ML092180124: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:JOB PERFORMANCE MEASURE TASK CONDITIONS: | {{#Wiki_filter:Examinees Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. | : 1. | ||
: 2. | You are an extra NLO. | ||
: 3. | : 2. | ||
: 4. | Both Units are at 100% power. | ||
: 5. | : 3. | ||
Maintenance has recently been performed on 2PR09J CC HX Outlet Radiation Monitor. | |||
: 4. | |||
An attempt was made to start 2PR09J from the Control Room and failed. | |||
: 5. | |||
Further discussion/investigation determined that there might be a problem with the alignment of the monitor. | |||
INITIATING CUES: | INITIATING CUES: | ||
The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Base as correct for 2PR09J. | The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Base as correct for 2PR09J. | ||
JOB PERFORMANCE MEASURE TASK CONDITIONS: | Examinees Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 2. | : 2. | ||
: 2. | You are an extra NLO. | ||
: 6. | : 2. | ||
: 7. | Both Units are at 100% power. | ||
: 8. | : 6. | ||
Maintenance has recently been performed on 2PR09J CC HX Outlet Radiation Monitor. | |||
: 7. | |||
An attempt was made to start 2PR09J from the Control Room and failed. | |||
: 8. | |||
Further discussion/investigation determined that there might be a problem with the alignment of the monitor. | |||
INITIATING CUES: | INITIATING CUES: | ||
The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Base as correct for 2PR09J. | The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Base as correct for 2PR09J. | ||
JOB PERFORMANCE MEASURE | Page 3 of 6 JOB PERFORMANCE MEASURE Rev. 1, 6/01/2006 TASK TITLE: | ||
TPO No: 4C.AR-03 | Perform Local Start of CC HX Outlet Radiation Monitor (2PR09J) | ||
The Examinee: | JPM No.: N-116 TPO No: 4C.AR-03 K&A No.: (A) 2.1.30 K&A IMP: 3.9 EXAMINEE:_______________________________ | ||
FAILED __________ | DATE: ___/___/___ | ||
EVALUATION METHOD: | The Examinee: | ||
LOCATION: | PASSED_________ this JPM TIME STARTED: ________ | ||
FAILED __________ | |||
TIME FINISHED: ________ | |||
EVALUATION METHOD: | |||
PERFORM______ | |||
SIMULATE_______ | |||
LOCATION: | |||
IN PLANT __x___ | |||
MATERIALS: | MATERIALS: | ||
: 1. Copy of BOP AR/PR-1. | : 1. Copy of BOP AR/PR-1. | ||
| Line 46: | Line 61: | ||
==REFERENCES:== | ==REFERENCES:== | ||
: 1. | : 1. | ||
BOP AR/PR-1, Rev. 14, Startup of Skid Mounted Process Radiation Monitors. | |||
TASK STANDARDS: | TASK STANDARDS: | ||
: 1. | : 1. | ||
: 2. | Locally startup 2PR09J per BOP AR/PR-1. | ||
: 2. | |||
Demonstrates the use of good Core Work Practices (CWP). | |||
TASK CONDITIONS: | TASK CONDITIONS: | ||
: 1. | : 1. | ||
: 2. | You are an extra NLO. | ||
: 3. | : 2. | ||
: 4. | Both Units are at 100% power. | ||
: 5. | : 3. | ||
Maintenance has recently been performed on 2PR09J CC HX Outlet Radiation Monitor. | |||
: 4. | |||
An attempt was made to start 2PR09J from the Control Room and failed. | |||
: 5. | |||
Further discussion/investigation determined that there might be a problem with the alignment of the monitor. | |||
INITIATING CUES: | INITIATING CUES: | ||
The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Base as correct for 2PR09J. | The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Base as correct for 2PR09J. | ||
CRITICAL ELEMENTS: (*) 3 & 5 APPROXIMATE COMPLETION TIME: 15 minutes | CRITICAL ELEMENTS: (*) 3 & 5 APPROXIMATE COMPLETION TIME: 15 minutes | ||
PERFORMANCE CHECKLIST | PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 4 of 6 RECORD START TIME ______ | ||
: 1. Refer to BOP AR/PR-1 and | : 1. Refer to BOP AR/PR-1 and determine step F.3.a is the appropriate step for startup of 2PR09J. | ||
NOTE: Step 1 may be performed at any time. | NOTE: Step 1 may be performed at any time. | ||
Cue: (if asked) The M line-ups are complete. | Cue: (if asked) The M line-ups are complete. | ||
: 2. Verify the Hand/Off/Auto switch is | ° Locate and Open, BOP AR/PR-1 and determine step F.3.a is the appropriate step. | ||
in the Off position. | R R | ||
R | |||
*3. Place the local main power disconnect switch in the ON | : 2. | ||
position. | Verify the Hand/Off/Auto switch is in the Off position. | ||
Cue: Hand/Off/Auto switch is in the OFF position. | |||
Cue: (after the disconnect is on) | At _2PR09J: | ||
Disconnect switch is in the UP position | ° VERIFY/PLACE the HAND/OFF/AUTO switch in the OFF position. | ||
: 4. Check the status of the circuits inside the RM-80 cabinets. | R R | ||
R | |||
Cue: The Red NO GO LED is off | *3. | ||
Cue: The Red LOSS OF COUNTS LED is off. | Place the local main power disconnect switch in the ON position. | ||
Cue: Disconnect switch is in the DOWN position Cue: (after the disconnect is on) | |||
Disconnect switch is in the UP position At 2PR09J: | |||
PLACE the LOCAL MAIN POWER DISCONNECT Switch in the ON position. | |||
R R | |||
R | |||
: 4. Check the status of the circuits inside the RM-80 cabinets. | |||
Cue: The Green GO LED is flashing. | |||
Cue: The Red NO GO LED is off. | |||
Cue: The Red LOSS OF COUNTS LED is off. | |||
At 2PR09J, Inside the RM-80 cabinet: | |||
° GREEN GO LED is FLASHING. | |||
° RED NO GO LED is OFF. | |||
° RED LOSS OF COUNTS LED is OFF. | |||
R R | |||
R | |||
PERFORMANCE CHECKLIST | PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 5 of 6 | ||
*5. Place the sample pump control switch in the Auto position. | *5. | ||
* VERIFY/PLACE the | Place the sample pump control switch in the Auto position. | ||
Cue: HAND/OFF/AUTO switch for the sample pump is in AUTO position. | |||
: 6. | At 2PR09J: | ||
Note: | * VERIFY/PLACE the HAND/OFF/AUTO switch for the Sample Pump in the AUTO position. | ||
R R | |||
Cue: (if the skid is running) | R | ||
: 6. | |||
Check if Sample Pump is running. | |||
Note: If the Sample pump is running use actual indications on the PR skid. | |||
Cue: (if the skid is running) | |||
Indications are as you see them at the skid. | |||
Cue: (if the skid is NOT running) The GREEN light above the switch is lit and there is ~5 gpm flow indicated. | Cue: (if the skid is NOT running) The GREEN light above the switch is lit and there is ~5 gpm flow indicated. | ||
Cue: (If asked) U-2 NSO, report flow light is lit on 2PR09J. | Cue: (If asked) U-2 NSO, report flow light is lit on 2PR09J. | ||
: 7. Check instrument available light is on at the RM-80 door. | At 2PR09J: | ||
° Check if the sample pump is running | |||
: 8. | ° Determines step F.3.a.6) is not required R | ||
R R | |||
: 7. Check instrument available light is on at the RM-80 door. | |||
Cue: Instrument available light is lit. | |||
At 2PR09J, On the door of the RM-80: | |||
° Check the INSTRUMENT AVAILABLE light is ON R | |||
R R | |||
: 8. | |||
Check that the monitor status is normal operating condition. | |||
Cue: As U-2 NSO, report that the 2PR09J is operating properly. | |||
° CHECK that the Monitor Status is NORMAL OPERATING CONDITION R | |||
R R | |||
PERFORMANCE CHECKLIST | PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 6 of 6 | ||
: 9. Complete the Electrical lineup per BOP AR/PR-E_. | : 9. Complete the Electrical lineup per BOP AR/PR-E_. | ||
Cue: Electrical lineup is being completed by another operator. | |||
Cue: (if required) This JPM is completed | |||
COMMENTS: | ° Compelte the electrical line up per BOP AR/PR-E4/E5/E6. | ||
R R | |||
R RECORD STOP TIME_________ | |||
COMMENTS: | |||
JOB PERFORMANCE MEASURE TASK CONDITIONS: | Examinees Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. You are the Unit 1 NLO. | : 1. | ||
: 2. Unit 1 has experienced a large break LOCA. | You are the Unit 1 NLO. | ||
: 3. Unit 1 containment hydrogen concentration is 3.0%. | : 2. | ||
: 4. Unit 1 containment temperature is 220°F and pressure is 21 psia. | Unit 1 has experienced a large break LOCA. | ||
: 3. | |||
Unit 1 containment hydrogen concentration is 3.0%. | |||
: 4. | |||
Unit 1 containment temperature is 220°F and pressure is 21 psia. | |||
INITIATING CUES: | INITIATING CUES: | ||
: 1. The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner. | : 1. The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner. | ||
: 2. Unit 2 NLO is standing by to assist as required. | : 2. Unit 2 NLO is standing by to assist as required. | ||
JOB PERFORMANCE MEASURE TASK CONDITIONS: | Page 2 of 7 JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. You are the Unit 1 NLO. | : 1. | ||
: 2. Unit 1 has experienced a large break LOCA. | You are the Unit 1 NLO. | ||
: 3. Unit 1 containment hydrogen concentration is 3.0%. | : 2. | ||
: 4. Unit 1 containment temperature is 220°F and pressure is 21 psia. | Unit 1 has experienced a large break LOCA. | ||
: 3. | |||
Unit 1 containment hydrogen concentration is 3.0%. | |||
: 4. | |||
Unit 1 containment temperature is 220°F and pressure is 21 psia. | |||
INITIATING CUES: | INITIATING CUES: | ||
: 1. The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner. | : 1. | ||
: 2. Unit 2 NLO is standing by to assist as required. | The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner. | ||
: 2. | |||
Unit 2 NLO is standing by to assist as required. | |||
JOB PERFORMANCE MEASURE | Page 3 of 7 JOB PERFORMANCE MEASURE Rev. 3, 4/28/2006 TASK TITLE: | ||
The Examinee: | Startup of a Hydrogen Recombiner JPM No.: In-Plant JPM j TPO No: 4D.EP-03 K&A No.: 028A4.01 K&A IMP. 4.0/4.0 EXAMINEE: _______________________________ | ||
FAILED __________ | DATE: ___/___/___ | ||
EVALUATION METHOD: | The Examinee: | ||
LOCATION: | PASSED_________ this JPM TIME STARTED: ________ | ||
FAILED __________ | |||
TIME FINISHED: ________ | |||
EVALUATION METHOD: | |||
PERFORM______ | |||
SIMULATE_______ | |||
LOCATION: | |||
IN PLANT ____X____ | |||
MATERIALS: | MATERIALS: | ||
: 1. Key #491 for the hydrogen recombiner. | : 1. | ||
: 2. Copy of BOP OG-10. | Key #491 for the hydrogen recombiner. | ||
: 3. Picture of Recombiner control panels (if required) | : 2. | ||
Copy of BOP OG-10. | |||
: 3. | |||
Picture of Recombiner control panels (if required) | |||
GENERAL | GENERAL | ||
==REFERENCES:== | ==REFERENCES:== | ||
BOP OG-10, Startup of a Hydrogen Recombiner (Rev. 8) | BOP OG-10, Startup of a Hydrogen Recombiner (Rev. 8) | ||
TASK STANDARDS: | TASK STANDARDS: | ||
Perform the required operator actions of BOP OG-10, Startup of a Hydrogen Recombiner. | Perform the required operator actions of BOP OG-10, Startup of a Hydrogen Recombiner. | ||
TASK CONDITIONS: | TASK CONDITIONS: | ||
: 1. You are the Unit 1 NLO. | : 1. | ||
: 2. Unit 1 has experienced a large break LOCA. | You are the Unit 1 NLO. | ||
: 3. Unit 1 containment hydrogen concentration is 3.0%. | : 2. | ||
: 4. Unit 1 containment temperature is 220°F and pressure is 21 psia. | Unit 1 has experienced a large break LOCA. | ||
: 3. | |||
Unit 1 containment hydrogen concentration is 3.0%. | |||
: 4. | |||
Unit 1 containment temperature is 220°F and pressure is 21 psia. | |||
INITIATING CUES: | INITIATING CUES: | ||
: 1. The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner. | : 1. The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner. | ||
: 2. Unit 2 NLO is standing by to assist as required. | : 2. Unit 2 NLO is standing by to assist as required. | ||
CRITICAL ELEMENTS: (*) 7, 9, 11, 12, 13, & 15 APPROXIMATE COMPLETION TIME: 15 minutes | CRITICAL ELEMENTS: (*) 7, 9, 11, 12, 13, & 15 APPROXIMATE COMPLETION TIME: 15 minutes | ||
PERFORMANCE CHECKLIST | PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 4 of 7 RECORD START TIME ______ | ||
: 1. Refer to BOP OG-10, Startup of a | : 1. Refer to BOP OG-10, Startup of a Hydrogen Recombiner Note: Step 1 may be performed at any time. | ||
Cue: Prerequisites 1 through 4 are met | Cue: Prerequisites 1 through 4 are met | ||
*2. Obtain key #491 to unlock | ° LOCATE and OPEN BOP OG-10 R | ||
: 3. Locate 0A hydrogen recombiner | R R | ||
*2. Obtain key #491 to unlock the panel door and key #207 to operate the start switch | |||
: 4. Set temperature controls | ° PROCEED to the WEC office and OBTAIN keys for 0OG04J R | ||
Cue: 0TIC-0GO47 is set at 1325 °F | R R | ||
: 3. Locate 0A hydrogen recombiner control cabinet 0OG04J Note: 401 AB, P13 | |||
° LOCATE 0OG04J | |||
° UNLOCK using key #491 R | |||
R R | |||
NOTE For the rest of this JPM, use cues only when plant equipment is not available to provide this information. | |||
: 4. Set temperature controls Cue: 0TIC-0GO47 is set at 1325 °F Cue: 0TSH-0GO45 is set at 1325°F Cue: 0TSH-0GO51 is set at 150°F At 0OG04J, SET: | |||
° 0TIC-0GO47 at 1325 °F | |||
° 0TSH-0GO45 at 1325 °F | |||
° 0TSH-0GO51 at 150 °F R | |||
R R | |||
PERFORMANCE CHECKLIST | PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 5 of 7 | ||
*5. Align breakers | *5. Align breakers Cue: CB-1 is closed Cue: CB-2 is closed Cue: CB-3 is closed Cue: CB-4 is closed Cue: CB-5 is closed At 0OG04J, CLOSE: | ||
Cue: CB-1 is closed | ° CB-1 | ||
*6. Lineup the hydrogen recombiner | ° CB-2 | ||
Cue: HS-1 is in the STOP position | ° CB-3 | ||
° CB-4 | |||
*7. Line up Division 12 powered valves | ° CB-5 R | ||
Cue: Unit 2 Assist NSO reports that | R R | ||
*6. | |||
Lineup the hydrogen recombiner Cue: HS-1 is in the STOP position Cue: KS-1 is set at 2 hours Cue: JS-1 is in AUTO Cue: JS-2 is in AUTO At 0OG04J: | |||
° VERIFY/PLACE HS-1 in STOP | |||
° SET KS-1 to 2 hours VERIFY in AUTO: | |||
° JS-1 | |||
° JS-2 R | |||
R R | |||
*7. Line up Division 12 powered valves Cue: Unit 2 Assist NSO reports that 1OG080 is OPEN Cue: Unit 2 Assist NSO reports that 1OG084 is OPEN Cue: Unit 2 Assist NSO reports that 1OG082 is OPEN Cue: Unit 2 Assist NSO reports that 1OG079 is OPEN DIRECT Unit 2 Assist NSO to OPEN: | |||
1OG080 1OG084 1OG082 1OG079 R | |||
R R | |||
Formatted: Bullets and Numbering | |||
PERFORMANCE CHECKLIST | PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 6 of 7 | ||
: 8. Locate local control panel | : 8. Locate local control panel 0OG09J Note: Unit 2 lower cable spreading room, 439 Q25 | ||
*9. Hydrogen recombiner A discharge valve | ° LOCATE 0OG09J R | ||
Cue: 0OG060 indicates OPEN | R R | ||
*9. Hydrogen recombiner A discharge valve Cue: 0OG060 indicates OPEN At 0OG09J: | |||
: 10. Locate local control panel | VERIFY/OPEN 0OG060 R | ||
*11. Hydrogen recombiner A suction valve | R R | ||
Cue: 0OG059 RED light is LIT | : 10. Locate local control panel 0OG08J Note: 401 AB, P13 | ||
° LOCATE 0OG08J R | |||
*12. Start the hydrogen recombiner | R R | ||
Cue: HS-1 is in the START position | *11. Hydrogen recombiner A suction valve Cue: 0OG059 RED light is LIT At 0OG08J: | ||
VERIFY/OPEN 0OG059 R | |||
*13. Establish flow rate | R R | ||
*12. Start the hydrogen recombiner Cue: HS-1 is in the START position At 0OG04J: | |||
Using key #207, PLACE key-lock switch HS-1 in START R | |||
R R | |||
*13. Establish flow rate Cue: 1FI-0OG041 indicates 80 SCFM THOTTLE 0OG059 to obtain > 70 SCFM as indicated on 1FI-0OG041 R | |||
R R | |||
PERFORMANCE CHECKLIST | PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 7 of 7 | ||
: 14. Locate the hydrogen analyzer | : 14. Locate the hydrogen analyzer 0OG05J Note: 401 AB, P13 | ||
*15. Place hydrogen analyzer in operation | ° LOCATE 0OG05J R | ||
Cue: HS-12 is in the | R R | ||
*15. Place hydrogen analyzer in operation Cue: HS-12 is in the BLOWER OUTLET position Cue: CB-1 is in the ON position Cue: HS-10 is in the OPERATE position Cue: This JPM is completed At 0OG05J PLACE: | |||
HS-12 in BLOWER OUTLET CB-1 in ON HS-10 in OPERATE R | |||
R R | |||
COMMENTS: | RECORD STOP TIME_________ | ||
COMMENTS: | |||
JOB PERFORMANCE MEASURE TASK CONDITIONS: | Examinees Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. You are a Non-Licensed Operator. | : 1. | ||
: 2. The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel. | You are a Non-Licensed Operator. | ||
: 3. The 2A AF pump is OOS for maintenance and the 2B AF pump did not automatically start, and will not manually start with the MCR switch. | : 2. | ||
The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel. | |||
: 3. | |||
The 2A AF pump is OOS for maintenance and the 2B AF pump did not automatically start, and will not manually start with the MCR switch. | |||
INITIATING CUES: | INITIATING CUES: | ||
The Shift Manager has just directed you to initiate a local emergency start of the 2B AF pump using 2BOA ELEC-5, Attachment D. | The Shift Manager has just directed you to initiate a local emergency start of the 2B AF pump using 2BOA ELEC-5, Attachment D. | ||
JOB PERFORMANCE MEASURE TASK CONDITIONS: | Page 2 of 6 JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 2. You are a Non-Licensed Operator. | : 2. | ||
: 2. The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel. | You are a Non-Licensed Operator. | ||
: 3. The 2A AF pump is OOS for maintenance and the 2B AF pump did not automatically start, and will not manually start with the MCR switch. | : 2. | ||
The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel. | |||
: 3. | |||
The 2A AF pump is OOS for maintenance and the 2B AF pump did not automatically start, and will not manually start with the MCR switch. | |||
INITIATING CUES: | INITIATING CUES: | ||
The Shift Manager has just directed you to initiate a local emergency start of the 2B AF pump using 2BOA ELEC-5, Attachment D. | The Shift Manager has just directed you to initiate a local emergency start of the 2B AF pump using 2BOA ELEC-5, Attachment D. | ||
JOB PERFORMANCE MEASURE | Page 3 of 5 JOB PERFORMANCE MEASURE Rev. 4, 5/19/2006 TASK TITLE: | ||
The Examinee: | Local Emergency Start of 2B AFW Pump (364) | ||
FAILED __________ | JPM No.: N-56a TPO No: 4D.OA-35 K&A No.: 2.1.30 K&A IMP. 3.9 / 3.4 EXAMINEE: _______________________________ | ||
EVALUATION METHOD: | DATE: ___/___/___ | ||
LOCATION: | The Examinee: | ||
PASSED_________ this JPM TIME STARTED: ________ | |||
FAILED __________ | |||
TIME FINISHED: ________ | |||
EVALUATION METHOD: | |||
PERFORM______ | |||
SIMULATE_______ | |||
LOCATION: | |||
IN PLANT___X___ | |||
MATERIALS: | MATERIALS: | ||
Copy of 2BOA ELEC-5, Attachment D, AF Pump GENERAL | Copy of 2BOA ELEC-5, Attachment D, AF Pump GENERAL | ||
==REFERENCES:== | ==REFERENCES:== | ||
: 1. 2BOA ELEC-5, Local Emergency Control Of Safe Shutdown Equipment (Rev. | : 1. | ||
2BOA ELEC-5, Local Emergency Control Of Safe Shutdown Equipment (Rev. | |||
100) | 100) | ||
: 2. 2BOA ELEC-5, Attachment D, Diesel Driven Auxiliary Feedwater Pump Local Start. (Rev. 100) | : 2. | ||
2BOA ELEC-5, Attachment D, Diesel Driven Auxiliary Feedwater Pump Local Start. (Rev. 100) | |||
TASK STANDARDS: | TASK STANDARDS: | ||
Correctly perform the actions required for 2B AF Pump Local Emergency Start. | Correctly perform the actions required for 2B AF Pump Local Emergency Start. | ||
TASK CONDITIONS: | TASK CONDITIONS: | ||
: 1. You are a Non-Licensed Operator. | : 1. | ||
: 2. The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel. | You are a Non-Licensed Operator. | ||
: 3. The 2A AF pump is OOS for maintenance and the 2B AF pump did not automatically start, and will not manually start with the MCR switch. | : 2. | ||
The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel. | |||
: 3. | |||
The 2A AF pump is OOS for maintenance and the 2B AF pump did not automatically start, and will not manually start with the MCR switch. | |||
INITIATING CUES: | INITIATING CUES: | ||
The Shift Manager has just directed you to initiate a local emergency start of the 2B AF pump using BOA ELEC-5, Attachment D. | The Shift Manager has just directed you to initiate a local emergency start of the 2B AF pump using BOA ELEC-5, Attachment D. | ||
CRITICAL ELEMENTS: (*) 9 & 10 APPROXIMATE COMPLETION TIME: 10 minutes | CRITICAL ELEMENTS: (*) 9 & 10 APPROXIMATE COMPLETION TIME: 10 minutes | ||
PERFORMANCE CHECKLIST | PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 4 of 6 RECORD START TIME ________ | ||
: 1. Locate the 2B AF pump. | : 1. | ||
Note: Provide the Candidate with a | Locate the 2B AF pump. | ||
copy of 2BOA ELEC-5, Attachment D. | Note: Provide the Candidate with a copy of 2BOA ELEC-5, Attachment D. | ||
NOTE JPM steps 2 and 3 may be performed in any order | On 383 Aux Bldg: | ||
: 2. Verify/Start associated Aux Lube Oil Pump. | LOCATE 2B AF pump. | ||
Cue: Aux Lube Oil Pump CS is in | R R | ||
: 3. Verify/Start Gearbox Lube Oil Pump. | R NOTE JPM steps 2 and 3 may be performed in any order | ||
Cue: Gearbox Lube Oil Pump CS is | : 2. | ||
: 4. Place ENGINE START Switch to | Verify/Start associated Aux Lube Oil Pump. | ||
MAN. | Cue: Aux Lube Oil Pump CS is in the START position. | ||
Cue: ENGINE START Switch is in | VERIFY/START 2B Aux Lube Oil Pump. | ||
: 5. Check Air Box Tripped | R R | ||
annunciator NOT LIT. | R | ||
: 3. | |||
Verify/Start Gearbox Lube Oil Pump. | |||
Cue: Gearbox Lube Oil Pump CS is in the START position. | |||
VERIFY/START Gearbox Lube Oil Pump. | |||
R R | |||
R | |||
: 4. | |||
Place ENGINE START Switch to MAN. | |||
Cue: ENGINE START Switch is in MAN. | |||
At 2AF01J: | |||
PLACE ENGINE START Switch to MAN. | |||
R R | |||
R | |||
: 5. | |||
Check Air Box Tripped annunciator NOT LIT. | |||
Cue: Air Box Trip Annunciator is NOT LIT. | |||
At 2AF01J: | |||
CHECK Diesel Air Box Trip reset. | |||
R R | |||
R | |||
PERFORMANCE CHECKLIST | PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 5 of 6 | ||
: 6. Momentarily depress the RESET | : 6. | ||
button. | Momentarily depress the RESET button. | ||
Cue: The RESET button was depressed and released. | |||
NOTE Alternate path initiated in the following step. | At 2AF01J: | ||
: 7. Depress the 2B AF Pump START | DEPRESS and RELEASE the Reset button. | ||
R R | |||
R NOTE Alternate path initiated in the following step. | |||
: 7. Depress the 2B AF Pump START pushbutton. | |||
Cue: The engine does NOT crank. | |||
At 2AF01J: | |||
DEPRESS the Start button. | DEPRESS the Start button. | ||
VERIFY the engine starts. | VERIFY the engine starts. | ||
R R | |||
R | |||
: 8. Try to start the 2B AF pump with the other battery bank. | : 8. Try to start the 2B AF pump with the other battery bank. | ||
Cue: The other battery bank is | Cue: The other battery bank is selected (A or B depending on current selection) | ||
NOTE: Located on 2AF01J Cue: The Reset pushbutton has | NOTE: Located on 2AF01J Cue: The Reset pushbutton has been depressed and released. | ||
Cue: The Engine does NOT start. | Cue: The Engine does NOT start. | ||
*9. Place Engine Start switch to | SELECT other battery bank DEPRESS and RELEASE the Reset button. | ||
AUTO. | DEPRESS the Start button. | ||
Cue: Engine Start switch is in | R R | ||
R | |||
*9. Place Engine Start switch to AUTO. | |||
Cue: Engine Start switch is in AUTO. | |||
At 2AF01J: | |||
PLACE Engine Start switch to AUTO. | |||
R R | |||
R | |||
PERFORMANCE CHECKLIST | PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 6 of 6 | ||
*10. Start the 2B AF pump at Emergency Control panel 2AF03J. | *10. Start the 2B AF pump at Emergency Control panel 2AF03J. | ||
NOTE: U2 - 364 M18, by the U0 CC | NOTE: U2 - 364 M18, by the U0 CC pump Cue: The Remote Emergency Start switch is in START Cue: The Run light is LIT LOCATE panel 2AF03J PLACE Remote Emergency Start switch in START VERIFY Run light LIT R | ||
R R | |||
: 11. Monitor 2B AF pump operation. | : 11. Monitor 2B AF pump operation. | ||
Cue: AF-7T1 will be completed by | Cue: AF-7T1 will be completed by another NLO who will monitor the pump. | ||
PERFORM BOP AF-7T1 R | |||
R R | |||
Cue: This JPM is complete. | Cue: This JPM is complete. | ||
RECORD STOP TIME ________ | RECORD STOP TIME ________ | ||
COMMENTS: | COMMENTS:}} | ||
Latest revision as of 10:12, 14 January 2025
| ML092180124 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 05/19/2008 |
| From: | NRC/RGN-III/DNMS/MLB |
| To: | Exelon Generation Co, Exelon Nuclear |
| References | |
| Download: ML092180124 (19) | |
Text
Examinees Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1.
You are an extra NLO.
- 2.
Both Units are at 100% power.
- 3.
Maintenance has recently been performed on 2PR09J CC HX Outlet Radiation Monitor.
- 4.
An attempt was made to start 2PR09J from the Control Room and failed.
- 5.
Further discussion/investigation determined that there might be a problem with the alignment of the monitor.
INITIATING CUES:
The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Base as correct for 2PR09J.
Examinees Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 2.
You are an extra NLO.
- 2.
Both Units are at 100% power.
- 6.
Maintenance has recently been performed on 2PR09J CC HX Outlet Radiation Monitor.
- 7.
An attempt was made to start 2PR09J from the Control Room and failed.
- 8.
Further discussion/investigation determined that there might be a problem with the alignment of the monitor.
INITIATING CUES:
The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Base as correct for 2PR09J.
Page 3 of 6 JOB PERFORMANCE MEASURE Rev. 1, 6/01/2006 TASK TITLE:
Perform Local Start of CC HX Outlet Radiation Monitor (2PR09J)
JPM No.: N-116 TPO No: 4C.AR-03 K&A No.: (A) 2.1.30 K&A IMP: 3.9 EXAMINEE:_______________________________
DATE: ___/___/___
The Examinee:
PASSED_________ this JPM TIME STARTED: ________
FAILED __________
TIME FINISHED: ________
EVALUATION METHOD:
PERFORM______
SIMULATE_______
LOCATION:
IN PLANT __x___
MATERIALS:
- 1. Copy of BOP AR/PR-1.
- 2. Key CAT60 or a picture of the RM-80 Motherboard GENERAL
REFERENCES:
- 1.
BOP AR/PR-1, Rev. 14, Startup of Skid Mounted Process Radiation Monitors.
TASK STANDARDS:
- 1.
Locally startup 2PR09J per BOP AR/PR-1.
- 2.
Demonstrates the use of good Core Work Practices (CWP).
TASK CONDITIONS:
- 1.
You are an extra NLO.
- 2.
Both Units are at 100% power.
- 3.
Maintenance has recently been performed on 2PR09J CC HX Outlet Radiation Monitor.
- 4.
An attempt was made to start 2PR09J from the Control Room and failed.
- 5.
Further discussion/investigation determined that there might be a problem with the alignment of the monitor.
INITIATING CUES:
The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Base as correct for 2PR09J.
CRITICAL ELEMENTS: (*) 3 & 5 APPROXIMATE COMPLETION TIME: 15 minutes
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 4 of 6 RECORD START TIME ______
- 1. Refer to BOP AR/PR-1 and determine step F.3.a is the appropriate step for startup of 2PR09J.
NOTE: Step 1 may be performed at any time.
Cue: (if asked) The M line-ups are complete.
° Locate and Open, BOP AR/PR-1 and determine step F.3.a is the appropriate step.
R R
R
- 2.
Verify the Hand/Off/Auto switch is in the Off position.
Cue: Hand/Off/Auto switch is in the OFF position.
At _2PR09J:
° VERIFY/PLACE the HAND/OFF/AUTO switch in the OFF position.
R R
R
- 3.
Place the local main power disconnect switch in the ON position.
Cue: Disconnect switch is in the DOWN position Cue: (after the disconnect is on)
Disconnect switch is in the UP position At 2PR09J:
PLACE the LOCAL MAIN POWER DISCONNECT Switch in the ON position.
R R
R
- 4. Check the status of the circuits inside the RM-80 cabinets.
Cue: The Green GO LED is flashing.
Cue: The Red NO GO LED is off.
Cue: The Red LOSS OF COUNTS LED is off.
At 2PR09J, Inside the RM-80 cabinet:
° GREEN GO LED is FLASHING.
° RED NO GO LED is OFF.
° RED LOSS OF COUNTS LED is OFF.
R R
R
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 5 of 6
- 5.
Place the sample pump control switch in the Auto position.
Cue: HAND/OFF/AUTO switch for the sample pump is in AUTO position.
At 2PR09J:
- VERIFY/PLACE the HAND/OFF/AUTO switch for the Sample Pump in the AUTO position.
R R
R
- 6.
Check if Sample Pump is running.
Note: If the Sample pump is running use actual indications on the PR skid.
Cue: (if the skid is running)
Indications are as you see them at the skid.
Cue: (if the skid is NOT running) The GREEN light above the switch is lit and there is ~5 gpm flow indicated.
Cue: (If asked) U-2 NSO, report flow light is lit on 2PR09J.
At 2PR09J:
° Check if the sample pump is running
° Determines step F.3.a.6) is not required R
R R
- 7. Check instrument available light is on at the RM-80 door.
Cue: Instrument available light is lit.
At 2PR09J, On the door of the RM-80:
° Check the INSTRUMENT AVAILABLE light is ON R
R R
- 8.
Check that the monitor status is normal operating condition.
Cue: As U-2 NSO, report that the 2PR09J is operating properly.
° CHECK that the Monitor Status is NORMAL OPERATING CONDITION R
R R
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 6 of 6
- 9. Complete the Electrical lineup per BOP AR/PR-E_.
Cue: Electrical lineup is being completed by another operator.
Cue: (if required) This JPM is completed
° Compelte the electrical line up per BOP AR/PR-E4/E5/E6.
R R
R RECORD STOP TIME_________
COMMENTS:
Examinees Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1.
You are the Unit 1 NLO.
- 2.
Unit 1 has experienced a large break LOCA.
- 3.
Unit 1 containment hydrogen concentration is 3.0%.
- 4.
Unit 1 containment temperature is 220°F and pressure is 21 psia.
INITIATING CUES:
- 1. The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner.
- 2. Unit 2 NLO is standing by to assist as required.
Page 2 of 7 JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1.
You are the Unit 1 NLO.
- 2.
Unit 1 has experienced a large break LOCA.
- 3.
Unit 1 containment hydrogen concentration is 3.0%.
- 4.
Unit 1 containment temperature is 220°F and pressure is 21 psia.
INITIATING CUES:
- 1.
The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner.
- 2.
Unit 2 NLO is standing by to assist as required.
Page 3 of 7 JOB PERFORMANCE MEASURE Rev. 3, 4/28/2006 TASK TITLE:
Startup of a Hydrogen Recombiner JPM No.: In-Plant JPM j TPO No: 4D.EP-03 K&A No.: 028A4.01 K&A IMP. 4.0/4.0 EXAMINEE: _______________________________
DATE: ___/___/___
The Examinee:
PASSED_________ this JPM TIME STARTED: ________
FAILED __________
TIME FINISHED: ________
EVALUATION METHOD:
PERFORM______
SIMULATE_______
LOCATION:
IN PLANT ____X____
MATERIALS:
- 1.
Key #491 for the hydrogen recombiner.
- 2.
Copy of BOP OG-10.
- 3.
Picture of Recombiner control panels (if required)
GENERAL
REFERENCES:
BOP OG-10, Startup of a Hydrogen Recombiner (Rev. 8)
TASK STANDARDS:
Perform the required operator actions of BOP OG-10, Startup of a Hydrogen Recombiner.
TASK CONDITIONS:
- 1.
You are the Unit 1 NLO.
- 2.
Unit 1 has experienced a large break LOCA.
- 3.
Unit 1 containment hydrogen concentration is 3.0%.
- 4.
Unit 1 containment temperature is 220°F and pressure is 21 psia.
INITIATING CUES:
- 1. The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner.
- 2. Unit 2 NLO is standing by to assist as required.
CRITICAL ELEMENTS: (*) 7, 9, 11, 12, 13, & 15 APPROXIMATE COMPLETION TIME: 15 minutes
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 4 of 7 RECORD START TIME ______
Cue: Prerequisites 1 through 4 are met
° LOCATE and OPEN BOP OG-10 R
R R
- 2. Obtain key #491 to unlock the panel door and key #207 to operate the start switch
° PROCEED to the WEC office and OBTAIN keys for 0OG04J R
R R
° LOCATE 0OG04J
° UNLOCK using key #491 R
R R
NOTE For the rest of this JPM, use cues only when plant equipment is not available to provide this information.
- 4. Set temperature controls Cue: 0TIC-0GO47 is set at 1325 °F Cue: 0TSH-0GO45 is set at 1325°F Cue: 0TSH-0GO51 is set at 150°F At 0OG04J, SET:
° 0TIC-0GO47 at 1325 °F
° 0TSH-0GO45 at 1325 °F
° 0TSH-0GO51 at 150 °F R
R R
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 5 of 7
- 5. Align breakers Cue: CB-1 is closed Cue: CB-2 is closed Cue: CB-3 is closed Cue: CB-4 is closed Cue: CB-5 is closed At 0OG04J, CLOSE:
° CB-1
° CB-2
° CB-3
° CB-4
° CB-5 R
R R
- 6.
Lineup the hydrogen recombiner Cue: HS-1 is in the STOP position Cue: KS-1 is set at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Cue: JS-1 is in AUTO Cue: JS-2 is in AUTO At 0OG04J:
° VERIFY/PLACE HS-1 in STOP
° SET KS-1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> VERIFY in AUTO:
° JS-1
° JS-2 R
R R
- 7. Line up Division 12 powered valves Cue: Unit 2 Assist NSO reports that 1OG080 is OPEN Cue: Unit 2 Assist NSO reports that 1OG084 is OPEN Cue: Unit 2 Assist NSO reports that 1OG082 is OPEN Cue: Unit 2 Assist NSO reports that 1OG079 is OPEN DIRECT Unit 2 Assist NSO to OPEN:
1OG080 1OG084 1OG082 1OG079 R
R R
Formatted: Bullets and Numbering
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 6 of 7
- 8. Locate local control panel 0OG09J Note: Unit 2 lower cable spreading room, 439 Q25
° LOCATE 0OG09J R
R R
- 9. Hydrogen recombiner A discharge valve Cue: 0OG060 indicates OPEN At 0OG09J:
VERIFY/OPEN 0OG060 R
R R
- 10. Locate local control panel 0OG08J Note: 401 AB, P13
° LOCATE 0OG08J R
R R
- 11. Hydrogen recombiner A suction valve Cue: 0OG059 RED light is LIT At 0OG08J:
VERIFY/OPEN 0OG059 R
R R
- 12. Start the hydrogen recombiner Cue: HS-1 is in the START position At 0OG04J:
Using key #207, PLACE key-lock switch HS-1 in START R
R R
- 13. Establish flow rate Cue: 1FI-0OG041 indicates 80 SCFM THOTTLE 0OG059 to obtain > 70 SCFM as indicated on 1FI-0OG041 R
R R
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 7 of 7
° LOCATE 0OG05J R
R R
- 15. Place hydrogen analyzer in operation Cue: HS-12 is in the BLOWER OUTLET position Cue: CB-1 is in the ON position Cue: HS-10 is in the OPERATE position Cue: This JPM is completed At 0OG05J PLACE:
HS-12 in BLOWER OUTLET CB-1 in ON HS-10 in OPERATE R
R R
RECORD STOP TIME_________
COMMENTS:
Examinees Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1.
You are a Non-Licensed Operator.
- 2.
The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel.
- 3.
The 2A AF pump is OOS for maintenance and the 2B AF pump did not automatically start, and will not manually start with the MCR switch.
INITIATING CUES:
The Shift Manager has just directed you to initiate a local emergency start of the 2B AF pump using 2BOA ELEC-5, Attachment D.
Page 2 of 6 JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 2.
You are a Non-Licensed Operator.
- 2.
The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel.
- 3.
The 2A AF pump is OOS for maintenance and the 2B AF pump did not automatically start, and will not manually start with the MCR switch.
INITIATING CUES:
The Shift Manager has just directed you to initiate a local emergency start of the 2B AF pump using 2BOA ELEC-5, Attachment D.
Page 3 of 5 JOB PERFORMANCE MEASURE Rev. 4, 5/19/2006 TASK TITLE:
Local Emergency Start of 2B AFW Pump (364)
JPM No.: N-56a TPO No: 4D.OA-35 K&A No.: 2.1.30 K&A IMP. 3.9 / 3.4 EXAMINEE: _______________________________
DATE: ___/___/___
The Examinee:
PASSED_________ this JPM TIME STARTED: ________
FAILED __________
TIME FINISHED: ________
EVALUATION METHOD:
PERFORM______
SIMULATE_______
LOCATION:
IN PLANT___X___
MATERIALS:
Copy of 2BOA ELEC-5, Attachment D, AF Pump GENERAL
REFERENCES:
- 1.
2BOA ELEC-5, Local Emergency Control Of Safe Shutdown Equipment (Rev.
100)
- 2.
2BOA ELEC-5, Attachment D, Diesel Driven Auxiliary Feedwater Pump Local Start. (Rev. 100)
TASK STANDARDS:
Correctly perform the actions required for 2B AF Pump Local Emergency Start.
TASK CONDITIONS:
- 1.
You are a Non-Licensed Operator.
- 2.
The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel.
- 3.
The 2A AF pump is OOS for maintenance and the 2B AF pump did not automatically start, and will not manually start with the MCR switch.
INITIATING CUES:
The Shift Manager has just directed you to initiate a local emergency start of the 2B AF pump using BOA ELEC-5, Attachment D.
CRITICAL ELEMENTS: (*) 9 & 10 APPROXIMATE COMPLETION TIME: 10 minutes
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 4 of 6 RECORD START TIME ________
- 1.
Locate the 2B AF pump.
Note: Provide the Candidate with a copy of 2BOA ELEC-5, Attachment D.
On 383 Aux Bldg:
LOCATE 2B AF pump.
R R
R NOTE JPM steps 2 and 3 may be performed in any order
- 2.
Verify/Start associated Aux Lube Oil Pump.
Cue: Aux Lube Oil Pump CS is in the START position.
VERIFY/START 2B Aux Lube Oil Pump.
R R
R
- 3.
Verify/Start Gearbox Lube Oil Pump.
Cue: Gearbox Lube Oil Pump CS is in the START position.
VERIFY/START Gearbox Lube Oil Pump.
R R
R
- 4.
Place ENGINE START Switch to MAN.
Cue: ENGINE START Switch is in MAN.
At 2AF01J:
PLACE ENGINE START Switch to MAN.
R R
R
- 5.
Check Air Box Tripped annunciator NOT LIT.
Cue: Air Box Trip Annunciator is NOT LIT.
At 2AF01J:
CHECK Diesel Air Box Trip reset.
R R
R
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 5 of 6
- 6.
Momentarily depress the RESET button.
Cue: The RESET button was depressed and released.
At 2AF01J:
DEPRESS and RELEASE the Reset button.
R R
R NOTE Alternate path initiated in the following step.
- 7. Depress the 2B AF Pump START pushbutton.
Cue: The engine does NOT crank.
At 2AF01J:
DEPRESS the Start button.
VERIFY the engine starts.
R R
R
- 8. Try to start the 2B AF pump with the other battery bank.
Cue: The other battery bank is selected (A or B depending on current selection)
NOTE: Located on 2AF01J Cue: The Reset pushbutton has been depressed and released.
Cue: The Engine does NOT start.
SELECT other battery bank DEPRESS and RELEASE the Reset button.
DEPRESS the Start button.
R R
R
- 9. Place Engine Start switch to AUTO.
Cue: Engine Start switch is in AUTO.
At 2AF01J:
PLACE Engine Start switch to AUTO.
R R
R
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 6 of 6
- 10. Start the 2B AF pump at Emergency Control panel 2AF03J.
NOTE: U2 - 364 M18, by the U0 CC pump Cue: The Remote Emergency Start switch is in START Cue: The Run light is LIT LOCATE panel 2AF03J PLACE Remote Emergency Start switch in START VERIFY Run light LIT R
R R
- 11. Monitor 2B AF pump operation.
Cue: AF-7T1 will be completed by another NLO who will monitor the pump.
PERFORM BOP AF-7T1 R
R R
Cue: This JPM is complete.
RECORD STOP TIME ________
COMMENTS: