{{#Wiki_filter:ES-301                              Administrative Topics Outline                                      Form ES-301-1 PVNGS Facility: _______________________________                                                              03/19/12 Date of Examination: _____________
{{#Wiki_filter:}}
Examination Level: RO  SRO                                            Operating Test Number: __________
Administrative Topic            Type                      Describe activity to be performed (see Note)              Code*
Determine ability to stand shift with training and license proficiency time. (2.1.4)
Conduct of Operations                N,R In Lower Mode determine Pressurizer level and RCS volume to be drained to the Refueling Water Tank (RWT). (2.1.25)
Conduct of Operations                M,R Tech Review a permit (clearance) (2.2.13)
Equipment Control                    N,R Determine the proper REP task and RCA entry requirements. (2.3.7)
D Radiation Control
`  Emergency Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
* Type Codes & Criteria:          (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301, Page 22 of 27
 
ES-301                              Administrative Topics Outline                                  Form ES-301-1 PVNGS Facility: _______________________________                                                          03/19/12 Date of Examination: _____________
Examination Level: RO          SRO                                     Operating Test Number: __________
Administrative Topic            Type                      Describe activity to be performed (see Note)              Code*
Determine if manning is met with medical and training requirements.
(2.1.4)
Conduct of Operations                N,R Determine "if time shutdown" is met and makeup flow requirements for mid-loop (2.1.20)
Conduct of Operations                N,R Identify LCOs and Conditions associated with the numerous Main Steam Isolation Valve pressures.
Equipment Control                    M,R        (2.2.22)
Determine hold points exceeded, approval needed, and which AO will perform the task (2.3.4)
M,R Radiation Control Determine Classification, Protective Action Recommendation and Release status (2.4.41)
D,R
`  Emergency Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
* Type Codes & Criteria:          (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301, Page 22 of 27 6IZMWMSR 
 
A-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK: 1290020301 Conduct of Shift Operations TASK STANDARD: At the completion of this JPM the applicant will have determined that he IS current in training, he CAN assume RO duties on Dec 31, and he CANNOT assume RO duties on Jan 1 due to not performing at least 5 12-hour shifts in the previous quarter.
K/A:      2.1.4                                      K/A RATING:        RO:    3.3 SRO:          3.8 K/A:                                                  K/A RATING:        RO:          SRO:
APPLICABLE POSITION(S):                    RO        VALIDATION TIME:                10 minutes
 
==REFERENCES:==
40DP-9OP02, Conduct of Shift Operations SUGGESTED TESTING ENVIRONMENT: SIMULATOR                                  PLANT          OTHER          X JPM TYPE Time Critical? (Yes/No)      No                    Alternative Path? (Yes/No)  No PRA/SRA related? (Yes/No)        No APPROVAL Developed By:              Larry Burton              Date:      10/04/2011 Revised By:                                          Date:
Technical Review                                    Operations Approval EP Review                        N/A                Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                        Date:
Evaluator Name:
Time to complete:                  Minutes            GRADE (Circle  One)  SAT / UNSAT
* Page 1 of 10
 
A-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. SIMULATOR SETUP:
x    IC#:
x    SCENARIOS, MALFUNCTIONS, OVERRIDES, etc. for Setup:
COMMAND/COMMUNICATION                                        DESCRIPTION x  SPECIAL INSTRUCTIONS:
o None x  REQUIRED CONDITIONS:
o None x  SIMULATOR EVALUATION PRE-CHECK Correct IC Alarm Silence Off Procedures available, page checked, and clean For JPMs administered during transients, another instructor available to control plant parameters.
Verified by: ____________________________        Date: ____________________
(NA if Simulator setup not required)
: 2. SPECIAL TOOLS/EQUIPMENT:
A copy of 40DP-9OP02 available. This JPM was written using Revision 56 of 40DP-9OP02.
: 3. JPM PERFORMANCE:
x  MALFUNCTIONS, OVERRIDES, etc. during JPM STEP        COMMAND/COMMUNICATION                                DESCRIPTION Page 2 of 10
 
A-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANT JPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o You may use any source of information normally available.
INITIAL CONDITIONS:
x    You are currently licensed at PVNGS.
x    You have been assigned to work control for last 4 months.
x    Today is December 27th.
x    You attended LOCT training November 8th -11th but did not take the written exam.
x    The LOCT cycle completed Friday, December 2nd.
x    Attached is a spreadsheet of shifts you covered in this quarter.
x    You met all license maintenance requirements for the 3rd quarter.
x    You have been asked to take the dayshift on December 31st and January 1st.
INITIATING CUE:
x    You are directed to determine if you:
: 1. are current in Training
: 2. meet requirements to assume RO duties on December 31st
: 3. meet requirements to assume RO duties on January 1st.
Provide your answers on the attached sheet.
Page 3 of 10
 
A-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*) denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 10
 
A-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
STEP                            CUE                    STANDARD
: 1.
* 3.6.1.1 of 40DP-9OP02                                      Examinee determines that it has been less than 6 weeks since the An Operator's training is current                          completion of the last training cycle when all required material in an                            and they are therefore current in LOCT Training Cycle is completed.                          LOCT.
If any LOCT material is missed during a training cycle, make-up training shall be completed no later than 6 weeks from the end of the training cycle that the training was part of.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                    STANDARD
: 2.
* 3.6.2 of 40DP-9OP02                                        Examinee determines that since they are current in training and met license ACTIVE NRC Operators License                                maintenance requirements in the 3rd exists when an operator has a valid                        quarter they can take the shift on license and has actively performed                        December 31st.
the functions of an operator or senior operator on a minimum of five 12-hour shifts per calendar quarter.
SAT / UNSAT Comments (required for UNSAT):
Page 5 of 10
 
A-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                            CUE                              STANDARD
: 3.
* 3.6.2 of 40DP-9OP02                                                    Examinee determines that they CAN NOT take the shift on January 1st ACTIVE NRC Operators License                                          because they did not perform 5-12 exists when an operator has a valid                                    hour shift in the 4th quarter.
license and has actively performed the functions of an operator or senior operator on a minimum of five 12-hour shifts per calendar quarter.
SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparedness organization for resolution.
NORMAL TERMINATION POINT Page 6 of 10
 
A-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam Answer Key October 15th                    12 hour day shift (RO)
October 16th                    10 hour shift 0630 to 1630 (RO)
November 24th                    12 hour day shift (CO)
December 11th                    6.5 hours 1200 to 1830 (CO)
December 25th                    12 hour day shift (RO)
: 1. Are you current in Training YES / NO If NO what must be done to become current?
_____________________________________________________________________
_____________________________________________________________________
: 2. Can you assume RO duties on December 31st?    YES / NO If NO why not?
_____________________________________________________________________
_____________________________________________________________________
: 3. Can you assume RO duties on January 1st ?      YES / NO If NO why not?
The operator did not perform at least 5 -12 hour shifts of license proficiency time in the 4th quarter therefore the operator CAN NOT assume the RO duties in the next quarter.
Answer Key Page 7 of 10
 
A-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED 000          10/04/2011                      New JPM for 2012 NRC Initial Exam REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 8 of 10
 
A-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam EXAMINEE HANDOUT INITIAL CONDITIONS:
x  You are currently licensed at PVNGS.
x  You have been assigned to work control for last 4 months.
x  Today is December 27th.
x  You attended LOCT training November 8th -11th but did not take the written exam.
x  The LOCT cycle completed Friday, December 2nd.
x  Attached is a spreadsheet of shifts you covered in this quarter.
x  You met all license maintenance requirements for the 3rd quarter.
x  You have been asked to take the dayshift on December 31st and January 1st.
INITIATING CUE:
x  You are directed to determine if you:
: 1. are current in Training
: 2. meet requirements to assume RO duties on December 31st
: 3. meet requirements to assume RO duties on January 1st.
Provide your answers on the attached sheet.
Page 9 of 10
 
A-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam October 15th                  12 hour day shift October 16th                  10 hour shift 0630 to 1630 November 24th                  12 hour day shift December 11th                  6.5 hours 1200 to 1830 December 21st                  12 hour day shift
: 1. Are you current in Training YES / NO If NO what must be done to become current?
_____________________________________________________________________
_____________________________________________________________________
: 2. Can you assume RO duties on December 31st?    YES / NO If NO why not?
_____________________________________________________________________
_____________________________________________________________________
: 3. Can you assume RO duties on January 1st ?      YES / NO If NO why not?
_____________________________________________________________________
_____________________________________________________________________
Page 10 of 10
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                              Page 19 of 62 Revision Conduct of Shift Operations                            40DP-9OP02                56 3.6 Licensed Operator Watchstanding Proficiency 3.6.1  A VALID NRC Operators License exists when the holder of that license is current in Licensed Operator Continuing Training (LOCT).
3.6.1.1 An Operator's training is current when all required material in an LOCT Training Cycle is completed. If any LOCT material is missed during a training cycle, make-up training shall be completed no later than 6 weeks from the end of the training cycle that the training was part of.
3.6.1.2 If the operator fails to make up the classroom training and simulator training within 6 weeks of the end of the training cycle, the operator shall be removed from license duties until the make-up training is completed.
3.6.2  An ACTIVE NRC Operators License exists when an operator has a valid license and has actively performed the functions of an operator or senior operator on a minimum of five 12-hour shifts per calendar quarter.
* Actively Performed means that the operator held a position on the shift crew that required the individual to be licensed as defined in the Technical Specifications and that the operator carried out and was responsible for the duties covered by that position.
* For maintenance of an active SRO license any shift spent in either the SM or CRS position will be credited.
* An SRO must stand at least one complete shift per calendar quarter in an SRO-only supervisory position. The remainder of the shifts required in a calendar quarter may be performed in either a credited SRO or RO position.
* For time to be credited it must be a continuous shift (i.e., 4 hours of watch shift responsibilities spent on each of 3 different shifts does not equal one 12 hour shift).
* Overtime may be credited if the overtime work is in a position appropriately credited for watchstanding proficiency. Overtime as an extra helper after the official watch has been turned over to another watchstander does not count toward proficiency time.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                Page 20 of 62 Revision Conduct of Shift Operations                            40DP-9OP02                56 3.6.3  A third Reactor/Control Operator in excess of those required by technical specifications may be credited with license proficiency hours if the following administrative controls are in place:
* The licensee shall list all licensed shift crew positions, including titles, descriptions of duties and which positions are required by technical specification.
* For those shift crew positions in excess of those required by technical specifications, a description of how the position is meaningfully and fully engaged in the function and duties of the license position required by technical specification.
* If theses administrative controls are not met, the individual shall not be given watch-standing proficiency credit for shift positions in excess of technical specification requirements.
3.6.3.1 At the conclusion of an individual shift, the Shift Manager will determine and concur that the 3rd RO was engaged in the functions and duties of a licensed operator in the Control Room and therefore can utilize the shift time towards their proficiency. This determination will be made by verifying that the 3rd RO:
* Completed the full 12 hour shift
* Participated in shift turnover both at the beginning and end of shift
* Participated in licensed operator functions and performed licensed operator duties in the Control Room. Examples of these functions and duties include:
* Control Board manipulations and monitoring,
* Performing peer checks and Independent Verifications,
* Responding to alarms or off-normal conditions,
* Providing briefings as needed,
* Performing permit and clearance activities.
3.6.3.2 Should the Shift Manager determine that the 3rd RO did not satisfy these requirements, then their completed shift time could not be used towards their proficiency requirement.
3.6.4  Only one excess Reactor/Control Operator above the minimum licensed positions required by technical specifications can be credited per shift per Unit.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                              Page 21 of 62 Revision Conduct of Shift Operations                            40DP-9OP02                56 3.6.5  Each licensed individual is responsible to report the completion of the license proficiency hours each quarter to the Nuclear Training department, Operations Training. Failure to complete this notification will result in the suspension of qualifications for licensed duties.
3.6.5.1 Open CORA\AutoLog.
3.6.5.2 From the Tools Menu, select the License Hot Time Tracking Tool.
3.6.5.3 Generate an Individual Licensed Operator Proficiency report and 3.6.5.4 Send it to the Training System Administrator, Nuclear Training Department, Operations Training.
This report should be sent as early in the quarter as possible after you have completed the required proficiency time, to allow enough time for the data to be entered into training records.
3.6.6  An individual is classified active for the current calendar quarter if they meet any one of the following conditions:
* The individual meets the requirements of step 3.6.2.
* The individual has completed the Operator License Reactivation Job Qualification Card in the current or previous calendar quarter.
(NLR10-xx-001, xx references the revision number.)
* The individual has been issued (not renewed) an Operators License (RO or SRO) in the current or previous calendar quarter.
3.6.7  Each individual attempting to reactivate an inactive but valid license shall complete the Operator License Reactivation Job Qualification Card prior to resuming licensed operator duties.
3.6.8  An SRO being reactivated to assume an SM position shall function under instruction as the SM.
3.6.9  An SRO being reactivated to assume the CRS position can function under instructions as either the CRS or SM.
3.6.10 SRO licensed personnel functioning as ROs being reactivated to assume an SRO position shall perform 40 hours under direction of the SM/CRS prior to assuming an SRO position.
3.6.11 An SRO/RO that reactivates their SRO license also reactivates their ability to perform RO duties.
 
A-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK: 270130401, Implement Reactor Coolant System draining operations TASK STANDARD: Determined Pzr level is ~31% and RWT will increase 1.23 to 1.35% RWT level.
K/A:      2.1.25                                  K/A RATING:        RO:    3.9 SRO:      4.2 K/A:                                              K/A RATING:        RO:        SRO:
APPLICABLE POSITION(S):                RO        VALIDATION TIME:              15 minutes
 
==REFERENCES:==
40OP-9ZZ16, RCS Drain Operations SUGGESTED TESTING ENVIRONMENT: SIMULATOR                              PLANT        OTHER        X JPM TYPE Time Critical? (Yes/No)      No                Alternative Path? (Yes/No)  No PRA/SRA related? (Yes/No)        No APPROVAL Developed By:              Larry Burton          Date:      10/05/2011 Revised By:                                      Date:
Technical Review                                Operations Approval EP Review                        N/A            Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                    Date:
Evaluator Name:
Time to complete:                Minutes        GRADE (Circle  One)  SAT / UNSAT
* Page 1 of 9
 
A-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. SPECIAL TOOLS/EQUIPMENT:
40OP-9ZZ16. This JPM was written using Revision 72 of 40OP-9ZZ16.
Page 2 of 9
 
A-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANT JPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o  You may use any source of information normally available.
INITIAL CONDITIONS:
x    The plant is in mode 5.
x    Pressurizer pressure is 50 PSIA.
x    Pressurizer temperature is 150 °F.
x    RCN-LI-103 indicates 30%.
x    RCA-LI-110X indicates 42%.
x    RCB-LI-110Y indicates 38%.
x    Preparations are being made to lower RCS level.
INITIATING CUE:
x    The CRS directs you to determine the following per 40OP-9ZZ16 (RCS Drain Operations):
: 1. ACTUAL PRZR level based on current indications
: 2. Using appendix E, calculate the expected change in RWT level if the RCS were drained from actual level to the top of the Reactor Vessel Flange level.
Use the spaces on the cue sheet to document your answers.
Page 3 of 9
 
A-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*) denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 9
 
A-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
STEP                          CUE                STANDARD
: 1.
* Precautions and Limitations 3.1.4                      Using Appendix B examinee determines that :
Correct channels RCA-LI-110X
        & RCB-LI-110Y using Appendix                          RCA-LI-110X level is 32% +/- 2%.
B-                                                    RCB-LI-110Y level is 30% +/- 2%.
Pressurizer Indicated Vs. Actual Level For RCA-LI-110X And RCBLI-110Y.
SAT / UNSAT Comments (required for UNSAT):
STEP                          CUE                STANDARD
: 2.
* Precautions and Limitations 3.1.4                      Using Appendix C examinee determines that :
Correct RCN-LI-103 using Appendix C - Pressurizer                              RCN-LI-103 level is 31% +/- 2%.
Indicated Vs. Actual Level For RCN-LI-103.
SAT / UNSAT Comments (required for UNSAT):
Page 5 of 9
 
A-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                            STANDARD
: 3.
* Using appendix E the examinee                                          Determine amount of water (in determines the change in RWT                                          gallons) to be drained by in the level if the RCS were drained                                          pressurizer by interpreting from the table or the chart the amount from ~30% pressurizer level to                                        of water at ~ 30% level.
flange level (114 feet).
Examinee should determine actual initial volume in the RCS is
[103400 gal]. Change in RCS volume is [9300 - 10140 gal].
The examinee determines the level increase in the RWT by using the graph to determine the gallons of water drained from RCS is 9300-10140 gallons divided by 7538 gallons / % in the RWT = a change of 1.23 to 1.35%
Acceptable answer 1.23 to 1.35
                                                                              % change in RWT Level.
SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparedness organization for resolution.
NORMAL TERMINATION POINT Page 6 of 9
 
A-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam ANSWER KEY
: 1. Actual pressurizer level per:
x  RCN-LI-103      _________31% (+2%)___
x  RCA-LI-110X _________32% (+2%)___
x  RCB-LI-110Y _________30% (+2%)___
: 2. Expected change in RWT level ______1.23 to 1.35%
ANSWER KEY Page 7 of 9
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                                        Page 222 of 336 Revision RCS Drain Operations                                    40OP-9ZZ16                      72 Appendix B Page 1 of 1 Appendix B - Pressurizer Indicated Vs. Actual Level For RCA-LI-110X And RCB-LI-110Y ANSWER KEY Pressurizer Indicated Vs. Actual Level for RCA-LI-110X and RCB-LI-110Y 110X and 110Y Pressurizer Indicated vs. actual level for deviation from normal operating to cold pressurizer conditions.
2400 psia, 662°F 2250 psia, 653°F 100 2000 psia, 636°F 90 1500 psia, 596°F 80 500 psia, 467°F 70 14.7 psia, 60 Actual Level (%)
70°F 50 40 110X 110Y                  30 20 10 0
10    20    30      40      50      60      70      80    90      100 Indicated Level (%)
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                                          Page 223 of 336 Revision RCS Drain Operations                                    40OP-9ZZ16                  72 Appendix C Page 1 of 1 Appendix C - Pressurizer Indicated Vs. Actual Level For RCN-LI-103 ANSWER KEY Pressurizer Indicated Vs. Actual Level for RCN-LI-103 2250 psia, 653°F 103                              2000 psia, 636°F 1500 psia, 596°F 1000 psia, 545°F 750 psia, 511°F 500 psia, 467°F 250 psia, 401°F 100                                                                                        14.7 psia, 60°F 90 80 70 60 Actual Level (%)
50 40 103                  30 20 10 0
10      20    30    40      50    60    70          80    90    100 Indicated Level (%)
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                          Page 244 of 336 Revision RCS Drain Operations                              40OP-9ZZ16                  72 Appendix E Page 1 of 4 Appendix E - Determination of Volume to be Drained Both RWLIS Narrow and Wide range indication start at plant elevation 99 ft.7 in.
Between elevation 99 ft. 7 in. & 102 ft. 11in. use Narrow range channel RCN-LI-752A.
For elevations above 102 ft. 11 in. use Wide range channel RCN-LI-752B.
With SG nozzle dams installed, about 17,000 gallons will be drained to lower level from 112 ft. 6 in. to 101 ft.9 in.
Each RSG tube bundle contains about 15,497 gallons.
106,100 gallons 20%    WR. 120' 7 1/4" 100,700 93,800 93,300 86,000 77,500 71,500    70,500 32,800 27,800
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                      Page 245 of 336 Revision RCS Drain Operations                                  40OP-9ZZ16            72 Appendix E Page 2 of 4 Determination Of Volume To Be Drained (2) RCS INVENTORY (3) HUT    (3) RWT (1) RWLIS              FOR GIVEN REFERENCE                                                              LEVEL        LEVEL INDICATION          ELEVATION cubic ft /
GAIN - ft  GAIN - %
gallons 50% PZR Level        131 ft 5 in WR          14,183 / 106,100            +8.4        +14.1 10% PZR Level          117 ft WR            13,463 / 100,700            +7.9        +13.4 Top of Rx Vessel Flange 114 ft WR              12,533 / 93,800            +7.4        +12.4 2% PZR Level Refueling Water Level    113 ft 6 in WR          12,473 / 93,300            +7.3        +12.4 Enter Reduced Inventory      111 ft WR              11,499 / 86,000            +6.8        +11.4 Limited to 107 ft WR              10,365 / 77,500            +6.1        +10.3 1 SDC Pump / Loop Limited to 1 SDC Pump 104 ft WR              9,559 / 71,500            +5.6        +9.5
      & 1 SDC Loop Top of the Hot Leg -
103 ft 1 in WR            9,420 / 70,500            +5.5        +9.4 Enter Mid-Loop Ops 101 ft 4 in Centerline of RCS Hotleg                            4,380 / 32,800            +2.6        +4.4 WR & NR (1)  WR. is Wide Range RCN-LI-752B, and NR. is Narrow Range RCN-LI-752A.
(2)  Values were determined as follows: gal = c.f. x 7.4805 gal/c.f. then rounding the product to nearest 100 gal.
(3)  HUT  level assumes 12,704 gallons/foot in tank.
RWT  level assumes 7,538 gallons/% in tank.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                          Page 246 of 336 Revision RCS Drain Operations                                  40OP-9ZZ16            72 Appendix E Page 3 of 4 Volume to be drained = Initial Volume minus Final Volume.
Example: Draining the RCS from 50% Pzr level to Mid-Loop condition using gallons:
Ivol - Fvol = Voldrained:  106,100 - 32,800 = 73,300 gallons drained.
D HUT level: 73,300 divided by 12,704 gal/foot = + 5.8 ft. increase in HUT level.
D RWT level: 73,300 divided by 7,538 gal/% = + 9.7% level increase in RWT level.
Using the previous example another way to determine the HUT/RWT level increase is to use the starting RCS inventory at 50% Pzr level, 8.4 ft. for the HUT or 14.1% for the RWT then subtract the final RCS inventory value at midloop, 2.6 ft. for the HUT or 4.4% for the RWT, or 8.4 ft. minus 2.6 ft. = 5.8 ft. level increase in HUT and 14.1% minus 4.4 = 9.7% level increase in RWT level. These level increases are in addition to existing tank levels.
Volume to be drained may be determined several hours prior to actual drain. Under these circumstances, normal plant operations such as VCT divert/makeup may cause a change in assumed initial conditions. The result is an unexpected volume change. Document assumed initial and final levels below:
Assumed Conditions Initial Pzr. Level:                    Final RWLIS:
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                                  Page 247 of 336 Revision RCS Drain Operations                                          40OP-9ZZ16                  72 Appendix E Page 4 of 4 Significant Plant Elevations RWLIS Level Plant Reference Point                            Significance Indication (Note 1) 149 ft.                                                        Pressurizer Manway 141 ft.                                                        Versa-Vent Removal 141 ft                                                    RCE-V007 - RVHV Vent Valve 131 ft. 5 in. W.R.            50% Pzr Level 117 ft. W.R.              10% Pzr Level              Enter PARTIAL DRAIN condition. Required to monitor and record RCS level indication.
114 ft. 1 in.              ICI Seal Table 114 ft. W.R.          Top Rx Vessel Flange                      Enter Lowered Inventory 113 ft. 6 in. W.R.                                            Normal level when entering Mode 6
      <111 ft. W.R.                                        Enter REDUCED INVENTORY CONDITION
      <107 ft. W.R.                                        May continue to operate both SDC loops, but are limited to 1 SDC pump per loop.
      <104 ft. W.R.        104 ft is top of RCP bowl              Limited to 1 SDC pump and loop.
103 ft. 1 in. W.R.    (103 ft. 1 in. down to 102 ft.) Maintain SDC flow rate between 3780 - 4600 gpm.
103 ft. 1 in.W.R.            Top of Hot Leg            SG tubes begin to drain. ENTER MID-LOOP 102 ft. 11 in.                                      Theoretical level to remove SG Primary Manways 102 ft. 4 in. N.R.            Hot Leg Lip            Elevation at which RCS fluid will start spilling over into the SG bowls from the Hot Leg.
102 ft. N.R.      (102 ft. down to 101 ft. 6 in.) Maintain SDC flow rate between 3780 - 4150 gpm.
102 ft. N.R.                Cold Leg Lip          Elevation at which RCS fluid will start spilling over into the SG bowls from the cold leg.
101 ft. 10 in. N.R.                                    Optimum level for Steam Generator nozzle dam installation.
101 ft, 6 in. N.R.      2 in. above RCS Hot Leg          Minimum Level for MID-LOOP Operations.
Centerline 99 ft. 7 in. N.R./W.R.      Bottom of Hot Leg          Bottom range of Control Room RWLIS indication.
Note 1 - From 117 ft. 8 3/8 in. to 102 ft. 11in., use Wide Range indicator RCN-LI-752B.
From 102 ft. 11in. to 99 ft. 7 in., use Narrow Range indicator RCN-LI-752A.
 
A-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED 000          10/06/2011                      New JPM REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 8 of 9
 
A-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam EXAMINEE HANDOUT INITIAL CONDITIONS:
x  The plant is in mode 5.
x  Pressurizer pressure is 50 PSIA.
x  Pressurizer temperature is 150 &deg;F.
x  RCN-LI-103 indicates 30%.
x  RCA-LI-110X indicates 42%.
x  RCB-LI-110Y indicates 38%.
x  Preparations are being made to lower RCS level.
INITIATING CUE:
x  The CRS directs you to determine the following per 40OP-9ZZ16 (RCS Drain Operations):
: 1. ACTUAL PRZR level based on current indications
: 2. Using appendix E, calculate the expected change in RWT level if the RCS were drained from actual level to the top of the Reactor Vessel Flange level.
Provide your answers in the spaces below:
: 1. Actual pressurizer level per:
x  RCN-LI-103      ____________
x  RCA-LI-110X ____________
x  RCB-LI-110Y ____________
: 2. Expected change in RWT level _____________ %
Page 9 of 9
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                                        Page 222 of 336 Revision RCS Drain Operations                                    40OP-9ZZ16                      72 Appendix B Page 1 of 1 Appendix B - Pressurizer Indicated Vs. Actual Level For RCA-LI-110X And RCB-LI-110Y Pressurizer Indicated Vs. Actual Level for RCA-LI-110X and RCB-LI-110Y Pressurizer Indicated vs. actual level for deviation from normal operating to cold pressurizer conditions.
2400 psia, 662&deg;F 2250 psia, 653&deg;F 100 2000 psia, 636&deg;F 90 1500 psia, 596&deg;F 80 500 psia, 467&deg;F 70 14.7 psia, 60 Actual Level (%)
70&deg;F 50 40 30 20 10 0
10    20    30      40      50      60      70      80    90      100 Indicated Level (%)
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                                          Page 223 of 336 Revision RCS Drain Operations                                    40OP-9ZZ16                  72 Appendix C Page 1 of 1 Appendix C - Pressurizer Indicated Vs. Actual Level For RCN-LI-103 Pressurizer Indicated Vs. Actual Level for RCN-LI-103 2250 psia, 653&deg;F 2000 psia, 636&deg;F 1500 psia, 596&deg;F 1000 psia, 545&deg;F 750 psia, 511&deg;F 500 psia, 467&deg;F 250 psia, 401&deg;F 100                                                                                        14.7 psia, 60&deg;F 90 80 70 60 Actual Level (%)
50 40 30 20 10 0
10      20    30    40      50    60    70          80    90    100 Indicated Level (%)
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                          Page 244 of 336 Revision RCS Drain Operations                              40OP-9ZZ16                  72 Appendix E Page 1 of 4 Appendix E - Determination of Volume to be Drained Both RWLIS Narrow and Wide range indication start at plant elevation 99 ft.7 in.
Between elevation 99 ft. 7 in. & 102 ft. 11in. use Narrow range channel RCN-LI-752A.
For elevations above 102 ft. 11 in. use Wide range channel RCN-LI-752B.
With SG nozzle dams installed, about 17,000 gallons will be drained to lower level from 112 ft. 6 in. to 101 ft.9 in.
Each RSG tube bundle contains about 15,497 gallons.
106,100 gallons 20%    WR. 120' 7 1/4" 100,700 93,800 93,300 86,000 77,500 71,500    70,500 32,800 27,800
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                      Page 245 of 336 Revision RCS Drain Operations                                  40OP-9ZZ16            72 Appendix E Page 2 of 4 Determination Of Volume To Be Drained (2) RCS INVENTORY (3) HUT    (3) RWT (1) RWLIS              FOR GIVEN REFERENCE                                                              LEVEL        LEVEL INDICATION          ELEVATION cubic ft /
GAIN - ft  GAIN - %
gallons 50% PZR Level        131 ft 5 in WR          14,183 / 106,100            +8.4        +14.1 10% PZR Level          117 ft WR            13,463 / 100,700            +7.9        +13.4 Top of Rx Vessel Flange 114 ft WR              12,533 / 93,800            +7.4        +12.4 2% PZR Level Refueling Water Level    113 ft 6 in WR          12,473 / 93,300            +7.3        +12.4 Enter Reduced Inventory      111 ft WR              11,499 / 86,000            +6.8        +11.4 Limited to 107 ft WR              10,365 / 77,500            +6.1        +10.3 1 SDC Pump / Loop Limited to 1 SDC Pump 104 ft WR              9,559 / 71,500            +5.6        +9.5
      & 1 SDC Loop Top of the Hot Leg -
103 ft 1 in WR            9,420 / 70,500            +5.5        +9.4 Enter Mid-Loop Ops 101 ft 4 in Centerline of RCS Hotleg                            4,380 / 32,800            +2.6        +4.4 WR & NR (1)  WR. is Wide Range RCN-LI-752B, and NR. is Narrow Range RCN-LI-752A.
(2)  Values were determined as follows: gal = c.f. x 7.4805 gal/c.f. then rounding the product to nearest 100 gal.
(3)  HUT  level assumes 12,704 gallons/foot in tank.
RWT  level assumes 7,538 gallons/% in tank.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                          Page 246 of 336 Revision RCS Drain Operations                                  40OP-9ZZ16            72 Appendix E Page 3 of 4 Volume to be drained = Initial Volume minus Final Volume.
Example: Draining the RCS from 50% Pzr level to Mid-Loop condition using gallons:
Ivol - Fvol = Voldrained:  106,100 - 32,800 = 73,300 gallons drained.
D HUT level: 73,300 divided by 12,704 gal/foot = + 5.8 ft. increase in HUT level.
D RWT level: 73,300 divided by 7,538 gal/% = + 9.7% level increase in RWT level.
Using the previous example another way to determine the HUT/RWT level increase is to use the starting RCS inventory at 50% Pzr level, 8.4 ft. for the HUT or 14.1% for the RWT then subtract the final RCS inventory value at midloop, 2.6 ft. for the HUT or 4.4% for the RWT, or 8.4 ft. minus 2.6 ft. = 5.8 ft. level increase in HUT and 14.1% minus 4.4 = 9.7% level increase in RWT level. These level increases are in addition to existing tank levels.
Volume to be drained may be determined several hours prior to actual drain. Under these circumstances, normal plant operations such as VCT divert/makeup may cause a change in assumed initial conditions. The result is an unexpected volume change. Document assumed initial and final levels below:
Assumed Conditions Initial Pzr. Level:                    Final RWLIS:
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                                  Page 247 of 336 Revision RCS Drain Operations                                          40OP-9ZZ16                  72 Appendix E Page 4 of 4 Significant Plant Elevations RWLIS Level Plant Reference Point                            Significance Indication (Note 1) 149 ft.                                                        Pressurizer Manway 141 ft.                                                        Versa-Vent Removal 141 ft                                                    RCE-V007 - RVHV Vent Valve 131 ft. 5 in. W.R.            50% Pzr Level 117 ft. W.R.              10% Pzr Level              Enter PARTIAL DRAIN condition. Required to monitor and record RCS level indication.
114 ft. 1 in.              ICI Seal Table 114 ft. W.R.          Top Rx Vessel Flange                      Enter Lowered Inventory 113 ft. 6 in. W.R.                                            Normal level when entering Mode 6
      <111 ft. W.R.                                        Enter REDUCED INVENTORY CONDITION
      <107 ft. W.R.                                        May continue to operate both SDC loops, but are limited to 1 SDC pump per loop.
      <104 ft. W.R.        104 ft is top of RCP bowl              Limited to 1 SDC pump and loop.
103 ft. 1 in. W.R.    (103 ft. 1 in. down to 102 ft.) Maintain SDC flow rate between 3780 - 4600 gpm.
103 ft. 1 in.W.R.            Top of Hot Leg            SG tubes begin to drain. ENTER MID-LOOP 102 ft. 11 in.                                      Theoretical level to remove SG Primary Manways 102 ft. 4 in. N.R.            Hot Leg Lip            Elevation at which RCS fluid will start spilling over into the SG bowls from the Hot Leg.
102 ft. N.R.      (102 ft. down to 101 ft. 6 in.) Maintain SDC flow rate between 3780 - 4150 gpm.
102 ft. N.R.                Cold Leg Lip          Elevation at which RCS fluid will start spilling over into the SG bowls from the cold leg.
101 ft. 10 in. N.R.                                    Optimum level for Steam Generator nozzle dam installation.
101 ft, 6 in. N.R.      2 in. above RCS Hot Leg          Minimum Level for MID-LOOP Operations.
Centerline 99 ft. 7 in. N.R./W.R.      Bottom of Hot Leg          Bottom range of Control Room RWLIS indication.
Note 1 - From 117 ft. 8 3/8 in. to 102 ft. 11in., use Wide Range indicator RCN-LI-752B.
From 102 ft. 11in. to 99 ft. 7 in., use Narrow Range indicator RCN-LI-752A.
 
A-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK: 1290310301 Perform a Tech Review of a Permit TASK STANDARD: Upon completion of this JPM the examinee identifies 3 non typo errors found during a permit Tech Review.
K/A:      2.2.13                                  K/A RATING:        RO:    4.1 SRO:      4.3 K/A:                                              K/A RATING:        RO:        SRO:
APPLICABLE POSITION(S):                  RO        VALIDATION TIME:              20 minutes
 
==REFERENCES:==
40DP-9OP29, Permit and Tagging Process, Various Plant Drawings SUGGESTED TESTING ENVIRONMENT: SIMULATOR                              PLANT        OTHER        X JPM TYPE Time Critical? (Yes/No)      No                Alternative Path? (Yes/No)  No PRA/SRA related? (Yes/No)        No APPROVAL Developed By:              Alan Malley            Date:      10/04/2011 Revised By:                    N/A                Date:
Technical Review                                  Operations Approval EP Review                        N/A            Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                    Date:
Evaluator Name:
Time to complete:                Minutes          GRADE (Circle  One)  SAT / UNSAT
* Page 1 of 10
 
A-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. SPECIAL TOOLS/EQUIPMENT:
x A computer available for access to procedures and plant drawings.
Page 2 of 10
 
A-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANT JPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o You may use any source of information normally available.
INITIAL CONDITIONS:
Unit 1 is 100% power The A High Pressure Safety Injection (HPSI) Pump (SIA-P02) has a severe seal leak on the pump. The CRS has directed that a permit be hung to isolate and drain the A HPSI pump.
Permit 12-0003 was generated manually due to the Site Work Management System (SWMS) being down.
The CRS has addressed Tech Specs.
INITIATING CUE:
The CRS has directed you to perform a Tech Review of Permit 12-0003 and identify any errors (Non-clerical - not typos) on the permit.
Page 3 of 10
 
A-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*) denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 10
 
A-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
STEP                            CUE                    STANDARD
: 1.      Reviews Permit to determine scope                          Examinee reviews Permit and of work to be performed.                                    determines work scope to be repair seal leak on 1-M-SIA-P02.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                    STANDARD
: 2.
* Identifies one (1) error on the permit                      Examinee determines the following with Tag 2.                                                inaccuracy/inadequacy.
x Tag 2 is the wrong circuit breaker (breaker is for the A LPSI pump)
The order of identification of the errors in steps 2, 3, and 4 of this JPM is not critical.
SAT / UNSAT Comments (required for UNSAT):
Page 5 of 10
 
A-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                            CUE                    STANDARD
: 3.
* Identifies one (1) error on the permit                      Examinee determines the following with Tag 5.                                                inaccuracy/inadequacy.
Tag 5 has the wrong position (CLOSED) for the breaker for the Recirc Valve SIA-UV-666. The breaker position should be OPEN The order of identification of the errors in steps 2, 3, and 4 of this JPM is not critical.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                    STANDARD
: 4.
* Identifies one (1) error on the permit                      Examinee determines the following with Tag 9.                                                inaccuracy/inadequacy.
x Tag 9 has the wrong valve number. It identifies the drain valve as SIA-V550 (which is the drain valve for SIA-P01) and it could be SIA-V980, 955 or 956.
The order of identification of the errors in steps 2, 3, and 4 of this JPM is not critical.
SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
NOTE:
Page 6 of 10
 
A-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparedness organization for resolution.
NORMAL TERMINATION POINT Page 7 of 10
 
FOR 2012 NRC EXAM ONLY Tag Assignment Sheet Unit No: __1____ Permit No: __12-0003__      Page __1__ of __1__
TAG PLACEMENT                                          TAG REMOVAL Tag Tag No.              Equipment ID.
Color Hang Order      Component        Placed      Verified      Restore          Restore        Restored Position        By          By          Order            Position        By 1J-SIA-HS001 Handswitch for 1                                      Yellow    1              N/A SIA-P02 (HPSI
(      A pump) 2        1E-PBA-S03F, 4.16KV Breaker                                                        Wrong Breaker Red        3          RACKED OUT for 1-M-SIA-P01 IA V470 1P-SIA-V470                              6 3                                      Red                      CLOSED SIA-P02 Suction Valve                                                                        May mark this as wrong, but not counted as an error.
1P-SIA-UV-666, SIA-P02                              DO NOT 4                                      Red        7 Recirc Valve                                OPERATE 1E-PHA-M3507, 480VAC                  4                                                        Wrong Position 5          Breaker to SIA-UV666 (SIA-  Red P02 Recirc Valve)                              CLOSED 1J-SIA-HS-666, Handswitch for 6          SIA-UV666 (SIA-P02 Recirc  Yellow    2              N/A Valve) 1P-SIA-V476, SIA-P02 7                                      Red        5            CLOSED Discharge Valve 8        1P-SIA-V1024 Yellow    9              N/A SIA-P02 Vent Valve Valv 1P-SIA-V550                                                                          Wrong Valve 9                                      Yellow    8              N/An SIA P01 D SIA-P01  Drain Valve
* Special instructions on yellow tag ANSWER KEY Page 8 of 10
 
A-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 9 of 10
 
A-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam EXAMINEE HANDOUT INITIAL CONDITIONS:
Unit 1 is 100% power The A High Pressure Safety Injection (HPSI) Pump (SIA-P02) has a severe seal leak on the pump. The CRS has directed that a permit be hung to isolate and drain the A HPSI pump.
Permit 12-0003 was generated manually due to the Site Work Management System (SWMS) being down.
The CRS has addressed Tech Specs.
INITIATING CUE:
The CRS has directed you to perform a Tech Review of Permit 12-0003 and identify any errors (Non-clerical - not typos) on the permit.
Page 10 of 10
 
2012 NRC EXAM ONLY NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                                Page      65    of    79 Revision Power Block Permit and Tagging                                40DP-9OP29                      45 Appendix B            Page 2 of 3 Palo Verde                                                                                            1      2 Nuclear Generating Station                      Permit Form                                    Page    of Facility No.                            Permit No.                        System UNIT 1                          12-003                            SI EQ I.D.                                  EQ Description 1MSIAP02                                High Pressure Safety Injection Pump 'A' Reason For Permit:
Isolate the pump due to severe pump seal leakage Equip Conditions Required For Work                                        Special Instructions De-energized                        X  Yes        No      01-E-SIB-001 Depressurized                        X  Yes        No      01-E-SIB-018 Yes    X  No 01-M-SIP-001 Continuously Vented Drained                              X  Yes        No Purged                                  Yes    X  No Isolated                            X  Yes        No SWMS Search                              Yes    X  No TSCCR                                X  Yes        No TSCCR No.
3712771 Prepared By:                                            Ext:        Date:                Time:
JOE TAGGER                                              2648    3/19/2012              0650 Tag Placement Authorized (responsible supervisor)        Ext:        Date:                Time:
EQ Conditions Established (operator)                    Ext:        Date:                Time:
Tag Removal Authorized: (responsible supervisor)        Ext:        Date:                Time:
Permit Cancelled: (responsible supervisor)              Ext:        Date:                Time:
Requestor/Ext. (Print)                    Work Document                Signature/Date/Time Operations                                              Tech. Rev:
Unit 1 Shift Manager                                    Authorized:
N/A X82-1206 Accepted:
Released:
PV-E0213 Ver. 3                                                                                      40DP-9OP29
 
FOR 2012 NRC EXAM ONLY Tag Assignment Sheet Unit No: __1____ Permit No: __12-0003____        Page __1__ of __1__
TAG PLACEMENT                            TAG REMOVAL Tag Equipment ID.          Tag Color No.                                            Hang        Component    Placed  Verified Restore    Restore    Restored Order        Position      By      By    Order      Position      By 1J-SIA-HS001 Handswitch for 1                                  Yellow        1            N/A SIA-P02 (HPSI A pump) 1E-PBA-S03F, 4.16kV VAC                                RACKED 2                                  Red          3 Breaker for 1-M-SIA-P01                                  OUT 1P-SIA-V470 3                                  Red          6        CLOSED SIA-P02 Suction Valve 1P-SIA-UV-666, SIA-P02 Recirc                          DO NOT 4                                  Red          7 Valve                                                  OPERATE 1E-PHA-M3507, 480VAC 5  Breaker to SIA-UV666 (SIA-P02    Red          4        CLOSED Recirc Valve) 1J-SIA-HS-666, Handswitch for 6  SIA-UV666 (SIA-P02 Recirc      Yellow        2            N/A Valve) 1P-SIA-V476, SIA-P02 7                                  Red          5        CLOSED Discharge Valve 1P-SIA-V981 8                                  Yellow        9            N/A SIA-P02 Seal Cavity Vent Valve 1P-SIA-V550 9                                  Yellow        8            N/A SIA-P01 Drain Valve CANDIDATE
 
A-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK: Determine proper REP task, determine RCA entry requirements TASK STANDARD: Upon completion of this JPM, the examinee has determined the proper task, the requirements for a pre-job brief, the RP coverage required, dress-out and dosimetry requirements, required EPD settings and that no PVNGS RP administrative limit will be exceeded.
K/A:      2.3.7                                      K/A RATING:        RO:    3.5 SRO:          3.6 K/A:                                                  K/A RATING:        RO:            SRO:
APPLICABLE POSITION(S):                  RO          VALIDATION TIME:                  15 minutes
 
==REFERENCES:==
NGW01, Initial Radiation Worker Practices SUGGESTED TESTING ENVIRONMENT: SIMULATOR                                  PLANT            OTHER        X JPM TYPE Time Critical? (Yes/No)      No                  Alternative Path? (Yes/No)  No PRA/SRA related? (Yes/No)        No APPROVAL Developed By:              Phil Capehart            Date:      06/07/2005 Revised By:                Alan Malley              Date:      10/12/2010 Technical Review                                    Operations Approval EP Review                          N/A              Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                        Date:
Evaluator Name:
Time to complete:                  Minutes            GRADE (Circle  One)  SAT / UNSAT
* Page 1 of 11
 
A-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. SPECIAL TOOLS/EQUIPMENT:
x  A copy of the Emergency Response REP 9-9999-0.
x  RP Procedures available.
Page 2 of 11
 
A-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANTJPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATEany equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o  You may use any source of information normally available.
INITIATING CUE:
x  You have been directed to align SDC after control room fire.
x  The OSC has been manned and RP has mandated the use of the Emergency Response REP, 9-9999-0.
x  Your current yearly exposure is 984 mrem.
x  The radiation level where the task is to be performed is 36 mrem/hr.
x  The time to complete this task will be 30 minutes.
INITIATING CUE:
Your tasks are to locate the Emergency Response REP 9-9999-0 and determine:
: 1. the proper task for this evolution.
: 2. if a RP Pre-Job Brief is required prior to entering the RCA?
: 3. RP coverage during job performance.
: 4. dress-out requirements and dosimetry.
: 5. required EPD settings.
: 6. determine if any PVNGS Administrative RP limits will be exceeded.
Page 3 of 11
 
A-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*)denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 11
 
A-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
STEP                            CUE                  STANDARD
: 1.
* Examinee reviews REP and survey                            Examinee determines entry on and determines task he can enter on.                        TASK1 is required.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                  STANDARD
: 2.
* Examinee determines if RP pre-job                          Determines must perform RP pre-Brief is required for entry into the                        job brief.
RCA.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                  STANDARD
: 3.
* Examinee determines RP coverage                            RP coverage is:
requirements during job                                        x Intermittent performance.
SAT / UNSAT Comments (required for UNSAT):
Page 5 of 11
 
A-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                            CUE                  STANDARD
: 4.
* Examinee determines dress-out                            PC and respiratory protection requirements and Dosimetry                                equipment requirements per direction from the RPM / RPC / RAC or designee.
Dosimetry -
x Record TLD x    EPD SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                  STANDARD
: 5.
* Determine the REP required EPD                            Examinee determines EPD is settings.                                                required with alarm settings of :
x 500mRem dose and x  5,000 mRem/hr Dose Rate (as stated on the REP)
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                  STANDARD
: 6.
* Determine if any PVNGS RP                                Examinee determines no PVNGS RP administrative limit has been                            administrative limits have been exceeded.                                                exceeded.
SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
NOTE:
Page 6 of 11
 
A-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparednessorganization for resolution.
NORMAL TERMINATION POINT Page 7 of 11
 
A-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam ANSWER KEY
: 1. Determine proper task for this evolution.
Proper task is TASK 1.
: 2. Is a RP Pre-Job Brief required prior to entering the RCA?
Yes.
: 3. Determine RP coverage during job performance.
Intermittent.
: 4. Determine dress-out requirements and dosimetry.
PC and respiratory protection equipment requirements per direction from the RPM / RPC
/ RAC or designee.
Dosimetry - Record TLD and EPD. (May indicated as directed by RP per REP. If that is the answer follow up with What are the dosimetry requirements for any RCA entry?)
: 5. Determine required EPD settings.
Examinee determines EPD is required with Dose alarm settings of 500mRem and Dose Rate alarm setting of 5,000 mrem/hr.
(may list alarm warning at 400 mRem).
: 6. Determine if any PVNGS RP Administrative limit will be exceeded. Yes/No (circle the correct answer)
ANSWER KEY Page 8 of 11
 
ANSWER      PVNGS KEY RADIATION EXPOSURE PERMIT REP No.: 9-9999 Rev.: 00 Task Number One Task
 
== Description:==
LHRA - Emergency Plan implementation and Plant support tasks.
INCLUDES:
* Radiation exposure not to exceed PVNGS Administrative Hold Points.
HRA Entry:    YES              LHRA Entry:    YES            Minimum Available Dose: 200 mRem Dosimeter Settings Dose (mRem)                  Rate (mRem/hr)                  Time (HH:MM)                    Chirp Rate Warning: 400                  Warning: 5000 Alarm: 500                    Alarm: 5000                    Alarm: 13:00                  0.1 mrem Authorization List Required: NO                                                  Authorization Expires: NO Requirements Requirement Groups                                        Requirement Descriptions ALARA Review                              NO PROTECTIVE AND MONITORING (PC, Other: -
Respiratory, Dosimetry)                  -- Additional exposure monitoring equipment per direction from the RPM / RPC /
RAC or designee.
                                          -- PC and Respiratory protective equipment requirements per direction from the RPM / RPC / RAC or designee.
Review and implement REP Standard Instructions [75RP-9RP02, App. P, attached]
RP COVERAGE                              CONTINUOUS IN LHRA INTERMITTENT RPTs: Implement Radiological Controls Directions contained in associated ALARA Plan(s).
RP PRE-JOB BRIEFING                      YES Additional Instructions Prerequisites:
* Review available radiological survey data with RP prior to entry.
* Complete radiation protection briefing and obtain RP authorization prior to each RCA entry as directed by RPM, RPC, or RAC.
* Entry to areas where no current radiological survey exists requires RP evaluation and authorization.
* LHRA entry requires RPM, RPC, RAC, or authorized designee approval.
General:
* Dosimetry requirements may be modified and EPD setpoints adjusted per RPM, RPC, RAC or authorized designee.
* The 10 CFR 20.1201(a) Occupational Dose Limits apply to non-emergency conditions. All reasonable efforts should be made to observe these limits during emergency conditions.
RP Hold Points:
Attachments N/A ANSWER KEY 8/28/2009 12:07:18PM                                                                                          Page 1 of 4
 
A-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED 0            06/08/05            6          New Admin Task JPM 1            7/11/05          NRC          Revised to combine with JPM JP2 2            10/12/11            6        Revised to latest JPM format and REP REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 9 of 11
 
A-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam CANDIDATE INITIATING CUE:
x  You have been directed to align SDC after control room fire.
x  The OSC has been manned and RP has mandated the use of the Emergency Response REP, 9-9999-0.
x  Your current yearly exposure is 984 mrem.
x  The radiation level where the task is to be performed is 36 mrem/hr.
x  The time to complete this task will be 30 minutes.
INITIATING CUE:
Your tasks are to locate the Emergency Response REP 9-9999-0 and determine:
: 1. the proper task for this evolution.
: 2. if a RP Pre-Job Brief is required prior to entering the RCA?
: 3. RP coverage during job performance.
: 4. dress-out requirements and dosimetry.
: 5. required EPD settings.
: 6. determine if any PVNGS Administrative RP limits will be exceeded.
USE THE ANSWER SHEET ON THE NEXT PAGE TO DOCUMENT YOUR ANSWERS.
CANDIDATE Page 10 of 11
 
A-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam CANDIDATE
: 1. Determine the proper task for this evolution.
: 2. Is a RP Pre-Job Brief required prior to entering the RCA?
: 3. Determine RP coverage during job performance.
: 4. Determine dress-out requirements and dosimetry.
: 5. Determine required EPD settings.
: 6. Determine if any PVNGS RP Administrative limit will be exceeded. Yes/No (circle the correct answer)
CANDIDATE Page 11 of 11
 
PVNGS RADIATION EXPOSURE PERMIT REP Title                                                                        REP Number EMERGENCY RESPONSE                                                              9-9999 Rev. 00 Comments: JOB SCOPE: Emergency response.
Locations Buildings                            Elevations                              Rooms All buildings with RCAs                    ALL                                  N/A Radiological Conditions                                                                              Unit LHRA Work Area Dose Rates as communicated in Formal          LHRA(s)                                  N/A Pre-job briefing and recorded in RP Logbook.
Pre-job or Historical survey(s) attached.                    N/A                                      N/A Review current work area survey(s).                          Prior to entering RCA                    N/A Tasks (1) LHRA - Emergency Plan implementation and Plant support tasks.
(2) LHRA - Emergency Plan implementation and Plant support tasks as authorized by RPM or RPC.
(3) VHRA - Life-saving actions and Plant protective measures as explicitly authorized by Site Emergency Coordinator.
(4) RA - Drill Support.
Global Instructions Prerequisites:
General:
RP Hold Points:
Attachments ALARA Plan 9-9999 Rev 00.pdf Classification / Estimates 1.16 Task: REACTOR OPERATION + SURVEIL REP Type:                                                    REP Status:          Begin Date:      Close On Date:
SREP, JHES Cat. 1                                                  ACTIVE            7/31/2009 Estimated Dose: 100 mrem        Estimated Hours: 735.00      Actual Dose:                Actual Hours:
Prepared By: GYGER, JEFFREY M                                Leader:
Approvals Approver Title                                    Name                                                      Date Department Leader                                  MCDONNELL, JAMES P                                    08/28/2009 Section Leader                                    WAGNER, MARTHA M                                      08/28/2009 Technician                                        GYGER, JEFFREY M                                      08/28/2009 8/28/2009 11:49:30AM                                                                                        Page 1 of 1
 
PVNGS RADIATION EXPOSURE PERMIT REP No.: 9-9999 Rev.: 00 Task Number One Task
 
== Description:==
LHRA - Emergency Plan implementation and Plant support tasks.
INCLUDES:
* Radiation exposure not to exceed PVNGS Administrative Hold Points.
HRA Entry:    YES              LHRA Entry:    YES            Minimum Available Dose: 200 mRem Dosimeter Settings Dose (mRem)                  Rate (mRem/hr)                  Time (HH:MM)                    Chirp Rate Warning: 400                  Warning: 5000 Alarm: 500                    Alarm: 5000                    Alarm: 13:00                  0.1 mrem Authorization List Required: NO                                                  Authorization Expires: NO Requirements Requirement Groups                                        Requirement Descriptions ALARA Review                              NO PROTECTIVE AND MONITORING (PC, Other: -
Respiratory, Dosimetry)                  -- Additional exposure monitoring equipment per direction from the RPM / RPC /
RAC or designee.
                                          -- PC and Respiratory protective equipment requirements per direction from the RPM / RPC / RAC or designee.
Review and implement REP Standard Instructions [75RP-9RP02, App. P, attached]
RP COVERAGE                              CONTINUOUS IN LHRA INTERMITTENT RPTs: Implement Radiological Controls Directions contained in associated ALARA Plan(s).
RP PRE-JOB BRIEFING                      YES Additional Instructions Prerequisites:
* Review available radiological survey data with RP prior to entry.
* Complete radiation protection briefing and obtain RP authorization prior to each RCA entry as directed by RPM, RPC, or RAC.
* Entry to areas where no current radiological survey exists requires RP evaluation and authorization.
* LHRA entry requires RPM, RPC, RAC, or authorized designee approval.
General:
* Dosimetry requirements may be modified and EPD setpoints adjusted per RPM, RPC, RAC or authorized designee.
* The 10 CFR 20.1201(a) Occupational Dose Limits apply to non-emergency conditions. All reasonable efforts should be made to observe these limits during emergency conditions.
RP Hold Points:
Attachments N/A 8/28/2009 12:07:18PM                                                                                          Page 1 of 4
 
PVNGS RADIATION EXPOSURE PERMIT REP No.: 9-9999 Rev.: 00 Task Number Two Task
 
== Description:==
LHRA - Emergency Plan implementation and Plant support tasks as authorized by RPM or RPC.
INCLUDES:
* Potential to exceed PVNGS radiation exposure Administrative Hold Points anticipated.
HRA Entry:    YES              LHRA Entry:    YES            Minimum Available Dose: 0 mRem Dosimeter Settings Dose (mRem)                  Rate (mRem/hr)                  Time (HH:MM)                    Chirp Rate Warning: 800                  Warning: 5000 Alarm: 1000                    Alarm: 5000                    Alarm: 13:00                  10 mrem Authorization List Required: NO                                                  Authorization Expires: NO Requirements Requirement Groups                                        Requirement Descriptions ALARA Review                              YES PROTECTIVE AND MONITORING (PC, Other: -
Respiratory, Dosimetry)                  -- Additional exposure monitoring equipment per direction from the RPM / RPC /
RAC or designee.
                                          -- PC and Respiratory protective equipment requirements per direction from the RPM / RPC / RAC or designee.
                                          -- Administration of Potassium Iodide (KI) for projected Thyroid CDE doses in excess of 25 REM as authorized by Emergency Coordinator.
Review and implement REP Standard Instructions [75RP-9RP02, App. P, attached]
RP COVERAGE                              CONTINUOUS IN LHRA INTERMITTENT RPTs: Implement Radiological Controls Directions contained in associated ALARA Plan(s).
RP PRE-JOB BRIEFING                      YES Additional Instructions Prerequisites:
* Review available radiological survey data with RP prior to entry.
* Complete radiation protection briefing and obtain RP authorization prior to each RCA entry as directed by RPM, RPC, or RAC.
* An Emergency Classification of "Notification of Unusual Event" (NUE) or an Emergency requiring immediate attention or higher has been declared.
* RPM or RPC authorization required prior to entry on this task.
* Entry to areas where no current radiological survey exists requires RP evaluation and authorization.
General:
* Dosimetry requirements may be modified and EPD setpoints adjusted per RPM, RPC, RAC or authorized designee.
* The 10 CFR 20.1201(a) Occupational Dose Limits apply to non-emergency conditions. All reasonable efforts should be made to observe these limits during emergency conditions.
* The RPM or RPC may authorize personnel radiation exposure within the Occupational Dose limits specified in 10 CFR 20.1201(a).
RP Hold Points:
Attachments N/A 8/28/2009 12:07:18PM                                                                                          Page 2 of 4
 
PVNGS RADIATION EXPOSURE PERMIT REP No.: 9-9999 Rev.: 00 Task Number Three Task
 
== Description:==
VHRA - Life-saving actions and Plant protective measures as explicitly authorized by Site Emergency Coordinator.
INCLUDES:
* Potential to exceed 10CFR20 radiation exposure limits anticipated.
HRA Entry:    YES              LHRA Entry:    YES              Minimum Available Dose: 0 mRem Dosimeter Settings Dose (mRem)                  Rate (mRem/hr)                    Time (HH:MM)                  Chirp Rate Warning: 20000                Warning: 250000 Alarm: 25000                  Alarm: 250000                    Alarm: 13:00                  10 mrem Authorization List Required: NO                                                    Authorization Expires: NO Requirements Requirement Groups                                          Requirement Descriptions ALARA Review                              YES PROTECTIVE AND MONITORING (PC, Other: -
Respiratory, Dosimetry)                    -- Additional exposure monitoring equipment per direction from the RPM / RPC /
RAC or designee.
                                          -- PC and Respiratory protective equipment requirements per direction from the RPM / RPC / RAC or designee.
                                          -- Administration of Potassium Iodide (KI) for projected Thyroid CDE doses in excess of 25 REM as authorized by Emergency Coordinator.
Review and implement REP Standard Instructions [75RP-9RP02, App. P, attached]
RP COVERAGE                                CONTINUOUS RPTs: Implement Radiological Controls Directions contained in associated ALARA Plan(s).
RP PRE-JOB BRIEFING                        YES Additional Instructions Prerequisites:
* Review available radiological survey data with RP prior to entry.
* Complete radiation protection briefing and obtain RP authorization prior to each RCA entry as directed by RPM, RPC, or RAC.
* An Emergency Classification of "Notification of Unusual Event" (NUE) or higher has been declared.
* Emergency Coordinator has authorized entry on this task.
* Entry to areas where no current radiological survey exists requires RP evaluation and authorization.
* LHRA entry requires RPM, RPC, RAC or authorized designee approval.
General:
* NOTE: Each emergency responder to obtain a pre-set fast response EPD [located in 140 auxiliary building RCA access control EPD racks, right hand column, labeled "Emergency use EPDs, REP 9-9999 Task 3"].
* Dosimetry requirements may be modified and EPD setpoints adjusted per RPM, RPC, RAC, EC or authorized designee.
* The 10 CFR 20.1201(a) Occupational Dose Limits apply to non-emergency conditions. All reasonable efforts should be made to observe these limits during emergency conditions.
* The Emergency Coordinator, after consultation with Radiation Protection staff, must authorize any projected personnel radiation exposure in excess of the limits specified in 10 CFR 20.1201(a).
RP Hold Points:
Attachments N/A 8/28/2009 12:07:18PM                                                                                            Page 3 of 4
 
PVNGS RADIATION EXPOSURE PERMIT REP No.: 9-9999 Rev.: 00 Task Number Four Task
 
== Description:==
RA - Drill Support.
INCLUDES:
* Drill support entry, radiation exposure not to exceed EPD setpoints.
HRA Entry:    NO              LHRA Entry:    NO              Minimum Available Dose: 15 mRem Dosimeter Settings Dose (mRem)                  Rate (mRem/hr)                  Time (HH:MM)                    Chirp Rate Warning: 12                  Warning: 75 Alarm: 15                    Alarm: 75                      Alarm: 13:00                  0.1 mrem Authorization List Required: NO                                                  Authorization Expires: NO Requirements Requirement Groups                                        Requirement Descriptions ALARA Review                              YES PROTECTIVE AND MONITORING (PC, Other: -
Respiratory, Dosimetry)                  PC and Respiratory protection equipment requirements per direction from RPM
                                          / RPC / RAC or designee.
Review and implement REP Standard Instructions [75RP-9RP02, App. P, attached]
RP COVERAGE                              INTERMITTENT RPTs: Implement Radiological Controls Directions contained in associated ALARA Plan(s).
RP PRE-JOB BRIEFING                      YES Additional Instructions Prerequisites:
* Review available radiological survey data with RP prior to entry.
* Entry to areas where no current radiological survey exists requires RP evaluation and authorization.
General:
RP Hold Points:
* NO HRA, LHRA, or VHRA entries on this task.
Attachments N/A 8/28/2009 12:07:18PM                                                                                          Page 4 of 4
 
Radiation Exposure Permits                                            75RP-9RP02                Revision 27 Appendix P Page 1 of 1                ( Sample )
Radiation Exposure Permit Standard Instructions All RCA entrants shall comply with the following PVNGS REP Standard Instructions except where REP provides specific alternate direction:
Monitoring and Protective Equipment:
Dosimetry - EPD/TLD Protective Clothing -
* RP Authorized Work at CA Boundaries -
* HCA / HPCA entry - Double Set Lab Coat and Gloves
* Wet work - Wet set
* CA entry - Full Set General:
* Contact RP prior to each RCA entry.
* Review current radiological survey data for work area prior to entry.
* Notify RP prior to contaminated system opening, contaminated surface destroying activities, or insulation removal.
* Stand by in low dose "Cold Area" when not actively involved in job.
* To limit exposure to airborne radioactive material when working in High Contamination Areas, apply engineered controls as directed by RP. This typically involves misting work area surfaces and maintaining damp while working.
* Work at CA Boundaries (e.g. Removing Tools, Equipment or Materials from CAs) requires RP Authorization.
* Radiation Workers PC requirements may be modified with RP Leader authorization.
* Personnel may enter a HCA / HPCA wearing a modified Double Set (consisting of a Full Set with outer shoe covers and gloves) to perform minor tasks with low probability of personnel contamination as determined and authorized by an RP Leader prior to each entry.
* Within contaminated areas, RP authorization required for body position other than standing.
RP personnel shall observe the following REP Standard Instructions in addition to the above:
* EPD dose rate setpoint may be adjusted as determined prudent by RP Leader based on review of work plan and radiological conditions. RP Leader to document all setpoint adjustments in RP electronic log.
* Ensure worker dosimetry is positioned appropriately to monitor highest whole body exposure (Ref.
75RP-9RP16).
* Task Specific TEDE /ALARA Screening required for: Work area conditions >500,000 dpm/100cm2
(), >500 dpm/100cm2 (), Contaminated system breach, Contaminated surface destroying activity or where a job/work area air sample yields >1.0 DAC (excluding Noble gas).
* RP Technicians entering an HPCA / HCA to perform RP monitoring tasks with low probability of personnel contamination may wear a modified Double Set consisting of a Full Set with outer shoe covers and gloves.
* RP Technicians, meeting the experience requirements of Section 4.5.2 of ANSI/ANS 3.1-1978, may relax RP Technicians Protective Clothing requirements for minor tasks with low probability of contamination.
* If individual is unable to self monitor (read dosimeter) due to any instance including but not limited to:
telemetric dosimeter use, re-positioning of dosimetry by RP, multi-dosimeter use, or outer set of PCs being worn, then RP will assume exposure monitoring for that individual (Ref: 75RP-9RP16, 75RP-9RP29, 75DP-0RP02).
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                                      Page 67 of 67
 
ALARA PLAN Plan #:      9-9999              Revision #:    00 Title: EMERGENCY RESPONSE Section One REP Task Number  REP Task Description LHRA - Emergency Plan implementation and Plant support tasks.
1 LHRA - Emergency Plan implementation and Plant support tasks as authorized by 2    RPM or RPC.
VHRA - Life-saving actions and Plant protective measures as explicitly authorized 3    by Site Emergency Coordinator.
RA - Drill Support.
4 Radiological Controls Directions Task 1 2 3 4 _
PREREQUISITE:
HRA Entry - RP Pre-job brief and RP authorization required as directed by RPM, RPC, or 1 2 3    RAC.
LHRA / VHRA Entry - Formal RP Pre-job brief and RP authorization required as directed 1 2 3    by RPM, RPC, or RAC.
Fast entry EPDs are set to Task-2 set points.
2 The EDE / TEDE ratio will be used to track internal exposure.
1 2 3 Task 1 2 3 4 _
GENERAL:
Page 2 of 6
 
ALARA PLAN Plan #: 9-9999    Revision #: 00 Title: EMERGENCY RESPONSE Section One Task 1 2 3 4 _ RP HOLD POINT:
Page 3 of 6
 
ALARA PLAN Plan #:      9-9999            Revision #:        00 Title: EMERGENCY RESPONSE Section Two NOTE:
There are no REP requirements contained in this section. The following is provided as supplemental background information.
Operating Experience / Lessons Learned FUEL BUILDING RADIOLOGICAL CONDITIONS AFTER LOCA After a Loss of Coolant Accident (LOCA) a Recirculation Actuation Signal (RAS) will occur. Highly radioactive water will fill the suction lines to the Safety Injection pumps. Back-leakage from the suction lines past check valves to the Refueling Water Tank is assumed and this will cause radioactive material to build up in the Refueling Water Tank. The Refueling Water Tank is vented to the Fuel Building normal ventilation. The normal building ventilation exhaust is isolated after a Safety Injection Actuation Signal so the Refueling Water Tank radioactive material (airborne nobles gasses and iodines) will migrate into the Fuel Building and remain there.
After a design basis LOCA, the disposition to CRDR 97-Q-0265 indicates that the following tasks may need to be performed in the Fuel Building:
* Obtaining iodine and particulate samples from RU-145/146
* Restart of the spent fuel pool (PC) cooling pumps
* Alignment of EW to the spent fuel pool heat exchangers
* Makeup to the spent fuel pool
* Periodic checks of spent fuel pool temperature and level Very high airborne levels may build up in the Fuel Building after a LOCA and continue to rise for several days after shutdown. Calculation 13-NC-CH-0314 rev 3 indicates 10,000 Rem/hr Thyroid CDE, 80 Rem/hr skin dose, and 7 Rem/hr TEDE are possible 100 hours after shutdown. Use of PCs, plastics, and SCBAs would be required for entries into the Fuel Building.
SPRAY POND VALVE OPERATION Within 24 hours of a LOCA, Operations will need to open the Essential Spray Pond cross-tie valves. The valves are located at the Essential Spray Ponds. This job should be performed when the Essential Spray Ponds are upwind of the affected unit to minimize radiation exposure to Operations personnel.
.
Page 4 of 6
 
ALARA PLAN Plan #:      9-9999                                    Revision #:        00 Title: EMERGENCY RESPONSE Section Three REP development Worksheet NOTE: Pre-job development information only. There are no REP requirements contained in this section.
ALARA Measures:
: 1. Temporary Shielding                                12. Special Anti-Cs (beta protection or other)
: 2. Component/System Flushing                          13. Reduced PC/Anticipated PCE authorization
: 3. Remote monitoring                                  14. TEDE ALARA Screening/Evaluation
: 4. Remote radiation survey techniques                15. Pre-Job Decontamination
: 5. Robotic support                                    16. Contamination fixatives
: 6. Planning Walk down with Work Group                17. Wrap/Sleeve/Cover components
: 7. Relocate Component (low dose area)                18. Contamination containment tent/enclosure
: 8. Minimize Crew size                                19. HEPA filtration (ventilation syst. or vacuum)
: 9. Mock-up practice                                  20. Other:
: 10. Specialized Tooling [e.g., long-handled]          21. Other:
: 11. Re-schedule to optimal ALARA window              22. Other:
Comments:
Job Estimate:
Eff.
REP                                                            #                      Actual              Actual Activity Description          Location  Craft                # Entries                  mR/
Task                                                        Persons                    [hours]              [mRem]
hr All    2009 Actual dose received      All areas  N/A        N/A          126          682      N/A      0.000 All    2008 Actual dose received      All areas  N/A        N/A          322          1,415    N/A      0.000 All    2007 Actual dose received      All areas  N/A        N/A          227          873      N/A      0.001 All    2006 Actual dose received      All areas  N/A        N/A          105          325      N/A      0.000 All    2005 Actual dose received      All areas  N/A        N/A          119          391      N/A      0.000 All    2004 Actual dose received      All areas  N/A        N/A          239          725      N/A      0.004
                                                                                                    ///////
TOTAL                                                                  Averages          735                0.000
                                                                                                      /
Developmental survey(s):    N/A Page 5 of 6
 
ALARA PLAN Plan #:    9-9999                                        Revision #:        00 Title: EMERGENCY RESPONSE Section Three REP development Worksheet NOTE: Pre-job development information only. There are no REP requirements contained in this section.
Estimate basis / assumptions: Historical averages from the last six years. Although little to no radiation exposure has been received over the last six years on this REP, 100 mRem is used in this estimate to allow minor surveillance activities.
Job-REP required (estimate >300 mRem) ? :                    YES              NO New REP # :
Assign to existing REP # :        9-9999 Do identified ALARA Measures or Radiological Controls Directions necessitate a REP revision (new or upgraded; Protective, Surveillance, or Controls requirements to the existing REP/ALARA Plan) ? :
YES            NO                N/A Page 6 of 6
 
A-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK: 1290020301, Conduct of Shift Operations TASK STANDARD: Determine Shift Manning Requirements by determining the TRO does not meet training requirements, the CO does not meet License maintenance time therefore the crew does not meet minimum manning and another reactor operator is required.
K/A:      2.1.4                                      K/A RATING:        RO:    3.3 SRO:        3.8 K/A:                                                K/A RATING:        RO:          SRO:
APPLICABLE POSITION(S):                  SRO        VALIDATION TIME:                15 minutes
 
==REFERENCES:==
40DP-9OP02, Conduct of Shift Ops SUGGESTED TESTING ENVIRONMENT: SIMULATOR                                PLANT          OTHER        X JPM TYPE Time Critical? (Yes/No)      No                  Alternative Path? (Yes/No)  No PRA/SRA related? (Yes/No)        No APPROVAL Developed By:              Larry Burton            Date:      10/12/2011 Revised By:                    N/A                Date:
Technical Review                                    Operations Approval EP Review                          N/A              Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                      Date:
Evaluator Name:
Time to complete:                  Minutes          GRADE (Circle  One)  SAT / UNSAT
* Page 1 of 12
 
A-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. SPECIAL TOOLS/EQUIPMENT:
x 40DP-9OP02 available. This JPM was written using Revision 56 of 40DP-9OP02 Page 2 of 12
 
A-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANT JPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o You may use any source of information normally available.
Page 3 of 12
 
A-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INITIAL CONDITIONS:
x    You are the CRS for a crew that is scheduled to take the Unit 1 dayshift tomorrow April 1st (new quarter).
x    Unit 1 is in Mode 1.
x    STA position will be filled by a non-licensed STA x    Unit 2 is providing the Fire Team Advisor.
x    The crew was in the 4th week of the previous training cycle.
x    The training cycle completed 7 weeks ago, there was no evaluated scenario.
x    The table below reflects your crews status of Training and License Maintenance times.
Operator                  Training                          Shifts previous Quarter SM                Attended all classes              Every shift for the quarter in the SM Passed written exam                position CRS              Attended all classes              One (1) 12 hour shift as CRS Passed written exam                Remaining shifts in RO positions RO                Attended all training              Every shift in an RO positions Passed written exam CO                Attended all classes              Short term disability Passed written exam                One (1) 6 hour shift as RO One (1) 10 hour shift as CO Four (4) 12 hour shifts as RO TRO              Attended all classes              Every shift in an RO positions Did not take written exam INITIATING CUE:
You are directed to determine:
: 1. The current status of the 5 licensed positions.
: 2. If the crew meets the procedural requirements to assume the shift.
: 3. If not, what position(s) need to be filled to meet these requirements?
Page 4 of 12
 
A-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*) denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 5 of 12
 
A-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
STEP                            CUE                    STANDARD
: 1.      Obtain 40DP-9OP02, Conduct of                              Obtain 40DP-9OP02, Conduct of Shift Operations.                                          Shift Operations.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                    STANDARD
: 2.
* 3.6.1.1/.2 of 40DP-9OP02                                    Examinee determines that the TRO is not current in LOCT training due to An Operator's training is current                          not completing their training within 6 when all required material in an                            weeks of the end of the cycle.
LOCT Training Cycle is completed.
If any LOCT material is missed during a training cycle, make-up training shall be completed no later than 6 weeks from the end of the training cycle that the training was part of.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                    STANDARD
: 3.
* 3.6.2 of 40DP-9OP02                                        Examinee determines that the CRS meets the requirements of at least one ACTIVE NRC Operators License                                12 hour shift in the SRO position.
exists when an operator has a valid license and has actively performed the functions of an operator or senior operator on a minimum of five 12-hour shifts per calendar quarter.
SAT / UNSAT Comments (required for UNSAT):
Page 6 of 12
 
A-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                            CUE                              STANDARD
: 4.
* 3.6.2 of 40DP-9OP02                                                    Examinee determines that the CO does not meet Watchstanding ACTIVE NRC Operators License                                          Proficiency requirements as they did exists when an operator has a valid                                    not stand five (5) 12 hour shifts n the license and has actively performed                                  previous quarter.
the functions of an operator or senior operator on a minimum of five 12-hour shifts per calendar quarter.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                              STANDARD
: 4.
* 3.1 of 40DP-9OP02                                                      Examinee determines that at least one more Reactor Operator is The minimum required shift crew                                        required to meet minimum shift manning per Unit is:                                                  manning requirements.
         Manager.
        Control Room Supervisor.
               Operators.
SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparedness organization for resolution.
NORMAL TERMINATION POINT Page 7 of 12
 
A-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam ANSWER KEY INITIAL CONDITIONS:
x    You are the CRS for a crew that is scheduled to take the Unit 1 dayshift tomorrow April 1st (new quarter).
x    Unit 1 is in Mode 1.
x    STA position will be filled by a non-licensed STA x    Unit 2 is providing the Fire Team Advisor.
x    The crew was in the 4th week of the training cycle.
x    The training cycle completed 7 weeks ago, there was no evaluated scenario.
x    The table below reflects your crews status of Training, License Maintenance times and Medical requirements.
Operator                  Training                          Shifts previous Quarter SM                Attended all classes              Every shift for the quarter in the SM Passed written exam                position CRS                Attended all classes              One (1) 12 hour shift as CRS Passed written exam                Remaining shifts in RO positions RO                Attended all training              Every shift in an RO positions Passed written exam CO                Attended all classes              Short term disability Passed written exam                6 hour shift as RO 10 hour shift as CO Four (4) 12 hour shifts as RO TRO                Attended all classes              Every shift in an RO positions Did not take written exam INITIATING CUE:
x    You are directed to determine:
: 1. The current status of the 5 licensed positions.
: 2. If the crew meets the procedural requirements to assume the shift.
: 3. If not, what positions need to be filled to meet these requirements?
Provide your answers on the attached sheet.
Page 8 of 12
 
A-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam ANSWER KEY
: 1. The current status of the 5 licensed positions.
Operator              Qualified                  Qualified License Training?                  Maintenance time?
SM                  YES / NO                      YES / NO CRS                  YES / NO                      YES / NO RO                  YES / NO                      YES / NO CO                  YES / NO                      YES / NO TRO                  YES / NO                      YES / NO
: 2. Does the crew meet the procedural requirements to assume the shift.
YES / NO
: 3. If not, what position(s) need to be filled to meet these requirements?
There is only one qualified reactor Operator for the shift.
At least one more Reactor Operator is required to meet minimum shift requirements.
ANSWER KEY Page 9 of 12
 
A-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED 000          10/12/2011                      New JPM for 2012 NRC Initial Exam REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 10 of 12
 
A-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam Candidate Handout INITIAL CONDITIONS:
x    You are the CRS for a crew that is scheduled to take the Unit 1 dayshift tomorrow April 1st (new quarter).
x    Unit 1 is in Mode 1.
x    STA position will be filled by a non-licensed STA x    Unit 2 is providing the Fire Team Advisor.
x    The crew was in the 4th week of the previous training cycle.
x    The training cycle completed 7 weeks ago, there was no evaluated scenario.
x    The table below reflects your crews status of Training, License Maintenance times and Medical requirements.
Operator                  Training                          Shifts previous Quarter SM                Attended all classes                Every shift for the quarter in the SM Passed written exam                position CRS                Attended all classes                One (1) 12 hour shift as CRS Passed written exam                Remaining shifts in RO positions RO                Attended all training              Every shift in an RO positions Passed written exam CO                Attended all classes                Short term disability Passed written exam                One (1) 6 hour shift as RO One (1) 10 hour shift as CO Four (4) 12 hour shifts as RO TRO                Attended all classes                Every shift in an RO positions Did not take written exam INITIATING CUE:
x    You are directed to determine:
: 1. The current status of the 5 licensed positions.
: 2. If the crew meets the procedural requirements to assume the shift.
: 3. If not, what position(s) need to be filled to meet these requirements?
Provide your answers on the attached sheet.
Page 11 of 12
 
A-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam Candidate Handout
: 1. The current status of the 5 licensed positions.
Operator              Qualified                  Qualified License Training?                  Maintenance time?
SM                  YES / NO                      YES / NO CRS                  YES / NO                      YES / NO RO                  YES / NO                      YES / NO CO                  YES / NO                      YES / NO TRO                  YES / NO                      YES / NO
: 2. Does the crew meet the procedural requirements to assume the shift.
YES / NO
: 3. If not, what positions need to be filled to meet these requirements?
Candidate Handout Page 12 of 12
 
A-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK: 1270130401 Implement reactor coolant system draining operations TASK STANDARD: Upon completion of this JPM, the examinee will determine that the time required for shutdown based on EW temperature is met and that HPSI cold leg flow should be ~ 212 gpm.
K/A:      2.1.20                                  K/A RATING:        RO:    4.6 SRO:          4.6 K/A:      2.1.25                                  K/A RATING:        RO:    3.9 SRO:          4.2 APPLICABLE POSITION(S):                SRO        VALIDATION TIME:                15 minutes
 
==REFERENCES:==
40OP-9ZZ16, RCS Drain Operations; Unit 3 Safety Analysis Operational Data Manual SUGGESTED TESTING ENVIRONMENT: SIMULATOR                              PLANT          OTHER        X JPM TYPE Time Critical? (Yes/No)      No                Alternative Path? (Yes/No)  No PRA/SRA related? (Yes/No)        No APPROVAL Developed By:            Alan Malley            Date:      09/08/2009 Revised By:                Alan Malley          Date:      07/07/2011 Technical Review                                Operations Approval EP Review                        N/A            Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                    Date:
Evaluator Name:
Time to complete:                Minutes          GRADE (Circle  One)  SAT / UNSAT
* A-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. SPECIAL TOOLS/EQUIPMENT:
x 40OP-9ZZ16, RCS Drain Operations available. This JPM was written using Revision 71 of 40OP-9ZZ16. This JPM may be used with later revisions if it is verified that the later revision does not affect this JPM.
x Unit 3 Safety Analysis Operational Data Manual available. This JPM was written using Revision 4 of the Unit 3 Safety Analysis Operational Data Manual. This JPM may be used with later revisions if it is verified that the later revision does not affect this JPM.
 
A-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANT JPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
o    Inform the control room staff of any discovered deficiencies.
o    Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o    You may use any source of information normally available.
INITIAL CONDITIONS:
x  Unit 3 was shutdown 91 hours ago.
x  The Decay heat load is 15.5 MWs.
x  The crew is preparing to drain the RCS for a Hot Mid-Loop.
x  You are an extra SRO in Unit 3.
x  It is anticipated that the crew will have to reduce Shutdown Cooling flow to 3780 gpm during Mid-Loop operations.
x  RWT temperature as read on 1-J-CHN-TT-210 is 70 &deg;F.
x  EW Heat Exchanger temperature as read on 3-J-EWN-TT-083 and TT-084 is 86 &deg;F.
INITIATING CUE:
The Control Room Supervisor has directed that you perform the following two tasks:
: 1. Perform prerequisite step 7.2.12 of 40OP-9ZZ16 (RCS Drain Operations) to determine if Essential Cooling Water temperature vs. Time Post Shutdown requirements of the Safety Analysis Operational Data portion of the Core Data Book is met before SDC flow is lowered to 3780 gpm.
: 2. Perform prerequisite step 7.2.13 of 40OP-9ZZ16 (RCS Drain Operations) to determine makeup flow rate required to prevent boiling using HPSI cold leg injection.
Provide your answers below:
: 1. Prerequisite step 7.2.12 is met / is not met.
(Circle one)
: 2. Required makeup flow to prevent boiling - __________ gpm per cold leg.
 
A-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*) denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
 
A-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
STEP                            CUE                  STANDARD
: 1.
* Step 7.2.12 of 40OP-9ZZ16:                                Examinee refers to the Safety Analysis Operation Data Manual to Essential Cooling Water temperature                      verify Essential Cooling Water vs. Time Post Shutdown                                    temperature Vs Time Post Shutdown requirements of the Safety Analysis                      requirements are met.
Operational Data portion of the Core Data Book are met before SDC flow                        Examinee may refer to step 4.2 of is lowered to 3780 gpm. REFER TO                          40OP-9ZZ16.
Step 4.2 for additional information Examinee determines that for an EW temperature of 86 &deg;F the time for shutdown has to be 87 hours, therefore being 91 hours after shutdown does meet the requirements.
SAT / UNSAT Comments (required for UNSAT):
 
A-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                            STANDARD
: 2.
* Step 7.2.13 of 40OP-9ZZ16:                                            Examinee determines HSPI Cold leg injection flow should be ~ 212 gpm Makeup flow rate required to prevent                                  (+/- 10 gpm) per cold leg using boiling has been determined by one                                    Appendix W and the 70&deg;F line for of the following:                                                      15.5 MWs.
Hot Mid Loop (pre core offload) x This is applicable for HPSI makeup via the cold leg and should be N/Ad if this makeup path is not selected.
x Decay heat load, in MW, has been determined. Target decay heat load is equal to or less than 16.0 MW.
x Required HPSI makeup flow per loop has been determined from Appendix W - Makeup Flow to Prevent Boiling.
(REFER TO Step 4.30 for additional discussion)
SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparedness organization for resolution.
NORMAL TERMINATION POINT
 
A-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam Provide your answers below:
: 1. Prerequisite step 7.2.12 is met.
(Circle one)
: 2. Required makeup flow to prevent boiling - 212 gpm(+/- 10 gpm) per cold leg.
 
By:  Arshad Taufiq              Safety Analysis Operational Data                SAOD Unit 3 Manual 3990 MWt                                  Rev 4 Reviewer:  Ness Kilic                                                            Page 37 of 43 ANSWER KEY TABLE 2.8.1 Minimum Time to Reduced Flow SDC Operations Following Reactor Shutdown To Maintain RCS Temperature at or Below 135 Deg. F Note:          Refer to Note 2.8.0 for information regarding the use of this table EW Inlet              EW Inlet          Decay Heat /          Time After Temperature            Temperature        SDC capacity            Shutdown (Actual - 0F)        (Indicated - 0F)          (MW)                  (Hrs)
(1,2,3JEWN083/84) 92                    87                  15.5                  91 91                    86                  15.9                  87 90                    85                  16.3                  82 89                    84                  16.6                  79 88                    83                  17.0                  75 87                    82                  17.4                  71 Source of Data: 13-MC-SI-231, Revision 4 ANSWER KEY
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                                                  40OP-9ZZ16          Appendix W Page 1 of 1 RCS Drain Operations                                    Revision      71      Page 314 of 335 Appendix W - Makeup Flow to Prevent Boiling 1.0  General Information                                          ANSWER KEY 1.1                              This table correlates decay heat to the required HPSI flow to EACH loop to prevent boiling in the RCS.
Minimum Flow Requirements to Prevent Core Boiling 350 TRWT = 100oF 300  TRWT = 90oF TRWT = 80oF TRWT = 70oF 250 200 150 HPSI Flow per Cold-Leg (gpm) 100 50 0
20.00          18.00      16.00        14.00        12.00          10.00      8.00        6.00        4.00 Decay Heat (MW)
ANSWER KEY
 
A-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED 000          07/07/2011            6        Converted from a NRC Initial License Exam JPM REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
 
A-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam EXAMINEE HANDOUT INITIAL CONDITIONS:
x  Unit 3 was shutdown 91 hours ago.
x  The Decay heat load is 15.5 MWs.
x  The crew is preparing to drain the RCS for a Hot Mid-Loop.
x  You are an extra SRO in Unit 3.
x  It is anticipated that the crew will have to reduce Shutdown Cooling flow to 3780 gpm during Mid-Loop operations.
x  RWT temperature as read on 1-J-CHN-TT-210 is 70 &deg;F.
x  EW Heat Exchanger temperature as read on 3-J-EWN-TT-083 and TT-084 is 86 &deg;F.
INITIATING CUE:
The Control Room Supervisor has directed that you perform the following two tasks:
: 1. Perform prerequisite step 7.2.12 of 40OP-9ZZ16 (RCS Drain Operations) to determine if Essential Cooling Water temperature vs.
Time Post Shutdown requirements of the Safety Analysis Operational Data portion of the Core Data Book is met before SDC flow is lowered to 3780 gpm.
: 2. Perform prerequisite step 7.2.13 of 40OP-9ZZ16 (RCS Drain Operations) to determine makeup flow rate required to prevent boiling using HPSI cold leg injection.
Provide your answers below:
: 1. Prerequisite step 7.2.12 is met / is not met.
(Circle one)
: 2. Required makeup flow to prevent boiling - __________ gpm per cold leg.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                Page 22 of 336 Revision RCS Drain Operations                                    40OP-9ZZ16              72 4.0 PERSONAL INDOCTRINATION 4.1 Plant activities may preclude the performance of specific steps in the order presented. The Shift Manager may re-sequence or delay steps as necessary to accomplish the procedure objectives, except for those portions of the procedure requiring the securing of plant draining at specified plant elevations since these will be used to allow for entire RCS pressure equalization/level stabilization.
4.2 The analyses that supports SDC operation at reduced flow rate (3780 gpm) have been revised to reduce conservatism and permit more expedient entry into Mid-Loop.
* Table 2.8.1 has been added to the Safety Analysis Operational Data portion of the Core Data Book which defines the criteria necessary to reduce SDC flow.
Supplements to Table 2.8.1 for specific unit and outage applications may be applicable and incorporated in the SAOD.
* SAOD Table 2.8.1 is applicable anytime the plant is in mode 5 or mode 6 and it is required to reduce SDC flow. The table is independent of RCS level.
* This table shows the required number of hours post shutdown, as a function of Essential Cooling Water temperature, after which a single train of SDC can provide sufficient cooling at reduced flow (i.e.: 3780 gpm), to maintain the RCS at or below 135&deg;F in accordance with LCO 3.4.8, LCO 3.9.4, and LCO 3.9.5.
Flow may be reduced to 3780 gpm to preclude vortexing at the SDC suction nozzle during Mid-Loop operations.
* Normal SDC flow is defined by Tech Specs as 3780 to 5000 gpm (indicated). In most situations, SDC flow is maintained at or near 4,000 gpm. If Operations had 1 train SDC available and elected to reduce flow to 3780 shortly after shutdown, it is likely that RCS temperature will increase. Compensatory action is to increase SDC flow.
* There are some situations where SDC flow could NOT be significantly increased. For example we have administrative controls preventing SDC flow greater than 4150 gpm while in mid-loop. The analyses supporting the data in the SAOD demonstrate that the SDC will provide sufficient cooling capacity thereby providing some assurance that the plant will be cooled in lieu of increasing flow.
* By meeting the SAOD Essential Cooling Water temperature/time post shutdown requirements, there is assurance that the core will be maintained at refueling mode temperature (135&deg;F) in the unlikely event that SDC flow is reduced and Operations does NOT have to ability to increase SDC flow to mitigate an increasing RCS temperature.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                            Page 23 of 336 Revision RCS Drain Operations                                40OP-9ZZ16              72 4.3 RWLIS Flow Compensation.
* The RWLIS level channels are capable of being flow compensated to obtain actual RCS level.
* Flow Compensation is used to offset/correct a channels level error induced when that channels train of SDC is in operation.
* Additionally, SDC flow oscillates. Indicated RCS level will fluctuate as a result.
* Normally the Refueling Wtr. Lvl. Flow Compensation Selector Switch is placed in the "BOTH" position.
* The Refueling Wtr. Lvl. Flow Compensation Selector Switch may also be selected for the train of SDC Loop that is in operation.
* The "NONE" position is used when the RWLIS is secured.
4.4 RWLIS channel alarms.
* Selectable with the Refueling Water Level Alarm Selector Switch.
* This selects the alarm input from "Channel A", Channel B, or "BOTH" depending on which RWLIS channels are in operation.
* Normally "BOTH" is selected.
* Upon receiving the alarm, the point ID should be checked to determine the channel causing the alarm.
* The fourth position, "NONE" is used when the system is secured.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                            Page 24 of 336 Revision RCS Drain Operations                                  40OP-9ZZ16              72 4.5 When RCS level can not be displayed in the Control Room by any available means, level shall be monitored locally and recorded at least once every 15 minutes.
: 1. Use the instructions, data sheet(s), and level correction curves found in Appendix D - Operating the Refueling Water Level Indicating System when local monitoring is required. (This requirement is N/A with no fuel in the Rx Vessel).
: 2. Monitoring with gage glasses
* RCS operations at MidLoop levels can be monitored using the Train "A" or "B" RWLIS local gage glass.
* The SDC loop associated with the selected RWLIS local gage glass cannot be in operation.
* When the RCS level is between the 101 ft. 4 in. and 102 ft. 9 in.
elevation, the RWLIS local gage glass associated with the SDC Loop in operation will indicate off-scale low.
4.6 CETs, unheated HJTCs and SDCHX inlet and outlet temperature indicators are the only reliable RCS temperature indications with SDC in operation and the RCS loops not filled.
4.7 The SDCHX outlet valve and bypass valve can be throttled to reduce flow in an attempt to reduce cavitation. Do not start the standby SDC loop until the cause of cavitation has been determined, or both trains may become air bound.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                              Page 25 of 336 Revision RCS Drain Operations                                40OP-9ZZ16            72 4.8    Operating only one train of SDC when drained/draining minimizes the possibility of air binding both SDC loops simultaneously, allowing faster recovery from a loss of shutdown cooling. The switches, indicators and their functions, for the RWLIS are listed below:
: 1. The following are all located on Control Board B02:
* RCN-HS-752, Refueling Water Level Alarm Enable Selector Switch.
* RCN-HS-752-1, Refueling Water Level Flow Compensation Selector Switch.
* RCN-LI-752A Narrow Range Refueling Water Level.
* RCN-LI-752B, Wide Range Refueling Water Level.
* RCN-LR-752, Refueling Water Level Trend Recorder.
* Window 2B10A, Refueling Water Level Lo alarm window.
* Window 2B10B, Refueling Water Level Lo-Lo alarm window.
: 2. The RWLIS instrument tolerances are (+) one in. for narrow range and (+)
seven in. for wide range.
: 3. Various inputs to the PMS computer will allow the operator to observe parameters associated with the RWLIS and are listed in the table below.
RWLIS                          Train "A"    Train "B" Refueling Water Level NR in Feet                    RCL-752A    RCL-753A Refueling Water Level WR in Feet                    RCL-752B      RCL-753B Refueling Water Level Lo Alarm (no Train)                  RCLS-752 Refueling Water Level Lo-Lo Alarm (no Train)              RCLSL-752
: 4. Local Refueling Water Level Gage Glasses: RCN-LG-752/Train "A" and RCN-LG-753/Train B each consist of three vertically staggered level gauges covering a total span of 27 7/8 in.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                  Page 26 of 336 Revision RCS Drain Operations                                    40OP-9ZZ16                72 4.9  Two normal paths are available for draindown.
4.9.1    The selection of the normal drain path to be used should be evaluated based on the RCS boron concentration, RCS activity (both gaseous and degassed), the current RWT boron concentration and the effect that draining the RCS may have on the final RWT boron concentration when selected.
4.9.2    It is desirable to utilize the letdown purification filter, purification ion-exchanger, and pre-holdup ion exchanger when utilizing either of these drain paths.
4.10 The alternate drain path uses the six inch recirculation line on the outlet of the SDC Heat Exchanger and may be an option when the normal paths are not available and permitted by the Shift Manager. This drain path is also subject to the following considerations:
: 1. Draining will dilute the contents of the RWT by a small amount.
: 2. Use of SIE-V298 to achieve low specified drain rates will require frequent monitoring and adjustments as necessary to establish the specified drain rate.
: 3. Use of the alternate drain path will require two more Nuclear Operators in communication with the Control Room.
: 4. There are times when shutdown purification may be in service while draining the RCS or adjusting level while in a pre-existing condition. If the SI system six inch full-flow recirc valve is used, then total flow is actually a summation of flow through the full-flow recirc, normal SI loop return flow and letdown flow.
Total = SIN-FI-300+SIA-FI-306 or SIB-FI-307+CHN-FI-202 Conversely, the drain path can be used without shutdown purification in service. In that configuration, total flow is a summation of flow through the full-flow recirc, normal SI loop return flow.
Total = SIN-FI-300+SIA-FI-306 or SIB-FI-307 4.11 A blank flange will be installed on the Pressurizer/RV Head Vent to the Containment downstream of RCA-HV-106. The vent path will be through the RCA-HV-106 tailpiece drain line into the radioactive drain funnel on the 120 ft. level by the SIT 1A. The tailpiece isolation valve, RCN-V203 will be fully opened to maximize the vent path.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                  Page 27 of 336 Revision RCS Drain Operations                                    40OP-9ZZ16            72 4.12 The Steam Generator U Tubes will not drain at the same rate as the rest of the system. The shape of the tubes forms a trap which inhibits or delays the draining process. RCS level while draining will tend to stall when the top of the hot leg is reached as individual tubes will be draining into the RCS. This process will take considerable time and when the majority of the SG tubes have dumped RCS level will again trend down until the desired RCS level is established. Some of the tubes that have not completely drained will let down over a period of several days. This water may accumulate in the bowl(s) of the Steam Generator. Due to this, close monitoring is necessary to prevent possibly overflowing of the open bowl areas.
4.13 Replacement Steam Generator Primary Manway Removal:
4.13.1  The steam generator primary manways man be released to maintenance after it has been confirmed that RCS level is sufficiently low to prevent spillage out the manway.
4.13.2  During drain, level reduction will stall at or above the top of the hot leg.
Indicated level will stop going down, but the receiving tank level -
typically the RWT - will continue to increase. This is the baseline point.
4.13.3  ERFDADS point SPDS0268 is available to monitor RWT level in gallons.
When level stalls, log the value of SPDS0268.
4.13.4  A target VOLUME in the RWT is calculated as follows:
SPDS0268 + 28,000 gallons = Target Volume.
28,000 is the calculated volume of both steam generator tube bundles and the steam generator bowls.
4.13.5  Once the Target Volume is achieved in the RWT, then level is sufficiently below the manway lips to have reasonable assurance that water will NOT spill out the manways when they are open. This level can be verified as long as two conditions exist.
* A visible level less than 102 ft. 11 in. in the hot leg.
* RCS level is continuously lowering within the hot leg.
4.14 Frequent comparisons should be made during draindown to cross-check indicated RCS levels against volume changes in the HUT or RWT.
4.15 The RWLIS is calibrated at RCS temperature, level, boron concentration and containment temperatures other than those at which the system is operated. This introduces an inherent error. RWLIS_Spreadsheet.xls is available to determine this introduced error.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                              Page 28 of 336 Revision RCS Drain Operations                                  40OP-9ZZ16            72 4.16 Shift Technical Advisors maintain technical and operational custody over the RWLIS_Spreadsheet.xls program. The STAs are responsible to ensure that the correct version of RWLIS_Spreadsheet.xls is loaded on the Operations Personal Computer and that it is validated.
4.17 Hold points are provided to verify that pressure in the reactor vessel head area is trending towards equalization with the remainder of the RCS. A negative pressure in the reactor vessel head area will typically be reflected by the following conditions:
: 1. The RCS volume drained to the HUT or RWT (from Appendix E -
Determination of Volume to be Drained) will not be correct. Less water will be shown to have drained than expected.
: 2. The Refueling Water Level Indication System (RWLIS) will indicate a water level lower than what is expected to exist for the actual volume drained.
: 3. Reactor Vessel Level Monitoring System (RVLMS) could indicate a higher water level than is indicated on RWLIS.
: 4. A void is normally indicated by RVLMS when the T between the heated and unheated thermocouples is equal to or greater than 200&deg;F.
: 5. Pressure equalization in the reactor vessel head area will be shown by a decreasing disparity between the above indications typified by:
* RWLIS will indicate a level rise concurrent with a lowering level increasing void size) as indicated by RVLMS.
* Total RCS volume actually drained approaches the expected value calculated from Appendix E - Determination of Volume to be Drained.
This is indicated by a rise in HUT/ RWT level.
: 6. Destack activities performed while draining or while in a stable configuration can affect indicated RCS level. Removing ICI seal table plugs or opening other mechanical penetrations on the RV Head will allow air entry into the area under the head. The vacuum under the head will equalize with containment.
RWLIS will react accordingly. RWLIS will show a level increase.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                            Page 29 of 336 Revision RCS Drain Operations                                40OP-9ZZ16            72 4.18 VCT and RCS level indicators are only one indication as to the state of the RCS.
Both the RWLIS and VCT level indicators must be compared to ensure that changes in VCT level are consistent with that of RCS levels and not attributed to temperature swings.
: 1. Lowering VCT level is an indication of rising level in the RCS.
: 2. Rising VCT level is an indication of lowering level in the RCS.
: 3. Abnormal decreases in VCT level, while steady state, that require frequent MAKE-UP additions to the VCT are indications that the RCS is being drained.
: 4. Rising VCT level, while steady state, is an indication that water is being introduced into the RCS from another source which must be quickly identified and isolated.
: 5. Rising VCT level MAY be a possible indication of air entrainment (vortexing) in the operating SDC loop and should be investigated.
4.19 When RCS levels are maintained above the hot leg, system pressure differences can cause shifting of RCS inventories between the Pressurizer and the RV Head area.
4.20 The introduction of several new style Heated Junction Thermocouples used in the QSPDS system is causing a false Rx void indication for the RVLMS display when in Mode 5. Due to their ability to produce a higher T and with the RCS at reduced temperatures, the 200&deg;F alarm setpoint can be exceeded but may not be representative of true Rx Vessel level. Appendix A - Adjusting (RVLMS) Heated Junction Thermocouples Heater Power Controllers provides this guidance. When the Restoration Section of this procedure is being performed the Heater Controller Setpoints will be returned to their normal settings.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                Page 30 of 336 Revision RCS Drain Operations                                  40OP-9ZZ16            72 4.21 Definitions:
: 1. Partially drained: RCS level is less than 10% pressurizer level or less than 117 ft. elevation but greater than 114 ft.
: 2. LOWERED INVENTORY: exists anytime the RCS level is equal to or less than 114 ft. but greater than 111 ft.
: 3. Reduced Inventory: RCS level is equal to or less than 111 ft. elevation but greater than 103 ft. 1 in. with fuel in the Rx. Vessel.
: 4. Mid-Loop: RCS level is equal to or less than 103 ft. 1 in. elevation but equal to or greater than 101 ft. 6 in. with fuel in the Rx. Vessel.
: 5. Vortexing: The whirlpool effect on the water at the SDC pump suction connection at the RCS Hot Leg which is caused by low RCS levels in conjunction with high SDC system flow rates.
: 6. Level Change: Deliberate or inadvertent actions that results in a change in RCS inventory. Variations in level due to temperature changes are not considered a Level Change although they may result in the need for one.
: 7. Bulk Temperature: The actual temperature in the core. This is indicated at the CETs with no RCS flow or at SIA-TI-351X/SIB-TI-352X, SDC Hx. inlet temperature with SDC flow.
4.22 Prior to opening a path from the RCS cold leg to the Containment of equal to or greater than one square inch, the Pressurizer Manway must be removed as the hot leg vent path. Hot leg vent path requirements are discussed in Appendix P - RCS Level/Hot Side Venting Requirements vs. Days Post Shutdown.
* RCP seal housing removed and a blocking device installed between the RCP shaft and the thrust bearing is not considered a breach of the cold leg.
4.23 Appendix P - RCS Level/Hot Side Venting Requirements vs. Days Post Shutdown is used when the SG nozzle dams are installed with the reactor vessel head in place. Appendix P - RCS Level/Hot Side Venting Requirements vs. Days Post Shutdown shall be used to determine the maximum RCS water level possible for a given decay heat load while in the aforementioned configuration.
4.24 Appendix N - Monitoring RCS Boron Concentration During SG Decontamination is to be used to monitor the RCS boron concentration during Steam Generator decontamination with fuel in the Reactor Vessel.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                Page 31 of 336 Revision RCS Drain Operations                                  40OP-9ZZ16              72 4.25 Level Anomaly:
A 108 ft. level plateau (Section 6.0) is added to this procedure as directed in CRDR 2695262 (CRAI 2730369). This CRDR evaluated a level anomaly that occurred at approximately 107 ft. 9 in. during 1R11. Indicated RCS level suddenly increased.
While the indicated level suddenly increased, the historical dynamics of the RWLIS are such that the actual level is always greater than indicated level during a draindown with the reactor vessel head installed.
It is postulated that the anomaly occurred because the hydraulic line pressure balance was upset when level was sufficiently low enough to make a direction change from the horizontal portion of the pressurizer surge line into the vertical portion of the pressurizer surge line at approximately 107 ft. 9 in. The purpose of Section 6.0 is to minimize the possibility of this occurrence by stopping the drain and allowing level to stabilize before proceeding to a lower level.
While the goal of Section 6.0 is to minimize the possibility of occurrence, it should be noted that it is unlikely that it will always prevent occurrence. Be aware that this anomaly can occur at approximately 107 ft. 9 in. while draining.
4.26 Greylock Hubs: (CRDR 2742525)
While draining the RCS, indicated RCS level is lower than actual RCS level. The drain rate is greater than the ability of the 7/32 inch orifice in the reactor vessel head to pass air into the reactor vessel. Since the remainder of the RCS is at atmospheric pressure via the pressurizer manway, this keeps level in the reactor vessel higher than indicated level.
The greylock hubs can be opened to provide additional venting capacity under the RV head while draining.
An additional reactor level-equalizing valve RCE-V007 has been installed that should also improve the offset between the actual and indicated level (in additional to opening the greylock hubs).
When the greylock hubs are opened, additional vent space is created, allowing increased air to be vented into the reactor vessel. The air volume under the reactor vessel head equalizes to atmospheric pressure. This allows water trapped under the reactor vessel head to move into the RCS. The result is that indicated RCS level will rise. The magnitude of the level rise is dependent on the vacuum under the reactor vessel head. Typically, the lower the level before the greylock hubs are opened, the larger the magnitude of level rise. A level rise of up to 30 inches has been observed.
Opening the greylock hubs will be a procedural driven event. RCS drain will commence. Once Maintenance has reported that they are ready to open the greylock hubs, RCS drain will be suspended with level between 118 feet and 111 ft., 6 in. Only then will Maintenance be directed to open the greylock hubs.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                              Page 32 of 336 Revision RCS Drain Operations                                40OP-9ZZ16              72 4.27 The following are concerns only when fuel is in the Rx Vessel.
: 1. If SDC is lost 24 hours after shutdown with the RCS at Mid-Loop level, boiling can occur in 10 minutes followed by core uncovery in 45 minutes.
The above worst case condition assumes the RCS is at 135&deg;F bulk temperature when SDC is lost, the SG Nozzle Dams are installed, a Hot Leg Vent path does not exist, and no operator actions.
: 2. Anytime the cold leg is not intact with the reactor fueled and the reactor vessel head in place, the preferred pumped makeup path is Appendix S - Hot Leg Makeup Path Using HPSI Pump.
: 3. For cases with the cold leg intact, with the reactor fueled and the reactor vessel head in place, availability of a HPSI pump for RCS cold leg makeup is desired since it will add water at any pressure where SDC may be operated at, and its suction cannot be aligned to the SDC system.
: 4. In the event all Vital AC power is lost when in Reduced Inventory, it is important that at least one RCS Gravity Make-up path has been both maintained and initiated with flow being regulated to keep the core covered/
cooled.
: 5. Appendix F - Shiftly Verification tracks makeup paths when in Reduced Inventory. It shall be completed near the end of each shift and attached to the Shift Managers Turnover Sheet.
: 6. Maintaining an operable Diesel Generator will ensure that the makeup paths chosen will be functional on a loss of off-site power. The train relationship between the selected makeup path and the operable Diesel Generator need not be maintained as procedures to provide power to both PBA-S03 and PBB-S04 buses from a single Diesel Generator are already in place in the Degraded Electrical procedure, 40AO-9ZZ12. If plant work will place the electrical system into a condition where PBA-S03 and PBB-S04 cannot be powered from a single Diesel Generator, then maintain one Diesel Generator operable and the other Diesel Generator available to provide power to its respective emergency bus. In addition, a single operable Diesel Generator and one or more Gas Turbine Generators may be used to provide power to the non-operable Diesels vital bus.
: 7. CETs will be used in Mid-Loop condition to provide an indication of core conditions should a loss of SDC occur.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                              Page 33 of 336 Revision RCS Drain Operations                                  40OP-9ZZ16              72 4.28 Gravity Makeup
: 1. Gravity makeup must be available as a makeup path during a loss of all AC power. It does NOT prevent boiling in the core. When used, gravity makeup will only makeup for the amount of water boiled off.
: 2. Slug flow will occur should this path be needed with levels above the top of the hot leg. Pressure will build under the RV head forcing water out of the core into the pressurizer. When level has breached the hot leg, the head will be vented through the hot leg to the pressurizer. When pressure is less than the head pressure of the RWT, then water will flow from the RWT into the core.
: 3. Slug flow will occur several times until level has boiled down into the hot leg.
Once in the hot leg, makeup must be throttled to maintain level 101 ft., 6 in. to 102 ft., 4 in. (RVLMS sensors six and five respectively) This maintains the vent path for steam to escape through the hot leg vent.
: 4. Using at least one string of RVLMS is the most effective method to control level during gravity makeup. 40EP-9EO11, Lower Mode Functional Recovery directs alternate indication when RVLMS is unavailable.
: 5. Gravity makeup, like the pumped makeup path, is a pre-staged alignment.
40EP-9EO11, Lower Mode Functional Recovery, directs when flow is initiated.
4.29 HPSI Cold Leg Makeup
: 1. HPSI cold leg makeup is our first choice to add water to the RCS on a loss of Shutdown Cooling.
: 2. When used with decay heat equal to or less than 16 Mw, HPSI makeup will provide sufficient flow to maintain the RCS subcooled.
: 3. When used with decay heat GREATER than 16 Mw, HPSI will not provide sufficient flow to prevent boiling. This will occur within approximately the first 87 hours after shutdown.
: 4. HPSI makeup is a pre-staged alignment. 40EP-9EO11, Lower Mode Functional Recovery, directs when flow is initiated.
4.30 Engineering calculations have determined the flow requirements to maintain the core subcooled during a loss of shutdown cooling. These calculations assume a maximum HPSI flow of 254 gpm per cold leg runout flow. (based on actual engineering design configuration calculations.)
: 1. RWT temperature is critical to permitting drain operations at 16 Mw decay heat.
: 2. Sufficient HPSI flow for 16 Mw is achieved with RWT temperature of 80&deg;F or less.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                Page 34 of 336 Revision RCS Drain Operations                                  40OP-9ZZ16              72 4.31 RCP SEAL REPLACEMENT ONLY:
: 1. Recent RETRAN analysis has shown that with RCS level equal to or greater than 10% (117 ft.) and SG tubes full, there is sufficient inventory available to mitigate a Loss of SDC as long as decay heat is less than 19.4 MW (48 hrs shutdown) and the pressurizer manway is removed.
: 2. The 16 MW limit may be N/Ad.
4.32 Use 40EP-9EO11, Lower Mode Functional Recovery, to respond to a Loss of Shutdown Cooling.
4.33 If a Safety Injection or Containment Spray pump fails to develop or maintain expected discharge pressure, flow and/or motor current, then along with system valve alignment, gas or vapor binding of the pump should be among the items considered when determining the reason for anomalous indications. [ref 2.3.7]
4.34 Safety Injection or Containment Spray pump indications such as pump amps, discharge pressure, and/or pump flow should be monitored during pump start and operation. Indications such as fluctuation of running current, less than expected running current, failure to develop discharge pressure and/or failure to develop expected flow can indicate pump gas binding, pump cavitation, an isolated suction source or pump suction vortexing. If anomalous indications are observed, then the CRS should be immediately notified and consideration should be given to stopping the pump and investigating the reason for the anomalous indications. [ref 2.3.7]
4.35 We use the shutdown risk assessment (SRA) as a planning tool to limit risk while performing maintenance. The SRA credits aligning two RCS makeup paths/
sources prior to removing the pressurizer manway. Part of each of these alignments is ensuring that there is sufficient water available to provide adequate makeup for 4 hours. The volumes of water can be wholly in the RWT or apportioned between the RWT and the water in the refueling pool. If makeup is required, water will spill from the pressurizer manway or out the RV head/flange gap into the refueling pool. In order to recover water from the refueling pool, the manual isolation valves on the conical flanges must be opened. This will allow the water in the refueling pool to drain into the containment recirculation sumps for recovery by the safety injection pumps. The SRA allows the conical flange manual isolation valve to be closed as long as a contingency plan is established that will open the valves in a timely manner. The contingency plan needs to be in place before the makeup paths/sources are aligned or the pressurizer manway removed.
(CRDR 3545489/PCR 3558471)
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                              Page 35 of 336 Revision RCS Drain Operations                                40OP-9ZZ16              72 4.36 (CRDR 3543758/PCR 3543759)
Normally, a single SDC pump (LPSI or CS) is in operation on the in-service SDC loop. RCS thermal conditions may dictate that a second pump be placed in operation on the in-service SDC loop. This configuration is permitted in 40OP-9SI01, Shutdown Cooling Initiation. When configured with two pumps, the upper flow limit is 8500 gpm. This presents some challenges when draining the RCS with elevated SDC flow.
* The RWLIS flow compensation curves in Appendix D - Operating the Refueling Water Level Indicating System are not calculated for SDC flow in excessive of 5000 gpm.
* RCS level comparisons will be out-of-tolerance with the specifications in the RWLIS Level Comparison Chart in Appendix D - Operating the Refueling Water Level Indicating System.
Little data currently exists showing RWLIS behavior with two pumps in service.
Only a single data point has been collected. During 3R15, B train SDC was in service with the LPSI and CS pumps in operation. SDC flow was 8300 gpm; 10%
pressurizer level. Old reactor vessel head and head vent system. The B train RWLIS (in-service SDC) wide range level indicated 112 feet; the A train RWLIS (idle train SDC) indicated 117 feet.
Generally, drain operations are suspended until the cause of deviations between level indication is identified and corrected. There are contingency actions already built into this procedure to accommodate situations where there are unexplained deviations between level indication. They consist of identifying the cause and then having the Unit Department Leaders approval prior to draining.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                Page 36 of 336 Revision RCS Drain Operations                                  40OP-9ZZ16              72 4.37 RCE-V007, Reactor Vessel Head Manual Vent to Containment and RCE-V212, Reactor Vessel Head Vent Isolation Valve.
During normal operations, these valves are locked closed in 40AC-0ZZ06, Locked Valve, Breaker and Component Control. They must be unlocked and opened in order to provide the maximum available vent under the RV head while removing water from the RCS.
Destack is performed in parallel with both 40OP-9ZZ23, Outage GOP and this procedure. It is possible that RCE-V007 and RCE-V212 are opened during destack before the steps in this procedure are performed. Depending on the progress of destack activities, access may not be possible to check physical positions of these valve. Destack activities will remove the RCGVS piping making it all that more important that RCE-V007 and RCE-V212 are opened.
Credit can be taken for opening RCE-V007 and RCE-V212 that take place in other procedures as follows:
* It is verified that the steps in the other procedure that opens RCE-V007 and RCE-V212, are complete.
* The entry for RCE-V007 and RCE-V212 in 40AC-0ZZ06, Locked Valve, Breaker and Component Control shows that the valves have been unlocked and opened.
* Plant conditions have not changed from when RCE-V007 and RCE-V212 were opened.
It should be noted that the provisions of this discussion do not supercede the authority of the SM/CRS to direct that RCE-V007 and RCE-V212 be physically checked.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                        Page 75 of 336 Revision RCS Drain Operations                                40OP-9ZZ16              72
____    7.2.10    Verify the Containment Equipment Hatch is in place and closed prior to entering Reduced Inventory Operations.
____    7.2.11    The Mid-Loop Operations Coordinator is stationed and the requirements of 40DP-9ZZ30, Reduced Inventory Operations are met. This step does not need to be completed until just prior to lowering RCS level below 111 ft. as indicated by the RWLIS.
____    7.2.12    Essential Cooling Water temperature vs. Time Post Shutdown requirements of the Safety Analysis Operational Data portion of the Core Data Book are met before SDC flow is lowered to 3780 gpm. REFER TO Step 4.2 for additional information
____    7.2.13    Makeup flow rate required to prevent boiling has been determined by one of the following:
Hot Mid Loop (pre core offload)                        Cold Mid Loop (post core reload)
____        This is applicable for HPSI                ____      This is applicable for HPSI makeup via the cold leg and                          makeup via the cold leg and should be N/Ad if this makeup                        should be N/Ad if this makeup path is not selected.                                path is not selected NOTE                                ____      Determine hours after shutdown.
RCP SEAL REPLACEMENT ONLY:
Recent RETRAN analysis has shown that with RCS level equal to or greater than 10% (117 ft.)
and SG tubes full, there is sufficient inventory available to mitigate a Loss of SDC as long as decay heat is less than 19.4 MW (48 hrs shutdown) and the pressurizer manway is removed. The 16 MW limit may be N/Ad.
____        Decay heat load, in MW, has been            ____      REFER TO 40EP-9EO10, determined. Target decay heat                        Standard Appendices, Appendix load is equal to or less than 16.0                    203 to determine required makeup MW.                                                  flow.
____        Required HPSI makeup flow per              ____      Required HPSI makeup flow per loop has been determined from                        loop has been determined from Appendix W - Makeup Flow to                          Appendix W - Makeup Flow to Prevent Boiling. (REFER TO Step                      Prevent Boiling. (REFER TO Step 4.30 for additional discussion)                      4.30 for additional discussion) 7.2.13.1 Log required makeup flow below.
Reqd HPSI Makeup        __________ gpm.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                                                  40OP-9ZZ16          Appendix W Page 1 of 1 RCS Drain Operations                                    Revision      72      Page 317 of 336 Appendix W - Makeup Flow to Prevent Boiling 1.0  General Information 1.1                              This table correlates decay heat to the required HPSI flow to EACH loop to prevent boiling in the RCS.
Minimum Flow Requirements to Prevent Core Boiling 350 TRWT = 100oF 300  TRWT = 90oF TRWT = 80oF TRWT = 70oF 250 200 150 HPSI Flow per Cold-Leg (gpm) 100 50 0
20.00          18.00      16.00        14.00        12.00          10.00      8.00        6.00        4.00 Decay Heat (MW)
 
A-7 PVNGS JOB PERFORMANCE MEASURE JPM BASIS INFORMATION TASK: 1290190102 Ensure Compliance with Tech Specs TASK STANDARD: Upon completion of this JPM, the examinee will have determined which LCO and action applied for each time.
K/A:      2.2.22                                    K/A RATING:        RO:    3.4 SRO:      4.1 K/A:                                                K/A RATING:        RO:        SRO:
APPLICABLE POSITION(S):                  SRO        VALIDATION TIME:              15 minutes
 
==REFERENCES:==
Technical Specifications SUGGESTED TESTING ENVIRONMENT: SIMULATOR                                PLANT        OTHER        X JPM TYPE Time Critical? (Yes/No)      No                  Alternative Path? (Yes/No)  No PRA/SRA related? (Yes/No)        No APPROVAL Developed By:            Jordan Johnston          Date:      05/18/2007 Revised By:                Alan Malley            Date:      01/12/2012 Technical Review                                    Operations Approval EP Review                          N/A              Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                      Date:
Evaluator Name:
Time to complete:                  Minutes          GRADE (Circle  One)  SAT / UNSAT
* Page 1 of 11
 
A-7 PVNGS JOB PERFORMANCE MEASURE
: 1. SIMULATOR SETUP:
Tech Specs available Computer available Page 2 of 11
 
A-7 PVNGS JOB PERFORMANCE MEASURE TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANTJPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATEany equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o You may use any source of information normally available.
INITIAL CONDITIONS:
Unit 1 is in Mode 1 and has had a series of events associated with the Main Steam Isolation Valves (MSIVs).
INITIATING CUE:
Your tasks are to:
: 1. evaluate MSIV status for the time line (attached) and determine what LCO(s) and action(s) should have been applied for each time and
: 2. determine what is the latest time the plant is required to be in Mode 2 and still maintain compliance with Tech Specs.
The following chart gives a chronological order of conditions that existed with Unit 1s MSIVs.
Fill out all LCO actions that are entered.
Use the table below to provide your answers.
Page 3 of 11
 
A-7 PVNGS JOB PERFORMANCE MEASURE Time      MSIV      Accumulator      Pressure                    LCO and action entered number        Train 170      A                4950 170      B                5100 180      A                5200 Today at  180      B                5300 1100      171      A                5100 171      B                5210 181      A                5300 181      B                5250 170      A                4950 170      B                5100 180      A                4975 Today at  180      B                5300 1200      171      A                5100 171      B                5210 181      A                5300 181      B                5250 170      A                4950 170      B                4900 180      A                5100 Today at  180      B                5300 1300      171      A                5100 171      B                5150 181      A                5300 181      B                5250 T = ________ Latest time required to be in Mode 2 to still maintain compliance with Tech Specs.
Page 4 of 11
 
A-7 PVNGS JOB PERFORMANCE MEASURE INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*)denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 5 of 11
 
A-7 PVNGS JOB PERFORMANCE MEASURE JPM START TIME:
STEP                            CUE                    STANDARD
: 1.
* Examinee determines LCO and                              Examinee enters LCO 3.7.2 condition for Today at 1100.                            condition a.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                    STANDARD
: 2.
* Examinee determines LCO and                              Examinee enters LCO 3.7.2 condition for Today at 1200.                            condition c.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                    STANDARD
: 3.
* Examinee determines LCO and                              Examinee enters LCO 3.7.2 condition for Today at 1300.                            conditions d and f.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                    STANDARD
: 4.
* Examinee determines latest time to                      Examinee determines T=2300 hours enter Mode 2                                            due to 4 hours (condition f) allowed for valve to be inoperable and then 6 hours per condition g.
SAT / UNSAT Comments (required for UNSAT):
Page 6 of 11
 
A-7 PVNGS JOB PERFORMANCE MEASURE JPM STOP TIME:
NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparednessorganization for resolution.
NORMAL TERMINATION POINT Page 7 of 11
 
A-7 PVNGS JOB PERFORMANCE MEASURE ANSWER KEY Time      MSIV    Accumulator        Pressure                LCO(s) and action(s) entered number        Train 170      A                4950 170      B                5100 180      A                5200 Today at  180      B                5300        LCO 3.7.2 condition a 1100      171      A                5100 171      B                5210 181      A                5300 181      B                5250 170      A                4950 170      B                5100        LCO 3.7.2 condition c 180      A                4975 Today at  180      B                5300        Note: Examinee may also list LCO 3.7.2 condition 1200      171      A                5100        a since he will still be tracking time. This is not 171      B                5210        required for the JPM to be SAT.
181      A                5300 181      B                5250 170      A                4950 170      B                4900 180      A                5100 Today at  180      B                5300 LCO 3.7.2 conditions d and f 1300      171      A                5100 171      B                5150 181      A                5300 181      B                5250 T = _2300____  Latest time required to be in Mode 2 to still maintain compliance with Tech Specs.
ANSWER KEY Page 8 of 11
 
A-7 PVNGS JOB PERFORMANCE MEASURE RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED 1          01/12/2012            6          Reformatted and modified times and conditions.
REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 9 of 11
 
A-7 PVNGS JOB PERFORMANCE MEASURE CANDIDATE INITIAL CONDITIONS:
Unit 1 is in Mode 1 and has had a series of events associated with the Main Steam Isolation Valves (MSIVs).
INITIATING CUE:
Your tasks are to:
: 1. evaluate MSIV status for the time line (attached) and determine what LCO(s) and action(s) should have been applied for each time and
: 2. determine what is the latest time the plant is required to be in Mode 2 and still maintain compliance with Tech Specs.
The following chart gives a chronological order of conditions that existed with Unit 1s MSIVs.
Fill out all LCO actions that are entered.
Use the table below to provide your answers.
(CONTINUED ON NEXT PAGE)
Page 10 of 11
 
A-7 PVNGS JOB PERFORMANCE MEASURE Time      MSIV number        Accumulator      Pressure              LCO and action entered Train 170                A                4950 170                B                5100 180                A                5200 Today at  180                B                5300 1100      171                A                5100 171                B                5210 181                A                5300 181                B                5250 170                A                4950 170                B                5100 180                A                4975 Today at  180                B                5300 1200      171                A                5100 171                B                5210 181                A                5300 181                B                5250 170                A                4950 170                B                4950 180                A                5100 Today at  180                B                5300 1300      171                A                5100 171                B                5100 181                A                5300 181                B                5250 T = ________ Latest time required to be in Mode 2 to still maintain compliance with Tech Specs.
CANDIDATE Page 11 of 11
 
A-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK: 1290020301, Conduct On Shift Operations IAW Conduct of Shift Operations TASK STANDARD: Upon completion of the JPM, the examinee will have determined the required hold points that will be exceeded, the required approval needed to exceed the hold points, and which AO will perform the task.
K/A:      2.3.4                                      K/A RATING:        RO:      3.2 SRO:        3.7 K/A:                                                  K/A RATING:        RO:          SRO:
APPLICABLE POSITION(S):                  SRO          VALIDATION TIME:                  20 minutes
 
==REFERENCES:==
75DP-9RP01, Radiation Exposure and Access Control SUGGESTED TESTING ENVIRONMENT: SIMULATOR                                  PLANT            OTHER        X JPM TYPE Time Critical? (Yes/No)      No                    Alternative Path? (Yes/No)  No PRA/SRA related? (Yes/No)        No APPROVAL Developed By:              Larry Burton              Date:      10-11-2011 Revised By:                    N/A                  Date:
Technical Review                                    Operations Approval EP Review                        N/A                Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                        Date:
Evaluator Name:
Time to complete:                Minutes            GRADE (Circle  One)  SAT / UNSAT
* Page 1 of 11
 
A-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. SPECIAL TOOLS/EQUIPMENT:
: 1. 75DP-9RP01 This JPM was written using Revision 17 of 75DP-9RP01. This JPM may be used with later revisions if it is verified that the later revision does not affect this JPM.
: 2. Calculator
: 3. Pen and Paper Page 2 of 11
 
A-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANT JPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o You may use any source of information normally available.
Page 3 of 11
 
A-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INITIAL CONDITIONS:
You are the Outage SRO. You will be assigning a job to one AO from a work pool of three (listed below).
The job is to depressurize and drain piping associated with Main Spray valve 100F.
RP surveys show the AO will be in a 150 mr/hr field. The job will take 45 minutes.
Evaluate the information about each AO below and answer the questions below.
2011 Exposure                G. Norman                  A. Palmer          F. Couples (in mrem)                RW Operator                  Shift AO          FIN Operator Previous 4 years                  8227                      527                    832 dose (2007-2010) 1st Quarter (2011)                1446                      103                    414 Most exposure was from Spent resin operations 2nd Quarter (2011)                  113                      62                    317 rd 3 Quarter (2011)                  122                        24                    188 th 4 Quarter (to date)                65                      1207                    982 Most exposure was from Most exposure was from RCP lineups at outage  EDT sludge lancing support.
beginning INITIATING CUE:
Use the worksheet on the following page to document answers.
x    List any hold point that may occur during this job (assuming each one performed the evolution).
x    List whose approval would be necessary for any hold points that would be exceeded.
(Assume authorization for current dose levels have already been obtained.)
x    Determine which one of the above AOs will perform the task; provide justification for your selection.
Page 4 of 11
 
A-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*) denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 5 of 11
 
A-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
STEP                          CUE                STANDARD
: 1.
* Examinee determines total dose                        Examinee calculates that 112.5 received for the job.                                  mrem will be accumulated on this job.
SAT / UNSAT Comments (required for UNSAT):
STEP                          CUE                STANDARD
: 2.
* Examinee determines the hold                          Examinee determines hold points points that will be exceeded for                      exceeded are:
each operator.
G. Norman - would exceed 10 rem cumulative exposure in 5 years.
A. Palmer - would exceed 1500 mrem for the calendar year.
F. Couples - would exceed 2000 mrem for the calendar year.
SAT / UNSAT Comments (required for UNSAT):
Page 6 of 11
 
A-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                                CUE                            STANDARD
: 3.
* Examinee determines whose                                              Examinee determines the approval required                                                      approval need for each operator is as follows:
G. Norman - Vice President, Nuclear Operations A. Palmer - RP Dept. Leader F. Couples - RP Director SAT / UNSAT Comments (required for UNSAT):
STEP                                CUE                            STANDARD
: 4.
* Examinee ascertains which                                              Examinee determines A. Palmer, Auxiliary Operator will perform                                        Shift AO has the lowest year to the job based on ALARA criteria.                                      date exposure based on ALARA, lowest dose.
SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparedness organization for resolution.
NORMAL TERMINATION POINT Page 7 of 11
 
A-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam ANSWER KEY List any hold point that may occur during this job (assuming each one performed the evolution):
Norman          10 rem in 5 years (Step 3.11.2.2(d))
Palmer          1500 mrem for the calendar year (Step 3.11.2.2(a))
Couples          2000 mrem for the calendar year (Step 3.11.2.2(b))
List whose approval would be necessary for any hold points that would be exceeded:
Norman            V.P. Nuclear Operations (Step 3.11.2.2(d))
Palmer            RP Department Leader (Step 3.11.2.2(a))
Couples          RP Director (Step 3.11.2.2(b))
x  Determine which one of the above AOs will perform the task; provide justification for your selection.
AO to perform work      A. Palmer - ALARA due to lowest dose ANSWER KEY Page 8 of 11
 
A-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED 003          10/11/2011            6          Modified JPM from 2010 NRC Initial Exam REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 9 of 11
 
A-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam Examinee Handout INITIAL CONDITIONS:
You are the Outage SRO. You will be assigning a job to one AO from a work pool of three (listed below).
The job is to depressurize and drain piping associated with Main Spray valve 100F.
RP surveys show the AO will be in a 150 mr/hr field. The job will take 45 minutes.
Evaluate the information about each AO below and answer the questions below.
2011 Exposure                  G. Norman                      A. Palmer          F. Couples (in mrem)                  RW Operator                      Shift AO        FIN Operator Previous 4 years                    8227                          527                  832 dose (2007-2010) 1st Quarter (2011)                  1446                          103                  414 Most exposure was from Spent resin operations 2nd Quarter (2011)                    113                          62                  317 rd 3 Quarter (2011)                      122                          24                  188 th 4 Quarter (to                          65                        1207                  982 date)                                                  Most exposure was from Most exposure was from RCP lineups at outage  EDT sludge lancing beginning              support.
INITIATING CUE:
Use the worksheet on the following page to document answers.
x    List any hold point that may occur during this job (assuming each one performed the evolution).
x    List whose approval would be necessary for any hold points that would be exceeded. (Assume authorization for current dose levels have already been obtained.)
x    Determine which one of the above AOs will perform the task; provide justification for your selection.
Page 10 of 11
 
A-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam Candidate Worksheet Exposure                      G. Norman                  A. Palmer            F. Couples (in mrem)                    RW Operator                  Shift AO          FIN Operator Previous 4 years dose                    8227                      527                    832 2007-2010 1st Quarter (2011)                      1446                      103                    414 Most exposure was from Spent resin operations 2nd Quarter (2011)                        113                      62                      317 rd 3 Quarter (2011)                          122                      24                      188 th 4 Quarter (to date)                        65                      1207                    982 Most exposure was from Most exposure was from RCP lineups at outage  EDT sludge lancing support.
beginning List any hold point that may occur during this job (assuming each one performed the evolution):
G. Norman A. Palmer F. Couples List whose approval would be necessary for any hold points that would be exceeded:
G. Norman A. Palmer F. Couples Determine which one of the above AOs will perform the task; provide justification for your selection.
AO to perform work Page 11 of 11
 
A-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK: 1240100202 Classify events requiring emergency plan implementation TASK STANDARD: An Alert is declared within 15 minutes. NAN Form EP-0541 is completed per the EP procedures and notification initiated within 14 minutes.
K/A:      2.4.40                                    K/A RATING:          RO:    2.7 SRO:          4.5 K/A:                                                K/A RATING:          RO:            SRO:
APPLICABLE POSITION(S):                  SRO        VALIDATION TIME:                    15 minutes
 
==REFERENCES:==
EP-0900 Appendix L (Emergency Coordinator - STSC), EP-0901(Classifications),
EP-0902 (Notifications), and EP-0905 (Protective Actions), EAL Charts SUGGESTED TESTING ENVIRONMENT: SIMULATOR                            X    PLANT            OTHER        X JPM TYPE Time Critical? (Yes/No)      Yes                Alternative Path? (Yes/No)    No PRA/SRA related? (Yes/No)        No APPROVAL Developed By:              Larry Burton            Date:      02/12/2008 Revised By:                Alan Malley            Date:      05/20/2011 Technical Review                                    Operations Approval EP Review                                          Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                        Date:
Evaluator Name:
Time to complete:                  Minutes          GRADE (Circle    One)  SAT / UNSAT *
* For E-Plan JPMs, a grade of UNSAT requires a PVAR to be written, remediation, and re-evaluation.
PVAR # _____________
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to the Emergency Preparedness organization for resolution.
Page 1 of 9
 
A-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. This JPM can be performed in the simulator or as an Admin JPM.
: 2. SPECIAL TOOLS/EQUIPMENT:
x EP-0900 (rev 20, EP-0901 (rev 1), EP-0902 (rev 1), EP-0905 (rev 2). Form EP-0803 B (PAR Flowchart) available (Sample of Form in EP-0903, Appendix A) x Form EP-0804 B (Release Evaluation Flowchart) available (Sample of Form in EP-0905, Section 5.1.4) x Hot and Cold EAL charts x A copy of form 541 is available (if not performed in the simulator). The current revision of the form is 541AA but other revisions may be used if it does not affect the information needed for completion of this JPM.
Page 2 of 9
 
A-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANT JPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o  You may use any source of information normally available.
INITIAL CONDITIONS:
x  You are the Unit 1 CRS.
x  The plant is under a tornado warning from the National Weather Service.
x  The crew has implemented 40AO-9ZZ21, Acts of Nature, and the applicable actions have been completed OR in progress.
x  Site Security reports a tornado has touched down and caused structural damage to the Auxiliary Building with no injury to plant personnel.
x  The SM was at the morning meeting in Unit 2 and is waiting until tornado has left immediate area before returning to the Unit.
INITIATING CUE:
x  You are to perform the duties of the Emergency Coordinator until relieved.
x  Assume the STA concurs with your E-Plan determination.
THIS IS A TIME CRITICAL JPM Page 3 of 9
 
A-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*) denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 9
 
A-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
STEP                              CUE                  STANDARD
: 1.      The examinee enters EP-0901,                                Examinee refers to the EAL charts to Classifications to classify the event.                      determine the classification.
Start Time: __________
(Begins when examinee receives and acknowledges Initiating CUE)
SAT / UNSAT Comments (required for UNSAT):
STEP                              CUE                  STANDARD
: 2.
* Examinee determines classification.                        The examinee determines the classification is an ALERT based on EAL HA1.2.
End Time: ___________
Classification Time: _________
(this time must be < 15 minutes)
Notification Start Time: _________
SAT / UNSAT Comments (required for UNSAT):
Page 5 of 9
 
A-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                              STANDARD
: 3.
* The examinee enters EP-0902 to                                        The examinee completes form 541 make notifications.                                                  and hands the form to the STSC Inform Cue (when the examinee      communicator. The form must calls for the Area 2 operator):    contain the following information:
I am the Area 2 operator      Fills out NAN Form EP-0541 as follows:
o    Step 1 marked This is a drill box.
o    Step 2 - ALERT, date and time, Status code [HA1.2].
Inform Cue: After examinee hands the communicator form 541:          o    Step 3 - ERFDADS data and Authenticator Code (Authenticator code is already This concludes this JPM.
filled in on the form).
If requested Cue: There are no      o    Step 4 - No Radioactive release radiation monitors in alert or high      is in progress.
alarm.                              o    Step 5 -PAR is NONE.
o    Step 6 signed with time and date.
Evaluator Note: Critical portion of this step is to correctly identify an ALERT, status codes; NO release is occurring and no PAR with the correct date and time on the form.
End Time:___________
Notification Time:__________
(this time must be less than 14 minutes to allow the communicator 1 minute to start notifications)
SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
Page 6 of 9
 
A-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparedness organization for resolution.
NORMAL TERMINATION POINT Page 7 of 9
 
ANSWER KEY FORM EP-0541 AA                                                            PVNGS EMERGENCY PREPAREDNESS PALO VERDE NAN EMERGENCY MESSAGE FORM
: 1. (check one)
This is a drill                          This is an actual event
: 2. This is Palo Verde Nuclear Generating Station Notification of a(n) (Check highest applicable classification level for event notifications)
(Check Event Termination for terminating event)
UNUSUAL EVENT                ALERT                  SITE AREA EMERGENCY                                  GENERAL EMERGENCY Declared at          XXXX                    on      XX /        XX / XX                      EAL:                      HA1.2 (time)                                    (MM/DD/YY)                                    (driving current classification only)
EVENT TERMINATION AT (time)
                                                                                                /
(MM/DD/YY)
                                                                                                              /
: 3. The wind speed is                      22                        MPH from                            320                    degrees (35 foot elevation - 15 min avg)                                (35 foot elevation - 15 min avg)
Authenticator Code                          Bravo Zulu This is (name)                                                  STSC Comm.            (Check one)
NAN Comm
: 4.
There is NO radioactive release due to this event.
A radioactive release is occurring which does NOT exceed federally approved limits due to this event.
A radioactive release is occurring that exceeds federally approved limits due to this event.
: 5. The following action is recommended:
There are NO PROTECTIVE ACTIONS required.
Shelter 2-mile radius Evacuate 2-mile radius and 5-miles in sectors Evacuate 5-mile radius and 10-miles in sectors Recommend consideration of Kl as a protective measure for:                                    emergency workers  general public
[check appropriate box(es)]
Other
: 6. Approval                                                                                                                                    /        /
(EC/EOD signature)                                                            (time)                            (MM/DD/YY)
: 7.      Independent review completed              (If time permits while still meeting 15 minutes reporting requirement)
(Checked by EC/EOD qualified person)
: 8.            Responding Agency                                        Alternate Link                                  Time                Message Recd
                                                            NAN Radio B/U
                                                            NAN Radio B/U
                                                            NAN Radio B/U
                                                            NAN Radio B/U
                                                            NAN Radio B/U
                                                            NAN Radio B/U ANSWER KEY EP-0541 AA
 
m                ANSWER KEYHA2 HA1 - Natural or destructive phenomena        oper affecting VITAL AREAS.                        estab ent are 1.a. Seismic event greater than                1. FI Operating Basis Earthquake (OBE)            DA as indicated by ANY Force Balance            str Accelerometer reading greater than 0.10g. de d      AND ly    b. Earthquake confirmed by ANY of the following:
Earthquake felt in plant on        National Earthquake Center Control Room indication of degraded performance of systems required for the safe shutdown of the plant.
OR
: 2. Tornado touching down or high winds reaching 100 mph resulting in VISIBLE DAMAGE to ANY POWER BLOCK structure OR Control Room indication of degraded k        performance of safety systems.
OR
: 3. Internal flooding in ANY POWER BLOCK structure resulting in an electrical shock hazard that precludes access to operate or monitor safety equipment OR Control Room indication of degraded performance of those safety systems.
OR
: 4. Vehicle crash resulting in VISIBLE DAMAGE to ANY POWER BLOCK structure OR Control Room indication of degraded performance of safety systems ANSWER KEY                          HU2 m    HU1 - Natural or destructive phenomena        not e
 
A-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 8 of 9
 
A-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam EXAMINEE HANDOUT INITIAL CONDITIONS:
x  You are the Unit 1 CRS.
x  The plant is under a tornado warning from the National Weather Service.
x  The crew has implemented 40AO-9ZZ21, Acts of Nature, and the applicable actions have been completed OR in progress.
x  Site Security reports a tornado has touched down and caused structural damage to the Auxiliary Building with no injury to plant personnel.
x  The SM was at the morning meeting in Unit 2 and is waiting until tornado has left immediate area before returning to the Unit.
INITIATING CUE:
x  You are to perform the duties of the Emergency Coordinator until relieved.
x  Assume the STA concurs with your E-Plan determination.
THIS IS A TIME CRITICAL JPM Page 9 of 9
 
FORM EP-0541 AA                                                            PVNGS EMERGENCY PREPAREDNESS PALO VERDE NAN EMERGENCY MESSAGE FORM
: 1. (check one)            This is a drill                          This is an actual event
: 2. This is Palo Verde Nuclear Generating Station Notification of a(n) (Check highest applicable classification level for event notifications)
(Check Event Termination for terminating event)
UNUSUAL EVENT                ALERT                  SITE AREA EMERGENCY                                  GENERAL EMERGENCY Declared at                                    on              /            /                  EAL:
(time)                                    (MM/DD/YY)                                    (driving current classification only)
EVENT TERMINATION AT (time)
                                                                                                /
(MM/DD/YY)
                                                                                                              /
: 3. The wind speed is                                                MPH from                                                    degrees (35 foot elevation - 15 min avg)                                (35 foot elevation - 15 min avg)
Authenticator Code                          Bravo Zulu This is (name)                                                  STSC Comm.            (Check one)
NAN Comm
: 4.      There is NO radioactive release due to this event.
A radioactive release is occurring which does NOT exceed federally approved limits due to this event.
A radioactive release is occurring that exceeds federally approved limits due to this event.
: 5. The following action is recommended:
There are NO PROTECTIVE ACTIONS required.
Shelter 2-mile radius Evacuate 2-mile radius and 5-miles in sectors Evacuate 5-mile radius and 10-miles in sectors Recommend consideration of Kl as a protective measure for:                                    emergency workers  general public
[check appropriate box(es)]
Other
: 6. Approval                                                                                                                                    /        /
(EC/EOD signature)                                                            (time)                            (MM/DD/YY)
: 7.      Independent review completed              (If time permits while still meeting 15 minutes reporting requirement)
(Checked by EC/EOD qualified person)
: 8.            Responding Agency                                        Alternate Link                                  Time                Message Recd
                                                            NAN Radio B/U
                                                            NAN Radio B/U
                                                            NAN Radio B/U
                                                            NAN Radio B/U
                                                            NAN Radio B/U
                                                            NAN Radio B/U EP-0541 AA
 
TodaysDateand                                            METEOROLOGICALDATATOWER(RG)                                      UnitX        Mode1 Time
                                                                                           10SECONDAVERAGE   15MINUTEAVERAGE  1HOURAVERAGE  
                                                                                                  DATA              DATA              DATA      
                                                                                                                                                
 WINDSPEED200FTLEVEL(WS200)MI/HR                                   23                23                17      
 WINDSPEED35FTLEVEL(WS35)MI/HR                                 22                22                15      
                                                                                                                                                
 WINDDIRECTION200FTLEVEL(WD200)DEGREES                                         319                320              320      
 WINDDIRECTION35FTLEVEL(WD35)DEGREES                                       319                320              320      
 STDDEVEIATIONINWINDDIRECTIONDEGREES                                                            0.0                      
                                                                                                                                               
 DELTATEMPERATURE(T)&deg;F                     O.99              O.99            O.99    
 ATMOSPHERICSTABILITYCLASS(ASC)                                                                                     D                      
                                                                                                                                               
                                                                                                                                               
 TEMPERATURE(T)&deg;F            84.62              84.57            84.57    
 DEWPOINT(D)&deg;F           80                  80              80      
        
        
        
        
        
 
Todays Date and                    METEOROLOGICAL DATA TOWER (RG)                  Unit X          Mode 1 Time 10 SECOND AVERAGE 15 MINUTE AVERAGE      1 HOUR AVERAGE DATA            DATA                  DATA WIND SPEED 200 FT LEVEL (WS200)          MI/HR            23              23                  17 WIND SPEED 35 FT LEVEL (WS35)            MI/HR          22                22                  15 WIND DIRECTION 200 FT LEVEL (WD200)    DEGREES          319              320                  320 WIND DIRECTION 35 FT LEVEL (WD35)      DEGREES          319              320                  320 STD DEVEIATION IN WIND DIRECTION        DEGREES                            0.0 DELTA TEMPERATURE (T)                        &deg;F        -O.99            -O.99                -O.99 ATMOSPHERIC STABILITY CLASS (ASC)                                          D TEMPERATURE (T)                              &deg;F        84.62            84.57                84.57 DEW POINT (D)                                &deg;F          80              80                    80
 
                                                                              
PVNGS Facility: _____________________________                                                              03/19/12 Date of Examination: ______________
Exam Level: RO  SRO-I                  SRO-U                            Operating Test No.: _______________
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title                                      Type Code*          Safety Function
: a. Perform Containment Power Access Purge (3.8 029 A2.03)                                    D              8
: b. Perform actions for a loss of letdown (3.1 004 A2.07)                                    N,A              1
: c. Startup second MFP (3.4 039 A4.03)                                                        N,A            4S
: d. Fill a SIT (3,3 006 A1.13)                                                                N              3
: e. Pump RDT with high temperature (3,5 007 A 2.05)                                          L,N              5
: f. Reset inadvertent MSIS (3.2 013 A4.01)                                                  L,D,A            2
: g. Restore offsite power to PBA-S03 (powered from DG A) (3.6 062 A4.01)                    D              6
: h. Place CS B in service on SDC (3.4 005 A4.01)                                              L,D            4P In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. Align SDC valves during a Control Room Fire (4.2 067 AA2.16)                          L,N,A,E,R          4P
: j. Operation of AFA-P01 from Remote Shutdown Panel (3.4 061 A3.01)                        L,D,E,P            4S
: k. Align offsite power to PBB per Appendix C of 40AO-9ZZ19 (3.6 062 A2.06)              D,EN,E, A            6
@          All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                  Criteria for RO / SRO-I / SRO-U                `
(A)lternate path                                                                4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                                  9/    8/ 4 (E)mergency or abnormal in-plant                                                    1/    1/ 1 (EN)gineered safety feature                                                        - / -  / 1 (control room system)  `
(L)ow-Power / Shutdown                                                              1/    1/ 1 (N)ew or (M)odified from bank including 1(A)                                        2/    2/ 1 (P)revious 2 exams                                                                  3/    3 / 2 (randomly selected)
(R)CA                                                                              1/    1/ 1 (S)imulator ES-301, Page 23 of 27
 
                                                                                
PVNGS Facility: _____________________________                                                              03/19/12 Date of Examination: ______________
Exam Level: RO              SRO-I  SRO-U                                  Operating Test No.: _______________
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title                                      Type Code*          Safety Function
: a. Perform Containment Power Access Purge (3.8 029 A2.03)                                      D              8
: b. Perform actions for a loss of letdown (3.1 004 A2.07)                                      N,A              1
: c. Fill a SIT (3.3 006 A1.13)                                                                  N              3
: d. Pump RDT with high temperature (3.5 007 A2.05)                                            L,N              5
: e. Reset inadvertent MSIS (3.2 013 A 4.01)                                                  L,D,A            2
: f. Restore offsite power to PBA-S03 (powered from DG A) (3.6 062 A 4.01)                    D              6
: g. ESD with no CIAS, CSAS with CIAS valves that fail to close (3.7 012 A 4.02)            L,N,A,EN            7 h.
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. Align SDC valves during a Control Room Fire (4.2 067 AA2.16)                          L,N,A,E,R          4P
: j. Operation of AFA-P01 from Remote Shutdown Panel (3.4 061 A3.01)                        L,D,E,P            4S
: k. Align offsite power to PBB per Appendix C of 40AO-9ZZ19 (3.6 062 A2.06)                D,EN,E,A            6
@          All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                    Criteria for RO / SRO-I / SRO-U                `
(A)lternate path                                                                  4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                                  9/    8/ 4 (E)mergency or abnormal in-plant                                                    1/    1/ 1 (EN)gineered safety feature                                                        - / -  / 1 (control room system)  `
(L)ow-Power / Shutdown                                                              1/    1/ 1 (N)ew or (M)odified from bank including 1(A)                                        2/    2/ 1 (P)revious 2 exams                                                                  3/    3 / 2 (randomly selected)
(R)CA                                                                                1/    1/ 1 (S)imulator ES-301, Page 23 of 27
 
                                                                                
PVNGS Facility: _____________________________                                                              03/19/12 Date of Examination: ______________
Exam Level: RO              SRO-I        SRO-U                             Operating Test No.: _______________
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title                                      Type Code*          Safety Function
: a. Perform Containment Power Access Purge (3.8 029 A2.03)                                      D              8
: b. Perform actions for a loss of letdown (3.1 004 A2.07)                                      N,A              1
: c. ESD with no CIAS, CSAS with CIAS valves that fail to close (3.7 012 A 4.02)            L,N,A,EN            7 d.
e.
f.
g.
h.
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. Align SDC valves during a Control Room Fire (4.2 067 AA2.16)                          L,N,A,E,R          4P
: j. Operation of AFA-P01 from Remote Shutdown Panel (3.4 061 A3.01)                        L,D,E,P            4S k.
@          All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                    Criteria for RO / SRO-I / SRO-U                `
(A)lternate path                                                                  4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                                  9/    8/ 4 (E)mergency or abnormal in-plant                                                    1/    1/ 1 (EN)gineered safety feature                                                        - / -  / 1 (control room system)  `
(L)ow-Power / Shutdown                                                              1/    1/ 1 (N)ew or (M)odified from bank including 1(A)                                        2/    2/ 1 (P)revious 2 exams                                                                  3/    3 / 2 (randomly selected)
(R)CA                                                                                1/    1/ 1 (S)imulator ES-301, Page 23 of 27
 
S-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK: 0500010601 Place containment refueling purge subsystem in service TASK STANDARD: Containment Power Access Purge Subsystem placed in service.
K/A:      3.8 029 A2.03                          K/A RATING:        RO:    2.7 SRO:        3.1 K/A:                                              K/A RATING:        RO:        SRO:
APPLICABLE POSITION(S):                  RO        VALIDATION TIME:                10 minutes
 
==REFERENCES:==
40OP-9CP01, Containment Purge System SUGGESTED TESTING ENVIRONMENT: SIMULATOR X                            PLANT          OTHER JPM TYPE Time Critical? (Yes/No)      No                Alternative Path? (Yes/No)  No PRA/SRA related? (Yes/No)        No APPROVAL Developed By:              John Dedon            Date:      09/09/2007 Revised By:                Alan Malley            Date:      11/17/2011 Technical Review                                  Operations Approval E-Plan Review                                    Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                    Date:
Evaluator Name:
Time to complete:                  Minutes        GRADE (Circle  One)  SAT / UNSAT *
* For E-Plan JPMs, a grade of UNSAT requires a PVAR to be written, remediation, and re-evaluation.PVAR # _____________
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal postcritique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to the Emergency Planning organization for resolution.
Page 1 of 11
 
S-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. SIMULATOR SETUP:
x    IC#: 108 (This JPM is designed to run with JS-2 for the 2012 NRC exam) x    SCENARIOS, MALFUNCTIONS, OVERRIDES,etc. for Setup:
COMMAND/COMMUNICATION                                            DESCRIPTION None x  SPECIAL INSTRUCTIONS:
o None x  REQUIRED CONDITIONS:
o None x  SIMULATOR EVALUATION PRE-CHECK Correct IC Alarm Silence Off Procedures available, page checked, and clean For JPMs administered during transients, another instructor available to control plant parameters.
Verified by: ____________________________            Date: ____________________
(NA if Simulator setup not required)
: 2. SPECIAL TOOLS/EQUIPMENT:
x  Copy of 40OP-9CP01 available with prerequisites signed off. This JPM was written using Revision 19 of 40OP-9CP01.
If IC-108 is not available perform the following:
x rfCH03 f:open - Opens IA supply to CP-UV-4A, IA-VB47 x rfCH04 f:open - Opens IA supply to CP-UV-5B, IA-VB45 x rfIP38 f:0.00 - Sets Containment pressure to 0.0 psig Page 2 of 11
 
S-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANTJPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATEany equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o You may use any source of information normally available.
INITIAL CONDITIONS:
x The Unit is at 50% power.
x Containment entry is to be made this shift.
INITIATING CUE:
x  The CRS direct you to place the Containment Power Access Purge Subsystem in service per 40OP-9CP01, Containment Purge System, Section 6.0.
x An Auxiliary Operator has been briefed and is in the field.
x All prerequisites are complete.
x The CRS has authorized breaking the ZZ06 locks and the ZZ06 book has been filled out.
Page 3 of 11
 
S-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*)denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 11
 
S-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
STEP                                CUE                            STANDARD
: 1.      Step 6.3.1:                          INFORM CUE:                      Examinee contacts Effluent Tech to determine if 74ST-9SQ07 is current.
Ensure that the channel checks in    Effluents Tech reports that 74ST-74ST-9SQ07, Radiation Monitoring      9SQ07 is current.
System Shiftly Surveillance Test that are required to meet SR 3.3.8.1 for RU-37 and/or RU-38 are current.
SAT / UNSAT Comments (required for UNSAT):
STEP                                CUE                            STANDARD
: 2.
* Step 6.3.2:                          INFORM CUE:                      Examinee directs an Auxiliary Operator to unlock and open IAN-Unlock and open IAN-VB45, Air        The Auxiliary Operator reports    VB45, Air Supply to CPB-UV-5B Supply to CPB-UV-5B and CP-HV-        that IAN-VB45, Air Supply to      and CP-HV-43 per 40AC-0ZZ06.
43 per 40AC-0ZZ06.                    CPB-UV-5B and CP-HV-43 has been unlocked and opened.
SAT / UNSAT Comments (required for UNSAT):
STEP                                CUE                            STANDARD
: 3.
* Step 6.3.3:                          INFORM CUE:                      Examinee directs an Auxiliary Operator tounlock and open IAN-Unlock and open IAN-VB47, Air        The Auxiliary Operator reports    VB47, Air Supply to CPA-UV-4A.
Supply to CPA-UV-4A per 40AC-        that IAN-VB47, Air Supply to 9ZZ06.                                CPA-UV-4Ahas been unlocked and opened.
SAT / UNSAT Comments (required for UNSAT):
Page 5 of 11
 
S-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                                CUE                            STANDARD
: 4.
* Step 6.3.4:                          INFORM CUE:                          Examinee directs an Auxiliary Operator to:
IF RU-34 is available,THEN place it  The Auxiliary Operator reports in service as follows:              that CPB-V024 (Isolation between    x    open CPB-V024 (Isolation x Ensure CPB-V024 is open.          Power Access Purge Duct and RU-          between Power Access Purge (Isolation between Power Access  34) has been opened and CPB-              Duct and RU-34).
Purge Duct and RU-34).          V023 (Isolation between Refueling    x    close CPB-V023 (Isolation x Ensure CPB-V023 is closed.        Purge Duct and RU-34) has been            between Refueling Purge Duct (Isolation between Refueling    closed.                                  and RU-34).
Purge Duct and RU-34).
SAT / UNSAT Comments (required for UNSAT):
STEP                                CUE                            STANDARD
: 5.      Step 6.3.5:                                                              Examinee verifies containment pressure less than or equal to 0.03 Ensure Containment Pressure is less                                      psig.
than or equal to 0.03 psig (1" H2O) or negative pressure damage may occur to ductwork when fan CPN-J02 starts.
SAT / UNSAT Comments (required for UNSAT):
Note prior to step 6.3.6 NOTE When starting the Containment Power Access Purge Supplyand Exhaust Units, the "CNTMT PRG SYS TRBL" alarm, Annunciator Window 7A10B, alarms temporarily on"Component Low Differential Pressure" and clears in a fewseconds.
Page 6 of 11
 
S-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                                  CUE                                STANDARD
: 6.
* Step 6.3.6:                                                                Examinee places CPN-HS-1 in the ACCESS PURGE position.
Place CPN-HS-1, Containment Purge Mode Selector Switch in the ACCESS PURGE position to start the Containment Power AccessPurge.
SAT / UNSAT Comments (required for UNSAT):
Note before step 6.3.7 NOTE After CPA-HS-4 and CPB-HS-5 are taken to open:
: 1. CPA-UV-4B, CPB-UV-5B and CPN-PV-43open. If containment pressure is less than or equal to 0.03 psig, CPA-UV-4A andCPB-UV-5A also open. If UV-4A/5A doesn't open, dual indication will be received on HS-4 and HS-5.
: 2. Dampers M03, M06 and M07 open.
: 3. Fans CPN-A02 and CPN-J02 start.
STEP                                  CUE                                STANDARD
: 7.
* Step 6.3.7:                                                                Examinee places CPA-HS-4 to the OPEN position.
Place CPA-HS-4, Containment Power Access Purge Isolation Valves CP-UV-4A/4B to the OPEN position.
SAT / UNSAT Comments (required for UNSAT):
Page 7 of 11
 
S-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                            CUE                  STANDARD
: 8.      Step 6.3.8:                                                If the examinee should receive dual indication on CPA-HS-4, the IF dual position indication is                            examinee takes CPA-HS-4 to the received on CPA-HS-4, THEN                                OPEN position again.
CPA-HS-4 must be taken to the open position again to open CP-UV-4A.                          Examiner Note: This is not an expected action.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                  STANDARD
: 9.
* Step 6.3.9:                                                Examinee places CPB-HS-5 to the OPEN position.
Place CPB-HS-5, Containment Power Access Purge Isolation Valves CP-UV-5A/5B to the OPEN position.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                  STANDARD
: 10. Step 6.3.10:                                              If the examinee should receive dual indication on CPB-HS-5 the IF dual position indication is                            examinee takes CPB-HS-5 to the received on CPB-HS-5, THEN CPB-                            OPEN position again.
HS-5 must be taken to the open position again to open CP-UV-5A.                          Examiner Note: This is not an expected action.
SAT / UNSAT Comments (required for UNSAT):
Page 8 of 11
 
S-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                                CUE                          STANDARD
: 11.      Step 6.3.11:                        INFORM CUE:                        Examinee checks that CPN-PV-43 is open.
Check that CPN-PV-43, Vent Valve    Another operator will complete the is open by observing the red Valve  remainder of this procedure.
Position Indicator on B07 is illuminated.
SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Planning organization for resolution.
NORMAL TERMINATION POINT Page 9 of 11
 
S-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                  COMMENTS NUMBER          DATE          REVISED 001          12/04/2003            6          Corrected setting for containment pressure in setup.
002          08/09/2007            6          Updated simulator commands 003          01/12/2011            6          Updated format and procedure revision 004          11/17/2011            6          Added IC for 2012 NRC exam.
REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 10 of 11
 
S-1 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam EXAMINEE HANDOUT INITIAL CONDITIONS:
x The Unit is at 50% power.
x Containment entry is to be made this shift.
INITIATING CUE:
x  The CRS direct you to place the Containment Power Access Purge Subsystem in service per 40OP-9CP01, Containment Purge System, Section 6.0.
x An Auxiliary Operator has been briefed and is in the field.
x All prerequisites are complete.
x The CRS has authorized breaking the ZZ06 locks and the ZZ06 book has been filled out.
Page 11 of 11
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                                        Page 16 of 61 Revision CONTAINMENT PURGE SYSTEM                                                        40OP-9CP01              19 6.3.4      IF RU-34 is available, THEN place it in service as follows:
____      1. Ensure CPB-V024 is open. (Isolation between Power Access Purge Duct and RU-34).
____      2. Ensure CPB-V023 is closed. (Isolation between Refueling Purge Duct and RU-34).
____    6.3.5      Ensure Containment Pressure is less than or equal to 0.03 psig (1" H2O) or negative pressure damage may occur to ductwork when fan CPN-J02 starts.
          ---------------------------------------- NOTE          ----------------------------------------
When starting the Containment Power Access Purge Supply and Exhaust Units, the "CNTMT PRG SYS TRBL" alarm, Annunciator Window 7A10B, alarms temporarily on "Component Low Differential Pressure" and clears in a few seconds.
          ------------------------------------------------------------------------------------------------
____    6.3.6      Place CPN-HS-1, Containment Purge Mode Selector Switch in the ACCESS PURGE position to start the Containment Power Access Purge.
          ---------------------------------------- NOTE          ----------------------------------------
After CPA-HS-4 and CPB-HS-5 are taken to open:
: 1) CPA-UV-4B, CPB-UV-5B and CPN-PV-43 open. If containment pressure is less than or equal to 0.03 psig, CPA-UV-4A and CPB-UV-5A also open. If UV-4A/5A doesn't open, dual indication will be received on HS-4 and HS-5.
: 2) Dampers M03, M06 and M07 open.
: 3) Fans CPN-A02 and CPN-J02 start.
          ------------------------------------------------------------------------------------------------
____    6.3.7      Place CPA-HS-4, Containment Power Access Purge Isolation Valves CP-UV-4A/4B to the OPEN position.
____    6.3.8      IF dual position indication is received on CPA-HS-4, THEN CPA-HS-4 must be taken to the open position again to open CP-UV-4A.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                            Page 17 of 61 Revision CONTAINMENT PURGE SYSTEM                              40OP-9CP01          19
____  6.3.9  Place CPB-HS-5, Containment Power Access Purge Isolation Valves CP-UV-5A/5B to the OPEN position.
____  6.3.10 IF dual position indication is received on CPB-HS-5, THEN CPB-HS-5 must be taken to the open position again to open CP-UV-5A.
____  6.3.11 Check that CPN-PV-43, Vent Valve is open by observing the red Valve Position Indicator on B07 is illuminated.
____  6.3.12 Log the time that the 8 inch Containment Purge Valves were opened on the release permit.
6.3.13 Notify BOTH of the following of the start time for the release:
____  RMS/Effluents Technician
____  Unit Radiation Protection
____  6.3.14 IF the Containment Power Access Purge will continue beyond the shift, THEN contact the RMS/Effluents Technician to ensure the Shiftly ST required by SR 3.3.8.1 is current per 74ST-9SQ07, Radiation Monitoring System Shiftly Surveillance Test.
 
S-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK: 1250370201 Respond to a loss of letdown TASK STANDARD: Action completed for a loss of letdown including placing Pzr level control in manual to close the letdown control valves, isolating letdown, stopping a charging pump, and aligning the standby backpressure control valve K/A:      3.4 004 A2.07                            K/A RATING:        RO:      3.4 SRO:        3.7 K/A:                                                K/A RATING:        RO:            SRO:
APPLICABLE POSITION(S):                  RO          VALIDATION TIME:                    15 minutes
 
==REFERENCES:==
40AO-9ZZ05, Loss of Letdown SUGGESTED TESTING ENVIRONMENT: SIMULATOR X                              PLANT            OTHER JPM TYPE Time Critical? (Yes/No)      No                  Alternative Path? (Yes/No)    Yes PRA/SRA related? (Yes/No)        No APPROVAL Developed By:              Alan Malley            Date:      02-08-2012 Revised By:                                        Date:
Technical Review                                  Operations Approval EP Review                          N/A            Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                      Date:
Evaluator Name:
Time to complete:                  Minutes          GRADE (Circle  One)    SAT / UNSAT
* Page 1 of 14
 
S-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. SIMULATOR SETUP:
x    IC#: 108 x    SCENARIOS, MALFUNCTIONS, OVERRIDES,etc. for Setup:
COMMAND/COMMUNICATION                                    DESCRIPTION x  SPECIAL INSTRUCTIONS:
o Letdown is lost with CHN-PV-201Q selected and failed closed.
x  REQUIRED CONDITIONS:
o None x  SIMULATOR EVALUATION PRE-CHECK Correct IC Alarm Silence Off Procedures available, page checked, and clean For JPMs administered during transients, another instructor available to control plant parameters.
Verified by:  N/A    Date: ____________________
(NA if Simulator setup not required)
: 2. SPECIAL TOOLS/EQUIPMENT:
x  40AO-9ZZ05 available. This JPM was written using Revision 22 40AO-9ZZ05.
: 3. JPM PERFORMANCE:
x  MALFUNCTIONS, OVERRIDES, etc. during JPM STEP        COMMAND/COMMUNICATION                            DESCRIPTION Page 2 of 14
 
S-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANTJPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATEany equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o You may use any source of information normally available.
INITIAL CONDITIONS:
The plant is at 50% power.
LD HDR SYS TRBL alarm is in.
INITIATING CUE:
The CRS directs you to perform the actions of 40AO-9ZZ05, Loss of Letdown.
Page 3 of 14
 
S-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*)denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 14
 
S-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
STEP                            CUE                  STANDARD
: 1.      Step 1 of 40AO-9ZZ05 Section 3.0:                          The examinee enters the AOP Entry Time and Date.
Enter AOP Entry Time and Date:________________
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                  STANDARD
: 2.      Step 2 of 40AO-9ZZ05 Section 3.0:                          The examinee N/As this step.
IF the Pressurizer is solid, THEN perform the following:
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                  STANDARD
: 3.
* Step 3 of 40AO-9ZZ05 Section 3.0:                          The examinee Place RCN-LIC-110, PLCS Master Controller, in MAN Place RCN-LIC-110, PLCS Master and close the selected Letdown Controller, in MAN and close the Control Valve(s).
selected Letdown Control Valve(s).
Examiner Note: Valve CHN-LV-110P is the selected valve.
SAT / UNSAT Comments (required for UNSAT):
Page 5 of 14
 
S-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                          CUE                  STANDARD
: 4.      Step 4 of 40AO-9ZZ05 Section 3.0:                        The examinee determines backpressure is NOT less than Check that letdown backpressure is setpoint by looking at the less than setpoint.
Backpressure controller (CHN-PIC-201) and goes to the contingency step.
SAT / UNSAT Comments (required for UNSAT):
STEP                          CUE                  STANDARD
: 5.
* Step 4.1 of 40AO-9ZZ05 Section                          The examinee closes one of the 3.0:                                                    following valves:
IF letdown backpressure is greater than setpoint, THEN ensure at least                      x    CHB-UV-515, Regen Hx Inlet ONE of the following is closed:                                Isol Valve x CHB-UV-515, Regen Hx Inlet                            x    CHA-UV-516, Regen Hx Inlet Isol Valve                                              Isol Valve x CHA-UV-516, Regen Hx Inlet                            x    CHB-UV-523, Regen Hx Outlet Isol Valve                                              Isol Valve x CHB-UV-523, Regen Hx Outlet                          ALTERNATE PATH Isol Valve SAT / UNSAT Comments (required for UNSAT):
Page 6 of 14
 
S-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                            CUE                  STANDARD
: 6.
* Step 5 of 40AO-9ZZ05 Section 3.0:                        The examinee stops one of the charging pumps.
IF pressurizer level is 33% or more AND rising, THEN ensure no more than one Charging Pump is running.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                  STANDARD
: 7.      Step 6 of 40AO-9ZZ05 Section 3.0:                        The examinee will N/A or circle this step since pressurizer level is < 56%.
IF BOTH of the following conditions exist:
x The unit is in Mode 1, 2 or 3 x pressurizer level is 56% or more and rising THEN perform the following:
: a. Enter LCO 3.4.9, Pressurizer, Condition A.
: b. Initiate actions in reparation for a Unit shutdown within 6 hours.
SAT / UNSAT Comments (required for UNSAT):
Page 7 of 14
 
S-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                                  CUE                            STANDARD
: 8.      Step 7 of 40AO-9ZZ05 Section 3.0:    If sent as the area operator to      The examinee determines CHE-PV-check CHE-PV-201Q, INFORM            201Q has failed closed.
Determine the cause of the loss of CUE:
letdown (REFER TO Appendix E, Supplementary Information) by evaluating ANY of the following:      CHE-PV-201Q is closed and has an x PLCS failures                      air leak on the air supply line.
x NC flow to Letdown Heat x Exchanger                          IF REQUESTED CUE (may be x SIAS/CIAS                          asked in step 10 of the JPM): The x CVCS component failures            CRS desires to place the standby backpressure control valve in service x Loss of IA x Loss of power SAT / UNSAT Comments (required for UNSAT):
STEP                                  CUE                            STANDARD
: 9.      Step 8 of 40AO-9ZZ05 Section 3.0:                                          The examinee N/As this step.
IF RCS pressure is less than 1000 psia, AND it is desired to place the standby valve in service, THEN PERFORM Appendix F, Aligning Letdown Control And Backpressure Valves.
SAT / UNSAT Comments (required for UNSAT):
Page 8 of 14
 
S-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                                  CUE                              STANDARD
: 10. Step 9 of 40AO-9ZZ05 Section 3.0:      IF REQUESTED CUE: The CRS            The examinee signs this step and desires to place the standby          proceeds to Appendix F.
IF the selected Letdown Control or backpressure control valve in service Backpressure Control Valve(s) has failed, AND it is desired to place the standby valve in service, THEN PERFORM Appendix F, Aligning Letdown Control And Backpressure Valves.
SAT / UNSAT Comments (required for UNSAT):
STEP                                  CUE                              STANDARD
: 11. Step 1 of 40AO-9ZZ05 Appendix F:                                            The examinee enters the entry time and date.
Enter Appendix Entry Time and Date:________________
SAT / UNSAT Comments (required for UNSAT):
STEP                                  CUE                              STANDARD
: 12. Step 2 of 40AO-9ZZ05 Appendix F:                                            The examinee N/As this step.
IF CHN-LV-110Q, Letdown Control Valve, is failed, THEN perform the following to place CHN-LV-110P in service:
SAT / UNSAT Comments (required for UNSAT):
Page 9 of 14
 
S-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                            CUE                STANDARD
: 13. Step 3 of 40AO-9ZZ05 Appendix F:                          The examinee N/As this step.
IF CHN-LV-110P, Letdown Control Valve, is isolated, AND RCS pressure is less than 1000 psia, THEN perform the following to place CHN-LV-110P in service:
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                STANDARD 14      Step 4 of 40AO-9ZZ05 Appendix F:                          The examinee N/As this step.
IF CHN-LV-110P, Letdown Control Valve, is failed, THEN perform the following to place CHN-LV-110Q in service:
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                STANDARD
: 15. Step 5 of 40AO-9ZZ05 Appendix F:                          The examinee N/As this step.
IF CHN-LV-110Q, Letdown Control Valve, is isolated, AND RCS pressure is less than 1000 psia, THEN perform the following to place CHN-LV-110Q in service:
SAT / UNSAT Comments (required for UNSAT):
Page 10 of 14
 
S-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                            STANDARD
: 16.
* Step 6.a of 40AO-9ZZ05 Appendix    INFORM CUE:                      The examinee directs an operator to F:                                                                  open CHN-V348, Backpressure The area operator reports CHN-  Control Valve CHN-PV-201P Inlet IF CHN-PV-201Q, Backpressure V348, Backpressure Control Valve Isol Valve.
Control Valve, is failed, THEN perform the following to place CHN- CHN-PV-201P Inlet Isol Valve is PV-201P in service:                open.
Direct an operator to open CHN-V348, Backpressure Control Valve CHN-PV-201P Inlet Isol Valve.
SAT / UNSAT Comments (required for UNSAT):
STEP                              CUE                            STANDARD
: 17.
* Step 6.b of 40AO-9ZZ05 Appendix                                      The examinee places the F:                                                                  Backpressure Control Valve Selector to the 201P position.
Place the Backpressure Control Valve Selector to the 201P position.
SAT / UNSAT Comments (required for UNSAT):
Page 11 of 14
 
S-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                                CUE                            STANDARD
: 18.
* Step 6.c of 40AO-9ZZ05 Appendix    INFORM CUE: The operator          The examinee directs an area F:                                  reports CHN-V350, Backpressure    operator to slowly open CHN-V350, Control Valve CHN-PV-201P          Backpressure Control Valve CHN-Direct an operator to slowly open Outlet Isol Valve has been slowly  PV-201P Outlet Isol Valve.
CHN-V350, Backpressure Control opened.
Valve CHN-PV-201P Outlet Isol Valve.
Another operator will complete the remainder of this procedure.
SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparednessorganization for resolution.
NORMAL TERMINATION POINT Page 12 of 14
 
S-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 13 of 14
 
S-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam CANDIDATE INITIAL CONDITIONS:
The plant is at 50% power.
LD HDR SYS TRBL alarm is in.
INITIATING CUE:
The CRS directs you to perform the actions of 40AO-9ZZ05, Loss of Letdown.
CANDIDATE Page 14 of 14
 
PALO VERDE NUCLEAR GENERATING STATION                                40AO-9ZZ05              Revision 22 Page 1 of 46 LOSS OF LETDOWN This procedure addresses abnormal conditions resulting in a loss of letdown flow.
Procedure guidance is provided to:
* Control pressurizer level within acceptable bands
* Identify and correct the cause of the loss of letdown flow
* Install jumpers allowing letdown restoration with failed instrumentation
* Restore letdown flow
* Allow continued operation without letdown
* Supplement a plant shutdown without letdown Procedure Usage Requirements                                Sections Continuous Use:
* Have a copy of the procedure or applicable              All pages within view or be in direct communication with an individual with a copy.
* Review and understand the procedure or section of the procedure before performing any steps.
* Read and understand each step prior to performing it; performing each step as written and in the sequence specified except when the procedure or approved process specifically allows it.
* Use a placekeeping method.
* Review the document at the completion of the task to verify that all appropriate steps are performed and documented.
Rev                                            Description                                      Page 22  PCR 3815053: Sect 3.0 step 5, bolded and capitalized the logic word AND. The existing    5, 18 level of detail for the action verb ensure is already adequate per 40DP-9AP15, step 5.1.
Appendix A Step 15/15.1, removed excess level of detail with respect to the action verb Start (including deletion of the contingency action) consistent with guidance in 40DP-9AP15, EOP/AOP Writers Guide, step 5.1.
Functional Owner: AOP/EOP Team Leader
 
PALO VERDE NUCLEAR GENERATING STATION                                        40AO-9ZZ05                          Revision 22 Page 2 of 46 LOSS OF LETDOWN TABLE OF CONTENTS SECTION                                                                                                              PAGE 1.0 ENTRY CONDITIONS.......................................................................................................3 2.0 EXIT CONDITIONS...........................................................................................................3 3.0 INSTRUCTIONS/CONTINGENCY ACTIONS...................................................................4
 
==4.0 REFERENCES==
................................................................................................................12 APPENDIX                                                                                                              PAGE Appendix A, Restoration of Letdown With A Pressurizer Steam Bubble .............................13 Appendix B, Restoration of Letdown During Solid Plant Operations ...................................25 Appendix C, Extended Operations Without Letdown ...........................................................29 Appendix D, Restoring RCP Seal Injection ..........................................................................33 Appendix E, Supplementary Information .............................................................................35 Appendix F, Aligning Letdown Control And Backpressure Valves ......................................39
 
PALO VERDE NUCLEAR GENERATING STATION                        40AO-9ZZ05          Revision 22 Page 3 of 46 LOSS OF LETDOWN 1.0 ENTRY CONDITIONS The Loss of Letdown procedure may be entered when ANY of the following conditions exist:
* CHN-FI-202, Letdown Flow, indicating zero
* LD HDR SYS TRBL alarm (3A10A) 2.0 EXIT CONDITIONS The Loss of Letdown procedure may be exited when ANY of the following conditions exist:
* Charging and letdown are in service controlling pressurizer level
* Letdown is not required for controlling pressurizer level IF the Reactor trips, THEN PERFORM 40EP-9EO01, Standard Post Trip Actions.
 
PALO VERDE NUCLEAR GENERATING STATION      40AO-9ZZ05            Revision 22 Page 4 of 46 LOSS OF LETDOWN 3.0 INSTRUCTIONS/CONTINGENCY ACTIONS INSTRUCTIONS                    CONTINGENCY ACTIONS
____ 1. Enter AOP Entry Time and Date:
________________
___ 2. IF the Pressurizer is solid, THEN perform the following:
: a. Ensure Controlled Bleedoff is isolated on all standby RCPs.
: b. Place all Charging Pumps in PULL TO LOCK.
: c. Close the RCP Seal Injection    c.1 Close CHB-HV-255, Seal Flow Control Valves.                Injection Supply Header Isolation Valve.
: d. Open CHE-PDV-240, Charging Line to Reactor Coolant Loop 2A Differential Pressure Control Valve.
: e. Place CHN-PIC-201, Letdown Backpressure Controller, in MAN and close both Letdown Backpressure Valves.
: f. Operate Charging Pumps to maintain pressurizer pressure within the desired band.
___ 3. Place RCN-LIC-110, PLCS Master Controller, in MAN and close the selected Letdown Control Valve(s).
 
PALO VERDE NUCLEAR GENERATING STATION              40AO-9ZZ05              Revision 22 Page 5 of 46 LOSS OF LETDOWN INSTRUCTIONS                          CONTINGENCY ACTIONS
___ 4. Check that letdown backpressure    ____ 4.1  IF letdown backpressure is is less than setpoint.                        greater than setpoint, THEN ensure at least ONE of the following is closed:
* CHB-UV-515, Regen Hx Inlet Isol Valve
* CHA-UV-516, Regen Hx Inlet Isol Valve
* CHB-UV-523, Regen Hx Outlet Isol Valve
___ 5. IF pressurizer level is 33% or more AND rising, THEN ensure no more than one Charging Pump is running.
___ 6. IF BOTH of the following conditions exist:
* The unit is in Mode 1, 2 or 3
* pressurizer level is 56% or more and rising THEN perform the following:
: a. Enter LCO 3.4.9, Pressurizer, Condition A.
: b. Initiate actions in preparation for a Unit shutdown within 6 hours.
 
PALO VERDE NUCLEAR GENERATING STATION    40AO-9ZZ05        Revision 22 Page 6 of 46 LOSS OF LETDOWN INSTRUCTIONS                    CONTINGENCY ACTIONS
___ 7. Determine the cause of the loss of letdown (REFER TO Appendix E, Supplementary Information) by evaluating ANY of the following:
* PLCS failures
* NC flow to Letdown Heat Exchanger
* SIAS/CIAS
* CVCS component failures
* Loss of IA
* Loss of power
___ 8. IF RCS pressure is less than 1000 psia, AND it is desired to place the standby valve in service, THEN PERFORM Appendix F, Aligning Letdown Control And Backpressure Valves.
___ 9. IF the selected Letdown Control or Backpressure Control Valve(s) has failed, AND it is desired to place the standby valve in service, THEN PERFORM Appendix F, Aligning Letdown Control And Backpressure Valves.
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ05              Revision 22 Page 7 of 46 LOSS OF LETDOWN INSTRUCTIONS                          CONTINGENCY ACTIONS
___ 10. IF ALL of the following conditions exist:
* CHB-UV-515, Regen Hx Inlet Isolation, closed due to an invalid high temperature interlock
* CHN-TI-221, Regenerative Heat Exchanger Letdown Temperature, indication is available
* Letdown is desired THEN direct maintenance to PERFORM 81DP-0DC17, Temporary Modification Control, to install a jumper across relay 63X-T221, points 19 and 20 in cabinet E-ZJB-C03.
(REFER TO drawing E-CHB-031)
___ 11. IF CHB-UV-523, Regen Hx Outlet    ____ 11.1 IF CHB-UV-523, Regen Hx Outlet Isolation is closed due to an                Isolation is closed due to an invalid high temperature alarm,              invalid high temperature alarm, AND letdown is desired,                      AND letdown is desired, THEN place CHB-HS-523,                      THEN direct maintenance to LETDOWN CTMT ISOL, to                        PERFORM 81DP-0DC17, OPEN.                                      Temporary Modification Control, to install a jumper across Terminals 1 and 2 on TB 4 in cabinet E-ZAB-C02 (REFER TO drawing E-CHB-013).
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ05              Revision 22 Page 8 of 46 LOSS OF LETDOWN INSTRUCTIONS                          CONTINGENCY ACTIONS
___ 12. IF the Pressurizer is solid,      ____ 12.1 IF letdown can NOT be restored, AND RCS pressure is less than                THEN perform the following:
500 psia, THEN perform the following to                a. PERFORM the appropriate restore letdown:                                  procedures to place the plant in a condition where letdown
: a. PERFORM Appendix B,                            is NOT needed.
Restoration of Letdown During Solid Plant Operations.                b. GO TO step 17.
: b. GO TO step 16.
___ 13. IF letdown can be restored, THEN perform the following:
: a. PERFORM Appendix A, Restoration of Letdown With A Pressurizer Steam Bubble.
: b. GO TO step 16.
 
PALO VERDE NUCLEAR GENERATING STATION      40AO-9ZZ05        Revision 22 Page 9 of 46 LOSS OF LETDOWN INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 14. IF a plant shutdown or cooldown is needed, THEN perform the following:
: a. Consider ALL of the following to assist in reducing and controlling pressurizer level less than 56%:
* Initiating the downpower with pressurizer level low in the operating band
* Maintaining Tavg at the lower end of the allowable Tavg-Tref band
* Maximizing CEA insertion while maintaining ASI within the allowable band
* Maximizing boration when the Charging Pumps are running
* Performing Appendix C, Extended Operations Without Letdown, if the downpower is delayed.
(continue)
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ05        Revision 22 Page 10 of 46 LOSS OF LETDOWN INSTRUCTIONS                      CONTINGENCY ACTIONS
___14.  (continued)
: b. PERFORM ANY of the following procedures to shutdown or cooldown the plant:
* 40OP-9ZZ05, Power Operations
* 40OP-9ZZ10, Mode 3 to Mode 5 Operations
* 40OP-9ZZ24, SNOW Outage
* A procedure as directed by the CRS/SM
___ 15. IF a plant shutdown or cooldown is NOT needed, THEN PERFORM Appendix C, Extended Operations Without Letdown.
___ 16. IF jumpers have been installed to allow restoration of letdown, AND the failure has been corrected, THEN direct maintenance to PERFORM 81DP-0DC17, Temporary Modification Control, to remove the jumpers.
 
PALO VERDE NUCLEAR GENERATING STATION                    40AO-9ZZ05        Revision 22 Page 11 of 46 LOSS OF LETDOWN INSTRUCTIONS                                  CONTINGENCY ACTIONS
___ 17. IF jumpers are NOT installed, AND ONE of the following conditions exist:
* Charging and letdown are in service controlling pressurizer level
* Letdown is NOT required for controlling pressurizer level THEN GO TO the appropriate procedure for current plant conditions.
End of Section 3.0
 
PALO VERDE NUCLEAR GENERATING STATION                  40AO-9ZZ05              Revision 22 Page 12 of 46 LOSS OF LETDOWN
 
==4.0 REFERENCES==
* 01DP-0AP01, Procedure Process
* 40DP-0AP06, Abnormal Operating Procedure Writers Guide
* O.D.E.R. 86-23, Loss of Seal Injection Flow
* Letter 255-00633 MKM/SBJ, Closure of Reactor Coolant Pump Controlled Bleedoff Valve, 22 Feb, 1995
* CRDR 080128, action 01, Provide information about the power supply for the NC flow switch. Action 03, Incorporate ICR 44502
* CRDR 950738, action 03, Incorporate direction for installation of jumpers for failure of NCN-FSL-613
* CRDR 330402.05 - Add a note addressing expected HP Cooler inlet temperature rise on loss of Seal Injection
* CRDR 180322 - Reduce backpressure prior to starting any additional charging pumps End of Section 4.0
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ05        Revision 22 Page 13 of 46 LOSS OF LETDOWN Appendix A        Page 1 of 12 Appendix A, Restoration of Letdown With A Pressurizer Steam Bubble INSTRUCTIONS                      CONTINGENCY ACTIONS
____ 1. Enter Appendix Entry Time and Date:
________________
___ 2. Ensure at least ONE of the following valves are closed:
* CHB-UV-515, Regenerative Heat Exchanger Inlet Isolation Valve
* CHA-UV-516, Regenerative Heat Exchanger Inlet Isolation Valve
* CHB-UV-523, Regenerative Heat Exchanger Outlet Isolation Valve
___ 3. Ensure the selected Letdown Control Valve(s) are closed.
___ 4. Ensure BOTH of the following ERFDADS points associated with Letdown are set to alarm at the appropriate setpoint:
* CHT221, Regen Hx Outlet Temperature, at a high alarm of 380&deg;F
* CHP201, Letdown Intermediate Press /
Backpressure, at a low alarm of 205 psig
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ05        Revision 22 Page 14 of 46 LOSS OF LETDOWN Appendix A        Page 2 of 12 Appendix A, Restoration of Letdown With A Pressurizer Steam Bubble INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 5. Place CHN-PIC-201, Letdown Backpressure Controller in MAN and open the selected Letdown Backpressure Valve(s) to 60%
output.
___ 6. IF no Charging Pumps are running, THEN perform the following:
: a. Ensure controlled bleedoff is isolated on all standby RCPs prior to Seal 2 Outlet Temperature exceeding 250&deg;F.
: b. Isolate RCP seal injection by closing ONE of the following:
* Seal Injection Flow Control Valves
* CHB-HV-255, Seal Injection Supply Header Isolation Valve
: c. Open CHE-PDV-240, Charging Line to Reactor Coolant Loop 2A Differential Pressure Control Valve.
: d. Start at least one Charging Pump.
 
PALO VERDE NUCLEAR GENERATING STATION              40AO-9ZZ05              Revision 22 Page 15 of 46 LOSS OF LETDOWN Appendix A            Page 3 of 12 Appendix A, Restoration of Letdown With A Pressurizer Steam Bubble INSTRUCTIONS                          CONTINGENCY ACTIONS
___ 7. WHEN the selected Letdown          ___ 7.1  IF CHB-UV-523 will NOT open, Control Valve(s) is closed,                  AND computer point CHTS224 is THEN ensure ALL of the following            in alarm, isolation valves are open:                  THEN perform the following:
* CHB-UV-523, Regenerative                a. Place CHN-TIC-223, Letdown Heat Exchanger Outlet                        Heat Exchanger Outlet Isolation Valve                              Temperature Controller, in MAN.
* CHB-UV-515, Regenerative Heat Exchanger Inlet Isolation          b. Raise the controller output Valve                                        until NC flow from the Letdown Heat Exchanger
* CHA-UV-516, Regenerative                    clears the alarm.
Heat Exchanger Inlet Isolation Valve                                  c. Open CHB-UV-523.
___ 8. IF ANY isolation valve is open in override or manual, THEN ensure compliance with LCO 3.6.3, Containment Isolation Valves.
___ 9. IF letdown flow has been lost for 22 minutes or more, AND RCS temperature is greater than 130&deg;F, THEN perform the following:
: a. Open CHN-HV-526, Letdown Control Valves Bypass Valve.
: b. WHEN flow has been maintained through CHN-HV-526 for at least four minutes, THEN close CHN-HV-526.
 
PALO VERDE NUCLEAR GENERATING STATION                      40AO-9ZZ05            Revision 22 Page 16 of 46 LOSS OF LETDOWN Appendix A            Page 4 of 12 Appendix A, Restoration of Letdown With A Pressurizer Steam Bubble INSTRUCTIONS                                  CONTINGENCY ACTIONS CAUTION Insufficient letdown backpressure will cause flashing in the letdown system.
___ 10. Slowly adjust the Letdown Control Valve(s) and Backpressure Control Valve(s) to establish ALL of the following:
* Letdown flow approximately 25 - 35 gpm
* Letdown backpressure 220 to 300 psig
* Regenerative Heat Exchange Letdown Temperature less than saturation temperature for the existing backpressure
___ 11. WHEN letdown flow is indicated, THEN maintain Letdown Heat Exchanger Outlet Temperature less than 135&deg;F.
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ05        Revision 22 Page 17 of 46 LOSS OF LETDOWN Appendix A        Page 5 of 12 Appendix A, Restoration of Letdown With A Pressurizer Steam Bubble INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 12. IF a second charging pump will NOT be started, THEN perform the following:
: a. Slowly adjust RCN-LIC-110 to establish ALL of the following:
* The desired pressurizer level
* Letdown Heat Exchanger temperature less than 135&deg;F
: b. GO TO step 20.
___ 13. IF a second charging pump will be started, THEN ensure ALL of the following are in manual:
* RCN-LIC-110, PLCS Master Controller
* CHN-PDIC-240, Charging Header Backpressure Control Valve
* CHN-PIC-201, Letdown Backpressure Control
 
PALO VERDE NUCLEAR GENERATING STATION                                          40AO-9ZZ05                    Revision 22 Page 18 of 46 LOSS OF LETDOWN Appendix A                    Page 6 of 12 Appendix A, Restoration of Letdown With A Pressurizer Steam Bubble INSTRUCTIONS                                                CONTINGENCY ACTIONS
------------------------------------------------------------ NOTE -----------------------------------------------------------
LD HDR SYS TRBL (3A10A) will alarm and remain locked in as long as PTID CHPS201, Letdown Heat Exchanger to LD Back Press Valve Press Hi - Lo is 308 psig or less. This alarm is used to diagnosis a letdown line break in the Aux Building and to ensure subcooling. This alarm will not be available once backpressure is reduced to less than 308 psig.
---------------------------------------------------------------------------------------------------------------------------------
___ 14.      Ensure CHN-PIC-201 is adjusted to maintain 220 - 300 psig and as close to 220 psig as possible.
------------------------------------------------------------ NOTE -----------------------------------------------------------
With one charging pump running, the nominal, steady-state regen heat exchanger outlet temperature is approximately 265&deg; as indicated on CHN-TI-221. This temperature will decrease when the second charging pump is started. Subsequent manual increases in letdown flow rate may cause transient temperature increases up to 380&deg;F or higher if not properly controlled.
---------------------------------------------------------------------------------------------------------------------------------
___ 15.      Start the second Charging Pump.
 
PALO VERDE NUCLEAR GENERATING STATION                    40AO-9ZZ05            Revision 22 Page 19 of 46 LOSS OF LETDOWN Appendix A            Page 7 of 12 Appendix A, Restoration of Letdown With A Pressurizer Steam Bubble INSTRUCTIONS                                CONTINGENCY ACTIONS CAUTION Any increase in letdown flow rate may produce relatively large increases in intermediate letdown pressure as indicated by CHN-PIC-201. These pressure spikes may result in the lifting of CHN-PSV-345, Regen Hx to Letdown Hx Relief.
___ 16. Perform the following:
: a. Slowly adjust RCN-LIC-110 to establish ALL the following:
* Appropriate letdown flow for two charging pumps
* Letdown flow less than 150 gpm
* Letdown Heat Exchanger temperature less than 135&deg;F
: b. IF CHT221 reaches 380&deg;F or more, THEN reduce the letdown flow to drop temperature to less than 380&deg;F.
: c. Slowly adjust CHN-PIC-201 to maintain backpressure 220 to 300 psig.
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ05        Revision 22 Page 20 of 46 LOSS OF LETDOWN Appendix A        Page 8 of 12 Appendix A, Restoration of Letdown With A Pressurizer Steam Bubble INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 17. IF a third charging pump will NOT be started, THEN perform the following:
: a. Slowly adjust RCN-LIC-110 to establish ALL of the following:
* The desired pressurizer level
* Letdown flow less than 150 gpm
* Letdown Heat Exchanger temperature less than 135&deg;F
: b. Slowly adjust CHN-PIC-201 to maintain backpressure 220 to 300 psig.
: c. GO TO step 20.
 
PALO VERDE NUCLEAR GENERATING STATION                                          40AO-9ZZ05                    Revision 22 Page 21 of 46 LOSS OF LETDOWN Appendix A                    Page 9 of 12 Appendix A, Restoration of Letdown With A Pressurizer Steam Bubble INSTRUCTIONS                                                CONTINGENCY ACTIONS
------------------------------------------------------------ NOTE -----------------------------------------------------------
Regen heat exchanger outlet temperature as indicated on CHN-TI-221 will decrease when the third charging pump is started. Subsequent manual increases in letdown flow rate may cause transient temperature to increase if not properly controlled.
---------------------------------------------------------------------------------------------------------------------------------
___ 18.      IF letdown flow is appropriate for the number of running Charging Pumps, AND it is desired to start a third Charging Pump, THEN start the third Charging Pump by taking the handswitch to the START position.
 
PALO VERDE NUCLEAR GENERATING STATION                    40AO-9ZZ05            Revision 22 Page 22 of 46 LOSS OF LETDOWN Appendix A            Page 10 of 12 Appendix A, Restoration of Letdown With A Pressurizer Steam Bubble INSTRUCTIONS                                CONTINGENCY ACTIONS CAUTION Any increase in letdown flow rate may produce relatively large increases in intermediate letdown pressure as indicated by CHN-PIC-201. These pressure spikes may result in the lifting of CHN-PSV-345, Regen Hx to Letdown Hx Relief.
___ 19. Perform the following:
: a. Slowly adjust RCN-LIC-110 to establish ALL the following:
* Appropriate letdown flow for three charging pumps
* Letdown flow less than 150 gpm
* Letdown Heat Exchanger temperature less than 135&deg;F
: b. IF CHT221 reaches 380&deg;F or more, THEN reduce the letdown flow to drop temperature to less than 380&deg;F.
: c. Slowly adjust CHN-PIC-201 to maintain backpressure 220 to 300 psig.
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ05              Revision 22 Page 23 of 46 LOSS OF LETDOWN Appendix A          Page 11 of 12 Appendix A, Restoration of Letdown With A Pressurizer Steam Bubble INSTRUCTIONS                          CONTINGENCY ACTIONS
___ 20. WHEN pressurizer level is at the  ___ 20.1 Manually control pressurizer level desired setpoint,                          at the desired setpoint.
THEN transfer RCN-LIC-110 to ONE of the following:
* Remote Automatic
* Local Automatic
___ 21. Adjust CHN-PDIC-240 to 90-135 psid and place in AUTO.
___ 22. Perform the following:            t22.1 Manually control backpressure at the desired setpoint.
: a. Slowly adjust CHN-PIC-201 setpoint to 375 psig.
: b. Place CHN-PIC-201 in AUTO.
___ 23. IF CHN-TIC-223, Letdown Hx        ___ 23.1 IF plant conditions will NOT allow Outlet Temperature Controller, is          automatic operation of in MANUAL,                                CHN-TIC-223, AND plant conditions will allow,            THEN manually control Letdown THEN transfer CHN-TIC-223 to                Heat Exchanger Outlet AUTO with a setpoint of 120&deg;F.            Temperature less than 120&deg;F.
___ 24. IF the Pressurizer Level Control  ___ 24.1 Manually operate the Charging System is automatically                    Pumps.
controlling pressurizer level, THEN ensure ALL available Charging Pumps are green flagged for automatic control.
 
PALO VERDE NUCLEAR GENERATING STATION                      40AO-9ZZ05                    Revision 22 Page 24 of 46 LOSS OF LETDOWN Appendix A                Page 12 of 12 Appendix A, Restoration of Letdown With A Pressurizer Steam Bubble INSTRUCTIONS                                  CONTINGENCY ACTIONS
___ 25. IF RCP seal injection is in
                                                ------------------------- NOTE -------------------------
operation, THEN ensure flow is 6.0 to                  Adequate seal injection flow exists 7.5 gpm.                                    when seal injection flow is greater than controlled bleedoff flow.
                                                ------------------------------------------------------------
___ 25.1 IF RCP seal injection is in operation, AND flow can NOT be adjusted to 6.0 to 7.5 gpm, THEN balance flows to ensure that seal injection flow is greater than bleedoff flow to all RCPs.
___ 26. IF RCP seal injection is isolated, AND seal injection is desired, THEN PERFORM Appendix D, Restoring RCP Seal Injection.
___ 27. IF jumpers were installed to allow letdown restoration, AND ANY of the following conditions occur while letdown is in service:
* NC is lost
* Regen Hx Letdown Temperature is 413&deg;F or more THEN ensure letdown is isolated.
End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ05          Revision 22 Page 25 of 46 LOSS OF LETDOWN Appendix B            Page 1 of 4 Appendix B, Restoration of Letdown During Solid Plant Operations INSTRUCTIONS                      CONTINGENCY ACTIONS
____ 1. Enter Appendix Entry Time and Date:
________________
___ 2. IF letdown was aligned from the RCS loop, THEN GO TO step 5.
___ 3. IF letdown was being supplied from the shutdown cooling purification line, THEN open both Backpressure Control Valves.
___ 4. WHEN letdown flow is indicated, THEN perform the following:
: a. Ensure one Charging Pump is running.
: b. Slowly close the Backpressure Control Valves to establish the desired RCS pressure.
: c. Balance and transfer the          c.1 Manually operate the Letdown Backpressure                  Backpressure Control Valves.
Controller to AUTO.
: d. GO TO step 12. of this Appendix.
 
PALO VERDE NUCLEAR GENERATING STATION              40AO-9ZZ05              Revision 22 Page 26 of 46 LOSS OF LETDOWN Appendix B              Page 2 of 4 Appendix B, Restoration of Letdown During Solid Plant Operations INSTRUCTIONS                          CONTINGENCY ACTIONS
___ 5. WHEN the Letdown Control Valves are closed, THEN open both Backpressure Control Valves.
___ 6. WHEN the Letdown Control            ___ 6.1  IF CHB-UV-523 will NOT open, Valves are closed,                          AND computer point CHTS224 is THEN open ALL of the following:              in alarm, THEN perform the following:
* CHB-UV-523, Regenerative Heat Exchanger Outlet                  a. Place CHN-TIC-223, Letdown Isolation Valve                              Heat Exchanger Outlet Temperature Controller, in
* CHB-UV-515, Regenerative                    MAN.
Heat Exchanger Inlet Isolation Valve                                  b. Raise the controller output until NC flow from the
* CHA-UV-516, Regenerative                    Letdown Heat Exchanger Heat Exchanger Inlet Isolation              clears the alarm.
Valve
: c. Open CHB-UV-523.
___ 7. IF letdown has been lost for greater than 22 minutes, AND RCS temperature is greater than 130&deg;F, THEN perform the following:
: a. Open CHN-HV-526, Letdown Control Valves Bypass.
: b. WHEN flow has been maintained through CHN-HV-526 for at least four minutes, THEN close CHN-HV-526.
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ05          Revision 22 Page 27 of 46 LOSS OF LETDOWN Appendix B            Page 3 of 4 Appendix B, Restoration of Letdown During Solid Plant Operations INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 8. Open both Letdown Control Valves.
___ 9. WHEN letdown flow is indicated, THEN perform the following:
: a. Ensure one Charging Pump is running.
: b. Slowly close the Backpressure Control Valves to establish the desired RCS pressure.
: c. Balance and transfer the          c.1 Manually operate the Letdown Backpressure                  Backpressure Control Valves.
Controller to AUTO.
___ 10. IF jumpers were installed to allow letdown restoration, AND ANY of the following conditions occur while letdown is in service:
* NC is lost
* Regen Hx Letdown Temperature is 413&deg;F or more THEN ensure letdown is isolated.
 
PALO VERDE NUCLEAR GENERATING STATION                  40AO-9ZZ05              Revision 22 Page 28 of 46 LOSS OF LETDOWN Appendix B              Page 4 of 4 Appendix B, Restoration of Letdown During Solid Plant Operations INSTRUCTIONS                              CONTINGENCY ACTIONS
___ 11. IF CHN-TIC-223, Letdown Hx              ___ 11.1 IF plant conditions will NOT allow Outlet Temperature Controller, is                automatic operation of in MAN,                                        CHN-TIC-223, AND plant conditions will allow,                THEN manually control letdown THEN transfer CHN-TIC-223 to                    heat exchanger outlet AUTO with a setpoint of 120&deg;F.                temperature less than 120&deg;F.
___ 12. IF RCP seal injection is desired, THEN PERFORM Appendix D, Restoring RCP Seal Injection.
End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION                                          40AO-9ZZ05                    Revision 22 Page 29 of 46 LOSS OF LETDOWN Appendix C                    Page 1 of 4 Appendix C, Extended Operations Without Letdown INSTRUCTIONS                                                CONTINGENCY ACTIONS
____ 1.        Enter Appendix Entry Time and Date:
________________
___ 2.        WHEN letdown can be restored, THEN GO TO Appendix A, Restoration of Letdown With A Pressurizer Steam Bubble.
------------------------------------------------------------ NOTE -----------------------------------------------------------
Boron equalization should be minimized since it depletes RCS hydrogen. The reduction in RCS hydrogen concentration may require entry into chemistry actions levels that may cause the unit to be shutdown.
---------------------------------------------------------------------------------------------------------------------------------
___ 3.        IF boron equalization is in progress, THEN stop boron equalization.
___ 4.        Notify Chemistry that the plant will be operated with letdown flow isolated.
 
PALO VERDE NUCLEAR GENERATING STATION                                          40AO-9ZZ05                    Revision 22 Page 30 of 46 LOSS OF LETDOWN Appendix C                    Page 2 of 4 Appendix C, Extended Operations Without Letdown INSTRUCTIONS                                                CONTINGENCY ACTIONS
------------------------------------------------------------ NOTE -----------------------------------------------------------
RCP HP seal cooler inlet temperature is expected to rise to between 200&deg;F and 220&deg;F when seal injection is stopped. All other seal temperatures are expected to remain normal.
------------------------------------------------------------ NOTE -----------------------------------------------------------
Intentional entry into L.C.O. 3.4.9, Pressurizer, Condition A is prohibited.
---------------------------------------------------------------------------------------------------------------------------------
___ 5.        WHEN the CRS determines seal injection and charging are to be stopped, OR pressurizer level is 56% or more and rising, THEN perform the following:
: a. IF the unit is in Mode 1, 2 or 3, THEN ensure compliance with LCO 3.4.9, Pressurizer.
: b. Ensure controlled bleedoff is isolated on all standby RCPs prior to Seal 2 Outlet Temperature exceeding 250&deg;F.
: c. Close the Seal Injection Flow                                  c.1 Close CHB-HV-255, Seal Control Valves.                                                      Injection Supply Header Isolation Valve.
: d. Place all Charging Pumps in PULL TO LOCK.
 
PALO VERDE NUCLEAR GENERATING STATION                                          40AO-9ZZ05                    Revision 22 Page 31 of 46 LOSS OF LETDOWN Appendix C                    Page 3 of 4 Appendix C, Extended Operations Without Letdown INSTRUCTIONS                                                CONTINGENCY ACTIONS
------------------------------------------------------------ NOTE -----------------------------------------------------------
RCP controlled bleedoff will lower pressurizer level approximately 10% in 55 minutes. This assumes three gpm bleedoff flow from each RCP.
---------------------------------------------------------------------------------------------------------------------------------
___ 6.        IF charging has been stopped, AND ANY of the following conditions exist:
* Pressurizer level is less than 53%
* Seal injection is needed THEN perform the following:
: a. Open CHN-PDV-240, Charging Line to Reactor Coolant Loop 2A Differential Pressure Control Valve.
: b. Start at least one Charging Pump.
: c. Adjust CHN-PDIC-240 to 90-135 psid and place in AUTO.
: d. IF seal injection is needed, THEN restore seal injection.
: e. Operate charging as needed to maintain pressurizer level between 33 and 53%.
 
PALO VERDE NUCLEAR GENERATING STATION                  40AO-9ZZ05        Revision 22 Page 32 of 46 LOSS OF LETDOWN Appendix C          Page 4 of 4 Appendix C, Extended Operations Without Letdown INSTRUCTIONS                                CONTINGENCY ACTIONS
___ 7. IF VCT level needs to be lowered, THEN direct an operator to perform the following:
: a. Open CHN-V117, VCT drain to the EDT (Blending Room, 120 of the Auxiliary Bldg.).
: b. WHEN the desired level is reached, THEN close CHN-V117.
End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION                    40AO-9ZZ05                    Revision 22 Page 33 of 46 LOSS OF LETDOWN Appendix D                    Page 1 of 2 Appendix D, Restoring RCP Seal Injection INSTRUCTIONS                                CONTINGENCY ACTIONS
____ 1. Enter Appendix Entry Time and Date:
________________
___ 2. Perform the following to restore RCP seal injection:
: a. Ensure the Seal Injection Flow Control Valves are closed.
: b. Ensure CHB-HV-255, Seal Injection Supply Header Isolation Valve, is open.
: c. Ensure CHN-UV-231P, Seal Injection HX Isolation Valve, is open.
: d. Adjust seal injection flow to    ------------------------- NOTE -------------------------
establish 6.0 to 7.5 gpm by          Adequate seal injection flow exists operating ANY of the                  when seal injection flow is greater than following:                            controlled bleedoff flow.
* Seal Injection Flow        ------------------------------------------------------------
Controllers d.1 IF RCP seal injection flow can
* CHN-PDIC-240,                                  NOT be adjusted to 6.0 to Charging Line DP                                7.5 gpm, Controller                                      THEN balance flows to ensure that seal injection flow is greater than bleedoff flow to all RCPs.
___ 3. Ensure the Seal Injection Flow        ___ 3.1      Manually control seal injection Controllers are in AUTO.                          flow.
 
PALO VERDE NUCLEAR GENERATING STATION                                          40AO-9ZZ05                    Revision 22 Page 34 of 46 LOSS OF LETDOWN Appendix D                    Page 2 of 2 Appendix D, Restoring RCP Seal Injection INSTRUCTIONS                                                CONTINGENCY ACTIONS
------------------------------------------------------------ NOTE -----------------------------------------------------------
The desired setpoint on CHN-PDIC-240, Charging Line DP Controller, is 90 to 135 psid.
---------------------------------------------------------------------------------------------------------------------------------
___ 4.        IF CHN-PDIC-240, Charging Line                        ___ 0.1      Manually control CHN-PDIC-240.
DP Controller, is in MAN, THEN balance and transfer CHN-PDIC-240, Charging Line DP Controller, to AUTO.
___ 5.        IF BOTH of the following conditions exist for ANY RCP:
* Seal injection flow is established
* NC flow is greater than 450 gpm THEN consider restoring controlled bleedoff.
End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION                      40AO-9ZZ05            Revision 22 Page 35 of 46 LOSS OF LETDOWN Appendix E              Page 1 of 4 Appendix E, Supplementary Information 1.0 Pressurizer Level Control System Failures:
* If the PLCS is in automatic and a failure in the PLCS results in indicated pressurizer level being 15% or more above the setpoint, the normally running and standby Charging Pumps will stop, letdown flow will rise and letdown may isolate on high Regenerative Heat Exchanger Letdown Temperature.
2.0 Loss of Nuclear Cooling flow from the Letdown Heat Exchanger:
* CHB-UV-523, Regen Hx Outlet Isol Valve, will close when Letdown Heat Exchanger to Letdown Back Pressure Valve Temperature is 135&deg;F or more, as sensed by CHN-TS-224-2.
* Low NC flow may result in closure of the Backpressure Control Valves due to temperature exceeding 148&deg;F on the Letdown Heat Exchanger outlet as sensed by CHN-TT-224.
3.0 SIAS/CIAS:
* CHA-UV-516, Regen Hx Inlet Isol Valve will close on a SIAS/CIAS Train A actuation, CIAS A subgroup relay K204 failure or SIAS A subgroup relay K409 failure.
* CHB-UV-515, Regen Hx Inlet Isol Valve will close on a SIAS Train B actuation or SIAS B subgroup relay K409 failure.
* CHB-UV-523, Regen Hx Outlet Isol Valve will close on a CIAS Train B actuation or CIAS B subgroup relay K204 failure.
 
PALO VERDE NUCLEAR GENERATING STATION                      40AO-9ZZ05            Revision 22 Page 36 of 46 LOSS OF LETDOWN Appendix E              Page 2 of 4 Appendix E, Supplementary Information 4.0 CVCS Component Failures:
* CHB-UV-515, Regen HX Inlet Isol Valve, is interlocked closed at 413&deg;F Regen Heat Exchanger Letdown Temperature as sensed by CHB-TT-221.
* The Backpressure Control Valves are interlocked closed at 148&deg;F Letdown Heat Exchanger Outlet Temperature as sensed by CHN-TT-224. Computer point CHTSH224 will indicate NORM if less than 148&deg;F. The Backpressure Control Valves may be operated in MANUAL with CHN-TT-224 failed.
* CHN-PT-201, Letdown Hx to Letdown Backpressure Valves Pressure, failing low will close the Backpressure Valves.
5.0 Loss Of Instrument Air:
(Listed pressures are measured at the instrument air header pressure transmitter IAN-PIT-32.)
* NCN-TV-223, Letdown Hx Outlet Temperature Control Valve, fails closed at 90 psig, which will result in an auto closure of CHB-UV-523 due to a high letdown temperature condition.
* CHA-UV-516 and CHB-UV-515, Letdown to Regen Hx Isol Valves fail closed at approximately 38 psig.
* CHB-UV-523 Regen Hx Outlet Isol Valve fails closed at approximately 38 psig.
* CHN-LV-110 P/Q, Letdown Control Valves fail closed at approximately 25 psig.
* CHN-PV-201 P/Q Backpressure Control Valves fail closed at approximately 25 psig.
 
PALO VERDE NUCLEAR GENERATING STATION                    40AO-9ZZ05              Revision 22 Page 37 of 46 LOSS OF LETDOWN Appendix E              Page 3 of 4 Appendix E, Supplementary Information 6.0 Loss of NKN-D42:
* Loss of power to the 63X relay in cabinet ZAB-C02 will cause CHB-UV-523, Regen Hx Outlet Isol Valve to close.
* All Charging Pumps stop. PLCS control circuit loses power deenergizing the Charging Pump Mode Selection circuit. Charging Pumps may be manually operated.
7.0 Loss Of NNN-D11:
* Pressurizer Level Controller RCN-LIC-110 fails to no output. No control is available in manual or auto. Letdown Valves CHN-LV-110P and CHN-LV-110Q close.
8.0 Loss Of NNN-D12:
* Letdown Backpressure Controller, CHN-PIC-201, fails to no output. Backpressure Control Valves CHN-PV-201P and CHN-PV-201Q close.
* CHN-TIC-223 fails to zero output closing NCN-TV-223. Loss of power to CHN-TSL-224 and CHN-TS-224-2 in cabinet ZJN-C01E will cause CHB-UV-523, Regen Hx Outlet Isol Valve, to close.
 
PALO VERDE NUCLEAR GENERATING STATION                    40AO-9ZZ05              Revision 22 Page 38 of 46 LOSS OF LETDOWN Appendix E              Page 4 of 4 Appendix E, Supplementary Information 9.0 Loss of PKA-M41/D21:
* IAA-UV-2, Instrument Air Containment Isolation Valve, fails closed causing CHA-UV-516 and CHB-UV-515, Regen Hx Inlet Isol Valves, to close.
* CHA-UV-516, Regen Hx Inlet Isol Valve, fails closed on loss of power.
* Charging Pumps aligned to Train A buses must be operated locally and will have no automatic features or electrical protection.
10.0 Loss of PKB-M42/D22:
* CHB-UV-515, Regen Hx Inlet Isol Valve, fails closed on loss of power.
* CHB-UV-523, Regen Hx Outlet Isol Valve, fails closed on loss of power.
* Charging Pumps aligned to Train B buses must be locally operated and will have no automatic features or electrical protection.
11.0 Loss Of PNB-D26:
* Power is lost to CHB-TT-221 and CHB-TSHH-221-1 causing CHB-UV-515, Letdown to Regen Hx Isol Valve, to fail closed.
End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ05        Revision 22 Page 39 of 46 LOSS OF LETDOWN Appendix F          Page 1 of 8 Appendix F, Aligning Letdown Control And Backpressure Valves INSTRUCTIONS                      CONTINGENCY ACTIONS
____ 1. Enter Appendix Entry Time and Date:
________________
___ 2. IF CHN-LV-110Q, Letdown Control Valve, is failed, THEN perform the following to place CHN-LV-110P in service:
: a. Direct an operator to open CHN-V341, CHN-LV-110P Inlet Valve.
: b. Place the Letdown Control Valve Selector to the 110P position.
: c. Direct an operator to slowly open CHN-V342, CHN-LV-110P Outlet Valve.
: d. WHEN letdown flow is established, THEN direct an operator to perform a local leak check on the Letdown Control Valves.
: e. Direct an operator to isolate CHN-LV-110Q by closing BOTH of the following:
* CHN-V343, CHN-LV-110Q Inlet Valve
* CHN-V340, CHN-LV-110Q Outlet Valve
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ05        Revision 22 Page 40 of 46 LOSS OF LETDOWN Appendix F          Page 2 of 8 Appendix F, Aligning Letdown Control And Backpressure Valves INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 3. IF CHN-LV-110P, Letdown Control Valve, is isolated, AND RCS pressure is less than 1000 psia, THEN perform the following to place CHN-LV-110P in service:
: a. Direct an operator to open CHN-V341, CHN-LV-110P Inlet Valve.
: b. Place the Letdown Control Valve Selector to the BOTH position.
: c. Direct an operator to slowly open CHN-V342, CHN-LV-110P Outlet Valve.
: d. WHEN letdown flow is established, THEN direct an operator to perform a local leak check on the Letdown Control Valves.
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ05        Revision 22 Page 41 of 46 LOSS OF LETDOWN Appendix F          Page 3 of 8 Appendix F, Aligning Letdown Control And Backpressure Valves INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 4. IF CHN-LV-110P, Letdown Control Valve, is failed, THEN perform the following to place CHN-LV-110Q in service:
: a. Direct an operator to open CHN-V343, CHN-LV-110Q Inlet Valve.
: b. Place the Letdown Control Valve Selector to the 110Q position.
: c. Direct an operator to slowly open CHN-V340, CHN-LV-110Q Outlet Valve.
: d. WHEN letdown flow is established, THEN direct an operator to perform a local leak check on the Letdown Control Valves.
: e. Direct an operator to isolate CHN-LV-110P by closing BOTH of the following:
* CHN-V341, CHN-LV-110P Inlet Valve
* CHN-V342, CHN-LV-110P Outlet Valve
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ05        Revision 22 Page 42 of 46 LOSS OF LETDOWN Appendix F          Page 4 of 8 Appendix F, Aligning Letdown Control And Backpressure Valves INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 5. IF CHN-LV-110Q, Letdown Control Valve, is isolated, AND RCS pressure is less than 1000 psia, THEN perform the following to place CHN-LV-110Q in service:
: a. Direct an operator to open CHN-V343, CHN-LV-110Q Inlet Valve.
: b. Place the Letdown Control Valve Selector to the BOTH position.
: c. Direct an operator to slowly open CHN-V340, CHN-LV-110Q Outlet Valve.
: d. WHEN letdown flow is established, THEN direct an operator to perform a local leak check on the Letdown Control Valves.
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ05        Revision 22 Page 43 of 46 LOSS OF LETDOWN Appendix F          Page 5 of 8 Appendix F, Aligning Letdown Control And Backpressure Valves INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 6. IF CHN-PV-201Q, Backpressure Control Valve, is failed, THEN perform the following to place CHN-PV-201P in service:
: a. Direct an operator to open CHN-V348, Backpressure Control Valve CHN-PV-201P Inlet Isol Valve.
: b. Place the Backpressure Control Valve Selector to the 201P position.
: c. Direct an operator to slowly open CHN-V350, Backpressure Control Valve CHN-PV-201P Outlet Isol Valve.
: d. WHEN letdown flow is established, THEN direct an operator to perform a local leak check on the Backpressure Control Valves.
: e. Direct an operator to isolate CHN-PV-201Q by closing BOTH of the following:
* CHN-V347, Backpressure Control Valve CHN-PV-201Q Inlet Isol Valve
* CHN-V349, Backpressure Control Valve CHN-PV-201Q Outlet Isol Valve
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ05        Revision 22 Page 44 of 46 LOSS OF LETDOWN Appendix F          Page 6 of 8 Appendix F, Aligning Letdown Control And Backpressure Valves INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 7. IF CHN-PV-201P, Backpressure Control Valve, is isolated, AND RCS pressure is less than 1000 psia, THEN perform the following to place CHN-PV-201P in service:
: a. Direct an operator to open CHN-V348, Backpressure Control Valve CHN-PV-201P Inlet Isol Valve.
: b. Place the Backpressure Control Valve Selector to the BOTH position.
: c. Direct an operator to slowly open CHN-V350, Backpressure Control Valve CHN-PV-201P Outlet Isol Valve.
: d. WHEN letdown flow is established, THEN direct an operator to perform a local leak check on the Backpressure Control Valves.
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ05        Revision 22 Page 45 of 46 LOSS OF LETDOWN Appendix F          Page 7 of 8 Appendix F, Aligning Letdown Control And Backpressure Valves INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 8. IF CHN-PV-201P, Backpressure Control Valve, is failed, THEN perform the following to place CHN-PV-201Q in service:
: a. Direct an operator to open CHN-V347, Backpressure Control Valve CHN-PV-201Q Inlet Isol Valve.
: b. Place the Backpressure Control Valve Selector to the 201Q position.
: c. Direct an operator to slowly open CHN-V349, Backpressure Control Valve CHN-PV-201Q Outlet Isol Valve.
: d. WHEN letdown flow is established, THEN direct an operator to perform a local leak check on the Backpressure Control Valves.
: e. Direct an operator to isolate CHN-PV-201P by closing BOTH of the following:
* CHN-V348, Backpressure Control Valve CHN-PV-201P Inlet Isol Valve
* CHN-V350, Backpressure Control Valve CHN-PV-201P Outlet Isol Valve
 
PALO VERDE NUCLEAR GENERATING STATION                  40AO-9ZZ05        Revision 22 Page 46 of 46 LOSS OF LETDOWN Appendix F          Page 8 of 8 Appendix F, Aligning Letdown Control And Backpressure Valves INSTRUCTIONS                              CONTINGENCY ACTIONS
___ 9. IF CHN-PV-201Q, Backpressure Control Valve, is isolated, AND RCS pressure is less than 1000 psia, THEN perform the following to place CHN-PV-201Q in service:
: a. Direct an operator to open CHN-V347, Backpressure Control Valve CHN-PV-201Q Inlet Isol Valve.
: b. Place the Backpressure Control Valve Selector to the BOTH position.
: c. Direct an operator to slowly open CHN-V349, Backpressure Control Valve CHN-PV-201Q Outlet Isol Valve.
: d. WHEN letdown flow is established, THEN direct an operator to perform a local leak check on the Backpressure Control Valves.
End of Appendix
 
S-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK: L211045 Placing the second Feedwater pump on-line.
TASK STANDARD: Second Feedwater pump has been tripped due to high vibrations.
K/A:      3.4 039 A4.03                          K/A RATING:        RO:    2.8 SRO:        2.8 K/A:                                              K/A RATING:        RO:        SRO:
APPLICABLE POSITION(S):                  RO        VALIDATION TIME:                15 minutes
 
==REFERENCES:==
40OP-9FT02, FEEDWATER PUMP TURBINE B SUGGESTED TESTING ENVIRONMENT: SIMULATOR X                            PLANT          OTHER JPM TYPE Time Critical? (Yes/No)      No                Alternative Path? (Yes/No)  Yes PRA/SRA related? (Yes/No)        No APPROVAL Developed By:              Larry Burton          Date:      02/16/2012 Revised By:                                      Date:
Technical Review                                  Operations Approval EP Review                          N/A            Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                    Date:
Evaluator Name:
Time to complete:                  Minutes        GRADE (Circle  One)  SAT / UNSAT *
* For E-Plan JPMs, a grade of UNSAT requires a PVAR to be written, remediation, and re-evaluation.
PVAR # _____________
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to the Emergency Preparedness organization for resolution.
Page 1 of 12
 
S-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. SIMULATOR SETUP:
x    IC#: 109 (This IC is setup to run JS-3 and JS-4 for the 2012 NRC exam).
x    SCENARIOS, MALFUNCTIONS, OVERRIDES, etc. for Setup:
COMMAND/COMMUNICATION                                          DESCRIPTION x  SPECIAL INSTRUCTIONS:
o None x  REQUIRED CONDITIONS:
o None x  SIMULATOR EVALUATION PRE-CHECK Correct IC Alarm Silence Off Run Scenario file 2012 NRC S3-S4 from the exam jump drive Procedures available, page checked, and clean For JPMs administered during transients, another instructor available to control plant parameters.
Verified by: ____________________________          Date: ____________________
(NA if Simulator setup not required)
: 2. SPECIAL TOOLS/EQUIPMENT:
x  40OP-9FT02. This JPM was written using Revision 38 of 40OP-9FT02.
x  MALFUNCTIONS, OVERRIDES, etc. during JPM STEP          COMMAND/COMMUNICATION                                  DESCRIPTION Following      Key 1                                  MFWT B Hi Vibrations greater than 5 mils step 6      mfFW15B r:45 f:30 IF IC-109 is not available, perform the following to setup for this JPM:
x Reset to IC-16 x Startup the B feedpump using section 4.3 of 40OP-9FT02 until feedpump speed is ~ 1000 rpm.
Page 2 of 12
 
S-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANTJPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o You may use any source of information normally available.
INITIAL CONDITIONS:
x    Unit 1 is at 50% power.
x    40OP-9FT02, Main Feedwater Pump B has been completed thru section 4.3 in preparation of placing the B MFP in service.
x    An Auxiliary Operator is stationed at the B MFP.
INITIATING CUE:
x    The CRS directs you to place the second Feedpump (MFP B) on-line per Section 4.4 of 40OP-9FT02, Main Feedwater Pump B.
Page 3 of 12
 
S-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*)denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 12
 
S-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
NOTE The bias adjustment on SGN-FIC-1108, FWPT Speed Setpoint Controller, will add or subtract RPM from its input signal from the Master Controller.
STEP                          CUE                    STANDARD 1      Step 4.4.1 Ensure BOTH of the following:
___ SGN-FIC-1108, FWPT                                  Examinee verifies places SGN-Speed Setpoint Controller is in                          FIC-1108 in auto.
auto.
Examiner Note: Auto is R on
____ FWPT B bias is set with                            the controller.
100 RPM of FWPT A.
Examinee adjusts FWPT B bias to within 100 RPM of FWPT A.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                    STANDARD Step 4.4.2
: 2.                                                              Examinee verifies current SG WHEN performing Step 4.4.3                              levels.
through Step 4.4.5, THEN ensure proper steam generator levels are maintained.
SAT / UNSAT Comments (required for UNSAT):
Page 5 of 12
 
S-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                            STANDARD
: 3.      Step 4.4.3                                                            Examinee adjusts FTN-HS-54 potentiometer until FWPT B Adjust FTN-HS-54, Manual                                              discharge pressure matches Speed Control, to match pump                                          FWPT A discharge pressure.
discharge pressure with the other FWPT discharge pressure.
SAT / UNSAT Comments (required for UNSAT):
STEP                              CUE                            STANDARD
: 4.      Step 4.4.4                                                            Examinee verifies open FWN-HV-32, FWPT B discharge valve.
Ensure FWN-HV-32, FWPT Discharge Valve, for FWN-P01B is open.
SAT / UNSAT Comments (required for UNSAT):
NOTE:
Any of the following may be useful when placing the second feed pump in service.
x    DFWCS Auto/manual stations display. AM_STNS_C) x    DFWCS Feedwater pump display. (FWP_C) x    PMS page display FEED PUMP PERFORMANCE (PC-3)
Page 6 of 12
 
S-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                                  CUE                            STANDARD
: 5.      Step 4.4.5                                                                Examinee proceeds to sub steps 1-5.
Perform ALL of the following to place FWPT Speed Setpoint Controllers in Auto:
SAT / UNSAT Comments (required for UNSAT):
NOTE Using this option may adversely affect Steam Generator levels if the controller is adjusted too fast.
STEP                                  CUE                            STANDARD
: 6.      Step 4.4.5                                                                Examinee adjusts FTN-HS 54 until FWPT B actual speed is
: 1. Slowly adjust FTN-HS-                                              within 10 RPM of the output on 54, Manual Speed                                                  SGN-FIC-1108 Control, to match FWPT actual speed with the output as read on SGN-FIC-1108, FWPT Speed Setpoint Controller.
(within 10 RPM of each other).
SAT / UNSAT Comments (required for UNSAT):
Examiner Note:
Direct the driver to activate Key 1, (Hi vibrations on MFP B)
Page 7 of 12
 
S-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                          STANDARD Window 6A09C alarms
: 7.
* If requested cue:                Examinee notes window 6A09C FWPT B HI VIB and addresses FWPT B HI VIB The CRS directs the examinee to  40AL-9RK6A (B06 Alarm address the ARP.                  Response)
ALTERNATE PATH SAT / UNSAT Comments (required for UNSAT):
NOTE:
There have been problems with the vibration monitoring circuitry. Vibration levels are directed to be checked prior to initiating action in the level chart on the next page.
STEP                              CUE                          STANDARD
: 8.
* FIRST PRIORITY OPERATOR                                            Examinee verifies vibration ACTION                                                            readings on MTN-YR-301, point 14 and computer point FTY18.
: 1. Check FWPT B vibration on recorder MTN-YR-301, point 14, on board B07.
: 2. Check FWPT B vibration on computer point FTY18.
SAT / UNSAT Comments (required for UNSAT):
Page 8 of 12
 
S-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                        STANDARD
: 9. SECOND PRIORITY                  When requested cue:          Examinee takes action to ensure OPERATOR ACTION                                                that the Vibration Group is CRS will ensure that the      informed of the need to take local
: 1. Direct a Technician from  Vibration Group is contacted. FWPT bearing readings.
the Vibration Group to take local readings on the bearing.
SAT / UNSAT Comments (required for UNSAT):
STEP                              CUE                        STANDARD
: 10.
* SECOND PRIORITY                  When requested cue:          Examinee sends AO to FWPT B OPERATOR ACTION                                                to validate vibration readings.
AO reports a much higher than
: 2. Direct a Nuclear Operator  normal level of vibrations at to locally check if the    FWPT B.
turbine is vibrating more than normal. 5 mils vibration will cause an obvious high level of vibration to the FWPT.
SAT / UNSAT Comments (required for UNSAT):
Page 9 of 12
 
S-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                          STANDARD
: 11.
* SECOND PRIORITY                    When Requested Cue:                Examinee trips FWPT B using OPERATOR ACTION                                                        FTN-HS-52, (Feedwater Pump CRS concurs with tripping          Turbine B Manual Trip).
: 2. IF the 5 mils is confirmed FWPT B.
and sustained, THEN trip                                      Examiner Note:
the FWPT and initiate a    This JPM is complete.
RPCB.                                                        At 50% power RPCB system is disabled SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparedness organization for resolution.
NORMAL TERMINATION POINT Page 10 of 12
 
S-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED 000          02/16/2012        New JPM REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 11 of 12
 
S-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam EXAMINEE HANDOUT INITIAL CONDITIONS:
x  Unit 1 is at 50% power.
x  40OP-9FT02, Main Feedwater Pump B has been completed thru section 4.3 in preparation of placing the B MFP in service.
x  Auxiliary Operator is stationed at the B MFP.
INITIATING CUE:
x  The CRS directs you to place the second Feedpump (MFP B) on-line per Section 4.4 of 40OP-9FT02, Main Feedwater Pump B.
Page 12 of 12
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                                        Page 24 of 105 Revision FEEDWATER PUMP TURBINE B                                                      40OP-9FT02              38 4.4      Placing the Second Feedwater Pump On-Line
          ---------------------------------------- NOTE ----------------------------------------
The bias adjustment on SGN-FIC-1108, FWPT Speed Setpoint Controller, will add or subtract RPM from its input signal from the Master Controller.
          ------------------------------------------------------------------------------------------------
4.4.1      Ensure BOTH of the following:
____      SGN-FIC-1108, FWPT Speed Setpoint Controller, is in auto.
____      FWPT B bias is set within 100 RPM of FWPT A.
____      4.4.2      WHEN performing Step 4.4.3 through Step 4.4.5, THEN ensure proper steam generator levels are maintained.
____      4.4.3      Adjust FTN-HS-54, Manual Speed Control, to match pump discharge pressure with the other FWPT discharge pressure.
____      4.4.4      Ensure FWN-HV-32, FWPT Discharge Valve, for FWN-P01B is open.
          ---------------------------------------- NOTE ----------------------------------------
Any of the following may be useful when placing the second feed pump in service.
* DFWCS Auto/manual stations display. (AM_STNS_C)
* DFWCS Feedwater pump display. (FWP_C)
* PMS page display FEED PUMP PERFORMANCE (PC-3).
          ------------------------------------------------------------------------------------------------
____      4.4.5      Perform ALL of the following to place FWPT Speed Setpoint Controllers in Auto:
          ---------------------------------------- NOTE ----------------------------------------
Using this option may adversely affect Steam Generator levels if the controller is adjusted too fast.
          ------------------------------------------------------------------------------------------------
____      1. Slowly adjust FTN-HS-54, Manual Speed Control, to match FWPT actual speed with the output as read on SGN-FIC-1108, FWPT Speed Setpoint Controller.
(within 10 RPM of each other)
____      2. IF it is desired to adjust the deviation meter with the bias, THEN ensure FWPT speed is greater than 4155 RPM.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                                      Page 25 of 105 Revision FEEDWATER PUMP TURBINE B                                                      40OP-9FT02              38
        ---------------------------------------- NOTE ----------------------------------------
Step 4.4.5.3 may be performed in parallel with the rest of this section.
        ------------------------------------------------------------------------------------------------
____      3. Notify the FW Pump Engineer that FW Pump "B" is at minimum pump speed operation (shaft seal operation).
____      4. Adjust the bias on SGN-FIC-1108, FWPT Speed Setpoint Controller, until there is a zero deviation on FTN-SDI-102, Manual/Auto Control Deviation.
____      5. Place FTN-HS-100, Auto/Manual Selector Switch, in AUTO.
(Control of the FWPT will now be with Speed Setpoint Controllers.)
____      6. Balance FWPT A & B discharge pressures, flows, and differential pressures between Main Feedwater Pump Discharge Pressure and Main Steam Header Pressure using the bias on SGN-FIC-1107, FWPT Speed Setpoint Controller, and SGN-FIC-1108, FWPT Speed Setpoint Controller.
 
S-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM JPM BASIS INFORMATION TASK: 0120020701Fill a Safety Injection Tank TASK STANDARD: SIT 2B level increased by 5% NR.
K/A:      3.3 006 A1.13                            K/A RATING:        RO:    3.5 SRO:      3.7 K/A:                                                K/A RATING:        RO:        SRO:
APPLICABLE POSITION(S):                  RO        VALIDATION TIME:              20 minutes
 
==REFERENCES:==
40OP-9SI03 SUGGESTED TESTING ENVIRONMENT: SIMULATOR X                              PLANT        OTHER JPM TYPE Time Critical? (Yes/No)      No                Alternative Path? (Yes/No)  No PRA/SRA related? (Yes/No)        No APPROVAL Developed By:              Larry Burton            Date:      09/09/2011 Revised By:                                        Date:
Technical Review                                  Operations Approval EP Review                          N/A            Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                      Date:
Evaluator Name:
Time to complete:                  Minutes          GRADE (Circle  One)  SAT / UNSAT
* Page 1 of 13
 
S-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM
: 1. SIMULATOR SETUP:
NOTE: There are two different setups for this JPM dependent upon on which other JPM it is to be run with. Pay close attention to the IC and Scenario files to be used.
x    IC#: 109 (This IC is setup to run S-3 and S-4 for the 2012 NRC exam.)
x    IC#: 110 (This IC is setup to run S-4 and S-7 for the 2012 NRC exam.)
: 2. SCENARIOS, MALFUNCTIONS, OVERRIDES,etc. for Setup:
COMMAND/COMMUNICATION                                                DESCRIPTION None x  SPECIAL INSTRUCTIONS:
o None x  REQUIRED CONDITIONS:
o None x  SIMULATOR EVALUATION PRE-CHECK Correct IC Alarm Silence Off Procedures available, page checked, and clean For JPMs administered during transients, another instructor available to control plant parameters.
Verified by: ____________________________                Date: ____________________
(NA if Simulator setup not required)
: 3. SPECIAL TOOLS/EQUIPMENT:
40OP-9SI03. This JPM was written using Revision 34 of 40OP-9SI03. \
: 4. JPM PERFORMANCE:
x  MALFUNCTIONS, OVERRIDES, etc. during JPM STEP      COMMAND/COMMUNICATION                                            DESCRIPTION 8    Go to simulator diagram page SI1 and click      When directed to throttle SIB-UV-667 to reach 1400 on Components/Motor Operated valves              psig.
(CRF)/SIBUV667/crMVSI01SIBUV667_9 and adjust slowly as the operator directs. (It should end up ~ f:40) 11    MRF SI05 f:5                                    When directed to throttle open SIB-V400 Page 2 of 13
 
S-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANTJPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATEany equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o You may use any source of information normally available.
INITIAL CONDITIONS:
x    Level in SIT 2B has been lowering over the last 24 hours.
x    Maintenance has identified a leaking connection.
x    Engineering is developing a trouble shooting game plan.
x    HPSI pump B pre-start checks have been completed.
x    SIE-V463, SIT Fill and Drain Line Containment Isolation is OPEN with a dedicated assigned at the valve to close the valve if required. (A manual SESS has been inserted).
x    SIB-V219, Mini Flow Recirc Orifice Bypass Valve is OPEN.
x    HPSI B has been declared Inoperable and unavailable.
x    SIB-UV-667, HPSI B to the RWT isolation valve has been throttled 9 turns OPEN.
x    The HPSI discharge header was vented during the previous shift.
x    SIE-V220, SIT 2B Fill & Drain Header Manual Isol Valve has been verified open.
x    Manual HPSI B SESS alarm has been inserted x    40OP-9SI03, section 6.3 (Filling the Safety Injection Tanks to Establish or Maintain Normal level has been completed thru step 6.3.5.25.
INITIATING CUE:
x    The CRS directs you to start HPSI pump B and fill the 2B SIT by 5% Narrow range starting at step 6.3.5.26 of 40OP-9SI03 to maintain/restore normal level in SIT 2B.
Page 3 of 13
 
S-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*)denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 13
 
S-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM JPM START TIME:
NOTE When HPSI Pump B is started, it will be recircing to the RWT.
CAUTION HPSI pump operation between 85 and 225 gpm for greater than 1 hour will result in pump damage.
STEP                                CUE                              STANDARD
: 1.
* Step 6.3.5.26                    If requested cue:                        Examinee starts HPSI Pump B using SIB-HS-2.
Start HPSI Pump B using SIB-HS-2, HPSI PUMP B P02.            The Auxiliary Operator reports everyone is clear of the HPSI pump.
SAT / UNSAT Comments (required for UNSAT):
STEP                                CUE                              STANDARD
: 2. Step 6.3.5.27                                                              Examinee verifies discharge pressure (approximately 1600 psi)
Verify ALL of the following indicated on SIN-PI-309 and expected responses:
motor run amps <120.
x  Discharge pressure is indicated on SIN-PI-309, HPSI HEADER B TO RC LOOPS PRESSURE x  Unit 1 Only - Motor run current less than 120 amps SAT / UNSAT Comments (required for UNSAT):
Page 5 of 13
 
S-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM STEP                                CUE                              STANDARD
: 3.      Step 6.3.5.28                                                            Examinee verifies no anomalous HPSI Pump indications.
IF anomalous HPSI Pump indications are observed, THEN perform the following:
: a. Notify the CRS immediately.
: b. Consider stopping HPSI Pump B.
: c. Evaluate the reason for anomalous indications.
SAT / UNSAT Comments (required for UNSAT):
NOTE When a HPSI pump is first started, some seal leakage is expected for a short duration.
During normal HPSI pump operation, a dripping seal is normally acceptable, a steady stream is indication of seal damage.
STEP                                CUE                              STANDARD
: 4.      Step 6.3.5.29                      When Requested Cue:                  Examinee directs AO to inspect HPSI pump B seals for leakage.
Inspect HPSI Pump B seals for leakage.                            AO reports only a dripping seal with no indication of unusual leakage at HPSI pump B.
SAT / UNSAT Comments (required for UNSAT):
Page 6 of 13
 
S-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM STEP                            CUE                    STANDARD
: 5. Step 6.3.5.30                                                Examinee NAs step.
IF leakage is discovered at the pump seals, THEN notify System Engineering.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                    STANDARD
: 6. Step 6.3.5.31                    If Requested Cue:          Examinee verifies that HAB-Z01 is running by either SEAS Verify that HAB-Z01, Aux. Bldg.
AO verifies that HAB-Z01 is window 12L or local indication.
HPSI Pump Room Ess. Air Control Unit, has started by ONE  running.
of the following methods:
x  SEAS window 12L blue light at ESB-UA-2F is not on when status display button on ESB-UA-2D is depressed x  Local observation that HAB-Z01 is running.
SAT / UNSAT Comments (required for UNSAT):
Page 7 of 13
 
S-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM STEP                          CUE                STANDARD
: 7. Step 6.3.5.32                                          Examinee NAs step.
IF HAB-Z01 Aux. Bldg. HPSI Pump Room Ess. Air Control Unit, did NOT start when HPSI Pump B started, THEN notify the SM/CRS.
SAT / UNSAT Comments (required for UNSAT):
STEP                          CUE                STANDARD
: 8.
* Step 6.3.5.33                                          Examinee directs AO to throttle closed on SIB-UV-667 until SIN-Throttle manually SIB-UV-667, PI-309 indicates approximately HPSI B to the RWT Isolation 1400 psig.
Valve, to adjust HPSI Pump B discharge pressure to 1400 psig indicated on SIN-PI-309, HPSI                          Examiner Note: Driver action Pmp B Hdr Disch Press.                                required to throttle closed SIB-UV-667.
SAT / UNSAT Comments (required for UNSAT):
STEP                          CUE                STANDARD
: 9.
* Step 6.3.5.34                                          Examinee opens SIA-UV-682.
Open SIA-UV-682 using SIA-HS-682, MISC DRAIN HEADER TO RWT VLV.
SAT / UNSAT Comments (required for UNSAT):
Page 8 of 13
 
S-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM STEP                                CUE                            STANDARD
: 10.
* Step 6.3.5.35                      When Requested Cue:                    Examinee directs AO to unlock SIB-V400.
Unlock SIB-V400, SIT Fill and Drain Isolation Valve HPSI          SIB-V400 has been unlocked Recirc, per 40AC-0ZZ06, Locked      per 40AC-0ZZ06.
Valve, Breaker and Component Control.
SAT / UNSAT Comments (required for UNSAT):
STEP                                CUE                            STANDARD
: 11.
* Step 6.3.5.36                      When Requested Cue:                    Examinee directs AO to throttle open SIB-V400.
Throttle open SIB-V400, SIT Fill and Drain Isolation Valve HPSI      AO throttles SIB-V400 as Recirc, slowly to control SIT fill  directed.
rate.
SAT / UNSAT Comments (required for UNSAT):
NOTE If a SIT Fill and Drain Manual Isolation Valve is closed to isolate an inoperable and open SIT Fill and Drain Air Operated Valve, opening the SIT Fill and Drain Manual Isolation Valve makes the associated SIT inoperable and LCO 3.5.1 or LCO 3.5.2 is applicable.
Page 9 of 13
 
S-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM STEP                          CUE                          STANDARD
: 12. Step 6.3.5.37                    If Requested Cue:                Examinee NAs step.
IF the SIT Fill & Drain Manual Isolation Valve for the SIT to be SIE-V220 has been verified filled is closed, THEN open the  open.
SIT Fill & Drain Manual Isolation Valve for the SIT to be filled:
x SIE-V220, SIT 2B Fill &
Drain Header Manual Isol Valve SAT / UNSAT Comments (required for UNSAT):
STEP                          CUE                          STANDARD
: 13. Step 6.3.5.38                                                      Examinee records current SIT level.
IF the unit is in MODES 1 through 4, THEN record initial SIT level:
SAT / UNSAT Comments (required for UNSAT):
Note:
x  Annunciator window 2B11A, SIT LVL HI-LO, alarms on SIT hi level at 63% NR level.
x  Annunciator window 2B11B, SIT LVL HI-HI/LO-LO, alarms on SIT hi-hi level at 69% NR level.
Page 10 of 13
 
S-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM STEP                              CUE                            STANDARD
: 14.
* Step 6.3.5.39                                                          Examinee OPENS SIB-UV-621.
Open the SIT Fill & Drain Valve for the SIT to be filled:
x    SIB-UV-621 using SIB-HS-621, SIT 2B FILL & DRAIN VLV SAT / UNSAT Comments (required for UNSAT):
STEP                              CUE                            STANDARD
: 15.
* Step 6.3.5.40                      After level has increased by      Examinee monitors SIT 2B level 5%, Inform CUE:                    increase using SIN-LI-313 (NR)
Monitor level of the SIT being and SIB-LI-311 (WR).
filled:
Another operator will complete SIN-LI-      R) SIT 2B LVL,      the remaining actions.
313          LT-333 SIB-LI311    L) SIT 2B LVL LT--321 SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparednessorganization for resolution.
NORMAL TERMINATION POINT Page 11 of 13
 
S-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED 000          09/30/11                        New JPM REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 12 of 13
 
S-4 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM EXAMINEE HANDOUT INITIAL CONDITIONS:
x  Level in SIT 2B has been lowering over the last 24 hours.
x  Maintenance has identified a leaking connection.
x  Engineering is developing a trouble shooting gameplan.
x  HPSI pump B pre-start checks have been completed.
x  SIE-V463, SIT Fill and Drain Line Containment Isolation is OPEN with a dedicated assigned at the valve to close the valve if required. (A manual SESS has been inserted).
x  SIB-V219, Mini Flow Recirc Orifice Bypass Valve is OPEN.
x  HPSI B has been declared Inoperable and unavailable.
x  SIB-UV-667, HPSI B to the RWT isolation valve has been throttled 9 turns OPEN.
x  The HPSI discharge header was vented during the previous shift.
x  SIE-V220, SIT 2B Fill & Drain Header Manual Isol Valve has been verified open.
x  Manual HPSI B SESS alarm has been inserted x  40OP-9SI03, section 6.3 (Filling the Safety Injection Tanks to Establish or Maintain Normal level has been completed thru step 6.3.5.25.
INITIATING CUE:
x  The CRS directs you to start HPSI pump B and fill the 2B SIT by 5% Narrow range starting at step 6.3.5.26 of 40OP-9SI03 to maintain/restore normal level in SIT 2B.
Page 13 of 13
 
S-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK:      1260010101 Respond to an alarm TASK STANDARD:          RMWT water added to RDT K/A:      3.5 007 A2.05                            K/A RATING:          RO:      3.2 SRO:      3.6 K/A:                                                K/A RATING:          RO:          SRO:
APPLICABLE POSITION(S):                  RO        VALIDATION TIME:                  15 minutes
 
==REFERENCES:==
40AL-9RK3A, Panel B03A Alarm Responses SUGGESTED TESTING ENVIRONMENT:                  SIMULATOR          X      PLANT        OTHER JPM TYPE Time Critical? (Yes/No)      No                  Alternative Path? (Yes/No)  No PRA/SRA related? (Yes/No)        No APPROVAL Developed By:              Larry Burton          Date:      09/30/2011 Revised By:                    N/A                Date:
Technical Review                                  Operations Approval EP Review                          N/A            Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                      Date:
Evaluator Name:
Time to complete:                  Minutes          GRADE (Circle          SAT / UNSAT
* One)
Page 1 of 10
 
S-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. SIMULATOR SETUP:
x      IC#: 107 (This IC is designed to run JS-5 and JS-6 together for the 2012 NRC exam) x      SCENARIOS, MALFUNCTIONS, OVERRIDES,etc. for Setup:
COMMAND/COMMUNICATION                                                DESCRIPTION See Special Instructions x    SPECIAL INSTRUCTIONS:
o After the IC is loaded, place the simulator in run and perform the following to bring the Reactor Drain Tank Hi Temperature alarm to the top of the alarm screen:
Go to the Panel Overview for B03 Click on alarm window B03A window 7A.
Override ALARM_OFF the Reactor Drain Tank Hi Temperature alarm.
Then override No_override for the Reactor Drain Tank Hi Temperature alarm.
x    REQUIRED CONDITIONS:
o None x    SIMULATOR EVALUATION PRE-CHECK Correct IC Alarm Silence Off Procedures available, page checked, and clean For JPMs administered during transients, another instructor available to control plant parameters.
Verified by: ____________________________          Date: ____________________
(NA if Simulator setup not required)
: 2. SPECIAL TOOLS/EQUIPMENT:
This JPM was written using Revision 28 of 40AL-9RK3A.
: 3. JPM PERFORMANCE:
x    MALFUNCTIONS, OVERRIDES, etc. during JPM STEP          COMMAND/COMMUNICATION                                      DESCRIPTION None Page 2 of 10
 
S-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANTJPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATEany equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o  You may use any source of information normally available.
INITIAL CONDITIONS:
x    A pressurizer relief valve RCE-PSV-201 had been leaking past its seat.
x    RCS pressure has been reduced to 2210 psia.
x    Downstream temperatures from RCE-PSV-201 have stabilized.
INITIATING CUE:
x    The CRS directs you to take action per 40AL-9RK3A, window 3A07A to clear alarm point CHTS268, Reactor Drain Tank Temperature Hi.
Page 3 of 10
 
S-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*)denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o  Any step marked UNSAT requires comments.
o  If this is the first JPM of the set then ensure the examinee has been briefed.
o  Step sequence is not critical unless noted or will prevent achieving the task standard.
o  Notify the unit Shift Manager of in-plant JPM performance.
o  Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o  Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 10
 
S-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
STEP                                    CUE                                  STANDARD First Priority Action (3A07A)
: 1.                                                  If requested cue:                      Examinee may refer to cue to verify that the Hi temperature and Pressure
: 1. Consider performing 40AO-                                                  were due to a leaking Pressurizer 9ZZ02, Excessive RCS                The CRS will address 40AO-9ZZ02.                                PSV.
Leakage, in conjunction with this procedure.
: 2. Check the Reactor Drain Tank Temperature is greater than orequal to 140&deg;F OR increasing by reading Temperature indicatorCHN-TI-268 on panel B03.
: 3. Monitor RDT pressure at CHN-PI-268 on B03.
: 4. Monitor the pressurizer relief to RDT temperatures atRCN-TI-106, RCN-TI-107, RCN-TI-108 and RCN-TI-109 on B04 to determine if pressurizer relief leakage is the cause of the Hi Temperature.
: 5. IF a valid alarm is received while shutdown cooling is in service, THEN refer to 40EP-9EO11, Lower Mode Function Recovery.
SAT / UNSAT Comments (required for UNSAT):
NOTE This alarm response will mitigate a high temperature condition in the RDT.It will also address RDT Hi-Lo Level and RDT Hi pressure conditions whichresults from hot water leakage into the RDT.
Page 5 of 10
 
S-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                                    CUE                                  STANDARD
: 2.        Second Priority Action, step 1                                                  Examinee verifies GRA-UV-1 and GRB-UV-2 OPEN.
Ensure GRA-UV-1 and GRB-UV-2, Containment Isolation Valves for the RDT/Gas Surge Header, are open.
SAT / UNSAT Comments (required for UNSAT):
STEP                                    CUE                                  STANDARD
: 3.
* Second Priority Action, step 2                                                  Examinee opens CHN-UV-540.
Open CHN-UV-540, RDT Vent to Gas Surge Tank, to establish a vent of the RDT.
SAT / UNSAT Comments (required for UNSAT):
NOTE before step 3:
The following steps may have to be done concurrently or alternately one or more times to control the temperature and level in the reactor drain tank.
STEP                                    CUE                                  STANDARD
: 4.
* Second Priority Action, step 3.1                                                Examinee starts either RMW pump CHN-P03A/B.
Start CHN-P03A or CHN-P03B, RMW pump, from B03.
SAT / UNSAT Comments (required for UNSAT):
Page 6 of 10
 
S-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                                CUE                      STANDARD
: 5.
* Second Priority Action, step 3.2                                  Examinee opens CHN-UV-580, Makeup Supply Header to RDT Open CHN-UV-580, Makeup Supply                                    Containment Isolation, from B03.
Header to RDT Containment Isolation, from B03.
SAT / UNSAT Comments (required for UNSAT):
STEP                                CUE                      STANDARD
: 6.
* Second Priority Action, step 3.3      Inform Cue:                Examinee directs an Auxiliary Operator to slowly OPEN CHN-Direct an Auxiliary Operator to        AO reports that CHN-V790 is V790, RMW header isolation.
slowly OPEN CHN-V790, RMW              open.
header isolation, located on the 110 ft. of the aux. building letdown valve gallery.
SAT / UNSAT Comments (required for UNSAT):
Page 7 of 10
 
S-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                                    CUE                              STANDARD
: 7.      Second Priority Action, step 3.4      Inform Cue:                          Examinee closes CHN-UV-580.
WHEN RDT temperature is less than      After RDT Temperature is less 140 degrees,THEN close CHN-UV-        than 140 degrees:
580, Makeup Supply Header to RDT Containment Isolation.
x  The CRS directs you to stop filling the RDT at this time.
After the examinee closes CHN-UV-580:
x  Another operator will complete steps to reduce RDT level.
SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparednessorganization for resolution.
NORMAL TERMINATION POINT Page 8 of 10
 
S-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 9 of 10
 
S-5 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam EXAMINEE HANDOUT INITIAL CONDITIONS:
x    A pressurizer relief valve RCE-PSV-201 had been leaking past its seat.
x    RCS pressure has been reduced to 2210 psia.
x    Downstream temperatures from RCE-PSV-201 have stabilized.
INITIATING CUE:
x    The CRS directs you to take action per 40AL-9RK3A, window 3A07A to clear alarm point CHTS268, Reactor Drain Tank Temperature Hi.
Page 10 of 10
 
40AL-9RK3A      Panel BO3A Alarm Responses            Rev. 28      3A07A REAC DRN LOOP TRBL                          Page 2 of 9    Page 43 of 130 RESPONSE SECTION GROUP A PT ID                      POSSIBLE CAUSE                          SETPOINT CHTS268        Reactor Drain Tank Temperature Hi                        140&deg;F AUTO ACTION
____ 1. None FIRST PRIORITY OPERATOR ACTION
____ 1. Consider performing 40AO-9ZZ02, Excessive RCS Leakage, in conjunction with this procedure.
____ 2. Check the Reactor Drain Tank Temperature is greater than or equal to 140&deg;F OR increasing by reading Temperature indicator CHN-TI-268 on panel B03.
____ 3. Monitor RDT pressure at CHN-PI-268 on B03.
____ 4. Monitor the pressurizer relief to RDT temperatures at RCN-TI-106, RCN-TI-107, RCN-TI-108 and RCN-TI-109 on B04 to determine if pressurizer relief leakage is the cause of the Hi Temperature.
____ 5. IF a valid alarm is received while shutdown cooling is in service, THEN refer to 40EP-9EO11, Lower Mode Function Recovery.
SECOND PRIORITY OPERATOR ACTION NOTE This alarm response will mitigate a high temperature condition in the RDT. It will also address RDT Hi-Lo Level and RDT Hi pressure conditions which result from hot water leakage into the RDT.
____ 1. Ensure GRA-UV-1 and GRB-UV-2, Containment Isolation Valves for the RDT/Gas Surge Header, are open.
____ 2. Open CHN-UV-540, RDT Vent to Gas Surge Tank, to establish a vent of the RDT.
(CONTINUED)
 
40AL-9RK3A      Panel BO3A Alarm Responses            Rev. 28      3A07A REAC DRN LOOP TRBL                          Page 3 of 9  Page 44 of 130 NOTE The following steps may have to be done concurrently or alternately one or more times to control the temperature and level in the reactor drain tank.
____ 3. Perform the following steps to add Reactor Makeup Water to the RDT for cooling the contents of the RDT:
_____ 3.1  Start CHN-P03A or CHN-P03B, RMW pump, from B03.
_____ 3.2  Open CHN-UV-580, Makeup Supply Header to RDT Containment Isolation, from B03.
_____ 3.3  Direct an Auxiliary Operator to slowly OPEN CHN-V790, RMW header isolation, located on the 110 ft. of the aux.
building letdown valve gallery.
_____ 3.4  WHEN RDT temperature is less than 140 degrees, THEN close CHN-UV-580, Makeup Supply Header to RDT Containment Isolation.
____ 4. Perform the following steps to pump the RDT to the CVCS HUT.
_____ 4.1  IF RDT temperature has been reduced to less than 140 degrees, THEN refer to 40OP-9CH01, CVCS Normal Operations, to pump the RDT.
_____ 4.2  Ensure the HUT is NOT being processed through the Reactor Drain Filter.
_____ 4.3  Open CHA-UV-560, RDT outlet isolation valve, from B03.
_____ 4.4  Open CHB-UV-561, RDT containment isolation valve, from B03.
_____ 4.5  Open GAA-UV-2, LP N2 supply to the RDT, from B07.
_____ 4.6  Place CHE-UV-500, VCT inlet valve to the "VCT RESET" position from B03.
_____ 4.7  Place CHE-UV-565, Preholdup IX divert valve to the "BYPASS" position.
(CONTINUED)
 
40AL-9RK3A      Panel BO3A Alarm Responses            Rev. 28        3A07A REAC DRN LOOP TRBL                          Page 4 of 9    Page 45 of 130
_____ 4.8  The Shift Manager/CRS shall determine whether to use or bypass the gas stripper and direct the required line up.
_____ 4.9  WHEN the gas stripper flowpath has been lined up, THEN ensure valve CHN-UV-567 is in the HOLDUP TANK position.
CAUTION The seals to the reactor drain pumps will be damaged if fluid temperature at the pump inlet exceeds 200&deg;F.
_____ 4.10 IF RDT temperature is  200&deg;F, THEN have an Auxiliary Operator monitor temperature at the suction of the reactor drain pumps with a portable temperature monitoring device to ensure temperature at the pump suction does not exceed 200 degrees.
_____ 4.11 Start CHN-P04A OR CHN-P04B, Reactor Drain Pump.
____ 5. Control RDT level by stopping and starting of the selected reactor drain pump and by throttling CHN-V790, reactor makeup water to the RDT.
____ 6. Maintain RDT level between 52% and 75%.
____ 7. Maintain RDT pressure between 0.5 psig and 5 psig.
____ 8. IF at any time RDT pressure reaches 10 psig, THEN close CHN-UV-580, AND GO TO alarm response for window 3A07B, REAC DRAIN TK PRESS HI, of this procedure starting with Secondary Operator Actions, step 4.
____ 9. Determine the source(s) of leakage into the RDT. Possible sources of leakage include but are not limited to the following:
* Spray Control Valve Drains
* PASS Vents/Drains
* Regen H-X Drain
* Pressurizer Reliefs
* Reactor Vessel O-Ring Drain
* RC Hot Leg Drains
* RCP Loop Drains (CONTINUED)
 
40AL-9RK3A      Panel BO3A Alarm Responses            Rev. 28      3A07A REAC DRN LOOP TRBL                          Page 5 of 9    Page 46 of 130
____ 10. Inform the Effluent Technician, Radiation Protection and Chemistry that the RDT is being pumped to the CVCS HUT.
____ 11. Direct Chemistry to sample the RDT for oxygen concentration.
NOTE A possible GR auto-dilution (N2) may result from high O2 concentration in the gas collection header.
____ 12. IF Oxygen Concentration is  2%,
THEN direct a Nuclear Operator to ensure a waste gas compressor is running AND sample for oxygen every 30 minutes.
____ 13. WHEN the following conditions are satisfied:
* The source of leakage into the RDT has been isolated.
* RDT temperature is  130 degrees.
* RDT Oxygen concentration is < 2%.
THEN close CHN-UV-540, RDT Vent to Gas Surge Tank, and restore CVCS/RDT lineup as directed by Shift Manager/CRS per 40OP-9CH01, CVCS Normal Operations.
End of Response
 
S-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK: 1250310201 Respond to an Inadvertent MSIS TASK STANDARD: Inadvertent MSIS reset K/A:      3.2 013 A4.01                          K/A RATING:        RO:    4.5  SRO:      4.8 K/A:                                              K/A RATING:        RO:        SRO:
APPLICABLE POSITION(S):                  RO        VALIDATION TIME:                10 minutes
 
==REFERENCES:==
40AO-9ZZ17, Inadvertent PPS-ESFAS Actuations SUGGESTED TESTING ENVIRONMENT: SIMULATOR X                            PLANT          OTHER JPM TYPE Time Critical? (Yes/No)      No                Alternative Path? (Yes/No)  Yes PRA/SRA related? (Yes/No)        No APPROVAL Developed By:              Larry Burton          Date:      10/27/2011 Revised By:                    N/A              Date:
Technical Review                                  Operations Approval EP Review                          N/A            Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                    Date:
Evaluator Name:
Time to complete:                  Minutes        GRADE (Circle  One)  SAT / UNSAT *
* For E-Plan JPMs, a grade of UNSAT requires a PVAR to be written, remediation, and re-evaluation.PVAR # _____________
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal postcritique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to the Emergency Preparedness organization for resolution.
Page 1 of 13
 
S-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. SIMULATOR SETUP:
x    IC#: 107 (This IC is setup to run JS-5 and JS-6 together for the 2012 NRC exam) x    SCENARIOS, MALFUNCTIONS, OVERRIDES, etc. for Setup:
COMMAND/COMMUNICATION                                            DESCRIPTION None x    SPECIAL INSTRUCTIONS:
o None x    REQUIRED CONDITIONS:
o None x    SIMULATOR EVALUATION PRE-CHECK Correct IC Alarm Silence Off Procedures available, page checked, and clean For JPMs administered during transients, another instructor available to control plant parameters.
Verified by:  N/A      Date: ____________________
(NA if Simulator setup not required)
: 2. SPECIAL TOOLS/EQUIPMENT:
x    40AO-9ZZ17 available. This JPM was written using Revision 16 of 40AO-9ZZ17.
If IC-107 is not available then perform the following to setup for this JPM:
x Imf cm SRRP01IRMSISAB_1 - MSIS relay failure x Imf cm TRRX12SGALT1114_4 - SG 1 high level transmitter failure x Override and OPEN Downcomer Isolation and MSIVs for SG 1 x Delete the two malfunctions entered above.
Page 2 of 13
 
S-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANTJPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o You may use any source of information normally available.
INITIAL CONDITIONS:
x  Unit 1 is at 2% power.
x  An inadvertent MSIS has occurred due to a power supply failure.
x  The CRS has implemented 40AO-9ZZ17, Inadvertent PPS-ESFAS Actuations.
x  The faulted power supply has been replaced.
INITIATING CUE:
x  The CRS directs you to reset MSIS, in accordance with appendix B of 40AO-9ZZ17, Inadvertent PPS-ESFAS Actuations.
Page 3 of 13
 
S-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*)denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 13
 
S-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
STEP                              CUE                          STANDARD
: 1.        Step 1 of Appendix B:                                              Examinee enters appendix entry time and date.
Enter Appendix Entry Time and Date:
SAT / UNSAT Comments (required for UNSAT):
STEP                              CUE                          STANDARD
: 2.        Step 2 of Appendix B:                                              Examinee writes MSIS.
Enter actuation(s) to be reset:
SAT / UNSAT Comments (required for UNSAT):
Notes before step 3:
x  Overriding equipment disables automatic ESFAS operation of the equipment. Depending on plant conditions, this action may make the equipment inoperable.
x  The HPSI, LPSI and CS pump minimum recirculation flow provides sufficient heat removal for only one hour of pump operation.
Page 5 of 13
 
S-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                            CUE                  STANDARD
: 3.      Step 3 of Appendix B:                                    Examinee NAs step based on cue provided.
IF the PPS-ESFAS actuation was caused by failure to reset the SG or PZR Pressure variable setpoints during a controlled cooldown, THEN perform the following:
SAT / UNSAT Comments (required for UNSAT):
STEP                              CUE                STANDARD
: 4.      Step 4 of Appendix B:                                      Examinee determines that the A train SG 1 level HI Bistable Check the Bistable Trip Lamps at trip lamp is lit.
the PPS Remote Operators Module (B05) for the affected PPS-ESFAS actuation input parameters on all PPS Channels satisfy ONE of the following x  NOT lit x  Bypassed SAT / UNSAT Comments (required for UNSAT):
Page 6 of 13
 
S-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                          CUE                  STANDARD
: 5.
* Contingency Step 4.1.                                  Examinee resets the A channel Bistable Trip Lamp on B05.
: a. Reset the affected Bistable Trip Lamps at the PPS Remote Operators Module (B05).                        Alternate Path Step SAT / UNSAT Comments (required for UNSAT):
STEP                          CUE                  STANDARD
: 6.      Step 5 of appendix B                                    Examinee determines that the A train MSIS initiation relay lamp is Check the affected PPS-ESFAS                            not lit.
actuation Initiation Relay lamps are illuminated at the PPS emote Operators Module (B05) on all PPS Channels.
SAT / UNSAT Comments (required for UNSAT):
STEP                          CUE                  STANDARD
: 7.
* Contingency Step 5.2.a                                  Examinee obtains the key for channel A.
x    Obtain the PPS Initiation Reset key for the affected                    Alternate Path Step Train.
SAT / UNSAT Comments (required for UNSAT):
Page 7 of 13
 
S-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                          CUE                  STANDARD
: 8.
* Contingency Step 5.2.b                                  Examinee unlocks the Initiation Path Reset Train on channel A.
x  Unlock the affected Initiation Path Reset Train (PPS Cabinets).
Alternate Path Step SAT / UNSAT Comments (required for UNSAT):
STEP                          CUE                  STANDARD
: 9.
* Contingency Step 5.2.c                                  Examinee resets the affected Initiation Path by depressing the x    Reset the affected                            appropriate (MSIS) Initiation Initiation Path by                            Path Reset pushbutton (PPS depressing the                                Cabinets).
appropriate Initiation Path Reset pushbutton (PPS Cabinets).
Alternate Path Step SAT / UNSAT Comments (required for UNSAT):
STEP                          CUE                  STANDARD
: 10. Contingency Step 5.2.d                                  Examinee locks the Initiation Path Reset Train (PPS x  Lock the Initiation Path                      Cabinets).Alternate Path Step Reset Train (PPS Cabinets).
SAT / UNSAT Comments (required for UNSAT):
Page 8 of 13
 
S-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                            CUE                  STANDARD
: 11. Contingency Step 5.2.e                                  Examinee removes the PPS Initiation Reset key.
x  Remove the PPS Initiation Reset key.                          Alternate Path Step SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                  STANDARD
: 12. Contingency Step 5.2.f                                    Examinee checks the affected Initiation Signal lamps are x  Check the affected                              illuminated for the affected PPS Initiation Signal lamps                          channels (On status panels above are illuminated for the                          PPS Cabinets).
affected PPS channels (On status panels above PPS Cabinets).                                  Alternate Path Step SAT / UNSAT Comments (required for UNSAT):
Page 9 of 13
 
S-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                        STANDARD
: 13. Step 6 of appendix B.                                              Examinee determines that the A train MSIS signal lamps are not Check the actuated PPS-ESFAS                                      illuminated.
leg 1-3 and leg 2-4 Actuation Signal lamps are illuminated for PPS Train A and Train B Actuation Signals (On status panels above PPS Cabinet A, SBAC01 and PPS Cabinet B, SBBC01).
SAT / UNSAT Comments (required for UNSAT):
STEP                              CUE                        STANDARD
: 14.
* Contingency Step 6.1.              Examiner Note:                  Examinee performs the Pressing either pushbutton S64A following:
Perform the following for the      or S74A will reset the MSIS affected Train(s):                LOCKOUT.                            a. Presses the LOCKOUT RESET pushbutton(s) for
: a. Press the LOCKOUT                                                  the affected PPS-ESFAS RESET pushbutton(s) for                                          actuation(s) (Aux Relay the affected PPS-ESFAS                                            Cabinets Bay 6 & 7).
actuation(s) (Aux Relay Cabinets Bay 6 & 7).                                          b. Checks both red ON lamps are illuminated for
: b. Check both red ON                                                the affected PPS-ESFAS lamps are illuminated for                                        actuation (Aux Relay the affected PPS-ESFAS    Inform Cue: Another operator            Cabinets Bay 6 & 7).
actuation (Aux Relay      will complete this appendix.
Alternate Path Step Cabinets Bay 6 & 7).
SAT / UNSAT Comments (required for UNSAT):
Page 10 of 13
 
S-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM STOP TIME:
NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparedness organization for resolution.
NORMAL TERMINATION POINT Page 11 of 13
 
S-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED 000          10/27/2011                      New JPM REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 12 of 13
 
S-6 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam EXAMINEE HANDOUT INITIAL CONDITIONS:
x  Unit 1 is at 2% power.
x  An inadvertent MSIS has occurred due to a power supply failure.
x  The CRS has implemented 40AO-9ZZ17, Inadvertent PPS-ESFAS Actuations.
x  The faulted power supply has been replaced.
INITIATING CUE:
x  The CRS directs you to reset MSIS, in accordance with appendix B of 40AO-9ZZ17, Inadvertent PPS-ESFAS Actuations.
Page 13 of 13
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ17        Revision 16 Page 54 of 89 INADVERTENT PPS-ESFAS ACTUATIONS Appendix B      Page 1 of 5 Appendix B, PPS-ESFAS Reset INSTRUCTIONS                        CONTINGENCY ACTIONS
____ 1. Enter Appendix Entry Time and Date:
________________
___ 2. Enter actuation(s) to be reset:
________________
 
PALO VERDE NUCLEAR GENERATING STATION                                            40AO-9ZZ17                    Revision 16 Page 55 of 89 INADVERTENT PPS-ESFAS ACTUATIONS Appendix B                Page 2 of 5 Appendix B, PPS-ESFAS Reset INSTRUCTIONS                                                CONTINGENCY ACTIONS
------------------------------------------------------------ NOTE -----------------------------------------------------------
Overriding equipment disables automatic ESFAS operation of the equipment.
Depending on plant conditions, this action may make the equipment inoperable.
------------------------------------------------------------ NOTE -----------------------------------------------------------
The HPSI, LPSI and CS pump minimum recirculation flow provides sufficient heat removal for only one hour of pump operation.
---------------------------------------------------------------------------------------------------------------------------------
___3.      IF the PPS-ESFAS actuation was caused by failure to reset the SG or PZR Pressure variable setpoints during a controlled cooldown, THEN perform the following:
: a. Direct I&C to clear the affected trip signals.
: b. Evaluate the need to override and position PPS-ESFAS actuated equipment.
REFER TO the appropriate attachment in Appendix C, PPS-ESFAS Check, for a list of actuated equipment.
: c. Override and position equipment as needed.
: d. WHEN the trip signals are cleared, THEN continue with this appendix.
 
PALO VERDE NUCLEAR GENERATING STATION              40AO-9ZZ17                Revision 16 Page 56 of 89 INADVERTENT PPS-ESFAS ACTUATIONS Appendix B              Page 3 of 5 Appendix B, PPS-ESFAS Reset INSTRUCTIONS                          CONTINGENCY ACTIONS
___4. Check the Bistable Trip Lamps at  ___ 4.1 Perform the following for any the PPS Remote Operators                    tripped input parameter:
Module (B05) for the affected PPS-ESFAS actuation input                    a. Reset the affected Bistable parameters on all PPS Channels                    Trip Lamps at the PPS satisfy ONE of the following.                    Remote Operators Module (B05).
* NOT lit
: b. IF the trip light will NOT reset,
* Bypassed                                      AND ANY parameter is tripped on two or more channels, THEN GO TO step 7.1 of this appendix.
 
PALO VERDE NUCLEAR GENERATING STATION                40AO-9ZZ17                Revision 16 Page 57 of 89 INADVERTENT PPS-ESFAS ACTUATIONS Appendix B              Page 4 of 5 Appendix B, PPS-ESFAS Reset INSTRUCTIONS                            CONTINGENCY ACTIONS
___5. Check the affected PPS-ESFAS        ___ 5.1 IF the AFAS 1 or 2 Initiation Relay actuation Initiation Relay lamps              lamps are NOT lit, are illuminated at the PPS Remote            THEN GO TO step 7.1 of this Operators Module (B05) on all                appendix.
PPS Channels.
___ 5.2 Perform the following for any de-energized PPS-ESFAS Initiation Path(s):
: a. Obtain the PPS Initiation Reset key for the affected Train.
: b. Unlock the affected Initiation Path Reset Train (PPS Cabinets).
: c. Reset the affected Initiation Path by depressing the appropriate Initiation Path Reset pushbutton (PPS Cabinets).
: d. Lock the Initiation Path Reset Train (PPS Cabinets).
: e. Remove the PPS Initiation Reset key.
: f. Check the affected Initiation Signal lamps are illuminated for the affected PPS channels (On status panels above PPS Cabinets).
: g. IF the Initiation Path will NOT reset, THEN GO TO step 7.1 of this appendix.
 
PALO VERDE NUCLEAR GENERATING STATION                  40AO-9ZZ17              Revision 16 Page 58 of 89 INADVERTENT PPS-ESFAS ACTUATIONS Appendix B          Page 5 of 5 Appendix B, PPS-ESFAS Reset INSTRUCTIONS                              CONTINGENCY ACTIONS
___6. Check the actuated PPS-ESFAS            ___ 6.1 Perform the following for the leg 1-3 and leg 2-4 Actuation                    affected Train(s):
Signal lamps are illuminated for PPS Train A and Train B                          a. Press the LOCKOUT RESET Actuation Signals                                    pushbutton(s) for the affected (On status panels above                              PPS-ESFAS actuation(s)
PPS Cabinet A, SBAC01 and                            (Aux Relay Cabinets PPS Cabinet B, SBBC01).                              Bay 6 & 7).
: b. Check both red ON lamps are illuminated for the affected PPS-ESFAS actuation (Aux Relay Cabinets Bay 6 & 7).
___7. IF the PPS-ESFAS actuation is          ___ 7.1 IF the PPS-ESFAS actuation will reset,                                          NOT reset, THEN GO TO ONE of the                            THEN perform the following:
following steps of this procedure as appropriate:                                  a. Evaluate the need to override and position
* Section 3.0, AFAS, step 10.                      PPS-ESFAS actuated equipment.
* Section 4.0, CIAS, step 9.                        REFER TO the appropriate attachment in Appendix C,
* Section 5.0, CSAS, step 20.
PPS-ESFAS Check, for a list
* Section 6.0, MSIS, step 13.                      of actuated equipment.
* Section 7.0, RAS, step 9.                    b. Override and position equipment as needed.
* Section 8.0, SIAS OR SIAS/
CIAS, step 16.
End of Appendix
 
S-7 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK: 0720010401 Perform manual PB switching operations TASK STANDARD: Offsite power has been paralleled to PBA-S03.
K/A:      3.6-062-A4.07                          K/A RATING:        RO:    3.1  SRO:        3.1 K/A:                                              K/A RATING:        RO:        SRO:
APPLICABLE POSITION(S):                  RO        VALIDATION TIME:                15 minutes
 
==REFERENCES:==
40OP-9PB01 SUGGESTED TESTING ENVIRONMENT: SIMULATOR X                            PLANT          OTHER JPM TYPE Time Critical? (Yes/No)      No                Alternative Path? (Yes/No)  No PRA/SRA related? (Yes/No)        No APPROVAL Developed By:            Jordan Johnston        Date:      04/18/2008 Revised By:                Alan Malley          Date:      10/21/2011 Technical Review                                  Operations Approval EP Review                          N/A            Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                    Date:
Evaluator Name:
Time to complete:                  Minutes        GRADE (Circle  One)  SAT / UNSAT *
* For E-Plan JPMs, a grade of UNSAT requires a PVAR to be written, remediation, and re-evaluation.
PVAR # _____________
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to the Emergency Preparedness organization for resolution.
Page 1 of 12
 
S-7 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. SIMULATOR SETUP:
This JPM is setup to run with either JS-4 or JS-8. Therefore the ICs are for two different situations. Pay close attention to the setup based on which JPM is running in parallel with this JPM.
A. IC#: If running with JS-8 use IC #112 If running with JS-4 use IC #110 B. SCENARIOS, MALFUNCTIONS, OVERRIDES, etc. for Setup:
COMMAND/COMMUNICATION                                        DESCRIPTION None C. SPECIAL INSTRUCTIONS:
x None D. REQUIRED CONDITIONS:
x Diesels carrying the class buses x One offsite power line now supplying the switchyard and down to NAN-X03 E. SIMULATOR EVALUATION PRE-CHECK Correct IC Alarm Silence Off Procedures available, page checked, and clean For JPMs administered during transients, another instructor available to control plant parameters.
Verified by: ____________________________          Date: ____________________
(NA if Simulator setup not required)
: 2. SPECIAL TOOLS/EQUIPMENT:
F. Copy of 40OP-9PB01 available. This JPM was written using Revision 24 of 40OP-9PB01.
: 3. JPM PERFORMANCE:
G. MALFUNCTIONS, OVERRIDES, etc. during JPM STEP        COMMAND/COMMUNICATION                                  DESCRIPTION N/A Page 2 of 12
 
S-7 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANT JPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o You may use any source of information normally available.
INITIAL CONDITIONS:
x  You are the third RO in Unit 1.
x  NBN-X03 tripped due to a faulty relay on the supply breaker.
x  The relay has been repaired.
x  NBN-X03 is now energized.
INITIATING CUE:
x  The CRS directs you to parallel offsite power back onto PBA-S03 per section 14 of 40OP-9PB01.
Page 3 of 12
 
S-7 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*) denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 12
 
S-7 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
STEP                              CUE                      STANDARD
: 1. Perform Prerequisites (section  If requested cue (as area      Examinee determines that all 14.2)                            operator):                    prerequisites are complete.
x  Diesel Generator A is supplying power to PBA-S03, isolated from offsite  Breaker PBA-S03L is racked in power.                      and available for operation.
x  Power is available from ESF Service Transformer NBN-X03.
x  Diesel Generator B is NOT paralleled with offsite power.
x  Breaker PBA-S03L is racked in and available for operation.
SAT / UNSAT Comments (required for UNSAT):
STEP                              CUE                      STANDARD
: 2. Step 14.3.1 and 14.3.1.1:        If requested cue: The Area    Examinee determines that DG A operator reports the Emergency is not in override.
IF Diesel Generator A is in the  Run lit is illuminated.
emergency mode, THEN perform the following:
: 1. Ensure DG B is NOT in override.
SAT / UNSAT Comments (required for UNSAT):
Page 5 of 12
 
S-7 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                            CUE                          STANDARD
: 3. Step 14.3.1.2:                    If requested Cue (as area        Examinee checks that Neutral operator):                      overvoltage, Overcurrent, and Ensure ALL of the following                                        Negative Sequential Trip are all alarm conditions are reset at    Neutral overvoltage,            reset.
DGA-B01:                          Overcurrent, and Negative x NEUTRAL                      Sequential Trip are all clear at OVERVOLTAGE                the Diesel Generator panel x OVERCURRENT x NEG SEQ TRIP SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                          STANDARD
: 4. Step 14.3.1.3:                                                    Examinee N/As step since there are no alarms.
IF ANY of the alarms are not reset, THEN ensure the alarms are reset per 40AL-9DG01, Diesel Generator A Alarm Responses.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                          STANDARD
: 5. Step 14.3.1.4:                    When Requested Cue:              Examinee obtains CRS permission to override DG A.
Obtain Control Room Supervisor    The CRS has given you permission to override the        permission to override Diesel emergency mode condition.        Generator A.
SAT / UNSAT Comments (required for UNSAT):
Page 6 of 12
 
S-7 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                            CUE                              STANDARD
: 6.
* Steps 14.3.1.5 and 14.3.1.6:                                          Examinee puts DG A in override.
x  Take DGA-HS-1 to Start x  Check the white OVERRIDE light on.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                              STANDARD
: 7.
* Step 14.3.2.1:                                                        Examinee places PEA-SS-G01D in the DROOP position.
Ensure PEA-SS-G01D, Diesel Generator A Speed Mode Select switch, is in the DROOP position.
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                              STANDARD
: 8.
* Step 14.3.2.2:                                                        Examinee places PBA-SS-S03L to ON.
Place PBA-SS-S03L, synchronizing switch for normal supply breaker PBA-S03L, in the ON position.
SAT / UNSAT Comments (required for UNSAT):
Note before step 14.3.2.3 Increasing Diesel Generator speed will cause the synchroscope to move in the slow direction and decreasing Diesel Generator speed will cause the synchroscope to move in the fast direction.
Page 7 of 12
 
S-7 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                      STANDARD
: 9.
* Step 14.3.2.3:                                                  Examinee adjusts DG A speed so the synchroscope is moving Adjust DG A speed using PEA-                                    slowly in the Fast direction.
SC-G01, Diesel Generator A Speed switch, to cause the synchroscope to move slowly in the Fast direction.
SAT / UNSAT Comments (required for UNSAT):
Note before step 14.3.2.4 Running Voltmeter MAN-EI-002R represents PBA-S03 Bus voltage. Incoming voltmeter MAN-EI-002I represents ESF Service Transformer voltage.
STEP                              CUE                      STANDARD
: 10.
* Step 14.3.2.4:                                                  Examinee matches voltages between DG A and NBN-X03 Match the DG voltage with the                                  (ESF Service Transformer)
ESF Service Transformer voltage                                  output.
using PEA-EC-G01, DG A                                          Examiner Note: The meters for Voltage Switch.                                                  this evolution are:
MAN-EI-002R for DG (PBA-S03)
MAN-EI-002I for NBN-X03.
SAT / UNSAT Comments (required for UNSAT):
Caution before Step 14.3.2.5 There is no sync-check protection on the normal supply breaker.
Page 8 of 12
 
S-7 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                        STANDARD
: 11.
* Step 14.3.2.5:                                                      Examinee closes PBA-S03L when the synchroscope is at the WHEN the synchroscope needle                                      12 oclock position.
is at the 12 oclock position, THEN close PBA-S03L.
SAT / UNSAT Comments (required for UNSAT):
STEP                              CUE                        STANDARD
: 12. Step 14.3.2.6:                                                      Examinee places the synch switch in the OFF position.
Place the synchronizing switch in the OFF position.
SAT / UNSAT Comments (required for UNSAT):
STEP                              CUE                        STANDARD
: 13. Step 14.3.2.7:                      INFORM CUE:
Unit 1 only: If it is desired to    The Diesel Generator will be continue to operate DG A, go to      shut down by another operator.
40OP-9DG01.
SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
NOTE:
Page 9 of 12
 
S-7 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparedness organization for resolution.
NORMAL TERMINATION POINT Page 10 of 12
 
S-7 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 11 of 12
 
S-7 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam EXAMINEE HANDOUT INITIAL CONDITIONS:
x  You are the third RO in Unit 1.
x  NBN-X03 tripped due to a faulty relay on the supply breaker.
x  The relay has been repaired.
x  NBN-X03 is now energized.
INITIATING CUE:
x  The CRS directs you to parallel offsite power back onto PBA-S03 per section 14 of 40OP-9PB01.
Page 12 of 12
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                              Page 44 of 78 Revision 4.16 kV Class 1E Power (PB)                          40OP-9PB01            24 14.0 MANUAL TRANSFER OF PBA-S03 FROM DIESEL GENERATOR A TO NBN-X03 14.1  Personnel Indoctrination 14.1.1  This section of the procedure transfers PBA-S03 from its emergency source of power to its normal source of power.
14.1.2  It should take approximately 10-15 minutes to transfer PBA-S03 from its emergency source of power, the emergency diesel generator, to its normal source of power NBN-X03.
14.2  Prerequisites
____  14.2.1  Diesel Generator A is supplying power to PBA-S03, isolated from offsite power.
____  14.2.2  Power is available from ESF Service Transformer NBN-X03.
____  14.2.3  Diesel Generator B is NOT paralleled with offsite power.
____  14.2.4  Breaker PBA-S03L is racked in and available for operation.
14.3  Instructions
____  14.3.1  IF Diesel Generator A is in the emergency mode, THEN perform the following:
____  1. Ensure Diesel Generator B is NOT in OVERRIDE.
____  2. Ensure ALL of the following alarm conditions are reset at DGA-B01:
* NEUTRAL OVERVOLTAGE
* OVERCURRENT
* NEG SEQ TRIP
____  3. IF ANY of the alarms are not reset, THEN ensure the alarms are reset per 40AL-9DG01, Diesel Generator A Alarm Responses.
____  4. Obtain Control Room Supervisor permission to override the emergency mode condition.
____  5. Take DGA-HS-1, Diesel Generator A START/STOP switch on B01, to the START position.
____  6. Check the white OVERRIDE light is illuminated.
 
NUCLEAR ADMINISTRATIVE AND TECHNICAL MANUAL                                                      Page 45 of 78 Revision 4.16 kV Class 1E Power (PB)                                              40OP-9PB01              24 14.3.2      Parallel Diesel Generator A to offsite power as follows:
____      1. Ensure PEA-SS-G01D, Diesel Generator A Speed Mode Select switch, is in the DROOP position.
____      2. Place PBA-SS-S03L, synchronizing switch for normal supply breaker PBA-S03L, in the ON position.
        ---------------------------------------- NOTE ----------------------------------------
Increasing Diesel Generator speed will cause the synchroscope to move in the slow direction and decreasing Diesel Generator speed will cause the synchroscope to move in the fast direction.
        ------------------------------------------------------------------------------------------------
____      3. Adjust DG A speed using PEA-SC-G01, Diesel Generator A Speed switch, to cause the synchroscope to move slowly in the Fast direction.
        ---------------------------------------- NOTE ----------------------------------------
Running Voltmeter MAN-EI-002R represents PBA-S03 Bus voltage. Incoming voltmeter MAN-EI-002I represents ESF Service Transformer voltage.
        ------------------------------------------------------------------------------------------------
____      4. Match the Diesel Generator voltage with ESF Service Transformer voltage using PEA-EC-G01, Diesel Generator A Voltage switch.
CAUTION There is no sync-check protection on the normal supply breaker.
____      5. WHEN the synchroscope needle is at the 12 oclock position, THEN close PBA-S03L.
____      6. Place the synchronizing switch in the OFF position.
____      7. Unit 1 only IF it is desired to continue to operate Diesel Generator A to prevent possible BOP-ESFAS lockup, THEN GO TO 40OP-9DG01, Emergency Diesel Generator A, section 6.0.
____      8. IF it is desired to shutdown Diesel Generator A, THEN GO TO 40OP-9DG01, Emergency Diesel Generator A, section 7.0 to unload and shutdown Diesel Generator A.
 
S-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM JPM BASIS INFORMATION TASK: 1240000401 Implement instructions and contingencies for Lower Mode Recovery procedure TASK STANDARD: Train B CS placed on SDC to the point of opening one injection valve.
K/A:      3.4 005 A4.01                            K/A RATING:        RO:    3.6 SRO:      3.4 K/A:                                                K/A RATING:        RO:        SRO:
APPLICABLE POSITION(S):                  RO        VALIDATION TIME:              15 minutes
 
==REFERENCES:==
40EP-9EO10, Standard Appendices, Appendix 240 SUGGESTED TESTING ENVIRONMENT: SIMULATOR X                              PLANT        OTHER JPM TYPE Time Critical? (Yes/No)      No                Alternative Path? (Yes/No)  No PRA/SRA related? (Yes/No)        No APPROVAL Developed By:              Larry Burton            Date:      11/01/2011 Revised By:                    N/A                Date:
Technical Review                                  Operations Approval EP Review                          N/A            Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                      Date:
Evaluator Name:
Time to complete:                  Minutes          GRADE (Circle  One)  SAT / UNSAT
* Page 1 of 14
 
S-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM
: 1. SIMULATOR SETUP:
x IC#: 112 (This IC is setup to run JS-7 and JS-8 together for the 2012 NRC exam) x Run scenario file: 2012 NRC JS-7 and 8 x SCENARIOS, MALFUNCTIONS, OVERRIDES,etc. for Setup:
COMMAND/COMMUNICATION                                        DESCRIPTION x SPECIAL INSTRUCTIONS:
o Run scenario file 2012 NRC JS-7 and 8 from the exam jump drive.
o  Hang caution tags on LPSI pump A o  Hang supplied equipment status tags on SIA-HV-683, SIB-UV-671 and SIB-HV-692 x REQUIRED CONDITIONS:
o None x SIMULATOR EVALUATION PRE-CHECK Correct IC Alarm Silence Off Procedures available, page checked, and clean For JPMs administered during transients, another instructor available to control plant parameters.
Verified by: ____________________________        Date: ____________________
(NA if Simulator setup not required)
: 2. SPECIAL TOOLS/EQUIPMENT:
x  40EP-9EO10. This JPM was written using Revision 69 of 40EP-9EO10 (SA-240).
: 3. JPM PERFORMANCE:
x MALFUNCTIONS, OVERRIDES, etc. during JPM STEP        COMMAND/COMMUNICATION                                  DESCRIPTION 4      (K-1) Closes SIB-V104                    CS B Suction Isolation 7      (K-2) Opens SIB-V185                      Shutdown Cooling Return to CS Page 2 of 14
 
S-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANTJPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o You may use any source of information normally available.
INITIAL CONDITIONS:
x Unit 1 was on SDC using LPSI pump B.
x LPSI pump B has tripped due to an 86 fault.
x LPSI Pump A is under clearance.
x The unit is in Mode 5 with RCS temperature is ~ 150&deg;F.
x RCS pressure is ~ 195 psia.
x An AO has been briefed and is standing by in the field to operate components as needed.
x CS pump B is not aligned for SDC operations.
INITIATING CUE:
x The CRS directs you to place Containment Spray pump B on Shutdown Cooling per Standard Appendix 240.
Page 3 of 14
 
S-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*)denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 14
 
S-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM JPM START TIME:
STEP                              CUE                        STANDARD
: 1. Step 1 of Appendix 240:                                      Examinee verifies that RCS temperature and pressure are Check ALL of the following:
within limits.
x CS Pump B is NOT running to support another success path                                  Examinee verifies that RCS level x RCS temperature is less                                is 101 ft. 6 in. or more.
than 185&deg;F [185&deg;F]
x RCS pressure is less than 210 [210 psia]
One SDC Pump Operation x RCS level is 101 ft. 6 in.
or more Two SDC Pump Operation x RCS level is 104 ft. 6 in.
or more SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                        STANDARD
: 2. Step 2 of Appendix 240:          When Requested Cue:          Examinee informs RP that CS pump B will be used for SDC Inform Radiation Protection and  RP and the effluent tech flow.
RMS Technician that Train B      acknowledge that CS pump B SDC is being placed in service. will be used for SDC flow.
SAT / UNSAT Comments (required for UNSAT):
Page 5 of 14
 
S-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM STEP                            CUE                      STANDARD
: 3. Step 3 of Appendix 240:                                        Examinee verifies that the support systems are running.
Check that ALL of the following support systems are in-service:
x  SP B x  EW B x  EC B SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                      STANDARD
: 4.
* Step 4 of Appendix 240:                                        Examinee verifies CS pump B not running and directs an AO to IF CS Pump B is NOT aligned close SIB-104 for standby SDC, THEN perform the following:                    Inform CUE:
: a. Direct an operator to close Direct the driver to activate SIB-V104, CS B            Key-1, wait 30 seconds then SUCTION ISOLATION.        report as AO that SIB-104 (CS (CS B Room)              pump B Suction Isolation) is CLOSED.
(continued)
SAT / UNSAT Comments (required for UNSAT):
Page 6 of 14
 
S-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM STEP                            CUE                        STANDARD
: 5.
* Step 4.b of Appendix 240:        If Requested Cue:              Examinee closes:
Close ALL of the following            a. SIB-HV-692 is verified      x  SIB-UV-665 valves:                                  closed and de-energized.
x  SIB-HV-658 x  SIB-HV-692, LPSI Pump                                        x  SIB-HV-693 B Suction From RWT            b. SIB-UV-671 is verified x  SIB-UV-668, LPSI Pump            closed and de-energized. x  SIB-HV-615 B Recirc Valve                                              x  SIB-HV-625 x  SIB-UV-665, Cntmt Spray Pump B Recirc x  SIB-HV-658, SDCHX B Outlet to Reactor Coolant Loops 2A/2B x  SIB-UV-671, Cntmt Spray B Discharge to Spray Header x  SIB-HV-693, Cntmt Spray SDC Hx B Bypass x  SIB-HV-695, LPSI Containment Spray from SDC Hx B Crosstie x  SIB-UV-615, LPSI B Injection Valve x  SIB-UV-625, LPSI B Injection Valve (continued)
SAT / UNSAT Comments (required for UNSAT):
Page 7 of 14
 
S-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM STEP                          CUE                  STANDARD
: 6.
* Step 4.c of Appendix 240:                              Examinee OPENS:
Open ALL of the following                                  x  SIB-HV-690 valves:                                                    x  SIB-HV-689 x  SIB-UV-652, Loop 2 to                          All other valves are verified SDC/LPSI Pump B                                OPEN.
Suction Valve x  SID-UV-654, Loop 2 to SDC LPSI Pump B Suction Valve x  SIB-UV-656, Loop 2 to SDC LPSI Pump B Suction Valve x  SIB-HV-690, SDC Loop B Warm-up Bypass Valve x  SIB-HV-689, Cntmt Spray Pump B Discharge to SDCHX B Valve x  SIB-HV-679, CS Pump B Discharge to SDCHX B x  SIB-HV-694, LPSI/CS to SDCHX B Cross-tie Vlv x  SIB-HV-696, SDCHX B Outlet to Reactor Coolant Loops 2A/2B Valve (continued)
SAT / UNSAT Comments (required for UNSAT):
Page 8 of 14
 
S-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM STEP                            CUE                        STANDARD
: 7.
* Step 4.d of Appendix 240:                                        Examinee throttles SIB-HV-307 to ~ 20% open.
Throttle SIB-HV-307, LPSI to SDCHX B Bypass Valve, to 20%
open.
(continued)
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                        STANDARD
: 8.
* Step 4.e of Appendix 240:        Inform CUE:                      Examinee directs AO to open SIB-V185.
Direct an operator to open SIB-  Direct the driver to activate V185, SHUTDOWN COOLING          Key-2, wait 30 seconds then RETURN TO CS(CS B            report as AO that SIB-V185 Room)                            (SHUTDOWN COOLING RETURN TO CS) is OPEN.
Check SIB-V185,SHUTDOWN COOLING RETURN TO CS is        The operator has checked the open using local valve stem      local valve stem position and it position indication.            indicates SIB-V185 is open.
SAT / UNSAT Comments (required for UNSAT):
Page 9 of 14
 
S-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM STEP                          CUE                  STANDARD
: 9.
* Step 5 of Appendix 240:                                Examinee starts CS pump B using SIB-HS-6.
WHEN SIB-V185, SHUTDOWN COOLING RETURN TO CS is open, THEN start CS Pump B.
SAT / UNSAT Comments (required for UNSAT):
STEP                          CUE                  STANDARD
: 10. Step 6 of Appendix 240:                                Examinee verifies CS pump current is less than 95 amps.
Check CS Pump running current is less than 95 amps.
SAT / UNSAT Comments (required for UNSAT):
STEP                          CUE                  STANDARD
: 11. Step 7 of Appendix 240:                                Examinee NAs this step since the plant is NOT in Mode 4.
IF the plant is in Mode 4, THEN throttle open SIB-HV-307 to establish a SDC flow of 4000 -
4750 gpm.
SAT / UNSAT Comments (required for UNSAT):
Page 10 of 14
 
S-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM STEP                          CUE                STANDARD
: 12. Step 8 of Appendix 240:                                Examinee verifies that flow is between 3780 and 4750 gpm on IF the plant is in Mode 5 or 6,                        SIB-FI-307 (B02).
THEN throttle open SIB-HV-307 to establish ONE of the following:
One SDC Pump with RCS Lvl 101 ft. 6 in. - 102 ft.
x 3780 - 4000 gpm One SDC Pump with RCS Lvl 102 ft. - 103 ft. 1 in.
x 3780 - 4600 gpm One SDC Pump with RCS Lvl greater than 103 ft. 1 in.
x 3780 - 4750 gpm Two SDC Pumps with RCS Lvl greater than 104 ft. 6 in.
x    3780 - 4750 gpm per loop SAT / UNSAT Comments (required for UNSAT):
Page 11 of 14
 
S-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM STEP                              CUE                            STANDARD
: 13.
* Step 9 of Appendix 240:                                                Examinee establishes and maintains a SDC flow of 3780 -
Perform the following to establish                                    4750 gpm as indicated on SIB-FI-SDC flow:                                                              307.
: a. Adjust SIB-HV-307 as necessary to maintain the desired SDC flow.
: b. Throttle open SIB-UV-615 to between 5- 15%.
: c. Throttle closed SIB-HV-690
: d. Maintain the SDC Heat Exchanger heatup rate to19&deg;F/min or less.
x SIB-TT-352X onSIB-      Examiner Note:
TR-352 x ERFDADS point            Once the examinee has SIT352X                established flow thru SIB-UV-615 and has commenced throttling SIB-HV-690 closed, then inform the examinee that another operator will complete Standard Appendix 240.
SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparedness organization for resolution.
NORMAL TERMINATION POINT Page 12 of 14
 
S-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED 000          11/01/11            6          New JPM REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 13 of 14
 
S-8 PVNGS JOB PERFORMANCE MEASURE 2012 NRC EXAM EXAMINEE HANDOUT INITIAL CONDITIONS:
x Unit 1 was on SDC using LPSI pump B.
x LPSI pump B has tripped due to an 86 fault.
x LPSI Pump A is under clearance.
x The unit is in Mode 5 with RCS temperature is ~ 150&deg;F.
x RCS pressure is ~ 195 psia.
x An AO has been briefed and is standing by in the field to operate components as needed.
x CS pump B is not aligned for SDC operations.
INITIATING CUE:
x The CRS directs you to place Containment Spray pump B on Shutdown Cooling per Standard Appendix 240.
Page 14 of 14
 
PALO VERDE NUCLEAR GENERATING STATION                  40EP-9EO10          Revision: 69 Page 1200 of 1350 STANDARD APPENDICES Appendix 240          Page 1 of 9 Appendix 240, LM - Placing Train B CS on SDC INSTRUCTIONS                              CONTINGENCY ACTIONS
____ 1. Check ALL of the following:            ____ 1.1 IF ANY of the following conditions exist:
* CS Pump B is NOT running to support another success path
* CS Pump is running in support of another success
* RCS temperature is less than                    path 185&deg;F [185&deg;F]
* RCS temperature is 185&deg;F
* RCS pressure is less than 210                    [185&deg;F] or more
[210 psia]
* RCS pressure 210 psia or One SDC Pump Operation                              more
* RCS level is 101 ft. 6 in. or
* RCS level is NOT appropriate more                                            for the number of SDC Pumps that will be running Two SDC Pump Operation THEN inform the CRS to use
* RCS level is 104 ft. 6 in. or another heat removal method.
more
____ 2. Inform Radiation Protection and RMS Technician that Train B SDC is being placed in service.
 
PALO VERDE NUCLEAR GENERATING STATION          40EP-9EO10            Revision: 69 Page 1201 of 1350 STANDARD APPENDICES Appendix 240            Page 2 of 9 INSTRUCTIONS                        CONTINGENCY ACTIONS
____ 3. Check that ALL of the following ____ 3.1 IF any of the support systems are support systems are inservice:            NOT inservice, AND are available to support
* SP B                                  Train B SDC, THEN place the appropriate
* EW B support system in service.
* EC B
____ 3.2 IF EW B is NOT available, THEN ensure that NC is cross tied to EW B for the SDC Hx that will be placed in service, REFER TO Appendix 244, LM - NC Cross Tie to EW Train B.
 
PALO VERDE NUCLEAR GENERATING STATION    40EP-9EO10        Revision: 69 Page 1202 of 1350 STANDARD APPENDICES Appendix 240      Page 3 of 9 INSTRUCTIONS                  CONTINGENCY ACTIONS
____ 4. IF CS Pump B is NOT aligned for standby SDC, THEN perform the following:
: a. Direct an operator to close SIB-V104, CS B SUCTION ISOLATION. (CS B Room)
: b. Close ALL of the following valves:
* SIB-HV-692, LPSI Pump B Suction From RWT Valve
* SIB-UV-668, LPSI Pump B Recirc Valve
* SIB-UV-665, Containment Spray Pump B Recirc Valve
* SIB-HV-658, SDCHX B Outlet to Reactor Coolant Loops 2A/2B Valve
* SIB-UV-671, Containment Spray B Discharge to Spray Header
* SIB-HV-693, Containment Spray SDC Hx B Bypass Valve
* SIB-HV-695, LPSI Containment Spray from SDC Hx B Crosstie Valve
* SIB-UV-615, LPSI B Injection Valve
* SIB-UV-625, LPSI B Injection Valve (continue)
 
PALO VERDE NUCLEAR GENERATING STATION    40EP-9EO10        Revision: 69 Page 1203 of 1350 STANDARD APPENDICES Appendix 240      Page 4 of 9 INSTRUCTIONS                  CONTINGENCY ACTIONS
____ 4. (continued)
: c. Open ALL of the following valves:
* SIB-UV-652, Loop 2 to SDC/
LPSI Pump B Suction Valve
* SID-UV-654, Loop 2 to SDC LPSI Pump B Suction Valve
* SIB-UV-656, Loop 2 to SDC LPSI Pump B Suction Valve
* SIB-HV-690, SDC Loop B Warm-up Bypass Valve
* SIB-HV-689, Containment Spray Pump B Discharge to SDCHX B Valve
* SIB-HV-679, CS Pump B Discharge to SDCHX B
* SIB-HV-694, LPSI/CS to SDCHX B Cross-tie Valve
* SIB-HV-696, SDCHX B Outlet to Reactor Coolant Loops 2A/2B Valve
: d. Throttle SIB-HV-307, LPSI to SDCHX B Bypass Valve, to 20% open.
(continue)
 
PALO VERDE NUCLEAR GENERATING STATION            40EP-9EO10            Revision: 69 Page 1204 of 1350 STANDARD APPENDICES Appendix 240            Page 5 of 9 INSTRUCTIONS                        CONTINGENCY ACTIONS
____ 4.  (Continued)
: e. Direct an operator to perform BOTH of the following:
: 1) Open SIB-V185, SHUTDOWN COOLING RETURN TO CS (CS B Room)
: 2) Check SIB-V185, SHUTDOWN COOLING RETURN TO CS is open using local valve stem position indication.
____ 5. WHEN SIB-V185, SHUTDOWN COOLING RETURN TO CS is open, THEN start CS Pump B.
____ 6. Check CS Pump running current    ____ 6.1 Reduce SDC flow until CS Pump is less than 95 amps.                      running current is less than 95 amps without allowing SDC flow to fall below ANY of the following:
* Mode 4 - 4000 gpm
* Mode 5 - 3780 gpm
* Mode 6 - 3780 gpm
____ 6.2 IF CS Pump current can NOT be reduced below 95 amps, THEN inform the CRS to consider another method of heat removal.
 
PALO VERDE NUCLEAR GENERATING STATION      40EP-9EO10        Revision: 69 Page 1205 of 1350 STANDARD APPENDICES Appendix 240      Page 6 of 9 INSTRUCTIONS                    CONTINGENCY ACTIONS
____ 7. IF the plant is in Mode 4, THEN throttle open SIB-HV-307 to establish a SDC flow of 4000 - 4750 gpm.
____ 8. IF the plant is in Mode 5 or 6, THEN throttle open SIB-HV-307 to establish ONE of the following:
One SDC Pump with RCS Lvl 101 ft. 6 in. - 102 ft.
* 3780 - 4000 gpm One SDC Pump with RCS Lvl 102 ft. - 103 ft. 1 in.
* 3780 - 4600 gpm One SDC Pump with RCS Lvl greater than 103 ft. 1 in.
* 3780 - 4750 gpm Two SDC Pumps with RCS Lvl greater than 104 ft. 6 in.
* 3780 - 4750 gpm per loop
 
PALO VERDE NUCLEAR GENERATING STATION        40EP-9EO10          Revision: 69 Page 1206 of 1350 STANDARD APPENDICES Appendix 240          Page 7 of 9 INSTRUCTIONS                    CONTINGENCY ACTIONS
____ 9. Perform the following to establish SDC flow:
: a. Adjust SIB-HV-307 to maintain SDC flow.
: b. Throttle open SIB-UV-615 to        b.1 IF SIB-UV-615 is between 5-15%.                        unavailable, THEN throttle open SIB-UV-635 to 5-15%.
: c. Throttle closed SIB-HV-690
: d. Maintain the SDC Heat              d.1 IF at any time the SDC Exchanger heatup rate to              Heat Exchanger heatup 19&deg;F/min or less.                      rate exceeds 19&deg;F/min, THEN reduce the flow
* SIB-TT-352X on                      through the SDC Heat SIB-TR-352                          Exchanger.
* ERFDADS point SIT352X
: e. WHEN the SDC Heat Exchanger heatup rate has stabilized, THEN throttle open SIB-UV-625 to between 5-15%.
: f. Adjust SIB-HV-658 as necessary to control RCS temperature.
____ 10. Maintain the RCS cooldown rate for the current plant conditions.
 
PALO VERDE NUCLEAR GENERATING STATION        40EP-9EO10        Revision: 69 Page 1207 of 1350 STANDARD APPENDICES Appendix 240      Page 8 of 9 INSTRUCTIONS                      CONTINGENCY ACTIONS
____ 11. Perform the following to close SIB-HV-690:
: a. Throttle the following valves incrementally to compensate for the closure of SIB-HV-690:
* SIB-UV-615
* SIB-UV-625
: b. Throttle close SIB-HV-690.
: c. WHEN SIB-HV-690 is closed, THEN perform the following:
: 1) Hold SIB-HS-690 in the closed position for five seconds.
: 2) Direct a second operator to hold SIB-HS-690 closed for an additional five seconds.
____ 12. Perform the following to fully open the LPSI Injection Valves:
: a. Throttle the following valves incrementally to maintain the desired SDC flow while fully opening the LPSI Injection Valves:
* SIB-HV-307
* SIB-HV-658
: b. Throttle open the LPSI Injection Valves.
 
PALO VERDE NUCLEAR GENERATING STATION                40EP-9EO10        Revision: 69 Page 1208 of 1350 STANDARD APPENDICES Appendix 240      Page 9 of 9 INSTRUCTIONS                            CONTINGENCY ACTIONS
____ 13. Adjust BOTH of the following valves to control RCS temperature and SDC flow rate:
* SIB-HV-658
* SIB-HV-306
____ 14. IF the RWLIS is in service, THEN perform the following:
: a. IF SDC Loop B is the only SDC loop in service, THEN place the Refueling Water Level Flow Compensation Selector in the CHANNEL B position.
: b. IF both SDC loops are in service, THEN place the Refueling Water Level Flow Compensation Selector in the BOTH position.
: c. Place the Refueling Water Level Alarm Enable Selector in the BOTH position.
____ 15. Inform the CRS that CS Pump B is on SDC.
End of Appendix
 
S-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK: 1240060201 - Verify proper CIAS/CSAS actuation TASK STANDARD: Ensure that a CIAS/CSAS has actuated and that an isolation valve has closed for each required penetration.
K/A:      3.7 012 A4.02                            K/A RATING:        RO:    3.3 SRO:        3.4 K/A:                                                K/A RATING:        RO:        SRO:
APPLICABLE POSITION(S):                  RO          VALIDATION TIME:              10 minutes
 
==REFERENCES:==
40EP9EO05, Excessive Steam Demand SUGGESTED TESTING ENVIRONMENT: SIMULATOR X                              PLANT        OTHER JPM TYPE Time Critical? (Yes/No)      No                Alternative Path? (Yes/No)  Yes PRA/SRA related? (Yes/No)        No APPROVAL Developed By:              Larry Burton            Date:    10/27/2011 Revised By:                    N/A                Date:
Technical Review                                    Operations Approval EP Review                          N/A              Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                      Date:
Evaluator Name:
Time to complete:                  Minutes          GRADE (Circle One)  SAT / UNSAT *
* For E-Plan JPMs, a grade of UNSAT requires a PVAR to be written, remediation, and re-evaluation.
PVAR # _____________
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to the Emergency Preparedness organization for resolution.
Page 1 of 9
 
S-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. SIMULATOR SETUP:
x      IC#: 111 x      SCENARIOS, MALFUNCTIONS, OVERRIDES, etc. for Setup:
COMMAND/COMMUNICATION                                          DESCRIPTION cm MVSW03WCBUV61_5                                      WC-UV-61 fail to auto close cm MVSW03WCAUV62_5                                      WC-UV-62 fail to auto close Scenario file -- no CSAS                                Prevents CSAS actuation Scenario file -- no SICI                                Prevents CIAS and SIAS actuation mf MS01A f:10                                          SG 1 ESD -10%
x    SPECIAL INSTRUCTIONS:
o None x    REQUIRED CONDITIONS:
o Stop RCPs 1A and 2A.
o Align AFB flow to SG 2.
o Wait for sequencer to finish starting equipment.
x    SIMULATOR EVALUATION PRE-CHECK Correct IC Alarm Silence Off Procedures available, page checked, and clean For JPMs administered during transients, another instructor available to control plant parameters.
Verified by:      N/A    Date: ____________________
(NA if Simulator setup not required)
: 2. SPECIAL TOOLS/EQUIPMENT:
x    40EP-9EO05 available. This JPM was written using Revision 26 of 40EP-9EO05.
: 3. JPM PERFORMANCE:
x    MALFUNCTIONS, OVERRIDES, etc. during JPM STEP          COMMAND/COMMUNICATION                                  DESCRIPTION Page 2 of 9
 
S-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANTJPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o You may use any source of information normally available.
INITIAL CONDITIONS:
x  Unit 1 automatically tripped due to an ESD on SG 1.
x  SPTAs have been completed.
x  The CRS has implemented 40EP-9EO05, Excess Steam Demand.
INITIATING CUE:
x  The CRS has directed you to verify plant conditions starting with step 23 of 40EP-9EO05, Excess Steam Demand.
Page 3 of 9
 
S-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*)denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 9
 
S-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
STEP                            CUE                      STANDARD
: 1.
* Step 23 of 40EP-9EO05            If Requested Cue:            Examinee determines that Containment pressure is > 3 psig IF containment pressure is      The CRS concurs with manual  and manually actuates CIAS.
3 psig or more, THEN check      CIAS actuation CIAS is actuated.                                              Alternate Path SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                      STANDARD
: 2.
* Step 24 of 40EP-9EO05            If Requested Cue:            Examinee checks SESS panels (B02) after CIAS actuation and IF CIAS has actuated,            The CRS concurs with closing  determines that the Chill Water THEN check that an isolation    WCB-UV-61 and WCA-UV-62.      (WC) return header has not valve is closed for each                                      properly isolated and closes containment penetration required Examiner Note: Closing either WCB-UV-62 and WCA-UV-61.
to be closed.                    valve will meet containment closure criteria.            Valves will stroke closed once they have been taken to close and picked up the Over-ride light.
Alternate Path SAT / UNSAT Comments (required for UNSAT):
Page 5 of 9
 
S-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                      STANDARD
: 3. Step 25 of 40EP-9EO05                                          Examinee leaves the CS pumps running because containment IF the following conditions exist:                            pressure is > 8.5 psig.
           
Pump(s) are operating on the miniflow(s)
            
expected to exceed 8.5 psig within one hour of the CS Pump start THEN stop the Containment Spray Pump(s).
SAT / UNSAT Comments (required for UNSAT):
STEP                              CUE                      STANDARD
: 4.
* Step 26 of 40EP-9EO05              If Requested Cue:          Examinee determines that Containment pressure is > 8.5 IF containment pressure is        The CRS concurs with manual psig and manually actuates 8.5 psig or more,                  CSAS actuation              CSAS.
THEN check CSAS is actuated.
Alternate Path SAT / UNSAT Comments (required for UNSAT):
Page 6 of 9
 
S-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                                CUE                        STANDARD
: 5.
* Step 27 of 40EP-9EO05                                                Examinee performs the following:
IF CSAS has actuated, THEN perform the following:
: a. Ensure at least one                                              a. Verifies that both CS Containment Spray                                                  header flows are > 4350 header flow is greater                                              gpm.
than 4350 gpm.
: b. Ensure all RCPs are off.                                        b. Stops RCPs 1B and 2B.
: c. Ensure RCP controlled bleedoff flow is isolated.
: d. PERFORM Appendix 19,                                            c. Isolates controlled Containment Hydrogen                                                bleedoff by closing (B03)
Control to align the Hydrogen recombiners.                                                  o    RCN-HS-430 Inform Cue: After the                      o    RCN-HS-431 examinee closes the BO valves :            o    RCN-HS-432 o    RCN-HS-433 Another operator will perform the remaining steps.
SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparedness organization for resolution.
NORMAL TERMINATION POINT Page 7 of 9
 
S-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED 000          10/27/2011                      New JPM REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 8 of 9
 
S-9 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam EXAMINEE HANDOUT INITIAL CONDITIONS:
x  Unit 1 automatically tripped due to an ESD on SG 1.
x  SPTAs have been completed.
x  The CRS has implemented 40EP-9EO05, Excess Steam Demand.
INITIATING CUE:
x  The CRS has directed you to verify plant conditions starting with step 23 of 40EP-9EO05, Excess Steam Demand.
Page 9 of 9
 
PALO VERDE NUCLEAR GENERATING STATION                        40EP-9EO05            Revision 26 Page 14 of 45 EXCESS STEAM DEMAND INSTRUCTIONS                                CONTINGENCY ACTIONS
: 22. IF the break is inside Containment, THEN place the Hydrogen Analyzers in service.
: 23. IF containment pressure is                    23.1 Manually actuate CIAS.
3 psig or more, THEN check CIAS is actuated.
CAUTION High radiation levels may result in personnel exposure when attempting local manual valve operation.
: 24. IF CIAS has actuated,                        24.1 Ensure that an isolation valve is closed THEN check that an isolation valve is              for each containment penetration closed for each containment                        required to be closed.
penetration required to be closed.
: 25. IF the following conditions exist:
* The Containment Spray Pump(s) are operating on the miniflow(s)
* Containment pressure is not expected to exceed 8.5 psig within one hour of the CS Pump start THEN stop the Containment Spray Pump(s).
: 26. IF containment pressure is                    26.1 Manually actuate CSAS.
8.5 psig or more, THEN check CSAS is actuated.
 
PALO VERDE NUCLEAR GENERATING STATION        40EP-9EO05        Revision 26 Page 15 of 45 EXCESS STEAM DEMAND INSTRUCTIONS                  CONTINGENCY ACTIONS
: 27. IF CSAS has actuated, THEN perform the following:
: a. Ensure at least one Containment Spray header flow is greater than 4350 gpm.
: b. Ensure all RCPs are off.
: c. Ensure RCP controlled bleedoff flow is isolated.
: d. PERFORM Appendix 19, Containment Hydrogen Control to align the Hydrogen recombiners.
: 28. IF SIAS has actuated, THEN perform the following:
: a. Energize SIAS Load Shed Panels.
REFER TO Appendix 21, List of SIAS Load Shed Panels.
: b. PERFORM Appendix 17, Restoration of Containment Cooling.
 
P-1 PVNGS JOB PERFORMANCE MEASURE JPM BASIS INFORMATION TASK: 1250440201 Respond to a Control Room Fire TASK STANDARD: First 7 steps of Appendix W of 40AO-9ZZ19 to align SDC for service completed.
K/A:      4.2 067 AA2.16                        K/A RATING:        RO:    3.3 SRO:          4.0 K/A:                                              K/A RATING:        RO:          SRO:
APPLICABLE POSITION(S):                AO/RO      VALIDATION TIME:                20 minutes
 
==REFERENCES:==
40AO-9ZZ19, Control Room Fire, Appendix W SUGGESTED TESTING ENVIRONMENT: SIMULATOR                              PLANT    X    OTHER JPM TYPE Time Critical? (Yes/No)      No              Alternative Path? (Yes/No)  Yes PRA/SRA related? (Yes/No)        No APPROVAL Developed By:              Alan Malley          Date:      09-30-2012 Revised By:                    N/A              Date:
Technical Review                                Operations Approval EP Review                          N/A          Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                    Date:
Evaluator Name:
Time to complete:                  Minutes        GRADE (Circle  One)  SAT / UNSAT *
* For E-Plan JPMs, a grade of UNSAT requires a PVAR to be written, remediation, and re-evaluation.
PVAR # _____________
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to the Emergency Preparedness organization for resolution.
Page 1 of 11
 
P-1 PVNGS JOB PERFORMANCE MEASURE
: 1. SPECIAL TOOLS/EQUIPMENT:
x A copy of 40AO-9ZZ19, Control Room Fire, Appendix W (up to Step 7) available.
This JPM was written using Revision 26 of 40AO-9ZZ19.
Page 2 of 11
 
P-1 PVNGS JOB PERFORMANCE MEASURE TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANT JPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o  You may use any source of information normally available.
INITIAL CONDITIONS:
x    A Control Room fire has occurred.
x    The CRS has entered 40AO-9ZZ19, Control Room Fire.
x    The plant is being cooled down to SDC conditions.
INITIATING CUE:
x    The CRS directs you to perform Appendix W, Placing SDC Train B in Service.
The vent hoses have been installed per Attachment W-2.
Page 3 of 11
 
P-1 PVNGS JOB PERFORMANCE MEASURE INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*) denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 11
 
P-1 PVNGS JOB PERFORMANCE MEASURE JPM START TIME:
STEP                            CUE                      STANDARD
: 1.      Step 1 of Appendix W:                                          Examinee enters current date and time.
Enter Appendix Entry Time and Date:
SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                      STANDARD
: 2.      Step 2 of Appendix W:            IF REQUESTED CUE: Vent hoses have been installed per Ensure vent hoses have been      Attachment W-2 installed per Attachment W-2, Periodic Venting of SDC Train B.
SAT / UNSAT Comments (required for UNSAT):
Page 5 of 11
 
P-1 PVNGS JOB PERFORMANCE MEASURE STEP                            CUE                              STANDARD
: 3.
* Step 3 of Appendix W:          If Requested Cue (before valve      Examinee uses the handswitch on operation):                          breaker PHB-M3804 to close SIB-Close SIB-HV-689, CS B                                              HV-689.
Discharge. (PHB-M3804)              Red light is ON, Green light is OFF.
INFORM CUE (after handswitch operation):
Red light is OFF, Green light is ON SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                              STANDARD
: 4.      Step 4 of Appendix W:          If Requested Cue (before valve      Examinee attempts to close SIB-HV-operation):                          695 from the breaker handswitch.
Close SIB-HV-695, LPSI-CS From                                      Valve does not close so examinee SDHX B X-Tie. (PHB-M3810)            Red light is ON, Green light is goes to contingency step 4.1.
OFF.
INFORM CUE (after handswitch operation):
Red light is ON, Green light is OFF SAT / UNSAT Comments (required for UNSAT):
Page 6 of 11
 
P-1 PVNGS JOB PERFORMANCE MEASURE STEP                            CUE                              STANDARD
: 5.
* Step 4.1 of Appendix W:        Inform Cue (after examinee          Examinee engages clutch on SIB-simulates closing valve):            HV-695 and turns handwheel in the Manually close SIB-HV-695 (SDC                                      counter-clockwise direction.
Hx Valve Gallery)              The handwheel has been rotated in the clockwise direction and has stopped moving as expected. The stem is down.                        ALTERNATE PATH SAT / UNSAT Comments (required for UNSAT):
STEP                            CUE                              STANDARD
: 6.
* Step 5 of Appendix W:          If Requested Cue (before valve      Examinee uses the handswitch on operation):                          breaker PHB-M3609 to close SIB-Close SIB-UV-668, LPSI Pump B                                        UV-668.
Recirc. (PHB-M3609)                  Red light is ON, Green light is OFF.
INFORM CUE (after handswitch operation):
Red light is OFF, Green light is ON SAT / UNSAT Comments (required for UNSAT):
Page 7 of 11
 
P-1 PVNGS JOB PERFORMANCE MEASURE STEP                              CUE                            STANDARD
: 7.
* Step 6 of Appendix W:            If Requested Cue (before valve        Examinee uses the handswitch on operation):                          breaker PHB-M3805 to close SIB-Close SIB-HV-692, LPSI Pump                                            HV-692.
Suction from RWT. (PHB-M3805)          Red light is ON, Green light is OFF.
INFORM CUE (after handswitch operation):
Red light is OFF, Green light is ON SAT / UNSAT Comments (required for UNSAT):
STEP                              CUE                            STANDARD
: 8.
* Step 7 of Appendix W:            If Requested Cue (before valve        Examinee uses the handswitch on operation):                          breaker PHB-M3412 to close SIB-Close SIB-HV-658, SDHX B                                              HV-658.
Outlet to RC Loops 2A/2B Valve.        Red light is ON, Green light is (PHB-M3412)                            OFF.
INFORM CUE (after handswitch operation):
Red light is OFF, Green light is ON INFORM CUE (after completion of this step): Another operator will complete this appendix.
SAT / UNSAT Comments (required for UNSAT):
Page 8 of 11
 
P-1 PVNGS JOB PERFORMANCE MEASURE JPM STOP TIME:
NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparedness organization for resolution.
NORMAL TERMINATION POINT Page 9 of 11
 
P-1 PVNGS JOB PERFORMANCE MEASURE RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED 0          09/30/2012            6          Record created.
REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 10 of 11
 
P-1 PVNGS JOB PERFORMANCE MEASURE EXAMINEE HANDOUT INITIAL CONDITIONS:
x  A Control Room fire has occurred.
x  The CRS has entered 40AO-9ZZ19, Control Room Fire.
x  The plant is being cooled down to SDC conditions.
INITIATING CUE:
x  The CRS directs you to perform Appendix W, Placing SDC Train B in Service. The vent hoses have been installed per Attachment W-2.
Page 11 of 11
 
Examinee Handout X
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ19          Revision 26 Page 166 of 195 CONTROL ROOM FIRE Appendix W          Page 1 of 11 Appendix W, Placing SDC Train B in Service INSTRUCTIONS                          CONTINGENCY ACTIONS
____ 1. Enter Appendix Entry Time and Date:
________________
___ 2. Ensure vent hoses have been installed per Attachment W-2, Periodic Venting of SDC Train B.
___ 3. Close SIB-HV-689, CS B            ___ 3.1  Manually close SIB-HV-689.
Discharge. (PHB-M3804)                    (CS Pump Room B)
___ 4. Close SIB-HV-695, LPSI-CS        ___ 4.1  Manually close SIB-HV-695 From SDHX B X-Tie.                        (SDC Hx Valve Gallery)
(PHB-M3810)
___ 5. Close SIB-UV-668, LPSI Pump B    ___ 5.1  Manually close SIB-UV-668.
Recirc. (PHB-M3609)                        (LPSI B Pump Room)
___ 6. Close SIB-HV-692, LPSI Pump      ___ 6.1  Manually close SIB-UV-692.
Suction from RWT. (PHB-M3805)              (LPSI B Pump Room)
___ 7. Close SIB-HV-658, SDHX B          ___ 7.1  Manually close SIB-HV-658.
Outlet to RC Loops 2A/2B Valve.            (SDHX B Room)
(PHB-M3412)
___ 8. Ensure that BOTH of the following LPSI Injection Valves are closed:
* SIB-UV-615 (PHB-M3606)
* SIB-UV-625 (PHB-M3621)
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ19          Revision 26 Page 167 of 195 CONTROL ROOM FIRE Appendix W          Page 2 of 11 Appendix W, Placing SDC Train B in Service INSTRUCTIONS                        CONTINGENCY ACTIONS
___ 9. Open SIB-UV-652, SDC Suction    ___ 9.1  Manually open SIB-UV-652.
Valve. (PHB-M3604)                        (90 CTMT outside 2A RCP Room)
___ 10. Unlock and close PKD-B44, Power Supply Disconnect for SID-UV-654.
(Battery Room D)
___ 11. Open SID-UV-654, Loop 2 to      ___ 11.1 Manually open SID-UV-654.
Shutdown Cooling LPSI Pump                (90 CTMT East)
Suction Valve, using the local keyswitch.
(Battery Room D)
___ 12. Open SIB-UV-656, RC Loop 2      ___ 12.1 Manually open SIB-UV-656 SDC-LPSI Pump Suction Valve.              (East Pen Room)
(PHB-M3605)
___ 13. Open SIB-HV-690, RC Loop B      ___ 13.1 Manually open SIB-HV-690 Warmup Bypass Valve.                      (East Pen Room)
(PHB-M3806)
___ 14. Open SIB-HV-694, LPSI-CS to      ___ 14.1 Manually open SIB-HV-694 SDHX B X-Tie Valve.                      (SDC Valve Gallery)
(PHB-M3414)
___ 15. Open SIB-HV-696, SDHX B Outlet  ___ 15.1 Manually open SIB-HV-696 to RC Loops 2A/2B Valve.                  (SDC Valve Gallery)
(PHB-M3415)
 
PALO VERDE NUCLEAR GENERATING STATION              40AO-9ZZ19              Revision 26 Page 168 of 195 CONTROL ROOM FIRE Appendix W              Page 3 of 11 Appendix W, Placing SDC Train B in Service INSTRUCTIONS                          CONTINGENCY ACTIONS
___ 16. Throttle SIB-HV-307, LPSI-SDHX      ___ 16.1 Manually throttle SIB-HV-307 to B Bypass Valve to approximately              approximately 20% open.
20% open.                                    (LPSI B Pump Room)
(PHB-M3803)
___ 17. Inform the CRS that LPSI B is ready to be started.
___ 18. WHEN LPSI B is running,            ___ 18.1 WHEN LPSI B is running, THEN throttle SIB-HV-307, to                THEN manually throttle establish a flowrate of 4000 - 5000          SIB-HV-307 to establish a flowrate gpm as indicated by a d/p of 2.5 -          of 4000 - 5000 gpm as indicated 3.3 psid on the temporary flow              by a d/p of 2.5 - 3.3 psid on the instrument. (PHB-M3803)                      temporary flow instrument.
(LPSI B Pump Room)
___ 19. Perform the following to begin heating up the SDC Loop:
: a. Throttle open SIB-UV-615,              a.1  Manually open SIB-UV-615.
LPSI Header to RC Loop 2A                  (88 East Wrap) to begin the heatup.
(PHB-M3606)
: b. WHEN the SDC Loop                      b.1  WHEN the SDC Loop heatup rate has stabilized,                heatup rate has stabilized, THEN throttle open                          THEN manually open SIB-UV-625, LPSI Header to                  SIB-UV-625.
RC Loop 2B to continue the                  (88 East Wrap) heatup.
(PHB-M3621)
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ19          Revision 26 Page 169 of 195 CONTROL ROOM FIRE Appendix W          Page 4 of 11 Appendix W, Placing SDC Train B in Service INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 20. IF the heatup rate on the SDHX exceeds 19&deg;F/min, THEN adjust warmup flow through the SDC Loop to reduce the heatup rate.
___ 21. Maintain ALL of the following while SDC is in service:
* SDC flowrate
* Desired RCS cooldown rate
* A SDHX heatup rate less than 19&deg;F/min
___ 22. Incrementally adjust ALL of the following valves to stop the warm up bypass flow:
* SIB-UV-615 (PHB-M3606)
* SIB-UV-625 (PHB-M3621)
* SIB-HV-690 (PHB-M3806)
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ19          Revision 26 Page 170 of 195 CONTROL ROOM FIRE Appendix W          Page 5 of 11 Appendix W, Placing SDC Train B in Service INSTRUCTIONS                        CONTINGENCY ACTIONS
___ 23. WHEN closed indication for SIB-HV-690 is received, THEN perform the following:
: a. Hold the handswitch in the closed position for five seconds. (PHB-M3806)
: b. Direct a second operator to hold the handswitch closed for an additional five seconds.
___ 24. Incrementally adjust ALL of the following valves to fully open the loop injection valves:
* SIB-UV-615 (PHB-M3606)
* SIB-UV-625 (PHB-M3621)
* SIB-HV-307 (PHB-M3803)
___ 25. Adjust SIB-HV-658 (PHB-M3412) and SIB-HV-307 (PHB-M3803) as needed to maintain BOTH of the following:
* SDC flowrate 4000 - 5000 gpm as indicated by a d/p of 2.5 - 3.3 psid on the temporary flow instrument
* Desired RCS cooldown rate
 
PALO VERDE NUCLEAR GENERATING STATION                                                                        40AO-9ZZ19                        Revision 26 Page 171 of 195 CONTROL ROOM FIRE Appendix W                        Page 6 of 11 Attachment W-1, SDC-B Simplified Drawing                                                                                                      Page 1 of 1 UV-625 UV-615 HV-658 UV-671            HV-307 HV-696 HV-695 HV-694 HV-689 HV-679 HV-668 HV-693 RWT CS B                              LPSI B HPSI B        HV-690 CHB-HV-530 HV-692 RAS                                    UV-656        UV-654  UV-652
 
PALO VERDE NUCLEAR GENERATING STATION                                            40AO-9ZZ19                    Revision 26 Page 172 of 195 CONTROL ROOM FIRE Appendix W                    Page 7 of 11 Attachment W-2, Periodic Venting of SDC Train B [Ref. Step 4.13]                                            Page 1 of 5 INSTRUCTIONS                                                CONTINGENCY ACTIONS
------------------------------------------------------------ NOTE -----------------------------------------------------------
Implement this Appendix, as necessary, per the following criteria:
* As soon as possible after lowering SDCHX inlet temperature below 190&deg;F.
* Once per shift when heating up or cooling down.
* Once every three days while at steady state condition (no change in temperature or pressure) after three successive gas free vents have occurred at steady state.
---------------------------------------------------------------------------------------------------------------------------------
___ 1.        Remove pipe cap from the following vent valves:
* SIB-V886 (Upper Level in the East Penetration Room)
* SIB-V870 (Upper Level in the East Penetration Room)
* SIB-V019 (CS Pump B Room)
* Unit-1 Only SIB-V1029 (Upper level of the East Penetration Room)
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ19        Revision 26 Page 173 of 195 CONTROL ROOM FIRE Appendix W        Page 8 of 11 Attachment W-2, Periodic Venting of SDC Train B                Page 2 of 5 INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 2. Install a hose adaptor on the following vent valves:
* SIB-V886
* SIB-V870
* SIB-V019
* Unit-1 Only SIB-V1029
___ 3. Connect hoses as follows:
: a. Connect one hose end to hose adaptor of the following valves:
* SIB-V886
* SIB-V870
* SIB-V019
* Unit-1 Only SIB-V1029
: b. Connect other hose end to ONE of the following:
* Floor drain
* As directed by Radiation Protection
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ19        Revision 26 Page 174 of 195 CONTROL ROOM FIRE Appendix W        Page 9 of 11 Attachment W-2, Periodic Venting of SDC Train B [              Page 3 of 5 INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 4. Ensure SDC temperature is less than 190&deg;F.
(SIB-TI-352X at RSP).
___ 5. Inform Radiation Protection that SDC header B is to be vented.
___ 6. Perform the following to vent through SIB-V886:
: a. Open SIB-V886 1/4 to 1/2 turn.
: b. Check no air is present,          b.1 Open SIB-886 to 2 turns.
during the vent.
: c. Maintain SIB-V886 open for 2 to 3 minutes after a solid stream of water is observed.
: d. Close SIB-V886.
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ19        Revision 26 Page 175 of 195 CONTROL ROOM FIRE Appendix W      Page 10 of 11 Attachment W-2, Periodic Venting of SDC Train B                Page 4 of 5 INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 7. Perform the following to vent through SIB-V870
: a. Unlock SIB-V870 per 40AC-0ZZ06, Locked Valve, Breaker and Component Control.
: b. Open SIB-V870 1/4 to 1/2 turn.
: c. Check no air is present, c.1 Open SIB-V870 to 2 turns.
during the vent.
: d. Maintain SIB-V870 open for 2 to 3 minutes after a solid stream of water is observed.
: e. Close SIB-V870.
___ 8. Perform the following to vent through SIB-V019
: a. Open SIB-V019 1/4 to 1/2 turn.
: b. Check no air is present,          b.1 Open SIB-V019 to 2 turns.
during the vent.
: c. Maintain SIB-V019 open for 2 to 3 minutes after a solid stream of water is observed.
: d. Close SIB-V019.
 
PALO VERDE NUCLEAR GENERATING STATION                  40AO-9ZZ19        Revision 26 Page 176 of 195 CONTROL ROOM FIRE Appendix W      Page 11 of 11 Attachment W-2, Periodic Venting of SDC Train B                        Page 5 of 5 INSTRUCTIONS                              CONTINGENCY ACTIONS
___ 9. Unit-1 Only Perform the following to vent through SIB-V1029
: a. Open SIB-V1029 1/4 to 1/2 turn.
: b. Check no air is present,                  b.1 Open SIB-V1029 to 2 turns.
during the vent.
: c. Maintain SIB-V1029 open for 2 to 3 minutes after a solid stream of water is observed.
: d. Close SIB-V1029.
___ 10. Verify the following valves closed using independent verification per 02DP-0ZZ01, Verification of Plant Activities:
: a. SIB-V886
: b. SIB-V870
: c. SIB-V019
: d. Unit-1 Only SIB-V1029
___ 11. Inform the Shift Manager/CRS that venting of the SDC header B is complete.
End of Appendix
 
P-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK: 1240023901 Perform operation of AFA-P01 at the Remote Shutdown Panel TASK STANDARD:            Feeding the Steam Generators with AFA-P01 from the Remote Shutdown Panel K/A:      3.4-061-A3.01                          K/A RATING:        RO:    4.2 SRO:        4.2 K/A:                                              K/A RATING:        RO:        SRO:
APPLICABLE POSITION(S):                  RO        VALIDATION TIME:                20 minutes
 
==REFERENCES:==
40AO-9ZZ18, Shutdown Outside Control Room, Appendix E SUGGESTED TESTING ENVIRONMENT: SIMULATOR                              PLANT    X    OTHER JPM TYPE Time Critical? (Yes/No)      No                Alternative Path? (Yes/No)  No PRA/SRA related? (Yes/No)        Yes APPROVAL Developed By:              Alan Malley          Date:      10/02/2007 Revised By:                Alan Malley          Date:      08/24/2011 Technical Review                                  Operations Approval EP Review                          N/A            Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                    Date:
Evaluator Name:
Time to complete:                  Minutes        GRADE (Circle  One)  SAT / UNSAT *
* For E-Plan JPMs, a grade of UNSAT requires a PVAR to be written, remediation, and re-evaluation.
PVAR # _____________
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to the Emergency Preparedness organization for resolution.
Page 1 of 11
 
P-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. SPECIAL TOOLS/EQUIPMENT:
x A copy of Appendix E of 40AO-9ZZ18. This JPM was written using Revision 11 of 40AO-9ZZ18.
x If locks are broken on doors for the RSP, replacement locking devices (obtained from Shift Manager) will be needed to relock the RSP after each JPM.
Page 2 of 11
 
P-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANT JPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o You may use any source of information normally available.
INITIAL CONDITIONS:
x  The CRS has entered 40AO-9ZZ18, Shutdown Outside Control Room.
INITIATING CUE:
x  The CRS directs you to perform Appendix E, Auxiliary Feed Pump Operations, to start and feed the Steam Generators using AFA-P01 (Train A Auxiliary Feedwater Pump) from the Remote Shutdown Panel.
Page 3 of 11
 
P-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*) denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 11
 
P-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
STEP                                CUE                              STANDARD
: 1.      Step 1 of Appendix E:                                                    Examinee enters date and time Enter Appendix Entry Time and Date:________________
SAT / UNSAT Comments (required for UNSAT):
STEP                                CUE                              STANDARD
: 2.      Step 2 of Appendix E:                                                    Examinee NAs this step since initiating cue directed use of AFA-IF AFB-P01 will be used, THEN                                            P01.
perform the following:..
SAT / UNSAT Comments (required for UNSAT):
Note prior to step 3:
AFA-HS-52A, Turbine Driven AFW Pump Speed Control Transfer, switch position must be changed as rapidly as possible to minimize the chances of an overspeed trip.
Page 5 of 11
 
P-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                          CUE                            STANDARD
: 3.      Step 3.a of Appendix E:          Inform Cue:                        Examinee simulates turning the After the examinee simulates      speed potentiometer in the counter-IF AFA-P01 will be used, THEN    turning the speed potentiometer    clockwise direction until the dial is at perform the following:          counter-clockwise provide the      minimum.
Adjust AFA-SK-52B, Auxiliary    following cue:
Feedwater Pump A Speed to        The potentiometer has stopped minimum.                        moving and reads 0.
SAT / UNSAT Comments (required for UNSAT):
STEP                          CUE                            STANDARD
: 4.
* Step 3.b of Appendix E:          Inform Cue:                        Examinee simulates turning the speed control transfer switch left to After the examinee simulates Place AFA-HS-52A, Speed Control                                    the REMOTE SHUTDOWN turning the speed control transfer Transfer, to the REMOTE                                            position.
handswitch to the REMOTE SHUTDOWN position.              SHUTDOWN position provide the following cue:
The handswitch is pointing to the left.
SAT / UNSAT Comments (required for UNSAT):
Page 6 of 11
 
P-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                            CUE                            STANDARD
: 5.
* Step 3.c of Appendix E:        If Requested Cue:                  Examinee simulates opening either SGA-UV-134 or SGA-UV-138.
The CRS states you can use either Open ONE of the following      valve.
Steam Supply Valves:            Inform Cue:                        EXAMINER NOTE:
x    SGA-UV-134      After the examinee simulates      The indication is as follows:
x    SGA-UV-138      turning handswitch for either SGA-UV-134 or SGA-UV-138 provide the following cue for the  When the SGA-UV-134 (or 138) appropriate valves:                handswitch is taken to open the top lights (#1) for 134A (138A) will go The indication for SGA-UV-134A from green to red. After ~ 30 or 138A (as appropriate) red light seconds the bottom lights (#2) for is on.
134 (138) will go from green to red.
Thirty (30) seconds later the red light for SGA-UV-134 or 138 (as appropriate) came on and both            (#1)                (#1)
Green lights are off.
Green                Red Speed is approximately 1000 rpm.        134A                134A Green                Red 134        134      134
(#2)                (#2)
SAT / UNSAT Comments (required for UNSAT):
Page 7 of 11
 
P-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                        STANDARD
: 6.
* Step 3.d of Appendix E:            Inform Cue:                      The examinee adjusts the potentiometer to raise speed to 3590-As the examinee goes to increase Adjust turbine speed using AFA-SK-                                  3600 rpm in Unit 1 and 3 or 3560-on the speed potentiometer:
52B to ONE of the following:                                        3570 in Unit 2.
Unit 1 and 3 Cue:
Unit 1 & 3 only -
x  Speed is 3600 rpm x    3590-3600 rpm Unit 2 Cue:
Unit 2 only x  Speed is 3560 rpm x    3560-3570 rpm SAT / UNSAT Comments (required for UNSAT):
STEP                              CUE                        STANDARD
: 7.
* Step 3.e of Appendix E:            Inform Cue:                      Examinee simulates placing the handswitches for AFA-UV-37 and When the examinee takes the Open BOTH of the following AFW                                      AFC-UV-36.
handswitches for AFA-UV-37 and Pump A to Steam Generator          AFC-UV-36 to open provide the Downstream Valves:                following cue:
x    AFA-UV-37                The red lights for AFA-UV-37 and x    AFC-UV-36                AFC-UV-36 are on and the green lights are off.
SAT / UNSAT Comments (required for UNSAT):
Page 8 of 11
 
P-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                                    CUE                          STANDARD
: 8.
* Step 3.f of Appendix E:              Inform Cue:                      Examine determines SG WR level and throttles open both SG Upstream When examinee looks at SG level Maintain steam generator levels 35-                                    valves.
transmitters:
80% WR with ANY of the following AFA Pump A to Steam Generator        Steam Generator Wide Range Upstream Valves::                    Levels are 30% WR.
x  AFA-HV-32                    If requested Cue:
x  AFC-HV-33                    The as found position of AFA-HV-32 and AFC-HV-33 are as indicated on the panel.
Inform Cue:
When the examinee simulates jogging open AFA-UV-32 and AFC-HV-33 provide the following cue:
AFA-UV-32 and AFC-HV-33 red and green lights are on.
Inform Cue:
When examine looks at AF flow:
Flow is 350 gpm.
Inform Cue:
After feed is established provide the following cue:
Another operator will finish Appendix E.
SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Preparedness organization for resolution.
NORMAL TERMINATION POINT Page 9 of 11
 
P-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED 02          03/28/07            6          Updated initiating cue to include that FWPT and Main Turbine shafts have stopped turning. Editorial updates.
03          12/02/09            6          Updated to new format and removed non-critical steps at the end of the JPM.
04          08/24/2011            6          Updated to new format.
REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 10 of 11
 
P-2 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam EXAMINEE HANDOUT INITIAL CONDITIONS:
x  The CRS has entered 40AO-9ZZ18, Shutdown Outside Control Room.
INITIATING CUE:
x  The CRS directs you to perform Appendix E, Auxiliary Feed Pump Operations, to start and feed the Steam Generators using AFA-P01 (Train A Auxiliary Feedwater Pump) from the Remote Shutdown Panel.
Page 11 of 11
 
PALO VERDE NUCLEAR GENERATING STATION                            40AO-9ZZ18            Revision 11 Page 1 of 100 SHUTDOWN OUTSIDE CONTROL ROOM The purpose of this procedure is to provide the necessary instructions to bring the plant to Cold Shutdown if the Control Room has been determined uninhabitable by the Control Room Supervisor for any reason other than fire. Instructions are provided for immediate actions to be taken by personnel while evacuating the Control Room as assigned by the Control Room Supervisor, and the subsequent actions to be taken upon establishing control at the Remote Shutdown Panel (RSP). Instructions are also given for reestablishing control of the plant from the Main Control Room when conditions allow Control Room habitation.
Continuous Use:
* Have a copy of the procedure or                    All applicable pages within view or be in direct communication with an individual with a copy.
* Review and understand the procedure or section of the procedure before performing any steps.
* Read and understand each step prior to performing it; performing each step as written and in the sequence specified except when the procedure or approved process specifically allows it.
* Use a placekeeping method.
* Review the document at the completion of the task to verify that all appropriate steps are performed and documented.
REV                                  DESCRIPTION 11  1) Added caution to Appendix E steps 3 and 4 to clarify substep actions and      41, 43 prevent a potential turbine driven AFW pump trip when switching control to Remote Shutdown or Cont Room positions.
Also, added reference for adverse CRDR 3732225. [Pri-3 PCR 3775316]                27 Functional Owner: AOP/EOP Team Leader
 
PALO VERDE NUCLEAR GENERATING STATION                                        40AO-9ZZ18                          Revision 11 Page 2 of 100 SHUTDOWN OUTSIDE CONTROL ROOM TABLE OF CONTENTS SECTION                                                                                                              PAGE 1.0 ENTRY CONDITIONS......................................................................................................3 2.0 EXIT CONDITIONS..........................................................................................................3 3.0 INSTRUCTIONS / CONTINGENCY ACTIONS................................................................4
 
==4.0 REFERENCES==
...............................................................................................................27 APPENDIX                                                                                                            PAGE Appendix A, Aligning Charging Pump Suction to the RWT ................................................... 28 Appendix B, Turbine Building Actions.................................................................................... 33 Appendix C, RCS Pressure Temperature Limits ................................................................... 36 Appendix D, ADV Operation .................................................................................................. 37 Appendix E, Auxiliary Feed Pumps Operation ...................................................................... 40 Appendix F, Secondary Plant Shutdown ............................................................................... 44 Appendix G, Stopping Cooling Tower Fans........................................................................... 59 Appendix H, Cooldown Precautions and Limitations............................................................. 61 Appendix I, RCS Cooldown Log............................................................................................ 66 Appendix J, RCS Void Indications/Recovery......................................................................... 68 Appendix K, Charging Pump Pulsation Dampeners.............................................................. 70 Appendix L, SIT Isolation Valves ........................................................................................... 73 Appendix M, Placing SDC Train A in Service ........................................................................ 77 Appendix N, Placing SDC Train B in Service ........................................................................ 88 Appendix O, LPSI Pump Pre-Start Checklist ........................................................................ 99
 
PALO VERDE NUCLEAR GENERATING STATION                    40AO-9ZZ18            Revision 11 Page 3 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 1.0  ENTRY CONDITIONS This procedure may be entered when the CRS has determined that the Control Room is uninhabitable for any reason other than fire.
2.0  EXIT CONDITIONS This procedure may be exited when control of the plant has been re-established from the Control Room.
 
PALO VERDE NUCLEAR GENERATING STATION                                            40AO-9ZZ18                    Revision 11 Page 4 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0      INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                                                CONTINGENCY ACTIONS
____ 1.        Enter AOP Entry Time and Date:
________________
------------------------------------------------------------ NOTE -----------------------------------------------------------
40EP-9EO01, Standard Post Trip Actions are NOT performed when the Control Room is evacuated.
------------------------------------------------------------ NOTE -----------------------------------------------------------
Steps 2 through 6 are expected to be performed in the Control Room.
---------------------------------------------------------------------------------------------------------------------------------
___2.      Perform the following:
: a. Trip the reactor.
: b. Check that power is lowering.
: c. Check that all full strength CEAs are inserted.
: d. Enter the time of the trip.
__________________
___3.      Stop one RCP in each loop.                            ___ 3.1 Direct an operator to trip one RCP in each loop at the switchgear.
 
PALO VERDE NUCLEAR GENERATING STATION              40AO-9ZZ18            Revision 11 Page 5 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                          CONTINGENCY ACTIONS
___4. Check that the Main Turbine is      ___ 4.1 Manually trip the turbine from the tripped.                                    Control Room.
___ 4.2 IF the turbine could NOT be tripped from the Control Room, THEN direct an operator to trip the turbine locally.
___5. IF time permits, THEN place PLCS in Local Auto with the setpoint at 50%.
___6. IF time permits, THEN place BOTH of the following switches in the BOTH position:
* CHN-HS-110-1, Letdown Control Valve Selector
* CHN-HS-201, Backpressure Control Valve Select
___7. Exit the Control Room and continue in this procedure from the Remote Shutdown Panel.
___8. Direct all available Operations personnel from the affected unit to report to the Remote Shutdown Panel.
 
PALO VERDE NUCLEAR GENERATING STATION      40AO-9ZZ18        Revision 11 Page 6 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                    CONTINGENCY ACTIONS
___9. IF ANY of the following conditions exist:
* Reactor power is NOT lowering
* Any full strength CEA is NOT fully inserted THEN direct an operator to PERFORM Appendix A, Aligning Charging Pump Suction to the RWT.
___10. Direct an operator to PERFORM Appendix B, Turbine Building Actions.
 
PALO VERDE NUCLEAR GENERATING STATION                                            40AO-9ZZ18                    Revision 11 Page 7 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0      INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                                                CONTINGENCY ACTIONS
------------------------------------------------------------ NOTE -----------------------------------------------------------
Phone line N-12 on the green phone at the Remote Shutdown Panel is powered from an uninterruptable power supply and is recommended for unit to unit communications.
---------------------------------------------------------------------------------------------------------------------------------
___11. IF the Emergency Coordinator position is NOT manned, OR the Emergency Coordinator position was manned in the STSC due to a previous E-Plan classification, THEN inform an unaffected unit Shift Manager of affected unit status and request activation of the unaffected units STSC to classify the event.
___12. IF the Emergency Coordinator position is manned in the TSC due to a previous E-Plan classification, THEN inform the Emergency Coordinator in the TSC to classify the event.
 
PALO VERDE NUCLEAR GENERATING STATION    40AO-9ZZ18        Revision 11 Page 8 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                  CONTINGENCY ACTIONS
___13. Perform the following:
: a. Direct Chemistry to PERFORM 74DP-9ZZ05, Abnormal Occurrence Checklist for reactor trip.
: b. Direct an operator to open BOTH of the following Hot Leg Sample CTMT Isolation Valves:
* SSA-UV-203 (SSA-J04 120 ft. West Electrical Penetration Room)
* SSB-UV-200 (SSB-J04 100 ft. East Penetration Room)
___14. Check that pressurizer level meets BOTH of the following:
* 10 - 65%
* Trending as expected 33 - 53%
 
PALO VERDE NUCLEAR GENERATING STATION                40AO-9ZZ18                    Revision 11 Page 9 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                            CONTINGENCY ACTIONS
___15. Check that pressurizer pressure  ___ 15.1 Control Pressurizer Heaters and meets ALL of the following:                    Auxiliary Spray and restore pressurizer pressure to BOTH of
* 1837 - 2285 psia                          the following:
* Trending as expected
* Trending as expected 2225 - 2275 psia                              2225 - 2275 psia
* Within the P/T Limits. REFER
* Within the P/T Limits. REFER TO Appendix C, RCS Pressure                    TO Appendix C, RCS Pressure Temperature Limits                            Temperature Limits.
___16. IF at least one RCP is running,
                                        ------------------------- NOTE -------------------------
THEN check BOTH of the following:                            Natural circulation flow should occur within 5 - 15 minutes after the RCPs
* Loop 'T is less than 10&deg;F        were tripped.
* The RCS is subcooled.        ------------------------------------------------------------
REFER TO Appendix C, RCS Pressure Temperature Limits  ___ 16.1 IF no RCPs are running, THEN check natural circulation flow in at least one loop by ALL of the following:
* Loop 'T is less than 65&deg;F
* Hot and cold leg temperatures are constant or lowering
* The RCS is subcooled. REFER TO Appendix C, RCS Pressure Temperature Limits
* Pressurizer level is NOT rising at a rate greater than can be explained by charging flow
 
PALO VERDE NUCLEAR GENERATING STATION              40AO-9ZZ18              Revision 11 Page 10 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                          CONTINGENCY ACTIONS
___17. Check that ALL of the following    ___ 17.1 IF SBCS or FWCS are NOT conditions exist:                          controlling in automatic, THEN perform the following:
* Tc is 560 - 570&deg;F
: a. Initiate MSIS.
* Steam generator levels are 35 - 80% WR                        b. PERFORM Appendix D, ADV Operation to operate the ADVs.
* Steam generator pressures are 1140 - 1200 psia                    c. Feed the Steam Generators with ONE of the following:
(REFER TO Appendix E, Auxiliary Feed Pumps Operation)
* AFB-P01
* AFA-P01
___18. IF steaming to atmosphere, THEN inform Radiation Protection and the RMS Technician.
___19. Check that ALL of the following electrical buses are energized:
* At least one class 4.16 kV bus
* At least one non-class 13.8 kV bus (Appendix B)
* At least one non-class 4.16 kV bus (Appendix B)
 
PALO VERDE NUCLEAR GENERATING STATION      40AO-9ZZ18        Revision 11 Page 11 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                    CONTINGENCY ACTIONS
___20. Check that at least ONE of the following trains of PK and PN on the same train as the energized class 4.16 kV bus:
* PKA-M41, PKC-M43 and PNA-D25
* PKB-M42, PKD-M44 and PNB-D26
___21. Perform the following:
: a. Contact an unaffected unit and request ALL of the following information from SPDS for the affected unit:
* RVUH level
* CTMT temperature
* CTMT pressure
: b. Check that ALL of the following are met:
* RVUH level is 100%
* CTMT temp is less than 117&deg;F
* CTMT pressure is less than 2.5 psig
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18              Revision 11 Page 12 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                          CONTINGENCY ACTIONS
___22. Contact the RMS Technician and    ___ 22.1 IF the RMS Tech is NOT available, request assistance in determining          THEN contact an unaffected unit BOTH of the following:                    and request assistance in determining BOTH of the following
* No containment area or                  from SPDS:
atmosphere radiation monitor alarms or unexplained rise in
* No containment area or activity                                    atmosphere radiation monitor alarms or unexplained rise in
* No steam plant activity                    activity radiation monitor alarms or unexplained rise in activity
* No steam plant activity radiation monitor alarms or unexplained rise in activity
___23. Determine if a plant cooldown is needed by considering BOTH of the following:
* Plant status
* Auxiliary system availability
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ18        Revision 11 Page 13 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                      CONTINGENCY ACTIONS
___24. IF the plant is to be maintained in Hot Standby from the RSP, THEN perform the following:
: a. Direct Chemistry to sample the RCS for boron at least once every hour.
: b. PERFORM 72ST-9RX14, Shutdown Margin - Modes 3, 4, and 5 to ensure adequate Shutdown Margin.
: c. Direct an operator to PERFORM Appendix F, Secondary Plant Shutdown.
: d. Direct an operator to PERFORM Appendix G, Stopping Cooling Tower Fans.
: e. Maintain the plant in Hot Standby.
___25. IF a plant cooldown is needed, THEN GO TO step 28.
___26. WHEN the Control Room can be re-entered, THEN GO TO step 27.
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ18        Revision 11 Page 14 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                      CONTINGENCY ACTIONS
___27. WHEN the Control Room can be re-entered, THEN perform the following:
: a. Direct one Reactor Operator to remain at the RSP until control has been regained from the Control Room.
: b. PERFORM SPTAs from the Control Room.
: c. IF the ADVs are being used, THEN PERFORM Appendix D, ADV Operation to transfer control of the ADVs to the Control Room.
: d. IF AFA-P01 is being used, THEN PERFORM Appendix E, Auxiliary Feed Pumps Operation to transfer control of the pump to the Control Room.
: e. WHEN BOTH of the following conditions exist:
* The SPTAs have been completed
* Control of the plant has been established from the Control Room THEN GO TO the appropriate procedure for current plant conditions.
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ18        Revision 11 Page 15 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                    CONTINGENCY ACTIONS
___28. Perform the following:
: a. Review Appendix H, Cooldown Precautions and Limitations.
: b. Direct an operator to PERFORM Appendix G, Stopping Cooling Tower Fans.
___29. Direct an operator(s) to PERFORM Appendix A, Aligning Charging Pump Suction to the RWT.
___30. Ensure that Steam Generator feed is being supplied by ONE of the following:
(REFER TO Appendix E, Auxiliary Feed Pumps Operation)
* AFB-P01
* AFA-P01
___31. IF the Main Feed Pumps are running, THEN direct an operator to trip the Main Feed Pumps locally.
 
PALO VERDE NUCLEAR GENERATING STATION      40AO-9ZZ18        Revision 11 Page 16 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                    CONTINGENCY ACTIONS
___32. Perform the following:
: a. PERFORM Appendix D, ADV Operation to establish control of RCS temperature with the ADVs.
: b. Initiate a MSIS.
___33. Direct an operator to PERFORM Appendix F, Secondary Plant Shutdown.
___34. Perform the following:
: a. Ensure compliance with LCO 3.4.3, RCS Pressure/
Temperature Limits.
: b. Record RCS temp in Appendix I, RCS Cooldown Log every 15 minutes.
: c. Establish a cooldown rate of approximately 60&deg;F per hour using ADVs.
 
PALO VERDE NUCLEAR GENERATING STATION              40AO-9ZZ18              Revision 11 Page 17 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                          CONTINGENCY ACTIONS
___35. IF any RCPs are running,          ___ 35.1 IF performing a natural circulation THEN depressurize to maintain              cooldown, PZR pressure within the P/T                THEN perform the following:
Limits REFER TO Appendix C, RCS Pressure Temperature                    a. Maintain RCS pressure as high Limits.                                        as possible within the P/T Limits. REFER TO Appendix C, RCS Pressure Temperature Limits.
: b. Monitor for the formation of voids during the cooldown.
REFER TO Appendix J, RCS Void Indications/Recovery.
: c. Cooldown to 350 to 300&deg;F and hold for 50 hours to allow the reactor vessel head to cool.
___36. Direct an operator to rack out PZR heater breakers on NGN-L11 and NGN-L12 as needed to control PZR pressure.
 
PALO VERDE NUCLEAR GENERATING STATION                  40AO-9ZZ18          Revision 11 Page 18 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                              CONTINGENCY ACTIONS
___37. WHEN RCS cold leg temperature is 485&deg;F or more, AND the Low Pressurizer Pressure Trip setpoint needs to be lowered, THEN ensure the current RCS pressure is greater than the RCS pressure below based on RCS Tcold prior to resetting the setpoint.
RCS          RCS        RCS    RCS      RCS        RCS Cold Leg    Pressure  Cold Leg Pressure  Cold Leg  Pressure Temp        (psia)      Temp    (psia)    Temp      (psia) 485          1135        520    1355      555        1630 490          1165        525    1390      560        1675 495          1195        530    1430      565        1720 500          1225        535    1465      570        1770 505          1255        540    1505      575        1820 510          1285        545    1545 515          1320        550    1590
___38. WHEN the conditions of step 37.
have been satisfied, THEN reset all four PPS channel Low Pressurizer Pressure Trip setpoints
 
PALO VERDE NUCLEAR GENERATING STATION      40AO-9ZZ18        Revision 11 Page 19 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                    CONTINGENCY ACTIONS
___39. IF ALL of the following conditions exist:
* PZR pressure is less than 1000 psia
* Letdown is in service
* CHN-HS-110-1, Letdown Control Valve Selector is in BOTH THEN perform the following to place the standby Letdown Control Valve in service:
: a. Direct an operator to open ONE of the following Letdown Control Valve Inlet Valves:
CHN-LV-110P
* CHN-V341 CHN-LV-110Q
* CHN-V343
: b. Direct an operator to slowly open ONE of the following Letdown Control Valve Outlet Valves:
CHN-LV-110P
* CHN-V342 CHN-LV-110Q
* CHN-V340
 
PALO VERDE NUCLEAR GENERATING STATION    40AO-9ZZ18        Revision 11 Page 20 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                  CONTINGENCY ACTIONS
___40. WHEN PZR pressure is less than 1000 psia, THEN PERFORM Appendix K, Charging Pump Pulsation Dampeners.
___41. WHEN PZR pressure is between 1000 and 750 psia, THEN perform the following:
: a. Depressurize the SITs to between 300 and 330 psig.
: b. Direct an operator to PERFORM Appendix L, SIT Isolation Valves, to energize the SIT Isolation Valves.
 
PALO VERDE NUCLEAR GENERATING STATION      40AO-9ZZ18        Revision 11 Page 21 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                    CONTINGENCY ACTIONS
___42. IF ALL of the following conditions exist:
* PZR pressure is 750 psia
* Letdown is in service
* CHN-HS-201, Backpressure Control Valve Select is in BOTH THEN perform the following to place the standby Backpressure Control Valve in service:
: a. Direct an operator to open ONE of the following Backpressure Control Valve Inlet Valves:
CHN-LV-201P
* CHN-V348 CHN-LV-201Q
* CHN-V347
: b. Direct an operator to slowly open ONE of the following Backpressure Control Valve Outlet Valves:
CHN-LV-201P
* CHN-V350 CHN-LV-201Q
* CHN-V349
 
PALO VERDE NUCLEAR GENERATING STATION      40AO-9ZZ18        Revision 11 Page 22 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                    CONTINGENCY ACTIONS
___43. WHEN pressurizer pressure is less than 400 psia, THEN perform the following:
: a. Direct the operator performing Appendix L, SIT Isolation Valves to isolate the SITs.
: b. Bypass the low pressurizer pressure trips.
___44. Start ANY of the following at the appropriate breaker as needed to support SDC:
* Spray Pond Pump A (PBA-S03C)
* Spray Pond Pump B (PBB-S04C)
* Essential Cooling Water Pump A. (PBA-S03M)
* Essential Cooling Water Pump B. (PBB-S04M)
* Essential Chiller A (PBA-S03G)
* Essential Chiller B (PBB-S04G)
 
PALO VERDE NUCLEAR GENERATING STATION      40AO-9ZZ18        Revision 11 Page 23 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                  CONTINGENCY ACTIONS
___45. WHEN temp is less than 350&deg;F, AND pressure is less than 385 psia, THEN PERFORM ONE of the following:
* Appendix M, Placing SDC Train A in Service
* Appendix N, Placing SDC Train B in Service
___46. WHEN temperature is less than 300&deg;F, THEN stop all of the RCPs.
___47. Direct an operator to rackout ALL of the following RCP breakers:
* NAN-S01M
* NAN-S01L
* NAN-S02L
* NAN-S02M
___48. Lower Pressurizer pressure to 250 psia.
 
PALO VERDE NUCLEAR GENERATING STATION    40AO-9ZZ18        Revision 11 Page 24 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                  CONTINGENCY ACTIONS
___49. WHEN ANY cold leg temperature is less than or equal to 221&deg;F, THEN ensure that ALL of the following Shutdown Cooling Suction Valves are open for LTOP protection:
* SIA-UV-651(PHA-M3503)
* SIC-UV-653 (PKC-B43)
* SIB-UV-652 (PHB-M3604)
* SID-UV-654 (PKD-B44)
___50. Shutdown Aux Feedwater.
___51. Direct an operator to open BOTH of the following breakers:
* PHA-M3511, SIA-UV-672
* PHB-M3612, SIB-UV-671
 
PALO VERDE NUCLEAR GENERATING STATION      40AO-9ZZ18        Revision 11 Page 25 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                    CONTINGENCY ACTIONS
___52. Perform the following to lower pressurizer pressure to 150 psia:
: a. Fully open the Letdown Backpressure Control Valves.
: b. Turn off Pressurizer Heaters.
: c. Ensure no more than one Charging Pump running.
: d. Lower pressure using Auxiliary Spray.
: e. Stabilize pressure at 150 psia using Pressurizer Heaters.
___53. Stabilize RCS temperature at 190&deg;F.
___54. WHEN the Control Room can be re-entered, THEN continue in this procedure.
___55. Direct one Reactor Operator to remain at the Remote Shutdown Panel until control has been regained from the Control Room.
 
PALO VERDE NUCLEAR GENERATING STATION                  40AO-9ZZ18        Revision 11 Page 26 of 100 SHUTDOWN OUTSIDE CONTROL ROOM 3.0  INSTRUCTIONS / CONTINGENCY ACTIONS INSTRUCTIONS                                CONTINGENCY ACTIONS
___56. Direct other Control Room staff to ensure control of ALL of the following from the Control Room:
* Shutdown Cooling
* Pressurizer Heaters and Spray Valves
* Charging and Letdown
* Any operating secondary systems
___57. WHEN control of the plant has been established from the Control Room, THEN GO TO the appropriate procedure for current plant conditions.
End of Section 3.0
 
PALO VERDE NUCLEAR GENERATING STATION                  40AO-9ZZ18            Revision 11 Page 27 of 100 SHUTDOWN OUTSIDE CONTROL ROOM
 
==4.0  REFERENCES==
* 01DP-0AP01, Procedure Process.
* 40DP-0AP06, Abnormal Operating Procedure Writers Guide.
* 4XAO-XZZ27, Shutdown Outside Control Room.
* RCTS 014245, Action 01, Verify Shutdown Margin by sampling the RCS boron concentration every hour.
* RCTS 031193, Action 01, Develop procedures to address achieving cold shutdown from the Remote Shutdown Panel using either safety train.
* RCTS 033164, Action 01, Change procedure in order to prevent exceeding the maximum shutdown cooling warmup rate.
* RCTS 034561, Action 01, Shift charging pump suction to the RWT.
* RCTS 034892, Action 01, Issue Shutdown Outside Control Room procedure.
* RCTS 043021, Action 45, Address manual ADV operation.
* Study 13-MS-B047, CHARGING PUMP NPSH
* Adverse CRDR 3732225, Auxiliary Feedwater Turbine Trip Upon Transfer To Remote Shutdown Panel During 2R16. (PCR 3775316)
 
PALO VERDE NUCLEAR GENERATING STATION                                            40AO-9ZZ18                    Revision 11 Page 28 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix A                      Page 1 of 5 Appendix A, Aligning Charging Pump Suction to the RWT INSTRUCTIONS                                                CONTINGENCY ACTIONS
____ 1.        Enter Appendix Entry Time and Date:
________________
------------------------------------------------------------ NOTE -----------------------------------------------------------
If a PC Cleanup Pump is recirculating the RWT contents, no more than two Charging Pumps may be operating when the suction is transferred from the VCT to the RWT via the CHE-HV-536 pathway.
---------------------------------------------------------------------------------------------------------------------------------
___2.      IF this appendix is being performed to emergency borate the core, THEN perform the following at MCC NHN-M72:
: a. Open CHE-HV-536, RWT Gravity Feed Line to Chrg Pump Suction Valve.
(NHN-M7209)
: b. IF a PC Cleanup Pump is recirculating the RWT contents THEN ensure no more than two Charging Pumps are running.
: c. Close CHN-UV-501, VCT Outlet.
(NHN-M7208)
(continue)
 
PALO VERDE NUCLEAR GENERATING STATION      40AO-9ZZ18          Revision 11 Page 29 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix A          Page 2 of 5 Appendix A, Aligning Charging Pump Suction to the RWT INSTRUCTIONS                    CONTINGENCY ACTIONS
___2.  (continued)
: d. IF a PC Cleanup Pump is recirculating the RWT contents THEN perform the following:
: 1) Stop the Fuel Pool Cleanup Pump that is taking a suction from the RWT.
: 2) Close ONE of the following as appropriate:
* PCN-V043, PCN-P02A Discharge Isolation Valve
* PCN-V059, PCN-P02B Discharge Isolation Valve
 
PALO VERDE NUCLEAR GENERATING STATION      40AO-9ZZ18          Revision 11 Page 30 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix A          Page 3 of 5 Appendix A, Aligning Charging Pump Suction to the RWT INSTRUCTIONS                  CONTINGENCY ACTIONS
___3. Perform the following to divert letdown to the HUT:
: a. Ensure BOTH of the following breakers are open:
* NHN-M1309, CHN-P02A, Boric Acid Make-up Pump A
* NHN-M1020, CHN-P02B, Boric Acid Make-up Pump B
: b. Close CHN-V195, RMW to VCT. (Miracle Room)
: c. Open CHN-V655, Gas Stripper Manual Bypass Valve.
(Crud Tank Room Entry)
: d. Close CHN-V496, Inlet to Gas Stripper Divert Valve.
(Gas Stripper Entry)
(continue)
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ18          Revision 11 Page 31 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix A          Page 4 of 5 Appendix A, Aligning Charging Pump Suction to the RWT INSTRUCTIONS                      CONTINGENCY ACTIONS
___3.  (continued)
: e. Perform the following to position CHE-UV-500, Letdown To VCT/PRE-Holdup IOX Selector, to divert to the HUT (Miracle Room):
: 1) Open DS22-06 on ZAN-C01.
: 2) Close the local instrument air isolation adjacent to CHE-UV-500.
: 3) Throttle open the petcock on the filter regulator to bleed off IA pressure.
: 4) Close the filter petcock.
: 5) IF depressurizing the air supply using the petcock was not successful, THEN perform the following:
i Locate a fitting between the IA regulator and the CHE-UV-500 actuator.
ii Depressurize the air supply at the fitting.
iii WHEN the air supply is depressurized, THEN ensure the fitting is tightened.
: 6) Unlock and rotate the handwheel for CHE-UV-500 in the clockwise direction until the stem indicator shows FULL CLOSED.
 
PALO VERDE NUCLEAR GENERATING STATION                                            40AO-9ZZ18                    Revision 11 Page 32 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix A                      Page 5 of 5 Appendix A, Aligning Charging Pump Suction to the RWT INSTRUCTIONS                                                CONTINGENCY ACTIONS
------------------------------------------------------------ NOTE -----------------------------------------------------------
VCT level can be monitored on CHN-LI-227 in the Crud Tank Room entry or at the Remote Shutdown Panel.
---------------------------------------------------------------------------------------------------------------------------------
___4.      IF this appendix is being performed for a plant cooldown, THEN perform the following at MCC NHN-M72:
: a. Open CHE-HV-536, RWT Gravity Feed Line to Chrg Pump Suction Valve.
(NHN-M7209)
: b. WHEN VCT level is 20 - 25%,
THEN close CHN-UV-501, VCT Outlet. (NHN-M7208)
End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION              40AO-9ZZ18          Revision 11 Page 33 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix B          Page 1 of 3 Appendix B, Turbine Building Actions INSTRUCTIONS                          CONTINGENCY ACTIONS
____ 1. Enter Appendix Entry Time and Date:
________________
___2. Perform the following:
: a. Check that voltage is indicated on ALL of the following buses:
* NAN-S01
* NAN-S02
* NBN-S01
* NBN-S02
: b. Inform the CRS at the Remote Shutdown Panel of the status of the buses.
___3. Check that BOTH of the following  ___ 3.1 Inform the CRS.
breakers are open:
* NAN-S01A
* NAN-S02A
 
PALO VERDE NUCLEAR GENERATING STATION              40AO-9ZZ18              Revision 11 Page 34 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix B              Page 2 of 3 Appendix B, Turbine Building Actions INSTRUCTIONS                          CONTINGENCY ACTIONS
___4. Check that ALL of the following    ___ 4.1 Inform the CRS.
valves are closed:
* Turbine Stop Valves
* Turbine Control Valves
* Turbine Combined Intercept Valves
___5. Ensure the Generator Field Shorting Breaker is closed.
___6. Check that ALL of the following    ___ 6.1 IF ANY of the following pumps are pumps start:                                NOT running:
* Motor Suction Pump
* Motor Suction Pump (LON-HS-51B)
* Turning Gear Oil Pump
* Turning Gear Oil Pump (LON-
* Lift Oil Pumps                              HS-62B)
THEN start the pump(s) using the test button(s) on top of the Main Lube Oil Reservoir.
___7. Ensure that LON-TIC-32, Main Lube Oil Temperature Controller is adjusted to maintain lube oil temperature between 80&deg;F and 102&deg;F.
 
PALO VERDE NUCLEAR GENERATING STATION              40AO-9ZZ18          Revision 11 Page 35 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix B          Page 3 of 3 Appendix B, Turbine Building Actions INSTRUCTIONS                          CONTINGENCY ACTIONS
___8. WHEN the Main Turbine stops rolling, THEN ensure the Turbine goes on the Turning Gear.
___9. Contact the CRS at the RSP for further instructions.
End of Appendix
 
RCS Press Temp Limits Normal CTMT Conditions 2500 100 &deg;F/hr Cooldown 200 &deg;F Subcooled 2000 RCP NPSH 1500                                                                                                                                                                              SHUTDOWN OUTSIDE CONTROL ROOM          PALO VERDE NUCLEAR GENERATING STATION 1000 350 psia transition line RCS Pressure (psia)
QSPDS no longer useful Minimum Subcooled 500                                                                                                                                                                  Appendix C                                          40AO-9ZZ18 SDC Region Appendix C, RCS Pressure Temperature Limits 0
Page 36 of 100 0        50        100          150    200      250  300    350      400      450      500      550  600 RCS Temperature (Th &deg;F)                                                                                            Page 1 of 1                                          Revision 11
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 37 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix D          Page 1 of 3 Appendix D, ADV Operation INSTRUCTIONS                        CONTINGENCY ACTIONS
____ 1. Enter Appendix Entry Time and Date:
________________
___2. Ensure that the output of the ADV Controller(s) that will be used is at minimum:
* SGA-HIC-179B
* SGA-HIC-184B
* SGB-HIC-178B
* SGB-HIC-185B
___3. IF SGA-HV-179 will be operated, THEN place BOTH of the following switches to OPEN PERM:
* SGA-HS-179C
* SGC-HS-179D
___4. IF SGA-HV-184 will be operated, THEN place BOTH of the following switches to OPEN PERM:
* SGA-HS-184C
* SGC-HS-184D
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 38 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix D          Page 2 of 3 Appendix D, ADV Operation INSTRUCTIONS                        CONTINGENCY ACTIONS
___5. IF SGB-HV-178 will be operated, THEN place BOTH of the following switches to OPEN PERM:
* SGB-HS-178C
* SGD-HS-178D
___6. IF SGB-HV-185 will be operated, THEN place BOTH of the following switches to OPEN PERM:
* SGB-HS-185C
* SGD-HS-185D
___7. Perform the following for the ADV(s) to be operated:
: a. Press the LOCAL pushbutton on the ADV Controller(s).
: b. Adjust the position demand to at least 30%.
: c. WHEN the ADV opens, THEN adjust valve position as needed to control RCS heat removal rate.
 
PALO VERDE NUCLEAR GENERATING STATION                  40AO-9ZZ18          Revision 11 Page 39 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix D          Page 3 of 3 Appendix D, ADV Operation INSTRUCTIONS                              CONTINGENCY ACTIONS
___8. IF control of the ADVs is to be transferred to the Control Room, THEN perform the following for the ADV(s) being used:
: a. Direct the Control Room Operator to match the controller setpoint with indicated position.
: b. Press the CONTROL ROOM pushbutton on the controller at the RSP.
: c. Inform the Control Room Operator that control of the ADV has been transferred.
End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 40 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix E          Page 1 of 4 Appendix E, Auxiliary Feed Pumps Operation INSTRUCTIONS                        CONTINGENCY ACTIONS
____ 1. Enter Appendix Entry Time and Date:
________________
___2. IF AFB-P01 will be used, THEN perform the following:
: a. Direct an operator to start AFB-P01 locally at PBB-S04S.
: b. Open BOTH of the following AFW Pump B to Steam Generator Downstream Valves:
* AFB-UV-34
* AFB-UV-35
: c. Maintain steam generator levels 35 - 80% WR with ANY of the following AFW Pump B to Steam Generator Upstream Valves:
* AFB-HV-30
* AFB-HV-31
 
PALO VERDE NUCLEAR GENERATING STATION                      40AO-9ZZ18            Revision 11 Page 41 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix E            Page 2 of 4 Appendix E, Auxiliary Feed Pumps Operation INSTRUCTIONS                                CONTINGENCY ACTIONS CAUTION AFA-HS-52A, Turbine Driven AFW Pump Speed Control Transfer, switch position must be changed as rapidly as possible to minimize the chances of an overspeed trip.
___3. IF AFA-P01 will be used, THEN perform the following:
: a. Adjust AFA-SK-52B, Auxiliary Feedwater Pump A Speed to minimum.
: b. Place AFA-HS-52A, Speed Control Transfer, to the REMOTE SHUTDOWN position.
: c. Open ONE of the following Steam Supply Valves:
* SGA-UV-134
* SGA-UV-138 (continue)
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 42 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix E          Page 3 of 4 Appendix E, Auxiliary Feed Pumps Operation INSTRUCTIONS                        CONTINGENCY ACTIONS
___3.  (continued)
: d. Adjust turbine speed using AFA-SK-52B to ONE of the following:
Unit 1 & 3 only -
* 3590 - 3600 rpm.
Unit 2 only -
* 3560 - 3570 rpm.
: e. Open BOTH of the following AFW Pump A to Steam Generator Downstream Valves:
* AFA-UV-37
* AFC-UV-36
: f. Maintain steam generator levels 35 - 80% WR with ANY of the following AFW Pump A to Steam Generator Upstream Valves:
* AFA-HV-32
* AFC-HV-33
 
PALO VERDE NUCLEAR GENERATING STATION                    40AO-9ZZ18            Revision 11 Page 43 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix E            Page 4 of 4 Appendix E, Auxiliary Feed Pumps Operation INSTRUCTIONS                              CONTINGENCY ACTIONS CAUTION AFA-HS-52A, Turbine Driven AFW Pump Speed Control Transfer, switch position must be changed as rapidly as possible to minimize the chances of an overspeed trip.
___4. IF control of AFA-P01 will be transferred to the Control Room, THEN perform the following:
: a. Set AFA-SK-52B, Remote Shutdown Panel speed control to minimum.
: b. Ensure that AFA-SK-52A, Control Room speed control is set to minimum.
: c. Place AFA-HS-52A to the CONT ROOM position.
: d. Adjust turbine speed using AFA-SK-52A to ONE of the following:
Unit 1 & 3 only -
* 3590 - 3600 rpm Unit 2 only -
* 3560 - 3570 rpm End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 44 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix F        Page 1 of 15 Appendix F, Secondary Plant Shutdown INSTRUCTIONS                        CONTINGENCY ACTIONS
____ 1. Enter Appendix Entry Time and Date:
________________
___2. IF ANY of the Main Feedwater Pumps are tripped, THEN perform the following:
: a. WHEN the MFPT(s) stop turning, THEN ensure that the MFWPT(s) go on the turning gear.
: b. Inform the CRS that the cooldown rate should be watched while opening drain valves.
: c. Open BOTH of the following disconnect switches in Aux Relay Cabinet ZTN-C02 for ANY tripped MFPT(s):
MFPT A
* DS-20-02, FTN-HV-1
* DS-20-03, FTN-HV-9 MFPT B
* DS-22-02, FTN-HV-2
* DS-22-03, FTN-HV-10 (continue)
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 45 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix F        Page 2 of 15 Appendix F, Secondary Plant Shutdown INSTRUCTIONS                        CONTINGENCY ACTIONS
___2.  (continued)
: d. Open ALL of the following breakers for ANY tripped MFPT(s):
MFPT A
* NHN-M0213, FTN-HV-3
* NHN-M0204, FTN-HV-5
* NHN-M0205, FTN-HV-7
* NHN-M0206, FTN-HV-11
* NHN-M0207, FTN-HV-13 MFPT B
* NHN-M2106, FTN-HV-4
* NHN-M2102, FTN-HV-6
* NHN-M2103, FTN-HV-8
* NHN-M2104, FTN-HV-12
* NHN-M2105, FTN-HV-14 (continue)
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 46 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix F        Page 3 of 15 Appendix F, Secondary Plant Shutdown INSTRUCTIONS                        CONTINGENCY ACTIONS
___2.  (continued)
: e. Open ALL of the following drain valves for ANY tripped MFPT(s):
MFPT A
* FTN-HV-3
* FTN-HV-5
* FTN-HV-7
* FTN-HV-11
* FTN-HV-13 MFPT B
* FTN-HV-4
* FTN-HV-6
* FTN-HV-8
* FTN-HV-12
* FTN-HV-14
: f. Open the casing drain valve for ANY tripped MFPT(s):
MFPT A
* FTN-v016 MFPT B
* FTN-V012
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 47 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix F        Page 4 of 15 Appendix F, Secondary Plant Shutdown INSTRUCTIONS                        CONTINGENCY ACTIONS
___3. Ensure that no more than one of the following Condensate Pumps is running:
CDN-P01A
* NBN-S01D CDN-P01B
* NBN-S01E CDN-P01C
* NBN-S02D
___4. Stop BOTH of the Heater Drain Pumps at the associated breakers:
EDN-P01A
* NBN-S02E EDN-P01B
* NBN-S01F
___5. Check MTN-HV-327C, MSR Blanketing Steam Feed Valve closed at NHN-M0710.
(TB 140 ft North of MTLO Room)
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 48 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix F        Page 5 of 15 Appendix F, Secondary Plant Shutdown INSTRUCTIONS                        CONTINGENCY ACTIONS
___6. Check ALL of the following valves closed at NHN-M22:
(TB 140 ft North of MTLO Room)
* MTN-HV-327D, MSR Blanketing Steam Feed Valve at NHN-M2206
* MTN-UV-328B, MSR Reheating Steam Source Valve at NHN-M2207
* MTN-UV-330B, MSR Reheating Steam High Load Valve at NHN-M2212
___7. Check ALL of the following valves closed at NHN-M09:
(TB 140 ft Southeast Corner)
* MTN-HV-327G, MSR Blanketing Steam Feed Valve at NHN-M0907
* MTN-HV-327H, MSR Blanketing Steam Feed Valve at NHN-M0908
* MTN-UV-328D, MSR Reheating Steam Source Valve at NHN-M0921
* MTN-UV-330D, MSR Reheating Steam High Load Valve at NHN-M0922
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 49 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix F        Page 6 of 15 Appendix F, Secondary Plant Shutdown INSTRUCTIONS                        CONTINGENCY ACTIONS
___8. Check ALL of the following valves closed at NHN-M23:
(TB 140 ft Northeast Corner)
* MTN-HV-327F, MSR Blanketing Steam Feed Valve at NHN-M2310
* MTN-HV-327E, MSR Blanketing Steam Feed Valve at NHN-M2311
* MTN-HV-327A, MSR Blanketing Steam Feed Valve at NHN-M2318
* MTN-UV-328C, MSR Reheating Steam Source Valve at NHN-M2334
* MTN-UV-330C, MSR Reheating Steam High Load Valve at NHN-M2335
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 50 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix F        Page 7 of 15 Appendix F, Secondary Plant Shutdown INSTRUCTIONS                        CONTINGENCY ACTIONS
___9. Check ALL of the following valves closed at NHN-M05:
(TB 140 ft North Wall)
* MTN-HV-327B, MSR Blanketing Steam Feed Valve at NHN-M0511
* MTN-UV-330A, MSR Reheating Steam High Load Valve at NHN-M0521
* MTN-UV-328A, MSR Reheating Steam Source Valve at NHN-M0522
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 51 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix F        Page 8 of 15 Appendix F, Secondary Plant Shutdown INSTRUCTIONS                        CONTINGENCY ACTIONS
___10. Check ALL of the following valves open at NHN-M05:
(TB 140 ft North Wall)
* MTN-HV-247, Turbine Control Valve Pipe Drain Valve at NHN-M0505
* MTN-HV-315, MSR Reheating Steam Source Valve at NHN-M0506
* MTN-HV-251, MSR Reheating Steam Source Valve at NHN-M0507
* MTN-HV-248, Turbine Control Valve Pipe Drain Valve at NHN-M0508
* MTN-HV-242, Turbine Stop Valve Before Seat Drain Valve at NHN-M0512
* MTN-HV-244, Turbine Stop Valve Before Seat Drain Valve at NHN-M0513
* MTN-HV-246, Turbine Stop Valve After Seat Drain Valve at NHN-M0514
* MTN-HV-253, HP Turbine to MSR Upstream Crossover Pipe Drain Valve at NHN-M0524 (continue)
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 52 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix F        Page 9 of 15 Appendix F, Secondary Plant Shutdown INSTRUCTIONS                        CONTINGENCY ACTIONS
___10. (continued)
* MTN-HV-255, HP Turbine to MSR Upstream Crossover Pipe Drain Valve at NHN-M0526
* MTN-HV-256, HP Turbine to MSR Upstream Crossover Pipe Drain Valve at NHN-M0527
* MTN-HV-388A, MSR Second Stage Reheating Steam Line Drain Valve at NHN-M0531
* MTN-UV-389A, MSR First Stage Reheating Steam Line Drain Valve at NHN-M0532
* EDN-PV-29, MSR Reheating Steam Source Valve at NHN-M0533
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 53 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix F        Page 10 of 15 Appendix F, Secondary Plant Shutdown INSTRUCTIONS                        CONTINGENCY ACTIONS
___11. Check ALL of the following valves open at NHN-M23:
(TB 140 ft Northeast Corner)
* MTN-HV-254, HP Turbine to MSR Upstream Crossover Pipe Drain Valve at NHN-M2303
* MTN-UV-380, HP Turbine to MSR Downstream Crossover Pipe Drain Valve at NHN-M2304
* MTN-UV-321, HP Turbine to MSR Downstream Crossover Pipe Drain Valve at NHN-M2305
* MTN-HV-388C, MSR Second Stage Reheating Steam Line Drain Valve at NHN-M2307
* MTN-UV-389C, MSR First Stage Reheating Steam Line Drain Valve at NHN-M2313
* MTN-HV-374, MSR Reheating Steam Source Valve at NHN-M2316
* MTN-HV-375, MSR Reheating Steam Source Valve at NHN-M2317
* EDN-PV-33, MSR Reheating Steam Source Valve at NHN-M2329
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 54 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix F        Page 11 of 15 Appendix F, Secondary Plant Shutdown INSTRUCTIONS                        CONTINGENCY ACTIONS
___12. Check ALL of the following valves open at NHN-M09:
(TB 140 ft Southeast Corner)
* MTN-HV-388D, MSR Second Stage Reheating Steam Line Drain Valve at NHN-M0905
* MTN-UV-389D, MSR First Stage Reheating Steam Line Drain Valve at NHN-M0906
* MTN-HV-259, HP Turbine to MSR Upstream Crossover Pipe Drain Valve at NHN-M0910
* MTN-HV-376, MSR Reheating Steam Source Valve at NHN-M0923
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 55 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix F        Page 12 of 15 Appendix F, Secondary Plant Shutdown INSTRUCTIONS                        CONTINGENCY ACTIONS
___13. Check ALL of the following valves open at NHN-M24:
(TB 140 ft South Wall)
* MTN-HV-258, HP Turbine to MSR Upstream Crossover Pipe Drain Valve at NHN-M2405
* MTN-UV-322, HP Turbine to MSR Downstream Crossover Pipe Drain Valve at NHN-M2408
* MTN-HV-377, MSR Reheating Steam Source Valve at NHN-M2409
* MTN-UV-381, HP Turbine to MSR Downstream Crossover Pipe Drain Valve at NHN-M2410
* EDN-PV-34, MSR Reheating Steam Source Valve at NHN-M2430
* EDN-PV-36, MSR Reheating Steam Source Valve at NHN-M2431
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 56 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix F        Page 13 of 15 Appendix F, Secondary Plant Shutdown INSTRUCTIONS                        CONTINGENCY ACTIONS
___14. Check ALL of the following valves open at NHN-M22:
(TB 140 ft North of MTLO Room)
* MTN-HV-316, MSR Reheating Steam Source Valve at NHN-M2202
* MTN-HV-252, MSR Reheating Steam Source Valve at NHN-M2203
* MTN-HV-260, HP Turbine to MSR Upstream Crossover Pipe Drain Valve at NHN-M2211
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 57 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix F        Page 14 of 15 Appendix F, Secondary Plant Shutdown INSTRUCTIONS                        CONTINGENCY ACTIONS
___15. Check ALL of the following valves open at NHN-M07:
(TB 140 ft North of MTLO Room)
* MTN-HV-249, Turbine Control Valve Pipe Drain Valve at NHN-M0706
* MTN-HV-257, HP Turbine to MSR Upstream Crossover Pipe Drain Valve at NHN-M0709
* MTN-HV-243, Turbine Stop Valve Before Seat Drain Valve at NHN-M0713
* MTN-HV-245, Turbine Stop Valve Before Seat Drain Valve at NHN-M0714
* MTN-HV-388B, MSR Second Stage Reheating Steam Line Drain Valve at NHN-M0715
* MTN-UV-389B, MSR First Stage Reheating Steam Line Drain Valve at NHN-M0716
* EDN-PV-30, MSR Reheating Steam Source Valve at NHN-M0721
 
PALO VERDE NUCLEAR GENERATING STATION                40AO-9ZZ18          Revision 11 Page 58 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix F        Page 15 of 15 Appendix F, Secondary Plant Shutdown INSTRUCTIONS                              CONTINGENCY ACTIONS
___16. Perform the following to maintain condenser vacuum:
: a. Open GSN-HV-14, Auxiliary Steam to Gland Seal Regulator Valve.
: b. Close GSN-HV-5, Main Steam to Gland Seal Regulator Valve.
End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION                                            40AO-9ZZ18                    Revision 11 Page 59 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix G                      Page 1 of 2 Appendix G, Stopping Cooling Tower Fans INSTRUCTIONS                                                CONTINGENCY ACTIONS
____ 1.        Enter Appendix Entry Time and Date:
________________
------------------------------------------------------------ NOTE -----------------------------------------------------------
To ensure the site environmental license is not violated, anytime a Circulating Water pump is operating, a sufficient number of Cooling Tower Fans must remain operating on each inservice Cooling Tower to prevent spillage on the ground.
---------------------------------------------------------------------------------------------------------------------------------
___2.      IF Circulating Water Pumps are still in operation, THEN ensure an adequate number of Cooling Tower Fans are operating on each inservice Cooling Tower to prevent spillage on the ground.
___3.      WHEN directed by the CRS, THEN stop fans at the associated breakers in the correct sequence.
REFER TO Attachment G-1, Cooling Tower Fan Stop Sequence.
 
PALO VERDE NUCLEAR GENERATING STATION                            40AO-9ZZ18          Revision 11 Page 60 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix G            Page 2 of 2 Attachment G-1, Cooling Tower Fan Stop Sequence                                    Page 1 of 1 Fans should be stopped in a sequence that first stops the center fan followed by all fans in the inner ring and then the fans in the outer ring in pairs or threesomes.
Cooling Tower #1:
: a. Fan E
: b. Fans L, C & I
: c. 1. Fans O & H
: 2. Fans P & F                                      1. Fans O, K & G
: 3. Fans A & G                  OR                  2. Fans P, J & D
: 4. Fans B & D                                      3. Fans A, H & M
: 5. Fans K & M                                      4. Fans B, F & N
: 6. Fans J & N Cooling Towers #2 & #3:
: a. Fan N
: b. Fans G, A & P
: c. 1. Fans B & H
: 2. Fans C & O                                      1. Fans B, E & M
: 3. Fans F & M                  OR                  2. Fans C, I & L
: 4. Fans D & L                                      3. Fans F, H & J
: 5. Fans E & J                                      4. Fans D, O & K
: 6. Fans I & K End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION                                            40AO-9ZZ18                    Revision 11 Page 61 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix H                      Page 1 of 5 Appendix H, Cooldown Precautions and Limitations INSTRUCTIONS                                                CONTINGENCY ACTIONS
____ 1.        Enter Appendix Entry Time and Date:
________________
___2.      Ensure compliance with LCO 3.4.3, RCS Pressure/
Temperature Limits.
___3.      Ensure compliance with TLCO 3.4.102 for pressurizer cooldown rate.
------------------------------------------------------------ NOTE -----------------------------------------------------------
Pressurizer level channels RCA-LI-110X and RCB-LI-110Y are calibrated for hot operating conditions. Actual level is lower than indicated level for lower pressurizer temperatures.
---------------------------------------------------------------------------------------------------------------------------------
___4.      Determine actual pressurizer level during the cooldown by using current pressurizer pressure and the graph in Attachment H-1, Actual Pressurizer Level Determination.
 
PALO VERDE NUCLEAR GENERATING STATION      40AO-9ZZ18          Revision 11 Page 62 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix H          Page 2 of 5 Appendix H, Cooldown Precautions and Limitations INSTRUCTIONS                    CONTINGENCY ACTIONS
___5. Comply with ANY of the following LCOs as applicable:
* LCO 3.4.5, RCS Loops - Mode 3
* LCO 3.4.6, RCS Loops - Mode 4
* LCO 3.4.7, RCS Loops - Mode 5, Loops Filled
* LCO 3.4.8, RCS Loops - Mode 5, Loops Not Filled
___6. Perform the following:
: a. Direct Chemistry to sample the RCS for boron at least once per hour.
: b. Ensure compliance with LCO 3.1.1, Shutdown Margin (SDM) Reactor Trip Breakers Open
 
PALO VERDE NUCLEAR GENERATING STATION                                            40AO-9ZZ18                    Revision 11 Page 63 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix H                      Page 3 of 5 Appendix H, Cooldown Precautions and Limitations INSTRUCTIONS                                                CONTINGENCY ACTIONS
------------------------------------------------------------ NOTE -----------------------------------------------------------
TSR 3.4.102.2 requires determination of spray water temperature differential for each cycle of auxiliary spray operation. Direct indication of pressurizer temperature and spray water temperature is not available at the Remote Shutdown Panel.
---------------------------------------------------------------------------------------------------------------------------------
___7.      Perform the following:
: a. Log BOTH of the following in Appendix I, RCS Cooldown Log for each cycle of Auxiliary Spray:
* RWT temperature. (Local indication)
* PZR temperature.
(Sat temp for current PZR press)
: b. Direct Engineering to evaluate Pressurizer spray nozzle usage prior to the next startup.
___8.      Ensure that LTOPs are placed in service with ANY cold leg temperature less than or equal to 221&deg;F to comply with LCO 3.4.13, Low Temperature Overpressure (LTOP) Protection Systems.
 
PALO VERDE NUCLEAR GENERATING STATION                                            40AO-9ZZ18                    Revision 11 Page 64 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix H                      Page 4 of 5 Appendix H, Cooldown Precautions and Limitations INSTRUCTIONS                                                CONTINGENCY ACTIONS
------------------------------------------------------------ NOTE -----------------------------------------------------------
The following steps apply to a natural circulation cooldown.
---------------------------------------------------------------------------------------------------------------------------------
___9.      Maintain adequate subcooling in the RCS to minimize the possibility of void formations.
___10. Allow 5 to 15 minutes for plant response time during natural circulation cooldown.
___11. Monitor for void formation during depressurization. REFER TO Appendix J, RCS Void Indications/
Recovery.
 
PALO VERDE NUCLEAR GENERATING STATION                                  40AO-9ZZ18              Revision 11 Page 65 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix H              Page 5 of 5 Attachment H-1, Actual Pressurizer Level Determination                                      Page 1 of 1 Pressurizer Indicated vs. actual level for deviation from normal operating to cold pressurizer conditions.
2400 psia, 662qF 2250 psia, 653qxF 100 2000 psia, 636qF 90 1500 psia, 596qF 80 500 psia, 467qF 70 14.7 psia, Actual Level (%)
60                                                                        70qF 50 40 30 20 10 0
10  20    30    40    50    60    70    80    90    100 Indicated Level (%)
End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION      40AO-9ZZ18          Revision 11 Page 66 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix I          Page 1 of 2 Appendix I, RCS Cooldown Log RCS                                RCS COOL                                  COOL TIME                              TIME DOWN                                DOWN TEMPERATURE                      TEMPERATURE RATE                                  RATE
(&deg;F/hr)                              (&deg;F/hr)
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 67 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix I          Page 2 of 2 Appendix I, RCS Cooldown Log PZR AUX SPRAY CYCLE LOG RWT                PZR CYCLE              TEMPERATURE        TEMPERATURE TIME                                              INITIAL NUMBER                (From local    (Sat temperature for indication.)  current PZR pressure.)
1 2
3 4
5 6
7 8
9 10 11 12 13 14 15 16 17 18 19 20 21 End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION                                            40AO-9ZZ18                    Revision 11 Page 68 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix J                      Page 1 of 2 Appendix J, RCS Void Indications/Recovery INSTRUCTIONS                                                CONTINGENCY ACTIONS
____ 1.        Enter Appendix Entry Time and Date:
________________
------------------------------------------------------------ NOTE -----------------------------------------------------------
During RCS depressurization while in a natural circulation cooldown, the reactor vessel upper head region can become stagnant due to negligible flow through that region. The only cooling in the upper head region is the result of heat loss to ambient and heat conducted down through the reactor vessel and internal structures. If RCS pressure decreases below the saturation pressure corresponding to the water temperature in the upper head region, condensable voids will form.
---------------------------------------------------------------------------------------------------------------------------------
___2.      Monitor for indications of possible RCS voiding as indicated by ANY of the following:
* Pressurizer level rise significantly greater than expected while operating auxiliary spray
* Pressurizer level lowering while operating Charging or HPSI Pumps
* Letdown flow unexpectedly greater than charging flow
 
PALO VERDE NUCLEAR GENERATING STATION                40AO-9ZZ18          Revision 11 Page 69 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix J          Page 2 of 2 Appendix J, RCS Void Indications/Recovery INSTRUCTIONS                              CONTINGENCY ACTIONS
___3. IF voiding is indicated, THEN perform the following:
: a. Stop the depressurization.
: b. Stop the cooldown.
: c. Raise and lower RCS pressure within the P/T Limits (REFER TO Appendix C, RCS Pressure Temperature Limits) using ANY of the following methods:
* Pressurizer heaters and spray. REFER TO Appendix I, RCS Cooldown Log
* Available Charging pumps
: d. Monitor for void elimination.
REFER TO step 2.
___4. WHEN voids have been eliminated, THEN resume the cooldown/
depressurization.
End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 70 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix K          Page 1 of 3 Appendix K, Charging Pump Pulsation Dampeners INSTRUCTIONS                      CONTINGENCY ACTIONS
____ 1. Enter Appendix Entry Time and Date:
________________
___2. IF it is desired to adjust the pulsation dampener for CHA-P01, THEN direct an operator to perform the following:
: a. Ensure that Charging Pump A is NOT running.
: b. Rack out PGA-L31C4, Charging Pump 1.
: c. PERFORM 40OP-9CH13, Charging Pump Pulsation Dampener Operation to adjust CHA-P01 pulsation dampener to 500 psig.
___3. WHEN the pulsation dampener is charged to 500 psig, THEN rack in PGA-L31C4.
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 71 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix K          Page 2 of 3 Appendix K, Charging Pump Pulsation Dampeners INSTRUCTIONS                      CONTINGENCY ACTIONS
___4. IF it is desired to adjust the pulsation dampener for CHB-P01, THEN direct an operator to perform the following:
: a. Ensure that Charging Pump B is NOT running.
: b. Rack out PGB-L32C4, Charging Pump 2.
: c. PERFORM 40OP-9CH13, Charging Pump Pulsation Dampener Operation to adjust CHB-P01 pulsation dampener to 500 psig.
: d. WHEN the pulsation dampener is charged to 500 psig, THEN rack in PGB-L32C4.
 
PALO VERDE NUCLEAR GENERATING STATION                  40AO-9ZZ18          Revision 11 Page 72 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix K          Page 3 of 3 Appendix K, Charging Pump Pulsation Dampeners INSTRUCTIONS                                CONTINGENCY ACTIONS
___5. IF it is desired to adjust the pulsation dampener for CHE-P01, THEN direct an operator to perform the following:
: a. Ensure that Charging Pump E is NOT running.
: b. Rack out ONE of the following as appropriate:
* PGA-L35C3, Charging Pump 3
* PGB-L36C2, Charging Pump 3
: c. PERFORM 40OP-9CH13, Charging Pump Pulsation Dampener Operation to adjust CHE-P01 pulsation dampener to 500 psig.
: d. WHEN the pulsation dampener is charged to 500 psig, THEN rack in ONE of the following as appropriate:
* PGA-L35C3, Charging Pump 3
* PGB-L36C2, Charging Pump 3 End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION              40AO-9ZZ18          Revision 11 Page 73 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix L          Page 1 of 4 Appendix L, SIT Isolation Valves INSTRUCTIONS                          CONTINGENCY ACTIONS
____ 1. Enter Appendix Entry Time and Date:
________________
___2. Obtain keys for operating SIT Isolation Valves from FPN-E02, Emergency Equipment Cabinet.
(100 ft B Switchgear Room, NW corner)
 
PALO VERDE NUCLEAR GENERATING STATION              40AO-9ZZ18          Revision 11 Page 74 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix L          Page 2 of 4 Appendix L, SIT Isolation Valves INSTRUCTIONS                          CONTINGENCY ACTIONS
___3. Unlock and close ALL of the following breakers:
* PHA-M3316, Safety Injection Tank 3 Isol Vlv J-SIA-UV-634
* PHA-M3316A, Back-up Breaker for M3316
* PHA-M3318, Safety Injection Tank 4 Isol Vlv J-SIA-UV-644
* PHA-M3334, Back-up Breaker for M3318
* PHB-M3619, Safety Injection Tank 1 Isol Vlv J-SIB-UV-614
* PHB-M3641A, Back-up Breaker for M3619
* PHB-M3618, Safety Injection Tank 2 Isol Vlv J-SIB-UV-624
* PHB-M3641, Back-up Breaker for M3618
 
PALO VERDE NUCLEAR GENERATING STATION              40AO-9ZZ18          Revision 11 Page 75 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix L          Page 3 of 4 Appendix L, SIT Isolation Valves INSTRUCTIONS                          CONTINGENCY ACTIONS
___4. WHEN directed by the CRS, THEN close ALL of the following valves using the local handswitches on the breakers:
* SIA-UV-634, Safety Injection Tank 3 Isol Vlv (PHA-M3316)
* SIA-UV-644, Safety Injection Tank 4 Isol Vlv (PHA-M3318)
* SIB-UV-614, Safety Injection Tank 1 Isol Vlv (PHB-M3619)
* SIB-UV-624, Safety Injection Tank 2 Isol Vlv (PHB-M3618)
 
PALO VERDE NUCLEAR GENERATING STATION              40AO-9ZZ18          Revision 11 Page 76 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix L          Page 4 of 4 Appendix L, SIT Isolation Valves INSTRUCTIONS                            CONTINGENCY ACTIONS
___5. Open ALL of the following:
* PHA-M3316, Safety Injection Tank 3 Isol Vlv J-SIA-UV-634
* PHA-M3316A, Back-up Breaker for M3316
* PHA-M3318, Safety Injection Tank 4 Isol Vlv J-SIA-UV-644
* PHA-M3334, Back-up Breaker for M3318
* PHB-M3619, Safety Injection Tank 1 Isol Vlv J-SIB-UV-614
* PHB-M3641A, Back-up Breaker for M3619
* PHB-M3618, Safety Injection Tank 2 Isol Vlv J-SIB-UV-624
* PHB-M3641, Back-up Breaker for M3618 End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 77 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix M        Page 1 of 11 Appendix M, Placing SDC Train A in Service INSTRUCTIONS                      CONTINGENCY ACTIONS
____ 1. Enter Appendix Entry Time and Date:
________________
___2. Inform Chemistry that the SDC Loop will be ready for sampling in approximately one half hour.
___3. Ensure that at least one of the following SDC Suction Valves is closed:
* SIA-UV-651 (PHA-M3503)
* SIC-UV-653 (PKC-B43)
___4. Ensure that BOTH of the following LPSI Injection Valves are closed:
* SIA-UV-635 (PHA-M3321)
* SIA-UV-645 (PHA-M3319)
___5. Open SIA-HV-688, CS-SDHX A Bypass. (PHA-M3313)
___6. Close SIA-HV-684, CS A Discharge. (PHA-M3705)
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 78 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix M        Page 2 of 11 Appendix M, Placing SDC Train A in Service INSTRUCTIONS                        CONTINGENCY ACTIONS
___7. Ensure that CHA-HV-531, RWT to SI Train A Suction Valve is open.
(Aux Bldg 51 ft)
___8. Close SIA-HV-687, LPSI-CS From SDHX A X-Tie.
(PHA-M3711)
___9. Ensure that SIA-HV-683, LPSI Pump Suction from RWT is open.
(PHA-M3706)
___10. Ensure that SIA-UV-669, LPSI Pump A Recirc Valve is open.
(PHA-M3510)
___11. Ensure that SIA-UV-660, Train A Pumps Combined Recirc to RWT Valve is open. (PKA-D2111)
___12. Open SIA-UV-655, RC Loop 1 SDC-LPSI Pump Suction Valve.
(PHA-M3504)
___13. Open SIA-UV-691, RC Loop A Warmup Bypass Valve.
(PHA-M3707)
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 79 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix M        Page 3 of 11 Appendix M, Placing SDC Train A in Service INSTRUCTIONS                        CONTINGENCY ACTIONS
___14. Open SIA-HV-685, LPSI-CS to SDHX A X-Tie Valve.
(PHA-M3311)
___15. Open SIA-HV-686, SDHX A Outlet to RC Loops 1A/1B Valve.
(PHA-M3312)
___16. Request that an operator be stationed at SIA-HV-306, LPSI-SDHX A Bypass Valve to monitor the position of the valve.
___17. Throttle SIA-HV-306 approximately 20% open.
(PHA-M3709)
___18. Vent the SDC suction line from ONE of the following locations until the header is free of air:
* SIA-V909 (lower level of the West Penetration room)
* SIA-V876 (upper level of the West Penetration room)
___19. Ensure Appendix O, LPSI Pump Pre-Start Checklist has been completed.
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 80 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix M        Page 4 of 11 Appendix M, Placing SDC Train A in Service INSTRUCTIONS                        CONTINGENCY ACTIONS
___20. Vent the LPSI pump A seal cavity using SIA-V977.
___21. Perform an Independent Verification on SIA-V977 being closed per 02DP-0ZZ01, Verification of Plant Activities.
___22. Perform the following:
: a. Start LPSI pump A using the local handswitch.
(PBA-S03F)
: b. Check the following expected indication:
* Unit 1 Only - Motor run current is less than 100 amps.
* Units 2 & 3 Only - Motor run current is less than 95 amps.
 
PALO VERDE NUCLEAR GENERATING STATION                                            40AO-9ZZ18                    Revision 11 Page 81 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix M                    Page 5 of 11 Appendix M, Placing SDC Train A in Service INSTRUCTIONS                                                CONTINGENCY ACTIONS
------------------------------------------------------------ NOTE -----------------------------------------------------------
When the pump is first started, some leakage is expected for a short duration.
------------------------------------------------------------ NOTE -----------------------------------------------------------
During normal pump operation, a dripping seal is normally acceptable, a steady stream is indication of seal damage.
(SDOC #N001-1101-00052)
---------------------------------------------------------------------------------------------------------------------------------
___23. WHEN LPSI A has been started, THEN direct an Auxiliary Operator to check the pump seal leakoff drain line for leakage.
___24. IF leakage is discovered at the pump seal leakoff drain line, THEN notify Mechanical/System Engineering of the pump seal leakage.
___25. Check that LPSI pump A room fan HAA-Z02 has started by local observation that HAA-Z02 is running.
___26. IF fan HAA-Z02 did not start when the LPSI pump started, THEN inform the Shift Manager/
CRS.
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 82 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix M        Page 6 of 11 Appendix M, Placing SDC Train A in Service INSTRUCTIONS                      CONTINGENCY ACTIONS
___27. Throttle SIA-HV-657, SDCHX A Outlet to RC Loops 1A/1B Valve to establish a LPSI flow rate determined by the table below.
(PHA-M3310)
MODE 4                MODE 5 OR 6 4,000 - 4,750 gpm        3,780 - 4,750 gpm
___28. Direct Chemistry to sample the SDC Loop at the SDHX A Outlet.
___29. WHEN the boron concentration of the SDC Loop is greater than the RCS boron concentration, THEN perform the following:
: a. Close SIA-HV-657.
(PHA-M3310)
: b. Throttle SIA-HV-306 to establish a LPSI flow rate of between 800 and 1200 gpm.
(PHA-M3709)
: c. Stop the LPSI Pump.
: d. Roll the UC fuses for LPSI A to OFF.
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 83 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix M        Page 7 of 11 Appendix M, Placing SDC Train A in Service INSTRUCTIONS                      CONTINGENCY ACTIONS
___30. WHEN LPSI pump A has been shutdown for 5 minutes, THEN check that LPSI Pump A fan HAA-Z02 has automatically stopped by local observation.
___31. IF fan HAA-Z02 did not stop approximately 5 minutes after the LPSI pump was shutdown, THEN inform the Shift Manager/
CRS.
___32. Close SIA-UV-669. (PHA-M3510)
___33. Close SIA-HV-683. (PHA-M3706)
___34. Open SIA-UV-651. (PHA-M3503)
___35. Unlock and close PKC-B43, Power Supply Disconnect for SIC-UV-653. (Battery Room C)
___36. Open SIA-UV-653, Loop 1 to Shutdown Cooling LPSI Pump Suction Valve, using the local keyswitch. (PKC-B43)
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 84 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix M        Page 8 of 11 Appendix M, Placing SDC Train A in Service INSTRUCTIONS                        CONTINGENCY ACTIONS
___37. Perform the following:
: a. Roll the UC fuses for LPSI Pump A to ON.
: b. Start LPSI pump A using the local handswitch.
(PBA-S03F)
: c. Check the following expected indication:
* Unit 1 Only - Motor run current is less than 100 amps.
* Units 2 & 3 Only - Motor run current is less than 95 amps.
___38. Throttle SIA-HV-306, to establish a LPSI flow rate determined by the table below. (PHA-M3709)
MODE 4                  MODE 5 OR 6 4,000 - 4,750 gpm          3,780 - 4,750 gpm
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 85 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix M        Page 9 of 11 Appendix M, Placing SDC Train A in Service INSTRUCTIONS                        CONTINGENCY ACTIONS
___39. Perform the following to begin heating up the SDC Loop:
: a. Throttle open SIA-UV-635, LPSI Header to RC Loop 1A to begin the heatup.
(PHA-M3321)
: b. WHEN the SDC Loop heatup rate has stabilized, THEN throttle open SIA-UV-645, LPSI Header to RC Loop 1B to continue the heatup. (PHA-M3319)
___40. IF at any time the heatup rate on the SDC Heat Exchanger exceeds 19&deg;F/min, THEN reduce the flow through the SDC Heat Exchanger.
___41. Maintain ALL of the following while SDC is in service:
* SDC flow rate for the current mode
* Desired RCS cooldown rate.
* A SDC Heat Exchanger heatup rate less than 19&deg;F/min
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 86 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix M        Page 10 of 11 Appendix M, Placing SDC Train A in Service INSTRUCTIONS                      CONTINGENCY ACTIONS
___42. Incrementally adjust ALL of the following valves to stop the warm up bypass flow:
* SIA-UV-635 (PHA-M3321)
* SIA-UV-645 (PHA-M3319)
* SIA-HV-691 (PHA-M3707)
___43. WHEN closed indication for SIA-HV-691 is received, THEN perform the following:
: a. Hold the handswitch in the closed position for five seconds. (PHA-M3707)
: b. Direct a second operator to hold the handswitch closed for an additional five seconds.
___44. Incrementally adjust ALL of the following valves to fully open the loop injection valves:
* SIA-UV-635 (PHA-M3321)
* SIA-UV-645 (PHA-M3319)
* SIA-HV-306 (PHA-M3709)
 
PALO VERDE NUCLEAR GENERATING STATION                40AO-9ZZ18          Revision 11 Page 87 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix M        Page 11 of 11 Appendix M, Placing SDC Train A in Service INSTRUCTIONS                              CONTINGENCY ACTIONS
___45. Adjust SIA-HV-657 (PHA-M3310) and SIA-HV-306 (PHA-M3709) as necessary to maintain BOTH of the following:
* SDC flow rate for the current mode
* RCS cooldown rate End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 88 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix N        Page 1 of 11 Appendix N, Placing SDC Train B in Service INSTRUCTIONS                      CONTINGENCY ACTIONS
____ 1. Enter Appendix Entry Time and Date:
________________
___2. Inform Chemistry that the SDC Loop will be ready for sampling in approximately one half hour.
___3. Ensure that at least one of the following SDC Suction Valves is closed:
* SIB-UV-652 (PHB-M3604)
* SID-UV-654 (PKD-B44)
___4. Ensure that BOTH of the following LPSI Injection Valves are closed:
* SIB-UV-615 (PHB-M3606)
* SIB-UV-625 (PHB-M3621)
___5. Open SIB-HV-693, CS-SDHX B Bypass. (PHB-M3413)
___6. Close SIB-HV-689, CS B Discharge. (PHB-M3804)
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 89 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix N        Page 2 of 11 Appendix N, Placing SDC Train B in Service INSTRUCTIONS                        CONTINGENCY ACTIONS
___7. Ensure that CHB-HV-530, RWT to SI Train B Suction Valve is open.
(Aux Building 51 ft)
___8. Close SIB-HV-695, LPSI-CS From SDHX B X-Tie.
(PHB-M3810)
___9. Ensure that SIB-HV-692, LPSI Pump Suction from RWT is open.
(PHB-M3805)
___10. Ensure that SIB-UV-668, LPSI Pump B Recirc Valve is open.
(PHB-M3609)
___11. Ensure that SIB-UV-659, Train B Pumps Combined Recirc to RWT Valve is open. (Remote Shutdown Panel)
___12. Open SIB-UV-656, RC Loop 2 SDC-LPSI Pump Suction Valve.
(PHB-M3605)
___13. Open SIB-UV-690, RC Loop B Warmup Bypass Valve.
(PHB-M3806)
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 90 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix N        Page 3 of 11 Appendix N, Placing SDC Train B in Service INSTRUCTIONS                        CONTINGENCY ACTIONS
___14. Open SIB-UV-694, LPSI-CS to SDHX B X-Tie Valve.
(PHB-M3414)
___15. Open SIB-UV-696, SDHX B Outlet to RC Loops 2A/2B Valve.
(PHB-M3415)
___16. Request that an operator be stationed at SIB-HV-307, LPSI-SDHX B Bypass Valve to monitor the position of the valve.
___17. Throttle SIB-HV-307 to approximately 20% open.
(PHB-M3803)
___18. Vent the SDC suction line from ONE of the following locations until the header is free of air:
* SIB-V886 (Lower level of the East Penetration room)
* SIB-V870 (Upper level of the East Penetration room)
* Unit-1 Only SIB-V1029 (Upper level of the East Penetration Room)
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 91 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix N        Page 4 of 11 Appendix N, Placing SDC Train B in Service INSTRUCTIONS                        CONTINGENCY ACTIONS
___19. Ensure Appendix O, LPSI Pump Pre-Start Checklist has been completed.
___20. Vent the LPSI pump B seal cavity using SIB-V979.
___21. Perform an Independent Verification on SIB-V979 being closed per 02DP-0ZZ01, Verification of Plant Activities.
___22. Perform the following:
: a. Start LPSI pump B using the local handswitch.
(PBB-S04F)
: b. Check the following expected indication:
* Unit 1 Only - Motor run current is less than 100 amps.
* Units 2 & 3 Only - Motor run current is less than 95 amps.
 
PALO VERDE NUCLEAR GENERATING STATION                                            40AO-9ZZ18                    Revision 11 Page 92 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix N                    Page 5 of 11 Appendix N, Placing SDC Train B in Service INSTRUCTIONS                                                CONTINGENCY ACTIONS
------------------------------------------------------------ NOTE -----------------------------------------------------------
When the pump is first started, some leakage is expected for a short duration.
------------------------------------------------------------ NOTE -----------------------------------------------------------
During normal pump operation, a dripping seal is normally acceptable, a steady stream is indication of seal damage.
(SDOC #N001-1101-00052)
---------------------------------------------------------------------------------------------------------------------------------
___23. WHEN LPSI B has been started, THEN direct an Auxiliary Operator to check the pump seal leakoff drain line for leakage.
___24. IF leakage is discovered at the pump seal leakoff drain line, THEN notify Mechanical/System Engineering of the pump seal leakage.
___25. Check that LPSI pump B room fan HAB-Z02 has started by local observation that HAB-Z02 is running.
___26. IF fan HAB-Z02 did not start when the LPSI pump started, THEN inform the Shift Manager/
CRS.
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 93 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix N        Page 6 of 11 Appendix N, Placing SDC Train B in Service INSTRUCTIONS                      CONTINGENCY ACTIONS
___27. Throttle SIB-HV-658, SDCHX B Outlet to RC Loops 2A/2B Valve to establish a LPSI flow rate determined by the table below.
(PHB-M3412)
MODE 4                MODE 5 OR 6 4,000 - 4,750 gpm        3,780 - 4,750 gpm
___28. Direct Chemistry to sample the SDC Loop at the SDHX B Outlet.
___29. WHEN the boron concentration of the SDC Loop is greater than the RCS boron concentration, THEN perform the following:
: a. Close SIB-HV-658.
(PHB-M3412)
: b. Throttle SIB-HV-307 to establish a LPSI flow rate of between 800 and 1200 gpm.
(PHB-M3803)
: c. Stop the LPSI Pump.
: d. Roll the UC fuses for LPSI B to OFF.
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 94 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix N        Page 7 of 11 Appendix N, Placing SDC Train B in Service INSTRUCTIONS                      CONTINGENCY ACTIONS
___30. WHEN LPSI pump B has been shutdown for 5 minutes, THEN check that LPSI Pump B fan HAB-Z02 has automatically stopped by local observation.
___31. IF fan HAB-Z02 did not stop approximately 5 minutes after the LPSI pump was shutdown, THEN inform the Shift Manager/
CRS.
___32. Close SIB-UV-668. (PHB-M3609)
___33. Close SIB-HV-692. (PHB-M3805)
___34. Open SIB-UV-652. (PHB-M3604)
___35. Unlock and close PKD-B44, Power Supply Disconnect for SID-UV-654. (Battery Room D)
___36. Open SID-UV-654, Loop 2 to Shutdown Cooling LPSI Pump Suction Valve, using the local keyswitch. (Battery Room D)
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 95 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix N        Page 8 of 11 Appendix N, Placing SDC Train B in Service INSTRUCTIONS                        CONTINGENCY ACTIONS
___37. Perform the following:
: a. Roll the UC fuses for LPSI Pump B to ON.
: b. Start LPSI pump B using the local handswitch.
(PBB-S04F)
: c. Check the following expected indication:
* Unit 1 Only - Motor run current is less than 100 amps.
* Units 2 & 3 Only - Motor run current is less than 95 amps.
___38. Throttle SIB-HV-307, to establish a LPSI flow rate determined by the table below. (PHB-M3803)
MODE 4                  MODE 5 OR 6 4,000 - 4,750 gpm          3,780 - 4,750 gpm
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ18          Revision 11 Page 96 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix N        Page 9 of 11 Appendix N, Placing SDC Train B in Service INSTRUCTIONS                        CONTINGENCY ACTIONS
___39. Perform the following to begin heating up the SDC Loop:
: a. Throttle open SIB-UV-615, LPSI Header to RC Loop 2A to begin the heatup.
(PHB-M3606)
: b. WHEN the SDC Loop heatup rate has stabilized, THEN throttle open SIB-UV-625, LPSI Header to RC Loop 2B to continue the heatup. (PHB-M3621)
___40. IF at any time the heatup rate on the SDC Heat Exchanger exceeds 19&deg;F/min, THEN reduce the flow through the SDC Heat Exchanger.
___41. Maintain ALL of the following while SDC is in service:
* SDC flow rate for the current mode
* Desired RCS cooldown rate
* A SDC Heat Exchanger heatup rate less than 19&deg;F/min
 
PALO VERDE NUCLEAR GENERATING STATION            40AO-9ZZ18          Revision 11 Page 97 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix N        Page 10 of 11 Appendix N, Placing SDC Train B in Service INSTRUCTIONS                        CONTINGENCY ACTIONS
___42. Incrementally adjust ALL of the following valves to stop the warm up bypass flow:
* SIB-UV-615 (PHB-M3606)
* SIB-UV-625 (PHB-M3621)
* SIB-HV-690 (PHB-M3806)
___43. WHEN closed indication for SIB-HV-690 is received, THEN perform the following:
: a. Hold the handswitch in the closed position for five seconds. (PHB-M3806)
: b. Direct a second operator to hold the handswitch closed for an additional five seconds.
___44. Incrementally adjust ALL of the following valves to fully open the loop injection valves:
* SIB-UV-615 (PHB-M3606)
* SIB-UV-625 (PHB-M3621)
* SIB-HV-307 (PHB-M3803)
 
PALO VERDE NUCLEAR GENERATING STATION                40AO-9ZZ18          Revision 11 Page 98 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix N        Page 11 of 11 Appendix N, Placing SDC Train B in Service INSTRUCTIONS                              CONTINGENCY ACTIONS
___45. Adjust SIB-HV-658 (PHB-M3412) and SIB-HV-307 (PHB-M3803) as necessary to maintain BOTH of the following:
* SDC flow rate for the current mode
* RCS cooldown rate End of Appendix
 
PALO VERDE NUCLEAR GENERATING STATION                                            40AO-9ZZ18                    Revision 11 Page 99 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix O                      Page 1 of 2 Appendix O, LPSI Pump Pre-Start Checklist
____ 1.        Enter Appendix Entry Time and Date:
________________
___2.      LPSI A or B Pre-Start Checklist
------------------------------------------------------------ NOTE -----------------------------------------------------------
The motor bearing oil levels increase during operation. When oil level is to the top of the sightglass, a level cannot be seen. A slight brown color difference indicates the sight glass is full.
---------------------------------------------------------------------------------------------------------------------------------
2.1      Ensure the LPSI Pump motor bearing oil levels are at their normal level: (Add oil if the oil levels are below normal.)
___      Upper bearing oil level is normal
___      Lower bearing oil level is normal
------------------------------------------------------------ NOTE -----------------------------------------------------------
The oil in the LPSI Pump radial bearing (coupling) sightglass will be drawn into the bearing during pump operation. When the pump is shutdown the oil will drain back into the sightglass.
---------------------------------------------------------------------------------------------------------------------------------
____      2.2      Ensure the LPSI Pump radial bearing oil level is between the top scribe mark and 1/8 of an inch below the bottom scribe mark on the sightglass.
(Sightglass is located behind the coupling guard screen) 2.3      For LPSI A ensure the Motor Space Heater has been energized by checking the following:
___      2.3.1      Breaker PHA-D3706 is closed.
___      2.3.2      Motor Space Heater light is lit on PHA-M3709A
 
PALO VERDE NUCLEAR GENERATING STATION                    40AO-9ZZ18          Revision 11 Page 100 of 100 SHUTDOWN OUTSIDE CONTROL ROOM Appendix O            Page 2 of 2 2.4 For LPSI B ensure the Motor Space Heater has been energized by checking the following:
___  2.4.1    Breaker PHB-D3806 is closed.
___  2.4.2    Motor Space Heater light is lit on PHB-M3834
____  2.5 IF the space heater has not been on, THEN evaluate for any conditions that might result in condensation forming on the motor windings before starting the pump. (high humidity, water around the pump)
End of Appendix
 
P-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM BASIS INFORMATION TASK:      1250440201 Respond to a control room fire TASK STANDARD:            40AO-9ZZ19 Appendix C Step 8 completed within 15 minutes, Step 7.1 completed within 30 minutes, and step 11 completed within 60 minutes. DG B is stopped.
K/A:      3.6 062 A2.06                            K/A RATING:          RO:    3.4 SRO:          3.9 K/A:                                                K/A RATING:          RO:          SRO:
APPLICABLE POSITION(S):                  RO        VALIDATION TIME:                  20 minutes
 
==REFERENCES:==
40AO-9ZZ19, Control Room Fire SUGGESTED TESTING ENVIRONMENT: SIMULATOR                                PLANT    X    OTHER JPM TYPE Time Critical? (Yes/No)        Yes              Alternative Path? (Yes/No)  Yes PRA/SRA related? (Yes/No)          No APPROVAL Developed By:                Alan Malley          Date:    02/16/2011 Revised By:                      N/A              Date:          N/A Technical Review                                  Operations Approval E-Plan Review                                      Training Approval (Only required for Emergency Plan JPMs)
EVALUATION Examinee Name:                                                      Date:
Evaluator Name:
Time to complete:                  Minutes        GRADE (Circle  One)  SAT / UNSAT *
.
Page 1 of 14
 
P-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam
: 1. SPECIAL TOOLS/EQUIPMENT:
o 40AO-9ZZ19, Control Room Fire, Appendix C available. This JPM was written using Revision 26 of 40AO-9ZZ19.
Page 2 of 14
 
P-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:
SPECIAL CONSIDERATIONS:
IN-PLANT JPMs ONLY:
o Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
o  Inform the control room staff of any discovered deficiencies.
o  Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do NOT enter contaminated, airborne, or high radiation areas.
ALL JPMs:
o You may use any source of information normally available.
INITIAL CONDITIONS:
o  The Control Room has been evacuated due to a fire.
o  The CRS has entered 40AO-9ZZ19, Control Room Fire.
o  PBB-S04 is energized from offsite power.
o  DG B is running with no Spray Pond pump.
INITIATING CUE:
o  The CRS directs you to perform Appendix C, PBB-S04 Energized from Offsite Power.
THIS JPM IS TIME CRITICAL Page 3 of 14
 
P-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam INFORMATION FOR EVALUATOR'S USE:
o An asterisk (*) denotes a Critical Step o At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
o Any step marked UNSAT requires comments.
o If this is the first JPM of the set then ensure the examinee has been briefed.
o Step sequence is not critical unless noted or will prevent achieving the task standard.
o Notify the unit Shift Manager of in-plant JPM performance.
o Performance of this JPM may require entry into areas with alarmed doors. Security requirements must be observed.
o Locked valves may be involved. No attempt will be made to actually operate any valves.
Page 4 of 14
 
P-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam JPM START TIME:
STEP                                    CUE                                  STANDARD
: 1.        Step 1 of Appendix C:                                                            Examinee enters Entry time and date.
Enter Appendix Entry Time AND Date: ________________                                                          START TIME: ______________
SAT / UNSAT Comments (required for UNSAT):
Notes before step 2:
NOTE The telephone number for the B Train Remote Shutdown Panel is:
Unit 1 - 1235 Unit 2 - 2235 Unit 3 - 3235 NOTE Actions directed by this appendix are time critical and must be performed as quickly as possible to ensure that effects of the fire do not prevent safe shutdown of the unit.
NOTE Portable lanterns should be used when performing actions in response to a fire. This will ensure that lighting is available if the emergency lighting system is degraded.
STEP                                    CUE                                  STANDARD
: 2.        Step 2 of Appendix C:                    INFORM CUE: You have                    Examinee proceeds to the Emergency Obtain a portable lantern from the      obtained the portable lantern from      Equipment Cabinet.
Emergency Equipment Cabinet,            the Equipment Cabinet.
FPN-C02. (B Switchgear Room, Northwest corner)
SAT / UNSAT Comments (required for UNSAT):
Page 5 of 14
 
P-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                                CUE                            STANDARD
: 3.
* Step 3 of Appendix C:                INFORM CUE (as examinee            Examinee places the following On PHB-M32, place ALL of the        simulates turning each disconnect): disconnects in LOCAL.
following Control Room Circuits      Indicate that the disconnect switch Disconnect Switches in LOCAL:      is pointing to LOCAL.              _____ PHB-M3209, Battery Charger (Switchgear Room B)                                                            D PKD-H14 x  PHB-M3209, Battery Charger                                          _____ PHB-M3205, Control Room D PKD-H14                                                                  Circuits Disconnect Switches x  PHB-M3205, Control Room                                                    (4 switches)
Circuits Disconnect Switches (4 switches)
SAT / UNSAT Comments (required for UNSAT):
STEP                                CUE                            STANDARD
: 4.
* Step 4 of Appendix C:                INFORM CUE (as examinee            Examinee simulates placing all 5 Place all of the disconnect switches simulates turning each disconnect): disconnect switches to LOCAL.
on DGB-C01, DG Disconnect            Indicate that the disconnect switch Cabinet in LOCAL. (5 switches)    is pointing to LOCAL.
(Switchgear Room B)
SAT / UNSAT Comments (required for UNSAT):
Page 6 of 14
 
P-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                                CUE                            STANDARD
: 5.
* Step 5 of Appendix C:              INFORM CUE (as examinee            Examinee simulates placing the Ensure the disconnect switches for simulates turning each disconnect): disconnect on each of the following ALL of the following breakers on  Indicate that the disconnect switch breakers to LOCAL:
PBB-S04 are in LOCAL:            is pointing to LOCAL.
x  PBB-S04S, Aux Feed Water                                          _____ PBB-S04S Pump AFB-P01                                                      _____ PBB-S04N x  PBB-S04N, 4160 - 480 LC                                            _____ PBB-S04M PGB-L36                                                          _____ PBB-S04L x  PBB-S04M, Essential Cooling
_____ PBB-S04K Water Pump EWB-P01 x  PBB-S04L, ESF Service                                            _____ PBB-S04J Transformer NBN-X03                                              _____ PBB-S04H x  PBB-S04K, ESF Service                                            _____ PBB-S04G Transformer NBN-X04 Examiner Note: The following        _____ PBB-S04F x  PBB-S04J, 4160 - 480 LC PGB-L32                      breakers are the only ones not      _____ PBB-S04C x  PBB-S04H, 4160 - 480 LC      manipulated:                        _____ PBB-S04B PGB-L34 x  PBB-S04G, Essential Chiller        x  PBB-S04P - Spare ECB-E01                            x  PBB-S04D - Containment x  PBB-S04F, LP Safety Injection          Spray Pump B Pump SIB-P01                      x  PBB-S04E - High Pressure x  PBB-S04C, Essential Spray              Safety Injection Pump B Pond Pump SPB-P01 x  PBB-S04B, Diesel Generator PEB-G02 SAT / UNSAT Comments (required for UNSAT):
Page 7 of 14
 
P-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                            STANDARD
: 6.
* Step 6 of Appendix C:            INFORM CUE (as examinee            Examinee places all the following simulates turning each disconnect): disconnects in LOCAL:
Place ALL of the following Indicate that the disconnect switch disconnect switches in LOCAL:
is pointing to LOCAL.              _____ CS-2/B2 on PGB-L36B1 x  CS-2/B2 on PGB-L36B1 x  CS-1/B2 on PGB-L34B1                                            _____ CS-1/B2 on PGB-L34B1 x  CS-2/C4 on PGB-L32C1                                            _____ CS-2/C4 on PGB-L32C1 x  CS-1/B2 on PGB-L32B1                                            _____ CS-1/B2 on PGB-L32B1 SAT / UNSAT Comments (required for UNSAT):
STEP                              CUE                            STANDARD
: 7.      Step 7 of Appendix C:            INFORM CUE: The breaker for        Examinee checks PGB-L32C4 CHB-P01 indicator says OPEN.      breaker position indication.
Check that breaker PGB-L32C4, Charging Pump 2 CHB-P01, is closed.                          IF REQUESTED CUE: The springs indicate charged.
ALTERNATE PATH SAT / UNSAT Comments (required for UNSAT):
Page 8 of 14
 
P-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                                CUE                          STANDARD
: 8.
* Step 7.1 of Appendix C:            When Requested cue:              Examiner Note: Log the time the Charging Pump breaker is IF breaker PGB-L32C4, Charging The Charging pump suction has    simulated closed.
Pump 2 CHB-P01, is open, THEN PERFORM the following:              been aligned to the RWT per Step 6 of Appendix G, Upper Auxiliary Examinee performs the following:
: a. Ensure charging pump suction Building Actions.
is aligned to the RWT per Step 6 of Appendix G, Upper                                              a. Contacts the CRS at the Auxiliary Building Actions. Inform Cue (after examinee                Remote Shutdown panel (or
: b. Close breaker PGB-L32C4,        simulates closing PGB-L32C4):              the Aux Bldg AO) to Charging Pump 2 CHB-P01.                                                  determine if charging pump The breaker position indication            suction is aligned to the says CLOSED.                            RWT.
: b. Closes breaker PGB-L32C4 for Charging Pump B (Time Critical)
Time: ___________ There should be less than 30 minutes from the time in step one to when the charging pump breaker is closed.
ALTERNATE PATH SAT / UNSAT Comments (required for UNSAT):
Page 9 of 14
 
P-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                              STANDARD
: 9.
* Step 8 of Appendix C:              Inform Cue as each breaker is        Examiner Note: Log the time each closed (use only cues for            breaker is simulated closed.
Ensure that ALL of the following indications stated by examinee that breakers are closed:
he/she is observing):                Examinee simulates closing the x  PBB-S04S, Aux Feed Water                                          following breakers:
Pump AFB-P01                  Red light is on/ green light is off.
x  PBB-S04N, 4160 - 480V LC
________ PBB-S04S, Aux Feed PGB-L36 Amps pegged high and are now                    Water Pump AFB-P01 x  PBB-S04M, Essential Cooling steady at __*(See below)__ amps.      ________PBB-S04N, 4160 - 480V Water Pump, EWB-P01 x  PBB-S04J, 4160 - 480V LC                                                      LC PGB-L36 PGB-L32                      Breaker made a closing sound.        ________PBB-S04M, Essential x  PBB-S04H, 4160 - 480V LC                                                      Cooling Water Pump, PGB-L34                      *AMP reading are as follows:                    EWB-P01 x  PBB-S04G, Essential Chiller                                        ________PBB-S04J, 4160 - 480V ECB-E01                          x    PBB-S04S - 70 amps                      LC PGB-L32 x  PBB-S04C, Essential Spray        x    PBB-S04N - 15 amps          ________PBB-S04H, 4160 - 480V Pond Pump SPB-P01                x    PBB-S04M - 80 amps                      LC PGB-L34 x    PBB-S04J - 15 amps          ________PBB-S04G, Essential x    PBB-S04H - 15 amps                      Chiller ECB-E01 x    PBB-S04G - 0 amps (after
________PBB-S04C, Essential
                                                    ~ 45 seconds it will read ~
Spray Pond Pump SPB-23 amps)
P01 x    PBB-S04C - 80 amps (Time Critical)
_______ There should be less than 15 minutes from step 1 until PBB-S04C is closed.
_______There should be less than 45 minutes from step 1 until PBB-S04S is closed.
________There should be less than 40 minutes from step 1 until PBB-S04G is closed.
SAT / UNSAT Comments (required for UNSAT):
Page 10 of 14
 
P-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                            STANDARD
: 10. Step 9 of Appendix C:              Inform Cue:                        Examinee simulates informing the CRS.
Inform the CRS that ALL of the following are running:            The CRS has been informed that the following are running:
x    Charging Pump B x    Aux Feed Pump B x  Charging Pump B x    Spray Pond Pump B x  Aux Feed Pump B x    Essential Cooling Water Pump B                            x  Spray Pond Pump B x    Essential Chiller B          x  Essential Cooling Water Pump B x  Essential Chiller B SAT / UNSAT Comments (required for UNSAT):
STEP                              CUE                            STANDARD
: 11.
* Step 10 of Appendix C:            Inform Cue:                        Examinee simulates pushing DGB-HS-30 to stop Diesel Generator B.
IF Diesel Generator B is running, THEN perform the following: (DG    DG B is running and a LOP has Control Panel)                    not occurred.
: a. Press DGB-HS-30, Emergency Stop.
: b. IF a loss of Offsite Power occurs, THEN PERFORM        After examinee pushing ONE of the following as      Emergency Stop button(use only appropriate:                cues for indications stated by x Appendix D, PBB-S04        examinee that he/she is observing):
Energized from DG B x Appendix E, PBB-S04 De-      x  The DG is slowing.
energized.                x  Use pen to indicate RPMs are lowering.
x  DG run alarm is off.
x  Etc.
SAT / UNSAT Comments (required for UNSAT):
Page 11 of 14
 
P-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam STEP                              CUE                            STANDARD
: 12.
* Step 11 of Appendix C:              Inform Cue: The valve has turned  Examiner Note: Log the time the clockwise and has stopped moving  valve is simulated closed.
Ensure that DGB-V064, Jacket as expected.
Water Standpipe Make-up Header Isolation valve, is closed. (DG B                                      Examinee simulates closing DGB-Room)                                                                  V064.
(Time Critical)
________There should be less than 60 minutes from step 1 until DGB-V064 is closed.
SAT / UNSAT Comments (required for UNSAT):
JPM STOP TIME:
NOTE:
Problems/issues identified on E-Plan JPMs during performance will be documented with a formal post-critique using Form 0800 (Electronic Forms under Emergency Preparedness) and forwarded to Emergency Planning organization for resolution.
NORMAL TERMINATION POINT Page 12 of 14
 
P-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam RECORD OF REVISIONS REVISION      REVISION          REASON                                COMMENTS NUMBER          DATE          REVISED 0          02/17/2011            6          Record created REASON REVISED            Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.
: 1. Vendor reference document upgrade
: 2. Plant modification (include number)
: 3. Procedure upgrade
: 4. Internal or External Agency Commitment (indicate item number)
: 5. Technical Specification Change (indicate amendment number)
: 6. Other (explain in comments)
Page 13 of 14
 
P-3 PVNGS JOB PERFORMANCE MEASURE 2012 NRC Exam EXAMINEE HANDOUT INITIAL CONDITIONS:
o  The Control Room has been evacuated due to a fire.
o  The CRS has entered 40AO-9ZZ19, Control Room Fire.
o  PBB-S04 is energized from offsite power.
o  DG B is running with no Spray Pond pump.
INITIATING CUE:
o  The CRS directs you to perform Appendix C, PBB-S04 Energized from Offsite Power.
THIS JPM IS TIME CRITICAL Page 14 of 14
 
PALO VERDE NUCLEAR GENERATING STATION                                            40AO-9ZZ19                    Revision 26 Page 43 of 195 CONTROL ROOM FIRE Appendix C                      Page 1 of 6 Appendix C, PBB-S04 Energized from Offsite Power INSTRUCTIONS                                                CONTINGENCY ACTIONS
____ 1.        Enter Appendix Entry Time and Date:
________________
------------------------------------------------------------ NOTE -----------------------------------------------------------
The telephone number for the B Train Remote Shutdown Panel is:
Unit 1 - 1235                            Unit 2 - 2235                          Unit 3 - 3235
------------------------------------------------------------ NOTE -----------------------------------------------------------
Actions directed by this appendix are time critical and must be performed as quickly as possible to ensure that effects of the fire do not prevent safe shutdown of the unit.
------------------------------------------------------------ NOTE -----------------------------------------------------------
Portable lanterns should be used when performing actions in response to a fire. This will ensure that lighting is available if the emergency lighting system is degraded.
---------------------------------------------------------------------------------------------------------------------------------
___ 2.        Obtain a portable lantern from the Emergency Equipment Cabinet, FPN-C02. (B Switchgear Room, Northwest corner)
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ19          Revision 26 Page 44 of 195 CONTROL ROOM FIRE Appendix C          Page 2 of 6 Appendix C, PBB-S04 Energized from Offsite Power INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 3. On PHB-M32, place ALL of the following Control Room Circuits Disconnect Switches in LOCAL:
(Switchgear Room B)
* PHB-M3209, Battery Charger D PKD-H14
* PHB-M3205, Control Room Circuits Disconnect Switches (4 switches)
___ 4. Place all of the disconnect switches on DGB-C01, DG Disconnect Cabinet in LOCAL.
(5 switches) (Switchgear Room B)
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ19          Revision 26 Page 45 of 195 CONTROL ROOM FIRE Appendix C          Page 3 of 6 Appendix C, PBB-S04 Energized from Offsite Power INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 5. Ensure the disconnect switches for ALL of the following breakers on PBB-S04 are in LOCAL:
* PBB-S04S, Aux Feed Water Pump AFB-P01
* PBB-S04N, 4160 - 480 LC PGB-L36
* PBB-S04M, Essential Cooling Water Pump EWB-P01
* PBB-S04L, ESF Service Transformer NBN-X03
* PBB-S04K, ESF Service Transformer NBN-X04
* PBB-S04J, 4160 - 480 LC PGB-L32
* PBB-S04H, 4160 - 480 LC PGB-L34
* PBB-S04G, Essential Chiller ECB-E01
* PBB-S04F, LP Safety Injection Pump SIB-P01
* PBB-S04C, Essential Spray Pond Pump SPB-P01
* PBB-S04B, Diesel Generator PEB-G02
 
PALO VERDE NUCLEAR GENERATING STATION          40AO-9ZZ19              Revision 26 Page 46 of 195 CONTROL ROOM FIRE Appendix C              Page 4 of 6 Appendix C, PBB-S04 Energized from Offsite Power INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 6. Place ALL of the following disconnect switches in LOCAL:
* CS-2/B2 on PGB-L36B1
* CS-1/B2 on PGB-L34B1
* CS-2/C4 on PGB-L32C1
* CS-1/B2 on PGB-L32B1
___ 7. Check that breaker PGB-L32C4,  ___ 7.1  IF breaker PGB-L32C4, Charging Charging Pump 2 CHB-P01,                Pump 2 CHB-P01, is closed.                              is open, THEN PERFORM the following:
: a. Ensure charging pump suction is aligned to the RWT per Step 6 of Appendix G, Upper Auxiliary Building Actions.
: b. Close breaker PGB-L32C4, Charging Pump 2 CHB-P01.
[Ref. Step 4.13]
 
PALO VERDE NUCLEAR GENERATING STATION        40AO-9ZZ19          Revision 26 Page 47 of 195 CONTROL ROOM FIRE Appendix C          Page 5 of 6 Appendix C, PBB-S04 Energized from Offsite Power INSTRUCTIONS                      CONTINGENCY ACTIONS
___ 8. Ensure that ALL of the following breakers are closed:
* PBB-S04S, Aux Feed Water Pump AFB-P01
* PBB-S04N, 4160 - 480V LC PGB-L36
* PBB-S04M, Essential Cooling Water Pump, EWB-P01
* PBB-S04J, 4160 - 480V LC PGB-L32
* PBB-S04H, 4160 - 480V LC PGB-L34
* PBB-S04G, Essential Chiller ECB-E01
* PBB-S04C, Essential Spray Pond Pump SPB-P01
___ 9. Inform the CRS that ALL of the following are running:
* Charging Pump B
* Aux Feed Pump B
* Spray Pond Pump B
* Essential Cooling Water Pump B
* Essential Chiller B
 
PALO VERDE NUCLEAR GENERATING STATION                  40AO-9ZZ19          Revision 26 Page 48 of 195 CONTROL ROOM FIRE Appendix C          Page 6 of 6 Appendix C, PBB-S04 Energized from Offsite Power INSTRUCTIONS                              CONTINGENCY ACTIONS
___ 10. IF Diesel Generator B is running, THEN perform the following:
(DG Control Panel)
: a. Press DGB-HS-30, Emergency Stop.
: b. IF a loss of Offsite Power occurs, THEN PERFORM ONE of the following as appropriate:
* Appendix D, PBB-S04 Energized from DG B
* Appendix E, PBB-S04 De-energized.
___ 11. Ensure that DGB-V064, Jacket Water Standpipe Make-up Header Isolation Valve, is closed.
(DG B Room)
End of Appendix
 
Appendix    D                        Scenario Outline                        Form ES-D-1 Facility: PVNGS                  Scenario No.:  __1            Op-Test No:    2012 Examiners:                                              Operators:
Initial Conditions: (100% power, MOC).
Turnover: Unit 1 is at 100% power (250 EFPD). Auxiliary Feedwater Pump A and Containment Spray A are tagged out.
Event                Malf. No.              Event Type*                            Event Description No.
1    None                                    N        Shift Turbine Cooling water pumps.
CO/SRO 2    cmTRCV05CHNLT227_4                      C        Volume Control Tank level transmitter, CHN-LT-227 fails low RO/SRO      causing a boration. Crew takes action to return CCP suction to the Volume Control Tank.
3    mfRM01A                                  I        Control Room monitor, RU-29, fails high. Crew will bypass CREFAS A.
CO/SRO 4    cmCPCC06EWAP01_5                        C        Essential Cooling water pump A fails to auto start on CREFAS actuation. RO will start EW pump A.
(In setup)                            RO/SRO (TS) 5    mfTH06A f:0.02                          C        Steam Generator 1 Tube Leak ALL        40AO-9ZZ02, Excessive RCS Leakrate (TS) 6    mfED16C                                  C        Loss of Class DC power PKC-M43.
CO/SRO      40AO-9ZZ13, Loss of Class Instrument or Control Power (T/S) 7    mfTH06A f:50                            M        Steam Generator 1 Tube Leak degrades to a Rupture.
ALL        40EP-9EO04, Steam Generator Tube Rupture 8    cmCPSI01SIAP02_5                        C        HPSI pump A fails to auto start on SIAS/CIAS actuation (In setup)                            RO/SRO 9    mfRX01 f:0                                I        Tave fails low, Requires manual control of Main Feedwater CO/SRO      flow.
CRITICAL TASK - Reset MSIS during cooldown to prevent unmonitored release to public.
End    Faulted SG is isolated per                        Faulted SG is isolated point  Standard Appendix 113, SG 1 Isolation                                          CRITICAL TASK -Isolate faulted SG within 70 minutes of initiation of SGTR.
* (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor NUREG-1021, Revision 9                      1 of 2
 
Appendix      D                        Scenario Outline                        Form ES-D-1 Turnover Plant conditions:
Unit 1 is at 100% power.
The core is presently at 250 EFPD.
Risk Management Action Level is ORANGE.
Train B is protected equipment.
AF B and AF N are protected.
CS B is protected.
PC is NOT recircing the RWT.
Unit 2 is supplying the Aux Steam cross-tie header.
Vibration shop reported that in a review of data they found some unusual readings with Turbine Cooling Water pump A. A vibration technician and AO are have been briefed and are standing by for a TCW pump shift. Appendix D of 40OP-9TC01 has been completed.
Equipment out of service:
Auxiliary Feedpump A (AFA-P01) is tagged out due to a noisy bearing. LCO 3.7.5 conditions a and b have been entered. Expected to return to service in 7 hours.
CS A is tagged out for scheduled maintenance. LCO 3.6.6 condition a has been entered. Expected to return to service in 12 hours.
Planned shift activities:
Remove the A Turbine Cooling Water pump from service. The pre-start checklist has been completed and the area operator is standing by.
NUREG-1021, Revision 9                      2 of 2
 
Scenario 1 Overview Event 1 CO shift Turbine Cooling Water Pumps from A running to B running.
Event 2 Low failure of the Volume Control Tank level transmitter CHN-LT-227. This causes the charging pump suction to automatically shift from the Volume Control Tank to the Refueling Water Tank (resulting in boration of the RCS). The operator is directed by the alarm response to hold open the VCT outlet valve and hold closed the valve from the Refueling Water Tank while an auxiliary operator opens the breakers to the valves.
The crew may also reduce turbine load depending on how long the boration goes before the valves are repositioned.
Event 3 RU-29 (Control Room intake ventilation radiation monitor) fails high causing a Control Room Essential Filtration Actuation Signal (CREFAS). The crew should determine the rad monitor has failed high (confirmed by the Effluent Technician) and bypass RU-29 on the BOP-ESFAS panel behind the control boards.
Event 4 EW A pump fails to auto start on the previous CREFAS signal. The CRS should address Tech Specs and declare EW A inoperable as well as various other cascading Tech Specs.
Event 5 Steam Generator #1 Tube leak. The CRS should respond by entering Abnormal operating procedure 40AO-9ZZ02 and addressing Tech Specs. The crew should address charging pumps and letdown. The RO will perform a leakrate determination and the CO will minimize the release to environment.
Event 6 Loss of PKC-M43 (125 VDC Motor Control Center). The CRS should respond by entering Abnormal operating procedure 40AO-9ZZ13. The CO should place CEDMCS in standby and place CEAC 2 inop codes in the Core Protection Calculators.
Event 7 SG Tube leak degrades. The CRS should direct starting all available charging pumps, isolating letdown and tripping the reactor since pressurizer level continues to decrease.
The crew performs the Standard Post Trip Actions. After the SPTAs are complete, the CRS should enter 40EP-9EO04, SGTR and initiate and cooldown and depressurization of the RCS. Once below 540 &deg;F, the crew should isolate the affected SG.
Event 8 When the Safety Injection Actuation Signal actuates, the Train A High Pressure Safety Injection pump will fail to auto start. The RO should recognize this and manually start the pump.
Event 9 After the trip, the Tave from the Reactor Reg System will fail low. This will require action by the CO to establish feed to the Steam Generators.
Page 1 of 17
 
Appendix D                        Required Operator Actions                    Form ES-D-2 Op-Test No.: _____ Scenario No.: __1__ Event No.: __1__
Event
 
== Description:==
______Shift of the Turbine Cooling Water pumps____________________
____________________________________________________________________________
Time        Position                        Applicants Actions or Behavior T=0            CRS        Directs the CO to shift Turbine Cooling Water Pumps per 40OP-9TC01 - Turbine Cooling Water.
CO        Informs the Auxiliary Operator (AO) in the Turbine Building that he will be shifting TC Pumps. (Step 4.3.3.1)
Starts the standby pump (TCN-P01B) by placing handswitch, TCN-HS-22, in the "START" position (B07). (Step 4.3.3.2)
Directs the AO to close the casing vent valve for TCN-P01B (TCN-HCV-531). (Step 4.3.3.3)
Observes amps and light indication. (Step 4.3.3.4)
Directs the AO to close the discharge valve for TCN-P01A (TCN-HCV-25). (Step 4.3.3.5)
When the AO reports the discharge valve for TCN-P01A is closed, the CO stops the TC A pump using TCN-HS-21 (B07). (Step 4.3.3.6)
Directs the AO to open the discharge valve for TCN-P01A (TCN-HCV-25). (Step 4.3.3.8)
Directs the AO to visually inspect TC pump A to ensure no rotation then Open the casing vent valve (TCN-528). (Steps 4.3.3.9 and 4.3.3.10)
Informs the AO in the Turbine Building that the pump shifting operation is complete. (Step 4.3.3.11)
Examiner Note: May proceed to the next event after the examinee informs the operator to open the discharge valve for TCN-P01 (TCN-HV-25).
Page 2 of 17
 
Appendix D                      Required Operator Actions                        Form ES-D-2 Op-Test No.: _____ Scenario No.: __1__ Event No.: __2__
Event
 
== Description:==
____Volume Control Tank level transmitter CHN-LT-227 fails low______
__________________________________________________________________________
Time      Position                        Applicants Actions or Behavior T=7          Crew      The crew receives alarms on B03 (Windows 9A - VCT TRBL and 8B - VCT LVL LO-LO).
RO        Address the alarm response procedure (40AL-9RK3A - Panel B03A Alarm Responses).
Examiner Note: CHN-LT-227 is not indicated on the control boards but can be seen on the plant computer.
RO      Addresses the alarm response procedure (40AL-9RK3A) for window 8B Verifies that the AUTO ACTIONS (Steps 1-4) have occurred (B03):
x Boric acid makeup to charging pumps valve, CHN-UV-514 opens. (Loss of power to CHN-UV-514 will open CHE-HV-536).
x Volume Control Tank Outlet valve, CHN-UV-501 closes.
x Boric acid makeup pump recirc valve, CHN-UV-510 closes.
x One Boric acid makeup pump, CHN-P02A or CHN-P02B starts.
Checks the VCT level Lo-Lo alarm by reading level indicator CHN-LI-226 (B03). (Step 1 of first priority actions)
If the CRS directs, the RO goes to single charging pump operation per 40OP-9CH01, CVCS Normal Operations. This would entail the following:
x Manually lowering letdown flow to 20 to 30 gpm using RCN-LIC-110, Level Setpoint Controller (B04). (Step 4.4.3.9.1) x Place the normally running charging pump (CH B) in the Pull-to-Lock position (B03). (Step 4.4.3.9.2) x Restore one of the following (Step 4.4.3.9.3):
o Restore Pzr level control to AUTO o Balance charging and letdown flow to stabilize level in the VCT.
(Continued on next page)
Page 3 of 17
 
If level indicator CHN-LI-226 indicates normal VCT level (i.e.,
greater than 15% level), then perform the following to maintain charging pump suction aligned to the VCT: (Step 3 of first priority actions)
Examiner Note: The RO may hand off the Alarm Response Procedure to the CO to read as he holds the valves.
RO              x  Holds open CHN-UV-501, Volume Control Tank Outlet (Continued)            valve (B03). (Step 3.1 of first priority actions)
Examiner Note: IF the operators hand slips and CHN-UV-501 starts going closed, the operator should release the handswitch for CHN-UV-514 or a low suction pressure trip will occur on the charging pumps.
RO              x  Holds closed CHN-UV-514, Boric Acid Makeup to Charging (Continued)            Pumps Valve (B03). (Step 3.2 of first priority actions)
(If at any time, CHN-UV-501 begins to stroke closed or indicates intermediate position. then release CHN-HS-514 and check that CHN-UV-514 opens.)
x  Directs an AO to open the following breakers (in the following order): (Step 1 of second priority actions) o CHE-HV-536 breaker, NHN-M7209 o CHN-UV-501 breaker, NHN-M7208 o CHN-UV-514 breaker, NHN-M1528 x  Stations an operator(s) in the vicinity of the MCCs to close the following breakers when directed by the Control Room Operator. (Step 1.5 of second priority actions)
Examiner Note: May proceed to the next event after the breakers for the 3 valves are opened by the auxiliary operator and the CRS performs a brief.
Page 4 of 17
 
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: __1__ Event No.: __3 and 4__
Event
 
== Description:==
(3)_Control Room Radiation Monitor (RU-29) fails high causing a CREFAS
______ _________(4)_Essential Cooling Water Pump A fails to auto tart________________
Time      Position                        Applicants Actions or Behavior T = 23      Crew        The crew receives alarms on B05A (Windows 4A - CREFAS A, 4B
                          - CREFAS B, and 4C - HI CR RAD CH TRIP) and on the RMS panel for RU-29.
CO        The CO addresses the alarm response procedures (41AL-1RK5A -
Panel B05A Alarm Responses and 74RM-9EF41- (RMS Alarm Responses).
74RM-9EF41 Response:
x High alarm initiates a CREFAS.
x Notify RP.
x Notify Radiation Monitoring Technician (Effluent Tech).
x Monitor RU-29 or RU-30 for increasing trends.
x Monitor RU-143 and RU-145 readings and trends.
41AL-1RK5A Response (Window 4A- CREFAS B:
x Checks the auto actions for a CREFAS (SP pump, EW pump, Essential Chiller and Control Room Essential Ventilation should all start).
RO        Addresses the alarm response for the blue SEAS light (B02) and determines the EW A pump did not auto start.
Addresses the alarm response (41AL-1ES2A- Safety Equipment Status System Panel Alarm Responses) for the SESS panel and starts the EW A pump (B02).
41AL-1RK5A Response (Window 4A- CREFAS B):
If a CREFAS occurs and no SIAS and no LOP, then within 30 minutes stop the Control Bldg Normal Sply Fan A01 and ESF Swgr Room Norm Sply Fan A03 (B02).
Page 5 of 17
 
Crew        When called the Effluent Tech states that RU-29 has failed high due to a sudden increase in the output and requests that the control room place RU-29 in bypass.
CRS        Addresses Tech Specs and determines the EW A pump is inoperable and enters LCO 3.7.7 condition a. This will cause numerous other LCOs to be entered due to cascading Tech Specs.
Other tech specs entered are LCO 3.5.3, 3.6.6, 3.77, 3.7.5, 3.7.12, and TLCO 3.5.201 (however, these may not be addressed immediately).
Addresses Tech Spec (LCO 3.3.9) for RU-29 failing and determines only one Control Room Radiation monitor is required.
Directs the CO to bypass RU-29 on the BOP-ESFAS panel per 40OP-9SA01.
May elect to quarantine rather than start EW pump A.
CO        Bypasses RU-29 (CREFAS A) on the BOP-ESFAS Cabinet (back of control panels) per 40OP-9SA01.
x Performs a lamp test on the affected BOP ESFAS cabinet(s). (Step 4.6.3.4) x Ensures all lamps are lit. (Step 4.6.3.4) x Steps 4.6.3.5-4.6.3.10 are N/A.
x Places a check mark in the column provided for the module(s) /relays/trip circuit(s) to be placed in Bypass. (Step 4.6.3.11) x Place Bypass key in key slot for the selected Module and turns the key clockwise approximately 1/4 turn or until the Bypass light comes on. (Step 4.6.3.12)
Examiner Note: May proceed to the next event when RU-29 is bypassed at the BOP-ESFAS cabinet and the CRS performs a brief.
Page 6 of 17
 
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: __1__ Event No.: __5__
Event
 
== Description:==
__________ ____Steam Generator #1 Tube Leak ______________
_______________________________________________________________________
Time      Position                          Applicants Actions or Behavior T = 34      Crew        The crew receives alarms on RU-142, Main Steam Line N16 Monitors.
CO          The CO addresses the RMS Alarm Response procedure 74RM-9EF41.
x The CO determines that RU-142, channels 1 and 2 have the highest readings therefore SG #1 is affected.
x Monitors RU-4, RU-139, RU-141, and RU-143 for increases.
x Reports the leak rate and rate of change when requested by the CRS.
CRS          Enters 40AO-9ZZ02, Excessive RCS Leakrate (Section 5.0) and performs the following:
x Enter AOP Entry Time and Date. (Step 1) x If pressurizer level is lowering and additional makeup is required, then ensure all available charging pumps are running. (Step 2) x If all available charging pumps are running and pressurizer level is lowering, then isolate letdown. (Step 3)
Examiner Note: The leak rate should be ~ 1 gpm so additional makeup or isolation of letdown is not required at this time.
CRS              x  Ensure compliance with LCO 3.4.14 and 3.4.18 (enters (continued)            condition b of LCO 3.4.14 and condition b of LCO 3.4.18).
(Step 6) x  Directs Chemistry to perform the Abnormal Occurrence checklist for a SGTL. (Step 7) x  Notifies RP that an RCS leak exists. (Step 8)
(Continued on next page)
Page 7 of 17
 
CRS            x  Obtains the leakrate and rate of change of leakrate from (continued)          RMS. (Step 9) x  Refers to Appendix F, Steam Generator Tube Leak Guidelines to determine operator actions and determines a shutdown is required. (Step 10) x  Directs the RO to perform Appendix B, ERFDADS Leak Rate Determination. (Step 11) x  Commences performance of 40OP-9ZZ05, Power Operations to perform a plant shutdown. (Step 12)
Examiner Note: Since there is no time requirement for the shutdown, there is no need to wait for a down power prior to going to the next event.
CRS            x  Directs the CO to perform Appendix C, Minimize Release to (continued)          the environment. (Step 13)
RO      Performs Appendix B ERFDADS Leak Rate determination.
x Checks that TC is constant (+1&deg;F). (Step 2) x Checks that pressurizer pressure is stable between 2235 and 2265 psia. (Step 3) x Ensures Chemistry is not drawing samples. (Step 4) x Ensures Letdown is aligned to the VCT or isolated. (Step 5) x Ensures Charging pump suction is aligned to the VCT. (Step 6)
(The following actions occur on B03):
x Places 210X, Reactor Makeup Water to VCT controller, in MANUAL with a zero output. (Step 7) x Places 210Y, Boric Acid Makeup to VCT controller, in MANUAL with a zero output. (Step 8) x Places CHN-HS-527, Makeup to Charging Pumps Valve in CLOSED. (Step 9) x WHEN CHN-UV-527 indicates closed, THEN places CHN-HS-210, Makeup Mode Select Switch, in MANUAL. (Step 10) x Monitors the leakrate on ERFDADs and allows the trend to run for 15 minutes or until VCT level has lowered to 15%.
(Step 15)
Page 8 of 17
 
CO      CO performs Appendix C to minimize Release to the environment:
x Ensures ARN-HS-19, Post Filter Mode Select Switch is in the THRU FILTER MODE (B07). (Step 2) x Selects OFF on the switches for Steam bypass valves SGN-PV-1007 and 1008 (B06). (Step 4) x Directs an operator to perform Attachment C-1, Condensate Cross-Tie Isolation. (Step 5) x Throttles CDN-HV-275, Demineralizer Water Feed to Condensate Service Header Valve to maintain 50-100 psig on CDN-PI-201 (B05). (Step 6) x Directs an operator to close CDN-V099 CONDENSATE SERVICE HDR SUPPLY REG VALVE CDN-PV-200 OUTLET ISOL VALVE. (Step 7) x Ensures that both of the Condensate Pump Overboard Valves (CDN-HV 29 and 30) are closed (B05). (Step 8)
Examiner Note: May proceed to the next event after the crew determines the leak rate and a need to shutdown. The minimize release to environment actions by the CO will also be performed in the SGTR procedure.
Page 9 of 17
 
Appendix D                        Required Operator Actions                          Form ES-D-2 Op-Test No.: _____ Scenario No.: __1__ Event No.: __6__
Event
 
== Description:==
_______ _Loss of Channel C 125 VDC power (PKC-M43 )___________
_________________________________________________________________________
Time      Position                        Applicants Actions or Behavior T= 56        Crew      Receives numerous alarms on Panels B04 and B05. Also receive alarms on B01.
Identifies a loss of PKC-M43 by indications on B05 (loss of instrument and lights on B05 and/or ADV permissive lights on B06).
CRS        Enters 40AO-9ZZ13, Loss of Class Instrument or Control Power AOP Section 7.0 and performs the following:
x Enters LCO 3.0.3 due to failure to meet Tech Spec LCO 3.1.5 Condition B. (Note before Step 2) x Checks that PNC-D27 is energized. Goes to contingency step and performs Section 8.0. (Step 2) x Directs an operator to place CEDMCS in STANDBY. (Step 2) x Directs an operator to perform 72ST-9RX03, DNBR /LHR
                                /AZTILT/ASI With COLSS out Of Service within 15 minutes.
(Step 3) x Directs an operator to set the CEAC 2 INOP code in ALL operable CPCs. (Step 4) x Determines the effect of the de-energized buses using Appendix E. (Step 6) x Directs an operator to place PPS Channel C bistables in bypass. (Step 7) x Ensures compliance with Tech Specs (LCO 3.0.3 will be the most limiting - all others are listed in Appendix F). (Step 8)
CO          x  Places CEDMCS in Standby when directed (B04). (Step 2) x  Performs 72ST-9RX03 when directed. (Step 3) x  Sets CEAC 2 INOP codes in A, B, and D CPCs (B05). (Step 4) x  Bypasses all parameters on Channel C PPS (behind control boards). (Step 7)
Examiner Note: May proceed to the next event after the crew bypasses all parameters on Channel C PPS or sooner if needed. Placing the parameters in bypass is not critical to the remainder of the scenario.
Page 10 of 17
 
Appendix D                        Required Operator Actions                        Form ES-D-2 Op-Test No.: _____ Scenario No.: __1__ Event No.: __7, 8, and 9_
Event
 
== Description:==
______Steam Generator Tube leak degrades (Trip Initiator)___________
__________________________________________________________________________
Time      Position                        Applicants Actions or Behavior T = 70        Crew      Notices Pzr Level and RCS pressure are lowering.
CRS        x  Directs RO to start additional charging pumps and isolate letdown. (per AOP directions) x  Due to pressurizer level continuing to lower, directs a manual reactor trip and possibly a SIAS/CIAS based on trend.
x  Directs the crew to perform the Standard Post Trip Actions.
Standard Post Trip Actions CRS      The CRS enters the Standard Post Trip Actions.
: 1. Open the place keeper and enter the EOP Entry Time.
: 2. Determine that Reactivity Control acceptance criteria are met by the following:
: a. Check that reactor power is dropping.
: b. Check that start-up rate is negative.
: c. Check that ALL full strength CEAs are inserted.
x Crew cannot verify CEA positions due to loss of PKC, directs RO to borate the RCS using Standard Appendix 103.
Examiner Note: Due to the loss of PKC-M43, 2 of the 3 CEA position indications are not available so the crew should borate the RCS.
RO      Borates the RCS using Standard Appendix 103 - RCS Makeup /
Emergency Boration(B03) as follows:
: 1. Set the boric acid makeup flow rate on CHN-FIC-210Y, Boric Acid Makeup to VCT Flow Control, to 40 gpm or less.
: 2. Set the Target makeup volume (gallons) on CHN-FQIS-210Y, Boric Acid Makeup Totalized Flow Control, to a minimum of 5000 gallons.
: 3. Place CHN-HS-210, Makeup Mode Select Switch, in BORATE.
Page 11 of 17
 
RO      4. Check one Boric Acid Makeup Pump is running.
: 5. Ensure CHN-UV-527, Makeup to CHRG PMPS (VCT Bypass), is open.
: 6. IF the left pushbutton on CHN-FQIS-210Y indicates End, THEN press the End pushbutton.
: 7. IF the left pushbutton on CHN-FQIS-210Y indicates Reset, THEN press the Reset pushbutton.
: 8. Press the Start pushbutton on CHN-FQIS-210Y.
: 9. Check for BOTH of the following:
: a. CHN-FIC-210X indicates no Reactor Makeup Water flow. (CHN-FV-210X closed)
: b. Proper flow indicated on CHN-FIC-210Y.
: 10. Adjust the boric acid makeup setpoint on CHN-FIC-210Y to greater than or equal to 44 gpm.
CRS      3. Determine that Maintenance of Vital Auxiliaries acceptance (Continued)    criteria are met by the following:
: a. Check that the Main Turbine is tripped.
: b. Check that the Main Generator output breakers are open.
: c. Check that station loads have transferred to offsite electrical power such that BOTH of the following conditions are met:
x All vital and non-vital AC buses are powered x All vital and non-vital DC buses are powered
: 4. Determine that RCS Inventory Control acceptance criteria are met by the following:
: a. Check that pressurizer level meets BOTH of the following:
x 10 - 65%
x Trending as expected to 33 - 53%
(Continued on next page)
Page 12 of 17
: 5. Determine that RCS Pressure Control acceptance criteria are met by BOTH of the following:
x Pressurizer pressure is 1837 - 2285 psia x Pressurizer pressure is trending as expected to 2225
                                        - 2275 psia x RCS is 24&deg;F or more subcooled
: 6. Determine that Core Heat Removal acceptance criteria are met by ALL of the following:
x At least one RCP is operating x         
x RCS is 24&deg;F or more subcooled x
: 7. Determine that RCS Heat Removal acceptance criteria are met by the following:
: a. Check that at least one Steam Generator meets BOTH of the following conditions:
x Level is 35% WR or more x Feedwater is restoring or maintaining level 45 - 60%
NR
: b. Check that Tc is 560 - 570&deg;F.
: c. Check that steam generator pressure is 1140 - 1200 psia.
Examiner Note: Due to the low failure of Tave, the CO will have to either take manual control of the downcomer valves or use Auxiliary Feedwater to feed the SGs.(B02)
: 8. Determine that Containment Isolation acceptance criteria are met by the following:
: a. Check that Containment pressure is less than 2.5 psig.
: b. REFER TO Appendix 7, List of EOP Radiation Monitors and check BOTH of the following conditions:
x No valid containment area radiation monitor alarms or unexplained rise in activity x No valid steam plant activity monitor alarms or unexplained rise in activity
: 9. Determine that Containment Temperature, Pressure, and Combustible Gas Control acceptance criteria are met by the following:
: a. Check that containment temperature is less than 117&deg;F.
: b. Check that containment pressure is less than 2.5 psig.
: 10. IF any acceptance criteria are NOT met, OR ANY contingency action was taken, THEN GO TO Section 4.0, Diagnostic Actions to diagnose the event. Diagnoses a SGTR Page 13 of 17
 
SGTR Procedure CRS      Diagnoses a SGTR and goes to 40EP-9EO04, SGTR and performs the following:
x Directs the CO to ensure the Steam Generator Sample Valves are open. (Step 1.b) x Directs Chemistry to perform the Abnormal Occurrence Checklist. (Step 1.c) x Directs the SM to classify the event. (Step 2) x Checks a SIAS is actuated if pressurizer pressure drops to the SIAS setpoint. (Step 4) x If SIAS has actuated, directs RO to check that HPSI and LPSI pumps have started and that safety injection flow is adequate. (Step 5)
RO      Starts the HPSI A pump if not done during the SPTAs (B02). (per SES alarm response or Step 5 of SGTR)
Examiner Note: If RO has not started the HPSI A pump, the CRS should direct him to start the pump at this time.
CRS          x  May direct the RO to shift charging pump suction to the (continued)          RWT per Standard Appendix 10. (Step 6)
RO      Shifts Charging pump suction to the RWT using Appendix 10 as follows if directed: (Appendix 10) x Ensures CHB-HV-530 is open (B02). (Step 1.a) x Places the appropriate Charging Pump in Pull-to-Lock (B03). (Step 1.b) x Directs an Auxiliary Operator to perform Attachment 10-A for the appropriate charging pump. (Step 1.c)
CRS          x  Directs the RO to stop one RCP in each loop if pressurizer pressure remains below the SIAS setpoint (this may have been done in the SPTAs). (Step 7) x  Directs the RO to perform Appendix 16, RCP Trip Criteria.
(Step 8)
RO          x  Stops 1 RCP in each loop and monitors running RCPs using Appendix 16.
Page 14 of 17
 
CRS        x    Directs CO to go to THRU FILTER MODE and take SBCS 1007 and 1008 to OFF (may have been done in AOP earlier). (Step 9) x    Directs the CO to commence a cooldown to a T-hot of less than 540&deg;F using the SBCS. (Step 9.c)
CO          x    Commences a cooldown to a T-hot of less than 540&deg;F using the SBCS (B06).
Resets the MSIS setpoints as the SGs depressurize (may be done by RO combination of both operators).
CRS        x    Directs the CO or RO to perform Appendix 5, RCS and Pressurizer Cooldown Log. (Step 9.d) x    Directs the RO to depressurize the RCS to less than 1135 psia, approximately equal to the SG with the tube leak and within the P/T limits. (Step 12)
RO      Depressurizes the RCS using Main Spray (B04) or Aux Spray (B03). (Step 12)
CRS        x    Directs the RO or CO to reset the MSIS setpoints. (Step 13)
RO or CO      x    Resets the MSIS setpoints as the SGs depressurize (may be done by CO or combination of both operators).
CRITICAL TASK: Reset the MSIS during the cooldown to prevent an unmonitored release to the public.
CRS        x    Determines the most affected SG is SG#1. (Step 14) x    When T-hot is less than 540&deg;F, directs the CO to isolate SG#1 using Appendix 113, Steam Generator 1 Isolation.
(Step 15)
CO      Opens SG sample valves as directed (B07).
Commences a cooldown to T-hot of less than 540&deg;F using the SBCS (B06).
Page 15 of 17
 
CO When T-hot is less than 540&deg;F performs Appendix 113 to isolate SG#1 as follows: (This step addresses critical task below) x Checks both ADVs closed on SG#1 (B06): (Step 1) o ADV-184 o ADV-178 x  Closes both SG 1MSIVs using the fast close pushbuttons (B06): (Step 2) o SGE-UV-170 o SGE-UV-180 x  Ensures SGE-UV-169, SG1 MSIV Bypass Valve is closed (B06): (Step 3) x  Closes both SG 1 Economizer FWIVs using the fast close pushbuttons (B06): (Step 4) o SGA-UV-174 o SGB-UV-132 x  Closes both SG 1Downcomer Isolation Valves (B06): (Step 5) o SGA-UV-172 o SGB-UV-130 x  Closes both SG 1Blowdown Containment Isolation Valves (B07): (Step 6) o SGA-UV-500P o SGB-UV-500Q x  Closes BOTH of the following steam trap isolation valves (B06): (Step 7) o SGA-UV-1133 o SGB-UV-1135A/1135B Page 16 of 17
 
CO          x  Checks the SG Safety Valves on closed (B06). (Step 8) x  Ensures BOTH Aux Feed Pump A Steam Supply Valves are closed (B06): (Step 9) o SGA-UV-134 SG 1 Steam Supply to Aux Feed Pump A o SGA-UV-134A SG1 Steam Supply to Aux Feed Pump A Bypass x Ensures BOTH Auxiliary Feedwater Isolation Valves are closed (B06): (Step 10) o AFB-UV-34 Aux Feedwater to SG1 Downstream Valve AFC-UV-36 Aux Feedwater to SG 1 Downstream Valve CRITICAL TASK: Isolate the ruptured SG within 70 minutes of initiation of the SGTR.
Scenario termination: The scenario may be terminated when the ruptured SG is isolated.
Page 17 of 17
 
Appendix    D                        Scenario Outline                            Form ES-D-1 Facility: PVNGS                  Scenario No.:  __2              Op-Test No:    2012 Examiners:                                              Operators:
Initial Conditions: (100% power, MOC).
Turnover: Unit 1 is at 100% power (250 EFPD). AFA-P01 and Containment Spray A are tagged out.
Event No.              Malf. No.          Event Type*                              Event Description 1      None                                N          Shift from Hydraulic Fluid Pump B to Pump A per section 6.7 of CO/SRO        40OP-9C001, Electro-Hydraulic Control System.
2      mfNI02C f:0                          I        Control Channel 2 fails low (50% Power indicated). Crew selects CO/SRO        channel 1 at the RRS system panel.
40AO-9ZZ16, RRS Malfunctions 3      mfTH01A f:0.01                      C          Small RCS leak. Crew takes action per section 3 of ~16 gpm RO/SRO        40AO-9ZZ02, Excessive RCS Leakrate (TS) 4      mfAN_1A03D1                          C          LOP relay failure. Crew responds using 41AL-1RK1A (1A03D) doeED_ZLS037271DS_W1            CO/SRO        Crew determines that a LOP should not have occurred and takes action to bypass the appropriate relays per 40OP-9SA01 doRP_ZLSAAC02ALOP1_                (TS)
W1 5      IOR dims_ZDSGEUV170                R -RO        An MSIV goes closed. Crew responds per 40AL-9RK6A and begins a down power to less than 65% power.
C - CO/SRO 6      cmCPTP01CENP01B_6                    C          Stator Cooling Pump B trips with standby pump failing to auto CO/SRO        start.
7      mfTH01A f:3                          M          LOCA RCS leak degrades requiring a reactor trip.
ALL        40EP-9EO03, Loss of Coolant Accident 8      Scenario file no SI/CI              C          SIAS/CIAS/MSIS fail to automatically initiate.
RO/SRO        CRITICAL TASK - Initiate SI flow when the SIAS setpoint has been exceeded prior to completing Step 4 of the LOCA procedure.
9      cmCPRH05SIBP03_6                    C          CS pump B trips on an 86 lockout RO/SRO        CRITICAL TASK -Initiate CS flow when the CSAS setpoint has been exceeded prior to completing step 3 of CTPC-2 of the Functional Recovery Procedure.
                                                            .
40EP-9EO09, Functional Recovery Procedure End      Scenario may be ended once point    SIAS and CSAS flow have been established using LPSI.
* (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor NUREG-1021, Revision 9                      1 of 2
 
Appendix      D                      Scenario Outline                          Form ES-D-1 Turnover Plant conditions:
Unit 1 is at 100% power.
The core is presently at 250 EFPD.
Risk Management Action Level is ORANGE.
Train B is protected equipment.
AF B and AF N are protected.
CS B is protected.
PC is NOT recircing the RWT.
Unit 2 is supplying the Aux Steam cross-tie header.
Equipment out of service:
Auxiliary Feedpump A (AFA-P01) is tagged out due to a noisy bearing. LCO 3.7.5 conditions a and b have been entered. Expected to return to service in 7 hours.
CS A is tagged out for scheduled maintenance. LCO 3.6.6 condition a has been entered. Expected to return to service in 12 hours.
Planned shift activities:
The crew needs to shift EHC pumps from B to A to support vibration readings. The vibration tech is standing by.
NUREG-1021, Revision 9                      2 of 2
 
Scenario 2 Overview Event 1 The CO shifts the Electro Hydraulic Control (CO) pumps from B running to A running.
Event 2 One detector on Control Channel #2 fails low (resulting in an indication of 50%
power). The CRS should enter 40AO-9ZZ16 to address the failure. The CO will select the unaffected channel on the Reactor Reg Test Panel behind the control boards.
The CO will also address the alarm on the Digital Feedwater Control System (DFWCS) and place Control channel #2 in maintenance and remove the A-TUN lockout on the DFWCS.
Event 3 A small RCS leak (~ 16 gpm) occurs. The CRS should enter 40AO-9ZZ02 to address the leak. The RO will perform a leakrate calculation.
Event 4 A Loss of Power (LOP) undervoltage relay fails on the class Train A 4160 kV bus.
The crew addresses the alarm response procedure and Tech Specs. The CO should place the LOP/LS relay in bypass on the BOP-ESFAS panel behind the control boards.
Event 5 A Main Steam Isolation Valve fails closed. The CO addresses the alarm response procedure which directs a down power to 65%. The RO will borate and the CO will reduce turbine load.
Event 6 Stator Cooling Water Pump B trips with a failure of the A pump to auto start. The CO should address the alarm response and start the A pump within 70 seconds or a turbine trip will occur.
Event 7 The RCS leak degrades causing a LOCA. The crew performs the Standard Post Trip Actions (SPTAs).
Event 8 After the LOCA, a failure of PPS to initiate a Safety Injection Actuation Signal, Containment Isolation Actuation Signal and Main Steam Isolation Signal occurs. The crew should recognize the signals did not occur and manually initiate these actuations.
Event 9 After the crew enters the LOCA procedure, Containment Spray B will trip (CS A is tagged out). This will cause a loss of safety function CTPC. The CRS should transition the Functional Recovery Procedure and align a LPSI pump to supply Containment Spray.
Page 1 of 18
 
Appendix D                        Required Operator Actions                        Form ES-D-2 Op-Test No.: _____ Scenario No.: __2_ Event No.: __1__
Event
 
== Description:==
Shift from Hydraulic Fluid (EHC) Pump B to A running
_________________________________________________________________________
Time      Position                        Applicants Actions or Behavior T=0          CRS          Directs the CO to shift from Hydraulic Fluid Pump B to Pump A per 40OP-9CO01 (Electro-Hydraulic Control System).
CO          Informs the Auxiliary Operator in the Turbine Building that he will be shifting Hydraulic Fluid (EHC) pumps.
Starts Hydraulic Fluid Pump A by momentarily placing handswitch CON-HS-4, HYDRAULIC FLUID PUMP A P01A, to START (B06).
(Step 6.7.2.1)
Checks ALL the following for Hydraulic Fluid Pump A: (Step 6.7.2.2) x The red START light at handswitch CON-HS-4, HYDRAULIC FLUID PUMP A P01A, is on x Motor amps are less than 219 amps x Pump discharge pressure is between 1500 psig and 1750 psig, indicated locally on CON-PI-007, A CO Pump Local Disch Press Indicator Performs the following for Hydraulic Fluid Pump B: (Step 6.7.2.3) x Stops Hydraulic Fluid Pump B by momentarily placing handswitch CON-HS-5, HYDRAULIC FLUID PUMP B P01B, to STOP.
x Checks the green STOP light is on at handswitch CON-HS-5, HYDRAULIC FLUID PUMP B P01B.
The examiner may go to the next event after the Hydraulic Fluid Pump B is stopped.
Page 2 of 18
 
Appendix D                      Required Operator Actions                        Form ES-D-2 Op-Test No.: _____ Scenario No.: __2_ Event No.: __2__
Event
 
== Description:==
Control Channel 2 fails low (50% power indicated)
_________________________________________________________________________
Time      Position                      Applicants Actions or Behavior T= 8        Crew      The crew receives alarms on B03 and B05. (Windows 3A10B - AMI (Automatic Motion Inhibit) and 6A6A - DFWCS TRBL)
RO/CO      Address the alarm response procedure (40AL-9RK4A- Panel B04A Alarm Responses).
x Verifies a mismatch in Control Power readings (channel 2 reads 50%)
x Verifies that the Reactor Regulating system is not in test.
x With CRS concurrence switches CEDMCS out of Auto Sequential (AS) x Verifies pressurizer level is stable.
CRS        Enters 40AO-9ZZ16, RRS Malfunctions (section 5).
x Ensures that CEDMCS in NOT in Auto Sequential. (Step 1) x Directs the CO to determine the failed channel. (Step 2) x Refers to Appendix B to determine the impact of the failure.
(Step 3) o AMI on 5% deviation o DFWCS uses a canned value of 60% power x Directs the CO to select the unaffected instrument at the RRS Test Panel. (Step 4) x Verifies that Tavg/Tref mismatch is 3&deg;F or less. (Step 5) x Directs the CO to place CEDMCS back in AS. (Step 6)
Page 3 of 18
 
CO            x  Determines that Control Channel 2 is reading 50% indicating a failed detector.
x Selects channel 1 at the RRS Test Panel by performing the following from 40OP-9SF08 (Operation of the Reactor Regulation System):
o Select any mode other than Auto Sequential at CEDMCS (already performed in 40AO-9ZZ16) (Step 6.2.1) o Press the TEST PROBE pushbutton (Step 6.2.2) o Check that DVM voltage indicates zero volts. (Step 6.2.4).
o IF DVM voltage is NOT indicating zero volts, THEN perform the following (Step 6.2.5):
Notify the SM/CRS.
Notify I&C.
WHEN the SM/CRS directs, THEN continue performing this section.
o Press the DVM pushbutton that correspo   
to be selected: (Step 6.2.6) o Record voltage indicated on the DVM for the selected IN in the table below: (Step 6.2.7) o Place the I                   
input:
I   !
x Verifies that the Tavg/Tref mismatch is 3&deg;F or less.
x Places CEDMCS in the desired mode of operation as directed.
Addresses alarm response procedure (40AL-9RK6A Panel B06A Alarm Responses.) window 6A due to Reactor Power 8% deviation and places Control Channel 2 in Maintenance.
x Determine which transmitter is faulty.
x Place the faulty transmitter in the maintenance mode.
x Remove the Atune Lockout.
The examiner may go to the next event after CEDMCS is place in Automatic and Control Channel 2 is placed in maintenance on the DFWCS.
Page 4 of 18
 
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: _2__ Event No.: __3__
Event
 
== Description:==
Small RCS leak (~16 gpm)
_________________________________________________________________________
Time      Position                    Applicants Actions or Behavior T= 14        Crew    Crew observes a slight lowering of trends on pressurizer level and pressure.
Crew receives alarms on RU-1, Containment Monitor.
CO      The CO addresses the Alarm Response procedure for RMS 74RM-9EF41 - Radiation Monitoring System Alarm Responses.
x Notifies RP of the alarm.
x Notifies Radiation Monitoring Technician (Effluent Tech).
CRS      Enters 40AO-9ZZ02, Excessive RCS Leakrate (Section 3.0) and performs the following:
x Enter AOP Entry Time and Date. (Step 1) x If pressurizer level is lowering and additional makeup is required, then ensure all available charging pumps are running. (Step 2) x If all available charging pumps are running and pressurizer level is lowering, then isolate letdown. (Step 3)
Examiner Note: The leak rate is ~ 16 gpm so no additional makeup or isolation of letdown is required at this time.
CRS          x  Directs the SM to classify the event. (Step 6)
(continued)      x  Ensure compliance with LCO 3.4.14 condition a. (Step 7) x  Directs Chemistry to perform the Abnormal Occurrence checklist for a RCS leak. (Step 8) x  Notifies RP that an RCS leak exists. (Step 9) x  Directs the RO to perform Appendix B, ERFDADS Leak Rate Determination. (Step 10) x  Directs an operator to walkdown charging and letdown piping. (Step 12)
Page 5 of 18
 
RO      Performs Appendix B ERFDADS Leak Rate determination.
x Checks that TC is constant (+1&deg;F). (Step 2) x Checks that pressurizer pressure is stable between 2235 and 2265 psia. (Step 3) x Ensures Chemistry is not drawing samples. (Step 4) x Ensures Letdown is aligned to the VCT or isolated. (Step 5) x Ensures Charging pump suction is aligned to the VCT. (Step 6)
(The following actions occur on B03):
x Places 210X, Reactor Makeup Water to VCT controller, in MANUAL with a zero output. (Step 7) x Places 210Y, Boric Acid Makeup to VCT controller, in MANUAL with a zero output. (Step 8) x Places CHN-HS-527, Makeup to Charging Pumps Valve in CLOSED. (Step 9) x WHEN CHN-UV-527 indicates closed, THEN places CHN-HS-210, Makeup Mode Select Switch, in MANUAL. (Step 10) x Monitors the leakrate on ERFDADs and allows the trend to run for 15 minutes or until VCT level has lowered to 15%.
(Step 15)
The examiner may go to the next event after the CRS addresses Tech Specs and the leak rate is steady on ERFDADs. It is not necessary to wait the entire 15 minutes for the leak rate unless the CRS has not addressed Tech Specs.
Page 6 of 18
 
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: _2__ Event No.: __4__
Event
 
== Description:==
LOP relay failure____________________________________________
_________________________________________________________________________
Time      Position                        Applicants Actions or Behavior T= 22      Crew      The crew receives alarms on B01A. (Window 3D - UNDV A CH TRIP)
RO        Address the alarm response procedure (40AL-9RK1A - Panel B03A Alarm Responses).
x Verifies normal PBA-S03 bus voltage using PBA-EI-S03L.
x Determines which UV relay has tripped.
CRS            x    Evaluates Tech Specs and enters LCO 3.3.7 condition a.
x    Directs the CO to place UV-1 in bypass per section 4.6 of 40OP-9SA01, BOP ESFAS Modules Operation.
CO        Places UV-1 in bypass per 40OP-9SA01, BOP ESFAS Modules Operation.
x Ensures other train is relays are not in bypass. (Step 4.6.2.3) x Verifies that the Sequencer is not in Auto Test. (Step 4.6.3.1) x Performs a lamp test on BOP ESFAS cabinet A. (Step 4.6.3.4) x Places Bypass Key in slot for UV-1. (Step 4.6.3.12.1) x Turns the key clockwise ~ 1/4 turn or until the bypass light comes on. (Step 4.6.3.12.2)
The examiner may go to the next event after UV-1 is placed in bypass.
Page 7 of 18
 
Appendix D                        Required Operator Actions                      Form ES-D-2 Op-Test No.: _____ Scenario No.: __2_ Event No.: __5__
Event
 
== Description:==
MSIV 170 inadvertently goes closed___
________________________________________________________________________
Time        Position                        Applicants Actions or Behavior T= 32        Crew      The crew receives alarms on B06 (A), window 7A - SG ISOL VLV TRBL.
CO        Address the alarm response procedure 40AL-9RK6A -Panel B06A Alarm Responses.
x Checks MSIV handswitches (B06) and determines that MSIV-170 is closed as indicated by SGA-HS-170A & SGB-HS-170B.
x Informs CRS that the ARP directs a downpower to $'<> 
40OP-9ZZ05, Power Operations.
Examiner Note: An MSIV may be considered operable if it is closed and its opening capability is disabled. The CRS may decide to initiate a RPCB to downpower per step 6.3.1 of 40OP-9ZZ05. If this occurs go to the section for RPCB on page 10.
CRS        Refers to 40OP-9ZZ05, Power Operations (section 6 or 8).
x Informs Rx Engineering, ECC and Water Rec. Facility of power reduction. (Steps 6.2.5 - 6.2.9) x Refers to the Maneuvering Box Tools for downpower strategies. (Step 6.2.11) x Holds a reactivity brief.
x Directs Chemistry to monitor secondary chemistry during power reduction. (Step 6.3.6) x Ensures that RCN-LIC-110 (B03), Pressurizer Level Control is in Remote Auto. (Step 6.3.13) x Directs an operator to close SCN-V011 & SCN-V012, isolation valves for Blowdown Flash Tank controller. (Step 6.3.15) x Directs use of Appendix U (Route Operations of CEAs During Power Operations) if CEAs are going to be moved. (Step 6.3.25) x Directs the RO to borate per the established game plan from the Manuevering Box Tools or STA worksheet (~1850 gallons) at a rate determined by the CRS. (Step 6.3.25)
Continued on next page Page 8 of 18
 
RO Borates the RCS at the desired rate using 40OP-9CH01, CVCS Normal Operations.
(The following actions occur on B03):
x Set the desired boric acid makeup flow rate on the Foxboro controller. (Step 7.3.6) x CHN-FIC-210Y.Selects the Target makeup flow on the boric acid totalizer/counter module (Micro-Motion), CHN-FQIS-210Y. (Step 7.3.7) x Places CHN-HS-210 in borate. (Step 7.3.10.1) x Depresses the reset pushbutton - the left pushbutton on the totalizer/counter module (Micro-Motion). (Step 7.3.10.2) x Depresses the start pushbutton - the left pushbutton on the totalizer/counter module (Micro-Motion). (Step 7.3.10.3) o Actual system flow is displayed on the Process Flow bar graph - the middle bar graph on the selected makeup flow control module.
o Actual flow may be read on recorder CHN-FR 210Y, green pen.
CO    x  Adjust feed pump bias (B06) as directed by CRS x  Adjust ?[   \  ]             ^ `{
pressure to maintain sufficient feedwater flow.
x  Inserts CEAs per the power reduction plan.
x  Unloads the turbine by slowly lowering the Load Limit Potentiometer to maintain Tavg within +/- 3&deg; of Tref.
Page 9 of 18
 
RPCB section CRS          Directs an operator to initiate a RPCB (Step 6.3.1 of 40OP-9ZZ05)
Enters 40AO-9ZZ09, RPCB (Loss of Feedpump).
x Checks that a RPCB has actuated and CEA subgroups 4,5 ,
and 22 have inserted. (Step 2) x Checks the Main Turbine Setback-Runback has lowered Turbine load to 65% or less. (Step 3) x Directs the STA to perform Appendix D, Status Check.
(Step 5) x Directs the CO to restore and maintain SG levels 45-60%
NR. (Step 8) x Checks that RRS is adjusting CEA to restore Tave/Tref
                                  +3&deg;F. (Step 9).
x Directs an operator to remove RPCB from service (Step 12).
x Directs the CO to reduce the load limit pot to illuminate the LOAD LIMITING light.
x Directs an operator to place CEDMCS in Standby. (Step 16) x Directs the RO to start boron equalization (Step 19)
The examiner may go to the next event after the crew downpowers ~5% or the crew stabilizes after a RPCB is initiated.
Page 10 of 18
 
Appendix D                        Required Operator Actions                      Form ES-D-2 Op-Test No.: _____ Scenario No.: __2_ Event No.: __6 __
Event
 
== Description:==
Stator Cooling Pump B trips, standby pump A fails to auto start ___
________________________________________________________________________
Time        Position                        Applicants Actions or Behavior T= 40        Crew      Crew receives alarms on B06 (B) windows 7A, 7B and 7C.
CO            x  Refers to 40AL-9RK6B (Window 7B) x  Starts standby Stator Cooling Water pump CEN-P01A by going to start on handswitch, CEN-HS-30.
Examiner Note: Generator trip circuit has a 70-second delay. If condition persists, generator will trip.
CRS            x  Directs CO to start Stator Cooling Water Pump CEN-P01A.
The examiner may go to the next event after the standby Stator Cooling Water Pump is started or the Main Turbine trips.
Page 11 of 18
 
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: _2__ Event No.: _7&8_
Event
 
== Description:==
(7) RCS leak degrades to a LOCA, requiring a reactor trip.___________
________________(8) No SIAS, CIAS, and MSIS________________________________
Time      Position                        Applicants Actions or Behavior T= 44      Crew        Observes Pzr level and RCS pressure lowering.
Standard Post Trip Actions CRS        x  Directs RO to start additional charging pumps and isolate letdown.
x  Due to pressurizer level continuing to lower, directs a manual reactor trip and possibly a SIAS/CIAS/MSIS based on trend.
x  Directs the crew to perform 40EP-9EO01, Standard Post Trip Actions
: 1. Open the placekeeper and enter the EOP Entry Time.
: 2. Determine that Reactivity Control acceptance criteria are met by the following:
: a. Check that reactor power is dropping.
: b. Check that start-up rate is negative.
: c. Check that ALL full strength CEAs are inserted.
x Crew cannot verify CEA positions due to loss of PKC, directs RO to borate the RCS using Standard Appendix 103.
: 3. Determine that Maintenance of Vital Auxiliaries acceptance criteria are met by the following:
: a. Check that the Main Turbine is tripped.
: b. Check that the Main Generator output breakers are open.
: c. Check that station loads have transferred to offsite electrical power such that BOTH of the following conditions are met:
x All vital and non-vital AC buses are powered x All vital and non-vital DC buses are powered
: 4. Determine that RCS Inventory Control acceptance criteria are met by the following:
: a. Check that pressurizer level meets BOTH of the following:
x 10 - 65%
x Trending as expected to 33 - 53%
RO        Reports the status of the Electric Plant (all buses energized and DGs running with SP pumps IF SIAS/CIAS initiated).
Page 12 of 18
: 5. Determine that RCS Pressure Control acceptance criteria are met by BOTH of the following:
x Pressurizer pressure is 1837 - 2285 psia x Pressurizer pressure is trending as expected to 2225
                    - 2275 psia x RCS is 24&deg;F or more subcooled RO  Stops 2 RCPs when < 1837 psia, stops all 4 RCPs on the Loss of Subcooling (< 24&deg;).
: 6. Determine that Core Heat Removal acceptance criteria are met by ALL of the following:
x At least one RCP is operating x         
x RCS is 24&deg;F or more subcooled
: 7. Determine that RCS Heat Removal acceptance criteria are met by the following:
: a. Check that at least one Steam Generator meets BOTH of the following conditions:
x Level is 35% WR or more x Feedwater is restoring or maintaining level 45 - 60%
NR
: b. Check that Tc is 560 - 570&deg;F.
: c. Check that steam generator pressure is 1140 - 1200 psia.
Directs CO to use SBCS valves 1007/1008 or Atmospheric Dump Valves (ADVs) to control SG pressure due to loss of vacuum that occurs when a vacuum breaker opens.
CO  Uses Auxiliary Feedwater B to feed the SGs.
Uses SBCS valves 1007/1008 or Atmospheric Dump Valves (ADVs) to control SG pressure due to loss of vacuum that occurs when a vacuum breaker opens.
CRS    8. Determine that Containment Isolation acceptance criteria are met by the following:
: a. Check that Containment pressureis less than 2.5 psig.
: b. REFER TO Appendix 7, List of EOP Radiation Monitors and check BOTH of the following conditions:
x No valid containment area radiation monitor alarms or unexplained rise in activity x No valid steam plant activity monitor alarms or unexplained rise in activity (Continued on next page)
Page 13 of 18
: 9. Determine that Containment Temperature, Pressure, and Combustible Gas Control acceptance criteria are met by the following:
: a. Check that containment temperature is less than 117&deg;F.
: b. Check that containment pressure is less than 2.5 psig.
: 10. IF any acceptance criteria are NOT met, OR ANY contingency action was taken, THEN GO TO Section 4.0, Diagnostic Actions to diagnose the event.
Diagnoses a LOCA LOCA Procedure CRS        Diagnoses a LOCA (40EP-9EO03) and performs the following:
x Confirms the diagnosis by directing the performance of the Safety Function Status Check. (Step 1) x Directs the CO to ensure the Steam Generator Sample Valves are open. (Step 1) x Directs Chemistry to perform the Abnormal Occurrence Checklist. (Step 1) x Directs the SM to classify the event. (Step 2) x Checks a SIAS is actuated if pressurizer pressure drops to the SIAS setpoint. (Step 4)
Examiner Note: If the crew has not yet initiated SIAS/CIAS/MSIS, the CRS should direct manual ESFAS actuations at this time.
CRITICAL TASK: Initiate Safety Injection flow when the SIAS setpoint has been exceeded prior to completing Step 4 of the LOCA procedure.
CRS            x  If SIAS has actuated, directs RO to check that HPSI and LPSI pumps have started and that safety injection flow is adequate. (Step 5) x  May direct the RO to shift charging pump suction to the RWT per Standard Appendix 10. (Step 6) x  Directs the RO to stop one RCP in each loop if pressurizer pressure remains below the SIAS setpoint (this may have been done in the SPTAs). (Step 7)
(Continued on next page)
Page 14 of 18
 
CRS            x  Directs the RO to perform Appendix 16, RCP Trip Criteria.
continued            (Step 8) x  Directs the RO to verify that Letdown is isolated. (Step 9) x  Directs the CO to verify that the RCS sample lines are isolated. (Step 9) x  Directs the RO to place the Hydrogen Analyzers in service.
x  Verifies that CIAS is actuated. (Step 11) x  Directs the RO to verify that an isolation valve is closed for each containment penetration. (Step 14) x  If containment pressure is 8.5 psig or more, then check CSAS is actuated. (Step 16) x  If CSAS has actuated, then perform the following: (Step 17)
: a. Ensure at least one Containment Spray header flow is greater than 4350 gpm.
: b. Ensure all RCPs are off.
: c. Ensure RCP controlled bleedoff flow is isolated.
: d. PERFORM Appendix 19, Containment Hydrogen Control to align the Hydrogen recombiners.
The examiner may go to the next event after the crew verifies adequate CS flow.
Page 15 of 18
 
Op-Test No.: _____ Scenario No.: _2__ Event No.: _7&8_
Event
 
== Description:==
Trip of Containment Spray Pump B____________________________
_________________________________________________________________________
Time      Position                      Applicants Actions or Behavior Examiner Note: Direct the driver to activate Key 9 causing CS pump B (SIB-P03) to trip on an 86 lockout.
Functional Recovery Procedure T= 57        CRS        Diagnoses a lost Safety Function and goes to 40EP-9EO09, FRP and performs the following:
x Directs the SM to classify the event. (Step 1) x IF pressurizer pressure remains below the SIAS setpoint, THEN perform the following (Step 3):
o Ensure ONE RCP is stopped in each loop.
o IF RCS subcooling is less than 24&deg;F [44&deg;F], THEN ensure all RCPs are stopped.
x IF any RCPs are operating, THEN PERFORM Appendix 16, RCP Trip Criteria and check the RCP operating limits satisfied. (Step 4) x Perform the following:
o Ensure that the Steam Generator Sample Valves are open.
o Direct Chemistry to PERFORM 74DP-9ZZ05, Abnormal Occurrence Checklist.
x Place the Hydrogen Analyzers in service.
RO        Places the hydrogen analyzers in service as follows (this is expected to be completed without the procedure in hand):
x Open HPA-UV-1 x Open HPA-HV-7A and 7B x Place HPA-HS-9A to the ANALYZE position.
Page 16 of 18
 
CRS              x  Identify the success path(s) to be used to satisfy each safety function. REFER TO BOTH of the following: (Step 7) o Section 4.0, Safety Function Tracking.
o Section 6.0, Resource Assessment Trees.
x  PERFORM Section 5.0, Safety Function Status Check for those success paths in use.
x  Identifies CTPC-2 as Jeopardized.
x  If CSAS actuated, then check at least one CS header is delivering 4350 gpm or more. (Step 3) o    Implements contingency actions to establish CS flow.
RO        If it is desired to use LPSI Pump A to supply CS A train, and LPSI Pump A is not needed to support any RC, IC, or HR success path, then perform the following (B02): (Step 3.1)
: a. Ensure that LPSI Pump A is running.
: b. Ensure (closes) that SIA-HV-306, LPSI Shutdown Cooling Heat Exchanger A Bypass Valve, is closed.
: c. Ensure that SIA-HV-687, LPSI Containment Spray from Shutdown Heat Exchanger a Cross-Tie Valve, is open.
(Continued on next page)
Examiner Notes:
: 1. There is no indication of CS flow when using a LPSI pump for CS flow.
: 2. The CRS may either direct the following steps or give them to the RO to perform.
Page 17 of 18
 
RO            d. Ensure that SIA-UV-672, Containment Spray a Discharge to continued            Spray Header 1 Valve, is open.
: e. Ensure (opens) SIA-HV-685, LPSI-Containment Spray to Shutdown Heat Exchanger a Cross-Tie Valve, is open.
: f. Check that the LPSI pump is running at less than 60 amps.
If it is desired to use LPSI Pump B to supply CS B train, and LPSI Pump B is not needed to support any RC, IC, or HR success path, then perform the following (B02): (Step 3.2)
: a. Ensure that LPSI Pump B is running.
: b. Ensure (closes) that SIB-HV-307, LPSI Shutdown Cooling Heat Exchanger B Bypass Valve, is closed.
: c. Ensure that SIB-HV-695, LPSI Containment Spray from Shutdown Heat Exchanger B Cross-Tie Valve, is open.
: d. Ensure that SIB-UV-671, Containment Spray B Discharge to Spray Header 2 Valve, is open.
: e. Ensure (opens) SIB-HV-694, LPSI-Containment Spray to Shutdown Heat Exchanger a Cross-Tie Valve, is open.
: f. Check that the LPSI pump is running at less than 60 amps.
CRITICAL TASK: Initiate CS flow when the CSAS setpoint has been exceeded prior to completing step 3 of CTPC-2 of the Functional Recovery Procedure.
Scenario termination: The scenario may be ended once CSAS flow has been established using a LPSI pump.
Page 18 of 18
 
Appendix    D                        Scenario Outline                              Form ES-D-1 Facility: PVNGS                  Scenario No.:  __4              Op-Test No:      2012 Examiners:                                              Operators:
Initial Conditions: (100% power, MOC).
Turnover: Unit 1 is at 100% power (250 EFPD). AFA-P01 and Containment Spray A are tagged out.
Event No.              Malf. No.          Event Type*                              Event Description 1      None                                N          Shift Steam Bypass Master Controller, SGN-PIC-1010 from manual to automatic mode of operation.
CO/SRO 2      mfTRRX11SGCPT1013C_4                  I        Channel C SG 1 pressure transmitter fails low requiring multiple parameters to be placed in bypass. (SGC-PI-1013C)
CO/SRO (TS) 3      cmTRCV19RCALT110X_4                  I        Pressurizer level transmitter X fails low. Crew selects channel Y on pressurizer heater and level control selectors.
RO/SRO (TS) 4      mfCH01B                              C          Loss of Control Element Drive Mechanism cooling. HCN-A02A and A02C fans fail to auto-start mfCH01D                          CO/SRO 40AO-9ZZ20, Loss of HVAC 5      mfMC01A                            R -RO        Loss of condenser vacuum requiring the crew to downpower.
C - CO/SRO      40AO-9ZZ07, Loss of Condenser Vacuum 6      mfCV11A f:100                                  RCP 1A seal failure. Crew evaluates the status of the affected RCP.
40AO-9ZZ04, Reactor Coolant Pump Emergencies 7      cmCPRC02RCEP01A_6                    M          RCP 1A trips but PPS fails to initiate a reactor trip. RO opens mfRP04A                            ALL        L03B2 and L10B2 breakers on B01.
mfRP04C                                        CRITICAL TASK - Trip the Reactor prior to completion of mfRD12A                                        SPTAs 8      mfED02                              M          After the Reactivity Safety Function is addressed a Loss of mfEG06B                            ALL        Offsite Power will occur. DG B will trip when it starts.
40EP-9EO07, Loss of Offsite Power/Loss of Forced Circulation 9      cmCPCC08SPAP01_5                    C          Spray Pond pump A fails to auto start.
RO/SRO        CRITICAL TASK - Starts SPA-P01 prior to DG A running > 3 minutes with no cooling water.
CRITICAL TASK - Establish feed to at least one SG using AFN-P01 prior to lifting primary safeties.
40EP-9EO09, FRP (MVAC-3)
End      Once the crew has verified point    that Natural Circulation flow has been established NUREG-1021, Revision 9                      1 of 2
 
Appendix      D                      Scenario Outline                        Form ES-D-1
* (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Turnover Plant conditions:
Unit 1 is at 100% power.
The core is presently at 250 EFPD.
Risk Management Action Level is ORANGE.
Train B is protected equipment.
AF B and AF N are protected.
CS B is protected.
PC is NOT recircing the RWT.
Unit 2 is supplying the Aux Steam cross-tie header.
I&C have completed testing on the SBCS master controller SGN-PIC-1010 and it can be returned to automatic operation.
Equipment out of service:
Auxiliary Feedpump A (AFA-P01) is tagged out due to a noisy bearing. LCO 3.7.5 conditions a and b have been entered. Expected to return to service in 7 hours.
CS A is tagged out for scheduled maintenance. LCO 3.6.6 condition a has been entered. Expected to return to service in 12 hours.
Planned shift activities:
Shift SGN-PIC-1010 from local/auto to remote/auto mode of operation.
NUREG-1021, Revision 9                      2 of 2
 
Scenario 4 Overview Event 1 The CO shifts the Steam Bypass Master Controller from manual to Remote Automatic.
Event 2 A failure low of the Channel C SG #1 pressure transmitter. The CO should address the alarm response procedure. The CRS should address Tech Specs. The CO bypasses the correct parameters on the PPS cabinets.
Event 3 Pressurizer Level Transmitter X fails low. The RO addresses the alarm response procedure and selects the unaffected instrument.
Event 4 Loss of CEDM cooling fans A and C with the failure of the B and D to auto start. The CRS should enter 40AO-9ZZ20 and direct the CO to start the standby fans.
Event 5 Loss of condenser vacuum. The CRS enters 40AO-9ZZ07 and the crew down powers to maintain vacuum.
Event 6 RCP 1A seal failure. The crew responds to B04 alarms and determines a seal has failed on RCP 1A.
Event 7 RCP 1A trips, but an ATWS occurs. The RO opens breakers on Board 1 to trip the reactor. The crew performs the SPTAs.
Event 8 After the crew addresses reactivity control, a loss of offsite power will occur and the B DG trips causing a loss of PBB-S04.
Event 9 The A Spray Pond pump will fail to auto start requiring the RO to start it manually.
Page 1 of 20
 
Appendix D                        Required Operator Actions                        Form ES-D-2 Op-Test No.: _____ Scenario No.: __4_ Event No.: __1__
Event
 
== Description:==
Shifting the Steam Bypass Master Controller, SGN-PIC-1010 from the Manual to Automatic mode of operation.________________________________________
Time      Position                        Applicants Actions or Behavior T=0            CRS        Directs the CO to shift the Steam Bypass Master controller from Local/Auto to Remote/Auto mode of operation per 40OP-9SF05 (Operation of the Steam Bypass Control System).
CO        Depresses the MAN pushbutton on the Steam Bypass Master controller, SGN-PIC-1010 (B06) and verifies that the pushbutton backlight illuminates. (Step 4.4.3.1)
Places the Remote/Local Setpoint Selector switch on the left side of the Master Controller to the R (Remote) position ensuring full movement of switch travel. (Step 4.4.4.2)
Examiner Note: There should be no adjustment of the steam modulation setpoint (black and white pointer)
Verifies that the steam header pressure (red pointer) is less than or equal to the SBCS modulation setpoint program (black and white pointer), THEN depress the AUTO pushbutton on the bottom of the Master Controller and ensure that the pushbutton backlight illuminates. (Step 4.4.5.4)
The Master Controller is now in Remote-Automatic, and its output will be a function of the SBCS modulation setpoint program.
Verifies that the Local-Automatic Setpoint (black pointer) thumbwheel on the right side of the Master Controller to 1170 psia.
Page 2 of 20
 
Appendix D                      Required Operator Actions                        Form ES-D-2 Op-Test No.: _____ Scenario No.: __4__ Event No.: __2__
Event
 
== Description:==
Channel C SG 1 pressure transmitter (SGN-PI-1013C 0 fails low.
_________________________________________________________________________
Time      Position                      Applicants Actions or Behavior T= 4        Crew      Receives alarms on B05A windows 7C and 7D along with B05B windows 8C, 8D and 2D. Addresses alarm response procedure 41AL-1RK5A (Panel B05A Alarm Responses) and 40AL-9RK5B (Panel B05B Alarm Responses).
CO        Addresses the alarm response for window 7C (LO SG 1 PRESS CH Trip) and performs the following:
x Determines SGC-PI-1013C has failed low x Verifies SG 1 level on B05 class indicators.
x Determines SG 1 total feedwater/main steam flow on DFWCS monitor (B06) x Determines Tave on the Tave/Tref recorder, RCN-TR-100 (B04).
x When directed, bypasses parameters 11, 18 and 19 on Channel C PPS cabinet behind B06.
Examiner Note: Although the SG-2 HI delta P bistable is tripped, there is no direction for the crew to bypass the parameter as the bypass is non-functional.
CRS        Addresses Tech Specs and enters:
x LCO 3.3.1 condition A.
x LCO 3.3.5 condition A.
Refers to Tech Spec Bases and determines that in addition to the failed instrument SG 1 & 2 levels (ESF) must be placed in bypass.
Directs the CO to bypass parameters 11, 18 and 19 on Channel C PPS.
Page 3 of 20
 
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: _4__ Event No.: __3__
Event
 
== Description:==
Pressurizer level transmitter RCA-LT-110X fails low.______________ _
_________________________________________________________________________
Time      Position                        Applicants Actions or Behavior T= 14      Crew      Receives alarms on B04 windows 1A (PZR TRBL) and 2B (PZR LVL HI-LO) and addresses alarm response procedure 40AL-9RK4A (Panel B04A Alarm Responses).
RO        Diagnoses and reports that instrument RCA-LT-110X has failed low Addresses the Alarm Response procedure and performs the following:
x Determines RCA-LI-110X has failed low x Places the following handswitches on B04 in Channel Y o RCN-HS-110, Level Control Selector Channel X/Y o RCN-HS-100-3, Heater Control Selector Level Trip Channel X/Y x Resets and energizing the proportional heaters by taking the following Pzr heater control handswitches on B04 to ON:
o RCN-HS-100-1 o RCN-HS-100-2 CRS        Consults Tech Specs and enters:
x LCO 3.3.10 Condition a x LCO 3.3.11 Condition a Page 4 of 20
 
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: _4__ Event No.: __4__
Event
 
== Description:==
Loss of Control Element Drive Mechanism cooling. HCN-A02B and A02D fail to auto-start.______                              _______________________________
Time        Position                      Applicants Actions or Behavior T= 26          Crew      Receives alarms on B07 window 7A9B (CEDM ACU COOL SYS TRBL) and addresses the alarm response procedure 40AL-9RK7A (Panel B07A Alarm Responses).
CO      Determines that no CEDM fans are running and uses the ARP or direction from the CRS to start the A and C fans using handswitch HCA-HS-49 (B07).
Directs the auxiliary operator to check breakers locally (PGBL32E2 and PGB-L34D3.
Examiner Note:
x The crew may elect to wait for an auto-start of HCN-A02A/C.
x The standby fans are designed to auto-start after a two minute time delay, however the auto-start has been blocked for this scenario.
RO      Responds to alarms on SESS panel (Window 6D). Addresses the alarm response procedure.
CRS      Directs the CO to start CEDM cooling fans HCNA02A AND A02C per either:
x Loss of HVAC procedure, 40AO-9ZZ20 (Section 10).
x Alarm response procedure, 40AL-9RK7A.
May performs brief to address the failure and contingencies.
Page 5 of 20
 
Appendix D                      Required Operator Actions                          Form ES-D-2 Op-Test No.: _____ Scenario No.: _4_ Event No.: __5__
Event
 
== Description:==
Loss of Condenser Vacuum requiring the crew to downpower._______
________________________________________________________________________
Time      Position                        Applicants Actions or Behavior T= 32        Crew      Receives alarms on B05 window 14A (CNDS SYS TRBL) and address the alarm response procedure 40AL-9RK5B (Panel B05B Alarm Responses).
CO        Determines a loss of Vacuum is occurring in the A Condenser shell.
CRS        Enters Loss of Condenser Vacuum, 40AO-9ZZ07 and performs the following:
x Performs the diagnostic flow chart and goes to Section 4.0, Strategy/Power Reduction x Directs an auxiliary operator to (Step 1):
o Place seal water on the condenser expansion joints (Dog-bone seals), vacuum breakers, and steam packing exhauster Condenser drain o Check for air in leakage at the condenser shells, operation of the gland seal regulators, etc.
x Directs the CO to ensure ALL available air removal pumps are in operation. (Step 2)
CO        Starts the D Air Removal pump using handswitch ARN-HS-28 (B07).
As directed, opens all Air Removal pump D suction valves using handswitches ARN-HS-14, 15 and 16 (B07) (Step 3).
Examiner Note: A power reduction to improve condenser vacuum will only be effective for plant conditions impacting heat removal from the main condenser. A loss of vacuum due to air in-leakage can only be temporarily improved with a power reduction.
Page 6 of 20
 
CRS    Determines BOTH of the following (Step 7):
x Magnitude of the power reduction x The rate to reduce power Calculates the reactivity needed using ANY of the following (Step 8):
x Total gallons of boric acid and addition rate (53 gal/percent) x CEA insertion Directs the RO to commence a boration to reduce power if the CRS uses boration or may allow CEAs to insert in Automatic. (Step 9)
Directs the CO to lower turbine load and maintain Tavg/Tref mismatch 5&deg;F or less. (Step 9)
Examiner Note: CRS may choose to use CEAs in Auto Sequential or Manual Sequential for the power reduction.
RO    Commences a boration using 40OP-9CH01 (CVCS Normal Operations) at a rate and amount directed by the CRS by performing the following:
: 1. Sets the desired makeup flow rate on the Foxboro Controller, CHN-FIC-210Y on B03 (Step 7.3.6)
: 2. If the makeup rate is greater than 40 gpm, set the makeup flow to not more than 40 gpm initially. (Step 7.3.6.1)
: 3. Select the Target makeup volume (gallons) on the Boric Acid Flow Totalizer CHN-FQIS-210Y on B03 (Step 7.3.7)
: 4. Start the boration by (Step 7.3.10):
: a. Placing CHN-HS-210 on B03 to BORATE
: b. Depress the RESET pushbutton on the Totalizer
: c. Depress the START pushbutton on the Totalizer
: 5. Checks a boric acid pump started (Step 7.3.11)
: 6. Checks no flow on RMW flow indicator CHN-FIC-210X on B03 (Step 7.3.11)
Page 7 of 20
 
RO              7. Ensures CHN-UV-527 opened by red lights lit on CHN-HS-(continued)              527 (Step 7.3.12)
: 8. Checks flow increases on CHN-FIC-210Y on B03 (Step 7.3.13)
: 9. If desired flow is > 40 gpm, raise the flow setpoint on CHN-FIC-210Y to the desired flow rate (Step 7.3.15)
: 10. Informs the CRS that the boration is started.
CO          Lowers turbine load using the Load Limit Set potentiometer on B06 to maintain Tave within 5&deg;F of Tref.
CRS          When the vacuum leak is fixed, the CRS may direct the crew to stop the downpower.
RO          Restores CVCS to a normal lineup when boration is stopped Examiner Note: After the crew has reduced power ~ 5% direct the driver to delete the Loss of Vacuum malfunction.
If the crew is going to trip on this event, have the driver insert Event 7.
Page 8 of 20
 
Appendix D                      Required Operator Actions                          Form ES-D-2 Op-Test No.: _____ Scenario No.: _4__ Event No.: __6 __
Event
 
== Description:==
RCP 1A seal failure. Crew evaluates the status of the affected RCP._
________________________________________________________________________
Time      Position                      Applicants Actions or Behavior T=52        Crew      Receives alarms on B04 window 2A (RCP 1A TRBL) and address the alarm response procedure 40AL-9RK4A - Panel B04A Alarm Responses.
RO      Monitors RCP 1A seal 2 inlet pressure at RCN-PI-152 (B04).
Observes a high pressure condition and determines that the first seal on RCP 1A has failed.
Verifies that RCN-HS-430, Controlled Bleed-Off valve, indicates open (B03)
CRS        Enters Reactor Coolant Pump Motor Emergencies, 40AO-9ZZ04 and implements section 4, Abnormal Seal Parameters.
x  Directs the RO to verify Seal Injection flow is 6.0 to 7.5 gpm.
(Step 4) x  Verifies adequate Seal Injection and Nuclear Cooling water flow. (Step 6) x  Determines that no RCP trip setpoints have been exceeded.
(Step 7) x  Contacts engineering to evaluate RCP parameters. (Step 15)
Page 9 of 20
 
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: _4_ Event No.: _7 _
Event
 
== Description:==
RCP 1A trips but PPS fails to initiate a reactor trip. RO opens L03B2 and L10B2 breakers on B01.______________________________________________________
Time          Position                        Applicants Actions or Behavior T=62          Crew        Recognizes that RCP 1A has tripped by alarms (B04 and B05).
Recognizes that a Reactor Trip should have occurred by all 4 channels of bistable trip indication on PPS parameter indications on B05 and/or first out annunciator indication on B04.
Attempts to trip the reactor using the RTSG pushbuttons, then opens the B2 breakers for L03 and L10 on B01 to trip the reactor using handswitches. (Step 1 of the SPTAs) x  NGN-HS-L03B2 x  NGN-HS-L10B2 CRITICAL TASK - Trip the Reactor prior to completion of SPTAs.
CRS        Directs the crew to perform 40EP-9EO01, Standard Post Trip Actions Standard Post Trip Actions The CRS enters the Standard Post Trip Actions.
: 1. Open the placekeeper and enter the EOP Entry Time.
: 2. Determine that Reactivity Control acceptance criteria are met by the following:
: a. Check that reactor power is dropping.
: b. Check that start-up rate is negative.
: c. Check that ALL full strength CEAs are inserted.
x All vital and non-vital DC buses are powered Examiner Note: The SPTAs are continued on the next page.
CO        Reports the Reactivity Control Safety Function (CEAs inserted, power dropping, negative startup rate).
Examiner Note: Examiner Note: Instruct the driver to insert the LOOP and DG B faults after the reactivity report is completed and all CEAs have fully inserted. Spray Pond Pump A will fail to auto start.
Page 10 of 20
 
Appendix D                            Required Operator Actions                        Form ES-D-2 Op-Test No.: _____ Scenario No.: __4__ Event No.: __8 & 9 Event
 
== Description:==
_ (8) Loss of Offsite power and failure of DG B________________
_________________(9) Failure of SPA-P01 (SP-A) to auto start.___________________
Time          Position                          Applicants Actions or Behavior Examiner Note: Examiner Note: Instruct the driver to insert the LOOP and DG B faults after the reactivity report is completed and all CEAs have fully inserted. Spray Pond Pump A will fail to auto start.
Crew        Observes a LOP on PBB-S04 due to a Loss of Offsite power and subsequent non-recoverable failure of DG B to start and load.
(SPTAS CONTINUED)
: 3. Determine that Maintenance of Vital Auxiliaries acceptance criteria are met by the following:
: a. Check that the Main Turbine is tripped.
: b. Check that the Main Generator output breakers are open.
: c. Check that station loads have transferred to offsite electrical power such that BOTH of the following conditions are met:
x All vital and non-vital AC buses are powered x All vital and non-vital DC buses are powered RO        Reports the status of the Electric Plant:
x  Only AC bus energized is PBA-S03 being supplied by DG A with SP pump failing to auto start.
x  All class and non-class DC buses are energized x  Starts Spray Pond Pump A using SPA-HS-1 on B02.
Examiner Note: If the crew fails to start SPA-P01 within 7.5 minutes then instruct the driver to insert Key 31 causing a trip of DG A (Key-31). If this occurs the CRS should transition to the FRP.
CRITICAL TASK - Starts SPA-P01 prior to DG A running > 3 minutes with no cooling water.
Page 11 of 20
 
CRS    4. Determine that RCS Inventory Control acceptance criteria are met by the following:
: a. Check that pressurizer level meets BOTH of the following:
x 10 - 65%
x Trending as expected to 33 - 53%
: 5. Determine that RCS Pressure Control acceptance criteria are met by BOTH of the following:
x Pressurizer pressure is 1837 - 2285 psia x Pressurizer pressure is trending as expected to 2225
                  - 2275 psia x RCS is 24&deg;F or more subcooled
: 6. Determine that Core Heat Removal acceptance criteria are met by ALL of the following:
x At least one RCP is operating x         
x RCS is 24&deg;F or more subcooled
: 7. Determine that RCS Heat Removal acceptance criteria are met by the following:
: a. Check that at least one Steam Generator meets BOTH of the following conditions:
x Level is 35% WR or more x Feedwater is restoring or maintaining level 45 - 60%
NR
: b. Check that Tc is 560 - 570&deg;F.
: c. Check that steam generator pressure is 1140 - 1200 psia.
CO  Uses AFN and ADVs to feed and steam the SGs.
: 8. Determine that RCS Heat Removal acceptance criteria are met by the following:
: d. Check that at least one Steam Generator meets BOTH of the following conditions:
x Level is 35% WR or more x Feedwater is restoring or maintaining level 45 - 60%
NR
: e. Check that Tc is 560 - 570&deg;F.
: f. Check that steam generator pressure is 1140 - 1200 psia.
Page 12 of 20
: 9. Directs CO to use SBCS valves 1007/1008 or Atmospheric Dump Valves
: 10. Determine that Containment Isolation acceptance criteria are met by the following:
: a. Check that Containment pressureis less than 2.5 psig.
: b. REFER TO Appendix 7, List of EOP Radiation Monitors and check BOTH of the following conditions:
x No valid containment area radiation monitor alarms or unexplained rise in activity x No valid steam plant activity monitor alarms or unexplained rise in activity
: 11. Determine that Containment Temperature, Pressure, and Combustible Gas Control acceptance criteria are met by the following:
: a. Check that containment temperature is less than 117&deg;F.
: b. Check that containment pressure is less than 2.5 psig.
: 12. IF any acceptance criteria are NOT met, OR ANY contingency action was taken, THEN GO TO Section 4.0, Diagnostic Actions to diagnose the event.
Diagnoses a LOOP/LOFC or FRP if DG is tripped.
RO      Reports the status of the Electric Plant:
x    Only AC bus energized is PBA-S03 being supplied by DG A with SP pump failing to auto start.
x    All class and non-class DC buses are energized x    Starts Spray Pond Pump A using SPA-HS-1 on B02.
Examiner Note: Electric Plant report may be performed by the CO.
CO      Uses AFN and ADVs to feed and steam the SGs.
Page 13 of 20
 
Loss of Offsite Power / Loss of Forced Circulation CRS    Diagnoses a LOOP/LOFC (40EP-9EO07) and performs the following:
x Confirms the diagnosis by directing the STA to perform the Safety Function Status Check. (Step 1) x Directs Chemistry to perform the Abnormal Occurrence Checklist. (Step 1) x Directs the SM to classify the event. (Step 2) x Verifies that loads have sequenced on at least one 4.16kV AC vital bus (PBA-S03). (Step 4) x Directs RO to verify that seal injection is in service. (Step 5)
RO    May isolate Seal injection and start a charging pump.
CRS          x  Directs the CO to actuate an MSIS. (Step 6)
CO    Initiates MSIS when directed.
CRS          x  Check that Tcold is being maintained less than 570&deg;F. (Step 8) x  Inform RP that the unit is steaming to atmosphere. (Step 9) x  Ensure at least one SG has level being maintained within or being restored to 45 - 60% NR. (Step 10)
CO    Overrides and start AFN-P01.
Override Downcomer Isolation Valves:
x SG 1 - SGA-UV-172 and SGB-UV-130 x SG 2 - SGA-UV-175 and SGB-UV-135 Uses Downcomer control valves (SGN-FV-1113 and SGN-FV-1123) to establish feed to the SGs.
CRITICAL TASK: Establish feed to at least one SG using AFN-P01 prior to lifting primary safeties.
Page 14 of 20
 
CRS          x  Check that pressurizer level meets BOTH of the following (Step 11):
o 10 - 65%
o Trending to 33 - 53%
x  If VCT Makeup is NOT available and RWT level is >73%
then align Charging Pump suction through CHE-HV-536 or CHN-UV-514 per Standard Appendix 102. (Step 12)
RO      May shift charging pump suction to RWT per Appendix 103 by either opening CHA-HV-536 or starting a BAMP and opening CHN-UV-514.
CRS          x  Directs CO to verify natural circulation flow in at least one loop by ALL of the following (Step 14):
o         '<
o Hot and cold leg temperatures are constant or lowering o RCS is 24&deg;F or more subcooled using CET Subcooling o        [   RTDs and the maximum quadrant CET temperature (QSPDS, pages 211 and 213)
Scenario termination: The scenario may be terminated when the AFW flow has been established to the SGs.
Page 15 of 20
 
Op-Test No.: _____ Scenario No.: __4__ Event No.: __9___
Event
 
== Description:==
_ High temperature trip of DG A____(If Required)_____________
______________________________________________________________________
Time      Position                        Applicants Actions or Behavior Functional Recovery Procedure CRS        Determines that a loss of all feed water has occurred due to loss of MVAC.
Enters the Functional Recovery Procedure (40EP-9EO09) and performs the following:
x Ensures the event is being classified. (Step 1) x Directs the RO to perform Appendix 16 for any running RCPs. (Step 4) x Directs the CO to ensure SG sample valves are open. (Step 5) x Directs Chemistry to perform their Abnormal Occurrence Checklist for the FRP. (Step 5) x Directs the RO to place the Train A Hydrogen Analyzer in service. (Step 6)
RO        Places the hydrogen analyzers in service as follows (this is expected to be completed without the procedure in hand):
TRAIN A x Opens HPA-UV-1 x Opens HPA-HV-7A and 7B x Places HPA-HS-9A to the ANALYZE position.
CRS            x  Identifies the success paths to be used to satisfy each safety function. MVAC-3 and HR-1 should be jeopardized.
(Step 7)
Maintenance of Vital Auxiliaries (MVAC-3) x  Opens the Placekeeper (Step 1) x  Informs the Energy Control Center of Blackout (Step 2) x  Directs the CO to actuate an MSIS. (Step 3)
Page 16 of 20
 
NOTE The SBOGs cannot supply Units 2 and 3 simultaneously but can supply Unit 1 and 2 or Unit 1 and 3. All operations involving the SBOGs will be coordinated by Unit 1.
CRS x  Directs the RO to place all of the charging pump handswitches in PULL TO LOCK. (Step 6) x  Directs Appendix 80, Align SBOG to PBA-S03 (BO). (Step 7) x  Directs Appendix 53, Align Deenergized Buses. (Step 8)
RO        Performs Standard appendices 53 and 80 as directed Appendix 53:
: 1. IF inspection of de-energized buses is warranted, THEN direct an operator to perform the following for ANY deenergized buses:
: a. Check for protective relay targets.
: b. Evaluate and reset the targets. REFER TO 40DP- 0OP02, Relay Resetting.
: 2. Unit 1 only -
IF NAN-S05 is de-energized, THEN open ALL of the following breakers:
x NAN-S05G (NAN-HS-S05G) x NAN-S05F (NAN-HS-S05F) x NAN-S05J (NGN-HS-S05J) x NAN-S05D (NAN-HS-S05D) x NAN-S05B (NAN-HS-S05B) x Direct an operator to open 1-E-NAN-S05K, UPS BLDG LOAD BR SW A-E-NAN-WO/ UPS (Continued on next page)
Page 17 of 20
 
RO      1. Unit 1 only -
IF NAN-S06 is de-energized, THEN open ALL of the following breakers:
x NAN-S06C (NAN-HS-S06C) x NAN-S06D (NAN-HS-S06D) x NAN-S06J (NAN-HS-S06J) x NAN-S06B (NGN-HS-S06B) x NAN-S06F (NAN-HS-S06F) x NAN-S06H (NAN-HS-S06H)
Examiner Note: Steps 4 and 5 are for Units 2 and 3 only.
: 6. IF NAN-S03 is de-energized THEN open BOTH of the following breakers:
x NAN-S03A (NBN-HS-S03A) x NAN-S03B (NAN-HS-S03B)
: 7. IF NAN-S04 is de-energized THEN open BOTH of the following breakers:
x NAN-S04B (NAN-HS-S04B) x NAN-S04A (NBN-HS-S04A)
: 8. IF NAN-S01 is de-energized, THEN open ALL of the following breakers:
x NAN-S01A (NAN-HS-S01A) x NAN-S01N (NBN-HS-S01N) x NAN-S01F (NGN-HS-S01F) x NAN-S01E (NGN-HS-S01E) x NAN-S01D (NGN-HS-S01D) x NAN-S01G (NGN-HS-S01G) x NAN-S01H (NGN-HS-S01H)
: 9. IF NAN-S02 is de-energized, THEN open ALL of the following breakers:
x NAN-S02G (NGN-HS-S02G) x NAN-S02H (NGN-HS-S02H) x NAN-S02D (NGN-HS-S02D) x NAN-S02E (NGN-HS-S02E) x NAN-S02F (NGN-HS-S02F) x NAN-S02N (NBN-HS-S02N) x NAN-S02A (NAN-HS-S02A)
(continued on next page)
Page 18 of 20
 
RO NOTE: Appendix 80 or 81 may be performed concurrently with this Appendix. Progression through Appendix 80 or 81 may be at a point that one of the breakers identified in step 10 or step 11 below may be closed and the board is energized.
: 10. IF PBA-S03 is de-energized, THEN ensure that BOTH of the following breakers are open:
x PBA-S03K (PBA-HS-S03K) x    PBA-S03L (PBA-HS-S03L)
: 11. IF PBB-S04 is de-energized, THEN ensure that BOTH of the following breakers are open:
x PBB-S04L (PBB-HS-S04L) x    PBB-S04K (PBB-HS-S04K)
: 12. Ensure that all RCP breakers are open with handswitches in the green flag after stop position.
: 13. Ensure that all Circulating Water Pump breakers are open with handswitches in the green flag after stop position.
Appendix 80
: 1. Direct an operator to PERFORM Attachment 80-A, disable PBA-S03 Breakers.
: 2. Ensure the following breakers are open:
x PBA-S03B, Diesel Generator 4.16 KV Breaker to PBA-S03 x PBA-S03K, Alternate Supply Breaker to PBA-S03 x PBA-S03L, Normal Supply Breaker to PBA-S03 x NAN-S03A, 13.8 Kv Swgr Cubicle to ESF Xfmr NBN-X03 (NBN-HS-S03A) x PBB-S04L, Alternate Supply Breaker to PBB-S04
: 3. Direct an operator to close NAN-S03AB, 13.8KV SUPPLY FROM GTG.
: 4. Place ALL of the following in PULL TO LOCK:
x Train A Containment Normal ACUs x Train A CEDM ACUs (Continued on next page)
Page 19 of 20
 
RO
: 5. WHEN ALL of the following exist:
x SBOG is running, x NAN-S07 is energized, x NAN-S03AB is closed, THEN direct the SBOG operator to close ONE of the following unit supply breakers:
x Unit 1 only - NAN-S07D x Unit 2 only - NAN-S07E x Unit 3 only - NAN-S07F
: 6. WHEN informed that the 4.16 kV breakers are disabled (per Attachment 80-A), AND the unit supply breaker on NAN-S07 is closed, THEN perform the following:
: a. Place synchronizing switch PBA-SS-S03L, 4.16 KV Bus S03 Normal Supply, to ON.
: b. Close breaker PBA-S03L, 4.16 kV Bus S03 Normal Supply.
: c. Place synchronizing switch PBA-SS-S03L to OFF.
: 7. WHEN PBA-S03 is energized, THEN direct an operator to ensure that ANY of the breakers for the battery chargers that were initially aligned to the Train A 125 VDC buses are ON and that the main contactors are closed:
BATTERY CHARGER A x      PHA-M3523, BATTERY CHARGER A E-PKA-H11 BATTERY CHARGER C x PHA-M3111, BATTERY CHARGER C E-PKC-H13 BATTERY CHARGER AC x PHA-M3326, BATTERY CHARGER AC E-PKA-H15
: 8. WHEN informed that Attachment 80-A, Disable PBA-S03 Breakers, is complete, THEN continue this Appendix.
CO      Resets and start AFN-P01.
Override Downcomer Isolation Valves:
x SG 1 - SGA-UV-172 and SGB-UV-130 x SG 2 - SGA-UV-175 and SGB-UV-135 Uses Downcomer control valves (SGN-FV-1113 and SGN-FV-1123) to establish feed to the SGs.
CRITICAL TASK: Establish feed to at least one SG using AFN-P01.
Scenario termination: The scenario may be terminated when the AFW flow has been established to the SGs.
Page 20 of 20
 
ES-301                            Transient and Event Checklist                      Form ES-301-5 Facility: Palo Verde            Date of Exam:    3/16-3/24/2012      Operating Test No.:
A        E                                          Scenarios P        V 1                  2                3            4          T    M P        E O    I L        N        CREW              CREW              CREW        CREW T    N I        T      POSITION        POSITION            POSITION    POSITION I
C                S    A    B    S    A    B      S    A    B S    A      B    A M
A        T      R    T    O    R    T    O      R    T    O R    T    O    L    U N        Y      O    C    P    O      C    P      O    C    P O    C      P          M(*)
T        P E                                                                          R    I  U RO        RX                                                                          0  1  1  0 NOR                                  1                                      1  1  1  1 R1, R5,    I/C          2,4,5                  2,4,5,                                  8  4  4  2 R9, R11,                ,8                      6 R13        MAJ            7                      7                                      2  2  2  1 TS                                                                          0  0  2  2 RO        RX                              5                                            1  1  1  0 NOR                1                                                        1  1  1  1 I/C                3,5,        3,8,                                          7  4  4  2 R2,R10, 6,9          9
: R12, R14        MAJ                7          7                                            2  2  2  1 TS                                                                          0  0  2  2 RO        RX                                                                          0  1  1  0 NOR                                  1                                1    2  1  1  1 R3, R7    I/C          2,4,5                  2,4,5,                          2,4,5 11  4  4  2
                        ,8                      6 MAJ            7                      7                              7,8    4  2  2  1 TS                                                                          0  0  2  2 RO        RX                              5                                            1  1  1  0 NOR                1                                                  1    2  1  1  1 R4, R6,    I/C                3,5,        3,                                  2,4,5 10  4  4  2 R8                            6,9        8,9 MAJ                7          7                                    7,8    4  2  2  1 TS                                                                          0  0  2  2 RO        RX                                                                          0  1  1  0 NOR                                                                    1    1  1  1  1 R15        I/C          2,4,5                                                  2,4,5  7  4  4  2
                        ,8 MAJ            7                                                      7,8    3  2  2  1 TS                                                                          0  0  2  2 Revision 2
 
Facility: Palo Verde            Date of Exam:    3/16-3/24/2012        Operating Test No.:
A        E                                          Scenarios P        V 1              2                3              4          T    M P        E O    I L        N          CREW          CREW              CREW            CREW T    N I        T      POSITION        POSITION          POSITION        POSITION I
C                S    A  B    S    A    B      S    A    B    S    A      B    A M
A        T      R    T  O    R    T    O      R    T    O    R    T    O    L    U N        Y    O      C  P    O      C    P      O    C    P  O    C      P        M(*)
T        P E                                                                            R  I  U SRO-U      RX                                                                            0 1  1  0 NOR      1                                                  1                2 1  1  1 U1, U5      I/C    2,3,4                                              2,3,4              12 4  4  2
                    ,5,6,                                              ,5,9 8,9 MAJ      7                                                7,8                3 2  2  1 TS    4,5,6                                                2,3                5 0  2  2 SRO-U      RX                                                                            0 1  1  0 NOR                      1                                  1                2 1  1  1 U2, U3      I/C                    2,3,4                              2,3,4              12 4  4  2
                                  ,5,6,                              ,5,9 8,9 MAJ                      7                                  7,8                3 2  2  1 TS                      3,4                                2,3                4 0  2  2 SRO-U      RX                                                                            0 1  1  0 NOR                                  1                      1                2 1  1  1 U4          I/C                                2,4,5,                2,3,4              9  4  4  2 6                    ,5,9 MAJ                                  7                      7,8                3 2  2  1 TS                                                          2,3                2 0  2  2 SRO-I      RX                                                                5            1 1  1  0 NOR      1              1                                                    2 1  1  1 I1, I2, I3, I/C    2,3,4          2,3,4                                    3, 9        16 4  4  2 I4, I5              ,5,6,          ,5,6, 8,9            8,9 MAJ      7              7                                      7, 8          4 2  2  1 TS    4,5,6            3,4                                                    5 0  2  2 SRO-I      RX                            5                                              1 1  1  0 NOR      1                                                  1                2 1  1  1 I6          I/C    2,3,4                  3,8,                        2,3,4              15 4  4  2
                    ,5,6,                  9                          ,5,9 8,9 MAJ      7                    7                            7,8                4 2  2  1 TS    4,5,6                                                2,3                5 0  2  2 Revision 2
 
Facility: Palo Verde                    Date of Exam:    3/16-3/24/2012              Operating Test No.:
A          E                                                    Scenarios P          V 1                  2                    3                  4          T      M P          E O      I L        N          CREW                CREW                CREW                CREW T      N I        T        POSITION            POSITION              POSITION          POSITION I
C                  S      A      B    S    A      B        S    A      B    S    A      B    A M
A          T        R      T      O    R    T      O        R    T      O    R    T    O    L      U N          Y        O      C      P    O    C      P        O    C      P    O    C      P            M(*)
T          P E                                                                                          R    I  U SRO-I      RX                                                                            5          1    1    1  0 NOR                      1    1                                                          2    1    1  1 I7          I/C                      3,5, 2,3,4                                          3, 9        13  4    4  2 6,9 ,5,6, 8,9 MAJ                      7    7                                            7, 8        4    2    2  1 TS                            3,4                                                        2    0    2  2 Scenario RX                                                                                                1    1  0 3(spare)
NOR                                                  1            1                          1    1  1 totals I/C                                                2,3,4 2,4,5    3,9                          4    4  2
                                                                ,5,7, ,7,9 9
MAJ                                                  6    6      6                          2    2  1 TS                                                  3,5                                        0    2  2 Instructions:
: 1.      Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.      Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3.      Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
Revision 2
 
ES-301                                  Competencies Checklist                          Form ES-301-6 Facility: PVNGS          Date of Examination: 03/19/12                    Operating Test No.: 2012 APPLICANTS RO                        RO                      RO R1, R5, R9, R11, R13      R2, R10, R12, R14      R3, R7 Competencies                SCENARIO                  SCENARIO                SCENARIO 1      2    3    4      1    2    3      4    1    2    3    4 Interpret/Diagnose            2,4,  2,4,                3,5,  3,5,              2,4,  2,4,      2,4, Events and Conditions          5,7,  5,6,                6,7,  7,8,              5,7,  5,6,      5,6, 8      7                  9    9                  8    7        7,8 Comply With and                1,2,  1,2,                1,3,  3,5,              1,2,  1,2,      1,2, Use Procedures (1)            4,5,  4,5,                5,6,  7,8,              4,5,  4,5,      4,5, 7,8    6,7                7,9    9                7,8  6,7      6,7, 8
Operate Control                1,2,  1,2,                1,3,  3,5,              1,2,  1,2,      1,2, Boards (2)                    4,5,  4,5,                5,6,  7,8,              4,5,  4,5,      4,5, 6,7,    6,7                7,9    9                6,7,  6,7        7,8 8                                                  8 Communicate                    1,2,  1,2,                1,2,  1,2,              1,2,  1,2,      1,2, and Interact                  3,4,  3,4,                3,4,  3,4,              3,4,  3,4,      3,4, 5,6,  5,6,                5,6,  5,6,              5,6,  5,6,      5,6, 7,8,  7,8,                7,8,  7,8,              7,8,  7,8,      7,8, 9      9                  9    9                  9    9          9 Demonstrate Supervisory Ability (3)
Comply With and Use Tech. Specs. (3)
Notes:
(1)      Includes Technical Specification compliance for an RO.
(2)      Optional for an SRO-U.
(3)      Only applicable to SROs.
Instructions:Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
Revision 1
 
ES-301          Competencies Checklist        Form ES-301-6 Facility: PVNGS          Date of Examination: 03/19/12              Operating Test No.: 2012 APPLICANTS RO                      RO                  SRO-U R4, R6, R8              R15                U1, U5 Competencies                SCENARIO                  SCENARIO            SCENARIO 1      2    3    4      1    2  3    4    1    2    3    4 Interpret/Diagnose            3,5,  3,5,        2,4,  2,4,          2,4,  2,3,            2,3, Events and Conditions          6,7,  7,8,        5,6,  5,7,          5,6,  4,5,            4,5, 9      9        7,8    8            7,8  6,7,            6,7, 8,9              8,9 Comply With and                1,3,  3,5,        1,2,  1,2,          1,2,  1,2,            1,2, Use Procedures (1)            5,6,  7,8,        4,5,  4,5,          4,5,  3,4,            3,4, 7,9    9        6,7,  7,8          6,7,  5,6,            5,6, 8                    8  7,8,            7,8, 9                9 Operate Control                1,3,  3,5,        1,2,  1,2,          1,2, Boards (2)                    5,6,  7,8,        4,5,  4,5,          4,5, 7,9    9        7,8    6,7,          7,8 8
Communicate                    1,2,  1,2,        1,2,  1,2,          1,2,  1,2,            1,2, and Interact                  3,4,  3,4,        3,4,  3,4,          3,4,  3,4,            3,4, 5,6,  5,6,        5,6,  5,6,          5,6,  5,6,            5,6, 7,8,  7,8,        7,8,  7,8,          7,8,  7,8,            7,8, 9      9          9      9              9    9                9 Demonstrate                                                                  1,2,            1,2, Supervisory Ability (3)                                                      3,4,            3,4, 5,6,            5,6, 7,8,            7,8, 9                9 Comply With and                                                              4,5,              2,3 Use Tech. Specs. (3)                                                          6 Notes:
(1)      Includes Technical Specification compliance for an RO.
(2)      Optional for an SRO-U.
(3)      Only applicable to SROs.
Instructions:Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
Revision 1
 
ES-301          Competencies Checklist          Form ES-301-6 Facility: PVNGS          Date of Examination: 03/19/12                Operating Test No.: 2012 APPLICANTS SRO-U                    SRO-U                SRO-I U2, U3                  U4                    I1, I2, I3, I4, I5 Competencies                SCENARIO                  SCENARIO                SCENARIO 1      2    3    4      1    2    3    4    1      2        3  4 Interpret/Diagnose                    2,3,        2,3,        2,4,      2,3,  2,3,    2,3,        3,5, Events and Conditions                4,5,        4,5,        5,6,      4,5,  4,5,    4,5,        7,8, 6,7,        6,7,          7        6,7,  6,7,    6,7,          9 8,9        8,9                    8,9  8,9    8,9 Comply With and                      1,2,        1,2,        1,2,      1,2,  1,2,    1,2,        3,5, Use Procedures (1)                    3,4,        3,4,        4,5,      3,4,  3,4,    3,4,        6,7, 5,6,        5,6,        6,7      5,6,  5,6,    5,6,        8,9 7,8,        7,8,                  7,8,  7,8,    7,8, 9          9                      9    9        9 Operate Control                                                1,2,                                3,5, Boards (2)                                                    4,5,                                7,8, 6,7                                  9 Communicate                          1,2,        1,2,        1,2,      1,2,  1,2,    1,2,        1,2, and Interact                          3,4,        3,4,        3,4,      3,4,  3,4,    3,4,        3,4, 5,6,        5,6,        5,6,      5,6,  5,6,    5,6,        5,6, 7,8,        7,8,        7,8,      7,8,  7,8,    7,8,        7,8, 9          9            9          9    9        9          9 Demonstrate                          1,2,        1,2,                  1,2,  1,2,    1,2, Supervisory Ability (3)              3,4,        3,4,                  3,4,  3,4,    3,4, 5,6,        5,6,                  5,6,  5,6,    5,6, 7,8,        7,8,                  7,8,  7,8,    7,8, 9          9                      9    9        9 Comply With and                        3,4        2,3                    2,3  4,5,    3,4 Use Tech. Specs. (3)                                                            6 Notes:
(1)      Includes Technical Specification compliance for an RO.
(2)      Optional for an SRO-U.
(3)      Only applicable to SROs.
Instructions:Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
Revision 1
 
ES-301                                  Competencies Checklist                    Form ES-301-6 Facility: PVNGS          Date of Examination: 03/19/12              Operating Test No.: 2012 APPLICANTS SRO-I                    SRO-I I6                      I7 Competencies                  SCENARIO                SCENARIO          SCENARIO 1      2    3    4      1    2  3    4    1    2    3    4 Interpret/Diagnose            2,3,  3,5,        2,3,  3,5,  2,3,    2,3, Events and Conditions          4,5,  7,8,        4,5,  6,7,  4,5,    4,5, 6,7,    9        6,7,    9    6,7,    6,7, 8,9              8,9          8,9      8,9 Comply With and                1,2,  3,5,        1,2,  1,3,  1,2,    1,2, Use Procedures (1)            3,4,  7,8,        3,4,  5,6,  3,4,    3,4, 5,6,    9        5,6,  7,9  5,6,    5,6, 7,8,              7,8,        7,8,    7,8, 9                9            9        9 Operate Control                      3,5,              1,3, Boards (2)                            7,8,              5,6, 9                7,9 Communicate                    1,2,  1,2,        1,2,  1,2,  1,2,    1,2, and Interact                  3,4,  3,4,        3,4,  3,4,  3,4,    3,4, 5,6,  5,6,        5,6,  5,6,  5,6,    5,6, 7,8,  7,8,        7,8,  7,8,  7,8,    7,8, 9      9          9      9    9        9 Demonstrate                    1,2,              1,2,        1,2,    1,2, Supervisory Ability (3)        3,4,              3,4,        3,4,    3,4, 5,6,              5,6,        5,6,    5,6, 7,8,              7,8,        7,8,    7,8, 9                9            9        9 Comply With and                4,5,              2,3          3,4      2,3 Use Tech. Specs. (3)            6 Notes:
(1)      Includes Technical Specification compliance for an RO.
(2)      Optional for an SRO-U.
(3)      Only applicable to SROs.
Instructions:Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
Revision 1}}

Latest revision as of 01:51, 12 January 2025

PVNGS-2012-03-Final-Operating-Test
ML12152A409
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/16/2012
From:
Division of Reactor Safety IV
To:
Arizona Public Service Co
Thomas Farina
References
ES-301, ES-301-1
Download: ML12152A409 (569)