| number = ML19212A778
| number = ML19212A778
| issue date = 07/31/2019
| issue date = 07/31/2019
| title = 2019/07/31 Vogtle COL Docs - Acceptance Letter for Vogtle 3 and 4 LAR 19-002, Functional Arrangement ITAAC
| title = COL Docs - Acceptance Letter for Vogtle 3 and 4 LAR 19-002, Functional Arrangement ITAAC
| author name =  
| author name =  
| author affiliation = NRC
| author affiliation = NRC
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Vogtle PEmails From:                         Patel, Chandu Sent:                         Wednesday, July 31, 2019 2:51 PM To:                           Vogtle PEmails Cc:                           Patel, Chandu
{{#Wiki_filter:1 Vogtle PEmails From:
Patel, Chandu Sent:
Wednesday, July 31, 2019 2:51 PM To:
Vogtle PEmails Cc:
Patel, Chandu


==Subject:==
==Subject:==
Acceptance Letter for Vogtle 3 and 4 LAR 19-002, Functional Arrangement ITAAC Attachments:                   Acceptance Letter LAR 19-002.docx Acceptance letter for LAR 19-002 for Vogtle Units 3 and 4.
Acceptance Letter for Vogtle 3 and 4 LAR 19-002, Functional Arrangement ITAAC Attachments:
Chandu Patel, Senior Project Manager U.S. NRC, Office of New Reactors NRC/NRO/DNRL/LB4, Washington, DC 20555-0001 301.415.3025 MS T6C20M 1
Acceptance Letter LAR 19-002.docx Acceptance letter for LAR 19-002 for Vogtle Units 3 and 4.
Chandu Patel, Senior Project Manager U.S. NRC, Office of New Reactors NRC/NRO/DNRL/LB4, Washington, DC 20555-0001 301.415.3025 MS T6C20M  


Hearing Identifier:   Vogtle_COL_Docs_Public Email Number:         463 Mail Envelope Properties     (BL0PR0901MB43392803968B190962FF915D82DF0)
Hearing Identifier:
Vogtle_COL_Docs_Public Email Number:
463 Mail Envelope Properties (BL0PR0901MB43392803968B190962FF915D82DF0)  


==Subject:==
==Subject:==
Acceptance Letter for Vogtle 3 and 4 LAR 19-002, Functional Arrangement ITAAC Sent Date:             7/31/2019 2:51:18 PM Received Date:         7/31/2019 2:51:21 PM From:                 Patel, Chandu Created By:           Chandu.Patel@nrc.gov Recipients:
Acceptance Letter for Vogtle 3 and 4 LAR 19-002, Functional Arrangement ITAAC Sent Date:
7/31/2019 2:51:18 PM Received Date:
7/31/2019 2:51:21 PM From:
Patel, Chandu Created By:
Chandu.Patel@nrc.gov Recipients:  
"Patel, Chandu" <Chandu.Patel@nrc.gov>
"Patel, Chandu" <Chandu.Patel@nrc.gov>
Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office:           BL0PR0901MB4339.namprd09.prod.outlook.com Files                         Size                     Date & Time MESSAGE                       228                       7/31/2019 2:51:21 PM Acceptance Letter LAR 19-002.docx                     39427 Options Priority:                     Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Tracking Status: None Post Office:
Recipients Received:
BL0PR0901MB4339.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 228 7/31/2019 2:51:21 PM Acceptance Letter LAR 19-002.docx 39427 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:  


July 31, 2019 Mr. Brian H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.
July 31, 2019 Mr. Brian H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.
3535 Colonnade Parkway BIN B237 Birmingham, AL 35243
3535 Colonnade Parkway BIN B237 Birmingham, AL 35243  


==SUBJECT:==
==SUBJECT:==
ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS REQUEST FOR LICENSE AMENDMENT FOR FUNCTIONAL ARRANGEMENT ITAAC OPTIMIZATION FOR THE VOGTLE ELECTRIC GENERATING PLANT UNITS 3 AND 4 (LAR-19-002)(EPID NO. L-2019-LLA-0146)
ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS REQUEST FOR LICENSE AMENDMENT FOR FUNCTIONAL ARRANGEMENT ITAAC OPTIMIZATION FOR THE VOGTLE ELECTRIC GENERATING PLANT UNITS 3 AND 4 (LAR-19-002)(EPID NO. L-2019-LLA-0146)  


==Dear Mr. Whitley:==
==Dear Mr. Whitley:==
 
By {{letter dated|date=July 8, 2019|text=letter dated July 8, 2019}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19189A181), Southern Nuclear Operating Company (SNC) submitted a request for a license amendment to Combined License (COL) Numbers NPF-91 and NPF-92, for the Vogtle Electric Generating Plant Units 3 and 4, respectively. The requested amendment proposes changes to COL Appendix C (and plant specific Tier 1) to delete a number of functional arrangement Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) whose design commitments may be completed via other ITAAC or otherwise verified by other means.
By letter dated July 8, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19189A181), Southern Nuclear Operating Company (SNC) submitted a request for a license amendment to Combined License (COL) Numbers NPF-91 and NPF-92, for the Vogtle Electric Generating Plant Units 3 and 4, respectively. The requested amendment proposes changes to COL Appendix C (and plant specific Tier 1) to delete a number of functional arrangement Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) whose design commitments may be completed via other ITAAC or otherwise verified by other means.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the staff to complete its detailed technical reviews. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the staff to complete its detailed technical reviews. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of the 10 CFR, an amendment to the license must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 52.79 of the 10 CFR addresses content of technical information required.
Consistent with Section 50.90 of the 10 CFR, an amendment to the license must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 52.79 of the 10 CFR addresses content of technical information required.
Line 46: Line 61:
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment, in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the staffs detailed technical review by separate correspondence.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment, in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the staffs detailed technical review by separate correspondence.
SNC has requested staff approval of this license amendment request by December 31, 2019.
SNC has requested staff approval of this license amendment request by December 31, 2019.
The staff intends to complete this action by April 30, 2020. However, the staff will try to expedite its review to have it completed by December 31, 2019, unless we agree to a different date at a later time due to circumstances beyond our control. The staff estimates that it may take 425 hours to complete this licensing action.
The staff intends to complete this action by April 30, 2020. However, the staff will try to expedite its review to have it completed by December 31, 2019, unless we agree to a different date at a later time due to circumstances beyond our control. The staff estimates that it may take 425 hours to complete this licensing action.  


If you have any questions, please contact me at (301) 415-3025 or Chandu.Patel@nrc.gov.
If you have any questions, please contact me at (301) 415-3025 or Chandu.Patel@nrc.gov.
Sincerely, Chandu Patel, Senior Project Manager Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors Docket No(s): 52-025 52-026}}
Sincerely, Chandu Patel, Senior Project Manager Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors Docket No(s): 52-025 52-026}}

Latest revision as of 19:47, 4 January 2025

COL Docs - Acceptance Letter for Vogtle 3 and 4 LAR 19-002, Functional Arrangement ITAAC
ML19212A778
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/31/2019
From:
NRC
To:
NRC/NRO/DLSE/LB4
References
Download: ML19212A778 (4)


Text

1 Vogtle PEmails From:

Patel, Chandu Sent:

Wednesday, July 31, 2019 2:51 PM To:

Vogtle PEmails Cc:

Patel, Chandu

Subject:

Acceptance Letter for Vogtle 3 and 4 LAR 19-002, Functional Arrangement ITAAC Attachments:

Acceptance Letter LAR 19-002.docx Acceptance letter for LAR 19-002 for Vogtle Units 3 and 4.

Chandu Patel, Senior Project Manager U.S. NRC, Office of New Reactors NRC/NRO/DNRL/LB4, Washington, DC 20555-0001 301.415.3025 MS T6C20M

Hearing Identifier:

Vogtle_COL_Docs_Public Email Number:

463 Mail Envelope Properties (BL0PR0901MB43392803968B190962FF915D82DF0)

Subject:

Acceptance Letter for Vogtle 3 and 4 LAR 19-002, Functional Arrangement ITAAC Sent Date:

7/31/2019 2:51:18 PM Received Date:

7/31/2019 2:51:21 PM From:

Patel, Chandu Created By:

Chandu.Patel@nrc.gov Recipients:

"Patel, Chandu" <Chandu.Patel@nrc.gov>

Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>

Tracking Status: None Post Office:

BL0PR0901MB4339.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 228 7/31/2019 2:51:21 PM Acceptance Letter LAR 19-002.docx 39427 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

July 31, 2019 Mr. Brian H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.

3535 Colonnade Parkway BIN B237 Birmingham, AL 35243

SUBJECT:

ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS REQUEST FOR LICENSE AMENDMENT FOR FUNCTIONAL ARRANGEMENT ITAAC OPTIMIZATION FOR THE VOGTLE ELECTRIC GENERATING PLANT UNITS 3 AND 4 (LAR-19-002)(EPID NO. L-2019-LLA-0146)

Dear Mr. Whitley:

By letter dated July 8, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19189A181), Southern Nuclear Operating Company (SNC) submitted a request for a license amendment to Combined License (COL) Numbers NPF-91 and NPF-92, for the Vogtle Electric Generating Plant Units 3 and 4, respectively. The requested amendment proposes changes to COL Appendix C (and plant specific Tier 1) to delete a number of functional arrangement Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) whose design commitments may be completed via other ITAAC or otherwise verified by other means.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the staff to complete its detailed technical reviews. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of the 10 CFR, an amendment to the license must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 52.79 of the 10 CFR addresses content of technical information required.

This section stipulates that the submittal addresses the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment, in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the staffs detailed technical review by separate correspondence.

SNC has requested staff approval of this license amendment request by December 31, 2019.

The staff intends to complete this action by April 30, 2020. However, the staff will try to expedite its review to have it completed by December 31, 2019, unless we agree to a different date at a later time due to circumstances beyond our control. The staff estimates that it may take 425 hours0.00492 days <br />0.118 hours <br />7.027116e-4 weeks <br />1.617125e-4 months <br /> to complete this licensing action.

If you have any questions, please contact me at (301) 415-3025 or Chandu.Patel@nrc.gov.

Sincerely, Chandu Patel, Senior Project Manager Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors Docket No(s): 52-025 52-026