{{#Wiki_filter:ber 31, 2019
{{#Wiki_filter:October 31, 2019


==SUBJECT:==
==SUBJECT:==
Line 35: Line 35:


Sincerely,
Sincerely,
/RA/
/RA/  
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27
 
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety  
 
Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27  


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Numbers: 05000266 and 05000301 License Numbers: DPR-24 and DPR-27 Report Numbers: 05000266/2019411 and 05000301/2019411 Enterprise Identifier: I-2019-411-0028 Licensee: NextEra Energy Point Beach, LLC Facility: Point Beach Nuclear Plant, Units 1 and 2 Location: Two Rivers, WI 54241 Inspection Dates: October 7, 2019, to October 11, 2019 Inspector: M. Ziolkowski, Senior Physical Security Inspector Approved By: Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Enclosure
Docket Numbers:
05000266 and 05000301  
 
License Numbers:
DPR-24 and DPR-27  
 
Report Numbers:
05000266/2019411 and 05000301/2019411  
 
Enterprise Identifier: I-2019-411-0028  
 
Licensee:
NextEra Energy Point Beach, LLC  
 
Facility:
Point Beach Nuclear Plant, Units 1 and 2  
 
Location:
Two Rivers, WI 54241  
 
Inspection Dates:
October 7, 2019, to October 11, 2019  
 
Inspector:
M. Ziolkowski, Senior Physical Security Inspector  
 
Approved By:
Steven K. Orth, Chief
Plant Support Branch
Division of Reactor Safety  


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Point Beach Nuclear Plant, Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Point Beach Nuclear Plant, Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.


List of Findings and Violations No findings or violations of more-than-minor significance were identified.
===List of Findings and Violations===
No findings or violations of more-than-minor significance were identified.


Additional Tracking Items None.
===Additional Tracking Items===
None.


=INSPECTION SCOPES=
=INSPECTION SCOPES=
Line 59: Line 93:
SECURITY
SECURITY


==71130.06 - Protection of Safeguards Information The inspector evaluated the Safeguards Information Protection Program. The following elements were evaluated from this IP:
==71130.06 - Protection of Safeguards Information==
Protection of Safeguards Information==
The inspector evaluated the Safeguards Information Protection Program. The following elements were evaluated from this IP:  


==={{IP sample|IP=IP 71130.06|count=1}}
===Protection of Safeguards Information (1 Sample)===
 
(1)
    (1)
* Tier I: All Requirements
* Tier I: All Requirements
* Tier II: 02.04 (a-b), 02.05 (a), 02.06, 02.07 (c)
* Tier II: 02.04 (a-b), 02.05 (a), 02.06, 02.07 (c)
* Tier III: 02.08, 02.09 (a-b)
* Tier III: 02.08, 02.09 (a-b)


==71130.07 - Security Training The inspector evaluated the Nuclear Security Training Program. The following elements were evaluated from this IP.
==71130.07 - Security Training==
The inspector evaluated the Nuclear Security Training Program. The following elements were  


Security Training==
===evaluated from this IP.
 
Security Training===
{{IP sample|IP=IP 71130.07|count=1}}
{{IP sample|IP=IP 71130.07|count=1}}


    (1)
(1)
* Tier I: All Requirements
* Tier I: All Requirements
* Tier II: 02.05 (a-d), 02.06 (a-b), 02.07 (a)
* Tier II: 02.05 (a-d), 02.06 (a-b), 02.07 (a)
* Tier III: 02.10, 02.12 (a-b), 02.13 (a-b)71151 - Performance Indicator Verification The inspector verified licensee Performance Indicators submittals listed below:
* Tier III: 02.10, 02.12 (a-b), 02.13 (a-b)  
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)===
 
{{IP sample|IP=IP 71130.06|count=1}}
===71151 - Performance Indicator Verification  
: (1) 10/01/2018 - 09/30/2019
 
The inspector verified licensee Performance Indicators submittals listed below:  
 
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)  
 
===
{{IP sample|IP=IP 71151|count=1}}
 
(1)10/01/2018 - 09/30/2019


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Line 91: Line 135:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type             Designation     Description or Title                                     Revision or
Inspection
Procedure                                                                                            Date
Procedure
71130.06   Procedures       SY-AA-102-1000 Safeguards Information Program                           20
Type
71130.07   Miscellaneous                   National Rifle Association Rifle Night Qualification     07/19/2019
Designation
Description or Title
Revision or
Date
71130.06
Procedures
SY-AA-102-1000
Safeguards Information Program
71130.07
Miscellaneous
National Rifle Association Rifle Night Qualification
Endorsement
Endorsement
National Rifle Association Rifle Day Qualification       10/18/2018
07/19/2019
National Rifle Association Rifle Day Qualification
Endorsement
Endorsement
National Rifle Association Thermal Rifle Qualification   07/19/2019
10/18/2018
National Rifle Association Thermal Rifle Qualification
Endorsement
Endorsement
Point Beach Physical Fitness Test                         05/01/2013
07/19/2019
CS-40           G4S Physicians Report of Medical Examination             5
Point Beach Physical Fitness Test
LP-CT-27       Tactical Weapons Qualification
05/01/2013
Procedures       CS-933         Initial Armed Responder 40hr OJT                         4
CS-40
CT-04           Conduct Personnel Searches OJT/TPE
G4S Physicians Report of Medical Examination
CT-14           Conduct Area Searches OJT/TPE
LP-CT-27
CT-16           Determine the Amount of Force Required to Prevent an
Tactical Weapons Qualification
Procedures
CS-933
Initial Armed Responder 40hr OJT
CT-04
Conduct Personnel Searches OJT/TPE
CT-14
Conduct Area Searches OJT/TPE
CT-16
Determine the Amount of Force Required to Prevent an
Unauthorized Act OJT/TPE
Unauthorized Act OJT/TPE
CT-20           Respond to Contingency Events and Execute Defensive
CT-20
Respond to Contingency Events and Execute Defensive
Strategy OJT/TPE
Strategy OJT/TPE
CT-23           React to Bomb, Hostages and Civil Disturbances Situations
CT-23
React to Bomb, Hostages and Civil Disturbances Situations
OJT/TPE
OJT/TPE
PBSAP 1.15     Return to Work                                           1
PBSAP 1.15
STIP 220       Medical and Physical Fitness Requirements                 4
Return to Work
SY-AA-102-1001 Security Training                                         7
STIP 220
SY-AA-102-1002 New Hire Training and Qualification                       6
Medical and Physical Fitness Requirements
SY-AA-102-1007 Graded Approach to Security Training                     7
SY-AA-102-1001
71151     Self-Assessments PI-AA-101-1001- Nuclear Fleet Security Baseline Inspection Matrix; NRC   07/15/2019
Security Training
F01            Inspection Procedure: 71151, Performance Indicator
SY-AA-102-1002
New Hire Training and Qualification
SY-AA-102-1007
Graded Approach to Security Training
71151
Self-Assessments PI-AA-101-1001-
F01
Nuclear Fleet Security Baseline Inspection Matrix; NRC
Inspection Procedure: 71151, Performance Indicator
Verification
Verification
5
07/15/2019
}}
}}

Latest revision as of 06:34, 2 January 2025

Security Baseline Inspection Report 05000266/2019411 and 05000301/2019411 (DRS-M.Ziolkowski)
ML19304A121
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/31/2019
From: Steven Orth
Plant Support Branch II
To: Craven R
Point Beach
References
IR 2019411
Download: ML19304A121 (7)


Text

October 31, 2019

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2SECURITY BASELINE INSPECTION REPORT 05000266/2019411 AND 05000301/2019411

Dear Mr. Craven:

On October 11, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant, Units 1 and 2. On October 17, 2019, the NRC inspector discussed the results of this inspection with Mr. Mark Fencl and other members of your staff.

The results of this inspection are documented in the enclosed report.

The NRC inspector did not identify any finding or violation of more-than-minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under Title 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000266 and 05000301

License Numbers:

DPR-24 and DPR-27

Report Numbers:

05000266/2019411 and 05000301/2019411

Enterprise Identifier: I-2019-411-0028

Licensee:

NextEra Energy Point Beach, LLC

Facility:

Point Beach Nuclear Plant, Units 1 and 2

Location:

Two Rivers, WI 54241

Inspection Dates:

October 7, 2019, to October 11, 2019

Inspector:

M. Ziolkowski, Senior Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Point Beach Nuclear Plant, Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more-than-minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SECURITY

71130.06 - Protection of Safeguards Information

The inspector evaluated the Safeguards Information Protection Program. The following elements were evaluated from this IP:

Protection of Safeguards Information (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: 02.04 (a-b), 02.05 (a), 02.06, 02.07 (c)
  • Tier III: 02.08, 02.09 (a-b)

71130.07 - Security Training

The inspector evaluated the Nuclear Security Training Program. The following elements were

===evaluated from this IP.

Security Training===

(1)

  • Tier I: All Requirements
  • Tier II: 02.05 (a-d), 02.06 (a-b), 02.07 (a)
  • Tier III: 02.10, 02.12 (a-b), 02.13 (a-b)

===71151 - Performance Indicator Verification

The inspector verified licensee Performance Indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1)10/01/2018 - 09/30/2019

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

  • On October 17, 2019, the inspector presented the security baseline inspection results to Mr. Mark Fencl and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.06

Procedures

SY-AA-102-1000

Safeguards Information Program

71130.07

Miscellaneous

National Rifle Association Rifle Night Qualification

Endorsement

07/19/2019

National Rifle Association Rifle Day Qualification

Endorsement

10/18/2018

National Rifle Association Thermal Rifle Qualification

Endorsement

07/19/2019

Point Beach Physical Fitness Test

05/01/2013

CS-40

G4S Physicians Report of Medical Examination

LP-CT-27

Tactical Weapons Qualification

Procedures

CS-933

Initial Armed Responder 40hr OJT

CT-04

Conduct Personnel Searches OJT/TPE

CT-14

Conduct Area Searches OJT/TPE

CT-16

Determine the Amount of Force Required to Prevent an

Unauthorized Act OJT/TPE

CT-20

Respond to Contingency Events and Execute Defensive

Strategy OJT/TPE

CT-23

React to Bomb, Hostages and Civil Disturbances Situations

OJT/TPE

PBSAP 1.15

Return to Work

STIP 220

Medical and Physical Fitness Requirements

SY-AA-102-1001

Security Training

SY-AA-102-1002

New Hire Training and Qualification

SY-AA-102-1007

Graded Approach to Security Training

71151

Self-Assessments PI-AA-101-1001-

F01

Nuclear Fleet Security Baseline Inspection Matrix; NRC

Inspection Procedure: 71151, Performance Indicator

Verification

07/15/2019