ML15356A828: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
#REDIRECT [[IR 05000413/2016301]]
{{Adams
| number = ML15356A828
| issue date = 12/22/2015
| title = Notification of Licensed Operator Initial Examination 05000413/2016301 and 05000414/2016301
| author name = Mccoy G
| author affiliation = NRC/RGN-II/DRS
| addressee name = Henderson K
| addressee affiliation = Duke Energy Carolinas, LLC
| docket = 05000413, 05000414
| license number = NPF-035, NPF-052
| contact person =
| document report number = 50-413/16-301, 50-414/16-301
| document type = Letter, License-Operator, Part 55 Examination Related Material
| page count = 4
}}
See also: [[see also::IR 05000413/2016301]]
 
=Text=
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA  30303-1257
December 22, 2015
Mr. Kelvin Henderson
Site Vice President
Duke Energy Carolinas, LLC
Catawba Nuclear Station
4800 Concord Road
York, SC 29745
SUBJECT:
CATAWBA NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR
INITIAL EXAMINATION NOS. - 05000413/2016301 AND 05000414/2016301
Dear Mr. Henderson:
During a telephone conversation on December 16, 2015, between Mr. Bruce Boyette,
Operations Training Instructor, and Mr. Michael Meeks, Senior Operations Engineer,
arrangements were made for the administration of licensing examinations at Catawba Nuclear
Station.  The operating test is scheduled to be administered during the week of May 16, 2016. 
The written examination is scheduled to be administered the week of May 23, 2016.  The on-site
preparatory week is scheduled for the week of April 18, 2016.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 10 of NUREG-1021, "Operator
Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered.  Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by February 16, 2016.  Mr. Meeks provided the written examination outline to your staff
in September, 2015.  The operating test, written examination, and the supporting reference
materials identified in Attachment 3 to ES-201 will be due by March 17, 2016.  Pursuant to Title
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline, examination, and test before
they are submitted to the NRC for review and approval.  All materials shall be complete and
ready-to-use.   
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked.  Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
 
K. Henderson
2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above.  In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date.  If the applications are not received at least 30 days before the examination
date, a postponement may be necessary.  Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by the OMB under
approval number 3150-0018, which expires on April 30, 2016.  The public reporting burden for
this collection of information is estimated to average 2500 hours per response, including the
time for reviewing instructions, gathering and maintaining the data needed, writing the
examinations, and completing and reviewing the collection of information.  Send comments on
any aspect of this collection of information, including suggestions for reducing the burden, to the
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs document
system (ADAMS).  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm.adams.html (the Public Electronic Reading Room).
 
K. Henderson
3
Thank you for your cooperation in this matter.  Mr. Boyette has been advised of the policies and
guidelines referenced in this letter.  If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Meeks at (404) 997-4467, (Internet E-mail:
Michael.Meeks@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov). 
Sincerely,
/RA/
Gerald J. McCoy, Chief
Operations Branch 1
Division of Reactor Safety
Docket Nos.:  50-413, 50-414
License Nos.:  NPF-35, NPF-52
cc:  Distribution via Listserv
 
 
_________________________
SUNSI REVIEW COMPLETE
FORM 665 ATTACHED
OFFICE
RII:DRS
RII:DRS
SIGNATURE
GJM1 FOR MKM3
GJM1
NAME
MMEEKS
GMCCOY
DATE
12/22/2015
12/22/2015
12/    /2015
12/    /2015
12/    /2015
12/    /2015
12/    /2015
E-MAIL COPY?
    YES
NO   
  YES
NO    YES
N
  YES
NO   
  YES
NO      YES
NO   
  YES
NO
}}

Latest revision as of 05:55, 10 January 2025

Notification of Licensed Operator Initial Examination 05000413/2016301 and 05000414/2016301
ML15356A828
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/22/2015
From: Gerald Mccoy
Division of Reactor Safety II
To: Henderson K
Duke Energy Carolinas
References
50-413/16-301, 50-414/16-301
Download: ML15356A828 (4)


See also: IR 05000413/2016301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

December 22, 2015

Mr. Kelvin Henderson

Site Vice President

Duke Energy Carolinas, LLC

Catawba Nuclear Station

4800 Concord Road

York, SC 29745

SUBJECT:

CATAWBA NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION NOS. - 05000413/2016301 AND 05000414/2016301

Dear Mr. Henderson:

During a telephone conversation on December 16, 2015, between Mr. Bruce Boyette,

Operations Training Instructor, and Mr. Michael Meeks, Senior Operations Engineer,

arrangements were made for the administration of licensing examinations at Catawba Nuclear

Station. The operating test is scheduled to be administered during the week of May 16, 2016.

The written examination is scheduled to be administered the week of May 23, 2016. The on-site

preparatory week is scheduled for the week of April 18, 2016.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 10 of NUREG-1021, "Operator

Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by February 16, 2016. Mr. Meeks provided the written examination outline to your staff

in September, 2015. The operating test, written examination, and the supporting reference

materials identified in Attachment 3 to ES-201 will be due by March 17, 2016. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline, examination, and test before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

K. Henderson

2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the OMB under

approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for

this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, writing the

examinations, and completing and reviewing the collection of information. Send comments on

any aspect of this collection of information, including suggestions for reducing the burden, to the

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-

0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm.adams.html (the Public Electronic Reading Room).

K. Henderson

3

Thank you for your cooperation in this matter. Mr. Boyette has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Meeks at (404) 997-4467, (Internet E-mail:

Michael.Meeks@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov).

Sincerely,

/RA/

Gerald J. McCoy, Chief

Operations Branch 1

Division of Reactor Safety

Docket Nos.: 50-413, 50-414

License Nos.: NPF-35, NPF-52

cc: Distribution via Listserv

_________________________

SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

GJM1 FOR MKM3

GJM1

NAME

MMEEKS

GMCCOY

DATE

12/22/2015

12/22/2015

12/ /2015

12/ /2015

12/ /2015

12/ /2015

12/ /2015

E-MAIL COPY?

YES

NO

YES

NO YES

N

YES

NO

YES

NO YES

NO

YES

NO