ML100620892: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Page 1 of 2 | {{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 03/03/2010 07:10:38 Report 22 03/01/2010 - 06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Vogtle OL EXAM | ||
- INITIAL EXAM WEEK 4 | |||
PI&R | 1 VOGTLE/FEBRUARY 2010 EXAM AT POWER FACILITIES V23358 02/22/2010 03/05/2010 PSB1-RP | ||
This report shows only on-site and announced inspection procedures. | - RP OCCUPATIONAL BASELINE WEEK1 2 | ||
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/08/2010 03/12/2010 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/08/2010 03/12/2010 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/08/2010 03/12/2010 1, 2 IP Occupational Dose Assessment 71124.04 03/08/2010 03/12/2010 1, 2 IP Performance Indicator Verification 71151 03/08/2010 03/12/2010 EB3ISI | |||
- UNIT 2 INSERVICE INSPECTION 2 | |||
2 IP Inservice Inspection Activities - PWR 7111108P 03/15/2010 03/19/2010 EB3TI172 | |||
- TI-172 RCS DM BUTT WELDS 2 | |||
2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 03/15/2010 03/19/2010 EB3SGISI | |||
- UNIT 2 SGISI 1 | |||
2 IP Inservice Inspection Activities - PWR 7111108P 03/22/2010 03/26/2010 PSB1-RP | |||
- RP OCCUPATIONAL BASELINE WEEK 2 2 | |||
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/22/2010 03/26/2010 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/22/2010 03/26/2010 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/22/2010 03/26/2010 1, 2 IP Occupational Dose Assessment 71124.04 03/22/2010 03/26/2010 1, 2 IP Performance Indicator Verification 71151 03/22/2010 03/26/2010 PSB1EP | |||
- EMERGENCY PREPAREDNESS EXERCISE 3 | |||
1, 2 IP Exercise Evaluation 7111401 05/17/2010 05/21/2010 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 05/17/2010 05/21/2010 1, 2 IP Performance Indicator Verification 71151 05/17/2010 05/21/2010 EB1-CDBI | |||
- COMPONENT DESIGN BASES INSPECTION 7 | |||
1, 2 IP Component Design Bases Inspection 7111121 05/31/2010 06/04/2010 1, 2 IP Component Design Bases Inspection 7111121 06/14/2010 06/18/2010 1, 2 IP Component Design Bases Inspection 7111121 06/28/2010 07/02/2010 1, 2 IP Component Design Bases Inspection 7111121 07/12/2010 07/16/2010 FP | |||
- TFPI 6 | |||
1, 2 IP Fire Protection [Triennial] | |||
7111105T 08/02/2010 08/06/2010 1, 2 IP Fire Protection [Triennial] | |||
7111105T 08/16/2010 08/20/2010 PI&R | |||
- PROBLEM IDENTIFICATION AND RESOLUTION 4 | |||
1, 2 IP Identification and Resolution of Problems 71152B 02/07/2011 02/11/2011 1, 2 IP Identification and Resolution of Problems 71152B 02/21/2011 02/25/2011 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Enclosure | |||
Page 2 of 2 | Inspection / Activity Plan Page 2 of 2 03/03/2010 07:10:38 Report 22 03/01/2010 - 06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Vogtle OL EXAM | ||
This report shows only on-site and announced inspection procedures. | - INIITIAL EXAM PREP 2 | ||
1 VOGTLE/MARCH 2011 EXAM AT POWER FACILITIES V23347 02/14/2011 02/18/2011 OL EXAM | |||
- INITIAL EXAM - WEEK 1 3 | |||
1 VOGTLE/MARCH 2011 EXAM AT POWER FACILITIES V23347 03/14/2011 03/18/2011 OL EXAM | |||
- INITIAL EXAM - WEEK 2 3 | |||
1 VOGTLE/MARCH 2011 EXAM AT POWER FACILITIES V23347 03/21/2011 04/01/2011 EB3ISI | |||
- UNIT 1 INSERVICE INSPECTION 1 | |||
1 IP Inservice Inspection Activities - PWR 7111108P 03/28/2011 04/01/2011 PSB1-RP | |||
- RP RADIOLOGICAL HAZARD ASSESSMENT 1 | |||
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/04/2011 04/08/2011 PSB1EP | |||
- EMERGENCY PREPAREDNESS INSPECTION 1 | |||
1, 2 IP Alert and Notification System Evaluation 7111402 04/04/2011 04/08/2011 1, 2 IP Emergency Response Organization Augmentation Testing 7111403 04/04/2011 04/08/2011 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 04/04/2011 04/08/2011 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 04/04/2011 04/08/2011 1, 2 IP Drill/Exercise Performance 71151-EP01 04/04/2011 04/08/2011 1, 2 IP ERO Drill Participation 71151-EP02 04/04/2011 04/08/2011 1, 2 IP Alert & Notification System 71151-EP03 04/04/2011 04/08/2011 MODS | |||
- MODIFICATION/50.59 INSPECTION 3 | |||
1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 05/23/2011 05/27/2011 1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 06/06/2011 06/10/2011 EB3HS | |||
- HEAT SINK 1 | |||
1, 2 IP Heat Sink Performance 7111107T 06/27/2011 07/01/2011 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Enclosure}} | |||
Latest revision as of 06:19, 14 January 2025
| ML100620892 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/03/2010 |
| From: | Division Reactor Projects II |
| To: | Southern Nuclear Operating Co |
| Shared Package | |
| ML100620889 | List: |
| References | |
| IR-10-001 | |
| Download: ML100620892 (2) | |
Text
Inspection / Activity Plan Page 1 of 2 03/03/2010 07:10:38 Report 22 03/01/2010 - 06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Vogtle OL EXAM
- INITIAL EXAM WEEK 4
1 VOGTLE/FEBRUARY 2010 EXAM AT POWER FACILITIES V23358 02/22/2010 03/05/2010 PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK1 2
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/08/2010 03/12/2010 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/08/2010 03/12/2010 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/08/2010 03/12/2010 1, 2 IP Occupational Dose Assessment 71124.04 03/08/2010 03/12/2010 1, 2 IP Performance Indicator Verification 71151 03/08/2010 03/12/2010 EB3ISI
- UNIT 2 INSERVICE INSPECTION 2
2 IP Inservice Inspection Activities - PWR 7111108P 03/15/2010 03/19/2010 EB3TI172
2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 03/15/2010 03/19/2010 EB3SGISI
- UNIT 2 SGISI 1
2 IP Inservice Inspection Activities - PWR 7111108P 03/22/2010 03/26/2010 PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK 2 2
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/22/2010 03/26/2010 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/22/2010 03/26/2010 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/22/2010 03/26/2010 1, 2 IP Occupational Dose Assessment 71124.04 03/22/2010 03/26/2010 1, 2 IP Performance Indicator Verification 71151 03/22/2010 03/26/2010 PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE 3
1, 2 IP Exercise Evaluation 7111401 05/17/2010 05/21/2010 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 05/17/2010 05/21/2010 1, 2 IP Performance Indicator Verification 71151 05/17/2010 05/21/2010 EB1-CDBI
- COMPONENT DESIGN BASES INSPECTION 7
1, 2 IP Component Design Bases Inspection 7111121 05/31/2010 06/04/2010 1, 2 IP Component Design Bases Inspection 7111121 06/14/2010 06/18/2010 1, 2 IP Component Design Bases Inspection 7111121 06/28/2010 07/02/2010 1, 2 IP Component Design Bases Inspection 7111121 07/12/2010 07/16/2010 FP
- TFPI 6
1, 2 IP Fire Protection [Triennial]
7111105T 08/02/2010 08/06/2010 1, 2 IP Fire Protection [Triennial]
7111105T 08/16/2010 08/20/2010 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 4
1, 2 IP Identification and Resolution of Problems 71152B 02/07/2011 02/11/2011 1, 2 IP Identification and Resolution of Problems 71152B 02/21/2011 02/25/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 2 of 2 03/03/2010 07:10:38 Report 22 03/01/2010 - 06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Vogtle OL EXAM
- INIITIAL EXAM PREP 2
1 VOGTLE/MARCH 2011 EXAM AT POWER FACILITIES V23347 02/14/2011 02/18/2011 OL EXAM
- INITIAL EXAM - WEEK 1 3
1 VOGTLE/MARCH 2011 EXAM AT POWER FACILITIES V23347 03/14/2011 03/18/2011 OL EXAM
- INITIAL EXAM - WEEK 2 3
1 VOGTLE/MARCH 2011 EXAM AT POWER FACILITIES V23347 03/21/2011 04/01/2011 EB3ISI
- UNIT 1 INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 03/28/2011 04/01/2011 PSB1-RP
- RP RADIOLOGICAL HAZARD ASSESSMENT 1
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/04/2011 04/08/2011 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
1, 2 IP Alert and Notification System Evaluation 7111402 04/04/2011 04/08/2011 1, 2 IP Emergency Response Organization Augmentation Testing 7111403 04/04/2011 04/08/2011 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 04/04/2011 04/08/2011 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 04/04/2011 04/08/2011 1, 2 IP Drill/Exercise Performance 71151-EP01 04/04/2011 04/08/2011 1, 2 IP ERO Drill Participation 71151-EP02 04/04/2011 04/08/2011 1, 2 IP Alert & Notification System 71151-EP03 04/04/2011 04/08/2011 MODS
- MODIFICATION/50.59 INSPECTION 3
1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 05/23/2011 05/27/2011 1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 06/06/2011 06/10/2011 EB3HS
- HEAT SINK 1
1, 2 IP Heat Sink Performance 7111107T 06/27/2011 07/01/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure