ML113410126: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML113410126 | | number = ML113410126 | ||
| issue date = 11/30/2011 | | issue date = 11/30/2011 | ||
| title = | | title = Ltr to Ralph Andersen: Re Participation in Commission Briefing on Proposed Rule to Revise the Environmental Review for Renewal of Nuclear Power Plant Operating Licenses (Part 51) on 01/11/2011 | ||
| author name = Vietti-Cook A | | author name = Vietti-Cook A | ||
| author affiliation = NRC/SECY | | author affiliation = NRC/SECY | ||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 30, 2011 SECRETARY Ralph Andersen, Senior Director Radiation Safety and Environmental Protection Nuclear Energy Institute 1776 I Street NW, Suite 400 Washington, DC 20006 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 30, 2011 SECRETARY Ralph Andersen, Senior Director Radiation Safety and Environmental Protection Nuclear Energy Institute 1776 I Street NW, Suite 400 Washington, DC 20006 | ||
==Dear Mr. Andersen:== | ==Dear Mr. Andersen:== | ||
The U.S. Nuclear Regulatory Commission (NRC) is pleased that you will participate in a public Commission meeting on the proposed rule to revise the environmental review for renewal of nuclear power plant operating licenses (Part 51), on January 11, 2012, at 1 :00 p.m. The meeting will be held in the Commissioners' Conference Room on the first floor of the NRC's Headquarters building at One White Flint North, Rockville, Maryland. The Commission is interested in hearing the industry's persective on revision and implementation of the revised Part 51 as seen by applicants seeking to renew an operating license. I am enclosing a copy of the draft meeting agenda for your information (enclosure 1). My staff will keep you informed of any updates to the agenda. | |||
The U.S. Nuclear Regulatory Commission (NRC) is pleased that you will participate in a public Commission meeting on the proposed rule to revise the environmental review for renewal of nuclear power plant operating licenses (Part 51), on January 11, 2012, at 1:00 p.m. The meeting will be held in the Commissioners' Conference Room on the first floor of the NRC's Headquarters building at One White Flint North, Rockville, Maryland. The Commission is interested in hearing the industry's persective on revision and implementation of the revised Part 51 as seen by applicants seeking to renew an operating license. I am enclosing a copy of the draft meeting agenda for your information (enclosure 1). My staff will keep you informed of any updates to the agenda. | |||
To assist the Commission in preparing for the meeting, please e-mail any written material, including slides/viewgraphs, to Ms. Rochelle Savol and Ms. Sandy Joosten (rochelle.bavol@nrc.gov and sandy.joosten@nrc.gov) in the Office of the Secretary, by Januarv 4.2012, so that it can be distributed to the Commission for review in advance of the meeting. Enclosed are guidelines for slides, if you choose to use them (enclosure 2). | To assist the Commission in preparing for the meeting, please e-mail any written material, including slides/viewgraphs, to Ms. Rochelle Savol and Ms. Sandy Joosten (rochelle.bavol@nrc.gov and sandy.joosten@nrc.gov) in the Office of the Secretary, by Januarv 4.2012, so that it can be distributed to the Commission for review in advance of the meeting. Enclosed are guidelines for slides, if you choose to use them (enclosure 2). | ||
PowerPoint is the preferred format, but other electronic presentation formats may be used. This Commission meeting will be webcast live at the Web address: www.nrc.gov. If you intend to use slides, they will also be posted on the NRC website prior to the meeting. If you have any questions, please contact Ms. Savol at 301-415-1651. | PowerPoint is the preferred format, but other electronic presentation formats may be used. This Commission meeting will be webcast live at the Web address: www.nrc.gov. If you intend to use slides, they will also be posted on the NRC website prior to the meeting. If you have any questions, please contact Ms. Savol at 301-415-1651. | ||
Your presentation at the Commission meeting should be based on the assumption that Commissioners are familiar with the content of your written material. Please plan your oral presentation for 10 minutes, discussing the important points on which you wish to focus the Commission's attention. | Your presentation at the Commission meeting should be based on the assumption that Commissioners are familiar with the content of your written material. Please plan your oral presentation for 10 minutes, discussing the important points on which you wish to focus the Commission's attention. | ||
The NRC Headquarters building is located opposite the White Flint Metro Station on Rockville Pike and Marinelli Drive, Rockville, Maryland. The White Flint Metro Station is on the Red Line of the Washington area subway system. Reserved visitor parking for Commission guests is available. If you wish to use reserved parking, please notify Ms. Savol in advance. If reserved parking has been arranged, please check-in with the security staff at the entrance to the NRC campus on Marinelli Drive when you arrive. A Security Guard will call for an escort. Please | The NRC Headquarters building is located opposite the White Flint Metro Station on Rockville Pike and Marinelli Drive, Rockville, Maryland. The White Flint Metro Station is on the Red Line of the Washington area subway system. Reserved visitor parking for Commission guests is available. If you wish to use reserved parking, please notify Ms. Savol in advance. If reserved parking has been arranged, please check-in with the security staff at the entrance to the NRC campus on Marinelli Drive when you arrive. A Security Guard will call for an escort. Please | ||
- 2 note that visitors will be screened through metal detectors, will have their packages x-rayed, and will be required to present a picture identification card prior to signing in at the registration desk. | |||
Sincerely, | Sincerely, | ||
/'\\ | |||
nnette Vietti-Cook Secretary of the Commission | nnette Vietti-Cook Secretary of the Commission | ||
==Enclosures:== | ==Enclosures:== | ||
: 1. Draft Agenda | : 1. Draft Agenda | ||
: 2. Briefing Visuals Guidance | : 2. Briefing Visuals Guidance Draft: 11/30/11 SCHEDULING NOTE | ||
==Title:== | |||
BRIEFING ON PROPOSED RULE TO REVISE THE ENVIRONMENTAL REVIEW FOR RENEWAL OF NUCLEAR POWER PLANT OPERATING LICENSES (PART 51) | |||
==Purpose:== | |||
To provide the Commission with a discussion of the anticipated changes to Part 51 and the supporting technical basis document, NUREG-1437, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" (GElS). | |||
Scheduled: | |||
January 11, 2012 1:00 pm Duration: | |||
Approx. 3 hours Location: | |||
Commissioners' Conference Room, 1st fl OWFN | |||
==Participants:== | |||
Presentation External Panel 40 mins.* | |||
Industry Representatives Ralph Andersen, Senior Director, Radiation Safety and Environmental 10 mins.* | |||
Industry Representatives Ralph Andersen, Senior Director, Radiation Safety and Environmental | |||
Protection, Nuclear Energy Institute Topic: Industry's perspective on revision and implementation of the revised Part 51 as seen by applicants seeking to renew an operating license. | Protection, Nuclear Energy Institute Topic: Industry's perspective on revision and implementation of the revised Part 51 as seen by applicants seeking to renew an operating license. | ||
Jack Bailey, Vice President, Nuclear Generation Development, | Jack Bailey, Vice President, Nuclear Generation Development, 10 mins.* | ||
Tennessee Valley Authority Topic: Licensee's perspective on applying for renewal of an operating license. | Tennessee Valley Authority Topic: Licensee's perspective on applying for renewal of an operating license. | ||
(Note: Sequoyah would most likely become the first plant whose application would be affected by the rule change.) | (Note: Sequoyah would most likely become the first plant whose application would be affected by the rule change.) | ||
Public Interest Representatives Phillip Musegaas, Riverkeeper | Public Interest Representatives Phillip Musegaas, Riverkeeper 10 mins.* | ||
Topic: Public interest perspective on the Part 51 revisions. | Topic: Public interest perspective on the Part 51 revisions. | ||
George Jepsen, Connecticut Attorney General | George Jepsen, Connecticut Attorney General 10 mins.* | ||
(Invited but not yet confirmed.) | (Invited but not yet confirmed.) | ||
Topic: Environmental Impact of License Renewal Commission Q & A | Topic: Environmental Impact of License Renewal Commission Q & A 50 mins. | ||
1 | 1 | ||
Break | Break 5 mins. | ||
NRC Staff Panel | NRC Staff Panel 35 mins.* | ||
Bill Borchardt, Executive Director for Operations Eric Leeds, Director, NRR Melanie Galloway, Deputy Director, Division of License Renewal, NRR | Bill Borchardt, Executive Director for Operations Eric Leeds, Director, NRR Melanie Galloway, Deputy Director, Division of License Renewal, NRR 15 mins.* | ||
Topic: Overview of rule background and history and summary of public outreach and comments Andrew Imboden, Branch Chief, Environmental Review and | Topic: Overview of rule background and history and summary of public outreach and comments Andrew Imboden, Branch Chief, Environmental Review and 20 mins.* | ||
Guidance Update, NRR Topic: Discussion of the substantive changes to Part 51 and the revised GElS Commission Q & A | Guidance Update, NRR Topic: Discussion of the substantive changes to Part 51 and the revised GElS Commission Q & A 50 mins. | ||
Discussion - Wrap-up | Discussion - Wrap-up 5 mins. | ||
*For presentation only and does not include time for Commission Q & A's Documents: | *For presentation only and does not include time for Commission Q & A's Documents: | ||
Note: The final rule package is due 5/1/12. | Note: The final rule package is due 5/1/12. | ||
Background material due to SECY: December 27,2011. | Background material due to SECY: December 27,2011. | ||
Slides due to SECY: January 4, 2012. | Slides due to SECY: January 4, 2012. | ||
2 PRESENTATION TITLE Arial Black 40 on white background Date of Briefing Your name, title, office Arial Black 32 | |||
Slide Title - Arial Black 36 | Slide Title - Arial Black 36 | ||
| Line 67: | Line 73: | ||
* Top and Side margins 1 inch min. | * Top and Side margins 1 inch min. | ||
* Bottom margin 2 inch min. | * Bottom margin 2 inch min. | ||
* Number pages | * Number pages | ||
.* Explain acronyms or include a separate slide with list 2}} | .* Explain acronyms or include a separate slide with list 2}} | ||
Latest revision as of 21:42, 12 January 2025
| ML113410126 | |
| Person / Time | |
|---|---|
| Issue date: | 11/30/2011 |
| From: | Annette Vietti-Cook NRC/SECY |
| To: | Andersen R Nuclear Energy Institute |
| References | |
| Download: ML113410126 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 30, 2011 SECRETARY Ralph Andersen, Senior Director Radiation Safety and Environmental Protection Nuclear Energy Institute 1776 I Street NW, Suite 400 Washington, DC 20006
Dear Mr. Andersen:
The U.S. Nuclear Regulatory Commission (NRC) is pleased that you will participate in a public Commission meeting on the proposed rule to revise the environmental review for renewal of nuclear power plant operating licenses (Part 51), on January 11, 2012, at 1 :00 p.m. The meeting will be held in the Commissioners' Conference Room on the first floor of the NRC's Headquarters building at One White Flint North, Rockville, Maryland. The Commission is interested in hearing the industry's persective on revision and implementation of the revised Part 51 as seen by applicants seeking to renew an operating license. I am enclosing a copy of the draft meeting agenda for your information (enclosure 1). My staff will keep you informed of any updates to the agenda.
To assist the Commission in preparing for the meeting, please e-mail any written material, including slides/viewgraphs, to Ms. Rochelle Savol and Ms. Sandy Joosten (rochelle.bavol@nrc.gov and sandy.joosten@nrc.gov) in the Office of the Secretary, by Januarv 4.2012, so that it can be distributed to the Commission for review in advance of the meeting. Enclosed are guidelines for slides, if you choose to use them (enclosure 2).
PowerPoint is the preferred format, but other electronic presentation formats may be used. This Commission meeting will be webcast live at the Web address: www.nrc.gov. If you intend to use slides, they will also be posted on the NRC website prior to the meeting. If you have any questions, please contact Ms. Savol at 301-415-1651.
Your presentation at the Commission meeting should be based on the assumption that Commissioners are familiar with the content of your written material. Please plan your oral presentation for 10 minutes, discussing the important points on which you wish to focus the Commission's attention.
The NRC Headquarters building is located opposite the White Flint Metro Station on Rockville Pike and Marinelli Drive, Rockville, Maryland. The White Flint Metro Station is on the Red Line of the Washington area subway system. Reserved visitor parking for Commission guests is available. If you wish to use reserved parking, please notify Ms. Savol in advance. If reserved parking has been arranged, please check-in with the security staff at the entrance to the NRC campus on Marinelli Drive when you arrive. A Security Guard will call for an escort. Please
- 2 note that visitors will be screened through metal detectors, will have their packages x-rayed, and will be required to present a picture identification card prior to signing in at the registration desk.
Sincerely,
/'\\
nnette Vietti-Cook Secretary of the Commission
Enclosures:
- 1. Draft Agenda
- 2. Briefing Visuals Guidance Draft: 11/30/11 SCHEDULING NOTE
Title:
BRIEFING ON PROPOSED RULE TO REVISE THE ENVIRONMENTAL REVIEW FOR RENEWAL OF NUCLEAR POWER PLANT OPERATING LICENSES (PART 51)
Purpose:
To provide the Commission with a discussion of the anticipated changes to Part 51 and the supporting technical basis document, NUREG-1437, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" (GElS).
Scheduled:
January 11, 2012 1:00 pm Duration:
Approx. 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> Location:
Commissioners' Conference Room, 1st fl OWFN
Participants:
Presentation External Panel 40 mins.*
Industry Representatives Ralph Andersen, Senior Director, Radiation Safety and Environmental 10 mins.*
Protection, Nuclear Energy Institute Topic: Industry's perspective on revision and implementation of the revised Part 51 as seen by applicants seeking to renew an operating license.
Jack Bailey, Vice President, Nuclear Generation Development, 10 mins.*
Tennessee Valley Authority Topic: Licensee's perspective on applying for renewal of an operating license.
(Note: Sequoyah would most likely become the first plant whose application would be affected by the rule change.)
Public Interest Representatives Phillip Musegaas, Riverkeeper 10 mins.*
Topic: Public interest perspective on the Part 51 revisions.
George Jepsen, Connecticut Attorney General 10 mins.*
(Invited but not yet confirmed.)
Topic: Environmental Impact of License Renewal Commission Q & A 50 mins.
1
Break 5 mins.
NRC Staff Panel 35 mins.*
Bill Borchardt, Executive Director for Operations Eric Leeds, Director, NRR Melanie Galloway, Deputy Director, Division of License Renewal, NRR 15 mins.*
Topic: Overview of rule background and history and summary of public outreach and comments Andrew Imboden, Branch Chief, Environmental Review and 20 mins.*
Guidance Update, NRR Topic: Discussion of the substantive changes to Part 51 and the revised GElS Commission Q & A 50 mins.
Discussion - Wrap-up 5 mins.
- For presentation only and does not include time for Commission Q & A's Documents:
Note: The final rule package is due 5/1/12.
Background material due to SECY: December 27,2011.
Slides due to SECY: January 4, 2012.
2 PRESENTATION TITLE Arial Black 40 on white background Date of Briefing Your name, title, office Arial Black 32
Slide Title - Arial Black 36
- Text (Arial Black 32) on white.
- Top and Side margins 1 inch min.
- Bottom margin 2 inch min.
- Number pages
.* Explain acronyms or include a separate slide with list 2