ML083080445: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | {{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | ||
Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this transmittal | |||
document is decontrolled. | |||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
November 3, 2008 | |||
EA-08-248 | |||
James R. Douet | |||
Vice President Operations | |||
Entergy Operations, Inc. | EA-08-248 | ||
Grand Gulf Nuclear Station | |||
P.O. Box 756 | James R. Douet | ||
Port Gibson, MS 39150 | Vice President Operations | ||
SUBJECT: GRAND GULF NUCLEAR STATION - FINAL SIGNIFICANCE DETERMINATION | Entergy Operations, Inc. | ||
Grand Gulf Nuclear Station | |||
P.O. Box 756 | |||
Dear Mr. Douet: | Port Gibson, MS 39150 | ||
This letter is to provide you the final results of our significance determination of the preliminary | |||
Greater than Green finding identified in our previous communication dated September 18, 2008, | SUBJECT: GRAND GULF NUCLEAR STATION - FINAL SIGNIFICANCE DETERMINATION | ||
which included the subject inspection report. This Greater than Green finding was discussed in | FOR A GREATER THAN GREEN FINDING AND NOTICE OF VIOLATION (NRC | ||
detail in Section 3.3 of the subject inspection report. | PHYSICAL SECURITY SPECIAL INSPECTION REPORT 05000416/2008404) | ||
In a telephone conversation with Mr. Michael P. Shannon, Chief, Plant Support Branch-1, | |||
Division of Reactor Safety, NRC Region IV, on October 2, 2008, Mr. Bryan Ford, Senior | Dear Mr. Douet: | ||
Licensing Manager, Entergy Operations, Inc., indicated that Grand Gulf Nuclear Station did not | |||
contest the characterization of the risk significance of this finding and that you declined your | This letter is to provide you the final results of our significance determination of the preliminary | ||
opportunity to discuss this issue in a Regulatory Conference or to provide a written response. | Greater than Green finding identified in our previous communication dated September 18, 2008, | ||
After considering the information developed during the inspection, the NRC has concluded that | which included the subject inspection report. This Greater than Green finding was discussed in | ||
the inspection finding is appropriately characterized as Greater than Green. | detail in Section 3.3 of the subject inspection report. | ||
You have 30 calendar days from the date of this letter to appeal the staffs determination of | |||
significance for the identified Greater than Green finding. Such appeals will be considered to | In a telephone conversation with Mr. Michael P. Shannon, Chief, Plant Support Branch-1, | ||
have merit only if they meet the criteria given in NRC Inspection Manual Chapter 0609, | Division of Reactor Safety, NRC Region IV, on October 2, 2008, Mr. Bryan Ford, Senior | ||
Attachment 2. | Licensing Manager, Entergy Operations, Inc., indicated that Grand Gulf Nuclear Station did not | ||
contest the characterization of the risk significance of this finding and that you declined your | |||
opportunity to discuss this issue in a Regulatory Conference or to provide a written response. | |||
After considering the information developed during the inspection, the NRC has concluded that | |||
the inspection finding is appropriately characterized as Greater than Green. | |||
You have 30 calendar days from the date of this letter to appeal the staffs determination of | |||
significance for the identified Greater than Green finding. Such appeals will be considered to | |||
have merit only if they meet the criteria given in NRC Inspection Manual Chapter 0609, | |||
Attachment 2. | |||
UNITED STATES | |||
NUCLEAR REGULATORY COMM ISSION | |||
R E GI ON I V | |||
612 EAST LAMAR BLVD, SUITE 400 | |||
ARLINGTON, TEXAS 76011-4125 | |||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
The NRC has also determined that the condition discussed is a violation of 10 CFR 73.21, as | OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | ||
cited in the attached Notice of Violation (Notice). In accordance with the NRC Enforcement | The NRC has also determined that the condition discussed is a violation of 10 CFR 73.21, as | ||
Policy, the Notice is considered escalated enforcement action because it is associated with a | cited in the attached Notice of Violation (Notice). In accordance with the NRC Enforcement | ||
Greater than Green finding. | Policy, the Notice is considered escalated enforcement action because it is associated with a | ||
You are required to respond to this letter and should follow the instructions specified in the | Greater than Green finding. | ||
enclosed Notice when preparing your response. | |||
Plant performance for this issue has been determined to be beyond the licensee response | You are required to respond to this letter and should follow the instructions specified in the | ||
band. We will use the NRCs Security Action Matrix to determine the most appropriate NRC | enclosed Notice when preparing your response. | ||
response for this event. We will notify you by separate correspondence of that determination. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | Plant performance for this issue has been determined to be beyond the licensee response | ||
made available electronically for public inspection in the NRC Public Document Room or from | band. We will use the NRCs Security Action Matrix to determine the most appropriate NRC | ||
the NRCs document system (ADAMS), accessible from the NRCs Web site at | response for this event. We will notify you by separate correspondence of that determination. | ||
http://www.nrc.gov/reading-rm/adams.html. However, because of the security-related | |||
information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | ||
letters enclosure will not be available for public inspection. | made available electronically for public inspection in the NRC Public Document Room or from | ||
Because this issue involves security-related information, your response will not be made | the NRCs document system (ADAMS), accessible from the NRCs Web site at | ||
available electronically for public inspection in the NRC Public Document Room or from the | http://www.nrc.gov/reading-rm/adams.html. However, because of the security-related | ||
NRCs document system (ADAMS), accessible from the NRCs Web site at | information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this | ||
http://www.nrc.gov/reading-rm/adams.html. The material enclosed herewith contains security- | letters enclosure will not be available for public inspection. | ||
related information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized | |||
individuals could present a security vulnerability. Therefore, the material will not be made | Because this issue involves security-related information, your response will not be made | ||
available electronically for public inspection in the NRC Public Document Room or from the | available electronically for public inspection in the NRC Public Document Room or from the | ||
NRC=s document system (ADAMS), accessible from the NRCs Web site at | NRCs document system (ADAMS), accessible from the NRCs Web site at | ||
http://www.nrc.gov/reading-rm/adams.html. | http://www.nrc.gov/reading-rm/adams.html. The material enclosed herewith contains security- | ||
related information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized | |||
individuals could present a security vulnerability. Therefore, the material will not be made | |||
available electronically for public inspection in the NRC Public Document Room or from the | |||
NRC=s document system (ADAMS), accessible from the NRCs Web site at | |||
Docket: 50-416 | http://www.nrc.gov/reading-rm/adams.html. | ||
License: NPF-29 | |||
Enclosure: | |||
Notice of Violation | |||
Sincerely, | |||
/RA/ | |||
Elmo E. Collins | |||
Regional Administrator | |||
Docket: 50-416 | |||
License: NPF-29 | |||
Enclosure: | |||
Notice of Violation | |||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
cc w/o enclosure: | OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | ||
Senior Vice President | cc w/o enclosure: | ||
Entergy Nuclear Operations | Senior Vice President | ||
P.O. Box 31995 | Entergy Nuclear Operations | ||
Jackson, MS 39286-1995 | P.O. Box 31995 | ||
Senior Vice President and COO | Jackson, MS 39286-1995 | ||
Entergy Operations, Inc. | Senior Vice President and COO | ||
P.O. Box 31995 | Entergy Operations, Inc. | ||
Jackson, MS 39286-1995 | P.O. Box 31995 | ||
Vice President, Oversight | Jackson, MS 39286-1995 | ||
Entergy Services, Inc. | Vice President, Oversight | ||
P.O. Box 31995 | Entergy Services, Inc. | ||
Jackson, MS 39286-1995 | P.O. Box 31995 | ||
Senior Manager | Jackson, MS 39286-1995 | ||
Nuclear Safety & Licensing | |||
Entergy Nuclear Operations | Senior Manager | ||
P.O. Box 31995 | Nuclear Safety & Licensing | ||
Jackson, MS 39286-1995 | Entergy Nuclear Operations | ||
Manager, Licensing | P.O. Box 31995 | ||
Entergy Operations, Inc. | Jackson, MS 39286-1995 | ||
Grand Gulf Nuclear Station | Manager, Licensing | ||
P.O. Box 756 | Entergy Operations, Inc. | ||
Grand Gulf Nuclear Station | |||
P.O. Box 756 | |||
Port Gibson, MS 39150 | Port Gibson, MS 39150 | ||
}} | }} | ||
Latest revision as of 14:29, 14 January 2025
| ML083080445 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 11/03/2008 |
| From: | Collins E Region 4 Administrator |
| To: | Douet J Entergy Operations |
| References | |
| EA-08-248 IR-08-404 | |
| Download: ML083080445 (3) | |
See also: IR 05000416/2008404
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this transmittal
document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
November 3, 2008
James R. Douet
Vice President Operations
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Port Gibson, MS 39150
SUBJECT: GRAND GULF NUCLEAR STATION - FINAL SIGNIFICANCE DETERMINATION
FOR A GREATER THAN GREEN FINDING AND NOTICE OF VIOLATION (NRC
PHYSICAL SECURITY SPECIAL INSPECTION REPORT 05000416/2008404)
Dear Mr. Douet:
This letter is to provide you the final results of our significance determination of the preliminary
Greater than Green finding identified in our previous communication dated September 18, 2008,
which included the subject inspection report. This Greater than Green finding was discussed in
detail in Section 3.3 of the subject inspection report.
In a telephone conversation with Mr. Michael P. Shannon, Chief, Plant Support Branch-1,
Division of Reactor Safety, NRC Region IV, on October 2, 2008, Mr. Bryan Ford, Senior
Licensing Manager, Entergy Operations, Inc., indicated that Grand Gulf Nuclear Station did not
contest the characterization of the risk significance of this finding and that you declined your
opportunity to discuss this issue in a Regulatory Conference or to provide a written response.
After considering the information developed during the inspection, the NRC has concluded that
the inspection finding is appropriately characterized as Greater than Green.
You have 30 calendar days from the date of this letter to appeal the staffs determination of
significance for the identified Greater than Green finding. Such appeals will be considered to
have merit only if they meet the criteria given in NRC Inspection Manual Chapter 0609,
Attachment 2.
UNITED STATES
NUCLEAR REGULATORY COMM ISSION
R E GI ON I V
612 EAST LAMAR BLVD, SUITE 400
ARLINGTON, TEXAS 76011-4125
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
The NRC has also determined that the condition discussed is a violation of 10 CFR 73.21, as
cited in the attached Notice of Violation (Notice). In accordance with the NRC Enforcement
Policy, the Notice is considered escalated enforcement action because it is associated with a
Greater than Green finding.
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response.
Plant performance for this issue has been determined to be beyond the licensee response
band. We will use the NRCs Security Action Matrix to determine the most appropriate NRC
response for this event. We will notify you by separate correspondence of that determination.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the NRCs document system (ADAMS), accessible from the NRCs Web site at
http://www.nrc.gov/reading-rm/adams.html. However, because of the security-related
information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this
letters enclosure will not be available for public inspection.
Because this issue involves security-related information, your response will not be made
available electronically for public inspection in the NRC Public Document Room or from the
NRCs document system (ADAMS), accessible from the NRCs Web site at
http://www.nrc.gov/reading-rm/adams.html. The material enclosed herewith contains security-
related information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized
individuals could present a security vulnerability. Therefore, the material will not be made
available electronically for public inspection in the NRC Public Document Room or from the
NRC=s document system (ADAMS), accessible from the NRCs Web site at
http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Elmo E. Collins
Regional Administrator
Docket: 50-416
License: NPF-29
Enclosure:
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
cc w/o enclosure:
Senior Vice President
Entergy Nuclear Operations
P.O. Box 31995
Jackson, MS 39286-1995
Senior Vice President and COO
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Vice President, Oversight
Entergy Services, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Senior Manager
Nuclear Safety & Licensing
Entergy Nuclear Operations
P.O. Box 31995
Jackson, MS 39286-1995
Manager, Licensing
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Port Gibson, MS 39150