ML091520300: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:       RO SYSTEM a TITLE:       TERMINATE FROM EMERGENCY BORATION CANDIDATE: _____________________________________________
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:
EXAMINER: _____________________________________________
RO SYSTEM a TITLE:
TERMINATE FROM EMERGENCY BORATION CANDIDATE:
EXAMINER:  


JPM-RO SYSTEM a JOB PERFORMANCE MEASURE DATA PAGE Task:   Align Charging Pump Suction to SIRWT (Safety Injection Refueling Water Tank)
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 2 of 8 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task:
Alternate Path: NO Facility JPM #: PL-OPS-EOP-032J K/A: 004A4.18             Importance:       RO: 4.3       SRO: 4.1 K/A Statement: Ability to manually operate and/or monitor in the control room:
Align Charging Pump Suction to SIRWT (Safety Injection Refueling Water Tank)
Alternate Path: NO Facility JPM #: PL-OPS-EOP-032J K/A: 004A4.18 Importance:
RO: 4.3 SRO: 4.1 K/A Statement: Ability to manually operate and/or monitor in the control room:
Emergency borate valve Task Standard: Emergency Boration secured with Charging Pump suction to the SIRWT and all Charging Pumps operating.
Emergency borate valve Task Standard: Emergency Boration secured with Charging Pump suction to the SIRWT and all Charging Pumps operating.
Preferred Evaluation Location: Simulator         __X__   In Plant   _____
Preferred Evaluation Location: Simulator
Preferred Evaluation Method:       Perform     __X__   Simulate   _____
__X__
In Plant Preferred Evaluation Method:
Perform
__X__
Simulate  


==References:==
==References:==
EOP-4.0, Loss Of Coolant Recovery EOP Supplement 40, Charging Pump Suction Alignment Validation Time:5 minutes           Time Critical:     NO Candidate: ___________________________________________________
EOP-4.0, Loss Of Coolant Recovery EOP Supplement 40, Charging Pump Suction Alignment Validation Time: 5 minutes Time Critical:
Time Start: ________         Time Finish:       ________
NO Candidate: ___________________________________________________
Performance Time:         ________ minutes Performance Rating:       SAT______         UNSAT ______
Time Start: ________
Time Finish:
Performance Time:
________ minutes Performance Rating:
SAT______
UNSAT ______
Comments:
Comments:
Examiner: _______________________________                 Date:   ______________
Examiner: _______________________________
Signature PALISADES NUCLEAR PLANT                    Page 2 of 8                        JULY 2008
Date:
Signature  


JPM-RO SYSTEM a EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 3 of 8 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
EOP Supplement 40, Charging Pump Suction Alignment, Rev. 5 Also see Simulator Operator Instructions (last page of this document).
EOP Supplement 40, Charging Pump Suction Alignment, Rev. 5 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
READ TO CANDIDATE DIRECTION TO CANDIDATE:
Line 42: Line 56:
* PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.
* PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.
INITIATING CUES:
INITIATING CUES:
* During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.
* During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.  
PALISADES NUCLEAR PLANT                      Page 3 of 8                            JULY 2008


JPM-RO SYSTEM a Proc. Step             TASK ELEMENT 1                                 STANDARD                     Grade Locate EOP Supplement 40, Charging EOP Supplement 40 located.
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 4 of 8 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Locate EOP Supplement 40, Charging Pump Suction Alignment EOP Supplement 40 located.
n/a    Pump Suction Alignment                                                                  S U Comment:
S U Comment:
Evaluator hands operator a Working Copy.
Evaluator hands operator a Working Copy.
Proc. Step             TASK ELEMENT 2                                 STANDARD                     Grade Open Charging Pumps Suction From         MO-2160 handswitch taken to the open position 2.01    SIRWT Valve, MO-2160                      (valve opens).                                 S U Comment:
Proc. Step TASK ELEMENT 2 STANDARD Grade 2.01 Open Charging Pumps Suction From SIRWT Valve, MO-2160 MO-2160 handswitch taken to the open position (valve opens).
S U Comment:
Note: MO-2160 will take a little time to stroke open.
Note: MO-2160 will take a little time to stroke open.
CRITICAL STEP Proc. Step             TASK ELEMENT 3                                 STANDARD                     Grade Stop the Boric Acid Pumps.
CRITICAL STEP Proc. Step TASK ELEMENT 3 STANDARD Grade 2.02 Stop the Boric Acid Pumps.
P-56A AND P-56B handswitches to the trip P-56A 2.02                                              position (Pumps off).                         S U P-56B Comment:
P-56A P-56B P-56A AND P-56B handswitches to the trip position (Pumps off).
CRITICAL STEP PALISADES NUCLEAR PLANT                    Page 4 of 8                                  JULY 2008
S U Comment:
CRITICAL STEP  


JPM-RO SYSTEM a Proc. Step             TASK ELEMENT 4                                     STANDARD                       Grade Close the following valves:
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 5 of 8 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade 2.03 Close the following valves:
Boric Acid Pump Feed Valve, MO-2140 MO-2140, MO-2169, and MO-2170 Gravity Feed Valves                    handswitches taken to the closed position 2.03                                                  (valves close)                                       S U MO-2169 MO-2170 Comment:
Boric Acid Pump Feed Valve, MO-2140 Gravity Feed Valves MO-2169 MO-2170 MO-2140, MO-2169, and MO-2170 handswitches taken to the closed position (valves close)
S U Comment:
Note: MO-2140, MO-2169, and MO-2170 will take a little time to stroke closed.
Note: MO-2140, MO-2169, and MO-2170 will take a little time to stroke closed.
CRITICAL STEP Proc. Step             TASK ELEMENT 5                                     STANDARD                       Grade Ensure closed Charging Pumps Suction MO-2087 verified closed.
CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade 2.04 Ensure closed Charging Pumps Suction VCT Outlet Valve, MO-2087.
2.04    VCT Outlet Valve, MO-2087.                                                                       S U Comment:
MO-2087 verified closed.
Proc. Step             TASK ELEMENT 6                                     STANDARD                       Grade Operate each Charging Pump for at least     Determines that all Charging pumps will be left in-2.05    five minutes.                                service (given in initial conditions).               S U Comment:
S U Comment:
PALISADES NUCLEAR PLANT                      Page 5 of 8                                      JULY 2008
Proc. Step TASK ELEMENT 6 STANDARD Grade 2.05 Operate each Charging Pump for at least five minutes.
Determines that all Charging pumps will be left in-service (given in initial conditions).
S U Comment:  


JPM-RO SYSTEM a Proc. Step             TASK ELEMENT 7                                     STANDARD                       Grade WHEN each pump has been operated at         Determines that all Charging pumps will be left in-2.06    least five minutes, .                      service (given in initial conditions).               S U Comment:
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 6 of 8 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade 2.06 WHEN each pump has been operated at least five minutes,.
Determines that all Charging pumps will be left in-service (given in initial conditions).
S U Comment:
Evaluator Cue: Inform Operator that another Operator will perform this step.
Evaluator Cue: Inform Operator that another Operator will perform this step.
Proc. Step             TASK ELEMENT 8                                     STANDARD                       Grade EOP Supplement 40 is Signed, EOP Supplement 40 Signed, Dated/Timed n/a    Dated/Timed                                                                                      S U Comment:
Proc. Step TASK ELEMENT 8 STANDARD Grade n/a EOP Supplement 40 is Signed, Dated/Timed EOP Supplement 40 Signed, Dated/Timed S U Comment:
Proc. Step             TASK ELEMENT 9                                     STANDARD                       Grade Notify CRS of the completion of EOP CRS notified that EOP Supplement 40 complete n/a    Supplement 40                                                                                    S U Comment:
Proc. Step TASK ELEMENT 9 STANDARD Grade n/a Notify CRS of the completion of EOP Supplement 40 CRS notified that EOP Supplement 40 complete S U Comment:
END OF TASK PALISADES NUCLEAR PLANT                      Page 6 of 8                                      JULY 2008
END OF TASK  


JPM-RO SYSTEM a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 7 of 8 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* A Loss of Coolant Accident has occurred.
* A Loss of Coolant Accident has occurred.
Line 74: Line 94:
* PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.
* PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.
INITIATING CUES:
INITIATING CUES:
* During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.
* During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.  
PALISADES NUCLEAR PLANT                Page 7 of 8                          JULY 2008


JPM-RO SYSTEM a SIMULATOR OPERATOR INSTRUCTIONS USE IC-79 PALISADES NUCLEAR PLANT         Page 8 of 8                 JULY 2008}}
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 8 of 8 JULY 2008 SIMULATOR OPERATOR INSTRUCTIONS USE IC-79}}

Latest revision as of 11:35, 14 January 2025

NRC Region III, Initial License Exam, Job Performance Measure, JPM: RO System a, Title: Terminate from Emergency Boration
ML091520300
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200311 List:
References
Download: ML091520300 (8)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:

RO SYSTEM a TITLE:

TERMINATE FROM EMERGENCY BORATION CANDIDATE:

EXAMINER:

JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 2 of 8 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task:

Align Charging Pump Suction to SIRWT (Safety Injection Refueling Water Tank)

Alternate Path: NO Facility JPM #: PL-OPS-EOP-032J K/A: 004A4.18 Importance:

RO: 4.3 SRO: 4.1 K/A Statement: Ability to manually operate and/or monitor in the control room:

Emergency borate valve Task Standard: Emergency Boration secured with Charging Pump suction to the SIRWT and all Charging Pumps operating.

Preferred Evaluation Location: Simulator

__X__

In Plant Preferred Evaluation Method:

Perform

__X__

Simulate

References:

EOP-4.0, Loss Of Coolant Recovery EOP Supplement 40, Charging Pump Suction Alignment Validation Time: 5 minutes Time Critical:

NO Candidate: ___________________________________________________

Time Start: ________

Time Finish:

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 3 of 8 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

EOP Supplement 40, Charging Pump Suction Alignment, Rev. 5 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A Loss of Coolant Accident has occurred.
  • SIS and CHR have occurred.
  • PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.

INITIATING CUES:

  • During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.

JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 4 of 8 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Locate EOP Supplement 40, Charging Pump Suction Alignment EOP Supplement 40 located.

S U Comment:

Evaluator hands operator a Working Copy.

Proc. Step TASK ELEMENT 2 STANDARD Grade 2.01 Open Charging Pumps Suction From SIRWT Valve, MO-2160 MO-2160 handswitch taken to the open position (valve opens).

S U Comment:

Note: MO-2160 will take a little time to stroke open.

CRITICAL STEP Proc. Step TASK ELEMENT 3 STANDARD Grade 2.02 Stop the Boric Acid Pumps.

P-56A P-56B P-56A AND P-56B handswitches to the trip position (Pumps off).

S U Comment:

CRITICAL STEP

JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 5 of 8 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade 2.03 Close the following valves:

Boric Acid Pump Feed Valve, MO-2140 Gravity Feed Valves MO-2169 MO-2170 MO-2140, MO-2169, and MO-2170 handswitches taken to the closed position (valves close)

S U Comment:

Note: MO-2140, MO-2169, and MO-2170 will take a little time to stroke closed.

CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade 2.04 Ensure closed Charging Pumps Suction VCT Outlet Valve, MO-2087.

MO-2087 verified closed.

S U Comment:

Proc. Step TASK ELEMENT 6 STANDARD Grade 2.05 Operate each Charging Pump for at least five minutes.

Determines that all Charging pumps will be left in-service (given in initial conditions).

S U Comment:

JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 6 of 8 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade 2.06 WHEN each pump has been operated at least five minutes,.

Determines that all Charging pumps will be left in-service (given in initial conditions).

S U Comment:

Evaluator Cue: Inform Operator that another Operator will perform this step.

Proc. Step TASK ELEMENT 8 STANDARD Grade n/a EOP Supplement 40 is Signed, Dated/Timed EOP Supplement 40 Signed, Dated/Timed S U Comment:

Proc. Step TASK ELEMENT 9 STANDARD Grade n/a Notify CRS of the completion of EOP Supplement 40 CRS notified that EOP Supplement 40 complete S U Comment:

END OF TASK

JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 7 of 8 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • A Loss of Coolant Accident has occurred.
  • SIS and CHR have occurred.
  • PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.

INITIATING CUES:

  • During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.

JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 8 of 8 JULY 2008 SIMULATOR OPERATOR INSTRUCTIONS USE IC-79