SWEC S27312       INSTALL SPARES                                     6   142 06OCT07   11OCT07       LAFFERTY,J   S27311* S27313*       INSTALL SPARES S27533       LAB SITE VISIT TO GT (W/ WYLE)                   1*   145 09OCT07* 09OCT07       LAFFERTY,J                         LAB SITE VISIT TO GT (W/ WYLE)
: S27311, S27331 S27331 ATI OBTAIN PARTS 3
S27311       INSPECT / DISASSEMBLE SIRENS                       3     0 09OCT07   11OCT07       LAFFERTY,J   S27243, S27312*,       INSPECT / DISASSEMBLE SIRENS S27255*, S27321*
2 04OCT07A 06OCT07 LAFFERTY,J S27243 S27311 S27261 DRAFT LAB TEST PROCEDURE 5
S27257, ENGR - SIRN IPEC SIREN UPGRADE PROJECT                                   IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION                        Run Date                                10OCT07 11:33 NEW SIREN FEMA OPERABILITY FL-32 LT-S2                                                         SCHEDULE Sheet 3 of 6     © Primavera Systems, Inc.
0 04OCT07A 10OCT07 LIBBY S27251 S27351*
S27244 RECEIVE QUOTE - WYLE 1
05OCT07A 05OCT07A LAFFERTY,J S27245 S27247 CHANGE ORDER - BLUE RIDGE (LAB THIRD PARTY) 1 13 05OCT07A 01OCT07 LAFFERTY,J S27246 S27281 S27245 CHANGE ORDER - WYLE (CONSULT/LAB/REPORT) 3 11 05OCT07A 03OCT07 LAFFERTY,J S27244 S27281 S27342 APPROVE INSPECT/DISASSEMBLY PROCEDURE 2
4 05OCT07A 04OCT07 LAFFERTY,J S27341 S27311 S27257 PO D & M ELECTRIC (SIREN REMOVAL) 3 5 01OCT07*
03OCT07 LAFFERTY,J S27311 S27361 OBTAIN TEST DETAILS STAND - ATI 2
6 03OCT07*
04OCT07 LAFFERTY,J S27371*
S27246 RECEIVE QUOTE - BLUE RIDGE 1
150 04OCT07*
04OCT07 LAFFERTY,J S27247 S27256 PR SWEC 1
0 05OCT07*
05OCT07 LAFFERTY,J S27255*
S27371 FABRICATE TEST STAND 4
6 05OCT07 08OCT07 LAFFERTY,J S27361*
S27281 S27255 PO SWEC 3
0 06OCT07 08OCT07 LAFFERTY,J S27256*
S27311*
S27312 INSTALL SPARES 6
142 06OCT07 11OCT07 LAFFERTY,J S27311*
S27313*
S27533 LAB SITE VISIT TO GT (W/ WYLE) 1*
145 09OCT07*
09OCT07 LAFFERTY,J S27311 INSPECT / DISASSEMBLE SIRENS 3
0 09OCT07 11OCT07 LAFFERTY,J
: S27243, S27255*,
: S27257, S27312*,
S27321*
2007 2008 S
OCT NOV DEC JAN FEB M
PO TEST CHAMBER GA TECH REVIEW TEST PLAN REVIEW INSPECT/DISASSEMBLY PROCEDURE CHANGE ORDER - ATI (SPARES/CONSULT - 4 MOS)
ATI OBTAIN PARTS DRAFT LAB TEST PROCEDURE RECEIVE QUOTE - WYLE CHANGE ORDER - BLUE RIDGE (LAB THIRD PARTY)
CHANGE ORDER - WYLE (CONSULT/LAB/REPORT)
APPROVE INSPECT/DISASSEMBLY PROCEDURE PO D & M ELECTRIC (SIREN REMOVAL)
OBTAIN TEST DETAILS STAND - ATI RECEIVE QUOTE - BLUE RIDGE PR SWEC FABRICATE TEST STAND PO SWEC INSTALL SPARES LAB SITE VISIT TO GT (W/ WYLE)
INSPECT / DISASSEMBLE SIRENS
© Primavera Systems, Inc.
ENGR - SIRN IPEC SIREN UPGRADE PROJECT NEW SIREN FEMA OPERABILITY FL-32 LT-S2 Sheet 3 of 6 IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION SCHEDULE Run Date 10OCT07 11:33


Activity                         Activity                 PMGR WBSOrig Total Activity Item
Activity ID Activity Description WBS PMGR Orig Dur Total Float Comp Item Activity Description Early start Early finish Budgeted Quantity Resp Engr Key PMGR WBSPreds Succes LAB TESTING (Lafferty)
                                                                              % Early       Early Budgeted Resp PMGR WBS KeyPreds    Succes 2007                              2008 ID                        Description                    Dur Description Float Comp# start      finish Quantity Engr                        S    OCT              NOV            DEC          JAN      FEB    M LAB TESTING (Lafferty)
S27351 REV LAB PROC / RESOLVE COMMENTS (SE,ATI,WYLE,BR) 3 0 11OCT07 13OCT07 LAFFERTY,J S27261*
S27351       REV LAB PROC / RESOLVE COMMENTS (SE,ATI,WYLE,BR)       3     0 11OCT07   13OCT07       LAFFERTY,J   S27261* S27353*       REV LAB PROC / RESOLVE COMMENTS (SE,ATI,WYLE,BR)
S27353*
S27271       SUBMIT LAB PROCEDURE TO FEMA FOR INFO                   4     1 11OCT07* 14OCT07       LAFFERTY,J   S27251   S27272         SUBMIT LAB PROCEDURE TO FEMA FOR INFO S27313       PERFORM SILENT TEST                                   1*   142 12OCT07* 12OCT07       LAFFERTY,J   S27312*                 PERFORM SILENT TEST S27321       PACKAGE AND SHIP PARTS TO TEST LAB                     3     0 12OCT07   14OCT07       LAFFERTY,J   S27311* S27281*         PACKAGE AND SHIP PARTS TO TEST LAB S27353       APPROVE TEST PROCEDURE                                 1     0 14OCT07   14OCT07       LAFFERTY,J   S27351* S27281*         APPROVE TEST PROCEDURE S27272       ISSUE LAB TESTING PLAN                                 0     0           15OCT07*     LAFFERTY,J   S27271                     ISSUE LAB TESTING PLAN S27281       PERFORM LAB TESTING                                   14     0 15OCT07   28OCT07       LAFFERTY,J   S27245, S27161,                 PERFORM LAB TESTING S27247,  S27282*,
S27271 SUBMIT LAB PROCEDURE TO FEMA FOR INFO 4
S27249,  S27283, S27283       PERFORM LAB TESTING                                     0     0           28OCT07*     LAFFERTY,J   S27281                           PERFORM LAB TESTING S27282       EVALUATE RESULTS                                       2     1 29OCT07   30OCT07         WYLE     S27281* S27288*                 EVALUATE RESULTS S27284       SHIP PARTS TO IPEC                                     2     0 29OCT07   30OCT07       LAFFERTY,J   S27281* S27285*                 SHIP PARTS TO IPEC S27288       ISSUE LAB TEST  
1 11OCT07*
14OCT07 LAFFERTY,J S27251 S27272 S27313 PERFORM SILENT TEST 1*
142 12OCT07*
12OCT07 LAFFERTY,J S27312*
S27321 PACKAGE AND SHIP PARTS TO TEST LAB 3
0 12OCT07 14OCT07 LAFFERTY,J S27311*
S27281*
S27353 APPROVE TEST PROCEDURE 1
0 14OCT07 14OCT07 LAFFERTY,J S27351*
S27281*
S27272 ISSUE LAB TESTING PLAN 0
0 15OCT07*
LAFFERTY,J S27271 S27281 PERFORM LAB TESTING 14 0 15OCT07 28OCT07 LAFFERTY,J
: S27245, S27247,
: S27249, S27161, S27282*,
: S27283, S27283 PERFORM LAB TESTING 0
0 28OCT07*
LAFFERTY,J S27281 S27282 EVALUATE RESULTS 2
1 29OCT07 30OCT07 WYLE S27281*
S27288*
S27284 SHIP PARTS TO IPEC 2
0 29OCT07 30OCT07 LAFFERTY,J S27281*
S27285*
S27288 ISSUE LAB TEST  


==SUMMARY==
==SUMMARY==
2     1 31OCT07* 01NOV07         WYLE     S27282* S27161*,                 ISSUE LAB TEST  
2 1 31OCT07*
01NOV07 WYLE S27282*
S27161*,
: S27289, S27422*
S27285 RESTORE SIRENS 10 0 31OCT07 09NOV07 LAFFERTY,J S27284*
S27201*
S27289 ISSUE LAB TEST  


==SUMMARY==
==SUMMARY==
 
COMPLETE 0
S27289, S27422*
0 02NOV07*
S27285      RESTORE SIRENS                                        10      0 31OCT07  09NOV07      LAFFERTY,J   S27284* S27201*                       RESTORE SIRENS S27289      ISSUE LAB TEST  
WYLE S27288 COMPONENT TESTING (Raffaele, J)
S27386 ATI PROVIDE PARTS FOR BENCH TEST 3
05OCT07A 08OCT07A RAFFAELE,J S27382
: S27383, S27385 S27382 DRAFT PROCEDURE 3
07OCT07A 09OCT07A RAFFAELE,J
: S27383, S27386 S27383 REVIEW PROCEDURE 2*
137 09OCT07A 10OCT07 RAFFAELE,J
: S27382, S27386 S27384*
S27381 ISSUE PO - BENCH TEST INPUT 3
145 03OCT07*
05OCT07 RAFFAELE,J S27385 S27384 APPROVE PROCEDURE 3
137 11OCT07 13OCT07 RAFFAELE,J S27383*
S27385*
S27385 BENCH TEST AMPLIFIERS 4*
137 14OCT07 17OCT07 RAFFAELE,J
: S27381, S27384*,
S27386 2007 2008 S
OCT NOV DEC JAN FEB M
REV LAB PROC / RESOLVE COMMENTS (SE,ATI,WYLE,BR)
SUBMIT LAB PROCEDURE TO FEMA FOR INFO PERFORM SILENT TEST PACKAGE AND SHIP PARTS TO TEST LAB APPROVE TEST PROCEDURE ISSUE LAB TESTING PLAN PERFORM LAB TESTING PERFORM LAB TESTING EVALUATE RESULTS SHIP PARTS TO IPEC ISSUE LAB TEST  


==SUMMARY==
==SUMMARY==
COMPLETE                        0      0          02NOV07*        WYLE      S27288                              ISSUE LAB TEST  
RESTORE SIRENS ISSUE LAB TEST  


==SUMMARY==
==SUMMARY==
COMPLETE COMPONENT TESTING (Raffaele, J)
COMPLETE ATI PROVIDE PARTS FOR BENCH TEST DRAFT PROCEDURE REVIEW PROCEDURE ISSUE PO - BENCH TEST INPUT APPROVE PROCEDURE BENCH TEST AMPLIFIERS
S27386      ATI PROVIDE PARTS FOR BENCH TEST                        3        05OCT07A 08OCT07A      RAFFAELE,J  S27382  S27383,      ATI PROVIDE PARTS FOR BENCH TEST S27385 S27382      DRAFT PROCEDURE                                         3        07OCT07A 09OCT07A      RAFFAELE,J            S27383,      DRAFT PROCEDURE S27386 S27383      REVIEW PROCEDURE                                      2*    137 09OCT07A  10OCT07      RAFFAELE,J  S27382,  S27384*      REVIEW PROCEDURE S27386 S27381      ISSUE PO - BENCH TEST INPUT                            3    145 03OCT07*  05OCT07      RAFFAELE,J            S27385    ISSUE PO - BENCH TEST INPUT S27384      APPROVE PROCEDURE                                       3    137 11OCT07  13OCT07      RAFFAELE,J  S27383*  S27385*        APPROVE PROCEDURE S27385      BENCH TEST AMPLIFIERS                                 4*    137 14OCT07  17OCT07      RAFFAELE,J  S27381,                    BENCH TEST AMPLIFIERS S27384*,
© Primavera Systems, Inc.
S27386 ENGR - SIRN IPEC SIREN UPGRADE PROJECT                                         IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION                        Run Date                                    10OCT07 11:33 NEW SIREN FEMA OPERABILITY FL-32 LT-S2                                                             SCHEDULE Sheet 4 of 6     © Primavera Systems, Inc.
ENGR - SIRN IPEC SIREN UPGRADE PROJECT NEW SIREN FEMA OPERABILITY FL-32 LT-S2 Sheet 4 of 6 IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION SCHEDULE Run Date 10OCT07 11:33


Activity                       Activity                 PMGR WBSOrig Total Activity Item
Activity ID Activity Description WBS PMGR Orig Dur Total Float Comp Item Activity Description Early start Early finish Budgeted Quantity Resp Engr Key PMGR WBSPreds Succes ENGINEERING DESIGN REPORT (Grosjean)
                                                                              % Early       Early Budgeted Resp PMGR WBS KeyPreds    Succes 2007                                  2008 ID                        Description                    Dur Description Float Comp# start      finish Quantity Engr                        S    OCT            NOV          DEC            JAN            FEB      M ENGINEERING DESIGN REPORT (Grosjean)
S27391 PERFORM READ-THROUGH 1
S27391       PERFORM READ-THROUGH                                   1         25SEP07A 05OCT07A     GROSJEAN             S27401     PERFORM READ-THROUGH S27401       ISSUE REVISION ACTIONS                                 5         01OCT07A 05OCT07A     GROSJEAN     S27391   S27403,     ISSUE REVISION ACTIONS S27405, S27407, S27403       WRITE FAILURE, MODES, AND EFFECTS SECTION             30*   10 01OCT07   30OCT07           LEE     S27401   S27402,                 WRITE FAILURE, MODES, AND EFFECTS SECTION S27437, S27439 S27405       WRITE BACK-UP PWR, SURGE PROT & GROUNDING SECT         30   29 01OCT07   30OCT07       ONESIOS,JA   S27401   S27402,                 WRITE BACK-UP PWR, SURGE PROT & GROUNDING SECT S27407*
25SEP07A 05OCT07A GROSJEAN S27401 S27401 ISSUE REVISION ACTIONS 5
S27407       WRITE CONFIGURATION MANAGEMENT SECTION                 30   29 01OCT07   30OCT07       ONESIOS,JA   S27401, S27402,                 WRITE CONFIGURATION MANAGEMENT SECTION S27405*  S27409*
01OCT07A 05OCT07A GROSJEAN S27391
S27409       WRITE GEN OVERVW OF SYS OPS, TSTNG, & MT PROC ST       30   29 01OCT07   30OCT07       DIGENOVA   S27401, S27402                  WRITE GEN OVERVW OF SYS OPS, TSTNG, & MT PROC ST S27407*
: S27403, S27405,
S27411       PREPARE FIRST DRAFT                                     5   30 20OCT07   24OCT07       GROSJEAN     S27551* S27421*             PREPARE FIRST DRAFT S27421       REVIEW FIRST DRAFT                                     5   30 25OCT07   29OCT07       GROSJEAN     S27411* S27402                   REVIEW FIRST DRAFT S27422       UPDATE FINAL DRAFT BASED ON LAB TESTING                 5   22 02NOV07   06NOV07       GROSJEAN     S27288* S27402                       UPDATE FINAL DRAFT BASED ON LAB TESTING S27402       PREPARE FINAL DRAFT                                     5     0 29NOV07   03DEC07       GROSJEAN     S27209*, S27402A*,                                PREPARE FINAL DRAFT S27403, S27402M S27405, S27407, S27409, S27402M     DESIGN REPORT FINAL DRAFT                               0     0           03DEC07*     GROSJEAN     S27402                                             DESIGN REPORT FINAL DRAFT S27402A     APPROVAL FINAL DRAFT                                   10     0 04DEC07   13DEC07       GROSJEAN     S27402* S27402AM,                                     APPROVAL FINAL DRAFT S27431*
: S27407, S27403 WRITE FAILURE, MODES, AND EFFECTS SECTION 30*
S27402AM     APPROVE & SUBMIT FINAL REPORT TO FEMA                   0     0           13DEC07*     GROSJEAN     S27402A                                                 APPROVE & SUBMIT FINAL REPORT TO FEMA S27431       FEMA REVIEW & APPROVE FINAL REPORT                     10     0 14DEC07   23DEC07         FEMA     S27402A* S27081*,                                           FEMA REVIEW & APPROVE FINAL REPORT S27212*,
10 01OCT07 30OCT07 LEE S27401
S27431M S27431M     FEMA APPROVE FINAL REPORT                               0     0           23DEC07*         FEMA     S27431                                                       FEMA APPROVE FINAL REPORT FAILURE MODE ANALYSIS (Garvey)
: S27402, S27437, S27439 S27405 WRITE BACK-UP PWR, SURGE PROT & GROUNDING SECT 30 29 01OCT07 30OCT07 ONESIOS,JA S27401
S27432       ESTABLISH FMA TEAM                                     3     0 03OCT07A 10OCT07         GARVEY             S27433*       ESTABLISH FMA TEAM S27433       PERFORM FMA                                           20     0 11OCT07   30OCT07         GARVEY     S27432* S27435*                 PERFORM FMA S27435       DRAFT FMA REPORT                                       5     0 31OCT07   04NOV07         GARVEY     S27433* S27437*                   DRAFT FMA REPORT ENGR - SIRN IPEC SIREN UPGRADE PROJECT                                         IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION                        Run Date                                        10OCT07 11:33 NEW SIREN FEMA OPERABILITY FL-32 LT-S2                                                             SCHEDULE Sheet 5 of 6     © Primavera Systems, Inc.
: S27402, S27407*
S27407 WRITE CONFIGURATION MANAGEMENT SECTION 30 29 01OCT07 30OCT07 ONESIOS,JA
: S27401, S27405*
: S27402, S27409*
S27409 WRITE GEN OVERVW OF SYS OPS, TSTNG, & MT PROC ST 30 29 01OCT07 30OCT07 DIGENOVA
: S27401, S27407*
S27402 S27411 PREPARE FIRST DRAFT 5
30 20OCT07 24OCT07 GROSJEAN S27551*
S27421*
S27421 REVIEW FIRST DRAFT 5
30 25OCT07 29OCT07 GROSJEAN S27411*
S27402 S27422 UPDATE FINAL DRAFT BASED ON LAB TESTING 5
22 02NOV07 06NOV07 GROSJEAN S27288*
S27402 S27402 PREPARE FINAL DRAFT 5
0 29NOV07 03DEC07 GROSJEAN S27209*,
: S27403, S27405,
: S27407, S27409, S27402A*,
S27402M S27402M DESIGN REPORT FINAL DRAFT 0
0 03DEC07*
GROSJEAN S27402 S27402A APPROVAL FINAL DRAFT 10 0 04DEC07 13DEC07 GROSJEAN S27402*
: S27402AM, S27431*
S27402AM APPROVE & SUBMIT FINAL REPORT TO FEMA 0
0 13DEC07*
GROSJEAN S27402A S27431 FEMA REVIEW & APPROVE FINAL REPORT 10 0 14DEC07 23DEC07 FEMA S27402A*
S27081*,
S27212*,
S27431M S27431M FEMA APPROVE FINAL REPORT 0
0 23DEC07*
FEMA S27431 FAILURE MODE ANALYSIS (Garvey)
S27432 ESTABLISH FMA TEAM 3
0 03OCT07A 10OCT07 GARVEY S27433*
S27433 PERFORM FMA 20 0 11OCT07 30OCT07 GARVEY S27432*
S27435*
S27435 DRAFT FMA REPORT 5
0 31OCT07 04NOV07 GARVEY S27433*
S27437*
2007 2008 S
OCT NOV DEC JAN FEB M
PERFORM READ-THROUGH ISSUE REVISION ACTIONS WRITE FAILURE, MODES, AND EFFECTS SECTION WRITE BACK-UP PWR, SURGE PROT & GROUNDING SECT WRITE CONFIGURATION MANAGEMENT SECTION WRITE GEN OVERVW OF SYS OPS, TSTNG, & MT PROC ST PREPARE FIRST DRAFT REVIEW FIRST DRAFT UPDATE FINAL DRAFT BASED ON LAB TESTING PREPARE FINAL DRAFT DESIGN REPORT FINAL DRAFT APPROVAL FINAL DRAFT APPROVE & SUBMIT FINAL REPORT TO FEMA FEMA REVIEW & APPROVE FINAL REPORT FEMA APPROVE FINAL REPORT ESTABLISH FMA TEAM PERFORM FMA DRAFT FMA REPORT
© Primavera Systems, Inc.
ENGR - SIRN IPEC SIREN UPGRADE PROJECT NEW SIREN FEMA OPERABILITY FL-32 LT-S2 Sheet 5 of 6 IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION SCHEDULE Run Date 10OCT07 11:33


Activity                       Activity PMGR WBSOrig Total Activity Item
Activity ID Activity Description WBS PMGR Orig Dur Total Float Comp Item Activity Description Early start Early finish Budgeted Quantity Resp Engr Key PMGR WBSPreds Succes FAILURE MODE ANALYSIS (Garvey)
                                                            % Early       Early Budgeted Resp PMGR WBS KeyPreds  Succes 2007                            2008 ID                      Description    Dur Description Float Comp# start    finish Quantity Engr                    S OCT        NOV            DEC        JAN      FEB    M FAILURE MODE ANALYSIS (Garvey)
S27437 REVIEW FMA REPORT 5
S27437       REVIEW FMA REPORT                     5     0 05NOV07 09NOV07         GARVEY   S27403, S27439*              REVIEW FMA REPORT S27435*
0 05NOV07 09NOV07 GARVEY
S27439       ISSUE DESIGN REPORT INPUT             2     0 10NOV07 11NOV07         GARVEY   S27403, S27442*              ISSUE DESIGN REPORT INPUT S27437*
: S27403, S27435*
S27442       APPROVE FMA REPORT                   5     0 12NOV07 16NOV07         GARVEY   S27439* S27442M                 APPROVE FMA REPORT S27442M     FMA REPORT APPROVED                   0     0         16NOV07*       GARVEY   S27442                           FMA REPORT APPROVED ENGR - SIRN IPEC SIREN UPGRADE PROJECT                       IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION            Run Date                              10OCT07 11:33 NEW SIREN FEMA OPERABILITY FL-32 LT-S2                                           SCHEDULE Sheet 6 of 6     © Primavera Systems, Inc.}}
S27439*
S27439 ISSUE DESIGN REPORT INPUT 2
0 10NOV07 11NOV07 GARVEY
: S27403, S27437*
S27442*
S27442 APPROVE FMA REPORT 5
0 12NOV07 16NOV07 GARVEY S27439*
S27442M S27442M FMA REPORT APPROVED 0
0 16NOV07*
GARVEY S27442 2007 2008 S
OCT NOV DEC JAN FEB M
REVIEW FMA REPORT ISSUE DESIGN REPORT INPUT APPROVE FMA REPORT FMA REPORT APPROVED
© Primavera Systems, Inc.
ENGR - SIRN IPEC SIREN UPGRADE PROJECT NEW SIREN FEMA OPERABILITY FL-32 LT-S2 Sheet 6 of 6 IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION SCHEDULE Run Date 10OCT07 11:33}}

Latest revision as of 21:29, 14 January 2025

Siren Schedule 8 X 11 Dtd 10/10/07
ML072950266
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 10/10/2007
From:
Primavera Systems
To:
Office of Nuclear Reactor Regulation
Shared Package
ML072950167 List:
References
Download: ML072950266 (6)


Text

Activity ID Activity Description WBS PMGR Orig Dur Total Float Comp Item Activity Description Early start Early finish Budgeted Quantity Resp Engr Key PMGR WBSPreds Succes INDIAN POINT SIREN UPGRADE PROJECT IPEC SIREN OPERABILITY SCHEDULE SIREN ACOUSTIC OUTPUT RESOLUTION TREE REMOVAL (Phillips)

S27031 DEVELOP PLAN AND SCHEDULE WITH VENDOR 250 0 24AUG07A 09OCT07

PHILLIPS, S27041*

S27021 SURVEY FOLIAGE AND TREES 17 3 01OCT07 17OCT07

PHILLIPS, S27022 S27041 REMOVE TREE INTERFERENCES 38 0 10OCT07 16NOV07
PHILLIPS, S27031*

S27051*

S27051 CONDUCT INDEPENDENT ANALYSIS OF EXCEPTIONS 33*

0 15OCT07*

16NOV07 PHILLIPS S27041*

S27061*

S27022 FOLIAGE SURVEYS COMPLETE 0

0 20OCT07*

PHILLIPS, S27021 S27061 SUBMIT RESULTS REPORT TO FEMA 14 0 17NOV07 30NOV07 PHILLIPS S27051*

S27062 S27062 SUBMIT FINAL FOLIAGE REPORT TO FEMA 0

0 30NOV07*

PHILLIPS S27061 CONTROL SYSTEM (Sheikh, Z)

S27541 DRAFT CONTROL SYSTEM RELIABILITY REPORT 8

30 02OCT07A 09OCT07 SHEIKH, ZE S27551*

S27551 FINALIZE CONTROL SYSTEM RELIABILITY REPORT 10 30 10OCT07 19OCT07 SHEIKH, ZE S27541*

S27411*

S27081 COMPLETE ADDITIONAL SYSTEM WORK (TUNING/FILTERS) 20 50 24DEC07 13JAN08 GARVEY S27431*

SIREN TESTING FIELD MEASUREMENT TECHNIQUES (Miele)

S27101 DEVELOP CRITERIA FOR STEADY & REPEATABLE 3

0 01OCT07*

03OCT07 MIELE S27111*

S27111 CORRELATE DATA FROM PREVIOUS MEASUREMENTS 7

0 01OCT07 07OCT07 MIELE S27101*

S27121*

S27121 DETERM ALTERN APPROACH / FUTR FIELD MEASUREMENTS 7

0 08OCT07 14OCT07 MIELE S27111*

S27131*,

S27191*

S27131 OBTAIN EXPERT ENDORSEMENT OF NEW TECHNIQUE 10 0 15OCT07 24OCT07 MIELE S27121*

S27141*

POST RESOLUTION QUALIFICATION TESTING (Miele)

S27231 DEVEL INDEP SND CONTOUR MAPS/ACT SND PRESS LVLS 15 137 01OCT07*

15OCT07 MIELE S27183*

S27191 DETERMINE NECESSARY AMOUNT OF FIELD MEASUREMENTS 2

24 15OCT07 16OCT07 MIELE S27121*

S27201 2007 2008 S

OCT NOV DEC JAN FEB M

DEVELOP PLAN AND SCHEDULE WITH VENDOR SURVEY FOLIAGE AND TREES REMOVE TREE INTERFERENCES CONDUCT INDEPENDENT ANALYSIS OF EXCEPTIONS FOLIAGE SURVEYS COMPLETE SUBMIT RESULTS REPORT TO FEMA SUBMIT FINAL FOLIAGE REPORT TO FEMA DRAFT CONTROL SYSTEM RELIABILITY REPORT FINALIZE CONTROL SYSTEM RELIABILITY REPORT COMPLETE ADDITIONAL SYSTEM WO DEVELOP CRITERIA FOR STEADY & REPEATABLE CORRELATE DATA FROM PREVIOUS MEASUREMENTS DETERM ALTERN APPROACH / FUTR FIELD MEASUREMENTS OBTAIN EXPERT ENDORSEMENT OF NEW TECHNIQUE DEVEL INDEP SND CONTOUR MAPS/ACT SND PRESS LVLS DETERMINE NECESSARY AMOUNT OF FIELD MEASUREMENTS

© Primavera Systems, Inc.

ENGR - SIRN IPEC SIREN UPGRADE PROJECT NEW SIREN FEMA OPERABILITY FL-32 LT-S2 Sheet 1 of 6 IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION SCHEDULE Run Date 10OCT07 11:33

Activity ID Activity Description WBS PMGR Orig Dur Total Float Comp Item Activity Description Early start Early finish Budgeted Quantity Resp Engr Key PMGR WBSPreds Succes POST RESOLUTION QUALIFICATION TESTING (Miele)

S27183 COMP INDEP SND CONTOUR MAPS TO ATI FOR VALIDATN 2

137 16OCT07 17OCT07 MIELE S27231*

S27141 SUBMIT FIELD MEASUREMENT TECHNIQUE TO FEMA 1

0 25OCT07 25OCT07 MIELE S27131*

S27143 S27143 ISSUE FIELD MEASUREMENT TECHNIQUE DESCRIPTION 0

0 25OCT07*

MIELE S27141 S27161 REV DATA FROM ACOUSTIC TSTS FOR COMPLI W/ CRITER 5

3 02NOV07 06NOV07 MIELE

S27281, S27288*

S27201 S27201 FIELD TESTING OF LAB RESULTS 10 0 10NOV07 19NOV07 MIELE

S27161, S27191, S27285*

S27185*,

S27211*

S27201M COMPLETE FIELD TESTING OF LAB RESULTS 0

0 19NOV07*

MIELE S27211 PREPARE LAB/FIELD TEST REPORT 4

0 20NOV07 23NOV07 MIELE S27201*

S27209*

S27185 PROD NEW ATI SND CONT MAPS FRM VALIDAT LAB DATA 10 94 20NOV07 29NOV07 MIELE S27201*

S27209 APPROVE LAB/FIELD TEST REPORT 5

0 24NOV07 28NOV07 MIELE S27211*

S27210*,

S27221*,

S27402*

S27221 SUBMIT LAB/FIELD TEST REPORT TO FEMA 1

0 29NOV07 29NOV07 MIELE S27209*

S27222 S27222 SUBMIT LAB/FIELD TEST REPORT TO FEMA 0

0 29NOV07*

MIELE S27221 S27210 DEVELOP RESOLUTION ACTION PLAN 7

0 29NOV07 05DEC07 MIELE S27209*

S27210M, S27212 S27210M DEVELOP RESOLUTION ACTION PLAN 0

0 05DEC07*

MIELE S27210 S27212M FUNDING APPROVED FOR RESOLUTION IMPLEMENTATION 0

0 23DEC07*

MIELE S27212*,

S27212AM S27212AM START SIREN RESOLUTION IMPLEMENTATION 0

0 24DEC07*

MIELE S27212M S27212 IMPLEMENT SIREN RESOLUTION 60 0 24DEC07 22FEB08 MIELE

S27210, S27212M*,

S27431*

S27232*

S27232 FINAL ACCEPTANCE TESTING 10 0 23FEB08 03MAR08 S27212*

LAB TESTING (Lafferty)

S27241 DRAFT TEST PLAN 1

27SEP07A 27SEP07A LAFFERTY,J S27251 S27242 RECEIVE QUOTE - ATI 4

01OCT07A 04OCT07A LAFFERTY,J S27243 2007 2008 S

OCT NOV DEC JAN FEB M

COMP INDEP SND CONTOUR MAPS TO ATI FOR VALIDATN SUBMIT FIELD MEASUREMENT TECHNIQUE TO FEMA ISSUE FIELD MEASUREMENT TECHNIQUE DESCRIPTION REV DATA FROM ACOUSTIC TSTS FOR COMPLI W/ CRITER FIELD TESTING OF LAB RESULTS COMPLETE FIELD TESTING OF LAB RESULTS PREPARE LAB/FIELD TEST REPORT PROD NEW ATI SND CONT MAPS FRM VALIDAT LAB DATA APPROVE LAB/FIELD TEST REPORT SUBMIT LAB/FIELD TEST REPORT TO FEMA SUBMIT LAB/FIELD TEST REPORT TO FEMA DEVELOP RESOLUTION ACTION PLAN DEVELOP RESOLUTION ACTION PLAN FUNDING APPROVED FOR RESOLUTION IMPLEM START SIREN RESOLUTION IMPLEMENTATION IMPLEMENT SIREN RESOLUTION FINAL ACCEPTANCE TESTING DRAFT TEST PLAN RECEIVE QUOTE - ATI

© Primavera Systems, Inc.

ENGR - SIRN IPEC SIREN UPGRADE PROJECT NEW SIREN FEMA OPERABILITY FL-32 LT-S2 Sheet 2 of 6 IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION SCHEDULE Run Date 10OCT07 11:33

Activity ID Activity Description WBS PMGR Orig Dur Total Float Comp Item Activity Description Early start Early finish Budgeted Quantity Resp Engr Key PMGR WBSPreds Succes LAB TESTING (Lafferty)

S27249 PO TEST CHAMBER GA TECH 4

10 01OCT07A 04OCT07 LAFFERTY,J S27281 S27251 REVIEW TEST PLAN 3

02OCT07A 04OCT07A LAFFERTY,J S27241

S27261, S27271 S27341 REVIEW INSPECT/DISASSEMBLY PROCEDURE 4

03OCT07A 04OCT07A LAFFERTY,J S27342 S27243 CHANGE ORDER - ATI (SPARES/CONSULT - 4 MOS) 2 2 04OCT07A 06OCT07 LAFFERTY,J S27242

S27311, S27331 S27331 ATI OBTAIN PARTS 3

2 04OCT07A 06OCT07 LAFFERTY,J S27243 S27311 S27261 DRAFT LAB TEST PROCEDURE 5

0 04OCT07A 10OCT07 LIBBY S27251 S27351*

S27244 RECEIVE QUOTE - WYLE 1

05OCT07A 05OCT07A LAFFERTY,J S27245 S27247 CHANGE ORDER - BLUE RIDGE (LAB THIRD PARTY) 1 13 05OCT07A 01OCT07 LAFFERTY,J S27246 S27281 S27245 CHANGE ORDER - WYLE (CONSULT/LAB/REPORT) 3 11 05OCT07A 03OCT07 LAFFERTY,J S27244 S27281 S27342 APPROVE INSPECT/DISASSEMBLY PROCEDURE 2

4 05OCT07A 04OCT07 LAFFERTY,J S27341 S27311 S27257 PO D & M ELECTRIC (SIREN REMOVAL) 3 5 01OCT07*

03OCT07 LAFFERTY,J S27311 S27361 OBTAIN TEST DETAILS STAND - ATI 2

6 03OCT07*

04OCT07 LAFFERTY,J S27371*

S27246 RECEIVE QUOTE - BLUE RIDGE 1

150 04OCT07*

04OCT07 LAFFERTY,J S27247 S27256 PR SWEC 1

0 05OCT07*

05OCT07 LAFFERTY,J S27255*

S27371 FABRICATE TEST STAND 4

6 05OCT07 08OCT07 LAFFERTY,J S27361*

S27281 S27255 PO SWEC 3

0 06OCT07 08OCT07 LAFFERTY,J S27256*

S27311*

S27312 INSTALL SPARES 6

142 06OCT07 11OCT07 LAFFERTY,J S27311*

S27313*

S27533 LAB SITE VISIT TO GT (W/ WYLE) 1*

145 09OCT07*

09OCT07 LAFFERTY,J S27311 INSPECT / DISASSEMBLE SIRENS 3

0 09OCT07 11OCT07 LAFFERTY,J

S27243, S27255*,
S27257, S27312*,

S27321*

2007 2008 S

OCT NOV DEC JAN FEB M

PO TEST CHAMBER GA TECH REVIEW TEST PLAN REVIEW INSPECT/DISASSEMBLY PROCEDURE CHANGE ORDER - ATI (SPARES/CONSULT - 4 MOS)

ATI OBTAIN PARTS DRAFT LAB TEST PROCEDURE RECEIVE QUOTE - WYLE CHANGE ORDER - BLUE RIDGE (LAB THIRD PARTY)

CHANGE ORDER - WYLE (CONSULT/LAB/REPORT)

APPROVE INSPECT/DISASSEMBLY PROCEDURE PO D & M ELECTRIC (SIREN REMOVAL)

OBTAIN TEST DETAILS STAND - ATI RECEIVE QUOTE - BLUE RIDGE PR SWEC FABRICATE TEST STAND PO SWEC INSTALL SPARES LAB SITE VISIT TO GT (W/ WYLE)

INSPECT / DISASSEMBLE SIRENS

© Primavera Systems, Inc.

ENGR - SIRN IPEC SIREN UPGRADE PROJECT NEW SIREN FEMA OPERABILITY FL-32 LT-S2 Sheet 3 of 6 IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION SCHEDULE Run Date 10OCT07 11:33

Activity ID Activity Description WBS PMGR Orig Dur Total Float Comp Item Activity Description Early start Early finish Budgeted Quantity Resp Engr Key PMGR WBSPreds Succes LAB TESTING (Lafferty)

S27351 REV LAB PROC / RESOLVE COMMENTS (SE,ATI,WYLE,BR) 3 0 11OCT07 13OCT07 LAFFERTY,J S27261*

S27353*

S27271 SUBMIT LAB PROCEDURE TO FEMA FOR INFO 4

1 11OCT07*

14OCT07 LAFFERTY,J S27251 S27272 S27313 PERFORM SILENT TEST 1*

142 12OCT07*

12OCT07 LAFFERTY,J S27312*

S27321 PACKAGE AND SHIP PARTS TO TEST LAB 3

0 12OCT07 14OCT07 LAFFERTY,J S27311*

S27281*

S27353 APPROVE TEST PROCEDURE 1

0 14OCT07 14OCT07 LAFFERTY,J S27351*

S27281*

S27272 ISSUE LAB TESTING PLAN 0

0 15OCT07*

LAFFERTY,J S27271 S27281 PERFORM LAB TESTING 14 0 15OCT07 28OCT07 LAFFERTY,J

S27245, S27247,
S27249, S27161, S27282*,
S27283, S27283 PERFORM LAB TESTING 0

0 28OCT07*

LAFFERTY,J S27281 S27282 EVALUATE RESULTS 2

1 29OCT07 30OCT07 WYLE S27281*

S27288*

S27284 SHIP PARTS TO IPEC 2

0 29OCT07 30OCT07 LAFFERTY,J S27281*

S27285*

S27288 ISSUE LAB TEST

SUMMARY

2 1 31OCT07*

01NOV07 WYLE S27282*

S27161*,

S27289, S27422*

S27285 RESTORE SIRENS 10 0 31OCT07 09NOV07 LAFFERTY,J S27284*

S27201*

S27289 ISSUE LAB TEST

SUMMARY

COMPLETE 0

0 02NOV07*

WYLE S27288 COMPONENT TESTING (Raffaele, J)

S27386 ATI PROVIDE PARTS FOR BENCH TEST 3

05OCT07A 08OCT07A RAFFAELE,J S27382

S27383, S27385 S27382 DRAFT PROCEDURE 3

07OCT07A 09OCT07A RAFFAELE,J

S27383, S27386 S27383 REVIEW PROCEDURE 2*

137 09OCT07A 10OCT07 RAFFAELE,J

S27382, S27386 S27384*

S27381 ISSUE PO - BENCH TEST INPUT 3

145 03OCT07*

05OCT07 RAFFAELE,J S27385 S27384 APPROVE PROCEDURE 3

137 11OCT07 13OCT07 RAFFAELE,J S27383*

S27385*

S27385 BENCH TEST AMPLIFIERS 4*

137 14OCT07 17OCT07 RAFFAELE,J

S27381, S27384*,

S27386 2007 2008 S

OCT NOV DEC JAN FEB M

REV LAB PROC / RESOLVE COMMENTS (SE,ATI,WYLE,BR)

SUBMIT LAB PROCEDURE TO FEMA FOR INFO PERFORM SILENT TEST PACKAGE AND SHIP PARTS TO TEST LAB APPROVE TEST PROCEDURE ISSUE LAB TESTING PLAN PERFORM LAB TESTING PERFORM LAB TESTING EVALUATE RESULTS SHIP PARTS TO IPEC ISSUE LAB TEST

SUMMARY

RESTORE SIRENS ISSUE LAB TEST

SUMMARY

COMPLETE ATI PROVIDE PARTS FOR BENCH TEST DRAFT PROCEDURE REVIEW PROCEDURE ISSUE PO - BENCH TEST INPUT APPROVE PROCEDURE BENCH TEST AMPLIFIERS

© Primavera Systems, Inc.

ENGR - SIRN IPEC SIREN UPGRADE PROJECT NEW SIREN FEMA OPERABILITY FL-32 LT-S2 Sheet 4 of 6 IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION SCHEDULE Run Date 10OCT07 11:33

Activity ID Activity Description WBS PMGR Orig Dur Total Float Comp Item Activity Description Early start Early finish Budgeted Quantity Resp Engr Key PMGR WBSPreds Succes ENGINEERING DESIGN REPORT (Grosjean)

S27391 PERFORM READ-THROUGH 1

25SEP07A 05OCT07A GROSJEAN S27401 S27401 ISSUE REVISION ACTIONS 5

01OCT07A 05OCT07A GROSJEAN S27391

S27403, S27405,
S27407, S27403 WRITE FAILURE, MODES, AND EFFECTS SECTION 30*

10 01OCT07 30OCT07 LEE S27401

S27402, S27437, S27439 S27405 WRITE BACK-UP PWR, SURGE PROT & GROUNDING SECT 30 29 01OCT07 30OCT07 ONESIOS,JA S27401
S27402, S27407*

S27407 WRITE CONFIGURATION MANAGEMENT SECTION 30 29 01OCT07 30OCT07 ONESIOS,JA

S27401, S27405*
S27402, S27409*

S27409 WRITE GEN OVERVW OF SYS OPS, TSTNG, & MT PROC ST 30 29 01OCT07 30OCT07 DIGENOVA

S27401, S27407*

S27402 S27411 PREPARE FIRST DRAFT 5

30 20OCT07 24OCT07 GROSJEAN S27551*

S27421*

S27421 REVIEW FIRST DRAFT 5

30 25OCT07 29OCT07 GROSJEAN S27411*

S27402 S27422 UPDATE FINAL DRAFT BASED ON LAB TESTING 5

22 02NOV07 06NOV07 GROSJEAN S27288*

S27402 S27402 PREPARE FINAL DRAFT 5

0 29NOV07 03DEC07 GROSJEAN S27209*,

S27403, S27405,
S27407, S27409, S27402A*,

S27402M S27402M DESIGN REPORT FINAL DRAFT 0

0 03DEC07*

GROSJEAN S27402 S27402A APPROVAL FINAL DRAFT 10 0 04DEC07 13DEC07 GROSJEAN S27402*

S27402AM, S27431*

S27402AM APPROVE & SUBMIT FINAL REPORT TO FEMA 0

0 13DEC07*

GROSJEAN S27402A S27431 FEMA REVIEW & APPROVE FINAL REPORT 10 0 14DEC07 23DEC07 FEMA S27402A*

S27081*,

S27212*,

S27431M S27431M FEMA APPROVE FINAL REPORT 0

0 23DEC07*

FEMA S27431 FAILURE MODE ANALYSIS (Garvey)

S27432 ESTABLISH FMA TEAM 3

0 03OCT07A 10OCT07 GARVEY S27433*

S27433 PERFORM FMA 20 0 11OCT07 30OCT07 GARVEY S27432*

S27435*

S27435 DRAFT FMA REPORT 5

0 31OCT07 04NOV07 GARVEY S27433*

S27437*

2007 2008 S

OCT NOV DEC JAN FEB M

PERFORM READ-THROUGH ISSUE REVISION ACTIONS WRITE FAILURE, MODES, AND EFFECTS SECTION WRITE BACK-UP PWR, SURGE PROT & GROUNDING SECT WRITE CONFIGURATION MANAGEMENT SECTION WRITE GEN OVERVW OF SYS OPS, TSTNG, & MT PROC ST PREPARE FIRST DRAFT REVIEW FIRST DRAFT UPDATE FINAL DRAFT BASED ON LAB TESTING PREPARE FINAL DRAFT DESIGN REPORT FINAL DRAFT APPROVAL FINAL DRAFT APPROVE & SUBMIT FINAL REPORT TO FEMA FEMA REVIEW & APPROVE FINAL REPORT FEMA APPROVE FINAL REPORT ESTABLISH FMA TEAM PERFORM FMA DRAFT FMA REPORT

© Primavera Systems, Inc.

ENGR - SIRN IPEC SIREN UPGRADE PROJECT NEW SIREN FEMA OPERABILITY FL-32 LT-S2 Sheet 5 of 6 IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION SCHEDULE Run Date 10OCT07 11:33

Activity ID Activity Description WBS PMGR Orig Dur Total Float Comp Item Activity Description Early start Early finish Budgeted Quantity Resp Engr Key PMGR WBSPreds Succes FAILURE MODE ANALYSIS (Garvey)

S27437 REVIEW FMA REPORT 5

0 05NOV07 09NOV07 GARVEY

S27403, S27435*

S27439*

S27439 ISSUE DESIGN REPORT INPUT 2

0 10NOV07 11NOV07 GARVEY

S27403, S27437*

S27442*

S27442 APPROVE FMA REPORT 5

0 12NOV07 16NOV07 GARVEY S27439*

S27442M S27442M FMA REPORT APPROVED 0

0 16NOV07*

GARVEY S27442 2007 2008 S

OCT NOV DEC JAN FEB M

REVIEW FMA REPORT ISSUE DESIGN REPORT INPUT APPROVE FMA REPORT FMA REPORT APPROVED

© Primavera Systems, Inc.

ENGR - SIRN IPEC SIREN UPGRADE PROJECT NEW SIREN FEMA OPERABILITY FL-32 LT-S2 Sheet 6 of 6 IPEC NEW SIREN SYSTEM OPERABILITY RESOLUTION SCHEDULE Run Date 10OCT07 11:33