{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                                    NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                                  REGION II
REGION II  
                                245 PEACHTREE CENTER AVENUE NE, SUITE 1200
245 PEACHTREE CENTER AVENUE NE, SUITE 1200  
                                        ATLANTA, GEORGIA 30303-1257
ATLANTA, GEORGIA 30303-1257  
                                              July 25, 2011
July 25, 2011  
Mr. Robert J. Duncan II.
Vice President
Progress Energy
Mr. Robert J. Duncan II.  
H. B. Robinson Steam Electric Plant, Unit 2
Vice President  
3581 West Entrance Rd
Progress Energy  
Hartsville, SC 29550
H. B. Robinson Steam Electric Plant, Unit 2  
SUBJECT:         UPDATE OF NUCLEAR REGULATORY COMMISSION (NRC) DISTRIBUTION
3581 West Entrance Rd  
                  LIST FOR DOCUMENTS CONTAINING SAFEGUARDS (SGI), OFFICIAL USE
Hartsville, SC 29550  
                  ONLY (OUO), AND ROUTINE INFORMATION - (H. B. ROBINSON STEAM
                  ELECTRIC PLANT)
SUBJECT:  
Dear Mr. Duncan:
UPDATE OF NUCLEAR REGULATORY COMMISSION (NRC) DISTRIBUTION  
I am writing to request current information on those individuals authorized to receive documents
LIST FOR DOCUMENTS CONTAINING SAFEGUARDS (SGI), OFFICIAL USE  
containing Safeguards (SGI), Official Use Only (OUO), and Routine information on issues
ONLY (OUO), AND ROUTINE INFORMATION - (H. B. ROBINSON STEAM  
relating to your facility. Safeguards information is a special category of sensitive unclassified
ELECTRIC PLANT)  
information authorized by Section 147 of the Atomic Energy Act of 1954, as amended (the Act),
to be protected. While SGI is considered sensitive unclassified information, it is handled and
Dear Mr. Duncan:  
protected more like classified confidential information than like other sensitive unclassified
information (e.g., privacy and proprietary information).
I am writing to request current information on those individuals authorized to receive documents  
Access to SGI is controlled by a valid need-to-know basis. It is the responsibility of the NRC to
containing Safeguards (SGI), Official Use Only (OUO), and Routine information on issues  
maintain the integrity of SGI distribution, therefore we are currently in the process of verifying
relating to your facility. Safeguards information is a special category of sensitive unclassified  
the identity, and contact information of individuals designated to receive documents with SGI,
information authorized by Section 147 of the Atomic Energy Act of 1954, as amended (the Act),  
OUO, and Routine information for your facility.
to be protected. While SGI is considered sensitive unclassified information, it is handled and  
You are requested to provide an updated distribution list of those persons who should receive
protected more like classified confidential information than like other sensitive unclassified  
documents containing SGI, OUO, and Routine information within 20 days of the date of this
information (e.g., privacy and proprietary information).  
letter to: ATTN: Document Control Desk, Washington, D.C. 20555-0001; with a copy to the
Regional Administrator Region II, so that we can verify and/or update our distribution
Access to SGI is controlled by a valid need-to-know basis. It is the responsibility of the NRC to  
information.
maintain the integrity of SGI distribution, therefore we are currently in the process of verifying  
Please ensure that each list clearly specifies the individuals who are authorized to receive
the identity, and contact information of individuals designated to receive documents with SGI,  
matter specific correspondence. To facilitate this request, I have enclosed a copy of the NRCs
OUO, and Routine information for your facility.
official distribution list on file, which has been organized by category. Additionally, you will find
You are requested to provide an updated distribution list of those persons who should receive  
documents containing SGI, OUO, and Routine information within 20 days of the date of this  
letter to: ATTN: Document Control Desk, Washington, D.C. 20555-0001; with a copy to the  
Regional Administrator Region II, so that we can verify and/or update our distribution  
information.  
Please ensure that each list clearly specifies the individuals who are authorized to receive  
matter specific correspondence. To facilitate this request, I have enclosed a copy of the NRCs  
official distribution list on file, which has been organized by category. Additionally, you will find  
NRC Regulatory Issue Summary 2005-26 defining control of sensitive unclassified non-
NRC Regulatory Issue Summary 2005-26 defining control of sensitive unclassified non-
safeguards information related to nuclear power reactors, and NRC Regulatory Issue Summary
safeguards information related to nuclear power reactors, and NRC Regulatory Issue Summary  
2003-08, Summary of Safeguards Information Requirements.
2003-08, Summary of Safeguards Information Requirements.


Progress Energy                                   2
Progress Energy  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
2  
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://ww.nrc.gov/reading-
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its  
rm/adams.html (the Public Electronic Room).
enclosures will be available electronically for public inspection in the NRC Public Document  
Should you have any questions concerning this letter, please contact us.
Room or from the Publicly Available Records (PARS) component of NRCs document system  
                                              Sincerely,
(ADAMS). ADAMS is accessible from the NRC Web site at http://ww.nrc.gov/reading-
                                              /RA/
rm/adams.html (the Public Electronic Room).  
                                              Michael E. Ernstes, Chief
                                              Plant Support Branch 2
Should you have any questions concerning this letter, please contact us.  
                                              Division of Reactor Safety
Docket No.: 50-261
Sincerely,  
License No.: DPR-23
Enclosures:
1. Current Official Distribution List
2. NRC Regulatory Issue Summary 2005-26
3. NRC Regulatory Issue Summary 2003-08
/RA/  
Michael E. Ernstes, Chief  
Plant Support Branch 2  
Division of Reactor Safety  
Docket No.: 50-261  
License No.: DPR-23  
Enclosures:
1. Current Official Distribution List  
2. NRC Regulatory Issue Summary 2005-26  
3. NRC Regulatory Issue Summary 2003-08  


Progress Energy
2
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS).  ADAMS is accessible from the NRC Web site at http://ww.nrc.gov/reading-
rm/adams.html (the Public Electronic Room).
Should you have any questions concerning this letter, please contact us.
Sincerely,
/RA/
Michael E. Ernstes, Chief
Plant Support Branch 2
Division of Reactor Safety
Docket No.:  50-261
License No.:  DPR-23
Enclosures: 
1. Current Official Distribution List
2. NRC Regulatory Issue Summary 2005-26
3. NRC Regulatory Issue Summary 2003-08
X PUBLICLY AVAILABLE
G NON-PUBLICLY AVAILABLE
G SENSITIVE
X NON-SENSITIVE
ADAMS: X Yes
ACCESSION NUMBER: _________________________
X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED
OFFICE
RII:  DRS
RII:DRS
RII:DRP
SIGNATURE
RA
RA
RA
NAME
J. CALLOWAY
M. ERNSTES
R. MUSSER
DATE
07/21/2011
07/25/2011
07/22/2011
E-MAIL COPY?
    YES
NO      YES
NO      YES
NO   
  YES
NO      YES
NO      YES
NO      YES
NO   
OFFICIAL
RECORD
COPY DOCUMENT
NAME:
G:\\DRSII\\PSBII\\SGI
PROTECTION
LETTERS\\2011
SGI
DISTRIBUTION
UPDATE\\ROBINSON SGI PROTECTION UPDATE 2011.DOCX


  _________________________                X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED
OFFICIAL DISTRIBUTION LIST
OFFICE            RII: DRS        RII:DRS        RII:DRP
H.B. ROBINSON STEAM ELECTRIC PLANT
SIGNATURE        RA              RA              RA
Enclosure 1
NAME              J. CALLOWAY    M. ERNSTES      R. MUSSER
   
DATE                07/21/2011      07/25/2011      07/22/2011
ROUTINE DISTRIBUTION:  
E-MAIL COPY?        YES      NO YES        NO YES        NO YES      NO YES      NO    YES      NO YES    NO
cc w/encl:  
Division of Radiological Health
TN Dept. of Environment & Conservation
401 Church Street
Nashville, TN  37243-1532
Sandra Threatt, Manager
Nuclear Response and Emergency
Environmental Surveillance
Bureau of Land and Waste Management
Department of Health and Environmental
Control
Electronic Mail Distribution
Robert J. Duncan II
Vice President
H.B. Robinson Steam Electric Plant, Unit 2
Progress Energy
Electronic Mail Distribution
Brian C. McCabe
Manager, Nuclear Oversight
Shearon Harris Nuclear Power Plant
Progress Energy
Electronic Mail Distribution
Scott D. West
Superintendent Security
H. B. Robinson Steam Electric Plant
Progress Energy
Electronic Mail Distribution
Joseph W. Donahue
Vice President
Nuclear Oversight
Progress Energy
Electronic Mail Distribution
David T. Conley
Senior Counsel
Legal Department
Progress Energy
Electronic Mail Distribution
John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge
2300 N. Street, NW
Washington, DC  20037-1128
   
Richard Haynes
Director, Division of Waste Management
Bureau of Land and Waste Management
S.C. Department of Health and
Environmental Control
Electronic Mail Distribution
Kelvin Henderson
General Manager
Nuclear Fleet Operations
Progress Energy
Electronic Mail Distribution
Thomas Cosgrove
Plant General Manager
H.B. Robinson Steam Electric Plant, Unit 2
Progress Energy
Electronic Mail Distribution
Donna B. Alexander
Manager, Nuclear Regulatory Affairs
(interim)
Progress Energy
Electronic Mail Distribution
   
Robert P. Gruber
Executive Director
Public Staff - NCUC
4326 Mail Service Center
Raleigh, NC  27699-4326
   
W. Lee Cox, III
Section Chief
Radiation Protection Section
N.C. Department of Environmental
Commerce & Natural Resources
Electronic Mail Distribution
   
Greg Kilpatrick
Operations Manager
H.B. Robinson Steam Electric Plant, Unit 2
Progress Energy
Electronic Mail Distribution
   
Mark Yeager
Division of Radioactive Waste Mgmt.
S.C. Department of Health and
Environmental Control
Electronic Mail Distribution


                                OFFICIAL DISTRIBUTION LIST
OFFICIAL DISTRIBUTION LIST  
                          H.B. ROBINSON STEAM ELECTRIC PLANT
H.B. ROBINSON STEAM ELECTRIC PLANT  
ROUTINE DISTRIBUTION:
Enclosure 1
cc w/encl:                                       Richard Haynes
Division of Radiological Health                  Director, Division of Waste Management
ROUTINE DISTRIBUTION:  
TN Dept. of Environment & Conservation          Bureau of Land and Waste Management
cc w/encl (continued):  
401 Church Street                                S.C. Department of Health and
Public Service Commission
Nashville, TN 37243-1532                        Environmental Control
State of South Carolina
                                                Electronic Mail Distribution
P.O. Box 11649
Sandra Threatt, Manager
Columbia, SC  29211
Nuclear Response and Emergency                  Kelvin Henderson
Environmental Surveillance                      General Manager
Chairman
Bureau of Land and Waste Management              Nuclear Fleet Operations
North Carolina Utilities Commission
Department of Health and Environmental          Progress Energy
Electronic Mail Distribution  
Control                                          Electronic Mail Distribution
Electronic Mail Distribution
Henry Curry
                                                Thomas Cosgrove
Training Manager  
Robert J. Duncan II                              Plant General Manager
H.B. Robinson Steam Electric Plant, Unit 2
Vice President                                  H.B. Robinson Steam Electric Plant, Unit 2
Progress Energy  
H.B. Robinson Steam Electric Plant, Unit 2       Progress Energy
Electronic Mail Distribution  
Progress Energy                                 Electronic Mail Distribution
Electronic Mail Distribution
Senior Resident Inspector
                                                Donna B. Alexander
U.S. Nuclear Regulatory Commission
Brian C. McCabe                                  Manager, Nuclear Regulatory Affairs
H. B. Robinson Steam Electric Plant  
Manager, Nuclear Oversight                      (interim)
2112 Old Camden Rd
Shearon Harris Nuclear Power Plant              Progress Energy
Hartsville, SC  29550
Progress Energy                                  Electronic Mail Distribution
Electronic Mail Distribution
William R. Gideon
                                                Robert P. Gruber
Director Site Operations
Scott D. West                                    Executive Director
H. B. Robinson Steam Electric Plant, Unit 2  
Superintendent Security                          Public Staff - NCUC
Progress Energy  
H. B. Robinson Steam Electric Plant             4326 Mail Service Center
Electronic Mail Distribution  
Progress Energy                                 Raleigh, NC 27699-4326
Electronic Mail Distribution
Christos Kamilaris
                                                W. Lee Cox, III
Manager, Support Services
Joseph W. Donahue                                Section Chief
H.B. Robinson Steam Electric Plant, Unit 2
Vice President                                  Radiation Protection Section
Progress Energy  
Nuclear Oversight                                N.C. Department of Environmental
Electronic Mail Distribution  
Progress Energy                                  Commerce & Natural Resources
Electronic Mail Distribution                     Electronic Mail Distribution
Terry D. Hobbs
David T. Conley                                  Greg Kilpatrick
Plant General Manager
Senior Counsel                                  Operations Manager
Brunswick Steam Electric Plant
Legal Department                                H.B. Robinson Steam Electric Plant, Unit 2
Carolina Power & Light Company
Progress Energy                                  Progress Energy
Electronic Mail Distribution  
Electronic Mail Distribution                    Electronic Mail Distribution
John H. O'Neill, Jr.                             Mark Yeager
Supervisor, Licensing/Regulatory Programs
Shaw, Pittman, Potts & Trowbridge                Division of Radioactive Waste Mgmt.
(Vacant)
2300 N. Street, NW                              S.C. Department of Health and
H. B. Robinson Steam Electric Plant  
Washington, DC 20037-1128                        Environmental Control
3581 West Entrance Rd.
                                                Electronic Mail Distribution
Hartsville, SC  29550
                                                                                Enclosure 1
John W. Flitter
Director of Electric & Gas Regulation
South Carolina Office of Regulatory Staff
Electronic Mail Distribution  


                                OFFICIAL DISTRIBUTION LIST
OFFICIAL DISTRIBUTION LIST  
                          H.B. ROBINSON STEAM ELECTRIC PLANT
H.B. ROBINSON STEAM ELECTRIC PLANT  
ROUTINE DISTRIBUTION:
Enclosure 1
cc w/encl (continued):
Public Service Commission
OFFICIAL USE ONLY (OUO) DISTRIBUTION
State of South Carolina
cc w/encl
P.O. Box 11649
Thomas Cosgrove
Columbia, SC 29211
Plant General Manager  
Chairman
H.B. Robinson Steam Electric Plant, Unit 2  
North Carolina Utilities Commission
Progress Energy  
Electronic Mail Distribution
3581 West Entrance Rd.
Henry Curry
Hartsville, SC  29550
Training Manager
H.B. Robinson Steam Electric Plant, Unit 2
Christos Kamilaris
Progress Energy
Manager, Support Services
Electronic Mail Distribution
H.B. Robinson Steam Electric Plant, Unit 2
Senior Resident Inspector
Progress Energy
U.S. Nuclear Regulatory Commission
3581 West Entrance Rd.
H. B. Robinson Steam Electric Plant
Hartsville, SC   29550  
2112 Old Camden Rd
Hartsville, SC 29550
Joseph W. Donahue
William R. Gideon
Vice President
Director Site Operations
Nuclear Oversight
H. B. Robinson Steam Electric Plant, Unit 2
Progress Energy  
Progress Energy
TPP-15
Electronic Mail Distribution
100 E. Davie Street
Christos Kamilaris
Raleigh, NC  27601
Manager, Support Services
H.B. Robinson Steam Electric Plant, Unit 2
Kelvin Henderson
Progress Energy
General Manager  
Electronic Mail Distribution
Nuclear Fleet Operations
Terry D. Hobbs
Progress Energy  
Plant General Manager
TPP-15
Brunswick Steam Electric Plant
100 E. Davie Street
Carolina Power & Light Company
Raleigh, NC  27601
Electronic Mail Distribution
Supervisor, Licensing/Regulatory Programs
Edward T. O'Neil
(Vacant)
Director
H. B. Robinson Steam Electric Plant
Nuclear Protective Service and Emergency Preparedness
3581 West Entrance Rd.
Progress Energy
Hartsville, SC 29550
TPP-15
John W. Flitter
100 East Davie Street
Director of Electric & Gas Regulation
Raleigh, NC  27601
South Carolina Office of Regulatory Staff
Electronic Mail Distribution
Scott D. West
                                                              Enclosure 1
Superintendent Security
H. B. Robinson Steam Electric Plant  
Progress Energy
3581 West Entrance Road
Hartsville, SC   29550  


                              OFFICIAL DISTRIBUTION LIST
OFFICIAL DISTRIBUTION LIST  
                        H.B. ROBINSON STEAM ELECTRIC PLANT
H.B. ROBINSON STEAM ELECTRIC PLANT  
OFFICIAL USE ONLY (OUO) DISTRIBUTION
cc w/encl
Enclosure 1
Thomas Cosgrove
Plant General Manager
SAFEGUARDS (SGI) DISTRIBUTION:
H.B. Robinson Steam Electric Plant, Unit 2
cc w/encl  
Progress Energy
Edward T. O'Neil  
3581 West Entrance Rd.
Director  
Hartsville, SC 29550
Nuclear Protective Service and Emergency Preparedness  
Christos Kamilaris
Progress Energy  
Manager, Support Services
TPP-15  
H.B. Robinson Steam Electric Plant, Unit 2
100 East Davie Street  
Progress Energy
Raleigh, NC   27601  
3581 West Entrance Rd.
Hartsville, SC 29550
Scott D. West  
Joseph W. Donahue
Superintendent Security  
Vice President
H. B. Robinson Steam Electric Plant  
Nuclear Oversight
Progress Energy  
Progress Energy
3581 West Entrance Road  
TPP-15
Hartsville, SC   29550  
100 E. Davie Street
Raleigh, NC 27601
Kelvin Henderson
General Manager
Nuclear Fleet Operations
Progress Energy
TPP-15
100 E. Davie Street
Raleigh, NC 27601
Edward T. O'Neil
Director
Nuclear Protective Service and Emergency Preparedness
Progress Energy
TPP-15
100 East Davie Street
Raleigh, NC 27601
Scott D. West
Superintendent Security
H. B. Robinson Steam Electric Plant
Progress Energy
3581 West Entrance Road
Hartsville, SC 29550
                                                            Enclosure 1


                              OFFICIAL DISTRIBUTION LIST
ML051430228
                        H.B. ROBINSON STEAM ELECTRIC PLANT
UNITED STATES
SAFEGUARDS (SGI) DISTRIBUTION:
NUCLEAR REGULATORY COMMISSION
cc w/encl
OFFICE OF NUCLEAR REACTOR REGULATION
Edward T. O'Neil
WASHINGTON, D.C. 20555-0001
Director
November 7, 2005
Nuclear Protective Service and Emergency Preparedness
NRC REGULATORY ISSUE SUMMARY 2005-26
Progress Energy
CONTROL OF SENSITIVE UNCLASSIFIED NONSAFEGUARDS
TPP-15
INFORMATION RELATED TO NUCLEAR POWER REACTORS
100 East Davie Street
Raleigh, NC 27601
Scott D. West
Superintendent Security
H. B. Robinson Steam Electric Plant
Progress Energy
3581 West Entrance Road
Hartsville, SC 29550
                                                            Enclosure 1
 
                                        UNITED STATES
                            NUCLEAR REGULATORY COMMISSION
                        OFFICE OF NUCLEAR REACTOR REGULATION
                                WASHINGTON, D.C. 20555-0001
                                        November 7, 2005
                  NRC REGULATORY ISSUE SUMMARY 2005-26
        CONTROL OF SENSITIVE UNCLASSIFIED NONSAFEGUARDS
        INFORMATION RELATED TO NUCLEAR POWER REACTORS
ADDRESSEES
ADDRESSEES
All holders of operating licenses for nuclear power reactors and holders of and applicants for
All holders of operating licenses for nuclear power reactors and holders of and applicants for
Line 262: Line 462:
to inform the addressees of the appropriate handling of information that warrants controls
to inform the addressees of the appropriate handling of information that warrants controls
because of continuing concerns about terrorist attacks against the critical infrastructure of the
because of continuing concerns about terrorist attacks against the critical infrastructure of the
United States. The NRC intends to balance its responsibility to preserve public access to
United States. The NRC intends to balance its responsibility to preserve public access to
information and support meaningful participation in NRCs regulatory processes against its
information and support meaningful participation in NRCs regulatory processes against its
responsibility to withhold information that might unnecessarily compromise the security of
responsibility to withhold information that might unnecessarily compromise the security of
nuclear facilities. Licensees for operating nuclear power plants and reactor facility designers
nuclear facilities. Licensees for operating nuclear power plants and reactor facility designers
may need to assess their document control procedures to ensure they protect sensitive
may need to assess their document control procedures to ensure they protect sensitive
information. Although no specific action or written response is required, the NRC encourages
information. Although no specific action or written response is required, the NRC encourages
the addressees for this RIS, vendors and contractors, and others who may possess sensitive
the addressees for this RIS, vendors and contractors, and others who may possess sensitive
information to destroy, mark, or otherwise control the information to avoid inadvertently
information to destroy, mark, or otherwise control the information to avoid inadvertently
Line 273: Line 473:
BACKGROUND INFORMATION
BACKGROUND INFORMATION
NRC traditionally has given the public access to a significant amount of information about the
NRC traditionally has given the public access to a significant amount of information about the
facilities and materials the agency regulates. Openness has been and remains a cornerstone
facilities and materials the agency regulates. Openness has been and remains a cornerstone
of NRCs regulatory philosophy. The Atomic Energy Act, subsequent legislation, and various
of NRCs regulatory philosophy. The Atomic Energy Act, subsequent legislation, and various
NRC regulations have given the public the right to participate in the licensing and oversight
NRC regulations have given the public the right to participate in the licensing and oversight
process for nuclear power reactors and other NRC licensees. To participate in a meaningful
process for nuclear power reactors and other NRC licensees. To participate in a meaningful
way, the public must have access to information about the design and operation of regulated
way, the public must have access to information about the design and operation of regulated
facilities and use of nuclear materials. However, NRC and other Government agencies have
facilities and use of nuclear materials. However, NRC and other Government agencies have
always withheld some information from public disclosure for reasons of security, personal
always withheld some information from public disclosure for reasons of security, personal
privacy, or commercial or trade secret protection. In light of increased terrorist activity
privacy, or commercial or trade secret protection. In light of increased terrorist activity
worldwide, NRC reexamined its document disclosure policies.
worldwide, NRC reexamined its document disclosure policies.
ML051430228
Enclosure 2
                                                                                            Enclosure 2


                                                                                    RIS 2005-26
RIS 2005-26  
                                                                                    Page 2 of 5
Page 2 of 5
Since the events of September 11, 2001, NRC has issued advisories and taken specific actions
Since the events of September 11, 2001, NRC has issued advisories and taken specific actions
regarding the security of its licensed facilities. NRC has also assessed and revised its policies
regarding the security of its licensed facilities. NRC has also assessed and revised its policies
and practices for control of information so that information that could reasonably be expected to
and practices for control of information so that information that could reasonably be expected to
be useful to terrorists in planning or executing an attack against nuclear power plants or other
be useful to terrorists in planning or executing an attack against nuclear power plants or other
NRC-licensed facilities will be withheld from public disclosure. The most recent and detailed
NRC-licensed facilities will be withheld from public disclosure. The most recent and detailed
guidance on the control of information related to operating nuclear power plants is provided in
guidance on the control of information related to operating nuclear power plants is provided in
the Commission paper SECY-04-0191, Withholding Sensitive Unclassified Information
the Commission paper SECY-04-0191, Withholding Sensitive Unclassified Information
Concerning Nuclear Power Reactors From Public Disclosure, dated October 19, 2004, and the
Concerning Nuclear Power Reactors From Public Disclosure, dated October 19, 2004, and the
associated staff requirements memorandum dated November 9, 2004. Also see
associated staff requirements memorandum dated November 9, 2004. Also see
SECY-05-0091, Task Force Report on Public Disclosure of Security-Related Information,
SECY-05-0091, Task Force Report on Public Disclosure of Security-Related Information,
dated May 18, 2005, and the associated staff requirements memorandum dated June 30, 2005.
dated May 18, 2005, and the associated staff requirements memorandum dated June 30, 2005.  
The NRC staff is preparing similar guidance for materials licensees and expects to make it
The NRC staff is preparing similar guidance for materials licensees and expects to make it
available to the public in early 2006.
available to the public in early 2006.
Line 303: Line 502:
Considering the various reviews, legislation, and other changes since September 11, 2001, the
Considering the various reviews, legislation, and other changes since September 11, 2001, the
NRC staff believes that clarifying NRCs current procedures and policies regarding the control
NRC staff believes that clarifying NRCs current procedures and policies regarding the control
of information will be beneficial to stakeholders. NRC will continue to make available to the
of information will be beneficial to stakeholders. NRC will continue to make available to the
public most of the information that the agency receives from or sends to its licensees. In
public most of the information that the agency receives from or sends to its licensees. In
addition, the public will have access to a large amount of information included in various reports
addition, the public will have access to a large amount of information included in various reports
produced by the NRC staff. Much of NRCs information also will be readily available to the
produced by the NRC staff. Much of NRCs information also will be readily available to the
public via the NRC Web site (www.nrc.gov) and the NRCs electronic document management
public via the NRC Web site (www.nrc.gov) and the NRCs electronic document management
system (ADAMS) (www.nrc.gov/reading-rm/adams.html). In addition, other information may be
system (ADAMS) (www.nrc.gov/reading-rm/adams.html). In addition, other information may be
released to the public in response to formal or informal requests. The exceptions for certain
released to the public in response to formal or informal requests. The exceptions for certain
information to be withheld from public disclosure for reasons other than security (e.g., privacy,
information to be withheld from public disclosure for reasons other than security (e.g., privacy,
proprietary, and pre-decisional information) have not changed as a result of recent events. The
proprietary, and pre-decisional information) have not changed as a result of recent events. The
appropriate handling of Safeguards Information (SGI) is discussed in RIS-2003-08, Protection
appropriate handling of Safeguards Information (SGI) is discussed in RIS-2003-08, Protection
of Safeguards Information From Unauthorized Disclosure, dated April 30, 2003, and more
of Safeguards Information From Unauthorized Disclosure, dated April 30, 2003, and more
specific SGI designation guidance documents.
specific SGI designation guidance documents.
NRC withheld from public disclosure some information related to protecting operating nuclear
NRC withheld from public disclosure some information related to protecting operating nuclear
power plants although it does not meet the existing criteria for designation as SGI. This type of
power plants although it does not meet the existing criteria for designation as SGI. This type of
information was recognized before September 11, 2001, and, when submitted to NRC by a
information was recognized before September 11, 2001, and, when submitted to NRC by a
licensee, was withheld from public disclosure according to the provisions of 10 CFR
licensee, was withheld from public disclosure according to the provisions of 10 CFR
2.390(d)(1). This regulation states:
2.390(d)(1). This regulation states:
        (d) The following information is considered commercial or financial information within the
(d) The following information is considered commercial or financial information within the
        meaning of §9.17(a)(4) of this chapter and is subject to disclosure only in accordance
meaning of §9.17(a)(4) of this chapter and is subject to disclosure only in accordance
        with the provisions of §9.19 of this chapter.
with the provisions of §9.19 of this chapter.
        (1) Correspondence and reports to or from the NRC which contain information or
(1) Correspondence and reports to or from the NRC which contain information or
        records concerning a licensees or applicants physical protection, classified matter
records concerning a licensees or applicants physical protection, classified matter
        protection, or material control and accounting program for special nuclear material not
protection, or material control and accounting program for special nuclear material not
        otherwise designated as Safeguards Information or classified as National Security
otherwise designated as Safeguards Information or classified as National Security
        Information or Restricted Data.
Information or Restricted Data.
                                                                                          Enclosure 2
Enclosure 2


                                                                                        RIS 2005-26
RIS 2005-26  
                                                                                        Page 3 of 5
Page 3 of 5
NRC expects that licensees will continue to request NRC withhold some information citing
NRC expects that licensees will continue to request NRC withhold some information citing
10 CFR 2.390(d)(1) and that the volume of material requested to be withheld from public
10 CFR 2.390(d)(1) and that the volume of material requested to be withheld from public
disclosure under this provision will increase as the NRC staff and licensees implement the
disclosure under this provision will increase as the NRC staff and licensees implement the
guidance in this RIS. NRC changed its procedures shortly after September 11, 2001, to
guidance in this RIS. NRC changed its procedures shortly after September 11, 2001, to
withhold from public disclosure various categories of documents likely to include individual
withhold from public disclosure various categories of documents likely to include individual
records that warrant withholding under 10 CFR 2.390. The NRC staff will assess the need to
records that warrant withholding under 10 CFR 2.390. The NRC staff will assess the need to
withhold such document categories if licensees routinely identify specific documents containing
withhold such document categories if licensees routinely identify specific documents containing
sensitive information. The NRC staff will interact with licensees on a case-by-case basis
sensitive information. The NRC staff will interact with licensees on a case-by-case basis
regarding the use of the provisions of 10 CFR 2.390(d)(1) to assure that information is properly
regarding the use of the provisions of 10 CFR 2.390(d)(1) to assure that information is properly
controlled, under either Section 2.390(d)(1) or one of the other Freedom of Information Act
controlled, under either Section 2.390(d)(1) or one of the other Freedom of Information Act
(FOIA) exemptions that might be applicable. Licensees that identify information to be withheld
(FOIA) exemptions that might be applicable. Licensees that identify information to be withheld
from public disclosure in accordance with 10 CFR 2.390(d)(1) or other provision in the
from public disclosure in accordance with 10 CFR 2.390(d)(1) or other provision in the
regulation should use the same general practices as used for proprietary commercial or
regulation should use the same general practices as used for proprietary commercial or
financial information. As shown on the attached diagram, the cover letter should clearly state
financial information. As shown on the attached diagram, the cover letter should clearly state
that the document includes sensitive information and the affected pages should include the
that the document includes sensitive information and the affected pages should include the
marking Security-Related Information  Withhold Under 10 CFR 2.390. Unlike the
marking Security-Related Information  Withhold Under 10 CFR 2.390. Unlike the
requirements for withholding proprietary information, licensees are not required to provide an
requirements for withholding proprietary information, licensees are not required to provide an
affidavit for sensitive information withheld under 10 CFR 2.390(d) and related to (1) physical
affidavit for sensitive information withheld under 10 CFR 2.390(d) and related to (1) physical
protection or (2) material control and accounting.
protection or (2) material control and accounting.
Most information received and generated by NRC deals with design, operations, or other
Most information received and generated by NRC deals with design, operations, or other
matters not directly related to the physical security of nuclear facilities or radioactive materials.
matters not directly related to the physical security of nuclear facilities or radioactive materials.  
This information, if not protected as proprietary or under another exception, is generally made
This information, if not protected as proprietary or under another exception, is generally made
available to the public. After September 11, 2001, NRC and other Government agencies
available to the public. After September 11, 2001, NRC and other Government agencies
responded to concerns that some information easily available on public Web sites or by other
responded to concerns that some information easily available on public Web sites or by other
means might be useful to terrorists. SECY-04-0191 provides the primary NRC guidance on
means might be useful to terrorists. SECY-04-0191 provides the primary NRC guidance on
whether information related to operating nuclear power plants should be withheld from public
whether information related to operating nuclear power plants should be withheld from public
disclosure in light of the post-September 11 concerns. The NRC staff has posted the guidance
disclosure in light of the post-September 11 concerns. The NRC staff has posted the guidance
and related material within the public reading room (http://www.nrc.gov/reading-rm.html) on the
and related material within the public reading room (http://www.nrc.gov/reading-rm.html) on the
NRC Web site, and stakeholders can ask questions or make suggestions about the guidance
NRC Web site, and stakeholders can ask questions or make suggestions about the guidance
and the examples.
and the examples.
As discussed in SECY-04-0191, other Government agencies have issued regulations or
As discussed in SECY-04-0191, other Government agencies have issued regulations or
guidance for protecting information that could be reasonably expected to be useful to terrorists
guidance for protecting information that could be reasonably expected to be useful to terrorists
in planning or executing an attack on critical infrastructure.
in planning or executing an attack on critical infrastructure.
*       Protected critical infrastructure information (PCII) is information related to the security of
*
        critical infrastructure that is voluntarily provided to the Department of Homeland Security
Protected critical infrastructure information (PCII) is information related to the security of
        (DHS).
critical infrastructure that is voluntarily provided to the Department of Homeland Security
*       Critical energy infrastructure information (CEII) is defined in Federal Energy Regulatory
(DHS).  
        Commission (FERC) regulations as information related to energy-related infrastructure
*
        (e.g., hydroelectric dams and electric transmission systems).
Critical energy infrastructure information (CEII) is defined in Federal Energy Regulatory
*       Sensitive security information (SSI) is defined in Transportation Safety Administration
Commission (FERC) regulations as information related to energy-related infrastructure  
        (TSA) and Department of Transportation (DOT) regulations as information about the
(e.g., hydroelectric dams and electric transmission systems).
        security of transportation assets, including pipelines.
*
                                                                                            Enclosure 2
Sensitive security information (SSI) is defined in Transportation Safety Administration
(TSA) and Department of Transportation (DOT) regulations as information about the
security of transportation assets, including pipelines.
Enclosure 2


                                                                                      RIS 2005-26
RIS 2005-26  
                                                                                      Page 4 of 5
Page 4 of 5
Licensees may need to assess and revise their procedures for handling sensitive unclassified
Licensees may need to assess and revise their procedures for handling sensitive unclassified
nonsafeguards information in their normal activities and interactions with parties other than
nonsafeguards information in their normal activities and interactions with parties other than
NRC. During discussions of existing practices with various licensees, the NRC staff discovered
NRC. During discussions of existing practices with various licensees, the NRC staff discovered
that licensees vary in how they treat and protect information that was previously unprotected but
that licensees vary in how they treat and protect information that was previously unprotected but
now is considered sensitive. Some licensees have instituted more restrictive controls. Some
now is considered sensitive. Some licensees have instituted more restrictive controls. Some
have determined that their routine business practices provide an appropriate level of protection
have determined that their routine business practices provide an appropriate level of protection
for the sensitive information.
for the sensitive information.
As described in 10 CFR 2.390, information deemed sensitive because it relates to physical
As described in 10 CFR 2.390, information deemed sensitive because it relates to physical
protection or material control and accounting is protected in much the same way as commercial
protection or material control and accounting is protected in much the same way as commercial
or financial information. As with proprietary information, licensees are expected to have
or financial information. As with proprietary information, licensees are expected to have
sufficient internal controls to keep the information confidential. Possible methods to prevent the
sufficient internal controls to keep the information confidential. Possible methods to prevent the
inadvertent release of sensitive unclassified nonsafeguards information include marking
inadvertent release of sensitive unclassified nonsafeguards information include marking
documents as described in 10 CFR 2.390, restricting access to electronic recordkeeping
documents as described in 10 CFR 2.390, restricting access to electronic recordkeeping
systems, and controlling the reproduction, distribution, and destruction of potentially sensitive
systems, and controlling the reproduction, distribution, and destruction of potentially sensitive
records. NRC uses the marking Security-Related Information  Withhold Under
records. NRC uses the marking Security-Related Information  Withhold Under
10 CFR 2.390 and encourages the use of this marking by licensees and others possessing
10 CFR 2.390 and encourages the use of this marking by licensees and others possessing
information deemed sensitive using the guidance in SECY-04-0191. Licensees should ensure
information deemed sensitive using the guidance in SECY-04-0191. Licensees should ensure
that similar controls are in place when sensitive information is provided to outside parties such
that similar controls are in place when sensitive information is provided to outside parties such
as contractors or other Government agencies. The NRC staff posted information on NRCs
as contractors or other Government agencies. The NRC staff posted information on NRCs
Web site (http://www.nrc.gov/reading-rm.html) and included a feedback form for questions or
Web site (http://www.nrc.gov/reading-rm.html) and included a feedback form for questions or
suggestions on how to effectively control sensitive information.
suggestions on how to effectively control sensitive information.
BACKFIT DISCUSSION
BACKFIT DISCUSSION
This RIS requires no action or written response. Any action on the part of addressees to
This RIS requires no action or written response. Any action on the part of addressees to
assess and revise their document control procedures in accordance with the guidance
assess and revise their document control procedures in accordance with the guidance
contained in this RIS is strictly voluntary and, therefore, is not a backfit under 10 CFR 50.109.
contained in this RIS is strictly voluntary and, therefore, is not a backfit under 10 CFR 50.109.  
Consequently, the NRC staff did not perform a backfit analysis.
Consequently, the NRC staff did not perform a backfit analysis.
FEDERAL REGISTER NOTIFICATION
FEDERAL REGISTER NOTIFICATION
A notice of opportunity for public comment on this RIS was not published in the Federal
A notice of opportunity for public comment on this RIS was not published in the Federal
Register because it is informational and pertains to a staff position that does not represent a
Register because it is informational and pertains to a staff position that does not represent a
departure from current regulatory requirements and practice. NRC intends to work with the
departure from current regulatory requirements and practice. NRC intends to work with the
Nuclear Energy Institute, industry representatives, members of the public, and other
Nuclear Energy Institute, industry representatives, members of the public, and other
stakeholders in modifying related guidance documents.
stakeholders in modifying related guidance documents.
SMALL BUSINESS REGULATORY ENFORCEMENT FAIRNESS ACT OF 1996
SMALL BUSINESS REGULATORY ENFORCEMENT FAIRNESS ACT OF 1996
The NRC has determined that this action is not a rule and thus is not subject to the Small
The NRC has determined that this action is not a rule and thus is not subject to the Small
Business Regulatory Enforcement Fairness Act of 1996.
Business Regulatory Enforcement Fairness Act of 1996.  
                                                                                          Enclosure 2
Enclosure 2


                                                                                    RIS 2005-26
RIS 2005-26  
                                                                                    Page 5 of 5
Page 5 of 5
PAPERWORK REDUCTION ACT STATEMENT
PAPERWORK REDUCTION ACT STATEMENT
This RIS does not contain information collections and, therefore, is not subject to the
This RIS does not contain information collections and, therefore, is not subject to the
Line 423: Line 625:
Please direct any questions about this matter to the technical contacts listed below or to the
Please direct any questions about this matter to the technical contacts listed below or to the
appropriate Office of Nuclear Reactor Regulation (NRR) project manager.
appropriate Office of Nuclear Reactor Regulation (NRR) project manager.
                                            /RA/ By Patrick L. Hiland For/
/RA/ By Patrick L. Hiland For/
                                            Michael J. Case, Director
Michael J. Case, Director
                                            Division of Inspection and Regional Support
Division of Inspection and Regional Support
                                            Office of Nuclear Reactor Regulation
Office of Nuclear Reactor Regulation
Technical Contacts: William Reckley, NRR           Margie Kotzalas, NRR
Technical Contacts:
                      301-415-1323                 301-415-2737
William Reckley, NRR
                      E-mail: wdr@nrc.gov         E-mail: mxk5@nrc.gov
Margie Kotzalas, NRR
Attachment: Marking diagram for documents withheld under 10 CFR 2.390
301-415-1323
Note: NRC generic communications may be found on the NRC public Web site,
301-415-2737
E-mail: wdr@nrc.gov
E-mail: mxk5@nrc.gov
Attachment: Marking diagram for documents withheld under 10 CFR 2.390
Note: NRC generic communications may be found on the NRC public Web site,
http://www.nrc.gov, under Electronic Reading Room/Document Collections.
http://www.nrc.gov, under Electronic Reading Room/Document Collections.
                                                                                          Enclosure 2
Enclosure 2


                                                                                      Attachment
Security-Related Information
                                                                                      RIS-2005-26
Withhold Under 10 CFR 2.390
                                                                                      Page 1 of 1
Subject
                              SUGGESTED MARKINGS
XXXXXXXXXX
            Withhold From Public Disclosure In Accordance With 10 CFR 2.390
XXXXXXXXXX
                                                            Overall page marking on the top of all pages
XXXXXXXXXX
            Security-Related Information
XXXXXXXXXX
          Withhold Under 10 CFR 2.390
Attachment
                                                              Ensure Subject Line is non-sensitive
RIS-2005-26
          Subject
Page 1 of 1
                  XXXXXXXXXX
SUGGESTED MARKINGS
                  XXXXXXXXXX
Withhold From Public Disclosure In Accordance With 10 CFR 2.390
                  XXXXXXXXXX
                                                                                                                  Overall page marking on the top of all pages
                  XXXXXXXXXX
Ensure Subject Line is non-sensitive
                                    Appropriate Controls
Appropriate Controls
Access:                     Need-to-know in order to perform official licensee functions.
Access:
Storage:                     Openly within licensee facilities with electronic or other access
Need-to-know in order to perform official licensee functions.
                            controls, for example, key cards, guards, alarms.
Storage:
Mail:                       U.S. Postal Service first class mail, single opaque envelope with
Openly within licensee facilities with electronic or other access
                            no markings to indicate 10 CFR 2.390 contents.
controls, for example, key cards, guards, alarms.
Electronic Transmission:           Over encrypted phone, facsimile, computer, if available;
Mail:
                                    otherwise over non-encrypted circuits where recipient will
U.S. Postal Service first class mail, single opaque envelope with
                                    be present to receive the transmission.
no markings to indicate 10 CFR 2.390 contents.
                                                                                              Enclosure 2
Electronic Transmission:
Over encrypted phone, facsimile, computer, if available;
otherwise over non-encrypted circuits where recipient will
be present to receive the transmission.
Enclosure 2


                                                                                      RIS 2003-08
RIS 2003-08
                                                                                      Page 1 of 4
Page 1 of 4
                SUMMARY OF SAFEGUARDS INFORMATION REQUIREMENTS
SUMMARY OF SAFEGUARDS INFORMATION REQUIREMENTS
                                          I. AUTHORITY
I. AUTHORITY
The Atomic Energy Act of 1954, as amended, 42 U.S.C. §§ 2011 et seq. (Act), grants the
The Atomic Energy Act of 1954, as amended, 42 U.S.C. §§ 2011 et seq. (Act), grants the
Nuclear Regulatory Commission broad and unique authority to prohibit the unauthorized
Nuclear Regulatory Commission broad and unique authority to prohibit the unauthorized
Line 470: Line 680:
health and safety of the public or the common defense and security by significantly increasing
health and safety of the public or the common defense and security by significantly increasing
the likelihood of theft, diversion, or sabotage of materials or facilities subject to NRC jurisdiction.
the likelihood of theft, diversion, or sabotage of materials or facilities subject to NRC jurisdiction.
Section 147 of the Act, 42 U.S.C. § 2167.
Section 147 of the Act, 42 U.S.C. § 2167.
For licensees and any other person, whether or not a licensee (primarily 10 C.F.R. Part 50
For licensees and any other person, whether or not a licensee (primarily 10 C.F.R. Part 50
reactor licensees, 10 C.F.R. Part 70 licensees for special nuclear material, and their employees
reactor licensees, 10 C.F.R. Part 70 licensees for special nuclear material, and their employees
and contractors) subject to the requirements in 10 C.F.R. Part 73, Safeguards Information is
and contractors) subject to the requirements in 10 C.F.R. Part 73, Safeguards Information is
defined by NRC regulation as follows:
defined by NRC regulation as follows:
        Safeguards Information means information not otherwise classified as National
Safeguards Information means information not otherwise classified as National
        Security Information or Restricted Data which specifically identifies a licensee's
Security Information or Restricted Data which specifically identifies a licensee's
        or applicant's detailed, (1) security measures for the physical protection of
or applicant's detailed, (1) security measures for the physical protection of
        special nuclear material, or (2) security measures for the physical protection and
special nuclear material, or (2) security measures for the physical protection and
        location of certain plant equipment vital to the safety of production or utilization
location of certain plant equipment vital to the safety of production or utilization
        facilities.
facilities.
10 C.F.R. § 73.2.
10 C.F.R. § 73.2.
Specific requirements for the protection of Safeguards Information are contained in
Specific requirements for the protection of Safeguards Information are contained in
10 C.F.R. § 73.21. Access to Safeguards Information is limited as follows:
10 C.F.R. § 73.21. Access to Safeguards Information is limited as follows:
        (c) Access to Safeguards Information. (1) Except as the Commission may
(c) Access to Safeguards Information. (1) Except as the Commission may
        otherwise authorize, no person may have access to Safeguards Information
otherwise authorize, no person may have access to Safeguards Information
        unless the person has an established "need to know" for the information and is:
unless the person has an established "need to know" for the information and is:
        (i) An employee, agent, or contractor of an applicant, a licensee, the
        Commission, or the United States Government. However, an individual to be
(i) An employee, agent, or contractor of an applicant, a licensee, the
        authorized access to Safeguards Information by a nuclear power reactor
Commission, or the United States Government. However, an individual to be
        applicant or licensee must undergo a Federal Bureau of Investigation criminal
authorized access to Safeguards Information by a nuclear power reactor
        history check to the extent required by 10 CFR 73.57;
applicant or licensee must undergo a Federal Bureau of Investigation criminal
        (ii) A member of a duly authorized committee of the Congress;
history check to the extent required by 10 CFR 73.57;
        (iii) The Governor of a State or designated representatives;
        (iv) A representative of the International Atomic Energy Agency (IAEA) engaged
(ii) A member of a duly authorized committee of the Congress;
        in activities associated with the U.S./IAEA Safeguards Agreement who has been
        certified by the NRC;
(iii) The Governor of a State or designated representatives;
                                                                                            Enclosure 3
(iv) A representative of the International Atomic Energy Agency (IAEA) engaged
in activities associated with the U.S./IAEA Safeguards Agreement who has been
certified by the NRC;
Enclosure 3


                                                                                    RIS 2003-08
RIS 2003-08
                                                                                    Page 2 of 4
Page 2 of 4
        (v) A member of a state or local law enforcement authority that is responsible for
        responding to requests for assistance during safeguards emergencies; or
(v) A member of a state or local law enforcement authority that is responsible for
        (vi) An individual to whom disclosure is ordered pursuant to § 2.744(e) of this
responding to requests for assistance during safeguards emergencies; or
        chapter [10 CFR 2.744(e)].
(vi) An individual to whom disclosure is ordered pursuant to § 2.744(e) of this
        (2) Except as the Commission may otherwise authorize, no person may disclose
chapter [10 CFR 2.744(e)].
        Safeguards Information to any other person except as set forth in paragraph
        (c)(1) of this section.
(2) Except as the Commission may otherwise authorize, no person may disclose
Safeguards Information to any other person except as set forth in paragraph
(c)(1) of this section.
10 C.F.R. § 73.21(c).
10 C.F.R. § 73.21(c).
The need to know requirement is specified by NRC regulation as follows:
The need to know requirement is specified by NRC regulation as follows:
        Need to know means a determination by a person having responsibility for
Need to know means a determination by a person having responsibility for
        protecting Safeguards Information that a proposed recipient's access to
protecting Safeguards Information that a proposed recipient's access to
        Safeguards Information is necessary in the performance of official, contractual,
Safeguards Information is necessary in the performance of official, contractual,
        or licensee duties of employment.
or licensee duties of employment.
10 C.F.R. § 73.2.
10 C.F.R. § 73.2.
Thus, unless otherwise authorized by the Commission, NRC regulations limit access to
Thus, unless otherwise authorized by the Commission, NRC regulations limit access to
Safeguards Information to certain specified individuals who have been determined to have a
Safeguards Information to certain specified individuals who have been determined to have a
need to know, i.e., specified individuals whose access has been determined to be necessary
need to know, i.e., specified individuals whose access has been determined to be necessary
in the performance of official, contractual or licensee duties of employment.
in the performance of official, contractual or licensee duties of employment.
Furthermore, except as otherwise authorized by the Commission, no person may disclose
Furthermore, except as otherwise authorized by the Commission, no person may disclose
Safeguards Information to any other person unless that other person is one of the specified
Safeguards Information to any other person unless that other person is one of the specified
persons listed in 10 C.F.R. § 73.21(c)(1) and that person also has a need to know.
persons listed in 10 C.F.R. § 73.21(c)(1) and that person also has a need to know.
10 C.F.R. § 73.21(c)(2). These regulations and prohibitions on unauthorized disclosure of
10 C.F.R. § 73.21(c)(2). These regulations and prohibitions on unauthorized disclosure of
Safeguards Information are applicable to all licensees and all individuals:
Safeguards Information are applicable to all licensees and all individuals:
        This part [10 C.F.R. Part 73] prescribes requirements for the protection of
This part [10 C.F.R. Part 73] prescribes requirements for the protection of
        Safeguards Information in the hands of any person, whether or not a licensee of
Safeguards Information in the hands of any person, whether or not a licensee of
        the Commission, who produces, receives, or acquires Safeguards Information.
the Commission, who produces, receives, or acquires Safeguards Information.
10 C.F.R. § 73.1(b)(7).
10 C.F.R. § 73.1(b)(7).
The Commissions statutory authority to protect and prohibit the unauthorized disclosure of
The Commissions statutory authority to protect and prohibit the unauthorized disclosure of
Safeguards Information is even broader than is reflected in these regulations. Section 147 of
Safeguards Information is even broader than is reflected in these regulations. Section 147 of
the Act grants the Commission explicit authority to issue such orders, as necessary to prohibit
the Act grants the Commission explicit authority to issue such orders, as necessary to prohibit
the unauthorized disclosure of safeguards information . . . . This authority extends to
the unauthorized disclosure of safeguards information . . . . This authority extends to
information concerning special nuclear material, source material, and byproduct material, as
information concerning special nuclear material, source material, and byproduct material, as
well as production and utilization facilities.
well as production and utilization facilities.
                                                                                        Enclosure 3
Enclosure 3


                                                                                    RIS 2003-08
RIS 2003-08
                                                                                    Page 3 of 4
Page 3 of 4
The Act explicitly provides: Any person, whether or not a licensee of the Commission, who
The Act explicitly provides: Any person, whether or not a licensee of the Commission, who
violates any regulations adopted under this section shall be subject to the civil monetary
violates any regulations adopted under this section shall be subject to the civil monetary
penalties of Section 234 of this Act. Section 147a of the Act. Section 234a of the Act
penalties of Section 234 of this Act. Section 147a of the Act. Section 234a of the Act
provides for a civil monetary penalty not to exceed $120,000 for each violation. See
provides for a civil monetary penalty not to exceed $120,000 for each violation. See
10 C.F.R. § 2.205(j) (2003). Furthermore, a willful violation of any regulation or order governing
10 C.F.R. § 2.205(j) (2003). Furthermore, a willful violation of any regulation or order governing
Safeguards Information is a felony subject to criminal penalties in the form of fines or
Safeguards Information is a felony subject to criminal penalties in the form of fines or
imprisonment, or both. See Sections 147b and 223a of the Act.
imprisonment, or both. See Sections 147b and 223a of the Act.  
The NRC Enforcement Policy outlines potential NRC actions against both licensees and
The NRC Enforcement Policy outlines potential NRC actions against both licensees and
individuals for violations of the regulations and Orders using criteria that evaluate both the
individuals for violations of the regulations and Orders using criteria that evaluate both the
details and severity of the violation.
details and severity of the violation.
                                          II. DISCUSSION
II. DISCUSSION
All licensees and all other persons who now have, or in the future may have, access to
All licensees and all other persons who now have, or in the future may have, access to
Safeguards Information must comply with all applicable requirements delineated in regulations
Safeguards Information must comply with all applicable requirements delineated in regulations
and Orders governing the handling and unauthorized disclosure of Safeguards Information. As
and Orders governing the handling and unauthorized disclosure of Safeguards Information. As
stipulated in 10 C.F.R. § 73.21(a), licensees and persons who produce, receive or acquire
stipulated in 10 C.F.R. § 73.21(a), licensees and persons who produce, receive or acquire
Safeguards Information are required to ensure that Safeguards Information is protected against
Safeguards Information are required to ensure that Safeguards Information is protected against
unauthorized disclosure. To meet this requirement, licensees and persons subject to
unauthorized disclosure. To meet this requirement, licensees and persons subject to
10 C.F.R. § 73.21(a) shall establish and maintain an information protection system governing
10 C.F.R. § 73.21(a) shall establish and maintain an information protection system governing
the proper handling and unauthorized disclosure of Safeguards Information. All licensees
the proper handling and unauthorized disclosure of Safeguards Information. All licensees
should be aware that since the requirements of 10 C.F.R. § 73.21(a) apply to all persons who
should be aware that since the requirements of 10 C.F.R. § 73.21(a) apply to all persons who
receive Safeguards Information, they apply to all contractors whose employees may have
receive Safeguards Information, they apply to all contractors whose employees may have
Line 562: Line 778:
procedures on Safeguards Information or develop, maintain and implement their own
procedures on Safeguards Information or develop, maintain and implement their own
information protection system, but the licensees remain responsible for the conduct of their
information protection system, but the licensees remain responsible for the conduct of their
contractors. The elements of the required information protection system are specified in
contractors. The elements of the required information protection system are specified in
10 C.F.R. § 73.21(b) through (i). The information protection system must address, at a
10 C.F.R. § 73.21(b) through (i). The information protection system must address, at a
minimum, the following: the general performance requirement that each person who produces,
minimum, the following: the general performance requirement that each person who produces,
receives, or acquires Safeguards Information shall ensure that Safeguards Information is
receives, or acquires Safeguards Information shall ensure that Safeguards Information is
Line 575: Line 791:
requirements, all contractors, subcontractors, and individual employees also are individually
requirements, all contractors, subcontractors, and individual employees also are individually
responsible for complying with applicable requirements and all are subject to civil and criminal
responsible for complying with applicable requirements and all are subject to civil and criminal
sanctions for failures to comply. The NRC considers that violations of the requirements
sanctions for failures to comply. The NRC considers that violations of the requirements
applicable to the handling of Safeguards Information are a serious breach of adequate
applicable to the handling of Safeguards Information are a serious breach of adequate
protection of the public health and safety and the common defense and security of the United
protection of the public health and safety and the common defense and security of the United
States.
States.
                                                                                            Enclosure 3
Enclosure 3


                                                                                      RIS 2003-08
RIS 2003-08
                                                                                      Page 4 of 4
Page 4 of 4
As a result, the staff intends to use the NRC Enforcement Policy, including the discretion to
As a result, the staff intends to use the NRC Enforcement Policy, including the discretion to
increase penalties for violations, to determine appropriate sanctions against licensees and
increase penalties for violations, to determine appropriate sanctions against licensees and
individuals who violate these requirements. In addition, the Commission may use its discretion,
individuals who violate these requirements. In addition, the Commission may use its discretion,
based on the severity of the violation, to further increase the penalty for any violation up to the
based on the severity of the violation, to further increase the penalty for any violation up to the
statutory maximum. Willful violations of these requirements will also be referred to the
statutory maximum. Willful violations of these requirements will also be referred to the
Department of Justice for a determination of whether criminal penalties will be pursued.
Department of Justice for a determination of whether criminal penalties will be pursued.
                                                                                            Enclosure 3
Enclosure 3
}}
}}

Latest revision as of 05:17, 13 January 2025

Update of Nuclear Regulatory Commission (NRC) Distribution List for Documents Containing Safeguards (Sgi), Official Use Only (Ouo), and Routine Information - (Robinson Nuclear Plant)
ML112070095
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 07/25/2011
From: Ernstes M
NRC/RGN-II/DRS/PSB2
To: Duncan R
Progress Energy Co
References
RIS-03-008, RIS-05-026
Download: ML112070095 (17)


See also: RIS 2003-08

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

July 25, 2011

Mr. Robert J. Duncan II.

Vice President

Progress Energy

H. B. Robinson Steam Electric Plant, Unit 2

3581 West Entrance Rd

Hartsville, SC 29550

SUBJECT:

UPDATE OF NUCLEAR REGULATORY COMMISSION (NRC) DISTRIBUTION

LIST FOR DOCUMENTS CONTAINING SAFEGUARDS (SGI), OFFICIAL USE

ONLY (OUO), AND ROUTINE INFORMATION - (H. B. ROBINSON STEAM

ELECTRIC PLANT)

Dear Mr. Duncan:

I am writing to request current information on those individuals authorized to receive documents

containing Safeguards (SGI), Official Use Only (OUO), and Routine information on issues

relating to your facility. Safeguards information is a special category of sensitive unclassified

information authorized by Section 147 of the Atomic Energy Act of 1954, as amended (the Act),

to be protected. While SGI is considered sensitive unclassified information, it is handled and

protected more like classified confidential information than like other sensitive unclassified

information (e.g., privacy and proprietary information).

Access to SGI is controlled by a valid need-to-know basis. It is the responsibility of the NRC to

maintain the integrity of SGI distribution, therefore we are currently in the process of verifying

the identity, and contact information of individuals designated to receive documents with SGI,

OUO, and Routine information for your facility.

You are requested to provide an updated distribution list of those persons who should receive

documents containing SGI, OUO, and Routine information within 20 days of the date of this

letter to: ATTN: Document Control Desk, Washington, D.C. 20555-0001; with a copy to the

Regional Administrator Region II, so that we can verify and/or update our distribution

information.

Please ensure that each list clearly specifies the individuals who are authorized to receive

matter specific correspondence. To facilitate this request, I have enclosed a copy of the NRCs

official distribution list on file, which has been organized by category. Additionally, you will find

NRC Regulatory Issue Summary 2005-26 defining control of sensitive unclassified non-

safeguards information related to nuclear power reactors, and NRC Regulatory Issue Summary

2003-08, Summary of Safeguards Information Requirements.

Progress Energy

2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://ww.nrc.gov/reading-

rm/adams.html (the Public Electronic Room).

Should you have any questions concerning this letter, please contact us.

Sincerely,

/RA/

Michael E. Ernstes, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket No.: 50-261

License No.: DPR-23

Enclosures:

1. Current Official Distribution List

2. NRC Regulatory Issue Summary 2005-26

3. NRC Regulatory Issue Summary 2003-08

Progress Energy

2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://ww.nrc.gov/reading-

rm/adams.html (the Public Electronic Room).

Should you have any questions concerning this letter, please contact us.

Sincerely,

/RA/

Michael E. Ernstes, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket No.: 50-261

License No.: DPR-23

Enclosures:

1. Current Official Distribution List

2. NRC Regulatory Issue Summary 2005-26

3. NRC Regulatory Issue Summary 2003-08

X PUBLICLY AVAILABLE

G NON-PUBLICLY AVAILABLE

G SENSITIVE

X NON-SENSITIVE

ADAMS: X Yes

ACCESSION NUMBER: _________________________

X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED

OFFICE

RII: DRS

RII:DRS

RII:DRP

SIGNATURE

RA

RA

RA

NAME

J. CALLOWAY

M. ERNSTES

R. MUSSER

DATE

07/21/2011

07/25/2011

07/22/2011

E-MAIL COPY?

YES

NO YES

NO YES

NO

YES

NO YES

NO YES

NO YES

NO

OFFICIAL

RECORD

COPY DOCUMENT

NAME:

G:\\DRSII\\PSBII\\SGI

PROTECTION

LETTERS\\2011

SGI

DISTRIBUTION

UPDATE\\ROBINSON SGI PROTECTION UPDATE 2011.DOCX

OFFICIAL DISTRIBUTION LIST

H.B. ROBINSON STEAM ELECTRIC PLANT

Enclosure 1

ROUTINE DISTRIBUTION:

cc w/encl:

Division of Radiological Health

TN Dept. of Environment & Conservation

401 Church Street

Nashville, TN 37243-1532

Sandra Threatt, Manager

Nuclear Response and Emergency

Environmental Surveillance

Bureau of Land and Waste Management

Department of Health and Environmental

Control

Electronic Mail Distribution

Robert J. Duncan II

Vice President

H.B. Robinson Steam Electric Plant, Unit 2

Progress Energy

Electronic Mail Distribution

Brian C. McCabe

Manager, Nuclear Oversight

Shearon Harris Nuclear Power Plant

Progress Energy

Electronic Mail Distribution

Scott D. West

Superintendent Security

H. B. Robinson Steam Electric Plant

Progress Energy

Electronic Mail Distribution

Joseph W. Donahue

Vice President

Nuclear Oversight

Progress Energy

Electronic Mail Distribution

David T. Conley

Senior Counsel

Legal Department

Progress Energy

Electronic Mail Distribution

John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge

2300 N. Street, NW

Washington, DC 20037-1128

Richard Haynes

Director, Division of Waste Management

Bureau of Land and Waste Management

S.C. Department of Health and

Environmental Control

Electronic Mail Distribution

Kelvin Henderson

General Manager

Nuclear Fleet Operations

Progress Energy

Electronic Mail Distribution

Thomas Cosgrove

Plant General Manager

H.B. Robinson Steam Electric Plant, Unit 2

Progress Energy

Electronic Mail Distribution

Donna B. Alexander

Manager, Nuclear Regulatory Affairs

(interim)

Progress Energy

Electronic Mail Distribution

Robert P. Gruber

Executive Director

Public Staff - NCUC

4326 Mail Service Center

Raleigh, NC 27699-4326

W. Lee Cox, III

Section Chief

Radiation Protection Section

N.C. Department of Environmental

Commerce & Natural Resources

Electronic Mail Distribution

Greg Kilpatrick

Operations Manager

H.B. Robinson Steam Electric Plant, Unit 2

Progress Energy

Electronic Mail Distribution

Mark Yeager

Division of Radioactive Waste Mgmt.

S.C. Department of Health and

Environmental Control

Electronic Mail Distribution

OFFICIAL DISTRIBUTION LIST

H.B. ROBINSON STEAM ELECTRIC PLANT

Enclosure 1

ROUTINE DISTRIBUTION:

cc w/encl (continued):

Public Service Commission

State of South Carolina

P.O. Box 11649

Columbia, SC 29211

Chairman

North Carolina Utilities Commission

Electronic Mail Distribution

Henry Curry

Training Manager

H.B. Robinson Steam Electric Plant, Unit 2

Progress Energy

Electronic Mail Distribution

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

H. B. Robinson Steam Electric Plant

2112 Old Camden Rd

Hartsville, SC 29550

William R. Gideon

Director Site Operations

H. B. Robinson Steam Electric Plant, Unit 2

Progress Energy

Electronic Mail Distribution

Christos Kamilaris

Manager, Support Services

H.B. Robinson Steam Electric Plant, Unit 2

Progress Energy

Electronic Mail Distribution

Terry D. Hobbs

Plant General Manager

Brunswick Steam Electric Plant

Carolina Power & Light Company

Electronic Mail Distribution

Supervisor, Licensing/Regulatory Programs

(Vacant)

H. B. Robinson Steam Electric Plant

3581 West Entrance Rd.

Hartsville, SC 29550

John W. Flitter

Director of Electric & Gas Regulation

South Carolina Office of Regulatory Staff

Electronic Mail Distribution

OFFICIAL DISTRIBUTION LIST

H.B. ROBINSON STEAM ELECTRIC PLANT

Enclosure 1

OFFICIAL USE ONLY (OUO) DISTRIBUTION

cc w/encl

Thomas Cosgrove

Plant General Manager

H.B. Robinson Steam Electric Plant, Unit 2

Progress Energy

3581 West Entrance Rd.

Hartsville, SC 29550

Christos Kamilaris

Manager, Support Services

H.B. Robinson Steam Electric Plant, Unit 2

Progress Energy

3581 West Entrance Rd.

Hartsville, SC 29550

Joseph W. Donahue

Vice President

Nuclear Oversight

Progress Energy

TPP-15

100 E. Davie Street

Raleigh, NC 27601

Kelvin Henderson

General Manager

Nuclear Fleet Operations

Progress Energy

TPP-15

100 E. Davie Street

Raleigh, NC 27601

Edward T. O'Neil

Director

Nuclear Protective Service and Emergency Preparedness

Progress Energy

TPP-15

100 East Davie Street

Raleigh, NC 27601

Scott D. West

Superintendent Security

H. B. Robinson Steam Electric Plant

Progress Energy

3581 West Entrance Road

Hartsville, SC 29550

OFFICIAL DISTRIBUTION LIST

H.B. ROBINSON STEAM ELECTRIC PLANT

Enclosure 1

SAFEGUARDS (SGI) DISTRIBUTION:

cc w/encl

Edward T. O'Neil

Director

Nuclear Protective Service and Emergency Preparedness

Progress Energy

TPP-15

100 East Davie Street

Raleigh, NC 27601

Scott D. West

Superintendent Security

H. B. Robinson Steam Electric Plant

Progress Energy

3581 West Entrance Road

Hartsville, SC 29550

ML051430228

UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, D.C. 20555-0001

November 7, 2005

NRC REGULATORY ISSUE SUMMARY 2005-26

CONTROL OF SENSITIVE UNCLASSIFIED NONSAFEGUARDS

INFORMATION RELATED TO NUCLEAR POWER REACTORS

ADDRESSEES

All holders of operating licenses for nuclear power reactors and holders of and applicants for

certificates for reactor designs.

INTENT

The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS)

to inform the addressees of the appropriate handling of information that warrants controls

because of continuing concerns about terrorist attacks against the critical infrastructure of the

United States. The NRC intends to balance its responsibility to preserve public access to

information and support meaningful participation in NRCs regulatory processes against its

responsibility to withhold information that might unnecessarily compromise the security of

nuclear facilities. Licensees for operating nuclear power plants and reactor facility designers

may need to assess their document control procedures to ensure they protect sensitive

information. Although no specific action or written response is required, the NRC encourages

the addressees for this RIS, vendors and contractors, and others who may possess sensitive

information to destroy, mark, or otherwise control the information to avoid inadvertently

providing assistance to those who might use the information for malevolent acts.

BACKGROUND INFORMATION

NRC traditionally has given the public access to a significant amount of information about the

facilities and materials the agency regulates. Openness has been and remains a cornerstone

of NRCs regulatory philosophy. The Atomic Energy Act, subsequent legislation, and various

NRC regulations have given the public the right to participate in the licensing and oversight

process for nuclear power reactors and other NRC licensees. To participate in a meaningful

way, the public must have access to information about the design and operation of regulated

facilities and use of nuclear materials. However, NRC and other Government agencies have

always withheld some information from public disclosure for reasons of security, personal

privacy, or commercial or trade secret protection. In light of increased terrorist activity

worldwide, NRC reexamined its document disclosure policies.

Enclosure 2

RIS 2005-26

Page 2 of 5

Since the events of September 11, 2001, NRC has issued advisories and taken specific actions

regarding the security of its licensed facilities. NRC has also assessed and revised its policies

and practices for control of information so that information that could reasonably be expected to

be useful to terrorists in planning or executing an attack against nuclear power plants or other

NRC-licensed facilities will be withheld from public disclosure. The most recent and detailed

guidance on the control of information related to operating nuclear power plants is provided in

the Commission paper SECY-04-0191, Withholding Sensitive Unclassified Information

Concerning Nuclear Power Reactors From Public Disclosure, dated October 19, 2004, and the

associated staff requirements memorandum dated November 9, 2004. Also see

SECY-05-0091, Task Force Report on Public Disclosure of Security-Related Information,

dated May 18, 2005, and the associated staff requirements memorandum dated June 30, 2005.

The NRC staff is preparing similar guidance for materials licensees and expects to make it

available to the public in early 2006.

SUMMARY OF ISSUE

Considering the various reviews, legislation, and other changes since September 11, 2001, the

NRC staff believes that clarifying NRCs current procedures and policies regarding the control

of information will be beneficial to stakeholders. NRC will continue to make available to the

public most of the information that the agency receives from or sends to its licensees. In

addition, the public will have access to a large amount of information included in various reports

produced by the NRC staff. Much of NRCs information also will be readily available to the

public via the NRC Web site (www.nrc.gov) and the NRCs electronic document management

system (ADAMS) (www.nrc.gov/reading-rm/adams.html). In addition, other information may be

released to the public in response to formal or informal requests. The exceptions for certain

information to be withheld from public disclosure for reasons other than security (e.g., privacy,

proprietary, and pre-decisional information) have not changed as a result of recent events. The

appropriate handling of Safeguards Information (SGI) is discussed in RIS-2003-08, Protection

of Safeguards Information From Unauthorized Disclosure, dated April 30, 2003, and more

specific SGI designation guidance documents.

NRC withheld from public disclosure some information related to protecting operating nuclear

power plants although it does not meet the existing criteria for designation as SGI. This type of

information was recognized before September 11, 2001, and, when submitted to NRC by a

licensee, was withheld from public disclosure according to the provisions of 10 CFR 2.390(d)(1). This regulation states:

(d) The following information is considered commercial or financial information within the

meaning of §9.17(a)(4) of this chapter and is subject to disclosure only in accordance

with the provisions of §9.19 of this chapter.

(1) Correspondence and reports to or from the NRC which contain information or

records concerning a licensees or applicants physical protection, classified matter

protection, or material control and accounting program for special nuclear material not

otherwise designated as Safeguards Information or classified as National Security

Information or Restricted Data.

Enclosure 2

RIS 2005-26

Page 3 of 5

NRC expects that licensees will continue to request NRC withhold some information citing

10 CFR 2.390(d)(1) and that the volume of material requested to be withheld from public

disclosure under this provision will increase as the NRC staff and licensees implement the

guidance in this RIS. NRC changed its procedures shortly after September 11, 2001, to

withhold from public disclosure various categories of documents likely to include individual

records that warrant withholding under 10 CFR 2.390. The NRC staff will assess the need to

withhold such document categories if licensees routinely identify specific documents containing

sensitive information. The NRC staff will interact with licensees on a case-by-case basis

regarding the use of the provisions of 10 CFR 2.390(d)(1) to assure that information is properly

controlled, under either Section 2.390(d)(1) or one of the other Freedom of Information Act

(FOIA) exemptions that might be applicable. Licensees that identify information to be withheld

from public disclosure in accordance with 10 CFR 2.390(d)(1) or other provision in the

regulation should use the same general practices as used for proprietary commercial or

financial information. As shown on the attached diagram, the cover letter should clearly state

that the document includes sensitive information and the affected pages should include the

marking Security-Related Information Withhold Under 10 CFR 2.390. Unlike the

requirements for withholding proprietary information, licensees are not required to provide an

affidavit for sensitive information withheld under 10 CFR 2.390(d) and related to (1) physical

protection or (2) material control and accounting.

Most information received and generated by NRC deals with design, operations, or other

matters not directly related to the physical security of nuclear facilities or radioactive materials.

This information, if not protected as proprietary or under another exception, is generally made

available to the public. After September 11, 2001, NRC and other Government agencies

responded to concerns that some information easily available on public Web sites or by other

means might be useful to terrorists. SECY-04-0191 provides the primary NRC guidance on

whether information related to operating nuclear power plants should be withheld from public

disclosure in light of the post-September 11 concerns. The NRC staff has posted the guidance

and related material within the public reading room (http://www.nrc.gov/reading-rm.html) on the

NRC Web site, and stakeholders can ask questions or make suggestions about the guidance

and the examples.

As discussed in SECY-04-0191, other Government agencies have issued regulations or

guidance for protecting information that could be reasonably expected to be useful to terrorists

in planning or executing an attack on critical infrastructure.

Protected critical infrastructure information (PCII) is information related to the security of

critical infrastructure that is voluntarily provided to the Department of Homeland Security

(DHS).

Critical energy infrastructure information (CEII) is defined in Federal Energy Regulatory

Commission (FERC) regulations as information related to energy-related infrastructure

(e.g., hydroelectric dams and electric transmission systems).

Sensitive security information (SSI) is defined in Transportation Safety Administration

(TSA) and Department of Transportation (DOT) regulations as information about the

security of transportation assets, including pipelines.

Enclosure 2

RIS 2005-26

Page 4 of 5

Licensees may need to assess and revise their procedures for handling sensitive unclassified

nonsafeguards information in their normal activities and interactions with parties other than

NRC. During discussions of existing practices with various licensees, the NRC staff discovered

that licensees vary in how they treat and protect information that was previously unprotected but

now is considered sensitive. Some licensees have instituted more restrictive controls. Some

have determined that their routine business practices provide an appropriate level of protection

for the sensitive information.

As described in 10 CFR 2.390, information deemed sensitive because it relates to physical

protection or material control and accounting is protected in much the same way as commercial

or financial information. As with proprietary information, licensees are expected to have

sufficient internal controls to keep the information confidential. Possible methods to prevent the

inadvertent release of sensitive unclassified nonsafeguards information include marking

documents as described in 10 CFR 2.390, restricting access to electronic recordkeeping

systems, and controlling the reproduction, distribution, and destruction of potentially sensitive

records. NRC uses the marking Security-Related Information Withhold Under

10 CFR 2.390 and encourages the use of this marking by licensees and others possessing

information deemed sensitive using the guidance in SECY-04-0191. Licensees should ensure

that similar controls are in place when sensitive information is provided to outside parties such

as contractors or other Government agencies. The NRC staff posted information on NRCs

Web site (http://www.nrc.gov/reading-rm.html) and included a feedback form for questions or

suggestions on how to effectively control sensitive information.

BACKFIT DISCUSSION

This RIS requires no action or written response. Any action on the part of addressees to

assess and revise their document control procedures in accordance with the guidance

contained in this RIS is strictly voluntary and, therefore, is not a backfit under 10 CFR 50.109.

Consequently, the NRC staff did not perform a backfit analysis.

FEDERAL REGISTER NOTIFICATION

A notice of opportunity for public comment on this RIS was not published in the Federal

Register because it is informational and pertains to a staff position that does not represent a

departure from current regulatory requirements and practice. NRC intends to work with the

Nuclear Energy Institute, industry representatives, members of the public, and other

stakeholders in modifying related guidance documents.

SMALL BUSINESS REGULATORY ENFORCEMENT FAIRNESS ACT OF 1996

The NRC has determined that this action is not a rule and thus is not subject to the Small

Business Regulatory Enforcement Fairness Act of 1996.

Enclosure 2

RIS 2005-26

Page 5 of 5

PAPERWORK REDUCTION ACT STATEMENT

This RIS does not contain information collections and, therefore, is not subject to the

requirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).

CONTACT

Please direct any questions about this matter to the technical contacts listed below or to the

appropriate Office of Nuclear Reactor Regulation (NRR) project manager.

/RA/ By Patrick L. Hiland For/

Michael J. Case, Director

Division of Inspection and Regional Support

Office of Nuclear Reactor Regulation

Technical Contacts:

William Reckley, NRR

Margie Kotzalas, NRR

301-415-1323

301-415-2737

E-mail: wdr@nrc.gov

E-mail: mxk5@nrc.gov

Attachment: Marking diagram for documents withheld under 10 CFR 2.390

Note: NRC generic communications may be found on the NRC public Web site,

http://www.nrc.gov, under Electronic Reading Room/Document Collections.

Enclosure 2

Security-Related Information

Withhold Under 10 CFR 2.390

Subject

XXXXXXXXXX

XXXXXXXXXX

XXXXXXXXXX

XXXXXXXXXX

Attachment

RIS-2005-26

Page 1 of 1

SUGGESTED MARKINGS

Withhold From Public Disclosure In Accordance With 10 CFR 2.390

Overall page marking on the top of all pages

Ensure Subject Line is non-sensitive

Appropriate Controls

Access:

Need-to-know in order to perform official licensee functions.

Storage:

Openly within licensee facilities with electronic or other access

controls, for example, key cards, guards, alarms.

Mail:

U.S. Postal Service first class mail, single opaque envelope with

no markings to indicate 10 CFR 2.390 contents.

Electronic Transmission:

Over encrypted phone, facsimile, computer, if available;

otherwise over non-encrypted circuits where recipient will

be present to receive the transmission.

Enclosure 2

RIS 2003-08

Page 1 of 4

SUMMARY OF SAFEGUARDS INFORMATION REQUIREMENTS

I. AUTHORITY

The Atomic Energy Act of 1954, as amended, 42 U.S.C. §§ 2011 et seq. (Act), grants the

Nuclear Regulatory Commission broad and unique authority to prohibit the unauthorized

disclosure of Safeguards Information upon a determination that the unauthorized disclosure of

such information could reasonably be expected to have a significant adverse effect on the

health and safety of the public or the common defense and security by significantly increasing

the likelihood of theft, diversion, or sabotage of materials or facilities subject to NRC jurisdiction.

Section 147 of the Act, 42 U.S.C. § 2167.

For licensees and any other person, whether or not a licensee (primarily 10 C.F.R. Part 50

reactor licensees, 10 C.F.R. Part 70 licensees for special nuclear material, and their employees

and contractors) subject to the requirements in 10 C.F.R. Part 73, Safeguards Information is

defined by NRC regulation as follows:

Safeguards Information means information not otherwise classified as National

Security Information or Restricted Data which specifically identifies a licensee's

or applicant's detailed, (1) security measures for the physical protection of

special nuclear material, or (2) security measures for the physical protection and

location of certain plant equipment vital to the safety of production or utilization

facilities.

10 C.F.R. § 73.2.

Specific requirements for the protection of Safeguards Information are contained in

10 C.F.R. § 73.21. Access to Safeguards Information is limited as follows:

(c) Access to Safeguards Information. (1) Except as the Commission may

otherwise authorize, no person may have access to Safeguards Information

unless the person has an established "need to know" for the information and is:

(i) An employee, agent, or contractor of an applicant, a licensee, the

Commission, or the United States Government. However, an individual to be

authorized access to Safeguards Information by a nuclear power reactor

applicant or licensee must undergo a Federal Bureau of Investigation criminal

history check to the extent required by 10 CFR 73.57;

(ii) A member of a duly authorized committee of the Congress;

(iii) The Governor of a State or designated representatives;

(iv) A representative of the International Atomic Energy Agency (IAEA) engaged

in activities associated with the U.S./IAEA Safeguards Agreement who has been

certified by the NRC;

Enclosure 3

RIS 2003-08

Page 2 of 4

(v) A member of a state or local law enforcement authority that is responsible for

responding to requests for assistance during safeguards emergencies; or

(vi) An individual to whom disclosure is ordered pursuant to § 2.744(e) of this

chapter [10 CFR 2.744(e)].

(2) Except as the Commission may otherwise authorize, no person may disclose

Safeguards Information to any other person except as set forth in paragraph

(c)(1) of this section.

10 C.F.R. § 73.21(c).

The need to know requirement is specified by NRC regulation as follows:

Need to know means a determination by a person having responsibility for

protecting Safeguards Information that a proposed recipient's access to

Safeguards Information is necessary in the performance of official, contractual,

or licensee duties of employment.

10 C.F.R. § 73.2.

Thus, unless otherwise authorized by the Commission, NRC regulations limit access to

Safeguards Information to certain specified individuals who have been determined to have a

need to know, i.e., specified individuals whose access has been determined to be necessary

in the performance of official, contractual or licensee duties of employment.

Furthermore, except as otherwise authorized by the Commission, no person may disclose

Safeguards Information to any other person unless that other person is one of the specified

persons listed in 10 C.F.R. § 73.21(c)(1) and that person also has a need to know.

10 C.F.R. § 73.21(c)(2). These regulations and prohibitions on unauthorized disclosure of

Safeguards Information are applicable to all licensees and all individuals:

This part [10 C.F.R. Part 73] prescribes requirements for the protection of

Safeguards Information in the hands of any person, whether or not a licensee of

the Commission, who produces, receives, or acquires Safeguards Information.

10 C.F.R. § 73.1(b)(7).

The Commissions statutory authority to protect and prohibit the unauthorized disclosure of

Safeguards Information is even broader than is reflected in these regulations. Section 147 of

the Act grants the Commission explicit authority to issue such orders, as necessary to prohibit

the unauthorized disclosure of safeguards information . . . . This authority extends to

information concerning special nuclear material, source material, and byproduct material, as

well as production and utilization facilities.

Enclosure 3

RIS 2003-08

Page 3 of 4

The Act explicitly provides: Any person, whether or not a licensee of the Commission, who

violates any regulations adopted under this section shall be subject to the civil monetary

penalties of Section 234 of this Act. Section 147a of the Act. Section 234a of the Act

provides for a civil monetary penalty not to exceed $120,000 for each violation. See

10 C.F.R. § 2.205(j) (2003). Furthermore, a willful violation of any regulation or order governing

Safeguards Information is a felony subject to criminal penalties in the form of fines or

imprisonment, or both. See Sections 147b and 223a of the Act.

The NRC Enforcement Policy outlines potential NRC actions against both licensees and

individuals for violations of the regulations and Orders using criteria that evaluate both the

details and severity of the violation.

II. DISCUSSION

All licensees and all other persons who now have, or in the future may have, access to

Safeguards Information must comply with all applicable requirements delineated in regulations

and Orders governing the handling and unauthorized disclosure of Safeguards Information. As

stipulated in 10 C.F.R. § 73.21(a), licensees and persons who produce, receive or acquire

Safeguards Information are required to ensure that Safeguards Information is protected against

unauthorized disclosure. To meet this requirement, licensees and persons subject to

10 C.F.R. § 73.21(a) shall establish and maintain an information protection system governing

the proper handling and unauthorized disclosure of Safeguards Information. All licensees

should be aware that since the requirements of 10 C.F.R. § 73.21(a) apply to all persons who

receive Safeguards Information, they apply to all contractors whose employees may have

access to Safeguards Information and they must either adhere to the licensees policies and

procedures on Safeguards Information or develop, maintain and implement their own

information protection system, but the licensees remain responsible for the conduct of their

contractors. The elements of the required information protection system are specified in

10 C.F.R. § 73.21(b) through (i). The information protection system must address, at a

minimum, the following: the general performance requirement that each person who produces,

receives, or acquires Safeguards Information shall ensure that Safeguards Information is

protected against unauthorized disclosure; protection of Safeguards Information at fixed sites,

in use and in storage, and while in transit; inspections, audits and evaluations; correspondence

containing Safeguards Information; access to Safeguards Information; preparation, marking,

reproduction and destruction of documents; external transmission of documents; use of

automatic data processing systems; and removal of the Safeguards Information category.

As noted above, in addition to the responsibility of each licensee to ensure that all of its

employees, contractors and subcontractors, and their employees comply with applicable

requirements, all contractors, subcontractors, and individual employees also are individually

responsible for complying with applicable requirements and all are subject to civil and criminal

sanctions for failures to comply. The NRC considers that violations of the requirements

applicable to the handling of Safeguards Information are a serious breach of adequate

protection of the public health and safety and the common defense and security of the United

States.

Enclosure 3

RIS 2003-08

Page 4 of 4

As a result, the staff intends to use the NRC Enforcement Policy, including the discretion to

increase penalties for violations, to determine appropriate sanctions against licensees and

individuals who violate these requirements. In addition, the Commission may use its discretion,

based on the severity of the violation, to further increase the penalty for any violation up to the

statutory maximum. Willful violations of these requirements will also be referred to the

Department of Justice for a determination of whether criminal penalties will be pursued.

Enclosure 3