{{#Wiki_filter:UNITE D S TATE S
{{#Wiki_filter:October 8, 2008  
                                NUC LEAR RE GULATOR Y C OMMI S SI ON
                                                  RE G IO N I V
                                        612 EAST LAMAR BLVD , SU ITE 400
                                        AR L INGTON , TEXAS 7 60 11 - 4125
Mr. Ross T. Ridenoure  
                                            October 8, 2008
Senior Vice President and  
Mr. Ross T. Ridenoure
   Chief Nuclear Officer  
Senior Vice President and
Southern California Edison Company  
   Chief Nuclear Officer
San Onofre Nuclear Generating Station  
Southern California Edison Company
P.O. Box 128  
San Onofre Nuclear Generating Station
San Clemente, CA 92674-0128  
P.O. Box 128
San Clemente, CA 92674-0128
SUBJECT:       SAN ONOFRE NUCLEAR GENERATING STATION - NOTIFICATION OF
SUBJECT:  
                INSPECTION (NRC INSPECTION REPORT 05000361/2008005 AND
SAN ONOFRE NUCLEAR GENERATING STATION - NOTIFICATION OF  
                05000362/2008005) AND REQUEST FOR INFORMATION
INSPECTION (NRC INSPECTION REPORT 05000361/2008005 AND  
Dear Mr. Ridenoure:
05000362/2008005) AND REQUEST FOR INFORMATION  
From October 20-31, 2008, reactor inspectors from the U. S. Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline inservice inspection at
Dear Mr. Ridenoure:  
San Onofre Nuclear Generating Station, using NRC Inspection Procedure 71111.08.
Experience has shown that this inspection is a resource intensive inspection both for the NRC
From October 20-31, 2008, reactor inspectors from the U. S. Nuclear Regulatory  
inspectors and your staff. In order to minimize the impact to your onsite resources and to
Commissions (NRC) Region IV office will perform the baseline inservice inspection at  
ensure a productive inspection, we have enclosed a request for documents needed for this
San Onofre Nuclear Generating Station, using NRC Inspection Procedure 71111.08.
inspection. These documents have been divided into two groups. The first group (Section A
Experience has shown that this inspection is a resource intensive inspection both for the NRC  
of the enclosure) identified information to be provided prior to the inspection to ensure that the
inspectors and your staff. In order to minimize the impact to your onsite resources and to  
inspectors are adequately prepared. The second group (Section B of the enclosure) identifies
ensure a productive inspection, we have enclosed a request for documents needed for this  
the information the inspectors will need upon arrival at the site. It is important that all of these
inspection. These documents have been divided into two groups. The first group (Section A  
documents are up to date and complete in order to minimize the number of additional
of the enclosure) identified information to be provided prior to the inspection to ensure that the  
documents requested during the preparation and/or the onsite portions of the inspection.
inspectors are adequately prepared. The second group (Section B of the enclosure) identifies  
We have discussed the schedule for these inspection activities with your staff and understand
the information the inspectors will need upon arrival at the site. It is important that all of these  
that our regulatory contact for this inspection will be Mr. Dave Axline of your licensing
documents are up to date and complete in order to minimize the number of additional  
organization. Our inspection dates are subject to change based on your updated schedule of
documents requested during the preparation and/or the onsite portions of the inspection.  
outage activities. If there are any questions about this inspection or the material requested,
please contact the lead inspector Shiattin Makor at (817)276-6507 (Shiattin.Makor@nrc.gov ).
We have discussed the schedule for these inspection activities with your staff and understand  
that our regulatory contact for this inspection will be Mr. Dave Axline of your licensing  
organization. Our inspection dates are subject to change based on your updated schedule of  
outage activities. If there are any questions about this inspection or the material requested,  
please contact the lead inspector Shiattin Makor at (817)276-6507 (Shiattin.Makor@nrc.gov ).  
UNITED STATES
NUCLEAR REGULATORY COMMISSION
RE GIO N I V
612 EAST LAMAR BLVD, SUITE 400
ARLINGTON, TEXAS 76011-4125


Southern California Edison Company             -2-
Southern California Edison Company  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
- 2 -  
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its  
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
enclosure will be available electronically for public inspection in the NRC Public Document  
rm/adams.html (the Public Electronic Reading Room).
Room or from the Publicly Available Records (PARS) component of NRCs document  
                                                        Sincerely,
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
                                                            /RA/
rm/adams.html (the Public Electronic Reading Room).  
                                                        Russell L. Bywater, Chief
                                                        Engineering Branch 1
                                                        Division of Reactor Safety
Sincerely,  
Dockets: 50-361; 50-362
Licenses: NPF-10; NPF-15
Enclosures:
/RA/  
Documentation requested
  prior to and during the inspection
cc w/enclosure:
Russell L. Bywater, Chief  
Chairman, Board of Supervisors
County of San Diego
Engineering Branch 1  
1600 Pacific Highway, Room 335
San Diego, CA 92101
Division of Reactor Safety  
Gary L. Nolff
Power Projects/Contracts Manager
Dockets:   50-361; 50-362  
Riverside Public Utilities
Licenses: NPF-10; NPF-15  
2911 Adams Street
Riverside, CA 92504
Enclosures:
Eileen M. Teichert, Esq.
Documentation requested
Supervising Deputy City Attorney
  prior to and during the inspection  
City of Riverside
3900 Main Street
cc w/enclosure:  
Riverside, CA 92522
Chairman, Board of Supervisors  
Gary Yamamoto, Chief
County of San Diego  
Division of Drinking Water and
1600 Pacific Highway, Room 335  
   Environmental Management
San Diego, CA 92101  
Dept. of Public Health
1616 Capitol Avenue, Mail Stop 7400
Gary L. Nolff  
P.O. Box 997413
Power Projects/Contracts Manager  
Sacramento, CA 95899-7413
Riverside Public Utilities  
2911 Adams Street  
Riverside, CA 92504  
Eileen M. Teichert, Esq.  
Supervising Deputy City Attorney  
City of Riverside  
3900 Main Street  
Riverside, CA 92522  
Gary Yamamoto, Chief  
Division of Drinking Water and
   Environmental Management  
Dept. of Public Health  
1616 Capitol Avenue, Mail Stop 7400  
P.O. Box 997413  
Sacramento, CA 95899-7413  


Southern California Edison Company   -3-
Southern California Edison Company
Mike DeMarco
- 3 -  
San Diego Gas & Electric Company
8315 Century Park Court
Mike DeMarco  
CP21G
San Diego Gas & Electric Company  
San Diego, CA 92123-1548
8315 Century Park Court  
Gary Butner
CP21G  
Chief, Radiologic Health Branch
San Diego, CA 92123-1548  
State Department of Health Services
P.O. Box 997414 (MS 7610)
Gary Butner  
Sacramento, CA 95899-7414
Chief, Radiologic Health Branch  
Mayor
State Department of Health Services  
City of San Clemente
P.O. Box 997414 (MS 7610)  
100 Avenida Presidio
Sacramento, CA 95899-7414  
San Clemente, CA 92672
James D. Boyd, Commissioner
Mayor
California Energy Commission
City of San Clemente  
1516 Ninth Street (MS 34)
100 Avenida Presidio  
Sacramento, CA 95814
San Clemente, CA 92672  
Douglas K. Porter, Esq.
Southern California Edison Company
James D. Boyd, Commissioner  
2244 Walnut Grove Avenue
California Energy Commission  
Rosemead, CA 91770
1516 Ninth Street (MS 34)  
James T. Reilly
Sacramento, CA 95814  
Southern California Edison Company
San Onofre Nuclear Generating Station
Douglas K. Porter, Esq.  
P.O. Box 128
Southern California Edison Company  
San Clemente, CA 92674-0128
2244 Walnut Grove Avenue  
Daniel P. Breig
Rosemead, CA 91770  
Southern California Edison Company
San Onofre Nuclear Generating Station
James T. Reilly  
P.O. Box 128
Southern California Edison Company  
San Clemente, CA 92674-0128
San Onofre Nuclear Generating Station  
A. Edward Scherer
P.O. Box 128  
Southern California Edison Company
San Clemente, CA 92674-0128  
San Onofre Nuclear Generating Station
P.O. Box 128
Daniel P. Breig  
San Clemente, CA 92674-0128
Southern California Edison Company  
Albert R. Hochevar
San Onofre Nuclear Generating Station  
Southern California Edison Company
P.O. Box 128  
San Onofre Nuclear Generating Station
San Clemente, CA 92674-0128  
P.O. Box 128
San Clemente, CA 92674-0128
A. Edward Scherer  
Southern California Edison Company  
San Onofre Nuclear Generating Station  
P.O. Box 128  
San Clemente, CA 92674-0128  
Albert R. Hochevar  
Southern California Edison Company  
San Onofre Nuclear Generating Station  
P.O. Box 128  
San Clemente, CA 92674-0128  


Southern California Edison Company           -4-
Southern California Edison Company
Electronic distribution by RIV:
- 4 -  
Regional Administrator (Elmo.Collins@nrc.gov )
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov )
Electronic distribution by RIV:  
DRS Director (Roy.Caniano@nrc.gov )
Regional Administrator (Elmo.Collins@nrc.gov )  
DRS Deputy Director (Troy.Pruett@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)  
Senior Resident Inspector (Greg.Warnick@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov )  
Resident Inspector (John.Reynoso@nrc.gov )
DRS Director (Roy.Caniano@nrc.gov )  
Branch Chief, DRP/D (Michael.Hay@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)  
Senior Project Engineer, DRP/D (Don.Allen@nrc.gov )
Senior Resident Inspector (Greg.Warnick@nrc.gov)  
SO Site Secretary (Heather.Hutchinson@nrc.gov )
Resident Inspector (John.Reynoso@nrc.gov )  
Public Affairs Officer (Victor.Dricks@nrc.gov )
Branch Chief, DRP/D (Michael.Hay@nrc.gov)  
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )
Senior Project Engineer, DRP/D (Don.Allen@nrc.gov )  
RITS Coordinator (Marisa.Herrera@nrc.gov )
SO Site Secretary (Heather.Hutchinson@nrc.gov )  
SUNSI Review Completed: _RLB__ ADAMS: X Yes                 No     Initials: __RLB_
Public Affairs Officer (Victor.Dricks@nrc.gov )  
X Publicly Available       Non-Publicly Available   Sensitive       X Non-Sensitive
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )  
R:REACTORS/SO 2008005 rqst ltr-STM                                     ML082820538
RITS Coordinator (Marisa.Herrera@nrc.gov )  
EB1                   EB1                                                     EB1: Chief
STMakor               BWHenderson                                             RLBywater
/RA/                 /RA/                                                   /RA/
10/8/08               10/8/08                                                 10/8/08
OFFICIAL RECORD COPY T=Telephone                   E=E-mail     F=Fax
SUNSI Review Completed: _RLB__ ADAMS: X Yes  
  No           Initials: __RLB_
X   Publicly Available         Non-Publicly Available         Sensitive  
X   Non-Sensitive  
R:REACTORS/SO 2008005 rqst ltr-STM  
ML082820538  
EB1  
EB1  
EB1: Chief  
STMakor  
BWHenderson  
RLBywater  
/RA/  
/RA/  
/RA/  
10/8/08  
10/8/08  
10/8/08  
OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax  


                        INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Dates:           October 20-31, 2008
Inspection Procedures:       IP 71111.08 Inservice Inspection (ISI) Activities
                            TI 2515/172 Reactor Coolant System Dissimilar Metal Butt Welds
- 1 -
Inspectors:                 S. Makor, Reactor Inspector (Lead Inspector - ISI)
Enclosure
                            B. Henderson, Reactor Inspector
INSERVICE INSPECTION DOCUMENT REQUEST  
A.     Information Requested for the In-Office Preparation Week
      The following information should be sent to the Region IV office in hard copy or
      electronic format (ims.certrec.com preferred), in care of S. Makor, by October 15, 2008,
Inspection Dates:  
      to facilitate the selection of specific items that will be reviewed during the onsite
October 20-31, 2008  
      inspection week. The inspector will select specific items from the information requested
      below and then request from your staff additional documents needed during the onsite
Inspection Procedures:  
      inspection week (Section B of this enclosure). We ask that the specific items selected
IP 71111.08 Inservice Inspection (ISI) Activities  
      from the lists be available and ready for review on the first day of inspection. *Please
TI 2515/172 Reactor Coolant System Dissimilar Metal Butt Welds  
      provide requested documentation electronically if possible. If requested documents are
      large and only hard copy formats are available, please inform the inspector(s), and
Inspectors:  
      provide subject documentation during the first day of the onsite inspection. If you have
S. Makor, Reactor Inspector (Lead Inspector - ISI)  
      any questions regarding this information request, please call the inspector as soon as
B. Henderson, Reactor Inspector  
      possible.
A.1   ISI/Welding Programs and Schedule Information
A.  
      a)       A detailed schedule (including preliminary dates) of:
Information Requested for the In-Office Preparation Week  
                i)     Nondestructive examinations (NDEs) planned for Class 1 & 2 systems
                        and containment, performed as part of your ASME Section XI, Risk
The following information should be sent to the Region IV office in hard copy or  
                        Informed (if applicable), and augmented ISI programs during the
electronic format (ims.certrec.com preferred), in care of S. Makor, by October 15, 2008,  
                        upcoming outage.
to facilitate the selection of specific items that will be reviewed during the onsite  
                        Provide a status summary of the NDE inspection activities vs. the
inspection week. The inspector will select specific items from the information requested  
                        required inspection period percentages for this Interval by category per
below and then request from your staff additional documents needed during the onsite  
                        ASME Section XI, IWX-2400 (Do not provide separately if other
inspection week (Section B of this enclosure). We ask that the specific items selected  
                        documentation requested contains this information).
from the lists be available and ready for review on the first day of inspection. *Please  
                ii)     Reactor pressure vessel head (RPVH) examinations planned for the
provide requested documentation electronically if possible. If requested documents are  
                        upcoming outage.
large and only hard copy formats are available, please inform the inspector(s), and  
                iii)   Examinations planned for Alloy 82/182/600 components that are not
provide subject documentation during the first day of the onsite inspection. If you have  
                        included in the Section XI scope (If applicable).
any questions regarding this information request, please call the inspector as soon as  
                iv)     Examinations planned as part of your Boric Acid Corrosion Control
possible.  
                        Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).
                                              -1-                                        Enclosure
A.1  
ISI/Welding Programs and Schedule Information  
a)  
A detailed schedule (including preliminary dates) of:  
i)
Nondestructive examinations (NDEs) planned for Class 1 & 2 systems  
and containment, performed as part of your ASME Section XI, Risk  
Informed (if applicable), and augmented ISI programs during the  
upcoming outage.  
Provide a status summary of the NDE inspection activities vs. the  
required inspection period percentages for this Interval by category per  
ASME Section XI, IWX-2400 (Do not provide separately if other  
documentation requested contains this information).  
ii)
Reactor pressure vessel head (RPVH) examinations planned for the  
upcoming outage.  
iii)  
Examinations planned for Alloy 82/182/600 components that are not  
included in the Section XI scope (If applicable).  
iv)  
Examinations planned as part of your Boric Acid Corrosion Control  
Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).  


          v)       Welding activities that are scheduled to be completed during the
                  upcoming outage (ASME Class 1, 2, or 3 structures, systems, or
                  components (SSCs)).
    b)   A copy of ASME Section XI Code Relief Requests and associated NRC Safety
- 2 -
          Evaluations applicable to the examinations identified above.
Enclosure
    c)   A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,
          Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code
v)  
          Class 1 & 2 systems since the beginning of the last refueling outage. This should
Welding activities that are scheduled to be completed during the  
          include the previous Section XI pressure test(s) conducted during start up and
upcoming outage (ASME Class 1, 2, or 3 structures, systems, or  
          any evaluations associated with the results of the pressure tests. Also, include in
components (SSCs)).  
          the list the NDE reports with relevant conditions in the RPVH penetration nozzles
          which have been accepted for continued service. The list of NDE reports should
b)  
          include a brief description of the SSC where the relevant condition was identified.
A copy of ASME Section XI Code Relief Requests and associated NRC Safety  
    d)   A list with a brief description (e.g., system, material, pipe size, weld number, and
Evaluations applicable to the examinations identified above.
          NDE performed) of the welds in Code Class 1 and 2 systems which have been
          fabricated due to component repair/replacement activities since the beginning of
          the last refueling outage, or are planned to be fabricated this refueling outage.
c)  
    e)   If reactor vessel weld examinations required by the ASME Code are scheduled to
A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,  
          occur during the upcoming outage, provide a detailed description of the welds to
Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code  
          be examined and the extent of the planned examination. Please also provide
Class 1 & 2 systems since the beginning of the last refueling outage. This should  
          reference numbers for applicable procedures that will be used to conduct these
include the previous Section XI pressure test(s) conducted during start up and  
          examinations.
any evaluations associated with the results of the pressure tests. Also, include in  
    f)   Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of
the list the NDE reports with relevant conditions in the RPVH penetration nozzles  
          Section XI of the ASME Code that have been identified since the beginning of the
which have been accepted for continued service. The list of NDE reports should  
          last refueling outage.
include a brief description of the SSC where the relevant condition was identified.  
    g)   A list of any temporary non-code repairs in service (e.g., pinhole leaks).
    h)   Please provide copies of the most recent self assessments for the ISI, Welding,
d)  
          and Alloy 600 Programs.
A list with a brief description (e.g., system, material, pipe size, weld number, and  
A.2 Reactor Pressure Vessel Head (RPVH)
NDE performed) of the welds in Code Class 1 and 2 systems which have been  
    a)   Provide the detailed scope of the planned NDE of the reactor vessel head which
fabricated due to component repair/replacement activities since the beginning of  
          identifies the types of NDE methods to be used on each specific part of the
the last refueling outage, or are planned to be fabricated this refueling outage.  
          vessel head to fulfill commitments made in response to NRC Bulletin 2002-02
          and NRC Order EA-03-009. Also, include examination scope expansion criteria
e)  
          and planned expansion sample sizes if relevant conditions are identified (If
If reactor vessel weld examinations required by the ASME Code are scheduled to  
          applicable).
occur during the upcoming outage, provide a detailed description of the welds to  
    b)   A list of the standards and/or requirements that will be used to evaluate
be examined and the extent of the planned examination. Please also provide  
          indications identified during NDE of the reactor vessel head (e.g., the specific
reference numbers for applicable procedures that will be used to conduct these  
                                        -2-                                        Enclosure
examinations.  
f)  
Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of  
Section XI of the ASME Code that have been identified since the beginning of the  
last refueling outage.  
g)
A list of any temporary non-code repairs in service (e.g., pinhole leaks).  
h)  
Please provide copies of the most recent self assessments for the ISI, Welding,  
and Alloy 600 Programs.
A.2  
Reactor Pressure Vessel Head (RPVH)  
a)
Provide the detailed scope of the planned NDE of the reactor vessel head which  
identifies the types of NDE methods to be used on each specific part of the  
vessel head to fulfill commitments made in response to NRC Bulletin 2002-02  
and NRC Order EA-03-009. Also, include examination scope expansion criteria  
and planned expansion sample sizes if relevant conditions are identified (If  
applicable).  
b)
A list of the standards and/or requirements that will be used to evaluate  
indications identified during NDE of the reactor vessel head (e.g., the specific  


          industry or procedural standards which will be used to evaluate potential leakage
          and/or flaw indications).
A.3 Boric Acid Corrosion Control Program (BACCP)
    a)     Copy of the procedures that govern the scope, equipment and implementation of
- 3 -
          the inspections required to identify boric acid leakage and the procedures for
Enclosure
          boric acid leakage/corrosion evaluation.
industry or procedural standards which will be used to evaluate potential leakage  
    b)     Please provide a list of leaks (including Code class of the components) that have
and/or flaw indications).  
          been identified since the last refueling outage and associated corrective action
          documentation. If during the last cycle, the Unit was shutdown, please provide
A.3  
          documentation of containment walkdown inspections performed as part of the
Boric Acid Corrosion Control Program (BACCP)  
          BACCP.
    c)     Please provide a copy of the most recent self-assessment performed for the
a)
          BACCP.
Copy of the procedures that govern the scope, equipment and implementation of  
A.4 Steam Generator Tube (SGT) Inspections
the inspections required to identify boric acid leakage and the procedures for  
    a)     A detailed schedule of:
boric acid leakage/corrosion evaluation.  
          i)     SGT inspection, data analyses, and repair activities for the upcoming
                  outage (If occurring).
b)  
          ii)     SG secondary side inspection activities for the upcoming outage (If
Please provide a list of leaks (including Code class of the components) that have  
                  occurring).
been identified since the last refueling outage and associated corrective action  
    b)     Please provide a copy of your SG ISI Inspection Program and Plan. Please
documentation. If during the last cycle, the Unit was shutdown, please provide  
          include a copy of the Operational Assessment from last outage and a copy of the
documentation of containment walkdown inspections performed as part of the  
          following documents as they become available:
BACCP.  
          i)     Degradation Assessment
          ii)     Condition Monitoring Assessment
c)  
    c)     If you are planning on modifying your Technical Specifications such that they are
Please provide a copy of the most recent self-assessment performed for the  
          consistent with TSTF-449, please provide copies of your correspondence with
BACCP.  
          the NRC regarding deviations from the STS.
    d)     Copy of SG history documentation given to vendors performing eddy current (ET)
A.4  
          testing of the SGs during the upcoming outage.
Steam Generator Tube (SGT) Inspections  
    e)     Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy
          Current Technique Specification Sheets (ETSS). Additionally, please provide a
a)  
          copy of EPRI Appendix H ETSS Qualification Records.
A detailed schedule of:  
                                        -3-                                      Enclosure
i)
SGT inspection, data analyses, and repair activities for the upcoming  
outage (If occurring).  
ii)
SG secondary side inspection activities for the upcoming outage (If  
occurring).  
b)  
Please provide a copy of your SG ISI Inspection Program and Plan. Please  
include a copy of the Operational Assessment from last outage and a copy of the  
following documents as they become available:
i)  
Degradation Assessment  
ii)  
Condition Monitoring Assessment  
c)  
If you are planning on modifying your Technical Specifications such that they are  
consistent with TSTF-449, please provide copies of your correspondence with  
the NRC regarding deviations from the STS.  
d)  
Copy of SG history documentation given to vendors performing eddy current (ET)  
testing of the SGs during the upcoming outage.  
e)  
Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy  
Current Technique Specification Sheets (ETSS). Additionally, please provide a  
copy of EPRI Appendix H ETSS Qualification Records.  


    f)     Identify and quantify any SGT leakage experienced during the previous operating
          cycle. Also provide documentation identifying which SG was leaking and
          corrective actions completed or planned for this condition (If applicable).
    g)     Provide past history of the condition and issues pertaining to the secondary side
- 4 -
          of the steam generators (including items such as loose parts, fouling, top of tube
Enclosure
          sheet condition, crud removal amounts, etc.)
f)  
    h)     Please provide copies of your most recent self assessments of the SG
Identify and quantify any SGT leakage experienced during the previous operating  
          monitoring, loose parts monitoring, and secondary side water chemistry control
cycle. Also provide documentation identifying which SG was leaking and  
          programs.
corrective actions completed or planned for this condition (If applicable).  
    i)     Please also indicate where the primary, secondary, and resolution analyses are
          scheduled to take place.
g)
    j)     Please provide a summary of the scope of the SGT examinations, including
Provide past history of the condition and issues pertaining to the secondary side  
          examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the
of the steam generators (including items such as loose parts, fouling, top of tube  
          percentage of tubes to be examined. *Do not provide these documents
sheet condition, crud removal amounts, etc.)  
          separately if already included in other information requested.
A.5 Materials Reliability (MRP-139) Program Activities
h)  
    a)     A list of, with verification, that the baseline inspections of all applicable Dissimilar
Please provide copies of your most recent self assessments of the SG  
          Metal Butt Welds (DMBWs) have been completed by December 31, 2007.
monitoring, loose parts monitoring, and secondary side water chemistry control  
    b)     Verification that baseline inspection of hot leg and cold leg temperature DMBWs
programs.  
          have been included in the inspection program and that the schedules for the
          baseline inspections are consistent with the baseline schedules in MRP-139.
i)  
    c)     A list and schedule (examination dates) of all DMBW examinations planned for
Please also indicate where the primary, secondary, and resolution analyses are  
          the upcoming refueling outage. If none are scheduled, then data from previous
scheduled to take place.  
          examinations should be available for review.
    d)     A list and schedule for any welding to be performed on DMBWs in the upcoming
j)  
          outage. If no welding will be performed then records of previous welding on
Please provide a summary of the scope of the SGT examinations, including  
          DMBWs and postweld NDE documentation.
examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the  
    e)     A list and schedule of any stress improvement (SI) activities planned for the
percentage of tubes to be examined. *Do not provide these documents  
          upcoming refueling outage. If none are scheduled then have qualification reports
separately if already included in other information requested.
          for any SIs previously performed.
    f)     Documentation and description of how the baseline and inservice inspection
A.5  
          specifications in MRP-139 are satisfied at your facility.
Materials Reliability (MRP-139) Program Activities  
                                          -4-                                        Enclosure
a)  
A list of, with verification, that the baseline inspections of all applicable Dissimilar  
Metal Butt Welds (DMBWs) have been completed by December 31, 2007.  
b)  
Verification that baseline inspection of hot leg and cold leg temperature DMBWs  
have been included in the inspection program and that the schedules for the  
baseline inspections are consistent with the baseline schedules in MRP-139.  
c)  
A list and schedule (examination dates) of all DMBW examinations planned for  
the upcoming refueling outage. If none are scheduled, then data from previous  
examinations should be available for review.  
d)  
A list and schedule for any welding to be performed on DMBWs in the upcoming  
outage. If no welding will be performed then records of previous welding on  
DMBWs and postweld NDE documentation.  
e)  
A list and schedule of any stress improvement (SI) activities planned for the  
upcoming refueling outage. If none are scheduled then have qualification reports  
for any SIs previously performed.  
f)  
Documentation and description of how the baseline and inservice inspection  
specifications in MRP-139 are satisfied at your facility.  


A.6 Additional information related to all ISI activities
    a)     A list with a brief description of ISI, BACCP, and SGT inspection related issues
          (e.g., condition reports) entered into your corrective action program since the
          beginning of the last refueling outage (for Unit 2). For example, a list based upon
- 5 -
          data base searches using key words related to piping or SG tube degradation
Enclosure
          such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust,
A.6  
          corrosion, boric acid, or errors in piping/SGT examinations.
Additional information related to all ISI activities  
    b)     Please provide names and phone numbers for the following program leads:
          ISI contacts (Examination, planning)
a)
          Containment Exams
A list with a brief description of ISI, BACCP, and SGT inspection related issues  
          RPVH Exams
(e.g., condition reports) entered into your corrective action program since the  
          Snubbers and Supports
beginning of the last refueling outage (for Unit 2). For example, a list based upon  
          Repair and Replacement Program Manager
data base searches using key words related to piping or SG tube degradation  
          Licensing Contact
such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust,  
          Site Welding Engineer
corrosion, boric acid, or errors in piping/SGT examinations.  
          Boric Acid Corrosion Control Program
          SG Inspection Activities (site lead and vendor contact)
b)
B. Information to be provided onsite to the inspector(s) at the entrance meeting (April 28,
Please provide names and phone numbers for the following program leads:  
    2008):
B.1 ISI / Welding Programs and Schedule Information
ISI contacts (Examination, planning)  
    a)     Updated schedules for ISI/NDE activities, including SGT inspections, planned
Containment Exams  
          welding activities, and schedule showing contingency repair plans, if available.
RPVH Exams  
    b)     For ASME Code Class 1 and 2 welds selected by the inspector from the lists
Snubbers and Supports  
          provided from section A of this enclosure, please provide copies of the following
Repair and Replacement Program Manager  
          documentation for each subject weld:
Licensing Contact  
          i)       Weld data sheet (traveler)
Site Welding Engineer  
          ii)     Weld configuration and system location
Boric Acid Corrosion Control Program  
          iii)     Applicable Code Edition and Addenda for weldment
SG Inspection Activities (site lead and vendor contact)  
          iv)     Applicable Code Edition and Addenda for welding procedures
          v)       Applicable weld procedures (WPS) used to fabricate the welds
B.  
          vi)     Copies of procedure qualification records (PQRs) supporting the WPS
Information to be provided onsite to the inspector(s) at the entrance meeting (April 28,  
                    from B.1.b.v
2008):  
          vii)     Copies of mechanical test reports identified in the PQRs above
          viii)   Copies of the nonconformance reports for the selected welds (If
B.1  
                    applicable)
ISI / Welding Programs and Schedule Information  
          ix)     Radiographs of the selected welds and access to equipment to allow
                    viewing radiographs (If RT was performed)
a)  
          x)       Copies of the preservice examination records for the selected welds.
Updated schedules for ISI/NDE activities, including SGT inspections, planned  
          xi)     Copies of welder performance qualifications records applicable to the
welding activities, and schedule showing contingency repair plans, if available.  
                    selected welds, including documentation that welder maintained
                                          -5-                                      Enclosure
b)  
For ASME Code Class 1 and 2 welds selected by the inspector from the lists  
provided from section A of this enclosure, please provide copies of the following  
documentation for each subject weld:  
i)  
Weld data sheet (traveler)  
ii)  
Weld configuration and system location  
iii)  
Applicable Code Edition and Addenda for weldment  
iv)  
Applicable Code Edition and Addenda for welding procedures  
v)  
Applicable weld procedures (WPS) used to fabricate the welds  
vi)  
Copies of procedure qualification records (PQRs) supporting the WPS  
from B.1.b.v  
vii)  
Copies of mechanical test reports identified in the PQRs above  
viii)  
Copies of the nonconformance reports for the selected welds (If  
applicable)  
ix)  
Radiographs of the selected welds and access to equipment to allow  
viewing radiographs (If RT was performed)  
x)  
Copies of the preservice examination records for the selected welds.  
xi)  
Copies of welder performance qualifications records applicable to the  
selected welds, including documentation that welder maintained  


                    proficiency in the applicable welding processes specified in the WPS (at
                    least six months prior to the date of subject work)
          xii)     Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
    c)     For the ISI related corrective action issues selected by the inspector(s) from
- 6 -
          section A of this enclosure, provide a copy of the corrective actions and
Enclosure
          supporting documentation.
proficiency in the applicable welding processes specified in the WPS (at  
    d)     For the NDE reports with relevant conditions on Code Class 1 & 2 systems
least six months prior to the date of subject work)  
          selected by the inspector from section A above, provide a copy of the
xii)  
          examination records, examiner qualification records, and associated corrective
Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable  
          action documents.
    e)     A copy of (or ready access to) most current revision of the ISI Program Manual
c)  
          and Plan for the current Interval.
For the ISI related corrective action issues selected by the inspector(s) from  
    f)     For the NDEs selected by the inspector from section A of this enclosure, provide
section A of this enclosure, provide a copy of the corrective actions and  
          copy of the NDE procedures used to perform the examinations (including
supporting documentation.  
          calibration and flaw characterization/sizing procedures). For ultrasonic
          examination procedures qualified in accordance with ASME Code, Section XI,
d)  
          Appendix VIII, provide documentation supporting the procedure qualification
For the NDE reports with relevant conditions on Code Class 1 & 2 systems  
          (e.g., the EPRI performance demonstration qualification summary sheets). Also,
selected by the inspector from section A above, provide a copy of the  
          include qualification documentation of the specific equipment to be used (e.g.,
examination records, examiner qualification records, and associated corrective  
          ultrasonic unit, cables, and transducers including serial numbers) and NDE
action documents.  
          personnel qualification records.
B.2 Reactor Pressure Vessel Head (RPVH)
e)  
    a)     Provide the NDE personnel qualification records for the examiners who will
A copy of (or ready access to) most current revision of the ISI Program Manual  
          perform examinations of the RPVH.
and Plan for the current Interval.
    b)     Provide drawings showing the following: (If a visual examination is planned for
          the upcoming refueling outage)
f)  
          i)       RPVH and CRDM nozzle configurations
For the NDEs selected by the inspector from section A of this enclosure, provide  
          ii)     RPVH insulation configuration
copy of the NDE procedures used to perform the examinations (including  
    The drawings listed above should include fabrication drawings for the nozzle attachment
calibration and flaw characterization/sizing procedures). For ultrasonic  
    welds as applicable.
examination procedures qualified in accordance with ASME Code, Section XI,  
    c)     Copy of NDE reports from the last RPVH examination.
Appendix VIII, provide documentation supporting the procedure qualification  
    d)     Copy of evaluation or calculation demonstrating that the scope of the visual
(e.g., the EPRI performance demonstration qualification summary sheets). Also,  
          examination of the upper head will meet the 95% minimum coverage required by
include qualification documentation of the specific equipment to be used (e.g.,  
          NRC Order EA-03-009 (If a visual examination is planned for the upcoming
ultrasonic unit, cables, and transducers including serial numbers) and NDE  
          refueling outage).
personnel qualification records.  
                                        -6-                                      Enclosure
B.2  
Reactor Pressure Vessel Head (RPVH)  
a)  
Provide the NDE personnel qualification records for the examiners who will  
perform examinations of the RPVH.
b)  
Provide drawings showing the following: (If a visual examination is planned for  
the upcoming refueling outage)  
i)  
RPVH and CRDM nozzle configurations
ii)  
RPVH insulation configuration
The drawings listed above should include fabrication drawings for the nozzle attachment  
welds as applicable.
c)  
Copy of NDE reports from the last RPVH examination.  
d)  
Copy of evaluation or calculation demonstrating that the scope of the visual  
examination of the upper head will meet the 95% minimum coverage required by  
NRC Order EA-03-009 (If a visual examination is planned for the upcoming  
refueling outage).  


    e)     Provide a copy of the procedures that will be used to identify the source of any
          boric acid deposits identified on the RPVH. If no explicit procedures exist which
          govern this activity, provide a description of the process to be followed including
          personnel responsibilities and expectations.
- 7 -
    f)     Provide a copy of the updated calculation of effective degradation years (EDY)
Enclosure
          for the RPVH susceptibility ranking.
e)  
    g)     Provide copy of the vendor qualification report(s) that demonstrates the detection
Provide a copy of the procedures that will be used to identify the source of any  
          capability of the NDE equipment used for the RPVH examinations. Also, identify
boric acid deposits identified on the RPVH. If no explicit procedures exist which  
          any changes in equipment configurations used for the RPVH examinations which
govern this activity, provide a description of the process to be followed including  
          differ from that used in the vendor qualification report(s).
personnel responsibilities and expectations.
B.3 Boric Acid Corrosion Control Program (BACCP)
    a)     Please provide boric acid walkdown inspection results, an updated list of boric
f)
          acid leaks identified so far this outage, associated corrective action
Provide a copy of the updated calculation of effective degradation years (EDY)  
          documentation, and overall status of planned boric acid inspections.
for the RPVH susceptibility ranking.  
    b)     Please provide any engineering evaluations completed for boric acid leaks
          identified since the end of the last refueling outage. Please include a status of
g)
          corrective actions to repair and/or clean these boric acid leaks. Please identify
Provide copy of the vendor qualification report(s) that demonstrates the detection  
          specifically which known leaks, if any, have remained in service or will remain in
capability of the NDE equipment used for the RPVH examinations. Also, identify  
          service as active leaks.
any changes in equipment configurations used for the RPVH examinations which  
B.4 Steam Generator Tube (SGT) Inspections
differ from that used in the vendor qualification report(s).  
    a)     Copies of the Examination Technique Specification Sheets (ETSS) and
          associated justification for any revisions.
B.3  
    b)     Copy of the guidance to be followed if a loose part or foreign material is identified
Boric Acid Corrosion Control Program (BACCP)  
          in the SGs.
    c)     Please provide a copy of the ET procedures used to perform the SGT
a)  
          inspections (specifically calibration and flaw characterization/sizing procedures,
Please provide boric acid walkdown inspection results, an updated list of boric  
          etc.). Also include documentation for the specific equipment to be used.
acid leaks identified so far this outage, associated corrective action  
    d)     Please provide copies of your responses to NRC and industry operating
documentation, and overall status of planned boric acid inspections.  
          experience communications such as Generic Letters, Information Notices, etc.
          (as applicable to SGT inspections) *Do not provide these documents separately if
b)  
          already included in other information requested such as the degradation
Please provide any engineering evaluations completed for boric acid leaks  
          assessment.
identified since the end of the last refueling outage. Please include a status of  
    e)     List of corrective action documents generated by the vendor and/or site with
corrective actions to repair and/or clean these boric acid leaks. Please identify  
          respect to SG inspection activities.
specifically which known leaks, if any, have remained in service or will remain in  
                                        -7-                                        Enclosure
service as active leaks.
B.4  
Steam Generator Tube (SGT) Inspections  
a)  
Copies of the Examination Technique Specification Sheets (ETSS) and  
associated justification for any revisions.  
b)  
Copy of the guidance to be followed if a loose part or foreign material is identified  
in the SGs.  
c)  
Please provide a copy of the ET procedures used to perform the SGT  
inspections (specifically calibration and flaw characterization/sizing procedures,  
etc.). Also include documentation for the specific equipment to be used.  
d)  
Please provide copies of your responses to NRC and industry operating  
experience communications such as Generic Letters, Information Notices, etc.  
(as applicable to SGT inspections) *Do not provide these documents separately if  
already included in other information requested such as the degradation  
assessment.  
e)  
List of corrective action documents generated by the vendor and/or site with  
respect to SG inspection activities.  


B.5     Codes and Standards
        a)     Ready access to (i.e., copies provided to the inspector(s) for use during the
              inspection at the onsite inspection location, or room number and location where
              available):
- 8 -
              i)     Applicable Editions of the ASME Code (Sections V, IX and XI) for the
Enclosure
                      inservice inspection program and the repair/replacement program.
B.5  
              ii)     EPRI and industry standards referenced in the procedures used to
Codes and Standards  
                      perform the SGT eddy current examination.
Inspector Contact Information:
a)  
S.T. Makor                     B.W. Henderson
Ready access to (i.e., copies provided to the inspector(s) for use during the  
Reactor Inspector             Reactor Inspector
inspection at the onsite inspection location, or room number and location where  
817-276-6507                   817-276-6569
available):  
Shiattin.Makor@nrc.gov         Breck.Henderson@nrc.gov
Mailing Address:
i)
US NRC Region IV
Applicable Editions of the ASME Code (Sections V, IX and XI) for the  
Attn: S. T. Makor
inservice inspection program and the repair/replacement program.
612 Lamar Blvd., Suite 400
ii)
EPRI and industry standards referenced in the procedures used to  
perform the SGT eddy current examination.  
Inspector Contact Information:  
S.T. Makor  
B.W. Henderson  
Reactor Inspector  
Reactor Inspector  
817-276-6507
817-276-6569
Shiattin.Makor@nrc.gov  
Breck.Henderson@nrc.gov  
Mailing Address:  
US NRC Region IV  
Attn: S. T. Makor  
612 Lamar Blvd., Suite 400  
Arlington, TX 76011
Arlington, TX 76011
                                            -8-                                      Enclosure
}}
}}

Latest revision as of 14:48, 14 January 2025

IR 05000361-08-005, IR 05000362-08-005, on 10/20/2008 - 10/31/2008, San Onofre Nuclear Generating Station - Notification of Inspection and Request for Information
ML082820538
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/08/2008
From: Russ Bywater
Region 4 Engineering Branch 1
To: Ridenoure R
Southern California Edison Co
References
IR-08-005
Download: ML082820538 (12)


See also: IR 05000361/2008005

Text

October 8, 2008

Mr. Ross T. Ridenoure

Senior Vice President and

Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

SUBJECT:

SAN ONOFRE NUCLEAR GENERATING STATION - NOTIFICATION OF

INSPECTION (NRC INSPECTION REPORT 05000361/2008005 AND

05000362/2008005) AND REQUEST FOR INFORMATION

Dear Mr. Ridenoure:

From October 20-31, 2008, reactor inspectors from the U. S. Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline inservice inspection at

San Onofre Nuclear Generating Station, using NRC Inspection Procedure 71111.08.

Experience has shown that this inspection is a resource intensive inspection both for the NRC

inspectors and your staff. In order to minimize the impact to your onsite resources and to

ensure a productive inspection, we have enclosed a request for documents needed for this

inspection. These documents have been divided into two groups. The first group (Section A

of the enclosure) identified information to be provided prior to the inspection to ensure that the

inspectors are adequately prepared. The second group (Section B of the enclosure) identifies

the information the inspectors will need upon arrival at the site. It is important that all of these

documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Dave Axline of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact the lead inspector Shiattin Makor at (817)276-6507 (Shiattin.Makor@nrc.gov ).

UNITED STATES

NUCLEAR REGULATORY COMMISSION

RE GIO N I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

Southern California Edison Company

- 2 -

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Russell L. Bywater, Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-361; 50-362

Licenses: NPF-10; NPF-15

Enclosures:

Documentation requested

prior to and during the inspection

cc w/enclosure:

Chairman, Board of Supervisors

County of San Diego

1600 Pacific Highway, Room 335

San Diego, CA 92101

Gary L. Nolff

Power Projects/Contracts Manager

Riverside Public Utilities

2911 Adams Street

Riverside, CA 92504

Eileen M. Teichert, Esq.

Supervising Deputy City Attorney

City of Riverside

3900 Main Street

Riverside, CA 92522

Gary Yamamoto, Chief

Division of Drinking Water and

Environmental Management

Dept. of Public Health

1616 Capitol Avenue, Mail Stop 7400

P.O. Box 997413

Sacramento, CA 95899-7413

Southern California Edison Company

- 3 -

Mike DeMarco

San Diego Gas & Electric Company

8315 Century Park Court

CP21G

San Diego, CA 92123-1548

Gary Butner

Chief, Radiologic Health Branch

State Department of Health Services

P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414

Mayor

City of San Clemente

100 Avenida Presidio

San Clemente, CA 92672

James D. Boyd, Commissioner

California Energy Commission

1516 Ninth Street (MS 34)

Sacramento, CA 95814

Douglas K. Porter, Esq.

Southern California Edison Company

2244 Walnut Grove Avenue

Rosemead, CA 91770

James T. Reilly

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Daniel P. Breig

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

A. Edward Scherer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Albert R. Hochevar

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Southern California Edison Company

- 4 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov )

DRS Director (Roy.Caniano@nrc.gov )

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Greg.Warnick@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov )

Branch Chief, DRP/D (Michael.Hay@nrc.gov)

Senior Project Engineer, DRP/D (Don.Allen@nrc.gov )

SO Site Secretary (Heather.Hutchinson@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov )

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

SUNSI Review Completed: _RLB__ ADAMS: X Yes

No Initials: __RLB_

X Publicly Available Non-Publicly Available Sensitive

X Non-Sensitive

R:REACTORS/SO 2008005 rqst ltr-STM

ML082820538

EB1

EB1

EB1: Chief

STMakor

BWHenderson

RLBywater

/RA/

/RA/

/RA/

10/8/08

10/8/08

10/8/08

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

- 1 -

Enclosure

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates:

October 20-31, 2008

Inspection Procedures:

IP 71111.08 Inservice Inspection (ISI) Activities

TI 2515/172 Reactor Coolant System Dissimilar Metal Butt Welds

Inspectors:

S. Makor, Reactor Inspector (Lead Inspector - ISI)

B. Henderson, Reactor Inspector

A.

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or

electronic format (ims.certrec.com preferred), in care of S. Makor, by October 15, 2008,

to facilitate the selection of specific items that will be reviewed during the onsite

inspection week. The inspector will select specific items from the information requested

below and then request from your staff additional documents needed during the onsite

inspection week (Section B of this enclosure). We ask that the specific items selected

from the lists be available and ready for review on the first day of inspection. *Please

provide requested documentation electronically if possible. If requested documents are

large and only hard copy formats are available, please inform the inspector(s), and

provide subject documentation during the first day of the onsite inspection. If you have

any questions regarding this information request, please call the inspector as soon as

possible.

A.1

ISI/Welding Programs and Schedule Information

a)

A detailed schedule (including preliminary dates) of:

i)

Nondestructive examinations (NDEs) planned for Class 1 & 2 systems

and containment, performed as part of your ASME Section XI, Risk

Informed (if applicable), and augmented ISI programs during the

upcoming outage.

Provide a status summary of the NDE inspection activities vs. the

required inspection period percentages for this Interval by category per

ASME Section XI, IWX-2400 (Do not provide separately if other

documentation requested contains this information).

ii)

Reactor pressure vessel head (RPVH) examinations planned for the

upcoming outage.

iii)

Examinations planned for Alloy 82/182/600 components that are not

included in the Section XI scope (If applicable).

iv)

Examinations planned as part of your Boric Acid Corrosion Control

Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).

- 2 -

Enclosure

v)

Welding activities that are scheduled to be completed during the

upcoming outage (ASME Class 1, 2, or 3 structures, systems, or

components (SSCs)).

b)

A copy of ASME Section XI Code Relief Requests and associated NRC Safety

Evaluations applicable to the examinations identified above.

c)

A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,

Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code

Class 1 & 2 systems since the beginning of the last refueling outage. This should

include the previousSection XI pressure test(s) conducted during start up and

any evaluations associated with the results of the pressure tests. Also, include in

the list the NDE reports with relevant conditions in the RPVH penetration nozzles

which have been accepted for continued service. The list of NDE reports should

include a brief description of the SSC where the relevant condition was identified.

d)

A list with a brief description (e.g., system, material, pipe size, weld number, and

NDE performed) of the welds in Code Class 1 and 2 systems which have been

fabricated due to component repair/replacement activities since the beginning of

the last refueling outage, or are planned to be fabricated this refueling outage.

e)

If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined and the extent of the planned examination. Please also provide

reference numbers for applicable procedures that will be used to conduct these

examinations.

f)

Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of

Section XI of the ASME Code that have been identified since the beginning of the

last refueling outage.

g)

A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h)

Please provide copies of the most recent self assessments for the ISI, Welding,

and Alloy 600 Programs.

A.2

Reactor Pressure Vessel Head (RPVH)

a)

Provide the detailed scope of the planned NDE of the reactor vessel head which

identifies the types of NDE methods to be used on each specific part of the

vessel head to fulfill commitments made in response to NRC Bulletin 2002-02

and NRC Order EA-03-009. Also, include examination scope expansion criteria

and planned expansion sample sizes if relevant conditions are identified (If

applicable).

b)

A list of the standards and/or requirements that will be used to evaluate

indications identified during NDE of the reactor vessel head (e.g., the specific

- 3 -

Enclosure

industry or procedural standards which will be used to evaluate potential leakage

and/or flaw indications).

A.3

Boric Acid Corrosion Control Program (BACCP)

a)

Copy of the procedures that govern the scope, equipment and implementation of

the inspections required to identify boric acid leakage and the procedures for

boric acid leakage/corrosion evaluation.

b)

Please provide a list of leaks (including Code class of the components) that have

been identified since the last refueling outage and associated corrective action

documentation. If during the last cycle, the Unit was shutdown, please provide

documentation of containment walkdown inspections performed as part of the

BACCP.

c)

Please provide a copy of the most recent self-assessment performed for the

BACCP.

A.4

Steam Generator Tube (SGT) Inspections

a)

A detailed schedule of:

i)

SGT inspection, data analyses, and repair activities for the upcoming

outage (If occurring).

ii)

SG secondary side inspection activities for the upcoming outage (If

occurring).

b)

Please provide a copy of your SG ISI Inspection Program and Plan. Please

include a copy of the Operational Assessment from last outage and a copy of the

following documents as they become available:

i)

Degradation Assessment

ii)

Condition Monitoring Assessment

c)

If you are planning on modifying your Technical Specifications such that they are

consistent with TSTF-449, please provide copies of your correspondence with

the NRC regarding deviations from the STS.

d)

Copy of SG history documentation given to vendors performing eddy current (ET)

testing of the SGs during the upcoming outage.

e)

Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy

Current Technique Specification Sheets (ETSS). Additionally, please provide a

copy of EPRI Appendix H ETSS Qualification Records.

- 4 -

Enclosure

f)

Identify and quantify any SGT leakage experienced during the previous operating

cycle. Also provide documentation identifying which SG was leaking and

corrective actions completed or planned for this condition (If applicable).

g)

Provide past history of the condition and issues pertaining to the secondary side

of the steam generators (including items such as loose parts, fouling, top of tube

sheet condition, crud removal amounts, etc.)

h)

Please provide copies of your most recent self assessments of the SG

monitoring, loose parts monitoring, and secondary side water chemistry control

programs.

i)

Please also indicate where the primary, secondary, and resolution analyses are

scheduled to take place.

j)

Please provide a summary of the scope of the SGT examinations, including

examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the

percentage of tubes to be examined. *Do not provide these documents

separately if already included in other information requested.

A.5

Materials Reliability (MRP-139) Program Activities

a)

A list of, with verification, that the baseline inspections of all applicable Dissimilar

Metal Butt Welds (DMBWs) have been completed by December 31, 2007.

b)

Verification that baseline inspection of hot leg and cold leg temperature DMBWs

have been included in the inspection program and that the schedules for the

baseline inspections are consistent with the baseline schedules in MRP-139.

c)

A list and schedule (examination dates) of all DMBW examinations planned for

the upcoming refueling outage. If none are scheduled, then data from previous

examinations should be available for review.

d)

A list and schedule for any welding to be performed on DMBWs in the upcoming

outage. If no welding will be performed then records of previous welding on

DMBWs and postweld NDE documentation.

e)

A list and schedule of any stress improvement (SI) activities planned for the

upcoming refueling outage. If none are scheduled then have qualification reports

for any SIs previously performed.

f)

Documentation and description of how the baseline and inservice inspection

specifications in MRP-139 are satisfied at your facility.

- 5 -

Enclosure

A.6

Additional information related to all ISI activities

a)

A list with a brief description of ISI, BACCP, and SGT inspection related issues

(e.g., condition reports) entered into your corrective action program since the

beginning of the last refueling outage (for Unit 2). For example, a list based upon

data base searches using key words related to piping or SG tube degradation

such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust,

corrosion, boric acid, or errors in piping/SGT examinations.

b)

Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams

RPVH Exams

Snubbers and Supports

Repair and Replacement Program Manager

Licensing Contact

Site Welding Engineer

Boric Acid Corrosion Control Program

SG Inspection Activities (site lead and vendor contact)

B.

Information to be provided onsite to the inspector(s) at the entrance meeting (April 28,

2008):

B.1

ISI / Welding Programs and Schedule Information

a)

Updated schedules for ISI/NDE activities, including SGT inspections, planned

welding activities, and schedule showing contingency repair plans, if available.

b)

For ASME Code Class 1 and 2 welds selected by the inspector from the lists

provided from section A of this enclosure, please provide copies of the following

documentation for each subject weld:

i)

Weld data sheet (traveler)

ii)

Weld configuration and system location

iii)

Applicable Code Edition and Addenda for weldment

iv)

Applicable Code Edition and Addenda for welding procedures

v)

Applicable weld procedures (WPS) used to fabricate the welds

vi)

Copies of procedure qualification records (PQRs) supporting the WPS

from B.1.b.v

vii)

Copies of mechanical test reports identified in the PQRs above

viii)

Copies of the nonconformance reports for the selected welds (If

applicable)

ix)

Radiographs of the selected welds and access to equipment to allow

viewing radiographs (If RT was performed)

x)

Copies of the preservice examination records for the selected welds.

xi)

Copies of welder performance qualifications records applicable to the

selected welds, including documentation that welder maintained

- 6 -

Enclosure

proficiency in the applicable welding processes specified in the WPS (at

least six months prior to the date of subject work)

xii)

Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable

c)

For the ISI related corrective action issues selected by the inspector(s) from

section A of this enclosure, provide a copy of the corrective actions and

supporting documentation.

d)

For the NDE reports with relevant conditions on Code Class 1 & 2 systems

selected by the inspector from section A above, provide a copy of the

examination records, examiner qualification records, and associated corrective

action documents.

e)

A copy of (or ready access to) most current revision of the ISI Program Manual

and Plan for the current Interval.

f)

For the NDEs selected by the inspector from section A of this enclosure, provide

copy of the NDE procedures used to perform the examinations (including

calibration and flaw characterization/sizing procedures). For ultrasonic

examination procedures qualified in accordance with ASME Code,Section XI,

Appendix VIII, provide documentation supporting the procedure qualification

(e.g., the EPRI performance demonstration qualification summary sheets). Also,

include qualification documentation of the specific equipment to be used (e.g.,

ultrasonic unit, cables, and transducers including serial numbers) and NDE

personnel qualification records.

B.2

Reactor Pressure Vessel Head (RPVH)

a)

Provide the NDE personnel qualification records for the examiners who will

perform examinations of the RPVH.

b)

Provide drawings showing the following: (If a visual examination is planned for

the upcoming refueling outage)

i)

RPVH and CRDM nozzle configurations

ii)

RPVH insulation configuration

The drawings listed above should include fabrication drawings for the nozzle attachment

welds as applicable.

c)

Copy of NDE reports from the last RPVH examination.

d)

Copy of evaluation or calculation demonstrating that the scope of the visual

examination of the upper head will meet the 95% minimum coverage required by

NRC Order EA-03-009 (If a visual examination is planned for the upcoming

refueling outage).

- 7 -

Enclosure

e)

Provide a copy of the procedures that will be used to identify the source of any

boric acid deposits identified on the RPVH. If no explicit procedures exist which

govern this activity, provide a description of the process to be followed including

personnel responsibilities and expectations.

f)

Provide a copy of the updated calculation of effective degradation years (EDY)

for the RPVH susceptibility ranking.

g)

Provide copy of the vendor qualification report(s) that demonstrates the detection

capability of the NDE equipment used for the RPVH examinations. Also, identify

any changes in equipment configurations used for the RPVH examinations which

differ from that used in the vendor qualification report(s).

B.3

Boric Acid Corrosion Control Program (BACCP)

a)

Please provide boric acid walkdown inspection results, an updated list of boric

acid leaks identified so far this outage, associated corrective action

documentation, and overall status of planned boric acid inspections.

b)

Please provide any engineering evaluations completed for boric acid leaks

identified since the end of the last refueling outage. Please include a status of

corrective actions to repair and/or clean these boric acid leaks. Please identify

specifically which known leaks, if any, have remained in service or will remain in

service as active leaks.

B.4

Steam Generator Tube (SGT) Inspections

a)

Copies of the Examination Technique Specification Sheets (ETSS) and

associated justification for any revisions.

b)

Copy of the guidance to be followed if a loose part or foreign material is identified

in the SGs.

c)

Please provide a copy of the ET procedures used to perform the SGT

inspections (specifically calibration and flaw characterization/sizing procedures,

etc.). Also include documentation for the specific equipment to be used.

d)

Please provide copies of your responses to NRC and industry operating

experience communications such as Generic Letters, Information Notices, etc.

(as applicable to SGT inspections) *Do not provide these documents separately if

already included in other information requested such as the degradation

assessment.

e)

List of corrective action documents generated by the vendor and/or site with

respect to SG inspection activities.

- 8 -

Enclosure

B.5

Codes and Standards

a)

Ready access to (i.e., copies provided to the inspector(s) for use during the

inspection at the onsite inspection location, or room number and location where

available):

i)

Applicable Editions of the ASME Code (Sections V, IX and XI) for the

inservice inspection program and the repair/replacement program.

ii)

EPRI and industry standards referenced in the procedures used to

perform the SGT eddy current examination.

Inspector Contact Information:

S.T. Makor

B.W. Henderson

Reactor Inspector

Reactor Inspector

817-276-6507

817-276-6569

Shiattin.Makor@nrc.gov

Breck.Henderson@nrc.gov

Mailing Address:

US NRC Region IV

Attn: S. T. Makor

612 Lamar Blvd., Suite 400

Arlington, TX 76011